DAFTAR UPAH KERJA HARIAN

KEGIATAN : OPTIMALISASI FUNGSI JARINGAN IRIGASI YANG TELAH DIBANGUN


PEKERJAAN : REHABILITASI D. I WANGA
LOKASI : DESA WANGA KEC. LORE PEORE
TAHUN ANGGARAN : 2012
PERIODE :

WAKTU PELAKSANAAN UPAH HARIAN JUMLAH UPAH


NO. NAMA TANDA TANGAN
(Rp.) (Rp.)

1 ......................................

2 ......................................

3 ......................................

4 ......................................

5 ......................................

6 ......................................

7 ......................................

8 ......................................

9 ......................................

10 ......................................

11 ......................................

12 ......................................

13 ......................................

14 ......................................

15 ......................................

16 ......................................

17 ......................................

18 ......................................

19 ......................................

20 ......................................

21 ......................................

22 ......................................

23 ......................................

24 ......................................

25 ......................................

JUMLAH

Poso, 2012
MENYETUJUI :
KETUA PERKUMPULAN PETANI PEMAKAI AIR BENDAHARA
(P3A) " HARAPAN JAYA"

SUWASTO B E N I
LAPORAN HARIAN

KEGIATAN : OPTIMALISASI FUNGSI JARINGAN IRIGASI YANG TELAH DIBANGUN


PEKERJAAN : REHABILITASI D. I WANGA
PELAKSANA : CV. MEGA TAMA
TAHUN ANGGARAN : 2012

HARI :
TANGGAL :

A. PEKERJAAN C. TIBA / MUTASI : PERALATAN & BAHAN KONSTRUKSI POKOK


CACAH LOKASI LOKASI
NO. ITEM PEKERJAAN VOLUME SATUAN BOBOT NO. JENIS
VOLUME ASAL TUJUAN
PEKERJAAN PERSIAPAN 1.
1. Pemasangan Papan Nama Proyek 2.
2. Pembuatan Barak Kerja 3.
3. Pengukuran/ Pas. Bouwplank 4.
4. Pembuatan Kisdam 5.
5. Dokumentasi 6.
7.
PEK. BENDUNG 8.
1. Perbaikan Pintu 9.
2. Perbaikan Screen 10.
3. Pek. Galian Tanah Berbatu 11.
4. Pek. Timbunan Tanah 12.
5. Pek. Pas. Batu Kali 1 : 4 13.
6. Pek. Plesteran 1 :3 14.
7. Siaran 1 : 2 15.
8. Pek. Beton Betulang 16.
9. Bronjong 17.

B. PERSONIL PROYEK D. PEMAKAIAN PERALATAN

NO. TUGAS / JABATAN CACAH LOKASI NO. JENIS PERALATAN CACAH AKTIF SATUAN BAIK RUSAK

1. Pengawas Lapangan 1.
2. Kepala Tukang 2.
3. Mandor 3.
4. Tukang 4.
5. Pekerja 5.
6. Operator 6.
7. Pembantu Operator 7.
8.

E. CUACA / BENCANA ALAM / KEJADIAN PENGHAMBAT PEKERJAAN

NO. JENIS JAM KETERANGAN

1. Hujan Lebat
2. Gerimis
3. Banjir/Genangan Air
4. Longsor
5.
6.
7.

USUL / PENGAJUAN / SARAN / INSTRUKSI / KESEPAKATAN / PELAPORAN


URAIAN TANDA TANGAN

PELAKSANA

PENGAWAS LAPANGAN
PENGAWAS LAPANGAN
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023

NO. PHOTO PERHITUNGAN VOLUME SATUAN


SKETSA GAMBAR

0,30

0,30

1 PLESTERAN 2.10 x 12.00 = 25.20 25.20 M²


2 ACIAN 2.10 x 55.00 115.50 115.50 M²
1,50

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : IV JUNI

NO. PHOTO PERHITUNGAN VOLUME SATUAN


SKETSA GAMBAR

1 PAS BATU KALI 0.575 x 1.2 x 2.84 = 1.96 1.96 M³

0,30
2 BETON BERTULANG RB 0.30 x 0.30 x 57.00 = 5.13
0,30
0.09 x 0.90 x 1.00 = 0.08
5.21 5.21 M³
3 PIPA PERESAPAN 4.14 M¹

