01 Layout 1 : 3800
02 Site Plan 1 : 500 Pembangunan Benedict Hotel, Pringsewu
03 Lokasi Uji Tanah 1 : 360
04 Potongan Kontur 1 : 400
05 Denah Pondasi dan Sloof 1 : 360
06 Detail Pile Cap Tipe 1 1 : 400 No. Kontrak SK.01.10/PAUS/AN/07/2020
Jl.
Wi C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
s at
Arena Wisata Air aU
tam
Talang Indah a
DISKOMINFO Proyek :
Talang Indah
ta
an Ko
m
Jl. Ta
ra PT. ASALOLE JAYA
ate Engineering and Management Consultant
Sum
t
B ara Dibuat Oleh Nama TTD
tas
TW
L in
TW
J l. Ahli
Sabrina Cintia P.
Struktur
U
Ahli
Nadhira Salsabila D.
TPU Pajaseruk Struktur
sa
PT HM
Bang
Sampoerna Ahli
h
Steam era
Manajemen Tiara Anggraini
Pringsewu
uM
suma
Konstruksi
Mobil Paris (New Office) b
m
Ja
Jl.
Jl. Ku
Ahli
Caroline Clara C.
Geoteknik
Kuburan
China Nama Gambar :
Pringsewu
Layout
LAYOUT
JUMLAH
NO. GAMBAR GAMBAR SKALA
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
B Proyek :
58 57 56 55 54 53 52
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Wudhu Wudhu UP
45 46 47 48 49 50 51
A A
Staff Ruang Ruang
Musholla Dapur
Room Administrasi Janitor
27 26 25 24 23 22 21 20 19 18 17
Laundry Kamar Kamar
Room Mandi Mandi
44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
UP
32 33 34 35 36 37 38 39 40 41 42 43 44
Ahli
Struktur Sabrina Cintia P.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
B
Ahli
Caroline Clara C.
Geoteknik
JUMLAH
NO. GAMBAR GAMBAR SKALA
02 35 1 : 500
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
2.64 2.64 5.09 5.09 5.43 5.43 5.43 5.43 5.43 3.11
No. Kontrak SK.01.10/PAUS/AN/07/2020
737 1195
1188 1189 1187 1190 1191 1192 1193 1194 Tanggal 6 November 2020
Tempat Tempat
1.74
S1
Staff Ruang Ruang
4.80
Ahli
Struktur Sabrina Cintia P.
374 765 375 376 377 4 5 398 6 7
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
SKALA 1 : 360
Nama Gambar :
JUMLAH
NO. GAMBAR GAMBAR SKALA
03 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
1m
Lumpur
1m
Lumpur
Ahli
Nadhira Salsabila D.
Struktur
7,6 m
Pasir Sedang
Ahli
Manajemen Tiara Anggraini
13 m
Pasir Kasar Konstruksi
15 m Ahli
Pasir Halus Caroline Clara C.
Geoteknik
18 m
Pasir Sedang
Nama Gambar :
Potongan Kontur
POTONGAN KONTUR NO. GAMBAR
JUMLAH
GAMBAR SKALA
SKALA 1 : 400
04 35 1 : 400
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
43.35
2.50 5.00 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95 No. Kontrak SK.01.10/PAUS/AN/07/2020
1.15
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Ahli
Caroline Clara C.
SKALA 1 : 360 Geoteknik
Nama Gambar :
Denah Pondasi
dan Sloof
JUMLAH
NO. GAMBAR GAMBAR SKALA
05 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
2200
D22-100
400
Proyek :
1100
No. Kontrak SK.01.10/PAUS/AN/07/2020
D22-100
D22-100
3 4
3000
1100
PT. ASALOLE JAYA
Engineering and Management Consultant
Ahli
Struktur Sabrina Cintia P.
5 6 Ahli
Struktur
Nadhira Salsabila D.
D22-100
Ahli
Manajemen Tiara Anggraini
0
Konstruksi
1400
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
A
400 1400 400 No. Kontrak SK.01.10/PAUS/AN/07/2020
D22-200
B B'
D22-200
D22-200
800
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
DENAH PILE CAP TIPE 2 DETAIL PENULANGAN PILE CAP TIPE 2 Ahli
Manajemen Tiara Anggraini
SKALA 1 : 360 Konstruksi
Nama Gambar :
07 35 1 : 400
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
No. Kontrak SK.01.10/PAUS/AN/07/2020
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
Tempat Tempat
1.65
Musholla Dapur
Room Administrasi Janitor
Laundry Kamar Kamar
Room Mandi Mandi
11.90
1.15
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Denah Lantai 1
JUMLAH
NO. GAMBAR GAMBAR SKALA
08 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95 No. Kontrak SK.01.10/PAUS/AN/07/2020
UP
1.15
Ballroom
UP
PT. ASALOLE JAYA
Engineering and Management Consultant
Meeting Meeting
4.55
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
DENAH LANTAI 2
Manajemen Tiara Anggraini
Konstruksi
Ahli
SKALA 1 : 360 Geoteknik
Caroline Clara C.
Nama Gambar :
Denah Lantai 2
JUMLAH
NO. GAMBAR GAMBAR SKALA
09 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
Tanggal 6 November 2020
1.65
UP
Ruang
4.55
Kamar
Type 1 Janitor
11.90
Kamar Lift
Type 1 Ahli
Kamar Kamar Kamar Kamar
Struktur Sabrina Cintia P.
Type 2 Type 2 Type 2 Type 2
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Denah Lantai 3 - 6
JUMLAH
NO. GAMBAR GAMBAR SKALA
10 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
Tanggal 6 November 2020
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
1.65
Ruang
4.55
Janitor
1.15
Ahli
Struktur Sabrina Cintia P.
4.55
Staff Lift
Room
Kamar Kamar Kamar Kamar
Type 2 Type 2 Type 2 Type 2
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
SKALA 1 : 360
Denah Lantai 7
JUMLAH
NO. GAMBAR GAMBAR SKALA
11 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
No. Kontrak SK.01.10/PAUS/AN/07/2020
Kamar Mandi
dan Kamar
Bilas
Ruang
4.55
Janitor
11.90
1.15
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Ahli
Caroline Clara C.
