Perhitungan Kebutuhan Resource
Perhitungan Kebutuhan Resource
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
-
Mortar Utama -
96 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg sak 126,675.00 194,040.00 ü
97 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg sak 93,232.80 130,680.00 ü
98 Plester premium (MU-100)@ 40 kg sak 92,219.40 145,200.00 ü
99 Finish Plesteran/ Render (MU 290)@ 40 kg sak 161,637.30 246,840.00 ü
100 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) sak 72,964.80 105,600.00 ü
101 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) sak 145,929.60 198,000.00 ü
102 Acian Putih (MU-270)@25 kg sak 176,331.60 231,000.00 ü
103 Perata Lantai (MU-440)@40kg sak 93,232.80 131,788.80 ü
104 Perata Lantai Expose (MU 445) 40 kg sak 173,291.40 258,192.00 ü
105 Self Leveling Floor /Underlayment (MU-410) @25kg sak 148,969.80 409,860.00 ü
106 Primer Self Leveling Floor (MU-L410) @ 5lt Set 76,005.00 458,040.00 ü
107 Floor Hardener (MU 700) 25 kg sak 141,876.00 209,880.00 ü
108 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg sak 124,648.20 180,840.00 ü
109 Cerafix/Perekat Keramik (MU-420)@25 kg sak 89,179.20 125,136.00 ü
110 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg sak 390,159.00 592,812.00 ü
111 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg sak 245,242.80 355,212.00 ü
112 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg sak 301,993.20 454,740.00 ü
113 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg sak 304,020.00 491,832.00 ü
114 Colorfill/ Pengisi nat interior & eksterior (MU-408C) kg 11,700.00 16,500.00 ü
115 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) kg 20,500.00 28,380.00 ü
116 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg set 35,400.00 235,884.00 ü
117 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg set 90,400.00 126,852.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
118 FixGrout/Perbaikan struktur beton (MU-800)@20kg sak 84,000.00 118,800.00 ü
119 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg sak 253,500.00 378,180.00 ü
120 SkimRep/Perbaikan permukaan acian(MU-840)@25kg sak 238,149.00 470,052.00 ü
121 DryShield/Pelapis kedap air (MU-600)@3kg set 102,353.40 156,420.00 ü
122 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml set 40,536.00 48,180.00 ü
- -
Uzin - -
123 Beton Instan (UZ K300) 50 kg sak 111,430.00 110,600.16 ü
124 Plester dinding instan (UZ Plester) 50 Kg sak 81,040.00 109,148.16 ü
125 Plester Finish tanpa Aci (UZ Render) 50 kg sak 121,560.00 139,574.16 ü
126 Acian diatas beton (UZ SC100) 40 kg sak 102,313.00 155,713.80 ü
127 Acian dinding instan interior (UZ SC 50) 40 kg sak 119,534.00 145,259.40 ü
128 Acian dinding instan eksterior (UZ SC 75) 40 kg sak 126,625.00 148,170.00 ü
129 Perekat Bata Ringan (UZ TB20) 50 kg sak 101,300.00 157,897.08 ü
Bostik
Perekat Keramik & Batu Alam
130 Fix Crete 25kg sak 77,500.00 448,800.00 ü
131 Fix all 20kg sak 91,440.00 207,476.28 ü
132 Super Fix all 20kg sak 66,500.00 295,307.76 ü
133 Super Fix all trade/white 20kg sak 269,240.00 358,513.32 ü
134 Asaflex 45 kg (15lt +30 kgp) set 1,473,200.00 1,793,286.00 ü
135 Mortar Fix 100kg set 1,762,760.00 1,985,676.00 ü
136 Mortar Fix 50 kg set 1,727,200.00 1,913,340.00 ü
137 Mortar Fix 5 kg set 1,117,600.00 1,131,240.00 ü
138 Renofix 25 kg Zak 355,600.00 448,800.00 ü
139 Grout ( Semen Nat) 20 kg sak 350,520.00 536,024.28 ü
140 Grout ( Semen Nat) 1 kg sak 21,500.00 24,090.00 ü
141 Liquid Grout Adictive (LGA) 20 Lt pail 970,280.00 1,291,374.48 ü
142 Mega Lastic Acrilic Base 20Lt pail 970,280.00 1,291,374.48 ü
-
Wall System -
143 Skim Plas 25 Kg sak 72,100.00 156,057.00 ü
144 Skim Crete 25 Kg sak 80,340.00 204,996.00 ü
145 Fix. Plas 40 kg sak 66,950.00 142,560.00 ü
146 Fix T. 40 kg sak 77,250.00 207,906.60 ü
Waterproofing
147 Ultra Coat RC2 20 Lt pail 871,250.00 1,636,088.52 ü
148 Boscosem Slury 33 Kg set 533,000.00 684,937.44 ü
149 Damplix 2 20 kg set 978,875.00 2,136,761.88 ü
150 Damplix 3 45 kg set 2,818,750.00 2,834,892.72 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
151 Damplix 3E 35 kg set 1,486,250.00 1,572,453.96 ü
152 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m rol 1,142,875.00 1,244,451.12 ü
153 Indo primer ( lapisan primer WP membran) 20 Lt pail 973,750.00 1,018,963.44 ü
154 Integral Kristalisasi (Waterproofing kristal) 20 kg pail 1,998,750.00 2,186,647.32 ü
155 Sika Top Seal Set 20 kg + cairan set 312,625.00 -
Sealent
155 No More Nail (320 GR) bh 85,100.00 106,920.00 ü
156 Seal n Flex 1 (600 ML) bh 115,500.00 154,805.64 ü
157 Boscosil 313 (300 ML) bh 64,500.00 80,388.00 ü
158 Boscosil 616 (300 ML) bh 40,000.00 80,520.00 ü
159 Fil A Gap (300 ML) bh 49,500.00 51,387.60 ü
160 Boscosil Mastic (300 ML) khusus R. Pendingin bh 56,300.00 67,594.56 ü
161 Bostik Z Bond 6S (300 ML) bh 149,500.00 193,011.72 ü
162 Bostik Z PU Contrcuction (600 ML) bh 134,500.00 168,810.84 ü
163 Quelyd Super Express (250 GR) bh 48,500.00 49,665.00 ü
164 Expanda Foam (340 GR) bh 188,450.00 237,911.52 ü
165 Barel Gun bh 546,480.00 725,993.40 ü
166 Flash Band rol 195,000.00 228,513.12 ü
BAMBU
167 Bambu Ukuran 8"- 10" panjang 4 m btg 13,500.00 20,460.00 ü
168 Bambu Ukuran 3"-6" panjang 4 m btg 9,000.00 13,200.00 ü
169 Gedeg kulit kelas I m2 17,500.00 52,140.00 ü
170 Gedeg kulit kelas II m2 12,400.00 48,840.00 ü
171 Gedeg Biasa m2 10,000.00 48,510.00 ü
KAYU
172 Kayu jati Balok Ex. Bokonegoro m3 9,718,500.00 54,000,000.00 ü
173 Kayu jati papan Ex. Bokonegoro m3 12,276,000.00 66,000,000.00 ü
174 Kayu jati Usuk m3 7,850,000.00 3,000,000.00 ü
175 Kayu jati Reng m3 9,800,000.00 24,000,000.00 ü
176 Kayu merbau Balok m3 9,462,750.00 30,000,000.00 ü
177 Kayu merbau papan m3 9,104,700.00 42,000,000.00 ü
178 Kayu kamper balok m3 6,850,000.00 15,600,000.00 ü
179 Kayu kamper usuk/reng m3 5,950,000.00 15,600,000.00 ü
180 Kayu kamper papan m3 7,250,000.00 18,000,000.00 ü
181 Kayu Profil 4/5 kamper m3 5,845,000.00 15,600,000.00 ü
182 List Kayu m' 50,000.00 52,390.80 ü
183 List profil 2/4 kamper m' 50,000.00 50,820.00 ü
184 Kayu kruing balok m3 5,626,500.00 10,362,000.00 ü
185 Kayu kruing papan m3 5,933,400.00 10,494,000.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
186 Kayu Usuk Kruing m3 5,370,750.00 10,362,000.00 ü
187 Kayu Reng Kruing m3 5,150,000.00 10,362,000.00 ü
188 Kayu Papan Meranti m3 5,831,100.00 8,976,000.00 ü
189 Kayu Balok Meranti m3 6,150,000.00 9,009,000.00 ü
190 Kayu Usuk Meranti m3 5,250,000.00 8,976,000.00 ü
191 Kayu Reng Meranti m3 5,000,000.00 8,976,000.00 ü
192 Kayu Bangkirai Papan m3 11,253,000.00 26,400,000.00 ü
193 Kayu Bangkirai Balok m3 10,750,000.00 20,790,000.00 ü
