Anda di halaman 1dari 3

RAB LIONARDY JEWELLERY PEJATEN

Harga
No. Nama Pekerjaan Vol Sat Jumlah Bobot (%)
Satuan

I. Pekerjaan Persiapan (MOPDEMOP)


1 Pembongkaran & pembersihan 1 ls Rp 5,000,000 Rp 5,000,000 1.51
2 Pasang hording dan banner 1 muka ( gypsum board 9mm ) 30.9 m2 Rp 175,000 Rp 5,407,500 1.63
3 Pintu partisi 1 bh Rp 2,500,000 Rp 2,500,000 0.75
4 Bongkar partisi Selesai Pekerjaan 30.9 m1 Rp 65,000 Rp 2,008,500 0.61

II. Pekerjaan Sipil


1 Kolom Praktis 2 m3 Rp 2,800,000 Rp 5,600,000 1.69
2 Balok struktur 2 m3 Rp 3,500,000 Rp 7,000,000 2.11
3 Perkuatan struktur 1 ls Rp 5,000,000 Rp 5,000,000 1.51

III. Pekerjaan Pasangan


1 Perkerjaan Pasangan Dinding 115.7 m2 Rp 285,000 Rp 32,963,385 9.95
2 Pasangan Keramik Lantai granit 80x80 33.05 m2 Rp 425,000 Rp 14,044,550 4.24

IV. Pekerjaan Interior (Dalam)


1 Keramik Dinding ukuran 40 x 80cm 27.03 m2 Rp 285,000 Rp 7,703,550 2.33
2 Kaca Bevel Bagian Tengah uk. 2.15 x 3 m 1 bh Rp 11,600,000 Rp 11,600,000 3.50
Kaca bevel 5mm
Logo Acrylic susu stiker gold + LED
plywood 12 mm back side and frame fin. Duco
3 Kaca cermin Bagian samping uk. 3.8 x 3m 1 bh Rp 20,800,000 Rp 20,800,000 6.28
Kaca bevel 5mm
plywood 12 mm back side and frame fin. Duco
4 Meja Display uk. P.l.t 790x600x99 cm 7.9 m1 Rp 7,500,000 Rp 59,250,000 17.88
Plywood fin. Duco
kaca tempered 12mm
Logo Acrylic susu + LED stiker gold
Led dalam kaca + aksesoris
Led bagian bawah meja + Housing
Doubler Layer Kaca 12mm
hidden saklar + travo
5 Meja cashier uk. p.l.t 80x80x90 cm 1 bh Rp 11,500,000 Rp 11,500,000 3.47
plywood 12mm fin.duco
Logo Acrylic susu + LED stiker gold
6 Neon box p.l.t 55x45x10 cm 2 bh Rp 2,500,000 Rp 5,000,000 1.51
satinless + led
7 Pintu brankas uk. 250 x 800 cm 1 bh Rp 1,750,000 Rp 1,750,000 0.53
plywood 12mm fin.duco kusen alumunium 4 in
8 Pintu Coboy akses masuk karyawan 1 bh Rp 1,500,000 Rp 1,500,000 0.45
plywood 12mm fin.duco

V. Pekerjaan Interior (Luar)


1 Tower display p.l.t 350x300x50cm 1 bh Rp 2,500,000 Rp 2,500,000 0.75
plywood 12 mm back side and frame fin. Duco
kaca tempered 12mm
Spot LIght dalam kaca + aksesoris
2 Meja tower display 2 bh Rp 2,500,000 Rp 5,000,000 1.51
Mahoni fin.duco
3 rooling door 13.88 m2 Rp 1,200,000 Rp 16,650,000 5.03
type one sheet fin cat. Putih
4 Bulk Head uk. p.l.t 1100x50x20cm 1 bh Rp 27,500,000 Rp 27,500,000 8.30
plywood 12 mm fin. Duco
Logo Acrylic susu + lampu LED 2 buah
5 Backdrop depan uk. p.l.t 350x125x20cm 1 bh Rp 27,500,000 Rp 27,500,000 8.30
plywood 12 mm fin. Duco
Logo Acrylic susu + lampu LED
6 Tower Videotron uk . p.l.t 350 x 155 x 20cm 1 bh Rp 11,500,000 Rp 11,500,000 3.47
RAB LIONARDY JEWELLERY PEJATEN
Harga
No. Nama Pekerjaan Vol Sat Jumlah Bobot (%)
Satuan

plywood 12 mm fin. Duco


Braket besi dudukan viseotron
Lampu Led + Housing
hidden saklar + travo

VI. Pekerjaan Plafond


1 Pekerjaan Plafond Flat lt.1 33.05 m2 Rp 165,000 Rp 5,452,590 1.65
2 Pekerjaan Plafond Flat lt.2 5.5 m1 Rp 165,000 Rp 907,500 0.27

VII. Pekerjaan Listrik & Lain - Lain

1 Panel listrik 1 ls Rp 18,000,000 Rp 18,000,000 5.43


-MCCB 60A-3P, type NSX merk Schneider-->main input
-MCCB 6A-1P, type iC60N merk Schneider-->distribusi from phase
R.S.T(u/Stop kontak)
-MCB 6A-1P, type iC60N merk Schneider-->distribusi from phase
R.S.T(u/penerangan)
-pilot lamp
-busbar 200A
-Wiring & aksesories

2 Instalasi stop kontak 36 m1 Rp 150,000 Rp 5,400,000 1.63


Bahan kabel NYM 3x2,5mm

3 Instalasi lampu 76 m1 Rp 150,000 Rp 11,400,000 3.44


Bahan Kabel NYM 3x2,5mm
Untuk Lampu drop selang-seling dengan saklar double

4 Accesories
Stop kontak merk panasonic atau setara 5 bh Rp 85,000 Rp 425,000 0.13
Saklar lampu tunggal merk panasonic atau setara 2 bh Rp 85,000 Rp 170,000 0.05
Saklar lampu double merk panasonic atau setara 3 bh Rp 85,000 Rp 255,000 0.08
Lampu Drop plafond
Lampu logo Backdrop luar
Lampu logo Bulkhead
Lampu Tower Display
Lampu Meja
Box Secreen Led

Total Rp 331,287,575 100.00

Syarat pembayaran :
Penawaran Harga Berlaku 14 Hari
50% pada saat SPK/PO diterima
40% pada saat seluruh pekerjaan selesai
10% pada saat retensi selesai

jika ada penambahan item pekerjaan pada lokasi diluar dari penawaran diatas,
jaan tambahan dan akan ditambahkan pada saat pelunasan pembayaran.

Demikianlan surat penawaran ini kami sampaikan, selanjutnya kami tunggu konfirmasi dari Ibu/Bapak.
dan kerjasamanya kami ucapkan terima kasih.

Pembayaran Melalui
Bank : BCA
No rek : 7615580066
RAB LIONARDY JEWELLERY PEJATEN
Harga
No. Nama Pekerjaan Vol Sat Jumlah Bobot (%)
Satuan

A.n : SURALOKA BANGUN BERSAMA

Jakarta, 12 Oktober 2023


Hormat Kami

Anda mungkin juga menyukai