CATATAN :

NO. JUDUL GAMBAR SKALA KODE NO. GBR


01 DENAH INSTALASI AIR HUJAN 1 : 100 MEP 01
02 DENAH INSTALASI AIR BEKAS 1 : 100 MEP 02
03 DENAH INSTALASI AIR KOTOR 1 : 100 MEP 03
04 DENAH INSTALASI AIR BERSIH 1 : 100 MEP 04
05 DENAH INSTALASI LISTRIK PENERANGAN 1 : 100 MEP 05
06 DENAH STOP KONTAK 1 : 100 MEP 06
07 SINGLE LINE DIAGRAM NTS MEP 07

PEMBERI TUGAS :

KEGIATAN :

PEMBANGUNAN
RUMAH TINGGAL

PEKERJAAN :

RUMAH TINGGAL

DIBUAT :

..........................
.............
JUDUL GAMBAR SKALA

DAFTAR ISI
GAMBAR PEKERJAAN NTS
MEP
TAHUN NO LEMBAR JML LEMBAR

2020 00 07
CATATAN :

14000
4000 4000 4000 2000

ROOF DRAIN 4"

ROOF DRAIN 4"


DAK TALANG BELAKANG
RUANG CUCI
ELV. +03.00
-0.02

2790
KAMAR PEMBANTU
KAMAR TIDUR ±0.00
UTAMA TAMAN DAK TOREN
ELV. +03.00
±0.00 DAPUR
5500 ±0.00

TERAS

1710
ROOF DRAIN 4"

ROOF DRAIN 4"


TOILET
-0.02
INSTALASI AIR HUJAN DI BAWAH LANTAI
-0.03

INSTALASI AIR HUJAN DI BAWAH LANTAI


TOILET R. GANTI R. KELUARGA
2500

±0.00 ±0.00 R. MAKAN

5000
-0.03
12500

±0.00
PIPA PVC CLASS D Ø 4"

PIPA PVC CLASS D Ø 4"


TOILET
1500

-0.03
CARPORT

PEMBERI TUGAS :
R. TAMU KAMAR TIDUR
KAMAR TIDUR ±0.00 ±0.00
4000

4000
±0.00

TOILET
-0.03

TERAS

500
1000

-0.02
KEGIATAN :

INSTALASI AIR HUJAN DI DALAM LANTAI


INSTALASI AIR HUJAN DI DALAM TANAH

PEMBANGUNAN
4000 4000 4000 RUMAH TINGGAL
PIPA PVC CLASS D Ø 4"

PIPA PVC CLASS D Ø 4"


3000

PEKERJAAN :
TAMAN TAMAN

RUMAH TINGGAL

DIBUAT :
KE SALURAN PEMBUANGAN KE SALURAN PEMBUANGAN

24000

..........................
.............
JUDUL GAMBAR SKALA

DENAH INSTALASI AIR HUJAN DENAH INSTALASI AIR 1 : 100


HUJAN
SKALA : 1 : 100

TAHUN NO LEMBAR JML LEMBAR

2020 01 07
CATATAN :

14000
4000 4000 4000 2000

RUANG CUCI
FD 3" -0.02

2790
KAMAR PEMBANTU
KAMAR TIDUR ±0.00
UTAMA TAMAN
±0.00 DAPUR
5500

PIPA PVC CLASS D Ø 3"


INSTALASI AIR BEKAS DARI KITCHEN SINK
±0.00
FCO 3"
TERAS

1710
TOILET
-0.02
-0.03 FD 3"

INSTALASI AIR BEKAS


PIPA PVC CLASS D Ø 3"
TOILET R. GANTI R. KELUARGA
2500

±0.00 ±0.00 R. MAKAN

5000
-0.03
12500

±0.00
FD 3" FD 3"

FD 3"

TOILET
1500

INSTALASI AIR BEKAS


FCO Ø 3"

-0.03
CARPORT
PIPA PVC CLASS D Ø 3"

PIPA PVC CLASS D Ø 4"