194 Kayu Begisting 5/7 m3 2,625,000.00 -
195 Kayu Seseh Balok m3 4,250,565.00 4,177,800.00 ü
196 Kayu Dolken / Skapolding 10,500.00 27,720.00 ü
197 Kayu Seseh Dolken D 20 Panjang 3 m btg 245,520.00 244,200.00 ü
198 Kayu Seseh Dolken D 8-10 Panjang 4m btg 12,500.00 153,120.00 ü
199 Kayu Usuk Albesia 5/7 Panjang 4 m btg 68,541.00 75,240.00 ü
200 Kayu Reng mekanis Uk 2 x 3 x 400 cm m3 4,731,375.00 6,402,000.00 ü
201 Kayu Reng mekanis Uk 3 x 5 x 400 cm m3 5,831,100.00 6,800,640.00 ü
202 Kayu Usuk mekanis Uk 4 x 6 x 400 cm m3 5,831,100.00 7,128,000.00 ü
203 Kayu Usuk mekanis Uk 5 x 7 x 400 cm m3 6,905,250.00 6,903,600.00 ü
204 Kayu Balok mekanis Uk. 6 x 12 x 400 cm m3 6,905,250.00 7,458,000.00 ü
205 Kayu Balok mekanis Uk. 6 x 15 x 400 cm m3 6,905,250.00 7,656,000.00 ü
206 Kayu Balok mekanis Uk. 6 x 20 x 400 cm m3 6,905,250.00 8,857,200.00 ü
207 Kayu Kelas III lokal m3 2,150,000.00 3,956,700.00 ü
208 Kayu 7/7, Kelas III m3 3,800,000.00 -
209 Kayu Cempaka lokal m3 3,350,000.00 3,963,960.00 ü
210 Kayu Bakar m3 900,000.00 976,800.00 ü
211 Papan Bakesting m3 1,580,000.00 4,587,660.00 ü
212 Papan Kayu Ulin m3 5,432,130.00 20,790,000.00 ü
213 Papan Kayu, Kelas II m3 13,861,650.00 - ü
214 Balok Kayu Ulin m3 5,524,200.00 20,790,000.00 ü
215 Lem Aica Aibond kg 67,500.00 83,160.00 ü
216 Lem Kayu setara Fox ltr 18,200.00 27,720.00 ü
217 Minyak bekisting setara Calform NX*R ltr 47,500.00 53,118.12 ü
218 Jaro bubut bh 36,500.00 -
219 Kayu Perancah m3 48,500.00 -
Flooring/ Lantai
220 Parket Jati lokal Uk. 1,2 x 5 x 20 cm m2 261,000.00 403,920.00 ü
221 Parket Jati lokal Uk. 1,2 x 5 x 25 cm m2 278,500.00 409,200.00 ü
222 Parket Jati lokal Uk. 1,2 x 5 x 30 cm m2 321,500.00 415,800.00 ü
223 Jati Eksport Uk. 1,2 x 5 x 20 cm m2 289,500.00 429,000.00 ü
224 Jati Eksport Uk. 1,2 x 5 x 25 cm m2 400,000.00 456,720.00 ü
225 Jati Eksport Uk. 1,2 x 5 x 30 cm m2 419,980.00 469,920.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
226 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm m2 535,000.00 637,560.00 ü
227 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm m2 550,000.00 866,250.00 ü
228 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm m2 352,000.00 391,776.00 ü
229 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm m2 355,000.00 403,920.00 ü
230 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm m2 524,216.00 623,700.00 ü
231 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm m2 546,480.00 679,140.00 ü
232 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm m2 543,000.00 658,350.00 ü
233 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm m2 556,600.00 654,720.00 ü
234 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm m2 422,004.00 623,700.00 ü
235 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm m2 657,800.00 720,720.00 ü
236 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm m2 698,280.00 957,000.00 ü
Lambersering
237 Lambersering Bangkirai Uk. 1 x 9 x 200 cm m2 495,000.00 583,440.00 ü
238 Lambersering Kruing Uk. 2 x 9 x 200 cm m2 411,000.00 446,160.00 ü
Lis Kayu
239 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm btg 28,500.00 30,360.00 ü
240 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm btg 30,500.00 28,776.00 ü
241 Lis Plapond Uk. 0,8 x 5 x 400 cm btg 22,500.00 24,420.00 ü
242 Lis Plapond Uk.1 x 3 x 400 cm btg 20,000.00 22,440.00 ü
243 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm btg 33,500.00 33,000.00 ü
244 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm btg 52,500.00 58,080.00 ü
245 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm btg 58,812.00 69,960.00 ü
246 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm btg 68,200.00 76,560.00 ü
247 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm btg 86,190.00 104,940.00 ü
248 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm btg 106,500.00 126,720.00 ü
249 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm btg 126,750.00 122,760.00 ü
250 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm btg 131,820.00 186,780.00 ü
251 Lis Kaca Uk. 1,5 x 3 cm m' 17,000.00 16,896.00 ü
252 Lis Dowel Kecil Uk. 1 x 2 cm m' 6,500.00 5,940.00 ü
253 Lis Dowel Besar Uk. 1,3 x 3 cm m' 7,700.00 6,732.00 ü
254 Lis Kusen m' 6,700.00 6,336.00 ü
CONWOOD
Flooring/Deck Application
255 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs 83,000.00 103,620.00 ü
256 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs 138,500.00 176,880.00 ü
257 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs 175,000.00 201,960.00 ü
258 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs 170,000.00 203,280.00 ü
259 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs 260,000.00 298,320.00 ü
260 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs 335,000.00 392,040.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
261 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs 495,000.00 591,360.00 ü
Decorative Stair
262 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs 95,000.00 113,652.00 ü
263 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs 195,000.00 235,752.00 ü
264 Conwood Handrail (85 x 3050 x 30 mm) Pcs 151,000.00 204,072.00 ü
Ceiling Application
265 Celling Border (50 X 3050 X 11 mm) Pcs 45,000.00 60,456.00 ü
266 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs 65,000.00 72,336.00 ü
267 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs 78,000.00 91,740.00 ü
268 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs 130,000.00 147,840.00 ü
269 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs 520,000.00 620,512.20 ü
Eave/lisplank
270 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs 180,000.00 214,500.00 ü
Wall Application
271 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs 87,000.00 88,565.40 ü
272 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs 105,000.00 115,453.80 ü
273 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs 185,500.00 214,500.00 ü
274 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs 225,000.00 262,680.00 ü
Moulding Application
275 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs 42,000.00 71,280.00 ü
276 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs 42,000.00 80,520.00 ü
277 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs 67,500.00 65,003.40 ü
278 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs 61,500.00 87,780.00 ü
Decorative Application
279 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs 115,500.00 130,680.00 ü
280 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs 47,000.00 51,084.00 ü
281 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs 68,000.00 78,672.00 ü
