REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN


PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 71,6
71,600
00,6
,661
61.7
.74
4
II PEKERJAAN LANTAI SATU
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 85,289
85,289,188.
,188.88
88
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 167,98
167,981,535
1,535.41
.41
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 1,499,890,846.28
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 274,362,087.03
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 220,370,673.93
F PEKE
PEKERJAA
RJAAN
N INST
INSTALA
ALASI
SI LIST
LISTRIK
RIK Rp 33,021
33,021,608.
,608.75
75
G PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 50,062
50,062,547.
,547.57
57
H PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 73,181
73,181,083.
,083.25
25
I PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 177,75
177,757,231
7,231.94
.94
J PEKERJAAN
PEKERJAAN PENGECATAN
PENGECATAN Rp 88,745,599.59
Rp 2,670,662,402.63
III PEKERJAAN LA
LANTAI IIII
A PEKERJAAN
PEKERJAAN STRUKTUR BETON LANTAI II Rp 100,611,060.77
B PEKERJAAN
PEKERJAAN PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 292,483,206.05
C PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 223,789,732.12
D PEKERJAA
PEKERJAAN
N KONSTRUKSI ATAP Rp 228,872,143.78
E PEKE
PEKERJAA
RJAAN
N INST
INSTALA
ALASI
SI LIST
LISTRIK
RIK Rp 35,187
35,187,812.
,812.00
00
F PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 33,102
33,102,777.
,777.61
61
G PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 96,536
96,536,098.
,098.54
54
H PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 142,72
142,724,781
4,781.89
.89
I PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 97,405
97,405,802.
,802.73
73
J PEKERJAAN
PEKERJAAN TANGGA TRASRAM Rp 1,581,758.01
K PEKERJAA
PEKERJAAN
N SALURAN KELILING GEDUNG DAN RABAT KELILING BANGUNAN Rp 60,255,356.69
L PEKERJAA
PEKERJAAN
N FINI
FINISHIN
SHING
G Rp 213,85
213,858,762
8,762.40
.40
Rp 1,526,409,292.58
REAL COST (A) Rp 4,268
4,268,672,
,672,356.9
356.95
5
PPN 10% (B) Rp 426,8
426,867,23
67,235.70
5.70
TOTAL COST (A+B) Rp 4,695
4,695,539,
,539,592.6
592.65
5
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

MenyetujuKomitmen
ejabat Pembuat i: DibuatPerencana
Konsultan Oleh :
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI
Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,
IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
PROGRAM : #REF!

KEGIATAN : #REF!
LOKASI : #REF!
SUMBER DANA : #REF!
TAHUN ANGGARA: #REF!

KODE ARGA
ARGA SAT
SATAUA
AUA JUMLAH
JUMLAH H
HARG
ARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
NALIS (RP) (RP)
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal Lapangan 1.000 Ls - 2,000,000.00 2,000,000.00
2 Pembongkaran dinding bangunan l 1.000 Ls - 8,000,000.00 8,000,000.00
3 Pembuatan Gudang dan Peralatan 1.000 Ls - 2,500,000.00 2,500,000.00
4 Pengukuran dan Pemasangan Bou 1.000 Ls - 1,000,000.00 1,000,000.00
5 Papan Nama Proyek 1.000 Ls - 150,000.00 150,000.00
PEKERJAAN PERSIAPAN MLAH A Rp 13,650,000.00
REAL COST ###
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA

PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA


SU
SUB
B PEK
PEKER
ERJA
JAAN
AN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARA : 2019

KODE ARGA
ARGA SA
SATA
TAUA
UA JUM
JUMLAH
LAH HARGA
HARGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)

I
1 PEKE
PE
PenKERJ
RJAA
gu kurAAN
an NdaP
PEM
nEMBE
PeBENT
maNTUK
sanUKAN
ganAN
BoLA
LAHA
uwHAN
planNk 88.00 M' - Rp 40,463.94 Rp
Rp 3
3,,560,826.72
2 Men
Mengup
gupas
as tan
tanah
ah da
dan
n pemb
pembers
ersiha
ihan
n semak
semak (Land
(Land Clea
Clearin
ring)
g) 525.00 M 2
- Rp 1,887.84 Rp 991,114.90
3 Galian Tanah dan Pembuangan (Cut dan Fill) 630.00 M 3
- Rp 104,839.24 Rp 66,048,720.12
4 Air Kerja 1.00 Ls - Rp 500,000.00 Rp 500,000.00
5 Listrik Kerja 1.00 Ls - Rp 500,000.00 Rp 500,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN LANT
LANTAI
AI SATU
SATU
A PEKE
PEKERJ RJAA
AANN TA
TANA
NAHH DA
DANN PA
PASI
SIR
R
1 Pekerjaan Galian Tanah Pondasi Garis 306.02 M3 A.2.3.1.1 Rp 84,562.50 Rp 25,877,393.44
2 Pekerjaan Galian Tanah Pondasi Poer P1 89.10 M 3
A.2.3.1.1 Rp 84,562.50 Rp 7
7,,534,518.75
3
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 112.88 M A.2.3.1.9 Rp 61,875.00 Rp 6,984,140.63
3
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 44.55 M A.2.3.1.9 Rp 61,875.00 Rp 2,756,531.25
5 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 13.95 M3 A.2.3.1.11 Rp 238,425.00 Rp 3,326,624.81
6 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 2.70 M3 A.2.3.1.11 Rp 238,425.00 Rp 643,747.50
7 Pekerjaan timbunan tanah bawah lantai T = 45 cm 172.80 M 3
A.2.3.1.15 Rp 176,137.50 Rp 30,436,560.00
3
8 Pekerjaan pemadatan tanah per 20 cm 124.92 M A.2.3.1.10 Rp
Rp 61,875.00 Rp 7,729,672.50
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PE
PEKE
KERJ
RJAA
AANN PON
PONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 55.81 M3 A.3.2.1.9 Rp 530,369.40 Rp 29,599,916.21
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 153.60 M 3
A.3.2.1.2 R
Rp
p 900,922.00 ###
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAA
AANN STRU
STRUKTU
KTUR R BETON
BETON DADANN RABA
RABAT T
PEKERJAAN PONDASI POER
1 Pe
Peke
kerj
rjaa
aan
n Po
Pond
ndas
asii Po
Poer
er P
P1
1 ( 130
130 x 13
130
0)
- Lantai Kerja Poer K100 2.70 M3 A.A.4.1.1.4 Rp1,071,694.71 Rp 2,
2 ,893,575.71
3
- Beton K250 12.17 M . A.4.1.1.8 Rp1,315,511.11 Rp 16,007,139.22
- Pembesian 1,600.34 Kg A.4.1.1.17 Rp 19,789.40 Rp 31,669,670.17
- Bekisting 18.72 M2 A.4.1.1.20 Rp 215,718.80 Rp 4,038,255.94
PEKERJAAN STEK KOLOM
1 Pe
Peke
kerj
rjaa
aann St
Stek
ek K
Kol
olom
om K1
K1 ( 4
40
0x4
40
0)
- Beton K250 8.45 M3 . A.4.1.1.8 Rp1,315,511.11 Rp
R p 11,113,437.88
- Pembesian 1,128.76 Kg A.4.1.1.17 Rp 19,789.40 Rp 22,337,424.17
- Bekisting 42.24 M2 A.4.1.1.22 Rp 399,791.15 R
Rp
p 16,887,178.18
PEKERJAAN SLOOF
1 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S1 ( 25
25 x 30 )
- Beton K-225 15.00 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 19,541,233.97
- Pembesian 1,779.47 Kg A.4.1.1.17 Rp 19,789.40 Rp 35,214,549.43
- Bekisting 60.00 M2 A.4.1.1.21 Rp 229,468.80 R
Rp
p 13,768,128.00
2 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S2 ( 15
15 x 20 )
- Beton K-225 2.10 M3 . A.4.1.1.7 Rp1,302,748.93 Rp
Rp 2
2,,736,945.23
- Pembesian 351.84 Kg A.4.1.1.17 Rp 19,789.40 Rp 6,962,606.14
- Bekisting 14.01 M2 A.4.1.1.21 Rp 229,468.80 Rp 3,213,940.01
3 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S4 ( 15
15 x 15 )
- Beton K-225 0.20 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 257,944.29
- Pembesian 44.21 Kg A.4.1.1.17 Rp 19
19,789.40 Rp 874,924.09
- Bekisting 2.64 M2 A.4.1.1.21 Rp 229,468.80 Rp 605,797.63
PEKERJAAN KOLOM
1 Pek
Pek.. Kol
Kolom
om K1 ( 40 x 40 ) Pem
Pembun
bungku
gkus
s Baj
Baja
a H -B
-BEAM
EAM 300.
300.300.
300.10.1
10.15
5
- Beton K-225 13.50 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 17,590,237.17
- Pembesian 148.99 Kg A.4.1.1.17 Rp 19,789.40 Rp 2,948,461.69
- Bekisting 100.88 M2 A.4.1.1.22 Rp 399,791.15 Rp 40,330,931.21
2 Pekerjaan Kolom Praktis Kp ( 11 x 11 ) 201.76 M' A.4.1.1.35 Rp 121,138.82 Rp 24,440,968.32
PEKERJAAN BALOK
1 Peker
Pekerjaan
jaan Balok B1 ( 30 x 50 ) Pembun
Pembungkus
gkus Baja IWF 400.200.8
400.200.8.13
.13
- Beton K-225 13.20 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 17,196,285.89
- Pembesian 949.63 Kg A.4.1.1.17 Rp 19,789.40 Rp 18,792,544.91
- Bekisting 0.53 M2 A.4.1.1.23 Rp 412,454.90 Rp 217,776.19
KODE ARG
ARGA
A SAT
SATAUA
AUA JUMLAH
JUMLAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
2 Pe
Peke
kerj
rjaa
aan
nBBal
alok
ok B2 (1
(15
5 x 20 )
- Beton K-225 1.06 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 1
1,,375,702.87
- Pembesian 176.85 Kg A.4.1.1.17 Rp 19,789.40 Rp 3,499,696.36
- Bekisting 19.36 M2 A.4.1.1.23 Rp 412,454.90 Rp 7,985,126.86
PEKERJAAN BALOK LATEY
1 Pek
Pekerj
erjaan
aan Bal
Balok
ok Late
Latey
y BL1
BL1 (1
(12
2 x 20)
20) di atas
atas J1
J1
- Beton K-225 1.37 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 1
1,,788,413.73
- Pembesian 287.38 Kg A.4.1.1.17 Rp 19,789.40 Rp 5,687,006.58
- Bekisting 29.74 M2 A.4.1.1.23 Rp 412,454.90 Rp 12,268,058.55
2 Pekerjaan Balok Latey BL2 (10 x 15) di atas Pintu 46.86 M' A.4.1.1.36 Rp 144,219.35 Rp 6,758,118.74
PEKERJAAN PLAT LANTAI
1 Pla
Platt Lanta
Lantaii St
Steel
eel F
Floo
loorr Decki
Decking
ng/Bo
/Bond
ndek
ek
- Beton K-225 40.64 M3 A.4.1.1.17 R
Rpp1,302,748.93 Rp 52,947,207.94
- Pembesian Wire Mash M-10 2,956.35 kg A.4.1.1.19 R
Rpp 18,182.53 Rp 53,753,835.05
- St
Stee
eell oor
oor Decki
eckin
ng t = 0.7
.75
5 mm (Bon
Bonde
dek
k Gal
alv
vanis
anis)) 328
28.7
.77
7 M2 A.4.1
.4.1.1
.1.1
.19a
9a Rp 342
42,5
,55
51.0
1.00 ###
2 Pla
Platt Lant
Lantai
ai Bet
Beton
on (Lant
(Lantai
ai KM/W
KM/WC)
C)
- Beton K-225 4.88 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 6,356,372.59
- Pembesian 400.16 Kg A.4.1.1.17 Rp 19,789.40 Rp 7,918,924.70
- Bekisting 24.60 M2 A.4.1.1.24 Rp 500,991.15 Rp 12,324,382.29
PLAT TANGGA BETON
1 Pe
Peke
kerj
rjaa
aann Pla
Platt Tan
Tangg
gga
a
- Beton K-225 2.92 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 3,801,317.16
- Pembesian 296.66 Kg A.4.1.1.17 Rp 19,789.40 Rp 5,870,627.23
- Bekisting 15.72 M2 A.4.1.1.24 Rp 500,991.15 Rp 7,874,578.90
PEKERJAAN PLAT KANOPI
1 Peker
Pekerjaan
jaan Plat Kanop
Kanopii (Su
(Sunscr
nscreen
een J1 + Roster
Roster + Venti
Ventilasi)
lasi) T = 8 cm
- Beton K-225 1.83 M3 A.4.1.1.17 Rp1,302,748.93 Rp 2,384,551.64

- Pembesian 231.33 Kg2 A.4.1.1.24 Rp 19,789.40 Rp 4,577,891.43


- Bekisting 11.44 M A.4.1.1.24 Rp 500,991.15 Rp 5,731,338.76
PEKERJAAN BAJA BERAT (H-BEAM DAN IWF)
1 Pek
Pekerj
erjaan
aan KK1
1 Kolom
Kolom Baja
Baja H-BEA
H-BEAM M 300.30
300.300.10.10.1
0.15
5
- Kolom Baja H-BEAM 300.300.10.15 9,024.00 kg A.4.2.1.1 Rp 37,634.85 ###
- Pekerjaan Pasangan A An
ngkur Baut M - 19 P=700 mm 144.00 Bh - Rp 58,000.00 Rp 8,352,000.00
- Pekerjaan Pasangan Base Plat 12 mm 276.95 kg A.4.2.1.1 Rp 31,146.72 Rp 8,626,021.81
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Ka
Kawa
watt baja
baja la
las
s El
Elek
ektr
trod
oda
a 3.2
3.2 3,24
3,240.
0.00
00 CM A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp 9,46
9,469,
9,36
369.
9.80
80
- Cat Zincromate 167.04 M2 A.4.7.1.19 Rp 36,453.45 Rp 6,089,184.29
2 Pekerjaan B1 Balok Baja IWF 400.200.8.13 kg Rp -
- Balok Baja IWF 400.200.8.13 8,052.00 kg A.4.2.1.1 Rp 37,634.85 ###
- Pekerjaan Pasangan Mur Baut 2x7 M20 400.00 Bh - Rp 12,000.00 Rp 44,,800,000.00
- Pekerjaan Pasangan Base Plat 12 mm 565.20 kg A.4.2.1.1 Rp 31,146.72 Rp 17,604,126.14
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Ka
Kawa
watt baja
baja la
las
s El
Elek
ektr
trod
oda
a 3.2
3.2 3,28
3,280.
0.00
00 CM A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp 9,58
9,586,
6,27
275.
5.60
60
- Cat Zincromate 190.32 M2 A.4.7.1.19 Rp 36,453.45 Rp 6,937,820.60
3 Pekerjaan B2 Balok Baja IWF 250.125.6.9 kg Rp -
- Balok Baja IWF 250.125.6.9 2,061.94 kg A.4.2.1.1 Rp 37,634.85 Rp 77,600,652.07
- Pekerjaan Pasangan Mur Baut 2x7 M20 226.08 Bh - Rp 12,000.00 Rp 22,,712,960.00
- Pekerjaan Pasangan Base Plat 12 mm 864.00 kg A.4.2.1.1 Rp 31,146.72 Rp 26,910,766.08
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Ka
Kawa
watt baja
baja la
las
s El
Elek
ektr
trod
oda
a 3.2
3.2 1,24
1,248.
8.00
00 CM A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp 3,64
3,647,
7,46
460.
0.96
96
- Cat Zincromate 68.27 M2 A.4.7.1.19 Rp 36,453.45 Rp 2,488,560.38
4 Pekerjaan B3 Balok Baja IWF 200.100.5,5.8 kg Rp -
- Balok Baja IWF 200.100.5,5.8 949.82 kg A.4.2.1.1 Rp 37,634.85 Rp 35,746,517.64
- Pekerjaan Pasangan Mur Baut 2x7 M20 131.88 Bh - Rp 12,000.00 Rp 11,,582,560.00
- Pekerjaan Pasangan Base Plat 12 mm 224.00 kg A.4.2.1.1 Rp 31,146.72 Rp 6,976,865.28
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Ka
Kawa
watt baja
baja la
las
s El
Elek
ektr
trod
oda
a 3.2
3.2 574.
574.00
00 CM A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp 1,67
1,677,
7,59
598.
8.23
23
- Cat Zincromate 34.73 M2 A.4.7.1.19 Rp 36,453.45 Rp 1,266,152.26
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJ
PEKERJAA AAN
N PASANG
PASANGAN
AN & PLES
PLESTER
TERAN
AN DINDI
DINDING
NG
PEK. DINDING BATA RINGAN
1 Peker
ekerja
jaa
an Pas
Pasang
angan Dind
inding
ing Ba
Bata
ta Ri
Rin
ngan 100 x 20
200
0x6 641
41.3
.38
8 M2 A. 4.4
4.4.1.2
.1.26
6 Rp 2
205
05,3
,35
57.0
7.08 ###
2
2 Pekerjaan plesteran semen instan 1,282.75 M A.4.4.2.28 Rp
Rp 65,097.54 Rp 83,504,001.77
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Pekerjaan Acian semen instan 1,282.75 M2 A.4.4.2.29 R
Rp
p 44,031.76 Rp 56,481,831.41
2

2 Pekerjaan Acian instan pada Kolom 60.53 M A.4.4.2.29 Rp 44,031.76 Rp 2


2,,665,154.52
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKERJAAN
PEKERJAAN KUSEKUSEN N PINTU,
PINTU, JENDE
JENDELA
LA DAN VENT
VENTILASI
ILASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Pe
Peke
kerj
rjaa
aan
n Pi
Pinntu PJ
PJ1
1 1.00 Bh PJ1 AP Rp9,68
,685,419.73 Rp 9,685,41
,419.73
2 Pe
Peke
kerj
rjaa
aan
n Pi
Pinntu P2 12.00 Bh P2 AP Rp5,856,119.33 Rp 70,273,432.01
3 Pe
Peke
kerj
rjaa
aan
n Pi
Pinntu P3 1 2.0 0 Bh P3 AP Rp4,667,575.18 Rp 56,010,902.11
4 Pe
Peke
kerj
rjaa
aan
n Pi
Pinntu P4 2.00 Bh P4 AP Rp3,495,884.07 Rp 6,991,768.14
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Pe
Peke
kerj
rjaa
aan
n JJen
ende
dela
la J1 10.00 Bh J1 AP Rp6,577,483.53 Rp 65,774,835.28
KODE ARG
ARGAA SAT
SATAU
AUAA JUM
JUMLA
LAHH HAR
HARGA
GA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
2 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J2 2.00 Bh J2 AP Rp4,008,951.17 Rp 8,017,902.34
3 Pekerjaan Ventilasi V1 1.00 Bh V1 AP Rp3,616,414.31 Rp 3,616,414.31
4 Pekerjaan Ventilasi V2 6.00 Bh V2 AP Rp1,073,190.26 Rp 6,439,141.54
KERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
KODE AR
ARGA
GA SATAU
SATAUA
A JUMLAH
JUMLAH HAR
HARGA
GA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
F PEKE
PEKERJ
RJAA
AANN IN
INST
STAL
ALAS
ASII LI
LIST
STRI
RIK
K
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 33 Ttk A.4.7.2.A R
Rp
p 346,456.00 Rp 11,433,048.00
2 Pekerjaan Instalasi Stop Kontak 32 Ttk A.4.7.2.B Rp 3
3772,856.00 Rp 11,931,392.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Down Light 3" SL. 9 Watt 16 Bh A.4.7.2.G R
Rp
p 148,761.25 Rp 2,380,180.00
2 Pasangan Lampu Down Light 3" SL. 5 Watt 16 Bh A.4.7.2.H Rp 98,161.25 Rp 1,570,580.00
3 Pa
Pasa
sang
ngan
an La
Lamp
mpu u TL LE
LEDD 2X18
2X18 Watt
Watt 1 Bh A.4.
A.4.7.
7.2.
2.F
F Rp 354,
354,46
461.
1.25
25 Rp 354,
354,46
461.
1.25
25
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 14 Bh A.4.7.2.C Rp 27,101.25 Rp 379,417.50
2 Pasangan Saklar Ganda 8 Bh A.4.7.2.D Rp 31,446.25 Rp 251,570.00
PEKERJAAN PASANGAN STOP KONTAK
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 32 Bh A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,311
11.2
.25
5 Rp 905,
905,96
960.
0.00
00
PEKERJAAN PASANGAN KOTAK MCB
1 Pemasangan Box MCB 1.00 Bh - Rp 6
65
5,000.00 Rp 65,000.00
2 Pemasangan MCB 1.00 Bh - Rp 250,000.00 Rp 250,000.00
3 Pemasangan Instalasi Panel Listrik PLN 1.00 Set - Rp3,500,000.00 Rp 3,500,000.00
PEKERJAAN INSTALASI LISTRIK MLAH 6 ###
G PE
PEKE
KERJ
RJAA
AAN
N SAN
SANIT
ITAS
ASII
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 3.00 Bh A.5.1.1.1a Rp3,669,069.78 Rp 11,007,209.33
2 Pas
Pas.. Kloset
Kloset Jon
Jongko
gkok
k Ex.
Ex.TOT
TOTO/
O/KIA
KIA 3.00
3.00 Bh A.5
A.5.1.
.1.1
12 Rp 801,77
801,779.0
9.00
0 Rp 2,405,
2,405,337
337.00
.00
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 6.00 Bh A.5.1.1 5 Rp 9
9884,933.40 Rp 5
5,,909,600.40
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 35.00 M1 A.5.1.1 32 Rp 95,830.35 Rp 3,354,062.25
1
2 Pek
Pekerja
erjaan
an Pasan
asang
gan Pipa
ipa Pem
emb
buang
angan Air Kotor
otor di
dia.
a. 3" 50
50.0
.00
0 M A.5.1
.5.1.1
.1 31 Rp 85
85,7
,70
06.91
6.91 Rp 4,28
,285,34
5,345.
5.6
63
1

3 Pek
Pekerja
erjaan
an Pasan
asang
gan Pipa
ipa Pem
emas
asu
uka
kan
n Air Be
Berrsi
sih
h dia.
ia. 3/
3/4
4" 60
60.0
.00
0 M A.5.1
.5.1.1
.1 26 Rp 25
25,9
,97
77.60
7.60 Rp 1,55
,558,65
8,656.
6.0
00
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 6.00 Bh A.5.1.1 19a Rp 325,121.50 Rp 1,950,729.00
2 Pekerjaan Pasangan Kran Air 12.00 Bh A.5.1.1 19 Rp 97,696.50 Rp 1
1,,172,358.00
3 Pe
Peke
kerj
rjaa
aan
n Pasa
Pasang
ngan
an Fl
Floo
oorr Drai
Drain
n 14.0
14.00
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,20
203.
3.50
50 Rp 1,69
1,696,
6,84
849.
9.00
00
4 Pek
Pekerj
erjaan
aan Pas
Pasang
angan
an Tem
Tempat
pat Sab
Sabun
un 6.0
6.00
0 Bh A.5
A.5.1.
.1.1
1 14a Rp 68,67
68,678.5
8.50
0 Rp 412
412,07
,071.0
1.00
0
5 Pekerjaan Pipa Saluran Air Hujan 4" 18.00 M' A.5.1.1 36 R
Rpp 168,744.55 Rp 3,037,401.93
6 Pekerjaan Pembuatan Septick Tank + Peresapan 2.00 Unit A.5.1.1 33 Rp6,636,464.01 Rp 13,272,928.03
PEKERJAAN SANITASI MLAH 7 ###
H PE
PEKE
KERJ
RJAA
AAN
N PL
PLAF
AFON
ONDD
PEKERJAAN RANGKA PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Rang
Rangka
ka Pl
Plaf
afon
ond
d Alu
Alumini
miniu
um Holl
Hollow
ow 2/ 343.
343.90
90 M2 A.4.
A.4.2.
2.1.
1.21
21 Rp 130,
130,27
278.
8.50
50 Rp 44,8
44,802
02,7
,776
76.1
.15
5
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 312.90 M 2
A.4.5.1.7 Rp 53,658.00 Rp 16,789,588.20
3 Pekerjaan Pasangan Plafond Kalsiboard T. 3,5 mm 31.00 M 2
A.4.5.1.7a Rp 48,853.20 Rp 1,514,449.20
4 Pekerjaan Pasangan List Plafond Gypsumboard 376.89 M1 A.4.5.1.7b Rp 26,730.00 Rp 10,074,269.70
PEKERJAAN PLAFOND MLAH 8 ###
I PEK
PEKERJA
ERJAAAN LAN
LANTAI
TAI
PEKERJAAN URUGAN DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 17.55 M3 A.2.3.1.11 Rp 238,425.00 Rp 4,184,239.54
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 17.55 M 3
A.A.4.1.1.1 Rp1,081,510.75 Rp 18,979,972.88
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 271.64 M2 A.4.4.3.13 Rp 327,443.60 Rp 88,946,779.50
1
2 Plint homogenius tile 10 x 60 cm 145.05 M A.4.4.3.28 R
Rp
p 67,763.87 Rp 9,
9 ,829,149.10
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
1 Pek
Pekerja
erjaan
an Lanta
antaii Keram
eramiik (40
40//40
40)) 54
54.51 M2
.51 A.4.4
.4.4.3
.3.4
.4 Rp 162
62,2
,21
16.78
6.78 Rp 8,84
,842,43
2,436.
6.6
68
1
2 Pekerjaan Plint Dinding Tile (10/40) 45.04 M A.4.4.3.29 Rp
Rp 48,720.98 Rp 2,194,392.94
3 Pekerjaan Lantai Keramik Km/Wc (20/20) Unpolished .84 M
24.84 2
A.4.
.4.4.3.6 Rp 148,25
,252.52 Rp 3,682,592.65
4 Pe
Pek.
k. Dind
Dindin
ing
g Kera
Kerami
mik
k Wa
Warn
rna
a Km/W
Km/Wc
c (2
(20/
0/25
25)) 11
114.
4.70
70 M 2
A.
A.4.
4.4.
4.3.
3.54
54a
a Rp 293,
293,98
983.
3.58
58 Rp 33,7
33,718
18,7
,740
40.6
.69
9
PEKERJAAN LANTAI TANGGA
1 Mema
Memasa
sang
ng lant
lantai
ai hom
omog
ogen
eniu
ius
s ti
tile
le 30 x 60 cm + step
step nois
nois 23.09 M2 A.4.
23.09 A.4.4.
4.3.
3.24
24b
b Rp 319,
319,62
627.
7.83
83 Rp 7,37
7,378,
8,92
927.
7.97
97
PEKERJAAN LANTAI JUMLAH 9 ###
J PEKERJAAN PENGECATAN
PENGECATAN
PEKERJAAN PENGECATAN DINDIN
DINDING
G DAN KOL
KOLOM
OM
1 Pe
Peke
kerj
rjaa
aan
n Pe
Pen
ngeca
gecata
tan
n Di
Din
nding
ding 1,28
1,282.
2.75
75 M2 A.4.
A.4.7.
7.1.
1.10
10 Rp 54,0
54,013
13.5
.58
8 Rp 69,2
69,286
86,0
,021
21.3
.36
6
2 Pekerjaan Pengecatan Dinding Kolom 60.53 M 2
A.4.7.1.10 R
Rp
p 54,013.58 Rp 3,
3 ,269,333.67
PEKERJAAN PENGECATAN PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pe
Pen
ngeca
gecata
tan
n Pl
Plaf
afon
ond
d da
dan
n Li
List
st 343.90 M2
343.90 A.4
.4.7
.7.1
.1.5
.5 Rp 47,0
47,078
78.3
.35
5 Rp 16,1
16,190
90,2
,244
44.5
.57
7
PEKERJAAN PENGECATAN JUMLAH 10 ###
KODE ARGA
ARGA SAT
SATAU
AUA
A JUMLAH
JUMLAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
III PE
PEKE
KERJRJAA
AAN
N L
LAN
ANTA
TAII IIII
A PEKERJ
PEKERJAAN
AAN STR
STRUKT
UKTURUR BETO
BETON
N LANTA
LANTAII II
PEKERJAAN KOLOM BETON
1 Pek.
Pek. Ko
Kolo
lom
mKK2
2 ( 25 x 25
25 )
- Beton K-225 3.80 M3 . A.4.1.1.7 Rp1,302,748.93 R
Rpp 4,
4,950,445.94
2
- Bekisting 30.40 M A.4.1.1.22 Rp 399,791.15 Rp 12,153,650.96
2 Pe
Peke
kerj
rjaa
aann Kolo
Kolom
m Pr
Prak
akti
tis
s Kp ( 11 x 11 ) 22
228.
8.00
00 M' A.
A.4.
4.1.
1.1.
1.35
35 Rp 121,
121,13
138.
8.82
82 Rp 27,6
27,619
19,6
,650
50.9
.96
6
PEKERJAAN BALOK LATEY
1 Pek
Pekerj
erjaan
aan Balok
Balok Late
Latey
y BL1
BL1 (1
(122 x 20)
20) di atas
atas J1
- Beton K-225 1.57 M3 . A.4.1.1.7 Rp1,302,748.93 R
Rpp 2,
2,041,668.13
- Pembesian 328.07 Kg A.4.1.1.17 Rp 19,789.40 Rp 6,492,334.44
- Bekisting 16.98 M2 A.4.1.1.23 Rp 412,454.90 Rp 7,002,659.29
2 Pekerjaan Balok Latey BL2 (10 x 15) di atas Pintu 46.86 M' A.4.1.1.36 Rp 144,219.35 Rp 6,758,118.74
PEKERJAAN RINGBALK BETON
1 Pe
Peke
kerj
rjaa
aann Ring
RingBa
Balk
lk RB1
RB1 ((15
15 x 20 )
- Beton K-225 6.88 M3 . A.4.1.1.7 Rp1,302,748.93 R
Rpp 8,
8,965,518.15
- Pembesian 1,152.52 Kg A.4.1.1.17 Rp 19,789.40 R
Rpp 22,807,680.25
- Bekisting 45.88 M2 A.4.1.1.23 Rp 412,454.90 Rp 18,923,430.81
PEKERJAAN RINGBALK BETON MLAH 1 ###
B PEK
PEKERJ
ERJAAN
AAN PAS
PASANG
ANGAN
AN & P
PLES
LESTER
TERAN
AN D
DIND
INDING
ING
PEK. DINDING BATA RINGAN
1 Pek
eker
erja
jaan
an Pas
asan
ang
gan Dindi
indin
ng Ba
Bata
ta Ri
Rin
nga
gan
n 100 x 20
200
0x6 729.62 M2 A. 4.4.1
29.62 .4.1.2
.26
6 Rp 205
205,3
,35
57.
7.08
08 ###
2 Pekerjaan plesteran semen instan 1,282.75 M2
A.4.4.2.28 R
Rpp 65,097.54 Rp 83,504,001.77
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Pekerjaan Acian semen instan 1,282.75 M2 A.4.4.2.29 Rp
Rp 44,031.76 Rp 56,481,831.41
2 Pekerjaan Acian instan pada Kolom 60.53 M 2
A.4.4.2.29 R
Rp
p 44,031.76 Rp 2
2,,665,154.52
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 2 ###

C PEKERJAAN
PEKERJAAN KUSE
KUSEN N PINTU
PINTU,, JENDEL
JENDELA
A DAN VENT
VENTILASI
ILASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Pekeker
erja
jaan
an Pintu
intu P2 12.00 Bh P2 AP Rp5,856,119.33 Rp 70,273,432.01
2 Pekeker
erja
jaan
an Pintu
intu P3 12.00 Bh P3 AP Rp4,667,575.18 Rp 56,010,902.11
3 Pekeker
erja
jaan
an Pintu
intu P4 2.00 Bh P4 AP Rp3,495,884.07 Rp 6,991,768.14
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a JJ1
1 11.00 Bh J1 AP Rp6,577,483.53 Rp 72,352,318.80
2 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a JJ2
2 2.00 Bh J2 AP Rp4,008,951.17 Rp 8,017,902.34
3 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a JJ3
3 1.00 Bh J3 AP Rp3,704,267.17 Rp 3,704,267.17
4 Pekerjaan Ventilasi V2 6.00 Bh V2 AP Rp1,073,190.26 Rp 6,439,141.54
KERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 3 ###
D PEPEKE
KERJ
RJAA
AANN KO
KONS
NSTRTRUK
UKSI
SI A
ATA
TAPP
1 Pekerjaan Kuda - Kuda Baja Ringan prol C 75 0.75 614.62 M2 A.4.5.2.BJ1 Rp 249,023.86 ###
2
2 Pekerjaan Pasangan Atap Spandek 0.35 mm 614.62 M A.4.5.2.SP Rp 94,593.24 Rp 58,138,894.10
3 Pekerjaan Pasangan Nok Spandek 21.00 M' A.4.5.2.NK R
Rpp 106,157.70 Rp 2,229,311.70
4 Pekerjaan Pasangan Jurai Atap 44.80 M' A.4.5.2.JA R
Rpp 97,884.50 R
Rpp 4,
4,385,225.60
5 Pekerjaan Pasangan Kalsiplank 95.68 M' A.4.5.2.KP Rp 115,632.00 Rp 11,063,669.76
PEKERJAAN KONSTRUKSI ATAP MLAH 4 ###
E PE
PEKE
KERJ
RJAA
AANN IN
INST
STAL
ALASASII LIS
LISTR
TRIK
IK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 44 Ttk A.4.7.2.A R
Rp
p 346,456.00 Rp 15,244,064.00
2 Pekerjaan Instalasi Stop Kontak 33 Ttk A.4.7.2.B Rp 372,856.00 Rp 12,304,248.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Down Light 3" SL. 9 Watt 29 Bh A.4.7.2.G Rp
Rp 148,761.25 Rp 4,314,076.25
2 Pasangan Lampu Down Light 3" SL. 5 Watt 14 Bh A.4.7.2.H Rp 98,161.25 Rp 1,374,257.50
3 Pasa
Pasang
ngan
an La
Lamp
mpu u TL LE
LEDD 2X
2X18
18 Watt
Watt 1 Bh A.
A.4.
4.7.
7.2.
2.F
F Rp 354,
354,46
461.
1.25
25 Rp 354,
354,46
461.
1.25
25
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 14 Bh A.4.7.2.C Rp 27,101.25 Rp 379,417.50
2 Pasangan Saklar Ganda 9 Bh A.4.7.2.D Rp 31,446.25 Rp 283,016.25
PEKERJAAN PASANGAN STOP KONTAK
1 Pasa
Pasang
ngan
an Stop
Stop Ko
Kont
ntak
ak 33 Bh A.
A.4.
4.7.
7.2.
2.E
E Rp 28,3
28,311
11.2
.25
5 Rp 934,
934,27
271.
1.25
25
PEKERJAAN INSTALASI LISTRIK MLAH 5 ###
F PEKE
PEKERJ
RJAA
AAN
N SANI
SANITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 3.00 Bh A.5.1.1.1a Rp3,669,069.78 Rp 11,007,209.33
2 Pas
Pas.. Kloset
Kloset Jongko
Jongkok
k Ex.TOT
Ex.TOTO/
O/KIA
KIA 3.00
3.00 Bh A.5.1.
A.5.1.1
12 Rp 801,77
801,779.0
9.00
0 Rp 2,405,
2,405,337
337.00
.00
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 6.00 Bh A.5.1.1 5 Rp 9
9884,933.40 Rp 5
5,,909,600.40
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 35.00 M1 A.5.1.1 32 Rp 95,830.35 Rp 3,354,062.25
1
2 Pek
eker
erja
jaan
an Pas
asan
ang
gan Pipa
ipa Pem
emb
buan
ang
gan Air Kot
otor
or dia.
dia. 3" 50.00 M
50.00 A.5.1
.5.1.1
.1 31 Rp 85,7
85,70
06.
6.91
91 Rp 4,285
,285,3
,34
45.
5.63
63
3 Pek
eker
erja
jaan
an Pas
asan
ang
gan Pipa
ipa Pem
emas
asu
uka
kan
n Air Bers
ersih dia.
dia. 3/
3/4
4" 35.00 M1
35.00 A.5.1
.5.1.1
.1 26 Rp 25,9
25,97
77.
7.60
60 Rp 909,2
09,21
16.
6.00
00
KODE ARGA
ARGA SAT
SATAUA
AUA JUM
JUMLAH
LAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 6.00 Bh A.5.1.1 19a Rp 325,121.50 Rp 1,950,729.00
2 Pekerjaan Pasangan Kran Air 12.00 Bh A.5.1.1 19 Rp 97,696.50 R
Rpp 1,
1,172,358.00
3 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Floo
Floorr Drai
Drain
n 14.0
14.00
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,20
203.
3.50
50 Rp 1,
1,69
696,
6,84
849.
9.00
00
4 Pek
Pekerj
erjaan
aan Pasan
Pasangan
gan Tem
Tempat
pat Sab
Sabun
un 6.0
6.00
0 Bh A.5
A.5.1.
.1.1
1 14a Rp 68,678
68,678.50
.50 Rp 412
412,07
,071.0
1.00
0
PEKERJAAN SANITASI MLAH 6 ###
G PEKE
PEKERJ
RJAA
AAN
N PLAF
PLAFON
ONDD
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pasa
Pasan
nga
gan
n Ra
Ran
ngka
gka Plaf
Plafon
ond
d Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2/ 446.
44 74 M2
6.74 A.
A.4.
4.2.
2.1.
1.21
21 Rp 130,
130,27
278.
8.50
50 Rp 58,2
58,200
00,6
,617
17.0
.09
9
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 323.60 M 2
A.4.5.1.7 Rp 53,658.00 Rp 17,363,728.80
2
3 Pekerjaan Pasangan Plafond Kalsiboard T. 3,5 mm 123.14 M A.4.5.1.7a Rp 48,853.20 Rp 6,015,783.05
4 Pekerjaan Pasangan List Plafond Gypsumboard 559.52 M 1
A.4.5.1.7b Rp 26,730.00 Rp 14,955,969.60
PEKERJAAN PLAFOND MLAH 7 ###
H PE
PEK
KERJA
ERJAAAN LA
LANNTAI
TAI
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 252.13 M2 A.4.4.3.13 Rp 327,443.60 Rp 82,558,354.87
2 Plint homogenius tile 10 x 60 cm 136.42 M 1
A.4.4.3.28 R
Rp
p 67,763.87 Rp 9
9,,244,346.92
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
1 Peke
Pekerj
rjaa
aan
n La
Lant
ntai
ai Kera
Kerami
mik
k (4
(40/
0/40
40)) 66.0
66 5 M2
.05 A.4.4
.4.4.3
.3.4
.4 Rp 162,
162,21
216.
6.78
78 Rp 10,7
10,714
14,4
,418
18.3
.32
2
2 Pekerjaan Plint Dinding Tile (10/40) 57.60 M1 A.4.4.3.29 Rp
Rp 48,720.98 Rp 2,806,328.45
3 Pekerjaan Lantai Keramik Km/Wc (20/20) Unpolished 24.84 M 2
A.4.
.4.4.3.6 Rp 148,252.52 Rp 3,682,59
,592.65
.65
4 Pe
Pek.
k. Dind
Dindin
ing
g Kera
Kerami
mik
k Warn
Warna
a Km
Km/W
/Wc
c (2
(20/
0/25
25)) 11
114.70 M
4.70 2
A.
A.4.
4.4.
4.3.
3.54
54a
a Rp 293,
293,98
983.
3.58
58 Rp 33,7
33,718
18,7
,740
40.6
.69
9
PEKERJAAN LANTAI JUMLAH 8 ###
I PEKE
PEKERJ
RJAA
AANN PENG
PENGEC
ECAT
ATAN
AN
PEKERJAAN PENGECATAN DIND
DINDING
ING DAN KOLOM
1 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Di
Din
nding
ding 1,28
1,282.75 M2
2.75 A.
A.4.
4.7.
7.1.
1.10
10 Rp 54,0
54,013
13.5
.58
8 Rp 69,2
69,286
86,0
,021
21.3
.36
6
2
2 Pekerjaan Pengecatan Dinding Kolom 60.53 M A.4.7.1.10 R
Rp
p 54,013.58 Rp 3
3,,269,333.67
PEKERJAAN PENGECATAN PLAFOND
1 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Plaf
Plafon
ond
d dan
dan List
List 446.
44 74 M2
6.74 A.4.7
.4.7.1
.1.5
.5 Rp 47,0
47,078
78.3
.35
5 Rp 21,0
21,031
31,7
,782
82.0
.08
8
PEKERJAAN WATERPROOFING
1 Pekerjaan Waterproong Dak Beton 24.84 M2 A.4.7.1.23 R
Rp
p 153,730.50 Rp 3,818,665.62
PEKERJAAN PENGECATAN JUMLAH 9 ###
J PEKERJAAN TANGGA
TANGGA TRASRAM
1 Pekerjaan Urugan Pasir 0.83 M3 A.2.3.1.11 Rp 238,425.00 Rp 197,558.96
2
2 Peke
Pekerj
rjaa
aan
n Pasa
Pasan
nga
gan
n Pond
Pondas
asii Tras
Trasra
ram
m dan
dan Sa
Salu
lura
ran
n 1 Pc : 4.00 M
4.00 A. 4.4.
4.4.1.
1.8
8 Rp 133,
133,27
276.
6.33
33 Rp 533,
533,10
105.
5.32
32
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 8.00 M 2
A.4.4.2.3 Rp 63,809.28 R
Rpp 510,474.27
4 Pekerjaan Urugan Tanah 0.83 M 3
A.2.3.1.15 Rp 176,137.50 Rp 145,947.53
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.18 M3 A.A.4.1.1.1 R
Rp
p1,081,510.75 Rp 194,671.93
PEKERJAAN TANGGA TRASRAM JUMLAH 10 Rp1,581,758.01
K PEKERJAAN
PEKERJAAN SALUR
SALURAN
AN KEL
KELILING
ILING G
GEDUNG
EDUNG DAN RA
RABAT
BAT KE
KELILING
LILING BANGU
BANGUNAN
NAN
1 Pekerjaan Galian Tanah Saluran 20.00 M3 A.2.3.1.1 Rp 84,562.50 R
Rpp 1,
1,691,250.00
2 Pekerjaan Urugan Pasir Saluran 2.50 M 3
A.2.3.1.11 Rp 2
23
38,425.00 R
Rpp 596,062.50
3 Pekerjaan Beton Rabat Saluran T = 5 cm 2.50 M 3
A.A.4.1.1.1 R
Rp
p1,081,510.75 Rp 2,703,776.87
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,4 M 80.00 M2 A. 4.4.1.8 Rp 133,276.33 Rp 10,662,106.40
2
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 90.00 M A.4.4.2.3 Rp 63,809.28 Rp 5,742,835.56
6 Pekerjaan Penutup Saluran Keliling / Grill Besi 100.00 M' - Rp 250,000.00 Rp 25,000,000.00
7 Pekerjaan Beton Rabat Keliling Bangunan T = 7 cm 10.50 M3 A.A.4.1.1.1 Rp1,081,510.75 Rp 11,355,862.86
8 Pekerjaan Urugan Pasir Rabat Keliling Bangunan 10.50 M 3
A.2.3.1.11 Rp 238,425.00 Rp 2,503,462.50
AN KELILING GEDUNG
GEDUNG DAN RABAT KELILING
KELILING BANGUN
BANGUNAN
AN JUMLAH 11 ###
L PEKE
PEKERJ
RJAA
AAN
N FINI
FINISH
SHIN
INGG
1 Pek
eker
erja
jaan
an Alumi
lumin
nium
ium Ko
Kom
mpo
possit Pa
Pan
nel Bungku
kussan Luar Ge 25
256.00 M2
6.00 A.4.6
.4.6.1
.1B1
B1 Rp 828,0
28,03
36.
6.96
96 ###
2 Pemasangan Huruf Stainless 11.00 Bh - Rp 100,000.00 R
Rp
p 1,100,000.00
3 Pemas
Pemasanga
angann Handel
Handel Tang
Tangga
ga Pipa Stainless
Stainless Steel Bulat
Bulat 2 12.02 M' - Rp 65,000.00 Rp 781,300.00
PEKERJAAN FINISHING JUMLAH 12 Rp ###

REAL COST ###


RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA
PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA
SU
SUB
B PE
PEKE
KERJ
RJAA
AAN
N : PEMBANGUNAN AULA / RUANG PERTEMUAN
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGAR : 2019

