EKOWISATA EMBUNG REJOSARI

BILL OF QUANTITIES
PEKERJAAN LANDSCAPE LINGKUNGAN EMBUNG DESA REJOSARI

SPESIFIKASI HARGA
NO URAIAN LUAS (M²) VOLUME SAT TOTAL HARGA
Ø BTG (CM) TINGGI (M) JML/M² SATUAN

A PEKERJAAN SOFTSCAPE
I PERSIAPAN
1 Pembentukan dan Pengolahan Lahan 3.270 3.270,00 m2 15.000 49.050.000
2 Penambahan Tanah Taman 0,30 1.677 503,10 m³ 100.000 50.310.000
99.360.000
II PENGADAAN DAN PENANAMAN
A. POHON
1 Cassia fistula 3,5 - 4,0 13,00 phn 1.000.000 13.000.000
Hujan mas / Tengguli
13.000.000

B. SEMAK-PERDU
1 Lavandula angustifolia 0,15-0,20 9 230 2.070 nos 20.000 41.400.000
Lavender lokal
2 Tagetes erecta "yellow" 0,15-0,20 9 208 1.872 nos 15.000 28.080.000
Marigold kuning
3 Tagetes erecta "orange" 0,15-0,20 9 95 855 nos 15.000 12.825.000
Marigold orange
4 Vernonia eliptica 0,2-0,3 36 6 216 nos 7.500 1.620.000
Lee kwan yu
5 Pennisetum staceaum 0,15-0,20 16 45 712 nos 7.500 5.340.000
Alang-alang hijau
6 Vetivera ziasonides 0,15-0,20 25 173 4.315 nos 2.500 10.786.250
Akar wangi
7 Fimbristyllis umbella 0,15-0,20 25 74 1.850 nos 2.500 4.625.000
Mendong
8 Cyperus papyrus 0,3-0,5 139 nos 35.000 4.865.000
Papirus
9 Typha angustifolia 0,15-0,20 255 nos 15.000 3.825.000
Lidi air
9 Thalia dalibata 0,15-0,20 32 nos 35.000 1.120.000
Kana air
114.486.250

C. PENUTUP TANAH
1 Axonopus compressus 1.280 1.280,40 m2 35.000 44.814.000
Rumput gajah mini
44.814.000

B PEKERJAAN HARDSCAPE
1 Boardwalk 704,00 m2 4.500.000 3.168.000.000
Finish kayu komposit (wpc)
2 Amphitheatre playground 0,90 45 40,50 m³ 500.000 20.250.000
Finish concrete
3 Bangku taman 0,45 9 4,20 m³ 500.000 2.101.500
Finish concrete
4 Amphitheatre cannal 1,50 277 415,50 m³ 350.000 145.425.000
Gabion fin. WPC
5 Batu hias artificial 11,00 pcs 350.000 3.850.000
Verocement
6 Playground Set 1,00 set 8.600.000 8.600.000
Perosotan fiber - Terowongan custom - Jungkat jungkit - Kayu
7 Pedestrian Beach 113 0 5,65 m³ 7.500.000 42.375.000
Pasir silika/pantai
8 Mounding 0,30 135,64 40,69 m³ 200.000 8.138.460
Pembentukan kontur taman
9 Pagar Taman 28,48 m 250.000 7.119.250
Verocement
3.405.859.210

C UTILITAS DAN ELECTRICAL


1 (Spot light) - Philips 5 watt + Instalasi 10,00 pcs 450.000 4.500.000
Lampu pohon
2 Landscape lighting + Instalasi 36,00 pcs 1.000.000 36.000.000
Lampu taman
3 LED Strip 162,00 m 20.000 3.240.000
Lampu taman
4 Instalasi Pipa Conduit 325 345,00 m 15.000 5.175.000
Pipa cover kabel listrik underground
5 Grounding kabel listrik 325 345,00 m 85.000 29.325.000
Penanaman instalasi listrik
6 Instalasi MCB + Lembodos 46,00 set 12.500 575.000
PVC AW 1/2" + instalasi

78.815.000

D Maintenance
1 Perawatan selama 2 bulan

TOTAL 3.756.334.460
PEMBULATAN 3.756.300.000
PPN 10% 375.630.000
GRAND TOTAL 4.131.930.000