JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 71,6
71,600
00,6
,661
61.7
.74
4
II PEKERJAAN LANTAI SATU
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 85,289
85,289,188.
,188.88
88
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 167,98
167,981,535
1,535.41
.41
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 1,499,890,846.28
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 274,362,087.03
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 220,370,673.93
F PEKE
PEKERJAA
RJAAN
N INST
INSTALA
ALASI
SI LIST
LISTRIK
RIK Rp 33,021
33,021,608.
,608.75
75
G PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 50,062
50,062,547.
,547.57
57
H PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 73,181
73,181,083.
,083.25
25
I PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 177,75
177,757,231
7,231.94
.94
J PEKERJAAN
PEKERJAAN PENGECATAN
PENGECATAN Rp 88,745,599.59
Rp 2,670,662,402.63
III PEKERJAAN LA
LANTAI IIII
A PEKERJAAN
PEKERJAAN STRUKTUR BETON LANTAI II Rp 100,611,060.77
B PEKERJAAN
PEKERJAAN PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 292,483,206.05
C PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 223,789,732.12
D PEKERJAA
PEKERJAAN
N KONSTRUKSI ATAP Rp 228,872,143.78
E PEKE
PEKERJAA
RJAAN
N INST
INSTALA
ALASI
SI LIST
LISTRIK
RIK Rp 35,187
35,187,812.
,812.00
00
F PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 33,102
33,102,777.
,777.61
61
G PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 96,536
96,536,098.
,098.54
54
H PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 142,72
142,724,781
4,781.89
.89
I PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 97,405
97,405,802.
,802.73
73
J PEKERJAAN
PEKERJAAN TANGGA TRASRAM Rp 1,581,758.01
K PEKERJAA
PEKERJAAN
N SALURAN KELILING GEDUNG DAN RABAT KELILING BANGUNAN Rp 60,255,356.69
L PEKERJAA
PEKERJAAN
N FINI
FINISHIN
SHING
G Rp 213,85
213,858,762
8,762.40
.40
Rp 1,526,409,292.58
REAL COST (A) Rp 4,268
4,268,672,
,672,356.9
356.95
5
PPN 10% (B) Rp 426,8
426,867,23
67,235.70
5.70
TOTAL COST (A+B) Rp 4,695
4,695,539,
,539,592.6
592.65
5
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
MenyetujuKomitmen
ejabat Pembuat i: DibuatPerencana
Konsultan Oleh :
MPUS POLBANGTAN II GOWA CV. SUKMA LESTARI
Drs. JUHARI, M.Si ANJAS PRASETYA RUNTULALO,
IP. 19641231 1993303 1 002 Direktur
RENCANA ANGGARAN BIAYA ( RAB )
PROGRAM : #REF!
KEGIATAN : #REF!
LOKASI : #REF!
SUMBER DANA : #REF!
TAHUN ANGGARA: #REF!
KODE ARGA
ARGA SAT
SATAUA
AUA JUMLAH
JUMLAH H
HARG
ARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
NALIS (RP) (RP)
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal Lapangan 1.000 Ls - 2,000,000.00 2,000,000.00
2 Pembongkaran dinding bangunan l 1.000 Ls - 8,000,000.00 8,000,000.00
3 Pembuatan Gudang dan Peralatan 1.000 Ls - 2,500,000.00 2,500,000.00
4 Pengukuran dan Pemasangan Bou 1.000 Ls - 1,000,000.00 1,000,000.00
5 Papan Nama Proyek 1.000 Ls - 150,000.00 150,000.00
PEKERJAAN PERSIAPAN MLAH A Rp 13,650,000.00
REAL COST ###
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : RENCANA PEMBANGUNAN SARANA DAN PRASARANA KAMPUS II POLBANGTAN GOWA
KODE ARGA
ARGA SA
SATA
TAUA
UA JUM
JUMLAH
LAH HARGA
HARGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I
1 PEKE
PE
PenKERJ
RJAA
gu kurAAN
an NdaP
PEM
nEMBE
PeBENT
maNTUK
sanUKAN
ganAN
BoLA
LAHA
uwHAN
planNk 88.00 M' - Rp 40,463.94 Rp
Rp 3
3,,560,826.72
2 Men
Mengup
gupas
as tan
tanah
ah da
dan
n pemb
pembers
ersiha
ihan
n semak
semak (Land
(Land Clea
Clearin
ring)
g) 525.00 M 2
- Rp 1,887.84 Rp 991,114.90
3 Galian Tanah dan Pembuangan (Cut dan Fill) 630.00 M 3
- Rp 104,839.24 Rp 66,048,720.12
4 Air Kerja 1.00 Ls - Rp 500,000.00 Rp 500,000.00
5 Listrik Kerja 1.00 Ls - Rp 500,000.00 Rp 500,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN LANT
LANTAI
AI SATU
SATU
A PEKE
PEKERJ RJAA
AANN TA
TANA
NAHH DA
DANN PA
PASI
SIR
R
1 Pekerjaan Galian Tanah Pondasi Garis 306.02 M3 A.2.3.1.1 Rp 84,562.50 Rp 25,877,393.44
2 Pekerjaan Galian Tanah Pondasi Poer P1 89.10 M 3
A.2.3.1.1 Rp 84,562.50 Rp 7
7,,534,518.75
3
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 112.88 M A.2.3.1.9 Rp 61,875.00 Rp 6,984,140.63
3
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 44.55 M A.2.3.1.9 Rp 61,875.00 Rp 2,756,531.25
5 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 13.95 M3 A.2.3.1.11 Rp 238,425.00 Rp 3,326,624.81
6 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 2.70 M3 A.2.3.1.11 Rp 238,425.00 Rp 643,747.50
7 Pekerjaan timbunan tanah bawah lantai T = 45 cm 172.80 M 3
A.2.3.1.15 Rp 176,137.50 Rp 30,436,560.00
3
8 Pekerjaan pemadatan tanah per 20 cm 124.92 M A.2.3.1.10 Rp
Rp 61,875.00 Rp 7,729,672.50
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PE
PEKE
KERJ
RJAA
AANN PON
PONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 55.81 M3 A.3.2.1.9 Rp 530,369.40 Rp 29,599,916.21
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 153.60 M 3
A.3.2.1.2 R
Rp
p 900,922.00 ###
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAA
AANN STRU
STRUKTU
KTUR R BETON
BETON DADANN RABA
RABAT T
PEKERJAAN PONDASI POER
1 Pe
Peke
kerj
rjaa
aan
n Po
Pond
ndas
asii Po
Poer
er P
P1
1 ( 130
130 x 13
130
0)
- Lantai Kerja Poer K100 2.70 M3 A.A.4.1.1.4 Rp1,071,694.71 Rp 2,
2 ,893,575.71
3
- Beton K250 12.17 M . A.4.1.1.8 Rp1,315,511.11 Rp 16,007,139.22
- Pembesian 1,600.34 Kg A.4.1.1.17 Rp 19,789.40 Rp 31,669,670.17
- Bekisting 18.72 M2 A.4.1.1.20 Rp 215,718.80 Rp 4,038,255.94
PEKERJAAN STEK KOLOM
1 Pe
Peke
kerj
rjaa
aann St
Stek
ek K
Kol
olom
om K1
K1 ( 4
40
0x4
40
0)
- Beton K250 8.45 M3 . A.4.1.1.8 Rp1,315,511.11 Rp
R p 11,113,437.88
- Pembesian 1,128.76 Kg A.4.1.1.17 Rp 19,789.40 Rp 22,337,424.17
- Bekisting 42.24 M2 A.4.1.1.22 Rp 399,791.15 R
Rp
p 16,887,178.18
PEKERJAAN SLOOF
1 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S1 ( 25
25 x 30 )
- Beton K-225 15.00 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 19,541,233.97
- Pembesian 1,779.47 Kg A.4.1.1.17 Rp 19,789.40 Rp 35,214,549.43
- Bekisting 60.00 M2 A.4.1.1.21 Rp 229,468.80 R
Rp
p 13,768,128.00
2 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S2 ( 15
15 x 20 )
- Beton K-225 2.10 M3 . A.4.1.1.7 Rp1,302,748.93 Rp
Rp 2
2,,736,945.23
- Pembesian 351.84 Kg A.4.1.1.17 Rp 19,789.40 Rp 6,962,606.14
- Bekisting 14.01 M2 A.4.1.1.21 Rp 229,468.80 Rp 3,213,940.01
3 Pe
Peke
kerj
rjaa
aannSSlo
loof
of S4 ( 15
15 x 15 )
- Beton K-225 0.20 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 257,944.29
- Pembesian 44.21 Kg A.4.1.1.17 Rp 19
19,789.40 Rp 874,924.09
- Bekisting 2.64 M2 A.4.1.1.21 Rp 229,468.80 Rp 605,797.63
PEKERJAAN KOLOM
1 Pek
Pek.. Kol
Kolom
om K1 ( 40 x 40 ) Pem
Pembun
bungku
gkus
s Baj
Baja
a H -B
-BEAM
EAM 300.
300.300.
300.10.1
10.15
5
- Beton K-225 13.50 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 17,590,237.17
- Pembesian 148.99 Kg A.4.1.1.17 Rp 19,789.40 Rp 2,948,461.69
- Bekisting 100.88 M2 A.4.1.1.22 Rp 399,791.15 Rp 40,330,931.21
2 Pekerjaan Kolom Praktis Kp ( 11 x 11 ) 201.76 M' A.4.1.1.35 Rp 121,138.82 Rp 24,440,968.32
PEKERJAAN BALOK
1 Peker
Pekerjaan
jaan Balok B1 ( 30 x 50 ) Pembun
Pembungkus
gkus Baja IWF 400.200.8
400.200.8.13
.13
- Beton K-225 13.20 M3 . A.4.1.1.7 Rp1,302,748.93 Rp 17,196,285.89
- Pembesian 949.63 Kg A.4.1.1.17 Rp 19,789.40 Rp 18,792,544.91
- Bekisting 0.53 M2 A.4.1.1.23 Rp 412,454.90 Rp 217,776.19
KODE ARG
ARGA
A SAT
SATAUA
AUA JUMLAH
JUMLAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
2 Pe
Peke
kerj
rjaa
aan
nBBal
alok
ok B2 (1
(15
5 x 20 )
- Beton K-225 1.06 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 1
1,,375,702.87
- Pembesian 176.85 Kg A.4.1.1.17 Rp 19,789.40 Rp 3,499,696.36
- Bekisting 19.36 M2 A.4.1.1.23 Rp 412,454.90 Rp 7,985,126.86
PEKERJAAN BALOK LATEY
1 Pek
Pekerj
erjaan
aan Bal
Balok
ok Late
Latey
y BL1
BL1 (1
(12
2 x 20)
20) di atas
atas J1
J1
- Beton K-225 1.37 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 1
1,,788,413.73
- Pembesian 287.38 Kg A.4.1.1.17 Rp 19,789.40 Rp 5,687,006.58
- Bekisting 29.74 M2 A.4.1.1.23 Rp 412,454.90 Rp 12,268,058.55
2 Pekerjaan Balok Latey BL2 (10 x 15) di atas Pintu 46.86 M' A.4.1.1.36 Rp 144,219.35 Rp 6,758,118.74
PEKERJAAN PLAT LANTAI
1 Pla
Platt Lanta
Lantaii St
Steel
eel F
Floo
loorr Decki
Decking
ng/Bo
/Bond
ndek
ek
- Beton K-225 40.64 M3 A.4.1.1.17 R
Rpp1,302,748.93 Rp 52,947,207.94
- Pembesian Wire Mash M-10 2,956.35 kg A.4.1.1.19 R
Rpp 18,182.53 Rp 53,753,835.05
- St
Stee
eell oor
oor Decki
eckin
ng t = 0.7
.75
5 mm (Bon
Bonde
dek
k Gal
alv
vanis
anis)) 328
28.7
.77
7 M2 A.4.1
.4.1.1
.1.1
.19a
9a Rp 342
42,5
,55
51.0
1.00 ###
2 Pla
Platt Lant
Lantai
ai Bet
Beton
on (Lant
(Lantai
ai KM/W
KM/WC)
C)
- Beton K-225 4.88 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 6,356,372.59
- Pembesian 400.16 Kg A.4.1.1.17 Rp 19,789.40 Rp 7,918,924.70
- Bekisting 24.60 M2 A.4.1.1.24 Rp 500,991.15 Rp 12,324,382.29
PLAT TANGGA BETON
1 Pe
Peke
kerj
rjaa
aann Pla
Platt Tan
Tangg
gga
a
- Beton K-225 2.92 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 3,801,317.16
- Pembesian 296.66 Kg A.4.1.1.17 Rp 19,789.40 Rp 5,870,627.23
- Bekisting 15.72 M2 A.4.1.1.24 Rp 500,991.15 Rp 7,874,578.90
PEKERJAAN PLAT KANOPI
1 Peker
Pekerjaan
jaan Plat Kanop
Kanopii (Su
(Sunscr
nscreen
een J1 + Roster
Roster + Venti
Ventilasi)
lasi) T = 8 cm
- Beton K-225 1.83 M3 A.4.1.1.17 Rp1,302,748.93 Rp 2,384,551.64
3 Pek
Pekerja
erjaan
an Pasan
asang
gan Pipa
ipa Pem
emas
asu
uka
kan
n Air Be
Berrsi
sih
h dia.
ia. 3/
3/4
4" 60
60.0
.00
0 M A.5.1
.5.1.1
.1 26 Rp 25
25,9
,97
77.60
7.60 Rp 1,55
,558,65
8,656.
6.0
00
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 6.00 Bh A.5.1.1 19a Rp 325,121.50 Rp 1,950,729.00
2 Pekerjaan Pasangan Kran Air 12.00 Bh A.5.1.1 19 Rp 97,696.50 Rp 1
1,,172,358.00
3 Pe
Peke
kerj
rjaa
aan
n Pasa
Pasang
ngan
an Fl
Floo
oorr Drai
Drain
n 14.0
14.00
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,20
203.
3.50
50 Rp 1,69
1,696,
6,84
849.
9.00
00
4 Pek
Pekerj
erjaan
aan Pas
Pasang
angan
an Tem
Tempat
pat Sab
Sabun
un 6.0
6.00
0 Bh A.5
A.5.1.
.1.1
1 14a Rp 68,67
68,678.5
8.50
0 Rp 412
412,07
,071.0
1.00
0
5 Pekerjaan Pipa Saluran Air Hujan 4" 18.00 M' A.5.1.1 36 R
Rpp 168,744.55 Rp 3,037,401.93
6 Pekerjaan Pembuatan Septick Tank + Peresapan 2.00 Unit A.5.1.1 33 Rp6,636,464.01 Rp 13,272,928.03
PEKERJAAN SANITASI MLAH 7 ###
H PE
PEKE
KERJ
RJAA
AAN
N PL
PLAF
AFON
ONDD
PEKERJAAN RANGKA PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Rang
Rangka
ka Pl
Plaf
afon
ond
d Alu
Alumini
miniu
um Holl
Hollow
ow 2/ 343.
343.90
90 M2 A.4.
A.4.2.
2.1.
1.21
21 Rp 130,
130,27
278.
8.50
50 Rp 44,8
44,802
02,7
,776
76.1
.15
5
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 312.90 M 2
A.4.5.1.7 Rp 53,658.00 Rp 16,789,588.20
3 Pekerjaan Pasangan Plafond Kalsiboard T. 3,5 mm 31.00 M 2
A.4.5.1.7a Rp 48,853.20 Rp 1,514,449.20
4 Pekerjaan Pasangan List Plafond Gypsumboard 376.89 M1 A.4.5.1.7b Rp 26,730.00 Rp 10,074,269.70
PEKERJAAN PLAFOND MLAH 8 ###
I PEK
PEKERJA
ERJAAAN LAN
LANTAI
TAI
PEKERJAAN URUGAN DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 17.55 M3 A.2.3.1.11 Rp 238,425.00 Rp 4,184,239.54
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 17.55 M 3
A.A.4.1.1.1 Rp1,081,510.75 Rp 18,979,972.88
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 271.64 M2 A.4.4.3.13 Rp 327,443.60 Rp 88,946,779.50
1
2 Plint homogenius tile 10 x 60 cm 145.05 M A.4.4.3.28 R
Rp
p 67,763.87 Rp 9,
9 ,829,149.10
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
1 Pek
Pekerja
erjaan
an Lanta
antaii Keram
eramiik (40
40//40
40)) 54
54.51 M2
.51 A.4.4
.4.4.3
.3.4
.4 Rp 162
62,2
,21
16.78
6.78 Rp 8,84
,842,43
2,436.
6.6
68
1
2 Pekerjaan Plint Dinding Tile (10/40) 45.04 M A.4.4.3.29 Rp
Rp 48,720.98 Rp 2,194,392.94
3 Pekerjaan Lantai Keramik Km/Wc (20/20) Unpolished .84 M
24.84 2
A.4.
.4.4.3.6 Rp 148,25
,252.52 Rp 3,682,592.65
4 Pe
Pek.
k. Dind
Dindin
ing
g Kera
Kerami
mik
k Wa
Warn
rna
a Km/W
Km/Wc
c (2
(20/
0/25
25)) 11
114.
4.70
70 M 2
A.
A.4.
4.4.
4.3.
3.54
54a
a Rp 293,
293,98
983.
3.58
58 Rp 33,7
33,718
18,7
,740
40.6
.69
9
PEKERJAAN LANTAI TANGGA
1 Mema
Memasa
sang
ng lant
lantai
ai hom
omog
ogen
eniu
ius
s ti
tile
le 30 x 60 cm + step
step nois
nois 23.09 M2 A.4.
23.09 A.4.4.
4.3.
3.24
24b
b Rp 319,
319,62
627.
7.83
83 Rp 7,37
7,378,
8,92
927.
7.97
97
PEKERJAAN LANTAI JUMLAH 9 ###
J PEKERJAAN PENGECATAN
PENGECATAN
PEKERJAAN PENGECATAN DINDIN
DINDING
G DAN KOL
KOLOM
OM
1 Pe
Peke
kerj
rjaa
aan
n Pe
Pen
ngeca
gecata
tan
n Di
Din
nding
ding 1,28
1,282.
2.75
75 M2 A.4.
A.4.7.
7.1.
1.10
10 Rp 54,0
54,013
13.5
.58
8 Rp 69,2
69,286
86,0
,021
21.3
.36
6
2 Pekerjaan Pengecatan Dinding Kolom 60.53 M 2
A.4.7.1.10 R
Rp
p 54,013.58 Rp 3,
3 ,269,333.67
PEKERJAAN PENGECATAN PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pe
Pen
ngeca
gecata
tan
n Pl
Plaf
afon
ond
d da
dan
n Li
List
st 343.90 M2
343.90 A.4
.4.7
.7.1
.1.5
.5 Rp 47,0
47,078
78.3
.35
5 Rp 16,1
16,190
90,2
,244
44.5
.57
7
PEKERJAAN PENGECATAN JUMLAH 10 ###
KODE ARGA
ARGA SAT
SATAU
AUA
A JUMLAH
JUMLAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
III PE
PEKE
KERJRJAA
AAN
N L
LAN
ANTA
TAII IIII
A PEKERJ
PEKERJAAN
AAN STR
STRUKT
UKTURUR BETO
BETON
N LANTA
LANTAII II
PEKERJAAN KOLOM BETON
1 Pek.
Pek. Ko
Kolo
lom
mKK2
2 ( 25 x 25
25 )
- Beton K-225 3.80 M3 . A.4.1.1.7 Rp1,302,748.93 R
Rpp 4,
4,950,445.94
2
- Bekisting 30.40 M A.4.1.1.22 Rp 399,791.15 Rp 12,153,650.96
2 Pe
Peke
kerj
rjaa
aann Kolo
Kolom
m Pr
Prak
akti
tis
s Kp ( 11 x 11 ) 22
228.
8.00
00 M' A.
A.4.
4.1.
1.1.
1.35
35 Rp 121,
121,13
138.
8.82
82 Rp 27,6
27,619
19,6
,650
50.9
.96
6
PEKERJAAN BALOK LATEY
1 Pek
Pekerj
erjaan
aan Balok
Balok Late
Latey
y BL1
BL1 (1
(122 x 20)
20) di atas
atas J1
- Beton K-225 1.57 M3 . A.4.1.1.7 Rp1,302,748.93 R
Rpp 2,
2,041,668.13
- Pembesian 328.07 Kg A.4.1.1.17 Rp 19,789.40 Rp 6,492,334.44
- Bekisting 16.98 M2 A.4.1.1.23 Rp 412,454.90 Rp 7,002,659.29
2 Pekerjaan Balok Latey BL2 (10 x 15) di atas Pintu 46.86 M' A.4.1.1.36 Rp 144,219.35 Rp 6,758,118.74
PEKERJAAN RINGBALK BETON
1 Pe
Peke
kerj
rjaa
aann Ring
RingBa
Balk
lk RB1
RB1 ((15
15 x 20 )
- Beton K-225 6.88 M3 . A.4.1.1.7 Rp1,302,748.93 R
Rpp 8,
8,965,518.15
- Pembesian 1,152.52 Kg A.4.1.1.17 Rp 19,789.40 R
Rpp 22,807,680.25
- Bekisting 45.88 M2 A.4.1.1.23 Rp 412,454.90 Rp 18,923,430.81
PEKERJAAN RINGBALK BETON MLAH 1 ###
B PEK
PEKERJ
ERJAAN
AAN PAS
PASANG
ANGAN
AN & P
PLES
LESTER
TERAN
AN D
DIND
INDING
ING
PEK. DINDING BATA RINGAN
1 Pek
eker
erja
jaan
an Pas
asan
ang
gan Dindi
indin
ng Ba
Bata
ta Ri
Rin
nga
gan
n 100 x 20
200
0x6 729.62 M2 A. 4.4.1
29.62 .4.1.2
.26
6 Rp 205
205,3
,35
57.
7.08
08 ###
2 Pekerjaan plesteran semen instan 1,282.75 M2
A.4.4.2.28 R
Rpp 65,097.54 Rp 83,504,001.77
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Pekerjaan Acian semen instan 1,282.75 M2 A.4.4.2.29 Rp
Rp 44,031.76 Rp 56,481,831.41
2 Pekerjaan Acian instan pada Kolom 60.53 M 2
A.4.4.2.29 R
Rp
p 44,031.76 Rp 2
2,,665,154.52
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 2 ###
C PEKERJAAN
PEKERJAAN KUSE
KUSEN N PINTU
PINTU,, JENDEL
JENDELA
A DAN VENT
VENTILASI
ILASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Pekeker
erja
jaan
an Pintu
intu P2 12.00 Bh P2 AP Rp5,856,119.33 Rp 70,273,432.01
2 Pekeker
erja
jaan
an Pintu
intu P3 12.00 Bh P3 AP Rp4,667,575.18 Rp 56,010,902.11
3 Pekeker
erja
jaan
an Pintu
intu P4 2.00 Bh P4 AP Rp3,495,884.07 Rp 6,991,768.14
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a JJ1
1 11.00 Bh J1 AP Rp6,577,483.53 Rp 72,352,318.80
2 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a JJ2
2 2.00 Bh J2 AP Rp4,008,951.17 Rp 8,017,902.34
3 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a JJ3
3 1.00 Bh J3 AP Rp3,704,267.17 Rp 3,704,267.17
4 Pekerjaan Ventilasi V2 6.00 Bh V2 AP Rp1,073,190.26 Rp 6,439,141.54
KERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 3 ###
D PEPEKE
KERJ
RJAA
AANN KO
KONS
NSTRTRUK
UKSI
SI A
ATA
TAPP
1 Pekerjaan Kuda - Kuda Baja Ringan prol C 75 0.75 614.62 M2 A.4.5.2.BJ1 Rp 249,023.86 ###
2
2 Pekerjaan Pasangan Atap Spandek 0.35 mm 614.62 M A.4.5.2.SP Rp 94,593.24 Rp 58,138,894.10
3 Pekerjaan Pasangan Nok Spandek 21.00 M' A.4.5.2.NK R
Rpp 106,157.70 Rp 2,229,311.70
4 Pekerjaan Pasangan Jurai Atap 44.80 M' A.4.5.2.JA R
Rpp 97,884.50 R
Rpp 4,
4,385,225.60
5 Pekerjaan Pasangan Kalsiplank 95.68 M' A.4.5.2.KP Rp 115,632.00 Rp 11,063,669.76
PEKERJAAN KONSTRUKSI ATAP MLAH 4 ###
E PE
PEKE
KERJ
RJAA
AANN IN
INST
STAL
ALASASII LIS
LISTR
TRIK
IK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 44 Ttk A.4.7.2.A R
Rp
p 346,456.00 Rp 15,244,064.00
2 Pekerjaan Instalasi Stop Kontak 33 Ttk A.4.7.2.B Rp 372,856.00 Rp 12,304,248.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Down Light 3" SL. 9 Watt 29 Bh A.4.7.2.G Rp
Rp 148,761.25 Rp 4,314,076.25
2 Pasangan Lampu Down Light 3" SL. 5 Watt 14 Bh A.4.7.2.H Rp 98,161.25 Rp 1,374,257.50
3 Pasa
Pasang
ngan
an La
Lamp
mpu u TL LE
LEDD 2X
2X18
18 Watt
Watt 1 Bh A.
A.4.
4.7.
7.2.
2.F
F Rp 354,
354,46
461.
1.25
25 Rp 354,
354,46
461.
1.25
25
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 14 Bh A.4.7.2.C Rp 27,101.25 Rp 379,417.50
2 Pasangan Saklar Ganda 9 Bh A.4.7.2.D Rp 31,446.25 Rp 283,016.25
PEKERJAAN PASANGAN STOP KONTAK
1 Pasa
Pasang
ngan
an Stop
Stop Ko
Kont
ntak
ak 33 Bh A.
A.4.
4.7.
7.2.
2.E
E Rp 28,3
28,311
11.2
.25
5 Rp 934,
934,27
271.
1.25
25
PEKERJAAN INSTALASI LISTRIK MLAH 5 ###
F PEKE
PEKERJ
RJAA
AAN
N SANI
SANITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 3.00 Bh A.5.1.1.1a Rp3,669,069.78 Rp 11,007,209.33
2 Pas
Pas.. Kloset
Kloset Jongko
Jongkok
k Ex.TOT
Ex.TOTO/
O/KIA
KIA 3.00
3.00 Bh A.5.1.
A.5.1.1
12 Rp 801,77
801,779.0
9.00
0 Rp 2,405,
2,405,337
337.00
.00
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 6.00 Bh A.5.1.1 5 Rp 9
9884,933.40 Rp 5
5,,909,600.40
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 35.00 M1 A.5.1.1 32 Rp 95,830.35 Rp 3,354,062.25
1
2 Pek
eker
erja
jaan
an Pas
asan
ang
gan Pipa
ipa Pem
emb
buan
ang
gan Air Kot
otor
or dia.
dia. 3" 50.00 M
50.00 A.5.1
.5.1.1
.1 31 Rp 85,7
85,70
06.
6.91
91 Rp 4,285
,285,3
,34
45.
5.63
63
3 Pek
eker
erja
jaan
an Pas
asan
ang
gan Pipa
ipa Pem
emas
asu
uka
kan
n Air Bers
ersih dia.
dia. 3/
3/4
4" 35.00 M1
35.00 A.5.1
.5.1.1
.1 26 Rp 25,9
25,97
77.
7.60
60 Rp 909,2
09,21
16.
6.00
00
KODE ARGA
ARGA SAT
SATAUA
AUA JUM
JUMLAH
LAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 6.00 Bh A.5.1.1 19a Rp 325,121.50 Rp 1,950,729.00
2 Pekerjaan Pasangan Kran Air 12.00 Bh A.5.1.1 19 Rp 97,696.50 R
Rpp 1,
1,172,358.00
3 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Floo
Floorr Drai
Drain
n 14.0
14.00
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,20
203.
3.50
50 Rp 1,
1,69
696,
6,84
849.
9.00
00
4 Pek
Pekerj
erjaan
aan Pasan
Pasangan
gan Tem
Tempat
pat Sab
Sabun
un 6.0
6.00
0 Bh A.5
A.5.1.
.1.1
1 14a Rp 68,678
68,678.50
.50 Rp 412
412,07
,071.0
1.00
0
PEKERJAAN SANITASI MLAH 6 ###
G PEKE
PEKERJ
RJAA
AAN
N PLAF
PLAFON
ONDD
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pasa
Pasan
nga
gan
n Ra
Ran
ngka
gka Plaf
Plafon
ond
d Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2/ 446.
44 74 M2
6.74 A.
A.4.
4.2.
2.1.
1.21
21 Rp 130,
130,27
278.