KODE ARG
ARGA
A SA
SATAU
TAUA
A JUM
JUMLAH
LAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBENT
ENTUK
UKAN
AN LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 179.18 M' - Rp 40,463.94 R
Rpp 7,250,328.77
2 Men
Mengup
gupas
as tan
tanah
ah da
dan
n pemb
pembers
ersiha
ihan
n semak
semak (Lan
(Land
d Cle
Cleari
aring
ng 486.00 M2 - Rp 1,887.84 Rp 917,489.23
3 Galian Tanah dan Pembuangan (Cut dan Fill) 583.20 M 3
- Rp 104,839.24 Rp 61,142,243.77
4 Air Kerja 1.00 Ls - Rp 500,000.00 Rp 5
5000,000.00
5 Listrik Kerja 1.00 Ls - Rp 500,000.00 Rp 500,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AANN PEM
PEMBA
BANG
NGUN
UNAN
AN AUL
AULAA
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DA
DANN PASI
PASIRR
1 Pekerjaan Galian Tanah Pondasi Garis 116.45 M3 A.2.3.1.1 Rp 84,562.50 Rp 9
9,,847,387.69
3
2 Pekerjaan Galian Tanah Pondasi Poer P1 34.61 M A.2.3.1.1 Rp 84,562.50 Rp 2,926,369.88
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 29.12 M3 A.2.3.1.9 Rp 61,875.00 Rp 1,801,598.91
5 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 17.30 M3 A.2.3.1.9 Rp 61,875.00 Rp 1,070,623.13
6 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 8.46 M 3
A.2.3.1.11 Rp 238,425.00 Rp 2,017,337.77
7 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 1.33 M 3
A.2.3.1.11 Rp 238,425.00 Rp 317,343.68
8 Pekerjaan timbunan tanah bawah lantai T = 65 cm 327.60 M3 A.2.3.1.15 Rp 176,137.50 Rp 57,702,645.00
9 Pekerjaan pemadatan tanah per 20 cm 286.40 M3 A.2.3.1.10 Rp 61,875.00 Rp 17,721,024.75
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANN P
PON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 33.84 M3 A.3.2.1.9 Rp 530,369.40 Rp 17,950,034.12
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 85.60 M 3
A.3.2.1.2 Rp 900,922.00 Rp 77,119,283.57
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAAN
AAN STRUKT
STRUKTUR UR BETON
BETON DAN RABATRABAT
PEKERJAAN PONDASI POER
1 Pek
Pekerj
erjaan
aan Pondas
Pondasii Poer
Poer P1 ( 11
110
0 x 110 )
- Lantai Kerja Poer K100 1.33 M3 A.A.4.1.1.4 Rp1,071,694.71 Rp 1,426,425.66
3
- Beton K250 6.60 M A. A.4.1.1.8 Rp1,315,511.11 R
Rpp 8,682,373.34
- Pembesian 1,701.34 Kg A.4.1.1.17 Rp 19,789.40 R
Rpp 33,668,544.82
- Bekisting 26.40 M2 A.4.1.1.20 Rp 215,718.80 Rp 5,694,976.32
PEKERJAAN STEK KOLOM
1 Peke
Pekerj
rjaa
aannSStek
tek Ko
Kolo
lom
m K1 ( 40 x 40 )
- Beton K250 9.75 M3 A. A.4.1.1.8 Rp1,315,511.11 Rp 12,826,759.55
- Pembesian 1,558.88 Kg A.4.1.1.17 Rp 19,789.40 R
Rp
p 30,849,376.78
- Bekisting 97.50 M2 A.4.1.1.22 Rp 399,791.15 R
Rp
p 38,981,236.29
PEKERJAAN SLOOF
1 Peke
Pekerj
rjaa
aann Slo
Sloof
of S1 ( 2
25
5 x 40 )
- Beton K-225 7.96 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 10,369,881.49
- Pembesian 1,732.62 Kg A.4.1.1.17 Rp 19,789.40 R
Rp
p 34,287,467.20
- Bekisting 63.68 M2 A.4.1.1.21 Rp 229,468.80 R
Rp
p 14,612,573.18
2 Peke
Pekerj
rjaa
aann Slo
Sloof
of S2 ( 1
15
5 x 20 )
- Beton K-225 2.99 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 3
3,,891,832.16
- Pembesian 500.30 Kg A.4.1.1.17 Rp 19,789.40 Rp 9,900,561.46
- Bekisting 39.83 M2 A.4.1.1.21 Rp 229,468.80 Rp 9,140,201.24
PEKERJAAN KOLOM
1 Pe
Pek.
k. Ko
Kolo
lom
mK K1
1 ( 40 x 40
40 )
- Beton K-225 12.96 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 16,883,626.15
- Pembesian 2,499.04 Kg A.4.1.1.17 Rp 19,789.40 R
Rp
p 49,454,579.25
- Bekisting 129.60 M2 A.4.1.1.22 Rp 399,791.15 R
Rpp 51,812,933.04
2 Pe
Pek.
k. Ko
Kolo
lom
mK K1
1 ( 60 x 40
40 )
- Beton K-225 1.94 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 2
2,,532,543.92
- Pembesian 312.38 Kg A.4.1.1.17 Rp 19,789.40 Rp 6,181,822.41
- Bekisting 16.20 M2 A.4.1.1.22 Rp 399,791.15 Rp 6,476,616.63
3 Pek.
Pek. Kolo
Kolom
m K3
K3 ( 3
30
0 x 30 )
- Beton K-225 0.36 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 474,851.99
- Pembesian 59.44 Kg A.4.1.1.17 Rp 19,789.40 Rp 1,176,368.96
- Bekisting 4.86 M2 A.4.1.1.22 Rp 399,791.15 Rp 1,942,984.99
4 Pek.
Pek. Kolo
Kolom
m K4
K4 ( 2
20
0 x 30 )
- Beton K-225 1.94 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp
Rp 2
2,,532,543.92
- Pembesian 394.59 Kg A.4.1.1.17 Rp 19,789.40 Rp 7,808,728.73
- Bekisting 32.40 M2 A.4.1.1.22 Rp 399,791.15 R
Rp
p 12,953,233.26
5 Pek.
Pek. Kolo
Kolom
m K5
K5 ( 2
20
0 x 30 )
- Beton K-225 0.49 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 633,135.98
- Pembesian 98.65 Kg A.4.1.1.17 Rp 19,789.40 Rp 1,952,182.18
- Bekisting 8.10 M2 A.4.1.1.22 Rp 399,791.15 Rp 3,238,308.32
2 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 224.45 M' A.4.1.1.35 Rp 121,138.82 Rp 27,189,608.15
PEKERJAAN BALOK
1 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kBB1
1 ( 30 x 45
45 )
- Beton K-225 2.32 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 3,
3,016,189.46
- Pembesian 391.12 Kg A.4.1.1.17 Rp 19,789.40 Rp 7,739,939.34
- Bekisting 20.58 M2 A.4.1.1.23 Rp 412,454.90 Rp 8,488,321.84
2 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kBB2
2 (25
(25 x 50
50 )
- Beton K-225 8.40 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 10,943,091.02
- Pembesian 1,532.53 Kg A.4.1.1.17 Rp 19,789.40 Rp 30,327,925.57
- Bekisting 84.00 M2 A.4.1.1.23 Rp 412,454.90 R
Rp
p 34,646,211.60
3 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kBB3
3 (25
(25 x 40
40 )
- Beton K-225 0.80 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 1,
1,042,199.15
- Pembesian 163.11 Kg A.4.1.1.17 Rp 19,789.40 Rp 3,227,870.23
- Bekisting 8.40 M2 A.4.1.1.23 Rp 412,454.90 Rp 3,464,621.16
PEKERJAAN BALOK LATEY
1 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kLLat
atey
ey (1
(15
5 x 20
20))
- Beton K-225 0.75 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp
Rp 977,843.35
- Pembesian 150.05 Kg A.4.1.1.17 Rp 19,789.40 Rp 2,969,453.22
- Bekisting 22.52 M2 A.4.1.1.23 Rp 412,454.90 Rp 9,287,659.44
PEKERJAAN PLAT KANOPI DAN TERAS
2 Pe
Peke
kerj
rjaan
aan Pl
Plat
at Ka
Kano
nopi
pi T = 10 cm
- Beton K-225 1.81 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 2,352,764.57
- Pembesian 228.25 Kg A.4.1.1.24 Rp 19,789.40 Rp 4,516,866.21
- Bekisting 22.58 M2 A.4.1.1.24 Rp 500,991.15 R
Rp
p 11,309,875.21
2 Pekerj
Pekerjaan
aan Pla
Platt Atap
Atap Ter
Teras
as T = 10
10 c
cm
m
- Beton K-225 1.31 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 1,709,857.97
- Pembesian 160.13 Kg A.4.1.1.24 Rp 19,789.40 Rp 3,168,777.03
- Bekisting 13.13 M2 A.4.1.1.24 Rp 500,991.15 Rp 6,575,508.84
2 Pekerj
Pekerjaan
aan Pla
Platt Atap
Atap Ter
Teras
as T = 10
10 c
cm
m
- Beton K-225 1.61 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 2,103,418.42
- Pembesian 196.98 Kg A.4.1.1.24 Rp 19,789.40 Rp 3,898,138.97
- Bekisting 16.15 M2 A.4.1.1.24 Rp 500,991.15 Rp 8,089,003.11
PEKERJAAN BAJA BERAT
1 Pekerj
Pekerjaan
aan Kolom
Kolom Baja
Baja 30
300.1
0.150
50.9.
.9.6,5
6,5
- Kolom Baja 300.150.9.6,5 308.28 kg A.4.2.1.1 Rp 37,634.85 Rp 11,602,071.56
- Peker
erjjaan Pasangan Angkur Baut M - 19 P=700 mm 48.00 Bh - Rp 58,000.00 Rp 2,784,000.00
- Pekerjaan Pasangan Base Plat 12 mm 135.65 kg A.4.2.1.1 Rp 31,146.72 Rp 4,224,990.27
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Ka
Kawa
watt baja
baja las
las El
Elek
ektr
trod
oda
a 3.2
3.2 1,39
1,392.
2.00
00 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp 4,06
4,068,
8,32
321.
1.84
84
- Cat Zincromate 9.74 M2 A.4.7.1.19 Rp 36,453.45 Rp 355,202.42
2 Pekerjaan Kaki Kuda-Kuda Baja IWF 250.125.9.6 kg Rp -
- Balok Baja IWF 250.125.9.6 2,067.26 kg A.4.2.1.1 Rp 37,634.85 Rp 77,801,170.55
- Pekerjaan Pasangan Mur Baut M - 16 280.00 Bh - Rp 12,000.00 Rp 3,360,000.00
- Pekerjaan Pasangan Base Plat 12 mm 131.88 kg A.4.2.1.1 Rp 31,146.72 Rp 4,107,629.43
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Kawa
Kawatt ba
baja
ja las
las El
Elek
ektr
trod
oda
a 3.
3.2
2 57
576.
6.18
18 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 1,
1,68
683,
3,96
969.
9.60
60
- Cat Zincromate 69.14 M2 A.4.7.1.19 Rp 36,453.45 Rp 2,520,449.86
2 Pekerjaan Kaki Kuda-Kuda Baja IWF 200.100.8.5,5 kg Rp -
- Balok Baja IWF200.100.8.5,5 435.20 kg A.4.2.1.1 Rp 37,634.85 Rp 16,378,661.13
- Pekerjaan Pasangan Mur Baut M - 16 120.00 Bh - Rp 12,000.00 Rp 1,440,000.00
- Pekerjaan Pasangan Base Plat 12 mm 60.29 kg A.4.2.1.1 Rp 31,146.72 Rp 1,877,773.46
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Kawa
Kawatt ba
baja
ja las
las El
Elek
ektr
trod
oda
a 3.
3.2
2 16
168.
8.30
30 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 49
491,
1,88
881.
1.15
15
- Cat Zincromate 16.73 M2 A.4.7.1.19 Rp 36,453.45 Rp 609,793.31
2 Pekerjaan Kaki Kuda-Kuda dan Nok Baja IWF 150.75.5.7 kg Rp -
- Balok Baja IWF 150.75.5.7 1,728.30 kg A.4.2.1.1 Rp 37,634.85 Rp 65,044,311.26
- Pekerjaan Pasangan Mur Baut M - 16 520.00 Bh - Rp 12,000.00 Rp 6,240,000.00
- Pekerjaan Pasangan Base Plat 12 mm 240.21 kg A.4.2.1.1 Rp 31,146.72 Rp 7,481,753.61
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Kawa
Kawatt ba
baja
ja las
las El
Elek
ektr
trod
oda
a 3.
3.2
2 75
750.
0.99
99 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 2,
2,19
194,
4,86
869.
9.86
86
- Cat Zincromate 90.12 M2 A.4.7.1.19 Rp 36,453.45 Rp 3,285,130.23
2 Pekerjaan Gording C 150.50.2.2,3 kg Rp -
- Gording C 150.50.2.2,3 505.74 kg A.4.2.1.1 Rp 37,634.85 Rp 19,033,446.78
- Pekerjaan Pasangan Mur Baut M - 10 156.00 Bh - Rp 8,000.00 Rp 1,
1 ,248,000.00
- Cat Zincromate 90.12 M2 A.4.7.1.19 Rp 36,453.45 Rp 3,285,130.23
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJ
PEKERJAANAAN PAS
PASANG
ANGAN
AN & PLES
PLESTER
TERAN
AN D
DIND
INDING
ING
PEK. DINDING BATA RINGAN
1 Pekerjaan Pasangan Dinding B
Ba
ata Ringan 273.79 M2 A. 4.4.1.26 R
Rpp 205,357.08 Rp 56,223,912.67
2 Pekerjaan plesteran semen instan 547.57 M 2
A.4.4.2.28 Rp
Rp 65,097.54 Rp 35,645,604.11
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Pekerjaan Acian semen instan 547.57 M2 A.4.4.2.29 R
Rp
p 44,031.76 Rp 24,110,569.06
2 Pekerjaan Acian instan pada Kolom 82.08 M2 A.4.4.2.29 R
Rp
p 44,031.76 Rp 33,,614,127.07
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKER
PEKERJAAN
JAAN KUSEN PINTU, JENDELA
JENDELA DAN VENTI
VENTILASI
LASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u PJ
PJ1
1 1.00 Bh P1 AP Rp7,033,560.04 Rp 7,033,560.04
2 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P2 2.00 Bh PJ2 AP Rp5,665,766.24 Rp 11,331,532.49
3 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P3 1.00 Bh PJ3 AP Rp3,826,037.52 Rp 3,826,037.52
4 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P4 4.00 Bh P4 AP Rp2,483,533.96 Rp 9,934,135.84
5 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P5 6.00 Bh Ls Rp 28
287,500.00 Rp 1,
1,725,000.00
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J1 1.00 Bh J1 AP Rp5,920,983.54 Rp 5,920,983.54
2 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J2 6.00 Bh J2 AP Rp7,004,149.04 Rp 42,024,894.25
3 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J3 4.00 Bh J3 AP Rp7,934,050.35 Rp 31,736,201.41
4 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J4 4.00 Bh J4 AP Rp1,922,394.32 Rp 7,689,577.28
5 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J5 3.00 Bh J5 AP Rp1,816,119.73 Rp 5,448,359.20
6 Pekerjaan Ventilasi V1 9.00 Bh V1 AP Rp 783,174.47 Rp 7,048,570.27
KERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEKE
PEKERJ
RJAA
AAN N K
KON
ONSTSTRU
RUKS
KSII A
ATA
TAPP
2 Pekerjaan Pasangan Atap Spandek 0.35 mm 457.34 M2 A.4.5.2.SP Rp 94,593.24 Rp 43,261,213.34
3 Pekerjaan Pasangan Nok Spandek 17.16 M' A.4.5.2.NK R
Rp
p 10
1 06,157.70 Rp 1,
1 ,821,666.13
4 Pekerjaan Pasangan Jurai Atap 31.28 M' A.4.5.2.JA Rp
Rp 97,884.50 R
Rpp 3,061,827.16
4 Pekerjaan Pasangan Kalsiplank 88.00 M' A.4.5.2.KP Rp
Rp 11
1 15,632.00 Rp 10,175,616.00
PEKERJAAN KONSTRUKSI ATAP MLAH 6 ###
G PEKE
PEKERJ
RJAA
AANN IN
INST
STAL
ALAS
ASII LISTR
LISTRIK
IK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 122.00 Ttk A.4.7.2.A Rp 346,456.00 Rp 42,267,632.00
2 Pekerjaan Instalasi Stop Kontak 6.00 Tt
Ttk A.4.7.2.B Rp
R p 372,856.00 Rp
Rp 2,237,136.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Gantung Variasi 15 Watt 1.00 Bh Ls Rp1,000,000.00 Rp 1,
1,000,000.00
2 Pasangan Lampu Bared LED 22 Watt 8.00 Bh A.4.7.2.L Rp 80
804,911.25 Rp 6,
6,439,290.00
3 Emergency downlight 18 Watt 28.00 Bh A.4.7.2.I Rp 197,711.25 R
Rpp 5,535,915.00
4 Downlight 18 Watt 52.00 B
Bh
h A.4.7.2.G Rp
Rp 148,761.25 Rp 7,735,585.00
5 Downlight 9 Watt 7.00 Bh A.4.7.2.H Rp 9
988,161.25 Rp 687,128.75
6 Lampu neon panjang 5 Watt 26.00 Bh A.4.7.2.F Rp 335
54,461.25 Rp 9,
9,215,992.50

1 PEKERJAAN PASANGAN
Pasangan Saklar TunggaSAKLAR
l 4.00 Bh A.4.7.2.C Rp 27,101.25 Rp 108,405.00
2 Pasangan Saklar Ganda 22.00 Bh A.4.7.2.D Rp 31,446.25 Rp 691,817.50
PEKERJAAN PASANGAN STOP KONTAK
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 6.00
6.00 Bh A.
A.4.
4.7.
7.2.
2.E
E Rp 28,3
28,311
11.2
.25
5 Rp 16
169,
9,86
867.
7.50
50
PEKERJAAN PASANGAN KOTAK MCB
1 Pemasangan Box MCB 1.00 Bh - Rp 65
65,000.00 Rp 65,000.00
2 Pemasangan MCB 1.00 Bh - Rp 250,000.00 Rp 250,000.00
3 Pemasangan Instalasi Panel Listrik PLN 1.00 Set - Rp3,500,000.00 Rp 3,500,000.00
PEKERJAAN INSTALASI LISTRIK MLAH 7 ###
H PE
PEKE
KERJ
RJAA
AAN
N SAN
SANIT
ITAS
ASII
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 6.00 Bh A.5.1.1.1a Rp3,669,069.78 Rp 22,014,418.67
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 1.00 Bh A.5.1.1 5 Rp 984,933.40 R
Rpp 984,933.40
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 11.92 M1 A.5.1.1 32 Rp 95,830.35 Rp 1,142,297.77
2 Peker
ekerjjaan
aan Pasan
asang
gan Pip
ipa
a Pemb
embuang
angan Air Ko
Koto
torr dia. 3" 13.67
.67 M 1
A.5.1
.5.1.1
.1 31 Rp 85,70
,706.91
.91 Rp 1,17
,171,61
,613.49
.49
3 Peker
ekerjjaan
aan Pasan
asang
gan Pip
ipa
a Pemas
emasu
uka
kan
n Air Ber
ersi
sih
h dia. 3/4"
/4" 9.85
.85 M1 A.5
.5.1
.1.1
.1 26 Rp 25,97
,977.60
.60 Rp 255,87
,879.36
.36
4 Peker
ekerjjaan
aan Pasan
asang
gan Pip
ipa
a Pemas
emasu
uka
kan
n Air Ber
ersi
sih
h dia. 1" 69.27
.27 M1 A.5
.5.1
.1.1
.1 27 Rp 35,13
,133.04
.04 Rp 2,43
,433,66
,665.51
.51
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 1.00 Bh A.5.1.1 19a Rp 325,121.50 Rp 325,121.50
2 Pekerjaan Pasangan Kran Air 6.00 Bh A.5.1.1 19 Rp 97,696.50 R
Rp
p 586,179.00
3 Peke
Pekerj
rjaan
aan Pasa
Pasang
ngan
an Fl
Floo
oorr Dr
Drai
ain
n 6.
6.00
00 Bh A.5.
A.5.1.
1.1
1 14 Rp 12
121,
1,20
203.
3.50
50 Rp 72
727,
7,22
221.
1.00
00
4 Pek
Pekerj
erjaan
aan Pasang
Pasangan
an Tempat
Tempat Sab
Sabun
un 6.0
6.00
0 Bh A.5.1.
A.5.1.1
1 14
14a
a Rp 68,67
68,678.5
8.50
0 Rp 412,0
412,071.
71.00
00
6 Pekerjaan
aan Pembuatan Septick Tank + Pere
eresapan 4.00 Unit A.5.1.1 32 Rp6,636,464.01 Rp 26,545,856.06
PEKERJAAN SANITASI MLAH 8 ###
I PEKE
PEKERJ
RJA
AAN PLA
PLAFON
FOND
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Rang
Rangka
ka Pl
Plaf
afon
ond
d Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2 381.
381.44
44 M2 A.4.
A.4.2.
2.1.
1.21
21 Rp 130,
130,27
278.
8.50
50 Rp 49,6
49,692
92,9
,962
62.0
.04
4
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 381.44 M 2
A.4.5.1.7 Rp 53,658.00 Rp 20,467,114.35
1
6 Pekerjaan Pasangan List Plafond Gypsumboard 156.00 M A.4.5.1.7b Rp 26,730.00 Rp 4,169,880.00
PEKERJAAN PLAFOND MLAH 9 ###

J PEKERJAAN LANTAIDIBAWAH LANTAI


PEKERJAAN URUGAN
1 Pekerjaan Urugan Pasir Dibawah Lantai 22.21 M3 A.2.3.1.11 R
Rpp 238,425.00 Rp 5,296,403.95
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 22.21 M 3
A.A.4.1.1.1 Rp1,081,510.75 Rp 24,024,820.36
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 434.70 M2 A.4.4.3.13 Rp 327,443.60 ###
1
2 Plint homogenius tile 10 x 60 cm 234.42 M A.4.4.3.28 Rp 60,516.47 Rp 14,186,271.48
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
3 Pekerjaan Lantai K
Ke
eramik K
Km
m/Wc (20/20) Unpolished 9.59 M2 A.4.4.3.6 Rp 148,252.52 Rp 1,421,000.42
4 Pek.
Pek. Di
Dind
ndin
ing
g Kera
Kerami
mik
k Wa
Warn
rna
a Km/W
Km/Wc
c (2
(20/
0/25
25)) 45
45.6
.69
9 M 2
A.4.
A.4.4.
4.3.
3.54
54a
a Rp 29
293,
3,98
983.
3.58
58 Rp 13
13,4
,432
32,1
,109
09.7
.77
7
PEKERJAAN LANTAI TANGGA
5 Me
Mema
masa
sang
ng la
lant
ntai
ai ho
homo
moge
geni
nius
us ti
tile
le 30 x 30 cm + step
step no
nois
is 45
45.7
.77
7 M2 A.4.
A.4.4.
4.3.
3.24
24b
b Rp 31
319,
9,62
627.
7.83
83 Rp 14
14,6
,630
30,6
,644
44.0
.06
6
PEKERJAAN LANTAI JUMLAH 10 ###
K PE
PEKE
KERJ
RJAA
AANN PENG
PENGECECAT
ATAN
AN
PEKERJAAN PENGECATAN DINDING DAN KOLOM
1 Peke
Pekerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Di
Dind
ndin
ing
g 547.57 M2
547.57 A.4.
A.4.7.
7.1.
1.10
10 Rp 54,0
54,013
13.5
.58
8 Rp 29,5
29,576
76,3
,332
32.0
.09
9
2 Pekerjaan Pengecatan Dinding Kolom 82.08 M2 A.4.7.1.10 Rp
Rp 54,013.58 Rp 4
4,,433,434.24
PEKERJAAN PENGECATAN PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Pl
Plaf
afon
ond
d dan
dan List
List 381.
381.44
44 M2 A.
A.4.
4.7.
7.1.
1.5
5 Rp 47,0
47,078
78.3
.35
5 Rp 17,9
17,957
57,3
,396
96.3
.34
4
PEKERJAAN PENGECATAN JUMLAH 11 ###
L PE
PEKE
KERJ
RJAA
AANN TA
TANG
NGGA
GA TRAS
TRASRARAMM
1 Pekerjaan Urugan Pasir 0.83 M3 A.2.3.1.11 Rp 238,425.00 R
Rp
p 197,558.96
2 Peke
Pekerj
rjaan
aan Pasa
Pasang
ngan
an Pond
Pondas
asii Tras
Trasra
ram
m da
dan
n Sa
Salu
lura
ran
n 1 Pc : 10
101.
1.72
72 M 2
A. 4.4.
4.4.1.
1.8
8 Rp 13
133,
3,27
276.
6.33
33 Rp 13
13,5
,556
56,8
,868
68.2
.29
9
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 203.44 M 2
A.4.4.2.3 Rp 63,809.28 Rp 12,981,360.74
4 Pekerjaan Urugan Tanah 8.29 M 3
A.2.3.1.15 Rp 176,137.50 R
Rpp 1,459,475.33
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.83 M3 A.A.4.1.1.1 R
Rp
p1,081,510.75 Rp 896,139.81
PEKERJAAN TANGGA TRASRAM JUMLAH 12 ###
M PEKERJAAN
PEKERJAAN S SALURA
ALURANN KELI
KELILING
LING G
GEDUNG
EDUNG DAN RA
RABAT
BAT KELILING
KELILING BANGUNAN
BANGUNAN
1 Pekerjaan Galian Tanah Saluran 14.37 M3 A.2.3.1.1 Rp 84,562.50 Rp 1
1,,214,824.88
2 Pekerjaan Urugan Pasir Saluran 1.80 M 3
A.2.3.1.11 Rp 238,425.00 R
Rpp 428,151.69
3 Pekerjaan Beton Rabat Saluran T = 5 cm 1.80 M 3
A.A.4.1.1.1 R
Rpp1,081,510.75 Rp 1,942,122.93
2
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,4 M 57.46 M A. 4.4.1.8 Rp 133,276.33 Rp 7,658,591.03
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 64.65 M2 A.4.4.2.3 Rp 63,809.28 Rp 4,125,078.78
5 Pekerjaan Penutup Saluran Keliling / Grill Besi 71.83 M' - Rp 250,000.00 Rp 17,957,500.00
3 Pekerjaan Beton Rabat Keliling Bangunan T = 7 cm 3.84 M3 A.A.4.1.1.1 Rp1,081,510.75 Rp 4,150,297.50
2 Pekerjaan Urugan Pasir Rabat Keliling Bangunan 3.84 M 3
A.2.3.1.11 Rp 238,425.00 Rp 914,955.94
AN KELILING GEDUNG
GEDUNG DAN RABAT KELILKELILINGING BANGUNAN JUMLAH 13 ###
N PE
PEKE
KERJ
RJAA
AAN
N FIN
FINIS
ISHI
HING
NG
1 Pekerjaan Pasangan Wall Panel GRC tebal = 8cm 75.69 M2 Ls Rp 850,000.00 Rp 64,336,160.00
2 Pekerjaan Pasangan Batu Alam 7.546 M 2
Ls Rp 1
18
80,000.00 R
Rpp 1
1,,358,316.00
3 Pemasangan Huruf Stainless 4.00 Bh - Rp 100,000.00 Rp 400,000.00
PEKERJAAN FINISHING JUMLAH 14 Rp ###

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN

PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 16,7
16,790
90,8
,859
59.9
.93
3
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 11,204
11,204,814.
,814.71
71
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 12,328
12,328,535.
,535.14
14
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 23,209,546.28
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 25,773,977.23
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 32,067,478.11
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 23,099
23,099,748.
,748.72
72
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 20,709
20,709,349.
,349.16
16
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 16,168
16,168,162.
,162.49
49
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 55,689
55,689,811.
,811.40
40
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 7,798,748.00
K PEKERJAA
PEKERJAAN
N SALURAN KELILING GEDUNG Rp 9,967,020.46
Rp 238,017,191.70
REAL COST (A) Rp 254,8
254,808,05
08,051.63
1.63
PPN 10% (B) Rp 25,48
25,480,805
0,805.16
.16
TOTAL COST (A+B) Rp 280,2
280,288,85
88,856.79
6.79
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA
PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA
SUB
SUB P
PEK
EKER
ERJJAA
AAN
N : PEMBANGUNAN GUDANG SEKAM
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARA: 2019

KODE AR
ARGA
GA SATAU
SATAUA
A JUM
JUMLAH
LAH HA
HARG
RGA
A
NO URAIAN PEKERJAAN VOLUME SAT. ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PEMB
PEMBEN
ENTU
TUKA
KAN
N LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 36.000 M' - Rp 40,480.44 Rp
Rp 1,457,295.84
2 Mengup
Mengupas
as tanah
tanah da
dan
n pemb
pembers
ersiha
ihan
n semak
semak (Land
(Land Cleari
Clearin
n 123.25 M
2
- Rp 1,890.59 Rp 233,014.96
3 Galian Tanah dan Pembuangan (Cut dan Fill) 147.900 M 3
- Rp 95,338.40 Rp14,100,549.13
4 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
5 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AAN NBBAN
ANGU
GUNA
NAN
N
A PEKE
PEKERJ RJAA
AAN N TAN
TANAH
AH DAN
DAN PAS
PASIR
IR
1 Pekerjaan Galian Tanah Pondasi Garis 15.120 M3 A.2.3.1.1 Rp 84,727.50 Rp 1,281,079.80
2 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 1.544 M 3
A.2.3.1.9 Rp 62,205.00 Rp 96,069.40
3 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 1.260 M3 A ..2
2.3.1.1 1 Rp 238 ,,4
491.00 Rp 300 ,,4
498.66
4 Pekerjaan timbunan tanah bawah lantai T = 45 cm 46.182 M3 A.2.3.1.15 Rp 176,302.50 Rp 8,141,927.13
5 Pekerjaan pemadatan tanah per 20 cm 22.269 M 3
A.2.3.1.10 Rp 62,205.00 Rp 1,
1,385,239.72
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PE
PEKE
KERJ
RJAA
AANN P
PON
ONDA
DASISI
1 Pekerjaan Pasangan Pondasi Batu Kosong 5.040 M3 A.3.2.1.9 Rp 530,626.80 Rp 2,
2,674,359.07
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 10.710 M 3
A.3.2.1.2 Rp 901,417.00 Rp 9,
9 ,654,176.07
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAAN
AAN STRUKT
STRUKTUR UR BETON
BETON DAN RAB
RABAT AT
PEKERJAAN SLOOF
1 Pe
Peke
kerj
rjaa
aan
n Slo
Sloof
of S2 ( 15
15 x 20 )
- Beton K-250 1.080 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,421,343.63
- Pembesian 180.866 Kg A.4.1.1.17 Rp 19,792.04 Rp 3,579,712.40
- Bekisting 7.200 M2 A.4.1.1.21 Rp 229,640.40 Rp 1,653,410.88
PEKERJAAN KOLOM
2 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 50.050 M' A.4.1.1.35 Rp 121,198.22 Rp 6,
6 ,065,970.91
PEKERJAAN RINGBALOK
3 Pe
Peke
kerj
rjaa
aann Ring
Ringba
balk
lk (1
(15
5 x 15 )
- Beton K-250 0.810 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,066,007.72
- Pembesian 132.335 Kg A.4.1.1.17 Rp 19,792.04 Rp 2,619,187.48
- Bekisting 8.100 M2 A.4.1.1.23 Rp 412,672.70 Rp 3,342,648.87
PEKERJAAN BALOK LATEY
4 Pek. Balok Latey (10 x 15) 24.00 M' A.4.1.1.36 R
Rp
p 1
14
44,219.35 Rp
R p 3,461,264.40
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJ
PEKERJAAN
AAN PAS
PASANANGAN
GAN & PLES
PLESTER
TERANAN DI
DINDI
NDING
NG
PEK. DINDING TRANSRAM 1Pc : 2 Ps , t = 0,3 M
1 Pekerjaan Pasangan Dinding Batu Bata 18.240 M2 A. 4.4.1.8 Rp 133,375.33 Rp 2,
2,432,766.02
2 Pekerjaan Plesteran Dinding tebal 1.5 cm 36.480 M 2
A.4.4.2.3 Rp 63,908.28 Rp 2,331,374.20
PEKERJAAN DINDING
DINDING 1Pc : 4 Ps
3 Pekerjaan Pasangan Dinding Batu Bata 79.688 M2 A. 4.4.1.9 Rp 130,163.00 Rp 2,
2,374,173.12
4 Pekerjaan Plesteran Dinding tebal 1.5 cm 159.375 M2 A.4.4.2.5 Rp 61,059.86 Rp 9,731,414.55
PEKERJAAN FINISHING DINDING DAN KOLOM
5 Peke
Pekerj
rja
aan Ac
Aciian 195.
195.855 M2
855 A.4.
A.4.4.
4.2.
2.27
27 Rp 42
42,,22
226.
6.25
25 Rp 8,
8,27
270,
0,22
222.
2.19
19
6 Pekerjaan Acian Kolom 15.015 M A.4.4.2.27
2
Rp 42,226.25 Rp 634,027.14
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKER
PEKERJAAN
JAAN KUSEN PINTU
PINTU,, JENDE
JENDELA
LA DAN VENTI
VENTILASI
LASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u PJ
PJ1
1 1.000 Bh PJ1 AP Rp4,620,233.74 Rp 4,
4,620,233.74
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
2 Peke
Pekerj
rjaa
aan
n Jen
Jende
dela
la J1 2.000 Bh J1 AP Rp1,341,027.33 Rp 2,
2,682,054.66
3 Peke
Pekerj
rjaa
aan
n Jen
Jende
dela
la J2 10.000 Bh J 2 AP Rp2,476,518.97 Rp24,765,189.71
ERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEPEKE
KERJ
RJAA
AANN PL
PLAF
AFONOND
D
PEKERJAAN RANGKA PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Ra
Rang
ngka
ka Pl
Plaf
afon
ond
d Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2 11
115.
5.323 M2
323 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp
Rp15
15,0
,037
37,7
,742
42.6
.63
3
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 115.323 M2 A.4.5.1.7 Rp 52,890.20 Rp 6,
6,099,430.09
1
3 Pekerjaan Pasangan List Plafond Gypsumboard 72.000 M A.4.5.1.7a Rp 27,258.00 Rp 1,
1,962,576.00
PEKERJAAN PLAFOND MLAH 6 ###
G PEKE
PEKERRJA
JAAN
AN LA
LAN
NTA
TAII
PEKERJAAN URUGAN DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 5.766 M3 A.2.3.1.15 Rp 176,302.50 Rp 1,016,582.25
3
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 3.470 M A.A.4.1.1.4 Rp1,072,090.71 Rp 3
3,,720,154.76
3 Pekerjaan Beton Rabat Bawah Lantai T = 7 cm 3.215 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 3
3,,446,315.99
PEKERJAAN LANTAI DAN DINDING KERAMIK
2

4 Pekerjaan Lantai Keramik (40/40) 69.400 M1 A.4.4.3.4 Rp 162,302.58 Rp11,263,799.05


5 Pekerjaan Plint Dinding Tile (10/40) 35.400 M A.4.4.3.29 Rp
Rp 35,663.76 Rp 1,262,497.10
PEKERJAAN LANTAI JUMLAH 7 ###
H PEKE
PEKERJ
RJAA
AANN PE
PENG
NGEC
ECAT
ATANAN
PEKERJAAN PENGECATAN DINDING DAN KOLOM KOLOM
1 Pekerjaan Pengecatan Dinding Interior 97.928 M2 A.4.7.1.10a Rp 42,208.38 Rp 4,133,360.64
2 Pekerjaan Pengecatan Dinding Exterior 97.928 M2 A.4.7.1.10 Rp 54,033.38 Rp 5,291,353.33
2
3 Pekerjaan Pengecatan Dinding Kolom 15.015 M A.4.7.1.10a Rp 42,208.38 Rp
Rp 633,758.75
PEKERJAAN PENGECATAN PLAFOND
4 Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Plafo
lafond
nd da
dan
n List
List 12
129.
9.72
723
3 M2 A.
A.4.
4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp 6,
6,10
109,
9,68
689.
9.76
76
PEKERJAAN PENGECATAN JUMLAH 8 ###
I PEKE
PEKERJ
RJAA
AANN KO
KONS
NSTR
TRUK
UKSSI AT
ATAP
AP
1 Pe
Peke
kerj
rjaa
aan
n Ku
Kuda
da - Ku
Kuda
da Ba
Baja
ja Ring
Ringan
an C -TRU
-TRUSS
SS 75 0.
0.75
75 13
139.
9.24
244
4 M2 A.
A.4.
4.5.
5.2.
2.BJ
BJ1
1 Rp 24
249,
9,35
353.
3.86
86 Rp34
Rp34,7
,720
20,9
,903
03.7
.70
0
2 Pekerjaan Pasangan Atap Spandek 139.244 M2 A.4.5.2.SP Rp 94,632.84 Rp13,177,007.16
3 Pekerjaan Pasangan Nok Spandek 5.970 M' A.4.5.2.NK Rp 10
106,197.30 Rp
Rp 633,997.88
4 Pekerjaan Pasangan Jurai Atap 19.40 M' A.4.5.2.JA Rp 97,884.50 Rp
Rp 1,898,959.30
5 Pekerjaan Pasangan Kalsiplank 45.48 M' A.4.5.2.KP Rp
Rp 11
115,632.00 Rp
R p 5,258,943.36
PEKERJAAN KONSTRUKSI ATAP MLAH 9 ###
J PEKERJAAN INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 8.000 Ttk A.4.7.2.A Rp 3
3446,555.00 Rp 2,772,440.00
2 Pekerjaan Instalasi Stop Kontak 4.000 Ttk A.4.7.2.B Rp 372,955.00 Rp 1,491,820.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 8.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 480,194.00
PEKERJAAN PASANGAN SAKLAR
4 Pasangan Saklar Ganda 4.000 Ttk A.4.7.2.D Rp
Rp 31,479.25 Rp 125,917.00
PEKERJAAN PASANGAN STOP KONTAK
5 Pa
Pasa
sang
ngan
an St
Stop
op Ko
Kont
ntak
ak 4.
4.00
000
0 Tt
Ttk
k A.
A.4.
4.7.
7.2.
2.E
E Rp 28
28,3
,344
44.2
.25
5 Rp 11
113,
3,37
377.
7.00
00
PEKERJAAN PASANGAN KOTAK MCB
6 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
7 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
8 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp2,500,000.00 Rp 2,500,000.00
PEKERJAAN INSTALASI LISTRIK JUMLAH 10 ###
K PEK
PEKERJ
ERJAAN
AAN SA
SALUR
LURAN AN KELILIN
KELILING
G GED
GEDUNG
UNG
1 Pekerjaan Galian Tanah Saluran 3.45 M3 A.2.3.1.1 Rp 84,727.50 Rp
Rp 292,309.88
3
2 Pekerjaan Urugan Pasir Saluran 1.150 M A.2.3.1.11 R
Rp
p 23
238,491.00 Rp
Rp 274,264.65
3 Pekerjaan Beton Rabat Saluran T = 5 cm 1.150 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 1,
1,232,904.32
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 41.400 M2 A. 4.4.1.8 Rp 133,375.33 Rp 5,
5,521,738.66
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 41.400 M 2
A.4.4.2.3 Rp 63,908.28 Rp 2,645,802.96
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 11 ###

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN

PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 23,7
23,782
82,2
,275
75.4
.49
9
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 27,768
27,768,767.
,767.80
80
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 35,777
35,777,748.
,748.47
47
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 191,378,426.31
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 88,747,149.76
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 27,772,112.63
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 48,062
48,062,990.
,990.25
25
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 97,997
97,997,326.
,326.77
77
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 32,549
32,549,392.
,392.28
28
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP BAJA BERA
BERAT
T Rp 162,03
162,034,077
4,077.54
.54
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 13,966,684.50
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 24,942
24,942,302.
,302.02
02
L PEKERJAAN
PEKERJAAN SALURAN KELILING GEDUNG Rp 14,733,644.67
Rp 765,730,622.99
REAL COST (A) Rp 789,5
789,512,89
12,898.48
8.48
PPN 10% (B) Rp 78,95
78,951,289
1,289.85
.85
TOTAL COST (A+B) Rp 868,4
868,464,18
64,188.33
8.33
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA
PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA
SUB
SUB PEK
PEKER
ERJJAA
AAN
N : PEMBANGUNAN WORKSHOP

LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL


TAHUN ANGGARA: 2019

KODE ARGA
ARGA SA
SATAU
TAUA
A JUMLAH
JUMLAH HAR
HARGA
GA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PEK
PEKER
ERJA
JAAN
AN PEM
PEMBE
BENT
NTUK
UKAN
AN LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 79.000 M' - Rp 40,480.44 Rp
Rp 3,197,954.76
2 Me
Meng
ngup
upas
as ta
tana
nah
h da
dan
n pe
pemb
mber
ersi
siha
han
n sema
semak
k (L
(Lan
and
d Clea
Cleari
rin
n 16
166.
6.25
25 M
2
- Rp 1,
1,89
890.
0.59
59 Rp 31
314,
4,31
310.
0.24
24
3 Galian Tanah dan Pembuangan (Cut dan Fill) 199.500 M3 - Rp 95,338.40 Rp19,020,010.49
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
7 P3K 1.000 Ls
Ls - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN BA
BANG
NGUN
UNAN
AN
A PEKE
PEKERJ RJAA
AANN TA
TANA
NAHHDDAN
AN PASI
PASIR
R
1 Pekerjaan Galian Tanah Pondasi Garis 63.793 M3 A.2.3.1.1 Rp 84,727.50 Rp 5,404,979.04
2 Pekerjaan Galian Tanah Pondasi Poer (65 X 65) 9.408 M 3
A.2.3.1.1 Rp 84,727.50 Rp 797,116.32
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 10.863 M3 A.2.3.1.9 Rp 62,205.00 Rp 675,701.81
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 4.704 M 3
A.2.3.1.9 Rp 62,205.00 Rp 292,612.32
5 Pekerjaan Urugan Pasir B aw
awah Pondasi Ga
Garris T=5 cm 2.765 M 3
A.2.3.1.11 Rp 238,491.00 Rp 659,427.62
6 Pekerjaan Urugan Pasir B aw
awah Pondasi Poer T = 5 cm 0.392 M 3
A.2.3.1.11 Rp 238,491.00 Rp 93,488.47
3
7 Pekerjaan timbunan tanah bawah lantai T = 30 cm 95.601 M A.2.3.1.15 Rp 176,302.50 Rp16,854,607.15
8 Pekerjaan pemadatan tanah per 20 cm 48.080 M3 A.2.3.1.10 Rp 62,205.00 Rp 2,990,835.06
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANN PON
PONDA
DASSI
1 Pekerjaan Pasangan Pondasi Batu Kosong 11.060 M3 A.3.2.1.9 Rp 530,626.80 Rp 5,868,732.41
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 33.180 M3 A.3.2.1.2 Rp 901,417.00 Rp29,909,016.06
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAAN
AAN STRUKT
STRUKTUR UR BETO
BETON NDDAN
AN RA
RABAT
BAT
PEKERJAAN PONDASI POER
1 Pekerj
Pekerjaan
aan Pondas
Pondasii P
Poer
oer P1 ( 70 x 70 )
- Lantai Kerja Poer K100 0.392 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 420,259.56
- Beton K250 1.568 M A. A.4.1.1.8 Rp1,316,058.91
3
Rp
Rp 2,063,580.37
- Pembesian 255.201 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,050,955.45
- Bekisting 3.380 M2 A.4.1.1.20 Rp 215,890.40 Rp 729,709.55
PEKERJAAN STEK KOLOM
2 Pe
Peke
kerj
rjaa
aann St
Stek
ek Ko
Kolo
lom
m K1 ( 30 x 30 )
- Beton K250 1.440 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 1,895,124.83
- Pembesian 241.218 Kg A.4.1.1.17 Rp 19,792.04 Rp 4,774,199.33
- Bekisting 9.600 M2 A.4.1.1.22 Rp 400,008.95 Rp 3,840,085.92
PEKERJAAN SLOOF
3 Pe
Peke
kerj
rjaa
aann Slo
Sloof
of S1 ( 20
20 x 30 )
- Beton K-250 4.740 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 6,238,119.24
- Pembesian 760.554 Kg A.4.1.1.17 Rp 19,792.04 Rp15,052,909.30
- Bekisting 47.400 M2 A.4.1.1.21 Rp 229,640.40 Rp10,884,954.96
PEKERJAAN KOLOM
4 Pek.
Pek. Ko
Kolo
lom
m K1 ( 30
30 x 30 ) Pi
Pijak
jakan
an Kolo
Kolom
m baja
baja
- Beton K-250 0.864 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,137,074.90
- Pembesian 147.976 Kg A.4.1.1.17 Rp 19,792.04 Rp 2,928,742.01
- Bekisting 5.760 M2 A.4.1.1.22 Rp 400,008.95 Rp 2,304,051.55
5 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 30.800 M' A.4.1.1.35 Rp 121,198.22 Rp 3,
3 ,732,905.18
PEKERJAAN RINGBALOK
6 Pe
Peke
kerj
rjaa
aann Ri
Ring
ngba
balk
lk B1
B1 ( 15
15 x 15 )
- Beton K-250 1.778 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 2,339,294.72
- Pembesian 290.403 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,747,661.41
2
- Bekisting 17.775 M A.4.1.1.23 Rp 412,672.70 Rp 7,335,257.24
PEKERJAAN BAJA BERAT (IWF)
7 Kolom Baja H Beam 300.150.9.6.5 2472.11 kg A.4.2.1.1 Rp 37,654.65 Rp93,086,512.12
Pekerjaan Pasangan Angkur 22 mm L = 75 cm 64.00 Bh - Rp 58,000.00 Rp 3,
3,712,000.00
Pekerjaan Pasangan Plat 12 mm 135.65 kg A.4.2.1.1 Rp 37,654.65 Rp 5,107,777.96
Pek
eker
erjjaa
aan
n Peng
nge
elas
lasan Kawa
watt baja
aja las El
Elek
ektr
tro
oda 3.2 450.00
.00 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,
2,92
922
2.6
.65
5 Rp 1,3
1,315
15,1
,19
90.
0.25
25
Cat Zincromate 11.16 M2 A.4.7.1.19 Rp 36,453.45 Rp 406,820.50
PEKERJAAN BALOK LATEY
8 Pek. Balok Latey (10 x 15) 21.25 M' A.4.1.1.36 R
Rpp 144,219.35 Rp 3,064,661.19
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###

D PEK
PEKERJ
ERJAAN
AAN
PEKERJAAN PAS
PASANG
ANGAN
DINDING AN :&
1Pc 4 PLESTER
PLES
Ps TERAN
AN DIND
DINDING
ING

1 Pekerjaan Pasangan Dinding Bata Ringan 222.111 M2 A. 4.4.1.26 Rp 205,423.08 Rp45,626,642.44


2 Pekerjaan Plesteran Dinding tebal 1.5 cm 405.221 M2 A.4.4.2.5 Rp 61,059.86 Rp24,742,748.12
PEKERJAAN FINISHING DINDING DAN KOLOM
3 Pek
eker
erjjaa
aan
n Aci
cian
an 405
05.221 M2
.22 A.4
.4.4
.4.2
.2.2
.27
7 Rp 42,
2,2
226.2
.25
5 Rp1
Rp17,1
,110
10,9
,97
71.
1.70
70
2
4 Pekerjaan Acian Kolom 30.000 M A.4.4.2.27 Rp
Rp 42,226.25 Rp
Rp 1,266,787.50
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKERJ
PEKERJAAN
AAN KUS
KUSENEN PINT
PINTU,
U, JE
JENDE
NDELA
LA DAN VEN
VENTILA
TILASI
SI ALUM
ALUMINIU
INIUM
M
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Pe
Peke
kerj
rjaa
aan
n Pi
Pint
ntu
u P1 2.000 Bh PJ1 AP Rp3,809,078.19 Rp 7,
7,618,156.38
2 Pe
Peke
kerj
rjaa
aan
n Pi
Pint
ntu
u P2 2.000 Bh Ls Rp 287,500.00 Rp 575,000.00
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
3 Pe
Peke
kerj
rjaa
aan
n Jen
Jende
dela
la J1 2.000 Bh J1 AP Rp3,856,256.86 Rp 7,
7,712,513.73
4 Pekerjaan Ventilasi V1 3.000 Bh V1 AP Rp 955,480.84 Rp 2,866,442.52
5 Pekerjaan Roster Glassblock 200.000 Bh - Rp 45,000.00 Rp
Rp 9,000,000.00
PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5
ERJAAN KUSEN PINTU, ###

F PEKE
PEKERRJAAN
JAAN
PEKERJAAN PLAF
PLAFON
OND
RANGKA D
PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Ra
Rang
ngka
ka Pl
Plaf
afon
ond
d Al
Alum
umin
iniu
ium
m Holl
Hollow
ow 2 24
240.
0.180 M2
180 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp
Rp31
31,3
,318
18,8
,823
23.5
.51
1
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 240.180 M 2
A.4.5.1.7 Rp 52,890.20 Rp12,703,168.24
3 Pekerjaan Pasangan List Plafond Gypsumboard 148.250 M1 A.4.5.1.7a Rp 27,258.00 Rp 4,040,998.50
PEKERJAAN PLAFOND MLAH 6 ###
G PEKE
PEKERRJAAN
JAAN LA
LAN
NTA
TAII
PEKERJAAN LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai T = 10 cm 24.018 M3 A.2.3.1.11 Rp 238,425.00 Rp 5,726,491.65
3 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 12.009 M 3
A.A.4.1.1.1 Rp1,081,510.75 Rp12,987,862.58
PEKERJAAN LANTAI KHUSUS WORKSHOP (BEBAN MESIN)
Pek
eker
erjjaa
aan
n Lan
anta
taii Bet
eton
on K = 25
250
0 T = 15 cm 19.
9.24
24 M3 A. A.
A.4.
4.1.
1.1
1.8 Rp1
Rp1,3
,31
15,
5,51
511
1.1
.11
1 Rp2
Rp25,3
,307
07,1
,14
45.
5.03
03
Pembesian Wire Mash M-10 ### M3 A.4.1.1.19 Rp
Rp 18,182.53 Rp
Rp19,854,128.96
Floor Hardener 128.250 M2 Ls Rp -
PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pekerjaan Lantai Keramik (40/40) 147.555 M2 A.4.4.3.4 Rp 16
1 62,302.58 Rp23,948,557.19
1
2 Pekerjaan Plint Dinding Tile (10/40) 71.950 M2 A.4.4.3.29 Rp
Rp 35,663.76 Rp 2,566,007.53
3 Pekerjaan Lantai KKe
eramik K Kmm/Wc (20/20) Unpolished 9.145 M A.4.4.3.6 Rp 148,344.92 Rp 1,
1,356,614.31
4 Pe
Pek.
k. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Warn
Warna
a Km
Km/W
/Wc
c (20/
(20/25
25)) 21
21.240 M2 A.
.240 A.4.
4.4.
4.3.
3.54
54a
a Rp 29
294,
4,28
280.
0.58
58 Rp 6,
6,25
250,
0,51
519.
9.52
52
PEKERJAAN LANTAI JUMLAH 7 ###
H PEKE
PEKERJRJAA
AANN PE
PENG
NGEC
ECAT
ATAN
AN
PEKERJAAN PENGECATAN DINDING DAN K KOLOM
OLOM
1 Pekerjaan Pengecatan Dinding Interior 280.831 M2 A.4.7.1.10a Rp 42,208.38 R p1
p11,853,403.28
2 Pekerjaan Pengecatan Dinding Exterior 124.391 M 2
A.4.7.1.10 Rp 54,033.38 Rp 6,721,243.94
2
3 Pekerjaan Pengecatan Dinding Kolom 30.000 M A.4.7.1.10a Rp 42,208.38 Rp 1,266,251.25
PEKERJAAN PENGECATAN PLAFOND
4 Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Plaf
Plafon
ond
d da
dan
n List
List 26
269.
9.830 M2
830 A.
A.4.
4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp
Rp12
12,7
,708
08,4
,493
93.8
.81
1
PEKERJAAN PENGECATAN JUMLAH 8 ###
I PEKER
PEKERJAJAAN
AN KKON
ONST
STRU
RUKS
KSII ATAP
ATAP BAJA
BAJA BER
BERAT
AT
1 PEKERJAAN ATAP
Pekerjaan Pasangan Atap Spandek 269.118 M2 A.4.5.2.SP Rp 94,632.84 Rp25,467,399.29
Pekerjaan Pasangan Nok Spandek 11.650 M' A.4.5.2.NK Rp
Rp 106,197.30 Rp 1,237,198.55
Pekerjaan Pasangan Jurai Atap 28.44 M' A.4.5.2.JA Rp 97,884.50 Rp 2,783,835.18
Pekerjaan Pasangan Kalsiplank 68.64 M' A.4.5.2.KP Rp 115,632.00 Rp 7,936,980.48
2 PEKERJAAN KAKI KUDA-KUDA BAJAWF
Pekerjaan Kaki Kuda-kuda Baja 150.75.5.7 1231.44 kg A.4.2.1.1 Rp 37,654.65 Rp46,369,442.20
Pekerjaan Pasangan Mur Baut M - 16 320.00 Bh - Rp 10,000.00 Rp 3,200,000.00
Pekerjaan Pasangan Plat 12 mm 197.82 kg A.4.2.1.1 Rp 37,654.65 Rp 7,448,842.86
Pek
eker
erjjaa
aan
n Peng
nge
elas
lasan Kawa
watt baja
aja las El
Elek
ektr
tro
oda 3.2 311.70
.70 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,
2,92
922
2.6
.65
5 Rp 91010,9
,98
88.
8.45
45
Cat Zincromate 37.40 M2 A.4.7.1.19 Rp 36,453.45 Rp 1,363,504.84
3 PEKERJAAN GORDING CNP
Pekerjaan Gording C 150.50.20.2,3 1644.38 kg A.4.2.1.1 Rp 37,654.65 Rp61,918,365.85
Pekerjaan Pasangan Mur Baut M - 10 144.00 Bh - Rp 8,000.00 Rp 1,152,000.00
4 Pekerjaan Trekstank 113.46 kg A.4.1.1.17 Rp 19,792.04 Rp 2,245,519.85
PEKERJAAN KONSTRUKSI ATAP BAJA BERAT MLAH 9 ###
J PEKERJAAN INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 14.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 4,
4,851,770.00
2 Pekerjaan Instalasi Stop Kontak 12.000 Ttk A.4.7.2.B Rp 372,955.00 Rp 4,475,460.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Down Light 3" SL. 9 Watt 2.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 120,048.50
2 Pasangan Lampu Down Light 3" SL. 5 Watt 4.000 Ttk A.4.7.2.H Rp 46,494.25 Rp 185,977.00
3 Pasangan Lampu TL LED 2X18 Watt (8 Titik) 8.000 Ttk A.4.7.2.G Rp 116,894.25 Rp 935,154.00
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 2.000 Ttk A.4.7.2.C Rp
Rp 27,134.25 Rp 54,268.50
2 Pasangan Saklar Ganda 6.000 Ttk A.4.7.2.D R
Rp
p 31,479.25 Rp 188,875.50
PEKERJAAN PASANGAN STOP KONTAK Rp -
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 12.0
12.000
00 Ttk
Ttk A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,344
44.2
.25
5 Rp 340,
340,13
131.
1.00
00
PEKERJAAN PASANGAN KOTAK MCB Rp -
1 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
2 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
3 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp
Rp2
2,500,000.00 Rp 2,500,000.00
PEKERJAAN INSTALASI LISTRIK LAH 10 ###
K PE
PEKE
KERJ
RJAA
AAN
N SA
SANI
NITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 2.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp 7,340,251.56
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 1.000 Bh A.5.1.1 5 Rp 9
98
85,329.40 Rp
Rp 985,329.40
2 Pasangan Urinoir + Perlengkapan 3.000 Bh A.5.1.1 4 Rp2,127,196.50 Rp 6,381,589.50
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 15.000 M1 A.5.1.1 32 Rp 95,856.75 Rp 1 ,4
,437,851.25
2 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pipa
Pipa Pe
Pemb
mbua
uang
ngan
an Air
Air Ko
Koto
torr di
dia.
a. 3" 15.0
15.000
00 M 1
A.5.
A.5.1.
1.1
1 31 Rp 85,7
85,733
33.3
.31
1 Rp 1,2
1,285
85,9
,999
99.6
.69
9
3 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pipa
Pipa Pe
Pema
masu
suka
kan
n Air
Air Bers
Bersih
ih di
dia.
a. 3/4"
3/4" 50.0
50.000
00 M 1
A.5.
A.5.1.
1.1
1 26 Rp 25,9
25,990
90.8
.80
0 Rp 1,29
1,299,
9,54
540.
0.00
00
PEKERJAAN PAS. ASSESORI PELENGKAP
2 Pekerjaan Pasangan Kran Air (Wastafel) 1.000 Bh A.5.1.1 19a Rp 325,154.50 Rp 325,154.50
3 Pekerjaan Pasangan Kran Air 2.000 Bh A.5.1.1 19 R
Rp
p 97,729.50 Rp
Rp 195,459.00
4 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Fl
Floo
oorr Dr
Drai
ain
n 2.00
2.000
0 Bh A.5.
A.5.1.
1.1
1 14 Rp 121,
121,23
236.
6.50
50 Rp 242,
242,47
473.
3.00
00
5 Pekerjaan Pasangan Tempat Sabun Toilet 2.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 137,423.00
9 Pekerjaan Pembuatan Septick Tank + Peresapan 1.000 Unit A.5.1.1 32 Rp
Rp5
5,311,231.13 Rp 5,311,231.13
PEKERJAAN SANITASI JUMLAH 11 ###
L PEK
PEKERJ
ERJAAN
AAN SAL
SALURA
URAN
N KEL
KELILIN
ILING
G GED
GEDUNG
UNG
1 Pekerjaan Galian Tanah Saluran 3.98 M3 A.2.3.1.1 Rp 84,727.50 Rp 337,351.01
3
2 Pekerjaan Urugan Pasir Saluran 0.995 M A.2.3.1.11 R
Rp
p 23
238,491.00 Rp
Rp 237,393.94
3
3 Pekerjaan Beton Rabat Saluran T = 5 cm 0.995 M A.A.4.1.1.4 Rp1,072,090.71 Rp 1
1,,067,159.09
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 66.360 M 2
A. 4.4.1.8 Rp 133,375.33 Rp 8,
8,850,786.90
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 66.360 M2 A.4.4.2.3 Rp 63,908.28 Rp 4,240,953.73
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 12 ###

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN

PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 18,2
18,261
61,8
,873
73.1
.15
5
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 20,940
20,940,253.
,253.47
47
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 28,431
28,431,672.
,672.04
04
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 86,705,541.02
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 64,940,224.52

E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 19,503,043.81
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 32,106
32,106,477.
,477.29
29
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 44,318
44,318,654.
,654.37
37
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 26,120
26,120,668.
,668.97
97
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 78,045
78,045,283.
,283.85
85
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 9,400,518.50
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 19,871
19,871,196.
,196.42
42
L PEKERJAA
PEKERJAAN
N TAN
TANGGA
GGA TRASRAM
TRASRAM Rp 17,019
17,019,933.
,933.68
68
M PEKERJAAN
PEKERJAAN SALURAN KELILING GEDUNG Rp 8,731,991.58
N PEKE
PEKERJAA
RJAAN
N FINI
FINISHIN
SHING
G Rp 25,325
25,325,485.
,485.60
60
Rp 481,460,945.13
REAL COST (A) Rp 499,7
499,722,81
22,818.27
8.27
PPN 10% (B) Rp 49,97
49,972,281
2,281.83
.83
TOTAL COST (A+B) Rp 549,6
549,695,10
95,100.10
0.10
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA

PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA


SUB
SUB PEKE
PEKER
RJAAN
JAAN : PEMBANGUNAN RUANG KELAS LAPANGAN

LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL


TAHUN ANGGARA : 2019

KODE AR
ARGA
GA SATAU
SATAUA
A JUMLAH
JUMLAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMBE
MBENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 75.500 M' - Rp 40,480.44 Rp
Rp 3,056,273.22
2
2 Meng
Mengup
upas
as tana
tanah
h dan
dan pemb
pember
ersi
siha
han
n sema
semak
k (Lan
(Land
d Clea
Cleari
ring
ng 120.
120.00
00 M - Rp 1,
1,89
890.
0.59
59 Rp 22
226,
6,87
870.
0.55
55
3 Galian Tanah dan Pembuangan (Cut dan Fill) 144.000 M3 - Rp 95,338.40 Rp13,728,729.38
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
5 00,000.00
7 P3K 1.000 L
Ls
s - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN BA
BANG
NGUN
UNAN
AN
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DAN
DAN PASI
PASIR
R
3

