I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR BETON BERTULANG
IV PEKERJAAN DINDING DAN PELAPIS DINDING
V PEKERJAAN KAP/ATAP
VI PEKERJAAN PLAFOND
VII PEKERJAAN INSTALASI LISTRIK
VIII PEKERJAAN LANTAI
IX PEKERJAAN KM/WC & INTALASI AIR
IX PEKERJAAN PINTU DAN JENDELA
X PEKERJAAN CAT
Jumlah #REF!
PPN 10% #REF!
Total #REF!
Pebulatan 433,533,000.00
MAIFRIANTO, ST
Leader
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA
I PEKERJAAN PERSIAPAN
1 1 m2 Pembersihan dan Pengupasan Permukaan Tanah (Striping) 1.1.f © M2 Rp 11,300.00
2 Pengukuran dan pemasangan 1 M" Bouwplank 1.1.d © M1 Rp 90,640.00
II PEKERJAAN BONGKARAN
1 Err:509 Err:509 M3 Err:509
V PEKERJAAN BETON
1 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, w/c 0,87 A.4.1.1.1 M3 Rp 1,106,706.86
2 Membuat Lantai kerja beton mutu f3c = 19,3 Mpa (K 225), slump (12 ± 2) Cm, w/c 0,58 A.4.1.1.7 M3 Rp 1,316,849.29
3 Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 M2 Rp 231,462.00
4 Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.19 M2 Rp 244,882.00
5 Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.20 M2 Rp 389,686.00
6 Pemasangan 1 m2 bekisting untuk balok A.4.1.1.21 M2 Rp 398,761.00
X PEKERJAAN PLAFOND
1 Pemasangan 1 m2 langit-langit GRC board ukuran (120 x 240 x 9) mm, tebal 4 mm Err:509 M2 Err:509
JUMLAH 46,322,782.17
PEMBULATAN 46,300,000.00
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan Ls 1.00 750,000.00 750,000.00
750,000.00
II PEKERJAAN PONDASI
a. Pondasi Plat Setempat
1 Galian Tanah Pondasi M3 2.55 91,025.00 231,931.70
2 Urugan Kembali 1/4 Galian M3 0.64 66,550.00 42,392.35
3 Pasir Urug M3 0.10 194,810.00 19,091.38
4 Coran Lantai Kerja M3 0.10 1,106,706.86 108,457.27
5 Pek, Pondasi Plat Setempat
- Beton K 200 M3 0.39 1,282,788.57 502,853.12
- Pembesian Kg 70.56 17,642.35 1,244,844.22
- Cetakan 2 x pakai M2 0.39 231,462.00 90,733.10
2,240,303.14
I PEKERJAAN PENDAHULUAN
1 Pas, Plank Proyek Ls 1.00 100,000.00 100,000.00
2 Persiapan Lapangan Ls 1.00 3,500,000.00 3,500,000.00
2 Pembersihan Lapangan M2 175.50 11,300.00 1,983,150.00
3 Pas. Papan Bouwplank M1 24.00 90,640.00 2,175,360.00
4 Manajemen Mutu Ls 1.00 2,000,000.00 2,000,000.00
5 Pek . K3 Ls 1.00 8,425,000.00 8,425,000.00
Jumlah 18,183,510.00
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
FERDIAN ASMAN, ST
Leader
JENIS PEKERJAAN : 1.1.d © Pengukuran dan pemasangan 1 M" Bouwplank
SATUAN : M1
HARGA SATUAN PEKERJAAN : Rp 90,640.00 (Analisa Umum Halaman 149)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang Kayu L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0050 160,000.00 800.00
JUMLAH TENAGA KERJA 27,900.00
B BAHAN
Kayu balok 5/7 Kelas II m3 0.0120 2,750,000.00 33,000.00
Paku biasa 2" - 5" Kg 0.0200 25,000.00 500.00
Kayu papan 3/20 Kelas II m3 0.0070 3,000,000.00 21,000.00
JUMLAH HARGA BAHAN 54,500.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Mandor L.04 OH 0.0050 160,000.00 800.00
JUMLAH TENAGA KERJA 11,300.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 11,300.00
E Overhead & profit 10% x Jumlah -
F Harga Satuan Pekerjaan (D+E) 11,300.00
A TENAGA
Pekerja L.01 OH 0.7500 105,000.00 78,750.00
Mandor L.04 OH 0.0250 160,000.00 4,000.00
JUMLAH TENAGA KERJA 82,750.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.6750 105,000.00 70,875.00
Mandor L.04 OH 0.0675 160,000.00 10,800.00
JUMLAH TENAGA KERJA 81,675.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Mandor L.04 OH 0.0500 160,000.00 8,000.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Mandor L.04 OH 0.0100 160,000.00 1,600.00
JUMLAH TENAGA KERJA 33,100.00
B BAHAN
Pasir urug m3 1.2000 120,000.00 144,000.00
JUMLAH HARGA BAHAN 144,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7800 105,000.00 81,900.00
Tukang Batu L.02 OH 0.3900 150,000.00 58,500.00
Kepala tukang L.03 OH 0.0390 160,000.00 6,240.00
Mandor L.04 OH 0.0390 160,000.00 6,240.00
JUMLAH TENAGA KERJA 152,880.00
B BAHAN
Batu belah m3 1.2000 185,000.00 222,000.00
Pasir urug m3 0.4320 120,000.00 51,840.00
JUMLAH HARGA BAHAN 273,840.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang Batu L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 160,000.00 12,000.00
Mandor L.04 OH 0.0750 160,000.00 12,000.00
JUMLAH TENAGA KERJA 294,000.00
B BAHAN
semen portland kg 163.0000 1,580.00 257,540.00
Pasir pasang m3 0.5200 150,000.00 78,000.00
Batu Kali m3 1.2000 190,000.00 228,000.00
JUMLAH HARGA BAHAN 563,540.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 247.0000 1,580.00 390,260.00
Pasir beton Kg 869.0000 150.00 130,350.00
Split Kg 999.0000 280.00 279,720.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 811,080.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 276.0000 1,580.00 436,080.00
Pasir beton Kg 828.0000 150.00 124,200.00
Split Kg 1012.0000 280.00 283,360.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 854,390.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 299.0000 1,580.00 472,420.00
Pasir beton Kg 799.0000 150.00 119,850.00
Split Kg 1017.0000 280.00 284,760.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 887,780.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.1 Pemasangan 1 m3 beton mutu f'c = 7,4 Mpa (K 100)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,106,706.86 (Analisa CK Halaman 1066)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 247.0000 1,580.00 390,260.00
Pasir beton Kg 869.0000 107.14 93,107.14
Split Kg 999.0000 280.00 279,720.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 773,837.14
C PERALATAN
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,240,402.43
A TENAGA
Pekerja L.01 OH 1.650 105,000.00 173,250.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala tukang L.03 OH 0.028 160,000.00 4,480.00
Mandor L.04 OH 0.083 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 326.00 1,580.00 515,080.00
Pasir beton Kg 760.00 107.14 81,428.57
Split Kg 1029.00 280.00 288,120.00
Air Liter 215.00 50.00 10,750.00
JUMLAH HARGA BAHAN 895,378.57
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.6 Pembuatan 1 m3 beton mutu f'c = 16,9 Mpa (K 200),(AHSP 2022)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,282,788.57 (Analisa CK Halaman 1068)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 352.0000 1,580.00 556,160.00
Pasir beton Kg 731.0000 107.14 78,321.43
Split Kg 1031.0000 280.00 288,680.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 933,911.43
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650 105,000.00 173,250.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala tukang L.03 OH 0.028 160,000.00 4,480.00
Mandor L.04 OH 0.083 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 371.00 1,580.00 586,180.00
Pasir beton Kg 698.00 107.14 74,785.71
Split Kg 1047.00 280.00 293,160.00
Air Liter 215.00 50.00 10,750.00
JUMLAH HARGA BAHAN 964,875.71
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 160,000.00 4,480.00
Mandor L.04 OH 0.0830 160,000.00 13,280.00
JUMLAH TENAGA KERJA 232,260.00
B BAHAN
Semen Portland Kg 384.0000 1,580.00 606,720.00
Pasir beton Kg 692.0000 107.14 74,142.86
Split Kg 1039.0000 280.00 290,920.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 982,532.86
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0700 105,000.00 7,350.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 160,000.00 1,120.00
Mandor L.04 OH 0.0040 160,000.00 640.00
JUMLAH TENAGA KERJA 19,610.00
B BAHAN
Besi beton Kg 10.5000 13,050.00 137,025.00
Kawat beton Kg 0.1500 25,000.00 3,750.00
JUMLAH HARGA BAHAN 140,775.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.5200 105,000.00 54,600.00
Tukang L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 160,000.00 4,160.00
Mandor L.04 OH 0.0260 160,000.00 4,160.00
JUMLAH TENAGA KERJA 101,920.00
B BAHAN
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 - 10 Cm Kg 0.3000 25,000.00 7,500.00
Minyak bekisting Liter 0.1000 10,000.00 1,000.00
