Perencanaan Pembangunan

Masjid Nurul Falaq

Lokasi : Desa Rompu-Rompu, Kec. Poleang Utara, Kabupaten Bombana

Tahun Anggaran 2021

SOFT DRAWING
KEGIATAN :

PE ER AAN PERENCANAAN PE AN UNAN


ES ID NURUL ALA

A LO ASI DESA RO PU RO PU
PR PR PR PR PR PR EC. POLEAN UTARA O ANA

TA UN AN ARAN

PR PR PR PR PR PR
SOFT DRAWING
DIPERIKSA DAN DISETUJUI OLEH :

PANITIA PE AN UNAN
ES ID NURUL ALA
DESA RO PU RO PU EC. POLEAN UTARA

C
PR PR
PR PR PR PR
....................................

MENGETAHUI OLEH :

EPALA DESA
DESA RO PU RO PU EC. POLEAN UTARA

D
PR PR
PR PR PR PR ....................................
KONSULTAN PERENCANA :

E ASNUR NASARUDDIN
PR PR PR PR PR PR TIM PERENCANA PARAF
LEADER
ARSITEK

PR PR SIPIL
ELEKTRIKAL

PR PR PR PR NA A A AR S ALA

ODE A AR
NO.LE AR U LA

RENCANA PONDASI POER PLAT


60
4 52 4
KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ

LOKASI : DESA ROMPU-ROMPU


KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021

150
45 60 45 SOFT DRAWING

5 8
RABAT LANTAI BETON, T=8 CM

PASIR URUG, T=5 CM


7 DIPERIKSA DAN DISETUJUI OLEH :
SLOEF S1 (30X60)
PANITIA PEMBANGUNAN
MESJID NURUL FALAQ
10 - Ø16D
45

DESA ROMPU-ROMPU KEC. POLEANG UTARA

10 - Ø16D ....................................

150
137
16 - Ø16D (ulir)
150
60

7 MENGETAHUI OLEH :

BEUGEL Ø8 - 15 cm KEPALA DESA


DESA ROMPU-ROMPU KEC. POLEANG UTARA
45

....................................
PERMUKAAN TANAH ASLI
KONSULTAN PERENCANA :
40

DETAIL TELAPAK PONDASI POER PLAT (PR1)


100

skala 1: 15
ASNUR NASARUDDIN
50

TIM PERENCANA PARAF


LEADER
ARSITEK
SIPIL
55

LANTAI KERJA 5 CM
ELEKTRIKAL
PASIR URUG, T=5 CM

45 60 45 NAMA GAMBAR SKALA


150

POTONGAN PONDASI POER PLAT (PR1)


skala 1: 15

KODE GAMBAR
NO.LEMBAR JUMLAH
30
4 4

30
ELV. ±0.00 RABAT LANTAI BETON, T=8 CM
ELV. ±0.00

5 8
RABAT LANTAI BETON, T=8 CM

5 8
KEGIATAN :
PASIR URUG, T=5 CM
PASIR URUG, T=5 CM PEKERJAAN : PERENCANAAN PEMBANGUNAN
SLOEF S2 (25X50)
MESJID NURUL FALAQ

40
LOKASI : DESA ROMPU-ROMPU
KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021

PAS. BATU GUNUNG 1:3

148
SOFT DRAWING
135

135
8 - Ø12

TANAH URUG DIPADATKAN


DIPERIKSA DAN DISETUJUI OLEH :

100
185

PANITIA PEMBANGUNAN
BEUGEL Ø8 -10
MESJID NURUL FALAQ
DESA ROMPU-ROMPU KEC. POLEANG UTARA

ELV. -1.48 PERMUKAAN TANAH ASLI


ELV. -1.48 PERMUKAAN TANAH ASLI
....................................
TANAH URUG DIPADATKAN

20
25
PAS. BATU KOSONG, T=20 CM
MENGETAHUI OLEH :
50

5
PASIR URUG, T=5 CM
KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA
5 70 5
100

80
40

DETAIL PONDASI BATU GUNUNG (PG) ....................................