282 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs 58,000.00 64,680.00 ü
283 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs 47,000.00 40,920.00 ü
284 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs 52,000.00 64,680.00 ü
285 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs 39,500.00 52,272.00 ü
286 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs 54,500.00 61,512.00 ü
287 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs 57,000.00 64,548.00 ü
288 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs 45,000.00 48,840.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
Planks
289 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs 96,000.00 79,200.00 ü
290 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs 97,000.00 79,200.00 ü
BESI
291 Mour + Bout bh 12,500.00 12,540.00 ü
292 Besi strip kg 16,380.00 20,097.00 ü
293 Besi strip 30x3 mm m' 22,680.00 29,040.00 ü
294 Baja Strip (0,2 x 2) cm / Plat Strip Kg 20,160.00 24,090.00 ü
295 Besi Beton U24 (Polos) Kg 12,500.00 18,018.00 ü
296 Besi Beton Ulir U 32 Kg 13,200.00 18,711.00 ü
297 Besi Ulir 13,0x 12 sni (Ts-40) Kg 13,300.00 10,916.40 ü
298 Besi Ulir 16,0x 12 sni (Ts-40) kg 13,400.00 11,589.60 ü
299 Besi Ø5 (3,8 x 6,0) btg 8,619.00 9,108.00 ü
300 Besi Ø6 (5,0 x 12) btg 22,815.00 24,684.00 ü
301 Besi Ø6 (5,2 x 12) btg 24,336.00 27,192.00 ü
302 Besi Ø6 (5,7 x 12) btg 38,000.00 30,360.00 ü
303 Besi Ø8 (6,5 x 12) btg 39,500.00 40,920.00 ü
304 Besi Ø8 (6,7 x 12) btg 40,200.00 43,560.00 ü
305 Besi Ø8 (6,9 x 12) SNI btg 48,700.00 46,200.00 ü
306 Besi Ø8 (7,1 x 12) SNI btg 52,000.00 52,536.00 ü
307 Besi Ø8 (7,4 x 12) SNI btg 53,400.00 52,800.00 ü
308 Besi Ø8 (7,6 x 12) SNI btg 54,000.00 55,440.00 ü
309 Besi Ø8 (7,7 x 12) SNI btg 54,700.00 54,120.00 ü
310 Besi Ø8 (7,8 x 12) SNI btg 55,600.00 56,760.00 ü
311 Besi Ø8 SNI U 24 btg 56,000.00 63,360.00 ü
312 Besi Ø10 (8,4 x 12) SNI btg 57,400.00 64,680.00 ü
313 Besi Ø10 (8,6 x 12) SNI btg 60,800.00 68,640.00 ü
314 Besi Ø10 (8,9 x 12) SNI btg 65,400.00 69,828.00 ü
315 Besi Ø10 (9,2 x 12) SNI btg 70,100.00 71,280.00 ü
316 Besi Ø10 (9,4 x 12) SNI btg 74,600.00 75,108.00 ü
317 Besi Ø10 (9,6 x 12) SNI btg 75,000.00 81,840.00 ü
318 Besi Ø10 (9,8 x 12) SNI btg 75,200.00 85,272.00 ü
319 Besi Ø10 SNI U 24 btg 90,000.00 67,320.00 ü
320 Besi Ø10 Ulir (9,5 x 12) SNI btg 91,200.00 77,880.00 ü
321 Besi Ø10 Ulir (9,7 x 12) SNI btg 86,697.00 78,936.00 ü
322 Besi Ø12 (11,5 x 12) SNI btg 113,500.00 108,240.00 ü
323 Besi Ø13 Ulir (11,5 x 12) SNI btg 126,000.00 108,240.00 ü
324 Besi Ø13 Ulir (11,7 x 12) SNI btg 130,200.00 117,480.00 ü
325 Besi Ø13 Ulir (12,0 x 12) SNI btg 135,200.00 118,668.00 ü
326 Besi Ø13 Ulir (12,5 x 12) SNI btg 140,400.00 127,380.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
327 Besi Ø13 Ulir (12,7 x 12) SNI btg 145,000.00 132,132.00 ü
328 Besi Ø16 Ulir (14 x 12) SNI btg 185,100.00 149,160.00 ü
329 Besi Ø16 Ulir (14,5 x 12) SNI btg 190,000.00 161,040.00 ü
330 Besi Ø16 Ulir (15,0 x 12) SNI btg 201,400.00 171,600.00 ü
331 Besi Ø16 Ulir (15,5 x 12) SNI btg 215,000.00 195,360.00 ü
332 Besi Ø16 Ulir (15,7 x 12) SNI btg 225,000.00 201,960.00 ü
333 Wiremesh M6@50m rol 5,034,960.00 3,504,600.00 ü
334 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m lbr 650,000.00 514,800.00 ü
335 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m lbr 900,000.00 788,040.00 ü
336 Wermes Diameter 8 (U 50) lbr 969,384.00 711,334.80 ü
337 Beugel Besi O8 kg 15,210.00 17,569.20 ü
338 Beugel penguat /plaat kg 18,252.00 103,019.40 ü
339 Kawat Beton RRT kg 20,280.00 35,244.00 ü
340 Kawat berduri m' 86,190.00 246,180.00 ü
341 Kawat Ayak / Kuasa 5 X 5 cm m2 25,350.00 69,960.00 ü
342 Kawat Harmonika 3 X 3 cm m2 30,420.00 64,152.00 ü
343 Kawat Nyamuk m2 30,420.00 50,952.00 ü
344 Kawat Jaring m2 30,420.00 36,300.00 ü
345 Kawat Bronjong kg 54,756.00 63,888.00 ü
346 Besi / Baja profil kg 22,000.00 38,808.00 ü
347 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 kg 23,310.00 19,166.40 ü
348 Baja WF (150 x 12 GG) btg 2,457,000.00 2,195,424.00 ü
349 Baja WF (200 x 12 GG) btg 3,150,000.00 3,345,408.00 ü
350 Besi Baja WF 200 x 100 x 4,5 x 7 kg 23,375.00 16,698.00 ü
351 Besi Baja WF 200 x 100 x 5,5x8 kg 20,790.00 -
352 Besi Baja WF 250 x 125 x 5 x 7 kg 22,680.00 16,698.00 ü
353 Besi Baja C 100 x 50 x 3,2 kg 25,200.00 16,698.00 ü
354 Baja Ringan Type C- 75, 0.8 m' 25,200.00 25,740.00 ü
355 Baja Ringan Type C- 75, 0.6 m' 24,570.00 130,680.00 ü
356 Reng Baja m' 20,160.00 11,180.40 ü
357 Profil Canal "C" Tipe C71.075 btg 108,360.00 446,160.00 ü
358 Profil Canal "C" Tipe C81.075 btg 120,960.00 137,039.76 ü
359 Profil Canal "C" Tipe C81.065 btg 113,400.00 131,769.00 ü
360 Profil "Omega / reng Tipe AA btg 57,960.00 90,420.00 ü
361 Profil "Omega / reng Tipe A btg 69,300.00 77,484.00 ü
362 Profil "Omega / reng Tipe AB btg 81,900.00 67,082.40 ü
363 Profil Aluminium Kaca 3/4 m' 22,680.00 22,044.00 ü
364 Profil Aluminium L 3 cm lis Kaca m' 22,680.00 22,044.00 ü
365 Profil Aluminium 4" m' 27,720.00 100,980.00 ü
366 Besi Plat kg 30,240.00 36,096.72 ü
367 Besi plat 3 X 6 tebal 1,2 mm btg 119,700.00 313,051.20 ü
368 Besi plat 4 X 8 tebal 1,8 mm btg 31,500.00 705,962.40 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
369 Baja Plat Hitam L = 10 lbr 365,400.00 2,620,860.00 ü
370 Baja Plat Hitam L = 8 lbr 648,900.00 2,103,948.00 ü
371 Baut Galvanis 3/4 x 2 " bh 13,230.00 9,837.96 ü
372 Baut Galvanis 3/4 x 2 1/2 " bh 13,356.00 11,311.08 ü
373 Baut Galvanis 3/4 x 3 " bh 15,120.00 12,306.36 ü
374 Baut Galvanis 3/4 x 3 1/2 " bh 17,010.00 13,757.04 ü
375 Baut Galvanis 3/4 x 4 " bh 18,270.00 14,702.16 ü
376 Baut Galvanis 3/4 x 4 1/2 " bh 19,152.00 16,117.20 ü
377 Baut Galvanis 3/4 x 5 " bh 11,970.00 17,133.60 ü
378 Baut Galvanis 3/4 x 5 1/2 " bh 12,600.00 10,208.88 ü
379 Baut Galvanis 3/4 x 6 " bh 22,680.00 20,037.60 ü
380 Plat Siku Panjang 30 cm bh 27,720.00 34,848.00 ü
381 Plat Siku Panjang 40 cm bh 19,530.00 37,752.00 ü
382 Plat Siku Panjang 50 cm bh 20,790.00 43,560.00 ü
383 Plat Siku Panjang 60 cm bh 23,940.00 50,820.00 ü
384 Plat Aluminium 2mm m2 39,060.00 399,300.00 ü
385 Besi siku / engsel m' 43,470.00 -
386 Besi Siku L.30.30.3 mm btg 42,840.00 107,496.84 ü
387 Baut UNC 5/8 x 2" bh 2,898.00 5,016.00 ü
388 Baut UNC 5/8 x 2 1/2" bh 3,150.00 4,686.00 ü
389 Baut UNC 5/8 x 3" bh 3,150.00 5,577.00 ü
390 Baut UNC 5/8 x 3 1/2" bh 3,906.00 5,662.80 ü
391 Baut UNC 5/8 x 4" bh 4,410.00 6,316.20 ü
392 Baut UNC 5/8 x 4 1/2" bh 5,040.00 6,824.40 ü
393 Baut UNC 5/8 x 5" bh 5,418.00 7,369.56 ü
394 Baut UNC 5/8 x 5 1/2" bh 5,670.00 7,898.88 ü