0,90

0,30

0,91

0,25

1,25

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : III JUNI

NO. PERHITUNGAN VOLUME SATUAN

1 PAS BATU KALI 0.575 x 1.2 x 13.91 = 9.60 9.60 M³

0,30
2 BETON BERTULANG KLM 0.00 x 0.00 x 0.00 = 0.00

0,30 0.09 x 0.90 x 13.02 = 1.05 M³


1.05 M³ 1.05 M³

3 PIPA PERESAPAN 22.00 M¹


0,90

0,30

0,91

0,25

1,25

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN
FATMAH RONE ACHMAD MUSA
Direktur
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : II JUNI

NO. PERHITUNGAN VOLUME SATUAN

1 PAS BATU KALI 0.55 x 1.2 x 12 = 7.92 7.92 M³

2 BETON BERTULANG KLM 0.00 x 0.00 x 0.00 = 0.00


0,30
0.09 x 0.90 x 5.00 = 0.41 M³
0.41 M³ 0.41 M³
0,30
3 PIPA PERESAPAN 18.00 M¹

0,90

0,30

0,91

0,25

1,25

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : III (KETIGA) AGUSTUS

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 1.00 2.59
II DIVISI PEKERJAAN TANAH
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 24.75 1.81 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 - - -
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52 - - -
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 - - -
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 - - -
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 - 3.94
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 - - - -
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 - - - -
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53 - - - -
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 - 8.34 8.34

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU KE III ( BULAN AGUSTUS )

NO. PHOTO SKETSA GAMBAR PERHITUNGAN VOLUME SATUAN

1. GALIAN TANAH 1.00 x 1.00 x 15.75 = 15.75

1. GALIAN ENDAPAN 1.80 x 5.00 = 9.00

24.75

1. BATU KOSONG 0.25 x 1.00 x 15.75 = 3.94

0,90

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : IV (KEEMPAT) AGUSTUS

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
II DIVISI PEKERJAAN TANAH
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 24.75 1.81 - - 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 - - - - -
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52 0.74 1.21 0.74 1.21
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 - - 36.55 1.27 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 - - 11.81 12.45 11.81 12.45
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 1.78 - 3.94 1.78
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 - - - - -
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 - - - - -
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 6.18 14.93 21.11

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU KE IV ( BULAN AGUSTUS )

NO. PHOTO SKETSA GAMBAR PERHITUNGAN VOLUME SATUAN

1. PONDASI 0.75 x 1.00 x 15.75 = 11.81

Besi/Batang Berat besi/Batang


1 BESI TULANG SLF 3.42 x 10.70 = 36.55 M³

1 BETON SLF 0.30 x 0.30 x 8.20 = 0.74 M³

0,90

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN BULANAN

KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN : AGUSTUS

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 - - 1.00 2.59 1.00 2.59
II DIVISI PEKERJAAN TANAH -
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 - - 24.75 1.81 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 - - - - - -
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52 0.74 1.21 0.74 1.21
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 - - 36.55 1.27 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 - - 11.81 12.45 11.81 12.45
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 - - 3.94 1.78 3.94 1.78
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 - - - - -
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 - - - - - -
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 - 21.11 21.11

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN AGUSTUS

NO. PHOTO SKETSA GAMBAR PERHITUNGAN VOLUME SATUAN

1. GALIAN TANAH 0.90 x 1.00 x 24.00 = 21.60

0,90

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : I (PERTAMA) SEPTEMBER

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
II DIVISI PEKERJAAN TANAH - 0.00 - - - - - -
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 24.75 1.81 - - 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 - - - - -
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52 0.74 1.21 0.74 1.21
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 11.81 12.45 - 11.81 12.45
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 1.78 - 3.94 1.78
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 - - - - -
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 - - - - - -
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 21.11 - 21.11

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU KE I (BULAN SEPTEMBER)

NO. PHOTO SKETSA GAMBAR PERHITUNGAN VOLUME SATUAN

1. BATU KOSONG 0.25 x 1.00 x 24.00 = 6.00


0,30

2. PONDASI 0.65 x 1.00 x 24.00 = 15.60


0,30

0,90

0,30

0,65

0,25

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : II (KEDUA) SEPTEMBER

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
II DIVISI PEKERJAAN TANAH
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 24.75 1.81 - - 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 - - 0.20 0.00 0.20 0.00
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 11.81 12.45 - - 11.81 12.45
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 1.78 - 3.94 1.78
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 - - 7.55 0.94 7.55 0.94
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 - - 1.45 0.07 1.45 0.07
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53 6.00 2.53 6.00 2.53
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 19.90 3.54 23.44