MAIN LINE INSTALASI AIR BEKAS
PEMBERI TUGAS :
R. TAMU KAMAR TIDUR
KAMAR TIDUR ±0.00 ±0.00
4000

4000
±0.00

TOILET
-0.03
FD 3"
TERAS

500
1000

-0.02 INSTALASI AIR BEKAS


PIPA PVC CLASS D Ø 3"

KEGIATAN :

MAIN LINE INSTALASI AIR BEKAS


PIPA PVC CLASS D Ø 4"
PIPA PVC CLASS D Ø 3"
INSTALASI AIR BEKAS DARI KITCHEN SINK

PEMBANGUNAN
4000 4000 4000 RUMAH TINGGAL
3000

PEKERJAAN :
TAMAN TAMAN

RUMAH TINGGAL

DIBUAT :

KE SALURAN PEMBUANGAN KE SALURAN PEMBUANGAN

24000

..........................
.............
JUDUL GAMBAR SKALA

DENAH INSTALASI AIR BEKAS DENAH PONDASI 1 : 100


TAPAK
SKALA : 1 : 100

TAHUN NO LEMBAR JML LEMBAR

2020 02 07
CATATAN :

14000
4000 4000 4000 2000

RUANG CUCI
-0.02

2790
KAMAR PEMBANTU
KAMAR TIDUR ±0.00
UTAMA TAMAN
±0.00 DAPUR
5500 ±0.00

TERAS

1710
TOILET
-0.02
-0.03

RESAPAN. 1,5 M3 dia=1,25 Mtr, T=1,1


PIPA PVC CLASS D Ø 4"
INSTALASI AIR KOTOR
TOILET R. GANTI R. KELUARGA
2500

±0.00 ±0.00 R. MAKAN

5000
-0.03
12500

±0.00

Mtr
FCO Ø 4"

TOILET
1500

INSTALASI AIR KOTOR INSTALASI AIR KOTOR INSTALASI AIR KOTOR


-0.03 PIPA PVC CLASS D Ø 4" PIPA PVC CLASS D Ø 4" PIPA PVC CLASS D Ø 4"
CARPORT

SEPTIC TANK FIBER BIO


KAP. 1 M3 dia=1,25 Mtr, T=1,1 Mtr
PIPA PVC CLASS D Ø 4"
INSTALASI AIR KOTOR
PEMBERI TUGAS :
R. TAMU KAMAR TIDUR
KAMAR TIDUR ±0.00 ±0.00
4000

4000
±0.00

TOILET
-0.03

TERAS

500
1000

-0.02
KEGIATAN :

PEMBANGUNAN
4000 4000 4000 RUMAH TINGGAL
3000

PEKERJAAN :
TAMAN TAMAN

RUMAH TINGGAL

DIBUAT :

..........................
.............
JUDUL GAMBAR SKALA

DENAH INSTALASI AIR KOTOR DENAH INSTALASI AIR 1 : 100


BEKAS
SKALA : 1 : 100

TAHUN NO LEMBAR JML LEMBAR

2020 03 07
CATATAN :

14000
4000 4000 4000 2000
PVC AW 3/4" turun di dalam dinding

dari toren ke kamar mandi pembantu


PVC AW 3/4" turun di dalam dinding
dari toren ke R. Cuci

RUANG CUCI
-0.02
PVC AW 3/4" turun

2790
di dalam dinding

PVC AW
Ø 3/4"
AW Ø 3/4"
PIPA PVC
PVC AW 3/4" turun di dalam dinding
dari toren ke R. Cuci KAMAR PEMBANTU
KAMAR TIDUR INSTALASI AIR BERSIH ±0.00
UTAMA TAMAN PIPA PVC AW Ø 1" DI ATAS PLAFOND