Geoteknik
SKALA 1 : 360
Nama Gambar :
Denah
Rooftop Floor
JUMLAH
NO. GAMBAR GAMBAR SKALA
12 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Tampak Depan
TAMPAK DEPAN
SKALA 1 : 360 NO. GAMBAR
JUMLAH
GAMBAR SKALA
13 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
14 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Tampak Samping
TAMPAK SAMPING KANAN Kanan
SKALA 1 : 360 NO. GAMBAR
JUMLAH
GAMBAR SKALA
15 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Tampak Samping
TAMPAK SAMPING KIRI Kiri
SKALA 1 : 360 NO. GAMBAR
JUMLAH
GAMBAR SKALA
16 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
TAMPAK POTONGAN AS A - A
Nama Gambar :
Tampak Potongan
SKALA 1 : 360 As A-A
JUMLAH
NO. GAMBAR GAMBAR SKALA
17 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
18 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
19 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Nama Gambar :
SKALA 1 : 360
Denah Kolom dan
Balok Lt. 2
JUMLAH
NO. GAMBAR GAMBAR SKALA
20 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Nama Gambar :
SKALA 1 : 360
Denah Kolom dan
Balok Lt. 3 - 6
JUMLAH
NO. GAMBAR GAMBAR SKALA
21 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Nama Gambar :
SKALA 1 : 360 Denah Kolom dan
Balok Lt. 7
JUMLAH
NO. GAMBAR GAMBAR SKALA
22 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Nama Gambar :
SKALA 1 : 360
Denah Kolom dan
Balok Rooftop Floor
JUMLAH
NO. GAMBAR GAMBAR SKALA
23 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
No. Kontrak SK.01.10/PAUS/AN/07/2020
Musholla Dapur
Room Administrasi Janitor
Laundry Kamar Kamar
Room Mandi Mandi
11.90
1.15
UP
PT. ASALOLE JAYA
Engineering and Management Consultant
4.55
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Nama Gambar :
SKALA 1 : 360 Denah Pola
Keramik Lantai 1
JUMLAH
NO. GAMBAR GAMBAR SKALA
24 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
UP
1.15
Ballroom
UP
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Denah Pola
Keramik Lantai 2
JUMLAH
NO. GAMBAR GAMBAR SKALA
25 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
UP
Ruang
4.55
Kamar
Type 1 Janitor
11.90
1.15
UP
Kamar Lift
Type 1
Kamar Kamar Kamar Kamar
Type 2 Type 2 Type 2 Type 2 Dibuat Oleh Nama TTD
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Nama Gambar :
SKALA 1 : 360
Denah Pola Keramik
Lantai 3 - 6
JUMLAH
NO. GAMBAR GAMBAR SKALA
26 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
Tanggal 6 November 2020
1.65
Ruang
4.55
Janitor
11.90
Staff Lift
Room Ahli
Struktur Sabrina Cintia P.
Kamar Kamar Kamar Kamar
Type 2 Type 2 Type 2 Type 2
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
SKALA 1 : 360
Nama Gambar :
27 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
43.35
2.50 2.50 4.82 4.82 5.15 5.15 5.15 5.15 5.15 2.95
Kamar Mandi
dan Kamar
Bilas
Ruang
4.55
Janitor
11.90
1.15
Lift
Movie Room
Dibuat Oleh Nama TTD
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
SKALA 1 : 360
Nama Gambar :
28 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
K2 K1 K1 C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
13 15 17
2D13
2D19
B2 No. Kontrak SK.01.10/PAUS/AN/07/2020
D10 - 100
12D19 12D19
Ahli
Nama
Sabrina Cintia P.
TTD
LANTAI 1 Struktur
0.00
2D13
Ahli
Nadhira Salsabila D.
Struktur
4D19
Ahli
LANTAI 0
Manajemen Tiara Anggraini
-1.20
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Potongan Kolom
POTONGAN KOLOM DAN BALOK dan Balok
SKALA 1 : 90 NO. GAMBAR
JUMLAH
GAMBAR SKALA
29 35 1 : 90
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
500
400
4D19 C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
4D16
Proyek :
D10 - 100/150
300
Dibuat Oleh Nama TTD
4D19 Ahli
Struktur Sabrina Cintia P.
3D16 PROFIL K2
PROFIL K1 Ahli
Struktur
Nadhira Salsabila D.
Ahli
Manajemen Tiara Anggraini
Konstruksi
Profil Kolom
PROFIL KOLOM
JUMLAH
3D16
30 35 1 : 10
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
300
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
4D19
Proyek :
200
Pembangunan Benedict Hotel, Pringsewu
D10 - 150
600 2D13 2D13 400
3D16
Dibuat Oleh Nama TTD
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
2D19 Ahli
Manajemen Tiara Anggraini
Konstruksi
Nama Gambar :
Profil Balok
PROFIL BALOK
SKALA 1 : 10 NO. GAMBAR
JUMLAH
GAMBAR SKALA
31 35 1 : 10
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\achma\Pictures\logo-unila.png
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
Proyek :
K1 B2 K1 B2 K1 K1 B2 K1 K1 K1 B2 K1
B2 B2 B2 B2 B2 B2 B2 B2 B2 K1 B2 K1 B2
No. Kontrak SK.01.10/PAUS/AN/07/2020
B2 B2
B2 B2 B2
B2 B2 B2 B2 Tanggal 6 November 2020
B3 K1 B3 K1 K1
K1 B3 B3
B3 B3 B3
B3
B3 B3
B3 B3 B2 B2
B3 B3 B2 B3 B2 B2
B2 B2 B2 B2
K2 K2 K1 K1
K1 B2 B2 K2 K2 K2 K2 C:\Users\achma\Downloads\WhatsApp_Image_2022-12-29_at_22.40.52-removebg-preview.png
B2 B2
B2 B2 B2
B2 B2
B2 K1 B2 K2 B2 B2 K1 B2
B2 K2 K2 K2 K2 B2 K1 K1
B2 B2 B2 B2 B2
B2
B2 B2 B2
B2 B2 B2 B2 B2
B2 PT. ASALOLE JAYA
B3 Engineering and Management Consultant
B3 B3 B3 B3 B3 B3 K2 K1 K1
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Profil Balok
DETAIL PENULANGAN PELAT
SKALA 1 : 10 NO. GAMBAR
JUMLAH
GAMBAR SKALA
32 36 1 : 320
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
UP UP Proyek :
3.00
No. Kontrak
3.00
SK.01.10/PAUS/AN/07/2020
1.05
1.05
Ahli
Struktur Sabrina Cintia P.