395 Baut UNC 5/8 x 6" bh 5,922.00 8,421.60 ü
396 Baut UNC 3/4 x 2" bh 6,300.00 7,695.60 ü
397 Baut UNC 3/4 x 2 1/2" bh 7,308.00 8,349.00 ü
398 Baut UNC 3/4 x 3" bh 11,970.00 9,147.60 ü
399 Baut UNC 3/4 x 3 1/2" bh 12,852.00 10,018.80 ü
400 Baut UNC 3/4 x 4" bh 13,986.00 10,817.40 ü
401 Baut UNC 3/4 x 4 1/2" bh 14,616.00 11,616.00 ü
402 Baut UNC 3/4 x 5" bh 15,120.00 12,559.80 ü
403 Baut UNC 3/4 x 5 1/2" bh 16,380.00 13,358.40 ü
404 Baut UNC 3/4 x 6" bh 8,820.00 14,229.60 ü
405 Baut CB 3/8 x 5" bh 3,150.00 2,574.00 ü
406 Baut CB 3/8 x 3" bh 1,953.00 1,597.20 ü
407 Baut CB 3/8 x 2" bh 1,701.00 1,346.40 ü
408 Behel 7/8 bh 6,552.00 172,788.00 ü
409 Baut Baja A325 16 x 50 bh 10,710.00 9,900.00 ü
410 Baut Baja A325 16 x 60 bh 12,222.00 9,728.40 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
411 Baut Baja A325 16 x 70 bh 12,726.00 10,164.00 ü
412 Baut Baja A325 16 x 80 bh 14,490.00 11,616.00 ü
413 Baut Baja A325 16 x 90 bh 15,561.00 12,705.00 ü
414 Baut Baja A325 16 x 100 bh 17,010.00 13,866.60 ü
415 Baut Baja A325 16 x 110 bh 19,530.00 15,972.00 ü
416 Baut Baja A325 16 x 120 bh 21,420.00 17,424.00 ü
417 Baut Baja A325 16 x 130 bh 22,680.00 18,876.00 ü
418 Baut Baja A325 16 x 140 bh 25,704.00 20,328.00 ü
419 Baut Baja A325 16 x 150 bh 25,830.00 21,054.00 ü
420 Baut Baja A325 19 x 50 bh 17,010.00 13,939.20 ü
421 Baut Baja A325 19 x 60 bh 18,900.00 15,318.60 ü
422 Baut Baja A325 19 x 70 bh 20,790.00 16,589.76 ü
423 Baut Baja A325 19 x 80 bh 21,829.50 17,424.00 ü
424 Baut Baja A325 19 x 90 bh 24,570.00 20,110.20 ü
425 Baut Baja A325 19 x 100 bh 26,460.00 21,344.40 ü
426 Baut Baja A325 19 x 110 bh 26,460.00 23,232.00 ü
427 Baut Baja A325 19 x 120 bh 30,240.00 24,684.00 ü
428 Baut Baja A325 19 x 130 bh 31,500.00 27,370.20 ü
429 Baut Baja A325 19 x 140 bh 34,272.00 27,297.60 ü
430 Baut Baja A325 19 x 150 bh 35,280.00 29,040.00 ü
431 Baut Galvanis 3/8 x 2 " bh 2,520.00 1,887.60 ü
432 Baut Galvanis 3/8 x 2 1/2 " bh 2,646.00 2,032.80 ü
433 Baut Galvanis 3/8 x 3 " bh 2,835.00 2,250.60 ü
434 Baut Galvanis 3/8 x 3 1/2 " bh 3,402.00 2,461.80 ü
435 Baut Galvanis 3/8 x 4 " bh 3,528.00 2,671.68 ü
436 Baut Galvanis 3/8 x 4 1/2 " bh 3,654.00 2,970.00 ü
437 Baut Galvanis 3/8 x 5 " bh 3,780.00 3,121.80 ü
438 Baut Galvanis 3/8 x 5 1/2 " bh 4,032.00 3,484.80 ü
439 Baut Galvanis 3/8 x 6 " bh 4,788.00 3,630.00 ü
440 Baut Galvanis 5/8 x 2 " bh 6,426.00 5,154.60 ü
441 Baut Galvanis 5/8 x 2 1/2 " bh 7,232.40 5,844.96 ü
442 Baut Galvanis 5/8 x 3 " bh 7,812.00 6,353.16 ü
443 Baut Galvanis 5/8 x 3 1/2 " bh 8,820.00 7,114.80 ü
444 Baut Galvanis 5/8 x 4 " bh 9,576.00 7,623.00 ü
445 Baut Galvanis 5/8 x 4 1/2 " bh 10,332.00 8,203.80 ü
446 Baut Galvanis 5/8 x 5 " bh 10,899.00 8,682.96 ü
447 Baut Galvanis 5/8 x 5 1/2 " bh 12,411.00 9,801.00 ü
448 Baut Galvanis 5/8 x 6 " bh 12,000.00 10,309.20 ü
449 Besi Pipa Galvanis lonjor 125,000.00 1,118,040.00 ü
450 besi tangga D 19, enamel cat bh 96,000.00 -
451 Handle Besi Ø 12, enamel cat bh 98,000.00 -
452 Angker diameter 12mm bh 111,000.00 21,489.60 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
453 Skruf Fixer 5 cm bh 20,000.00 858.00 ü
454 Dynabolt bh 5,500.00 6,600.00
455 Rapidrant gln 102,000.00 -
456 Sealant tube 46,000.00 54,912.00 ü
457 Silicon kg 45,000.00 102,148.20 ü
458 Elektrode 0,6 % bh 120,000.00 190,575.00 ü
459 Elektrode 2 % bh 318,000.00 353,232.00 ü
BESI PAGAR
460 Pagar Setara BRC T.90 diameter 6mm m' 270,000.00 274,032.00 ü
461 Pagar Setara BRC T.120 diameter 6mm m' 290,000.00 312,180.00 ü
462 Pagar Setara BRC T.150 diameter 6mm m' 291,500.00 320,760.00 ü
463 Pagar Setara BRC T.175 diameter 7mm m' 490,000.00 485,760.00 ü
464 Pagar Setara BRC T.190 diameter 7mm m' 695,000.00 722,700.00 ü
465 Pagar HotDip Galvanized T.90 diameter 6mm m' 243,000.00 234,300.00 ü
466 Pagar HotDip Galvanized T.120 diameter 6mm m' 267,000.00 250,800.00 ü
467 Pagar HotDip Galvanized T.150 diameter 6mm m' 296,000.00 320,100.00 ü
468 Pagar HotDip Galvanized T.175 diameter 6mm m' 320,000.00 353,760.00 ü
469 Pagar HotDip Galvanized T.190 diameter 6mm m' 250,000.00 372,504.00 ü
-
CAT -
470 Cat Marka Jalan Kg 62,000.00 98,400.00 ü
471 Glas Bit Kg 39,200.00 38,115.00 ü
472 Cat besi kg 58,580.00 129,132.96 ü
473 Cat Menie besi Kg 41,200.00 69,300.00 ü
474 Cat menie Kayu kg 30,500.00 68,607.00 ü
475 Cat Dasar Tembok Setara Emco Kg 37,000.00 82,328.40 ü
476 Cat Setara weldon biasa Kg 33,500.00 83,160.00 ü
477 Cat Setara weldon warna Kg 35,500.00 91,476.00 ü
478 Cat Setara weldon warna tua Kg 41,700.00 106,722.00 ü
479 Cat Setara emco Lux Biasa kg 35,400.00 52,272.00 ü
480 Cat Setara emco Lux Warna kg 38,000.00 64,020.00 ü
481 Cat Setara emco Lux Warna Tua kg 41,000.00 72,072.00 ü
482 Cat tembok Setara Decolith kg 39,200.00 55,440.00 ü
483 Cat tembok Setara Dulux Exterior kg 147,500.00 175,329.00 ü
484 Cat tembok Setara Dulux Interior kg 112,500.00 129,591.00 ü
485 Cat tembok Setara Vinilex kg 47,500.00 55,343.64 ü
486 Cat Galvanis kg 57,400.00 121,663.08 ü
487 Cat Kayu Emco kg 67,500.00 88,426.80 ü
488 Cat Baja Chromate (anti karat) Kg 62,000.00 152,460.00 ü
489 Cat Kansteen Kg 70,500.00 81,840.00 ü
490 Kalkarium Kg 13,250.00 -
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
491 Kapur sirih Kg 15,500.00 -
492 Kapur padam m3 11,500.00 -
493 Amplas lbr 16,500.00 9,543.60 ü
494 Kuas Bh 14,500.00 22,110.00 ü
-
Cat KCA -
495 Cat Natural@25 kg Pail 437,000.00 894,960.00 ü
496 Cat Flakes@25 kg Pail 762,500.00 1,171,500.00 ü
497 Cat Genteng @25kg Pail 315,500.00 1,079,760.00 ü
-
Stone Coating : -
498 Clear gloss air kg 76,500.00 105,336.00 ü
499 Black gloss air kg 67,500.00 115,500.00 ü
500 Clear gloss solvent kg 75,975.00 105,072.00 ü
501 Black gloss solvent kg 90,500.00 112,200.00 ü
502 Clear doft solvent kg 86,200.00 112,200.00 ü
503 Black doft solvent kg 46,500.00 113,124.00 ü
504 Dempul / Plamir ltr 43,052.50 73,180.80 ü
505 Dempul / Plamir Altik ltr 42,500.00 64,491.24 ü
506 Dempul Impra Kayu ltr 17,000.00 68,607.00 ü
507 Kuas untuk mengecat bh 12,500.00 21,120.00 ü
508 Lem Fox (Rajawali Kuning) Gln 156,500.00 221,067.00 ü
509 Lem Wall Paper Kg 83,500.00 42,240.00 ü
510 Mild zak 12,500.00 18,295.20 ü
511 Minyak cat ltr 22,500.00 64,491.24 ü
512 Melamine Lack / Imfra ltr 88,500.00 106,722.00 ü
513 Okear / Veap Kg 27,000.00 124,080.00 ü
514 Plamir kayu kg 33,500.00 68,607.00 ü
515 Plamir tembok setara wall Putty kg 36,500.00 221,067.00 ü
516 Politur ultra ltr 67,400.00 104,129.52 ü
517 Politur Jadi ltr 71,500.00 105,197.40 ü
518 vernis ltr 42,039.50 83,853.00 ü
519 Residu / Teer Ltr 46,500.00 50,160.00 ü
520 Roll Buah 29,000.00 53,361.00 ü
521 Sending Seaker ltr 87,118.00 105,600.00 ü