7 skala 1: 15
KONSULTAN PERENCANA :
7
55

LANTAI KERJA, T=5 CM


PASIR URUG, T=5 CM
15 40 15 DIMENSI MUTU BAJA
70
KOLOM PEDESTAL

POTONGAN PONDASI POER PLAT (PR2) 60


skala 1: 15
4 52 4 ULIR = U-34 ASNUR NASARUDDIN
POLOS = U-24

4
TIM PERENCANA PARAF
7

LEADER
20

5 - Ø16D

ARSITEK

5 - Ø16D
KD 60
SIPIL

52
ELEKTRIKAL

7
70
30

MUTU BETON
NAMA GAMBAR SKALA
4

K200 - (1 M3)
20

325 Kg - Semen ( 7 sak)


0,52 M3 - Pasir Kasar
0,68 M3 - Batu Split 2 cm
KODE GAMBAR
20 30 20 TULANGAN POKOK 16 - Ø16D (ulir) NO.LEMBAR JUMLAH
70
BEUGEL Ø8 - 10
DETAIL TELAPAK PONDASI POER PLAT (PR2)
skala 1: 15
KEGIATAN :

E ER AAN ERENCANAAN E AN UNAN


ES ID NURUL FALA

A LO ASI DESA RO U RO U
S S S S S EC. OLEAN U ARA O ANA
S S S S S S
A UN AN ARAN

S S S S S
SOFT DRAWING
S S S S S S DIPERIKSA DAN DISETUJUI OLEH :

ANI IA E AN UNAN
ES ID NURUL FALA
DESA RO U RO U EC. OLEAN U ARA

C
S S S S S
....................................

MENGETAHUI OLEH :
S S S S S S E ALA DESA
DESA RO U RO U EC. OLEAN U ARA

D
S S S S S
....................................
KONSULTAN PERENCANA :

S S S S S S

E ASNUR NASARUDDIN
S S S S S
TIM PERENCANA PARAF

S S S S LEADER
F ARSITEK
S S S SIPIL
ELEKTRIKAL

S S
NA A A AR S ALA

ODE A AR
RENCANA SLOEF NO.LE AR U LA
KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ

LOKASI : DESA ROMPU-ROMPU


KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021


TUMPUAN KETERANGAN TUMPUAN KETERANGAN

SLOEF UTAMA TULANGAN POKOK SLOEF TERAS TULANGAN POKOK


30
4 22 4 ATAS 3 Ø 16 D ATAS 2 Ø 16 D
SOFT DRAWING
25

4
TENGAH 4 Ø 12 TENGAH 2 Ø 12
4 17 4
3 Ø 16 D BAWAH 2 Ø 16 D BAWAH 2 Ø 16 D DIPERIKSA DAN DISETUJUI OLEH :

4
BEUGEL 2 Ø 16 D BEUGEL PANITIA PEMBANGUNAN
2 Ø 12
MESJID NURUL FALAQ
60
52

Ø 8 - 10 Ø 8 - 10 DESA ROMPU-ROMPU KEC. POLEANG UTARA

42
50
MUTU BAJA 2 Ø 12 MUTU BAJA
2 Ø 12
ULIR U-34 ULIR U-34

POLOS U-24 POLOS U-24


4

4
2 Ø 16 D 2 Ø 16 D
MUTU BETON MUTU BETON
....................................

K 200 K 200
S1 LAPANGAN KETERANGAN
S2 LAPANGAN KETERANGAN
MENGETAHUI OLEH :

KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA
TULANGAN POKOK TULANGAN POKOK
30
ATAS 2 Ø 16 D ATAS 2 Ø 16 D
4 22 4 25
TENGAH 4 Ø 12 TENGAH 2 Ø 12
4