Ahli
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Detail Tangga
DETAIL TANGGA TIPE 1 Tipe 1
SKALA 1 : 70 NO. GAMBAR
JUMLAH
GAMBAR SKALA
32 35 1 : 70
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
Potongan Tangga
POTONGAN TANGGA TIPE 1 Tipe 1
SKALA 1 : 360 NO. GAMBAR
JUMLAH
GAMBAR SKALA
33 35 1 : 360
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
0.60 4.20 0.84
C:\Users\mildamsr\Downloads\LOGO UNIVERSITAS.png
0.60
1.33 Proyek :
UP
0.60
No. Kontrak SK.01.10/PAUS/AN/07/2020
LANTAI 1
Tanggal 6 November 2020
0.60
Engineering and Management Consultant
Ahli
Struktur Sabrina Cintia P.
UP
0.60
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
LANTAI 2 - 7 Ahli
Geoteknik
Caroline Clara C.
Nama Gambar :
Detail Tangga
DETAIL TANGGA TIPE 2 Tipe 2
JUMLAH
SKALA 1 : 50 NO. GAMBAR GAMBAR SKALA
34 35 1 : 50
Universitas Lampung
Fakultas Teknik
Jurusan Teknik Sipil
Proyek :
Ahli
Struktur Sabrina Cintia P.
Ahli
Nadhira Salsabila D.
Struktur
Ahli
Manajemen Tiara Anggraini
Konstruksi
Ahli
Caroline Clara C.
Geoteknik
Nama Gambar :
35 35 1 : 360
WORK BREAKDOWN STRUCTURE ( WBS)
A.2. Pengukuran/ B.2. Galian Tanah C.3.a. Pekerjaan C.4.a. Pekerjaan C.5.a. Pekerjaan C.6.a. Pekerjaan
Pemasangan Pile Cap D(1).1. Kolom D(1).2. Pelat D(2).1. Kolom D(2).2. Balok D(2).3. Pelat
Beton K-300 Beton K-300 Beton K-300 Beton K-300
Bowplank
A.3. Pembuatan B.3. Galian Tanah C.3.b. Pekerjaan C.4.b. Pekerjaan C.5.b. Pekerjaan C.6.b. Pekerjaan D(1).1.a. Pekerjaan D(1).2.a. Pekerjaan D(2).1.a. Pekerjaan D(2).2.a. Pekerjaan D(2).3.a. Pekerjaan
Direksi Keet Foot Plat Tangga Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300
A.5. Mobilisasi B.5. Urugan Pasir C.4.d. Pekerjaan C.5.d. Pekerjaan C.6.d. Pekerjaan D(2).3.c.
D(1).1.c . Pekerjaan D(1).2.c . Pekerjaan D(2).1.c . Pekerjaan D(2).2.c . Pekerjaan
dan Demobilisasi Bawah Pile Cap Pemadatan Pemadatan Pemadatan
Bekisting Bekisting Bekisting Bekisting Pekerjaan Bekisting
Alat (Vibrator) (Vibrator) (Vibrator)
A.6. Pembuatan B.6. Urugan Pasir D(1).1.d. Pekerjaan D(1).2.d. Pekerjaan D(2).1.d. Pekerjaan D(2).2.d. Pekerjaan D(2).3.d. Pekerjaan
Papan Nama Bawah Foot Plat Pemadatan Pemadatan Pemadatan Pemadatan Pemadatan
Proyek Tangga (Vibrator) (Vibrator) (Vibrator) (Vibrator) (Vibrator)
D. Pekerjaan Beton
Bertulang
D(3).1. Kolom D(3).2. Balok D(3).3. Pelat D(4).1. Kolom D(4).2. Balok D(4).3. Pelat D(5).1. Kolom D(5).2. Balok D(5).3. Pelat D(6).1. Kolom D(6).2. Balok D(6).3. Pelat
D(3).1.a. Pekerjaan D(3).2.a. Pekerjaan D(3).3.a. Pekerjaan D(4).1.a. Pekerjaan D(4).2.a. Pekerjaan D(4).3.a. Pekerjaan D(5).1.a. Pekerjaan D(5).2.a. Pekerjaan D(5).3.a. Pekerjaan D(6).1.a. Pekerjaan D(6).2.a. Pekerjaan D(6).3.a. Pekerjaan
Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300
D(3).1.b. Pekerjaan D(3).2.b. Pekerjaan D(3).3.b. Pekerjaan D(4).1.b. Pekerjaan D(4).2.b. Pekerjaan D(4).3.b. Pekerjaan D(5).1.b. Pekerjaan D(5).2.b. Pekerjaan D(5).3.b. Pekerjaan D(6).1.b. Pekerjaan D(6).2.b. Pekerjaan D(6).3.b. Pekerjaan
Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan
D(3).1.c . Pekerjaan D(3).2.c . Pekerjaan D(3).3.c . Pekerjaan D(4).1.c . Pekerjaan D(4).2.c . Pekerjaan D(4).3.c . Pekerjaan D(5).1.c . Pekerjaan D(5).2.c . Pekerjaan D(5).3.c . Pekerjaan D(6).1.c . Pekerjaan D(6).2.c . Pekerjaan D(6).3.b. Pekerjaan
Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Besi Tulangan
D(3).1.d. Pekerjaan D(3).2.d. Pekerjaan D(3).3.d. Pekerjaan D(4).1.d. Pekerjaan D(4).2.d. Pekerjaan D(4).3.d. Pekerjaan D(5).1.d. Pekerjaan D(5).2.d. Pekerjaan D(5).3.d. Pekerjaan D(6).1.d. Pekerjaan D(6).1.d. Pekerjaan D(6).3.d. Pekerjaan
Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator) Pemadatan (Vibrator)
Lanjutan…
F. Pekerjaan
D. Pekerjaan Beton E. Pekerjaan G. Pekerjaan
Pintu, Jendela,
Bertulang Dinding Plafond
Kunci
E.1. Pekerjaan E.2. Pekerjaan F.1. Pemasangan F.2. Pemasangan G.1. Pmasangan
D(7) Lantai 7 D(8) Roof Top D(9) Top Floor
Pasangan Dinding Kaca Pintu Jendela Plafond
E.2.a. Pemasangan
E.1.a. Pasangan
Kaca Laminated F.2.a. Kusen G.1.a. Rangka
D(7).1. Kolom D(7).2. Balok D(7).3. Pelat D(8).1. Kolom D(8).2. Balok D(8).3. Pelat D(9).1. Balok D(9).2. Pelat Batu Bata 1SP : 4 F.1.a. Kusen Pintu