8.50
50 Rp 58,2
58,200
00,6
,617
17.0
.09
9
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 323.60 M 2
A.4.5.1.7 Rp 53,658.00 Rp 17,363,728.80
2
3 Pekerjaan Pasangan Plafond Kalsiboard T. 3,5 mm 123.14 M A.4.5.1.7a Rp 48,853.20 Rp 6,015,783.05
4 Pekerjaan Pasangan List Plafond Gypsumboard 559.52 M 1
A.4.5.1.7b Rp 26,730.00 Rp 14,955,969.60
PEKERJAAN PLAFOND MLAH 7 ###
H PE
PEK
KERJA
ERJAAAN LA
LANNTAI
TAI
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 252.13 M2 A.4.4.3.13 Rp 327,443.60 Rp 82,558,354.87
2 Plint homogenius tile 10 x 60 cm 136.42 M 1
A.4.4.3.28 R
Rp
p 67,763.87 Rp 9
9,,244,346.92
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
1 Peke
Pekerj
rjaa
aan
n La
Lant
ntai
ai Kera
Kerami
mik
k (4
(40/
0/40
40)) 66.0
66 5 M2
.05 A.4.4
.4.4.3
.3.4
.4 Rp 162,
162,21
216.
6.78
78 Rp 10,7
10,714
14,4
,418
18.3
.32
2
2 Pekerjaan Plint Dinding Tile (10/40) 57.60 M1 A.4.4.3.29 Rp
Rp 48,720.98 Rp 2,806,328.45
3 Pekerjaan Lantai Keramik Km/Wc (20/20) Unpolished 24.84 M 2
A.4.
.4.4.3.6 Rp 148,252.52 Rp 3,682,59
,592.65
.65
4 Pe
Pek.
k. Dind
Dindin
ing
g Kera
Kerami
mik
k Warn
Warna
a Km
Km/W
/Wc
c (2
(20/
0/25
25)) 11
114.70 M
4.70 2
A.
A.4.
4.4.
4.3.
3.54
54a
a Rp 293,
293,98
983.
3.58
58 Rp 33,7
33,718
18,7
,740
40.6
.69
9
PEKERJAAN LANTAI JUMLAH 8 ###
I PEKE
PEKERJ
RJAA
AANN PENG
PENGEC
ECAT
ATAN
AN
PEKERJAAN PENGECATAN DIND
DINDING
ING DAN KOLOM
1 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Di
Din
nding
ding 1,28
1,282.75 M2
2.75 A.
A.4.
4.7.
7.1.
1.10
10 Rp 54,0
54,013
13.5
.58
8 Rp 69,2
69,286
86,0
,021
21.3
.36
6
2
2 Pekerjaan Pengecatan Dinding Kolom 60.53 M A.4.7.1.10 R
Rp
p 54,013.58 Rp 3
3,,269,333.67
PEKERJAAN PENGECATAN PLAFOND
1 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Plaf
Plafon
ond
d dan
dan List
List 446.
44 74 M2
6.74 A.4.7
.4.7.1
.1.5
.5 Rp 47,0
47,078
78.3
.35
5 Rp 21,0
21,031
31,7
,782
82.0
.08
8
PEKERJAAN WATERPROOFING
1 Pekerjaan Waterproong Dak Beton 24.84 M2 A.4.7.1.23 R
Rp
p 153,730.50 Rp 3,818,665.62
PEKERJAAN PENGECATAN JUMLAH 9 ###
J PEKERJAAN TANGGA
TANGGA TRASRAM
1 Pekerjaan Urugan Pasir 0.83 M3 A.2.3.1.11 Rp 238,425.00 Rp 197,558.96
2
2 Peke
Pekerj
rjaa
aan
n Pasa
Pasan
nga
gan
n Pond
Pondas
asii Tras
Trasra
ram
m dan
dan Sa
Salu
lura
ran
n 1 Pc : 4.00 M
4.00 A. 4.4.
4.4.1.
1.8
8 Rp 133,
133,27
276.
6.33
33 Rp 533,
533,10
105.
5.32
32
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 8.00 M 2
A.4.4.2.3 Rp 63,809.28 R
Rpp 510,474.27
4 Pekerjaan Urugan Tanah 0.83 M 3
A.2.3.1.15 Rp 176,137.50 Rp 145,947.53
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.18 M3 A.A.4.1.1.1 R
Rp
p1,081,510.75 Rp 194,671.93
PEKERJAAN TANGGA TRASRAM JUMLAH 10 Rp1,581,758.01
K PEKERJAAN
PEKERJAAN SALUR
SALURAN
AN KEL
KELILING
ILING G
GEDUNG
EDUNG DAN RA
RABAT
BAT KE
KELILING
LILING BANGU
BANGUNAN
NAN
1 Pekerjaan Galian Tanah Saluran 20.00 M3 A.2.3.1.1 Rp 84,562.50 R
Rpp 1,
1,691,250.00
2 Pekerjaan Urugan Pasir Saluran 2.50 M 3
A.2.3.1.11 Rp 2
23
38,425.00 R
Rpp 596,062.50
3 Pekerjaan Beton Rabat Saluran T = 5 cm 2.50 M 3
A.A.4.1.1.1 R
Rp
p1,081,510.75 Rp 2,703,776.87
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,4 M 80.00 M2 A. 4.4.1.8 Rp 133,276.33 Rp 10,662,106.40
2
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 90.00 M A.4.4.2.3 Rp 63,809.28 Rp 5,742,835.56
6 Pekerjaan Penutup Saluran Keliling / Grill Besi 100.00 M' - Rp 250,000.00 Rp 25,000,000.00
7 Pekerjaan Beton Rabat Keliling Bangunan T = 7 cm 10.50 M3 A.A.4.1.1.1 Rp1,081,510.75 Rp 11,355,862.86
8 Pekerjaan Urugan Pasir Rabat Keliling Bangunan 10.50 M 3
A.2.3.1.11 Rp 238,425.00 Rp 2,503,462.50
AN KELILING GEDUNG
GEDUNG DAN RABAT KELILING
KELILING BANGUN
BANGUNAN
AN JUMLAH 11 ###
L PEKE
PEKERJ
RJAA
AAN
N FINI
FINISH
SHIN
INGG
1 Pek
eker
erja
jaan
an Alumi
lumin
nium
ium Ko
Kom
mpo
possit Pa
Pan
nel Bungku
kussan Luar Ge 25
256.00 M2
6.00 A.4.6
.4.6.1
.1B1
B1 Rp 828,0
28,03
36.
6.96
96 ###
2 Pemasangan Huruf Stainless 11.00 Bh - Rp 100,000.00 R
Rp
p 1,100,000.00
3 Pemas
Pemasanga
angann Handel
Handel Tang
Tangga
ga Pipa Stainless
Stainless Steel Bulat
Bulat 2 12.02 M' - Rp 65,000.00 Rp 781,300.00
PEKERJAAN FINISHING JUMLAH 12 Rp ###
KODE ARG
ARGA
A SA
SATAU
TAUA
A JUM
JUMLAH
LAH HA
HARGA
RGA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBENT
ENTUK
UKAN
AN LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 179.18 M' - Rp 40,463.94 R
Rpp 7,250,328.77
2 Men
Mengup
gupas
as tan
tanah
ah da
dan
n pemb
pembers
ersiha
ihan
n semak
semak (Lan
(Land
d Cle
Cleari
aring
ng 486.00 M2 - Rp 1,887.84 Rp 917,489.23
3 Galian Tanah dan Pembuangan (Cut dan Fill) 583.20 M 3
- Rp 104,839.24 Rp 61,142,243.77
4 Air Kerja 1.00 Ls - Rp 500,000.00 Rp 5
5000,000.00
5 Listrik Kerja 1.00 Ls - Rp 500,000.00 Rp 500,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AANN PEM
PEMBA
BANG
NGUN
UNAN
AN AUL
AULAA
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DA
DANN PASI
PASIRR
1 Pekerjaan Galian Tanah Pondasi Garis 116.45 M3 A.2.3.1.1 Rp 84,562.50 Rp 9
9,,847,387.69
3
2 Pekerjaan Galian Tanah Pondasi Poer P1 34.61 M A.2.3.1.1 Rp 84,562.50 Rp 2,926,369.88
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 29.12 M3 A.2.3.1.9 Rp 61,875.00 Rp 1,801,598.91
5 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 17.30 M3 A.2.3.1.9 Rp 61,875.00 Rp 1,070,623.13
6 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 8.46 M 3
A.2.3.1.11 Rp 238,425.00 Rp 2,017,337.77
7 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 1.33 M 3
A.2.3.1.11 Rp 238,425.00 Rp 317,343.68
8 Pekerjaan timbunan tanah bawah lantai T = 65 cm 327.60 M3 A.2.3.1.15 Rp 176,137.50 Rp 57,702,645.00
9 Pekerjaan pemadatan tanah per 20 cm 286.40 M3 A.2.3.1.10 Rp 61,875.00 Rp 17,721,024.75
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANN P
PON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 33.84 M3 A.3.2.1.9 Rp 530,369.40 Rp 17,950,034.12
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 85.60 M 3
A.3.2.1.2 Rp 900,922.00 Rp 77,119,283.57
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAAN
AAN STRUKT
STRUKTUR UR BETON
BETON DAN RABATRABAT
PEKERJAAN PONDASI POER
1 Pek
Pekerj
erjaan
aan Pondas
Pondasii Poer
Poer P1 ( 11
110
0 x 110 )
- Lantai Kerja Poer K100 1.33 M3 A.A.4.1.1.4 Rp1,071,694.71 Rp 1,426,425.66
3
- Beton K250 6.60 M A. A.4.1.1.8 Rp1,315,511.11 R
Rpp 8,682,373.34
- Pembesian 1,701.34 Kg A.4.1.1.17 Rp 19,789.40 R
Rpp 33,668,544.82
- Bekisting 26.40 M2 A.4.1.1.20 Rp 215,718.80 Rp 5,694,976.32
PEKERJAAN STEK KOLOM
1 Peke
Pekerj
rjaa
aannSStek
tek Ko
Kolo
lom
m K1 ( 40 x 40 )
- Beton K250 9.75 M3 A. A.4.1.1.8 Rp1,315,511.11 Rp 12,826,759.55
- Pembesian 1,558.88 Kg A.4.1.1.17 Rp 19,789.40 R
Rp
p 30,849,376.78
- Bekisting 97.50 M2 A.4.1.1.22 Rp 399,791.15 R
Rp
p 38,981,236.29
PEKERJAAN SLOOF
1 Peke
Pekerj
rjaa
aann Slo
Sloof
of S1 ( 2
25
5 x 40 )
- Beton K-225 7.96 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 10,369,881.49
- Pembesian 1,732.62 Kg A.4.1.1.17 Rp 19,789.40 R
Rp
p 34,287,467.20
- Bekisting 63.68 M2 A.4.1.1.21 Rp 229,468.80 R
Rp
p 14,612,573.18
2 Peke
Pekerj
rjaa
aann Slo
Sloof
of S2 ( 1
15
5 x 20 )
- Beton K-225 2.99 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 3
3,,891,832.16
- Pembesian 500.30 Kg A.4.1.1.17 Rp 19,789.40 Rp 9,900,561.46
- Bekisting 39.83 M2 A.4.1.1.21 Rp 229,468.80 Rp 9,140,201.24
PEKERJAAN KOLOM
1 Pe
Pek.
k. Ko
Kolo
lom
mK K1
1 ( 40 x 40
40 )
- Beton K-225 12.96 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 16,883,626.15
- Pembesian 2,499.04 Kg A.4.1.1.17 Rp 19,789.40 R
Rp
p 49,454,579.25
- Bekisting 129.60 M2 A.4.1.1.22 Rp 399,791.15 R
Rpp 51,812,933.04
2 Pe
Pek.
k. Ko
Kolo
lom
mK K1
1 ( 60 x 40
40 )
- Beton K-225 1.94 M3 A. A.4.1.1.7 Rp1,302,748.93 R
Rpp 2
2,,532,543.92
- Pembesian 312.38 Kg A.4.1.1.17 Rp 19,789.40 Rp 6,181,822.41
- Bekisting 16.20 M2 A.4.1.1.22 Rp 399,791.15 Rp 6,476,616.63
3 Pek.
Pek. Kolo
Kolom
m K3
K3 ( 3
30
0 x 30 )
- Beton K-225 0.36 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 474,851.99
- Pembesian 59.44 Kg A.4.1.1.17 Rp 19,789.40 Rp 1,176,368.96
- Bekisting 4.86 M2 A.4.1.1.22 Rp 399,791.15 Rp 1,942,984.99
4 Pek.
Pek. Kolo
Kolom
m K4
K4 ( 2
20
0 x 30 )
- Beton K-225 1.94 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp
Rp 2
2,,532,543.92
- Pembesian 394.59 Kg A.4.1.1.17 Rp 19,789.40 Rp 7,808,728.73
- Bekisting 32.40 M2 A.4.1.1.22 Rp 399,791.15 R
Rp
p 12,953,233.26
5 Pek.
Pek. Kolo
Kolom
m K5
K5 ( 2
20
0 x 30 )
- Beton K-225 0.49 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 633,135.98
- Pembesian 98.65 Kg A.4.1.1.17 Rp 19,789.40 Rp 1,952,182.18
- Bekisting 8.10 M2 A.4.1.1.22 Rp 399,791.15 Rp 3,238,308.32
2 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 224.45 M' A.4.1.1.35 Rp 121,138.82 Rp 27,189,608.15
PEKERJAAN BALOK
1 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kBB1
1 ( 30 x 45
45 )
- Beton K-225 2.32 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 3,
3,016,189.46
- Pembesian 391.12 Kg A.4.1.1.17 Rp 19,789.40 Rp 7,739,939.34
- Bekisting 20.58 M2 A.4.1.1.23 Rp 412,454.90 Rp 8,488,321.84
2 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kBB2
2 (25
(25 x 50
50 )
- Beton K-225 8.40 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 10,943,091.02
- Pembesian 1,532.53 Kg A.4.1.1.17 Rp 19,789.40 Rp 30,327,925.57
- Bekisting 84.00 M2 A.4.1.1.23 Rp 412,454.90 R
Rp
p 34,646,211.60
3 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kBB3
3 (25
(25 x 40
40 )
- Beton K-225 0.80 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp 1,
1,042,199.15
- Pembesian 163.11 Kg A.4.1.1.17 Rp 19,789.40 Rp 3,227,870.23
- Bekisting 8.40 M2 A.4.1.1.23 Rp 412,454.90 Rp 3,464,621.16
PEKERJAAN BALOK LATEY
1 Pe
Peke
kerj
rjaan
aan Ba
Balo
lok
kLLat
atey
ey (1
(15
5 x 20
20))
- Beton K-225 0.75 M3 A. A.4.1.1.7 Rp1,302,748.93 Rp
Rp 977,843.35
- Pembesian 150.05 Kg A.4.1.1.17 Rp 19,789.40 Rp 2,969,453.22
- Bekisting 22.52 M2 A.4.1.1.23 Rp 412,454.90 Rp 9,287,659.44
PEKERJAAN PLAT KANOPI DAN TERAS
2 Pe
Peke
kerj
rjaan
aan Pl
Plat
at Ka
Kano
nopi
pi T = 10 cm
- Beton K-225 1.81 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 2,352,764.57
- Pembesian 228.25 Kg A.4.1.1.24 Rp 19,789.40 Rp 4,516,866.21
- Bekisting 22.58 M2 A.4.1.1.24 Rp 500,991.15 R
Rp
p 11,309,875.21
2 Pekerj
Pekerjaan
aan Pla
Platt Atap
Atap Ter
Teras
as T = 10
10 c
cm
m
- Beton K-225 1.31 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 1,709,857.97
- Pembesian 160.13 Kg A.4.1.1.24 Rp 19,789.40 Rp 3,168,777.03
- Bekisting 13.13 M2 A.4.1.1.24 Rp 500,991.15 Rp 6,575,508.84
2 Pekerj
Pekerjaan
aan Pla
Platt Atap
Atap Ter
Teras
as T = 10
10 c
cm
m
- Beton K-225 1.61 M3 A.4.1.1.17 Rp1,302,748.93 R
Rp
p 2,103,418.42
- Pembesian 196.98 Kg A.4.1.1.24 Rp 19,789.40 Rp 3,898,138.97
- Bekisting 16.15 M2 A.4.1.1.24 Rp 500,991.15 Rp 8,089,003.11
PEKERJAAN BAJA BERAT
1 Pekerj
Pekerjaan
aan Kolom
Kolom Baja
Baja 30
300.1
0.150
50.9.
.9.6,5
6,5
- Kolom Baja 300.150.9.6,5 308.28 kg A.4.2.1.1 Rp 37,634.85 Rp 11,602,071.56
- Peker
erjjaan Pasangan Angkur Baut M - 19 P=700 mm 48.00 Bh - Rp 58,000.00 Rp 2,784,000.00
- Pekerjaan Pasangan Base Plat 12 mm 135.65 kg A.4.2.1.1 Rp 31,146.72 Rp 4,224,990.27
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Ka
Kawa
watt baja
baja las
las El
Elek
ektr
trod
oda
a 3.2
3.2 1,39
1,392.
2.00
00 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp 4,06
4,068,
8,32
321.
1.84
84
- Cat Zincromate 9.74 M2 A.4.7.1.19 Rp 36,453.45 Rp 355,202.42
2 Pekerjaan Kaki Kuda-Kuda Baja IWF 250.125.9.6 kg Rp -
- Balok Baja IWF 250.125.9.6 2,067.26 kg A.4.2.1.1 Rp 37,634.85 Rp 77,801,170.55
- Pekerjaan Pasangan Mur Baut M - 16 280.00 Bh - Rp 12,000.00 Rp 3,360,000.00
- Pekerjaan Pasangan Base Plat 12 mm 131.88 kg A.4.2.1.1 Rp 31,146.72 Rp 4,107,629.43
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Kawa
Kawatt ba
baja
ja las
las El
Elek
ektr
trod
oda
a 3.
3.2
2 57
576.
6.18
18 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 1,
1,68
683,
3,96
969.
9.60
60
- Cat Zincromate 69.14 M2 A.4.7.1.19 Rp 36,453.45 Rp 2,520,449.86
2 Pekerjaan Kaki Kuda-Kuda Baja IWF 200.100.8.5,5 kg Rp -
- Balok Baja IWF200.100.8.5,5 435.20 kg A.4.2.1.1 Rp 37,634.85 Rp 16,378,661.13
- Pekerjaan Pasangan Mur Baut M - 16 120.00 Bh - Rp 12,000.00 Rp 1,440,000.00
- Pekerjaan Pasangan Base Plat 12 mm 60.29 kg A.4.2.1.1 Rp 31,146.72 Rp 1,877,773.46
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Kawa
Kawatt ba
baja
ja las
las El
Elek
ektr
trod
oda
a 3.
3.2
2 16
168.
8.30
30 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 49
491,
1,88
881.
1.15
15
- Cat Zincromate 16.73 M2 A.4.7.1.19 Rp 36,453.45 Rp 609,793.31
2 Pekerjaan Kaki Kuda-Kuda dan Nok Baja IWF 150.75.5.7 kg Rp -
- Balok Baja IWF 150.75.5.7 1,728.30 kg A.4.2.1.1 Rp 37,634.85 Rp 65,044,311.26
- Pekerjaan Pasangan Mur Baut M - 16 520.00 Bh - Rp 12,000.00 Rp 6,240,000.00
- Pekerjaan Pasangan Base Plat 12 mm 240.21 kg A.4.2.1.1 Rp 31,146.72 Rp 7,481,753.61
- Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngel
elas
asan
an Kawa
Kawatt ba
baja
ja las
las El
Elek
ektr
trod
oda
a 3.
3.2
2 75
750.
0.99
99 CM A.
A.4.
4.2.
2.1.
1.5
5 Rp 2,
2,92
922.
2.65
65 Rp 2,
2,19
194,
4,86
869.
9.86
86
- Cat Zincromate 90.12 M2 A.4.7.1.19 Rp 36,453.45 Rp 3,285,130.23
2 Pekerjaan Gording C 150.50.2.2,3 kg Rp -
- Gording C 150.50.2.2,3 505.74 kg A.4.2.1.1 Rp 37,634.85 Rp 19,033,446.78
- Pekerjaan Pasangan Mur Baut M - 10 156.00 Bh - Rp 8,000.00 Rp 1,
1 ,248,000.00
- Cat Zincromate 90.12 M2 A.4.7.1.19 Rp 36,453.45 Rp 3,285,130.23
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJ
PEKERJAANAAN PAS
PASANG
ANGAN
AN & PLES
PLESTER
TERAN
AN D
DIND
INDING
ING
PEK. DINDING BATA RINGAN
1 Pekerjaan Pasangan Dinding B
Ba
ata Ringan 273.79 M2 A. 4.4.1.26 R
Rpp 205,357.08 Rp 56,223,912.67
2 Pekerjaan plesteran semen instan 547.57 M 2
A.4.4.2.28 Rp
Rp 65,097.54 Rp 35,645,604.11
PEKERJAAN FINISHING DINDING DAN KOLOM
1 Pekerjaan Acian semen instan 547.57 M2 A.4.4.2.29 R
Rp
p 44,031.76 Rp 24,110,569.06
2 Pekerjaan Acian instan pada Kolom 82.08 M2 A.4.4.2.29 R
Rp
p 44,031.76 Rp 33,,614,127.07
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKER
PEKERJAAN
JAAN KUSEN PINTU, JENDELA
JENDELA DAN VENTI
VENTILASI
LASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u PJ
PJ1
1 1.00 Bh P1 AP Rp7,033,560.04 Rp 7,033,560.04
2 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P2 2.00 Bh PJ2 AP Rp5,665,766.24 Rp 11,331,532.49
3 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P3 1.00 Bh PJ3 AP Rp3,826,037.52 Rp 3,826,037.52
4 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P4 4.00 Bh P4 AP Rp2,483,533.96 Rp 9,934,135.84
5 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u P5 6.00 Bh Ls Rp 28
287,500.00 Rp 1,
1,725,000.00
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J1 1.00 Bh J1 AP Rp5,920,983.54 Rp 5,920,983.54
2 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J2 6.00 Bh J2 AP Rp7,004,149.04 Rp 42,024,894.25
3 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J3 4.00 Bh J3 AP Rp7,934,050.35 Rp 31,736,201.41
4 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J4 4.00 Bh J4 AP Rp1,922,394.32 Rp 7,689,577.28
5 Peke
Pekerj
rjaa
aan
n JJen
ende
dela
la J5 3.00 Bh J5 AP Rp1,816,119.73 Rp 5,448,359.20
6 Pekerjaan Ventilasi V1 9.00 Bh V1 AP Rp 783,174.47 Rp 7,048,570.27
KERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEKE
PEKERJ
RJAA
AAN N K
KON
ONSTSTRU
RUKS
KSII A
ATA
TAPP
2 Pekerjaan Pasangan Atap Spandek 0.35 mm 457.34 M2 A.4.5.2.SP Rp 94,593.24 Rp 43,261,213.34
3 Pekerjaan Pasangan Nok Spandek 17.16 M' A.4.5.2.NK R
Rp
p 10
1 06,157.70 Rp 1,
1 ,821,666.13
4 Pekerjaan Pasangan Jurai Atap 31.28 M' A.4.5.2.JA Rp
Rp 97,884.50 R
Rpp 3,061,827.16
4 Pekerjaan Pasangan Kalsiplank 88.00 M' A.4.5.2.KP Rp
Rp 11
1 15,632.00 Rp 10,175,616.00
PEKERJAAN KONSTRUKSI ATAP MLAH 6 ###
G PEKE
PEKERJ
RJAA
AANN IN
INST
STAL
ALAS
ASII LISTR
LISTRIK
IK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 122.00 Ttk A.4.7.2.A Rp 346,456.00 Rp 42,267,632.00
2 Pekerjaan Instalasi Stop Kontak 6.00 Tt
Ttk A.4.7.2.B Rp
R p 372,856.00 Rp
Rp 2,237,136.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Gantung Variasi 15 Watt 1.00 Bh Ls Rp1,000,000.00 Rp 1,
1,000,000.00
2 Pasangan Lampu Bared LED 22 Watt 8.00 Bh A.4.7.2.L Rp 80
804,911.25 Rp 6,
6,439,290.00
3 Emergency downlight 18 Watt 28.00 Bh A.4.7.2.I Rp 197,711.25 R
Rpp 5,535,915.00
4 Downlight 18 Watt 52.00 B
Bh
h A.4.7.2.G Rp
Rp 148,761.25 Rp 7,735,585.00
5 Downlight 9 Watt 7.00 Bh A.4.7.2.H Rp 9
988,161.25 Rp 687,128.75
6 Lampu neon panjang 5 Watt 26.00 Bh A.4.7.2.F Rp 335
54,461.25 Rp 9,
9,215,992.50
1 PEKERJAAN PASANGAN
Pasangan Saklar TunggaSAKLAR
l 4.00 Bh A.4.7.2.C Rp 27,101.25 Rp 108,405.00
2 Pasangan Saklar Ganda 22.00 Bh A.4.7.2.D Rp 31,446.25 Rp 691,817.50
PEKERJAAN PASANGAN STOP KONTAK
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 6.00
6.00 Bh A.
A.4.
4.7.
7.2.
2.E
E Rp 28,3
28,311
11.2
.25
5 Rp 16
169,
9,86
867.
7.50
50
PEKERJAAN PASANGAN KOTAK MCB
1 Pemasangan Box MCB 1.00 Bh - Rp 65
65,000.00 Rp 65,000.00
2 Pemasangan MCB 1.00 Bh - Rp 250,000.00 Rp 250,000.00
3 Pemasangan Instalasi Panel Listrik PLN 1.00 Set - Rp3,500,000.00 Rp 3,500,000.00
PEKERJAAN INSTALASI LISTRIK MLAH 7 ###
H PE
PEKE
KERJ
RJAA
AAN
N SAN
SANIT
ITAS
ASII
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 6.00 Bh A.5.1.1.1a Rp3,669,069.78 Rp 22,014,418.67
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 1.00 Bh A.5.1.1 5 Rp 984,933.40 R
Rpp 984,933.40
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 11.92 M1 A.5.1.1 32 Rp 95,830.35 Rp 1,142,297.77
2 Peker
ekerjjaan
aan Pasan
asang
gan Pip
ipa
a Pemb
embuang
angan Air Ko
Koto
torr dia. 3" 13.67
.67 M 1
A.5.1
.5.1.1
.1 31 Rp 85,70
,706.91
.91 Rp 1,17
,171,61
,613.49
.49
3 Peker
ekerjjaan
aan Pasan
asang
gan Pip
ipa
a Pemas
emasu
uka
kan
n Air Ber
ersi
sih
h dia. 3/4"
/4" 9.85
.85 M1 A.5
.5.1
.1.1
.1 26 Rp 25,97
,977.60
.60 Rp 255,87
,879.36
.36
4 Peker
ekerjjaan
aan Pasan
asang
gan Pip
ipa
a Pemas
emasu
uka
kan
n Air Ber
ersi
sih
h dia. 1" 69.27
.27 M1 A.5
.5.1
.1.1
.1 27 Rp 35,13
,133.04
.04 Rp 2,43
,433,66
,665.51
.51
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 1.00 Bh A.5.1.1 19a Rp 325,121.50 Rp 325,121.50
2 Pekerjaan Pasangan Kran Air 6.00 Bh A.5.1.1 19 Rp 97,696.50 R
Rp
p 586,179.00
3 Peke
Pekerj
rjaan
aan Pasa
Pasang
ngan
an Fl
Floo
oorr Dr
Drai
ain
n 6.
6.00
00 Bh A.5.
A.5.1.
1.1
1 14 Rp 12
121,
1,20
203.
3.50
50 Rp 72
727,
7,22
221.
1.00
00
4 Pek
Pekerj
erjaan
aan Pasang
Pasangan
an Tempat
Tempat Sab
Sabun
un 6.0
6.00
0 Bh A.5.1.
A.5.1.1
1 14
14a
a Rp 68,67
68,678.5
8.50
0 Rp 412,0
412,071.
71.00
00
6 Pekerjaan
aan Pembuatan Septick Tank + Pere
eresapan 4.00 Unit A.5.1.1 32 Rp6,636,464.01 Rp 26,545,856.06
PEKERJAAN SANITASI MLAH 8 ###
I PEKE
PEKERJ
RJA
AAN PLA
PLAFON
FOND
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Rang
Rangka
ka Pl
Plaf
afon
ond
d Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2 381.
381.44
44 M2 A.4.
A.4.2.
2.1.
1.21
21 Rp 130,
130,27
278.