522 Soda Api Kg 12,000.00 33,541.20 ü
523 Thiner A Spesial ltr 31,200.00 38,115.00 ü
524 Thiner B ltr 12,500.00 38,115.00 ü
525 Teack Oil ltr 69,500.00 92,238.96 ü
526 Wall Paper Setara Silk House m2 785,075.00 914,760.00 ü
527 Wood Filler ltr 47,500.00 83,853.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
528 Cat Scotlight Ltr 75,975.00 234,960.00 ü
529 Mowilex Kg 80,500.00 -
KACA
530 Bingkai Nako Silver daun 49,500.00 62,040.00 ü
531 Bingkai Nako Coklat daun 53,000.00 56,760.00 ü
532 Glass Block bh 33,000.00 56,400.00 ü
533 Kaca 2 mm bening m2 107,000.00 106,722.00 ü
534 Kaca 3 mm bening m2 132,000.00 130,680.00 ü
535 Kaca 5 mm bening m2 112,500.00 208,560.00 ü
536 Kaca 6 mm bening m2 265,000.00 259,182.00 ü
537 Kaca 8 mm bening m2 319,000.00 440,609.40 ü
538 Kaca 10 mm bening m2 342,000.00 533,610.00 ü
539 Kaca 12 mm bening m2 595,000.00 686,070.00 ü
540 Kaca Cermin 3 mm m2 205,000.00 234,960.00 ü
541 Kaca Cermin 5 mm m2 370,000.00 426,888.00 ü
542 Kaca Es/Kapur 3 mm m2 237,000.00 274,428.00 ü
543 Kaca Es/Kapur 5 mm m2 236,000.00 356,400.00 ü
544 Kaca Nako Bening m2 137,000.00 137,214.00 ü
545 Kaca Nako Rayben m2 180,000.00 182,952.00 ü
546 Kaca ryben 3 mm m2 120,000.00 138,600.00 ü
547 Kaca ryben 5 mm m2 196,500.00 213,444.00 ü
548 Kaca asahi tebal 3 mm polos clear m2 103,000.00 105,600.00 ü
549 Kaca asahi tebal 3 mm ryben dark grey m2 120,000.00 123,420.00 ü
550 Kaca asahi tebal 3 mm cermin mirror m2 183,500.00 195,360.00 ü
551 Kaca asahi tebal 3 mm es mislet m2 200,000.00 201,663.00 ü
552 Kaca asahi tebal 3 mm biru dark blue m2 297,500.00 326,403.00 ü
553 Kaca asahi tebal 3 mm one way m2 425,000.00 485,100.00 ü
554 Kaca asahi tebal 5 mm polos clear m2 122,500.00 130,020.00 ü
555 Kaca asahi tebal 5 mm ryben dark grey m2 152,500.00 157,311.00 ü
556 Kaca asahi tebal 5 mm cermin mirror m2 261,000.00 510,840.00 ü
557 Kaca asahi tebal 5 mm es mislet m2 271,000.00 263,340.00 ü
558 Kaca asahi tebal 6 mm polos clear m2 187,000.00 200,970.00 ü
559 Kaca asahi tebal 8 mm polos clear m2 380,000.00 400,554.00 ü
560 Kaca asahi tebal 10 mm polos clear m2 421,000.00 485,100.00 ü
561 Kaca asahi tebal 12 mm polos clear m2 432,000.00 502,425.00 ü
562 Kaca tempered asahimas tebal 3mm polos clear m2 247,000.00 282,051.00 ü
563 Kaca tempered asahimas tebal 3mm ryben dark grey m2 289,000.00 335,412.00 ü
564 Kaca tempered asahimas tebal 3mm sanergy clear m2 318,500.00 837,144.00 ü
565 Kaca tempered asahimas tebal 4mm polos clear m2 249,500.00 283,800.00 ü
566 Kaca tempered asahimas tebal 4mm sanergy clear m2 798,000.00 959,112.00 ü
567 Kaca tempered asahimas tebal 5mm polos clear m2 275,000.00 311,157.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
568 Kaca tempered asahimas tebal 5mm ryben dark grey m2 271,000.00 385,308.00 ü
569 Kaca tempered asahimas tebal 5mm stopsol m2 519,000.00 604,296.00 ü
570 Kaca tempered asahimas tebal 5mm warna m2 449,000.00 515,592.00 ü
571 Kaca tempered asahimas tebal 5mm sanergy clear m2 951,500.00 1,125,432.00 ü
572 Kaca tempered asahimas tebal 6mm polos clear m2 376,500.00 418,440.00 ü
573 Kaca tempered asahimas tebal 6mm ryben dark grey m2 482,500.00 562,716.00 ü
574 Kaca tempered asahimas tebal 6mm stopsol m2 579,000.00 1,143,450.00 ü
575 Kaca tempered asahimas tebal 6mm warna m2 546,500.00 646,569.00 ü
576 Kaca tempered asahimas tebal 6mm diamon m2 739,000.00 861,399.00 ü
577 Kaca tempered asahimas tebal 6mm sanergy clear m2 1,240,000.00 1,392,600.00 ü
578 Kaca tempered asahimas tebal 8mm polos clear m2 500,000.00 547,800.00 ü
579 Kaca tempered asahimas tebal 8mm stopsol m2 1,368,000.00 1,568,952.00 ü
580 Kaca tempered asahimas tebal 8mm warna m2 912,000.00 1,013,859.00 ü
581 Kaca tempered asahimas tebal 8mm diamon m2 1,256,000.00 1,494,108.00 ü
582 Kaca tempered asahimas tebal 8mm sanergy clear m2 1,617,000.00 1,905,750.00 ü
583 Kaca tempered asahimas tebal 10mm polos clear m2 617,000.00 668,052.00 ü
584 Kaca tempered asahimas tebal 10mm diamon m2 1,817,000.00 2,134,440.00 ü
585 Kaca tempered asahimas tebal 12mm polos clear m2 700,000.00 783,090.00 ü
586 Kaca tempered asahimas tebal 12mm diamon m2 2,317,000.00 2,720,025.00 ü
587 Kaca tempered asahimas tebal 15mm polos clear m2 5,419,000.00 6,398,469.00 ü
588 Kaca tempered asahimas tebal 15mm diamon m2 6,921,000.00 8,316,000.00 ü
589 Kaca tempered asahimas tebal 19mm polos clear m2 6,217,000.00 7,363,818.00 ü
590 Kaca tempered asahimas tebal 19mm diamon m2 9,700,000.00 10,130,967.00 ü
591 Kaca tebal 3+3 mm laminet biasa m2 422,000.00 478,170.00 ü
592 Kaca tebal 4+4 mm laminet biasa m2 518,000.00 584,892.00 ü
593 Kaca tebal 5+5 mm laminet biasa m2 573,000.00 658,350.00 ü
594 Kaca tebal 6+6 mm laminet biasa m2 717,000.00 791,736.00 ü
595 Kaca tebal 8+8 mm laminet biasa m2 917,500.00 1,280,400.00 ü
596 Kaca tebal 10+10 mm laminet biasa m2 1,217,500.00 1,442,826.00 ü
597 Kaca tebal 12+12 mm laminet biasa m2 1,116,500.00 1,641,024.00 ü
598 Kaca tebal 3+3 mm laminet tempered m2 1,417,500.00 1,326,402.00 ü
599 Kaca tebal 4+4 mm laminet tempered m2 1,422,500.00 1,463,616.00 ü
600 Kaca tebal 5+5 mm laminet tempered m2 1,437,500.00 1,501,038.00 ü
601 Kaca tebal 6+6 mm laminet tempered m2 1,861,000.00 1,905,750.00 ü
602 Kaca tebal 8+8 mm laminet tempered m2 1,965,000.00 2,314,620.00 ü
603 Kaca tebal 10+10 mm laminet tempered m2 2,354,000.00 2,686,068.00 ü
604 Kaca tebal 12+12 mm laminet tempered m2 2,968,000.00 2,957,724.00 ü
605 Ongkos polin kaca tempered tebal 5mm m' 36,500.00 29,040.00 ü
606 Ongkos polin kaca tempered tebal 6mm m' 38,700.00 30,360.00 ü
607 Ongkos polin kaca tempered tebal 8mm m' 43,600.00 44,880.00 ü
608 Ongkos polin kaca tempered tebal 10mm m' 44,600.00 40,920.00 ü
609 Ongkos polin kaca tempered tebal 12mm m' 54,000.00 43,560.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
610 Ongkos polin kaca tempered tebal 19mm m' 68,900.00 147,840.00 ü
PIPA
611 Pipa Galvanis 1" m' 125,000.00 77,131.56 ü
612 Pipa Galvanis 1,5 BSA m' 480,000.00 116,424.00 ü
613 Pipa Galvanis 2" m' 337,590.00 163,548.00 ü
614 Pipa Galvanis 3" m' 416,361.00 250,866.00 ü
615 Pipa Maspion AW 1/2 m' 7,672.50 10,478.16 ü
616 Pipa Maspion AW 3/4 m' 8,951.25 13,860.00 ü
617 Pipa Maspion AW 1 m' 11,508.75 16,008.96 ü
618 Pipa Maspion AW 1-1/2 m' 22,250.25 30,492.00 ü
619 Pipa Maspion AW 1-1/4 m' 16,623.75 25,905.00 ü
620 Pipa Maspion AW 2 m' 30,690.00 38,610.00 ü
621 Pipa Maspion AW 2-1/2 m' 40,920.00 49,500.00 ü
622 Pipa Maspion AW 3 m' 57,543.75 70,620.00 ü
623 Pipa Maspion AW 4 m' 86,955.00 101,970.00 ü
624 Pipa Maspion AW 5 m' 138,105.00 158,268.00 ü
625 Pipa Maspion AW 6 m' 179,025.00 213,345.00 ü