Tempered Tebal 12 Jendela Plafond Besi Hollow
PP
mm
E.1.b. Plesteran
D(7).1.a. Pekerjaan D(7).2.a. Pekerjaan D(7).3.a. Pekerjaan D(8).1.a. Pekerjaan D(8).2.a. Pekerjaan D(8).3.a. Pekerjaan D(9).1.a. Pekerjaan D(9).2.a. Pekerjaan G.1.b. Pemasangan
Dinding Bata 1/2 F.1.b. Daun Pintu F.2.b. Kaca 8 mm
Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Beton K-300 Gypsum 9 mm
Bata
D(7).1.b. Pekerjaan D(7).2.b. Pekerjaan D(7).3.b. Pekerjaan D(8).1.b. Pekerjaan D(8).2.b. Pekerjaan D(8).3.b. Pekerjaan D(9).1.b. Pekerjaan D(9).2.b. Pekerjaan E.1.c. Acian F.1.c. Kunci Pintu G.1.c. Pengecatan
Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan Dinding 1/2 Bata Antik Plafond
D(7).1.c . Pekerjaan D(7).2.c . Pekerjaan D(7).3.c . Pekerjaan D(8).1.c . Pekerjaan D(8).2.c . Pekerjaan D(8).3.c . Pekerjaan D(9).1.c . Pekerjaan D(9).2.c . Pekerjaan
F.1.d. Engsel Pintu
Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting Bekisting
D(7).1.d. Pekerjaan D(7).2.d. Pekerjaan D(7).3.d. Pekerjaan D(8).1.d. Pekerjaan D(8).2.d. Pekerjaan D(8).3.d. Pekerjaan D(9).1.d. Pekerjaan D(9).2.d. Pekerjaan
Pemadatan Pemadatan Pemadatan Pemadatan Pemadatan Pemadatan Pemadatan Pemadatan
(Vibrator) (Vibrator) (Vibrator) (Vibrator) (Vibrator) (Vibrator) (Vibrator) (Vibrator)
Lanjutan…
H.1.b. Cat Dinding Luar K.1.b. Pekerjaan Beton L.3. Jasa Pengiriman M.3. Pemasangan Saklar N.3. Pemasangan Floor O.3. Pekerjaan Paving T.
(Eksterior) K-300 Unit Lift Double Draine 6 cm
L.4. Testing
H.1.c. Cat Kusen, Daun M.4. Pemasangan Stop N.4. Pemasangan Bak
K.1.c. Bekisting Tangga Commisioning dan
Pintu/Jendela Kontak Cuci Piring
Perijinan Depnaker
Project
Name: Project Name
Address: Enter address here
Client: Owner
Shape Codes According to: EN ISO 3766:2003
Revision Number:
Revision Date:
1
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
2
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
3
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
4
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
5
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
6
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
7
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
8
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
9
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
10
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
11
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
12
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
13
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
14
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
15
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
16
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
17
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
18
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
19
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
20
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
21
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
22
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
23
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
24
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
25
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
26
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
27
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
28
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
29
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
30
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
31
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
32
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
33
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
34
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
35
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
36
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
37
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
38
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
39
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
40
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
41