JUMLAH HARGA BAHAN 108,500.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.5200 105,000.00 54,600.00
Tukang L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 160,000.00 4,160.00
Mandor L.04 OH 0.0260 160,000.00 4,160.00
JUMLAH TENAGA KERJA 101,920.00
B BAHAN
Papan Kayu kelas III m3 0.0450 2,500,000.00 112,500.00
Paku 5 - 10 Cm Kg 0.3000 25,000.00 7,500.00
Minyak bekisting Liter 0.1000 7,000.00 700.00
JUMLAH HARGA BAHAN 120,700.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 160,000.00 5,280.00
JUMLAH TENAGA KERJA 129,360.00
B BAHAN
Papan Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 - 12 Cm Kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 7,000.00 1,400.00
Balok kayu kelas II m3 0.0150 2,750,000.00 41,250.00
Plywod tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken kayu φ 8-10 Cm Batang 2.0000 12,500.00 25,000.00
JUMLAH HARGA BAHAN 224,900.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 160,000.00 5,280.00
JUMLAH TENAGA KERJA 129,360.00
B BAHAN
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 - 12 Cm Kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 7,000.00 1,400.00
Balok kayu kelas II m3 0.0180 2,750,000.00 49,500.00
Plywod tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken kayu φ 8-10 Cm panjang 4 Batang 2.0000 12,500.00 25,000.00
JUMLAH HARGA BAHAN 233,150.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 160,000.00 5,280.00
JUMLAH TENAGA KERJA 129,360.00
B BAHAN
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 - 12 Cm Kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 7,000.00 1,400.00
Balok kayu kelas II m3 0.0150 2,750,000.00 41,250.00
Plywod tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken kayu φ 8-10 cm panjang 4 Batang 6.0000 12,500.00 75,000.00
JUMLAH HARGA BAHAN 274,900.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 160,000.00 5,280.00
JUMLAH TENAGA KERJA 129,360.00
B BAHAN
Kayu kelas III m3 0.0300 2,500,000.00 75,000.00
Paku 5 - 10 Cm Kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 7,000.00 1,400.00
Balok kayu kelas II m3 0.0200 2,750,000.00 55,000.00
Plywod tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken kayu φ 8-10 Cm Batang 3.0000 12,500.00 37,500.00
Penjaga jarak bekising/Spacer Bh 4.0000 19,500.00 78,000.00
JUMLAH HARGA BAHAN 304,150.00
C PERALATAN
SATUAN : M2
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 160,000.00 5,280.00
Mandor L.04 OH 0.0330 160,000.00 5,280.00
JUMLAH TENAGA KERJA 129,360.00
B BAHAN
Kayu kelas III m3 0.0300 2,500,000.00 75,000.00
Paku 5 - 10 Cm Kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.1500 7,000.00 1,050.00
Balok kayu kelas II m3 0.0150 2,750,000.00 41,250.00
Plywod tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken kayu φ 8-10 Cm Batang 2.0000 12,500.00 25,000.00
JUMLAH HARGA BAHAN 199,550.00
C PERALATAN
SATUAN : M2
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0080 160,000.00 1,280.00
JUMLAH TENAGA KERJA 25,330.00
B BAHAN
Kayu kelas III (papan) m3 0.0264 2,500,000.00 66,000.00
Paku 5 - 10 Cm Kg 0.6000 25,000.00 15,000.00
Dolken kayu φ 8-10 Cm Batang 0.5000 12,500.00 6,250.00
JUMLAH HARGA BAHAN 87,250.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.35 Membuat 1 m kolom praktis beton bertulang (11 x 11) Cm
SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp 122,924.53
A TENAGA
Pekerja L.01 OH 0.1800 105,000.00 18,900.00
Tukang Batu L.02 OH 0.0200 150,000.00 3,000.00
Tukang kayu L.02 OH 0.0200 150,000.00 3,000.00
Tukang besi L.02 OH 0.0200 150,000.00 3,000.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0090 160,000.00 1,440.00
JUMLAH TENAGA KERJA 30,300.00
B BAHAN
Kayu kelas III m3 0.0020 2,500,000.00 5,000.00
Paku 5 - 12 Cm Kg 0.0100 25,000.00 250.00
Minyak bekisting Liter 1.2000 7,000.00 8,400.00
Besi beton polos Kg 3.0000 17,642.35 52,927.05
Kawat beton Kg 0.4500 17,000.00 7,650.00
Semen Portland Kg 4.0000 1,580.00 6,320.00
Pasir beton m3 0.0060 150,000.00 900.00
Split m3 0.0090 280.00 2.52
JUMLAH HARGA BAHAN 81,449.57
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0430 105,000.00 4,515.00
Tukang L.02 OH 0.0430 150,000.00 6,450.00
Kepala tukang L.03 OH 0.0043 160,000.00 688.00
Mandor L.04 OH 0.0021 160,000.00 336.00
JUMLAH TENAGA KERJA 11,989.00
B BAHAN
Profil alluminium m 1.1000 15,000.00 16,500.00
Skrup fixer bh 2.0000 1,500.00 3,000.00
Sealant Tube 0.0600 50,000.00 3,000.00
JUMLAH HARGA BAHAN 22,500.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0850 105,000.00 8,925.00
Tukang L.02 OH 0.0850 150,000.00 12,750.00
Kepala tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0050 160,000.00 800.00
JUMLAH TENAGA KERJA 23,915.00
B BAHAN
Pintu alluminium m 4.4000 15,000.00 66,000.00
Profil kaca m 4.5000 1,500.00 6,750.00
Sealant Tube 0.0600 50,000.00 3,000.00
JUMLAH HARGA BAHAN 75,750.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 160,000.00 4,800.00
Mandor L.04 OH 0.0080 160,000.00 1,280.00
JUMLAH TENAGA KERJA 66,830.00
B BAHAN
Seng plat m2 1.0500 15,000.00 15,750.00
Paku 1 Cm - 2,5 Cm kg 0.0100 1,500.00 15.00
Besi strip kg 0.5000 50,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0180 160,000.00 2,880.00
JUMLAH TENAGA KERJA 97,730.00
B BAHAN
rangka metal hollow 40.40.2mm m1 4.0000 47,500.00 190,000.00
aksesories (perkuatan, las, dll) ls 0.0100 47,500.00 475.00
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 160,000.00 2,400.00
JUMLAH TENAGA KERJA 50,500.00
B BAHAN
Bata Merah buah 70.0000 800.00 56,000.00
Semen Portland Kg 18.9500 1,580.00 29,941.00
Pasir Pasang m3 0.0380 150,000.00 5,700.00
JUMLAH HARGA BAHAN 91,641.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0150 160,000.00 2,400.00
JUMLAH TENAGA KERJA 50,500.00
B BAHAN
Bata Merah buah 70.0000 800.00 56,000.00
Semen Portland Kg 11.5000 1,580.00 18,170.00
Pasir Pasang m3 0.0430 150,000.00 6,450.00
JUMLAH HARGA BAHAN 80,620.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 160,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Semen Portland Kg 10.2240 1,580.00 16,153.92
Pasir Pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN 19,153.92
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 160,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Semen Portland Kg 6.2400 1,580.00 9,859.20
Pasir Pasang m3 0.0240 150,000.00 3,600.00
JUMLAH HARGA BAHAN 13,459.20
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2000 - -
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0100 160,000.00 1,600.00
JUMLAH TENAGA KERJA 18,200.00
B BAHAN
Semen Portland Kg 3.2500 1,580.00 5,135.00
JUMLAH HARGA BAHAN 5,135.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 160,000.00 5,600.00
JUMLAH TENAGA KERJA 137,200.00
B BAHAN
keramik ukuran 20 Cm x 20 Cm Doos 1.0500 65,000.00 68,250.00
Semen Portland Kg 10.4000 1,580.00 16,432.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
Semen warna (tepung affa) Kg 0.5000 5,000.00 2,500.00
JUMLAH HARGA BAHAN 93,932.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7500 105,000.00 78,750.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0350 160,000.00 5,600.00
JUMLAH TENAGA KERJA 142,450.00
B BAHAN
Keramik ukuran 40 Cm x 40 Cm dous 1.0500 85,000.00 89,250.00
Semen Portland Kg 10.0000 1,580.00 15,800.00
Semen warna Kg 0.5000 20,000.00 10,000.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 121,800.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 160,000.00 7,200.00
JUMLAH TENAGA KERJA 176,400.00
B BAHAN
Keramik ukuran 20 Cm x 20 Cm Doos 1.0500 65,000.00 68,250.00
Semen Portland Kg 9.3000 1,580.00 14,694.00
Semen warna Kg 1.9400 20,000.00 38,800.00
Pasir Pasang m3 0.0180 150,000.00 2,700.00
JUMLAH HARGA BAHAN 124,444.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 160,000.00 7,200.00
Mandor L.04 OH 0.0450 160,000.00 7,200.00
JUMLAH TENAGA KERJA 176,400.00
B BAHAN
Keramik ukuran 20 Cm x 40 Cm Buah 12.5000 5,833.33 72,916.67
Semen Portland Kg 0.3207 1,580.00 506.69
Semen warna Kg 1.3750 20,000.00 27,500.00