8.50
50 Rp 49,6
49,692
92,9
,962
62.0
.04
4
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 381.44 M 2
A.4.5.1.7 Rp 53,658.00 Rp 20,467,114.35
1
6 Pekerjaan Pasangan List Plafond Gypsumboard 156.00 M A.4.5.1.7b Rp 26,730.00 Rp 4,169,880.00
PEKERJAAN PLAFOND MLAH 9 ###
PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 16,7
16,790
90,8
,859
59.9
.93
3
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 11,204
11,204,814.
,814.71
71
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 12,328
12,328,535.
,535.14
14
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 23,209,546.28
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 25,773,977.23
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 32,067,478.11
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 23,099
23,099,748.
,748.72
72
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 20,709
20,709,349.
,349.16
16
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 16,168
16,168,162.
,162.49
49
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 55,689
55,689,811.
,811.40
40
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 7,798,748.00
K PEKERJAA
PEKERJAAN
N SALURAN KELILING GEDUNG Rp 9,967,020.46
Rp 238,017,191.70
REAL COST (A) Rp 254,8
254,808,05
08,051.63
1.63
PPN 10% (B) Rp 25,48
25,480,805
0,805.16
.16
TOTAL COST (A+B) Rp 280,2
280,288,85
88,856.79
6.79
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
KODE AR
ARGA
GA SATAU
SATAUA
A JUM
JUMLAH
LAH HA
HARG
RGA
A
NO URAIAN PEKERJAAN VOLUME SAT. ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PEMB
PEMBEN
ENTU
TUKA
KAN
N LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 36.000 M' - Rp 40,480.44 Rp
Rp 1,457,295.84
2 Mengup
Mengupas
as tanah
tanah da
dan
n pemb
pembers
ersiha
ihan
n semak
semak (Land
(Land Cleari
Clearin
n 123.25 M
2
- Rp 1,890.59 Rp 233,014.96
3 Galian Tanah dan Pembuangan (Cut dan Fill) 147.900 M 3
- Rp 95,338.40 Rp14,100,549.13
4 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
5 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AAN NBBAN
ANGU
GUNA
NAN
N
A PEKE
PEKERJ RJAA
AAN N TAN
TANAH
AH DAN
DAN PAS
PASIR
IR
1 Pekerjaan Galian Tanah Pondasi Garis 15.120 M3 A.2.3.1.1 Rp 84,727.50 Rp 1,281,079.80
2 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 1.544 M 3
A.2.3.1.9 Rp 62,205.00 Rp 96,069.40
3 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 1.260 M3 A ..2
2.3.1.1 1 Rp 238 ,,4
491.00 Rp 300 ,,4
498.66
4 Pekerjaan timbunan tanah bawah lantai T = 45 cm 46.182 M3 A.2.3.1.15 Rp 176,302.50 Rp 8,141,927.13
5 Pekerjaan pemadatan tanah per 20 cm 22.269 M 3
A.2.3.1.10 Rp 62,205.00 Rp 1,
1,385,239.72
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PE
PEKE
KERJ
RJAA
AANN P
PON
ONDA
DASISI
1 Pekerjaan Pasangan Pondasi Batu Kosong 5.040 M3 A.3.2.1.9 Rp 530,626.80 Rp 2,
2,674,359.07
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 10.710 M 3
A.3.2.1.2 Rp 901,417.00 Rp 9,
9 ,654,176.07
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAAN
AAN STRUKT
STRUKTUR UR BETON
BETON DAN RAB
RABAT AT
PEKERJAAN SLOOF
1 Pe
Peke
kerj
rjaa
aan
n Slo
Sloof
of S2 ( 15
15 x 20 )
- Beton K-250 1.080 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,421,343.63
- Pembesian 180.866 Kg A.4.1.1.17 Rp 19,792.04 Rp 3,579,712.40
- Bekisting 7.200 M2 A.4.1.1.21 Rp 229,640.40 Rp 1,653,410.88
PEKERJAAN KOLOM
2 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 50.050 M' A.4.1.1.35 Rp 121,198.22 Rp 6,
6 ,065,970.91
PEKERJAAN RINGBALOK
3 Pe
Peke
kerj
rjaa
aann Ring
Ringba
balk
lk (1
(15
5 x 15 )
- Beton K-250 0.810 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,066,007.72
- Pembesian 132.335 Kg A.4.1.1.17 Rp 19,792.04 Rp 2,619,187.48
- Bekisting 8.100 M2 A.4.1.1.23 Rp 412,672.70 Rp 3,342,648.87
PEKERJAAN BALOK LATEY
4 Pek. Balok Latey (10 x 15) 24.00 M' A.4.1.1.36 R
Rp
p 1
14
44,219.35 Rp
R p 3,461,264.40
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEKERJ
PEKERJAAN
AAN PAS
PASANANGAN
GAN & PLES
PLESTER
TERANAN DI
DINDI
NDING
NG
PEK. DINDING TRANSRAM 1Pc : 2 Ps , t = 0,3 M
1 Pekerjaan Pasangan Dinding Batu Bata 18.240 M2 A. 4.4.1.8 Rp 133,375.33 Rp 2,
2,432,766.02
2 Pekerjaan Plesteran Dinding tebal 1.5 cm 36.480 M 2
A.4.4.2.3 Rp 63,908.28 Rp 2,331,374.20
PEKERJAAN DINDING
DINDING 1Pc : 4 Ps
3 Pekerjaan Pasangan Dinding Batu Bata 79.688 M2 A. 4.4.1.9 Rp 130,163.00 Rp 2,
2,374,173.12
4 Pekerjaan Plesteran Dinding tebal 1.5 cm 159.375 M2 A.4.4.2.5 Rp 61,059.86 Rp 9,731,414.55
PEKERJAAN FINISHING DINDING DAN KOLOM
5 Peke
Pekerj
rja
aan Ac
Aciian 195.
195.855 M2
855 A.4.
A.4.4.
4.2.
2.27
27 Rp 42
42,,22
226.
6.25
25 Rp 8,
8,27
270,
0,22
222.
2.19
19
6 Pekerjaan Acian Kolom 15.015 M A.4.4.2.27
2
Rp 42,226.25 Rp 634,027.14
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKER
PEKERJAAN
JAAN KUSEN PINTU
PINTU,, JENDE
JENDELA
LA DAN VENTI
VENTILASI
LASI ALUMINIUM
ALUMINIUM
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Peke
Pekerj
rjaa
aan
n Pi
Pint
ntu
u PJ
PJ1
1 1.000 Bh PJ1 AP Rp4,620,233.74 Rp 4,
4,620,233.74
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
2 Peke
Pekerj
rjaa
aan
n Jen
Jende
dela
la J1 2.000 Bh J1 AP Rp1,341,027.33 Rp 2,
2,682,054.66
3 Peke
Pekerj
rjaa
aan
n Jen
Jende
dela
la J2 10.000 Bh J 2 AP Rp2,476,518.97 Rp24,765,189.71
ERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEPEKE
KERJ
RJAA
AANN PL
PLAF
AFONOND
D
PEKERJAAN RANGKA PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Ra
Rang
ngka
ka Pl
Plaf
afon
ond
d Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2 11
115.
5.323 M2
323 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp
Rp15
15,0
,037
37,7
,742
42.6
.63
3
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 115.323 M2 A.4.5.1.7 Rp 52,890.20 Rp 6,
6,099,430.09
1
3 Pekerjaan Pasangan List Plafond Gypsumboard 72.000 M A.4.5.1.7a Rp 27,258.00 Rp 1,
1,962,576.00
PEKERJAAN PLAFOND MLAH 6 ###
G PEKE
PEKERRJA
JAAN
AN LA
LAN
NTA
TAII
PEKERJAAN URUGAN DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 5.766 M3 A.2.3.1.15 Rp 176,302.50 Rp 1,016,582.25
3
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 3.470 M A.A.4.1.1.4 Rp1,072,090.71 Rp 3
3,,720,154.76
3 Pekerjaan Beton Rabat Bawah Lantai T = 7 cm 3.215 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 3
3,,446,315.99
PEKERJAAN LANTAI DAN DINDING KERAMIK
2
PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 23,7
23,782
82,2
,275
75.4
.49
9
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 27,768
27,768,767.
,767.80
80
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 35,777
35,777,748.
,748.47
47
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 191,378,426.31
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 88,747,149.76
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 27,772,112.63
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 48,062
48,062,990.
,990.25
25
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 97,997
97,997,326.
,326.77
77
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 32,549
32,549,392.
,392.28
28
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP BAJA BERA
BERAT
T Rp 162,03
162,034,077
4,077.54
.54
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 13,966,684.50
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 24,942
24,942,302.
,302.02
02
L PEKERJAAN
PEKERJAAN SALURAN KELILING GEDUNG Rp 14,733,644.67
Rp 765,730,622.99
REAL COST (A) Rp 789,5
789,512,89
12,898.48
8.48
PPN 10% (B) Rp 78,95
78,951,289
1,289.85
.85
TOTAL COST (A+B) Rp 868,4
868,464,18
64,188.33
8.33
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
KODE ARGA
ARGA SA
SATAU
TAUA
A JUMLAH
JUMLAH HAR
HARGA
GA
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PEK
PEKER
ERJA
JAAN
AN PEM
PEMBE
BENT
NTUK
UKAN
AN LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 79.000 M' - Rp 40,480.44 Rp
Rp 3,197,954.76
2 Me
Meng
ngup
upas
as ta
tana
nah
h da
dan
n pe
pemb
mber
ersi
siha
han
n sema
semak
k (L
(Lan
and
d Clea
Cleari
rin
n 16
166.
6.25
25 M
2
- Rp 1,
1,89
890.
0.59
59 Rp 31
314,
4,31
310.
0.24
24
3 Galian Tanah dan Pembuangan (Cut dan Fill) 199.500 M3 - Rp 95,338.40 Rp19,020,010.49
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
7 P3K 1.000 Ls
Ls - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN BA
BANG
NGUN
UNAN
AN
A PEKE
PEKERJ RJAA
AANN TA
TANA
NAHHDDAN
AN PASI
PASIR
R
1 Pekerjaan Galian Tanah Pondasi Garis 63.793 M3 A.2.3.1.1 Rp 84,727.50 Rp 5,404,979.04
2 Pekerjaan Galian Tanah Pondasi Poer (65 X 65) 9.408 M 3
A.2.3.1.1 Rp 84,727.50 Rp 797,116.32
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 10.863 M3 A.2.3.1.9 Rp 62,205.00 Rp 675,701.81
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 4.704 M 3
A.2.3.1.9 Rp 62,205.00 Rp 292,612.32
5 Pekerjaan Urugan Pasir B aw
awah Pondasi Ga
Garris T=5 cm 2.765 M 3
A.2.3.1.11 Rp 238,491.00 Rp 659,427.62
6 Pekerjaan Urugan Pasir B aw
awah Pondasi Poer T = 5 cm 0.392 M 3
A.2.3.1.11 Rp 238,491.00 Rp 93,488.47
3
7 Pekerjaan timbunan tanah bawah lantai T = 30 cm 95.601 M A.2.3.1.15 Rp 176,302.50 Rp16,854,607.15
8 Pekerjaan pemadatan tanah per 20 cm 48.080 M3 A.2.3.1.10 Rp 62,205.00 Rp 2,990,835.06
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANN PON
PONDA
DASSI
1 Pekerjaan Pasangan Pondasi Batu Kosong 11.060 M3 A.3.2.1.9 Rp 530,626.80 Rp 5,868,732.41
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 33.180 M3 A.3.2.1.2 Rp 901,417.00 Rp29,909,016.06
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAAN
AAN STRUKT
STRUKTUR UR BETO
BETON NDDAN
AN RA
RABAT
BAT
PEKERJAAN PONDASI POER
1 Pekerj
Pekerjaan
aan Pondas
Pondasii P
Poer
oer P1 ( 70 x 70 )
- Lantai Kerja Poer K100 0.392 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 420,259.56
- Beton K250 1.568 M A. A.4.1.1.8 Rp1,316,058.91
3
Rp
Rp 2,063,580.37
- Pembesian 255.201 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,050,955.45
- Bekisting 3.380 M2 A.4.1.1.20 Rp 215,890.40 Rp 729,709.55
PEKERJAAN STEK KOLOM
2 Pe
Peke
kerj
rjaa
aann St
Stek
ek Ko
Kolo
lom
m K1 ( 30 x 30 )
- Beton K250 1.440 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 1,895,124.83
- Pembesian 241.218 Kg A.4.1.1.17 Rp 19,792.04 Rp 4,774,199.33
- Bekisting 9.600 M2 A.4.1.1.22 Rp 400,008.95 Rp 3,840,085.92
PEKERJAAN SLOOF
3 Pe
Peke
kerj
rjaa
aann Slo
Sloof
of S1 ( 20
20 x 30 )
- Beton K-250 4.740 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 6,238,119.24
- Pembesian 760.554 Kg A.4.1.1.17 Rp 19,792.04 Rp15,052,909.30
- Bekisting 47.400 M2 A.4.1.1.21 Rp 229,640.40 Rp10,884,954.96
PEKERJAAN KOLOM
4 Pek.
Pek. Ko
Kolo
lom
m K1 ( 30
30 x 30 ) Pi
Pijak
jakan
an Kolo
Kolom
m baja
baja
- Beton K-250 0.864 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,137,074.90
- Pembesian 147.976 Kg A.4.1.1.17 Rp 19,792.04 Rp 2,928,742.01
- Bekisting 5.760 M2 A.4.1.1.22 Rp 400,008.95 Rp 2,304,051.55
5 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 30.800 M' A.4.1.1.35 Rp 121,198.22 Rp 3,
3 ,732,905.18
PEKERJAAN RINGBALOK
6 Pe
Peke
kerj
rjaa
aann Ri
Ring
ngba
balk
lk B1
B1 ( 15
15 x 15 )
- Beton K-250 1.778 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 2,339,294.72
- Pembesian 290.403 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,747,661.41
2
- Bekisting 17.775 M A.4.1.1.23 Rp 412,672.70 Rp 7,335,257.24
PEKERJAAN BAJA BERAT (IWF)
7 Kolom Baja H Beam 300.150.9.6.5 2472.11 kg A.4.2.1.1 Rp 37,654.65 Rp93,086,512.12
Pekerjaan Pasangan Angkur 22 mm L = 75 cm 64.00 Bh - Rp 58,000.00 Rp 3,
3,712,000.00
Pekerjaan Pasangan Plat 12 mm 135.65 kg A.4.2.1.1 Rp 37,654.65 Rp 5,107,777.96
Pek
eker
erjjaa
aan
n Peng
nge
elas
lasan Kawa
watt baja
aja las El
Elek
ektr
tro
oda 3.2 450.00
.00 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,
2,92
922
2.6
.65
5 Rp 1,3
1,315
15,1
,19
90.
0.25
25
Cat Zincromate 11.16 M2 A.4.7.1.19 Rp 36,453.45 Rp 406,820.50
PEKERJAAN BALOK LATEY
8 Pek. Balok Latey (10 x 15) 21.25 M' A.4.1.1.36 R
Rpp 144,219.35 Rp 3,064,661.19
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEK
PEKERJ
ERJAAN
AAN
PEKERJAAN PAS
PASANG
ANGAN
DINDING AN :&
1Pc 4 PLESTER
PLES
Ps TERAN
AN DIND
DINDING
ING
F PEKE
PEKERRJAAN
JAAN
PEKERJAAN PLAF
PLAFON
OND
RANGKA D
PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Ra
Rang
ngka
ka Pl
Plaf
afon
ond
d Al
Alum
umin
iniu
ium
m Holl
Hollow
ow 2 24
240.
0.180 M2
180 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp
Rp31
31,3
,318
18,8
,823
23.5
.51
1
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 240.180 M 2
A.4.5.1.7 Rp 52,890.20 Rp12,703,168.24
3 Pekerjaan Pasangan List Plafond Gypsumboard 148.250 M1 A.4.5.1.7a Rp 27,258.00 Rp 4,040,998.50
PEKERJAAN PLAFOND MLAH 6 ###
G PEKE
PEKERRJAAN
JAAN LA
LAN
NTA
TAII
PEKERJAAN LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai T = 10 cm 24.018 M3 A.2.3.1.11 Rp 238,425.00 Rp 5,726,491.65
3 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 12.009 M 3
A.A.4.1.1.1 Rp1,081,510.75 Rp12,987,862.58
PEKERJAAN LANTAI KHUSUS WORKSHOP (BEBAN MESIN)
Pek
eker
erjjaa
aan
n Lan
anta
taii Bet
eton
on K = 25
250
0 T = 15 cm 19.
9.24
24 M3 A. A.
A.4.
4.1.
1.1
1.8 Rp1
Rp1,3
,31
15,
5,51
511
1.1
.11
1 Rp2
Rp25,3
,307
07,1
,14
45.
5.03
03
Pembesian Wire Mash M-10 ### M3 A.4.1.1.19 Rp
Rp 18,182.53 Rp
Rp19,854,128.96
Floor Hardener 128.250 M2 Ls Rp -
PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pekerjaan Lantai Keramik (40/40) 147.555 M2 A.4.4.3.4 Rp 16
1 62,302.58 Rp23,948,557.19
1
2 Pekerjaan Plint Dinding Tile (10/40) 71.950 M2 A.4.4.3.29 Rp
Rp 35,663.76 Rp 2,566,007.53
3 Pekerjaan Lantai KKe
eramik K Kmm/Wc (20/20) Unpolished 9.145 M A.4.4.3.6 Rp 148,344.92 Rp 1,
1,356,614.31
4 Pe
Pek.
k. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Warn
Warna
a Km
Km/W
/Wc
c (20/
(20/25
25)) 21
21.240 M2 A.
.240 A.4.
4.4.
4.3.
3.54
54a
a Rp 29
294,
4,28
280.
0.58
58 Rp 6,
6,25
250,
0,51
519.
9.52
52
PEKERJAAN LANTAI JUMLAH 7 ###
H PEKE
PEKERJRJAA
AANN PE
PENG
NGEC
ECAT
ATAN
AN
PEKERJAAN PENGECATAN DINDING DAN K KOLOM
OLOM
1 Pekerjaan Pengecatan Dinding Interior 280.831 M2 A.4.7.1.10a Rp 42,208.38 R p1
p11,853,403.28
2 Pekerjaan Pengecatan Dinding Exterior 124.391 M 2
A.4.7.1.10 Rp 54,033.38 Rp 6,721,243.94
2
3 Pekerjaan Pengecatan Dinding Kolom 30.000 M A.4.7.1.10a Rp 42,208.38 Rp 1,266,251.25
PEKERJAAN PENGECATAN PLAFOND
4 Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Plaf
Plafon
ond
d da
dan
n List
List 26
269.
9.830 M2
830 A.
A.4.
4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp
Rp12
12,7
,708
08,4
,493
93.8
.81
1
PEKERJAAN PENGECATAN JUMLAH 8 ###
I PEKER
PEKERJAJAAN
AN KKON
ONST
STRU
RUKS
KSII ATAP
ATAP BAJA
BAJA BER
BERAT
AT
1 PEKERJAAN ATAP
Pekerjaan Pasangan Atap Spandek 269.118 M2 A.4.5.2.SP Rp 94,632.84 Rp25,467,399.29
Pekerjaan Pasangan Nok Spandek 11.650 M' A.4.5.2.NK Rp
Rp 106,197.30 Rp 1,237,198.55
Pekerjaan Pasangan Jurai Atap 28.44 M' A.4.5.2.JA Rp 97,884.50 Rp 2,783,835.18
Pekerjaan Pasangan Kalsiplank 68.64 M' A.4.5.2.KP Rp 115,632.00 Rp 7,936,980.48
2 PEKERJAAN KAKI KUDA-KUDA BAJAWF
Pekerjaan Kaki Kuda-kuda Baja 150.75.5.7 1231.44 kg A.4.2.1.1 Rp 37,654.65 Rp46,369,442.20
Pekerjaan Pasangan Mur Baut M - 16 320.00 Bh - Rp 10,000.00 Rp 3,200,000.00
Pekerjaan Pasangan Plat 12 mm 197.82 kg A.4.2.1.1 Rp 37,654.65 Rp 7,448,842.86
Pek
eker
erjjaa
aan
n Peng
nge
elas
lasan Kawa
watt baja
aja las El
Elek
ektr
tro
oda 3.2 311.70
.70 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,
2,92
922
2.6
.65
5 Rp 91010,9
,98
88.
8.45
45
Cat Zincromate 37.40 M2 A.4.7.1.19 Rp 36,453.45 Rp 1,363,504.84
3 PEKERJAAN GORDING CNP
Pekerjaan Gording C 150.50.20.2,3 1644.38 kg A.4.2.1.1 Rp 37,654.65 Rp61,918,365.85
Pekerjaan Pasangan Mur Baut M - 10 144.00 Bh - Rp 8,000.00 Rp 1,152,000.00
4 Pekerjaan Trekstank 113.46 kg A.4.1.1.17 Rp 19,792.04 Rp 2,245,519.85
PEKERJAAN KONSTRUKSI ATAP BAJA BERAT MLAH 9 ###
J PEKERJAAN INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 14.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 4,
4,851,770.00
2 Pekerjaan Instalasi Stop Kontak 12.000 Ttk A.4.7.2.B Rp 372,955.00 Rp 4,475,460.00
PEKERJAAN PASANGAN LAMPU
1 Pasangan Lampu Down Light 3" SL. 9 Watt 2.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 120,048.50
2 Pasangan Lampu Down Light 3" SL. 5 Watt 4.000 Ttk A.4.7.2.H Rp 46,494.25 Rp 185,977.00
3 Pasangan Lampu TL LED 2X18 Watt (8 Titik) 8.000 Ttk A.4.7.2.G Rp 116,894.25 Rp 935,154.00
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 2.000 Ttk A.4.7.2.C Rp
Rp 27,134.25 Rp 54,268.50
2 Pasangan Saklar Ganda 6.000 Ttk A.4.7.2.D R
Rp
p 31,479.25 Rp 188,875.50
PEKERJAAN PASANGAN STOP KONTAK Rp -
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 12.0
12.000
00 Ttk
Ttk A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,344
44.2
.25
5 Rp 340,
340,13
131.
1.00
00
PEKERJAAN PASANGAN KOTAK MCB Rp -
1 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
2 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
3 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp
Rp2
2,500,000.00 Rp 2,500,000.00
PEKERJAAN INSTALASI LISTRIK LAH 10 ###
K PE
PEKE
KERJ
RJAA
AAN
N SA
SANI
NITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 2.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp 7,340,251.56
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 1.000 Bh A.5.1.1 5 Rp 9
98
85,329.40 Rp
Rp 985,329.40
2 Pasangan Urinoir + Perlengkapan 3.000 Bh A.5.1.1 4 Rp2,127,196.50 Rp 6,381,589.50
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 15.000 M1 A.5.1.1 32 Rp 95,856.75 Rp 1 ,4
,437,851.25
2 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pipa
Pipa Pe
Pemb
mbua
uang
ngan
an Air
Air Ko
Koto
torr di
dia.
a. 3" 15.0
15.000
00 M 1
A.5.
A.5.1.
1.1
1 31 Rp 85,7
85,733
33.3
.31
1 Rp 1,2
1,285
85,9
,999
99.6
.69
9
3 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pipa
Pipa Pe
Pema
masu
suka
kan
n Air
Air Bers
Bersih
ih di
dia.
a. 3/4"
3/4" 50.0
50.000
00 M 1
A.5.
A.5.1.
1.1
1 26 Rp 25,9
25,990
90.8
.80
0 Rp 1,29
1,299,
9,54
540.
0.00
00
PEKERJAAN PAS. ASSESORI PELENGKAP
2 Pekerjaan Pasangan Kran Air (Wastafel) 1.000 Bh A.5.1.1 19a Rp 325,154.50 Rp 325,154.50
3 Pekerjaan Pasangan Kran Air 2.000 Bh A.5.1.1 19 R
Rp
p 97,729.50 Rp
Rp 195,459.00
4 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Fl
Floo
oorr Dr
Drai
ain
n 2.00
2.000
0 Bh A.5.
A.5.1.
1.1
1 14 Rp 121,
121,23
236.
6.50
50 Rp 242,
242,47
473.
3.00
00
5 Pekerjaan Pasangan Tempat Sabun Toilet 2.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 137,423.00
9 Pekerjaan Pembuatan Septick Tank + Peresapan 1.000 Unit A.5.1.1 32 Rp
Rp5
5,311,231.13 Rp 5,311,231.13
PEKERJAAN SANITASI JUMLAH 11 ###
L PEK
PEKERJ
ERJAAN
AAN SAL
SALURA
URAN
N KEL
KELILIN
ILING
G GED
GEDUNG
UNG
1 Pekerjaan Galian Tanah Saluran 3.98 M3 A.2.3.1.1 Rp 84,727.50 Rp 337,351.01
3
2 Pekerjaan Urugan Pasir Saluran 0.995 M A.2.3.1.11 R
Rp
p 23
238,491.00 Rp
Rp 237,393.94
3
3 Pekerjaan Beton Rabat Saluran T = 5 cm 0.995 M A.A.4.1.1.4 Rp1,072,090.71 Rp 1
1,,067,159.09
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 66.360 M 2
A. 4.4.1.8 Rp 133,375.33 Rp 8,
8,850,786.90
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 66.360 M2 A.4.4.2.3 Rp 63,908.28 Rp 4,240,953.73
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 12 ###
PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 18,2
18,261
61,8
,873
73.1
.15
5
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 20,940
20,940,253.
,253.47
47
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 28,431
28,431,672.
,672.04
04
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 86,705,541.02
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 64,940,224.52
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 19,503,043.81
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 32,106
32,106,477.
,477.29
29
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 44,318
44,318,654.
,654.37
37
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 26,120
26,120,668.
,668.97
97
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 78,045
78,045,283.
,283.85
85
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 9,400,518.50
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 19,871
19,871,196.
,196.42
42
L PEKERJAA
PEKERJAAN
N TAN
TANGGA
GGA TRASRAM
TRASRAM Rp 17,019
17,019,933.
,933.68
68
M PEKERJAAN
PEKERJAAN SALURAN KELILING GEDUNG Rp 8,731,991.58
N PEKE
PEKERJAA
RJAAN
N FINI
FINISHIN
SHING
G Rp 25,325
25,325,485.
,485.60
60
Rp 481,460,945.13
REAL COST (A) Rp 499,7
499,722,81
22,818.27
8.27
PPN 10% (B) Rp 49,97
49,972,281
2,281.83
.83
TOTAL COST (A+B) Rp 549,6
549,695,10
95,100.10
0.10
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
KODE AR
ARGA
GA SATAU
SATAUA
A JUMLAH
JUMLAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMBE
MBENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 75.500 M' - Rp 40,480.44 Rp
Rp 3,056,273.22
2
2 Meng
Mengup
upas
as tana
tanah
h dan
dan pemb
pember
ersi
siha
han
n sema
semak
k (Lan
(Land
d Clea
Cleari
ring
ng 120.
120.00
00 M - Rp 1,
1,89
890.
0.59
59 Rp 22
226,
6,87
870.
0.55
55
3 Galian Tanah dan Pembuangan (Cut dan Fill) 144.000 M3 - Rp 95,338.40 Rp13,728,729.38
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
5 00,000.00
7 P3K 1.000 L
Ls
s - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN BA
BANG
NGUN
UNAN
AN
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DAN
DAN PASI
PASIR
R
3
G PEK
PEKER
ERJA
JAA
AN LA
LANT
NTAI
AI
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 17.373 M3 A.2.3.1.15 Rp 176,302.50 Rp 3
3,,062,815.18
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 8.686 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 9,312,447.92
PEKERJAAN LANTAI DAN DINDING KERAMIK
3 Pekerjaan Lantai Keramik (40/40) 121.085 M2 A.4.4.3.4 Rp 162,302.58 Rp19,652,407.90
1
4 Pekerjaan Plint Dinding Tile (10/40) 98.500 M A.4.4.3.29 Rp 35,663.76 Rp 3,512,880.36
5 Pekerj
erjaan Lantai Keramik Km/Wc (20/20) Unpolished 3.64
.640 M2 A.4
.4.4
.4..3.6 Rp 148,344.92 Rp 539,9
,97
75.5
.52
2
2
6 Pek.
Pek. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Warn
Warna
a Km/W
Km/Wc
c (20/
(20/25
25)) 19
19.440 M
.440 A.
A.4.
4.4.
4.3.
3.54
54a
a Rp 29
294,
4,28
280.
0.58
58 Rp 5,
5,72
720,
0,81
814.
4.48
48
7 Peke
Pekerj
rjaa
aan
n La
Lant
ntai
ai Tang
Tangga
ga Homo
Homoge
geno
nous
us Ti
Tile
le (40/
(40/40
40)) Poli
Polish
sh 15.510 M
15.510 2
A.4.