1 Pekerjaan Galian Tanah Pondasi Garis 49.533 M3 A.2.3.1.1 Rp 84,727.50 Rp 4,196,764.89


2 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 6.795 M A.2.3.1.9 Rp 62,205.00 Rp 422,682.98
3 P ek
ekerjaan Urugan P asi
asirr Baw ah
ah Pondasi Garis T=5 cm 3.161 M3 A.2.3. 1
1..11 Rp 238,491.00 Rp 753,929.67
3
4 Pekerjaan timbunan tanah bawah lantai T = 30 cm 73.352 M A.2.3.1.15 Rp 176,302.50 Rp12,932,079.27
3
5 Pekerjaan pemadatan tanah per 20 cm 42.357 M A.2.3.1.10 Rp 62,205.00 Rp 2,634,796.66
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANNPPON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 12.645 M3 A.3.2.1.9 Rp 530,626.80 Rp 6,
6,709,775.89
3
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 24.098 M A.3.2.1.2 Rp 901,417.00 Rp21,721,896.16
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAA
AAN
N STRU
STRUKTUKTUR R BE
BETON
TON D
DAN
AN RAB
RABATAT
PEKERJAAN SLOOF
1 Pek
Peker
erja
jaan
an Sl
Sloo
ooff S
S1
1 ( 15 x 20
20 )
- Beton K-250 2.393 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,148,670.95
- Pembesian 400.669 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,930,057.33
- Bekisting 15.950 M2 A.4.1.1.21 Rp 229,640.40 Rp 3,662,764.38
2 Pek.
Pek. Kolo
Kolom
mK K1
1 ( 25 x 25
25 )
- Beton K-250 3.500 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 4,606,206.19
- Pembesian 611.121 Kg A.4.1.1.17 Rp 19,792.04 Rp12,095,325.51
- Bekisting 28.000 M2 A.4.1.1.22 Rp 400,008.95 Rp11,200,250.60
3 Pek
Pek.. Kol
Kolom
om K2 ( 30
30 x 30 ) Ter
Teras
as
- Beton K-250 1.440 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 1,895,124.83
- Pembesian 177.973 Kg A.4.1.1.17 Rp 19,792.04 Rp 3,522,445.33
- Bekisting 19.200 M2 A.4.1.1.22 Rp 400,008.95 Rp 7,680,171.84
4 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 12.000 M' A.4.1.1.35 Rp 121,198.22 Rp 1,
1,454,378.64
PEKERJAAN RINGBALOK
5 Pek
Peker
erja
jaan
an Ri
Ring
ngba
balk
lk B1
B1 ( 15
15 x 20
20 )
- Beton K-250 2.303 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,030,225.65
- Pembesian 385.597 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,631,747.96
- Bekisting 21.106 M2 A.4.1.1.23 Rp 412,672.70 Rp 8,709,973.17
6 Pekerjaan Balok (33 x 15 ) M3 Rp -
3
- Beton K-250 0.297 M A. A.4.1.1.8 Rp1,316,058.91 Rp 390,869.50
- Pembesian 30.144 Kg A.4.1.1.17 Rp 19
1 9,792.04 Rp 59
5 96,618.73
- Bekisting 1.890 M2 A.4.1.1.23 Rp 412,672.70 Rp 779,951.40
PEKERJAAN PLAT
7 Pek
Peker
erja
jaan
an Pla
Platt ter
teras
as t=10c
t=10cm
m
- Beton K-225 0.941 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp
R p 1,225,750.58
- Pembesian 114.741 Kg A.4.1.1.17 Rp 19,792.04 Rp 2,270,958.00
2
- Bekisting 4.703 M A.4.1.1.24 Rp 501,208.95 Rp 2,356,935.09
PEKERJAAN BALOK LATEY
8 Pek.
Pek. Ba
Balo
lok
k Lat
Latey
ey (20
(20 x 2
20)
0)
- Beton K-250 0.698 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 917,951.09
- Pembesian 24.502 Kg A.4.1.1.17 Rp 1
199,792.04 Rp 48
4 84,947.95
- Bekisting 2.700 M2 A.4.1.1.23 Rp 412,672.70 Rp 1,114,216.29
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEK
PEKERJA
ERJAANAN PAS
PASANG
ANGAN
AN & PLES
PLESTER
TERAN
AN D
DIND
INDING
ING
PEKERJAAN DINDING 1Pc : 4 Ps
1 Pekerjaan Pasangan Dinding Bata Ringan 148.670 M2 A. 4.4.1.26 Rp 205,423.08 Rp30,540,248.56
2 Pekerjaan Plesteran Dinding tebal 1.5 cm 297.340 M 2
A.4.4.2.5 Rp 61,059.86 Rp18,155,537.58
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Peke
Pekerrja
jaa
an Aci
cian
an 297.340 M2
.34 A.4
A.4.4.2
.4.2.2
.27
7 Rp 42,
2,2
226
26.2
.25
5 Rp1
Rp12,55
,555,55
,553.18
.18
2
2 Pekerjaan Acian Kolom 87.360 M A.4.4.2.27 Rp 42,226.25 Rp
Rp 3,688,885.20
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKERJAAN
PEKERJAAN KUSE
KUSEN N PINTU,
PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMIN
ALUMINIUM
IUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u PJ
PJ1
1 3.000 Bh P1 AP Rp3,760,976.87 Rp11,282,930.61
2 Pintu KM/WC
KM/WC Alumin
Aluminiumium (Len
(Lengkap
gkap Accessories
Accessories)) Lebar
Lebar 6 2.000 Bh Ls Rp 287,500.00 Rp 575,000.00
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
3 Peke
Pekerj
rjaa
aan
n Je
Jend
ndel
ela
a J1 2.000 Bh J1 AP Rp2,217,619.15 Rp 4,
4,435,238.30
4 Peke
Pekerj
rjaa
aan
nVVen
enti
tila
lasi
si V1
V1 3.000 Bh V1 AP Rp 586,148.96 Rp 1,758,446.87
5 Pekerjaan Ventilasi V2 2.000 Bh V2 AP Rp 725,714.02 Rp 1,451,428.04
ERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEK
PEKER
ERJA
JAA
AN PLA
PLAFO FON ND
PEKERJAAN RANGKA PLAFOND
1 Peker
Pekerja
jaan
an Pasa
Pasang
ngan
an Ra
Rang
ngka
ka Plaf
Plafon
ond
d Al
Alum
umin
iniu
ium
m Holl
Hollow
ow 2 156.
156.625 M2
625 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp
Rp20
20,4
,423
23,4
,477
77.1
.11
1
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 156.625 M 2
A.4.5.1.7 Rp 52,890.20 Rp 8,283,927.58
1
3 Pekerjaan Pasangan List Plafond Gypsumboard 124.700 M A.4.5.1.7a Rp 27,258.00 Rp 3
3,,399,072.60
PEKERJAAN PLAFOND MLAH 6 ###

G PEK
PEKER
ERJA
JAA
AN LA
LANT
NTAI
AI
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 17.373 M3 A.2.3.1.15 Rp 176,302.50 Rp 3
3,,062,815.18
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 8.686 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 9,312,447.92
PEKERJAAN LANTAI DAN DINDING KERAMIK
3 Pekerjaan Lantai Keramik (40/40) 121.085 M2 A.4.4.3.4 Rp 162,302.58 Rp19,652,407.90
1
4 Pekerjaan Plint Dinding Tile (10/40) 98.500 M A.4.4.3.29 Rp 35,663.76 Rp 3,512,880.36
5 Pekerj
erjaan Lantai Keramik Km/Wc (20/20) Unpolished 3.64
.640 M2 A.4
.4.4
.4..3.6 Rp 148,344.92 Rp 539,9
,97
75.5
.52
2
2
6 Pek.
Pek. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Warn
Warna
a Km/W
Km/Wc
c (20/
(20/25
25)) 19
19.440 M
.440 A.
A.4.
4.4.
4.3.
3.54
54a
a Rp 29
294,
4,28
280.
0.58
58 Rp 5,
5,72
720,
0,81
814.
4.48
48
7 Peke
Pekerj
rjaa
aan
n La
Lant
ntai
ai Tang
Tangga
ga Homo
Homoge
geno
nous
us Ti
Tile
le (40/
(40/40
40)) Poli
Polish
sh 15.510 M
15.510 2
A.4.
A.4.4.
4.3.
3.4
4 Rp 16
162,
2,30
302.
2.58
58 Rp 2,5
2,517
17,3
,313
13.0
.02
2
PEKERJAAN LANTAI JUMLAH 7 ###
H PEKE
PEKERJ
RJAA
AANN PEN
PENGE
GECA
CATA
TANN
PEKERJAAN PENGECATAN DINDI
DINDING
NG DAN KOLOM
1 Pekerjaan Pengecatan Dinding Interior 184.720 M2 A.4.7.1.10a Rp 42,208.38 Rp 7,796,731.03
2 Pekerjaan Pengecatan Dinding Exterior 112.620 M2 A.4.7.1.10 Rp
Rp 54,033.38 Rp 6,085,238.69
3 Pekerjaan Pengecatan Dinding Kolom 87.360 M2 A.4.7.1.10a Rp 42,208.38 Rp 3,687,323.64
PEKERJAAN PENGECATAN PLAFOND
4 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Plaf
Plafon
ond
d dan
dan List
List 181.
181.565 M2
565 A.4.
A.4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp 8,
8,55
551,
1,37
375.
5.60
60
PEKERJAAN PENGECATAN JUMLAH 8 ###
I PEKER
PEKERJAJAAN
AN KO
KONS
NSTR
TRUK
UKSI
SI ATAP
ATAP
1 Peke
Pekerrja
jaa
an Ku
Kud
da - Ku
Kud
da Baja
Baja Rin
Ringan C -TR
-TRUSS 75 0.7
.75
5 199.936 M2 A.4.5
.93 .4.5.2
.2.B
.BJ1
J1 Rp 249
49,3
,35
53.86
.86 Rp4
Rp49,85
,854,81
,812.63
.63
2
2 Pekerjaan Pasangan Atap Spandek 199.936 M A.4.5.2.SP Rp
Rp 94,632.84 Rp18,920,510.50
3 Pekerjaan Pasangan Nok Spandek 2.000 M' A.4.5.2.NK R
Rp
p 1
1006,197.30 Rp 212,394.60
4 Pekerjaan Pasangan Jurai Atap 30.16 M' A.4.5.2.JA Rp 97,884.50 Rp 2,952,196.52
5 Pekerjaan Pasangan Kalsiplank 52.80 M' A.4.5.2.KP Rp 115,632.00 Rp 6,105,369.60
PEKERJAAN KONSTRUKSI ATAP MLAH 9 ###
J PEKERJAAN INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 11.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 3,812,105.00
2 Pekerjaan Instalasi Stop Kontak 4.000 Ttk A.4.7.2.B Rp 37
3 72,955.00 Rp 1,491,820.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 2.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 120,048.50
4 Pasangan Lampu Down Light 3" SL. 5 Watt 3.000 Ttk A.4.7.2.H Rp 46,494.25 Rp 139,482.75
5 Pasangan Lampu TL LED 2X18 Watt (8 Titik) 6.000 Ttk A.4.7.2.G Rp 116,894.25 Rp 701,365.50
PEKERJAAN PASANGAN SAKLAR
6 Pasangan Saklar Tunggal 3.000 Ttk A.4.7.2.C Rp 27,134.25 Rp
Rp 81,402.75
7 Pasangan Saklar Ganda 4.000 Ttk A.4.7.2.D Rp 31,479.25 Rp 125,917.00
PEKERJAAN PASANGAN STOP KONTAK Rp -
8 Pasa
Pasang
ngan
an Stop
Stop Kont
Kontak
ak 4.00
4.000
0 Ttk
Ttk A.4.
A.4.7.
7.2.
2.E
E Rp 28
28,3
,344
44.2
.25
5 Rp 11
113,
3,37
377.
7.00
00
PEKERJAAN PASANGAN KOTAK MCB Rp -
9 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
10 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
11 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp2,500,0
,00
00.0
.00
0 Rp 2,5
,50
00,0
,00
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK JUMLAH 10 ###
K PEKE
PEKERJ
RJAA
AAN
N SANI
SANITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 2.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp 7 ,,3
340,251.56
PEKERJAAN PAS. WASTAFEL DAN URINOIR
2 Pasangan Wastafel Perlengkapan 2.000 Bh A.5.1.1 5 Rp 985,329.40 Rp 1,970,658.80
PEKERJAAN PAS. PIPA PVC
3 Pekerj
erjaan Pasangan Pipa Pembuangan Padat dia. 4" 15.000 M1 A.5
.5.1
.1..1 32 Rp 95,8
,85
56.7
.75
5 Rp 1
1,,437,851.25
4 Peke
Pekerrja
jaa
an Pasan
asang
gan Pipa
ipa Pemb
Pembu
uang
angan Air Ko
Kottor dia.
ia. 3" 15.000 M1
.00 A.5
.5.1
.1.1
.1 31 Rp 85,7
,73
33.3
.31
1 Rp 1,2
1,285
85,9
,99
99.69
.69
5 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pi
Pipa
pa Pema
Pemasu
suka
kan
n Ai
Airr Be
Bers
rsih
ih dia.
dia. 3/4"
3/4" 50.000 M1
50.000 A.5.
A.5.1.
1.1
1 26 Rp 25
25,9
,990
90.8
.80
0 Rp 1,2
1,299
99,5
,540
40.0
.00
0
PEKERJAAN PAS. ASSESORI PELENGKAP
6 Pekerjaan Pasangan Kran Air (Wastafel) 2.000 Bh A.5.1.1 19a Rp 325,154.50 Rp 650,309.00
7 Pekerjaan Pasangan Kran Air 2.000 Bh A.5.1.1 19 Rp 97,729.50 Rp
Rp 195,459.00
8 Peker
Pekerja
jaan
an Pasa
Pasang
ngan
an Fl
Floo
oorr Dr
Drai
ain
n 2.00
2.000
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 12
121,
1,23
236.
6.50
50 Rp 24
242,
2,47
473.
3.00
00
9 Pekerjaan Pasangan Tempat Sabun Toilet 2.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 137,423.00
10 Pekerj
erjaan Pemb
embuatan Septick Tank + Peres
esa
apan 1.00
.000 Unit A.5
.5.1
.1..1 32 Rp5,311,231.13 Rp 5,311,231.13
PEKERJAAN SANITASI JUMLAH 11 ###
L PEK
PEKER
ERJA
JAAN
AN TA
TANG
NGGA
GA TRAS
TRASRA
RAM
M
1 Pekerjaan Urugan Pasir 0.90 M3 A.2.3.1.11 Rp 238,491.00 Rp 214,641.90
2 Peker
Pekerja
jaan
an Pasa
Pasang
ngan
an Pond
Pondas
asii Tras
Trasra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 45.90 M2 A. 4.
45.90 4.4.
4.1.
1.26
26 Rp 20
205,
5,42
423.
3.08
08 Rp 9
9,4
,428
28,9
,919
19.1
.14
4
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 91.80 M2 A.4.4.2.3 Rp 63,908.28 Rp 5,866,780.47
4 Pekerjaan Urugan Tanah 8.76 M 3
A.2.3.1.9 R
Rp
p 62,205.00 Rp 544,710.52
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.90 M3 A.A.4.1.1.4 R
Rpp1,072,090.71 Rp 964,881.64
PEKERJAAN TANGGA TRASRAM JUMLAH 12 ###
M PEK
PEKERJ
ERJAAN
AAN SA
SALUR
LURAN
AN KKELIL
ELILING
ING GED
GEDUNG
UNG
1 Pekerjaan Galian Tanah Saluran 3.63 M3 A.2.3.1.1 Rp
Rp 84,727.50 Rp 307,560.83
2 Pekerjaan Urugan Pasir Saluran 1.210 M3 A.2.3.1.11 Rp 2
23
38,491.00 Rp
Rp 288,574.11
3 Pekerjaan Beton Rabat Saluran T = 5 cm 1.210 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 1,
1,297,229.76
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 33.880 M2 A. 4.4.1.8 Rp 133,375.33 Rp 4,
4,518,756.18
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 36.300 M2 A.4.4.2.3 Rp 63,908.28 Rp 2,319,870.71
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 13 ###
N PEKE
PEKERJ
RJAA
AANNF FIN
INIS
ISHI
HING
NG
1 Pekerjaan Pipa Hollow 4 x 4 cm 86.400 M' Ls Rp 152,748.75 Rp13,197,492.00
2
2 Pekerjaan Pagar 3.267 M Ls Rp3,712,272.30 Rp12,127,993.60
PEKERJAAN FINISHING JUMLAH 14 Rp ###

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN

PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 97,0
97,065
65,1
,171
71.0
.08
8
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 89,563
89,563,758.
,758.51
51
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 91,861
91,861,150.
,150.68
68
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 898,515,432.35
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 319,282,125.02

E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 141,231,203.41
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 86,586
86,586,701.
,701.31
31
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 172,57
172,572,539
2,539.77
.77
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 157,87
157,872,474
2,474.83
.83
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 46,182
46,182,155.
,155.20
20
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 44,744,856.00
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 54,728
54,728,752.
,752.84
84
L PEKERJAAN
PEKERJAAN PIPA SALURAN AIR HUJAN Rp 5,865,415.12
M PEKERJAAN
PEKERJAAN TANGGA TRASRAM Rp 12,481,507.01
N PEKERJAA
PEKERJAAN
N SALURAN KELILING GEDUNG Rp 18,973,631.56
0 PEKE
PEKERJAA
RJAAN
N FINI
FINISHIN
SHING
G Rp 52,503
52,503,380.
,380.00
00
P PEKE
PEKERJAA
RJAAN
N KUBA
KUBAH
H Rp 20,000
20,000,000.
,000.00
00
Rp 2,192,965,083.63
REAL COST (A) Rp 2,290
2,290,030,
,030,254.7
254.71
1

PPN 10% (B) Rp 229,0


229,003,02
03,025.47
5.47
TOTAL COST (A+B) Rp 2,519
2,519,033,
,033,280.1
280.18
8
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA
PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA
SUB
SUB PE
PEKE
KER
RJAAN
JAAN : PEMBANGUNAN MASJID

LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL


TAHUN ANGGARA : 2019

KODE ARGA
ARGA SA
SATA
TAUA
UA JUMLAH
JUMLAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N P
PEM
EMBE
BENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 284.090 M' - Rp 40,480.44 R
Rp
p11,500,088.20
2
2 Me
Meng
ngup
upas
as tana
tanah
h da
dan
n pe
pemb
mber
ersih
sihan
an semak
semak (La
(Land
nd Clea
Cleari
ring
ng 72
725.
5.00
00 M - Rp 1,8
1,890
90.59
.59 Rp 1,37
1,370,
0,67
676.2
6.24
4
3
3 Galian Tanah dan Pembuangan (Cut dan Fill) 870.000 M - Rp 95,338.40 Rp82,944,406.64
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 5
5000,000.00
7 P3K 1.000 Ls
Ls - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AANN LANT
LANTAI
AI SA
SATU
TU
A PE
PEKE
KERJRJAA
AANN TANA
TANAHHD DAN
AN PA
PASI
SIR
R
3
1 Pekerjaan Galian Tanah Pondasi Garis 136.432 M3 A.2.3.1.1 Rp 84,727.50 Rp11,559,529.57
2 Pekerjaan Galian Tanah Pondasi Poer (100 X 100) 24.336 M A.2.3.1.1 Rp 84,727.50 Rp 2,
2,061,928.44
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 24.858 M3 A.2.3.1.9 Rp 62,205.00 Rp 1
1,,546,284.11
3
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 12.168 M A.2.3.1.9 Rp 62,205.00 Rp 756,910.44
3
5 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 11.108 M A.2. 3.
3.1.11 Rp 238, 49
491.00 Rp 2,649,134. 18
18
6 Pekerjaan Urugan Pasir Bawah Pondasi P oe
oer T = 5 cm 1.014 M3 A.2. 3.
3.1.11 Rp 238, 49
491.00 Rp 241,829.87
3
7 Pekerjaan timbunan tanah bawah lantai T = 70 cm 356.105 M A.2. 3.
3.1.15 Rp 176, 30
302.50 Rp62,782,113. 61
61
3
8 Pekerjaan pemadatan tanah per 20 cm 128.061 M A.2.3.1.10 Rp 62,205.00 Rp 7,966,028.28
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANNPPON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 11.108 M3 A.3.2.1.9 Rp 530,626.80 Rp 5
5,,894,149.43
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 95.369 M3 A.3.2.1.2 Rp 901,417.00 Rp85,967,001.25
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAA
AANN ST
STRUK
RUKTURTUR BET
BETON
ON DAN
DAN R RAB
ABAT
AT
PEKERJAAN PONDASI POER
1 Pekerj
Pekerjaan
aan Pondas
Pondasii Poer
Poer P1 ( 100
100 x 100 )
3
- Lantai Kerja Poer K100 2.028 M A.A.4.1.1.4 RpRp1,072,090.71 Rp 2,174,199.96
- Beton K250 4.200 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 5,527,447.43
- Pembesian 886.340 Kg A.4.1.1.17 Rp 19,792.04 Rp17,542,464.95
- Bekisting 24.000 M2 A.4.1.1.20 Rp 215,890.40 Rp 5,181,369.60
PEKERJAAN STEK KOLOM
2 Peke
Pekerj
rjaa
aannSSte
tek
k Kolo
Kolom
m K1 ( 30
30 x 30
30 )
- Beton K250 3.648 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 4,800,982.91
- Pembesian 325.559 Kg A.4.1.1.17 Rp 19,792.04 Rp 6,443,482.32
- Bekisting 18.240 M2 A.4.1.1.22 Rp 400,008.95 Rp 7,296,163.25
PEKERJAAN SLOOF
3 Peke
Pekerj
rjaa
aann Slo
Sloof
of S1 ( 3
30
0 x 45 )
- Beton K-250 7.560 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 9,949,405.38
- Pembesian 296.078 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,859,982.95
- Bekisting 25.200 M2 A.4.1.1.21 Rp 229,640.40 Rp 5,786,938.08
4 Peke
Pekerj
rjaa
aann Slo
Sloof
of S2 ( 3
30
0 x 40 )
- Beton K-250 9.036 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp11,891,908.33
- Pembesian 378.312 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,487,565.10
- Bekisting 30.120 M2 A.4.1.1.21 Rp 229,640.40 Rp 6,916,768.85
5 Pe
Pekerjaan Sloof S3 ( 20 x 30 ) Rp -
- Beton K-250 0.960 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 1,263,416.56
- Pembesian 80.385 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,590,983.29
- Bekisting 4.800 M2 A.4.1.1.21 Rp 229,640.40 Rp 1,102,273.92
6 Pekerjaan Sloof S4 ( 15 x 40 )
Pe Rp -
- Beton K-250 0.240 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 315,854.14
- Pembesian 20.096 Kg A.4.1.1.17 Rp 1
199,792.04 Rp 3
3997,745.82
- Bekisting 1.600 M2 A.4.1.1.21 Rp 229,640.40 Rp 367,424.64
7 Pekerjaan Sloof S5 ( 15 x 20 ) Rp -
3
- Beton K-250 3.864 M A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 5,084,856.82
- Pembesian 647.049 Kg A.4.1.1.17 Rp 19,792.04 Rp12,806,421.11
- Bekisting 25.758 M2 A.4.1.1.21 Rp 229,640.40 Rp 5,915,077.42
PEKERJAAN KOLOM
8 Pek.
Pek. Kolo
KolommK K1
1 ( 40 x 4
40
0)
- Beton K-250 10.560 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp13,897,582.12
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp25,160,286.61
- Bekisting 52.800 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp21,120,472.56
9 Pek.
Pek. Kolo
Kolom
mKK2
2 ( 30 x 8
80
0)
- Beton K-250 8.640 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p11,370,749.00
- Pembesian 938.422 Kg A.4.1.1.17 Rp 19,792.04 Rp18,573,272.19
- Bekisting 39.600 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp15,840,354.42
10 Pek.
Pek. K
Kol
olom
om K3
K3 ( 2
20
0x5
50
0)
- Beton K-250 2.400 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,158,541.39
- Pembesian 379.014 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,501,465.38
- Bekisting 16.800 M2 A.4.1.1.22 Rp 400,008.95 Rp 6,720,150.36
11 Pek.
Pek. K
Kol
olom
om K4
K4 ( 3
30
0x3
30
0)
- Beton K-250 8.764 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp11,534,203.52
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp24,005,017.21
- Bekisting 58.428 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp23,371,722.93
12 Pek.
Pek. K
Kol
olom
om K5
K5 ( 2
20
0x3
30
0)
- Beton K-250 14.400 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp18,951,248.34
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp45,183,717.16
- Bekisting 120.000 M2 A.4.1.1.22 Rp 400,008.95 Rp48,001,074.00

13 Pek.
Pek. K
Kol
olom
om K6
K6 ( 1
15
5x3
35
5)
- Beton K-250 2.646 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,482,291.88
- Pembesian 471.957 Kg A.4.1.1.17 Rp 19,792.04 Rp 9,340,987.75
- Bekisting 50.400 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp20,160,451.08
14 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 84.000 M' A.4.1.1.35 Rp 121,198.22 Rp10,180,650.48
PEKERJAAN RINGBALOK DAN BALOK
15 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 1 ( 30 x 45 )
- Beton K-250 7.560 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 9,949,405.38
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp22,714,722.47
- Bekisting 33.600 M2 A.4.1.1.23 Rp 412,672.70 Rp
Rp13,865,802.72
16 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 2 ( 30 x 40 ) M3 Rp -
3
- Beton K-250 9.036 M A. A.4.1.1.8 Rp1,316,058.91 Rp
R p11,891,908.33
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp26,549,494.59
- Bekisting 41.415 M2 A.4.1.1.23 Rp 412,672.70 Rp17,090,839.87
17 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 3 ( 30 x 30 )
- Beton K-250 1.440 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,895,124.83
- Pembesian 218.613 Kg A.4.1.1.17 Rp 19,792.04 Rp 4,326,787.34
- Bekisting 7.200 M2 A.4.1.1.23 Rp 412,672.70 Rp 2,971,243.44
18 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 4 ( 15 x 20 )
- Beton K-250 2.693 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 3,543,488.62
- Pembesian 450.910 Kg A.4.1.1.17 Rp 19,792.04 Rp 8,924,421.89
- Bekisting 24.681 M2 A.4.1.1.23 Rp 412,672.70 Rp
Rp10,185,278.08
19 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 5 ( 10 x 10 )
- Beton K-250 0.400 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 526,423.56
- Pembesian 241.734 Kg A.4.1.1.17 Rp 19,792.04 Rp 4,784,403.28
- Bekisting 6.000 M2 A.4.1.1.23 Rp 412,672.70 Rp 2,476,036.20
20 Pek
Pekerj
erjaan
aan Balok
Balok 1 ( 15 x 30 )
- Beton K-250 1.800 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 2,368,906.04
- Pembesian 293.027 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,799,592.22
- Bekisting 15.000 M2 A.4.1.1.23 Rp 412,672.70 Rp 6,190,090.50
21 Pek
Pekerj
erjaan
aan Balok
Balok 2 ( 15 x 20 )
- Beton K-250 0.120 M3 A. A.4.1.1.8 Rp - Rp -
- Pembesian 20.096 Kg A.4.1.1.17 Rp1,316,058.91 Rp
Rp26,447,856.82
- Bekisting 1.100 M2 A.4.1.1.23 Rp 412,672.70 Rp 453,939.97
PEKERJAAN BALOK LATEY
22 Pek
Pek.. Balo
Balok
kLLate
atey
y ((15
15 x 3
30)
0)
- Beton K-250 2.070 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 2,724,241.95
- Pembesian 296.749 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,873,258.50
- Bekisting 13.800 M2 A.4.1.1.23 Rp 412,672.70 Rp 5,694,883.26
23 Pek. Balok Latey (10 x 15) diatas ventilasi 12.000 M' A.4.1.1.36 Rp 144,219.35 Rp 1
1,,730,632.20
PEKERJAAN PLAT t=12 cm
24 Peker
Pekerjaan
jaan Plat Beton Bang
Bangunan
unan Utama
Utama T = 12 cm
- Beton K-225 14.688 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp19,142,822.39
- Pembesian 528.870 Kg A.4.1.1.17 Rp 19,792.04 Rp10,467,414.08
- Bekisting 61.200 M2 A.4.1.1.24 Rp 501,208.95 Rp
Rp30,673,987.74
25 Peker
Pekerjaan
jaan P
Plat
lat Be
Beton
ton A
Area
rea Wu
Wudhu
dhu dan
dan WC T = 12 cm
cm
- Beton K-225 4.032 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp 5,254,892.42
- Pembesian 409.920 Kg A.4.1.1.17 Rp 19,792.04 Rp 8,113,151.40
- Bekisting 16.800 M 2
A.4.1.1.24 Rp 501,208.95 Rp 8,420,310.36
26 Peker
Pekerjaan
jaan Plat Beton Mihr
Mihrab
ab T = 12 cm
- Beton K-225 0.792 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp 1,032,211.01

- Pembesian 80.520 Kg2 A.4.1.1.17 Rp 19,792.04 Rp 1,593,654.74


- Bekisting 3.300 M A.4.1.1.24 Rp 501,208.95 Rp 1,653,989.54
PEKERJAAN BAJA BERAT (IWF)
27 Kolom Baja IWF 300.150.9.6,5 528.48 kg A.4.2.1.1 Rp 37,654.65 Rp19,899,729.43
Pekerjaan Pasangan Baut M - 19 96.00 Bh - Rp 12,000.00 Rp 1,152,000.00
Pekerjaan Pasangan Plat 12 mm 180.86 kg A.4.2.1.1 Rp 37,654.65 Rp 6,810,370.62
Pekerjaan Pasangan Angkur 22 mm L = 75 cm 36.00 M' - Rp 58,000.00 Rp 2,
2,088,000.00
Peke
Pekerj
rjaa
aann Peng
Pengel
elas
asan
an Ka
Kawa
watt baja
baja la
las
s Elek
Elektr
trod
oda
a 3.2
3.2 1080
1080.0
.00
0 CM A.4.
A.4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 3,
3,15
156,
6,45
456.
6.60
60
Cat Zincromate 12.96 M2 A.4.7.1.19 Rp 36,453.45 Rp 472,436.71
28 Kaki Kuda-Kuda IWF 150.75.5.7 934.64 kg A.4.2.1.1 Rp 37,654.65 Rp35,193,542.08
Pekerjaan Pasangan Baut M - 16 336.00 Bh - Rp 10,000.00 Rp 3,360,000.00
Pekerjaan Pasangan Plat 12 mm 305.21 kg A.4.2.1.1 Rp 37,654.65 Rp11,492,500.42
Cat Zincromate 30.04 M2 A.4.7.1.19 Rp 36,453.45 Rp 1,095,134.54
29 Gording C 150.50.2.2,3 1697.72 kg A.4.2.1.1 RRp
p 37,654.65 Rp
Rp63,927,074.99
Pekerjaan Pasangan Baut M - 10 160.00 Bh - Rp 8,000.00 Rp
Rp 1,280,000.00
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJA
PEKERJAANAN PAS
PASANG
ANGAN AN & PLES
PLESTER
TERAN
AN DIND
DINDING
ING
PEKERJAAN DINDING
DINDING 1Pc : 4 Ps
1 Pekerjaan Pasangan Dinding Bata Ringan 705.675 M2 A. 4.4.1.26 Rp 205,423.08 ###
2
2 Pekerjaan Plesteran Dinding tebal 1.5 cm ### M A.4.4.2.5 Rp 61,059.86 Rp86,176,839.98
PEKERJAAN FINISHING DINDING DAN KOLOM
3 Pek
eker
erja
jaan
an Acia
Acian
n # M2
###
## A.4.
A.4.4
4.2.2
.2.27
7 Rp 42,2
,22
26.2
.25
5 Rp59,
9,5
596
96,0
,02
26.3
.38
8
2
4 Pekerjaan Acian Kolom 676.056 M A.4.4.2.27 Rp 42,226.25 Rp
Rp28,547,309.67
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKERJAAN
PEKERJAAN KUSEN PINTU, JENDEL JENDELA
A DAN VENTILASI
VENTILASI ALUMIN
ALUMINIUM
IUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u PJ
PJ11 3.000 Bh PJ1 AP ### RRp
p34,898,278.93
2 Pekeker
erja
jaan
an Pi
Pin
ntu P
P22 4.000 Bh P2 AP Rp2,780,832.39 Rp11,123,329.55
3 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P3 PaPabr
brik
ikas
asii 4.000 Bh Ls Rp 228
87,500.00 Rp 1,150,000.00
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
4 Peke
Pekerj
rjaa
aan
n Je
Jend
ndel
ela
a J1 6.000 Bh J1 AP ### RRpp81,114,245.95
5 Peke
Pekerj
rjaa
aan
n Je
Jend
ndel
ela
a J2 6.000 Bh J2 AP Rp 933,805.95 Rp 5,602,835.70
6 Peke
Pekerj
rjaa
aan
n Je
Jend
ndel
ela
a V1 1.000 Bh V1 AP Rp 8
8446,448.71 R p 846,448.71
ERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEK
PEKER
ERJA
JAAN
AN PLAF
PLAFON ONDD
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Ra
Rang
ngka
ka Plaf
Plafon
ond
d Al
Alum
umin
iniu
ium
m Holl
Hollow
ow 2 421.
421.435 M2
435 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp
Rp54
54,9
,953
53,9
,973
73.0
.09
9
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 421.435 M 2
A.4.5.1.7 Rp 52,890.20 Rp22,289,776.15
3 Pekerjaan Pasangan List Plafond Gypsumboard 342.760 M1 A.4.5.1.7a Rp 27,258.00 Rp 9,
9,342,952.08
PEKERJAAN PLAFOND MLAH 6 ###
G PEK
PEKER
ERJA
JAAN
AN LA
LANNTA
TAII
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 58.948 M3 A.2.3.1.15 Rp 176,302.50 Rp10,392,679.77
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 29.474 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp31,598,801.56
PEKERJAAN LANTAI DAN DINDING KERAMIK
3 Pekerjaan Granit (60/60) 32.71 M2 A.4.4.3.13 R
Rp
p 32
327,443.60 Rp
Rp10,710,680.16
4 Pekerjaan Plint Granit Tile (10/60) 42.1 M' A.4.4.3.28
A.4.4.3.28 Rp 67,7
67,763.8
63.87
7 Rp 2,852
2,852,858
,858.86
.86
5 Pekerjaan Lantai Keramik (60/60) 416.72 M2 A.4.4.3.3 Rp 2
2113,545.37 Rp88,988,626.74
6 Pekerjaan Plint Dinding Tile (10/60) 202.45 M' A.4.4.3.29
A.4.4.3.29 Rp
Rp 56,6
56,657.6
57.69
9 Rp11,470
Rp11,470,348
,348.89
.89
2
7 Pekerjaan Lantai Garis Sha (15/60) 21.00 M A.4.4.3.3 Rp 213,545.37 Rp 4,484,452.78
2
8 Pek
eker
erja
jaan
an Lanta
antaii Dep
epa
an WC Hom
Homogen
ogenoous Ti
Tile
le (40
(40/40) P 28.213 M
.21 A.4
A.4.4.3
.4.3.4
.4 Rp 16
162
2,3
,30
02.5
.58
8 Rp 4,5
4,578
78,9
,977
77.7
.77
7
11 Peke
ekerjaan Lantai Kera
eramik Km/Wc (20/20) Unpolished 5.295 M2
.29 A.4.4
.4..3.6 Rp 148,3
,34
44.9
.92
2 Rp 785,516.03
12 Pek.
Pek. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Warn
Warna
a Km/W
Km/Wc
c (20/
(20/25
25)) 22.800 M2 A.
22.800 A.4.
4.4.
4.3.
3.54
54a
a Rp 29
294,
4,28
280.
0.58
58 Rp 6,
6,70
709,
9,59
597.
7.22
22
PEKERJAAN LANTAI JUMLAH 7 ###
H PEKE
PEKERJRJAA
AANN PE
PENG
NGEC
ECAT
ATAN
AN
PEKERJAAN PENGECATAN DINDING DAN KO KOLOM
LOM
1 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Dind
Dindin
ing
g ### M2
### A.4.
A.4.7.
7.1.
1.10
10 Rp 54
54,0
,033
33.3
.38
8 Rp
Rp76
76,2
,260
60,0
,014
14.6
.61
1
2
2 Pekerjaan Pengecatan Dinding Kolom 676.056 M A.4.7.1.10a Rp 42,208.38 Rp28,535,225.17
PEKERJAAN PENGECATAN PLAFOND
3 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Plaf
Plafon
ond
d da
dan
n List
List 48
489.
9.98
987
7 M2 A.4.
A.4.7.
7.1.
1.5
5 Rp 47,0
47,098
98.1
.15
5 Rp23
Rp23,0
,077
77,4
,476
76.5
.51
1
PEKERJAAN WATERPROOFING
4 Pekerjaan Waterproong Dak Beton 195.120 M2 A.4.7.1.23 Rp 153,750.30 Rp29,999,758.54
PEKERJAAN PENGECATAN JUMLAH 8 ###
I PEKERJA
PEKERJAANAN KONSTR
KONSTRUKS
UKSII AT
ATAP
AP BAJ
BAJA
A RING
RINGAN
AN
1 Peker
ekerja
jaa
an Kuda
uda - Ku
Kud
da Baja
aja Ring
ingan C -TRU
-TRUS
SS 75 0.75
.75 55.944 M2 A.
.94 A.4
4.5.2
.5.2.B
.BJ1
J1 Rp 249,3
49,35
53.8
3.86 Rp13,9
3,949,85
,852.1
.14
4
2 Pekerjaan Pasangan Atap Spandek 307.587 M2 A.4.5.2.SP Rp 94,632.84 Rp29,107,829.82
3 Pekerjaan Pasangan Jurai Spandek 31.920 M' A.4.5.2.JA Rp 97,884.50 R
Rpp 3,124,473.24
PEKERJAAN KONSTRUKSI ATAP BAJA RINGAN MLAH 9 ###
J PEKERJAAN INSTALASI
INSTALASI LISTRIK

1 SAMBUNGAN
Pekerjaan InstINSTALASI LISTRIK
alasi Titik L ampu 59 Ttk A.4.7.2.A Rp 3
3446,555.00 Rp20,446,745.00
2 Pekerjaan Instalasi Stop Kontak 21 Ttk A.4.7.2.B Rp 3
3772,955.00 Rp 7,832,055.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu DownLight 3" SL. 13 Watt 27 Ttk A.4.7.2.I Rp 197,711.25 Rp 55,,338,203.75
4 Pasa
Pasang
ngan
an Bare
Barett TL
TLCC LED
LED 20 Watt
Watt 5 Tt
Ttk
k A.4.
A.4.7.
7.2.
2.L
L Rp 804,
804,91
911.
1.25
25 Rp 4,
4,02
024,
4,55
556.
6.25
25
5 Pasangan Lampu SL 20 Watt 21 Ttk A.4.7.2.K Rp 54,133.75 R
Rpp 1,136,808.75
6 Pasangan Lampu SL 10 Watt 6 Ttk A.4.7.2.J Rp 48,441.25 Rp 290,647.50
PEKERJAAN PASANGAN SAKLAR
7 Pasangan Saklar Tunggal 6 Ttk A.4.7.2.C Rp
Rp 27,134.25 Rp 162,805.50
8 Pasangan Saklar Ganda 2 Ttk A.4.7.2.D Rp 31,479.25 Rp
Rp 62,958.50
PEKERJAAN PASANGAN STOP KONTAK Rp -
9 Pasa
Pasang
ngan
an St
Stop
op Ko
Kont
ntak
ak 21 Tt
Ttk
k A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,344
44.2
.25
5 Rp 59
595,
5,22
229.
9.25
25
PEKERJAAN PASANGAN KOTAK MCB Rp -
10 Pemasangan Box MCB 1 Bh Ls Rp 6
65
5,000.00 Rp 65,000.00
11 Pemasangan MCB 1 Bh Ls Rp 250,000.00 Rp 250,000.00
12 Pem
emaasangan Instalasi Panel Listrik PLN 1 Set Ls Rp3,500,000.00 Rp 3,5
,50
00,0
,00
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK LAH 10 ###

K PEKE
PEKERJ
RJAA
AAN
N SANI
SANITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 4.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp14,680,503.11
PEKERJAAN PAS. WASTAFEL DAN URINOIR
2 Pasangan Wastafel Perlengkapan 4.000 Bh A.5.1.1 5 Rp 985,329.40 Rp 3,941,317.60
3 Pasangan Urinoir + Perlengkapan 4.000 Bh A.5.1.1 4 Rp2,127,196.50 Rp 8
8,,508,786.00
PEKERJAAN PAS. PIPA PVC
4 Pek
eker
erjjaan Pasangan Pipa Pemb
embuangan Padat dia. 4" 30.000 M1
.00 A.5.
.5.1.1 32 Rp 95,85
,856.75
.75 Rp 2,8
2,87
75,7
,70
02.5
.50
0
1
5 Peker
ekerja
jaa
an Pas
asan
ang
gan Pip
Pipa Pem
emb
buang
angan Air Koto
Kotorr dia.
ia. 3" 30.000 M
.00 A.5.1
.5.1.1
.1 31 Rp 85,7
,73
33.3
.31
1 Rp 2,57
2,571,99
,999.38
.38
6 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pipa
Pipa Pema
Pemasu
suka
kan
n Air
Air Bers
Bersih
ih dia.
dia. 3/
3/4"
4" 75
75.000 M1
.000 A.5.
A.5.1.
1.1
1 26 Rp 25,9
25,990
90.8
.80
0 Rp 1
1,9
,949
49,3
,310
10.0
.00
0
PEKERJAAN PAS. ASSESORI PELENGKAP
7 Pekerjaan Pasangan Kran Air (Wastafel) 4.000 Bh A.5.1.1 19a R
Rp
p 325,154.50 Rp 1,
1,300,618.00
8 Pekerjaan Pasangan Kran Air 36.000 Bh A.5.1.1 19 Rp
Rp 97,729.50 Rp 3,518,262.00
9 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Floo
Floorr Drai
Drain
n 4.
4.00
000
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,23
236.
6.50
50 Rp 484,
484,94
946.
6.00
00
10 Pekerjaan Pasangan Tempat Sabun Toilet 4.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 274,846.00
11 Pekerjaan Pasangan Mesin Pompa Air 1.000 Bh Ls Rp2,500,000.00 Rp 2,500,000.00
12 Pekerjaan Pasangan Tangki Air = 1200 Liter 1.000 Bh Ls Rp1,500,000.00 Rp 1,
1,500,000.00
13 Pek
eker
erjjaan Pembuatan Sept
eptick Tank + Peres
esa
apan 2.0
.00
00 Unit A.5.
.5.1.1 32 Rp5,311,231.13 Rp10,622,4
,46
62.2
.25
5
PEKERJAAN SANITASI LAH 11 ###
L PE
PEKE
KERJ
RJAA
AAN
N PIPA
PIPA SAL
SALUR
URAN
AN A
AIR
IR HUJ
HUJAN
AN
1 Pek.
Pek. Pas.
Pas. Pipa
Pipa Salu
Salura
ran
n Air
Air Hu
Huja
jan
n tert
tertan
anam
am Dala
Dalam
m Kolo
Kolom
m 36
36.00 M1
.00 A.
A.5.
5.1.
1.1
1 35 Rp 142,
142,72
722.
2.11
11 Rp 5,13
5,137,
7,99
996.
6.12
12
1
2 Pekerjaan Pasangan Pipa Saluran Air Hujan 3" M Rp -
3 Pemasangan Floor Drain 6.00 Bh A.5.1.1 14 Rp 121,236.50 Rp 727,419.00
PEKERJAAN PIPA SALURAN AIR HUJAN JUMLAH 12 ###
M PE
PEKE
KERJ
RJAA
AANN TANG
TANGGAGA TRA
TRASR
SRAM
AM
1 Pekerjaan Urugan Pasir 0.61 M3 A.2.3.1.11 Rp 238,491.00 Rp 145,169.47
2
2 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pond
Pondas
asii Tr
Tras
asra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 34
34.49 M
.49 A. 4.4.
4.4.1.
1.26
26 Rp 205,
205,42
423.
3.08
08 Rp 7,0
7,085
85,6
,658
58.1
.13
3
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 68.99 M2 A.4.4.2.3 Rp 63,908.28 Rp 4,408,776.88
3
4 Pekerjaan Urugan Tanah 3.04 M A.2.3.1.9 R
Rp
p 62,205.00 Rp 189,320.92
3
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.61 M A.A.4.1.1.4 R
Rpp1,072,090.71 Rp 652,581.61
PEKERJAAN TANGGA TRASRAM JUMLAH 13 ###
N PEKERJA
PEKERJAANAN SALURA
SALURAN N KKELIL
ELILING
ING GEDUNG
GEDUNG
1 Pekerjaan Galian Tanah Saluran 26.05 M3 A.2.3.1.1 Rp 84,727.50 Rp 2,207,549.59
2 Pekerjaan Urugan Pasir Saluran 3.722 M3 A.2.3.1.11 Rp 2
23
38,491.00 R
Rp
p 887,687.35
3 Pekerjaan Beton Rabat Saluran T = 5 cm 1.241 M 3
A.A.4.1.1.4 Rp
R p1,072,090.71 Rp 1,
1,330,142.94
2
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 49.628 M A. 4.4.1.8 Rp 133,375.33 Rp 6
6,,619,150.88
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 124.070 M2 A.4.4.2.3 Rp 63,908.28 Rp 7
7,,929,100.80
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 14 ###
O PEKE
PEKERJ
RJAA
AAN
N FIN
FINIS
ISHI
HING
NG
1 Pekerjaan Pasangan Batu Alam 4.333 M2 Ls Rp 180,000.00 Rp 779,940.00
2 Pekerjaan Pasangan Wall Panel GRC tebal = 8cm 60.086 M2
Ls Rp 850,000.00 Rp51,073,440.00
3 Pekerjaan Pemasangan Huruf Stainless Steel 10.000 Bh Ls Rp 65,000.00 Rp
Rp 650,000.00
PEKERJAAN FINISHING JUMLAH 15 Rp ###
P PE
PEK
KERJA
ERJAAN
AN KUBA
UBAH
1 Pekerjaan Pasangan Kubah GRC dan Rangka d = 900 t = 1.000 Set Ls ### Rp20,000,000.00
PEKERJAAN KUBAH JUMLAH 16 ###

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN

PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 24,5
24,593
93,0
,001
01.2
.26
6
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 21,348
21,348,025.
,025.74
74
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 37,151
37,151,993.
,993.79
79
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 111,810,994.60
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 76,741,472.13

E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp -
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 8,184,
8,184,015.4
015.400
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 26,814
26,814,899.
,899.23
23
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 20,268
20,268,350.
,350.87
87
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP BAJA BERA
BERAT
T Rp 224,26
224,268,713
8,713.54
.54
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 15,533,896.75
K PEKE
PEKERJAA
RJAAN
N TEM
TEMPAT
PAT BILA
BILAS
S KAKI Rp 1,772,
1,772,049.1
049.11
1
L PEKERJAA
PEKERJAAN
N FINI
FINISHIN
SHING
G Rp -
Rp 543,894,411.16
REAL COST (A) Rp 568,4
568,487,41
87,412.42
2.42
PPN 10% (B) Rp 56,84
56,848,741
8,741.24
.24
TOTAL COST (A+B) Rp 625,3
625,336,15
36,153.66
3.66
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA
PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA
SUB
SUB P
PEK
EKER
ERJA
JAAN
AN : PEMBANGUNAN KANDANG AYAM PETELUR

LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL


TAHUN ANGGARA: 2019

KODE AR
ARGA
GA SA
SATAU
TAUA
A JUMLAH
JUMLAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PEKER
PEKERJAA
JAAN
N PEMBE
PEMBENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 94.000 M' - Rp 40,480.44 Rp
Rp 3,805,161.36
2 Mengup
Mengupas
as tanah
tanah dan
dan pemb
pembers
ersiha
ihan
n semak
semak (Land
(Land Cleari
Clearin
n 168.00 M 2
- Rp 1,890.59 Rp 317,618.77
3 Galian Tanah dan Pembuangan (Cut dan Fill) 201.600 M 3 - Rp 95,338.40 Rp19,220,221.13
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
7 P3K 1.000 Ls
Ls - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AAN N LA
LANT
NTAI
AI S
SAT
ATU
U
A PEKE
PEKERJ RJAA
AAN NTTAN
ANAH
AH DAN
DAN PAS
PASIR
IR
1 Pekerjaan Galian Tanah Pondasi Garis 76.140 M3 A.2.3.1.1 Rp 84,727.50 Rp 6,451,151.85
2 Pekerjaan Galian Tanah Pondasi Poer (80 X 80) 7.290 M 3
A.2.3.1.1 Rp 84,727.50 Rp 617,663.48
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 16.920 M 3
A.2.3.1.9 Rp 62,205.00 Rp 1,
1,052,508.60
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 3.645 M 3
A.2.3.1.9 Rp 62,205.00 Rp 226,737.23
5 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 4.230 M3 A.2.3.1.11 Rp 238,491.00 Rp 1 ,0
,0 0
08
8,816.93
6 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 0.620 M3 A.2.3.1.11 Rp 238,491.00 Rp 14
47
7,749.94
3
7 Pekerjaan timbunan tanah bawah lantai T = 40 cm 55.440 M A.2.3.1.15 Rp 176,302.50 Rp 9,774,210.60
8 Pekerjaan pemadatan tanah per 20 cm 33.264 M 3
A.2.3.1.10 Rp 62,205.00 Rp 2,069,187.12
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANN PON
PONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 16.920 M3 A.3.2.1.9 Rp 530,626.80 Rp 8,978,205.46
3
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 31.255 M A.3.2.1.2 Rp 901,417.00 Rp28,173,788.34
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAAN
AAN STRUKT
STRUKTUR UR BETO
BETON ND DAN
AN R
RABA
ABATT
PEKERJAAN PONDASI POER
1 Pe
Peke
kerj
rjaa
aan
n Po
Pond
ndas
asii Po
Poer
er P
P1
1 ( 80 x 80
80 )
- Lantai Kerja Poer K100 0.387 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 415,113.52
- Beton K250 7.290 M A. A.4.1.1.8 Rp1,316,058.91 Rp
3
R p 9,594,069.47
- Pembesian 298.702 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,911,913.77
- Bekisting 3.200 M2 A.4.1.1.20 Rp 215,890.40 Rp 690,849.28
PEKERJAAN STEK KOLOM
2 Pe
Peke
kerj
rjaa
aann St
Stek
ek K
Kol
olom
om K1
K1 ( 25 x 25 )
- Beton K250 0.500 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 658,029.46
- Pembesian 89.235 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,766,135.92
- Bekisting 4.800 M2 A.4.1.1.22 Rp 400,008.95 Rp 1,920,042.96
PEKERJAAN SLOOF
3 Pekerjaan Sloof S1 ( 20 x 25 )
Pe Rp -
- Beton K-250 4.150 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 5,461,644.49
- Pembesian 651.695 Kg A.4.1.1.17 Rp 19,792.04 Rp12,898,365.99
- Bekisting 20.750 M2 A.4.1.1.21 Rp 229,640.40 Rp 4,765,038.30
4 Pe
Peke
kerj
rjaa
aann Slo
Sloof
of S2 ( 15
15 x 20 )
- Beton K-250 0.422 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 555,903.28
- Pembesian 70.739 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,400,065.29
2
- Bekisting 2.816 M A.4.1.1.21 Rp 229,640.40 Rp 646,667.37
PEKERJAAN KOLOM
5 Pe
Pek.
k. Ko
Kolo
lom
m K1 ( 25 x 25 ) Rp -
- Beton K-250 0.250 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 329,014.73
- Pembesian 29.303 Kg A.4.1.1.17 Rp 1
199,792.04 Rp 5 79,959.22
- Bekisting 2.000 M2 A.4.1.1.22 Rp 400,008.95 Rp 800,017.90
6 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 27.000 M' A.4.1.1.35 Rp 121,198.22 Rp 3,
3,272,351.94
PEKERJAAN RINGBALOK
7 Pek
Pekerj
erjaan
aan Bal
Balok
ok B1 ( 15 x 15 ) Rp -
3
- Beton K-250 0.210 M A. A.4.1.1.8 Rp1,316,058.91 Rp 276,372.37
- Pembesian 30.047 Kg A.4.1.1.17 Rp 19,792.04 Rp 594,698.99
- Bekisting 1.925 M2 A.4.1.1.23 Rp 412,672.70 Rp 794,394.95
8 Pe
Peke
kerj
rjaa
aann Ri
Ring
ngba
balk
lk (1
(12
2 x 15 )
- Beton K-250 0.360 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 473,781.21
- Pembesian 70.363 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,392,630.99
- Bekisting 4.200 M2 A.4.1.1.23 Rp 412,672.70 Rp 1,733,225.34
PEKERJAAN BAJA BERAT (IWF)
9 Pekerjaan Kolom Baja 150.75.5.7 347.20 kg A.4.2.1.1 Rp 37,654.65 Rp13,073,694.48
Pekerjaan Pasangan Baut M - 19 40.00 Bh - Rp 12,000.00 Rp
Rp 480,000.00
Pekerjaan Pasangan Plat 16 mm 58.88 kg A.4.2.1.1 Rp 37,654.65 Rp 2,216,917.52
Pekerjaan Pasangan Angkur 22 mm L = 75 cm 30.00 M' - Rp 58,000.00 Rp 1,
1,740,000.00
Pek
eker
erjjaa
aan
n Peng
ngel
elas
asan
an Kaw
awa
at baja
aja las El
Ele
ekt
ktro
rod
da 3.
3.2
2 450.00
0.00 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,9
,92
22.
2.65
65 Rp 1,3
1,31
15,1
,190
90.2
.25
5
Cat Zincromate 11.16 M2 A.4.7.1.19 Rp 36,453.45 Rp 406,820.50
10 Pekerjaan Ringbalk Baja 150.75.5.7 770.00 kg A.4.2.1.1 Rp 37,654.65 Rp28,994,080.50
Pekerjaan Pasangan Mur Baut M - 16 160.00 Bh - Rp 10,000.00 Rp 1,600,000.00
Pekerjaan Pasangan Plat 12 mm 49.46 kg A.4.2.1.1 Rp 37,654.65 Rp 1,862,210.72
Pek
eker
erjjaa
aan
n Peng
ngel
elas
asan
an Kaw
awaat baja
aja las El
Ele
ekt
ktro
rod
da 3.
3.2
2 206.25
6.25 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,9
,92
22.
2.65
65 Rp 60602
2,7
,795
95.5
.53
3
Cat Zincromate 24.75 M2 A.4.7.1.19 Rp 36,453.45 Rp 902,222.89
11 Pekerjaan Trektank 85.22 kg A.4.1.1.17 Rp 19,792.04 Rp 1,686,775.48
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEK
PEKERJ
ERJAAN
AAN PAS
PASANG
ANGAN
AN & PLESTER
PLESTERAN
AN D
DIND
INDING
ING
1 Pekerjaan Pasangan Dinding Bata Ringan 184.198 M2 A. 4.4.1.26 Rp 205,423.08 Rp37,838,416.86
2 Pekerjaan Plesteran Dinding tebal 1.5 cm 368.395 M2 A.4.4.2.5 Rp 61,059.86 Rp22,494,145.65
PEKERJAAN FINISHING DINDING DAN KOLOM Rp -
3 Pek
eker
erjjaa
aan
n Aci
cian
an 36
368.395 M2
8.395 A.4
.4..4.
4.2.
2.2
27 Rp 42
42,2
,22
26.
6.25
25 Rp1
Rp15,
5,55
555
5,9
,939
39.3
.37
7
4 Pekerjaan Acian Kolom 20.200 M A.4.4.2.27
2
Rp 42,226.25 Rp 852,970.25
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKERJ
PEKERJAANAAN KUS
KUSENEN PINTU
PINTU,, JENDE
JENDELA
LA DAN VEN
VENTILA
TILASI
SI ALUMI
ALUMINIU
NIUM
M
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Pe
Peke
kerj
rjaa
aan
n Pi
Pint
ntu
u PJ1
PJ1 1.000 Bh 0.00 Rp - Rp -
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
2 Pe
Peke
kerj
rjaa
aan
n Jen
Jende
dela
la J1 2.000 Bh 0.00 Rp - Rp -
3 Pe
Peke
kerj
rjaa
aan
n Jen
Jende
dela
la J2 10.000 Bh 0.00 Rp - Rp -
4 Pekerjaan Ventilasi V1 Bh Rp -
PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5
ERJAAN KUSEN PINTU, Rp -
F PEKE
PEKER RJAAN
JAAN PLAF
PLAFON OND
D
PEKERJAAN RANGKA PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Ra
Rang
ngka
ka Plafo
lafond
nd Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2 37
37.8
.840
40 M2 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp 4,934
4,934,2
,233
33.8
.83
3
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 37.840 M2 A.4.5.1.7 Rp 52,890.20 Rp 2,
2,001,365.17
3 Pekerjaan Pasangan List Plafond Gypsumboard 45.800 M 1
A.4.5.1.7a Rp 27,258.00 Rp 1,248,416.40
PEKERJAAN PLAFOND MLAH 7 ###
G PEKE
PEKERRJAAN
JAAN LA
LAN
NTA
TAII
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 16.012 M3 A.2.3.1.15 Rp 176,302.50 Rp 2,
2,822,955.63
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 1.892 M 3
A.A.4.1.1.4 Rp1,072,090.71 Rp 2,
2 ,028,395.62
3 Pekerjaan Beton Rabat Bawah Lantai T = 7 cm 8.560 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 9,
9 ,176,667.63
PEKERJAAN RABAT LANTAI KELILING BANGUNAN
4 Pekerjaan Urugan Pasir Keliling Bangunan + Teras 5.408 M3 A.2.3.1.15 Rp 176,302.50 Rp 953,443.92
5 Pekerjaan Beton Rabat Keliling Bangunan T = 7 cm 3.786 M 3
A.A.4.1.1.4 Rp1,072,090.71 Rp 4,
4,058,506.59
PEKERJAAN LANTAI DAN DINDING KERAMIK
6 Pekerjaan Lantai Keramik (40/40) 37.840 M2 A.4.4.3.4 Rp 1
1662,302.58 Rp 6,141,529.63
7 Pekerjaan Plint Dinding Tile (10/40) 45.800 M 1
A.4.4.3.29 Rp
Rp 35,663.76 Rp
R p 1,633,400.21
PEKERJAAN LANTAI JUMLAH 8 ###
H PEKE
PEKERJ
RJAA
AANN PE
PENG
NGEC
ECAT
ATANAN
PEKERJAAN PENGECATAN DINDING DAN KO KOLOM
LOM
1 Pekerjaan Pengecatan Dinding Interior 228.626 M2 A.4.7.1.10a Rp 42,208.38 Rp 9,649,910.84
2
2 Pekerjaan Pengecatan Dinding Exterior 139.770 M A.4.7.1.10 Rp 54,033.38 Rp 7,552,217.81
3 Pekerjaan Pengecatan Dinding Kolom 20.200 M 2
A.4.7.1.10a Rp 42,208.38 Rp 852,609.18
PEKERJAAN PENGECATAN PLAFOND
4 Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Plaf
Plafon
ond
d da
dan
n List
List 47
47.0
.000
00 M2 A.4.
A.4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp 2,
2,21
213,
3,61
613.
3.05
05
PEKERJAAN PENGECATAN JUMLAH 9 ###
I PEKER
PEKERJAJAAN
AN KKON
ONST
STRU
RUKS
KSII ATAP
ATAP BAJA
BAJA BERAT
BERAT
1 Pekerjaan Pasangan Atap Spandek 269.222 M2 A.4.5.2.SP Rp 94,632.84 Rp25,477,278.96
2 Pekerjaan Pasangan Nok Spandek 26.240 M' A.4.5.2.NK R
Rpp 106,197.30 Rp 2,786,617.15
3 Pekerjaan Pasangan Kalsiplank 73.00 M' A.4.5.2.KP Rp
Rp 111
15,632.00 R
Rpp 8,441,136.00
PEKERJAAN KAKI KUDA-KUDA BAJA
4 Pekerjaan Kaki Kuda-Kuda Baja 150.75.5.7 1163.68 kg A.4.2.1.1 Rp 37,654.65 Rp43,817,963.11
Pekerjaan Pasangan Baut M - 16 160.00 Bh - Rp 10,000.00 R
Rpp 1,600,000.00
Pekerjaan Pasangan Plat 12 mm 49.46 kg A.4.2.1.1 Rp 37,654.65 Rp 1,862,210.72
Peke
ekerja
rjaan Peng
ngeelasa
lasan
n Kawat
awat baj
aja
a las
las El
Elek
ekttro
rod
da 3.2 311.
1.70
70 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,9
,92
22.6
.65
5 Rp 910,9 ,988
88.4
.45
5
Cat Zincromate 37.40 M2 A.4.7.1.19 Rp 115,632.00 R
Rp
p 4,325,099.33
PEKERJAAN GORDING BAJA
5 Pekerjaan Gording CNP 125.50.20.2,3 1824.68 kg A.4.2.1.1 Rp 36,453.45 Rp66,515,776.16
Pekerjaan Pasangan Baut M - 16 140.00 Bh - Rp 10,000.00 R
Rpp 1,400,000.00

PEKERJAAN KONSTRUKSI ATAP BAJA BERAT MLAH 4 ###


J PEKERJAAN INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 23.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 7,
7,970,765.00
2 Pekerjaan Instalasi Stop Kontak 3.000 Ttk A.4.7.2.B Rp 372,955.00 Rp 1,118,865.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 5.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 300,121.25
4 Pasangan Lampu TL LED 2X18 Watt (8 Titik) 18.000 Ttk A.4.7.2.G Rp 116,894.25 Rp 2
2,,104,096.50
PEKERJAAN PASANGAN SAKLAR
5 Pasangan Saklar Tunggal 4.000 Ttk A.4.7.2.C Rp
Rp 27,134.25 Rp 108,537.00
6 Pasangan Saklar Ganda 1.000 Ttk A.4.7.2.D Rp 31,479.25 Rp 31,479.25
PEKERJAAN PASANGAN STOP KONTAK Rp -
7 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kontntak
ak 3.00
3.000
0 Ttk
Ttk A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,344
44.2
.25
5 Rp 85,0
85,032
32.7
.75
5
8 PEKERJAAN PASANGAN KOTAK MCB Rp -
9 Pemasangan Box MCB 1.00 Bh Ls Rp 65
6 5,000.00 Rp 65,000.00
10 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
11 Pemas
emasan
ang
gan Ins
nsttalas
alasii Panel
anel Lis
isttri
rik
k PLN 1.
1.00
00 Set Ls Rp
Rp3,
3,50
5000,0
,00
00.0
.00
0 Rp 3,5
,50
00,0
,000
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK MLAH 5 ###
K PE
PEKE
KERJ
RJAA
AAN
N TEMP
TEMPATAT BIL
BILAS
AS KA
KAKI
KI
1 Pekerjaan Galian Tanah Saluran 2.45 M3 A.2.3.1.1 Rp 84,727.50 Rp 207,582.38
2 Pekerjaan Urugan Pasir Saluran 0.140 M 3
A.2.3.1.11 Rp 238,491.00 Rp
Rp 33,388.74
3 Pekerjaan Beton Rabat Saluran T = 5 cm 0.140 M 3
A.A.4.1.1.4 Rp
Rp1,072,090.71 Rp 150,092.70
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 7.000 M 2
A. 4.4.1.8 Rp 133,375.33 Rp 933,627.31
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 7.000 M 2
A.4.4.2.3 Rp 63,908.28 Rp 447,357.99
PEKERJAAN TEMPAT BILAS KAKI ###
L PE
PEKE
KERJ
RJAA
AANN FINI
FINISH
SHIN
ING
G
1 Pemasangan Logo dan Huruf Acrylic Bh
PEKERJAAN FINISHING JUMLAH 12 Rp Rp -

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN

PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 16,6
16,602
02,4
,432
32.0
.08
8
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 16,966
16,966,793.
,793.92
92
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 30,670
30,670,156.
,156.58
58
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 70,560,906.17
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 16,619,576.38

E PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 19,546
19,546,532.
,532.03
03
F PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 16,612
16,612,541.
,541.07
07
G PEKERJAA
PEKERJAAN
N KONSTRUKSI ATAP Rp 69,405,287.71
H PEKERJAAN
PEKERJAAN INSTALASI LISTRIK Rp 5,463,171.25
I PEKE
PEKERJAA
RJAAN
N TAN
TANGGA
GGA TRASRAA
TRASRAAM
M Rp 17,019
17,019,933.
,933.68
68
J PEKERJAAN
PEKERJAAN KAYU TEMPAT
TEMPAT MAKAN KAMBING Rp 48,232,066.75
Rp 311,096,965.53
REAL COST (A) Rp 327,6
327,699,39
99,397.61
7.61
PPN 10% (B) Rp 32,76
32,769,939
9,939.76
.76
TOTAL COST (A+B) Rp 360,4
360,469,33
69,337.37
7.37
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA

PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA


SUB
SUB PEKE
PEKER
RJAAN
JAAN : PEMBANGUNAN KANDANG KANDANG KAMBING
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARA : 2019

KODE AR
ARGA
GA SATAU
SATAUA
A JUM
JUMLAH
LAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMBE
MBENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 77.600 M' - Rp 40,480.44 Rp
Rp 3,141,282.14
2
2 Meng
Mengup
upas
as tana
tanah
h dan
dan pemb
pember
ersi
siha
han
n se
sema
mak
k (Lan
(Land
d Clea
Cleari
ring
ng 105.
105.00
00 M - Rp 1,
1,89
890.
0.59
59 Rp 19
198,
8,51
511.
1.73
73
3 Galian Tanah dan Pembuangan (Cut dan Fill) 126.000 M 3
- Rp 95,338.40 Rp12,012,638.20
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
5 00,000.00
7 P3K 1.000 L
Ls
s - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AANN LANT
LANTAI
AI SA
SATU
TU
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DAN
DAN PAS
PASIR
IR

1 Pekerjaan Galian Tanah Pondasi Garis 69.840 M3 A.2.3.1.1 Rp 84,727.50 Rp 5,917,368.60


2 Pekerjaan Galian Tanah Pondasi Poer (65 X 65) 6.750 M3 A.2.3.1.1 Rp 84,727.50 Rp 571,910.63
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 32.592 M3 A.2.3.1.9 Rp 62,205.00 Rp 2,
2,027,385.36
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 3.375 M3 A.2.3.1.9 Rp 62,205.00 Rp 209,941.88
3
5 P ek
eke rj
rjaan Urugan Pasir
sir Bawah P on
ondasi Garis T=5 cm 6.984 M A. 2
2..3.1. 1
11
1 Rp 238,491.00 Rp 1 ,6
,665,621. 1
14
4
6 P ek
eke rj
rjaan Urugan Pasir
sir Bawah P on
ondasi Poe r T = 5 cm 0.450 M 3
A. 2
2..3.1. 1
11
1 Rp 238,491.00 Rp 107,320.95
7 Pekerjaan timbunan tanah bawah lantai T = 30 cm 32.232 M3 A.2.3.1.15 Rp 176,302.50 Rp 5 ,6
,682,529.29
8 Pekerjaan pemadatan tanah per 20 cm 12.615 M3 A.2.3.1.10 Rp
Rp 62,205.00 Rp
Rp 784,716.08
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANNPPON
ONDA
DASSI
1 Pekerjaan Pasangan Pondasi Batu Kosong 13.968 M3 A.3.2.1.9 Rp 530,626.80 Rp 7,
7,411,795.14
3
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 25.802 M A.3.2.1.2 Rp 901,417.00 Rp23,258,361.43
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAA
AAN
N STRUK
STRUKTU TUR R BETON
BETON D DAN
AN RAB
RABAT
AT
PEKERJAAN PONDASI POER
1 Pek
Peker
erja
jaan
an Pon
Ponda
dasi
si P
Poe
oerr P1 ( 65 x 65 )

- Lantai Kerja Poer K100 0.450 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 482,440.82


- Beton K250 1.352 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 1,779,311.65
- Pembesian 258.295 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,112,179.16
- Bekisting 3.380 M2 A.4.1.1.20 Rp 215,890.40 Rp 729,709.55
PEKERJAAN STEK KOLOM
2 Pek
Peker
erja
jaan
an Stek
Stek Kolo
Kolom
m K1 ( 20 x 20 )
- Beton K250 0.320 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 421,138.85
- Pembesian 71.810 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,421,264.52
- Bekisting 3.200 M2 A.4.1.1.22 Rp 400,008.95 Rp 1,280,028.64
PEKERJAAN SLOOF
3 Pek
Peker
erja
jaan
an Sl
Sloo
ooff S
S1
1 ( 15 x 25
25 )
- Beton K-250 2.910 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,829,731.44
- Pembesian 410.279 Kg A.4.1.1.17 Rp 19,792.04 Rp 8,120,262.09
- Bekisting 19.400 M2 A.4.1.1.21 Rp 229,640.40 Rp 4,455,023.76
PEKERJAAN KOLOM
4 Pek.
Pek. Kolo
Kolomm KK1
1 ( 20 x 2
20
0 )
- Beton K-250 1.312 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 1,726,669.29
- Pembesian 264.008 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,225,255.59
- Bekisting 13.120 M2 A.4.1.1.22 Rp 400,008.95 Rp 5,248,117.42
5 Pek
Pek.. Kolom
Kolom K1 ( 20 x 20 ) Penyan
Penyangga
gga Plat
Plat Tem
Tempat
pat M
Maka
akan
n
- Beton K-250 0.048 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 63,170.83
- Pembesian 7.607 Kg A.4.1.1.17 Rp 19,792.04 Rp 150,560.33
- Bekisting 0.480 M2 A.4.1.1.22 Rp 400,008.95 Rp 192,004.30
PEKERJAAN RINGBALOK
6 Pek
Peker
erja
jaan
an Ba
Balo
lok
k B
B1
1 ( 15 x 25
25 )
- Beton K-250 2.910 M3 . A.4.1.1.8 Rp 19,792.04 Rp
Rp 57,594.82
- Pembesian 326.080 Kg A.4.1.1.17 Rp 19,792.04 Rp 6,453,790.39
- Bekisting 25.220 M2 A.4.1.1.23 Rp 412,672.70 Rp
Rp10,407,605.49
PEKERJAAN BALOK PENYANGGA TEMPAT MAKAN
8 Pek.
Pek. Ba
Balo
lok
k L
Lat
atey
ey (20
(20 x 2
20)
0)
- Beton K-250 2.328 M3 . A.4.1.1.8 Rp1,316,058.91 Rp 3,063,785.15
- Pembesian 158.447 Kg A.4.1.1.17 Rp 19,792.04 Rp 3,135,996.74
- Bekisting 17.460 M2 A.4.1.1.23 Rp 412,672.70 Rp 7,205,265.34
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEK
PEKERJ
ERJAAN
AAN PAS
PASAN
ANGAN
GAN & PLES
PLESTER
TERAN
AN DI
DINDI
NDING
NG
2
1 Pekerjaan Acian Kolom 28.864 M A.4.4.2.27 Rp 42,226.25 Rp
Rp 1,218,818.48
2 Pekerjaan Acian Plat dan Kolom tempat Makan 364.720 M2 A.4.4.2.27 Rp 42,226.25 Rp15,400,757.90
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEK
PEKER
ERJA
JAA
AN LA
LANTA
TAII
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 11.371 M3 A.2.3.1.15 Rp 176,302.50 Rp 2,
2,004,779.80
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 5.686 M3
A.A.4.1.1.4 Rp1,072,090.71 Rp 6,095,505.74
PEKERJAAN RABAT LANTAI KELILING BANGUNAN
3 Peke
Pekerj
rjaa
aan
n Uru
ruga
gan
n Pasi
Pasirr Keli
Kelili
ling
ng Ba
Bang
ngun
unan
an 1.818 M3
1.818 A.2.
A.2.3.
3.1.
1.15
15 Rp 17
176,
6,30
302.
2.50
50 Rp 32
320,
0,51
517.
7.95
95
4 Pekerjaan Beton Rabat Keliling Bangunan T = 5 cm 1.818 M3 A.A.4
.4..1.1.4 Rp
Rp1
1,0
,07
72,0
,09
90.7
.71
1 Rp 1 ,9
,949,0
,06
60.9
.91
1
PEKERJAAN LANTAI JUMLAH 8 ###
F PEKE
PEKERJ
RJAA
AANNP PEN
ENGE
GECA
CATA
TANN
PEKERJAAN PENGECATAN DINDING DAN KOLO KOLOMM
1 Pekerjaan Pengecatan Dinding Kolom 28.864 M2 A.4.7.1.10a Rp 42,208.38 Rp 1,218,302.54
2
2 Peke
Pekerj
rja
aan Peng
engec
ecat
atan
an Plat
lat dan Ko
Kolo
lom
m tem
tempat
pat Maka
akan 364.720 M
4.7 A.4
.4.7
.7.1
.1.1
.10
0a Rp 42
42,2
,208
08.3
.38
8 Rp
Rp1
15,3
,39
94,2
,23
38.53
.53
PEKERJAAN PENGECATAN JUMLAH 9 ###

G PEK
PEKER
ERJA
JAAN
AN KONS
KONSTR TRUK
UKSI
SI A
ATA
TAPP
1 Peke
Pekerj
rja
aan Kuda - Ku
Kud
da Baj
aja
a Ring
ingan C -TRU
TRUSS 75 0.7
.75
5 175.066 M2 A.4
5.0 .4.5
.5.2
.2.B
.BJ1
J1 Rp 24
249
9,3
,35
53.8
.86
6 Rp
Rp4
43,6
,65
53,3
,38
82.22
.22
2
2 Pekerjaan Pasangan Atap Spandek 175.066 M A.4.5.2.SP Rp
Rp 94,632.84 Rp16,566,991.89
3 Pekerjaan Pasangan Nok Spandek 16.150 M' A.4.5.2.NK Rp 106,197.30 Rp 1,
1,715,086.40
4 Pekerjaan Pasangan Kalsiplank 64.60 M' A.4.5.2.KP Rp 115,632.00 Rp 7,469,827.20
PEKERJAAN KONSTRUKSI ATAP MLAH 4 ###
H PEK
PEKER
ERJA
JAAN
AN INS
INSTA
TALALASI
SI LI
LIST
STRI
RIK
K
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 3.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 1,039,665.00
2 Pekerjaan Instalasi Stop Kontak 1.000 Ttk A.4.7.2.B Rp 37
372,955.00 Rp
Rp 372,955.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 3.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 180,072.75
PEKERJAAN PASANGAN SAKLAR
4 Pasangan Saklar Tunggal 1.000 Ttk A.4.7.2.C Rp 27,134.25 Rp
Rp 27,134.25
PEKERJAAN PASANGAN STOP KONTAK Rp -
5 Pasa
Pasang
ngan
an Stop
Stop Kont
Kontak
ak 1.00
1.000
0 Ttk
Ttk A.
A.4.
4.7.
7.2.
2.E
E Rp 28
28,3
,344
44.2
.25
5 Rp 28
28,3
,344
44.2
.25
5
PEKERJAAN PASANGAN KOTAK MCB Rp -
6 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
7 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
8 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp3,5
,50
00,0
,00
00.0
.00
0 Rp 3,5
,50
00,0
,00
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK MLAH 5 ###
I PEKER
PEKERJAJAAN
AN TANG
TANGGA GA TRAS
TRASRA
RAAM
AM
1 Pekerjaan Urugan Pasir 0.90 M3 A.2.3.1.11 Rp 238,491.00 Rp 214,641.90
2
2 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pond
Pondas
asii Tras
Trasra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 45.9
45.90
0 M A. 4.
4.4.
4.1.
1.26
26 Rp 20
205,
5,42
423.
3.08
08 Rp 9,4
9,428
28,9
,919
19.1
.14
4
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 91.80 M2 A.4.4.2.3 Rp 63,908.28 Rp 5,866,780.47
4 Pekerjaan Urugan Tanah 8.76 M3
A.2.3.1.9 R
Rp
p 62,205.00 Rp 544,710.52
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.90 M3
A.A.4.1.1.4 Rp
Rp1,072,090.71 Rp 964,881.64
PEKERJAAN TANGGA TRASRAAM ###
J PEKERJAAN KAYU TEMPAT MAKANMAKAN KAMBING
1 Tempat Makan Kambing Kayu (Kelas I Ulin) 34.144 M2 A.4.6.1.22 Rp 839,227.40 Rp28,654,580.35
2 Pekerjaan Pengecatan Permukaan Kayu Baru 34.14 M2 A.4.7.1.4 Rp 46,645.71 Rp 1,592,671.09
PEKERJAAN KAYU TEMPAT MAKAN KAMBING ###

REAL COST ###


RENCANA ANGGARAN BIA

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA


PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
NKKAM
AMPU
PUS
S IIII P
POL
OLIT
ITEK
EKNI
NIK
KPPEM
EMBA
BANG
NGUN
UN
SUB PEKERJAAN : PEMBANGUNAN AULA / RUANG PERTEMUAN
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARA: 2019

NO URAIAN PEKERJAAN VOLUME SAT.

I PEK
EKER
ERJJAAN PEM
PEMBE
BEN
NTU
TUK
KAN LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 88.00 M'
2
525.00
2 Mengupas
Mengup as tanah
tanah dan pem
pember
bersih
sihan
an sem
semak
ak (La
(Land
nd Cle
Cleari
aring)
ng) M
3 Galian Tanah dan Pembuangan (Cut dan Fill) 630.00 M3
4 Air Kerja 1.00 Ls
5 Listrik Kerja 1.00 Ls
PEKERJAAN PEMBENTUKAN LAHAN MLAH A
II PE
PEKE
KERJRJAA
AANNPPEM
EMBA
BANG
NGUN
UNAN
AN GUGUES
EST
THHOU
OUSE
SE
A PE
PEKE
KERJRJAA
AANN TA
TANNAH DA
DANN PA
PASI
SIRR
1 Pekerjaan Galian Tanah Pondasi Garis 55.75 M3
2 Pekerjaan Galian Tanah Pondasi Poer P1 0.83 M3
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 68.34 M3
5 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 0.42 M3
3
6 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 10.64 M3
7 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 0.05 M
8 Pekerjaan timbunan tanah bawah lantai T = 65 cm 25.99 M3
9 Pekerjaan pemadatan tanah per 20 cm 151.00 M3
PEKERJAAN TANAH DAN PASIR MLAH 1
B PEKERJAAN P PO
ONDASI
1 Pekerjaan Pasangan Pondasi Batu Kosong 42.56 M3
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 101.65 M3
PEKERJAAN PONDASI MLAH 2
C PE
PEKE
KERJ
RJAA
AAN
NS STR
TRUK
UKTU
TURRB
BET
ETON
ON DA
DAN NRRAB
ABAT
AT
PEKERJAAN PONDASI POER
1 Pe
Peke
kerj
rjaan
aan Po
Pond
ndas
asii P
Poe
oerr P
P1
1 ( 60 x 6
60
0)
- Lantai Kerja Poer K100 0.05 M3
- Beton K250 0.11 M3
- Pembesian 22.73 Kg
- Bekisting 1.44 M2
PEKERJAAN STEK KOLOM
1 Pe
Peke
kerj
rjaa
aannSSte
tek
kKKol
olom
om K1 ( 2
25
5 x 25 )

- Beton K250 0.28 M3


- Pembesian 45.42 Kg
- Bekisting 4.40 M2
PEKERJAAN SLOOF
1 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S1 ( 20 x 25 )
- Beton K-225 7.20 M3
- Pembesian 897.70 Kg
- Bekisting 72.00 M2
2 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S2 ( 15 x 20 )
- Beton K-225 1.10 M3
- Pembesian 183.38 Kg
2
- Bekisting 14.60 M
3 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S3 ( 15 x 15 )
- Beton K-225 0.23 M3
- Pembesian 51.25 Kg
- Bekisting 3.06 M2
PEKERJAAN KOLOM
1 Pek
ek.. K
Ko
olo
lom
m K1 ( 25 x 25 )
- Beton K-225 6.16 M3
- Pembesian 756.80 Kg
- Bekisting 129.60 M2
2 Pek
ek.. K
Ko
olo
lom
m K2 ( 20 x 30 )
- Beton K-225 0.36 M3
- Pembesian 63.28 Kg
- Bekisting 6.48 M2
3 Pek
ek.. K
Ko
olo
lom
m K3 ( 15 x 20 )
- Beton K-225 0.36 M3
- Pembesian 141.90 Kg
- Bekisting 19.44 M2
4 Pek
ek.. Ko
Kolo
lom
m K4 ( 20 x 30 )
- Beton K-225 M3
- Pembesian Kg

- Bekisting M2
5 Pek
ek.. Ko
Kolo
lom
m K5 ( 20 x 30 )
- Beton K-225 M3
- Pembesian Kg
- Bekisting M2

2 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 153.90 M'


PEKERJAAN BALOK
1 Pe
Peke
kerj
rjaa
aan
nBBal
alok
ok RB
RB1
1 ( 15 x 2
25
5)

- Beton K-225 0.93 M3


- Pembesian 192.63 Kg
- Bekisting 54.86 M2
2 Pe
Peke
kerj
rjaa
aannBBal
alok
ok RB
RB2
2 (15
(15 x2
x20)
0)
- Beton K-225 11.58 M3
- Pembesian 1,443.68 Kg
- Bekisting 411.17 M2
3 Peke
Pekerj
rjaa
aann Bal
Balok
ok B3 (2
(25
5 x 40
40 )
- Beton K-225 M3
- Pembesian Kg
- Bekisting M2

PEKERJAAN BALOK LATEY


1 Pe
Peke
kerj
rjaa
aan
nBBal
alok
ok La
Late
tey
y ((15
15 x 2
20)
0)
- Beton K-225 1.57 M3
- Pembesian 328.02 Kg
- Bekisting 33.95 M2
2 Pekerjaan Balok Latey BL2 (10 x 15) di atas Pintu M'
PEKERJAAN PLAT LANTAI
1 Plat
Pl at La
Lant
ntai
ai St
Stee
eell Flo
Floor
or De
Deck
ckin
ing/
g/Bo
Bond
ndek
ek
- Beton K-225 M3
- Pembesian Wire Mash M-10 kg
- Steel oor Decking t = 0.75 mm (Bondek Galvanis) M2
2 Plat
Plat La
Lant
ntai
ai Be
Beto
ton
n (La
(Lant
ntai
ai KM
KM/W
/WC)
C)
- Beton K-225 M3
- Pembesian Kg
- Bekisting M2
PLAT TANGGA BETON
1 Pekerjaa
aann Pl
Plat Tan
ang
gga
- Beton K-225 M3
- Pembesian Kg
- Bekisting M2

PEKERJAAN PLAT KANOPI


2 Pekerj
Pekerjaan
aan Plat
Plat Kano
Kanopi
pi (Sun
(Sunscr
screen
een J1
J1 + Roste
Rosterr + Venti
Ventilas
lasi)
i) T = 8 cm
cm
- Beton K-225 M3
- Pembesian Kg
- Bekisting M2
PEKERJAAN BAJA BERAT (H-BEAM DAN IWF)
1 Pekerj
Pekerjaan
aan K1 Kol
Kolom
om Baj
Baja
a H-BE
H-BEAM
AM 30
300.3
0.300
00.10
.10.15
.15
Kolom Baja H BEAM 300.300.10.15 kg
- Pekerjaan Pasangan Angkur Baut M - 19 P=700 mm Bh
- Pekerjaan Pasangan Base Plat 12 mm kg
- Pekerjaan Pengelasan Kawat baja las Elektroda 3.2 CM
- Cat Zincromate M2
2 Pekerjaan B1 Balok Baja IWF 400.200.8.13 kg
- Balok Baja IWF 400.200.8.13 kg
- Pekerjaan Pasangan Mur Baut 2x7 M20 Bh
- Pekerjaan Pasangan Base Plat 12 mm kg
- Pekerjaan Pengelasan Kawat baja las Elektroda 3.2 CM
- Cat Zincromate M2
3 Pekerjaan B2 Balok Baja IWF 250.125.6.9 kg
- Balok Baja IWF 250.125.6.9 kg
- Pekerjaan Pasangan Mur Baut 2x7 M20 Bh
- Pekerjaan Pasangan Base Plat 12 mm kg

- Pekerjaan Pengelasan Kawat baja las Elektroda 3.2 CM


- Cat Zincromate M2
4 Pekerjaan B3 Balok Baja IWF 200.100.5,5.8 kg
- Balok Baja IWF 200.100.5,5.8 kg
- Pekerjaan Pasangan Mur Baut 2x7 M20 Bh
- Pekerjaan Pasangan Base Plat 12 mm kg
- Pekerjaan Pengelasan Kawat baja las Elektroda 3.2 CM
- Cat Zincromate M2
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3
D PEK
PEKERERJAA
JAANN PAS
PASAN
ANGA
GAN
N & PL
PLEST
ESTER
ERAN
AN DIN
DINDIN
DING
G
PEK. DINDING BATA RINGAN
1 Pekerjaan Pasangan Dinding B
Ba
ata Ringan 854.13 M2
2 Pekerjaan plesteran semen instan 1,708.26 M2
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Pekerjaan Acian semen instan 1,708.26 M2
2 Pekerjaan Acian instan pada Kolom 260.83 M2
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4
E PEK
PEKER
ERJAA
JAAN
N KUS
KUSENEN PIN
PINTU,
TU, JEN
JENDEL
DELA
A DA
DAN
N V
VEN
ENTIL
TILASI
ASI AL
ALUMI
UMINI
NIUM
UM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU

1 Pekerjaa
aan
n Pintu PJ1 1.00 Bh
2 Pekerjaan P
Piintu P
P2
2 1.00 Bh
3 Pekerjaan P
Piintu P
P3
3 8.00 Bh
4 Pe
Peke
kerj
rjaa
aan
nPPin
intu
tu P4 Pa
Pabr
brik
ikas
asii 9.00 Bh
5 Pekerjaan Pi
Pintu P5
P5 Bh
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Pekerjaa
aan
n Jendela J1 2.00 Bh
2 Pekerjaa
aan
n Jendela J2 4.00 Bh
3 Pekerjaa
aan
n Jendela J3 4.00 Bh
4 Pekerjaa
aan
n Jendela J4 2.00 Bh
5 Pekerjaa
aan
n Jendela J5 4.00 Bh
6 Pekerjaan Ventilasi V1 Bh
7 Pekerjaan Ventilasi V2 Bh
PEKERJAAN KUSEN
KUSEN PINTU, JEND
JENDELA VENTILASI ALUMINIUM MLAH 5
ELA DAN VENTILASI
F PE
PEKE
KERJ
RJAA
AAN
N KO
KON
NST
STRU
RUKS
KSII AT
ATAP
AP
1 Pekerjaan Kuda - Kuda Baja Ringan prol C 75 0.75 87.68 M2
2 Pekerjaan Pasangan Atap Spandek 0.35 mm 87.68 M2
3 Pekerjaan Pasangan Nok Spandek 987.56 M'
4 Pekerjaan Pasangan Jurai Atap 27.04 M'
4 Pekerjaan Pasangan Kalsiplank 130.66 M'
PEKERJAAN KONSTRUKSI ATAP MLAH 6
G PE
PEKE
KERJ
RJAA
AANN IINS
NSTA
TALA
LASISI L
LIS
ISTRTRIKIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 49.00 T
Tttk
2 Pekerjaan Instalasi Stop Kontak 21.00 T
Tttk
PEKERJAAN PASANGAN LAMPU
1 pasangan lampu sumpit 5 Watt 19.00 Bh
2 pasangan lampu sumpit 14 Watt 5.00 B
Bhh
3 pasangan lampu sumpit 20 Watt 25.00 Bh
4 Downlight 18 Watt Bh
5 Downlight 9 Watt Bh
6 Lampu neon panjang 5 Watt Bh
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 49.00 Bh
2 Pasangan Saklar Ganda Bh
PEKERJAAN PASANGAN STOP KONTAK
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 21.0
21 .000 Bh
PEKERJAAN PASANGAN KOTAK MCB
1 Pemasangan Box MCB 1.00 Bh
2 Pemasangan MCB 1.00 Bh
3 Pe
Pema
masa
sang
ngan
an Inst
Instal
alas
asii Pa
Pane
nell Li
List
stri
rik
k PL
PLN
N 1.
1.00
00 Se
Sett
PEKERJAAN INSTALASI LISTRIK MLAH 7

H PEKERJAAN S
SA
ANITASI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 9.00 Bh
2 Pa
Pas.
s. Kl
Klos
oset
et Jo
Jong
ngko
kok
k Ex
Ex.T
.TOT
OTO/
O/KI
KIA
A Bh
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 1.00 Bh
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 441.13 M1
2 Pekerjaan P
Pa
asangan P
Piipa P
Pe
embuangan A
Aiir K
Ko
otor d
diia. 3
3"" 33.78 M1
3 Pekerjaa
aan
n Pas
asa
angan Pipa Pemasukan Air Bersih dia. 3/4" 61.92 M1
4 Pek
Pekerj
erjaan
aan Pas
Pasang
angan
an P
Pipa
ipa Pem
Pemasu
asukan
kan Air
Air B
Ber
ersih
sih dia
dia.. 1
1"" M1
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 1.00 Bh
2 Pekerjaan Pasangan Kran Air 10.00 Bh
3 Pek
eker
erjjaa
aan
n Pas
asan
anga
gan
n Flo
loor
or Dr
Drai
ain
n 11.00
.00 Bh
4 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Te
Temp
mpat
at Sa
Sabu
bun
n Bh
5 Pekerjaan Pipa Saluran Air Hujan 4" M'
6 Pekerjaan Pembuatan Septick Tank + Peresapan 1.00 Unit
PEKERJAAN SANITASI MLAH 8
I PEKERJAAN PLAFOND
PEKERJAAN RANGKA PLAFOND
2
1 Pekerj
Pekerjaa
aan
nPPas
asan
anga
gan
nRRan
angk
gka
a Pla
Plafo
fond
nd Al
Alum
umin
iniu
ium
m Ho
Holl
llow
ow 2/ 415.57
415.57 M
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 415.57 M2
5 Pe
Peke
kerj
rjaan
aan P
Pasa
asang
ngan
an P
Pla
lafo
fond
nd K
Kal
alsi
sibo
boar
ard
d T. 3
3,5
,5 m
mm
m M2
6 Pekerjaan Pasangan List Plafond Gypsumboard 540.34 M1
PEKERJAAN PLAFOND MLAH 9
J PEKERJAAN LANTAI
PEKERJAAN URUGAN DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 17.29 M3
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 17.29 M3
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 321.79 M2
2 Plint homogenius tile 10 x 60 cm 383.84 M1
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
1 Pe
Peke
kerj
rjaan
aan Lan
Lanta
taii Ke
Kera
rami
mik
k (20/
(20/20
20)) M2
2 Pe
Peke
kerj
rjaan
aan Pl
Plin
intt D
Din
indi
ding
ng Ti
Tile
le (1
(10/
0/40
40)) M1
3 Pekerjaan Lantai Keramik Km/Wc (20/20) Unpolished 24.10 M2

4 Pe
Pek.
k. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Wa
Warn
rna
a Km
Km/W
/Wc
c (20/
(20/25
25)) M2
PEKERJAAN LANTAI TANGGA
5 Memasan
Mem asang
g lantai
lantai hom
homoge
ogeniu
nius
s tile
tile 30 x 60 cm + step
step noi
noisin
sing (tangg M2
g (tangg
PEKERJAAN LANTAI JUMLAH 10 10
K PE
PEKE
KERRJA
JAAN
AN PE
PENNGECA
CATA
TANN
PEKERJAAN PENGECATAN DINDING DAN KOLOM KOLOM
1 Pe
Peke
kerj
rjaan
aan Pe
Peng
ngec
ecat
atan
an Di
Dind
ndin
ing
g 1,70
1,708.
8.26
26 M2
2 Pekerjaan Pengecatan Dinding Kolom 260.83 M2
PEKERJAAN PENGECATAN PLAFOND
1 Pe
Peke
kerj
rjaan
aan Pe
Peng
ngec
ecat
atan
an Pl
Plaf
afon
ond
d da
dan
n Li
List
st 41
415.57 M2
5.57
PEKERJAAN PENGECATAN JUMLAH 1111
L PE
PEKE
KERJ
RJAA
AANN TA
TAN
NGG
GGA
A TR
TRASASR
RAM
1 Pek
eker
erjjaa
aan
n Ur
Urug
ugan
an Pas
asiir M3
2 Pekerj
Pekerjaan
aan Pasan
Pasangan
gan Pond
Pondasi
asi Tra
Trasra
sram
m dan
dan Salur
Saluran
an 1 Pc : 3 Ps M2
3 Peke
Pekerj
rjaan
aan Pl
Ples
este
tera
ran
n Tra
Trasr
sram
am teb
tebal
al 1.
1.5
5 cm
cm M2
4 Pekerjaa
aan
n Ur
Urugan Ta
Tanah M3
5 Peke
Pekerj
rjaan
aan Be
Beto
ton
nRRaba
abatt Baw
Bawah
ah Lan
Lanta
taii T = 5 cm M3
PEKERJAAN TANGGA TRASRAM JUMLAH 12 12
M PEKERJAA
PEKE RJAANN SALUR
SALURAN
AN KEL
KELILIN
ILING
G GEDUN
GEDUNG G DAN
DAN RABAT
RABAT KELI
KELILING
LING B
3
1 Peke
Pekerj
rjaa
aan
n Gal
Galia
ian
n Tan
Tanah
ah Sa
Salu
lura
ran
n M
2 Peke
Pekerj
rjaa
aan
n Uru
Uruga
gan
n Pas
Pasir
ir Sa
Salu
lura
ran
n M3
3 Peke
Pekerj
rjaan
aan Be
Beto
ton
n Raba
Rabatt Sal
Salur
uran
an T = 5 cm
cm M3
4 Peke
Pekerj
rjaan
aan Tr
Tran
ansr
sram
am 1 Pc : 3 Ps , t = 0,
0,4
4M M2
2
5 Pekerj
Pekerjaan
aan Pl
Ples
este
tera
ran
n Tra
Trasr
sram
am teb
tebal
al 1.
1.5
5 cm
cm M
5 Pekerjaan Penutup Saluran Keliling / Grill Besi M'
3 Peke
Pekerj
rjaan
aan Be
Beto
ton
n Raba
Rabatt Keli
Kelili
ling
ng Ban
Bangu
guna
nan
n T = 7 cm
cm M3
2 Pe
Peke
kerj
rjaan
aan Uru
Uruga
gann Pasir
Pasir Raba
Rabatt Keli
Kelili
ling
ng Bang
Bangun
unan
an M3
LURAN KELILING GEDUNG DAN RABAT KELILING BANGUNAN
N PE
PEKE
KERRJA
JAAN
AN FIN
INIS
ISH
HIN
ING G
1 Pekerjaan
Pekerjaan Alum
Alumini
inium
um Kompo
Komposit
sit Pane
Panell Bungk
Bungkusan
usan Luar
Luar Gedu
Gedung Exte M2
ng Exte
3 Pemasangan Huruf Stainless Bh
3 Pemasan
Pem asangan
gan Han
Handel
del Tang
Tangga
ga Pi
Pipa
pa Sta
Stainl
inless
ess Ste
Steel
el Bul
Bulat
at 2" M'
PEKERJAAN FINISHING JUMLAH 14 14

A ( RAB )
KAMPUS II POLBANGTAN GOWA
N PERTANIAN (POLBANGTAN) GOWA

KODE AR
ARGA
GA SA
SATA
TAUA
UA JU
JUML
MLAH
AH HA
HARG
RGA
A
ANALISA (RP) (RP)

- Rp 40,463.94 R p 3,560,826.72
Rp
- Rp 1,887.84 Rp 991,114.90
- Rp 95,308.40 Rp 60,044,291.02
- Rp 500,000.00 Rp
Rp 500,000.00
- Rp 500,000.00 Rp
Rp 500,000.00
Rp ###
A.2.3.1.1
A.2.3.1.1 Rp 84
84,56
,562.5
2.50
0 Rp 4,7
4,714
14,10
,105.6
5.69
9
A.2.3.
A.2.3.1.1
1.1 Rp 84
84,56
,562.5
2.50
0 Rp 70
70,44
,440.5
0.56
6
A.2.3.
A.2.3.1.9
1.9 Rp 61
61,87
,875.0
5.00
0 Rp 4,2
4,228
28,53
,531.3
1.31
1
A.2.3.
A.2.3.1.9
1.9 Rp 61
61,87
,875.0
5.00
0 Rp 25
25,77
,770.9
0.94
4
A.2.3.1.1
A.2.3.1.11
1 Rp 238
238,425
,425.00
.00 Rp 2,53
2,536,63
6,633.38
3.38
A.2.3.1.1
A.2.3.1.11
1 Rp 238
238,425
,425.00
.00 Rp 11,6
11,682.8
82.83
3
A.2.3.1.1
A.2.3.1.15
5 Rp 176
176,137
,137.50
.50 Rp 4,57
4,578,10
8,102.49
2.49
A.2.3.1.1
A.2.3.1.10
0 R
Rp
p 61,8
61,875.0
75.00
0 Rp 9,34
9,343,12
3,122.53
2.53
Rp ###

A.3.2.
A.3.2.1.9
1.9 Rp 53
530,3
0,369
69.40
.40 Rp 22
22,57
,570,6
0,665
65.37
.37
A.3.2.
A.3.2.1.2
1.2 Rp 90
900,9
0,922
22.00
.00 Rp 91
91,57
,578,1
8,158
58.22
.22
Rp ###

A.A.4.1.1.4 Rp1,071,6
Rp1,071,694.71
94.71 Rp 52,513.0
52,513.04
4

A. A.4.1.1.8
A.4.1.1.1
A.4.1 .1.17 Rp1,315,5
Rp1,315,511.11
7 Rp 19,711.11
19,789.4
89.40
0 Rp
Rp 142,075
142,075.20
449
449,746.20
,746.80
.80
A.4.1.1.2
A.4.1.1.20
0 Rp 215
215,718
,718.80
.80 Rp 310
310,635
,635.07
.07

A. A.4.1.1.8 Rp1,315,5
Rp1,315,511.11
11.11 Rp 361,765
361,765.56
.56
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 898
898,868
,868.94
.94
A.4.1.1.2
A.4.1.1.22
2 Rp 399
399,791
,791.15
.15 Rp 1,75
1,759,08
9,081.06
1.06

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 9,379,79
9,379,792.31
2.31
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 17,7
17,764,9
64,998.4
98.42
2
A.4.1.1.2
A.4.1.1.21
1 Rp 229
229,468
,468.80
.80 Rp 16,5
16,521,7
21,753.6
53.60
0

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 1,426,51
1,426,510.08
0.08
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 3,62
3,628,94
8,946.51
6.51
A.4.1.1.2
A.4.1.1.21
1 Rp 229
229,468
,468.80
.80 Rp 3,35
3,350,24
0,244.48
4.48

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 298,980
298,980.88
.88
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 1,01
1,014,11
4,116.56
6.56
A.4.1.1.2
A.4.1.1.21
1 Rp 229
229,468
,468.80
.80 Rp 702
702,174
,174.53
.53

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 8,019,72
8,019,722.42
2.42
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 14,9
14,976,5
76,568.2
68.28
8
A.4.1.1.2
A.4.1.1.22
2 Rp 399
399,791
,791.15
.15 Rp 51,8
51,812,9
12,933.0
33.04
4

0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,748
Rp1,302,748.93
.93 Rp 82,437,3
82,437,343.73
43.73
A.4.1.1.1
A.4.1.1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 128
128,235
,235.29
.29

0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 ###
A.4.1.1.1
A.4.1.1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 384
384,705
,705.86
.86

0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp -

A.4
A.4.1.
.1.1.1
1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -

0.000 Rp - Rp -
0.000 Rp - Rp -

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp -
A.4.1.1.3
A.4.1.1.35
5 Rp 121
121,138
,138.82
.82 Rp 18,6
18,643,2
43,264.4
64.40
0

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 1,207,64
1,207,648.26
8.26
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 3,81
3,812,07
2,072.58
2.58
A.4.1.1.2
A.4.1.1.23
3 Rp 412
412,454
,454.90
.90 Rp 22,6
22,628,7
28,747.4
47.45
5

A. A.4.1.1.7 Rp1,302,748
Rp1,302,748.93
.93 Rp 15,084,5
15,084,529.88
29.88
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 28,5
28,569,5
69,571.7
71.76
6
A.4.1.
A.4.1.1.2
1.23
3 Rp 41
412,4
2,454
54.90
.90 ###

A. A.4.1.1.7 Rp1,302,748.93
Rp1,302,748.93 Rp -
A.4.1.
A.4 .1.1.1
1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
A.4.1.
A.4.1.1.2
1.23
3 Rp 41
412,4
2,454
54.90
.90 Rp -

A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 2,041,35
2,041,355.47
5.47
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 6,49
6,491,34
1,340.21
0.21
A.4.1.1.23
A.4.1.1.23 Rp 412
412,454
,454.90
.90 Rp 14,0
14,003,1
03,173.8
73.82
2
A.4.1.1.3
A.4.1.1.36
6 Rp 144,219
144,219.35
.35 Rp -

A.4.1.1.17
A.4.1.1.17 Rp1,302
Rp1,302,748
,748.93
.93 Rp -
A.4.1.
A.4.1.1.1
1.19
9 Rp 18,182.5
18,182.53
3 Rp -
A.4.1.1.19a
A.4.1.1.19a Rp 342,551
342,551.00
.00 Rp -

A.4.1.1.1
A.4.1.1.17
7 Rp1,
Rp1,302
302,748
,748.93
.93 Rp -
A.4.1.
A.4.1.1.1
1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 50
500,9
0,991
91.15
.15 Rp -

A.4.1.1.1
A.4.1.1.17
7 Rp1,
Rp1,302
302,748
,748.93
.93 Rp -

A.4.1.1.1
A.4.1.1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 500,9
500,991
91.15
.15 Rp -

A.4.1
A.4.1.1.1
.1.17
7 Rp1,302
Rp1,302,748
,748.93
.93 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 19,789.4
19,789.40
0 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 50
500,9
0,991
91.15
.15 Rp -

A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 58,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 12,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -

A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 12,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 12,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
###

A. 4.4
4.4.1.2
.1.26
6 Rp 205
205,357
,357.08
.08 ###
A.4.4.
A.4.4.2.2
2.28
8 Rp 65
65,09
,097.5
7.54
4 ###

A.4.4.2.2
A.4.4.2.29
9 Rp 44,0
44,031.7
31.76
6 Rp 75,2
75,217,7
17,716.2
16.22
2
A.4.4.2.2
A.4.4.2.29
9 Rp 44,0
44,031.7
31.76
6 Rp 11,4
11,484,8
84,892.6
92.68
8
###

PJ
PJ1
1 AP Rp
Rp9,
9,68
685,
5,41
419
9.7
.73
3 Rp 9,
9,68
685,
5,41
419.
9.73
73
P2 AP Rp
Rp5,
5,85
856,
6,11
119
9.3
.33
3 Rp 5,
5,85
856,
6,11
119.
9.33
33
P3 AP Rp
Rp4,
4,66
667,
7,57
575
5.1
.18
8 Rp 37
37,3
,340
40,6
,601
01.4
.41
1
P4 AP Rp
Rp3,
3,49
495,
5,88
884
4.0
.07
7 Rp 31
31,4
,462
62,9
,956
56.6
.63
3
0.00 Rp - Rp -

J1 AP Rp6,577,4
Rp6,577,483.53
83.53 Rp 13,154
13,154,967.06
,967.06
J2 AP Rp4,008,9
Rp4,008,951.17
51.17 Rp 16,035
16,035,804.69
,804.69
0.00 Rp - Rp -
0.00 Rp - Rp -
0.00 Rp - Rp -
V1 AP Rp3,616,414.31 Rp -
V2 AP Rp1,073,190.26 Rp -
###

A.4.5.2.BJ1 Rp 249,023.86
249,023.86 Rp 21,833,8
21,833,863.88
63.88
A.4.5.2.SP
A.4.5.2. SP Rp 94,5
94,593.2
93.24
4 Rp 8,29
8,293,72
3,726.74
6.74
A.4.5.
A.4.5.2.N
2.NK
K Rp 10
106,1
6,157
57.70
.70 ###
A.4.5.2.
A.4.5.2.NK
NK Rp 97,8
97,884.5
84.50
0 Rp 22,646
,646,796
,796.88
.88
A.4.5.2.
A.4. 5.2.KP
KP Rp 115
115,632
,632.00
.00 Rp 15,1
15,108,4
08,477.1
77.12
2
###

A.4.7.2.A Rp 346,456
346,456.00
.00 Rp 16,976,3
16,976,344.00
44.00
A.4.7.2.B Rp 372,856.00 Rp 7,829,976.00

0.00
0.00 Rp - Rp -
###
## # Rp - Rp -
0.00
0.00 Rp - Rp -
A.4.7.2.G
A.4.7.2.G Rp 148,761
148,761.25
.25 Rp -
A.4.7.2.
A.4.7.2.H
H Rp 98,161.2
98,161.25
5 Rp -
A.4.7.2.F
A.4.7 .2.F Rp 354
354,461
,461.25
.25 Rp -

A.4.7.2.C Rp
A.4.7.2.C 27,1
27,101.2
01.25
5 Rp 1,
1,327
327,961
,961.25
.25
A.4.7.2.
A.4.7.2.D
D Rp 31,4
31,446.2
46.25
5 Rp -

A.4.7.2.E
A.4.7.2.E Rp 28,3
28,311.2
11.25
5 Rp 594
594,536
,536.25
.25

- Rp 65,000.00 Rp 65,000.00
- Rp 250,000.00 R
Rp
p 250,000.00
- Rp3,500,000.00 Rp 3
3,,500,000.00
###
A.5.1.1.
A.5.1.1.1a
1a Rp3,
Rp3,669
669,069
,069.78
.78 Rp 33,0
33,021,6
21,628.0
28.00
0
A.5.1.1 2 Rp 801,779.00 Rp -

A.5.1.
A.5.1.1
15 Rp 98
984,9
4,933
33.40
.40 Rp 98
984,9
4,933
33.40
.40

A.5.1.1
A.5.1.1 32 Rp 95,8
95,830.3
30.35
5 Rp 42,2
42,273,6
73,642.3
42.30
0
A.5.1.1
A.5.1.1 31 Rp 85,7
85,706.9
06.91
1 Rp 2,89
2,895,17
5,179.50
9.50
A.5.1.1
A.5.1.1 26 Rp 25,9
25,977.6
77.60
0 Rp 1,60
1,608,53
8,532.99
2.99
0.000 Rp - Rp -