Pasir Pasang m3 0.0090 150,000.00 1,350.00
JUMLAH HARGA BAHAN 102,273.36
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2400 105,000.00 25,200.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0120 160,000.00 1,920.00
JUMLAH TENAGA KERJA 47,040.00
B BAHAN
Keramik 60 x 60 cm Bh 3.1000 53,000.00 164,300.00
Semen Portland Kg 9.6000 1,580.00 15,168.00
Semen warna (tepung affa) Kg 1.5000 20,000.00 30,000.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 216,218.00
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm,
tebal 9 mm
SATUAN : M2 (Analisa CK Halaman 1143)
HARGA SATUAN : Rp 51,207
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 160,000.00 800.00
Mandor L.04 OH 0.0050 160,000.00 800.00
JUMLAH TENAGA KERJA 19,600.00
B BAHAN
Gypsum board Lembar 0.3640 68,000.00 24,752.00
Paku triplek Kg 0.1100 20,000.00 2,200.00
JUMLAH HARGA BAHAN 26,952.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0030 160,000.00 480.00
JUMLAH TENAGA KERJA 16,740.00
B BAHAN
List Gypsum profil M 1.0500 25,000.00 26,250.00
Lem profil gypsum Kg 0.1500 5,000.00 750.00
JUMLAH HARGA BAHAN 27,000.00
C PERALATAN
SATUAN : M1
HARGA SATUAN : Rp 22,704
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0030 160,000.00 480.00
JUMLAH TENAGA KERJA 16,740.00
B BAHAN
List PVC M 1.0500 3,000.00 3,150.00
Paku Scrup Kg 0.1500 5,000.00 750.00
JUMLAH HARGA BAHAN 3,900.00
C PERALATAN
SATUAN : M2
HARGA SATUAN : Rp 190,036
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0010 160,000.00 160.00
JUMLAH TENAGA KERJA 37,760.00
B BAHAN
genteng metal bh 2.0000 65,000.00 130,000.00
Paku Kg 0.2000 25,000.00 5,000.00
JUMLAH HARGA BAHAN 135,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0080 160,000.00 1,280.00
JUMLAH TENAGA KERJA 100,030.00
B BAHAN
Canal Ringan M1 3.600 9,000.00 32,400.00
Kawat dia 4mm Kg 0.15025,000.00 3,750.00
Ramset Bh 1.050 300.00 315.00
PVC t.8mm m1 5.250 15,500.00 81,375.00
Paku Skrup kg 0.110 15,000.00 1,650.00
JUMLAH HARGA BAHAN 119,490.00
C PERALATAN
SATUAN : M2
HARGA SATUAN : Rp 84,546
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.0010 160,000.00 160.00
JUMLAH TENAGA KERJA 37,760.00
B BAHAN
genteng metal bh 2.0000 17,050.00 34,100.00
Paku Kg 0.2000 25,000.00 5,000.00
JUMLAH HARGA BAHAN 39,100.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.0000 105,000.00 630,000.00
Tukang L.02 OH 18.0000 150,000.00 2,700,000.00
Kepala tukang L.03 OH 1.8000 160,000.00 288,000.00
Mandor L.04 OH 0.3000 160,000.00 48,000.00
JUMLAH TENAGA KERJA 3,666,000.00
B BAHAN
Balok kayu m3 1.2000 2,750,000.00 3,300,000.00
Paku 10 Cm Kg 1.2500 20,000.00 25,000.00
Lem kayu Kg 1.0000 70,000.00 70,000.00
JUMLAH HARGA BAHAN 3,395,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 7.0000 105,000.00 735,000.00
Tukang L.02 OH 21.0000 150,000.00 3,150,000.00
Kepala tukang L.03 OH 2.1000 160,000.00 336,000.00
Mandor L.04 OH 0.3500 160,000.00 56,000.00
JUMLAH TENAGA KERJA 4,277,000.00
B BAHAN
Balok Kayu m3 1.1000 3,250,000.00 3,575,000.00
paku 10cm Kg 1.2500 25,000.00 31,250.00
lem kayu kg 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 3,606,250.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 2.4000 150,000.00 360,000.00
Kepala tukang L.03 OH 0.2400 160,000.00 38,400.00
Mandor L.04 OH 0.0400 160,000.00 6,400.00
JUMLAH TENAGA KERJA 488,800.00
B BAHAN
Papan kayu m3 0.0240 3,250,000.00 78,000.00
Lem kayu Kg 0.3000 25,000.00 7,500.00
JUMLAH HARGA BAHAN 85,500.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 3.0000 150,000.00 450,000.00
Kepala tukang L.03 OH 0.3000 160,000.00 48,000.00
Mandor L.04 OH 0.0500 160,000.00 8,000.00
JUMLAH TENAGA KERJA 611,000.00
B BAHAN
Papan kayu m3 0.0640 3,250,000.00 208,000.00
Lem kayu Kg 0.5000 25,000.00 12,500.00
JUMLAH HARGA BAHAN 220,500.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 4.0000 105,000.00 420,000.00
Tukang L.02 OH 12.0000 150,000.00 1,800,000.00
Kepala tukang L.03 OH 1.2000 160,000.00 192,000.00
Mandor L.04 OH 0.2000 160,000.00 32,000.00
JUMLAH TENAGA KERJA 2,444,000.00
B BAHAN
Balok kayu m3 1.1000 2,750,000.00 3,025,000.00
Besi strip tebal 5 mm Kg 15.0000 10,000.00 150,000.00
Paku 12 Cm Kg 5.6000 22,000.00 123,200.00
JUMLAH HARGA BAHAN 3,298,200.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 160,000.00 8,000.00
Mandor L.04 OH 0.0050 160,000.00 800.00
JUMLAH TENAGA KERJA 84,850.00
B BAHAN
Kunci tanam biasa Bh 1.0000 38,500.00 38,500.00
JUMLAH HARGA BAHAN 38,500.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
JUMLAH TENAGA KERJA 26,603.00
B BAHAN
Engsel pintu Bh 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0200 105,000.00 2,100.00
Tukang L.02 OH 0.0630 150,000.00 9,450.00
Kepala tukang L.03 OH 0.0063 160,000.00 1,008.00
Mandor L.04 OH 0.0030 160,000.00 480.00
JUMLAH TENAGA KERJA 13,038.00
B BAHAN
Plamuur Kg 0.1000 10,000.00 1,000.00
Cat dasar/dempul Kg 0.1000 25,000.00 2,500.00
Cat penutup Kg 0.2600 130,000.00 33,800.00
JUMLAH HARGA BAHAN 37,300.00
C PERALATAN
JENIS PEKERJAAN : 3.3.11.c Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 40,471
A TENAGA
Pekerja L.01 OH 0.0280 105,000.00 2,940.00
Tukang L.02 OH 0.0420 150,000.00 6,300.00
Kepala tukang L.03 OH 0.0042 160,000.00 672.00
Mandor L.04 OH 0.0030 160,000.00 480.00
JUMLAH TENAGA KERJA 10,392.00
B BAHAN
Cat dasar Kg 0.1200 25,000.00 3,000.00
Cat penutup Kg 0.1800 130,000.00 23,400.00
JUMLAH HARGA BAHAN 26,400.00
C PERALATAN
A TENAGA
Upah % 100.0000 500.00 50,000.00
A TENAGA
Upah % 100.0000 1,000.00 100,000.00
A TENAGA
Pekerja L.01 OH 0.0745 105,000.00 7,822.50
Tukang L.02 OH 0.0745 150,000.00 11,175.00
Kepala tukang L.03 OH 0.0075 160,000.00 1,200.00
Mandor L.04 OH 0.0038 160,000.00 608.00
JUMLAH TENAGA KERJA 20,805.50
B BAHAN
JENIS PEKERJAAN : A.4.5.2.33 Pemasangan 1 m2 Genteng metal ukuran 80x100 atap jurai
SATUAN : M2
HARGA SATUAN : Rp 160,666
A TENAGA
Pekerja L.01 OH 0.200 105,000.00 21,000.00
Tukang L.02 OH 0.100 150,000.00 15,000.00
Kepala tukang L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.001 160,000.00 160.00
JUMLAH TENAGA KERJA 37,760.00
B BAHAN
SATUAN : M2
HARGA SATUAN : Rp 1,534,566
A TENAGA
Pekerja L.01 OH 0.020 105,000.00 2,100.00
Tukang L.02 OH 0.080 150,000.00 12,000.00
Kepala tukang L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.006 160,000.00 960.00
JUMLAH TENAGA KERJA 16,660.00
B BAHAN
SATUAN : M
HARGA SATUAN : Rp 92,048 (Analisa CK Halaman 1161)
A TENAGA
Pekerja L.01 OH 0.250 105,000.00 26,250.00
Tukang L.02 OH 0.150 150,000.00 22,500.00
Kepala tukang L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.013 160,000.00 2,080.00
JUMLAH TENAGA KERJA 53,230.00
B BAHAN
SATUAN : M
HARGA SATUAN : Rp 70,675 (Analisa Ck Halaman 1175)
A TENAGA
Pekerja L.01 OH 0.100 105,000.00 10,500.00
Tukang L.02 OH 0.200 150,000.00 30,000.00
Kepala tukang L.03 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.005 160,000.00 800.00
JUMLAH TENAGA KERJA 44,500.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Mandor L.04 OH 0.0500 160,000.00 8,000.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
Tanah Timbunan m3 1.2000 75,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.040 105,000.00 4,200.00
Tukang L.02 OH 0.100 150,000.00 15,000.00
Kepala tukang L.03 OH 0.010 160,000.00 1,600.00
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 160,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Semen Portland Kg 15.5040 1,580.00 24,496.32
Pasir Pasang m3 0.0160 150,000.00 2,400.00
JUMLAH HARGA BAHAN 26,896.32
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0150 160,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Semen Portland sak 0.192 79,000.00 15,168.00
Pasir Pasang m3 0.0050 150,000.00 750.00
JUMLAH HARGA BAHAN 15,918.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 160,000.00 5,600.00
Mandor L.04 OH 0.0180 160,000.00 2,880.00
JUMLAH TENAGA KERJA 97,730.00
B BAHAN
Besi Hollow 40x40 tebal 2mm m 4.000 47,500.00 190,000.00
Besi Hollow 20x20 tebal 2mm m 5.0000 27,500.00 137,500.00