626 Pipa Maspion AW 8 m' 281,325.00 381,150.00 ü
627 Pipa Maspion AW 10 m' 398,970.00 540,540.00 ü
628 Pipa Maspion AW 12 m' 575,949.00 873,180.00 ü
629 Pipa Maspion AW 14 m' 810,216.00 1,109,665.92 ü
630 Pipa Maspion AW 16 m' 1,015,327.50 1,357,066.92 ü
631 Pipa Maspion C 3/4 m' 3,785.10 5,093.88 ü
632 Pipa Maspion C 5/8 m' 2,056.23 2,910.60 ü
633 Pipa Maspion C 1 m' 5,524.20 9,702.00 ü
634 Pipa Maspion C 1-1/2 m' 8,695.50 13,695.00 ü
635 Pipa Maspion C 1-1/4 m' 6,854.10 - ü
636 Pipa Maspion C 2 m' 12,787.50 12,078.00 ü ü
637 Pipa Maspion C 2-1/2 m' 16,572.60 17,919.00 ü
638 Pipa Maspion C 3 m' 19,181.25 26,532.00 ü
639 Pipa Maspion C 3-1/2 m' 21,738.75 38,478.00 ü
640 Pipa Maspion C 4 m' 24,756.60 62,007.00 ü
641 Pipa Maspion D 1/2 m' 11,764.50 88,308.00 ü
642 Pipa Maspion D 1-1/2 m' 13,299.00 107,250.00 ü
643 Pipa Maspion D 1-1/4 m' 11,253.00 189,717.00 ü
644 Pipa Maspion D 2 m' 15,345.00 331,089.00 ü
645 Pipa Maspion D 2-1/2 m' 23,017.50 451,275.00 ü
646 Pipa Maspion D 3 m' 33,247.50 45,113.64 ü
647 Pipa Maspion D 4 m' 46,035.00 63,756.00 ü
648 Pipa Maspion D 5 m' 76,725.00 103,950.00 ü
649 Pipa Maspion D 6 m' 92,070.00 125,883.12 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
650 Pipa Maspion D 8 m' 163,680.00 223,146.00 ü
651 Pipa Maspion D 10 m' 290,276.25 388,080.00 ü
652 Pipa Maspion D 12 m' 383,625.00 529,001.88 ü
653 Pipa Maspion D 14 m' 525,822.00 692,722.80 ü
654 Pipa Maspion D 16 m' 664,950.00 896,464.80 ü
655 Pipa / selang spiral sel kran m' 24,296.25 48,025.56 ü
656 Pipa langgeng warna abu - abu AW 1/2 m' 7,391.17 8,929.80 ü
657 Pipa langgeng warna abu - abu AW 3/4 m' 8,914.42 10,890.00 ü
658 Pipa langgeng warna abu - abu AW 1 m' 11,212.08 13,693.68 ü
659 Pipa langgeng warna abu - abu AW 1 1/4 m' 15,866.73 19,382.88 ü
660 Pipa langgeng warna abu - abu AW 1 1/2 m' 20,664.60 25,740.00 ü
661 Pipa langgeng warna abu - abu AW 2 m' 31,099.20 37,488.00 ü
662 Pipa langgeng warna abu - abu AW 2 1/2 m' 39,359.92 -
663 Pipa langgeng warna abu - abu AW 3 m' 51,313.68 50,160.00
664 Pipa langgeng warna abu - abu AW 4 m' 69,052.50 68,970.00 ü
665 Pipa langgeng warna abu - abu AW 5 m' 102,300.00 100,980.00 ü
666 Pipa langgeng warna abu - abu AW 6 m' 173,424.07 205,260.00 ü
667 Pipa langgeng warna abu - abu AW 8 m' 269,281.22 317,790.00 ü
668 Pipa langgeng warna abu - abu AW 10 m' 383,625.00 448,140.00 ü
669 Pipa langgeng warna abu - abu AW 12 m' 547,638.50 642,180.00 ü
670 Pipa langgeng warna abu - abu AW 16 m' 966,735.00 1,125,300.00 ü
671 Pipa langgeng warna abu - abu D 1 1/4 m' 9,718.50 1,158,079.56 ü
672 Pipa langgeng warna abu - abu D 1 1/2 m' 11,283.69 13,728.00 ü
673 Pipa langgeng warna abu - abu D 2 m' 14,833.50 17,325.00 ü
674 Pipa langgeng warna abu - abu D 2 1/2 m' 21,892.20 25,938.00 ü
675 Pipa langgeng warna abu - abu D 3 m' 31,845.99 37,290.00 ü
676 Pipa langgeng warna abu - abu D 4 m' 46,035.00 52,470.00 ü
677 Pipa langgeng warna abu - abu D 5 m' 73,656.00 86,130.00 ü
678 Pipa langgeng warna abu - abu D 6 m' 65,472.00 105,534.00 ü
679 Pipa langgeng warna abu - abu D 8 m' 158,309.25 186,054.00 ü
680 Pipa langgeng warna abu - abu D 10 m' 276,210.00 321,684.00 ü
681 Pipa langgeng warna abu - abu D 12 m' 376,464.00 439,230.00 ü
682 Pipa langgeng warna abu - abu D 14 m' 493,904.40 586,278.00 ü
683 Pipa langgeng warna abu - abu D 16 m' 639,886.50 746,328.00 ü
684 Pipa langgeng warna abu - abu D 20 m' 1,101,658.47 1,284,525.00 ü
685 Pipa langgeng warna abu - abu C 5/8 m' 2,066.46 1,321,429.56 ü
686 Pipa langgeng warna abu - abu C 1/2 m' 3,421.93 4,620.00 ü
687 Pipa langgeng warna abu - abu C 3/4 m' 3,703.26 4,818.00 ü
688 Pipa langgeng warna abu - abu C 1 m' 5,161.04 7,128.00 ü
689 Pipa langgeng warna abu - abu C 1 1/4 m' 6,838.75 9,438.00 ü
690 Pipa langgeng warna abu - abu C 1 1/2 m' 8,184.00 9,768.00 ü
691 Pipa langgeng warna abu - abu C 2 m' 12,337.38 14,718.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
692 Pipa langgeng warna abu - abu C 2 1/2 m' 15,728.62 19,470.00 ü
693 Pipa langgeng warna abu - abu C 3 m' 19,160.79 22,605.00 ü
694 Pipa langgeng warna abu - abu C 4 m' 24,419.01 28,875.00 ü
695 Pipa langgeng warna abu - abu C 5 m' 33,042.90 43,428.00 ü
696 Pipa winlon warna abu - abu AW 1/2 m' 6,317.03 7,524.00 ü
697 Pipa winlon warna abu - abu AW 3/4 m' 7,928.25 9,768.00 ü
698 Pipa winlon warna abu - abu AW 1 m' 10,485.75 12,738.00 ü
699 Pipa winlon warna abu - abu AW 1 1/4 m' 15,268.27 17,886.00 ü
700 Pipa winlon warna abu - abu AW 1 1/2 m' 18,168.48 21,450.00 ü
701 Pipa winlon warna abu - abu AW 2 m' 25,984.20 31,680.00 ü
702 Pipa winlon warna abu - abu AW 2 1/2 m' 33,912.45 39,237.00 ü
703 Pipa winlon warna abu - abu AW 3 m' 47,569.50 56,067.00 ü
704 Pipa winlon warna abu - abu AW 4 m' 73,528.13 85,734.00 ü
705 Pipa winlon warna abu - abu AW 5 m' 116,622.00 135,531.00 ü
706 Pipa winlon warna abu - abu AW 6 m' 146,851.65 170,940.00 ü
707 Pipa winlon warna abu - abu AW 8 m' 233,192.85 270,600.00 ü
708 Pipa winlon warna abu - abu AW 10 m' 331,707.75 388,080.00 ü
709 Pipa winlon warna abu - abu AW 12 m' 558,813.75 648,747.00 ü
710 Pipa winlon warna abu - abu D 1 1/4 m' 8,900.10 10,890.00 ü
711 Pipa winlon warna abu - abu D 1 1/2 m' 10,076.55 12,408.00 ü
712 Pipa winlon warna abu - abu D 2 m' 13,053.48 15,774.00 ü
713 Pipa winlon warna abu - abu D 2 1/2 m' 18,644.18 22,110.00 ü
714 Pipa winlon warna abu - abu D 3 m' 27,621.00 31,218.00 ü
715 Pipa winlon warna abu - abu D 4 m' 38,372.73 31,548.00 ü
716 Pipa winlon warna abu - abu D 6 m' 60,996.37 44,880.00 ü
717 Pipa winlon warna abu - abu D 8 m' 134,050.85 156,420.00 ü
718 Pipa winlon warna abu - abu D 10 m' 248,691.30 288,420.00 ü
719 Pipa winlon warna abu - abu D 12 m' 338,357.25 392,568.00 ü
720 Pipa winlon warna abu - abu C 5/8 m' 1,739.10 2,640.00 ü
721 Pipa winlon warna abu - abu C 1/2 m' 3,094.58 3,960.00 ü
722 Pipa winlon warna abu - abu C 3/4 m' 3,324.75 4,290.00 ü
723 Pipa winlon warna abu - abu C 1 m' 4,731.38 5,940.00 ü
724 Pipa winlon warna abu - abu C 1 1/4 m' 5,984.55 7,920.00 ü
725 Pipa winlon warna abu - abu C 1 1/2 m' 7,800.37 9,405.00 ü
726 Pipa winlon warna abu - abu C 2 m' 10,495.98 12,771.00 ü
727 Pipa winlon warna abu - abu C 2 1/2 m' 13,196.70 16,005.00 ü
728 Pipa winlon warna abu - abu C 3 m' 16,344.47 19,338.00 ü
729 Pipa winlon warna abu - abu C 4 m' 21,483.00 26,268.00 ü
730 Pipa wavin warna putih AW 1/2 m' 7,161.00 7,590.00 ü
731 Pipa wavin warna putih AW 3/4 m' 9,207.00 10,230.00 ü
732 Pipa wavin warna putih AW 1 m' 12,276.00 13,068.00 ü
733 Pipa wavin warna putih AW 1 1/4 m' 26,598.00 19,437.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