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
42
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
43
X Y & Partners
Project: Project Name Schedule ref: S.1 Date: 2023-01-02
Client: Owner Prepared by: Author Checked by: Checker
Member Bar Bar Length of Total Total Bend Shape Hook A B C D E/R HStart / HEnd Rev
Mark Diameter each bar No. Length Diameter Code Start/End
44
REKAPITULASI RENCANA ANGGARAN BIAYA
B PEKERJAAN TANAH
1 Pengeboran Tanah Bor Pile 12.20 m'
2 Galian Tanah Pilecap 144.91 m3
3 Galian Tanah Foot Plat Tangga 6.62 m3
4 Galian Tanah Sloof 101.28 m3
5 Urugan Pasir bawah Pilecap 18.11 m3
6 Urugan Pasir bawah Foot Plat Tangga 0.44 m3
7 Urugan Tanah Pilecap 18.84 m3
8 Urugan Tanah Foot Plat Tangga 0.69 m3
C PEKERJAAN PONDASI
1 Lantai Kerja bawah Pilecap K-200 9.06 m3
2 Lantai Kerja bawah Sloof K-200 8.86 m3
3 Pondasi Bore Pile
a. Pekerjaan Beton K-300 220.77 m3
b. Pekerjaan Besi Tulangan 68150.74 Kg
c. Pekerjaan Pemadatan (Vibrator) 220.77 m3
4 Pondasi Pile Cap
a. Pekerjaan Beton K-300 144.91 m3
b. Pekerjaan Besi Tulangan 6665.16 Kg
c. Pemasangan Bekisting 289.22 m2
3
d. Pekerjaan Pemadatan (Vibrator) 144.91 m
5 Pedestal Kolom
a. Pekerjaan Beton K-300 13.89 m3
b. Pekerjaan Besi Tulangan 3443.73 Kg
c. Pemasangan Bekisting 116.64 m2
3
d. Pekerjaan Pemadatan (Vibrator) 13.89 m
6 Pekerjaan Sloof
a. Pekerjaan Beton K-300 106.34 m3
b. Pekerjaan Besi Tulangan 12986.12 Kg
c. Pemasangan Bekisting 405.12 m2
d. Pekerjaan Pemadatan (Vibrator) 106.34 m3
LANTAI 3
1 Kolom
a. Pekerjaan Beton K-300 39.41 m3
b. Pekerjaan Besi Tulangan 6602.48 Kg
c. Pemasangan Bekisting 392.00 m2
d. Pekerjaan Pemadatan (Vibrator) 39.41 m3
2 Balok
a. Pekerjaan Beton K-300 51.32 m3
b. Pekerjaan Besi Tulangan 9417.44 Kg
c. Pemasangan Bekisting 453.13 m2
d. Pekerjaan Pemadatan (Vibrator) 51.32 m3
3 Pelat Lantai
a. Pekerjaan Beton K-300 49.53 m3
b. Pekerjaan Besi Tulangan 6560.64 Kg
2
c. Pemasangan Bekisting 11.66 m
d. Pekerjaan Pemadatan (Vibrator) 49.53 m3
LANTAI 4
1 Kolom
a. Pekerjaan Beton K-300 39.41 m3
b. Pekerjaan Besi Tulangan 6602.48 Kg
c. Pemasangan Bekisting 392.00 m2
d. Pekerjaan Pemadatan (Vibrator) 39.41 m3
2 Balok
a. Pekerjaan Beton K-300 51.32 m3
b. Pekerjaan Besi Tulangan 9417.44 Kg
2
c. Pemasangan Bekisting 453.13 m
d. Pekerjaan Pemadatan (Vibrator) 51.32 m3
3 Pelat Lantai
a. Pekerjaan Beton K-300 49.53 m3
b. Pekerjaan Besi Tulangan 6560.64 Kg
c. Pemasangan Bekisting 11.66 m2
d. Pekerjaan Pemadatan (Vibrator) 49.53 m3
LANTAI 5
1 Kolom
3
a. Pekerjaan Beton K-300 39.41 m
b. Pekerjaan Besi Tulangan 6602.48 Kg
2
c. Pemasangan Bekisting 392.00 m
3
d. Pekerjaan Pemadatan (Vibrator) 39.41 m
2 Balok
a. Pekerjaan Beton K-300 51.32 m3
b. Pekerjaan Besi Tulangan 9417.44 Kg
c. Pemasangan Bekisting 453.13 m2
d. Pekerjaan Pemadatan (Vibrator) 51.32 m3
3 Pelat Lantai
3
a. Pekerjaan Beton K-300 49.53 m
b. Pekerjaan Besi Tulangan 6560.64 Kg
c. Pemasangan Bekisting 11.66 m2
d. Pekerjaan Pemadatan (Vibrator) 49.53 m3
LANTAI 6
1 Kolom
a. Pekerjaan Beton K-300 39.41 m3
b. Pekerjaan Besi Tulangan 6602.48 Kg
2
c. Pemasangan Bekisting 392.00 m
d. Pekerjaan Pemadatan (Vibrator) 39.41 m3
2 Balok
a. Pekerjaan Beton K-300 51.32 m3
b. Pekerjaan Besi Tulangan 9417.44 Kg
2
c. Pemasangan Bekisting 453.13 m
d. Pekerjaan Pemadatan (Vibrator) 51.32 m3
3 Pelat Lantai
a. Pekerjaan Beton K-300 49.53 m3
b. Pekerjaan Besi Tulangan 6560.64 Kg
c. Pemasangan Bekisting 11.66 m2
3
d. Pekerjaan Pemadatan (Vibrator) 49.53 m
LANTAI 7
1 Kolom
a. Pekerjaan Beton K-300 39.08 m3
b. Pekerjaan Besi Tulangan 6602.48 Kg
c. Pemasangan Bekisting 191.80 m2
3
d. Pekerjaan Pemadatan (Vibrator) 39.08 m
2 Balok
a. Pekerjaan Beton K-300 51.31 m3
b. Pekerjaan Besi Tulangan 9417.44 Kg
c. Pemasangan Bekisting 453.28 m2
d. Pekerjaan Pemadatan (Vibrator) 51.31 m3
3 Pelat Lantai
a. Pekerjaan Beton K-300 49.53 m3
b. Pekerjaan Besi Tulangan 6560.64 Kg
c. Pemasangan Bekisting 11.66 m2
d. Pekerjaan Pemadatan (Vibrator) 49.53 m3
ROOF TOP
1 Kolom
a. Pekerjaan Beton K-300 1.98 m3
b. Pekerjaan Besi Tulangan 3994.02 Kg
c. Pemasangan Bekisting 155.20 m2
d. Pekerjaan Pemadatan (Vibrator) 1.98 m3
2 Balok
3
a. Pekerjaan Beton K-300 44.12 m