Perakitan & assesoris ( 35 % Harga Bahan ) ls 0.3500 327,500.00 114,625.00
JUMLAH HARGA BAHAN 442,125.00
C PERALATAN
A TENAGA
Pekerja L.01 Jam 0.2100 105,000.00 22,050.00
Mandor L.04 Jam 0.0070 160,000.00 1,120.00
JUMLAH TENAGA KERJA 23,170.00
B BAHAN
Kawat las kg 0.020 40,000.00 800.00
A TENAGA
Pekerja L.01 OH 0.0400 105,000.00 4,200.00
Tukang besi L.02 OH 0.0200 150,000.00 3,000.00
Kepala tukang L.03 OH 0.0020 160,000.00 320.00
Mandor L.04 OH 0.0020 160,000.00 320.00
JUMLAH TENAGA KERJA 7,840.00
B BAHAN
Kawat las listrik Kg 0.4000 40,000.00 16,000.00
SATUAN : M2
HARGA SATUAN : Rp 358,765
A TENAGA
Pekerja L.01 OH 0.020 105,000.00 2,100.00
Tukang L.02 OH 0.080 150,000.00 12,000.00
Kepala tukang L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.006 160,000.00 960.00
JUMLAH TENAGA KERJA 16,660.00
B BAHAN
JENIS PEKERJAAN : A.4.7.1.18 Pengecatan 1 m2 permukaan Baja / Galvanis secara manual 4 lapis
SATUAN : M2
HARGA SATUAN : Rp 94,847
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 160,000.00 4,000.00
Mandor L.04 OH 0.0013 160,000.00 208.00
JUMLAH TENAGA KERJA 67,958.00
B BAHAN
Menie A Kg 0.1000 50,000.00 5,000.00
Menie B Kg 0.1000 50,000.00 5,000.00
Cat Minyak Kg 0.0800 75,000.00 6,000.00
Kuas Bh 0.0100 20,000.00 200.00
Pengencer L 0.0100 15,000.00 150.00
JUMLAH HARGA BAHAN 16,350.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0120 160,000.00 1,920.00
Mandor L.04 OH 0.0030 160,000.00 480.00
JUMLAH TENAGA KERJA 17,700.00
B BAHAN
Cat Minyak Kg 0.3000 75,000.00 22,500.00
Kuas Bh 0.0100 20,000.00 200.00
Pengencer L 0.0100 15,000.00 150.00
JUMLAH HARGA BAHAN 22,850.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0110 105,000.00 1,155.00
Tukang L.02 OH 0.0180 150,000.00 2,700.00
Kepala tukang L.03 OH 0.0020 160,000.00 320.00
Mandor L.04 OH 0.0010 160,000.00 160.00
JUMLAH TENAGA KERJA 4,335.00
B BAHAN
Pipa Galvanis 3" kg 1.0000 21,000.00 21,000.00
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Mandor L.04 OH 0.0250 160,000.00 4,000.00
JUMLAH TENAGA KERJA 30,250.00
B BAHAN
Sirtu m3 1.2000 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0200 105,000.00 2,100.00
Tukang Kayu L.02 OH 0.2000 150,000.00 30,000.00
Kepala Tukang L.03 OH 0.0200 160,000.00 3,200.00
Mandor L.04 OH 0.0010 160,000.00 160.00
JUMLAH TENAGA KERJA 35,460.00
B BAHAN
kunci slot buah 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang Kayu L.02 OH 0.1500 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.0150 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
JUMLAH TENAGA KERJA 26,603.00
B BAHAN
kaca tebal 3mm m2 1.1000 70,000.00 77,000.00
silicone sealant 300ml tube 0.0500 30,000.00
JUMLAH HARGA BAHAN 77,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Tukang Kayu L.02 OH 1.1000 150,000.00 165,000.00
Kepala Tukang L.03 OH 0.0100 160,000.00 1,600.00
Mandor L.04 OH 0.1600 160,000.00 25,600.00
JUMLAH TENAGA KERJA 244,700.00
B BAHAN
Closet Duduk unit 1.0000 160,000.00 160,000.00
Perlengkapan Ls 6%xcloset 9,600.00 9,600.00
JUMLAH HARGA BAHAN 160,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang Kayu L.02 OH 1.0500 150,000.00 157,500.00
Kepala Tukang L.03 OH 0.1050 160,000.00 16,800.00
Mandor L.04 OH 0.0180 160,000.00 2,880.00
JUMLAH TENAGA KERJA 213,930.00
B BAHAN
Papan Kayu m3 0.0400 2,500,000.00 100,000.00
Paku 5-7 cm kg 0.0500 25,000.00 25,000.00
JUMLAH HARGA BAHAN 100,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0810 105,000.00 8,505.00
Tukang Kayu L.02 OH 0.1350 150,000.00 20,250.00
Kepala Tukang L.03 OH 0.0135 160,000.00 2,160.00
Mandor L.04 OH 0.0040 160,000.00 640.00
JUMLAH TENAGA KERJA 31,555.00
B BAHAN
Pipa PVC 4 m 1.2000 100,200.00 120,240.00
PERLENGKAPAN ls 35%x100.2 35,070.00 35,070.00
JUMLAH HARGA BAHAN 155,310.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0360 105,000.00 3,780.00
Tukang Kayu L.02 OH 0.0600 150,000.00 9,000.00
Kepala Tukang L.03 OH 0.0060 160,000.00 960.00
Mandor L.04 OH 0.0020 160,000.00 320.00
JUMLAH TENAGA KERJA 14,060.00
B BAHAN
Pipa PVC 3/4 m 1.2000 9,700.00 11,640.00
PERLENGKAPAN ls 35%x100.2 3,395.00 35,070.00
JUMLAH HARGA BAHAN 46,710.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0540 105,000.00 5,670.00
Tukang Kayu L.02 OH 0.0900 150,000.00 13,500.00
Kepala Tukang L.03 OH 0.0090 160,000.00 1,440.00
Mandor L.04 OH 0.0030 160,000.00 480.00
JUMLAH TENAGA KERJA 21,090.00
B BAHAN
Pipa PVC 1/2, m 1.2000 23,000.00 27,600.00
PERLENGKAPAN ls 35%x23000 8,050.00 35,070.00
JUMLAH HARGA BAHAN 62,670.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Mandor L.04 OH 0.0500 160,000.00 8,000.00
JUMLAH TENAGA KERJA 60,500.00
B BAHAN
Tanah Timbunan m3 1.0000 75,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
FERDIAN ASMAN, ST
Leader
REVISI RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PMBANGUNAN BAK INTAKE
LOKASI : PARIAMAN
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
FERDIAN ASMAN, ST
Leader
REVISI RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PMBANGUNAN BAK INTAKE
LOKASI : PARIAMAN
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
FERDIAN ASMAN, ST
Leader
REVISI RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PMBANGUNAN BAK INTAKE
LOKASI : PARIAMAN
jumlah 3,293,927.71
x2 6,587,855.42
total 23,513,975.62
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
FERDIAN ASMAN, ST
Leader
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PMBANGUNAN BAK INTAKE
LOKASI : PARIAMAN
I PEKERJAAN PENDAHULUAN
1 Pas, Plank Proyek Ls 1.00 100,000.00 100,000.00
2 Pembersihan Lapangan M2 175.50 11,300.00 1,983,150.00
3 Pas. Papan Bouwplank M1 24.00 90,640.00 2,175,360.00
4 Manajemen Mutu Ls 1.00 2,000,000.00 2,000,000.00
5 Pek . K3 Ls 1.00 1,500,000.00 1,500,000.00
Jumlah 7,758,510.00
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
FERDIAN ASMAN, ST
Leader
BACK UP DATA
KEGIATAN : Err:509
PEKERJAAN : PMBANGUNAN BAK INTAKE
LOKASI : PARIAMAN
I PEKERJAAN PENDAHULUAN
2 Pembersihan Lapangan = P x L = M2
= 6.5 x 6.75 = 43.88 = 43.88
II PEKERJAAN PONDASI
a. Pondasi Batu Kali
1 Galian Tanah Pondasi = P x L x T = M3
= 27.50 x 0.70 x 0.20 = 3.85 = 3.85
3 Urugan Pasir = P x L x T = M3
= 27.50 x 0.50 x 0.05 = 0.69 = 0.69
4 Pasir Urug = P x L x T x B = M3
= 0.60 x 0.60 x 0.05 x 6.00 = 0.11 0.11
Tul. Bagi
Besi Ø 0.012 m
Panjang 1 Sengkang = 4.00 m
Jumlah Sengkang = 1.49 Bh
Panjang Total Sengkang = 5.96 m
Berat Besi/m = 0.89 Kg
Berat Total Sengkang = 5.29 Kg
NO URAIAN PEKERJAAN DAN SKETSA P.E.R.H.I.T.U.N.G.A.N VOL
Pedestal
Tul. Pokok
Besi Ø 0.012 m
Jumlah Tul. = 4.00 Bh
Panjang Tul. = 1.98 m
Panjang Total Tul. = 7.92 m
Berat Besi/m = 0.89 Kg
Berat Tul pokok = 7.03 Kg
Sengkang
Besi Ø 0.008 m
Panjang 1 Sengkang = 0.39 m
Jumlah Sengkang = 8.00 Bh
Panjang Total Sengkang = 3.12 m
Berat Besi/m = 0.39 Kg
Berat Total Sengkang = 1.23 Kg
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M = 0.89 Kg
Beugel Ø8 mm Berat/M = 0.39 Kg
Pjg Tlg Pokok = 6.00 x 30.25 = 181.50 m
Beugel = 0.69 x 185 = 127.65 m
Berat Total Tlg Pokok = 181.50 x 0.89 = 161.1284 Kg
Berat Total Beugel = 127.65 x 0.39 = 50.36558 Kg
211.494 Kg 211.49
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M = 0.89 Kg
Beugel Ø8 mm Berat/M = 0.39 Kg
Pjg Tlg Pokok = 4.00 x 3.73 = 14.92 m
Beugel = 0.41 x 26 = 10.66 m
Berat Total Tlg Pokok = 14.92 x 0.89 = 13.24538 Kg
Berat Total Beugel = 10.66 x 0.39 = 4.20601 Kg
157.06 Kg 157.06
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M = 0.89 Kg
Beugel Ø8 mm Berat/M = 0.39 Kg
Pjg Tlg Pokok = 4.00 x 0.11 = 0.44 m
Beugel = 7.63 x 20 = 152.6 m
Berat Total Tlg Pokok = 0.44 x 0.89 = 0.390614 Kg
Berat Total Beugel = 152.60 x 0.39 = 60.20986 Kg
606.0047 Kg 606.00
2. Pembesian
Pembesian
Tlg Pokok Ø 10 mm Berat/M = 0.62 Kg
Beugel Ø6 mm Berat/M = 0.22 Kg
Pjg Tlg Pokok = 4.00 x 7.15 = 28.60 m
Beugel = 0.39 x 45.0 = 17.55 m
Berat Total Tlg Pokok = 28.60 x 0.62 = 17.732 Kg
Berat Total Beugel = 17.55 x 0.22 = 3.861 Kg
21.593 Kg 21.59
2. Pembesian
Pembesian
Tlg Pokok Ø 12 mm Berat/M = 0.89 Kg
Beugel Ø8 mm Berat/M = 0.39 Kg
Pjg Tlg Pokok = 4.00 x 30.25 = 121.00 m
Beugel = 0.55 x 185.0 = 101.75 m
Berat Total Tlg Pokok = 121.00 x 0.89 = 107.419 Kg
Berat Total Beugel = 101.75 x 0.39 = 40.14648 Kg
147.5654 Kg 147.57
2. Pembesian
Pembesian
Tlg Pokok Ø 10 mm Berat/M = 0.62 Kg
Beugel Ø8 mm Berat/M = 0.39 Kg
Pjg Tlg Pokok = 4.00 x 32.33 = 129.32 m
Beugel = 0.39 x 197.0 = 76.83 m
Berat Total Tlg Pokok = 129.32 x 0.62 = 79.72331 Kg
Berat Total Beugel = 76.83 x 0.39 = 30.31404 Kg
110.0374 Kg 110.04
NO URAIAN PEKERJAAN DAN SKETSA P.E.R.H.I.T.U.N.G.A.N VOL
2. Pembesian
Tul. Pokok Besi Ø 10 mm Berat/m¹ = 0.62 Kg
Tul. Pokok Bagi Ø 10 mm Berat/m¹ = 0.62 Kg
Panjang Tul. Pokok = 3.60 x 6.0 = 21.60 m
Panjang Tul. Bagi = 0.85 x 25.0 = 21.25 m
Berat Tul. Pokok = 0.62 x 21.60 = 13.32 Kg
Berat Tul. Bagi = 0.62 x 21.25 = 13.10 Kg
Berat Total Tul. = 13.10 + 13.32 = 26.42 Kg
2 Lapis = 52.83 Kg 52.83
3. Cetakan
= P x L = M2
= 3.70 x 0.85 = 3.15 3.15
2.00 x Pakai 1.57
IV PEKERJAAN DINDING
3 Plesteran 1:2 = Volume Pas. Bata 1:2 x 2 sisi = 18.04 x 2.00 = 36.075
Kolom kp 16.40 x 0.20 = 3.28 = 39.35
4 Plesteran 1:4 = Volume Pas. Bata 1:4 x 2 sisi = 71.74 x 2.00 = 143.47
Kolom kp -16.30 x 0.20 = -3.26 = 140.21
6 Pek. Dinding Keramik WC 10x20 = Volume Pas. Bata 1:2 x 2 sisi = 11.96 x 1.70 = 20.332
= 20.33
V PEKERJAAN KAP/ATAP
= 29.32
29.32
2 Pek . List PVC
Ruangan
= 31.14 x 2.00 = 62.28
62.28 62.28
### Err:509
Vertikal = 1.28 x 0.05 x 0.03 = 0.002 0.01
0.004
Horizontal = 0.44 x 0.05 x 0.03 = 0.001
0.001
0.01
IX PEKERJAAN PENGECATAN
1 Mencat Dinding dgn Cat Tembok = Volume Plester 1:2 + Plester 1:4
= 39.35 + 140.21 = 179.57
2 Mencat Plafond dgn Cat Tembok = Volume Plafond Gypsum = 23.66 = 23.66
1 Timbunan Tanah = P x L x T
20.00 x 0.80 x 0.80 = 12.80 = 12.80
a. Galian Tanah p x l x t
1.90 x 1.50 x 1.38
= 3.93 m3 3.93
b. Urugan Pasir = p x l x t
= 1.76 x 0.92 x 0.03
= 0.05 m3 0.05
NO URAIAN PEKERJAAN DAN SKETSA P.E.R.H.I.T.U.N.G.A.N VOL
c. cor Lantai = P X L X T =
v1
d .Pas. Dinding Bata = p x t
= 1.50 x 1.32
= 1.98 m2 1.98
v2
= p x t
0.75 x 0.50
= 0.38 m2 0.38
v total
= v1 + v2 =
1.98 + 0.38 = 2.36 m2 2.36
h1
= p x t
3.00 x 1.32 = 3.96 m2 3.96
Plasteran 1:2
plasteran dalam
= p x t
2.25 x 1.32 = 2.97 m2 2.97
plasteran dindingbtengah
= p x t
1.50 x 0.50 = 0.75 m2 0.75
2. Pembesian
Pembesian
Tlg Pokok Ø 10 mm Berat/M = 0.89 Kg
Beugel Ø6 mm Berat/M = 0.39 Kg
Pjg Tlg Pokok = 4.00 x 0.83 = 3.30 m
Beugel = 0.55 x 6.0 = 3.3 m
Berat Total Tlg Pokok = 3.30 x 0.89 = 2.929608 Kg
Berat Total Beugel = 3.30 x 0.39 = 1.302048 Kg
4.231656 Kg 4.23
2. pembesian
Tul. Pokok Besi Ø 10 mm Berat/m¹ = 0.62 Kg
Tul. Pokok Bagi Ø 10 mm Berat/m¹ = 0.62 Kg
Panjang Tul. Pokok = 1.86 x 8.0 = 14.88 m
Panjang Tul. Bagi = 1.02 x 13.0 = 13.26 m
Berat Tul. Pokok = 0.62 x 14.88 = 9.17 Kg
Berat Tul. Bagi = 0.62 x 13.26 = 8.17 Kg
Berat Total Tul. = 8.17 + 9.17 = 17.35 Kg
1 Lapis = 17.35 Kg 17.35
NO URAIAN PEKERJAAN DAN SKETSA P.E.R.H.I.T.U.N.G.A.N VOL
3. cetakan
= P x L = M2
= 1.88 x 0.98 = 1.84 1.84
2.00 x Pakai 0.92
Resapan
a. galian tanah = p x l x t
1.70 x 0.06 x 0.82 =
= 0.08 m3 0.08
b. urugan Pasir = p x l x t =
1.70 x 0.35 x 0.05 =
0.03 m3 0.03
c. lapisan ijuk = p x t
0.17 x 2.00 = 0.34 kg 0.34
d. urugan sirtu = p x t =
0.17 x 2.00 =
0.34 m3 0.34
Konsultan Perencana
CV. ARCHITECTURE MECHANICAL CONSULTANT
NOFRIZAL
Estimator
SAT
Ls
M2
M1
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
SAT
Kg
M2
M2
M3
Kg
M2
M2
M3
Kg
M2
M2
SAT
M3
Kg
M2
M2
M3
Kg
M2
M2
M3
Kg
M2
M2
M3
Kg
SAT
M2
M2
M3
Kg
M2
M2
M2
M2
SAT
M2
M2
M2
M2
M2
M1
M1
SAT
M2
M1
M2
M2
M3
M3
M2
M2
SAT
M3
M3
M3
M3
M2
M2
unit
Titik
Titik
Bh
Bh
Bh
M3
M3
M3
M3
m3
m3
SAT
m3
m2
m2
m2
m2
m2
m2
m2
m2
m3
kg
m2
m2
m3
kg
SAT
m2
m2
m3
m3
kg
m3
ULTANT
DAFTAR HARGA DASAR SATUAN UPAH
HARGA HARGA
No. URAIAN KODE KETERANGAN SATUAN PERJAM SATUAN PERHARI
( Rp.) ( Rp.)
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
Kegiatan : Err:509
Pekerjaan : PMBANGUNAN BAK INTAKE
Lokasi PARIAMAN
T.A : 2021
III PEKERJAAN BETON Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Jumlah Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
NOTE :
MAIFRIANTO, ST
Leader
ANALISA HARGA SATUAN PEKERJAAN
I PEKERJAAN
PEMBUATANPERSIAPAN
1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
I.2
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.2000 OH Pekerja 95,000.00 19,000.00
0.4000 OH Tukang Kayu 110,000.00 44,000.00
0.0200 OH Kepala Tukang 120,000.00 2,400.00
0.0200 OH Mandor 100,000.00 2,000.00
Bahan :
1.2500 btg Dolken Kayu ø 8-10/400 cm 20,000.00 25,000.00
2.5000 kg Semen Portland 1,400.00 3,500.00
1.2000 lbr Seng Gelombang 45,000.00 54,000.00
0.0050 m3 Pasir Beton 140,000.00 700.00
0.0090 m3 Koral Beton 150,000.00 1,350.00
0.0720 m3 Kayu 5/7 2,000,000.00 144,000.00
0.0600 kg Paku Biasa 18,000.00 1,080.00
0.4500 liter Meni Besi 15,384.62 6,923.08
67,400.00 236,553.08 303,953.08
Overhead + Fee ( Max. 10 % ) 30,395.31
Jumlah 334,348.38
II PEKERJAAN TANAH
2.1 PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 M
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.750 OH Pekerja 95,000.00 71,250.00
0.025 OH Mandor 100,000.00 2,500.00
73,750.00 73,750.00
Overhead + Fee ( Max. 10 % ) 7,375.00
Jumlah 81,125.00
3.7 PEMASANGAN 1 M3 PONDASISIKLOP, 60% BETON CAMPURAN 1SP : 2 PB : 3 KR DAN 40% BATU BELAH
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
3.400 OH Pekerja 95,000.00 323,000.00
0.850 OH Tukang batu 110,000.00 93,500.00
0.085 OH Kepala Tukang 120,000.00 10,200.00
0.170 OH Mandor 100,000.00 17,000.00
Bahan :
0.480 m3 Batu Belah 150,000.00 72,000.00
194.000 kg Semen Portland 1,400.00 271,600.00
0.312 m3 Pasir Beton 140,000.00 43,680.00
0.468 m3 Kerikil 150,000.00 70,200.00
443,700.00 457,480.00 901,180.00
Overhead + Fee ( Max. 10 % ) 90,118.00
Jumlah 991,298.00
IV PEKERJAAN BETON
4.1 MEMBUAT 1 M3 BETON MUTU F'C = 7,4 MPa (K 100), SLUMP (12 ± 2) CM, W/C = 0,87
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
247.000 kg Semen Portland 1,400.00 345,800.00
869 kg Pasir beton 100.00 86,900.00
999 kg Kerikil (Maksimum 30 mm) 83.33 83,250.00
215 Liter Air 40.00 8,600.00
198,660.00 524,550.00 723,210.00
Overhead + Fee ( Max. 10 % ) 72,321.00
Jumlah 795,531.00
4.2 MEMBUAT 1 M3 BETON MUTU F'C = 9,8 MPa (K 125), SLUMP (12 ± 2) CM, W/C = 0,78
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
276.000 kg Semen Portland 1,400.00 386,400.00
828 kg Pasir beton 100.00 82,800.00
1012 kg Kerikil (Maksimum 30 mm) 83.33 84,333.33
215 Liter Air 40.00 8,600.00
198,660.00 562,133.33 760,793.33
Overhead + Fee ( Max. 10 % ) 76,079.33
Jumlah 836,872.67
4.3 MEMBUAT 1 M3 BETON MUTU F'C = 12,2 MPa (K 150), SLUMP (12 ± 2) CM, W/C = 0,72
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
299.000 kg Semen Portland 1,400.00 418,600.00
799 kg Pasir beton 100.00 79,900.00
1017 kg Kerikil (Maksimum 30 mm) 83.33 84,750.00
215 Liter Air 40.00 8,600.00
198,660.00 591,850.00 790,510.00
Overhead + Fee ( Max. 10 % ) 79,051.00
Jumlah 869,561.00
4.4 MEMBUAT 1 M3 LANTAI KERJA BETON MUTU F'C = 7,4 MPa (K 100), SLUMP (3-6) CM, W/C = 0,87
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.200 OH Pekerja 95,000.00 114,000.00
0.200 OH Tukang Batu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.060 OH Mandor 100,000.00 6,000.00
Bahan :
230.000 kg Semen Portland 1,400.00 322,000.00
893 kg Pasir beton 100.00 89,300.00
1027 kg Kerikil (Maksimum 30 mm) 83.33 85,583.33
200 Liter Air 40.00 8,000.00
144,400.00 504,883.33 649,283.33
Overhead + Fee ( Max. 10 % ) 64,928.33
Jumlah 714,211.67
4.5 MEMBUAT 1 M3 BETON MUTU F'C = 14,5 MPa (K 175), SLUMP (12 ± 2) CM, W/C = 0,66
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
326.000 kg Semen Portland 1,400.00 456,400.00
760 kg Pasir beton 100.00 76,000.00
1029 kg Kerikil (Maksimum 30 mm) 83.33 85,750.00
215 Liter Air 40.00 8,600.00
198,660.00 626,750.00 825,410.00
Overhead + Fee ( Max. 10 % ) 82,541.00
Jumlah 907,951.00
4.6 EMBUAT 1 M3 BETON MUTU F'C = 16,9 MPa (K 200), SLUMP (12 ± 2) CM, W/C = 0,61
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
352.000 kg Semen Portland 1,400.00 492,800.00
731 kg Pasir beton 100.00 73,100.00
1031 kg Spilt 177.78 183,288.89
215 Liter Air 40.00 8,600.00
198,660.00 757,788.89 956,448.89
Overhead + Fee ( Max. 10 % ) 95,644.89
Jumlah 1,052,093.78
4.7 MMEMBUAT 1 M3 BETON MUTU F'C = 19,3 MPa (K 225), SLUMP (12 ± 2) CM, W/C = 0,58
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
371.000 kg Semen Portland 1,400.00 519,400.00
698 kg Pasir beton 100.00 69,800.00
1047 kg Split/ Batu Pecah 1/2 177.78 186,133.33
215 Liter Air 40.00 8,600.00
198,660.00 783,933.33 982,593.33
Overhead + Fee ( Max. 10 % ) 98,259.33
Jumlah 1,080,852.67
4.8 MEMBUAT 1 M3 BETON MUTU F'C = 21,7 MPa (K 250), SLUMP (12 ± 2) CM, W/C = 0,56
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
384.000 kg Semen Portland 1,400.00 537,600.00
692 kg Pasir beton 100.00 69,200.00
1039 kg Split/ Batu Pecah 1/2 177.78 184,711.11
215 Liter Air 40.00 8,600.00
198,660.00 800,111.11 998,771.11
Overhead + Fee ( Max. 10 % ) 99,877.11
Jumlah 1,098,648.22
4.9 MEMBUAT 1 M3 BETON MUTU F'C = 24,0 MPa (K 275), SLUMP (12 ± 2) CM, W/C = 0,53
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
406.000 kg Semen Portland 1,400.00 568,400.00
684 kg Pasir beton 100.00 68,400.00
1026 kg Split/ Batu Pecah 1/2 177.78 182,400.00
215 Liter Air 40.00 8,600.00
198,660.00 827,800.00 1,026,460.00
Overhead + Fee ( Max. 10 % ) 102,646.00
Jumlah 1,129,106.00
4.10 MEMBUAT 1 M3 BETON MUTU F'C = 26,4 MPa (K 300), SLUMP (12 ± 2) CM, W/C = 0,52
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.650 OH Pekerja 95,000.00 156,750.00
0.275 OH Tukang Batu 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 100,000.00 8,300.00
Bahan :
413.000 kg Semen Portland 1,400.00 578,200.00
681 m3 Pasir beton 100.00 68,100.00
1021 m3 Split/ Batu Pecah 1/2 177.78 181,511.11
215 Liter Air 40.00 8,600.00
198,660.00 836,411.11 1,035,071.11
Overhead + Fee ( Max. 10 % ) 103,507.11
Jumlah 1,138,578.22
4.11 MEMBUAT 1 M3 BETON MUTU F'C = 28,8 MPa (K 325), SLUMP (12 ± 2) CM, W/C = 0,49
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
2.100 OH Pekerja 95,000.00 199,500.00
0.350 OH Tukang Batu 110,000.00 38,500.00
0.035 OH Kepala Tukang 120,000.00 4,200.00
0.105 OH Mandor 100,000.00 10,500.00
Bahan :
439.000 kg Semen Portland 1,400.00 614,600.00
670 kg Pasir beton 100.00 67,000.00
1006 kg Split/ Batu Pecah 1/2 177.78 178,844.44
215 Liter Air 40.00 8,600.00
252,700.00 869,044.44 1,121,744.44
Overhead + Fee ( Max. 10 % ) 112,174.44
Jumlah 1,233,918.89
4.12 MEMBUAT 1 M3 BETON MUTU F'C = 31,2 MPa (K 350), SLUMP (12 ± 2) CM, W/C = 0,48
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
2.100 OH Pekerja 95,000.00 199,500.00
0.350 OH Tukang Batu 110,000.00 38,500.00
0.035 OH Kepala Tukang 120,000.00 4,200.00
0.105 OH Mandor 100,000.00 10,500.00
Bahan :
448.000 kg Semen Portland 1,400.00 627,200.00
667 kg Pasir beton 100.00 66,700.00
1000 kg Split/ Batu Pecah 1/2 177.78 177,777.78
215 Liter Air 40.00 8,600.00
252,700.00 880,277.78 1,132,977.78
Overhead + Fee ( Max. 10 % ) 113,297.78
Jumlah 1,246,275.56
4.19 MEMBUAT 1 M3 BETON MUTU F'C = 14,5 MPa (K 175), SLUMP (12 ± 2) CM, W/C = 0,66 (menggunakan molen)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.323 OH Pekerja 95,000.00 125,685.00
0.189 OH Tukang batu 110,000.00 20,790.00
0.019 OH Kepala tukang 120,000.00 2,280.00
0.132 OH Mandor 100,000.00 13,230.00
Bahan :
326.000 kg PC / Portland Cement 1,400.00 456,400.00
760.000 kg PB / Pasir Beton 100.00 76,000.00
1,029.000 kg Kr / Krikil 83.33 85,750.00
215.000 L Air 40.00 8,600.00
Peralatan :
0.250 Sewa/ Molen kapasitas 0,3 m3 50,000.00 12,500.00
Hari 161,985.00 639,250.00 801,235.00
Overhead + Fee ( Max. 10 % ) 80,123.50
Jumlah 881,358.50
4.20 MEMBUAT 1 M3 BETON MUTU F'C = 16,9 MPa (K 200), SLUMP (12 ± 2) CM, W/C = 0,61 (menggunakan molen)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.323 OH Pekerja 95,000.00 125,685.00
0.189 OH Tukang batu 110,000.00 20,790.00
0.019 OH Kepala tukang 120,000.00 2,280.00
0.132 OH Mandor 100,000.00 13,230.00
Bahan :
352.000 kg PC / Portland Cement 1,400.00 492,800.00
731.000 kg PB / Pasir Beton 100.00 73,100.00
1,031.000 kg Split/ Batu Pecah 1/2 177.78 183,288.89
215.000 L Air 40.00 8,600.00
Peralatan :
0.250 Sewa/ Molen kapasitas 0,3 m3 50,000.00 12,500.00
Hari 161,985.00 770,288.89 932,273.89
Overhead + Fee ( Max. 10 % ) 93,227.39
Jumlah 1,025,501.28
4.21 MEMBUAT 1 M3 BETON MUTU F'C = 19,3 MPa (K 225), SLUMP (12 ± 2) CM, W/C = 0,58 (menggunakan molen)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.323 OH Pekerja 95,000.00 125,685.00
0.189 OH Tukang batu 110,000.00 20,790.00
0.019 OH Kepala tukang 120,000.00 2,280.00
0.132 OH Mandor 100,000.00 13,200.00
Bahan :
371.000 kg PC / Portland Cement 1,400.00 519,400.00
698.000 kg PB / Pasir Beton 100.00 69,800.00
1,047.000 kg Split 177.78 186,133.33
215.000 L Air 40.00 8,600.00
Peralatan :
0.250 Sewa/ Molen kapasitas 0,3 m3 50,000.00 12,500.00
Hari 161,955.00 796,433.33 958,388.33
Overhead + Fee ( Max. 10 % ) 95,838.83
Jumlah 1,054,227.17
4.22 MEMBUAT 1 M3 BETON MUTU F'C = 21,7 MPa (K 250), SLUMP (12 ± 2) CM, W/C = 0,56 (menggunakan molen)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.323 OH Pekerja 95,000.00 125,685.00
0.189 OH Tukang batu 110,000.00 20,790.00
0.019 OH Kepala tukang 120,000.00 2,280.00
0.132 OH Mandor 100,000.00 13,200.00
Bahan :
384.000 kg PC / Portland Cement 1,400.00 537,600.00
692.000 kg PB / Pasir Beton 100.00 69,200.00
1,039.000 kg Split 177.78 184,711.11
215.000 L Air 40.00 8,600.00
Peralatan :
0.250 Sewa/ Molen kapasitas 0,3 m3 50,000.00 12,500.00
Hari 161,955.00 812,611.11 974,566.11
Overhead + Fee ( Max. 10 % ) 97,456.61
Jumlah 1,072,022.72
4.23 MEMBUAT 1 M3 BETON MUTU F'C = 24,0 MPa (K 275), SLUMP (12 ± 2) CM, W/C = 0,53 (menggunakan molen)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.323 OH Pekerja 95,000.00 125,685.00
0.189 OH Tukang batu 110,000.00 20,790.00
0.019 OH Kepala tukang 120,000.00 2,280.00
0.132 OH Mandor 100,000.00 13,200.00
Bahan :
406.000 kg PC / Portland Cement 1,400.00 568,400.00
684.000 kg PB / Pasir Beton 100.00 68,400.00
1,026.000 kg Split 177.78 182,400.00
215.000 L Air 40.00 8,600.00
Peralatan :
0.250 Sewa/ Molen kapasitas 0,3 m3 50,000.00 12,500.00
Hari 161,955.00 840,300.00 1,002,255.00
Overhead + Fee ( Max. 10 % ) 100,225.50
Jumlah 1,102,480.50
4.24 MEMBUAT 1 M3 BETON MUTU, f’c = 26,4 MPa (K300), SLUMP (12±2) CM, W/C = 0,52 (menggunakan molen)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.323 OH Pekerja 95,000.00 125,685.00
0.189 OH Tukang batu 110,000.00 20,790.00
0.019 OH Kepala tukang 120,000.00 2,280.00
0.132 OH Mandor 100,000.00 13,200.00
Bahan :
413.000 kg PC / Portland Cement 1,400.00 578,200.00
681.000 kg PB / Pasir Beton 100.00 68,100.00
1,021.000 kg Split 177.78 181,511.11
215.000 L Air 40.00 8,600.00
Peralatan :
0.250 Sewa/ Molen kapasitas 0,3 m3 50,000.00 12,500.00
Hari 161,955.00 848,911.11 1,010,866.11
Overhead + Fee ( Max. 10 % ) 101,086.61
Jumlah 1,111,952.72
V PEKERJAAN PEMBESIAN
5.1 PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0700 OH Pekerja 95,000.00 6,650.00
0.0700 OH Tukang Besi 110,000.00 7,700.00
0.0070 OH Kepala Tukang 120,000.00 840.00
0.0040 OH Mandor 100,000.00 400.00
Bahan :
10.5000 kg Besi Beton Polos/ Ulir 11,500.00 120,750.00
0.1500 kg Kawat Beton 20,000.00 3,000.00
15,590.00 123,750.00 139,340.00
Overhead + Fee ( Max. 10 % ) 13,934.00
Jumlah 153,274.00
VI PEKERJAAN BEKISTING
6.1 MEMASANG 1 M2 BEKISTING UNTUK PONDASI
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.520 OH Pekerja 95,000.00 49,400.00
0.260 OH Tukang Kayu 110,000.00 28,600.00
0.026 OH Kepala Tukang 120,000.00 3,120.00
0.026 OH Mandor 100,000.00 2,600.00
Bahan :
0.040 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.300 kg Paku 5 cm - 10 cm 18,000.00 5,400.00
0.100 Liter Minyak Bekisting 3,000.00 300.00
83,720.00 85,700.00 169,420.00
Overhead + Fee ( Max. 10 % ) 16,942.00
Jumlah 186,362.00
7.2 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 3 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.600 OH Pekerja 95,000.00 57,000.00
0.200 OH Tukang Batu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.030 OH Mandor 100,000.00 3,000.00
Bahan :
140.000 bh Bata Merah 850.00 119,000.00
32.950 kg PC 1,400.00 46,130.00
0.091 m3 Pasir Pasang 120,000.00 10,920.00
84,400.00 176,050.00 260,450.00
Overhead + Fee ( Max. 10 % ) 26,045.00
Jumlah 286,495.00
7.3 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 4 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.600 OH Pekerja 95,000.00 57,000.00
0.200 OH Tukang batu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.030 OH Mandor 100,000.00 3,000.00
Bahan :
140.000 bh Bata Merah 850.00 119,000.00
26.550 kg PC 1,400.00 37,170.00
0.093 m3 Pasir Pasang 120,000.00 11,160.00
84,400.00 167,330.00 251,730.00
Overhead + Fee ( Max. 10 % ) 25,173.00
Jumlah 276,903.00
7.4 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 5 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.600 OH Pekerja 95,000.00 57,000.00
0.200 OH Tukang batu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.030 OH Mandor 100,000.00 3,000.00
Bahan :
140.000 bh Bata Merah 850.00 119,000.00
22.200 kg PC 1,400.00 31,080.00
0.102 m3 Pasir Pasang 120,000.00 12,240.00
84,400.00 162,320.00 246,720.00
Overhead + Fee ( Max. 10 % ) 24,672.00
Jumlah 271,392.00
7.5 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1 BATA, CAMPURAN SPESI 1 PC : 6 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.600 OH Pekerja 95,000.00 57,000.00
0.200 OH Tukang batu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.030 OH Mandor 100,000.00 3,000.00
Bahan :
140.000 bh Bata Merah 850.00 119,000.00
18.500 kg PC 1,400.00 25,900.00
0.122 m3 Pasir Pasang 120,000.00 14,640.00
84,400.00 159,540.00 243,940.00
Overhead + Fee ( Max. 10 % ) 24,394.00
Jumlah 268,334.00
7.6 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 2 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
70.000 bh Bata Merah 850.00 59,500.00
18.950 kg PC 1,400.00 26,530.00
0.038 m3 Pasir Pasang 120,000.00 4,560.00
42,200.00 90,590.00 132,790.00
Overhead + Fee ( Max. 10 % ) 13,279.00
Jumlah 146,069.00
7.7 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 3 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
70.000 bh Bata Merah 850.00 59,500.00
14.370 kg PC 1,400.00 20,118.00
0.040 m3 Pasir Pasang 120,000.00 4,800.00
42,200.00 84,418.00 126,618.00
Overhead + Fee ( Max. 10 % ) 12,661.80
Jumlah 139,279.80
7.8 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 4 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
70.000 bh Bata Merah 850.00 59,500.00
11.500 kg PC 1,400.00 16,100.00
0.043 m3 Pasir Pasang 120,000.00 5,160.00
42,200.00 80,760.00 122,960.00
Overhead + Fee ( Max. 10 % ) 12,296.00
Jumlah 135,256.00
7.9 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 5 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
70.000 bh Bata Merah 850.00 59,500.00
9.680 kg PC 1,400.00 13,552.00
0.045 m3 Pasir Pasang 120,000.00 5,400.00
42,200.00 78,452.00 120,652.00
Overhead + Fee ( Max. 10 % ) 12,065.20
Jumlah 132,717.20
7.10 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 6 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
70.000 bh Bata Merah 850.00 59,500.00
8.320 kg PC 1,400.00 11,648.00
0.049 m3 Pasir Pasang 120,000.00 5,880.00
42,200.00 77,028.00 119,228.00
Overhead + Fee ( Max. 10 % ) 11,922.80
Jumlah 131,150.80
7.11 MEMASANG 1 M2 DINDING BATA MERAH UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 8 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
70.000 bh Bata Merah 850.00 59,500.00
6.500 kg PC 1,400.00 9,100.00
0.050 m3 Pasir Pasang 120,000.00 6,000.00
42,200.00 74,600.00 116,800.00
Overhead + Fee ( Max. 10 % ) 11,680.00
Jumlah 128,480.00
7.14 MEMASANG 1 M2 DINDING TERAWANG (ROSTER) UKURAN (12 X 11 X 24) CM, CAMPURAN SPESI 1 PC : 3 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
30.000 bh Terawang (Roster) #NAME? #NAME?
14.000 kg PC 1,400.00 19,600.00
0.032 m3 Pasir Pasang 120,000.00 3,840.00
42,200.00 #NAME? #NAME?
Overhead + Fee ( Max. 10 % ) #NAME?
Jumlah #NAME?
7.15 MEMASANG 1 M2 DINDING TERAWANG (ROSTER) UKURAN (12 X 11 X 24) CM, CAMPURAN SPESI 1 PC : 4 PP
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.300 OH Pekerja 95,000.00 28,500.00
0.100 OH Tukang batu 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 100,000.00 1,500.00
Bahan :
30.000 bh Terawang (Roster) #NAME? #NAME?
11.000 kg PC 1,400.00 15,400.00
0.035 m3 Pasir Pasang 120,000.00 4,200.00
42,200.00 #NAME? #NAME?
Overhead + Fee ( Max. 10 % ) #NAME?
Jumlah #NAME?
8.17 MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.150 OH Pekerja 95,000.00 14,250.00
0.070 OH Tukang batu 110,000.00 7,700.00
0.007 OH Kepala Tukang 120,000.00 840.00
0.008 OH Mandor 100,000.00 800.00
Bahan :
3.108 kg PC 1,400.00 4,351.20
23,590.00 4,351.20 27,941.20
Overhead + Fee ( Max. 10 % ) 2,794.12
Jumlah 30,735.32
X PEKERJAAN PLAFOND
10.2 MEMASANG 1 M2 LANGIT-LANGIT LAMBRIZIRING KAYU, TEBAL 9 MM
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.800 OH Pekerja 95,000.00 76,000.00
0.800 OH Tukang Kayu 110,000.00 88,000.00
0.080 OH Kepala Tukang 120,000.00 9,600.00
0.040 OH Mandor 100,000.00 4,000.00
Bahan :
0.015 m3 Kayu Papan 2,000,000.00 30,000.00
0.010 kg Paku Tripleks 18,000.00 180.00
177,600.00 30,180.00 207,780.00
Overhead + Fee ( Max. 10 % ) 20,778.00
Jumlah 228,558.00
10.3 MEMASANG 1 M2 LANGIT-LANGIT GYPSUM BOARD UKURAN (120 X 240 X 9) MM, TEBAL 9 MM
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.100 OH Pekerja 95,000.00 9,500.00
0.050 OH Tukang Kayu 110,000.00 5,500.00
0.005 OH Kepala Tukang 120,000.00 600.00
0.005 OH Mandor 100,000.00 500.00
Bahan :
0.364 Lembar Gypsum Board 65,000.00 23,660.00
0.110 kg Paku Skrup 18,000.00 1,980.00
16,100.00 25,640.00 41,740.00
Overhead + Fee ( Max. 10 % ) 4,174.00
Jumlah 45,914.00
11.8 EMASANGAN 1 M' NOK PINGGIR SAMPING ATAP SENG GELOMBANG WARNA
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.150 Pekerja 95,000.00 14,250.00
0.070 Tukang Kayu 110,000.00 7,700.00
0.007 Kepala Tukang 120,000.00 840.00
0.006 Mandor 100,000.00 600.00
Bahan :
0.300 Lbr Bola Bola seng - -
0.040 Kg Paku 18,000.00 720.00
23,390.00 720.00 24,110.00
Overhead + Fee ( Max. 10 % ) 2,411.00
Jumlah 26,521.00
6.21. MEMASANG 1 M1 LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I ATAU KELAS II
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.100 OH Pekerja 95,000.00 9,500.00
0.200 OH Tukang Kayu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.005 OH Mandor 100,000.00 500.00
Bahan :
0.0108 m3 Papan Kayu 2,000,000.00 21,600.00
0.100 kg Paku 5 cm dan 7 cm 18,000.00 1,800.00
34,400.00 23,400.00 57,800.00
Overhead + Fee ( Max. 10 % ) 5,780.00
Jumlah 63,580.00
6.22. MEMASANG 1 M1 LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I ATAU KELAS II
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.100 OH Pekerja 95,000.00 9,500.00
0.200 OH Tukang Kayu 110,000.00 22,000.00
0.020 OH Kepala Tukang 120,000.00 2,400.00
0.005 OH Mandor 100,000.00 500.00
Bahan :
0.011 m3 Papan Kayu 2,000,000.00 22,000.00
0.050 kg Paku 5 cm dan 7 cm 18,000.00 900.00
34,400.00 22,900.00 57,300.00
Overhead + Fee ( Max. 10 % ) 5,730.00
Jumlah 63,030.00
Bahan :
1.100 m3 Balok Kayu klass I 5,000,000.00 5,500,000.00
1.250 kg Paku 10 cm 18,000.00 22,500.00
1.000 kg Lem kayu 18,000.00 18,000.00
3,262,000.00 5,540,500.00 8,802,500.00
Overhead + Fee ( Max. 10 % ) 880,250.00
Jumlah 9,682,750.00
12.2 MEMBUAT DAN MEMASANG KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
6.000 OH Pekerja 95,000.00 570,000.00
18.000 OH Tukang Kayu 110,000.00 1,980,000.00