A.4.4.
4.3.
3.4
4 Rp 16
162,
2,30
302.
2.58
58 Rp 2,5
2,517
17,3
,313
13.0
.02
2
PEKERJAAN LANTAI JUMLAH 7 ###
H PEKE
PEKERJ
RJAA
AANN PEN
PENGE
GECA
CATA
TANN
PEKERJAAN PENGECATAN DINDI
DINDING
NG DAN KOLOM
1 Pekerjaan Pengecatan Dinding Interior 184.720 M2 A.4.7.1.10a Rp 42,208.38 Rp 7,796,731.03
2 Pekerjaan Pengecatan Dinding Exterior 112.620 M2 A.4.7.1.10 Rp
Rp 54,033.38 Rp 6,085,238.69
3 Pekerjaan Pengecatan Dinding Kolom 87.360 M2 A.4.7.1.10a Rp 42,208.38 Rp 3,687,323.64
PEKERJAAN PENGECATAN PLAFOND
4 Peke
Pekerj
rjaa
aan
n Peng
Pengec
ecat
atan
an Plaf
Plafon
ond
d dan
dan List
List 181.
181.565 M2
565 A.4.
A.4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp 8,
8,55
551,
1,37
375.
5.60
60
PEKERJAAN PENGECATAN JUMLAH 8 ###
I PEKER
PEKERJAJAAN
AN KO
KONS
NSTR
TRUK
UKSI
SI ATAP
ATAP
1 Peke
Pekerrja
jaa
an Ku
Kud
da - Ku
Kud
da Baja
Baja Rin
Ringan C -TR
-TRUSS 75 0.7
.75
5 199.936 M2 A.4.5
.93 .4.5.2
.2.B
.BJ1
J1 Rp 249
49,3
,35
53.86
.86 Rp4
Rp49,85
,854,81
,812.63
.63
2
2 Pekerjaan Pasangan Atap Spandek 199.936 M A.4.5.2.SP Rp
Rp 94,632.84 Rp18,920,510.50
3 Pekerjaan Pasangan Nok Spandek 2.000 M' A.4.5.2.NK R
Rp
p 1
1006,197.30 Rp 212,394.60
4 Pekerjaan Pasangan Jurai Atap 30.16 M' A.4.5.2.JA Rp 97,884.50 Rp 2,952,196.52
5 Pekerjaan Pasangan Kalsiplank 52.80 M' A.4.5.2.KP Rp 115,632.00 Rp 6,105,369.60
PEKERJAAN KONSTRUKSI ATAP MLAH 9 ###
J PEKERJAAN INSTALASI LISTRIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 11.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 3,812,105.00
2 Pekerjaan Instalasi Stop Kontak 4.000 Ttk A.4.7.2.B Rp 37
3 72,955.00 Rp 1,491,820.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 2.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 120,048.50
4 Pasangan Lampu Down Light 3" SL. 5 Watt 3.000 Ttk A.4.7.2.H Rp 46,494.25 Rp 139,482.75
5 Pasangan Lampu TL LED 2X18 Watt (8 Titik) 6.000 Ttk A.4.7.2.G Rp 116,894.25 Rp 701,365.50
PEKERJAAN PASANGAN SAKLAR
6 Pasangan Saklar Tunggal 3.000 Ttk A.4.7.2.C Rp 27,134.25 Rp
Rp 81,402.75
7 Pasangan Saklar Ganda 4.000 Ttk A.4.7.2.D Rp 31,479.25 Rp 125,917.00
PEKERJAAN PASANGAN STOP KONTAK Rp -
8 Pasa
Pasang
ngan
an Stop
Stop Kont
Kontak
ak 4.00
4.000
0 Ttk
Ttk A.4.
A.4.7.
7.2.
2.E
E Rp 28
28,3
,344
44.2
.25
5 Rp 11
113,
3,37
377.
7.00
00
PEKERJAAN PASANGAN KOTAK MCB Rp -
9 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
10 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
11 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp2,500,0
,00
00.0
.00
0 Rp 2,5
,50
00,0
,00
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK JUMLAH 10 ###
K PEKE
PEKERJ
RJAA
AAN
N SANI
SANITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 2.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp 7 ,,3
340,251.56
PEKERJAAN PAS. WASTAFEL DAN URINOIR
2 Pasangan Wastafel Perlengkapan 2.000 Bh A.5.1.1 5 Rp 985,329.40 Rp 1,970,658.80
PEKERJAAN PAS. PIPA PVC
3 Pekerj
erjaan Pasangan Pipa Pembuangan Padat dia. 4" 15.000 M1 A.5
.5.1
.1..1 32 Rp 95,8
,85
56.7
.75
5 Rp 1
1,,437,851.25
4 Peke
Pekerrja
jaa
an Pasan
asang
gan Pipa
ipa Pemb
Pembu
uang
angan Air Ko
Kottor dia.
ia. 3" 15.000 M1
.00 A.5
.5.1
.1.1
.1 31 Rp 85,7
,73
33.3
.31
1 Rp 1,2
1,285
85,9
,99
99.69
.69
5 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pi
Pipa
pa Pema
Pemasu
suka
kan
n Ai
Airr Be
Bers
rsih
ih dia.
dia. 3/4"
3/4" 50.000 M1
50.000 A.5.
A.5.1.
1.1
1 26 Rp 25
25,9
,990
90.8
.80
0 Rp 1,2
1,299
99,5
,540
40.0
.00
0
PEKERJAAN PAS. ASSESORI PELENGKAP
6 Pekerjaan Pasangan Kran Air (Wastafel) 2.000 Bh A.5.1.1 19a Rp 325,154.50 Rp 650,309.00
7 Pekerjaan Pasangan Kran Air 2.000 Bh A.5.1.1 19 Rp 97,729.50 Rp
Rp 195,459.00
8 Peker
Pekerja
jaan
an Pasa
Pasang
ngan
an Fl
Floo
oorr Dr
Drai
ain
n 2.00
2.000
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 12
121,
1,23
236.
6.50
50 Rp 24
242,
2,47
473.
3.00
00
9 Pekerjaan Pasangan Tempat Sabun Toilet 2.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 137,423.00
10 Pekerj
erjaan Pemb
embuatan Septick Tank + Peres
esa
apan 1.00
.000 Unit A.5
.5.1
.1..1 32 Rp5,311,231.13 Rp 5,311,231.13
PEKERJAAN SANITASI JUMLAH 11 ###
L PEK
PEKER
ERJA
JAAN
AN TA
TANG
NGGA
GA TRAS
TRASRA
RAM
M
1 Pekerjaan Urugan Pasir 0.90 M3 A.2.3.1.11 Rp 238,491.00 Rp 214,641.90
2 Peker
Pekerja
jaan
an Pasa
Pasang
ngan
an Pond
Pondas
asii Tras
Trasra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 45.90 M2 A. 4.
45.90 4.4.
4.1.
1.26
26 Rp 20
205,
5,42
423.
3.08
08 Rp 9
9,4
,428
28,9
,919
19.1
.14
4
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 91.80 M2 A.4.4.2.3 Rp 63,908.28 Rp 5,866,780.47
4 Pekerjaan Urugan Tanah 8.76 M 3
A.2.3.1.9 R
Rp
p 62,205.00 Rp 544,710.52
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.90 M3 A.A.4.1.1.4 R
Rpp1,072,090.71 Rp 964,881.64
PEKERJAAN TANGGA TRASRAM JUMLAH 12 ###
M PEK
PEKERJ
ERJAAN
AAN SA
SALUR
LURAN
AN KKELIL
ELILING
ING GED
GEDUNG
UNG
1 Pekerjaan Galian Tanah Saluran 3.63 M3 A.2.3.1.1 Rp
Rp 84,727.50 Rp 307,560.83
2 Pekerjaan Urugan Pasir Saluran 1.210 M3 A.2.3.1.11 Rp 2
23
38,491.00 Rp
Rp 288,574.11
3 Pekerjaan Beton Rabat Saluran T = 5 cm 1.210 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 1,
1,297,229.76
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 33.880 M2 A. 4.4.1.8 Rp 133,375.33 Rp 4,
4,518,756.18
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 36.300 M2 A.4.4.2.3 Rp 63,908.28 Rp 2,319,870.71
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 13 ###
N PEKE
PEKERJ
RJAA
AANNF FIN
INIS
ISHI
HING
NG
1 Pekerjaan Pipa Hollow 4 x 4 cm 86.400 M' Ls Rp 152,748.75 Rp13,197,492.00
2
2 Pekerjaan Pagar 3.267 M Ls Rp3,712,272.30 Rp12,127,993.60
PEKERJAAN FINISHING JUMLAH 14 Rp ###
PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 97,0
97,065
65,1
,171
71.0
.08
8
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 89,563
89,563,758.
,758.51
51
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 91,861
91,861,150.
,150.68
68
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 898,515,432.35
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 319,282,125.02
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 141,231,203.41
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 86,586
86,586,701.
,701.31
31
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 172,57
172,572,539
2,539.77
.77
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 157,87
157,872,474
2,474.83
.83
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 46,182
46,182,155.
,155.20
20
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 44,744,856.00
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 54,728
54,728,752.
,752.84
84
L PEKERJAAN
PEKERJAAN PIPA SALURAN AIR HUJAN Rp 5,865,415.12
M PEKERJAAN
PEKERJAAN TANGGA TRASRAM Rp 12,481,507.01
N PEKERJAA
PEKERJAAN
N SALURAN KELILING GEDUNG Rp 18,973,631.56
0 PEKE
PEKERJAA
RJAAN
N FINI
FINISHIN
SHING
G Rp 52,503
52,503,380.
,380.00
00
P PEKE
PEKERJAA
RJAAN
N KUBA
KUBAH
H Rp 20,000
20,000,000.
,000.00
00
Rp 2,192,965,083.63
REAL COST (A) Rp 2,290
2,290,030,
,030,254.7
254.71
1
KODE ARGA
ARGA SA
SATA
TAUA
UA JUMLAH
JUMLAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N P
PEM
EMBE
BENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 284.090 M' - Rp 40,480.44 R
Rp
p11,500,088.20
2
2 Me
Meng
ngup
upas
as tana
tanah
h da
dan
n pe
pemb
mber
ersih
sihan
an semak
semak (La
(Land
nd Clea
Cleari
ring
ng 72
725.
5.00
00 M - Rp 1,8
1,890
90.59
.59 Rp 1,37
1,370,
0,67
676.2
6.24
4
3
3 Galian Tanah dan Pembuangan (Cut dan Fill) 870.000 M - Rp 95,338.40 Rp82,944,406.64
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 5
5000,000.00
7 P3K 1.000 Ls
Ls - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AANN LANT
LANTAI
AI SA
SATU
TU
A PE
PEKE
KERJRJAA
AANN TANA
TANAHHD DAN
AN PA
PASI
SIR
R
3
1 Pekerjaan Galian Tanah Pondasi Garis 136.432 M3 A.2.3.1.1 Rp 84,727.50 Rp11,559,529.57
2 Pekerjaan Galian Tanah Pondasi Poer (100 X 100) 24.336 M A.2.3.1.1 Rp 84,727.50 Rp 2,
2,061,928.44
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 24.858 M3 A.2.3.1.9 Rp 62,205.00 Rp 1
1,,546,284.11
3
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 12.168 M A.2.3.1.9 Rp 62,205.00 Rp 756,910.44
3
5 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 11.108 M A.2. 3.
3.1.11 Rp 238, 49
491.00 Rp 2,649,134. 18
18
6 Pekerjaan Urugan Pasir Bawah Pondasi P oe
oer T = 5 cm 1.014 M3 A.2. 3.
3.1.11 Rp 238, 49
491.00 Rp 241,829.87
3
7 Pekerjaan timbunan tanah bawah lantai T = 70 cm 356.105 M A.2. 3.
3.1.15 Rp 176, 30
302.50 Rp62,782,113. 61
61
3
8 Pekerjaan pemadatan tanah per 20 cm 128.061 M A.2.3.1.10 Rp 62,205.00 Rp 7,966,028.28
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANNPPON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 11.108 M3 A.3.2.1.9 Rp 530,626.80 Rp 5
5,,894,149.43
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 95.369 M3 A.3.2.1.2 Rp 901,417.00 Rp85,967,001.25
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAA
AANN ST
STRUK
RUKTURTUR BET
BETON
ON DAN
DAN R RAB
ABAT
AT
PEKERJAAN PONDASI POER
1 Pekerj
Pekerjaan
aan Pondas
Pondasii Poer
Poer P1 ( 100
100 x 100 )
3
- Lantai Kerja Poer K100 2.028 M A.A.4.1.1.4 RpRp1,072,090.71 Rp 2,174,199.96
- Beton K250 4.200 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 5,527,447.43
- Pembesian 886.340 Kg A.4.1.1.17 Rp 19,792.04 Rp17,542,464.95
- Bekisting 24.000 M2 A.4.1.1.20 Rp 215,890.40 Rp 5,181,369.60
PEKERJAAN STEK KOLOM
2 Peke
Pekerj
rjaa
aannSSte
tek
k Kolo
Kolom
m K1 ( 30
30 x 30
30 )
- Beton K250 3.648 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 4,800,982.91
- Pembesian 325.559 Kg A.4.1.1.17 Rp 19,792.04 Rp 6,443,482.32
- Bekisting 18.240 M2 A.4.1.1.22 Rp 400,008.95 Rp 7,296,163.25
PEKERJAAN SLOOF
3 Peke
Pekerj
rjaa
aann Slo
Sloof
of S1 ( 3
30
0 x 45 )
- Beton K-250 7.560 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 9,949,405.38
- Pembesian 296.078 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,859,982.95
- Bekisting 25.200 M2 A.4.1.1.21 Rp 229,640.40 Rp 5,786,938.08
4 Peke
Pekerj
rjaa
aann Slo
Sloof
of S2 ( 3
30
0 x 40 )
- Beton K-250 9.036 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp11,891,908.33
- Pembesian 378.312 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,487,565.10
- Bekisting 30.120 M2 A.4.1.1.21 Rp 229,640.40 Rp 6,916,768.85
5 Pe
Pekerjaan Sloof S3 ( 20 x 30 ) Rp -
- Beton K-250 0.960 M3 A. A.4.1.1.8 Rp1,316,058.91 R
Rpp 1,263,416.56
- Pembesian 80.385 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,590,983.29
- Bekisting 4.800 M2 A.4.1.1.21 Rp 229,640.40 Rp 1,102,273.92
6 Pekerjaan Sloof S4 ( 15 x 40 )
Pe Rp -
- Beton K-250 0.240 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 315,854.14
- Pembesian 20.096 Kg A.4.1.1.17 Rp 1
199,792.04 Rp 3
3997,745.82
- Bekisting 1.600 M2 A.4.1.1.21 Rp 229,640.40 Rp 367,424.64
7 Pekerjaan Sloof S5 ( 15 x 20 ) Rp -
3
- Beton K-250 3.864 M A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 5,084,856.82
- Pembesian 647.049 Kg A.4.1.1.17 Rp 19,792.04 Rp12,806,421.11
- Bekisting 25.758 M2 A.4.1.1.21 Rp 229,640.40 Rp 5,915,077.42
PEKERJAAN KOLOM
8 Pek.
Pek. Kolo
KolommK K1
1 ( 40 x 4
40
0)
- Beton K-250 10.560 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp13,897,582.12
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp25,160,286.61
- Bekisting 52.800 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp21,120,472.56
9 Pek.
Pek. Kolo
Kolom
mKK2
2 ( 30 x 8
80
0)
- Beton K-250 8.640 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p11,370,749.00
- Pembesian 938.422 Kg A.4.1.1.17 Rp 19,792.04 Rp18,573,272.19
- Bekisting 39.600 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp15,840,354.42
10 Pek.
Pek. K
Kol
olom
om K3
K3 ( 2
20
0x5
50
0)
- Beton K-250 2.400 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,158,541.39
- Pembesian 379.014 Kg A.4.1.1.17 Rp 19,792.04 Rp 7,501,465.38
- Bekisting 16.800 M2 A.4.1.1.22 Rp 400,008.95 Rp 6,720,150.36
11 Pek.
Pek. K
Kol
olom
om K4
K4 ( 3
30
0x3
30
0)
- Beton K-250 8.764 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp11,534,203.52
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp24,005,017.21
- Bekisting 58.428 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp23,371,722.93
12 Pek.
Pek. K
Kol
olom
om K5
K5 ( 2
20
0x3
30
0)
- Beton K-250 14.400 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp18,951,248.34
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp45,183,717.16
- Bekisting 120.000 M2 A.4.1.1.22 Rp 400,008.95 Rp48,001,074.00
13 Pek.
Pek. K
Kol
olom
om K6
K6 ( 1
15
5x3
35
5)
- Beton K-250 2.646 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,482,291.88
- Pembesian 471.957 Kg A.4.1.1.17 Rp 19,792.04 Rp 9,340,987.75
- Bekisting 50.400 M2 A.4.1.1.22 Rp 400,008.95 Rp
Rp20,160,451.08
14 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 84.000 M' A.4.1.1.35 Rp 121,198.22 Rp10,180,650.48
PEKERJAAN RINGBALOK DAN BALOK
15 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 1 ( 30 x 45 )
- Beton K-250 7.560 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 9,949,405.38
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp22,714,722.47
- Bekisting 33.600 M2 A.4.1.1.23 Rp 412,672.70 Rp
Rp13,865,802.72
16 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 2 ( 30 x 40 ) M3 Rp -
3
- Beton K-250 9.036 M A. A.4.1.1.8 Rp1,316,058.91 Rp
R p11,891,908.33
- Pembesian ### Kg A.4.1.1.17 Rp 19,792.04 Rp26,549,494.59
- Bekisting 41.415 M2 A.4.1.1.23 Rp 412,672.70 Rp17,090,839.87
17 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 3 ( 30 x 30 )
- Beton K-250 1.440 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 1,895,124.83
- Pembesian 218.613 Kg A.4.1.1.17 Rp 19,792.04 Rp 4,326,787.34
- Bekisting 7.200 M2 A.4.1.1.23 Rp 412,672.70 Rp 2,971,243.44
18 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 4 ( 15 x 20 )
- Beton K-250 2.693 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 3,543,488.62
- Pembesian 450.910 Kg A.4.1.1.17 Rp 19,792.04 Rp 8,924,421.89
- Bekisting 24.681 M2 A.4.1.1.23 Rp 412,672.70 Rp
Rp10,185,278.08
19 Pek
Pekerj
erjaan
aan Ringb
Ringbalk
alk 5 ( 10 x 10 )
- Beton K-250 0.400 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 526,423.56
- Pembesian 241.734 Kg A.4.1.1.17 Rp 19,792.04 Rp 4,784,403.28
- Bekisting 6.000 M2 A.4.1.1.23 Rp 412,672.70 Rp 2,476,036.20
20 Pek
Pekerj
erjaan
aan Balok
Balok 1 ( 15 x 30 )
- Beton K-250 1.800 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 2,368,906.04
- Pembesian 293.027 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,799,592.22
- Bekisting 15.000 M2 A.4.1.1.23 Rp 412,672.70 Rp 6,190,090.50
21 Pek
Pekerj
erjaan
aan Balok
Balok 2 ( 15 x 20 )
- Beton K-250 0.120 M3 A. A.4.1.1.8 Rp - Rp -
- Pembesian 20.096 Kg A.4.1.1.17 Rp1,316,058.91 Rp
Rp26,447,856.82
- Bekisting 1.100 M2 A.4.1.1.23 Rp 412,672.70 Rp 453,939.97
PEKERJAAN BALOK LATEY
22 Pek
Pek.. Balo
Balok
kLLate
atey
y ((15
15 x 3
30)
0)
- Beton K-250 2.070 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 2,724,241.95
- Pembesian 296.749 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,873,258.50
- Bekisting 13.800 M2 A.4.1.1.23 Rp 412,672.70 Rp 5,694,883.26
23 Pek. Balok Latey (10 x 15) diatas ventilasi 12.000 M' A.4.1.1.36 Rp 144,219.35 Rp 1
1,,730,632.20
PEKERJAAN PLAT t=12 cm
24 Peker
Pekerjaan
jaan Plat Beton Bang
Bangunan
unan Utama
Utama T = 12 cm
- Beton K-225 14.688 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp19,142,822.39
- Pembesian 528.870 Kg A.4.1.1.17 Rp 19,792.04 Rp10,467,414.08
- Bekisting 61.200 M2 A.4.1.1.24 Rp 501,208.95 Rp
Rp30,673,987.74
25 Peker
Pekerjaan
jaan P
Plat
lat Be
Beton
ton A
Area
rea Wu
Wudhu
dhu dan
dan WC T = 12 cm
cm
- Beton K-225 4.032 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp 5,254,892.42
- Pembesian 409.920 Kg A.4.1.1.17 Rp 19,792.04 Rp 8,113,151.40
- Bekisting 16.800 M 2
A.4.1.1.24 Rp 501,208.95 Rp 8,420,310.36
26 Peker
Pekerjaan
jaan Plat Beton Mihr
Mihrab
ab T = 12 cm
- Beton K-225 0.792 M3 A. A.4.1.1.8 Rp1,303,296.73 Rp 1,032,211.01
1 SAMBUNGAN
Pekerjaan InstINSTALASI LISTRIK
alasi Titik L ampu 59 Ttk A.4.7.2.A Rp 3
3446,555.00 Rp20,446,745.00
2 Pekerjaan Instalasi Stop Kontak 21 Ttk A.4.7.2.B Rp 3
3772,955.00 Rp 7,832,055.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu DownLight 3" SL. 13 Watt 27 Ttk A.4.7.2.I Rp 197,711.25 Rp 55,,338,203.75
4 Pasa
Pasang
ngan
an Bare
Barett TL
TLCC LED
LED 20 Watt
Watt 5 Tt
Ttk
k A.4.
A.4.7.
7.2.
2.L
L Rp 804,
804,91
911.
1.25
25 Rp 4,
4,02
024,
4,55
556.
6.25
25
5 Pasangan Lampu SL 20 Watt 21 Ttk A.4.7.2.K Rp 54,133.75 R
Rpp 1,136,808.75
6 Pasangan Lampu SL 10 Watt 6 Ttk A.4.7.2.J Rp 48,441.25 Rp 290,647.50
PEKERJAAN PASANGAN SAKLAR
7 Pasangan Saklar Tunggal 6 Ttk A.4.7.2.C Rp
Rp 27,134.25 Rp 162,805.50
8 Pasangan Saklar Ganda 2 Ttk A.4.7.2.D Rp 31,479.25 Rp
Rp 62,958.50
PEKERJAAN PASANGAN STOP KONTAK Rp -
9 Pasa
Pasang
ngan
an St
Stop
op Ko
Kont
ntak
ak 21 Tt
Ttk
k A.4.
A.4.7.
7.2.
2.E
E Rp 28,3
28,344
44.2
.25
5 Rp 59
595,
5,22
229.
9.25
25
PEKERJAAN PASANGAN KOTAK MCB Rp -
10 Pemasangan Box MCB 1 Bh Ls Rp 6
65
5,000.00 Rp 65,000.00
11 Pemasangan MCB 1 Bh Ls Rp 250,000.00 Rp 250,000.00
12 Pem
emaasangan Instalasi Panel Listrik PLN 1 Set Ls Rp3,500,000.00 Rp 3,5
,50
00,0
,00
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK LAH 10 ###
K PEKE
PEKERJ
RJAA
AAN
N SANI
SANITA
TASI
SI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 4.000 Bh A.5.1.1.1a Rp3,670,125.78 Rp14,680,503.11
PEKERJAAN PAS. WASTAFEL DAN URINOIR
2 Pasangan Wastafel Perlengkapan 4.000 Bh A.5.1.1 5 Rp 985,329.40 Rp 3,941,317.60
3 Pasangan Urinoir + Perlengkapan 4.000 Bh A.5.1.1 4 Rp2,127,196.50 Rp 8
8,,508,786.00
PEKERJAAN PAS. PIPA PVC
4 Pek
eker
erjjaan Pasangan Pipa Pemb
embuangan Padat dia. 4" 30.000 M1
.00 A.5.
.5.1.1 32 Rp 95,85
,856.75
.75 Rp 2,8
2,87
75,7
,70
02.5
.50
0
1
5 Peker
ekerja
jaa
an Pas
asan
ang
gan Pip
Pipa Pem
emb
buang
angan Air Koto
Kotorr dia.
ia. 3" 30.000 M
.00 A.5.1
.5.1.1
.1 31 Rp 85,7
,73
33.3
.31
1 Rp 2,57
2,571,99
,999.38
.38
6 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pipa
Pipa Pema
Pemasu
suka
kan
n Air
Air Bers
Bersih
ih dia.
dia. 3/
3/4"
4" 75
75.000 M1
.000 A.5.
A.5.1.
1.1
1 26 Rp 25,9
25,990
90.8
.80
0 Rp 1
1,9
,949
49,3
,310
10.0
.00
0
PEKERJAAN PAS. ASSESORI PELENGKAP
7 Pekerjaan Pasangan Kran Air (Wastafel) 4.000 Bh A.5.1.1 19a R
Rp
p 325,154.50 Rp 1,
1,300,618.00
8 Pekerjaan Pasangan Kran Air 36.000 Bh A.5.1.1 19 Rp
Rp 97,729.50 Rp 3,518,262.00
9 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Floo
Floorr Drai
Drain
n 4.
4.00
000
0 Bh A.
A.5.
5.1.
1.1
1 14 Rp 121,
121,23
236.
6.50
50 Rp 484,
484,94
946.
6.00
00
10 Pekerjaan Pasangan Tempat Sabun Toilet 4.000 Bh A.5.1.1 14a Rp 68,711.50 Rp 274,846.00
11 Pekerjaan Pasangan Mesin Pompa Air 1.000 Bh Ls Rp2,500,000.00 Rp 2,500,000.00
12 Pekerjaan Pasangan Tangki Air = 1200 Liter 1.000 Bh Ls Rp1,500,000.00 Rp 1,
1,500,000.00
13 Pek
eker
erjjaan Pembuatan Sept
eptick Tank + Peres
esa
apan 2.0
.00
00 Unit A.5.
.5.1.1 32 Rp5,311,231.13 Rp10,622,4
,46
62.2
.25
5
PEKERJAAN SANITASI LAH 11 ###
L PE
PEKE
KERJ
RJAA
AAN
N PIPA
PIPA SAL
SALUR
URAN
AN A
AIR
IR HUJ
HUJAN
AN
1 Pek.
Pek. Pas.
Pas. Pipa
Pipa Salu
Salura
ran
n Air
Air Hu
Huja
jan
n tert
tertan
anam
am Dala
Dalam
m Kolo
Kolom
m 36
36.00 M1
.00 A.
A.5.
5.1.
1.1
1 35 Rp 142,
142,72
722.
2.11
11 Rp 5,13
5,137,
7,99
996.
6.12
12
1
2 Pekerjaan Pasangan Pipa Saluran Air Hujan 3" M Rp -
3 Pemasangan Floor Drain 6.00 Bh A.5.1.1 14 Rp 121,236.50 Rp 727,419.00
PEKERJAAN PIPA SALURAN AIR HUJAN JUMLAH 12 ###
M PE
PEKE
KERJ
RJAA
AANN TANG
TANGGAGA TRA
TRASR
SRAM
AM
1 Pekerjaan Urugan Pasir 0.61 M3 A.2.3.1.11 Rp 238,491.00 Rp 145,169.47
2
2 Peke
Pekerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Pond
Pondas
asii Tr
Tras
asra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 34
34.49 M
.49 A. 4.4.
4.4.1.
1.26
26 Rp 205,
205,42
423.