4 17 4
2 Ø 16 D BAWAH 3 Ø 16 D BAWAH 2 Ø 16 D

4
BEUGEL 2 Ø 16 D BEUGEL ....................................
2 Ø 12 Ø 8 - 20 Ø 8 - 20 KONSULTAN PERENCANA :
60
52

50
42
MUTU BAJA 2 Ø 12 MUTU BAJA
2 Ø 12
ULIR U-34 ULIR U-34

POLOS U-24 POLOS U-24

4
4

3 Ø 16 D 2 Ø 16 D
MUTU BETON MUTU BETON

K 200 K 200

ASNUR NASARUDDIN

TIM PERENCANA PARAF


LEADER
ARSITEK
SIPIL
ELEKTRIKAL

NAMA GAMBAR SKALA

KODE GAMBAR
NO.LEMBAR JUMLAH
1

KEGIATAN :

EKER AAN ERENCANAAN EM AN UNAN


A MES ID NURUL ALA
K K K K K K K K K LOKASI DESA ROM U ROM U
KEC. OLEAN UTARA OM ANA

TA UN AN ARAN 1
K K1 K K1 K1 K K1 K

SOFT DRAWING
K K
DIPERIKSA DAN DISETUJUI OLEH :

ANITIA EM AN UNAN
MES ID NURUL ALA
DESA ROM U ROM U KEC. OLEAN UTARA

C
K K1 K1 K1 K1 K

....................................
K K
MENGETAHUI OLEH :

K K KE ALA DESA
DESA ROM U ROM U KEC. OLEAN UTARA

D
K K1 K1 K1 K1 K
....................................
KONSULTAN PERENCANA :

K K

E
K1 K1 K K1 K K K1 K K1 K1 ASNUR NASARUDDIN

TIM PERENCANA PARAF


LEADER
K K ARSITEK
SIPIL
ELEKTRIKAL
K1 K1 K1 K1
NAMA AM AR SKALA

KODE AM AR
RENCANA KOLOM LANTAI 1 NO.LEM AR UMLA

11
1 2 3 4 5 6 7 8

250 700 700 700 250


KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ
A
KP KP K2 KP K2 KP KP LOKASI : DESA ROMPU-ROMPU

250
KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021


B
K3 KP K3 K3 KP K3

700 SOFT DRAWING


KP KP KP KP DIPERIKSA DAN DISETUJUI OLEH :

PANITIA PEMBANGUNAN
MESJID NURUL FALAQ
DESA ROMPU-ROMPU KEC. POLEANG UTARA

C
K3 K3 K3 K3
....................................
KP KP
700

KP KP MENGETAHUI OLEH :

KEPALA DESA
KP KP DESA ROMPU-ROMPU KEC. POLEANG UTARA

D
K3 K3 K3 K3
....................................
KONSULTAN PERENCANA :
700

KP KP KP KP

E KP KP
K3 K3 KP K3 KP K3 KP K3 K3 ASNUR NASARUDDIN

TIM PERENCANA PARAF


400

F LEADER
ARSITEK
SIPIL

G ELEKTRIKAL
K3 K3 K3 K3
NAMA GAMBAR SKALA

400 700 700 700 400

KODE GAMBAR
RENCANA KOLOM LANTAI 2 NO.LEMBAR JUMLAH

skala 1:150
KEGIATAN :
DIMENSI MUTU BAJA DIMENSI MUTU BAJA PEKERJAAN : PERENCANAAN PEMBANGUNAN
MESJID NURUL FALAQ
KOLOM UTAMA LANTAI 1 KOLOM TERAS
LOKASI : DESA ROMPU-ROMPU
60 KEC. POLEANG UTARA, BOMBANA

4 52 4 ULIR = U-34 ULIR = U-34 TAHUN ANGGARAN: 2021


POLOS = U-24 30 POLOS = U-24

4
4 22 4

4
SOFT DRAWING
K1 K2
60
52

30
22
MUTU BETON MUTU BETON DIPERIKSA DAN DISETUJUI OLEH :

4
PANITIA PEMBANGUNAN
MESJID NURUL FALAQ
4

K200 - (1 M3) K200 - (1 M3) DESA ROMPU-ROMPU KEC. POLEANG UTARA

325 Kg - Semen ( 7 sak) 325 Kg - Semen ( 7 sak)


0,52 M3 - Pasir Kasar 0,52 M3 - Pasir Kasar
0,68 M3 - Batu Split 2 cm 0,68 M3 - Batu Split 2 cm
TULANGAN POKOK 16 - Ø16D (ulir) TULANGAN POKOK 9 - Ø16D (ulir)
....................................
BEUGEL Ø8 - 10 BEUGEL Ø8 - 10