±0.00 DAPUR
POMPA BOOSTER

5500
60 L / mnit, 220 V, 125 W

±0.00
TOREN FIBER

TERAS
KAP. 1.000 L

1710
TOILET
-0.02
-0.03

PIPA PVC AW Ø 1" DI ATAS PLAFOND


INSTALASI AIR BERSIH

dari ground tank ke toren


Riser pipa air bersih PVC AW 1"
TOILET R. GANTI R. KELUARGA
2500

-0.03 ±0.00 ±0.00 R. MAKAN

5000
PIPA PVC AW Ø 1" DI BAWAH TANAH
12500

±0.00

PIPA TRANSFER AIR BERSIH


AW Ø 3/4"
PIPA PVC

INSTALASI AIR BERSIH


TOILET
1500

PIPA PVC AW Ø 3/4" DI ATAS PLAFOND

-0.03
CARPORT

PIPA PVC AW Ø 3/4" DI ATAS PLAFOND


PEMBERI TUGAS :

INSTALASI AIR BERSIH


R. TAMU KAMAR TIDUR
KAMAR TIDUR ±0.00 ±0.00
4000

4000
±0.00

TOILET
-0.03

TERAS

500
1000

-0.02
PVC AW 3/4" turun di dalam dinding
dari toren ke Toilet
KEGIATAN :

PVC AW 1/2" turun di dalam tanah


dari toren ke kran taman PEMBANGUNAN
4000 4000 4000 RUMAH TINGGAL
3000

POMPA TRANSFER
30 L / mnit, 220 V, 250 W
PEKERJAAN :
TAMAN TAMAN
GROUND TANK BETON
KAP. 2 M3
RUMAH TINGGAL

DIBUAT :
DARI SALURAN AIR PAM

24000

..........................
.............
JUDUL GAMBAR SKALA

DENAH INSTALASI AIR BERSIH DENAH INSTALASI AIR 1 : 100


BEKAS
SKALA : 1 : 100

TAHUN NO LEMBAR JML LEMBAR

2020 04 07
CATATAN :

14000
4000 4000 4000 2000

RUANG CUCI
-0.02

2790
KITCHEN
HOOD KAMAR PEMBANTU
KAMAR TIDUR ±0.00
UTAMA TAMAN
±0.00 DAPUR
5500 ±0.00

TERAS

1710
TOILET
-0.02
-0.03

TOILET R. GANTI R. KELUARGA


2500

±0.00 ±0.00 R. MAKAN

5000
-0.03
12500

±0.00

TOILET
1500

-0.03
CARPORT

PEMBERI TUGAS :
R. TAMU KAMAR TIDUR
KAMAR TIDUR ±0.00 ±0.00
4000

4000
±0.00
KODE KETERANGAN QTY

kWH
kWH meter 1 phase 1 pcs TOILET
220 V -0.03

TERAS
kWH

500
MCB Box 6 grup 1 pcs
1000

-0.02

Kabel Instalasi NYM KEGIATAN :


3x2,5 MM2 di dalam -
pipa conduit PEMBANGUNAN
4000 4000 4000 RUMAH TINGGAL
Exhaust Fan 5 pcs
3000

PEKERJAAN :
TAMAN TAMAN
LAMPU TAMAN 23W 4 pcs
2.300 Lumens Warm RUMAH TINGGAL
Downlight Bulb 6W
2 pcs DIBUAT :
600 Lumens Warm/
Cool White 4000K
PLC 8W
800 Lumens Warm/ 8 pcs
DayLight
Downlight Bulb 6W 24000
800 Lumens Warm/ 9 pcs
DayLight ..........................
Downlight Bulb 10,5W .............
1020 Lm Warm/Cool 12 pcs JUDUL GAMBAR SKALA
White 4000K
Single Switch with
DENAH INSTALASI STOP KONTAK
12 pcs DENAH STOP KONTAK 1 : 100
Phase & Neutral Socket SKALA : 1 : 100

Double Switch with TAHUN NO LEMBAR JML LEMBAR


7 pcs
Phase & Neutral Socket 2020 05 07
CATATAN :