3.08
08 Rp 7,0
7,085
85,6
,658
58.1
.13
3
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 68.99 M2 A.4.4.2.3 Rp 63,908.28 Rp 4,408,776.88
3
4 Pekerjaan Urugan Tanah 3.04 M A.2.3.1.9 R
Rp
p 62,205.00 Rp 189,320.92
3
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.61 M A.A.4.1.1.4 R
Rpp1,072,090.71 Rp 652,581.61
PEKERJAAN TANGGA TRASRAM JUMLAH 13 ###
N PEKERJA
PEKERJAANAN SALURA
SALURAN N KKELIL
ELILING
ING GEDUNG
GEDUNG
1 Pekerjaan Galian Tanah Saluran 26.05 M3 A.2.3.1.1 Rp 84,727.50 Rp 2,207,549.59
2 Pekerjaan Urugan Pasir Saluran 3.722 M3 A.2.3.1.11 Rp 2
23
38,491.00 R
Rp
p 887,687.35
3 Pekerjaan Beton Rabat Saluran T = 5 cm 1.241 M 3
A.A.4.1.1.4 Rp
R p1,072,090.71 Rp 1,
1,330,142.94
2
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 49.628 M A. 4.4.1.8 Rp 133,375.33 Rp 6
6,,619,150.88
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 124.070 M2 A.4.4.2.3 Rp 63,908.28 Rp 7
7,,929,100.80
PEKERJAAN SALURAN KELILING GEDUNG JUMLAH 14 ###
O PEKE
PEKERJ
RJAA
AAN
N FIN
FINIS
ISHI
HING
NG
1 Pekerjaan Pasangan Batu Alam 4.333 M2 Ls Rp 180,000.00 Rp 779,940.00
2 Pekerjaan Pasangan Wall Panel GRC tebal = 8cm 60.086 M2
Ls Rp 850,000.00 Rp51,073,440.00
3 Pekerjaan Pemasangan Huruf Stainless Steel 10.000 Bh Ls Rp 65,000.00 Rp
Rp 650,000.00
PEKERJAAN FINISHING JUMLAH 15 Rp ###
P PE
PEK
KERJA
ERJAAN
AN KUBA
UBAH
1 Pekerjaan Pasangan Kubah GRC dan Rangka d = 900 t = 1.000 Set Ls ### Rp20,000,000.00
PEKERJAAN KUBAH JUMLAH 16 ###
PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 24,5
24,593
93,0
,001
01.2
.26
6
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 21,348
21,348,025.
,025.74
74
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 37,151
37,151,993.
,993.79
79
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 111,810,994.60
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 76,741,472.13
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp -
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 8,184,
8,184,015.4
015.400
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 26,814
26,814,899.
,899.23
23
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 20,268
20,268,350.
,350.87
87
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP BAJA BERA
BERAT
T Rp 224,26
224,268,713
8,713.54
.54
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 15,533,896.75
K PEKE
PEKERJAA
RJAAN
N TEM
TEMPAT
PAT BILA
BILAS
S KAKI Rp 1,772,
1,772,049.1
049.11
1
L PEKERJAA
PEKERJAAN
N FINI
FINISHIN
SHING
G Rp -
Rp 543,894,411.16
REAL COST (A) Rp 568,4
568,487,41
87,412.42
2.42
PPN 10% (B) Rp 56,84
56,848,741
8,741.24
.24
TOTAL COST (A+B) Rp 625,3
625,336,15
36,153.66
3.66
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
KODE AR
ARGA
GA SA
SATAU
TAUA
A JUMLAH
JUMLAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PEKER
PEKERJAA
JAAN
N PEMBE
PEMBENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 94.000 M' - Rp 40,480.44 Rp
Rp 3,805,161.36
2 Mengup
Mengupas
as tanah
tanah dan
dan pemb
pembers
ersiha
ihan
n semak
semak (Land
(Land Cleari
Clearin
n 168.00 M 2
- Rp 1,890.59 Rp 317,618.77
3 Galian Tanah dan Pembuangan (Cut dan Fill) 201.600 M 3 - Rp 95,338.40 Rp19,220,221.13
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
500,000.00
7 P3K 1.000 Ls
Ls - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AAN N LA
LANT
NTAI
AI S
SAT
ATU
U
A PEKE
PEKERJ RJAA
AAN NTTAN
ANAH
AH DAN
DAN PAS
PASIR
IR
1 Pekerjaan Galian Tanah Pondasi Garis 76.140 M3 A.2.3.1.1 Rp 84,727.50 Rp 6,451,151.85
2 Pekerjaan Galian Tanah Pondasi Poer (80 X 80) 7.290 M 3
A.2.3.1.1 Rp 84,727.50 Rp 617,663.48
3 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 16.920 M 3
A.2.3.1.9 Rp 62,205.00 Rp 1,
1,052,508.60
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 3.645 M 3
A.2.3.1.9 Rp 62,205.00 Rp 226,737.23
5 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 4.230 M3 A.2.3.1.11 Rp 238,491.00 Rp 1 ,0
,0 0
08
8,816.93
6 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 0.620 M3 A.2.3.1.11 Rp 238,491.00 Rp 14
47
7,749.94
3
7 Pekerjaan timbunan tanah bawah lantai T = 40 cm 55.440 M A.2.3.1.15 Rp 176,302.50 Rp 9,774,210.60
8 Pekerjaan pemadatan tanah per 20 cm 33.264 M 3
A.2.3.1.10 Rp 62,205.00 Rp 2,069,187.12
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AANN PON
PONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 16.920 M3 A.3.2.1.9 Rp 530,626.80 Rp 8,978,205.46
3
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 31.255 M A.3.2.1.2 Rp 901,417.00 Rp28,173,788.34
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEKERJ
PEKERJAAN
AAN STRUKT
STRUKTUR UR BETO
BETON ND DAN
AN R
RABA
ABATT
PEKERJAAN PONDASI POER
1 Pe
Peke
kerj
rjaa
aan
n Po
Pond
ndas
asii Po
Poer
er P
P1
1 ( 80 x 80
80 )
- Lantai Kerja Poer K100 0.387 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 415,113.52
- Beton K250 7.290 M A. A.4.1.1.8 Rp1,316,058.91 Rp
3
R p 9,594,069.47
- Pembesian 298.702 Kg A.4.1.1.17 Rp 19,792.04 Rp 5,911,913.77
- Bekisting 3.200 M2 A.4.1.1.20 Rp 215,890.40 Rp 690,849.28
PEKERJAAN STEK KOLOM
2 Pe
Peke
kerj
rjaa
aann St
Stek
ek K
Kol
olom
om K1
K1 ( 25 x 25 )
- Beton K250 0.500 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 658,029.46
- Pembesian 89.235 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,766,135.92
- Bekisting 4.800 M2 A.4.1.1.22 Rp 400,008.95 Rp 1,920,042.96
PEKERJAAN SLOOF
3 Pekerjaan Sloof S1 ( 20 x 25 )
Pe Rp -
- Beton K-250 4.150 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 5,461,644.49
- Pembesian 651.695 Kg A.4.1.1.17 Rp 19,792.04 Rp12,898,365.99
- Bekisting 20.750 M2 A.4.1.1.21 Rp 229,640.40 Rp 4,765,038.30
4 Pe
Peke
kerj
rjaa
aann Slo
Sloof
of S2 ( 15
15 x 20 )
- Beton K-250 0.422 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 555,903.28
- Pembesian 70.739 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,400,065.29
2
- Bekisting 2.816 M A.4.1.1.21 Rp 229,640.40 Rp 646,667.37
PEKERJAAN KOLOM
5 Pe
Pek.
k. Ko
Kolo
lom
m K1 ( 25 x 25 ) Rp -
- Beton K-250 0.250 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 329,014.73
- Pembesian 29.303 Kg A.4.1.1.17 Rp 1
199,792.04 Rp 5 79,959.22
- Bekisting 2.000 M2 A.4.1.1.22 Rp 400,008.95 Rp 800,017.90
6 Pekerjaan Kolom Praktis Kp ( 15 x 15 ) 27.000 M' A.4.1.1.35 Rp 121,198.22 Rp 3,
3,272,351.94
PEKERJAAN RINGBALOK
7 Pek
Pekerj
erjaan
aan Bal
Balok
ok B1 ( 15 x 15 ) Rp -
3
- Beton K-250 0.210 M A. A.4.1.1.8 Rp1,316,058.91 Rp 276,372.37
- Pembesian 30.047 Kg A.4.1.1.17 Rp 19,792.04 Rp 594,698.99
- Bekisting 1.925 M2 A.4.1.1.23 Rp 412,672.70 Rp 794,394.95
8 Pe
Peke
kerj
rjaa
aann Ri
Ring
ngba
balk
lk (1
(12
2 x 15 )
- Beton K-250 0.360 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
Rp 473,781.21
- Pembesian 70.363 Kg A.4.1.1.17 Rp 19,792.04 Rp 1,392,630.99
- Bekisting 4.200 M2 A.4.1.1.23 Rp 412,672.70 Rp 1,733,225.34
PEKERJAAN BAJA BERAT (IWF)
9 Pekerjaan Kolom Baja 150.75.5.7 347.20 kg A.4.2.1.1 Rp 37,654.65 Rp13,073,694.48
Pekerjaan Pasangan Baut M - 19 40.00 Bh - Rp 12,000.00 Rp
Rp 480,000.00
Pekerjaan Pasangan Plat 16 mm 58.88 kg A.4.2.1.1 Rp 37,654.65 Rp 2,216,917.52
Pekerjaan Pasangan Angkur 22 mm L = 75 cm 30.00 M' - Rp 58,000.00 Rp 1,
1,740,000.00
Pek
eker
erjjaa
aan
n Peng
ngel
elas
asan
an Kaw
awa
at baja
aja las El
Ele
ekt
ktro
rod
da 3.
3.2
2 450.00
0.00 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,9
,92
22.
2.65
65 Rp 1,3
1,31
15,1
,190
90.2
.25
5
Cat Zincromate 11.16 M2 A.4.7.1.19 Rp 36,453.45 Rp 406,820.50
10 Pekerjaan Ringbalk Baja 150.75.5.7 770.00 kg A.4.2.1.1 Rp 37,654.65 Rp28,994,080.50
Pekerjaan Pasangan Mur Baut M - 16 160.00 Bh - Rp 10,000.00 Rp 1,600,000.00
Pekerjaan Pasangan Plat 12 mm 49.46 kg A.4.2.1.1 Rp 37,654.65 Rp 1,862,210.72
Pek
eker
erjjaa
aan
n Peng
ngel
elas
asan
an Kaw
awaat baja
aja las El
Ele
ekt
ktro
rod
da 3.
3.2
2 206.25
6.25 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,9
,92
22.
2.65
65 Rp 60602
2,7
,795
95.5
.53
3
Cat Zincromate 24.75 M2 A.4.7.1.19 Rp 36,453.45 Rp 902,222.89
11 Pekerjaan Trektank 85.22 kg A.4.1.1.17 Rp 19,792.04 Rp 1,686,775.48
PEKERJAAN STRUKTUR BETON DAN RABAT MLAH 3 ###
D PEK
PEKERJ
ERJAAN
AAN PAS
PASANG
ANGAN
AN & PLESTER
PLESTERAN
AN D
DIND
INDING
ING
1 Pekerjaan Pasangan Dinding Bata Ringan 184.198 M2 A. 4.4.1.26 Rp 205,423.08 Rp37,838,416.86
2 Pekerjaan Plesteran Dinding tebal 1.5 cm 368.395 M2 A.4.4.2.5 Rp 61,059.86 Rp22,494,145.65
PEKERJAAN FINISHING DINDING DAN KOLOM Rp -
3 Pek
eker
erjjaa
aan
n Aci
cian
an 36
368.395 M2
8.395 A.4
.4..4.
4.2.
2.2
27 Rp 42
42,2
,22
26.
6.25
25 Rp1
Rp15,
5,55
555
5,9
,939
39.3
.37
7
4 Pekerjaan Acian Kolom 20.200 M A.4.4.2.27
2
Rp 42,226.25 Rp 852,970.25
PEKERJAAN PASANGAN & PLESTERAN DINDING MLAH 4 ###
E PEKERJ
PEKERJAANAAN KUS
KUSENEN PINTU
PINTU,, JENDE
JENDELA
LA DAN VEN
VENTILA
TILASI
SI ALUMI
ALUMINIU
NIUM
M
PEKERJAAN KUSEN, DAUN DAN VENTILASI PINTU
1 Pe
Peke
kerj
rjaa
aan
n Pi
Pint
ntu
u PJ1
PJ1 1.000 Bh 0.00 Rp - Rp -
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
2 Pe
Peke
kerj
rjaa
aan
n Jen
Jende
dela
la J1 2.000 Bh 0.00 Rp - Rp -
3 Pe
Peke
kerj
rjaa
aan
n Jen
Jende
dela
la J2 10.000 Bh 0.00 Rp - Rp -
4 Pekerjaan Ventilasi V1 Bh Rp -
PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5
ERJAAN KUSEN PINTU, Rp -
F PEKE
PEKER RJAAN
JAAN PLAF
PLAFON OND
D
PEKERJAAN RANGKA PLAFOND
1 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Ra
Rang
ngka
ka Plafo
lafond
nd Alum
Alumin
iniu
ium
m Holl
Hollow
ow 2 37
37.8
.840
40 M2 A.
A.4.
4.2.
2.1.
1.21
21 Rp 13
130,
0,39
397.
7.30
30 Rp 4,934
4,934,2
,233
33.8
.83
3
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 37.840 M2 A.4.5.1.7 Rp 52,890.20 Rp 2,
2,001,365.17
3 Pekerjaan Pasangan List Plafond Gypsumboard 45.800 M 1
A.4.5.1.7a Rp 27,258.00 Rp 1,248,416.40
PEKERJAAN PLAFOND MLAH 7 ###
G PEKE
PEKERRJAAN
JAAN LA
LAN
NTA
TAII
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 16.012 M3 A.2.3.1.15 Rp 176,302.50 Rp 2,
2,822,955.63
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 1.892 M 3
A.A.4.1.1.4 Rp1,072,090.71 Rp 2,
2 ,028,395.62
3 Pekerjaan Beton Rabat Bawah Lantai T = 7 cm 8.560 M3 A.A.4.1.1.4 Rp1,072,090.71 Rp 9,
9 ,176,667.63
PEKERJAAN RABAT LANTAI KELILING BANGUNAN
4 Pekerjaan Urugan Pasir Keliling Bangunan + Teras 5.408 M3 A.2.3.1.15 Rp 176,302.50 Rp 953,443.92
5 Pekerjaan Beton Rabat Keliling Bangunan T = 7 cm 3.786 M 3
A.A.4.1.1.4 Rp1,072,090.71 Rp 4,
4,058,506.59
PEKERJAAN LANTAI DAN DINDING KERAMIK
6 Pekerjaan Lantai Keramik (40/40) 37.840 M2 A.4.4.3.4 Rp 1
1662,302.58 Rp 6,141,529.63
7 Pekerjaan Plint Dinding Tile (10/40) 45.800 M 1
A.4.4.3.29 Rp
Rp 35,663.76 Rp
R p 1,633,400.21
PEKERJAAN LANTAI JUMLAH 8 ###
H PEKE
PEKERJ
RJAA
AANN PE
PENG
NGEC
ECAT
ATANAN
PEKERJAAN PENGECATAN DINDING DAN KO KOLOM
LOM
1 Pekerjaan Pengecatan Dinding Interior 228.626 M2 A.4.7.1.10a Rp 42,208.38 Rp 9,649,910.84
2
2 Pekerjaan Pengecatan Dinding Exterior 139.770 M A.4.7.1.10 Rp 54,033.38 Rp 7,552,217.81
3 Pekerjaan Pengecatan Dinding Kolom 20.200 M 2
A.4.7.1.10a Rp 42,208.38 Rp 852,609.18
PEKERJAAN PENGECATAN PLAFOND
4 Pe
Peke
kerj
rjaa
aan
n Pe
Peng
ngec
ecat
atan
an Plaf
Plafon
ond
d da
dan
n List
List 47
47.0
.000
00 M2 A.4.
A.4.7.
7.1.
1.5
5 Rp 47
47,0
,098
98.1
.15
5 Rp 2,
2,21
213,
3,61
613.
3.05
05
PEKERJAAN PENGECATAN JUMLAH 9 ###
I PEKER
PEKERJAJAAN
AN KKON
ONST
STRU
RUKS
KSII ATAP
ATAP BAJA
BAJA BERAT
BERAT
1 Pekerjaan Pasangan Atap Spandek 269.222 M2 A.4.5.2.SP Rp 94,632.84 Rp25,477,278.96
2 Pekerjaan Pasangan Nok Spandek 26.240 M' A.4.5.2.NK R
Rpp 106,197.30 Rp 2,786,617.15
3 Pekerjaan Pasangan Kalsiplank 73.00 M' A.4.5.2.KP Rp
Rp 111
15,632.00 R
Rpp 8,441,136.00
PEKERJAAN KAKI KUDA-KUDA BAJA
4 Pekerjaan Kaki Kuda-Kuda Baja 150.75.5.7 1163.68 kg A.4.2.1.1 Rp 37,654.65 Rp43,817,963.11
Pekerjaan Pasangan Baut M - 16 160.00 Bh - Rp 10,000.00 R
Rpp 1,600,000.00
Pekerjaan Pasangan Plat 12 mm 49.46 kg A.4.2.1.1 Rp 37,654.65 Rp 1,862,210.72
Peke
ekerja
rjaan Peng
ngeelasa
lasan
n Kawat
awat baj
aja
a las
las El
Elek
ekttro
rod
da 3.2 311.
1.70
70 CM A.4
.4.2
.2.1
.1.5
.5 Rp 2,9
,92
22.6
.65
5 Rp 910,9 ,988
88.4
.45
5
Cat Zincromate 37.40 M2 A.4.7.1.19 Rp 115,632.00 R
Rp
p 4,325,099.33
PEKERJAAN GORDING BAJA
5 Pekerjaan Gording CNP 125.50.20.2,3 1824.68 kg A.4.2.1.1 Rp 36,453.45 Rp66,515,776.16
Pekerjaan Pasangan Baut M - 16 140.00 Bh - Rp 10,000.00 R
Rpp 1,400,000.00
PEKERJAAN : PE
PEMB
MBAN
ANGU
GUNA
NAN
N KAM
KAMPU
PUS
S II
II P
POL
OLIT
ITEK
EKNI
NIK
K P
PEM
EMBA
BANG
NGUN
UNAN
AN PE
PERT
RTAN
ANIA
IAN
N ((PO
POLB
LBAN
AN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA PUTRI
LOKASI : KEC. PONRE KABUPATEN BONE PROV. SUL-SEL
TAHUN ANGGARAN
ANGGARAN : 2019
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 16,6
16,602
02,4
,432
32.0
.08
8
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 16,966
16,966,793.
,793.92
92
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 30,670
30,670,156.
,156.58
58
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 70,560,906.17
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 16,619,576.38
E PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 19,546
19,546,532.
,532.03
03
F PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 16,612
16,612,541.
,541.07
07
G PEKERJAA
PEKERJAAN
N KONSTRUKSI ATAP Rp 69,405,287.71
H PEKERJAAN
PEKERJAAN INSTALASI LISTRIK Rp 5,463,171.25
I PEKE
PEKERJAA
RJAAN
N TAN
TANGGA
GGA TRASRAA
TRASRAAM
M Rp 17,019
17,019,933.
,933.68
68
J PEKERJAAN
PEKERJAAN KAYU TEMPAT
TEMPAT MAKAN KAMBING Rp 48,232,066.75
Rp 311,096,965.53
REAL COST (A) Rp 327,6
327,699,39
99,397.61
7.61
PPN 10% (B) Rp 32,76
32,769,939
9,939.76
.76
TOTAL COST (A+B) Rp 360,4
360,469,33
69,337.37
7.37
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
KODE AR
ARGA
GA SATAU
SATAUA
A JUM
JUMLAH
LAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMBE
MBENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 77.600 M' - Rp 40,480.44 Rp
Rp 3,141,282.14
2
2 Meng
Mengup
upas
as tana
tanah
h dan
dan pemb
pember
ersi
siha
han
n se
sema
mak
k (Lan
(Land
d Clea
Cleari
ring
ng 105.
105.00
00 M - Rp 1,
1,89
890.
0.59
59 Rp 19
198,
8,51
511.
1.73
73
3 Galian Tanah dan Pembuangan (Cut dan Fill) 126.000 M 3
- Rp 95,338.40 Rp12,012,638.20
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 50
5 00,000.00
7 P3K 1.000 L
Ls
s - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PE
PEKE
KERJRJAA
AANN LANT
LANTAI
AI SA
SATU
TU
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DAN
DAN PAS
PASIR
IR
G PEK
PEKER
ERJA
JAAN
AN KONS
KONSTR TRUK
UKSI
SI A
ATA
TAPP
1 Peke
Pekerj
rja
aan Kuda - Ku
Kud
da Baj
aja
a Ring
ingan C -TRU
TRUSS 75 0.7
.75
5 175.066 M2 A.4
5.0 .4.5
.5.2
.2.B
.BJ1
J1 Rp 24
249
9,3
,35
53.8
.86
6 Rp
Rp4
43,6
,65
53,3
,38
82.22
.22
2
2 Pekerjaan Pasangan Atap Spandek 175.066 M A.4.5.2.SP Rp
Rp 94,632.84 Rp16,566,991.89
3 Pekerjaan Pasangan Nok Spandek 16.150 M' A.4.5.2.NK Rp 106,197.30 Rp 1,
1,715,086.40
4 Pekerjaan Pasangan Kalsiplank 64.60 M' A.4.5.2.KP Rp 115,632.00 Rp 7,469,827.20
PEKERJAAN KONSTRUKSI ATAP MLAH 4 ###
H PEK
PEKER
ERJA
JAAN
AN INS
INSTA
TALALASI
SI LI
LIST
STRI
RIK
K
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 3.000 Ttk A.4.7.2.A Rp 346,555.00 Rp 1,039,665.00
2 Pekerjaan Instalasi Stop Kontak 1.000 Ttk A.4.7.2.B Rp 37
372,955.00 Rp
Rp 372,955.00
PEKERJAAN PASANGAN LAMPU
3 Pasangan Lampu Down Light 3" SL. 9 Watt 3.000 Ttk A.4.7.2.G Rp 60,024.25 Rp 180,072.75
PEKERJAAN PASANGAN SAKLAR
4 Pasangan Saklar Tunggal 1.000 Ttk A.4.7.2.C Rp 27,134.25 Rp
Rp 27,134.25
PEKERJAAN PASANGAN STOP KONTAK Rp -
5 Pasa
Pasang
ngan
an Stop
Stop Kont
Kontak
ak 1.00
1.000
0 Ttk
Ttk A.
A.4.
4.7.
7.2.
2.E
E Rp 28
28,3
,344
44.2
.25
5 Rp 28
28,3
,344
44.2
.25
5
PEKERJAAN PASANGAN KOTAK MCB Rp -
6 Pemasangan Box MCB 1.00 Bh Ls Rp 6
655,000.00 Rp 65,000.00
7 Pemasangan MCB 1.00 Bh Ls Rp 250,000.00 Rp 250,000.00
8 Pemasangan Instalasi Panel Listrik PLN 1.00 Set Ls Rp3,5
,50
00,0
,00
00.0
.00
0 Rp 3,5
,50
00,0
,00
00.0
.00
0
PEKERJAAN INSTALASI LISTRIK MLAH 5 ###
I PEKER
PEKERJAJAAN
AN TANG
TANGGA GA TRAS
TRASRA
RAAM
AM
1 Pekerjaan Urugan Pasir 0.90 M3 A.2.3.1.11 Rp 238,491.00 Rp 214,641.90
2
2 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Pond
Pondas
asii Tras
Trasra
ram
m dan
dan Salu
Salura
ran
n 1 Pc : 45.9
45.90
0 M A. 4.
4.4.
4.1.
1.26
26 Rp 20
205,
5,42
423.
3.08
08 Rp 9,4
9,428
28,9
,919
19.1
.14
4
3 Pekerjaan Plesteran Trasram tebal 1.5 cm 91.80 M2 A.4.4.2.3 Rp 63,908.28 Rp 5,866,780.47
4 Pekerjaan Urugan Tanah 8.76 M3
A.2.3.1.9 R
Rp
p 62,205.00 Rp 544,710.52
5 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 0.90 M3
A.A.4.1.1.4 Rp
Rp1,072,090.71 Rp 964,881.64
PEKERJAAN TANGGA TRASRAAM ###
J PEKERJAAN KAYU TEMPAT MAKANMAKAN KAMBING
1 Tempat Makan Kambing Kayu (Kelas I Ulin) 34.144 M2 A.4.6.1.22 Rp 839,227.40 Rp28,654,580.35
2 Pekerjaan Pengecatan Permukaan Kayu Baru 34.14 M2 A.4.7.1.4 Rp 46,645.71 Rp 1,592,671.09
PEKERJAAN KAYU TEMPAT MAKAN KAMBING ###
I PEK
EKER
ERJJAAN PEM
PEMBE
BEN
NTU
TUK
KAN LAHA
LAHAN
N
1 Pengukuran dan Pemasangan Bouwplank 88.00 M'
2
525.00
2 Mengupas
Mengup as tanah
tanah dan pem
pember
bersih
sihan
an sem
semak
ak (La
(Land
nd Cle
Cleari
aring)
ng) M
3 Galian Tanah dan Pembuangan (Cut dan Fill) 630.00 M3
4 Air Kerja 1.00 Ls
5 Listrik Kerja 1.00 Ls
PEKERJAAN PEMBENTUKAN LAHAN MLAH A
II PE
PEKE
KERJRJAA
AANNPPEM
EMBA
BANG
NGUN
UNAN
AN GUGUES
EST
THHOU
OUSE
SE
A PE
PEKE
KERJRJAA
AANN TA
TANNAH DA
DANN PA
PASI
SIRR
1 Pekerjaan Galian Tanah Pondasi Garis 55.75 M3
2 Pekerjaan Galian Tanah Pondasi Poer P1 0.83 M3
4 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 68.34 M3
5 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Poer 0.42 M3
3
6 Pekerjaan Urugan Pasir Bawah Pondasi Garis T=5 cm 10.64 M3
7 Pekerjaan Urugan Pasir Bawah Pondasi Poer T = 5 cm 0.05 M
8 Pekerjaan timbunan tanah bawah lantai T = 65 cm 25.99 M3
9 Pekerjaan pemadatan tanah per 20 cm 151.00 M3
PEKERJAAN TANAH DAN PASIR MLAH 1
B PEKERJAAN P PO
ONDASI
1 Pekerjaan Pasangan Pondasi Batu Kosong 42.56 M3
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 101.65 M3
PEKERJAAN PONDASI MLAH 2
C PE
PEKE
KERJ
RJAA
AAN
NS STR
TRUK
UKTU
TURRB
BET
ETON
ON DA
DAN NRRAB
ABAT
AT
PEKERJAAN PONDASI POER
1 Pe
Peke
kerj
rjaan
aan Po
Pond
ndas
asii P
Poe
oerr P
P1
1 ( 60 x 6
60
0)
- Lantai Kerja Poer K100 0.05 M3
- Beton K250 0.11 M3
- Pembesian 22.73 Kg
- Bekisting 1.44 M2
PEKERJAAN STEK KOLOM
1 Pe
Peke
kerj
rjaa
aannSSte
tek
kKKol
olom
om K1 ( 2
25
5 x 25 )
- Bekisting M2
5 Pek
ek.. Ko
Kolo
lom
m K5 ( 20 x 30 )
- Beton K-225 M3
- Pembesian Kg
- Bekisting M2
1 Pekerjaa
aan
n Pintu PJ1 1.00 Bh
2 Pekerjaan P
Piintu P
P2
2 1.00 Bh
3 Pekerjaan P
Piintu P
P3
3 8.00 Bh
4 Pe
Peke
kerj
rjaa
aan
nPPin
intu
tu P4 Pa
Pabr
brik
ikas
asii 9.00 Bh
5 Pekerjaan Pi
Pintu P5
P5 Bh
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
1 Pekerjaa
aan
n Jendela J1 2.00 Bh
2 Pekerjaa
aan
n Jendela J2 4.00 Bh
3 Pekerjaa
aan
n Jendela J3 4.00 Bh
4 Pekerjaa
aan
n Jendela J4 2.00 Bh
5 Pekerjaa
aan
n Jendela J5 4.00 Bh
6 Pekerjaan Ventilasi V1 Bh
7 Pekerjaan Ventilasi V2 Bh
PEKERJAAN KUSEN
KUSEN PINTU, JEND
JENDELA VENTILASI ALUMINIUM MLAH 5
ELA DAN VENTILASI
F PE
PEKE
KERJ
RJAA
AAN
N KO
KON
NST
STRU
RUKS
KSII AT
ATAP
AP
1 Pekerjaan Kuda - Kuda Baja Ringan prol C 75 0.75 87.68 M2
2 Pekerjaan Pasangan Atap Spandek 0.35 mm 87.68 M2
3 Pekerjaan Pasangan Nok Spandek 987.56 M'
4 Pekerjaan Pasangan Jurai Atap 27.04 M'
4 Pekerjaan Pasangan Kalsiplank 130.66 M'
PEKERJAAN KONSTRUKSI ATAP MLAH 6
G PE
PEKE
KERJ
RJAA
AANN IINS
NSTA
TALA
LASISI L
LIS
ISTRTRIKIK
SAMBUNGAN INSTALASI LISTRIK
1 Pekerjaan Instalasi Titik Lampu 49.00 T
Tttk
2 Pekerjaan Instalasi Stop Kontak 21.00 T
Tttk
PEKERJAAN PASANGAN LAMPU
1 pasangan lampu sumpit 5 Watt 19.00 Bh
2 pasangan lampu sumpit 14 Watt 5.00 B
Bhh
3 pasangan lampu sumpit 20 Watt 25.00 Bh
4 Downlight 18 Watt Bh
5 Downlight 9 Watt Bh
6 Lampu neon panjang 5 Watt Bh
PEKERJAAN PASANGAN SAKLAR
1 Pasangan Saklar Tunggal 49.00 Bh
2 Pasangan Saklar Ganda Bh
PEKERJAAN PASANGAN STOP KONTAK
1 Pa
Pasa
sang
ngan
an Stop
Stop Ko
Kont
ntak
ak 21.0
21 .000 Bh
PEKERJAAN PASANGAN KOTAK MCB
1 Pemasangan Box MCB 1.00 Bh
2 Pemasangan MCB 1.00 Bh
3 Pe
Pema
masa
sang
ngan
an Inst
Instal
alas
asii Pa
Pane
nell Li
List
stri
rik
k PL
PLN
N 1.
