BILL OF QUANTITY
NO. URAIAN
JUMLAH A
JUMLAH B
SUB TOTAL A+B
PPn 10%
TOTAL = SUB TOTAL A + B + PPn 10 %
JUMLAH TOTAL
Y
TOTAL BIAYA
( Rp. )
176,045,450.00
56,111,297.54
232,156,747.54
57,850,000
2,385,000
60,235,000
292,391,747.54
29,239,174.75
321,630,922.29
321,630,922.29
338,396,911.00
95.05
JUMLAH A.2
HARGA SATUAN Jumlah Personil JUMLAH (Rp)
ORANG/BULAN (Rp) ( Orang )
35,911,200.00 1 35,911,200.00
35,911,200.00 1 35,911,200.00
35,911,200.00 1 35,911,200.00
35,911,200.00 1 35,911,200.00
32,400,650.00 1 32,400,650.00
176,045,450.00
13,409,150.00 1 13,409,150.00
12,661,000.00 1 12,661,000.00
13,409,150.00 1 13,409,150.00
8,315,998.66 1 8,315,998.66
8,315,998.88 1 8,315,998.88
56,111,297.54
C DAFTAR KUANTITAS DAN HARGA
0 1 2 3 4
A TENAGA AHLI
Team Leader ( Ahli Madya
1 Manajemen Pelaksanaan Jalan dan S1 Teknik Sipil 5 Tahun Tetap
Jembatan )
Ahli Kualitas dan Biaya ( Ahli Madya
2 S1 Teknik Sipil 5 Tahun Tetap
Jalan
Ahli Teknik Jalan/Jembatan ( Ahli
3 S1 Teknik Sipil 5 Tahun Tetap
Madya Jalan )
Ahli Geoteknik ( Ahli Madya
4 S1 Teknik Sipil 5 Tahun Tetap
Geoteknik )
Ahli K3 Konstruksi ( Ahli Muda
5 Manajemen Keselamatan Kerja S1 Teknik Sipil 5 Tahun Tetap
Konstruksi )
B TENAGA SUB PROFESSIONAL
1 Inspektur D3 Teknik Sipil 1 Tahun Tetap
C TENAGA PENDUKUNG
1 Manager Kantor Lapangan SMA/SMK 1 Tahun Tetap
Jumlah Remunerasi
Imbalan Jasa (IJ)
Gaji Dasar (GD) Beban Biaya Sosial Beban Biaya Umum Beban Biaya Personil
(Keuntungan) 10%
(Rp.) (5) (BBS)30% x (5) (BBU) 50%X (5) x (5+6+7) (BBP) (5+6+7+8)
5 6 7 8 9
unerasi 232,156,747.54
1.151
31,200,000.00 35,911,200
31,200,000.00 35,911,200
31,200,000.00 35,911,200
11,650,000.00
I. BIAYA OPERASIONAL
Volume Satuan Harga Satuan (Rp.) Total (Rp.)
Biaya Peralatan Kantor
a. Theodolit TS 1.00 Unit 25,000.00 25,000.00
b. Hand GPS 1.00 Unit 25,000.00 25,000.00
c. Drone 1.00 Unit 800,000.00 800,000.00
Jumlah Sub Total 850,000.00
BIAYA SEWA & OPERASIONAL KANTOR
a. Sewa Kantor 1.00 Unit 5,000,000.00 5,000,000.00
b. Biaya OP Kantor Utama Proyek 1.00 Unit 500,000.00 500,000.00
c. Biaya ATK Kantor Utama 1.00 Unit 500,000.00 500,000.00
Jumlah Sub Total 6,000,000.00
BIAYA TRANSPORTASI & TUNJANGAN
a. Transportasi dari dan ke Kaimana (5 TA) 5.00 unit/bulan 4,000,000.00 20,000,000.00
b. Transportasi dari dan ke Kaimana (3 SP) 3.00 unit/bulan 4,000,000.00 12,000,000.00
c. Tunjangan Perumahan (TA) 3.00 unit/bulan 3,000,000.00 9,000,000.00
d. Tunjangan Perumahan (SP) 2.00 unit/bulan 2,000,000.00 4,000,000.00
e. Tunjangan Perumahan (TP) 2.00 unit/bulan 1,000,000.00 2,000,000.00
f. Operasional Kendaraan Roda 2 2.00 unit/bulan 1,000,000.00 2,000,000.00
g. Operasional Kendaraan Roda 2 2.00 unit/bulan 1,000,000.00 2,000,000.00
Jumlah Sub Total 51,000,000.00
JUMLAH B.1 57,850,000.00