b. Pekerjaan Besi Tulangan 8357.90 Kg
c. Pemasangan Bekisting 404.13 m2
d. Pekerjaan Pemadatan (Vibrator) 44.12 m3
3 Pelat Lantai
a. Pekerjaan Beton K-300 46.17 m3
b. Pekerjaan Besi Tulangan 6041.13 Kg
c. Pemasangan Bekisting 14.62 m2
3
d. Pekerjaan Pemadatan (Vibrator) 46.17 m
TOP FLOOR
1 Balok
a. Pekerjaan Beton K-300 10.59 m3
b. Pekerjaan Besi Tulangan 1854.46 Kg
c. Pemasangan Bekisting 92.20 m2
d. Pekerjaan Pemadatan (Vibrator) 10.59 m3
2 Pelat Lantai
a. Pekerjaan Beton K-300 13.21 m3
b. Pekerjaan Besi Tulangan 2096.22 Kg
2
c. Pemasangan Bekisting 4.93 m
d. Pekerjaan Pemadatan (Vibrator) 13.21 m3
E PEKERJAAN DINDING
1 Pekerjaan Pasangan
a. Pasangan Batu Bata 1SP : 4 PP 3896.99 m2
2
b. Plesteran Dinding Bata 1/2 bata 7793.98 m
c. Acian dinding 1/2 bata 7793.98 m2
2 Pekerjaan Dinding Kaca
2
a. Pemasangan Kaca Laminated Tempered Tebal 12 mm 400.00 m
G PEKERJAAN PLAFOND
1 Pekerjaan Pemasangan Plafond
a. Rangka Plafond Besi Hollow 2937.52 m2
b. Gypsum 9 mm 2937.52 m2
c. Pengecatan Plafond 2937.52 m2
H PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan
a. Cat Dinding Dalam (Interior) 5442.94 m2
b. Cat Dinding Luar (Ekseterior) 2351.04 m2
c. Cat Kusen, Daun Pintu/Jendela 206.40 m2
I PEKERJAAN KERAMIK
1 Pekerjaan Pemasangan Keramik Lantai
a. Pemasangan Lantai Ubin Granit 60 x 60 2937.52 m2
K PEKERJAAN TANGGA
1 Pekerjaan Tangga
a, Pembesian 12581.88 Kg
b. Pekerjaan Beton K-300 38.57 m3
c. Bekisiting Tangga 220.12 m2
2 Keramik Tangga
a. Pas. Keramik Anak Tangga + Bordes (30 x 30) 216.75 m2
3 Relling Tangga
a. Relling Tangga 298.44 m'
O PEKERJAAN LANDSCAPE
1 Pek. Tanah Timbunan Didatangkan 225.8087 m3
2 Pek. Pemadatan Urugan Tanah Timbunan Didatangkan 225.8087 m3
3 Pek. Paving T. 6 cm 2258.0867 m2
ANALISA HARGA
SATUAN PEKERJAAN
(PERMEN PU NO 1
TAHUN 2022)
PERMEN PU NO 1 TAHUN 2022
ANALISA HARGA SATUAN PEKERJAAN
A TENAGA
Pekerja L.01 jam 0.100 Rp. 100,000.00 Rp. 10,000.00
Mandor L.04 jam 0.005 Rp. 135,000.00 Rp. 675.00
Jumlah Tenaga Kerja (A) Rp. 10,675.00
B BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 3.400 Rp. 100,000.00 Rp. 340,000.00
Tukang Batu L.02 OH 0.850
Kepala Tukang L.03 OH 0.085
Mandor L.04 OH 0.170 Rp. 135,000.00 Rp. 22,950.00
Jumlah Tenaga Kerja (A) Rp. 362,950.00
B BAHAN
Batu Belah m3 0.480 Rp. 159,000.00 Rp. 76,320.00
Semen Portland Kg 194.000 Rp. 1,200.00 Rp. 232,800.00
Pasir Beton m3 0.312 Rp. 306,250.00 Rp. 95,550.00
Kerikil m3 0.468 Rp. 300,000.00 Rp. 140,400.00
Besi Beton Kg 126.000 Rp. 9,715.99 Rp. 1,224,215.25
Kawat Beton Kg 1.000 Rp. 27,563.00 Rp. 27,563.00
Jumlah Harga Bahan (B) Rp. 1,224,215.25
C PERALATAN
Analisa :
Item : Pengeboran Tanah Pondasi Bored Pile
Satuan : m'
Analisa :
Item : Pengecoran Beton K-300 Pondasi Bored Pile
Satuan : m3
B BAHAN
Beton Ready Mixed Kg 1.020 Rp. 1,071,875.00 Rp. 1,093,312.50
Jumlah Harga Bahan (B) Rp. 1,093,312.50
C PERALATAN
Truk Mixer Plant Kapsitas 7 m3 hari 1 Rp. 2,400,000.00 Rp. 2,400,000.00
CONCRETE PUMP Besar hari 1 Rp. 4,000,000.00 Rp. 4,000,000.00
CONCRETE VIBRATOR hari 1 Rp. 30,000.00 Rp. 30,000.00
U
Harga Satuan Jumlah Harga
No. ra Kode Satuan Koefisien
(Rp.) (Rp.)
ia
A TENAGA
Pekerja L.01 OH 0.700 Rp. 100,000.00 Rp. 70,000.00
Tukang L.02 OH 0.700 Rp. 125,000.00 Rp. 87,500.00
Kepala Tukang L.03 OH 0.070 Rp. 130,000.00 Rp. 9,100.00
Mandor L.04 OH 0.070 Rp. 135,000.00 Rp. 9,450.00
Jumlah Tenaga Kerja (A) Rp. 176,050.00
B BAHAN
Besi Beton (polos/ulir) Kg 105.000 Rp. 14,000.00 Rp. 1,470,000.00
Kawat Beton Kg 1.500 Rp. 27,563.00 Rp. 41,344.50
Jumlah Harga Bahan (B) Rp. 1,511,344.50
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.660 Rp. 100,000.00 Rp. 66,000.00
Tukang Kayu L.02 OH 0.330 Rp. 125,000.00 Rp. 41,250.00
Kepala Tukang L.03 OH 0.033 Rp. 130,000.00 Rp. 4,290.00
Mandor L.04 OH 0.033 Rp. 135,000.00 Rp. 4,455.00
Jumlah Tenaga Kerja (A) Rp. 115,995.00
B BAHAN
Kayu kelas III m3 0.040 Rp. 2,450,000.00 Rp. 98,000.00
Paku 5 cm - 12 cm Kg 0.400 Rp. 24,500.00 Rp. 9,800.00
B BAHAN
Besi metal Hollow 40.40 m 4.000 Rp. 17,500.00 Rp. 70,000.00
Assesories ( Perkuatan, Las dll ) Ls 100% x Rangka Rp. 17,500.00 Rp. 17,500.00
Jumlah Harga Bahan (B) Rp. 87,500.00
C PERALATAN
3
Pasir Pasang m 0.024 Rp. 196,000.00 Rp. 4,704.00
AHSP PUPR A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A TENAGA
Satuan : m2
A TENAGA
Pekerja L.01 OH 6.000 Rp. 100,000.00 Rp. 600,000.00
Tukang Kayu L.02 OH 18.000 Rp. 125,000.00 Rp. 2,250,000.00
Kepala Tukang L.03 OH 1.800 Rp. 130,000.00 Rp. 234,000.00
Mandor L.04 OH 0.300 Rp. 135,000.00 Rp. 40,500.00
Jumlah Tenaga Kerja (A) Rp. 3,124,500.00
B BAHAN
Balok kayu m3 1.200 Rp. 4,593,750.00 Rp. 5,512,500.00
Paku 10 cm Kg 1.250 Rp. 24,500.00 Rp. 30,625.00
Lem Kayu Kg 1.000 Rp. 30,625.00 Rp. 30,625.00
Jumlah Harga Bahan (B) Rp. 5,573,750.00
C PERALATAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Tukang cat L.02 OH 0.063 Rp. 125,000.00 Rp. 7,875.00
Kepala Tukang L.03 OH 0.0063 Rp. 130,000.00 Rp. 819.00
Mandor L.04 OH 0.003 Rp. 135,000.00 Rp. 450.00
Jumlah Tenaga Kerja (A) Rp. 11,144.00
B BAHAN
Plamuur Kg 0.100 Rp. 16,500.00 Rp. 1,650.00
Cat Dasar Kg 0.100 Rp. 52,063.00 Rp. 5,206.30
Cat Penutup Interior Setara Jotun Kg 0.260 Rp. 62,271.00 Rp. 16,190.46
Jumlah Harga Bahan (B) Rp. 23,046.76
C PERALATAN
AHSP PUPR A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DAN PERPIPAAN DALAM GEDUNG
A TENAGA
Pekerja L.01 OH 0.500 Rp. 100,000.00 Rp. 50,000.00
Tukang Batu L.02 OH 1.100 Rp. 125,000.00 Rp. 137,500.00
Kepala Tukang L.03 OH 0.010 Rp. 130,000.00 Rp. 1,300.00
Mandor L.04 OH 0.160 Rp. 135,000.00 Rp. 21,600.00
Jumlah Tenaga Kerja (A) Rp. 210,400.00
B BAHAN
Closet Duduk Unit 1.000 Rp. 2,500,000.00 Rp. 2,500,000.00
Perlengkapan Ls 0.060 Rp. 2,500,000.00 Rp. 150,000.00
Jumlah Harga Bahan (B) Rp. 2,650,000.00
C PERALATAN
C PERALATAN
C PERALATAN
B BAHAN
Cat meni Kg 0.200 Rp. 45,000.00 Rp. 9,000.00
Plamir Kg 0.150 Rp. 34,000.00 Rp. 5,100.00
Cat Dasar Kg 0.170 Rp. 52,063.00 Rp. 8,850.71
Cat Penutup Kg 0.350 Rp. 61,250.00 Rp. 21,437.50
Kuas bh 0.010 Rp. 24,500.00 Rp. 245.00
Pengencer Kg 0.030 Rp. 12,250.00 Rp. 367.50
Amplas Lbr 0.200 Rp. 8,000.00 Rp. 1,600.00
Jumlah Harga Bahan (B) Rp. 46,600.71
C PERALATAN
AHSP PUPR A.5.1.1.33 HARGA SATUAN PEKERJAAN SANITASI DAN PERPIPAAN DALAM GEDUNG
A TENAGA
Pekerja L.01 OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Tukang Batu L.02 OH 0.100 Rp. 125,000.00 Rp. 12,500.00
Kepala Tukang L.03 OH 0.010 Rp. 130,000.00 Rp. 1,300.00
Mandor L.04 OH 0.005 Rp. 135,000.00 Rp. 675.00
Jumlah Tenaga Kerja (A) Rp. 15,475.00
B BAHAN
Floor drain unit 1.000 Rp. 40,000.00 Rp. 40,000.00
HARGA SATUAN
NO URAIAN SATUAN KET
(RUPIAH)
A UPAH:
1 Pekerja OH Rp 100,000.00
2 Tukang dengan keahlian khusus OH Rp 130,000.00
3 Tukang Batu OH Rp 125,000.00
4 Tukang Besi OH Rp 125,000.00
5 Tukang Cat OH Rp 125,000.00
6 Tukang Gali OH Rp 125,000.00
7 Tukang Kayu OH Rp 125,000.00
10 Instalatur Listrik OH Rp 125,000.00
11 Asisten Instalatur Listrik OH Rp 110,000.00
12 Mandor OH Rp 135,000.00
13 Kepala Tukang OH Rp 130,000.00
14 Operator Terlatih OH Rp 135,000.00
15 Pembantu Operator OH Rp 100,000.00
16 Sopir Terlatih OH Rp 125,000.00
17 Juru ukur OH Rp 130,000.00
18 Penjaga Malam OH Rp 100,000.00
B BAHAN/MATERIAL
1 Air Ltr Rp 100.00
2 Semen portland Kg Rp 1,280.00
3 Pasir Pasang m3 Rp 275,625.00
3
4 Pasir Urug m Rp 196,000.00
5 Pasir Beton m3 Rp 306,250.00
6 Bata merah Bh Rp 750.00
7 Cat Tembok exterior kg Rp 79,625.00
8 Cat Tembok interior kg Rp 62,271.00
9 Plamuur Tembok kg Rp 16,500.00
10 Cat Dasar Kg Rp 52,063.00
11 Kran 1/2'' Bh Rp 26,031.00
12 Plamir Kg Rp 34,000.00
13 Cat penutup Kg Rp 18,150.00
14 Besi beton polos Kg Rp 14,000.00
15 Besi beton Ulir Kg Rp 14,500.00
16 Gypsum Board 9 mm lbr Rp 77,000.00
17 Minyak Cat ltr Rp 34,300.00
18 Minyak pelumas Ltr Rp 42,875.00
19 Kawat Beton kg Rp 27,563.00
20 Engsel Pintu Bh Rp 49,000.00
21 Engsel Jendela Bh Rp 32,667.00
22 Engsel Angin Bh Rp 42,875.00
23 Pipa PVC 1/2" (4 m) btg Rp 30,625.00
24 Pipa PVC 3/4" (4 m) btg Rp 42,875.00
25 Pipa PVC 1" (4 m) btg Rp 55,125.00
26 Pipa PVC 2" (4 m) btg Rp 98,000.00
27 Kayu kelas I (Papan) m3 Rp 10,535,000.00
3
28 Kayu kelas I (Balok) m Rp 9,800,000.00
29 Kayu kelas II (Papan) m3 Rp 4,777,500.00
3
30 Kayu kelas II (Balok) m Rp 4,593,750.00
31 Kayu kelas II (Usuk 2 x 3 cm) m3 Rp 4,287,500.00
