HKA
Nilai (Rp)
No Uraian Pekerjaan Sat
HKA CBAS Alt-1 Dev. CBAS Alt-2 Dev.
(1) (2) (3) (4) (5) (6) = (5) - (4) (7) (8) = (7) - (4)
1 Bahan Baku (Raw Material) ton 140.000 128.750 (11.250) 128.750 (11.250)
ASUMSI
A. Volume Crushing = 315.000 ton/tahun
= 26.250 ton/bulan
= 1.050 ton/hari
B. Jumlah alat
1. Excavator = 2 unit
2. Wheel Loader = 2 unit
3. Dump Truck = 2 unit