1.00
00 Se
Sett
PEKERJAAN INSTALASI LISTRIK MLAH 7
H PEKERJAAN S
SA
ANITASI
PEKERJAAN PASANGAN KLOSET
1 Pas. Kloset Duduk Ex.TOTO/KIA + Perlengkapan 9.00 Bh
2 Pa
Pas.
s. Kl
Klos
oset
et Jo
Jong
ngko
kok
k Ex
Ex.T
.TOT
OTO/
O/KI
KIA
A Bh
PEKERJAAN PAS. WASTAFEL DAN URINOIR
1 Pasangan Wastafel Perlengkapan 1.00 Bh
PEKERJAAN PAS. PIPA PVC
1 Pekerjaan Pasangan Pipa Pembuangan Padat dia. 4" 441.13 M1
2 Pekerjaan P
Pa
asangan P
Piipa P
Pe
embuangan A
Aiir K
Ko
otor d
diia. 3
3"" 33.78 M1
3 Pekerjaa
aan
n Pas
asa
angan Pipa Pemasukan Air Bersih dia. 3/4" 61.92 M1
4 Pek
Pekerj
erjaan
aan Pas
Pasang
angan
an P
Pipa
ipa Pem
Pemasu
asukan
kan Air
Air B
Ber
ersih
sih dia
dia.. 1
1"" M1
PEKERJAAN PAS. ASSESORI PELENGKAP
1 Pekerjaan Pasangan Kran Air (Wastafel) 1.00 Bh
2 Pekerjaan Pasangan Kran Air 10.00 Bh
3 Pek
eker
erjjaa
aan
n Pas
asan
anga
gan
n Flo
loor
or Dr
Drai
ain
n 11.00
.00 Bh
4 Pe
Peke
kerj
rjaa
aan
n Pa
Pasa
sang
ngan
an Te
Temp
mpat
at Sa
Sabu
bun
n Bh
5 Pekerjaan Pipa Saluran Air Hujan 4" M'
6 Pekerjaan Pembuatan Septick Tank + Peresapan 1.00 Unit
PEKERJAAN SANITASI MLAH 8
I PEKERJAAN PLAFOND
PEKERJAAN RANGKA PLAFOND
2
1 Pekerj
Pekerjaa
aan
nPPas
asan
anga
gan
nRRan
angk
gka
a Pla
Plafo
fond
nd Al
Alum
umin
iniu
ium
m Ho
Holl
llow
ow 2/ 415.57
415.57 M
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 415.57 M2
5 Pe
Peke
kerj
rjaan
aan P
Pasa
asang
ngan
an P
Pla
lafo
fond
nd K
Kal
alsi
sibo
boar
ard
d T. 3
3,5
,5 m
mm
m M2
6 Pekerjaan Pasangan List Plafond Gypsumboard 540.34 M1
PEKERJAAN PLAFOND MLAH 9
J PEKERJAAN LANTAI
PEKERJAAN URUGAN DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 17.29 M3
2 Pekerjaan Beton Rabat Bawah Lantai T = 5 cm 17.29 M3
PEKERJAAN LANTAI GRANIT TILE
1 Memasang lantai homogenius tile 60 x 60 cm 321.79 M2
2 Plint homogenius tile 10 x 60 cm 383.84 M1
PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK
1 Pe
Peke
kerj
rjaan
aan Lan
Lanta
taii Ke
Kera
rami
mik
k (20/
(20/20
20)) M2
2 Pe
Peke
kerj
rjaan
aan Pl
Plin
intt D
Din
indi
ding
ng Ti
Tile
le (1
(10/
0/40
40)) M1
3 Pekerjaan Lantai Keramik Km/Wc (20/20) Unpolished 24.10 M2
4 Pe
Pek.
k. Dind
Dindin
ing
g Ke
Kera
rami
mik
k Wa
Warn
rna
a Km
Km/W
/Wc
c (20/
(20/25
25)) M2
PEKERJAAN LANTAI TANGGA
5 Memasan
Mem asang
g lantai
lantai hom
homoge
ogeniu
nius
s tile
tile 30 x 60 cm + step
step noi
noisin
sing (tangg M2
g (tangg
PEKERJAAN LANTAI JUMLAH 10 10
K PE
PEKE
KERRJA
JAAN
AN PE
PENNGECA
CATA
TANN
PEKERJAAN PENGECATAN DINDING DAN KOLOM KOLOM
1 Pe
Peke
kerj
rjaan
aan Pe
Peng
ngec
ecat
atan
an Di
Dind
ndin
ing
g 1,70
1,708.
8.26
26 M2
2 Pekerjaan Pengecatan Dinding Kolom 260.83 M2
PEKERJAAN PENGECATAN PLAFOND
1 Pe
Peke
kerj
rjaan
aan Pe
Peng
ngec
ecat
atan
an Pl
Plaf
afon
ond
d da
dan
n Li
List
st 41
415.57 M2
5.57
PEKERJAAN PENGECATAN JUMLAH 1111
L PE
PEKE
KERJ
RJAA
AANN TA
TAN
NGG
GGA
A TR
TRASASR
RAM
1 Pek
eker
erjjaa
aan
n Ur
Urug
ugan
an Pas
asiir M3
2 Pekerj
Pekerjaan
aan Pasan
Pasangan
gan Pond
Pondasi
asi Tra
Trasra
sram
m dan
dan Salur
Saluran
an 1 Pc : 3 Ps M2
3 Peke
Pekerj
rjaan
aan Pl
Ples
este
tera
ran
n Tra
Trasr
sram
am teb
tebal
al 1.
1.5
5 cm
cm M2
4 Pekerjaa
aan
n Ur
Urugan Ta
Tanah M3
5 Peke
Pekerj
rjaan
aan Be
Beto
ton
nRRaba
abatt Baw
Bawah
ah Lan
Lanta
taii T = 5 cm M3
PEKERJAAN TANGGA TRASRAM JUMLAH 12 12
M PEKERJAA
PEKE RJAANN SALUR
SALURAN
AN KEL
KELILIN
ILING
G GEDUN
GEDUNG G DAN
DAN RABAT
RABAT KELI
KELILING
LING B
3
1 Peke
Pekerj
rjaa
aan
n Gal
Galia
ian
n Tan
Tanah
ah Sa
Salu
lura
ran
n M
2 Peke
Pekerj
rjaa
aan
n Uru
Uruga
gan
n Pas
Pasir
ir Sa
Salu
lura
ran
n M3
3 Peke
Pekerj
rjaan
aan Be
Beto
ton
n Raba
Rabatt Sal
Salur
uran
an T = 5 cm
cm M3
4 Peke
Pekerj
rjaan
aan Tr
Tran
ansr
sram
am 1 Pc : 3 Ps , t = 0,
0,4
4M M2
2
5 Pekerj
Pekerjaan
aan Pl
Ples
este
tera
ran
n Tra
Trasr
sram
am teb
tebal
al 1.
1.5
5 cm
cm M
5 Pekerjaan Penutup Saluran Keliling / Grill Besi M'
3 Peke
Pekerj
rjaan
aan Be
Beto
ton
n Raba
Rabatt Keli
Kelili
ling
ng Ban
Bangu
guna
nan
n T = 7 cm
cm M3
2 Pe
Peke
kerj
rjaan
aan Uru
Uruga
gann Pasir
Pasir Raba
Rabatt Keli
Kelili
ling
ng Bang
Bangun
unan
an M3
LURAN KELILING GEDUNG DAN RABAT KELILING BANGUNAN
N PE
PEKE
KERRJA
JAAN
AN FIN
INIS
ISH
HIN
ING G
1 Pekerjaan
Pekerjaan Alum
Alumini
inium
um Kompo
Komposit
sit Pane
Panell Bungk
Bungkusan
usan Luar
Luar Gedu
Gedung Exte M2
ng Exte
3 Pemasangan Huruf Stainless Bh
3 Pemasan
Pem asangan
gan Han
Handel
del Tang
Tangga
ga Pi
Pipa
pa Sta
Stainl
inless
ess Ste
Steel
el Bul
Bulat
at 2" M'
PEKERJAAN FINISHING JUMLAH 14 14
A ( RAB )
KAMPUS II POLBANGTAN GOWA
N PERTANIAN (POLBANGTAN) GOWA
KODE AR
ARGA
GA SA
SATA
TAUA
UA JU
JUML
MLAH
AH HA
HARG
RGA
A
ANALISA (RP) (RP)
- Rp 40,463.94 R p 3,560,826.72
Rp
- Rp 1,887.84 Rp 991,114.90
- Rp 95,308.40 Rp 60,044,291.02
- Rp 500,000.00 Rp
Rp 500,000.00
- Rp 500,000.00 Rp
Rp 500,000.00
Rp ###
A.2.3.1.1
A.2.3.1.1 Rp 84
84,56
,562.5
2.50
0 Rp 4,7
4,714
14,10
,105.6
5.69
9
A.2.3.
A.2.3.1.1
1.1 Rp 84
84,56
,562.5
2.50
0 Rp 70
70,44
,440.5
0.56
6
A.2.3.
A.2.3.1.9
1.9 Rp 61
61,87
,875.0
5.00
0 Rp 4,2
4,228
28,53
,531.3
1.31
1
A.2.3.
A.2.3.1.9
1.9 Rp 61
61,87
,875.0
5.00
0 Rp 25
25,77
,770.9
0.94
4
A.2.3.1.1
A.2.3.1.11
1 Rp 238
238,425
,425.00
.00 Rp 2,53
2,536,63
6,633.38
3.38
A.2.3.1.1
A.2.3.1.11
1 Rp 238
238,425
,425.00
.00 Rp 11,6
11,682.8
82.83
3
A.2.3.1.1
A.2.3.1.15
5 Rp 176
176,137
,137.50
.50 Rp 4,57
4,578,10
8,102.49
2.49
A.2.3.1.1
A.2.3.1.10
0 R
Rp
p 61,8
61,875.0
75.00
0 Rp 9,34
9,343,12
3,122.53
2.53
Rp ###
A.3.2.
A.3.2.1.9
1.9 Rp 53
530,3
0,369
69.40
.40 Rp 22
22,57
,570,6
0,665
65.37
.37
A.3.2.
A.3.2.1.2
1.2 Rp 90
900,9
0,922
22.00
.00 Rp 91
91,57
,578,1
8,158
58.22
.22
Rp ###
A.A.4.1.1.4 Rp1,071,6
Rp1,071,694.71
94.71 Rp 52,513.0
52,513.04
4
A. A.4.1.1.8
A.4.1.1.1
A.4.1 .1.17 Rp1,315,5
Rp1,315,511.11
7 Rp 19,711.11
19,789.4
89.40
0 Rp
Rp 142,075
142,075.20
449
449,746.20
,746.80
.80
A.4.1.1.2
A.4.1.1.20
0 Rp 215
215,718
,718.80
.80 Rp 310
310,635
,635.07
.07
A. A.4.1.1.8 Rp1,315,5
Rp1,315,511.11
11.11 Rp 361,765
361,765.56
.56
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 898
898,868
,868.94
.94
A.4.1.1.2
A.4.1.1.22
2 Rp 399
399,791
,791.15
.15 Rp 1,75
1,759,08
9,081.06
1.06
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 9,379,79
9,379,792.31
2.31
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 17,7
17,764,9
64,998.4
98.42
2
A.4.1.1.2
A.4.1.1.21
1 Rp 229
229,468
,468.80
.80 Rp 16,5
16,521,7
21,753.6
53.60
0
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 1,426,51
1,426,510.08
0.08
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 3,62
3,628,94
8,946.51
6.51
A.4.1.1.2
A.4.1.1.21
1 Rp 229
229,468
,468.80
.80 Rp 3,35
3,350,24
0,244.48
4.48
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 298,980
298,980.88
.88
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 1,01
1,014,11
4,116.56
6.56
A.4.1.1.2
A.4.1.1.21
1 Rp 229
229,468
,468.80
.80 Rp 702
702,174
,174.53
.53
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 8,019,72
8,019,722.42
2.42
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 14,9
14,976,5
76,568.2
68.28
8
A.4.1.1.2
A.4.1.1.22
2 Rp 399
399,791
,791.15
.15 Rp 51,8
51,812,9
12,933.0
33.04
4
0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,748
Rp1,302,748.93
.93 Rp 82,437,3
82,437,343.73
43.73
A.4.1.1.1
A.4.1.1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 128
128,235
,235.29
.29
0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 ###
A.4.1.1.1
A.4.1.1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 384
384,705
,705.86
.86
0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp -
A.4
A.4.1.
.1.1.1
1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
0.000 Rp - Rp -
0.000 Rp - Rp -
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp -
A.4.1.1.3
A.4.1.1.35
5 Rp 121
121,138
,138.82
.82 Rp 18,6
18,643,2
43,264.4
64.40
0
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 1,207,64
1,207,648.26
8.26
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 3,81
3,812,07
2,072.58
2.58
A.4.1.1.2
A.4.1.1.23
3 Rp 412
412,454
,454.90
.90 Rp 22,6
22,628,7
28,747.4
47.45
5
A. A.4.1.1.7 Rp1,302,748
Rp1,302,748.93
.93 Rp 15,084,5
15,084,529.88
29.88
A.4.1.1.1
A.4.1 .1.17
7 Rp 19,7
19,789.4
89.40
0 Rp 28,5
28,569,5
69,571.7
71.76
6
A.4.1.
A.4.1.1.2
1.23
3 Rp 41
412,4
2,454
54.90
.90 ###
A. A.4.1.1.7 Rp1,302,748.93
Rp1,302,748.93 Rp -
A.4.1.
A.4 .1.1.1
1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
A.4.1.
A.4.1.1.2
1.23
3 Rp 41
412,4
2,454
54.90
.90 Rp -
A. A.4.1.1.7 Rp1,302,7
Rp1,302,748.93
48.93 Rp 2,041,35
2,041,355.47
5.47
A.4.1.1.1
A.4.1 .1.17
7 RRp
p 19,7
19,789.4
89.40
0 Rp 6,49
6,491,34
1,340.21
0.21
A.4.1.1.23
A.4.1.1.23 Rp 412
412,454
,454.90
.90 Rp 14,0
14,003,1
03,173.8
73.82
2
A.4.1.1.3
A.4.1.1.36
6 Rp 144,219
144,219.35
.35 Rp -
A.4.1.1.17
A.4.1.1.17 Rp1,302
Rp1,302,748
,748.93
.93 Rp -
A.4.1.
A.4.1.1.1
1.19
9 Rp 18,182.5
18,182.53
3 Rp -
A.4.1.1.19a
A.4.1.1.19a Rp 342,551
342,551.00
.00 Rp -
A.4.1.1.1
A.4.1.1.17
7 Rp1,
Rp1,302
302,748
,748.93
.93 Rp -
A.4.1.
A.4.1.1.1
1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 50
500,9
0,991
91.15
.15 Rp -
A.4.1.1.1
A.4.1.1.17
7 Rp1,
Rp1,302
302,748
,748.93
.93 Rp -
A.4.1.1.1
A.4.1.1.17
7 Rp 19,78
19,789.4
9.40
0 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 500,9
500,991
91.15
.15 Rp -
A.4.1
A.4.1.1.1
.1.17
7 Rp1,302
Rp1,302,748
,748.93
.93 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 19,789.4
19,789.40
0 Rp -
A.4.1.
A.4.1.1.2
1.24
4 Rp 50
500,9
0,991
91.15
.15 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 58,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 12,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 12,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 37,634
37,634.8
.85
5 Rp -
- Rp 12,000.00 Rp -
A.4.
A.4.2.
2.1.
1.1
1 Rp 31,1
31,146
46.7
.72
2 Rp -
A.4.
A.4.2.
2.1.
1.5
5 Rp 2,92
2,922.
2.65
65 Rp -
A.4.7.
A.4.7.1.1
1.19
9 Rp 36,45
36,453.4
3.45
5 Rp -
###
A. 4.4
4.4.1.2
.1.26
6 Rp 205
205,357
,357.08
.08 ###
A.4.4.
A.4.4.2.2
2.28
8 Rp 65
65,09
,097.5
7.54
4 ###
A.4.4.2.2
A.4.4.2.29
9 Rp 44,0
44,031.7
31.76
6 Rp 75,2
75,217,7
17,716.2
16.22
2
A.4.4.2.2
A.4.4.2.29
9 Rp 44,0
44,031.7
31.76
6 Rp 11,4
11,484,8
84,892.6
92.68
8
###
PJ
PJ1
1 AP Rp
Rp9,
9,68
685,
5,41
419
9.7
.73
3 Rp 9,
9,68
685,
5,41
419.
9.73
73
P2 AP Rp
Rp5,
5,85
856,
6,11
119
9.3
.33
3 Rp 5,
5,85
856,
6,11
119.
9.33
33
P3 AP Rp
Rp4,
4,66
667,
7,57
575
5.1
.18
8 Rp 37
37,3
,340
40,6
,601
01.4
.41
1
P4 AP Rp
Rp3,
3,49
495,
5,88
884
4.0
.07
7 Rp 31
31,4
,462
62,9
,956
56.6
.63
3
0.00 Rp - Rp -
J1 AP Rp6,577,4
Rp6,577,483.53
83.53 Rp 13,154
13,154,967.06
,967.06
J2 AP Rp4,008,9
Rp4,008,951.17
51.17 Rp 16,035
16,035,804.69
,804.69
0.00 Rp - Rp -
0.00 Rp - Rp -
0.00 Rp - Rp -
V1 AP Rp3,616,414.31 Rp -
V2 AP Rp1,073,190.26 Rp -
###
A.4.5.2.BJ1 Rp 249,023.86
249,023.86 Rp 21,833,8
21,833,863.88
63.88
A.4.5.2.SP
A.4.5.2. SP Rp 94,5
94,593.2
93.24
4 Rp 8,29
8,293,72
3,726.74
6.74
A.4.5.
A.4.5.2.N
2.NK
K Rp 10
106,1
6,157
57.70
.70 ###
A.4.5.2.
A.4.5.2.NK
NK Rp 97,8
97,884.5
84.50
0 Rp 22,646
,646,796
,796.88
.88
A.4.5.2.
A.4. 5.2.KP
KP Rp 115
115,632
,632.00
.00 Rp 15,1
15,108,4
08,477.1
77.12
2
###
A.4.7.2.A Rp 346,456
346,456.00
.00 Rp 16,976,3
16,976,344.00
44.00
A.4.7.2.B Rp 372,856.00 Rp 7,829,976.00
0.00
0.00 Rp - Rp -
###
## # Rp - Rp -
0.00
0.00 Rp - Rp -
A.4.7.2.G
A.4.7.2.G Rp 148,761
148,761.25
.25 Rp -
A.4.7.2.
A.4.7.2.H
H Rp 98,161.2
98,161.25
5 Rp -
A.4.7.2.F
A.4.7 .2.F Rp 354
354,461
,461.25
.25 Rp -
A.4.7.2.C Rp
A.4.7.2.C 27,1
27,101.2
01.25
5 Rp 1,
1,327
327,961
,961.25
.25
A.4.7.2.
A.4.7.2.D
D Rp 31,4
31,446.2
46.25
5 Rp -
A.4.7.2.E
A.4.7.2.E Rp 28,3
28,311.2
11.25
5 Rp 594
594,536
,536.25
.25
- Rp 65,000.00 Rp 65,000.00
- Rp 250,000.00 R
Rp
p 250,000.00
- Rp3,500,000.00 Rp 3
3,,500,000.00
###
A.5.1.1.
A.5.1.1.1a
1a Rp3,
Rp3,669
669,069
,069.78
.78 Rp 33,0
33,021,6
21,628.0
28.00
0
A.5.1.1 2 Rp 801,779.00 Rp -
A.5.1.
A.5.1.1
15 Rp 98
984,9
4,933
33.40
.40 Rp 98
984,9
4,933
33.40
.40
A.5.1.1
A.5.1.1 32 Rp 95,8
95,830.3
30.35
5 Rp 42,2
42,273,6
73,642.3
42.30
0
A.5.1.1
A.5.1.1 31 Rp 85,7
85,706.9
06.91
1 Rp 2,89
2,895,17
5,179.50
9.50
A.5.1.1
A.5.1.1 26 Rp 25,9
25,977.6
77.60
0 Rp 1,60
1,608,53
8,532.99
2.99
0.000 Rp - Rp -
A.4.2
A.4.2.1.2
.1.21
1 Rp 130
130,278
,278.50
.50 Rp 54,1
54,139,6
39,627.8
27.80
0
A.4.5.
A.4.5.1.7
1.7 Rp 53
53,65
,658.0
8.00
0 Rp 22
22,29
,298,5
8,569
69.21
.21
A.4.5.
A.4.5.1.7
1.7a
a Rp 48
48,85
,853.2
3.20
0 Rp -
A.4.5.1.7
A.4.5.1.7b
b Rp 26,7
26,730.0
30.00
0 Rp 14,4
14,443,2
43,288.2
88.20
0
###
A.2.3.1.1
A.2.3.1.11
1 Rp 238
238,425
,425.00
.00 Rp 4,12
4,123,45
3,459.04
9.04
A.A.4.1.1.1 Rp1,081,5
Rp1,081,510.75
10.75 Rp 18,704,2
18,704,268.75
68.75
A.4.4.
A.4.4.3.1
3.13
3 Rp 32
327,4
7,443
43.60
.60 ###
A.4.4.3.2
A.4.4.3.28
8 Rp 60,5
60,516.4
16.47
7 Rp 23,2
23,228,6
28,642.8
42.80
0
A.
A.4.
4.4.
4.3.
3.4
4 Rp 16
162,
2,21
216.
6.78
78 Rp -
A.4.4.
A.4.4.3.2
3.29
9 Rp 35
35,63
,630.7
0.76
6 Rp -
A.4.4.
A.4.4.3.6
3.6 Rp 14
148,2
8,252
52.52
.52 Rp 3,5
3,572
72,51
,515.1
5.15
5
A.4.4.3.54a
A.4.4.3.54a Rp 293,983
293,983.58
.58 Rp -
A.4.4.3.24
A.4.4.3.24b
b Rp 319,627
319,627.83
.83 Rp -
###
A.4.7.1.1
A.4.7.1.10
0 Rp 54,0
54,013.5
13.58
8 Rp 92,2
92,269,2
69,251.2
51.23
3
A.4.7.1.1
A.4.7.1.10
0 Rp 54,0
54,013.5
13.58
8 Rp 14,0
14,088,4
88,468.7
68.79
9
A.4.7.
A.4.7.1.5
1.5 Rp 47
47,07
,078.3
8.35
5 Rp 19
19,56
,564,2
4,274
74.58
.58
###
A.2.3.
A.2.3.1.1
1.11
1 Rp 23
238,4
8,425
25.00
.00 Rp -
A. 4.4
4.4.1.
.1.8
8 Rp 13
133,2
3,276
76.33
.33 Rp -
A.4.
A.4.4.
4.2.
2.3
3 Rp 63,8
63,809
09.2
.28
8 Rp -
A.2.3.
A.2.3.1.1
1.15
5 Rp 17
176,1
6,137
37.50
.50 Rp -
A.A.4.1.1
A.A.4.1.1.1
.1 Rp1,
Rp1,081
081,510
,510.75
.75 Rp -
Rp -
NGUNAN
A.2.3.
A.2.3.1.
1.1
1 Rp 84,5
84,562
62.5
.50
0 Rp -
A.2.3.
A.2.3.1.1
1.11
1 Rp 238,4
238,425
25.00
.00 Rp -
A.A.4.1.1
A.A.4.1.1.1
.1 Rp1,
Rp1,081
081,510
,510.75
.75 Rp -
A. 4.4
4.4.1.
.1.8
8 Rp 13
133,2
3,276
76.33
.33 Rp -
A.4.
A.4.4.
4.2.
2.3
3 Rp 63,8
63,809
09.2
.28
8 Rp -
- Rp 250,000.00 Rp -
A.A.4.1.1
A.A.4.1.1.1
.1 Rp1,
Rp1,081
081,510
,510.75
.75 Rp -
A.2.3.
A.2.3.1.1
1.11
1 Rp 23
238,4
8,425
25.00
.00 Rp -
Rp -
A.4
A.4.6.
.6.1B
1B1
1 Rp 828,0
828,036
36.96
.96 Rp -
- Rp 100,000.00 Rp -
- Rp 65,000.00 Rp -
Rp Rp -
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
I PE
PEKE
KERJ
RJAA
AAN
N PE
PEMB
MBEN
ENTU
TUKA
KAN
N LA
LAHA
HAN
N Rp 23,7
23,713
13,2
,228
28.4
.48
8
II PEKERJAAN BANGUNAN
A PEKE
PEKERJAA
RJAAN
N TAN
TANAH
AH DAN PASIR
PASIR Rp 20,205
20,205,583.
,583.14
14
B PEKE
PEKERJAA
RJAAN
N POND
PONDASI
ASI Rp 44,802
44,802,630.
,630.41
41
C PEKERJAA
PEKERJAAN
N STRUKTUR BETON DAN RABAT Rp 80,824,606.44
D PEKERJAA
PEKERJAAN
N PASANGAN & PLESTERA
PLESTERAN
N DINDING Rp 129,680,375.45
E PEKERJAA
PEKERJAAN
N KUSEN PINTU, JENDELA DAN VENTILASI
VENTILASI ALUMINI
ALUMINIUM
UM Rp 58,308,281.86
F PEKE
PEKERJAA
RJAAN
N PLAF
PLAFOND
OND Rp 33,818
33,818,156.
,156.63
63
G PEKE
PEKERJAA
RJAAN
N LANT
LANTAI
AI Rp 60,746
60,746,257.
,257.58
58
H PEKE
PEKERJAA
RJAAN
N PENG
PENGECAT
ECATAN
AN Rp 47,982
47,982,661.
,661.56
56
I PEKE
PEKERJAA
RJAAN
N KONS
KONSTRU
TRUKSI
KSI ATAP Rp 80,531
80,531,344.
,344.05
05
J PEKERJAAN
PEKERJAAN INSTALASI
INSTALASI LISTRIK Rp 15,870,488.50
K PEKE
PEKERJAA
RJAAN
N SANI
SANITASI
TASI Rp 19,247
19,247,596.
,596.52
52
L PEKERJAA
PEKERJAAN
N TAN
TANGGA
GGA TRASRAM
TRASRAM Rp 875,5
875,581.33
81.33
M PEKERJAAN
PEKERJAAN SALURAN KELILING GEDUNG Rp 8,663,632.32
N PEKE
PEKERJAA
RJAAN
N FINI
FINISHIN
SHING
G Rp 877,539.76
877,539.76
Rp 602,434,735.55
REAL COST (A) Rp 626,1
626,147,96
47,964.03
4.03
PPN 10% (B) Rp 62,61
62,614,796
4,796.40
.40
TOTAL COST (A+B) Rp 688,7
688,762,76
62,760.43
0.43
DIBULA
DIB ULATKA
TKAN
N
Terbilang : #N/A
KODE AR
ARGA
GA SATA
SATAUA
UA JUM
JUMLAH
LAH HARG
HARGA
A
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA (RP) (RP)
I PE
PEKE
KERJ
RJAA
AAN
N P
PEM
EMBE
BENT
NTUK
UKAN
AN LA
LAHA
HAN
N
1 Pengukuran dan Pemasangan Bouwplank 95.250 M' - Rp 40,480.44 Rp
Rp 3,855,761.91
2 Meng
Mengup
upas
as tana
tanah
h dan
dan pemb
pember
ersi
siha
han
n sema
semak
k (Lan
(Land
d Clea
Cleari
ring
ng 160.
160.00
00 M2 - Rp 1,
1,89
890.
0.59
59 Rp 30
302,
2,49
494.