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU KE II (BULAN SEPTEMBER)

NO. PHOTO SKETSA GAMBAR PERHITUNGAN VOLUME SATUAN

1 BETON BERTULANG SLF 0.30 x 0.30 x 12.50 = 1.13 M³


0,30

0,30 2 BETON BERTULANG KLM 0.09 x 0.90 x 4.00 = 0.32 M³

1.45

0,90

1 PAS BATU KALI DINDING 0.6 x 1.2 x 12.5 = 9.00

0,30
TOTAL PASANGAN BATU = 7.55

0,65

0,25

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : III (KETIGA) SEPTEMBER

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
II DIVISI PEKERJAAN TANAH
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 24.75 1.81 - - 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 0.20 0.00 0.20 0.00 0.40 0.01
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 11.81 12.45 - - 11.81 12.45
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 1.78 - 3.94 1.78
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 7.55 0.94 6.92 0.86 14.47 1.79
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 1.45 0.07 1.36 0.07 2.81 0.14
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53 6.00 2.53 5.00 2.11 11.00 4.64
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 23.44 3.04 26.48

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU KE III (BULAN SEPTEMBER)

NO. PHOTO SKETSA GAMBAR PERHITUNGAN VOLUME SATUAN

0,30

0,30 1 BETON BERTULANG SLF 0.30 x 0.30 x 11.50 = 1.04 M³

2 BETON BERTULANG KLM 0.09 x 0.90 x 4.00 = 0.32 M³

0,90
1.36
PAS
1 BATU KALI DINDING 0.6 x 1.2 x 11.5 = 8.28 M³

TOTAL PASANGAN BATU = 6.92


0,30

0,65

0,25

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : III (KETIGA) SEPTEMBER

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
II DIVISI PEKERJAAN TANAH
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 24.75 1.81 - - 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 0.20 0.00 0.20 0.00 0.40 0.01
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 11.81 12.45 - - 11.81 12.45
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 1.78 - 3.94 1.78
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 7.55 0.94 6.92 0.86 14.47 1.79
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 1.45 0.07 1.36 0.07 2.81 0.14
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53 6.00 2.53 5.00 2.11 11.00 4.64
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 23.44 3.04 26.48

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU KE IV (BULAN SEPTEMBER)

NO. PERHITUNGAN VOLUME SATUAN

1 PLESTERAN 2.10 x 24.00 = 50.40 M2 50.40 M²

0,30
2 ACIAN 2.10 x 24.00 50.40 M2 50.40 M²

0,30
1 BETON BERTULANG SLF 0.30 x 0.30 x 24.00 = 2.16 M³

0,90

0,30

0,65

0,25

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN BULANAN

KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN : AGUSTUS

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I DIVISI UMUM
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 - - 1.00 2.59 1.00 2.59
II DIVISI PEKERJAAN TANAH -
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 - - 24.75 1.81 24.75 1.81
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 - - - - - -
III DIVISI PEKERJAAN STRUKTUR
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 - - 36.55 1.27 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 - - - - -
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 - - - - -
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 - - - - -
3.6 Acian 50.05 M2 34,910.71 1,747,281.04 1.89
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 - - - - - -
3.8 Pembuatan Pintu Air 2 Buah 6.20 M2 2,236,598.54 13,866,910.95 14.99 - - - -
3.9 Pengecetan Pintu Air 2 Buah 6.56 M2 81,800.60 536,611.94 0.58
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53
3.11 Pengangkutan Pintu Air 2 Buah 2.00 Bh 1,500,000.00 3,000,000.00 3.24
Jumlah 92,508,452.40 100.00 - 5.67 5.67