A.5.1.1 19a Rp 325,121.5


325,121.50
0 Rp 325,121
325,121.50
.50
A.5.1.1
A.5.1.1 19 Rp 97,6
97,696.5
96.50
0 Rp 976
976,965
,965.00
.00
A.5.1.1
A.5.1.1 14 Rp 121
121,203
,203.50
.50 Rp 1,33
1,333,23
3,238.50
8.50
A.5.1.1
A.5.1.1 14a Rp 68,6
68,678.5
78.50
0 Rp -
A.5.1.
A.5.1.1
1 31 Rp 16
168,7
8,744
44.55
.55 Rp -
A.5.1.1
A.5.1.1 32 Rp6,
Rp6,636
636,464
,464.01
.01 Rp 6,63
6,636,46
6,464.01
4.01
###

A.4.2
A.4.2.1.2
.1.21
1 Rp 130
130,278
,278.50
.50 Rp 54,1
54,139,6
39,627.8
27.80
0
A.4.5.
A.4.5.1.7
1.7 Rp 53
53,65
,658.0
8.00
0 Rp 22
22,29
,298,5
8,569
69.21
.21
A.4.5.
A.4.5.1.7
1.7a
a Rp 48
48,85
,853.2
3.20
0 Rp -
A.4.5.1.7
A.4.5.1.7b
b Rp 26,7
26,730.0
30.00
0 Rp 14,4
14,443,2
43,288.2
88.20
0
###

A.2.3.1.1
A.2.3.1.11
1 Rp 238
238,425
,425.00
.00 Rp 4,12
4,123,45
3,459.04
9.04
A.A.4.1.1.1 Rp1,081,5
Rp1,081,510.75
10.75 Rp 18,704,2
18,704,268.75
68.75

A.4.4.
A.4.4.3.1
3.13
3 Rp 32
327,4
7,443
43.60
.60 ###
A.4.4.3.2
A.4.4.3.28
8 Rp 60,5
60,516.4
16.47
7 Rp 23,2
23,228,6
28,642.8
42.80
0

A.
A.4.
4.4.
4.3.
3.4
4 Rp 16
162,
2,21
216.
6.78
78 Rp -
A.4.4.
A.4.4.3.2
3.29
9 Rp 35
35,63
,630.7
0.76
6 Rp -
A.4.4.
A.4.4.3.6
3.6 Rp 14
148,2
8,252
52.52
.52 Rp 3,5
3,572
72,51
,515.1
5.15
5
A.4.4.3.54a
A.4.4.3.54a Rp 293,983
293,983.58
.58 Rp -

A.4.4.3.24
A.4.4.3.24b
b Rp 319,627
319,627.83
.83 Rp -
###

A.4.7.1.1
A.4.7.1.10
0 Rp 54,0
54,013.5
13.58
8 Rp 92,2
92,269,2
69,251.2
51.23
3
A.4.7.1.1
A.4.7.1.10
0 Rp 54,0
54,013.5
13.58
8 Rp 14,0
14,088,4
88,468.7
68.79
9

A.4.7.
A.4.7.1.5
1.5 Rp 47
47,07
,078.3
8.35
5 Rp 19
19,56
,564,2
4,274
74.58
.58
###

A.2.3.
A.2.3.1.1
1.11
1 Rp 23
238,4
8,425
25.00
.00 Rp -
A. 4.4
4.4.1.
.1.8
8 Rp 13
133,2
3,276
76.33
.33 Rp -
A.4.
A.4.4.
4.2.
2.3
3 Rp 63,8
63,809
09.2
.28
8 Rp -
A.2.3.
A.2.3.1.1
1.15
5 Rp 17
176,1
6,137
37.50
.50 Rp -
A.A.4.1.1
A.A.4.1.1.1
.1 Rp1,
Rp1,081
081,510
,510.75
.75 Rp -
Rp -
NGUNAN
A.2.3.
A.2.3.1.
1.1
1 Rp 84,5
84,562
62.5
.50
0 Rp -
A.2.3.
A.2.3.1.1
1.11
1 Rp 238,4
238,425
25.00
.00 Rp -
A.A.4.1.1
A.A.4.1.1.1
.1 Rp1,
Rp1,081
081,510
,510.75
.75 Rp -
A. 4.4
4.4.1.
.1.8
8 Rp 13
133,2
3,276
76.33
.33 Rp -
A.4.
A.4.4.
4.2.
2.3
3 Rp 63,8
63,809
09.2
.28
8 Rp -
- Rp 250,000.00 Rp -
A.A.4.1.1
A.A.4.1.1.1
.1 Rp1,
Rp1,081
081,510
,510.75
.75 Rp -
A.2.3.
A.2.3.1.1
1.11
1 Rp 23
238,4
8,425
25.00
.00 Rp -
Rp -

A.4
A.4.6.
.6.1B
1B1
1 Rp 828,0
828,036
36.96
.96 Rp -
- Rp 100,000.00 Rp -
- Rp 65,000.00 Rp -
Rp Rp -

REAL COST ###


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN


PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI

LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL


TAHUN ANGGARAN
ANGGARAN : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)

I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 23,7
23,713
13,2
,228
28.4
.48
8
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 20,205
20,205,583.
,583.14
14
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 44,802
44,802,630.
,630.41
41
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 80,824,606.44
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 129,680,375.45
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 58,308,281.86
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 33,818
33,818,156.
,156.63
63
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 60,746
60,746,257.
,257.58
58
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 47,982
47,982,661.
,661.56
56
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 80,531
80,531,344.
,344.05
05
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 15,870,488.50
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 19,247
19,247,596.
,596.52
52
L PEKERJAA
PEKERJAAN
N TAN
TANGGA
GGA TRASRAM
TRASRAM Rp 875,5
875,581.33
81.33
M PEKERJAAN
PEKERJAAN SALURAN KELILING GEDUNG Rp 8,663,632.32
N PEKE
PEKERJAA
RJAAN
N FINI
FINISHIN
SHING
G Rp 877,539.76
877,539.76
Rp 602,434,735.55
REAL COST (A) Rp 626,1
626,147,96
47,964.03
4.03
PPN 10% (B) Rp 62,61
62,614,796
4,796.40
.40
TOTAL COST (A+B) Rp 688,7
688,762,76
62,760.43
0.43
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A

MAKASSAR, 17 MEI 2019

Menyetujui : Dibuat Oleh :


ejabat Pembuat Komitmen Konsultan Perencana
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI

Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,


IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA

PEKERJAAN : PEMBANGUNAN KAMPUS II POLITEKNIK PEMBANGUNAN PERTANIAN (POLBANGTAN) GOWA


SUB
SUB P
PEK
EKER
ERJJAAN
AAN : PEMBANGUNAN RUMAH DOSEN
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARA : 2019

KODE AR
ARGA
GA SATA
SATAUA
UA JUM
JUMLAH
LAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N P
PEM
EMBE
BENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 95.250 M' - Rp 40,480.44 Rp
Rp 3,855,761.91
2 Meng
Mengup
upas
as tana
tanah
h dan
dan pemb
pember
ersi
siha
han
n sema
semak
k (Lan
(Land
d Clea
Cleari
ring
ng 160.
160.00
00 M2 - Rp 1,
1,89
890.
0.59
59 Rp 30
302,
2,49
494.
4.07
07
3 Galian Tanah dan Pembuangan (Cut dan Fill) 192.000 M 3
- Rp 95,338.40 Rp18,304,972.50
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
7 P3K 1.000 L
Ls
s - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN BA
BANG
NGUN
UNAN
AN
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DAN
DAN PASI
PASIR
R
1 Pekerjaan Galian Tanah Pondasi Garis 74.914 M3 A.2.3.1.1 Rp 84,727.50 Rp 6,347,254.75
2 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 16.669 M3 A.2.3.1.9 Rp 62,205.00 Rp 1,
1,036,879.59
3 Pe k
ke
erjaan Urugan P as
asir Bawah Pondasi Garis T=5 cm 4.204 M3 A. 2
2..3.1.11 Rp 238, 4
49
91.00 Rp 1 ,0
,002,556.54
3
4 Pekerjaan timbunan tanah bawah lantai T = 40 cm 55.500 M A.2.3.1.15 Rp 176,302.50 Rp 9,784,788.75
5 Pekerjaan pemadatan tanah per 20 cm 32.700 M3 A.2.3.1.10 Rp 62,205.00 Rp 2,034,103.50
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AAN
NPPON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 17.595 M3 A.3.2.1.9 Rp 530,626.80 Rp 9,
9,336,378.55
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 39.345 M 3
A.3.2.1.2 Rp 901,417.00 Rp35,466,251.87
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAA
AAN
N STRU
STRUKTUKTUR R BE
BETON
TON DAN RA
RABABATT
PEKERJAAN SLOOF
1 Pek
Peker
erja
jaan
an Sl
Sloo
ooff S
S1
1 ( 15 x 20
20 )
- Beton K-250 2.693 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,543,488.62
- Pembesian 474.518 Kg A.4.1.1.17 Rp 19,792.04 Rp 9,391,669.11
- Bekisting 17.950 M2 A.4.1.1.21 Rp 229,640.40 Rp 4,122,045.18
PEKERJAAN KOLOM
2 Pek.
Pek. Kolo
KolommK K1
1 ( 15 x 40
40 )
- Beton K-250 0.756 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 994,940.54

- Pembesian 154.447 Kg A.4.1.1.17 Rp 19,792.04 Rp 3,056,812.00


- Bekisting 6.930 M2 A.4.1.1.22 Rp 400,008.95 Rp 2,772,062.02
3 Pek
Pek.. Kol
Kolom
om K2 ( 40
40 x 20 ) Ter
Teras
as
- Beton K-250 0.640 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 842,277.70
- Pembesian 64.918 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,284,864.78
- Bekisting 4.800 M2 A.4.1.1.22 Rp 400,008.95 Rp 1,920,042.96
4 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 100.000 M' A.4.1.1.35 Rp 121,198.22 Rp12,119,822.00
PEKERJAAN RINGBALOK
5 Pek
Peker
erja
jaan
an Ri
Ring
ngba
balk
lk B1
B1 ( 15
15 x 15
15 )
- Beton K-250 2.993 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,938,306.30
- Pembesian 366.679 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,257,331.96
- Bekisting 27.431 M2 A.4.1.1.23 Rp 412,672.70 Rp11,320,128.00
PEKERJAAN PLAT t=10cm
6 Pek
Pekerj
erjaan
aan Plat
Plat Be
Beton
ton Teras
Teras A T = 10 cm
cm
- Beton K-225 1.087 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp
R p 1,416,357.72
- Pembesian 132.584 Kg A.4.1.1.17 Rp 19,792.04 Rp 2,624,097.41
2
- Bekisting 5.434 M A.4.1.1.24 Rp 501,208.95 Rp 2,723,444.13
7 Pek
Pekerj
erjaan
aan Plat
Plat Be
Beton
ton Teras
Teras B T = 10 cm
cm
- Beton K-225 0.662 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp 862,130.79
- Pembesian 80.703 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,597,276.68
- Bekisting 3.308 M2 A.4.1.1.24 Rp 501,208.95 Rp 1,657,748.60
8 Pek
Peker
erja
jaan
an Pla
Platt me
meja
ja Dap
Dapur
ur T = 10 c
cm
m

- Beton K-225 0.321 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp


Rp 418,358.25
- Pembesian 39.162 Kg A.4.1.1.17 Rp 19
1 9,792.04 Rp 77
7 75,095.71
- Bekisting 1.605 M2 A.4.1.1.24 Rp 501,208.95 Rp 804,440.36
PEKERJAAN BALOK
9 Pek.
ek. Bal
Balo
ok (15
(15 x 20
20)
9 Pek.
ek. Bal
Balo
ok (15
(15 x 20
20)
- Beton K-250 0.225 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 296,113.26
- Pembesian 21.380 Kg A.4.1.1.17 Rp 19
1 9,792.04 Rp 42
4 23,158.08
- Bekisting 1.500 M2 A.4.1.1.23 Rp 412,672.70 Rp 619,009.05
10 Pek.
Pek. Balo
Balok
k (15
(15 x 30)
30)
- Beton K-250 0.585 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 769,894.46
- Pembesian 53.088 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,050,720.56
- Bekisting 3.900 M2 A.4.1.1.23 Rp 412,672.70 Rp 1,609,423.53
PEKERJAAN PROFIL BETON
11 Pek.
Pek. Pr
Pro
oll ( 7 x 15)
15)
- Beton K-250 0.466 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 613,546.66
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJ
PEKERJAAN
AAN PASANG
PASANGAN
AN & PLES
PLESTER
TERAN
AN D
DIND
INDING
ING
PEKERJAAN DINDING 1Pc : 4 Ps
1 Pekerjaan Pasangan Dinding Bata Ringan 315.985 M2 A. 4.4.1.26 Rp 205,423.08 Rp64,910,610.35
2
2 Pekerjaan Plesteran Dinding tebal 1.5 cm 592.970 M A.4.4.2.5 Rp 61,059.86 Rp36,206,662.81
PEKERJAAN FINISHING DINDING DAN KOLOM
3 Peker
ekerja
jaan
an Aci
cian
an 592.970 M2
.97 A.4.4
.4.4.2
.2.2
.27
7 Rp 42,
2,2
226.2
26.25
5 Rp
Rp2
25,
5,0
038,
8,8
899.4
99.46
6
4 Pekerjaan Acian Kolom 83.460 M2 A.4.4.2.27 Rp 42,226.25 Rp
Rp 3,524,202.83
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEK
PEKERJ
ERJAAN
AAN KUSEN
KUSEN PI
PINTU
NTU,, JEN
JENDEL
DELA
A DAN VEN
VENTILA
TILASI
SI ALUMIN
ALUMINIUM
IUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peker
ekerja
jaan
an Pin
intu
tu P1 1.0
.00
00 Bh PJ1 AP Rp7,933,944.05
.05 Rp 7,93
,933,944.05
2 Peker
ekerja
jaan
an Pin
intu
tu P2 2.0
.00
00 Bh PJ2 AP Rp4,181,457.96
.96 Rp 8,36
,362,915.93
3 Peker
ekerja
jaan
an Pin
intu
tu P3 2.000 Bh P3 A P Rp3,597,309.01 Rp 7
7,,194,618.01

4
5 Peker
ekerja
Peke
Pe jaan
kerj an
rjaanP
aan in
intu
Pintu P
Pintu
tu 4 Pab
P5
P5 Pabri
rika
kasi
si 2
2..0
00
00
0 B
Bh
h P4LsAP Rp
Rp2,2
48
270,,5
0050
5..0
120 Rp
Rp 4
4,,5
87
45
0,,0
10
100..0
205
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
6 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J1 1.000 Bh J1 AP Rp5,872,246.59 Rp 5,
5,872,246.59
7 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J2 1.000 Bh J2 A P Rp3,524,402.87 Rp 3,524,402.87
8 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J3 7.000 Bh J3 A P Rp2,547,486.02 Rp17,832,402.11
9 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a V1 3.000 Bh V1 AP Rp 724,214.02 Rp 2,172,642.05
ERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEPEKE
KERJ
RJAA
AAN
N PLA
PLAFO
FON ND
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Ra
Rang
ngka
ka Plaf
Plafon
ond
d Alum
Alumin
iniu
ium
m Ho
Holl
llow
ow 2 150.
150.750 M2
750 A.4.
A.4.2.
2.1.
1.21
21 Rp 130,
130,39
397.
7.30
30 Rp
Rp19
19,6
,657
57,3
,392
92.9
.98
8
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 150.750 M2 A.4.5.1.7 Rp 52,890.20 Rp 7,973,197.65
1
3 Pekerjaan Pasangan List Plafond Gypsumboard 227.000 M A.4.5.1.7a Rp 27,258.00 Rp 6
6,,187,566.00
PEKERJAAN PLAFOND MLAH 7 ###
G PE
PEKE
KERJ
RJAA
AANN LA
LANTAI
NTAI
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 12.029 M3 A.2.3.1.15 Rp 176,302.50 Rp 2,
2,120,716.33

2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 6.014 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 6,448,009.16


PEKERJAAN RABAT LANTAI KELILING BANGUNAN
3 Peke
Pekerj
rjaa
aan
n Ur
Urug
ugan
an Pasi
Pasirr Ke
Keli
lili
ling
ng Bang
Bangun
unan
an 2.
2.10
100
0 M3 A.2.
A.2.3.
3.1.
1.15
15 Rp 176,
176,30
302.
2.50
50 Rp 370,
370,23
235.
5.25
25
4 Peke
ekerjaan Beton Rabat Kel ililing Bangunan T = 5 cm .100 M
2.10 3
A.A.4.1.
.1.1.4 Rp1,072,090.71
.71 Rp 2 ,,2
251,390.49
PEKERJAAN LANTAI DAN DINDING KERAMIK
5 Pekerjaan Lantai Keramik (40/40) 235.122 M2 A.4.4.3.4 Rp 162,302.58 Rp38,160,907.21
6 Pekerjaan Plint Dinding Tile (10/40) 112.400 M1 A.4.4.3.29 Rp
Rp 35,663.76 Rp 4,008,606.62
7 Peke
ekerjaan Lantai Keramik Km/Wc (20/20) Unpolished 5.455 M2
.45 A.4.4.3.
.3.6 Rp 148,344.92 Rp 809,22
,221.55
8 Pek.
Pek. Dind
Dindin
ing
g Keram
Keramik
ik Warn
Warna
a Km
Km/W
/Wc
c (2
(20/
0/25
25)) 22.350 M
22.350 2
A.4.
A.4.4.
4.3.
3.54
54a
a Rp 294,
294,28
280.
0.58
58 Rp 6,
6,57
577,
7,17
170.
0.96
96
PEKERJAAN LANTAI JUMLAH 8 ###
H PE
PEKE
KERJRJAA
AANN PE
PENG
NGEC
ECAT
ATAN
AN
PEKERJAAN PENGECATAN DINDING DAN KOLOM
KOLOM
1 Pekerjaan Pengecatan Dinding Exterior 592.970 M2 A.4.7.1.10 Rp
Rp 54,033.38 Rp32,040,170.37
2 Pekerjaan Pengecatan Dinding Kolom 83.460 M2 A.4.7.1.10a Rp 42,208.38 Rp 3,522,710.98
PEKERJAAN PENGECATAN PLAFOND
3 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Plaf
Plafon
ond
d da
dan
n Li
List
st 19
196.
6.150 M2
150 A.4.
A.4.7.
7.1.
1.5
5 Rp 47,0
47,098
98.1
.15
5 Rp 9,
9,23
238,
8,30
302.
2.12
12
PEKERJAAN WATERPROOFING
4 Pekerjaan Waterproong Dak Beton 20.693 M2 A.4.7.1.23 Rp 153,750.30 Rp 3,181,478.08
PEKERJAAN PENGECATAN JUMLAH 9 ###
I PEKERJ
PEKERJAAN
AAN KONSTR
KONSTRUKS
UKSII A
ATAP
TAP BAJ
BAJA
A RINGAN
RINGAN
1 Peker
ekerja
jaan
an Kud
uda
a - Kud
Kuda Ba
Baja
ja Ringa
ingan
n C -TRU
TRUSS 75 0.
0.7
75 207.288 M2 A.
.28 A.4
4.5.2
.5.2.B
.BJJ1 Rp 249,3
49,353
53.8
.86
6 Rp
Rp5
51,
1,6
688,
8,0
062.1
62.19
9
2
2 Pekerjaan Pasangan Atap Spandek 207.288 M A.4.5.2.SP Rp
Rp 94,632.84 Rp19,616,251.10
3 Pekerjaan Pasangan Nok Spandek 2.000 M' A.4.5.2.NK Rp
Rp 10
1 06,197.30 Rp 212,394.60

4 Pekerjaan Pasangan Jurai Atap 28.80 M' A.4.5.2.JA Rp 97,884.50 Rp 2,819,073.60


5 Pekerjaan Pasangan Kalsiplank 53.58 M' A.4.5.2.KP Rp 115,632.00 Rp 6,195,562.56
PEKERJAAN KONSTRUKSI ATAP BAJA RINGAN MLAH 4 ###
J PEKERJAAN INSTALASI
INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 18.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 6,237,990.00
2 Pekerjaan Instalasi Stop Kontak 11.000 Ttk A.4.7.2.B Rp 372,955.00 Rp 4,102,505.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 15.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 900,363.75
4 Pasangan Lampu Down Light 3" SL. 5 Watt 3.000 Ttk A.4.7.2.H Rp 46,494.25 Rp 139,482.75
PEKERJAAN PASANGAN SAKLAR
5 Pasangan Saklar Tunggal 12.000 Ttk A.4.7.2.C Rp
Rp 27,134.25 Rp 325,611.00
6 Pasangan Saklar Ganda 3.000 Ttk A.4.7.2.D Rp 31,479.25 R
Rpp 94,437.75
PEKERJAAN PASANGAN STOP KONTAK Rp -
7 Pasa
Pasang
ngan
an St
Stop
op Ko
Kont
ntak
ak 9.
9.00
000
0 Tt
Ttk
k A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,344
44.2
.25
5 Rp 25
255,
5,09
098.
8.25
25
PEKERJAAN PASANGAN KOTAK MCB Rp -
8 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
9 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
10 Pem
emaasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp3,50
,500,00
,000.00
.00 Rp 3,500,000.00
PEKERJAAN INSTALASI LISTRIK MLAH 5 ###
K PEKE
PEKERJ
RJAA
AAN
N SAN
SANIT
ITAS
ASII
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 2.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp 7 ,,3
340,251.56
PEKERJAAN PAS. WASTAFEL DAN URINOIR
2 Pasangan Wastafel Perlengkapan 1.000 Bh A.5.1.1 5 Rp 9
9885,329.40 R
Rpp 985,329.40
3 Pasangan Urinoir + Perlengkapan 0.000 Bh A.5.1.1 4 Rp2,127,196.50 Rp -
PEKERJAAN PAS. PIPA PVC
4 Pek
eker
erjjaan Pasangan Pipa Pemb
embuangan Padat dia. 4" 15.000 M1 A.5.1.
.1.1 32 Rp 95,856.75 Rp 1,
1,437,851.25
1
5 Peker
ekerja
jaa
an Pas
asan
ang
gan Pip
Pipa Pem
emb
buang
angan Ai
Airr Kot
Kotor dia
ia.. 3" 15.
5.0
000 M A.5
A.5.1
.1.1
.1 31 Rp 85,7
,73
33.3
.31
1 Rp 1
1,2
,28
85,999
,999.6
.69
9
1
6 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pipa
Pipa Pema
Pemasu
suka
kan
n Air
Air Bers
Bersih
ih dia.
dia. 3/
3/4"
4" 50
50.0
.000
00 M A.5.
A.5.1.
1.1
1 26 Rp 25,9
25,990
90.8
.80
0 Rp 1
1,2
,299
99,5
,540
40.0
.00
0
PEKERJAAN PAS. ASSESORI PELENGKAP
7 Pekerj
Pekerjaan
aan Pasang
Pasangan
an Sho
Shower
wer + Perlen
Perlengka
gkapa
pan
n (Rg
(Rg.. Tidur
Tidur 1.0
1.000
00 Bh A.5.1.
A.5.1.1
1 5a Rp 589,1
589,154
54.50
.50 Rp 589
589,15
,154.5
4.50
0
8 Pekerjaan Pasangan Kran Air (Wastafel) 1.000 Bh A.5.1.1 19a Rp 325,154.50 Rp 325,154.50
9 Pekerjaan Pasangan Kran Air 3.000 Bh A.5.1.1 19 Rp 97,729.50 R
Rp
p 293,188.50
10 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Floo
Floorr Drai
Drain
n 2.
2.00
000
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,23
236.
6.50
50 Rp 242,
242,47
473.
3.00
00
11 Pekerjaan Pasangan Tempat Sabun Toilet 2.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 137,423.00
12 Pek
eker
erjjaan Pemb
embuatan Septick Tank + Peresapan 1.000 Unit A.5.1.
.1.1 32 Rp5,31
,311,23
,231.13
.13 Rp 5,311,231.13
PEKERJAAN SANITASI MLAH 6 ###
L PE
PEKE
KERJ
RJAA
AAN
N TAN
TANGG
GGA
A TRAS
TRASRA
RAM
M
1 Pekerjaan Urugan Pasir 0.04 M3 A.2.3.1.11 Rp 238,491.00 R
Rp
p 8,943.41
2
2 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pond
Pondas
asii Tr
Tras
asra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 2.
2.34
34 M A. 4.4.
4.4.1.
1.26
26 Rp
Rp 205,
205,42
423.
3.08
08 Rp 480,
480,69
690.
0.00
00
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 4.68 M2 A.4.4.2.3 Rp 63,908.28 Rp 299,090.77
4 Pekerjaan Urugan Tanah 0.75 M3 A.2.3.1.9 Rp 62,205.00 Rp
Rp 46,653.75
3
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.04 M A.A.4.1.1.4 R
Rp
p1,072,090.71 Rp 40,203.40
PEKERJAAN TANGGA TRASRAM Rp 875,581.33

M PEK
PEKERJA
ERJAAN
AN SALU
SALURA
RANN KELILI
KELILING
NG GEDU
GEDUNG
NG
1 Pekerjaan Galian Tanah Saluran 8.82 M3 A.2.3.1.1 R
Rpp 84,727.50 Rp 747,296.55
2 Pekerjaan Urugan Pasir Saluran 1.260 M3 A.2.3.1.11 Rp 2
23
38,491.00 R
Rp
p 300,498.66
3 Pekerjaan Beton Rabat Saluran T = 5 cm 0.420 M3 A.A.4.1.1.4 Rp
R p1,072,090.71 Rp 450,278.10
2
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 33.600 M A. 4.4.1.8 Rp 133,375.33 Rp 4
4,,481,411.09
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 42.000 M2 A.4.4.2.3 Rp 63,908.28 Rp 2,684,147.93
PEKERJAAN SALURAN KELILING GEDUNG ###
N PEKE
PEKERJ
RJAA
AAN
N FIN
FINIS
ISHI
HING
NG
1 Pekerjaan Pasangan Batu Alam 3.171 M2 Ls Rp 180,000.00 Rp 570,780.00
2
2 Pekerjaan Plesteran Metode Ciprat 4.800 M A.4.4.2.3 Rp 63,908.28 Rp 306,759.76
PEKERJAAN FINISHING JUMLAH 12 Rp Rp 877,539.76

REAL COST ###

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BONE
TAHUN 2018

Dalam Rupiah (Rp)

No BAHAN DASAR SPESIFIKASI SATUAN HARGA


1 2 3 4 Rp 5.00
1 Batu Kali Utuh M3 Rp 223,750.00
3
-Batu Pecah split 10-15 M Rp 295,000.00

-Batu Pecah Split 7 - 10 cm M3 Rp 340,500.00


-Batu Pecah Split 5 - 7 cm M3 Rp 410,000.00
-Batu Pecah Split 3 - 5 cm M3 Rp 440,000.00
-Batu Pecah Split 2 - 3 cm M3 Rp 520,000.00
3
-Batu Pecah Split 1 - 2 cm M Rp 550,000.00
-Batu Pecah Split 0,5 - 1 cm M3 Rp 550,000.00
3
Abu Batu M Rp 752,000.00
3
2 Batu Gunung M Rp 2
2334,000.00
3 Tanah Timbunan M3 Rp 110,000.00
3
4 Pasir Timbunan/Urug M Rp 155,000.00
Pasangan M3 Rp 165,000.00
3
Beton M Rp 183,525.00
3
5 Kerikil M Rp 209,000.00
6 Sirtu M3 Rp 131,750.00
7 Kapur Pasangan Za k Rp
Rp 70,950.00
8 Semen (PC) Tonasa 50 Kg Za k Rp 59,500.00
Kg Rp 1,190.00
Tonasa 40 Kg Za k Rp 57,357.00
Kg Rp 1,433.93
Puh Tiga Roda 50 kg Za k Rp 140,250.00
Bosowa 50 Kg Za k Rp 57,300.00
Bosowa 40 Kg Za k Rp 56,833.00
Semen Warna Kg Rp 9,775.00
9 Batu Merah Buah Rp 750.00
10 Batako Press Buah Rp 11,770.00
11 Paving Blok k225 Persegi Panjang M² Rp 83,825.00
Segi Enam M² Rp 88,780.00
Kacang M² R
Rp
p 99,000.00

Paving Blok K250 Persegi Panjang M² Rp 124,500.00


Segi Enam M² Rp 99,550.00
Kacang M² R
Rp
p 99,550.00
Paving Blok K300 Persegi Panjang M² Rp 88,350.00
Segi Enam M² Rp 93,000.00
Kacang M² Rp 102,300.00
Diamond (Manual) M² Rp 93,500.00
Paving Blok K 350 Persegi Panjang M² Rp 104,500.00
12 Consteen Beton 15 x 25 x 40 ( Press Mesin ) Buah Rp 121,000.00
15 x 25 x 50 ( Press Mesin ) Buah Rp 125,840.00
15 x 30 x 40 ( Press Mesin ) Buah Rp 123,200.00
13 Topi Uskup K300 Buah Rp 5,115.00
Gress Blok 3 x 45 cm Buah Rp 25,080.00
Panel Beton 240 x 40 x 5 cm Buah Rp 302,500.00
Tiang Panel Beton 5 Susun Buah Rp 317,350.00
3
14 Bata Ringan 100 x 200 x 600 isi 84 bh M Rp 977,500.00
15 Drymix pasangan bata Setara @ 40 kg zak Rp 83,720.00
16 Drymix plesteran Setara @ 40 kg zak Rp 76,475.00
17 Drymix acian Setara @ 40 kg zak Rp 111,377.50

18 Air Kerja Ltr Rp 175.00


b. BAH
BAHAN KA
KAYU
YU
1 Kayu Kls I Balok Gergaji Sawmil M3 Rp 10,000,000.00
3
Papan Gergaji Sawmil M Rp 11,550,000.00
Balok Gergaji Sensaw M3 Rp 9,075,000.00
3
Papan Gergaji Sensaw M Rp 9,900,000.00
2 Kayu Kls II Balok M3 Rp 3,837,500.00
3
Papan M Rp 4,262,500.00
3
3 Kayu Kls III Balok M Rp 2,500,000.00
Papan M3 Rp 2,750,000.00
Bambu Batang Rp 24,625.00
Dolken Kayu Dia 8/400 cm Batang Rp 23,000.00
c. BAHA
BAHAN
N LA
LANT
NTAI
AI
1 Tegel PC PC Abu-abu 20 x 20 cm Dos Rp 122,250.00
PC Abu-abu 30 x 30 cm Dos Rp 62,000.00
PC Warna 20 x 20 cm Dos Rp 68,500.00
PC Badak 20 x 20 cm Dos Rp 120,000.00
Pc Badak 30 x 30 cm Dos Rp 66,000.00
PC Wafel 20 x 20 cm Dos Rp 69,250.00
PC Wafel 30 x 30 cm Dos Rp 44,000.00
Plint PC 20 x 20 cm Buah Rp 66,000.00
Plint PC 30 x 30 cm Buah Rp 71,500.00
Tegel Mozaik 30 x 30 cm Buah Rp 67,833.00
2 Te
Tegel Kramik Puh 10 x 20 cm Dos Rp 71,638.00
Warna 10 x 20 cm Dos Rp 72,417.00
Puh 20 x 20 cm Dos Rp 69,679.00
Warna 20 x 20 cm Dos Rp 55,217.00
Warna 20 x 20 cm Bh Rp 2,208.68
Puh 20 x 25 cm Dos Rp 73,938.00
Warna 20 x 25 cm Dos Rp 59,764.00
Rp 2,988.20
Puh 30 x 30 cm Dos Rp 71,944.00
Warna 30 x 30 cm Dos Rp 74,750.00
Warna 30 x 30 cm Bh Rp 6,727.50
Puh 40 x 40 cm Dos Rp 148,500.00
warna 40 x 40 cm Dos Rp 74,750.00
Warna 40 x 40 cm Bh Rp 11,960.00
Warn
arna 60x 60 cm Dos Rp 157,000.00
Warna 60x 60 cm Bh Rp 52,333.33
Tegel Granit warna 60 x 60 cm Dos Rp 287,500.00
Warna 60 x 60 cm Bh Rp 71,875.00
warna 30 x 60 cm Dos Rp 241,500.00

Warna 30 x 60 cm Bh Rp 60,375.00

d. BAH
BAHAN KA
KACA
CA
3 Kaca Bening 2 mm M² Rp 96,250.00
1 Kaca Bening 3 mm M² Rp 118,625.00
2 Kaca Bening 5 mm M² Rp 133,250.00
2 Kaca Bening 6 mm M² Rp 287,500.00
2 Kaca Bening 8 mm M² Rp 379,500.00
2 Kaca Bening 10 mm M² Rp 506,000.00
4 Kaca Buram 3 mm M² Rp 177,750.00
5 Kaca Buram 5 mm M Rp 248,750.00
6 Kaca Ryben 3 mm M Rp 130,500.00
7 Kaca Ryben 5 mm M Rp 145,125.00
8 Kaca / Cermin 122 x 51 cm M Rp 79,625.00
2 Kaca tempered 12 mm Clear/ Polos M² Rp 1,207,500.00
9 Rang
Rangka
ka Nako
ako Tanp
Tanpaa Tera
Terali
li Ma
Mata
ta Daun
aun Rp 17,4
17,488
88.0
.00
0
10 Rangka Nako Lengkap Terali Daun Rp 83,600.00
11 JJe
endela Nako (Rangka + Kaca 5 mm) M² Rp 54,000.00
12 Silicon Sealant kaca / lem kaca Kg Rp 13,500.00

d. BA
BAHA
HAN
N ALUM
ALUMIN
INIU
IUM
M
1 Hollow Aluminium rangka plafond 40 x 20 x 2 mm Btg Rp 20,125.00
40 x 20 x 2 mm M' Rp 5,031.25
Hollow Aluminium rangka plafond 40 x 40 x 2 mm Btg Rp 27,600.00
40 x 40 x 2 mm M' Rp 6,900.00
Hollow Aluminium rangka plafond 40 x 20 x 8 mm Btg Rp 57,500.00
40 x 20 x 8 mm M' Rp 14,375.00
20 x 40 x 2 mm M' Rp 6,037.50
2 Kawat Penggantung Hollow aluminium kg Rp 28,750.00
Hollow Angel (sudut) M' Rp 6,900.00
3 Sunscreen Aluminium M² Rp 425,000.00
4 Prol Aluminium 4" M' Rp 138,862.50
5 Bingkai Pintu Aluminium M' Rp 70,000.00
6 Bingkai Jendela Aluminium M' Rp 50,000.00
7 prol alluminium T M' Rp 64,208.33
8 Spandrel Aluminium M' Rp 54,970.00
9 Aluminium Frame M' Rp 112,412.50
10 Pas. Duan Jendela Aluminium + Kaca Tebal 5 mm + Karet dan Sealent M² Rp 1,466,940.00
11 Pas. Duan Pintu Aluminium Panil Kaca Tebal 5 mm (Lengkap Accessories) Unit Rp 287,500.00
12 Pintu KM/WC Aluminium (Lengkap Accessories) Lebar 6 cm Unit Rp 287,500.00
13 Pintu KM/WC PVC KW.1 (Lengkap Accessories) Lebar 10 cm Unit Rp 241,500.00
14 Pintu berglass KM/WC Lembar Rp 253,000.00
15 Pintu KM/WC bahan PVC Lengkap Accessories Ex. Maspion Unit Rp 241,500.00
e. BAHA
BAHAN
N FFIN
INIS
ISHI
HING
NG KAYU
KAYU
Amplas halus untuk besi Amplas Lembar Rp 4,333.00
Amplas kasar untuk kayu Lembar Rp 3,891.00
Cat dasar Cap Ayam Kg Rp 31,350.00
Dempul Kaleng Kecil Rp 34,179.00
Lem aibon Kg Rp 22,875.00
Mani kayu Kg Rp 27,806.00
Minyak cat Liter Rp 19,628.00
Oker Kg Rp 40,250.00
Politur cap kayu / Ja Boyo Kg Rp 56,994.00
Vernis spesial netral warna Kaleng Rp 58,790.00
f. BAHAN B
BEESI
1 Besi Beton Polos Kg Rp 15,180.00
Panjang 12 Meter diameter = 6 mm Batang Rp 33,000.00
diameter = 8 mm Batang Rp 48,217.00
diameter = 10 mm Batang Rp 70,522.00
diameter = 12 mm Batang Rp 103,278.00
diameter = 14 mm Batang Rp 146,163.00
diameter = 16 mm Batang Rp 192,500.00

diameter = 19 mm Batang Rp 268,767.00


diameter = 22 mm Batang Rp 323,150.00
diameter = 25 mm Batang Rp 435,600.00
2 Besi Beton Ulir Kg Rp 16,041.67
3 Besi Prol (H - Beam / IWF)
Be Kg Rp 17,250.00
Kawat las Listrik (elektoda 3,2) Kg Rp 30,000.00
Angkur Baut, w 22 p= 700 mm Bh Rp 58,000.00
Mur Baut M20 Bh Rp 12,000.00
4 Paku Paku biasa 5 - 12 cm Kg Rp 18,040.00
Paku Asbes Ulir Kg Rp 54,588.00
Paku Seng (payung) RRT Kg Rp 51,810.00
Paku Skrup 3 1/2 inci Kg Rp 77,000.00
Sekrup Fixer (isi 1000/dos) Bh Rp 1,500.00
Paku Skrup 4 inci Kg Rp 77,000.00
Paku Payung Berulir 75 mm Kg Rp 57,750.00
Paku Sirap 1 cm Kg Rp 26,950.00
Paku Beton 5 - 10 cm puh Dos Rp 38,438.00
2 - 4 cm hitam Dos Rp 24,200.00
Sekrup Spandek Kg Rp 28,750.00

5 Kawat Beton Kg Rp 2
24
4,444.00
Nyamuk M Rp
Rp 24,600.00
Ayakan Kecil M Rp 22,367.00
Duri Rol R
Rp
p 268,500.00
6 Besi Plat 2 mm = 120 x 140 mm Lembar Rp 660,000.00
Rp 12,672.00
3 mm = 120 x 140 mm Lembar Rp 780,000.00
7 Be
Besi Strep 30,3 mm 1 x 3 Batang Rp 22,700.00
35,4 mm 1 1/2 x 4 Batang Rp 30,700.00
46,4 mm 2 x 4 Batang Rp 35,000.00
40,6
40,6 mm 2 x 6 Ba
Bata
tang
ng Rp 56,7
56,700
00.0
.00
0
50,6 mm 2 1/2 x 6 Batang Rp 247,500.00
8 Besi Siku 30.30.3 Batang Rp 66,500.00
40.40.4 Batang Rp 70,100.00
50.50.5 Batang Rp 190,587.00
60.60.6 Batang Rp 316,250.00
70.70.7 Batang Rp 388,500.00
40.40.3 Batang Rp 57,500.00
50.50.4 Batang Rp 114,750.00
9 Besi Kanal C 75/75 Batang Rp 99,367.00
75/65 Batang Rp 79,142.00
10 Reng 30/45 Batang Rp 38,000.00
11 Besi Plafond 18/38 Batang Rp 48,000.00
12 Besi Hallow 15/35 Batang Rp 26,500.00
35/35 Batang Rp 35,700.00
3m Batang Rp 9,629.00
Wiremesh M10 2,1 x 5,4 (61,79 kg/lbr) M2 Rp 126,500.00
Lemb
Lembar
ar Rp 1,03
1,035,
5,00
000.
0.00
00
Steel Floor Decking/Smartdeck 0.75 mm (BONDEK) M2 Rp 135,700.00
Scafolding M2 Rp 6,900.00
Sewa alat las Hari Rp 150,000.00
Stainless Steel Dia 5 cm M' Rp 65,000.00
g. BAH
BAHAN PIPA
PIPA
1 Pipa GIP Medium Class SNI / ISO Dia 1/2 inci - 6 m Batang Rp 177,445.00
Dia 3/4 Inci - 6 m Batang Rp 227,585.00
Dia 1 Inci - 6 m Batang Rp 295,240.00
Dia
Dia 1/2
1/2 In
Inci
ci - 6 m Bata
Batang
ng Rp 439,
439,04
040.
0.00
00
Dia 2 Inci - 6 m Batang Rp 537,386.00
Dia 2 1/2 Inci - 6 m Batang Rp 679,582.00
Dia 3 Inci - 6 m Batang Rp 1,165,083.00
1 Pipa GIP Medium Class SNI / ISO Dia 1/2 inci - 4 m Batang Rp 32,200.00
Dia 3/4 Inci - 4 m Batang Rp 39,100.00

Dia 1 Inci - 4 m Batang Rp 51,750.00


Dia
Dia 1 1/4
1/4 In
Inci
ci - 4 m Ba
Bata
tang
ng Rp 67,8
67,850
50.0
.00
0
Dia
Dia 1 1/2
1/2 In
Inci
ci - 4 m Ba
Bata
tang
ng Rp 55,2
55,200
00.0
.00
0
Dia 2 Inci - 4 m Batang Rp 71,300.00
Dia 2 1/2 Inci - 4 m Batang Rp 103,500.00
Dia 3 Inci - 4 m Batang Rp 132,250.00
Dia 3 Inci - 4 m Batang Rp 156,000.00
2 Pipa PVC SNI S10 (SCJ) Dia 1/2 Inci - 6 m Batang Rp 29,261.00
Dia 3/4 Inci - 6 m Batang Rp 43,413.00
Dia 1 Inci - 6 m Batang Rp 71,645.00
Dia
Dia 1 1/2
1/2 In
Inci
ci - 6 m Bata
Batang
ng Rp 167,
167,32
325.
5.00
00
Pipa PVC SNI S10 (RRJ)
Dia 2 Inci - 6 m Batang Rp 275,415.00
Dia 2 1/2 Inci - 6 m Batang Rp 396,453.00
Dia 3 Inci - 6 m Batang Rp 556,370.00
Dia 4 Inci - 6 m Batang Rp 830,720.00
Dia 6 Inci - 6 m Batang Rp 1,729,500.00
Dia 8 Inci - 6 m Batang Rp 2,806,513.00
Dia 10 Inci - 6 m Batang Rp 4,365,214.00

Dia 12 Inci - 6 m Batang Rp 6,931,335.00


Dia 14 Inci - 6 m Batang Rp 8,914,570.00
Pipa PVC SNI S12.5 (RRJ)
Dia 2 Inci - 6 m Batang Rp 231,150.00
Dia 2 1/2 Inci - 6 m Batang Rp 329,935.00
Dia 3 Inci - 6 m Batang Rp 466,458.00
Dia 4 Inci - 6 m Batang Rp 673,458.00
Dia 6 Inci - 6 m Batang Rp 1,415,995.00
Dia 8 Inci - 6 m Batang Rp 2,293,575.00
Dia 10 Inci - 6 m Batang Rp 3,589,265.00
Dia 12 Inci - 6 m Batang Rp 5,700,435.00
Pipa PVC Orange SNI ( untuk Limbah ) Dia 4 Inci Buah Rp 485,750.00
3 PVC Jenis D untuk Saluran Pembuangan Dia 1/2 Inci - 4 m Batang Rp 42,550.00
Dia 3/4 Inci - 4 m Batang Rp 52,900.00
Dia 1 Inci - 4 m Batang Rp 55,200.00
Dia 1 1/2 Inci - 4 m Batang Rp 57,500.00
Dia 2 Inci - 4 m Batang Rp 69,000.00
Dia 2 1/2 Inci - 4 m Batang Rp 86,250.00
Dia 3 Inci - 4 m Batang Rp 100,050.00
Dia 4 Inci - 4 m Batang Rp 155,250.00
Dia 5 Inci - 4 m Batang Rp 241,500.00
Dia 6 Inci - 4 m Batang Rp 310,500.00
Dia 8 Inci - 4 m Batang Rp 529,000.00
Dia 10 Inci - 4 m Batang Rp 545,250.00
4 PVC Jenis C Untuk Instalasi Listrik Clipsal 20 mm² (3m) Batang Rp 13,100.00
Dia 5/8 Inci - 4 m Batang Rp 18,000.00
Dia 3/4 Inci - 4 m Batang Rp 28,000.00
Dia 1 Inci - 4 m Batang Rp 37,250.00
Dia 1 1/2 Inci - 4 m Batang Rp 99,000.00
5 Sock Pvc Dia 1/2 Inch Buah Rp
Rp 3,500.00
Dia 3/4 Inch Buah Rp 4,000.00
Dia 1 Inch Buah Rp 7,000.00
Dia 1 1/4 Inch Buah Rp 7,000.00
Dia 1 1/2 Inch Buah Rp 8,000.00
Dia 2 Inch Buah Rp 9,000.00
Dia 2 1/2 Inch Buah Rp 9,500.00
Dia 3 Inch Buah Rp 12,000.00
Dia 4 Inch Buah Rp 17,000.00
6 Stop Kran PVC Rp 12,000.00
Dia 1/2 Inch Buah Rp 12,000.00
Dia 3/4 Inch Buah Rp 17,000.00
Dia 1 Inch Buah Rp 40,000.00

Dia 1 1/4 Inch Buah Rp 47,000.00


Dia 1 1/2 Inch Buah Rp 67,000.00
7 Stop Kran Gate Valve (SNI) Merk : Onda
Dia 1/2 Inch Buah Rp 49,725.00
Dia 3/4 Inch Buah Rp 73,875.00
Dia 1 Inch Buah Rp 122,750.00
Dia 1 1/4 Inch Buah Rp 191,750.00
Dia 1 1/2 Inch Buah Rp 260,750.00
Dia 2 Inch Buah Rp 364,250.00
Dia 2 1/2 Inch Buah Rp 605,750.00
Dia 3 Inch Buah Rp 789,750.00
Dia 4 Inch Buah Rp 1,554,500.00
8 Tee
Tee Pvc
Pvc (B
(BIA
IASA
SA))
Dia 1/2 Inch Batang R
Rp
p 5,000.00
Dia 3/4 Inch Batang R
Rp
p 7,000.00
Dia 1 Inch Batang Rp 7,000.00
Dia 1 1/4 Inch Batang Rp 8,000.00
Dia 1 1/2 Inch Batang Rp 9,000.00
Dia 2 Inch Batang Rp 12,000.00

Tes SNI Dia 4 Inch Buah Rp 127,000.00


9 Bend 90° Dia 4 Inch Buah Rp 147,000.00
10 IPAL Fiber Glass ISO 5 m³ Buah Rp 147,000.00
10 m³ Buah Rp 87,752,550.00
15 m³ Buah Rp 132,760,250.00
20 m³ Buah Rp 177,013,000.00
h. BAHAN
BAHAN LANG
LANGIT-
IT-LAN
LANGIT
GIT DAN
DAN PART
PARTISI
ISI
1 Enternit 100 x 100 Lokal Harpur Lembar Rp 22,000.00
2 Tr
T ripleks 122 x 244 x 0.2 cm Lembar Rp 52,000.00
122 x 244 x 0.3 cm Lembar Rp 52,000.00
122 x 244 x 0.4 cm Lembar Rp 65,000.00
122 x 244 x 0.6 cm Lembar Rp 77,000.00
122 x 244 x 0.9 cm Lembar Rp 105,000.00
122 x 244 x 1.2 cm Lembar Rp 187,200.00
122 x 244 x 1.8 cm Lembar Rp 216,000.00
3 Tripleks Melamin 122 x 244 x 0,3 cm Lembar Rp 117,000.00
4 Teakwood 122 x 244 x 0,3 cm Lembar Rp 87,000.00
80 x 244 x 0.03 cm Lembar Rp 77,000.00
5 Akusk 40 x 60 cm Lembar Rp 133,000.00
6 Hard Board 122 x 244 cm Lembar Rp 257,000.00
7 Asbes Plat Harek Lembar Rp 73,500.00
8 List Prol 2 x 3 cm Batang Rp
Rp 14,000.00
3 x 3 cm Batang Rp 18,000.00
4 x 4 cm Batang Rp 25,000.00
4 x 5 cm Batang Rp 26,000.00
5 x 5 cm Batang Rp 27,000.00
2 x 3 cm Batang Rp 12,000.00
3 x 3 cm Batang Rp 14,500.00
4 x 4 cm Batang Rp 17,000.00
5 x 5 cm Batang Rp 24,000.00
6 x 6 cm Batang Rp 25,000.00
9 Lamber sering klas II 1 x 9 x 400 cm Batang Rp 26,000.00
10 Plafond GRC T = 4 cm M2 Rp 72,000.00
11 G
Gyypsum board 120 x 240 cm tebal 9 mm Lembar Rp 70,000.00
Prol gypsum board Tipe CA (besar) 15 cm Lembar Rp 112,000.00
Prol gypsum board Tipe CE (besar) 12 cm Lembar Rp 90,000.00
Prol gypsum board Tipe SL (kecil) 9 cm Lembar Rp 68,000.00
Kalsi board Lembar Rp 58,000.00
12 Plafond PVC 20 x 400 cm tebal 9 mm M' Rp 39,000.00
Plafond Akusk 60 x 120 cm
List alumunium prol U 1 cm
List plafond gypsum t=5 cm M' Rp 20,000.00
Aluminium composite panel seven 4 mm 1,2 x 2,4 m M2 Rp 315,000.00
HPL ex. Taco M2 Rp 166,000.00

Karet puh pelapis kaca 5 mm M' Rp 5,000.00


Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara M' Rp 38,000.00
Sealent dengan lakban ex. GE/ Wacker non stain Tube Rp 57,000.00
Braket siku besi 70 x 70 x 7mm M' Rp 17,500.00
lem Vinyl Liter Rp 74,750.00
Lem Puh Kg Rp 63,250.00
i. BAHAN A
ATTAP
1 Genteng Beton Lembar Rp 18,500.00
Keramik (Glasur ) Lembar Rp 189,750.00
Asbes 0,3 cm Lembar Rp 55,770.00
Hares (115 x 85 x 0,5 cm) Lembar Rp 57,640.00
Spandek G550 AZ T = 0,4 mm M2 Rp 57,200.00
Metal Mul Roof Kasar
asar Pjg, 77 lb. 100 cm Buah Rp 62,400.00
Listplank kalsiplank M' Rp 30,000.00
2 Asbes Gelombang (rusa)
As Kaki Rp 51,700.00
3 Asb
Asbes
es Gelomb
Gelombang
ang Rp 7,0
7,040.
40.00
00
BMG 34" -BJLS 0,18 mm Kaki Rp 16,500.00
BMG 33" -BJLS 0,22 mm Kaki Rp 17,500.00
BMG 32" -BJLS 0,30 mm Kaki Rp 55,000.00

BMG 28" -BJLS 0,35 mm Kaki Rp 88,000.00


4 Sirap Ikat/m2 Rp 115,500.00
5 Seng Gelombang BWG 34" BJLS 0.18 mm 0,20 Rusa Kaki Rp 8,250.00
BWG 33" BJLS 0.22 mm Kaki Rp 8,250.00
BWG 32" BJLS 0.30 mm Kaki Rp 82,500.00
BWG 28 BJLS 0.35 mm Kaki/Lbr Rp 93,500.00
6 Seng Plat BMG 33" - BJLS 0,18 mm Kaki/Lbr Rp 57,750.00
BMG 32" - BJLS 0,22 mm Kaki/Lbr Rp 85,250.00
BMG 28" - BJLS 0,35 mm Kaki/Lbr Rp 96,250.00
7 Seng Super Deck ( Spandek ) 0,3 mm ( Silver ) M1 Rp 43,950.00
0,35 mm (Hijau) M1 Rp 72,775.50
180 x 77 cm - 8 kaki Lembar Rp 46,200.00
180 x 77 cm - 7 kaki Lembar Rp 185,900.00
180 x 77 cm - 6 kaki Lembar Rp 148,720.00
8 Seng Aluminium Gelombang SWG 32" 0.27 mm Lembar Rp 146,850.00
SWG 30" 0.31 mm Lembar Rp 148,500.00
SWG 28" 0.38 mm Lembar Rp 167,200.00
9 Se
S eng Plask (Fiber) 10000 KK Kaki Rp 14,925.00
10 Fiber Semen (Harlex) Super 240 x 108 x 0.6 cm Lembar Rp 37,400.00
Supe
Superr 180 x 108
108 x 0.
0.6
6 cm Lemb
Lembar
ar Rp 19,8
19,800
00.0
.00
0
Ekonomi 240 x 92 x 0.5 cm Lembar Rp 130,130.00
Ekonomi 180 x 92 x 0.5 cm Lembar Rp 130,130.00
Mini 240 x 105 x 0.4 cm Lembar Rp 111,540.00
Mini 180 x105 x 0.4 cm Lembar Rp 111,540.00
Super 240 x 105 x 0.4 cm Lembar Rp 185,900.00
Super 180 x 105 x 0.4 cm Lembar Rp 120,835.00
11 Nok/Bubungan Genteng Beton Buah Rp 27,500.00
Genteng Asbes Lembar R
Rp
p 13,200.00
Genteng Keramik Lembar Rp
Rp 13,200.00
Alm. SWG 28" - 168 cm Lembar Rp 129,800.00
Alm. SWG 28" - 64 cm Lembar Rp 92,950.00
Nok Genteng Mul Roof Pjg Kasar
sar, 80 cm Buah Rp 66,125.00
Nok Steel Gelombang Super - 180 cm Buah Rp 167,200.00
Mini - 105 cm Buah Rp 148,720.00
Ekonomi - 95 cm Buah Rp 102,300.00
Nok Steel Rada Super - 108 cm Buah Rp 102,300.00
Mini - 105 cm Buah Rp 111,650.00
Ekonomi - 95 cm Buah Rp 89,100.00
Nok 1/2 Lingkaran Buah Rp 68,750.00
12 Karet Pelapis Genteng 55 cm x 50 m M' Rp 5,500.00
Karet Pelapis Genteng Roll Rp 178,750.00
Atap Spandeq M2 Rp 57,200.00
Atap Spandeq M2 Rp 51,700.00

