Anda di halaman 1dari 3

HASIL TES SUHU RUANG

PT. BHINEKA TATAMULYA INDUSTRI


PT. PERDANA SETIA ABADI JAYA

Suhu
No Gedung Mesin +/-
24-Sep-18 5-Oct-18
1 MHI 1 43.7 40.7 3
2 Egan 2 42.8 40.7 2.1
3 Dahua 2 / Dahua 3 36.5 37.9 -1.4
Gedung 1
4 Metrik 2 35.8 38.2 -2.4
5 Beset 40.4 38.3 2.1
6 Erema 3 41.1 39.5 1.6
7 Egan 1 34.4 34.1 0.3
8 Dahua 1 / Metrik 36.1 38.8 -2.7
9 Gedung 2 SML 1 38.4 38.9 -0.5
10 Fujiteko 1 / Atlas 4 38.2 38.2 0
11 Delta / Galileo 38.2 38.2 0
12 Battenfeld 1 / Fuji 3 41.8 39.1 2.7
13 MHI 2 41.4 38.1 3.3
14 SML 2 / Fuji 2 37.2 37.2 0
15 Gedung 3 Golden / Rabbit 38 36.2 1.8
16 Dahua 4 / Kamf 2 36.5 38.5 -2
17 Galileo 5 / Bimec 36.1 37.2 -1.1
18 Azure 34.4 35.6 -1.2
19 Kamf 3 37.4 37.9 -0.5
Gedung 4
20 Battenfeld 2 40.2 38.5 1.7
21 Prolink / Artec 41.8 39.3 2.5
22 R2 Area Waste - 1 39.9 38.8 1.1
23 Area Waste - 2 40.5 39.3 1.2

Pengukuran dilakukan sebagai berikut :


1. Pengukuran dilakukan pada jam 13.15 WIB
2. Pengukuran dilakukan pada saat semua mesin ekstrusi jalan ( kecuali Egan 1 )
3. Pengukuran dilaksanakan pada tgl 24 September 2018 & 05 Oktober 2018

Keluhan Pekerja :
1. Kondisi panas di area mesin Erema 3, Beset, MHI 1 & Egan 2
2. Kondisi pengap & panas di area mesin MHI 2, Battenfeld 1 & Fuji 3
3. Kondisi panas di area Prolink & Artec ( R2 )
HASIL TES SUHU RUANG
PT. BHINEKA TATAMULYA INDUSTRI
PT. PERDANA SETIA ABADI JAYA

Suhu
No Gedung Mesin +/-
19-Feb-19 23-Mar-19
1 MHI 1 40 38 -2
2 Egan 2 38 36 -2
3 Dahua 2 / Dahua 3 35 34 -1
Gedung 1
4 Metrik 2 34 32 -2
5 Beset 39 32 -7
6 Erema 3 40 38 -2
7 Egan 1 35 34 -1
8 Dahua 1 / Metrik 34 32 -2
9 Gedung 2 SML 1 37 35 -2
10 Fujiteko 1 / Atlas 4 36.2 32 -4.2
11 Delta / Galileo 38.2 33.2 -5
12 Battenfeld 1 / Fuji 3 40.1 38 -2.1
13 MHI 2 40.1 38 -2.1
14 SML 2 / Fuji 2 37.2 32 -5.2
15 Gedung 3 Golden / Rabbit 38 31 -7
16 Dahua 4 / Kamf 2 37 30 -7
17 Galileo 5 / Bimec 35 32 -3
18 Azure 33.2 30 -3.2
19 Kamf 3 36 31.2 -4.8
Gedung 4
20 Battenfeld 2 38.4 34 -4.4
21 Prolink / Artec 39.2 37 -2.2
22 R2 Area Waste - 1 38 35 -3
23 Area Waste - 2 39.2 35 -4.2
HASIL TES SUHU RUANG
PT. BHINEKA TATAMULYA INDUSTRI
PT. PERDANA SETIA ABADI JAYA

Suhu
No Gedung Mesin +/-
27-May-19 10-Jun-19
1 MHI 1 40 38 -2
2 Egan 2 38 36 -2
3 Dahua 2 / Dahua 3 35 34 -1
Gedung 1
4 Metrik 2 34 32 -2
5 Beset 39 32 -7
6 Erema 3 40 38 -2
7 Egan 1 35 34 -1
8 Dahua 1 / Metrik 34 32 -2
9 Gedung 2 SML 1 37 35 -2
10 Fujiteko 1 / Atlas 4 36.2 32 -4.2
11 Delta / Galileo 38.2 33.2 -5
12 Battenfeld 1 / Fuji 3 40.1 38 -2.1
13 MHI 2 40.1 38 -2.1
14 SML 2 / Fuji 2 37.2 32 -5.2
15 Gedung 3 Golden / Rabbit 38 31 -7
16 Dahua 4 / Kamf 2 37 30 -7
17 Galileo 5 / Bimec 35 32 -3
18 Azure 33.2 30 -3.2
19 Kamf 3 36 31.2 -4.8
Gedung 4
20 Battenfeld 2 38.4 34 -4.4
21 Prolink / Artec 39.2 37 -2.2
22 R2 Area Waste - 1 38 35 -3
23 Area Waste - 2 39.2 35 -4.2

Pengukuran dilakukan sebagai berikut :


1. Pengukuran dilakukan pada jam 13.15 WIB
2. Pengukuran dilakukan pada saat semua mesin ekstrusi jalan

Keluhan Pekerja :
1. Kondisi panas di area mesin Erema 3, Beset, MHI 1 & Egan 2
2. Kondisi pengap & panas di area mesin MHI 2, Battenfeld 1 & Fuji 3
3. Kondisi panas di area Prolink & Artec ( R2 )

Anda mungkin juga menyukai