3
32 Kayu kelas II (Usuk 3 x 4 cm) m Rp 4,287,500.00
33 Kayu kelas II (Usuk 5 x 7 cm) m3 Rp 4,287,500.00
34 Kayu kelas III (papan) m3 Rp 2,450,000.00
3
35 Kayu kelas III (balok) m Rp 2,450,000.00
3
36 Kayu kelas III (5 x 7 cm) m Rp 2,143,750.00
3
37 Kayu Bakar m Rp 125,000.00
38 Kayu Dolken Ø 8-10/400 cm btg Rp 42,875.00
39 Cat Meni kg Rp 45,000.00
40 Batu Kerikil m3 Rp 300,000.00
41 Minyak Bekisting ltr Rp 10,000.00
42 Lem Kayu kg Rp 30,625.00
43 Cat Dasar kg Rp 52,063.00
44 Floor Drain Bh Rp 40,000.00
45 Seal Tape Bh Rp 6,125.00
46 Grendel Jendela set Rp 21,000.00
47 Cat Kayu Kg Rp 61,250.00
48 Besi strip tebal 2 mm Kg Rp 15,300.00
49 Jendela Naco Bh Rp 195,000.00
50 Kaca polos tebal 5 mm m² Rp 128,625.00
51 Kaca polos tebal 8 mm m² Rp 196,000.00
52 Meni besi liter Rp 30,000.00
53 Paku 5 - 7 cm Kg Rp 24,500.00
54 Paku 5 - 12 cm Kg Rp 24,500.00
55 Paku 5 - 10 cm Kg Rp 24,500.00
56 Paku Biasa Kg Rp 24,500.00
57 Pasir Beton m³ Rp 306,250.00
58 Pasir Pasang m³ Rp 275,625.00
59 Plywood 4 mm Lembar Rp 100,450.00
60 Plywood 9 mm Lembar Rp 177,625.00
61 Seng gelombang BJLS 28 Lbr Rp 55,125.00
62 Koral beton m3 Rp 385,000.00
63 Cat kayu Kg Rp 61,250.00
64 Triplek tebal 9 mm 122 x 244 cm Lbr Rp 134,750.00
65 Paku campuran Kg Rp 24,500.00
66 Kunci tanam Bh Rp 85,750.00
67 Dolken kayu diameter 8-10 m' Rp 10,718.75
68 Seng plat 3''x 6'' BJLS 28 Lbr Rp 55,125.00
69 Seng plat 3''x 6'' BJLS 30 Lbr Rp 61,250.00
70 Alumunium Composite Panel (ACP) Eksterior m² Rp 682,500.00
71 Plat sudut 70 mm Besi siku 25 gr Bh Rp 490,000.00
72 Beton Cor K300 Jaya Mixed m3 Rp 1,071,875.00
73 Besi Hollow 40.40.2 Kg Rp 17,500.00
74 Semen warna Kg Rp 16,000.00
75 Keramik Granit 60 x 60 warna/Motif m² Rp 232,000.00
76 Keramik Granit 60 x 60 polos m² Rp 200,000.00
77 Keramik 50 x 50 warna m² Rp 140,000.00
78 Keramik 50 x 50 polos m² Rp 130,000.00
79 Keramik 40 x 40 warna m² Rp 128,000.00
80 Keramik 40 x 40 polos m² Rp 115,000.00
81 Keramik 30 x 30 warna m² Rp 123,000.00
82 Keramik 30 x 30 polos m² Rp 110,000.00
83 Keramik 20 x 20 warna m² Rp 100,000.00
84 Keramik 20 x 20 polos m² Rp 95,000.00
85 Granit Lantai Stepnoning 30 x 60 cm Bh Rp 50,000.00
86 Plint Granit Artistik 10 x 20 Bh Rp 12,250.00
87 Plint Granit 10 x 60 Bh Rp 7,500.00
88 Paku skrup 1 cm - 2,5 cm Bh Rp 735.00
89 Paku skrup 3,5'' Bh Rp 1,613.00
90 Paku tripleks Kg Rp 30,625.00
91 Lem PVC Kg Rp 118,417.00
92 Kunci Lemari Bh Rp 24,500.00
93 Kunci Tanam Bh Rp 85,750.00
94 Kunci Tanam Antik Bh Rp 189,875.00
95 Kunci Tanam Kamar Mandi Bh Rp 140,875.00
96 Kait angin Bh Rp 30,500.00
97 Silicone Sealant tube Rp 40,000.00
98 Closet duduk Bh Rp 2,500,000.00
99 Kuas Bh Rp 24,500.00
100 Pengencer Ltr Rp 12,250.00
101 Amplas Lbr Rp 8,000.00
102 Beton Cor K300 Jaya Mixed m3 Rp 1,071,875.00
103 Beugel Besi O8 Hari Rp 19,000.00
104 Oli + Solar Ls Rp 35,850.00
105 Solar Industri Ltr Rp 14,149.00
106 Oli Gardan Ltr Rp 34,000.00
107 Railing Tangga, RAM, Selasar Stainless Stell m' Rp 1,425,000.00
108 Abu Batu m3 Rp 336,875.00
109 Paving Block 6 cm m² Rp 120,000.00
110 Bak cuci piring stainless set Rp 1,102,500.00
111 Bak cuci piring stainless steel Bh Rp 245,000.00
112 Shower Air Bh Rp 98,000.00
113 Pipa Listrik Btg Rp 5,000.00
114 Kabel NYM 3x2,5 mm2 m' Rp 14,000.00
115 T Dus Bh Rp 3,000.00
116 L Bow Bh Rp 2,000.00
117 Las Drop Bh Rp 2,000.00
118 Klem Bh Rp 100.00
119 Mangkok Bh Rp 3,000.00
120 Lampu SL 18 Watt Bh Rp 61,250.00
121 Stop Kontak Bh Rp 29,000.00
122 Saklar Tunggal Bh Rp 36,750.00
123 Saklar Ganda Bh Rp 49,000.00
124 Saklar Triple Bh Rp 67,375.00
125 Kabel NYY 4X35mm² m' Rp 282,975.00
126 Kabel NYY 4X95mm² m' Rp 747,250.00
127 Kabel NYY 4X150 mm² m' Rp 1,151,500.00
C PERALATAN
1 Concrete Pump Besar Ls Rp 4,000,000.00
2 Concrete Vibrator jam Rp 30,000.00
3 Mesin Bor jam Rp 650,000.00
4 Pipa Tremie dan Casing pelindung jam Rp 485,000.00
5 Bull Dozer jam Rp 450,000.00
6 Track Loader jam Rp 275,000.00
7 Dump Truck jam Rp 375,000.00
8 Alat Bantu jam Rp 375,000.00
9 Sewa Mini Crane, Kap. 10 Ton jam Rp 550,000.00
10 Sewa Mesin Bor Rotary Drilling 20 PK jam Rp 650,000.00
11 Alat Bantu Pipa Casing Pelindung Ls Rp 4,000,000.00