KEGIATAN
PEKERJAAN
REHABILITASI DI PAJALELE
5,578
6,045
5,579
5,114
5,180
5,259
6,294
5,354
5,300
5,561
6,020
5,485
5,306
5,514
6,204
5,535
5,530
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,37
0,45
0,47
0,39
4,26 1,18 0,83 0,81 2,12 4,41 4,74 1,06 1,02 0,63 0,83 0,83 5,40
DISTANCE (m) DISTANCE (m)
PJ50
7 PJ47 7
Galian 1.69 m² Galian 0.85 m²
+6.28
Timbunan 0.67 m² Timbunan 0.38 m² +6.20
+6.03
Pas. batu 1:4 0.94 m² 1 1
Pas. batu 1:4 0.94 m² +5.95
1 1
Plesteran 2.84 m' 2 2
Plesteran 2.84 m'
2 2
+5.28
+5.20
5,989
5,679
5,175
5,416
6,179
5,371
5,360
5,616
6,132
5,419
5,300
5,417
6,190
5,509
5,400
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,44
4,40 1,02 1,22 0,81 0,65 2,90 3,46 4,19 0,91 0,70 1,65 1,52 1,23 1,51 3,19
DISTANCE (m) DISTANCE (m)
PJ51
7 PJ48 7
Galian 1.77 m²
+6.25
Timbunan 0.42 m²
+6.00 Galian 1.62 m² +6.18
Pas. batu 1:4 0.94 m² 0.25 +5.93
1 1
Timbunan 0.43 m²
Plesteran 2.84 m' 2 2
Pas. batu 1:4 0.94 m² 0.75
+5.25
Plesteran 2.84 m' +5.18
0.40
bidang persamaan bidang persamaan
0.30 2.00 0.30
reference level reference level
4,00 4,00
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
5,497
5,927
5,453
5,285
5,560
6,200
6,254
6,758
6,790
5,770
6,164
5,280
5,121
5,128
5,329
6,320
5,556
5,470
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,30
0,34
4,39 1,48 0,93 0,65 0,84 0,63 0,81 2,47 2,70 4,54 1,31 1,30 0,81 0,51 1,67 4,12
DISTANCE (m) DISTANCE (m)
Propinsi :
Sulawesi Selatan
Galian Pasangan batu
Pekerjaan :
SURIADI, ST
IP
TL α
TM TA
8
R R
5
0 1 2 3 4 5 6 7 8 9 10
TITIK AWAL
SH = 1 : 1000
bidang persamaan / reference level
+ 1,00 meter
PATOK HEKTOMETER
Hm 6,09 Hm 7 Hm 8 Hm 9 Hm 10 Hm 11 Hm 12
HECTOMETER STONE
NOMOR PROFIL
PROFILE NUMBER
PJ.36 PJ.37 PJ.38 PJ.39 PJ.40 PJ.41 PJ.42 PJ.43 PJ.44 PJ.45 PJ.46 PJ.47 PJ.48
1018,9
1070,7
1123,1
1174,1
1227,4
608,8
657,2
705,8
753,2
811,9
854,8
889,8
938,8
1117
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
48,3 48,7 47,4 58,7 42,9 35,0 49,1 80,1 51,8 52,4 51,0 53,4
ACCUMULATED DISTANCE
7,03
6,80
6,59
6,84
6,37
6,40
6,31
5,82
6,22
6,04
5,99
5,93
LEFT BANK LEVEL
YANG ADA
EXISTING
7,12
6,94
6,86
7,39
7,07
6,86
6,82
6,56
6,43
6,29
6,18
6,20
RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
5,09
5,50
5,49
5,37
5,41
5,64
5,50
5,32
5,12
4,96
5,11
5,18
5,28
BED LEVEL IN CENTER LINE
ELEVASI TANAH ASLI PADA AS SALURAN
7,38
7,12
6,94
6,86
7,39
7,07
6,86
6,82
6,56
6,43
6,29
6,18
6,20
GROUND LEVEL IN CENTER LINE
ELEVASI TANGGUL
6,56
6,54
6,51
6,49
6,46
6,44
6,42
6,40
6,36
6,33
6,30
6,28
6,25
BANK LEVEL
ELEVASI MUKA AIR RENCANA
6,31
6,29
6,26
6,24
6,21
6,19
6,17
6,15
6,11
6,08
6,05
6,03
6,00
DESIGN WATER LEVEL
RENCANA / DESIGN
5,54
5,51
5,49
5,46
5,44
5,42
5,40
5,36
5,33
5,30
5,28
5,25
BED LEVEL
TRASE SALURAN R X Y L
ALIGNMENT TL α
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
BED LEVEL SIDE DRAIN LEFT SIDE
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN
BED LEVEL SIDE DRAIN RIGHT SIDE
TIPE BANGUNAN
TYPE OF STRUCTURE
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
CANAL DIMENSION AND ADDITIONAL DATA m I A
LONG-SECTION
SALURAN DI PAJALELE
L
IP
TL α
TM TA
R R
7
TITIK AKHIR
SH = 1 : 1000
bidang persamaan / reference level
+ 1,00 meter
PATOK HEKTOMETER
Hm 12,27 Hm 13 Hm 14 Hm 15 Hm 16 Hm 17
HECTOMETER STONE
NOMOR PROFIL
PROFILE NUMBER
PJ.48 PJ.49 PJ.50 PJ.51 PJ.52 PJ.53 PJ.54 PJ.55 PJ.56 PJ.57 PJ.58 PJ.59
1227,4
1277,7
1330,9
1384,6
1437,4
1487,8
1551,5
1603,5
1659,4
1713,6
1769,2
1820,0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
12,32
50,3 53,2 53.7 52,8 50,4 63,7 52,0 55,9 54,2 55,6 50,8
ACCUMULATED DISTANCE
6,02
6,13
6,16
6,18
6,23
5,64
6,18
6,21
6,37
5,90
6,46
LEFT BANK LEVEL
YANG ADA
EXISTING
6,20
6,19
6,32
6,26
6,40
6,15
6,31
6,27
6,06
6,17
6,09
RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
5,28
5,31
5,30
5,13
5,16
5,22
4,95
5,18
5,00
5,07
5,03
5,11
BED LEVEL IN CENTER LINE
ELEVASI TANAH ASLI PADA AS SALURAN
6,20
6,20
6,19
6,32
6,26
6,40
6,15
6,31
6,27
6,06
6,17
6,09
GROUND LEVEL IN CENTER LINE
ELEVASI TANGGUL
6,25
6,23
6,20
6,18
6,17
6,15
6,13
6,12
6,10
6,09
6,07
6,05
BANK LEVEL
ELEVASI MUKA AIR RENCANA
6,00
5,98
5,95
5,93
5,92
5,90
5,88
5,87
5,85
5,84
5,82
5,80
DESIGN WATER LEVEL
RENCANA / DESIGN
5,23
5,20
5,18
5,17
5,15
5,13
5,12
5,10
5,09
5,07
5,05
BED LEVEL
TRASE SALURAN R X Y L
ALIGNMENT TL α
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
BED LEVEL SIDE DRAIN LEFT SIDE
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN
BED LEVEL SIDE DRAIN RIGHT SIDE
TIPE BANGUNAN
TYPE OF STRUCTURE
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
CANAL DIMENSION AND ADDITIONAL DATA m I A
LONG-SECTION
SALURAN DI PAJALELE