MENGETAHUI OLEH :

KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA

DIMENSI MUTU BAJA DIMENSI MUTU BAJA


....................................
KOLOM UTAMA LANTAI 2 KOLOM PRAKTIS
KONSULTAN PERENCANA :

45 ULIR = U-34 ULIR = U-34


POLOS = U-24 POLOS = U-24
4 37 4
4

13

K3 KP

13
45
37

ASNUR NASARUDDIN
MUTU BETON MUTU BETON TIM PERENCANA PARAF
LEADER
4

ARSITEK
K200 - (1 M3) K200 - (1 M3) SIPIL
ELEKTRIKAL
325 Kg - Semen ( 7 sak) 325 Kg - Semen ( 7 sak)
0,52 M3 - Pasir Kasar 0,52 M3 - Pasir Kasar
0,68 M3 - Batu Split 2 cm 0,68 M3 - Batu Split 2 cm NAMA GAMBAR SKALA
TULANGAN POKOK 12 - Ø16D (ulir) TULANGAN POKOK 4 - Ø10
BEUGEL Ø8 - 10 BEUGEL Ø6 - 10

KODE GAMBAR
NO.LEMBAR JUMLAH
1 2 3 4 5 6 7 8
2600
250 350 350 350 350 350 350 250 KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ
A LOKASI : DESA ROMPU-ROMPU
B2 B2 B2 B2 B2 B2 B2 KEC. POLEANG UTARA, BOMBANA

250

250
B2 B2 B2 B2 B2 B2 B2 B2
TAHUN ANGGARAN: 2021
B
B2 B1 B1 B1 B1 B2
350

350
B2 B1 B1 B2 SOFT DRAWING
DIPERIKSA DAN DISETUJUI OLEH :
B2 B2
PANITIA PEMBANGUNAN
B1 B1
350

350
MESJID NURUL FALAQ
B2 VOID B2 DESA ROMPU-ROMPU KEC. POLEANG UTARA

C
B2 B1 B1 B1 B1 B2
350

350
B2 B1 B2 B1 B1 B2 B1 B2 ....................................

MENGETAHUI OLEH :
2750

2750
B2 B2 B2 B2 B2 B2 KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA
B1 B1
350

350
B2 B1 B2 B1 B2 B2

D
B2 B1 B1 B1 B1 B1 B1 B2
....................................
350

350
B2 B1 B2 B1 B2 B1 B2 B1 B2
KONSULTAN PERENCANA :

B2 B2 B2 B2 B2 B2 B2 B2
350

350
B2 B1 B2 B1 B2 B1 B2 B1 B2

E ASNUR NASARUDDIN
B1 B1 B1 B1 B1 B1 B1 B1
250

250
B2 B2 B2 B2 B2 TIM PERENCANA PARAF
B1 B1 B1 B1 LEADER
F ARSITEK
B2 B2 B2 B2 B2 B2
150

150
SIPIL
B1 B1
G ELEKTRIKAL

NAMA GAMBAR SKALA


150 250 350 350 350 350 350 350 250 150
2900

KODE GAMBAR
RENCANA BALOK LANTAI NO.LEMBAR JUMLAH

skala 1:150
KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ

LOKASI : DESA ROMPU-ROMPU


KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021


TUMPUAN KETERANGAN TUMPUAN KETERANGAN TUMPUAN KETERANGAN

BALOK UTAMA TULANGAN POKOK BALOK ANAK TULANGAN POKOK RINGBALK LANTAI 2 TULANGAN POKOK
30
4 22 4 ATAS 4 Ø 16 D ATAS 3 Ø 16 D ATAS 2 Ø 16 D
SOFT DRAWING
25 25
4

TENGAH 4 Ø 12 TENGAH 2 Ø 12 TENGAH 2 Ø 12


4 17 4 4 17 4
4 Ø 16 D BAWAH 2 Ø 16 D BAWAH 2 Ø 16 D BAWAH 2 Ø 16 D DIPERIKSA DAN DISETUJUI OLEH :