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
CALCULATION SHEET

KEGIATAN : PEMBANGUNAN TANGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN : AGUSTUS - SEPTEMBER

NO. PERHITUNGAN VOLUME SATUAN

1. GALIAN TANAH 0.90 x 1.00 x 24.00 = 21.60


0,30

2 PAS BATU KOSONG 0.25 x 1.00 x 24.00 = 6.00


0,30

3 PONDASI 0.65 x 1 x 24.00 = 15.60

4 BETON BERTULANG SLF 0.30 x 0.30 x 24 = 2.17


0,90

5 BETON BERTULANG KLM 0.09 x 0.90 x 8.00 = 0.64 M³


0,30

0,75 6 BETON BERTULANG RBK 0.30 x 0.30 x 24.00 = 2.16 M³


4.97
0,25

1,00
7 PAS BATU KALI DINDING 0.6 x 1.20 x 24 = 17.29
TOTAL PASANGAN DINDING = 14.47

TOTAL KESELURUHAN PASANGAN BATU = 30.07

8 PLESTERAN 2.10 x 24.00 = 50.40

9 ACIAN 2.10 x 24.00 50.40


0,90

1,00

DIBUAT OLEH : DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktris NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
MINGGU : IV (KEEMPAT) SEPTEMBER

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I PEKERJAAN PENDAHULUAN
1 Pengadaan dan Pemasangan Papan Proyek 1.00 Bh 300,000.00 300,000.00 0.32 1.00 0.32 - - 1.00 0.32
2 Pembuatan Barak Kerja 33.50 M3 1,000,000.00 1,000,000.00 1.08 - - - - - -
3 Pengukuran dan Pemasangan Bouwplank 16.54 M3 750,000.00 12,406,799.25 13.41 24.75 20.07 - - 24.75 20.07
4 Administrasi dan Dokumentasi 5.21 M³ 350,000.00 1,823,500.00 1.97 0.40 0.15 0.30 0.11 0.70 0.26

II PEKERJAAN PASANGAN
1 Pekerjaan Galian Tanah Biasa 22.20 M³ 72,514.40 1,609,819.68 1.74 36.55 2.87 - - 36.55 2.87
2 Pekerjaan Timbunan Tanah Kembali 18.54 M³ 42,504.00 788,024.16 0.85 11.81 0.54 - 11.81 0.54
3 Pekerjaan Batu Kosong 5.55 M³ 521,985.00 2,897,016.75 3.13 3.94 2.22 - 3.94 2.22
4 Pekerjaan Pasangan Batu Kali 1:4 29.29 M³ 1,136,524.30 33,288,796.75 35.98 14.47 17.78 - 14.47 17.78
III PEKERJAAN BETON BERTULANG/PLESTERAN DAN ACIAN
1 Pekerjaan Beton Tulang 4.68 M³ 4,005,661.78 18,746,497.13 20.26 2.81 12.17 2.16 9.35 4.97 21.52
2 Pekerjaan Plesteran 46.62 M2 103,422.89 4,821,575.13 5.21 - - 50.40 5.63 50.40 5.63
3 Pekerjaan Acian 46.62 M2 48,392.58 2,256,062.08 2.44 50.40 2.64 50.40 2.64
4 Pipa Peresapan PVC 2" 18.50 M 28,000.00 518,000.00 0.56 11.00 0.33 11.00 0.33

IV PEKERJAAN FINISHING
1 Pembersihan Akhir - Ls 500,000.00 - 0.00 - - 1.00 0.54 1.00 0.54

Jumlah 80,456,090.93 86.97 56.45 18.28 74.73

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur NIP. 19710622 200701 1 012
LAPORAN BULANAN

KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN : SEPTEMBER

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I PEKERJAAN PENDAHULUAN
1 Pengadaan dan Pemasangan Papan Proyek 1.00 Bh 300,000.00 300,000.00 0.32 1.00 2.59 - - 1.00 2.59
2 Pembuatan Barak Kerja 33.50 M3 1,000,000.00 33,497,200.00 36.21 - - - - - -
3 Pengukuran dan Pemasangan Bouwplank 16.54 M3 750,000.00 12,406,799.25 13.41 24.75 1.81 - - 24.75 1.81
4 Administrasi dan Dokumentasi 5.21 M³ 350,000.00 1,823,500.00 1.97 - - 0.70 0.26 0.70 0.26
-
II PEKERJAAN PASANGAN -
1 Pekerjaan Galian Tanah Biasa 22.20 M³ 72,514.40 1,609,819.68 1.74 36.55 1.27 - - 36.55 1.27
2 Pekerjaan Timbunan Tanah Kembali 18.54 M³ 42,504.00 788,024.16 0.85 11.81 12.45 11.81 0.54 23.62 12.99
3 Pekerjaan Batu Kosong 5.55 M³ 521,985.00 2,897,016.75 3.13 3.94 1.78 3.94 2.22 7.88 4.00
4 Pekerjaan Pasangan Batu Kali 1:4 29.29 M³ 1,136,524.30 33,288,796.75 35.98 - - 14.47 17.78 14.47 17.78
III PEKERJAAN BETON BERTULANG/PLESTERAN DAN ACIAN
1 Pekerjaan Beton Tulang 4.68 M³ 4,005,661.78 18,746,497.13 20.26 - - 4.97 21.52 4.97 21.52
2 Pekerjaan Plesteran 46.62 M2 103,422.89 4,821,575.13 5.21 - - 50.40 5.63 50.40 5.63
3 Pekerjaan Acian 46.62 M2 48,392.58 2,256,062.08 2.44 50.40 2.64 50.40 2.64
4 Pipa Peresapan PVC 2" 18.50 M 28,000.00 518,000.00 0.56 11.00 0.33 11.00 0.33