Nok Spandeq M' Rp 57,200.00


Nok Spandeq M' Rp 39,600.00
Sekrup Atal metal Buah Rp
Rp 55,550.00
Rang
Rangka
ka baja
baja ri
ring
ngan
an cana
canall C 75 0.75
0.75 M' Rp 23,0
23,004
04.2
.25
5
Reng Baja Ringan C 35 0.45 M' Rp 12,787.50
Talang Jurai M' Rp 65,000.00
Baut (Screw driver) Buah Rp 1,500.00
Dynabolt Buah Rp 8,500.00
Besi Hollow 1 M' Rp 77,000.00
Besi Hollow 3 M' Rp 77,000.00
Rangka Atap Baja Ringan M2 Rp 193,050.00

j. BAHAN PENGGANTUNG
1 Ku
K unci Tanam Union 1 x Slag Buah Rp 111,650.00
Union 2 x Slag Buah Rp 192,500.00
Yale 1 x Slag Buah Rp 114,000.00
Yale 2 x Slag Buah Rp 154,000.00
Kuda Terbang Buah Rp 139,370.00

2 Penggantung Hak Angin Kecil Buah Rp 20,825.00


Hak Angin Besar Buah Rp 26,325.00
Grendel Kecil Buah Rp 13,800.00
Grendel Besar Buah Rp 23,500.00
Engsel Pintu Pasang R
Rpp 38,500.00
Engsel Jendela Pasang Rp 28,600.00
Grendel Pintu Tanam/Expanyolet Buah Rp 139,700.00
Grendel Jendela Stainless Buah Rp 28,750.00
Handel Pintu Buah Rp 210,000.00
k. BAHA
BAHAN
N SANI
SANITE
TER
R
1 Kloset Duduk KIA (lengkap) Buah Rp 2,126,667.00
2 Kloset Duduk Toto Buah Rp 2,487,083.00
3 Kloset Jongkok Toto Buah Rp
Rp 396,700.00
Jet washer Toto Buah Rp 220,000.00
Hand shower lengkap dengan aksesories Toto Buah Rp 480,000.00
4 Wasthafel Warna Buah Rp 504,200.00
5 Wasthafel cuci piring logam Royal Buah Rp 210,375.00
6 Po
Pompa tangan terpasang Buah Rp 330,000.00
7 Urinor lengkap Buah Rp 1,296,250.00
8 Bak Mandi ber Buah Rp
Rp 192,500.00
9 Reservoir Fiber = 1 m Merk Grand : 1 m3 Fiber Buah Rp 1,265,000.00
Merk Grand : 1 m3 Stainless Buah Rp 4,180,000.00
10 Reservoir Fiber = 2 m Buah
11 Stop Kran 1/2 " Buah Rp
Rp 30,500.00
12 Floor Drain Stainless 4" Buah Rp 95,000.00
13 Roof Drain Stainless 4" Buah Rp 60,000.00
14 Kran Air kuningan Buah Rp 145,750.00
15 Kran Air puh FIA Buah Rp 33,250.00
16 Kloset duduk Polas ito Buah Rp 451,000.00
Warna Buah Rp 306,250.00
17 Kloset jongkok Polas ito Buah Rp 232,400.00
Warna Buah Rp 149,250.00
Tempat Sabun Buah Rp 47,250.00
Seal tape Buah Rp 6,500.00
Kran Air Ex. Onda Stainless (Wastafel) Buah Rp 240,000.00

18 Tali Ijuk M3 Rp 20,000.00


Ijuk M2 Rp 45,000.00
l BAHA
BAHAN
N FI
FINI
NISH
SHIN
ING
G / CAT
CAT
1 Cat Tembok Aviatex 5 Kg Rp 106,500.00
Mowilex Luar (Ext) 2,5 Kg Rp 287,500.00
Mowilex Dalam ( Int ) 2,5 Kg Rp 184,000.00
Metrolite 5 Kg Rp 107,200.00
Kimex 5 Kg Rp 86,250.00
Vinikex Nippon Paint 5 Kg Rp 99,000.00
Mowilex 5 Kg Rp 187,500.00
Vinotex( standar ) 5 Kg Rp 60,500.00
Vinotex( special ) 5 Kg Rp 88,000.00
2 Cat Kayu Glotex Kg Rp 49,200.00
Avian Kg R
Rp
p 61,000.00
Palatone Kg Rp 57,750.00
ICI Kg Rp 85,250.00
Politur Kg Rp 59,800.00
Meni Kg Rp 26,150.00
Altex kg R
Rp
p 30,500.00
Minyak Cat (AVIAN) Liter Rp 29,950.00

3 Cat Atap/Seng AGA Kg Rp 104,500.00


Nippon Kg Rp 220,000.00
Lem Seng Buah Rp 9,700.00
Yoko 5 Kg Rp 104,900.00
Amplas/Kertas Gosok Lembar Rp 4,500.00
Dempul Kg R
Rp
p 35,200.00
Residu Kg/10 Rp 27,500.00
4 Waterproong Sika Waterproong Kg Rp 184,000.00
Ca An Lumut (no drop) Kg Rp 34,500.00
5 Politur kg Rp 67,900.00
6 Dempul kg Rp 38,500.00
7 Pamur Tembok Kg R
Rp
p 63,100.00
8 Kertas Gosok lembar Rp 13,700.00
9 Lem Kayu gram Rp 16,500.00
10 Minyak Cat liter Rp 22,400.00
11 Minyak Bekisng liter Rp
Rp 11,000.00
12 Solar liter Rp 13,500.00
13 Kuas biasa 3 cm Eterna Bh Rp 15,000.00
14 Kuas biasa 4" Eterna Bh Rp 21,000.00
15 Kuas biasa 5 cm Eterna Bh Rp 25,000.00
16 Ku
Kuas
as R
Rol
olll Bh Rp 30,000.00
17 Ampl
Amplas
as halu
haluss Lbr Rp 5,000.00
17 Am
Ampl
plas
as kkas
asar
ar Lbr Rp 7,500.00
m. BAHAN
BAHAN INS
INSTAL
TALASI
ASI LISTR
LISTRIK
IK
1 Pipa Union Untuk Kabel 5/8 inci - 4 m Batang Rp 11,000.00
1 inci - 4 m Batang Rp 12,950.00
1 1/2 inci - 4 m Batang Rp 13,000.00
2 inci - 4 m Batang Rp 28,050.00
2 Kabel Listrik Tipe NYA (ex. Eterna)
1,5 mm 50 m Rp 121,000.00
1,5 mm Roll Rp 239,500.00
2,5 mm 50 m Rp 220,000.00
2,5 mm Roll Rp 349,700.00
Kabel NYM 3 x 2,5 mm2 Eterna 100 m Rp 1,150,000.00
2,5 mm M' Rp 11,500.00
Tipe NYY
2x1 1/2 mm Roll Rp 770,000.00
2x2 1/2 mm Roll Rp 1,100,000.00
2x4 mm Roll Rp 739,200.00
3 Lampu TL 1x20 W Buah Rp
Rp 99,000.00
2x20 W Buah Rp 247,500.00
1x40 W Buah Rp 132,000.00
2x40 W Buah Rp 66,000.00
4 Lampu Pijar 25 W Buah Rp
Rp 21,950.00
40 W Buah Rp
Rp 33,950.00
60 W Buah Rp
Rp 59,085.00
100 W Buah Rp 100,913.00
5 Lampu Taman Mercury Buah Rp 550,000.00
6 Sa
S aklar Broco Tunggal Puh Buah Rp 17,400.00
Tunggal Hitam Buah Rp 22,000.00
Double Puh Buah Rp 21,350.00
Double Hitam Buah Rp 17,600.00
7 Stop Kontak Hitam Buah Rp 17,900.00
Pu  h Buah Rp 18,500.00
8 Zek
Zeker
ering
ing Kast Lok
Lokal
al Bi
Biasa
asa
Lokal Buah Rp 5,500.00
Lokal Automas Buah Rp 49,500.00
Lokal 2 Group Automat Buah Rp 139,700.00
Lokal 3 Group Biasa Buah Rp 232,100.00

9 Fing Buah Rp 14,000.00


Flexible pipe M' Rp 8,000.00
Klem kabel No. 10 Buah Rp 1,500.00
Kee nee Buah Rp 3,000.00
Inbow Dos Buah Rp 6,000.00
Las DOP Buah Rp 3,000.00
Isolasi listrik, Ex Unibell Buah Rp 12,000.00
Tee Doz 5/8 Ex. Clipsal Buah Rp 9,000.00
Ground Box set Rp 105,600.00
Kawat Penghantar M' Rp 30,000.00
Fisher, mur baut, plat 1 mm set Rp 48,000.00
Arde Diameter 16 mm Buah Rp 840,000.00
MCB 6 A Ex Supran Buah Rp 30,750.00
MCB 32 A Ex Supran Buah Rp 60,500.00
Panil Box + Accecories + Lengkap Set Rp 111,100.00
Penangkal Per Lengkap Set Rp 92,700.00
n. UPAH
UPAH KERJ
KERJA
A
1 Pekerja Org/hr Rp 9
97
7,500.00
2 Pekerja semi trampil
Pe Org/hr R
Rpp 97,500.00
3 Pekerja trampil Org/hr Rp 127,500.00
4 Mekanik trampil Org/hr Rp 137,500.00
5 Me
Mekanik semi trampil Org/hr R
Rpp 120,000.00
6 Operator trampil Org/hr Rp 146,000.00
7 Op
Operator semi trampil Org/hr Rp 137,500.00
8 Pembantu Operator Org/hr Rp 127,500.00
9 Sopir trampil Org/hr Rp 127,500.00
10 Sopir semi trampil Org/hr R
Rpp 120,000.00

11 Pembantu sopir Org/hr Rp 97,500.00


12 Tukang Tukang Kayu Org/hr Rp 120,000.00
Tukang Batu Org/hr Rp 120,000.00
Tukang Cat Org/hr Rp 120,000.00
Tukang Listrik Org/hr Rp 120,000.00
Tukang Pipa Org/hr Rp 120,000.00
Tukang Besi Org/hr Rp 120,000.00
13 K
Keepala Tukang Kepala Tukang Kayu Org/hr Rp 146,000.00
Kepala Tukang Batu Org/hr Rp 146,000.00
Kepala Tukang Listrik Org/hr Rp 137,500.00
Kepala Tukang Cat Org/hr Rp 127,500.00
Kepal
Kepala
a Tuka
Tukang
ng Pi
Pipa
pa Org/
Org/hr
hr Rp 1
137
37,5
,500
00.0
.00
0
Kepala Tukang Besi Org/hr Rp 137,500.00
14 Mandor Org/hr Rp 1
15
50,000.00

Standar Nasional Indonesia (SNI)


AHSP BIDANG CIPTA KARYA-2016
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

Pembuatan 1 M2 Papan Nama Proyek A. 2.2.1.0


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 146,000.00 1,460.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 23,960.00
B BAHAN
Multipleks tebal 9 mm Lbr 0.500 105,000.00 52,500.00
Paku biasa 2” – 5” Kg 0.625 18,040.00 11,275.00
3
Cat Kayu M 1.250 61,000.00 76,250.00

JUMLAH HARGA BAHAN 140,025.


140,025.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 163,985.00


E Overhead & Profit (Maksimum 15 %) 10% X D 16,398.50
F Harga Satuan Pekerjaaan (D+E) 180,383.50

Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 146,000.00 1,460.00
Mandor L.04 OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 23,960.00
B BAHAN
Kayu balok 5/7 2 x Pakai M3 0.0120 2,500,000.00 30,000.00
Paku 2”-5” Kg 0.0200 18,040.00 360.80
3
Kayu papan 3/20 2 x Pakai M 0.0070 2,750,000.00 19,250.00
JUMLAH HARGA BAHAN 49,610.80
49,610.8 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 73,570.80


E Overhead & Profit (Maksimum 15 %) 10% X D 7,357.08
F Harga Satuan Pekerjaaan (D+E) 40,463.94

Pembuatan 1 M2 kantor sementara lantai kerja A. 2.2.1.5

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 146,000.00 1,460.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 23,960.00
B BAHAN
Dolken kayu dia. 8-10/400 cm Batang 1.250 23,000.00 28,750.00
3
Kayu M 0.180 2,500,000.00 450,000.00
Paku biasa Kg 0.080 18,040.00 1,443.20
Besi strip Kg 1.100 22,700.00 24,970.00
Semen portland Kg 35.000 1,190.00 41,650.00
Pasir pasang M3 0.150 165,000.00 24,750.00
3
Pasir beton M 0.100 183,525.00 18,352.50
Koral beton M3 0.150 440,000.00 66,000.00
Bata merah M2 30.000 750.00 22,500.00
Seng plat Lembar 0.250 57,750.00 14,437.50
Jendela naco Buah 0.200 17,488.00 3,497
3,497.60
.60
2
Kaca polos M 0.080 133,250.00 10,660.00
Kunci tanam Buah 0.150 192,500.00 28,875.00
Plywood 4 mm Lembar 0.060 65,000.00 3,900.00
JUMLAH HARGA BAHAN 739,785.
739,785.80
80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 763,745.80


E Overhead & Profit (Maksimum 15 %) 10% X D 76,374.58
F Harga Satuan Pekerjaaan (D+E) 840,120.38

Pembuatan 1 M2 rumah jaga ( konstruksi kayu ) A. 2.2.1.6


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00

Tukang Kayu L.02 OH 1.500 120,000.00 180,000.00


Kepala Tukang L.03 OH 0.150 146,000.00 21,900.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 306,900.
306,900.00
00
B BAHAN
Dolken kayu dia. 8-10/400 cm Batang 3.000 23,000.00 69,000.00
3
Kayu M 0.276 2,500,000.00 690,000.00
Paku biasa Kg 0.700 18,040.00 12,628.00
Seng gelombang Lembar 1.500 82,500.00 123,750.00
JUMLAH HARGA BAHAN 895,378.
895,378.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,202,278.00


E Overhead & Profit (Maksimum 15 %) 10% X D 120,227.80
F Harga Satuan Pekerjaaan (D+E) 1,322,505.80

Pembuatan 1 M2 gudang semen dan peralatan A. 2.2.1.7


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 2.000 120,000.00 240,000.00
Kepala Tukang L.03 OH 0.200 146,000.00 29,200.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 286,450.
286,450.00
00
B BAHAN
Dolken kayu dia. 8-10/400 cm Batang 1.700 23,000.00 39,100.00
3
Kayu M 0.210 2,500,000.00 525,000.00
Paku biasa Kg 0.300 18,040.00 5,412.00
Semen Portland Kg 10.500 1,190.00 12,495.00
Pasir beton M 3
0.030 165,000.00 4,950.00
Koral beton M3 0.050 440,000.00 22,000.00
Seng gelombang Lembar 1.500 82,500.00 123,750.00
Seng plat Lembar 0.250 57,750.00 14,437.50
JUMLAH HARGA BAHAN 747,144.
747,144.50
50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,033,594.50


E Overhead & Profit (Maksimum 15 %) 10% X D 103,359.45
F Harga Satuan Pekerjaaan (D+E) 1,136,953.95

Pembersihan 1 M2 lapangan dan perataan A. 2.2.1.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 105,000.
105,000.00
00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 105,000.00


E Overhead & Profit (Maksimum 15 %) 10% X D 10,500.00
F Harga Satuan Pekerjaaan (D+E) 115,500.00

Pembuatan 1 M2 steger/perancah
steger/perancah dari bambu A. 2.2.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 146,000.00 2,920.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 44,170.00
B BAHAN
Bambu diameter 6 - 8/600 cm Batang 1.250 24,625.00 30,781.25
3
Tali ijuk M 0.186 20,000.00 3,720.00
JUMLAH HARGA BAHAN 34,501.25
34,501.2 5
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 78,671.25


E Overhead & Profit (Maksimum 15 %) 10% X D 7,867.13

F Harga Satuan Pekerjaaan (D+E) 86,538.38

PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L101 OH 2.000 97,500.00 195,000.00
Pembantu Operator L083 OH 1.000 127,500.00 127,500.00
Operator L081 OH 1.000 146,000.00 146,000.00
Mandor L061 OH 1.000 150,000.00 150,000.00
JUMLAH TENAGA KERJA 618,500.
618,500.00
00
B BAHAN
Alat Bantu M170 Set 0.080 126,500.00 10,120.00

JUMLAH HARGA BAHAN 10,120.00


10,120.0 0
C PERALATAN
Bulldozer E001 JAM 5.000 698,059.82 3,490,299.08
JUMLAH HARGA ALAT 3,490,299.08

D Jumlah (A+B+C) 4,118,919.08


E Overhead & Profit (Maksimum 15 %) 10% X D 411,891.91
F Harga Satuan Pekerjaaan (D+E) 4,530,810.99
G Harga Satuan Pekerjaaan (F/2.400 M2/Hari) 1,887.84
ANGGAPAN/ASUMSI :
1 Men
Menggu
ggunak
nakan
an alat
alat ber
berat
at (2.
(2.400
400 m2/
m2/har
hari)
i)
2 Tidak
Tidak ad
ada
a po
pohon
hon b
besa
esarr dal
dalam
am da
damij
mija
a (h
(hany
anya
a sem
semak-
ak-sem
semak)
ak)

PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L101 OH 6.000 97,500.00 585,000.00
Pembantu Operator L083 OH 3.000 127,500.00 382,500.00
Operator L081 OH 3.000 146,000.00 438,000.00
Pembantu Sopir L099 OH 4.000 97,500.00 390,000.00
Sopir L091 OH 4.000 127,500.00 510,000.00
Mandor L061 OH 1.000 150,000.00 150,000.00
JUMLAH TENAGA KERJA 2,455,500.00
2,455,500 .00
B BAHAN
Alat Bantu M170 Set 0.240 126,500.00 30,360.00

JUMLAH HARGA BAHAN 30,360.00


30,360.0 0
C PERALATAN
Bulldozer E001 JAM 5.000 698,059.82 3,490,299.08
Motor Grader E010 JAM 5.000 515,641.54 2,578,207.69
Loader wheeled E052 JAM 5.000 479,351.29 2,396,756.46
Dump Truck 5 Ton E212 JAM 20.000 405,527.82 8,110,556.46
JUMLAH HARGA ALAT 16,575,819.69

D Jumlah (A+B+C) 19,061,679.69


E Overhead & Profit (Maksimum 15 %) 10% X D 1,906,167.97
F Harga Satuan Pekerjaaan (D+E) 20,967,847.66
G Harga Satuan Pekerjaaan (F/2.400 M2/Hari) 104,839.24
1 Me
Meng
nggu
guna
naka
kann al
alat
at be
bera
ratt (200
(200 m
m3/
3/ha
hari
ri))
2 20 % dibuan
dibuang
g dilok
dilokasi
asi ttanp
anpa
a diang
diangkut
kut dengan
dengan tru
truck
ck
3 80 % d
dib
ibua
uang
ng d
dan
an d
dia
iang
ngku
kutt de
deng
ngan
an ttru
ruck
ck
4 Jar
Jarak 1 rit pp < 2 km

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 M3 tanah biasa sedalam 1 m' A.2.3.1.1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 97,500.00 73,125.00
Mandor L.04 OH 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 76,875.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 76,875.00


E Overhead & Profit (Maksimum 15 %) 10% X D 7,687.50
F Harga Satuan Pekerjaaan (D+E) 84,562.50

Penggalian 1 M3 tanah biasa sedalam 2 m' A.2.3.1.2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 97,500.00 87,750.00
Mandor L.04 OH 0.0450 150,000.00 6,750.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 94,500.00


E Overhead & Profit (Maksimum 15 %) 10% X D 9,450.00
F Harga Satuan Pekerjaaan (D+E) 103,950.00

Pengurugan kembali 1 M3 galian tanah


Pengurugan kembali 1 m3 galian dihitung 1/3 kali dari koefisien pekerjaan galian A.2.3.1.9
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 97,500.00 48,750.00
Mandor L.04 OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 56,250.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,250.00


E Overhead & Profit (Maksimum 15 %) 10% X D 5,625.00
F Harga Satuan Pekerjaaan (D+E) 61,875.00

Pemadatan tanah 1 m3 tanah (per 20 cm ) A.2.3.1.10


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.500 97,500.00 48,750.00
Mandor OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 56,250.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,250.00


E Overhead & Profit (Maksimum 15 %) 10% X D 5,625.00
F Harga Satuan Pekerjaaan (D+E) 61,875.00

Pengurugan 1 M3 dengan pasir urug A.2.3.1.11


Harga Satuan Jumlah Harga
No Urai
Uraian
an Kode Satuan
Satuan oefi
oefisie
sie
(Rp) (Rp)
A TENAGA
Pekerja OH 0.300 97,500.00 29,250.00
Mandor OH 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 30,750.00
B BAHAN
Pasir urug M3 1.200 155,000.00 186,000.00
JUMLAH HARGA BAHAN 186,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 216,750.00


E Overhead & Profit (Maksimum 15 %) 10% X D 21,675.00
F Harga Satuan Pekerjaaan (D+E) 238,425.00

Pengurugan 1 M3 Sirtu padat ( Tanah timbunan pilihan ) A.2.3.1.14


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.250 97,500.00 24,375.00
Mandor OH 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Sirtu M3 1.200 131,750.00 158,100.00
JUMLAH HARGA BAHAN 158,100.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 186,225.00


E Overhead & Profit (Maksimum 15 %) 10% X D 18,622.50
F Harga Satuan Pekerjaaan (D+E) 204,847.50

Pengurugan 1 M3 Tanah Urug ( Tanah timbunan biasa ) A.2.3.1.15


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.250 97,500.00 24,375.00
Mandor OH 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Tanah timbunan biasa M3 1.200 110,000.00 132,000.00
JUMLAH HARGA BAHAN 132,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 160,125.00

E Overhead & Profit (Maksimum 15 %) 10% X D 16,012.50


F Harga Satuan Pekerjaaan (D+E) 176,137.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 3 Ps A.3.2.1.1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.5000 97,500.00 146,250.00
Tukang Batu OH 0.7500 120,000.00 90,000.00
Kepala Tukang OH 0.0750 146,000.00 10,950.00
Mandor OH 0.0750 150,000.00 11,250.00
JUMLAH TENAGA KERJA 258,450.00
B BAHAN
3

Batu gunung M 1.2000 234,000.00 280,800.00


Semen portland Kg 202.0000 1,190.00 240,380.00
Pasir pasang M3 0.4850 165,000.00 80,025.00
JUMLAH HARGA BAHAN 601,205.00
601,20 5.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 859,655.00


E Overhead & Profit (Maksimum 15 %) 10% X D 85,965.50
F Harga Satuan Pekerjaaan (D+E) 945,620.50

Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 4 Ps A.3.2.1.2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Pekerja OH 1.5000 97,500.00 146,250.00


Tukang Batu OH 0.7500 120,000.00 90,000.00
Kepala Tukang OH 0.0750 146,000.00 10,950.00
Mandor OH 0.0750 150,000.00 11,250.00
JUMLAH TENAGA KERJA 258,450.00
B BAHAN
Batu gunung M3 1.2000 234,000.00 280,800.00
Semen portland Kg 163.0000 1,190.00 193,970.00
3
Pasir pasang M 0.5200 165,000.00 85,800.00
JUMLAH HARGA BAHAN 560,570.00
560,57 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 819,020.00


E Overhead & Profit (Maksimum 15 %) 10% X D 81,902.00

F Harga Satuan Pekerjaaan (D+E) 900,922.00

Pemasangan 1 M3 pondasi batu kosong ( anstamping) A.3.2.1.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.7800 97,500.00 76,050.00
Tukang Batu OH 0.3900 120,000.00 46,800.00
Kepala Tukang OH 0.0390 146,000.00 5,694.00
Mandor OH 0.0390 150,000.00 5,850.00
JUMLAH TENAGA KERJA 134,394.00
B BAHAN
Batu Gunung M3 1.2000 234,000.00 280,800.00
3
Pasir urug M 0.4320 155,000.00 66,960.00
JUMLAH HARGA BAHAN 347,760.00
347,76 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 482,154.00


E Overhead & Profit (Maksimum 15 %) 10% X D 48,215.40

F Harga Satuan Pekerjaaan (D+E) 530,369.40


A.4.1.1 HARGA SATUAN PEKERJAAN BETON
Membuat 1 M3 beton mutu f c 7,4 MPa (K 100), slump (12 ± 2) cm, w/c 0.87 A.A.4.1.1.1
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.200 97,500.00 117,000.00
Tukang Batu OH 0.200 120,000.00 24,000.00
Kepala Tukang OH 0.020 146,000.00 2,920.00
Mandor OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 152,920.00
B BAHAN

Semen portland Kg 247.000 1,190.00 293,930.00


Pasir beton m3 0.621 183,525.00 113,916.59
Batu Pecah 2 - 3 cm m3 0.740 520,000.00 384,800.00
Air ltr 215.000 175.00 37,625.00
JUMLAH HARGA BAHAN 830,271.59
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 983,191.59


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 98,319.16
98,319.16
F Harga Satuan Pekerjaaan (D+E) 1,081,510.75

Membuat 1 M3 beton mutu f' = 9,8 Mpa (K 125), slump (12 ±2) cm, w/c = 0,78 A. A.4.1.1.2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 276.000 1,190.00 328,440.00
Pasir beton m3 0.591 183,525.00 108,541.93
Batu Pecah 2 - 3 cm m3 0.750 520,000.00 389,807.41
Air ltr 215.000 175.00 37,625.00
JUMLAH HARGA BAHAN 864,414.34
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,074,827.34


E Overhead & Profit (Maksimum
Overhead (Maksimum 15 %) 10% X D 107,482.73
107,482.73
F Harga Satuan Pekerjaaan (D+E) 1,182,310.07

Membuat 1 m3 beton mutu f' = 12,2 Mpa (K 150), slump (12 ±2) cm, w/c = 0,72 A. A.4.1.1.3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 97,500.00 160,875.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 146,000.00 4,088.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 299.000 1,190.00 355,810.00
Pasir beton Kg 0.571 183,525.00 104,740.34
Kerikil (Maks. 30 mm) Kg 0.753 520,000.00 391,733.33
Air Ltr 215.000 175.00 37,625.00

JUMLAH HARGA BAHAN 889,908.67


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,100,321.67


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 110,032.17
110,032.17
F Ha
Harg
rga
aSSat
atua
uan
n Peke
Pekerj
rjaaa
aaan
n ((D+
D+E)
E) 1,210,353.84
CATATAN
Bobot isi pasir + 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bucking factor pasir = 20 %

Membuat 1 M3 Lantai Kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 ± 6 ) cm, w/c = 0,87 A.A.4.1.1.4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.200 97,500.00 117,000.00

Tukang Batu OH 0.200 120,000.00 24,000.00


Kepala Tukang OH 0.020 146,000.00 2,920.00
Mandor OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 152,920.00
B BAHAN
Semen portland Kg 230.000 1,190.00 273,700.00
Pasir beton m3 0.638 183,525.00 117,062.73
Batu Pecah 2 - 3 cm m3 0.761 520,000.00 395,585.19
Air ltr 200.000 175.00 35,000.00
JUMLAH HARGA BAHAN 821,347.92
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 974,267.92


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 97,426.79
97,426.79

F Harga Satuan Pekerjaaan (D+E) 1,071,694.71

Membuat 1 M3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,65 A. A.4.1.1.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 326.000 1,190.00 387,940.00
Pasir beton m3 0.543 183,525.00 99,627.86
Batu Pecah 2 - 3 cm m3 0.762 520,000.00 396,355.56
Air ltr 215.000 175.00 37,625.00

JUMLAH HARGA BAHAN 921,548.41


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,131,961.41


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 113,196.14
113,196.14
F Harga Satuan Pekerjaaan (D+E) 1,245,157.55

Membuat 1 M3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61 A. A.4.1.1.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00

Kepala Tukang OH 0.028 146,000.00 4,088.00


Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 352.000 1,190.00 418,880.00
Pasir beton m3 0.522 183,525.00 95,826.27
Batu Pecah 2 - 3 cm m3 0.764 520,000.00 397,125.93
Air ltr 215.000 175.00 37,625.00
JUMLAH HARGA BAHAN 949,457.19
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,159,870.19


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 115,987.02
115,987.02
F Harga Satuan Pekerjaaan (D+E) 1,275,857.21

Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58 A. A.4.1.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 371.000 1,190.00 441,490.00
Pasir beton m3 0.499 183,525.00 91,500.32
Batu Pecah 2 - 3 cm m3 0.776 520,000.00 403,288.89
Air ltr 215.000 175.00 37,625.00

JUMLAH HARGA BAHAN 973,904.21


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,184,317.21


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 118,431.72
118,431.72
F Harga Satuan Pekerjaaan (D+E) 1,302,748.93

Membuat 1 M3 beton mutu f' = 21,7 Mpa (K 250), slump (12 ±2) cm, w/c = 0,56 A. A.4.1.1.8
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00

Kepala Tukang OH 0.028 146,000.00 4,088.00


Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 384.000 1,190.00 456,960.00
Pasir beton m3 0.494 183,525.00 90,713.79
Batu Pecah 2 - 3 cm m3 0.770 520,000.00 400,207.41
Air ltr 215.000 175.00 37,625.00
JUMLAH HARGA BAHAN 985,506.19
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,195,919.19


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 119,591.92
119,591.92
F Harga Satuan Pekerjaaan (D+E) 1,315,511.11

Membuat 1 M3 beton mutu f' = 24,0 Mpa (K 275), slump (12 ±2) cm, w/c = 0,53 A. A.4.1.1.9
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 406.000 1,190.00 483,140.00
Pasir beton m3 0.489 183,525.00 89,665.07
Batu Pecah 2 - 3 cm m3 0.760 520,000.00 395,200.00
Air ltr 215.000 175.00 37,625.00

JUMLAH HARGA BAHAN 1,005,630.07


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,216,043.07


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 0% X D -
F Harga Satuan Pekerjaaan (D+E) 1,216,043.07

Membuat 1 M3 beton mutu f' = 26,4 Mpa (K 300), slump (12 ±2) cm, w/c = 0,52 A. A.4.1.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00

Mandor OH 0.083 150,000.00 12,450.00


JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 413.000 1,190.00 491,470.00
Pasir beton m3 0.486 183,525.00 89,271.80
Batu Pecah 2 - 3 cm m3 0.756 520,000.00 393,274.07
Air ltr 215.000 175.00 37,625.00
JUMLAH HARGA BAHAN 1,011,640.88
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,222,053.88


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 122,205.39
122,205.39
F Harga Satuan Pekerjaaan (D+E) 1,344,259.27

Pembesian 1 kg dengan besi polos A.4.1.1.17


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 97,500.00 6,825.00
Tukang Batu L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 146,000.00 1,022.00
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 16,847.00
B BAHAN
Besi beton Polos Kg 10.500 15,180.00 159,390.00
Kawat beton Kg 0.150 24,444.00 3,666.60
JUMLAH HARGA BAHAN 163,056.60
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 179,903.60


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 17,990.36
17,990.36
F Harga Satuan Pekerjaaan (D+E) 197,893.96

19,789.40
Pembesian 1 kg dengan besi ulir A.4.1.1.17a
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 97,500.00 6,825.00
Tukang Batu L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 146,000.00 1,022.00
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 16,847.00
B BAHAN
Besi beton Ulir Kg 10.500 16,041.67 168,437.50
Kawat beton Kg 0.150 24,444.00 3,666.60

JUMLAH HARGA BAHAN 172,104.10


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 188,951.10


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 18,895.11
18,895.11
F Harga Satuan Pekerjaaan (D+E) 207,846.21
20,784.62

Pemasangan 10 kg jaring kawat baja (wiremesh) A.4.1.1.19


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 97,500.00 2,437.50
Tukang Batu L.02 OH 0.025 120,000.00 3,000.00

Kepala Tukang L.03 OH 0.025 146,000.00 3,650.00


Mandor L.04 OH 0.001 150,000.00 150.00
JUMLAH TENAGA KERJA 9,237.50
B BAHAN
Jaring kawat baja dilas Kg 10.200 15,180.00 154,836.00
Kawat beton Kg 0.050 24,444.00 1,222.20
JUMLAH HARGA BAHAN 156,058.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 165,295.70


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 16,529.57
16,529.57
F Harga Satuan Pekerjaaan (D+E) 181,825.27
18,182.53

Pemasangan 1 M2 Steel floor Decking (Bondek) A.4.1.1.19a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 97,500.00 11,700.00
Tukang Besi L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 137,500.00 825.00
Mandor L.04 OH 0.0060 150,000.00 900.00
JUMLAH TENAGA KERJA 20,625.00
B BAHAN
Steel floor Decking t = 0.75 mm m' 1.00
000
00 135, 70
700.00 135, 7
70
00.00
Asesoris (perkuatan,
(perkuatan, las dll) Ls 1.000 47,495.00 47,495.00
3
Kayu kelas III ( 2 kali pakai ) M 0.040 2,500,000.00 100,000.00
Scafolding M2 1.100 6,900.00 7,590.00
JUMLAH HARGA BAHAN 290,785.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 311,410.00


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% XD 31,141.00
31,141.00

F Har
Harga
ga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 342,55
342,551.0
1.00
0
Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 97,500.00 50,700.00
Tukang Batu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 146,000.00 3,796.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 89,596.00
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.300 18,040.00 5,412.00
Minyak bekisting Liter 0.100 11,000.00 1,100.00
JUMLAH HARGA BAHAN 106,512.00

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 196,108.00


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 19,610.80
19,610.80
F Harga Satuan Pekerjaaan (D+E) 215,718.80

Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 97,500.00 50,700.00
Tukang Batu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 146,000.00 3,796.00

Mandor L.04 OH 0.026 150,000.00 3,900.00


JUMLAH TENAGA KERJA 89,596.00
B BAHAN
Kayu kelas III ( 2 kali pakai) M3 0.045 2,500,000.00 112,500.00
Paku 5 - 12 cm Kg 0.300 18,040.00 5,412.00
Minyak bekisting Liter 0.100 11,000.00 1,100.00
JUMLAH HARGA BAHAN 119,012.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 208,608.00


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 20,860.80
20,860.80
F Harga Satuan Pekerjaaan (D+E) 229,468.80

Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 97,500.00 64,350.00
Tukang Batu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 146,000.00 4,818.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 113,718.00
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.400 18,040.00 7,216.00
Minyak bekisting Liter 0.200 11,000.00 2,200.00
3
Balok kelas II ( 2 kali pakai ) M 0.015 3,837,500.00 57,562.50
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350 105,000.00 36,750.00
Dolken Kayu (8-10) cm , panjang 4 m 2x pakai Batang 2.000 23,000.00 46,000.00

JUMLAH HARGA BAHAN 249,728.50


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 363,446.50


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 36,344.65
36,344.65
F Harga Satuan Pekerjaaan (D+E) 399,791.15
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 97,500.00 64,350.00
Tukang Batu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 146,000.00 4,818.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 113,718.00
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.400 18,040.00 7,216.00

Minyak bekisting Liter 0.200 11,000.00 2,200.00


Balok kelas II ( 2 kali pakai ) M3 0.018 3,837,500.00 69,075.00
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350 105,000.00 36,750.00
Dolken Kayu (8-10) cm , panjang 4 m 2x pakai Batang 2.000 23,000.00 46,000.00
JUMLAH HARGA BAHAN 261,241.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 374,959.00


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 37,495.90
37,495.90
F Harga Satuan Pekerjaaan (D+E) 412,454.90

Pemasangan 1 m2 bekisting untuk Lantai A.4.1.1.24

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 97,500.00 64,350.00
Tukang Batu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 146,000.00 4,818.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 113,718.00
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.400 18,040.00 7,216.00
Minyak bekisting Liter 0.200 11,000.00 2,200.00
3
Balok kelas II ( 2 kali pakai ) M 0.015 3,837,500.00 57,562.50
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350 105,000.00 36,750.00
Dolken Kayu (8-10) cm , panjang 4 m 2x pakai Batang 6.000 23,000.00 138,000.00
JUMLAH HARGA BAHAN 341,728.50

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 455,446.50


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 45,544.65
45,544.65
F Harga Satuan Pekerjaaan (D+E) 500,991.15

Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 97,500.00 64,350.00
Tukang Batu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 146,000.00 4,818.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 113,718.00
B BAHAN
Kayu kelas III M3 0.030 2,500,000.00 75,000.00
Paku 5 - 12 cm Kg 0.400 18,040.00 7,216.00
Minyak bekisting Liter 0.200 11,000.00 2,200.00
3
Balok kelas II M 0.020 3,837,500.00 76,750.00
Plywood 9 mm Lembar 0.350 105,000.00 36,750.00
Dolken Kayu (8-10) cm , panjang 4 m Batang 3.000 23,000.00 69,000.00
Penjaga jarak bekisting/spacer Buah 4.000 24,625.00 98,500.00
JUMLAH HARGA BAHAN 365,416.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 479,134.00


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 47,913.40
47,913.40
F Harga Satuan Pekerjaaan (D+E) 527,047.40

Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 97,500.00 64,350.00
Tukang Batu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 146,000.00 4,818.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 113,718.00
B BAHAN
Kayu kelas III M3 0.030 2,500,000.00 75,000.00
Paku 5 - 12 cm Kg 0.400 18,040.00 7,216.00
Minyak bekisting Liter 0.150 11,000.00 1,650.00
Balok kelas II M3 0.015 3,837,500.00 57,562.50
Plywood 9 mm Lembar 0.350 105,000.00 36,750.00
Dolken Kayu (8-10) cm , panjang 4 m Batang 2.000 23,000.00 46,000.00
JUMLAH HARGA BAHAN 224,178.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 337,896.50


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% X D 33,789.65
33,789.65
F Harga Satuan Pekerjaaan (D+E) 371,686.15

Membuat 1 M kolom praktis Beton bertulang (11 x 11) cm A.4.1.1.35


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.180 97,500.00 17,550.00
Tukang Batu L.02 OH 0.020 120,000.00 2,400.00
Tukang Kayu L.02 OH 0.020 120,000.00 2,400.00
Tukang Besi L.02 OH 0.020 120,000.00 2,400.00
Kepala Tukang L.03 OH 0.006 146,000.00 876.00
Mandor L.04 OH 0.009 150,000.00 1,350.00
JUMLAH TENAGA KERJA 26,976.00
B BAHAN
Kayu kelas III M3 0.002 2,500,000.00 5,000.00
Paku 5 - 12 cm Kg 0.010 18,040.00 180.40

Minyak bekisting Liter 1.000 11,000.00 11,000.00


Besi beton polos Kg 3.000 15,180.00 45,540.00
Kawat beton Kg 0.450 24,444.00 10,999.80
Semen portland Kg 4.000 1,190.00 4,760.00
Pasir beton M3 0.006 165,000.00 990.00
3
Batu Pecah 2 - 3 cm M 0.009 520,000.00 4,680.00
JUMLAH HARGA BAHAN 83,150.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 110,126.20


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% XD 11,012.62
11,012.62
F Harga Satuan Pekerjaaan (D+E) 121,138.82

Membuat 1 M ring balok Beton bertulang (10 x 15) cm A.4.1.1.36


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.297 97,500.00 28,957.50
Tukang Batu L.02 OH 0.033 120,000.00 3,960.00
Tukang Kayu L.02 OH 0.033 120,000.00 3,960.00
Tukang Besi L.02 OH 0.033 120,000.00 3,960.00
Kepala Tukang L.03 OH 0.010 146,000.00 1,460.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 44,547.50
B BAHAN
Kayu kelas III M3 0.003 2,500,000.00 7,500.00
Paku 5 - 12 cm Kg 0.020 18,040.00 360.80
Minyak bekisting Liter 1.000 7,000.00 7,000.00
Besi beton polos Kg 3.600 15,180.00 54,648.00

Kawat beton Kg 0.050 24,444.00 1,222.20


Semen portland Kg 5.500 1,190.00 6,545.00
Pasir beton M3 0.009 165,000.00 1,485.00
3
Batu Pecah 2 - 3 cm M 0.015 520,000.00 7,800.00
JUMLAH HARGA BAHAN 86,561.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 131,108.50


E Overhead
Overhead & Profit (Maksimum
(Maksimum 15 %) 10% XD 13,110.85
13,110.85
F Harga Satuan Pekerjaaan (D+E) 144,219.35

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas I A.4.6.1.1
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 97,500.00 682,500.00
Tukang Kayu L.02 OH 21.000 120,000.00 2
2,,520,000.00
Kepala Tukang L.03 OH 2.100 146,000.00 306,600.00
Mandor L.04 OH 0.350 150,000.00 52,500.00
JUMLAH TENAGA KERJA 3,561,600.00
3,561,600.0 0
B BAHAN
Balok kayu M3 1.100 9,075,000.00 9,982,500.00
Pa
Paku
ku 10 cm Kg 1.25
1.250
0 18,0
18,040
40.0
.00
0 22,5
22,550
50.0
.00
0
Lem
Lem ka
kayu
yu kg 1.0
1.000 16,5
6,500.0
0.00 16,5
16,500
00.0
.00
0
JUMLAH HARGA BAHAN 10,021,550.00
10,021,550.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,583,150.00


13,583,150.00
E Overh
Overhead
ead & Profit (10 %) 10% XD 1,358,31
1,358,315.00
5.00
F Harga Satuan Pekerjaaan (D+E) 14,941,465.000

Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas II A.4.6.1.2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 97,500.00 585,000.00
Tukang Kayu L.02 OH 18.000 120,000.00 2
2,,160,000.00
Kepala Tukang L.03 OH 1.800 146,000.00 262,800.00
Mandor L.04 OH 0.300 150,000.00 45,000.00
JUMLAH TENAGA KERJA 3,052,800.00
3,052,800.0 0
B BAHAN
Balok kayu M3 1.200 9,075,000.00 10,890,000
10,890,000.00
.00
Pa
Paku
ku 10 cm Kg 1.25
1.250
0 18,0
18,040
40.0
.00
0 22,5
22,550
50.0
.00
0
Lem
Lem ka
kayu
yu kg 1.0
1.000 16,5
6,500.0
0.00 16,5
16,500
00.0
.00
0
JUMLAH HARGA BAHAN 10,929,050.00
10,929,050.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 13,981,850.00


13,981,850.00
E Overh
Overhead
ead & Profit (10 %) 10% XD 1,398,18
1,398,185.00
5.00
F Harga Satuan Pekerjaaan (D+E) 15,380,035.000

Pembuatan dan pemasangan 1 M2 pintu klamp standar, kayu kelas II A.4.6.1.3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 97,500.00 34,125.00
Tukang Kayu L.02 OH 1.050 120,000.00 126,000.00
Kepala Tukang L.03 OH 0.105 146,000.00 15,330.00
Mandor L.04 OH 0.018 150,000.00 2,700.00
JUMLAH TENAGA KERJA 178,155.00
B BAHAN
Papan kayu M3 0.040 9,900,000.00 396,000.00
Pa
Paku
ku 5 - 7 cm Kg 0.0
0.050 18,0
8,040.0
0.00 902.0
2.00
JUMLAH HARGA BAHAN 396,902.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 575,057.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 57,505.7
57,505.70
0
F Harga Satuan Pekerjaaan (D+E) 632,562.700

Pembuatan dan pemasangan 1 M2 daun pintu panel, kayu kelas I A.4.6.1.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala Tukang L.03 OH 0.300 146,000.00 43,800.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 508,800.00
B BAHAN
Papan kayu M3 0.040 9,900,000.00 396,000.00

Lem
Lem ka
kayu
yu kg 0.50
.500 16,50
,500.00
.00 8,25
,250.00
.00
JUMLAH HARGA BAHAN 404,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 913,050.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 91,305.0
91,305.00
0
F Harga Satuan Pekerjaaan (D+E) 1,004,355.000

Pembuatan dan pemasangan 1 M2 daun pintu double multipleks 6 mm, rangka papan kayu kls II A.4.6.1.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 97,500.00 68,250.00
Tukang Kayu L.02 OH 2.100 120,000.00 252,000.00
Kepala Tukang L.03 OH 0.210 146,000.00 30,660.00
Mandor L.04 OH 0.035 150,000.00 5,250.00
JUMLAH TENAGA KERJA 356,160.00
B BAHAN
Papan kayu kelas II M3 0.025 4,262,500.00 106,562.50
Pa
Paku
ku bi
bia
asa kg 0.03
.030 18,04
,040.00
.00 541
541.20
.20
Lem
Lem ka
kayu
yu kg 0.50
.500 16,50
,500.00
.00 8,25
,250.00
.00
Mu
Mult
ltip
iple
leks
ks 6 mm lbr
lbr 0.34
0.347
7 77,0
77,000
00.0
.00
0 26,7
26,734
34.4
.40
0
JUMLAH HARGA BAHAN 142,088.10
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 498,248.10


E Overh
Overhead
ead & Profit (10 %) 10% XD 49,824.8
49,824.81
1
F Harga Satuan Pekerjaaan (D+E) 548,072.910

Pembuatan dan pemasangan 1 M2 daun pintu panel, kayu kelas II A.4.6.1.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala Tukang L.03 OH 0.300 146,000.00 43,800.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 508,800.00
B BAHAN
Papan kayu M3 0.040 4,262,500.00 170,500.00
Lem
Lem ka
kayu
yu kg 0.50
.500 16,50
,500.00
.00 8,25
,250.00
.00
JUMLAH HARGA BAHAN 178,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 687,550.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 68,755.0
68,755.00
0
F Harga Satuan Pekerjaaan (D+E) 756,305.000

Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu kelas I A.4.6.1.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 97,500.00 78,000.00
Tukang Kayu L.02 OH 2.400 120,000.00 288,000.00
Kepala Tukang L.03 OH 0.240 146,000.00 35,040.00
Mandor L.04 OH 0.040 150,000.00 6,000.00
JUMLAH TENAGA KERJA 407,040.00
B BAHAN
Papan kayu M3 0.024 9,900,000.00 237,600.00
Lem
Lem ka
kayu
yu kg 0.3
0.300 16,5
6,500.0
0.00 4,9
4,950.0
50.00
0
JUMLAH HARGA BAHAN 242,550.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 649,590.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 64,959.0
64,959.00
0
F Harga Satuan Pekerjaaan (D+E) 714,549.000

Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu kelas II A.4.6.1.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 97,500.00 78,000.00
Tukang Kayu L.02 OH 2.400 120,000.00 288,000.00
Kepala Tukang L.03 OH 0.240 146,000.00 35,040.00
Mandor L.04 OH 0.040 150,000.00 6,000.00
JUMLAH TENAGA KERJA 407,040.00
B BAHAN
Papan kayu M3 0.024 4,262,500.00 102,300.00
Lem
Lem ka
kayu
yu kg 0.3
0.300 16,5
6,500.0
0.00 4,9
4,950.0
50.00
0
JUMLAH HARGA BAHAN 107,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 514,290.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 51,429.0
51,429.00
0
F Harga Satuan Pekerjaaan (D+E) 565,719.000

Pembuatan dan pemasangan 1 M2 pintu dan jendela jalusi kayu kelas I A.4.6.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala Tukang L.03 OH 0.300 146,000.00 43,800.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 508,800.00
B BAHAN
Papan kayu M3 0.064 9,900,000.00 633,600.00
Lem
Lem ka
kayu
yu kg 0.5
0.500 16,5
6,500.0
0.00 8,2
8,250.0
50.00
0
JUMLAH HARGA BAHAN 641,850.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,150,650.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 115,065.
115,065.00
00
F Harga Satuan Pekerjaaan (D+E) 1,265,715.000

Pembuatan dan pemasangan 1 M2 pintu dan jendela jalusi kayu kelas II A.4.6.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Kayu L.02 OH 3.000 120,000.00 360,000.00

Kepala Tukang L.03 OH 0.300 146,000.00 43,800.00


Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 508,800.00
B BAHAN
Papan kayu M3 0.064 4,262,500.00 272,800.00
Lem
Lem ka
kayu
yu kg 0.5
0.500 16,5
6,500.0
0.00 8,2
8,250.0
0.00
JUMLAH HARGA BAHAN 281,050.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 789,850.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 78,985.0
78,985.00
0
F Harga Satuan Pekerjaaan (D+E) 868,835.000

Pe
Pema
mas
sang
angan 1 M3
M3 ko
konstr
struk
uksi
si kuda
da-k
-kud
uda
a ko
konven
vensio
sional,
al, ka
kayu kela
elas II,, IIII d
da
an III
III ben
benta
tan
ng 6 meter
ter A.4.6
.4.6.1
.1.1
.13
3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 97,500.00 390,000.00
Tukang Kayu L.02 OH 12.000 120,000.00 1
1,,440,000.00
Kepala Tukang L.03 OH 1.200 146,000.00 175,200.00
Mandor L.04 OH 0.200 150,000.00 30,000.00
JUMLAH TENAGA KERJA 2,035,200.00
B BAHAN
Balok kayu M3 1.100 9,075,000.00 9,982,500.00
9,982,500.00
Be
Besi
si str
strip
ip te
teba
ball 5m
5mm
m kg 15.0
15.000
00 22,7
22,700
00.0
.00
0 340,
340,50
500.
0.00
00
Pa
Paku
ku 12 cm kg 5.60
5.600
0 18,0
18,040
40.0
.00
0 101,
101,02
024.
4.00
00
JUMLAH HARGA BAHAN 10,424,024.
10,424,024.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,459,224.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 1,245,92
1,245,922.40
2.40
F Harga Satuan Pekerjaaan (D+E) 13,705,146.400

Pemasangan 1 M3 konstruksi kuda-kuda expose, kayu kelas I A.4.6.1.14


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 97,500.00 653,250.00
Tukang Kayu L.02 OH 20.100 120,000.00 2
2,,412,000.00
Kepala Tukang L.03 OH 2.010 146,000.00 293,460.00
Mandor L.04 OH 0.335 150,000.00 50,250.00
JUMLAH TENAGA KERJA 3,408,960.00
B BAHAN
Balok kayu M3 1.200 9,075,000.00 10,890,000.00
Be
Besi
si str
strip
ip te
teba
ball 5m
5mm
m kg 15.0
15.000
00 22,7
22,700
00.0
.00
0 340,
340,50
500.
0.00
00

Pa
Paku
ku 12 cm kg 5.60
5.600
0 18,0
18,040
40.0
.00
0 101,
101,02
024.
4.00
00
JUMLAH HARGA BAHAN 11,331,524.
11,331,524.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 14,740,484.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 1,474,04
1,474,048.40
8.40
F Harga Satuan Pekerjaaan (D+E) 16,214,532.400

Pemasangan 1 M3 konstruksi gordeng, kayu kelas II A.4.6.1.15

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 97,500.00 653,250.00
Tukang Kayu L.02 OH 20.100 120,000.00 2,412,000.00
Kepala Tukang L.03 OH 2.010 146,000.00 293,460.00
Mandor L.04 OH 0.335 150,000.00 50,250.00
JUMLAH TENAGA KERJA 3,408,960.00
3,408,960. 00
B BAHAN
Balok kayu M3 1.100 3,837,500.00 4,221,250.00
Be
Besi
si str
strip
ip te
teba
ball 5 mm Kg 15.0
15.000
00 22,7
22,700
00.0
.00
0 340,
340,50
500.
0.00
00
Pa
Paku
ku 12 cm kg 3.00
3.000
0 18,0
18,040
40.0
.00
0 54,1
54,120
20.0
.00
0
JUMLAH HARGA BAHAN 4,615,870.
4,615,870.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 8,024,830.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 802,483.0
802,483.00
0
F Harga Satuan Pekerjaaan (D+E) 8,827,313.000

Pemasangan 1 M’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II A.4.6.1.21
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 146,000.00 2,920.00
Mandor L.04 OH 0.005 150,000.00 7
75
50.00
JUMLAH TENAGA KERJA 37,420.00
B BAHAN
Papan Kayu M3 0.011 9,900,000.00 106,920.00
Pa
Paku
ku 5 da
dan
n 7 cm Lite
Literr 0.10
0.100
0 18,0
18,040
40.0
.00
0 1,80
1,804.
4.00
00
JUMLAH HARGA BAHAN 108,724.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 146,144.00


E Overh
Overhead
ead & Profit (10 %) 10% XD 14,614.4
14,614.40
0
F Harga Satuan Pekerjaaan (D+E) 160,758.400