734 Pipa wavin warna putih AW 1 1/2 m' 28,644.00 22,605.00 ü
735 Pipa wavin warna putih AW 2 m' 35,805.00 28,611.00 ü
736 Pipa wavin warna putih AW 2 1/2 m' 40,920.00 45,540.00 ü
737 Pipa wavin warna putih AW 3 m' 54,219.00 58,806.00 ü
738 Pipa wavin warna putih AW 4 m' 88,489.50 97,680.00 ü
739 Pipa wavin warna putih AW 5 m' 131,199.75 154,440.00 ü
740 Pipa wavin warna putih AW 6 m' 160,994.63 216,810.00 ü
741 Pipa wavin warna putih AW 8 m' 272,501.63 362,670.00 ü
742 Pipa wavin warna putih AW 10 m' 476,462.25 561,198.00 ü
743 Pipa wavin warna putih AW 12 m' 673,901.25 797,280.00 ü
744 Pipa wavin warna putih D 1 1/4 m' 10,102.13 12,870.00 ü
745 Pipa wavin warna putih D 1 1/2 m' 12,020.25 13,860.00 ü
746 Pipa wavin warna putih D 2 m' 17,902.50 18,150.00 ü
747 Pipa wavin warna putih D 2 1/2 m' 23,529.00 24,420.00 ü
748 Pipa wavin warna putih D 3 m' 30,178.50 32,175.00 ü
749 Pipa wavin warna putih D 4 m' 46,546.50 50,028.00 ü
750 Pipa wavin warna putih D 5 m' 71,482.13 77,418.00 ü
751 Pipa wavin warna putih D 6 m' 89,512.50 101,970.00 ü
752 Pipa wavin warna putih D 8 m' 134,396.63 179,190.00 ü
753 Pipa wavin warna putih D 10 m' 250,507.12 295,350.00 ü
754 Pipa wavin warna putih D 12 m' 351,400.50 429,000.00 ü
755 Pipa langgeng warna putih AW 1/2 m' 5,495.56 7,821.00 ü
756 Pipa langgeng warna putih AW 3/4 m' 7,527.23 17,165.28 ü
757 Pipa langgeng warna putih AW 1 m' 10,741.50 11,732.16 ü
758 Pipa langgeng warna putih AW 1 1/4 m' 11,339.95 20,757.00 ü
759 Pipa langgeng warna putih AW 1 1/2 m' 17,723.48 23,562.00 ü
760 Pipa langgeng warna putih AW 2 m' 22,685.02 25,856.16 ü
761 Pipa langgeng warna putih AW 2 1/2 m' 33,247.50 145,200.00 ü
762 Pipa langgeng warna putih AW 3 m' 44,628.37 52,473.96 ü
763 Pipa langgeng warna putih AW 4 m' 73,911.75 86,163.00 ü
764 Pipa langgeng warna putih AW 5 m' 122,248.50 139,659.96 ü
765 Pipa langgeng warna putih AW 6 m' 171,608.25 195,893.28 ü
766 Pipa langgeng warna putih AW 8 m' 288,486.00 328,780.32 ü
767 Pipa langgeng warna putih AW 10 m' 445,772.25 508,378.20 ü
768 Pipa langgeng warna putih AW 12 m' 628,377.75 716,800.92 ü
769 Pipa langgeng warna putih AW 14 m' 860,343.00 981,454.32 ü
770 Pipa langgeng warna putih AW 16 m' 1,075,684.50 1,226,772.36 ü
771 Pipa langgeng warna putih D 1 1/4 m' 9,667.35 11,220.00 ü
772 Pipa langgeng warna putih D 1 1/2 m' 10,971.68 12,738.00 ü
773 Pipa langgeng warna putih D 2 m' 14,322.00 16,005.00 ü
774 Pipa langgeng warna putih D 2 1/2 m' 19,089.18 21,655.92 ü
775 Pipa langgeng warna putih D 3 m' 24,117.23 27,485.04 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
776 Pipa langgeng warna putih D 4 m' 37,927.73 425,700.00 ü
777 Pipa langgeng warna putih D 5 m' 52,684.50 69,705.24 ü
778 Pipa langgeng warna putih D 6 m' 80,637.97 91,936.68 ü
779 Pipa langgeng warna putih D 8 m' 141,787.80 161,711.88 ü
780 Pipa langgeng warna putih D 10 m' 233,499.75 266,393.16 ü
781 Pipa langgeng warna putih D 12 m' 327,871.50 373,970.52 ü
782 Pipa langgeng warna putih D 14 m' 548,839.50 631,950.00 ü
783 Pipa langgeng warna putih D 16 m' 710,473.50 818,282.52 ü
784 Pipa langgeng warna putih D 20 m' 1,125,300.00 1,282,941.00 ü
785 Pipa langgeng warna putih C 5/8 m' 2,173.88 2,739.00 ü
786 Pipa setara warna putih C 1/2 m' 3,529.35 4,620.00 ü
787 Pipa langgeng warna putih C 3/4 m' 4,194.30 5,280.00 ü
788 Pipa langgeng warna putih C 1 m' 5,319.60 6,270.00 ü
789 Pipa langgeng warna putih C 1 1/4 m' 7,058.70 9,900.00 ü
790 Pipa langgeng warna putih C 1 1/2 m' 8,715.96 11,517.00 ü
791 Pipa langgeng warna putih C 2 m' 12,772.15 17,259.00 ü
792 Pipa langgeng warna putih C 2 1/2 m' 16,178.74 18,448.32 ü
793 Pipa langgeng warna putih C 3 m' 20,460.00 22,480.92 ü
794 Pipa langgeng warna putih C 4 m' 25,401.09 28,545.00 ü
795 Pipa winlon warna putih AW 1/2 m' 4,398.90 8,219.64 ü
796 Pipa winlon warna putih AW 3/4 m' 5,856.67 10,197.00 ü
797 Pipa winlon warna putih AW 1 m' 8,158.42 9,910.56 ü
798 Pipa winlon warna putih AW 1 1/4 m' 11,355.30 18,018.00 ü
799 Pipa winlon warna putih AW 1 1/2 m' 14,731.20 21,450.00 ü
800 Pipa winlon warna putih AW 2 m' 20,306.55 31,350.00 ü
801 Pipa winlon warna putih AW 2 1/2 m' 27,109.50 39,468.00 ü
802 Pipa winlon warna putih AW 3 m' 37,339.50 55,770.00 ü
803 Pipa winlon warna putih AW 4 m' 62,254.66 85,668.00 ü
804 Pipa winlon warna putih AW 5 m' 92,555.92 135,135.00 ü
805 Pipa winlon warna putih AW 6 m' 132,938.85 171,138.00 ü
806 Pipa winlon warna putih AW 8 m' 208,487.40 270,600.00 ü
807 Pipa winlon warna putih AW 10 m' 300,506.25 385,935.00 ü
808 Pipa winlon warna putih D 1 1/4 m' 7,033.12 8,537.76 ü
809 Pipa winlon warna putih D 1 1/2 m' 8,567.63 10,367.28 ü
810 Pipa winlon warna putih D 2 m' 11,457.60 13,949.76 ü
811 Pipa winlon warna putih D 2 1/2 m' 15,549.60 18,866.76 ü
812 Pipa winlon warna putih D 3 m' 19,385.85 23,517.12 ü
813 Pipa winlon warna putih D 4 m' 31,713.00 39,534.00 ü
814 Pipa winlon warna putih D 5 m' 46,546.50 56,258.40 ü
815 Pipa winlon warna putih D 6 m' 66,136.95 81,180.00 ü
816 Pipa winlon warna putih D 8 m' 112,670.15 137,137.44 ü
817 Pipa winlon warna putih D 10 m' 212,221.35 258,305.52 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
818 Pipa winlon warna putih C 5/8 m' 1,611.23 2,145.00 ü
819 Pipa winlon warna putih C 1/2 m' 2,982.04 3,620.76 ü
820 Pipa winlon warna putih C 3/4 m' 3,263.37 4,950.00 ü
821 Pipa winlon warna putih C 1 m' 4,833.67 5,831.76 ü
822 Pipa winlon warna putih C 1 1/4 m' 5,626.50 7,194.00 ü
823 Pipa winlon warna putih C 1 1/2 m' 7,033.12 8,537.76 ü
824 Pipa winlon warna putih C 2 m' 9,874.00 12,540.00 ü
825 Pipa winlon warna putih C 2 1/2 m' 12,434.56 15,180.00 ü
826 Pipa winlon warna putih C 3 m' 15,498.45 18,828.48 ü
827 Pipa winlon warna putih C 4 m' 20,649.25 25,106.40 ü
828 Pipa vilano warna putih AW 1/2 m' 4,092.00 5,280.00 ü
829 Pipa vilano warna putih AW 3/4 m' 5,626.50 6,765.00 ü
830 Pipa vilano warna putih AW 1 m' 7,365.60 8,910.00 ü
831 Pipa vilano warna putih AW 1 1/4 m' 10,690.35 12,872.64 ü
832 Pipa vilano warna putih AW 3 m' 33,400.95 40,242.84 ü
833 Pipa vilano warna putih AW 4 m' 47,058.00 57,913.68 ü
834 Pipa vilano warna putih AW 5 m' 80,049.75 96,563.28 ü
835 Pipa vilano warna putih AW 6 m' 114,576.00 137,606.04 ü
836 Pipa vilano warna putih D 1 1/4 m' 6,666.89 9,530.40 ü
837 Pipa vilano warna putih D 1 1/2 m' 7,928.25 11,505.12 ü
838 Pipa vilano warna putih D 2 m' 10,255.57 13,560.36 ü
839 Pipa vilano warna putih D 2 1/2 m' 14,066.25 16,896.00 ü
840 Pipa vilano warna putih D 3 m' 18,030.38 21,725.88 ü
841 Pipa vilano warna putih D 4 m' 27,876.75 33,794.64 ü
842 Pipa vilano warna putih D 5 m' 36,725.70 44,255.64 ü
843 Pipa vilano warna putih D 6 m' 64,449.00 76,447.80 ü