4.07
07
3 Galian Tanah dan Pembuangan (Cut dan Fill) 192.000 M 3
- Rp 95,338.40 Rp18,304,972.50
4 Administrasi dan Pengurusan Surat IMB (Nol Biaya) 1.000 Ls - Rp -
5 Air Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
6 Listrik Kerja 1.000 Ls - Rp 500,000.00 Rp 500,000.00
7 P3K 1.000 L
Ls
s - Rp 250,000.00 Rp 250,000.00
PEKERJAAN PEMBENTUKAN LAHAN MLAH A Rp ###
II PEKE
PEKERJ RJAA
AANN BA
BANG
NGUN
UNAN
AN
A PE
PEKE
KERJRJAA
AANNTTAN
ANAH
AH DAN
DAN PASI
PASIR
R
1 Pekerjaan Galian Tanah Pondasi Garis 74.914 M3 A.2.3.1.1 Rp 84,727.50 Rp 6,347,254.75
2 Pekerjaan Urugan Tanah Kembali Sisi Pondasi Garis 16.669 M3 A.2.3.1.9 Rp 62,205.00 Rp 1,
1,036,879.59
3 Pe k
ke
erjaan Urugan P as
asir Bawah Pondasi Garis T=5 cm 4.204 M3 A. 2
2..3.1.11 Rp 238, 4
49
91.00 Rp 1 ,0
,002,556.54
3
4 Pekerjaan timbunan tanah bawah lantai T = 40 cm 55.500 M A.2.3.1.15 Rp 176,302.50 Rp 9,784,788.75
5 Pekerjaan pemadatan tanah per 20 cm 32.700 M3 A.2.3.1.10 Rp 62,205.00 Rp 2,034,103.50
PEKERJAAN TANAH DAN PASIR MLAH 1 Rp ###
B PEKE
PEKERJ
RJAA
AAN
NPPON
ONDA
DASI
SI
1 Pekerjaan Pasangan Pondasi Batu Kosong 17.595 M3 A.3.2.1.9 Rp 530,626.80 Rp 9,
9,336,378.55
2 Pekerjaan Pasangan Pondasi Garis 1 Pc : 4 Ps 39.345 M 3
A.3.2.1.2 Rp 901,417.00 Rp35,466,251.87
PEKERJAAN PONDASI MLAH 2 Rp ###
C PEK
PEKERJ
ERJAA
AAN
N STRU
STRUKTUKTUR R BE
BETON
TON DAN RA
RABABATT
PEKERJAAN SLOOF
1 Pek
Peker
erja
jaan
an Sl
Sloo
ooff S
S1
1 ( 15 x 20
20 )
- Beton K-250 2.693 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp
R p 3,543,488.62
- Pembesian 474.518 Kg A.4.1.1.17 Rp 19,792.04 Rp 9,391,669.11
- Bekisting 17.950 M2 A.4.1.1.21 Rp 229,640.40 Rp 4,122,045.18
PEKERJAAN KOLOM
2 Pek.
Pek. Kolo
KolommK K1
1 ( 15 x 40
40 )
- Beton K-250 0.756 M3 A. A.4.1.1.8 Rp1,316,058.91 Rp 994,940.54
4
5 Peker
ekerja
Peke
Pe jaan
kerj an
rjaanP
aan in
intu
Pintu P
Pintu
tu 4 Pab
P5
P5 Pabri
rika
kasi
si 2
2..0
00
00
0 B
Bh
h P4LsAP Rp
Rp2,2
48
270,,5
0050
5..0
120 Rp
Rp 4
4,,5
87
45
0,,0
10
100..0
205
PEKERJAAN KUSEN, DAUN DAN VENTILASI JENDELA
6 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J1 1.000 Bh J1 AP Rp5,872,246.59 Rp 5,
5,872,246.59
7 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J2 1.000 Bh J2 A P Rp3,524,402.87 Rp 3,524,402.87
8 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a J3 7.000 Bh J3 A P Rp2,547,486.02 Rp17,832,402.11
9 Peke
Pekerj
rjaa
aan
n Jend
Jendel
ela
a V1 3.000 Bh V1 AP Rp 724,214.02 Rp 2,172,642.05
ERJAAN KUSEN PINTU, JENDELA DAN VENTILASI ALUMINIUM MLAH 5 ###
F PEPEKE
KERJ
RJAA
AAN
N PLA
PLAFO
FON ND
PEKERJAAN RANGKA PLAFOND
1 Peke
Pekerj
rjaa
aan
n Pasa
Pasang
ngan
an Ra
Rang
ngka
ka Plaf
Plafon
ond
d Alum
Alumin
iniu
ium
m Ho
Holl
llow
ow 2 150.
150.750 M2
750 A.4.
A.4.2.
2.1.
1.21
21 Rp 130,
130,39
397.
7.30
30 Rp
Rp19
19,6
,657
57,3
,392
92.9
.98
8
2 Pekerjaan Pasangan Plafond Gypsumboard 9 mm 150.750 M2 A.4.5.1.7 Rp 52,890.20 Rp 7,973,197.65
1
3 Pekerjaan Pasangan List Plafond Gypsumboard 227.000 M A.4.5.1.7a Rp 27,258.00 Rp 6
6,,187,566.00
PEKERJAAN PLAFOND MLAH 7 ###
G PE
PEKE
KERJ
RJAA
AANN LA
LANTAI
NTAI
PEKERJAAN RABAT DIBAWAH LANTAI
1 Pekerjaan Urugan Pasir Dibawah Lantai 12.029 M3 A.2.3.1.15 Rp 176,302.50 Rp 2,
2,120,716.33
M PEK
PEKERJA
ERJAAN
AN SALU
SALURA
RANN KELILI
KELILING
NG GEDU
GEDUNG
NG
1 Pekerjaan Galian Tanah Saluran 8.82 M3 A.2.3.1.1 R
Rpp 84,727.50 Rp 747,296.55
2 Pekerjaan Urugan Pasir Saluran 1.260 M3 A.2.3.1.11 Rp 2
23
38,491.00 R
Rp
p 300,498.66
3 Pekerjaan Beton Rabat Saluran T = 5 cm 0.420 M3 A.A.4.1.1.4 Rp
R p1,072,090.71 Rp 450,278.10
2
4 Pekerjaan Transram 1 Pc : 3 Ps , t = 0,45 M 33.600 M A. 4.4.1.8 Rp 133,375.33 Rp 4
4,,481,411.09
5 Pekerjaan Plesteran Trasram tebal 1.5 cm 42.000 M2 A.4.4.2.3 Rp 63,908.28 Rp 2,684,147.93
PEKERJAAN SALURAN KELILING GEDUNG ###
N PEKE
PEKERJ
RJAA
AAN
N FIN
FINIS
ISHI
HING
NG
1 Pekerjaan Pasangan Batu Alam 3.171 M2 Ls Rp 180,000.00 Rp 570,780.00
2
2 Pekerjaan Plesteran Metode Ciprat 4.800 M A.4.4.2.3 Rp 63,908.28 Rp 306,759.76
PEKERJAAN FINISHING JUMLAH 12 Rp Rp 877,539.76
Warna 30 x 60 cm Bh Rp 60,375.00
d. BAH
BAHAN KA
KACA
CA
3 Kaca Bening 2 mm M² Rp 96,250.00
1 Kaca Bening 3 mm M² Rp 118,625.00
2 Kaca Bening 5 mm M² Rp 133,250.00
2 Kaca Bening 6 mm M² Rp 287,500.00
2 Kaca Bening 8 mm M² Rp 379,500.00
2 Kaca Bening 10 mm M² Rp 506,000.00
4 Kaca Buram 3 mm M² Rp 177,750.00
5 Kaca Buram 5 mm M Rp 248,750.00
6 Kaca Ryben 3 mm M Rp 130,500.00
7 Kaca Ryben 5 mm M Rp 145,125.00
8 Kaca / Cermin 122 x 51 cm M Rp 79,625.00
2 Kaca tempered 12 mm Clear/ Polos M² Rp 1,207,500.00
9 Rang
Rangka
ka Nako
ako Tanp
Tanpaa Tera
Terali
li Ma
Mata
ta Daun
aun Rp 17,4
17,488
88.0
.00
0
10 Rangka Nako Lengkap Terali Daun Rp 83,600.00
11 JJe
endela Nako (Rangka + Kaca 5 mm) M² Rp 54,000.00
12 Silicon Sealant kaca / lem kaca Kg Rp 13,500.00
d. BA
BAHA
HAN
N ALUM
ALUMIN
INIU
IUM
M
1 Hollow Aluminium rangka plafond 40 x 20 x 2 mm Btg Rp 20,125.00
40 x 20 x 2 mm M' Rp 5,031.25
Hollow Aluminium rangka plafond 40 x 40 x 2 mm Btg Rp 27,600.00
40 x 40 x 2 mm M' Rp 6,900.00
Hollow Aluminium rangka plafond 40 x 20 x 8 mm Btg Rp 57,500.00
40 x 20 x 8 mm M' Rp 14,375.00
20 x 40 x 2 mm M' Rp 6,037.50
2 Kawat Penggantung Hollow aluminium kg Rp 28,750.00
Hollow Angel (sudut) M' Rp 6,900.00
3 Sunscreen Aluminium M² Rp 425,000.00
4 Prol Aluminium 4" M' Rp 138,862.50
5 Bingkai Pintu Aluminium M' Rp 70,000.00
6 Bingkai Jendela Aluminium M' Rp 50,000.00
7 prol alluminium T M' Rp 64,208.33
8 Spandrel Aluminium M' Rp 54,970.00
9 Aluminium Frame M' Rp 112,412.50
10 Pas. Duan Jendela Aluminium + Kaca Tebal 5 mm + Karet dan Sealent M² Rp 1,466,940.00
11 Pas. Duan Pintu Aluminium Panil Kaca Tebal 5 mm (Lengkap Accessories) Unit Rp 287,500.00
12 Pintu KM/WC Aluminium (Lengkap Accessories) Lebar 6 cm Unit Rp 287,500.00
13 Pintu KM/WC PVC KW.1 (Lengkap Accessories) Lebar 10 cm Unit Rp 241,500.00
14 Pintu berglass KM/WC Lembar Rp 253,000.00
15 Pintu KM/WC bahan PVC Lengkap Accessories Ex. Maspion Unit Rp 241,500.00
e. BAHA
BAHAN
N FFIN
INIS
ISHI
HING
NG KAYU
KAYU
Amplas halus untuk besi Amplas Lembar Rp 4,333.00
Amplas kasar untuk kayu Lembar Rp 3,891.00
Cat dasar Cap Ayam Kg Rp 31,350.00
Dempul Kaleng Kecil Rp 34,179.00
Lem aibon Kg Rp 22,875.00
Mani kayu Kg Rp 27,806.00
Minyak cat Liter Rp 19,628.00
Oker Kg Rp 40,250.00
Politur cap kayu / Ja Boyo Kg Rp 56,994.00
Vernis spesial netral warna Kaleng Rp 58,790.00
f. BAHAN B
BEESI
1 Besi Beton Polos Kg Rp 15,180.00
Panjang 12 Meter diameter = 6 mm Batang Rp 33,000.00
diameter = 8 mm Batang Rp 48,217.00
diameter = 10 mm Batang Rp 70,522.00
diameter = 12 mm Batang Rp 103,278.00
diameter = 14 mm Batang Rp 146,163.00
diameter = 16 mm Batang Rp 192,500.00
5 Kawat Beton Kg Rp 2
24
4,444.00
Nyamuk M Rp
Rp 24,600.00
Ayakan Kecil M Rp 22,367.00
Duri Rol R
Rp
p 268,500.00
6 Besi Plat 2 mm = 120 x 140 mm Lembar Rp 660,000.00
Rp 12,672.00
3 mm = 120 x 140 mm Lembar Rp 780,000.00
7 Be
Besi Strep 30,3 mm 1 x 3 Batang Rp 22,700.00
35,4 mm 1 1/2 x 4 Batang Rp 30,700.00
46,4 mm 2 x 4 Batang Rp 35,000.00
40,6
40,6 mm 2 x 6 Ba
Bata
tang
ng Rp 56,7
56,700
00.0
.00
0
50,6 mm 2 1/2 x 6 Batang Rp 247,500.00
8 Besi Siku 30.30.3 Batang Rp 66,500.00
40.40.4 Batang Rp 70,100.00
50.50.5 Batang Rp 190,587.00
60.60.6 Batang Rp 316,250.00
70.70.7 Batang Rp 388,500.00
40.40.3 Batang Rp 57,500.00
50.50.4 Batang Rp 114,750.00
9 Besi Kanal C 75/75 Batang Rp 99,367.00
75/65 Batang Rp 79,142.00
10 Reng 30/45 Batang Rp 38,000.00
11 Besi Plafond 18/38 Batang Rp 48,000.00
12 Besi Hallow 15/35 Batang Rp 26,500.00
35/35 Batang Rp 35,700.00
3m Batang Rp 9,629.00
Wiremesh M10 2,1 x 5,4 (61,79 kg/lbr) M2 Rp 126,500.00
Lemb
Lembar
ar Rp 1,03
1,035,
5,00
000.
0.00
00
Steel Floor Decking/Smartdeck 0.75 mm (BONDEK) M2 Rp 135,700.00
Scafolding M2 Rp 6,900.00
Sewa alat las Hari Rp 150,000.00
Stainless Steel Dia 5 cm M' Rp 65,000.00
g. BAH
BAHAN PIPA
PIPA
1 Pipa GIP Medium Class SNI / ISO Dia 1/2 inci - 6 m Batang Rp 177,445.00
Dia 3/4 Inci - 6 m Batang Rp 227,585.00
Dia 1 Inci - 6 m Batang Rp 295,240.00
Dia
Dia 1/2
1/2 In
Inci
ci - 6 m Bata
Batang
ng Rp 439,
439,04
040.
0.00
00
Dia 2 Inci - 6 m Batang Rp 537,386.00
Dia 2 1/2 Inci - 6 m Batang Rp 679,582.00
Dia 3 Inci - 6 m Batang Rp 1,165,083.00
1 Pipa GIP Medium Class SNI / ISO Dia 1/2 inci - 4 m Batang Rp 32,200.00
Dia 3/4 Inci - 4 m Batang Rp 39,100.00
j. BAHAN PENGGANTUNG
1 Ku
K unci Tanam Union 1 x Slag Buah Rp 111,650.00
Union 2 x Slag Buah Rp 192,500.00
Yale 1 x Slag Buah Rp 114,000.00
Yale 2 x Slag Buah Rp 154,000.00
Kuda Terbang Buah Rp 139,370.00
Pembuatan 1 M2 steger/perancah
steger/perancah dari bambu A. 2.2.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 146,000.00 2,920.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 44,170.00
B BAHAN
Bambu diameter 6 - 8/600 cm Batang 1.250 24,625.00 30,781.25
3
Tali ijuk M 0.186 20,000.00 3,720.00
JUMLAH HARGA BAHAN 34,501.25
34,501.2 5
C PERALATAN
Membuat 1 M3 beton mutu f' = 9,8 Mpa (K 125), slump (12 ±2) cm, w/c = 0,78 A. A.4.1.1.2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 276.000 1,190.00 328,440.00
Pasir beton m3 0.591 183,525.00 108,541.93
Batu Pecah 2 - 3 cm m3 0.750 520,000.00 389,807.41
Air ltr 215.000 175.00 37,625.00
JUMLAH HARGA BAHAN 864,414.34
C PERALATAN
Membuat 1 m3 beton mutu f' = 12,2 Mpa (K 150), slump (12 ±2) cm, w/c = 0,72 A. A.4.1.1.3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 97,500.00 160,875.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 146,000.00 4,088.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 299.000 1,190.00 355,810.00
Pasir beton Kg 0.571 183,525.00 104,740.34
Kerikil (Maks. 30 mm) Kg 0.753 520,000.00 391,733.33
Air Ltr 215.000 175.00 37,625.00
Membuat 1 M3 Lantai Kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 ± 6 ) cm, w/c = 0,87 A.A.4.1.1.4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.200 97,500.00 117,000.00
Membuat 1 M3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,65 A. A.4.1.1.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 326.000 1,190.00 387,940.00
Pasir beton m3 0.543 183,525.00 99,627.86
Batu Pecah 2 - 3 cm m3 0.762 520,000.00 396,355.56
Air ltr 215.000 175.00 37,625.00
Membuat 1 M3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61 A. A.4.1.1.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58 A. A.4.1.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 371.000 1,190.00 441,490.00
Pasir beton m3 0.499 183,525.00 91,500.32
Batu Pecah 2 - 3 cm m3 0.776 520,000.00 403,288.89
Air ltr 215.000 175.00 37,625.00
Membuat 1 M3 beton mutu f' = 21,7 Mpa (K 250), slump (12 ±2) cm, w/c = 0,56 A. A.4.1.1.8
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Membuat 1 M3 beton mutu f' = 24,0 Mpa (K 275), slump (12 ±2) cm, w/c = 0,53 A. A.4.1.1.9
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 210,413.00
B BAHAN
Semen portland Kg 406.000 1,190.00 483,140.00
Pasir beton m3 0.489 183,525.00 89,665.07
Batu Pecah 2 - 3 cm m3 0.760 520,000.00 395,200.00
Air ltr 215.000 175.00 37,625.00
Membuat 1 M3 beton mutu f' = 26,4 Mpa (K 300), slump (12 ±2) cm, w/c = 0,52 A. A.4.1.1.10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 97,500.00 160,875.00
Tukang Batu OH 0.275 120,000.00 33,000.00
Kepala Tukang OH 0.028 146,000.00 4,088.00
19,789.40
Pembesian 1 kg dengan besi ulir A.4.1.1.17a
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 97,500.00 6,825.00
Tukang Batu L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 146,000.00 1,022.00
Mandor L.04 OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 16,847.00
B BAHAN
Besi beton Ulir Kg 10.500 16,041.67 168,437.50
Kawat beton Kg 0.150 24,444.00 3,666.60
F Har
Harga
ga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 342,55
342,551.0
1.00
0
Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 97,500.00 50,700.00
Tukang Batu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 146,000.00 3,796.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 89,596.00
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040 2,500,000.00 100,000.00
Paku 5 - 12 cm Kg 0.300 18,040.00 5,412.00
Minyak bekisting Liter 0.100 11,000.00 1,100.00
JUMLAH HARGA BAHAN 106,512.00
C PERALATAN
C PERALATAN
Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas II A.4.6.1.2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 97,500.00 585,000.00
Tukang Kayu L.02 OH 18.000 120,000.00 2
2,,160,000.00
Kepala Tukang L.03 OH 1.800 146,000.00 262,800.00
Mandor L.04 OH 0.300 150,000.00 45,000.00
JUMLAH TENAGA KERJA 3,052,800.00
3,052,800.0 0
B BAHAN
Balok kayu M3 1.200 9,075,000.00 10,890,000
10,890,000.00
.00
Pa
Paku
ku 10 cm Kg 1.25
1.250
0 18,0
18,040
40.0
.00
0 22,5
22,550
50.0
.00
0
Lem
Lem ka
kayu
yu kg 1.0
1.000 16,5
6,500.0
0.00 16,5
16,500
00.0
.00
0
JUMLAH HARGA BAHAN 10,929,050.00
10,929,050.0 0
C PERALATAN
Lem
Lem ka
kayu
yu kg 0.50
.500 16,50
,500.00
.00 8,25
,250.00
.00
JUMLAH HARGA BAHAN 404,250.00
C PERALATAN
Pembuatan dan pemasangan 1 M2 daun pintu double multipleks 6 mm, rangka papan kayu kls II A.4.6.1.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 97,500.00 68,250.00
Tukang Kayu L.02 OH 2.100 120,000.00 252,000.00
Kepala Tukang L.03 OH 0.210 146,000.00 30,660.00
Mandor L.04 OH 0.035 150,000.00 5,250.00
JUMLAH TENAGA KERJA 356,160.00
B BAHAN
Papan kayu kelas II M3 0.025 4,262,500.00 106,562.50
Pa
Paku
ku bi
bia
asa kg 0.03
.030 18,04
,040.00
.00 541
541.20
.20
Lem
Lem ka
kayu
yu kg 0.50
.500 16,50
,500.00
.00 8,25
,250.00
.00
Mu
Mult
ltip
iple
leks
ks 6 mm lbr
lbr 0.34
0.347
7 77,0
77,000
00.0
.00
0 26,7
26,734
34.4
.40
0
JUMLAH HARGA BAHAN 142,088.10
C PERALATAN
Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu kelas I A.4.6.1.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 97,500.00 78,000.00
Tukang Kayu L.02 OH 2.400 120,000.00 288,000.00
Kepala Tukang L.03 OH 0.240 146,000.00 35,040.00
Mandor L.04 OH 0.040 150,000.00 6,000.00
JUMLAH TENAGA KERJA 407,040.00
B BAHAN
Papan kayu M3 0.024 9,900,000.00 237,600.00
Lem
Lem ka
kayu
yu kg 0.3
0.300 16,5
6,500.0
0.00 4,9
4,950.0
50.00
0
JUMLAH HARGA BAHAN 242,550.00
C PERALATAN
Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu kelas II A.4.6.1.6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 97,500.00 78,000.00
Tukang Kayu L.02 OH 2.400 120,000.00 288,000.00
Kepala Tukang L.03 OH 0.240 146,000.00 35,040.00
Mandor L.04 OH 0.040 150,000.00 6,000.00
JUMLAH TENAGA KERJA 407,040.00
B BAHAN
Papan kayu M3 0.024 4,262,500.00 102,300.00
Lem
Lem ka
kayu
yu kg 0.3
0.300 16,5
6,500.0
0.00 4,9
4,950.0
50.00
0
JUMLAH HARGA BAHAN 107,250.00
C PERALATAN
Pembuatan dan pemasangan 1 M2 pintu dan jendela jalusi kayu kelas I A.4.6.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala Tukang L.03 OH 0.300 146,000.00 43,800.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 508,800.00
B BAHAN
Papan kayu M3 0.064 9,900,000.00 633,600.00
Lem
Lem ka
kayu
yu kg 0.5
0.500 16,5
6,500.0
0.00 8,2
8,250.0
50.00
0
JUMLAH HARGA BAHAN 641,850.00
C PERALATAN
Pembuatan dan pemasangan 1 M2 pintu dan jendela jalusi kayu kelas II A.4.6.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 97,500.00 97,500.00
Tukang Kayu L.02 OH 3.000 120,000.00 360,000.00
Pe
Pema
mas
sang
angan 1 M3
M3 ko
konstr
struk
uksi
si kuda
da-k
-kud
uda
a ko
konven
vensio
sional,
al, ka
kayu kela
elas II,, IIII d
da
an III
III ben
benta
tan
ng 6 meter
ter A.4.6
.4.6.1
.1.1
.13
3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 97,500.00 390,000.00
Tukang Kayu L.02 OH 12.000 120,000.00 1
1,,440,000.00
Kepala Tukang L.03 OH 1.200 146,000.00 175,200.00
Mandor L.04 OH 0.200 150,000.00 30,000.00
JUMLAH TENAGA KERJA 2,035,200.00
B BAHAN
Balok kayu M3 1.100 9,075,000.00 9,982,500.00
9,982,500.00
Be
Besi
si str
strip
ip te
teba
ball 5m
5mm
m kg 15.0
15.000
00 22,7
22,700
00.0
.00
0 340,
340,50
500.
0.00
00
Pa
Paku
ku 12 cm kg 5.60
5.600
0 18,0
18,040
40.0
.00
0 101,
101,02
024.
4.00
00
JUMLAH HARGA BAHAN 10,424,024.
10,424,024.00
00
C PERALATAN
Pa
Paku
ku 12 cm kg 5.60
5.600
0 18,0
18,040
40.0
.00
0 101,
101,02
024.
4.00
00
JUMLAH HARGA BAHAN 11,331,524.
11,331,524.00
00
C PERALATAN
Pemasangan 1 M’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II A.4.6.1.21
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 146,000.00 2,920.00
Mandor L.04 OH 0.005 150,000.00 7
75
50.00
JUMLAH TENAGA KERJA 37,420.00
B BAHAN
Papan Kayu M3 0.011 9,900,000.00 106,920.00
Pa
Paku
ku 5 da
dan
n 7 cm Lite
Literr 0.10
0.100
0 18,0
18,040
40.0
.00
0 1,80
1,804.
4.00
00
JUMLAH HARGA BAHAN 108,724.00
C PERALATAN
C PERALATAN
E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 10% XD 3,421.35
3,421.35
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 37,634
37,634.85
.85
E Overh
Overhead
ead & Profit
Profit (Maksi
(Maksimum
mum 15 %) 13% XD 49,606.30
49,606.30
F Har
Harga
ga Satuan
Satuan Pek
Pekerj
erjaaa
aaann (D+
(D+E)
E) 431,19
431 ,193.2
3.20
0
Pemasangan 1 m1 kusen pintu aluminium A.4.2.1.11
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 97,500.00 4,192.50
Tukang Aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.0043 146,000.00 627.80
Mandor L.04 OH 0.0021 150,000.00 315.00
JUMLAH TENAGA KERJA 10,295.30
B BAHAN
Profil alluminium 4 " M1 1.10 138,862.50 152,748.75
Skrup fixer
Skrup fixer Bu
Buah
ah 2.00
2.00 1,50
1,500.
0.00
00 3,00
3,000.
0.00
00
Seal
Sealan
antt Tu
Tube
be 0.06
0.06 57
57,0
,000
00.0
.00
0 3,42
3,420.
0.00
00
JUMLAH HARGA BAHAN 159,168.
159,168.75
75
C PERALATAN
Tu
Tuka
kang
ng Batu
Batu OH 0.10
0.100
0 12
120,
0,00
000.
0.00
00 12
12,0
,000
00.0
.00
0
Kepa
Kepala
la Tu
Tuka
kang
ng OH 0.01
0.010
0 14
146,
6,00
000.
0.00
00 1,46
1,460.
0.00
00
Ma
Man
ndor
dor OH 0.015
.015 150
50,0
,000
00.0
.00
0 2,25
,250.00
0.00
JUMLAH TENAGA KERJA 44,960.00
B BAHAN
Ba
Bata
ta Me
Merrah m3 70.0
70.000
00 75
750.
0.0
00 52,5
52,500
00.0
.00
0
Seme
Semen
n po
port
rtla
land
nd kg 14
14.3
.370
70 1,19
1,190.
0.00
00 17
17,1
,100
00.3
.30
0
Pasi
Pasirr pa
pasa
sang
ng m3 0.04
0.040
0 16
165,
5,00
000.
0.00
00 6,60
6,600.
0.00
00
JUMLAH HARGA BAHAN 76,200.3
76,200.300
C PERALATAN
Pemasangan 1 M2 dinding bata ringan ( 100 x 200 x 600 ) cm dengan mortar siap pakai A. 4.4.1.26
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.67
0.6710
10 97,5
97,500
00.0
.00
0 65
65,4
,422
22.5
.50
0
Tu
Tuka
kang
ng Batu
Batu OH 0.10
0.1000
00 12
120,
0,00
000.
0.00
00 12
12,0
,000
00.0
.00
0
Kepa
Kepala
la Tu
Tuka
kang
ng OH 0.01
0.0100
00 14
146,
6,00
000.
0.00
00 1,46
1,460.
0.00
00
Mand
Mandor
or OH 0.01
0.0100
00 15
150,
0,00
000.
0.00
00 1,50
1,500.
0.00
00
E Overh
Overhead
ead & Profit (Maksimum
(Maksimum 15 %) 10% X D 4,429.18
4,429.18
F Harga Satuan Pekerjaaan (D+E) 48,720.980
Pemasangan 1 m' Plint keramik ukuran 10x 60 cm A.4.4.3.29
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerj
rja
a OH 0.09
0.090
0 97
97,5
,500
00.0
.00
0 8,77
8,775.
5.00
00
Tuka
Tukang
ng Batu
Batu OH 0.09
0.090
0 120,
120,00
000.
0.00
00 10,8
10,800
00.0
.00
0
Kepa
Kepala
la Tuka
Tukang
ng OH 0.00
0.009
9 146,
146,00
000.
0.00
00 1,31
1,314.
4.00
00
Ma
Mand
ndor
or OH 0.00
0.005
5 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 21,639.00
B BAHAN
Plint Keramik 10 x 60 cm Bh 0.517 52,333.33 27,038.89
Semen portland Kg 1.140 1,190.00 1,356.60
Semen warna M3 0.100 9,775.00 977.50
Pasing pasang Kg 0.003 165,000.00 495.00
JUMLAH HARGA BAHAN 29,867.99
C PERALATAN
Pemasangan 1 m
m2
2 la
langit- la
langit Gy
Gypsum B
Bo
o ar
ard ((1
120x240x9) mm
mm, tte
ebal 9 mm
mm (P
(Permukaan R
Ra
ata) A.4.5.1.7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.0300 120,000.00 3,600.00
Kepala Tukang L.03 OH 0.0050 146,000.00 730.00
Mandor L.04 OH 0.0050 150,000.00 75
7 50.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Gypsum
Gypsum Boa
Board
rd 9 mm Lembar
Lembar 0.364
0.3640
0 70,
70,00
000.0
0.00
0 25,
25,48
480.0
0.00
0
Pa
Paku
ku se
sekr
krup
up 3 cm Kg 0.11
0.110
0 77
77,0
,000
00.0
.00
0 8,47
8,470.