4
BEUGEL 3 Ø 16 D BEUGEL 2 Ø 16 D BEUGEL PANITIA PEMBANGUNAN
2 Ø 12
MESJID NURUL FALAQ
60
52

Ø 8 - 10 Ø 8 - 10 Ø 8 - 10 DESA ROMPU-ROMPU KEC. POLEANG UTARA

42

42
50

50
MUTU BAJA 2 Ø 12 MUTU BAJA 2 Ø 12 MUTU BAJA
2 Ø 12
ULIR U-34 ULIR U-34 ULIR U-34

POLOS U-24 POLOS U-24 POLOS U-24


4

4
2 Ø 16 D 2 Ø 16 D 2 Ø 16 D
MUTU BETON MUTU BETON MUTU BETON
....................................

K 200 K 200 K 200


B1 LAPANGAN KETERANGAN
B2 LAPANGAN KETERANGAN
RB LAPANGAN KETERANGAN
MENGETAHUI OLEH :

KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA
TULANGAN POKOK TULANGAN POKOK TULANGAN POKOK
30
ATAS 2 Ø 16 D ATAS 2 Ø 16 D ATAS 2 Ø 16 D
4 22 4 25 25
TENGAH 4 Ø 12 TENGAH 2 Ø 12 TENGAH 2 Ø 12
4

4 17 4 4 17 4
2 Ø 16 D BAWAH 4 Ø 16 D BAWAH 3 Ø 16 D BAWAH 2 Ø 16 D

4
BEUGEL 2 Ø 16 D BEUGEL 2 Ø 16 D BEUGEL ....................................
2 Ø 12 Ø 8 - 20 Ø 8 - 20 Ø 8 - 20 KONSULTAN PERENCANA :
60
52

50
42

50
42
MUTU BAJA 2 Ø 12 MUTU BAJA 2 Ø 12 MUTU BAJA
2 Ø 12
ULIR U-34 ULIR U-34 ULIR U-34

POLOS U-24 POLOS U-24 POLOS U-24


4

4
4

4 Ø 16 D 3 Ø 16 D 2 Ø 16 D
MUTU BETON MUTU BETON MUTU BETON

K 200 K 200 K 200

ASNUR NASARUDDIN

TIM PERENCANA PARAF


LEADER
ARSITEK
SIPIL
ELEKTRIKAL

NAMA GAMBAR SKALA

KODE GAMBAR
NO.LEMBAR JUMLAH
1 2 3 4 5 6 7 8
2600
250 350 350 350 350 350 350 250 KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ
A
LOKASI : DESA ROMPU-ROMPU

15 250

250
KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021


B

350
685 SOFT DRAWING
DIPERIKSA DAN DISETUJUI OLEH :

PANITIA PEMBANGUNAN

350
MESJID NURUL FALAQ
DESA ROMPU-ROMPU KEC. POLEANG UTARA

C
350

....................................

685
MENGETAHUI OLEH :
2750

2750
KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA
350

15
D
350

350
....................................
KONSULTAN PERENCANA :
350

350
E
ASNUR NASARUDDIN
250

250
TIM PERENCANA PARAF

F LEADER
ARSITEK
150

150
SIPIL
G ELEKTRIKAL

150 250 350 350 350 350 350 350 250 150 NAMA GAMBAR SKALA

2900

RENCANA PLAT LANTAI KODE GAMBAR


NO.LEMBAR JUMLAH
skala 1:150
Ø10-20

Ø10-20
Ø10-10

Ø10-10

Ø10-10

Ø10-10
KEGIATAN :

Ø10-10 (TULANGAN TUMPUAN ATAS) PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ

LOKASI : DESA ROMPU-ROMPU


KEC. POLEANG UTARA, BOMBANA

Ø10-10 (TULANGAN TUMPUAN ATAS)

Ø10-10 (TULANGAN TUMPUAN ATAS)


Ø10-20

Ø10-20
TAHUN ANGGARAN: 2021
Ø10-10 Ø10-10 Ø10-10

Ø10-20 Ø10-20 Ø10-20


Ø10-20 SOFT DRAWING
350

Ø10-20

Ø10-10 Ø10-10 Ø10-10 DIPERIKSA DAN DISETUJUI OLEH :

PANITIA PEMBANGUNAN
MESJID NURUL FALAQ
DESA ROMPU-ROMPU KEC. POLEANG UTARA

Ø10-20

Ø10-20
Ø10-10

Ø10-10

Ø10-10

Ø10-10
....................................