IV PEKERJAAN FINISHING
1 Pembersihan Akhir - Ls 500,000.00 - 0.00 - - 1.00 0.54 1.00 0.54

Jumlah 112,953,290.93 122.10 19.90 51.47 71.37

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur NIP. 19710622 200701 1 012
LAPORAN MINGGUAN
KEGIATAN : PENINGKATAN PEMBANGUNAN PUSAT - PUSAT PENGENDALI BANJIR
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2015
MINGGU : IV ( Keempat ) JUNI

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I Pekerjaan Persiapan
1. Pemasangan Papan Nama Proyek 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
2 Barak Kerja / gudang 33.50 M3 67,472.14 67,472.14 0.07 - - - - - -
3 Pengukuran/Pasang Bouwplank 16.54 M3 17,748.33 293,599.96 0.32 24.75 0.47 - - 24.75 0.47
4 Administrasi / Dokumentasi 5.21 M³ 1,512,338.00 7,879,280.98 8.52 0.70 1.14 0.10 0.16 0.80 1.31

II Pekerjaan Pasangan
1. Galian Tanah Biasa 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
2 Pasangan Batu Kosong 28.35 M³ 975,196.70 27,646,826.45 29.89 11.81 12.45 - - 11.81 12.45
3 Pas Batu Kali 1:4 6.12 M³ 418,117.60 2,558,879.71 2.77 3.94 1.78 1.96 0.89 5.90 2.67
4 Beton Bertulang 1:2:3 50.05 M2 114,751.02 5,743,288.55 6.21 14.47 1.79 5.21 0.65 19.68 2.44
5 Pipa Peresapan PVC 2" 7.92 ls 45,000.00 356,400.00 0.39 4.97 0.24 2.95 0.14 7.92 0.39
6 Urugan Tanah 3.64 M2 389,850.00 1,419,054.00 1.53 50.40 21.24 - - 50.40 21.24

III PEKERJAAN FINISIHING


1 Plesteran 1:3 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509
2 Acian Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509
3 Pembersihan Akhir - Ls 500,000.00 - 0.00 1.00 0.54 - - 1.00 0.54

Jumlah Err:509 Err:509 Err:509 Err:509 Err:509

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE RUDIANTO


Direktur
LAPORAN BULANAN

KEGIATAN : PENINGKATAN PEMBANGUNAN PUSAT-PUSAT PENGENDALI BANJIR


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN :

BULAN LALU BULAN INI JUMLAH


NO. URAIAN VOL. SAT. BOBOT (%)
VOLUME BOBOT(%) VOLUME BOBOT(%) VOLUME BOBOT(%)

I DIVISI UMUM
1.1 0 1.00 2,400,000.00 2.59
### Err:509 Err:509 Err:509 Err:509
2.2 0 16.54 17,748.33 0.32
### Err:509 Err:509 Err:509 Err:509

II PEKERJAAN PASANGAN
3.2 0 708.46 32,182.75 24.65

Jumlah - Err:509

#REF! #REF!
CV. RIFANDI #REF!