0.00
00
JUMLAH HARGA BAHAN 33,950.00
C PERALATAN
Pema
Pemas
sanga
angan
n 1 m2 la
lang
ngit
it-l
-la
ang
ngit
it Kals
KalsiB
iBoa
oard
rd (12
(120x24
x240x3
0x3,5
,5)) mm, teba
teball 3,
3,5
5 mm (P
(Per
ermu
muk
kaan
aan Rata
Rata)) A.4.
A.4.5.
5.1.
1.7a
7a
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 97,500.00 9,750.00
Tukang Kayu L.02 OH 0.0300 120,000.00 3,600.00
Kepala Tukang L.03 OH 0.0050 146,000.00 730.00
Mandor L.04 OH 0.0050 150,000.00 75
7 50.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Kal
Kalsi
si Board
Board 3,5 mm Lem
Lembar
bar 0.364
0.3640
0 58,
58,00
000.0
0.00
0 21,
21,11
112.0
2.00
0
Pa
Paku
ku se
sekr
krup
up 3 cm Kg 0.11
0.110
0 77
77,0
,000
00.0
.00
0 8,47
8,470.
0.00
00
JUMLAH HARGA BAHAN 29,582.00
C PERALATAN
Se
Sekr
kru
up Bh 0.110 1,500.
00.00 165.0
5.00
JUMLAH HARGA BAHAN 28,193.00
C PERALATAN
Rangka ho
Rangka hollow
llow alumun
alumunium
ium 40x
40x40
40 t:1
t:1mm
mm M' 4.050
4.050 38,
38,00
000.0
0.00
0 153
153,90
,900.0
0.00
0
Sealen
Sealentt den
dengan
gan lakban
lakban Tube
Tube 1.200
1.200 57,
57,00
000.0
0.00
0 68,
68,40
400.0
0.00
0
Brake
Brakett siku
siku be
besi
si 50 x 50 x 5mm
5mm M' 0.
0.50
500
0 47,6
47,646
46.7
.75
5 23,8
23,823
23.3
.38
8
Ba
Baut
ut Se
Sekr
krup
up Bh 12
12.0
.000
000
0 1,
1,50
500.
0.00
00 18
18,0
,000
00.0
.00
0
E Overhe
Overhead
ad & Profit
Profit (Maksi
(Maksimum
mum 15 %) 0% XD -
F Harga
Harga Satuan
Satuan Pek
Pekerj
erjaaa
aaan
n (D+
(D+E)
E) 97,884
97,884.50
.50
A.4.5.2.33
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 97,500.00 19,500.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 146,000.00 1,460.00
Mandor L.04 OH 0.0010 150,000.00 150.00
JUMLAH TENAGA KERJA 33,110.00
B BAHAN
Gente
Genteng
ng meta
metall Bu
Buah
ah 2.00
2.0000
00 62
62,4
,400
00.0
.00
0 12
124,8
4,800
00.0
.00
0
Pa
Paku
ku bi
bias
asa
a ½”-1
½”-1”” Kg 0.20
0.200
0 18,0
18,040
40.0
.00
0 3,60
3,608.
8.00
00
JUMLAH HARGA BAHAN 128,408.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0050 97,500.00 487.50
Tukang Kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.0500 146,000.00 7,300.00
Mandor L.04 OH 0.0030 150,000.00 4
4550.00
JUMLAH TENAGA KERJA 68,237.50
B BAHAN
Kunc
Kuncii ta
tana
nam
m KM Bh 1.00
1.0000
00 11
111,
1,65
650.
0.00
00 11
111,
1,65
650.
0.00
00
JUMLAH HARGA BAHAN 111,650.00
C PERALATAN
Pengecatan 1 m2
m2 bidang kayu baru (1 lapis plamur, 1 la
lapis cat dasar, 2 lapis ca
cat penutup) A.4.7.1.4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 97,500.00 6,825.00
Tukang Cat L.02 OH 0.0090 120,000.00 1,080.00
Kepala Tukang L.03 OH 0.0060 127,500.00 765.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 9,120.00
B BAHAN
Cat menie Kg 0.2000 26,150.00 5,230.00
Dempul kayu Kg 0.1500 34,179.00 5,126.85
Pengecatan 1 m2 Plafond ( 1lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) A.4.7.1.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 97,500.00 6,825.00
Tukang Cat L.02 OH 0.1050 120,000.00 12,600.00
Kepala Tukang L.03 OH 0.0040 127,500.00 510.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 20,385.00
B BAHAN
Plamuur Kg 0.1000 63,100.00 6,310.00
Cat dasar Kg 0.1000 21,440.00 2,144.00
Cat penutup Kg 0.2600 37,500.00 9,750.00
Kuas Buah 0.0100 33,950.00 339.50
Pengencer Kg 0.0300 13,000.00 390.00
Ampelas Lbr 0.200 17,400.00 3,480.00
JUMLAH HARGA BAHAN 22,413.50
C PERALATAN
Peng
Pengec
ecat
atan
an 1 m2
m2 tem
temb
bok ba
baru
ru ( 1
1la
lap
pis plam
plamuu
uur,
r, 1 la
lapis
pis ca
cat d
das
asar
ar,, 2 llap
apis
is cat
cat p
pe
enu
nutu
tup)
p) ekst
ekster
erio
iorr A.4
A.4.7.1
.7.1.1
.10
0
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 97,500.00 1,950.00
Tukang Cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 127,500.00 803.25
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 10,763.25
B BAHAN
Plamuur Kg 0.1000 63,100.00 6,310.00
Cat dasar Kg 0.1000 21,300.00 2,130.00
Cat penutup Kg 0.2600 115,000.00 29,900.00
JUMLAH HARGA BAHAN 38,340.00
C PERALATAN
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior A.4.7.1.10a
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 97,500.00 1,950.00
Tukang Cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 127,500.00 803.25
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 10,763.25
B BAHAN
Plamuur Kg 0.1000 63,100.00 6,310.00
Cat dasar Kg 0.1000 21,440.00 2,144.00
Cat penutup Kg 0.2600 73,600.00 19,136.00
JUMLAH HARGA BAHAN 27,590.00
C PERALATAN
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir A.4.7.1.19
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 97,500.00 5,850.00
Tukang Cat L.02 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.0120 127,500.00 1,530.00
Mandor L.04 OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 15,030.00
B BAHAN
Cat Kg 0.0800 220,000.00 17,600.00
Kwas Bh 0.0100 21,000.00 210.00
Pengencer Liter 0.0100 29,950.00 299.50
JUMLAH HARGA BAHAN 18,109.50
C PERALATAN
Ma
Mand
ndor
or OH 0.16
0.1600
00 15
150,
0,00
000.
0.00
00 24
24,0
,000
00.0
.00
0
JUMLAH TENAGA KERJA 479,210.00
B BAHAN
Closet duduk ex. Toto / setara Bh 1.000 2,487,083.00 2,487,083.00
jet washer Bh 1.000 220,000.00 220,000.00
Perlengkapan (6 % harga kloset) % 0.060 2,487,083.00 149,224.98
JUMLAH HARGA BAHAN 2,856,307.98
C PERALATAN
C PERALATAN
Ma
Mand
ndor
or OH 0.06
0.0600
00 15
150,
0,00
000.
0.00
00 9,00
9,000.
0.00
00
JUMLAH TENAGA KERJA 321,900.00
B BAHAN
Wastafel Unit 1.000 504,200.00 504,200.00
Semen Portland Kg 6.000 1,190.00 7,140.00
Pasir pasang M3 0.010 165,000.00 1,650.00
Perlengkapan 12 % harga wastafel % 0.120 504,200.00 60,504.00
JUMLAH HARGA BAHAN 573,494.00
C PERALATAN
C PERALATAN
A TENAGA
Peke
Pekerrja OH 0.01
0.0100
00 97
97,5
,500
00.0
.00
0 97
975.
5.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.40
0.4000
00 120,
120,00
000.
0.00
00 48,0
48,000
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.04
0.0400
00 146,
146,00
000.
0.00
00 5,
5,84
840.
0.00
00
Ma
Mand
ndor
or OH 0.00
0.0050
50 15
150,
0,00
000.
0.00
00 75
750.
0.00
00
JUMLAH TENAGA KERJA 55,565.00
B BAHAN
Kran air Wastafel Buah 1.000 240,000.00 240,000.00
Seal tape Buah 0.025 6,500.00 162.50
JUMLAH HARGA BAHAN 240,000.00
C PERALATAN
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 325,12
325,121.5
1.50
0
A.5.1.1 19
”
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Peke
Pekerrja OH 0.03
0.0360
60 97
97,5
,500
00.0
.00
0 3,51
3,510.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.06
0.0600
00 120,
120,00
000.
0.00
00 7
7,2
,200
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.00
0.0060
60 146,
146,00
000.
0.00
00 876.
876.00
00
Ma
Mand
ndor
or OH 0.00
0.0020
20 15
150,
0,00
000.
0.00
00 30
300.
0.00
00
JUMLAH TENAGA KERJA 11,886.00
B BAHAN
Pipa PVC 1/2" M 1.200 8,050.00 9,660.00
Perlengkapan Ls 0.350 8,050.00 2,817.50
JUMLAH HARGA BAHAN 9,660.00
C PERALATAN
A TENAGA
Peke
Pekerrja OH 0.03
0.036
6 97
97,5
,500
00.0
.00
0 3,51
3,510.
0.00
00
Tuka
Tukang
ng Ba
Batu
tu OH 0.06
0.060
0 120,
120,00
000.
0.00
00 7,
7,20
200.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.00
0.006
6 146,
146,00
000.
0.00
00 876.
876.00
00
Ma
Mand
ndor
or OH 0.00
0.002
2 15
150,
0,00
000.
0.00
00 30
300.
0.00
00
JUMLAH TENAGA KERJA 11,886.00
B BAHAN
Pipa PVC 3/4" M 1.200 9,775.00 11,730.00
Perlengkapan Ls 0.350 9,775.00 3,421.25
JUMLAH HARGA BAHAN 11,730.00
C PERALATAN
F Harga
Harga Sat
Satuan
uan Pek
Pekerj
erjaaa
aaan
n (D+E)
(D+E) 25,977
25,977.60
.60
Peke
Pekerrja OH 0.08
0.0810
10 97
97,5
,500
00.0
.00
0 7,89
7,897.
7.50
50
Tuka
Tukang
ng BaBatu
tu OH 0.13
0.1350
50 120,
120,00
000.
0.00
00 16,2
16,200
00.0
.00
0
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.01
0.0135
35 146,
146,00
000.
0.00
00 1,
1,97
971.
1.00
00
Ma
Mand
ndor
or OH 0.00
0.0040
40 15
150,
0,00
000.
0.00
00 60
600.
0.00
00
JUMLAH TENAGA KERJA 26,668.50
B BAHAN
Pipa PVC 3" M 1.200 33,062.50 39,675.00
Perlengkapan Ls 0.350 33,062.50 11,571.88
JUMLAH HARGA BAHAN 51,246.88
C PERALATAN
B BAHAN
Galian Tanah Biasa M3 8.807 84,562.50 744,741.94
Pas. Trasram 1/2 Bata 1 : 2 M2 1.494 138,908.55 207,529.37
Urugan pasir M3 1.281 238,425.00 305,422.43
Urugan tanah kembali M3 2.169 61,875.00 134,206.88
Plesteran Trasram 1/2 tebal 15 mm M2 13.440 73,872.22 992,842.58
Ijuk M2 1.350 45,000.00 60,750.00
Plat Beton bertulang K- 225 T = 10 cm M3 0.281 5,000,000.00 1,405,000.00
Acian semen (saus semen) M2 13.440 42,160.25 566,633.76
Pipa Hawa Galvanis dia. 1" M1 0.600 49,206.67 29,524.00
Kerikil beton M3 0.900 209,000.00 188,100.00
PVC Dia. 4" dipasang + tabungan M1 9.000 95,830.35 862,473.15
JUMLAH HARGA BAHAN 5,497,224.10
C PERALATAN
B BAHAN
Pipa PVC 4" M' 1.200 95,830.35 114,996.42
Perlengkapan Ls 0.350 33,540.62 11,739.22
JUMLAH HARGA BAHAN 126,735.64
C PERALATAN
B BAHAN
Saklar Ganda Bh 1.000 21,350.00 21,350.00
JUMLAH HARGA BAHAN 21,350.00
21,350.0 0
C PERALATAN
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Stop kontak Bh 1.000 18,500.00 18,500.00
JUMLAH HARGA BAHAN 18,500.00
18,500.0 0
C PERALATAN
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu Downlight Bh 1.000 82,000.00 82,000.00
JUMLAH HARGA BAHAN 82,000.00
82,000.0 0
C PERALATAN
(Rp) (Rp)
A TENAGA
Pemb
Pemban
antu
tu tuka
tukang
ng OH 0.00
0.0050
50 9
97,
7,50
500.
0.00
00 48
487.
7.50
50
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu Downlight 13 Watt Bh 1.000 172,500.00 172,500.00
JUMLAH HARGA BAHAN 172,500.
172,500.00
00
C PERALATAN
JUMLAH HARGA ALAT
B BAHAN
Lampu SL 20 Watt Bh 1.000 41,975.00 41,975.00
JUMLAH HARGA BAHAN 41,975.00
41,975.0 0
C PERALATAN
Tu
Tuka
kang
ng list
listri
rik
k OH 0.05
0.0500
00 12
120,
0,00
000.
0.00
00 6,00
6,000.
0.00
00
Ma
Mand
ndo
or OH 0.00
.0050 150,
150,0
000.0
00.00
0 75
750
0.00
.00
JUMLAH TENAGA KERJA 7,237.50
B BAHAN
Lampu Baret LED Phllips Bh 1.000 724,500.00 724,500.00
JUMLAH HARGA BAHAN 724,500.
724,500.00
00
C PERALATAN
P2 AP 1 Bh Pekerjaan pintu P2
7.5600 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,409,263.0
1,409,263.04
4
3.5340 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 3,265,347.9
3,265,347.97
7
2.3600 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 178,384.92
0.3800 M2 Kaca bening 5 mm (Pintu + ventilasi) @ Rp. 185,924.75 Rp 70,651.41
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
1.0000 Bh Grendel Ventilasi @ Rp. 23,500.00 Rp 23,500.00
1.0000 Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp 54,095.25
3.7200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 18,600.00
Total Rp 5,856,119.3
5,856,119.33
3
P3 AP 1 Bh Pekerjaan pintu P3
6.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,211,667.9
1,211,667.96
6
2.6820 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 2,478,116.3
2,478,116.37
7
0.2060 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 15,570.89
0.1600 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 29,747.96
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
1.0000 Bh Grendel Ventilasi @ Rp. 23,500.00 Rp 23,500.00
1.0000 Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp 54,095.25
3.7200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 18,600.00
Total Rp 4,667,575.1
4,667,575.18
8
P4 AP 1 Bh Pekerjaan pintu P4
5.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 987,975.41
1.8020 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,665,013.3
1,665,013.31
1
0.2060 M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp 15,570.89
J1 AP 1 Bh Pekerjaan jendela J1
21.1000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 3,933,260.6
3,933,260.60
0
9.8400 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 743,774.41
21.1000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 105,500.00
3.9200 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 728,825.02
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 115,000.00
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total Rp 6,577,483.5
6,577,483.53
3
J2 AP 1 Bh Pekerjaan jendela J2
10.3500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,929,348.2
1,929,348.21
1
12.0400 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 910,065.43
10.3500 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 51,750.00
1.8800 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 349,538.53
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
4.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 115,000.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 4,008,951.1
4,008,951.17
7
J3 AP 1 Bh Pekerjaan jendela J3
10.3500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,929,348.2
1,929,348.21
1
12.0400 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 910,065.43
10.3500 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 51,750.00
1.8800 M2 Kaca bening 5 mm (Jendela) @ Rp. 185,924.75 Rp 349,538.53
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 3,704,267.1
3,704,267.17
7
V1 AP 1 Bh Pekerjaan Ventilasi V1
9.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,770,899.3
1,770,899.32
2
9.7600 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 737,727.46
9.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 47,500.00
1.8800 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 349,538.53
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
4.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 115,000.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 3,616,414.3
3,616,414.31
1
V2 AP 1 Bh Pekerjaan Ventilasi V2
3.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 596,513.46
P2 AP 1 Bh Pekerjaan pintu P2
5.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 969,334.37
7.4000 M1 Pemasangan 1 m2 bingkai pintu aluminium @ Rp. 99,786.83 Rp 738,422.54
- M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp -
- M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp -
1.0800 M2 Kaca bening 5 mm (Pintu + ventilasi) @ Rp. 185,924.75 Rp 200,798.73
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
- Bh Grendel Ventilasi @ Rp. 23,500.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp -
7.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 36,000.00
Total Rp 2,780,832.3
2,780,832.39
9
J1 AP 1 Bh Pekerjaan jendela J1
32.7000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 6,095,621.8
6,095,621.88
8
32.9000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 2,486,806.7
2,486,806.71
1
45.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 227,500.00
7.8750 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 1,464,157.4
1,464,157.41
1
14.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 663,894.00
14.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 663,894.00
7.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 201,250.00
7.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 201,250.00
28.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 1,514,667.0
1,514,667.00
0
Total Rp 13,519,040
13,519,040.99
.99
J2 AP 1 Bh Pekerjaan jendela J2
3.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 596,513.46
0.4500 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 34,014.07
2.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 12,000.00
0.3200 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 59,495.92
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
1.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 28,750.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 933,805.95
V1 AP 1 Bh Pekerjaan Ventilasi V1
4.0000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 745,641.82
- M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp -
3.8000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 19,000.00
0.4400 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 81,806.89
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 846,448.71
J1 AP 1 Bh Pekerjaan jendela J1
5.8500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,090,501.1
1,090,501.16
6
- M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp -
6.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 32,000.00
1.2800 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 237,983.68
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 1,360,484.8
1,360,484.84
4
J2 AP 1 Bh Pekerjaan jendela J2
8.1000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,509,924.6
1,509,924.69
9
- M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp -
12.6000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 63,000.00
4.8600 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 903,594.29
- Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp -
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Set Grendel Jendela stainless @ Rp. 28,750.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 2,476,518.9
2,476,518.97
7
J1 AP 1 Bh Pekerjaan jendela J1
10.3500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,929,348.2
1,929,348.21
1
7.8000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 589,577.27
8.6000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 43,000.00
1.9750 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 367,201.38
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
4.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
2.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 57,500.00
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
Total Rp 3,856,256.8
3,856,256.86
6
V1 AP 1 Bh Pekerjaan Ventilasi V1
3.0000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 559,231.37
1.4400 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 108,845.04
2.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 11,000.00
0.2400 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 44,621.94
2.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 94,842.00
1.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 28,750.00
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 955,480.84
P3 AP 1 Bh Pekerjaan pintu P3
5.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 987,975.41
1.8900 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 923,980.75 Rp 1,746,323.6
1,746,323.62
2
- M1 Bingkai Ventilasi aluminium @ Rp. 75,586.83 Rp -
0.0900 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 16,733.23
3.0000 Bh Engsel Pintu @ Rp. 66,299.75 Rp 198,899.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 287,677.50 Rp 287,677.50
1.0000 Bh Grendel pintu tanam @ Rp. 139,700.00 Rp 139,700.00
1.0000 Set pegangan pintu @ Rp. 210,000.00 Rp 210,000.00
- Bh Grendel Ventilasi @ Rp. 23,500.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 54,095.25 Rp -
2.0000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 10,000.00
Total Rp 3,597,309.0
3,597,309.01
1
P4 AP 1 Bh Pekerjaan pintu P3
5.1500 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 960,013.84
1.5750 M2 Daun pintu Multipleks 18 mm Finishing HPL @ Rp. 186,410.46 Rp 293,596.47
- M1 Bingkai Ventilasi aluminium @ Rp. 923,980.75 Rp -
0.0900 M2 Kaca bening 5 mm (ventilasi) @ Rp. 75,586.83 Rp 6,802.81
3.0000 Bh Engsel Pintu @ Rp. 185,924.75 Rp 557,774.25
1.0000 Bh Kunci tanam 2x slag @ Rp. 66,299.75 Rp 66,299.75
1.0000 Bh Grendel pintu tanam @ Rp. 287,677.50 Rp 287,677.50
1.0000 Set pegangan pintu @ Rp. 139,700.00 Rp 139,700.00
- Bh Grendel Ventilasi @ Rp. 210,000.00 Rp -
- Bh Kait angin stainless Ventilasi @ Rp. 23,500.00 Rp -
2.0000 M1 Karet putih pelapis kaca @ Rp. 54,095.25 Rp 108,190.50
Total Rp 2,420,055.1
2,420,055.12
2
J1 AP 1 Bh Pekerjaan jendela J1
17.3000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 3,224,900.8
3,224,900.87
7
11.1000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 839,013.81
21.6000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 108,000.00
3.8750 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 720,458.41
6.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 284,526.00
6.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 284,526.00
3.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 86,250.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total Rp 5,872,246.5
5,872,246.59
9
J2 AP 1 Bh Pekerjaan jendela J2
10.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,957,309.7
1,957,309.78
8
9.3000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 702,957.52
8.1000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 40,500.00
0.6900 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 128,288.08
6.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 284,526.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
3.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 86,250.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total Rp 3,524,402.8
3,524,402.87
7
J3 AP 1 Bh Pekerjaan jendela J3
9.4000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,752,258.2
1,752,258.28
8
1.1000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 83,145.51
8.8000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 44,000.00
1.1000 M2 Kaca bening 5 mm (Jendela) @ Rp. 185,924.75 Rp 204,517.23
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 2,547,486.0
2,547,486.02
2
V1 AP 1 Bh Pekerjaan Ventilasi V1
3.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 652,436.59
- M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp -
3.2000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 16,000.00
0.3000 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 55,777.43
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
- Bh Kait angin stainless @ Rp. 54,095.25 Rp -
Total Rp 724,214.02
J1 AP 1 Bh Pekerjaan jendela J1
5.9000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,099,821.6
1,099,821.68
8
6.4000 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 483,755.71
6.4000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 32,000.00
0.7448 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 138,476.75
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
2.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 57,500.00
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total Rp 2,217,619.1
2,217,619.15
5
V1 AP 1 Bh Pekerjaan Ventilasi V1
2.8000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 521,949.27
2.8000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 14,000.00
0.2700 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 50,199.68
Total Rp 586,148.96
V2 AP 1 Bh Pekerjaan Ventilasi V2
3.5000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 652,436.59
3.5000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 17,500.00
0.3000 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 55,777.43
Total Rp 725,714.02
Total Rp 2,483,533.9
2,483,533.96
6
HARGA SATUAN PEKERJAAN JENDELA
J1 AP 1 Bh Pekerjaan jendela J1
3.9420 M2 Kaca bening 12 mm Tempered Glass @ Rp. 1,502,025.
1,502,025.25
25 Rp 5,920,983.5
5,920,983.54
4
Total Rp 5,920,983.5
5,920,983.54
4
J2 AP 1 Bh Pekerjaan jendela J2
23.1300 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 4,311,673.8
4,311,673.82
2
6.7100 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 507,187.63
23.1300 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 115,650.00
6.1450 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 1,142,507.5
1,142,507.59
9
8.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 379,368.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
4.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 115,000.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
Total Rp 7,004,149.0
7,004,149.04
4
J3 AP 1 Bh Pekerjaan jendela J3
28.0000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 5,219,492.7
5,219,492.74
4
6.6800 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 504,920.02
28.0000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 140,000.00
6.1450 M2 Kaca bening 5 mm (Jendela) @ Rp. 185,924.75 Rp 1,142,507.5
1,142,507.59
9
8.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 379,368.00
4.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 115,000.00
8.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 432,762.00
Total Rp 7,934,050.3
7,934,050.35
5
J4 AP 1 Bh Pekerjaan jendela J4
5.9000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,099,821.6
1,099,821.68
8
3.7600 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 284,206.48
5.9000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 29,500.00
1.4903 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 277,083.65
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
1.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 28,750.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 1,922,394.3
1,922,394.32
2
J5 AP 1 Bh Pekerjaan jendela J5
5.9000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 1,099,821.6
1,099,821.68
8
3.7600 M1 Bingkai Jendela Aluminium @ Rp. 75,586.83 Rp 284,206.48
5.9000 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 29,500.00
0.9187 M2 Kaca bening 5 mm (Jendela + ventilasi) @ Rp. 185,924.75 Rp 170,809.07
2.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 94,842.00
- Bh Engsel Ventilasi @ Rp. 47,421.00 Rp -
1.0000 Set Grendel Jendela stainless @ Rp. 28,750.00 Rp 28,750.00
- Bh Grendel Ventilasi @ Rp. 28,750.00 Rp -
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 1,816,119.7
1,816,119.73
3
V1 AP 1 Bh Pekerjaan Ventilasi V1
2.2000 M1 Rangka aluminium 4" x 1 3/4" @ Rp. 186,410.46 Rp 410,103.00
1.5200 M1 Bingkai Ventilasi Aluminium @ Rp. 75,586.83 Rp 114,891.98
1.5200 M1 Karet putih pelapis kaca @ Rp. 5,000.00 Rp 7,600.00
0.1011 M2 Kaca bening 5 mm (ventilasi) @ Rp. 185,924.75 Rp 18,796.99
2.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 94,842.00
1.0000 Bh Grendel Ventilasi @ Rp. 28,750.00 Rp 28,750.00
2.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 108,190.50
Total Rp 783,174.47
1. An J1 1 Bh Pekerjaan jendela J1
18.0500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 3,364,708.
3,364,708.71
71
13.2400 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,321,177.
1,321,177.63
63
18.05
.0500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
1.7200 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 832,286.07
2.0000 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 371,849.50
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total #REF!
5. An J5 1 Bh Pekerjaan jendela J5
20.2500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 3,774,811.
3,774,811.71
71
16.9600 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 1,692,384.
1,692,384.64
64
20.25
.2500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
2.3800 M2 Kaca bening 8 mm @ Rp. 483,887.25 Rp 1,151,651.
1,151,651.66
66
2.3780 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 442,129.06
4.0000 Bh Engsel Jendela stainless @ Rp. 47,421.00 Rp 189,684.00
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
2.0000 Set Grendel Jendela stainless @ Rp. #REF! #REF!
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
6.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 324,571.50
Total #REF!
Total #REF!
10. An. V2 1 Bh Pekerjaan Ventilasi V2
7.1500 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 1,332,834.
1,332,834.75
75
6.7200 M1 Bingkai Jendela Aluminium @ Rp. 99,786.83 Rp 670,567.50
7.1500 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.5200 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 96,680.87
8.0000 Bh Engsel Ventilasi @ Rp. 47,421.00 Rp 379,368.00
4.0000 Bh Grendel Ventilasi @ Rp. #REF! #REF!
4.0000 Bh Kait angin stainless @ Rp. 54,095.25 Rp 216,381.00
Total #REF!
11. An. V3 1 Bh Pekerjaan Ventilasi V3
2.5600 M1 Rangka aluminium 4" @ Rp. 186,410.46 Rp 477,210.76
2.5600 M1 Karet putih pelapis kaca @ Rp. #REF! #REF!
0.7600 M2 Kaca bening 5 mm @ Rp. 185,924.75 Rp 141,302.81
Total #REF!
Memasang 1 m2 Paving
Paving blok T = 8 cm K - 300
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pe
Peke
kerj
rja
a OH 0.
0.30
3000
00 75
75,0
,000
00.0
.00
0 22
22,5
,500
00.0
.00
0
Tuka
Tukang
ng Ba
Batu
tu OH 0.
0.10
1000
00 90
90,0
,000
00.0
.00
0 9,00
9,000.
0.00
00
Ke
Kepa
pala
la Tuka
Tukang
ng OH 0.
0.01
0100
00 95
95,0
,000
00.0
.00
0 95
950.
0.00
00
Ma
Mand
ndor
or OH 0.
0.01
0150
50 10
105,
5,00
000.
0.00
00 1,57
1,575.
5.00
00
JUMLAH TENAGA KERJA 34,025.00
B BAHAN
Paving blok T = 8 cm Bh 50.000 2,700.00 135,000.00
Pasir urug m3 0.070 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN