PEKERJAAN KU VILLA 2

KUTA MANDALIKA
November
DAILY REPORT PERIODE

PROGRESS STATUS
RENCANA REALISASI DEVIASI
PROYEK
(%) (%) (%)

KU VILLA'S 2

LOMBOK VILLA'S
Civil work ; 13 November 2023 Civil work ; NEXT WEEK
1. Construction Planks
2. Stone Footing
3.Fill Soil

TENAGA KERJA JAM KERJA ALAT KERJA


- Spv 1 orang 8 Jam
- Mandor 1 orang 8 Jam
- Pekerja 8 orang 8 Jam

Dibuat oleh: Diketahui/ Disetujui oleh :


SUPERVISOR PROJECT MANAGER

ALDITA HERYANA CHARLIE MOORE


LAPORAN MILESTONE PROYEK
PADA PROYEK PLTU 1 KALBAR ( 2 X 50 MW )
#REF!

PENCAPAIAN PROGRES MILESTONE


RENCANA & AKTUAL

NO STATUS UNIT DURASI SISA UNTUK


(SESUAI MILESTONE) RENCANA SESUAI REVISED SCHEDULE SESUAI
AKTUAL MENCAPAI TARGET
KONTRAK PENGAJUAN EOT 3
(HARI)

- Soil Investigation & Site Survey - 5/8/2010


-Test Piling - 11/13/2010
- First Piling 7/17/2010 2/10/2011
- Erection of Steel Structure 1/3/2011 7/18/2012
- Drum Lifting 4/6/2011 11/25/2013
- Hydro Test 6/12/2011 -
- Backfeeding - -
UNIT - First Firing - -
- Steam Blow Out - -
#1 - Synchronization 11/15/2011 -
- Load Rejection Test - -
- Reliability Run Test 1/2/2012 -
- Performance Test 2/14/2012 -
- COD 12/28/2011 10/17/2016 - 81
- TOC 12/28/2011 -
- SLO 12/28/2011 -
- FAC 12/28/2012 -
- Soil Investigation & Site Survey - 5/8/2010
-Test Piling - 11/13/2010
- First Piling 7/17/2010 2/10/2011
- Erection of Steel Structure 1/3/2011 7/18/2012
- Drum Lifting 5/23/2011 11/7/2012
- Hydro Test 9/3/2011 7/15/2013
- Backfeeding - -
UNIT - First Firing - -
- Steam Blow Out - -
#2 - Synchronization 11/15/2011 -
- Load Rejection Test - -
- Reliability Run Test 1/2/2012 -
- Performance Test 2/14/2012 -
- COD 2/28/2012 12/17/2016 - 142
- TOC 2/28/2012 -
- SLO 2/28/2012 -
- FAC 2/28/2013 -
KU VILLA 2 LOMBOK
KUTA MANDALIKA

FOTO PROGRES PERIODE TANGGAL 13 November 2023

Construction Planks Construction Planks Stone Footing

Stone Footing Fill Soil Fill Soil


PT PLN (Persero) Unit Induk Pembangunan Kalimantan Bagian Barat
UPP Pembangkit dan Jaringan Kalimantan Bagian Barat 4

FOTO PROGRESS PERIODE TANGGAL 22 - 26 JANUARI 2018


PROYEK GI 150 kV KETAPANG (60 MVA)

PROJECT OVERVIEW Coal Handling Control Building

Minggu Ini Minggu lalu


Kegiatan minggu ini:
1. Project Overview

PROJECT OVERVIEW

Minggu Ini
Kegiatan minggu ini:
1.

PEKERJAAN SWITCHYARD

Minggu Ini
Kegiatan minggu ini:
1.1 Perkerjaan pengecoran pondasi marshaling kiosk GI Kotabaru Ext. 60 MVA

PEKERJAAN SWITCHYARD

Minggu Ini
Kegiatan minggu ini:
1.2 Perkerjaan pengecoran pondasi

PEKERJAAN SWITCHYARD

Minggu Ini
Kegiatan minggu ini:
1.

PEKERJAAN SWITCHYARD

Minggu Ini
Kegiatan minggu ini:
1.4 Perkerjaan pengecoran pondasi gantry C22 GI Kotabaru Ext. 60 MVA

PEKERJAAN SWITCHYARD

Minggu Ini
Kegiatan minggu ini:
1.5 Perkerjaan

PEKERJAAN SWITCHYARD

Minggu Ini
Kegiatan minggu ini:
1.6 Pekerjaan pengujian kondisi fisik trafo pada site GI Kotabaru Ext. 60 MVA telah selesai