FATMAH RONE 0
Direktris Err:509
LAPORAN MINGGUAN
KEGIATAN : PENINGKATAN PEMBANGUNAN PUSAT - PUSAT PENGENDALI BANJIR
PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2015
MINGGU : I ( Pertama ) JULI

MINGGU LALU MINGGU INI SAMPAI DENGAN MINGGU INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I Pekerjaan Persiapan
1. Pemasangan Papan Nama Proyek 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
2 Barak Kerja / gudang 33.50 M3 67,472.14 67,472.14 0.07 - - - - - -
3 Pengukuran/Pasang Bouwplank 16.54 M3 17,748.33 293,599.96 0.32 24.75 0.47 - - 24.75 0.47
4 Administrasi / Dokumentasi 5.21 M³ 1,512,338.00 7,879,280.98 8.52 0.80 1.31 4.41 7.21 5.21 8.52

II Pekerjaan Pasangan
1. Galian Tanah Biasa 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
2 Pasangan Batu Kosong 28.35 M³ 975,196.70 27,646,826.45 29.89 11.81 12.45 - - 11.81 12.45
3 Pas Batu Kali 1:4 6.12 M³ 418,117.60 2,558,879.71 2.77 5.90 2.67 - - 5.90 2.67
4 Beton Bertulang 1:2:3 50.05 M2 114,751.02 5,743,288.55 6.21 19.68 2.44 - - 19.68 2.44
5 Pipa Peresapan PVC 2" 7.92 ls 45,000.00 356,400.00 0.39 7.92 0.39 - - 7.92 0.39
6 Urugan Tanah 3.64 M2 389,850.00 1,419,054.00 1.53 50.40 21.24 56.43 23.78 106.83 45.02

III PEKERJAAN FINISIHING


1 Plesteran 1:3 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 119.70 Err:509 Err:509 Err:509
2 Acian Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 119.70 Err:509 Err:509 Err:509
3 Pembersihan Akhir - Ls 500,000.00 - 0.00 1.00 0.54 1.00 0.54 2.00 1.08

Jumlah Err:509 Err:509 Err:509 Err:509 Err:509

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE RUDIANTO


Direktur
LAPORAN BULANAN

KEGIATAN : PEMBANGUNAN TANGGUL SUNGAI


PEKERJAAN : PEMBANGUNAN TANGGUL SUNGAI KELURAHAN SAYO
LOKASI : KELURAHAN SAYO KECAMATAN POSO KOTA SELATAN
TAHUN ANGGARAN : 2023
BULAN : III ( KETIGA ) JULI

BULAN LALU BULAN INI SAMPAI DENGAN BULAN INI


HARGA JUMLAH BOBOT
NO. URAIAN VOLUME BOBOT BOBOT BOBOT
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)

I Pekerjaan Persiapan
1.1 Mobilisas dan Demobilisasi 1.00 Bh 2,400,000.00 2,400,000.00 2.59 1.00 2.59 - - 1.00 2.59
2.1 Pekerjaan Galian 33.50 M3 67,472.14 2,260,127.77 2.44 - - - - - -
2.2 Pekerjaan Timbunan Tanah Kembali 16.54 M3 17,748.33 293,599.96 0.32 24.75 0.47 - - 24.75 0.47
3.1 Beton K175 5.21 M³ 1,512,338.00 7,879,280.98 8.52 0.70 1.14 4.41 7.21 5.11 8.35
-
II Pekerjaan Pasangan -
3.2 Baja Tulangan U24 polos 708.46 Kg 32,182.75 22,800,191.07 24.65 36.55 1.27 - - 36.55 1.27
3.3 Pasangan Batu Kali 28.35 M³ 975,196.70 27,646,826.45 29.89 23.62 24.90 - - 23.62 24.90
3.4 Pasangan Batu Kosong 6.12 M³ 418,117.60 2,558,879.71 2.77 7.88 3.56 - - 7.88 3.56
3.5 Plesteran 50.05 M2 114,751.02 5,743,288.55 6.21 14.47 1.79 - - 14.47 1.79
3.7 Pipa Peresapan 7.92 ls 45,000.00 356,400.00 0.39 4.97 0.24 - - 4.97 0.24
3.10 Pemasangan Pintu Air 2 Buah 3.64 M2 389,850.00 1,419,054.00 1.53 50.40 21.24 56.43 23.78 106.83 45.02
-
IV PEKERJAAN FINISIHING -
###### Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 119.70 Err:509 Err:509 Err:509
###### Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 119.70 Err:509 Err:509 Err:509
1 Pembersihan Akhir - Ls 500,000.00 - 0.00 1.00 0.54 1.00 0.54 2.00 1.08
-
Jumlah Err:509 Err:509 Err:509 Err:509 Err:509

DIBUAT OLEH DIPERIKSA OLEH :


CV. RIFANDI PENGAWAS LAPANGAN

FATMAH RONE ACHMAD MUSA


Direktur