1.800 OH Kepala Tukang 120,000.00 216,000.00
0.300 OH Mandor 100,000.00 30,000.00
Bahan :
1.200 m3 Balok Kayu klass II 2,000,000.00 2,400,000.00
1.250 kg Paku 10 cm 18,000.00 22,500.00
1.000 kg Lem kayu 18,000.00 18,000.00
2,796,000.00 2,440,500.00 5,236,500.00
Overhead + Fee ( Max. 10 % ) 523,650.00
Jumlah 5,760,150.00
12.3 MEMBUAT DAN MEMASANG KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS III
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
6.000 OH Pekerja 95,000.00 570,000.00
18.000 OH Tukang Kayu 110,000.00 1,980,000.00
1.800 OH Kepala Tukang 120,000.00 216,000.00
0.300 OH Mandor 100,000.00 30,000.00
Bahan :
1.200 m3 Balok Kayu klass III 2,000,000.00 2,400,000.00
1.250 kg Paku 10 cm 18,000.00 22,500.00
1.000 kg Lem kayu 18,000.00 18,000.00
2,796,000.00 2,440,500.00 5,236,500.00
Overhead + Fee ( Max. 10 % ) 523,650.00
Jumlah 5,760,150.00
12.5 MEMBUAT DAN MEMASANG PINTU KLAMP SEDERHANA, KAYU KELAS III
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.350 OH Pekerja 95,000.00 33,250.00
1.050 OH Tukang Kayu 110,000.00 115,500.00
0.105 OH Kepala Tukang 120,000.00 12,600.00
0.018 OH Mandor 100,000.00 1,800.00
Bahan :
0.040 m3 Papan kayu Klass III 2,000,000.00 80,000.00
0.050 kg Paku 5 cm - 7 cm 18,000.00 900.00
163,150.00 80,900.00 244,050.00
Overhead + Fee ( Max. 10 % ) 24,405.00
Jumlah 268,455.00
12.7 MEMBUAT DAN MEMASANG PINTU DAN JENDELA KACA, KAYU KELAS II
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.800 OH Pekerja 95,000.00 76,000.00
2.400 OH Tukang Kayu 110,000.00 264,000.00
0.240 OH Kepala Tukang 120,000.00 28,800.00
0.040 OH Mandor 100,000.00 4,000.00
Bahan :
0.024 m3 Papan kayu Klass II 2,000,000.00 48,000.00
0.300 kg Lem Kayu 18,000.00 5,400.00
372,800.00 53,400.00 426,200.00
Overhead + Fee ( Max. 10 % ) 42,620.00
Jumlah 468,820.00
12.8 MEMBUAT DAN MEMASANG PINTU DAN JENDELA JALUSI KAYU KELAS II
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.000 OH Pekerja 95,000.00 95,000.00
3.000 OH Tukang Kayu 110,000.00 330,000.00
0.300 OH Kepala Tukang 120,000.00 36,000.00
0.050 OH Mandor 100,000.00 5,000.00
Bahan :
0.064 m3 Papan kayu Klass II 2,000,000.00 128,000.00
0.500 kg Lem Kayu 18,000.00 9,000.00
466,000.00 137,000.00 603,000.00
Overhead + Fee ( Max. 10 % ) 60,300.00
Jumlah 663,300.00
12.17 PEMASANGAN 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM KAYU KELAS III
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.150 OH Pekerja 95,000.00 14,250.00
0.450 OH Tukang Kayu 110,000.00 49,500.00
0.045 OH Kepala Tukang 120,000.00 5,400.00
0.008 OH Mandor 100,000.00 800.00
Bahan :
0.028 m3 Balok Kayu 2,000,000.00 56,000.00
0.150 kg Paku 5 cm dan 7 cm 18,000.00 2,700.00
69,950.00 58,700.00 128,650.00
Overhead + Fee ( Max. 10 % ) 12,865.00
Jumlah 141,515.00
13.4 PEMBUATAN 1 M2 PINTU BESI PELAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
1.050 OH Pekerja 95,000.00 99,750.00
1.050 OH Tukang Besi 110,000.00 115,500.00
0.105 OH Kepala Tukang 120,000.00 12,600.00
0.052 OH Mandor 100,000.00 5,200.00
Bahan :
15.000 kg Besi Siku L 30.30.3 - -
32.800 kg Besi Plat Baja - -
0.05 kg Kawat Las - -
233,050.00 - 233,050.00
Overhead + Fee ( Max. 10 % ) 23,305.00
Jumlah 256,355.00
13.8 PEMASANGAN 1 M' KUSEN PINTU/ JENDELA ALLUMINIUM 4" (Dark Brown)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.043 OH Pekerja 95,000.00 4,085.00
0.043 OH Tukang Besi Konstruksi 110,000.00 4,730.00
0.0043 OH Kepala Tukang 120,000.00 516.00
0.0021 OH Mandor 100,000.00 210.00
Bahan :
1.100 m Kusen Aluminium 90,000.00 99,000.00
2.000 Buah Skrup Fixer 300.00 600.00
0.060 Tube Sealant 35,000.00 2,100.00
9,541.00 101,700.00 111,241.00
Overhead + Fee ( Max. 10 % ) 11,124.10
Jumlah 122,365.10
13.16 PEMASANGAN 1 M’ TALANG 1/2 LINGKARAN D-15 CM, SENG PELAT BJLS 30 LEBAR 45 CM
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.150 OH Pekerja 95,000.00 14,250.00
0.300 OH Tukang Besi 110,000.00 33,000.00
0.030 OH Kepala Tukang 120,000.00 3,600.00
0.008 OH Mandor 100,000.00 800.00
Bahan :
1.050 m' Seng Plat 15,000.00 15,750.00
0.010 kg Paku 1 cm - 2,5 cm 18,000.00 180.00
0.500 m3 Besi Strip 7,091.67 3,545.83
51,650.00 19,475.83 71,125.83
Overhead + Fee ( Max. 10 % ) 7,112.58
Jumlah 78,238.42
14.4 PENGECATAN 1 M2 KAYU LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0700 OH Pekerja 95,000.00 6,650.00
0.0090 OH Tukang cat 110,000.00 990.00
0.0060 OH Kepala tukang 120,000.00 720.00
0.0025 OH Mandor 100,000.00 250.00
Bahan :
0.1700 kg cat dasar 25,000.00 4,250.00
0.2600 kg cat penutup 80,000.00 20,800.00
0.0100 bh kuas 15,000.00 150.00
0.0300 kg Pengencer/ thiner 25,000.00 750.00
0.0200 lbr amplas 10,000.00 200.00
8,610.00 26,150.00 34,760.00
Overhead + Fee ( Max. 10 % ) 3,476.00
Jumlah 38,236.00
14.5 PENGECATAN 1 M2 BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0700 OH Pekerja 95,000.00 6,650.00
0.0090 OH Tukang cat 110,000.00 990.00
0.0060 OH Kepala tukang 120,000.00 720.00
0.0025 OH Mandor 100,000.00 250.00
Bahan :
0.2000 kg cat meni 20,000.00 4,000.00
0.1500 kg plamur 15,000.00 2,250.00
0.1700 kg cat dasar 25,000.00 4,250.00
0.2600 kg cat penutup 2 kali 80,000.00 20,800.00
0.0100 bh kuas 15,000.00 150.00
0.0300 kg Pengencer/ thiner 25,000.00 750.00
0.0200 lbr amplas 10,000.00 200.00
8,610.00 32,400.00 41,010.00
Overhead + Fee ( Max. 10 % ) 4,101.00
Jumlah 45,111.00
14.6 PENGECATAN 1 M2 BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0700 OH Pekerja 95,000.00 6,650.00
0.1050 OH Tukang cat 110,000.00 11,550.00
0.0040 OH Kepala tukang 120,000.00 480.00
0.0025 OH Mandor 100,000.00 250.00
Bahan :
0.2000 kg cat meni 20,000.00 4,000.00
0.1500 kg plamur 15,000.00 2,250.00
0.1700 kg cat dasar 25,000.00 4,250.00
0.3500 kg cat penutup 2 kali 80,000.00 28,000.00
0.0100 bh kuas 15,000.00 150.00
0.0300 kg Pengencer/ thiner 25,000.00 750.00
0.0200 lbr amplas 10,000.00 200.00
18,930.00 39,600.00 58,530.00
Overhead + Fee ( Max. 10 % ) 5,853.00
Jumlah 64,383.00
14.9 1PENGECATAN 1 M2 TEMBOK BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0200 OH Pekerja 95,000.00 1,900.00
0.0630 OH Tukang cat 110,000.00 6,930.00
0.0063 OH Kepala tukang 120,000.00 756.00
0.0025 OH Mandor 100,000.00 250.00
Bahan :
0.1000 kg plamir 15,000.00 1,500.00
0.1000 kg cat dasar 14,000.00 1,400.00
0.2600 kg cat penutup 2 x 45,000.00 11,700.00
9,836.00 14,600.00 24,436.00
Overhead + Fee ( Max. 10 % ) 2,443.60
Jumlah 26,879.60
14.10 PENGECATAN 1 M2 TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0280 OH Pekerja 95,000.00 2,660.00
0.0420 OH Tukang cat 110,000.00 4,620.00
0.0042 OH Kepala tukang 120,000.00 504.00
0.0025 OH Mandor 100,000.00 250.00
Bahan :
0.1200 kg cat dasar 14,000.00 1,680.00
0.1800 kg cat penutup 2 x 45,000.00 8,100.00
8,034.00 9,780.00 17,814.00
Overhead + Fee ( Max. 10 % ) 1,781.40
Jumlah 19,595.40
14.14 PENGECATAN 1 M2 PERMUKAAN BAJA GALVANIS SECARA MANUAL SISTEM 1 LAPIS CAT MUTAKHIR
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
0.0600 OH Pekerja 95,000.00 5,700.00
0.0600 OH Tukang cat 110,000.00 6,600.00
0.0120 OH Kepala tukang 120,000.00 1,440.00
0.0030 OH Mandor 100,000.00 300.00
Bahan :
0.3000 kg Cat 80,000.00 24,000.00
0.0100 Bh Kuas 15,000.00 150.00
0.0100 ltr pengencer 25,000.00 250.00
14,040.00 24,400.00 38,440.00
Overhead + Fee ( Max. 10 % ) 3,844.00
Jumlah 42,284.00
15.10 PEMASANGAN 1 BUAH BAK KONTROL PASANGAN BATA 45CM X 45CM TINGGI 50 CM
No. Koofisien Satuan Upah/ Bahan H. Satuan Harga Upah Harga Bahan Jumlah Harga
Upah :
3.200 OH Pekerja 95,000.00 304,000.00
1.150 OH Tukang Batu 110,000.00 126,500.00
0.0110 OH Kepala Tukang 120,000.00 1,320.00
0.016 OH Mandor 100,000.00 1,600.00
Bahan :
70.000 bh batu bata 850.00 59,500.00
77.000 kg semen portland 1,400.00 107,800.00
0.130 m3 pasir pasang 120,000.00 15,600.00
0.090 m3 pasir beton 140,000.00 12,600.00
0.020 m3 kerikil 150,000.00 3,000.00
2.600 kg baja tulangan 11,500.00 29,900.00
433,420.00 228,400.00 661,820.00
Overhead + Fee ( Max. 10 % ) 66,182.00
Jumlah 728,002.00