14000
4000 4000 4000 2000

STK 06 RUANG CUCI STK 10

-0.02 OUTDOOR 4

2790
STK 09 KAMAR PEMBANTU
KAMAR TIDUR ±0.00
UTAMA TAMAN OUTDOOR 3
±0.00 DAPUR
UNTUK POMPA BOOSTER DI DAK

5500 ±0.00

STK 08
TERAS

1710
TOILET
-0.02
AC 03 -0.03

STK 05

STK 07
TOILET R. GANTI R. KELUARGA
2500

-0.03 ±0.00 ±0.00 R. MAKAN

5000
12500

±0.00

TOILET
1500

-0.03
AC 04 AC 05 STK 04 CARPORT

AC 01
AC 02 STK 01 STK 03

OUTDOOR 1
STK 02

PEMBERI TUGAS :
R. TAMU KAMAR TIDUR
KAMAR TIDUR ±0.00 ±0.00
4000

4000
±0.00

TOILET
-0.03

TERAS

500
1000

-0.02
KEGIATAN :

PEMBANGUNAN
OUTDOOR 2
4000 4000 4000 UNTUK POMPA TRANSFER RUMAH TINGGAL
3000

POMPA TRANSFER
30 L / mnit, 220 V, 250 W
PEKERJAAN :
TAMAN TAMAN

RUMAH TINGGAL

DIBUAT :

24000

..........................
.............
JUDUL GAMBAR SKALA

DENAH INSTALASI STOP KONTAK AC


Stop Kontak AC 5 pcs DENAH STOP KONTAK 1 : 100
SKALA : 1 : 100 Elv. = + 02.75 FFL

Stop Kontak 220 V TAHUN NO LEMBAR JML LEMBAR


12 pcs
Elv. = + 01.50 FFL 2020 06 07
CATATAN :

STOP KONTAK
PENERANGAN 1 PHASE, 220 V UTILITY

DAYA NOMINAL

TERPASANG
KOEFISIEN
1P 1P KITCHEN
HOOD

DAYA
KETERANGAN

TAMAN
DOWNLIGHT

DOWNLIGHT

DOWNLIGHT
AC SPLIT

2.300 Lm
STOP KONTAK STOP KONTAK

1.400 Lm

1.020 Lm

800 Lm
600 Lm
EXHAUST KITCHEN

PLC
INDOOR OUTDOOR 1 PK

19 WATT LAMPU
1 PHASE 1 PHASE 9.000 btu/h FAN HOOD

10,5 WATT
13 WATT

250 W

250 W
8 WATT
6 WATT
1P 220 V 1P 220 V 1P 220 V
800 W 30 W 100 W

Q1 8A NYM 2X1,5 mm2


1. 9 10 2 - - - - - 3 1 424 0,8 339,2 IN DOOR AREA
Q2 10A NYM 3X2,5 mm2
2. - - - - - 6 - - - - 1.500 0,6 900 IN DOOR AREA
Q3 10A NYM 3X2,5 mm2
3. - - - - - 5 - - - - 1.250 0,6 750 IN DOOR AREA
Q4 10A NYM 3X2,5 mm2
4. - - - - - - - 2 - - 1.600 0,6 960 R. KELUARGA & R. MAKAN
35A Q5 10A NYM 3X2,5 mm2
5. - - - - - - - 3 - - 2.400 0,8 1.920 KAMAR TIDUR
Q6 10A NYM 3X2,5 mm2
6. - 2 - 8 4 - 4 - 2 - 1.221 0,9 1.098,9 OUT DOOR & GARASI
NYY 4X35 mm2

10A
7. - - - - - - - - - - - SPARE PEMBERI TUGAS :

9 12 2 8 4 11 4 5 5 1 8.395 5.968,1
ALOKASI PENAMBAHAN= 10% BEBAN TERPASANG= 596,8
TOTAL BEBAN = 6.564,9 VA ≈ 29,8 A

KEGIATAN :

PEMBANGUNAN
RUMAH TINGGAL

PEKERJAAN :

RUMAH TINGGAL

SINGLE LINE DIAGRAM DIBUAT :

SKALA : NTS

..........................
.............
JUDUL GAMBAR SKALA

SINGLE LINE DIAGRAM NTS

TAHUN NO LEMBAR JML LEMBAR

2020 07 07

Anda mungkin juga menyukai