Pemasangan 1 m2 Tempat Makan Kambing A.4.6.1.22


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 97,500.00 64,350.00
Tukang Batu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 146,000.00 4,818.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 113,718.00
B BAHAN
Kayu kelas I M3 0.040 11,550,000.
11,550,000.00
00 462,000.00
Paku 5 - 12 cm Kg 0.400 18,040.00 7,216.00
Balok kelas I M3 0.018 10,000,000.
10,000,000.00
00 180,000.00
JUMLAH HARGA BAHAN 649,216.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 762,934.00


E Overhead & Profit (Maksimum 15 %) 10% X D 76,293.40
F Harga Satuan Pekerjaaan (D+E) 839,227.40

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

Pemasangan 1 Kg Besi Profil A.4.2.1.1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 97,500.00 5,850.00
Tukang Las Konstruksi L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.006 146,000.00 876.00
Mandor L.04 OH 0.003 150,000.00 4
45
50.00
JUMLAH TENAGA KERJA 14,376.00
B BAHAN
Besi
Besi Prof
Profil
il Kg 1.15
1.150
0 17
17,2
,250
50.0
.00
0 19
19,8
,837
37.5
.50
0
JUMLAH HARGA BAHAN 19,837.50
19,837.5 0

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 34,213.50


E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 3,421.35
3,421.35
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 37,634
37,634.85
.85

Pemasangan 1 Kg Besi Plat A.4.2.1.1a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 97,500.00 5,850.00
Tukang Las Konstruksi L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.006 146,000.00 876.00
Mandor L.04 OH 0.003 150,000.00 4
45
50.00
JUMLAH TENAGA KERJA 14,376.00
B BAHAN
Be
Besi
si Pl
Plat
at Kg 1.100
.100 12,6
2,672.0
72.00
0 13
13,9
,939
39.2
.20
0
Cat Be
Besi
si Kg 0.050
.050 44,0
4,000.0
00.00
0 2,200
,200.0
.000
JUMLAH HARGA BAHAN 13,939.20
13,939.2 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 28,315.20


E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 2,831.52
2,831.52
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 31,146
31,146.72
.72

Pemasangan 1 Kg rangka kuda-kuda baja IWF/ CNP A.4.2.1.2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 97,500.00 5,850.00
Tukang Las Konstruksi L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.006 146,000.00 876.00
Mandor L.04 OH 0.003 150,000.00 4
45
50.00
JUMLAH TENAGA KERJA 14,376.00
B BAHAN
Besi
Besi Baja
Baja IW
IWF
F Kg 1.15
1.150
0 17
17,2
,250
50.0
.00
0 19
19,8
,837
37.5
.50
0
JUMLAH HARGA BAHAN 19,837.50
19,837.5 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 34,213.50

E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 3,421.35
3,421.35

F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 37,634
37,634.85
.85

Mengerjakan 10 cm pengelasan dengan Las Listrik A.4.2.1.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 97,500.00 3,900.00
Tukang Las L.02 OH 0.0200 120,000.00 2,400.00
Kepala Tukang L.03 OH 0.0020 146,000.00 292.00
Mandor L.04 OH 0.0020 150,000.00 300.00
JUMLAH TENAGA KERJA 6,892.00
B BAHAN
Kawa
Kawatt Las
Las List
Listri
rik
k Kg 0.40
0.4000
00 30
30,0
,000
00.0
.00
0 12
12,0
,000
00.0
.00
0
So
Sola
larr Ltr 0.30
.3000 13,5
3,500.0
00.00
0 4,050
,050.0
.00
0
Miny
Minyak
ak pelu
peluma
mas
s Lt
Ltrr 0.04
0.0400
00 11
11,0
,000
00.0
.00
0 44
440.
0.00
00
JUMLAH HARGA BAHAN 16,490.00
16,490.0 0
C PERALATAN
Sewa
Sewa alat
alat Jam
Jam 0.17
0.1700
00 18
18,7
,750
50.0
.00
0 3,
3,18
187.
7.50
50
JUMLAH HARGA ALAT 3,187.50

D Jumlah (A+B+C) 26,569.50


E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 2,656.95
2,656.95
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 29,226
29,226.45
.45
2,922.65

Pemasangan 1 M2 Sunscreen Aluminium A.4.2.1.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 97,500.00 7,800.00
Tukang Aluminium L.02 OH 0.800 120,000.00 96,000.00
Kepala Tukang L.03 OH 0.0800 146,000.00 11,680.00
Mandor L.04 OH 0.0040 150,000.00 600.00
JUMLAH TENAGA KERJA 116,080.
116,080.00
00
B BAHAN
Sunscre
Sunscreen
en Alu
Alumin
minium
ium (h
(hollo
ollow
w 2 x 4 cm) M1 1.0000
1.0000 425
425,00
,000.0
0.00
0 425
425,00
,000.0
0.000
JUMLAH HARGA BAHAN 425,000.
425,000.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 541,080.00


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 54,108.00
54,108.00
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 595,18
595,188.0
8.00
0

Pemasangan 1 M2 Rolling Door Aluminium A.4.2.1.10


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Khusus Aluminium L.02 OH 1.000 120,000.00 120,000.00
Kepala Tukang L.03 OH 0.100 146,000.00 14,600.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 239,600.
239,600.00
00
B BAHAN
Ro
Rolli
lling
ng Do
Door
or Alum
Alumin
iniu
ium
m 0,
0,8
8 M2 1.00
1.000
0 13
138,
8,86
862.
2.50
50 138,
138,86
862.
2.50
50
Assesoris 15 % Ls 0.150 20,829.38 3,124.41
JUMLAH HARGA BAHAN 141,986.
141,986.91
91
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 381,586.91

E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 13% XD 49,606.30
49,606.30
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaann (D+
(D+E)
E) 431,19
431 ,193.2
3.20
0
Pemasangan 1 m1 kusen pintu aluminium A.4.2.1.11
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 97,500.00 4,192.50
Tukang Aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 146,000.00 627.80
Mandor L.04 OH 0.0021 150,000.00 315.00
JUMLAH TENAGA KERJA 10,295.30
B BAHAN
Profil alluminium 4 " M1 1.10 138,862.50 152,748.75
Skrup fixer
Skrup fixer Bu
Buah
ah 2.00
2.00 1,50
1,500.
0.00
00 3,00
3,000.
0.00
00
Seal
Sealan
antt Tu
Tube
be 0.06
0.06 57
57,0
,000
00.0
.00
0 3,42
3,420.
0.00
00
JUMLAH HARGA BAHAN 159,168.
159,168.75
75
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 169,464.05


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 16,946.41
16,946.41
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 186,41
186,410.4
0.46
6

Pemasangan 1 m1 Pintu Kaca Rangka aluminium A.4.2.1.13


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 97,500.00 8,287.50
Tukang Aluminium L.02 OH 0.085 120,000.00 10,200.00
Kepala Tukang L.03 OH 0.0090 146,000.00 1,314.00
Mandor L.04 OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 20,551.50
B BAHAN
Profil alluminium 4 " M1 4.40 138,862.50 610,995.00
1
Profil Kaca M 4.50 133,250.00 599,625.00
Seal
Sealan
antt Tu
Tube
be 0.27
0.27 57
57,0
,000
00.0
.00
0 15
15,3
,390
90.0
.00
0
JUMLAH HARGA BAHAN 1,226,010
1,226,010.00
.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,246,561.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 124,656.1
124,656.15
5
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 1,371,
1,371,217.
217.65
65

Pemasangan 1 m2 bingkai pintu aluminium A.4.2.1.11a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 97,500.00 4,192.50
Tukang Aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 146,000.00 627.80
Mandor L.04 OH 0.0021 150,000.00 315.00
JUMLAH TENAGA KERJA 10,295.30
B BAHAN
Profil bingkai pintu alluminium 4 " M1 1.10 70,000.00 77,000.00
Seal
Sealan
antt Tu
Tube
be 0.06
0.06 57
57,0
,000
00.0
.00
0 3,42
3,420.
0.00
00
JUMLAH HARGA BAHAN 80,420.00
80,420.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 90,715.30


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 9,071.53
9,071.53
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 99,786
99,786.83
.83

Pemasangan 1 m2 bingkai Jendela aluminium A.4.2.1.11b


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 97,500.00 4,192.50
Tukang Aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 146,000.00 627.80
Mandor L.04 OH 0.0021 150,000.00 315.00
JUMLAH TENAGA KERJA 10,295.30
B BAHAN
Profil bingkai pintu alluminium 4 " M1 1.10 50,000.00 55,000.00
Seal
Sealan
antt Tu
Tube
be 0.06
0.06 57
57,0
,000
00.0
.00
0 3,42
3,420.
0.00
00
JUMLAH HARGA BAHAN 58,420.00
58,420.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 68,715.30


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 6,871.53
6,871.53
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 75,586
75,586.83
.83

Pemasangan 1 M2 Railling Stainless Steel A.4.2.1.10a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 97,500.00 34,125.00
Tukang Las Konstruksi L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 146,000.00 5,110.00
Mandor L.04 OH 0.018 150,000.00 2,700.00
JUMLAH TENAGA KERJA 83,935.00
B BAHAN
Stainless Steel Dia 5 cm M1 8.640 #REF! #REF!
Stainless Steel Dia 2 cm M1 9.200 #REF! #REF!
besi
besi plat
plat 5 mm Kg 1.27
1.275
5 37
37,6
,634
34.8
.85
5 47
47,9
,984
84.4
.43
3
Baut fisher Bh 4.000 #REF! #REF!
Ass
Asses
esor
oris
is (per
(perkua
kuata
tan,
n, las
las dll)
dll) Ls 1.00
1.000
0 30
30,0
,000
00.0
.00
0 30
30,0
,000
00.0
.00
0
cat meni besi Kg 0.0917 #REF! #REF!
cat 2x penutup ex. Avian / setara Kg 0.1833 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD #REF!!
#REF
F Ha
Harg
rga
a Sa
Satu
tuan
an Pe
Peke
kerj
rjaa
aaan
an (D
(D+E
+E)) #R
#REF
EF!!

Pemasangan 1 M2 Aluminium Hollow


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 97,500.00 34,125.00
Tukang Las Konstruksi L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 146,000.00 5,110.00
Mandor L.04 OH 0.018 150,000.00 2,700.00
JUMLAH TENAGA KERJA 83,935.00
B BAHAN
Aluminium Hollow 2 x 4 cm M1 7.200 #REF! #REF!
Al
Alu
umi
mini
nium
um Ho
Holl
llo
ow 4 x 4 cm M1 1.200
.200 - -
besi plat 5 mm Kg 1.275 - -
Baut fisher Bh 4.000 #REF! #REF!
Ass
Asses
esor
oris
is (per
(perkua
kuata
tan,
n, las
las dll)
dll) Ls 1.00
1.000
0 38
38,7
,750
50.0
.00
0 38
38,7
,750
50.0
.00
0
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD #REF!!
#REF
F Ha
Harg
rga
a Sa
Satu
tuan
an Pe
Peke
kerj
rjaa
aaan
an (D
(D+E
+E)) #R
#REF
EF!!
#REF!

Pemasangan 1 Bh Pintu Aluminium + Grendel utk KM/WC A.4.2.1.11


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 97,500.00 4,192.50
Tukang Aluminium L.02 OH 0.043 120,000.00 5,160.00

Kepala Tukang L.03 OH 0.0043 146,000.00 627.80

Mandor L.04 OH 0.0021 150,000.00 315.00


JUMLAH TENAGA KERJA 10,295.30
B BAHAN
Pintu
Pintu Alum
Alumin
iniu
ium
m + gr
gren
ende
dell Se
Sett 1.00
1.0000
00 28
287,
7,50
500.
0.00
00 287,
287,50
500.
0.00
00
Engs
Engsel
el pint
pintu
u Bh 3.00
3.0000
00 38
38,5
,500
00.0
.00
0 11
115,
5,50
500.
0.00
00
Se
Seme
menn Po
Port
rtla
land
nd (isi
(isi rong
rongga
ga ku
kuse
sen)
n) kg 2.67
2.6752
52 1,19
1,190.
0.00
00 3,18
3,183.
3.49
49
Pa
Pasir
sir pasa
pasang
ng (isi
(isi rong
rongga
ga kuse
kusen)
n) m3 0.01
0.0141
41 16
165,
5,00
000.
0.00
00 2,32
2,326.
6.50
50
JUMLAH HARGA BAHAN 408,509.
408,509.99
99
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 418,805.29


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 41,880.53
41,880.53
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 460,68
460,685.8
5.82
2
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 4 PP A. 4.4.1.3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.60
0.6000
00 97,5
97,500
00.0
.00
0 58
58,5
,500
00.0
.00
0
Tu
Tuka
kang
ng Batu
Batu OH 0.20
0.2000
00 12
120,
0,00
000.
0.00
00 24
24,0
,000
00.0
.00
0
Kepa
Kepala
la Tu
Tuka
kang
ng OH 0.02
0.0200
00 14
146,
6,00
000.
0.00
00 2,92
2,920.
0.00
00
Mand
Mandor
or OH 0.03
0.0300
00 15
150,
0,00
000.
0.00
00 4,50
4,500.
0.00
00
JUMLAH TENAGA KERJA 89,920.00
B BAHAN
Bata
Bata Mera
Merah
h m3 14
140.
0.00
000
0 75
750.
0.00
00 10
105,
5,00
000.
0.00
00
Seme
Semenn po
port
rtla
land
nd kg 26
26.5
.550
50 1,19
1,190.
0.00
00 31
31,5
,594
94.5
.50
0
Pasi
Pasirr pa
pasa
sang
ng m3 0.09
0.093
3 16
165,
5,00
000.
0.00
00 15
15,3
,345
45.0
.00
0
JUMLAH HARGA BAHAN 151,939.
151,939.50
50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 241,859.50


E Overhead & Profit (Maksimum 15 %) 10% X D 24,185.95
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 266,04
266,045.4
5.45
5

Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu campuran 1 SP : 3 PP A. 4.4.1.8


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerrja OH 0.300
.300 97
97,5
,50
00.00
0.00 29,2
29,250
50.0
.00
0

Tu
Tuka
kang
ng Batu
Batu OH 0.10
0.100
0 12
120,
0,00
000.
0.00
00 12
12,0
,000
00.0
.00
0
Kepa
Kepala
la Tu
Tuka
kang
ng OH 0.01
0.010
0 14
146,
6,00
000.
0.00
00 1,46
1,460.
0.00
00
Ma
Man
ndor
dor OH 0.015
.015 150
50,0
,000
00.0
.00
0 2,25
,250.00
0.00
JUMLAH TENAGA KERJA 44,960.00
B BAHAN
Ba
Bata
ta Me
Merrah m3 70.0
70.000
00 75
750.
0.0
00 52,5
52,500
00.0
.00
0
Seme
Semen
n po
port
rtla
land
nd kg 14
14.3
.370
70 1,19
1,190.
0.00
00 17
17,1
,100
00.3
.30
0
Pasi
Pasirr pa
pasa
sang
ng m3 0.04
0.040
0 16
165,
5,00
000.
0.00
00 6,60
6,600.
0.00
00
JUMLAH HARGA BAHAN 76,200.3
76,200.300
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 121,160.30


E Overhead & Profit (Maksimum 15 %) 10% X D 12,116.03
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 133,27
133,276.3
6.33
3

Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu campuran 1 SP : 4 PP A. 4.4.1.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.30
0.3000
00 97,5
97,500
00.0
.00
0 29
29,2
,250
50.0
.00
0
Tu
Tuka
kang
ng Batu
Batu OH 0.10
0.1000
00 12
120,
0,00
000.
0.00
00 12
12,0
,000
00.0
.00
0
Kepa
Kepala
la Tu
Tuka
kang
ng OH 0.01
0.0100
00 14
146,
6,00
000.
0.00
00 1,46
1,460.
0.00
00
Mand
Mandor
or OH 0.01
0.0150
50 15
150,
0,00
000.
0.00
00 2,25
2,250.
0.00
00
JUMLAH TENAGA KERJA 44,960.00
B BAHAN
Ba
Bata
ta Me
Merrah m3 70.0
70.000
00 75
750.
0.0
00 52,5
52,500
00.0
.00
0
Seme
Semen
n po
port
rtla
land
nd kg 11
11.5
.500
00 1,19
1,190.
0.00
00 13
13,6
,685
85.0
.00
0
Pasi
Pasirr pa
pasa
sang
ng m3 0.04
0.043
3 16
165,
5,00
000.
0.00
00 7,09
7,095.
5.00
00
JUMLAH HARGA BAHAN 73,280.0
73,280.000
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 118,240.00


E Overhead & Profit (Maksimum 15 %) 10% X D 11,824.00
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 130,06
130,064.0
4.00
0

Pemasangan 1 M2 dinding bata ringan ( 100 x 200 x 600 ) cm dengan mortar siap pakai A. 4.4.1.26
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.67
0.6710
10 97,5
97,500
00.0
.00
0 65
65,4
,422
22.5
.50
0
Tu
Tuka
kang
ng Batu
Batu OH 0.10
0.1000
00 12
120,
0,00
000.
0.00
00 12
12,0
,000
00.0
.00
0
Kepa
Kepala
la Tu
Tuka
kang
ng OH 0.01
0.0100
00 14
146,
6,00
000.
0.00
00 1,46
1,460.
0.00
00
Mand
Mandor
or OH 0.01
0.0100
00 15
150,
0,00
000.
0.00
00 1,50
1,500.
0.00
00

JUMLAH TENAGA KERJA 80,382.50


B BAHAN
Bata ringan 100x200x600 m3 0.100 977,500.00 97,750.00
Drymix perekat bata ringan Ex.MU-380 Setara @ 40 k zak 0.100 83,720.00 8,372.00
Air Liter 1.050 175.00 183.75
JUMLAH HARGA BAHAN 106,305.
106,305.75
75
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 186,688.25


E Overhead & Profit (Maksimum 15 %) 10% X D 18,668.83
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 205,35
205,357.0
7.08
8

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 15 mm A.4.4.2.3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.300 97,500.000 29,250.000
Tukang Batu OH 0.100 120,000.000 12,000.000
Kepala Tukang OH 0.010 146,000.000 1,460.000
Mandor OH 0.015 150,000.000 2,250.000
JUMLAH TENAGA KERJA 44,960.000
B BAHAN
Semen portland kg 7.776 1,190.000 9,253.440
Pasir pasang m3 0.023 165,000.000 3,795.000
JUMLAH HARGA BAHAN 13,048.440
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 58,008.440


E Overhead & Profit (Maksimum 15 %) 10% X D 5,800.844
F Harga Satuan Pekerjaaan (D+E) 63,809.284

Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 15 mm A.4.4.2.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.300 97,500.000 29,250.000
Tukang Batu OH 0.100 120,000.000 12,000.000

Kepala Tukang OH 0.010 146,000.000 1,460.000


Mandor OH 0.015 150,000.000 2,250.000
JUMLAH TENAGA KERJA 44,960.000
B BAHAN
Semen portland kg 5.184 1,190.000 6,168.960
Pasir pasang m3 0.026 165,000.000 4,290.000
JUMLAH HARGA BAHAN 10,458.960
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 55,418.960


E Overhead & Profit (Maksimum 15 %) 10% X D 5,541.896
F Harga Satuan Pekerjaaan (D+E) 60,960.856

Pekerjaan 1 M2 acian A.4.4.2.27


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.200 97,500.000 19,500.000
Tukang Batu OH 0.100 120,000.000 12,000.000
Kepala Tukang OH 0.010 146,000.000 1,460.000
Mandor OH 0.010 150,000.000 1,500.000
JUMLAH TENAGA KERJA 34,460.000
B BAHAN
Semen portland Kg 3.250 1,190.000 3,867.500
JUMLAH HARGA BAHAN 3,867.500
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,327.500

E Overhead & Profit (Maksimum 15 %) 10% X D 3,832.750


F Harga Satuan Pekerjaaan (D+E) 42,160.250
Pemasangan 1 M2 Plesteran dengan mortar siap pakai (MSP) A.4.4.2.28
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.050 97,500.000 4,875.000
Tukang Batu OH 0.150 120,000.000 18,000.000
Kepala Tukang OH 0.015 146,000.000 2,190.000
Mandor OH 0.015 150,000.000 2,250.000
JUMLAH TENAGA KERJA 27,315.000
B BAHAN
Drymix plesteran Setara @ 40 kg Kg 0.417 76,475.000 31,864.583
JUMLAH HARGA BAHAN 31,864.583
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 59,179.583


E Overhead & Profit (Maksimum 15 %) 10% X D 5,917.958
F Harga Satuan Pekerjaaan (D+E) 65,097.542

Pemasangan 1 M2 Acian dengan mortar siap pakai (MSP) A.4.4.2.29


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.200 97,500.000 19,500.000
Tukang Batu OH 0.100 120,000.000 12,000.000
Kepala Tukang OH 0.010 146,000.000 1,460.000
Mandor OH 0.010 150,000.000 1,500.000
JUMLAH TENAGA KERJA 34,460.000
B BAHAN
Drymix acian Setara @ 40 kg Kg 0.050 111,377.500 5,568.875

JUMLAH HARGA BAHAN 5,568.875


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 40,028.875


E Overhead & Profit (Maksimum 15 %) 10% X D 4,002.888
F Harga Satuan Pekerjaaan (D+E) 44,031.763

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Pemasangan 1 M2 lantai Keramik ukuran 60 x 60 cm A.4.4.3.3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.25
0.250
0 97
97,5
,500
00.0
.00
0 24
24,3
,375
75.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.12
0.125
5 120,
120,00
000.
0.00
00 15,0
15,000
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.01
0.013
3 146,
146,00
000.
0.00
00 1,89
1,898.
8.00
00
Ma
Mand
ndor
or OH 0.01
0.013
3 15
150,
0,00
000.
0.00
00 1,95
1,950.
0.00
00
JUMLAH TENAGA KERJA 43,223.00
B BAHAN
Ke
Kera
rami
mik
k Uk
Uk.. 60 x 60 cm (W
(War
arna
na)) Bh 2.77
2.778
8 52
52,33
,333.
3.33
33 14
145,3
5,370
70.37
.37
Seme
Semen
n port
portla
land
nd Kg 9.80
9.800
0 1,19
1,190.
0.00
00 11,6
11,662
62.0
.00
0
Pasi
Pasirr pasa
pasang
ng M3 0.04
0.045
5 165,
165,00
000.
0.00
00 7,42
7,425.
5.00
00
Seme
Semen
n war
arna
na Kg 0.60
0.600
0 9,77
9,775.
5.00
00 5,86
5,865.
5.00
00
JUMLAH HARGA BAHAN 170,322.37
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 213,545.37


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 0% X D -
F Harga Satuan Pekerjaaan (D+E) 213,545.370

Pemasangan 1 M2 lantai Keramik ukuran 40 x 40 cm A.4.4.3.4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.25
0.250
0 97
97,5
,500
00.0
.00
0 24
24,3
,375
75.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.12
0.125
5 120,
120,00
000.
0.00
00 15,0
15,000
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.01
0.013
3 146,
146,00
000.
0.00
00 1,89
1,898.
8.00
00
Ma
Mand
ndor
or OH 0.01
0.013
3 15
150,
0,00
000.
0.00
00 1,95
1,950.
0.00
00
JUMLAH TENAGA KERJA 43,223.00
B BAHAN
Ke
Kera
rami
mik
k Uk
Uk.. 40 x 40 cm (W
(War
arna
na)) Bh 6.63
6.630
0 11
11,96
,960.
0.00
00 79
79,29
,294.
4.80
80
Seme
Semenn port
portla
land
nd Kg 9.80
9.800
0 1,19
1,190.
0.00
00 11,6
11,662
62.0
.00
0
Pasi
Pasirr pasa
pasang
ng M3 0.04
0.045
5 165,
165,00
000.
0.00
00 7,42
7,425.
5.00
00
Seme
Semen
n war
arna
na Kg 0.60
0.600
0 9,77
9,775.
5.00
00 5,86
5,865.
5.00
00
JUMLAH HARGA BAHAN 104,246.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 147,469.80


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 14,746.98
14,746.98
F Harga Satuan Pekerjaaan (D+E) 162,216.780

Pemasangan 1 M2 lantai Keramik ukuran 30 x 30 cm A.4.4.3.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.26
0.260
0 97
97,5
,500
00.0
.00
0 25
25,3
,350
50.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.13
0.130
0 120,
120,00
000.
0.00
00 15,6
15,600
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.01
0.013
3 146,
146,00
000.
0.00
00 1,89
1,898.
8.00
00
Ma
Mand
ndor
or OH 0.01
0.013
3 15
150,
0,00
000.
0.00
00 1,95
1,950.
0.00
00
JUMLAH TENAGA KERJA 44,798.00
B BAHAN
Ke
Kera
rami
mik
k Uk
Uk.. 30 x 30 cm (W
(War
arna
na)) Bh 11
11.87
.870
0 6,728
6,728.1
.17
7 79
79,86
,863.
3.41
41
Seme
Semen
n port
portla
land
nd Kg 10.0
10.000
00 1,19
1,190.
0.00
00 11,9
11,900
00.0
.00
0
Pasi
Pasirr pasa
pasang
ng M3 0.04
0.045
5 165,
165,00
000.
0.00
00 7,42
7,425.
5.00
00
Seme
Semen
n war
arna
na Kg 0.60
0.600
0 9,77
9,775.
5.00
00 5,86
5,865.
5.00
00
JUMLAH HARGA BAHAN 105,053.41
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 149,851.41


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 14,985.14
14,985.14
F Harga Satuan Pekerjaaan (D+E) 164,836.552
Pemasangan 1 M2 Lantai keramik 20 x 20 cm A.4.4.3.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.27
0.270
0 97
97,5
,500
00.0
.00
0 26
26,3
,325
25.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.13
0.135
5 120,
120,00
000.
0.00
00 16,2
16,200
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.01
0.014
4 146,
146,00
000.
0.00
00 2,04
2,044.
4.00
00
Ma
Mand
ndor
or OH 0.01
0.014
4 15
150,
0,00
000.
0.00
00 2,10
2,100.
0.00
00
JUMLAH TENAGA KERJA 46,669.00
B BAHAN
Ke
Kera
rami
mik
k Uk
Uk.. 20 x 20 cm (W
(War
arna
na)) Bh 26
26.50
.500
0 2,208
2,208.6
.68
8 58
58,53
,530.
0.02
02
Seme
Semen
n port
portla
land
nd Kg 10.4
10.400
00 1,19
1,190.
0.00
00 12,3
12,376
76.0
.00
0
Pasi
Pasirr pasa
pasang
ng M3 0.04
0.045
5 165,
165,00
000.
0.00
00 7,42
7,425.
5.00
00
Seme
Semen
n war
arna
na Kg 1.00
1.000
0 9,77
9,775.
5.00
00 9,77
9,775.
5.00
00
JUMLAH HARGA BAHAN 88,106.02
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 134,775.02


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 13,477.50
13,477.50
F Harga Satuan Pekerjaaan (D+E) 148,252.522

Pemasangan 1 M2 dinding keramik 20 x 25 cm A.4.4.3.54a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.90
0.9000
00 97
97,5
,500
00.0
.00
0 87
87,7
,750
50.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.
0.45
4500
00 120,
120,00
000.
0.00
00 54,0
54,000
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.
0.04
0450
50 146,
146,00
000.
0.00
00 6,57
6,570.
0.00
00
Ma
Mand
ndor
or OH 0.04
0.0450
50 15
150,
0,00
000.
0.00
00 6,75
6,750.
0.00
00
JUMLAH TENAGA KERJA 155,070.00
B BAHAN
Ke
Kera
rami
mik
k Uk
Uk.. 20 x 25 cm (W
(War
arna
na)) bh 26
26.50
.5000
00 2,988
2,988.2
.20
0 79
79,18
,187.
7.30
30
Seme
Semen n port
portla
land
nd Kg 9.
9.30
3000
00 1,19
1,190.
0.00
00 11,0
11,067
67.0
.00
0
Pasi
Pasirr pasa
pasang
ng M3 0.
0.01
0180
80 165,
165,00
000.
0.00
00 2,97
2,970.
0.00
00
Seme
Semen
n war
arna
na Kg 1.94
1.9400
00 9,77
9,775.
5.00
00 18
18,9
,963
63.5
.50
0
JUMLAH HARGA BAHAN 112,187.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 267,257.80


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 26,725.78
26,725.78
F Harga Satuan Pekerjaaan (D+E) 293,983.580

Pemasangan 1 m2 lantai granit ukuran 60x 60 cm A.4.4.3.13


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.24
0.240
0 97
97,5
,500
00.0
.00
0 23
23,4
,400
00.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.12
0.120
0 120,
120,00
000.
0.00
00 14,4
14,400
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.01
0.012
2 146,
146,00
000.
0.00
00 1,75
1,752.
2.00
00
Ma
Mand
ndor
or OH 0.01
0.012
2 15
150,
0,00
000.
0.00
00 1,80
1,800.
0.00
00
JUMLAH TENAGA KERJA 41,352.00
B BAHAN
Granit 60 x 60 cm (W. Muda) Bh 3.100 71,875.00 222,812.50
Semen portland Kg 9.600 1,190.00 11,424.00
Semen warna M3 1.500 9,775.00 14,662.50
Pasir pasang Kg 0.045 165,000.00 7,425.00
JUMLAH HARGA BAHAN 256,324.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 297,676.00


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 29,767.60
29,767.60
F Harga Satuan Pekerjaaan (D+E) 327,443.600

Pemasangan 1 m2 lantai granit dinding KM/WC ukuran 30x 60 cm A.4.4.3.13a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.24
0.240
0 97
97,5
,500
00.0
.00
0 23
23,4
,400
00.0
.00
0
Tuka
Tukang
ng Batu
Batu OH 0.12
0.120
0 120,
120,00
000.
0.00
00 14,4
14,400
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.01
0.012
2 146,
146,00
000.
0.00
00 1,75
1,752.
2.00
00
Ma
Mand
ndor
or OH 0.01
0.012
2 15
150,
0,00
000.
0.00
00 1,80
1,800.
0.00
00
JUMLAH TENAGA KERJA 41,352.00
B BAHAN
Granit 60 x 60 cm (W. Muda) Bh 1.550 71,875.00 111,406.25
Semen portland Kg 9.600 1,190.00 11,424.00
Semen warna M3 1.500 9,775.00 14,662.50
Pasing pasang Kg 0.045 165,000.00 7,425.00
JUMLAH HARGA BAHAN 144,917.75
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 186,269.75


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 18,626.98
18,626.98
F Harga Satuan Pekerjaaan (D+E) 204,896.725

Pemasangan 1 m' granit Lantai Tangga ukuran 30 x 60 cm A.4.4.3.24b


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.45
0.450
0 97
97,5
,500
00.0
.00
0 43
43,8
,875
75.0
.00
0
Tuka
Tukang
ng Kayu
Kayu OH 0.90
0.900
0 120,
120,00
000.
0.00
00 108,
108,00
000.
0.00
00
Kepa
Kepala
la Tuka
Tukang
ng OH 0.04
0.045
5 146,
146,00
000.
0.00
00 6,57
6,570.
0.00
00
Ma
Mand
ndor
or OH 0.04
0.045
5 15
150,
0,00
000.
0.00
00 6,75
6,750.
0.00
00
JUMLAH TENAGA KERJA 165,195.00
B BAHAN
Granit 30 x 60 cm (Warna) Bh 1.550 60,375.00 93,581.25
Semen portland Kg 9.800 1,190.00 11,662.00
Semen warna M3 1.300 9,775.00 12,707.50
Pasing pasang Kg 0.045 165,000.00 7,425.00
JUMLAH HARGA BAHAN 125,375.75
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 290,570.75


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 29,057.08
29,057.08
F Harga Satuan Pekerjaaan (D+E) 319,627.825

Pemasangan 1 m' Plint Granit ukuran 10x 60 cm A.4.4.3.28


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.09
0.090
0 97
97,5
,500
00.0
.00
0 8,77
8,775.
5.00
00
Tuka
Tukang
ng Batu
Batu OH 0.09
0.090
0 120,
120,00
000.
0.00
00 10,8
10,800
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.00
0.009
9 146,
146,00
000.
0.00
00 1,31
1,314.
4.00
00
Ma
Mand
ndor
or OH 0.00
0.005
5 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 21,639.00
B BAHAN
Plint Granit 10 x 60 cm Bh 0.517 71,875.00 37,135.42
Semen portland Kg 1.140 1,190.00 1,356.60
Semen warna M3 0.100 9,775.00 977.50
Pasing pasang Kg 0.003 165,000.00 495.00
JUMLAH HARGA BAHAN 39,964.52
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 61,603.52


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 6,160.35
6,160.35
F Harga Satuan Pekerjaaan (D+E) 67,763.868

Pemasangan 1 m' Plint keramik ukuran 10x 40 cm A.4.4.3.29


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.09
0.090
0 97
97,5
,500
00.0
.00
0 8,77
8,775.
5.00
00
Tuka
Tukang
ng Batu
Batu OH 0.09
0.090
0 120,
120,00
000.
0.00
00 10,8
10,800
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.00
0.009
9 146,
146,00
000.
0.00
00 1,31
1,314.
4.00
00
Ma
Mand
ndor
or OH 0.00
0.005
5 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 21,639.00
B BAHAN
Plint Keramik 10 x 40 cm Bh 1.658 11,960.00 19,823.70
Semen portland Kg 1.140 1,190.00 1,356.60
Semen warna M3 0.100 9,775.00 977.50
Pasing pasang Kg 0.003 165,000.00 495.00
JUMLAH HARGA BAHAN 22,652.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 44,291.80

E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 4,429.18
4,429.18
F Harga Satuan Pekerjaaan (D+E) 48,720.980
Pemasangan 1 m' Plint keramik ukuran 10x 60 cm A.4.4.3.29
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.09
0.090
0 97
97,5
,500
00.0
.00
0 8,77
8,775.
5.00
00
Tuka
Tukang
ng Batu
Batu OH 0.09
0.090
0 120,
120,00
000.
0.00
00 10,8
10,800
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.00
0.009
9 146,
146,00
000.
0.00
00 1,31
1,314.
4.00
00
Ma
Mand
ndor
or OH 0.00
0.005
5 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 21,639.00
B BAHAN
Plint Keramik 10 x 60 cm Bh 0.517 52,333.33 27,038.89
Semen portland Kg 1.140 1,190.00 1,356.60
Semen warna M3 0.100 9,775.00 977.50
Pasing pasang Kg 0.003 165,000.00 495.00
JUMLAH HARGA BAHAN 29,867.99
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 51,506.99


E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 5,150.70
5,150.70
F Harga Satuan Pekerjaaan (D+E) 56,657.688

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

Pemasangan 1 m2 rangka Besi hollow 1x40.40.2m


1x40.40.2mm,
m, modul 60 x 60 cm, untuk plafon A.4.2.1.21
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 97,500.00 34,125.00
Tukang Besi L.02 OH 0.3500 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.0350 146,000.00 5,110.00
Mandor L.04 OH 0.0180 150,000.00 2,700.00
JUMLAH TENAGA KERJA 83,935.00
B BAHAN
M' 4.0000 6,900.00 27,600.00
Ls 10
100%
0%xr
xran
angk
gka
a 6,
6,90
900.
0.00
00 6,90
6,900.
0.00
00
JUMLAH HARGA BAHAN 34,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 118,435.00


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 11,843.5
11,843.50
0
F Harga Satuan Pekerjaaan (D+E) 130,278.500

Pemasangan 1 m
m2
2 la
langit- la
langit Gy
Gypsum B
Bo
o ar
ard ((1
120x240x9) mm
mm, tte
ebal 9 mm
mm (P
(Permukaan R
Ra
ata) A.4.5.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.0300 120,000.00 3,600.00
Kepala Tukang L.03 OH 0.0050 146,000.00 730.00
Mandor L.04 OH 0.0050 150,000.00 75
7 50.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Gypsum
Gypsum Boa
Board
rd 9 mm Lembar
Lembar 0.364
0.3640
0 70,
70,00
000.0
0.00
0 25,
25,48
480.0
0.00
0
Pa
Paku
ku se
sekr
krup
up 3 cm Kg 0.11
0.110
0 77
77,0
,000
00.0
.00
0 8,47
8,470.
0.00
00
JUMLAH HARGA BAHAN 33,950.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 48,780.00


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 4,878.00
4,878.00
F Harga Satuan Pekerjaaan (D+E) 53,658.000

Pema
Pemas
sanga
angan
n 1 m2 la
lang
ngit
it-l
-la
ang
ngit
it Kals
KalsiB
iBoa
oard
rd (12
(120x24
x240x3
0x3,5
,5)) mm, teba
teball 3,
3,5
5 mm (P
(Per
ermu
muk
kaan
aan Rata
Rata)) A.4.
A.4.5.
5.1.
1.7a
7a
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.0300 120,000.00 3,600.00
Kepala Tukang L.03 OH 0.0050 146,000.00 730.00
Mandor L.04 OH 0.0050 150,000.00 75
7 50.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Kal
Kalsi
si Board
Board 3,5 mm Lem
Lembar
bar 0.364
0.3640
0 58,
58,00
000.0
0.00
0 21,
21,11
112.0
2.00
0
Pa
Paku
ku se
sekr
krup
up 3 cm Kg 0.11
0.110
0 77
77,0
,000
00.0
.00
0 8,47
8,470.
0.00
00
JUMLAH HARGA BAHAN 29,582.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 44,412.00


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 4,441.20
4,441.20
F Harga Satuan Pekerjaaan (D+E) 48,853.200
Pemasangan 1 m’ list langit-langit Gypsum Board A.4.5.1.7b
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.0300 120,000.00 3,600.00
Kepala Tukang L.03 OH 0.0050 146,000.00 730.00
Mandor L.04 OH 0.0050 150,000.00 75
7 50.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
List Gyp
Gypsum
sum boa
board
rd Lembar
Lembar 0.050
0.0500
0 20,
20,00
000.0
0.00
0 1,000.
1,000.00
00
Pa
Paku
ku se
sekr
krup
up 3 cm Kg 0.11
0.110
0 77
77,0
,000
00.0
.00
0 8,47
8,470.
0.00
00
JUMLAH HARGA BAHAN 9,470.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 24,300.00


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 2,430.00
2,430.00
F Harga Satuan Pekerjaaan (D+E) 26,730.000

A.4.6.1A HARGA SATUAN PEKERJAAN PARTSI

Pemasangan 1 M2 Dinding partisi multipleks 6 mm A.4.6.1A1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Partisi L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.005 146,000.00 730.00
Mandor L.04 OH 0.005 150,000.00 7
75
50.00
JUMLAH TENAGA KERJA 17,230.00
B BAHAN
Mult
Multip
iple
leks
ks 6 mm Lb
Lbrr 0.36
0.364
4 77,0
77,000
00.0
.00
0 28,0
28,028
28.0
.00
0

Se
Sekr
kru
up Bh 0.110 1,500.
00.00 165.0
5.00
JUMLAH HARGA BAHAN 28,193.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 45,423.00


E Over
Overhea
headd & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 4,542.3
4,542.30
0
F Harga Satuan Pekerjaaan (D+E) 49,965.300

Pemasangan 1 M2 Dinding partisi Gypsumboard 9 mm A.4.6.1A2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Partisi L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.005 146,000.00 730.00
Mandor L.04 OH 0.005 150,000.00 7
75
50.00
JUMLAH TENAGA KERJA 17,230.00
B BAHAN
Gy
Gyps
psum
umbo
boar
ard
d 9 mm Lb
Lbrr 0.36
0.364
4 68,0
68,000
00.0
.00
0 24,7
24,752
52.0
.00
0
Sekr
Sekrup
up Bh 11.0
11.000
00 1,50
1,500.
0.00
00 16,5
16,500
00.0
.00
0
JUMLAH HARGA BAHAN 41,252.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 58,482.00


E Over
Overhea
headd & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 5,848.2
5,848.20
0
F Harga Satuan Pekerjaaan (D+E) 64,330.200

Membuat dan Memasang Daun Pintu Multipleks Lapis HPL 1 M2 A.4.6.1A2

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 97,500.00 1,950.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 146,000.00 2,920.00
Mandor L.04 OH 0.0025 150,000.00 375.00
JUMLAH TENAGA KERJA 29,245.00
B BAHAN
Multiplkes 18 mm M2 2.000 216,000.00 432,000.00
HPL M2 2.000 166,000.00 332,000.00
Paku Sekrup Kg 0.200 77,000.00 15,400.00
Lem vinil Ltr 0.250 74,750.00 18,687.50
Lem putih Kg 0.200 63,250.00 12,650.00
JUMLAH HARGA BAHAN 810,737.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 839,982.50


839,982.50
E Overhead
Overhead & Profit
Profit (Mak
(Maksimum
simum 15 %) 10% XD 83,998.2
83,998.25
5
F Harga Satuan Pekerjaaan (D+E) 923,980.750
A.4.6.1B HARGA SATUAN PEKERJAAN ALUMINIUM COMPOSITE

Pemasangan 1 M2 Aluminium Comp os


osite ex. Se
Sev
ven, besi ho llllow 4 x 4 cm , rangka 60 x 60 cm A.4.6.1B1
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.950 97,500.00 92,625.00
Tukang Besi L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 137,500.00 4,812.50
Mandor L.04 OH 0.018 150,000.00 2,700.00
JUMLAH TENAGA KERJA 142,137.50
B BAHAN
Alumunium Composite Panel PVDF 0.3 mm tebal
tebal M2 1.100 315,000.00 346,500.00

Rangka ho
Rangka hollow
llow alumun
alumunium
ium 40x
40x40
40 t:1
t:1mm
mm M' 4.050
4.050 38,
38,00
000.0
0.00
0 153
153,90
,900.0
0.00
0
Sealen
Sealentt den
dengan
gan lakban
lakban Tube
Tube 1.200
1.200 57,
57,00
000.0
0.00
0 68,
68,40
400.0
0.00
0
Brake
Brakett siku
siku be
besi
si 50 x 50 x 5mm
5mm M' 0.
0.50
500
0 47,6
47,646
46.7
.75
5 23,8
23,823
23.3
.38
8
Ba
Baut
ut Se
Sekr
krup
up Bh 12
12.0
.000
000
0 1,
1,50
500.
0.00
00 18
18,0
,000
00.0
.00
0

JUMLAH HARGA BAHAN 610,623.38


C PERALATAN
Alat bantu & Assesories (Perkuatan, las dll) Ls 35% 213,718.18
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 752,760.88


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 75,276.0
75,276.09
9
F Harga Satuan Pekerjaaan (D+E) 828,036.963

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

Pemasangan 1 M2 atap Spandek A.4.5.2.SP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 97,500.00 11,700.00
Tukang Kayu L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0060 146,000.00 876.00
Mandor L.04 OH 0.0060 150,000.00 900.00
JUMLAH TENAGA KERJA 20,676.00
B BAHAN
Spande
Spandek
k 0.35
0.35 mm Lem
Lembar
bar 0.7000
0.7000 72,775
72,775.50
.50 50,942
50,942.85
.85
Se
Sekr
krup
up Sp
Spen
ende
dek
k Kg 0.50
0.500
0 28,75
28,750.
0.00
00 1
14,
4,37
375.
5.00
00

JUMLAH HARGA BAHAN 65,317.85


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,993.85


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 8,599.39
8,599.39
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 94,593
94,593.24
.24

Pemasangan 1 M' nok atap spandek A.4.5.2.NK


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 97,500.00 14,625.00
Tukang Kayu L.02 OH 0.0700 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.0070 146,000.00 1,022.00
Mandor L.04 OH 0.0060 150,000.00 900.00
JUMLAH TENAGA KERJA 24,947.00
B BAHAN
Nok
Nok at
atap
ap Sp
Span
ande
dek
k Le
Leba
barr 0.40
0.40 M M1 1.05
1.0500
00 57
57,2
,200
00.0
.00
0 60
60,0
,060
60.0
.00
0
Se
Sekr
krup
up Sp
Spen
ende
dek
k Kg 0.40
0.400
0 28,75
28,750.
0.00
00 1
11,
1,50
500.
0.00
00
JUMLAH HARGA BAHAN 71,560.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 96,507.00


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 9,650.70
9,650.70
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 106,15
106,157.7
7.70
0

Pemasangan 1 M' Jurai atap A.4.5.2.JA


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 97,500.00 14,625.00
Tukang Kayu L.02 OH 0.0700 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.0070 146,000.00 1,022.00
Mandor L.04 OH 0.0060 150,000.00 900.00
JUMLAH TENAGA KERJA 24,947.00
B BAHAN
Ju
Jura
raii at
atap
ap Bh 1.10
1.1000
00 65,0
65,000
00.0
.00
0 71,5
71,500
00.0
.00
0
Se
Sekr
krup
up Sp
Spen
ende
dek
k kg 0.05
0.050
0 28,7
28,750
50.0
.00
0 1,43
1,437.
7.50
50
JUMLAH HARGA BAHAN 72,937.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 97,884.50

E Overhe
Overhead
ad & Profit
Profit (Maksi
(Maksimum
mum 15 %) 0% XD -
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 97,884
97,884.50
.50
A.4.5.2.33
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 97,500.00 19,500.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 146,000.00 1,460.00
Mandor L.04 OH 0.0010 150,000.00 150.00
JUMLAH TENAGA KERJA 33,110.00
B BAHAN
Gente
Genteng
ng meta
metall Bu
Buah
ah 2.00
2.0000
00 62
62,4
,400
00.0
.00
0 12
124,8
4,800
00.0
.00
0
Pa
Paku
ku bi
bias
asa
a ½”-1
½”-1”” Kg 0.20
0.200
0 18,0
18,040
40.0
.00
0 3,60
3,608.
8.00
00
JUMLAH HARGA BAHAN 128,408.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 161,518.00


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 16,151.80
16,151.80
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 177,66
177,669.8
9.80
0

Pemasangan 1 M' nok genteng metal A.4.5.2.37


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 97,500.00 24,375.00
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 146,000.00 2,190.00
Mandor L.04 OH 0.0130 150,000.00 1,950.00
JUMLAH TENAGA KERJA 46,515.00
B BAHAN
Nok
Nok Gent
Genten
eng
g meta
metall Bh 1.10
1.1000
00 66,1
66,125
25.0
.00
0 72,7
72,737
37.5
.50
0
Pa
Paku
ku bi
bias
asa
a ½”-1
½”-1”” kg 0.05
0.050
0 18,0
18,040
40.0
.00
0 902.
902.00
00
JUMLAH HARGA BAHAN 73,639.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 120,154.50


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 12,015.45
12,015.45
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 132,16
132,169.9
9.95
5

Pemasangan 1 M1 Kalsiplank 8 mm, uk 30 x 240 cm rangkap A.4.5.2.KP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 146,000.00 2,920.00
Mandor L.04 OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 37,420.00
B BAHAN
Ka
Kals
lsip
ipla
lank
nk 8 mm M1 2.00
2.0000
00 30,0
30,000
00.0
.00
0 60,0
60,000
00.0
.00
0
Paku
Paku pl
plaf
afo
ond Kg 0.10
0.100
0 77,0
77,000
00.0
.00
0 7,70
7,700.
0.00
00
JUMLAH HARGA BAHAN 67,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 105,120.00


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 10,512.00
10,512.00
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 115,63
115,632.0
2.00
0

Pemasangan 1 M2 Kuda - kuda baja ringan A.4.5.2.BJ1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 97,500.00 19,500.00
Tukang Kayu L.02 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.0100 146,000.00 1,460.00
Mandor L.04 OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 82,460.00
B BAHAN
Ba
Baja
ja ri
ring
ngan
an pr
profi
ofill C 75 0.75
0.75 M1 1.48
1.4880
80 23
23,0
,004
04.2
.25
5 34
34,2
,230
30.3
.32
2
Ba
Baut
ut (s
(scr
crew
ew dr
driv
iver
er)) bh 28.0
28.000
00 1,50
1,500.
0.00
00 42,0
42,000
00.0
.00
0
Dyna
Dynab
bol
oltt bh 1.60
1.600
0 8,50
8,500.
0.00
00 13,60
3,600.
0.00
00
Reng
Reng 45 M1 3.60
3.600
0 12,7
12,787
87.5
.50
0 46,03
6,035.
5.00
00
Ta
Tala
lang
ng ju
jura
raii M1 0.12
0.124
4 65,0
65,000
00.0
.00
0 8,06
8,060.
0.00
00

JUMLAH HARGA BAHAN 143,925.32


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 226,385.32


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 22,638.53
22,638.53
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 249,02
249,023.8
3.86
6

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Pemasangan 1 buah kunci tanam antik A.4.6.2.1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 97,500.00 5,850.00
Tukang Kayu L.02 OH 0.6000 120,000.00 72,000.00
Kepala Tukang L.03 OH 0.0600 146,000.00 8,760.00
Mandor L.04 OH 0.0030 150,000.00 4
4550.00
JUMLAH TENAGA KERJA 87,060.00
B BAHAN
Kunci tanam antik Bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 87,060.00


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 8,706.00
8,706.00
F Harga Satuan Pekerjaaan (D+E) 95,766.000

Pemasangan 1 buah kunci tanam 2 x slag stainless A.4.6.2.2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 97,500.00 975.00
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 146,000.00 7,300.00
Mandor L.04 OH 0.0050 150,000.00 7
7550.00
JUMLAH TENAGA KERJA 69,025.00
B BAHAN
Ku
Kunc
ncii ta
tana
nam
m 2 x slag
slag Bh 1.00
1.0000
00 192,
192,50
500.
0.00
00 192,
192,50
500.
0.00
00
JUMLAH HARGA BAHAN 192,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 261,525.00


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 26,152.50
26,152.50
F Harga Satuan Pekerjaaan (D+E) 287,677.500

Pemasangan 1 buah kunci kamar mandi A.4.6.2.2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0050 97,500.00 487.50
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 146,000.00 7,300.00
Mandor L.04 OH 0.0030 150,000.00 4
4550.00
JUMLAH TENAGA KERJA 68,237.50
B BAHAN
Kunc
Kuncii ta
tana
nam
m KM Bh 1.00
1.0000
00 11
111,
1,65
650.
0.00
00 11
111,
1,65
650.
0.00
00
JUMLAH HARGA BAHAN 111,650.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 179,887.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 17,988.75
17,988.75
F Harga Satuan Pekerjaaan (D+E) 197,876.250

Pemasangan 1 buah engsel pintu stainless A.4.6.2.5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 97,500.00 1,462.50
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 146,000.00 2,190.00
Mandor L.04 OH 0.0008 150,000.00 1
1220.00
JUMLAH TENAGA KERJA 21,772.50
B BAHAN
Engs
Engsel
el pint
pintu
u Bh 1.00
1.0000
00 38,5
38,500
00.0
.00
0 38,5
38,500
00.0
.00
0
JUMLAH HARGA BAHAN 38,500.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,272.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 6,027.25
6,027.25
F Harga Satuan Pekerjaaan (D+E) 66,299.750

Pemasangan 1 buah engsel jendela stainless A.4.6.2.6


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 97,500.00 975.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 146,000.00 1,460.00
Mandor L.04 OH 0.0005 150,000.00 75.00
JUMLAH TENAGA KERJA 14,510.00
B BAHAN
Engs
Engsel
el jend
jendel
ela
a Bh 1.00
1.0000
00 28,6
28,600
00.0
.00
0 28,6
28,600
00.0
.00
0
JUMLAH HARGA BAHAN 28,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 43,110.00


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 4,311.00
4,311.00
F Harga Satuan Pekerjaaan (D+E) 47,421.000

Pemasangan 1 buah kait angin A.4.6.2.9


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Pekerja L.01 OH 0.0150 97,500.00 1,462.50


Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 146,000.00 2,190.00
Mandor L.04 OH 0.0080 150,000.00 1,200.00
JUMLAH TENAGA KERJA 22,852.50
B BAHAN
Ka
Kait
it angi
angin
n stai
stainl
nles
ess
s Bh 1.00
1.0000
00 26,3
26,325
25.0
.00
0 26,3
26,325
25.0
.00
0
JUMLAH HARGA BAHAN 26,325.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,177.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 4,917.75
4,917.75
F Harga Satuan Pekerjaaan (D+E) 54,095.250

Pemasangan 1 M2 kaca tebal 5 mm A.4.6.2.17


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 97,500.00 1,462.50
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 146,000.00 2,190.00
Mandor L.04 OH 0.0008 150,000.00 1
1220.00
JUMLAH TENAGA KERJA 21,772.50
B BAHAN
Kaca tebal 5 mm M2 1.1000 133,250.00 146,575.00
Si
Silic
licon
on se
seal
alan
antt / lem
lem kaca
kaca Kg 0.05
0.0500
00 13,5
13,500
00.0
.00
0 675.
675.00
00
JUMLAH HARGA BAHAN 147,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 169,022.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 16,902.25
16,902.25
F Harga Satuan Pekerjaaan (D+E) 185,924.750