MENGETAHUI OLEH :

KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA
Ø10-1O (TULANGAN TUMPUAN ATAS)

Ø10-10 Ø10-10 Ø10-10


Ø10-20

Ø10-20
Ø10-20 Ø10-20 Ø10-20
250

Ø10-20 Ø10-20 ....................................

Ø10-10 Ø10-10 Ø10-10 KONSULTAN PERENCANA :


Ø10-10

Ø10-20

Ø10-10

Ø10-10

Ø10-20

Ø10-10
ASNUR NASARUDDIN

TIM PERENCANA PARAF

350 350 LEADER


ARSITEK

180 SIPIL
ELEKTRIKAL
10 10 10 10 10 10 10 10 10
10 10 10 20 20 20 20 20 10 10 10 10 10 10 20 20 20 20 20 NAMA GAMBAR SKALA
PLAT LANTAI TEBAL 18 CM
4

4
18

18
10 10 10 20 20 20 20 20 10 10 10 10 10 10 20 20 20 20 20 10 10 10
10 10 10 10 10 10 10 10
B1 B2 B1 KODE GAMBAR
NO.LEMBAR JUMLAH

DETAIL PLAT LANTAI


skala 1: 25
+7.00 RB RB KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ

LOKASI : DESA ROMPU-ROMPU


KEC. POLEANG UTARA, BOMBANA

TAHUN ANGGARAN: 2021

350
K2 K2
SOFT DRAWING
DIPERIKSA DAN DISETUJUI OLEH :

PANITIA PEMBANGUNAN
MESJID NURUL FALAQ
DESA ROMPU-ROMPU KEC. POLEANG UTARA

+3.50 PLAT LANTAI TEBAL 18 CM

....................................
B1 B2 B1
MENGETAHUI OLEH :

KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA

350
K1 K1

....................................
KONSULTAN PERENCANA :

+0.00 S1 S1

150
KD KD ASNUR NASARUDDIN

PERMUKAAN TANAH ASLI TIM PERENCANA PARAF


LEADER
ARSITEK

100
SIPIL
ELEKTRIKAL
PR PR
NAMA GAMBAR SKALA

700

KODE GAMBAR
NO.LEMBAR JUMLAH
1 2 3 4 5 6 7 8

250 700 700 700 250


KEGIATAN :

PEKERJAAN : PERENCANAAN PEMBANGUNAN


MESJID NURUL FALAQ
A
RB LOKASI : DESA ROMPU-ROMPU

250

250
KEC. POLEANG UTARA, BOMBANA
RB RB
TAHUN ANGGARAN: 2021
B
RB RB RB

700 SOFT DRAWING

700
RB RB RB RB
DIPERIKSA DAN DISETUJUI OLEH :

PANITIA PEMBANGUNAN
MESJID NURUL FALAQ
DESA ROMPU-ROMPU KEC. POLEANG UTARA

C
RB RB RB

....................................
2100

2100
700

700
RB RB RB RB MENGETAHUI OLEH :

KEPALA DESA
DESA ROMPU-ROMPU KEC. POLEANG UTARA

D
RB RB RB
....................................
KONSULTAN PERENCANA :
700

700
RB RB RB RB

E
RB RB RB RB RB ASNUR NASARUDDIN

TIM PERENCANA PARAF


400

400
F RB RB RB RB LEADER
ARSITEK
SIPIL

G ELEKTRIKAL
RB RB
NAMA GAMBAR SKALA

400 700 700 700 400

KODE GAMBAR
RENCANA RINGBALK NO.LEMBAR JUMLAH

skala 1:150