Pemasangan 1 M2 kaca tebal 8 mm A.4.6.2.18


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 97,500.00 1,462.50
Tukang Kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 146,000.00 2,190.00
Mandor L.04 OH 0.0008 150,000.00 1
1220.00
JUMLAH TENAGA KERJA 21,772.50
B BAHAN
Kaca tebal 8 mm M2 1.1000 379,500.00 417,450.00
Si
Silic
licon
on se
seal
alan
antt / lem
lem kaca
kaca Kg 0.05
0.0500
00 13,5
13,500
00.0
.00
0 675.
675.00
00
JUMLAH HARGA BAHAN 418,125.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 439,897.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 43,989.75
43,989.75
F Harga Satuan Pekerjaaan (D+E) 483,887.250

Pemasangan 1 M2 kaca tebal 12 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 97,500.00 2,437.50
Tukang L.02 OH 0.2500 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.0250 146,000.00 3,650.00
Mandor L.04 OH 0.0013 150,000.00 1
1995.00
JUMLAH TENAGA KERJA 36,282.50
B BAHAN
Kaca wire glas tebal 12 mm M2 1.1000 1,207,500.00 1,328,250.00
Si
Silic
licon
on se
seal
alan
antt / lem
lem kaca
kaca Kg 0.07
0.0700
00 13,5
13,500
00.0
.00
0 945.
945.00
00
JUMLAH HARGA BAHAN 1,329,195.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,365,477.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 136,547.7
136,547.75
5

F Harga Satuan Pekerjaaan (D+E) 1,502,025.250


A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

Pengecatan 1 m2
m2 bidang kayu baru (1 lapis plamur, 1 la
lapis cat dasar, 2 lapis ca
cat penutup) A.4.7.1.4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 97,500.00 6,825.00
Tukang Cat L.02 OH 0.0090 120,000.00 1,080.00
Kepala Tukang L.03 OH 0.0060 127,500.00 765.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 9,120.00
B BAHAN
Cat menie Kg 0.2000 26,150.00 5,230.00
Dempul kayu Kg 0.1500 34,179.00 5,126.85

Cat dasar Kg 0.1700 31,350.00 5,329.50


Cat penutup Kg 0.2600 61,000.00 15,860.00
Kuas Buah 0.0100 15,000.00 150.00
Pengencer Kg 0.0300 19,628.00 588.84
Ampelas Lbr 0.200 5,000.00 1,000.00
JUMLAH HARGA BAHAN 33,285.19
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 42,405.19


E Overhead
Overhead & Profit
Profit (Maksimum
(Maksimum 15 %) 10% XD 4,240.52
4,240.52
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 46,645
46,645.71
.71

Pengecatan 1 m2 Plafond ( 1lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) A.4.7.1.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 97,500.00 6,825.00
Tukang Cat L.02 OH 0.1050 120,000.00 12,600.00
Kepala Tukang L.03 OH 0.0040 127,500.00 510.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 20,385.00
B BAHAN
Plamuur Kg 0.1000 63,100.00 6,310.00
Cat dasar Kg 0.1000 21,440.00 2,144.00
Cat penutup Kg 0.2600 37,500.00 9,750.00
Kuas Buah 0.0100 33,950.00 339.50
Pengencer Kg 0.0300 13,000.00 390.00
Ampelas Lbr 0.200 17,400.00 3,480.00
JUMLAH HARGA BAHAN 22,413.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 42,798.50


E Overhead & Profit (Maksimum 15 %) 10% X D 4,279.85
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 47,078
47,078.35
.35

Peng
Pengec
ecat
atan
an 1 m2
m2 tem
temb
bok ba
baru
ru ( 1
1la
lap
pis plam
plamuu
uur,
r, 1 la
lapis
pis ca
cat d
das
asar
ar,, 2 llap
apis
is cat
cat p
pe
enu
nutu
tup)
p) ekst
ekster
erio
iorr A.4
A.4.7.1
.7.1.1
.10
0
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 97,500.00 1,950.00
Tukang Cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 127,500.00 803.25
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 10,763.25
B BAHAN
Plamuur Kg 0.1000 63,100.00 6,310.00
Cat dasar Kg 0.1000 21,300.00 2,130.00
Cat penutup Kg 0.2600 115,000.00 29,900.00
JUMLAH HARGA BAHAN 38,340.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,103.25


E Overhead & Profit (Maksimum 15 %) 10% X D 4,910.33
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 54,013
54,013.58
.58

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior A.4.7.1.10a
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 97,500.00 1,950.00
Tukang Cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 127,500.00 803.25
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 10,763.25
B BAHAN
Plamuur Kg 0.1000 63,100.00 6,310.00
Cat dasar Kg 0.1000 21,440.00 2,144.00
Cat penutup Kg 0.2600 73,600.00 19,136.00
JUMLAH HARGA BAHAN 27,590.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,353.25


E Overhead & Profit (Maksimum 15 %) 10% X D 3,835.33
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 42,188
42,188.58
.58

Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir A.4.7.1.19
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 97,500.00 5,850.00
Tukang Cat L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0120 127,500.00 1,530.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 15,030.00
B BAHAN
Cat Kg 0.0800 220,000.00 17,600.00
Kwas Bh 0.0100 21,000.00 210.00
Pengencer Liter 0.0100 29,950.00 299.50
JUMLAH HARGA BAHAN 18,109.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 33,139.50


E Overhead & Profit (Maksimum 15 %) 10% X D 3,313.95
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 36,453
36,453.45
.45

Pengecatan 1 m2 Waterproofing 3x cat penutup A.4.7.1.23


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 97,500.00 6,825.00
Tukang Cat L.02 OH 0.1050 120,000.00 12,600.00
Kepala Tukang L.03 OH 0.0040 127,500.00 510.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 20,385.00
B BAHAN
Sika waterproofing mortar kg 0.6000 184,000.00 110,400.00
Cat penutup ex. No drop kg 0.2600 34,500.00 8,970.00
Kuas 4 Bh 0.0100 21,000.00 210.00
JUMLAH HARGA BAHAN 119,370.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 139,755.00


E Overhead & Profit (Maksimum 15 %) 10% X D 13,975.50
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 153,73
153,730.5
0.50
0

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI

Pemasangan 1 buah closet duduk / monoblock A.5.1.1.1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 1.00
1.0000
00 97
97,5
,500
00.0
.00
0 97
97,5
,500
00.0
.00
0
Tuka
Tukang
ng Ba
Batu
tu OH 1.10
1.1000
00 120,
120,00
000.
0.00
00 132,
132,00
000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0100
00 146,
146,00
000.
0.00
00 1,
1,46
460.
0.00
00
Ma
Mand
ndor
or OH 0.16
0.1600
00 15
150,
0,00
000.
0.00
00 24
24,0
,000
00.0
.00
0
JUMLAH TENAGA KERJA 254,960.00
B BAHAN
Closet duduk Unit 1.000 2,126,667.00 2,126,667.00
Perlengkapan (6 % harga kloset) % 0.060 2,126,667.00 127,600.02

JUMLAH HARGA BAHAN 2,254,267.02


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,509,227.02


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 250,922.70
250,922.70
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 2,760,
2,760,149
149.72
.72

Pemasangan 1 buah closet duduk + tabung A.5.1.1.1a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerj
rja
a OH 3.30
3.3000
00 97,5
97,500
00.0
.00
0 321,
321,75
750.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 1.10
1.1000
00 120,
120,00
000.
0.00
00 132,
132,00
000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0100
00 146,
146,00
000.
0.00
00 1,
1,46
460.
0.00
00

Ma
Mand
ndor
or OH 0.16
0.1600
00 15
150,
0,00
000.
0.00
00 24
24,0
,000
00.0
.00
0
JUMLAH TENAGA KERJA 479,210.00
B BAHAN
Closet duduk ex. Toto / setara Bh 1.000 2,487,083.00 2,487,083.00
jet washer Bh 1.000 220,000.00 220,000.00
Perlengkapan (6 % harga kloset) % 0.060 2,487,083.00 149,224.98
JUMLAH HARGA BAHAN 2,856,307.98
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,335,517.98


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 333,551.80
333,551.80
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 3,669,
3,669,069
069.78
.78

Pemasangan 1 buah closet jongkok porslen A.5.1.1 2

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 1.00
1.0000
00 97
97,5
,500
00.0
.00
0 97
97,5
,500
00.0
.00
0
Tuka
Tukang
ng Ba
Batu
tu OH 1.50
1.5000
00 120,
120,00
000.
0.00
00 180,
180,00
000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.15
0.1500
00 146,
146,00
000.
0.00
00 21,9
21,900
00.0
.00
0
Ma
Mand
ndor
or OH 0.16
0.1600
00 15
150,
0,00
000.
0.00
00 24
24,0
,000
00.0
.00
0
JUMLAH TENAGA KERJA 323,400.00
B BAHAN
Closet jongkok Bh 1.000 396,700.00 396,700.00
Semen Portland Kg 6.000 1,190.00 7,140.00
Pasir pasang M3 0.010 165,000.00 1,650.00
JUMLAH HARGA BAHAN 405,490.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 728,890.00

E Overhead & Profi


Overhead Profitt (Maks
(Maksimum
imum 15 %) 10% XD 72,889.00
72,889.00
F Harga
Harga Sat
Satuan
uan PekPekerj
erjaaa
aaan
n (D+E)
(D+E) 801,779.0
801,779.000
Pemasangan 1 buah urinoir A.5.1.1 4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 1.00
1.0000
00 97
97,5
,500
00.0
.00
0 97
97,5
,500
00.0
.00
0
Tuka
Tukang
ng Ba
Batu
tu OH 1.00
1.0000
00 120,
120,00
000.
0.00
00 120,
120,00
000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.10
0.1000
00 146,
146,00
000.
0.00
00 14,6
14,600
00.0
.00
0
Ma
Mand
ndor
or OH 0.05
0.0500
00 15
150,
0,00
000.
0.00
00 7,50
7,500.
0.00
00
JUMLAH TENAGA KERJA 239,600.00
B BAHAN
Urinoir Unit 1.000 1,296,250.00 1,296,250.00
Semen Portland Kg 6.000 1,190.00 7,140.00
Pasir pasang M3 0.010 165,000.00 1,650.00
Perlengkapan 30 % harga urinoir % 0.300 1,296,250.00 388,875.00
JUMLAH HARGA BAHAN 1,693,915.00

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,933,515.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 193,351.50
193,351.50
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 2,126,
2,126,866
866.50
.50

Pemasangan 1 buah wastafel A.5.1.1 5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerj
rja
a OH 1.20
1.2000
00 97,5
97,500
00.0
.00
0 117,
117,00
000.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 1.45
1.4500
00 120,
120,00
000.
0.00
00 174,
174,00
000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.15
0.1500
00 146,
146,00
000.
0.00
00 21,9
21,900
00.0
.00
0

Ma
Mand
ndor
or OH 0.06
0.0600
00 15
150,
0,00
000.
0.00
00 9,00
9,000.
0.00
00
JUMLAH TENAGA KERJA 321,900.00
B BAHAN
Wastafel Unit 1.000 504,200.00 504,200.00
Semen Portland Kg 6.000 1,190.00 7,140.00
Pasir pasang M3 0.010 165,000.00 1,650.00
Perlengkapan 12 % harga wastafel % 0.120 504,200.00 60,504.00
JUMLAH HARGA BAHAN 573,494.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 895,394.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 89,539.40
89,539.40
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 984,93
984,933.4
3.40
0

Pemasangan 1 buah Hand Shower untuk mandi A.5.1.1 5a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.01
0.0100
00 97
97,5
,500
00.0
.00
0 97
975.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.40
0.4000
00 120,
120,00
000.
0.00
00 48,0
48,000
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.04
0.0400
00 146,
146,00
000.
0.00
00 5,
5,84
840.
0.00
00
Ma
Mand
ndor
or OH 0.00
0.0050
50 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 55,565.00
B BAHAN
Hand shower lengkap dengan aksesories Set 1.000 480,000.00 480,000.00
JUMLAH HARGA BAHAN 480,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 535,565.00

E Overhead & Profi


Overhead Profitt (Maks
(Maksimum
imum 15 %) 10% XD 53,556.50
53,556.50
F Harga
Harga Sat
Satuan
uan PekPekerj
erjaaa
aaan
n (D+E)
(D+E) 589,121.5
589,121.500

Pemasangan 1 buah floor drain A.5.1.1 14


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.01
0.0100
00 97
97,5
,500
00.0
.00
0 97
975.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.10
0.1000
00 120,
120,00
000.
0.00
00 12,0
12,000
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0100
00 146,
146,00
000.
0.00
00 1,
1,46
460.
0.00
00
Ma
Mand
ndor
or OH 0.00
0.0050
50 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 15,185.00
B BAHAN
floor drain Unit 1.000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 95,000.00

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 110,185.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 11,018.50
11,018.50
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 121,20
121,203.5
3.50
0

Pemasangan 1 buah tempat sabun A.5.1.1 14a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.01
0.0100
00 97
97,5
,500
00.0
.00
0 97
975.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.10
0.1000
00 120,
120,00
000.
0.00
00 12,0
12,000
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0100
00 146,
146,00
000.
0.00
00 1,
1,46
460.
0.00
00
Ma
Mand
ndor
or OH 0.00
0.0050
50 15
150,
0,00
000.
0.00
00 75
750.
0.00
00

JUMLAH TENAGA KERJA 15,185.00


B BAHAN
Tempat sabun Bh 1.000 47,250.00 47,250.00
JUMLAH HARGA BAHAN 47,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 62,435.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 6,243.50
6,243.50
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 68,678
68,678.50
.50

Pemasangan 1 buah kran (Wastafel) diameter ½” atau 3/4” A.5.1.1 19a


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Peke
Pekerrja OH 0.01
0.0100
00 97
97,5
,500
00.0
.00
0 97
975.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.40
0.4000
00 120,
120,00
000.
0.00
00 48,0
48,000
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.04
0.0400
00 146,
146,00
000.
0.00
00 5,
5,84
840.
0.00
00
Ma
Mand
ndor
or OH 0.00
0.0050
50 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 55,565.00
B BAHAN
Kran air Wastafel Buah 1.000 240,000.00 240,000.00
Seal tape Buah 0.025 6,500.00 162.50
JUMLAH HARGA BAHAN 240,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 295,565.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 29,556.50
29,556.50

F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 325,12
325,121.5
1.50
0

Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.01
0.0100
00 97
97,5
,500
00.0
.00
0 97
975.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.40
0.4000
00 120,
120,00
000.
0.00
00 48,0
48,000
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.04
0.0400
00 146,
146,00
000.
0.00
00 5,
5,84
840.
0.00
00
Ma
Mand
ndor
or OH 0.00
0.0050
50 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 55,565.00
B BAHAN
Kran air Buah 1.000 33,250.00 33,250.00
Sealtape Buah 0.025 6,500.00 162.50
JUMLAH HARGA BAHAN 33,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 88,815.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 8,881.50
8,881.50
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 97,696
97,696.50
.50

A.5.1.1 19

Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.03
0.0360
60 97
97,5
,500
00.0
.00
0 3,51
3,510.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.06
0.0600
00 120,
120,00
000.
0.00
00 7
7,2
,200
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.00
0.0060
60 146,
146,00
000.
0.00
00 876.
876.00
00
Ma
Mand
ndor
or OH 0.00
0.0020
20 15
150,
0,00
000.
0.00
00 30
300.
0.00
00
JUMLAH TENAGA KERJA 11,886.00

B BAHAN
Pipa PVC 1/2" M 1.200 8,050.00 9,660.00
Perlengkapan Ls 0.350 8,050.00 2,817.50
JUMLAH HARGA BAHAN 9,660.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,546.00


E Overhead & Profit (Maksimum 15 %) 10% 2,154.60
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 23,700
23,700.60
.60

Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Peke
Pekerrja OH 0.03
0.036
6 97
97,5
,500
00.0
.00
0 3,51
3,510.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.06
0.060
0 120,
120,00
000.
0.00
00 7,
7,20
200.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.00
0.006
6 146,
146,00
000.
0.00
00 876.
876.00
00
Ma
Mand
ndor
or OH 0.00
0.002
2 15
150,
0,00
000.
0.00
00 30
300.
0.00
00
JUMLAH TENAGA KERJA 11,886.00
B BAHAN
Pipa PVC 3/4" M 1.200 9,775.00 11,730.00
Perlengkapan Ls 0.350 9,775.00 3,421.25
JUMLAH HARGA BAHAN 11,730.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 23,616.00


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 2,361.60
2,361.60

F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 25,977
25,977.60
.60

Pemasangan 1 m’ pipa PVC tipe AW diameter 1” A.5.1.1 27


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.03
0.036
6 97
97,5
,500
00.0
.00
0 3,51
3,510.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.06
0.060
0 120,
120,00
000.
0.00
00 7,
7,20
200.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.00
0.006
6 146,
146,00
000.
0.00
00 876.
876.00
00
Ma
Mand
ndor
or OH 0.00
0.002
2 15
150,
0,00
000.
0.00
00 30
300.
0.00
00
JUMLAH TENAGA KERJA 11,886.00
B BAHAN
Pipa PVC 1" M 1.200 12,937.50 15,525.00
Perlengkapan Ls 0.350 12,937.50 4,528.13
JUMLAH HARGA BAHAN 20,053.13
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 31,939.13


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 3,193.91
3,193.91
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 35,133
35,133.04
.04

Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.05
0.054
4 97
97,5
,500
00.0
.00
0 5,26
5,265.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.09
0.090
0 120,
120,00
000.
0.00
00 10,8
10,800
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.00
0.009
9 146,
146,00
000.
0.00
00 1,3
1,314
14.0
.00
0
Ma
Mand
ndor
or OH 0.00
0.003
3 15
150,
0,00
000.
0.00
00 45
450.
0.00
00
JUMLAH TENAGA KERJA 17,829.00
B BAHAN

Pipa PVC 2" M 1.200 17,825.00 21,390.00


Perlengkapan Ls 0.350 17,825.00 6,238.75
JUMLAH HARGA BAHAN 27,628.75
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 45,457.75


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 4,545.78
4,545.78
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 50,003
50,003.53
.53

Pemasangan 1 m’ pipa PVC tipe AW diameter 3” A.5.1.1 31


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Peke
Pekerrja OH 0.08
0.0810
10 97
97,5
,500
00.0
.00
0 7,89
7,897.
7.50
50
Tuka
Tukang
ng BaBatu
tu OH 0.13
0.1350
50 120,
120,00
000.
0.00
00 16,2
16,200
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0135
35 146,
146,00
000.
0.00
00 1,
1,97
971.
1.00
00
Ma
Mand
ndor
or OH 0.00
0.0040
40 15
150,
0,00
000.
0.00
00 60
600.
0.00
00
JUMLAH TENAGA KERJA 26,668.50
B BAHAN
Pipa PVC 3" M 1.200 33,062.50 39,675.00
Perlengkapan Ls 0.350 33,062.50 11,571.88
JUMLAH HARGA BAHAN 51,246.88
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 77,915.38


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 7,791.54
7,791.54
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 85,706
85,706.91
.91

Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.08
0.0810
10 97
97,5
,500
00.0
.00
0 7,89
7,897.
7.50
50
Tuka
Tukang
ng Ba
Batu
tu OH 0.13
0.1350
50 120,
120,00
000.
0.00
00 16,2
16,200
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0135
35 146,
146,00
000.
0.00
00 1,
1,97
971.
1.00
00
Ma
Mand
ndor
or OH 0.00
0.0040
40 15
150,
0,00
000.
0.00
00 60
600.
0.00
00
JUMLAH TENAGA KERJA 26,668.50
B BAHAN
Pipa PVC 4" M 1.200 39,000.00 46,800.00
Perlengkapan Ls 0.350 39,000.00 13,650.00
JUMLAH HARGA BAHAN 60,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 87,118.50


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 8,711.85
8,711.85
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 95,830
95,830.35
.35

Pemasangan 1 Unit Septictank dan Peresapan A.5.1.1 33


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerj
rja
a OH 3.27
3.2700
00 97,5
97,500
00.0
.00
0 318,
318,82
825.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 1.50
1.5000
00 120,
120,00
000.
0.00
00 180,
180,00
000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.10
0.1000
00 146,
146,00
000.
0.00
00 14,6
14,600
00.0
.00
0
Ma
Mand
ndor
or OH 0.15
0.1500
00 15
150,
0,00
000.
0.00
00 22
22,5
,500
00.0
.00
0
JUMLAH TENAGA KERJA 535,925.00

B BAHAN
Galian Tanah Biasa M3 8.807 84,562.50 744,741.94
Pas. Trasram 1/2 Bata 1 : 2 M2 1.494 138,908.55 207,529.37
Urugan pasir M3 1.281 238,425.00 305,422.43
Urugan tanah kembali M3 2.169 61,875.00 134,206.88
Plesteran Trasram 1/2 tebal 15 mm M2 13.440 73,872.22 992,842.58
Ijuk M2 1.350 45,000.00 60,750.00
Plat Beton bertulang K- 225 T = 10 cm M3 0.281 5,000,000.00 1,405,000.00
Acian semen (saus semen) M2 13.440 42,160.25 566,633.76
Pipa Hawa Galvanis dia. 1" M1 0.600 49,206.67 29,524.00
Kerikil beton M3 0.900 209,000.00 188,100.00
PVC Dia. 4" dipasang + tabungan M1 9.000 95,830.35 862,473.15
JUMLAH HARGA BAHAN 5,497,224.10
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,033,149.10


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 603,314.91
603,314.91
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 6,636,
6,636,464
464.01
.01

Pemasangan 1 M1 Saluran Air hujan A.5.1.1 34


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
B BAHAN
Galian Tanah Biasa M3 0.180 84,562.50 15,221.25
Pas. Batu gunung 5/10, 1pc : 3 psr M3 0.120 945,620.50 113,474.46
Pek. Urugan pasir bawah batu gunung 5cm M3 0.030 238,425.00 7,152.75
Urugan tanah kembali M3 0.060 61,875.00 3,712.50
Plesteran Trasram 1/2 tebal 15 mm M2 1.200 73,872.22 88,646.66
Pemasangan besi polos dia. 12 jarak per 8 cm Kg 7.104 19,789.40 140,583.87
Pemasangan baja siku 2.20.20 Kg 1.770 37,634.85 66,613.68
Pek. Acian batu gunung M2 1.200 42,160.25 50,592.30
JUMLAH HARGA BAHAN 485,997.47
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 485,997.47


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 48,599.75
48,599.75
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 534,59
534,597.2
7.22
2

Pemasangan 1 M1 Saluran Pipa tanam A.5.1.1 35


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
B BAHAN
Memasang pipa PVC tipe AW Dia 4" M3 1.100 95,830.35 105,413.39
Beton tanpa tulangan K - 100 M3 0.0225 1,081,510.75 24,333.99
JUMLAH HARGA BAHAN 129,747.38
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 129,747.38


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 12,974.74
12,974.74
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 142,72
142,722.1
2.11
1

Pemasangan 1 m’ Saluran Air Hujan pipa PVC tipe AW diameter 4” A.5.1.1 36


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.08
0.0810
10 97
97,5
,500
00.0
.00
0 7,89
7,897.
7.50
50
Tuka
Tukang
ng Ba
Batu
tu OH 0.13
0.1350
50 120,
120,00
000.
0.00
00 16,2
16,200
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0135
35 146,
146,00
000.
0.00
00 1,
1,97
971.
1.00
00
Ma
Mand
ndor
or OH 0.00
0.0040
40 15
150,
0,00
000.
0.00
00 60
600.
0.00
00
JUMLAH TENAGA KERJA 26,668.50

B BAHAN
Pipa PVC 4" M' 1.200 95,830.35 114,996.42
Perlengkapan Ls 0.350 33,540.62 11,739.22
JUMLAH HARGA BAHAN 126,735.64
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 153,404.14


E Overhead
Overhead & Profi
Profitt (Maks
(Maksimum
imum 15 %) 10% XD 15,340.41
15,340.41
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 168,74
168,744.5
4.55
5

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

Pemasangan 1 M pipa GIP Ǿ 2" A.8.4.1.42


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.469 97,500.00 143,227.50
Tukang Pipa L.02 OH 0.735 120,000.00 88,200.00
Mandor L.04 OH 0.147 150,000.00 22,050.00
JUMLAH TENAGA KERJA 253,477.50
B BAHAN
Pipa GIP 2 " m' 1.0
.00
00 180,0
80,00
00.00
0.00 180,0
80,00
00.00
0.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 433,477.50


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 43,347.7
43,347.75
5
F Harga
Harga Sat
Satuan
uan Pek
Pekerja
erjaaan
aan (D+
(D+E)
E) 476,825
476,825.25
.25

Pemasangan 1 M pipa GIP Ǿ 3" A.8.4.1.44


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.327 97,500.00 226,882.50
Tukang Pipa L.02 OH 1.163 120,000.00 139,560.00
Mandor L.04 OH 0.233 150,000.00 34,950.00
JUMLAH TENAGA KERJA 401,392.50
B BAHAN
Pipa GIP 3 " m' 1.0
.00
00 213,3
13,33
33.33
3.33 213,3
13,33
33.33
3.33
JUMLAH HARGA BAHAN 213,333.33
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 614,725.83


E Overhe
Overhead
ad & Profit (Maksimu
(Maksimum
m 15 %) 10% XD 61,472.5
61,472.58
8
F Harga
Harga Sat
Satuan
uan Pek
Pekerja
erjaaan
aan (D+
(D+E)
E) 676,198
676,198.42
.42

A.4.7.2 HARGA SATUAN PEKERJAAN INSTALASI LISTRIK

Pemasangan 1 titik Lampu A.4.7.2.A


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pembantu tukang L.01 OH 0.3000 97,500.00 29,250.00
Tukang listrik L.02 OH 0.1500 120,000.00 18,000.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 49,500.00
B BAHAN
Kabel NYA (3x2,5) mm M1 12.000 11,500.00 138,000.00
Klem Kabel No. 10 Bh 6.000 1,500.00 9,000.00
Pipa PVC 5/8" M' 11.000 4,500.00 49,500.00
Inbow Dos Bh 3.000 6,000.00 18,000.00
Las Dop Bh 4.000 3,000.00 12,000.00
Isolasi Rol 0.330 12,000.00 3,960.00
T - Dos 5/8" Bh 3.000 9,000.00 27,000.00
Flexible pipe (Kabel ties) M' 1.000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 265,460.
265,460.00
00
C PERALATAN
Sewa alat 5% dari harga bahan Ls 1.000 13,273.00 13,273.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 314,960.00


E Overhead & Profit
Overhead Profit (Maksi
(Maksimum
mum 15 %) 10% XD 31,496.00
31,496.00
F Harga Satuan Pekerjaaan (D+E) 346,456.00

Pemasangan 1 titik stop kontak A.4.7.2.B


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.30
0.3000
00 97
97,5
,500
00.0
.00
0 29
29,2
,250
50.0
.00
0
Tu
Tuka
kang
ng list
listri
rik
k OH 0.15
0.1500
00 12
120,
0,00
000.
0.00
00 1
18,
8,00
000.
0.00
00
Mand
Mandor
or OH 0.01
0.0150
50 15
150,
0,00
000.
0.00
00 2,25
2,250.
0.00
00
JUMLAH TENAGA KERJA 49,500.00
B BAHAN
Kabel NYA (3x2,5) mm M1 14.000 11,500.00 161,000.00
Klem Kabel No. 10 Bh 6.000 1,500.00 9,000.00
Pipa PVC 5/8" btg 13.000 4,500.00 58,500.00
Inbow Dos Bh 3.000 6,000.00 18,000.00
Las Dop Bh 4.000 3,000.00 12,000.00
Isolasi Rol 0.330 12,000.00 3,960.00
T - Dos 5/8" Bh 3.000 9,000.00 27,000.00
Flexible pipe (Kabel ties) M' 1.000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 289,460.
289,460.00
00
C PERALATAN
Sewa alat 5% dari harga bahan Ls 1.000 14,473.00 14,473.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 338,960.00


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 33,896.00
33,896.00
F Harga Satuan Pekerjaaan (D+E) 372,856.00

Pemasangan 1 Buah Saklar Tunggal A.4.7.2.C


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Saklar Tunggal Bh 1.000 17,400.00 17,400.00
JUMLAH HARGA BAHAN 17,400.00
17,400.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 24,637.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 2,463.75
2,463.75
F Harga Satuan Pekerjaaan (D+E) 27,101.25

Pemasangan 1 Buah Saklar Ganda A.4.7.2.D


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50

B BAHAN
Saklar Ganda Bh 1.000 21,350.00 21,350.00
JUMLAH HARGA BAHAN 21,350.00
21,350.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 28,587.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 2,858.75
2,858.75
F Harga Satuan Pekerjaaan (D+E) 31,446.25

Pemasangan 1 Buah Stop Kontak A.4.7.2.E


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Stop kontak Bh 1.000 18,500.00 18,500.00
JUMLAH HARGA BAHAN 18,500.00
18,500.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 25,737.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 2,573.75
2,573.75
F Harga Satuan Pekerjaaan (D+E) 28,311.25

Pemasangan 1 Buah Lampu TL 2 X 18 Watt A.4.7.2.F


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu TL 2 X 18 watt Bh 1.000 315,000.00 315,000.00
JUMLAH HARGA BAHAN 315,000.
315,000.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 322,237.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 32,223.75
32,223.75
F Harga Satuan Pekerjaaan (D+E) 354,461.25

Pemasangan 1 Buah Downlight 9 Watt A.4.7.2.G


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN

Lampu Downlight Bh 1.000 128,000.00 128,000.00


JUMLAH HARGA BAHAN 128,000.
128,000.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 135,237.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 13,523.75
13,523.75
F Harga Satuan Pekerjaaan (D+E) 148,761.25

Pemasangan 1 Buah Downlight 5 Watt A.4.7.2.H


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50

Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu Downlight Bh 1.000 82,000.00 82,000.00
JUMLAH HARGA BAHAN 82,000.00
82,000.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 89,237.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 8,923.75
8,923.75
F Harga Satuan Pekerjaaan (D+E) 98,161.25

Pemasangan 1 Buah Downlight 13 Watt A.4.7.2.I


Harga Satuan Jumlah Harga

(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu Downlight 13 Watt Bh 1.000 172,500.00 172,500.00
JUMLAH HARGA BAHAN 172,500.
172,500.00
00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 179,737.50


E Overhead & Profit
Overhead Profit (Maksi
(Maksimum
mum 15 %) 10% XD 17,973.75
17,973.75
F Harga Satuan Pekerjaaan (D+E) 197,711.25

Pemasangan 1 Buah Lampu SL 10 Watt A.4.7.2.J


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu SL10 Watt Bh 1.000 36,800.00 36,800.00
JUMLAH HARGA BAHAN 36,800.00
36,800.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 44,037.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 4,403.75
4,403.75
F Harga Satuan Pekerjaaan (D+E) 48,441.25

Pemasangan 1 Buah Lampu SL 20 Watt A.4.7.2.K


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50

B BAHAN
Lampu SL 20 Watt Bh 1.000 41,975.00 41,975.00
JUMLAH HARGA BAHAN 41,975.00
41,975.0 0
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,212.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 4,921.25
4,921.25
F Harga Satuan Pekerjaaan (D+E) 54,133.75

Pemasangan 1 Buah Lampu Baret LED 20 Watt A.4.7.2.L


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50

Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu Baret LED Phllips Bh 1.000 724,500.00 724,500.00
JUMLAH HARGA BAHAN 724,500.
724,500.00
00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 731,737.50


E Overhead
Overhead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 73,173.75
73,173.75
F Harga Satuan Pekerjaaan (D+E) 804,911.25

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI GEDUNG ASRAMA PUTRI


PJ1 AP 1 Bh Pekerjaan pintu PJ1
20.4000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 3,802,773.2
3,802,773.28
8
3.5340 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 3,265,347.9
3,265,347.97
7
6.0800 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 1,130,422.4
1,130,422.48
8
6.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 397,798.50
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
2.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 279,400.00
2.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 420,000.00
20.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 102,000.00
Total Rp 9,685,419.7
9,685,419.73
3

P2 AP 1 Bh Pekerjaan pintu P2
7.5600 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,409,263.0
1,409,263.04
4
3.5340 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 3,265,347.9
3,265,347.97
7
2.3600 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 178,384.92
0.3800 M2 Kaca bening 5 mm (Pintu + ventilasi) @ Rp. 185,924.75 Rp 70,651.41
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
1.0000 Bh Grendel Ventilasi @ Rp. 23,500.00 Rp 23,500.00
1.0000 Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp 54,095.25
3.7200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 18,600.00
Total Rp 5,856,119.3
5,856,119.33
3

P3 AP 1 Bh Pekerjaan pintu P3
6.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,211,667.9
1,211,667.96
6
2.6820 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 2,478,116.3
2,478,116.37
7
0.2060 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 15,570.89
0.1600 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 29,747.96
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
1.0000 Bh Grendel Ventilasi @ Rp. 23,500.00 Rp 23,500.00
1.0000 Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp 54,095.25
3.7200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 18,600.00
Total Rp 4,667,575.1
4,667,575.18
8

P4 AP 1 Bh Pekerjaan pintu P4
5.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 987,975.41
1.8020 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,665,013.3
1,665,013.31
1
0.2060 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 15,570.89

0.1600 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 29,747.96


4.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 265,199.00
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 105,000.00 Rp 105,000.00
Total Rp 3,495,884.0
3,495,884.07
7

HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
21.1000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 3,933,260.6
3,933,260.60
0
9.8400 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 743,774.41
21.1000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 105,500.00
3.9200 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 728,825.02
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 115,000.00
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total Rp 6,577,483.5
6,577,483.53
3

J2 AP 1 Bh Pekerjaan jendela J2
10.3500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,929,348.2
1,929,348.21
1
12.0400 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 910,065.43
10.3500 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 51,750.00
1.8800 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 349,538.53
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
4.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 115,000.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 4,008,951.1
4,008,951.17
7

J3 AP 1 Bh Pekerjaan jendela J3
10.3500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,929,348.2
1,929,348.21
1
12.0400 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 910,065.43
10.3500 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 51,750.00
1.8800 M2 Kaca bening 5 mm (Jendela) @ Rp. 185,924.75 Rp 349,538.53
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 3,704,267.1
3,704,267.17
7
V1 AP 1 Bh Pekerjaan Ventilasi V1
9.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,770,899.3
1,770,899.32
2
9.7600 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 737,727.46
9.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 47,500.00
1.8800 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 349,538.53
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
4.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 115,000.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 3,616,414.3
3,616,414.31
1

V2 AP 1 Bh Pekerjaan Ventilasi V2
3.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 596,513.46

2.7600 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 208,619.65


3.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 16,000.00
0.4000 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 74,369.90
2.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 94,842.00
1.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 28,750.00
1.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 54,095.25
Total Rp 1,073,190.2
1,073,190.26
6

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI GEDUNG MASJID


PJ1 AP 1 Bh Pekerjaan pintu PJ1
26.8400 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 5,003,256.6
5,003,256.61
1
11.4000 M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp 1,137,569.8
1,137,569.86
6
18.0000 M1 Pemasangan 1 m2 bingkai Jendela aluminium @ Rp. 75,586.83 Rp 1,360,562.9
1,360,562.94
4
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
6.4820 M2 Kaca bening 5 mm (Pintu +Jendela + ventilasi) @ Rp. 185,924.75 Rp 1,205,164.2
1,205,164.23
3
6.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 397,798.50
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
2.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 279,400.00
4.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 840,000.00
8.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 379,368.00
4.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 115,000.00
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
38.8400 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 194,200.00
Total Rp 11,632,759
11,632,759.64
.64

P2 AP 1 Bh Pekerjaan pintu P2
5.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 969,334.37
7.4000 M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp 738,422.54
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
- M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp -
1.0800 M2 Kaca bening 5 mm (Pintu + ventilasi) @ Rp. 185,924.75 Rp 200,798.73
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
- Bh Grendel Ventilasi @ Rp. 23,500.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp -
7.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 36,000.00
Total Rp 2,780,832.3
2,780,832.39
9

HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
32.7000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 6,095,621.8
6,095,621.88
8
32.9000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 2,486,806.7
2,486,806.71
1
45.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 227,500.00
7.8750 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 1,464,157.4
1,464,157.41
1
14.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 663,894.00
14.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 663,894.00
7.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 201,250.00
7.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 201,250.00
28.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 1,514,667.0
1,514,667.00
0
Total Rp 13,519,040
13,519,040.99
.99

J2 AP 1 Bh Pekerjaan jendela J2
3.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 596,513.46
0.4500 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 34,014.07
2.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 12,000.00
0.3200 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 59,495.92
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
1.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 28,750.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 933,805.95

V1 AP 1 Bh Pekerjaan Ventilasi V1
4.0000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 745,641.82
- M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp -
3.8000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 19,000.00
0.4400 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 81,806.89
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 846,448.71

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI GUDANG SEKAM


PJ1 AP 1 Bh Pekerjaan pintu PJ1
6.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,174,385.8
1,174,385.87
7
14.0000 M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp 1,397,015.6
1,397,015.62
2
- M1 Pemasangan 1 m2 bingkai Jendela aluminium @ Rp. 75,586.83 Rp -
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
3.1860 M2 Kaca bening 5 mm (Pintu +Jendela + ventilasi) @ Rp. 185,924.75 Rp 592,356.25
6.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 397,798.50
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
2.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 279,400.00
2.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 420,000.00
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
14.3200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 71,600.00
Total Rp 4,620,233.7
4,620,233.74
4

HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
5.8500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,090,501.1
1,090,501.16
6
- M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp -
6.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 32,000.00
1.2800 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 237,983.68
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 1,360,484.8
1,360,484.84
4

J2 AP 1 Bh Pekerjaan jendela J2
8.1000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,509,924.6
1,509,924.69
9
- M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp -
12.6000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 63,000.00
4.8600 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 903,594.29
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 2,476,518.9
2,476,518.97
7

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI GEDUNG WORKSHOP


PJ1 AP 1 Bh Pekerjaan pintu PJ1
5.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 987,975.41
- M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp -
- M1 Pemasangan 1 m2 bingkai Jendela aluminium @ Rp. 75,586.83 Rp -
2.1000 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,940,359.5
1,940,359.58
8
0.1800 M2 Kaca bening 5 mm (Pintu +Jendela + ventilasi) @ Rp. 185,924.75 Rp 33,466.46
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
2.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 11,000.00
Total Rp 3,809,078.1
3,809,078.19
9

HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
10.3500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,929,348.2
1,929,348.21
1
7.8000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 589,577.27
8.6000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 43,000.00
1.9750 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 367,201.38
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
4.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
2.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 57,500.00
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
Total Rp 3,856,256.8
3,856,256.86
6

V1 AP 1 Bh Pekerjaan Ventilasi V1
3.0000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 559,231.37
1.4400 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 108,845.04
2.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 11,000.00
0.2400 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 44,621.94
2.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 94,842.00
1.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 28,750.00
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 955,480.84

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI RUMAH DOSEN


PJ1 AP 1 Bh Pekerjaan pintu PJ1
19.6500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 3,662,965.4
3,662,965.44
4
- M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp -
- M1 Pemasangan 1 m2 bingkai Jendela aluminium @ Rp. 75,586.83 Rp -
2.5200 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 2,328,431.4
2,328,431.49
9
2.5100 M2 Kaca bening 5 mm (Pintu +Jendela + ventilasi) @ Rp. 185,924.75 Rp 466,671.12
6.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 397,798.50
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
2.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 279,400.00
2.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 420,000.00
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
18.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 91,000.00
Total Rp 7,933,944.0
7,933,944.05
5

PJ2 AP 1 Bh Pekerjaan pintu P2


8.1000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,509,924.6
1,509,924.69
9
- M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp -
1.8900 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,746,323.6
1,746,323.62
2
- M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp -
0.3600 M2 Kaca bening 5 mm (Pintu + ventilasi) @ Rp. 185,924.75 Rp 66,932.91
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
- Bh Grendel Ventilasi @ Rp. 23,500.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp -
4.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 22,000.00
Total Rp 4,181,457.9
4,181,457.96
6

P3 AP 1 Bh Pekerjaan pintu P3
5.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 987,975.41
1.8900 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,746,323.6
1,746,323.62
2
- M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp -
0.0900 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 16,733.23
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
- Bh Grendel Ventilasi @ Rp. 23,500.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp -
2.0000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 10,000.00

Total Rp 3,597,309.0
3,597,309.01
1
P4 AP 1 Bh Pekerjaan pintu P3
5.1500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 960,013.84
1.5750 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 186,410.46 Rp 293,596.47
- M1 Bingkai Ventilasi aluminium @ Rp. 923,980.75 Rp -
0.0900 M2 Kaca bening 5 mm (ventilasi) @ Rp. 75,586.83 Rp 6,802.81
3.0000 Bh Engsel Pintu @ Rp. 185,924.75 Rp 557,774.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 66,299.75 Rp 66,299.75
1.0000 Bh Grendel pintu tanam @ Rp. 287,677.50 Rp 287,677.50
1.0000 Set pegangan pintu @ Rp. 139,700.00 Rp 139,700.00
- Bh Grendel Ventilasi @ Rp. 210,000.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 23,500.00 Rp -
2.0000 M1 Karet putih pelapis kaca @ Rp. 54,095.25 Rp 108,190.50
Total Rp 2,420,055.1
2,420,055.12
2

HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
17.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 3,224,900.8
3,224,900.87
7
11.1000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 839,013.81
21.6000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 108,000.00
3.8750 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 720,458.41
6.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 284,526.00
6.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 284,526.00
3.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 86,250.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total Rp 5,872,246.5
5,872,246.59
9

J2 AP 1 Bh Pekerjaan jendela J2
10.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,957,309.7
1,957,309.78
8
9.3000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 702,957.52
8.1000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 40,500.00
0.6900 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 128,288.08
6.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 284,526.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
3.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 86,250.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total Rp 3,524,402.8
3,524,402.87
7

J3 AP 1 Bh Pekerjaan jendela J3
9.4000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,752,258.2
1,752,258.28
8
1.1000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 83,145.51
8.8000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 44,000.00
1.1000 M2 Kaca bening 5 mm (Jendela) @ Rp. 185,924.75 Rp 204,517.23
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 2,547,486.0
2,547,486.02
2
V1 AP 1 Bh Pekerjaan Ventilasi V1
3.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 652,436.59
- M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp -
3.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 16,000.00
0.3000 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 55,777.43
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 724,214.02

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI GEDUNG KELAS LAPANGAN


P1 AP 1 Bh Pekerjaan pintu PJ1
5.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,025,257.5
1,025,257.50
0
1.9800 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,829,481.8
1,829,481.89
9
0.3225 M2 Kaca bening 5 mm (Pintu +Jendela + ventilasi) @ Rp. 185,924.75 Rp 59,960.73
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
2.0000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 10,000.00
Total Rp 3,760,976.8
3,760,976.87
7

HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
5.9000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,099,821.6
1,099,821.68
8
6.4000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 483,755.71
6.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 32,000.00
0.7448 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 138,476.75
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 2,217,619.1
2,217,619.15
5
V1 AP 1 Bh Pekerjaan Ventilasi V1
2.8000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 521,949.27
2.8000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 14,000.00
0.2700 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 50,199.68
Total Rp 586,148.96

V2 AP 1 Bh Pekerjaan Ventilasi V2
3.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 652,436.59
3.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 17,500.00
0.3000 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 55,777.43
Total Rp 725,714.02

HARGA SATUAN PEKERJAAN PINTU

1 PEKERJAAN PINTU, JENDELA DAN VENTILASI AULA


P1 AP 1 Bh Pekerjaan pintu PJ1
- M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp -
- M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp -
- M1 Pemasangan 1 m2 bingkai Jendela aluminium @ Rp. 75,586.83 Rp -
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
- M2 Kaca bening 5 mm (Pintu +Jendela + ventilasi) @ Rp. 185,924.75 Rp -
3.9420 M2 Kaca bening 12 mm Tempered Glass @ Rp. 1,502,025.
1,502,025.25
25 Rp 5,920,983.5
5,920,983.54
4
4.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 265,199.00
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
2.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 420,000.00
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp -
Total Rp 7,033,560.0
7,033,560.04
4

PJ2 AP 1 Bh Pekerjaan pintu P2


10.2300 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,906,978.9
1,906,978.95
5
9.2000 M1 Pemasangan 1 m' bingkai pintu aluminium @ Rp. 99,786.83 Rp 918,038.84
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
6.0000 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 453,520.98
3.5658 M2 Kaca bening 5 mm (Pintu + ventilasi) @ Rp. 185,924.75 Rp 662,970.47
6.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 397,798.50
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
2.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 279,400.00
2.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 420,000.00
2.0000 Bh Grendel Ventilasi @ Rp. 23,500.00 Rp 47,000.00
4.0000 Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp 216,381.00
15.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 76,000.00
Total Rp 5,665,766.2
5,665,766.24
4

PJ3 AP 1 Bh Pekerjaan pintu P3


7.0800 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,319,786.0
1,319,786.02
2
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
6.0000 M1 Pemasangan 1 m' bingkai pintu aluminium @ Rp. 99,786.83 Rp 598,720.98
2.5000 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 188,967.08
3.2984 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 613,254.20
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00

1.0000 Bh Grendel Ventilasi @ Rp. 23,500.00 Rp 23,500.00


2.0000 Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp 108,190.50
8.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 42,500.00
Total Rp 3,826,037.5
3,826,037.52
2
P4 AP 1 Bh Pekerjaan pintu P3
5.2700 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 982,383.10
1.7010 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 186,410.46 Rp 317,084.18
- M1 Bingkai Ventilasi aluminium @ Rp. 923,980.75 Rp -
0.1800 M2 Kaca bening 5 mm (ventilasi) @ Rp. 75,586.83 Rp 13,605.63
3.0000 Bh Engsel Pintu @ Rp. 185,924.75 Rp 557,774.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 66,299.75 Rp 66,299.75
1.0000 Bh Grendel pintu tanam @ Rp. 287,677.50 Rp 287,677.50
1.0000 Set pegangan pintu @ Rp. 139,700.00 Rp 139,700.00
- Bh Grendel Ventilasi @ Rp. 210,000.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 23,500.00 Rp -
2.2000 M1 Karet putih pelapis kaca @ Rp. 54,095.25 Rp 119,009.55

Total Rp 2,483,533.9
2,483,533.96
6
HARGA SATUAN PEKERJAAN JENDELA

J1 AP 1 Bh Pekerjaan jendela J1
3.9420 M2 Kaca bening 12 mm Tempered Glass @ Rp. 1,502,025.
1,502,025.25
25 Rp 5,920,983.5
5,920,983.54
4
Total Rp 5,920,983.5
5,920,983.54
4

J2 AP 1 Bh Pekerjaan jendela J2
23.1300 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 4,311,673.8
4,311,673.82
2
6.7100 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 507,187.63
23.1300 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 115,650.00
6.1450 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 1,142,507.5
1,142,507.59
9
8.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 379,368.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
4.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 115,000.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
Total Rp 7,004,149.0
7,004,149.04
4

J3 AP 1 Bh Pekerjaan jendela J3
28.0000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 5,219,492.7
5,219,492.74
4
6.6800 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 504,920.02
28.0000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 140,000.00
6.1450 M2 Kaca bening 5 mm (Jendela) @ Rp. 185,924.75 Rp 1,142,507.5
1,142,507.59
9
8.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 379,368.00
4.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 115,000.00
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
Total Rp 7,934,050.3
7,934,050.35
5

J4 AP 1 Bh Pekerjaan jendela J4
5.9000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,099,821.6
1,099,821.68
8
3.7600 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 284,206.48
5.9000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 29,500.00
1.4903 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 277,083.65
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
1.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 28,750.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 1,922,394.3
1,922,394.32
2

J5 AP 1 Bh Pekerjaan jendela J5
5.9000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,099,821.6
1,099,821.68
8
3.7600 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 284,206.48
5.9000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 29,500.00
0.9187 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 170,809.07
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
1.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 28,750.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 1,816,119.7
1,816,119.73
3

V1 AP 1 Bh Pekerjaan Ventilasi V1
2.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 410,103.00
1.5200 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 114,891.98
1.5200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 7,600.00
0.1011 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 18,796.99
2.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 94,842.00
1.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 28,750.00
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 783,174.47

HARGA SATUAN PEKERJAAN JENDELA

1. An J1 1 Bh Pekerjaan jendela J1
18.0500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 3,364,708.
3,364,708.71
71
13.2400 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,321,177.
1,321,177.63
63
18.05
.0500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
1.7200 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 832,286.07
2.0000 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 371,849.50
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total #REF!

2. An. J2 1 Bh Pekerjaan jendela J2


18.3500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 3,420,631.
3,420,631.85
85
13.4400 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,341,135.
1,341,135.00
00
18.35
.3500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
1.8600 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 900,030.29
2.0200 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 375,568.00
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total #REF!

3. An. J3 1 Bh Pekerjaan jendela J3


14.3500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 2,674,990.
2,674,990.03
03
12.4400 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,241,348.
1,241,348.17
17
14.35
.3500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.9400 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 454,854.02
1.8400 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 342,101.54
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
6.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 284,526.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
3.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
5.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 270,476.25
Total #REF!

4. An. J4 1 Bh Pekerjaan jendela J4


5.3000 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 987,975.41
4.8600 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 484,963.99
5.3000 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.5700 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 105,977.11
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
2.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 94,842.00
1.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
1.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total #REF!

5. An J5 1 Bh Pekerjaan jendela J5
20.2500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 3,774,811.
3,774,811.71
71
16.9600 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,692,384.
1,692,384.64
64
20.25
.2500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
2.3800 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 1,151,651.
1,151,651.66
66
2.3780 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 442,129.06
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total #REF!

6. An. J6 1 Bh Pekerjaan jendela J6


9.3000 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 1,733,617.
1,733,617.23
23
10.3200 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,029,800.
1,029,800.09
09
9.3000 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
1.2600 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 234,265.19
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
4.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
2.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total #REF!

7. An. J7 1 Bh Pekerjaan jendela J7


7.7000 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 1,435,360.
1,435,360.50
50
5.7600 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 574,772.14
7.7000 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
2.2200 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 412,752.95
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
4.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
2.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total #REF!

8. An. J8 1 Bh Pekerjaan jendela J8


17.7500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 3,308,785.
3,308,785.58
58
14.9600 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,492,810.
1,492,810.98
98
17.75
.7500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
1.7400 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 841,963.82
1.8780 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 349,166.68
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total #REF!

9. An. V1 1 Bh Pekerjaan Ventilasi V1


8.5500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 1,593,809.
1,593,809.39
39
8.1600 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 814,260.53
8.5500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.7600 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 141,302.81
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00

Total #REF!
10. An. V2 1 Bh Pekerjaan Ventilasi V2
7.1500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 1,332,834.
1,332,834.75
75
6.7200 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 670,567.50
7.1500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.5200 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 96,680.87
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total #REF!
11. An. V3 1 Bh Pekerjaan Ventilasi V3
2.5600 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 477,210.76
2.5600 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.7600 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 141,302.81
Total #REF!

12. An. V4 1 Bh Pekerjaan Ventilasi V4


2.5100 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 467,890.24
2.5100 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.7600 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 141,302.81
Total #REF!

13. An. V5 1 Bh Pekerjaan Ventilasi V5


6.9900 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 1,303,009.
1,303,009.08
08
6.9900 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
1.4800 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 275,168.63
Total #REF!

HARGA SATUAN PEKERJAAN PAVING BLOK

Memasang 1 m2 Paving
Paving blok T = 8 cm K - 300
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerj
rja
a OH 0.
0.30
3000
00 75
75,0
,000
00.0
.00
0 22
22,5
,500
00.0
.00
0
Tuka
Tukang
ng Ba
Batu
tu OH 0.
0.10
1000
00 90
90,0
,000
00.0
.00
0 9,00
9,000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.
0.01
0100
00 95
95,0
,000
00.0
.00
0 95
950.
0.00
00
Ma
Mand
ndor
or OH 0.
0.01
0150
50 10
105,
5,00
000.
0.00
00 1,57
1,575.
5.00
00
JUMLAH TENAGA KERJA 34,025.00
B BAHAN
Paving blok T = 8 cm Bh 50.000 2,700.00 135,000.00
Pasir urug m3 0.070 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (10 %) 10% XD #REF!
F Harga Satuan Pekerjaaan (D+E) #REF!

Memasang 1 m1 Pasang Kansteen


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerj
rja
a OH 0.
0.30
3000
00 75
75,0
,000
00.0
.00
0 22
22,5
,500
00.0
.00
0
Tuka
Tukang
ng Ba
Batu
tu OH 0.
0.10
1000
00 90
90,0
,000
00.0
.00
0 9,00
9,000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.
0.01
0100
00 95
95,0
,000
00.0
.00
0 95
950.
0.00
00
Ma
Mand
ndor
or OH 0.
0.01
0150
50 10
105,
5,00
000.
0.00
00 1,57
1,575.
5.00
00
JUMLAH TENAGA KERJA 34,025.00
B BAHAN
Kansteen uk. 10x25x40 cm K 250 Bh 2.500 28,600.00 71,500.00
Semen Portland kg 11.000 1,500.00 16,500.00
Pasir pasang M3 0.035 125,000.00 4,375.00
JUMLAH HARGA BAHAN 92,375.00
C PERALATAN 11
11
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 126,400.00


E Overhead & Profit (10 %) 10% XD 12,640.00
F Harga Satuan Pekerjaaan (D+E) 139,040.00