MARMER / GRANIT
1026 Marmer (30 x 30) m2 380,000.00 429,528.00 ü
1027 Marmer (40 x 40) m2 425,000.00 -
1028 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2 500,000.00 1,106,160.00 ü
1029 Batu Andesit (30 x 30 x 5 cm) m2 465,000.00 535,524.00 ü
1030 Roster Keramik (12 x 11 x 24) bh 56,100.00 65,617.20 ü
ü
GRANIT TILE
1031 Essenza 40 x 40 m2 400,000.00 436,798.56 ü
1032 Essenza 60 x 60 m2 475,000.00 536,659.20 ü
1033 Granito 40 x 40 cm m2 437,000.00 482,536.56 ü
1034 Nero Granito 30 x 60 cm m2 390,000.00 423,838.80 ü
1035 Nero Granito 40 x 40 cm m2 430,000.00 482,536.56 ü
1036 Nero Granito 60 x 60 cm m2 443,000.00 482,127.36 ü
1037 Setara Ex Cina 60 x 60 cm m2 225,000.00 505,560.00 ü
1038 Setara Ex Cina 80 x 80 cm m2 240,000.00 376,200.00 ü
KERAMIK
1039 Keramik Asia Tile 20 x 20 kelas I warna muda m2 70,000.00 102,399.00 ü
1040 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2 75,000.00 105,256.80 ü
1041 Keramik Setara Asia Tile 20 x 25 kelas I m2 75,000.00 106,986.00 ü
1042 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2 80,000.00 99,924.00 ü
1043 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2 85,000.00 82,183.20 ü
1044 Keramik Setara Asia Tile 40 x 40 kelas I m2 85,000.00 103,672.80 ü
1045 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2 149,000.00 198,000.00 ü
1046 Keramik Setara ARWANA ( warna putih) M2 58,000.00 93,060.00 ü
1047 Keramik Setara ARWANA ( warna tua) M2 66,300.00 93,060.00 ü
1048 Keramik Setara Diamond 10/20 cm (Warna Muda) M2 72,500.00 93,984.00 ü
1049 Keramik Setara Diamond 20/20 cm (Kelas I Warna Muda) M2 76,500.00 88,506.00 ü
1050 Keramik Setara Diamond 30/30 cm (Kelas I Warna Muda) M2 77,520.00 91,476.00 ü
1051 Keramik Setara Diamond 10/20 cm (Warna tua) M2 81,600.00 117,810.00 ü
1052 Keramik Setara Diamond 20/20 cm (Kelas I Warna Tua) M2 73,500.00 91,476.00 ü
1053 Keramik Setara Diamond 30/30 cm (Kelas I Warna Tua) M2 71,500.00 91,476.00 ü
1054 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna muda) M2 70,000.00 91,476.00 ü
1055 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna tua) M2 71,000.00 117,150.00 ü
1056 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna tua) m2 72,500.00 91,740.00 ü
1057 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna muda) m2 68,000.00 91,740.00 ü
1058 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2 70,000.00 96,162.00 ü
1059 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2 72,500.00 106,722.00 ü
1060 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2 76,500.00 124,806.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1061 Keramik Setara KIA 20/20 cm warna muda m2 71,400.00 105,072.00 ü
1062 Keramik Setara KIA 30/30 cm warna muda m2 76,500.00 109,560.00 ü
1063 Keramik Setara KIA 20/20 cm warna tua m2 66,300.00 100,623.60 ü
1064 Keramik Setara KIA 30/30 cm warna tua m2 69,360.00 113,520.00 ü
1065 Keramik Setara Mulia Warna Putih m2 112,200.00 107,484.96 ü
1066 Keramik Setara Mulia Warna Tua m2 66,300.00 69,300.00 ü
1067 Keramik Setara Mulia 20 x 20 cm Warna Tua m2 61,200.00 71,280.00 ü
1068 Keramik Setara Mulia 20 x 20 cm Warna Muda m2 63,240.00 71,656.20 ü
1069 Keramik Setara Mulia 30 x 30 cm Warna Putih m2 63,240.00 68,640.00 ü
1070 Keramik Setara Mulia 30 x 30 Warna Marbel m2 71,400.00 69,960.00 ü
1071 Keramik Setara Mulia 30 x 30 Warna Impresso m2 76,500.00 78,936.00 ü
1072 Keramik Setara Mulia 40 x 40 cm kelas I m2 79,560.00 87,120.00 ü
1073 Keramik Setara ROMAN 20/20 cm m2 86,700.00 134,640.00 ü
1074 Keramik Setara ROMAN 30/30 cm m2 89,760.00 155,760.00 ü
1075 Tegel PC abu - abu 20/20 cm m2 96,900.00 122,100.00 ü
1076 Tegel PC Warna 20/20 cm m2 96,900.00 122,100.00 ü
1077 Tegel PC Warna 30/30 cm m2 96,900.00 122,100.00 ü
1078 Tegel 30 x 30 TB PC m2 96,900.00 122,100.00 ü
1079 Tegel 30 x 30 TB PC Kuning m2 98,430.00 122,100.00 ü
1080 Tegel 30 x 30 Warna Merah m2 98,430.00 122,100.00 ü
1081 Tegel Bata 20 x 20 Merah m2 98,430.00 122,100.00 ü
1082 Tegel Bata 20 x 20 PC m2 98,430.00 122,100.00 ü
1083 Tegel B/TB 20 x 20 Kuning m2 98,430.00 122,100.00 ü
1084 Tegel Mozaik Porselint 30/30 cm m2 120,360.00 117,810.00 ü
1085 Tegel Wafel 20/20 cm Warna m2 125,460.00 106,722.00 ü
1086 Ubin PC Warna bh 90,000.00 9,702.00 ü
1087 Ubin PC Warna 20 / 20 Cm m2 94,860.00 114,345.00
1088 Batu Lahar 30/30 bh 137,700.00 38,808.00 ü
1089 Porselint 11/11 cm bh 91,800.00 69,300.00 ü
1090 Porselen m2 99,960.00 -
ATAP
1091 Alang-alang panjang 2,4 meter lbr 29,000.00 30,000.00 ü
1092 Alluminium foil M2 Double rol 283,920.00 411,840.00 ü
1093 Akustik 60 cm x 120 cm lbr 78,500.00 83,160.00 ü
1094 Asbes Bubungan lbr 60,000.00 67,914.00 ü
1095 Asbes Gelombang 1,80 m x 0,80 m lbr 30,927.00 53,361.00 ü
1096 Asbes Gelombang 1,80 m x 1,05 m lbr 52,728.00 66,000.00 ü
1097 Asbes Gelombang 2,10 m x 1,05 m lbr 68,952.00 78,672.00 ü
1098 Asbes Gelombang 2,4 m x 1,05 m lbr 83,148.00 92,136.00 ü
1099 Asbes Rata 2 m x 1 m x 4 mm lbr 77,064.00 88,077.00 ü
1100 Bentala tanah liat Ex Pejaten bh 81,000.00 129,591.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1101 Bentala Ex Kapal 100,000.00 114,180.00 ü
1102 Bentala Besar polos Lubang 24 cm bh 91,000.00 116,985.00 ü
1103 Bentala Besar Warna Lubang 25 cm bh 122,500.00 154,440.00 ü
1104 Bentala Besar polos Lubang 90 cm bh 214,500.00 231,000.00 ü
1105 Bentala Besar Warna Lubang 90 cm bh 219,500.00 233,640.00 ü
1106 Bubungan Besar bh 8,600.00 26,004.00 ü
1107 Bubungan Kecil bh 7,100.00 20,460.00 ü
1108 Bubungan Bambe Kecil bh 12,200.00 26,681.16 ü
1109 Bubungan Bulat Karang Pilang bh 29,600.00 34,650.00 ü
1110 Bubungan Bulat Jati Wangi bh 21,400.00 25,344.00 ü
1111 Bubungan Bulat Ngalayur isi 3,5/m bh 18,400.00 24,420.00 ü
1112 Bubungan Besar Good Year bh 22,500.00 34,320.00 ü
1113 Bubungan Beton Cisangkan bh 21,400.00 38,280.00 ü
1114 Bubungan Gerard lbr 18,400.00 97,020.00 ü
1115 Bubungan Karang Pilang isi 3,5/m bh 28,600.00 38,808.00 ü
1116 Bubungan Pletong Jatiwangi bh 33,700.00 22,869.00 ü
1117 Bubungan SL Utama bh 18,400.00 23,760.00 ü
1118 Bubungan SL Ngalayur bh 20,400.00 17,160.00 ü
1119 Bubungan Segi Tiga Karang Pilang bh 22,500.00 29,040.00 ü
1120 Bubungan Utama isi 3,5/m bh 11,700.00 23,100.00 ü
1121 Genteng Bambe bh 5,012.00 10,560.00 ü
1122 Genteng Bambe Karang Pilang bh 8,100.00 10,560.00 ü
1123 Genteng Bambe Kecil bh 6,138.00 9,240.00 ü
1124 Genteng Beton Cisangkan bh 12,276.00 21,780.00 ü
1125 Genteng Gemini bh 6,600.00 10,560.00 ü
1126 Genteng Gerard Polos m2 358,100.00 363,000.00 ü
1127 Genteng Good Year m2 5,600.00 9,240.00 ü
1128 Genteng Kanmuri (glazur) isi 14/m2 bh 4,200.00 19,800.00 ü
1129 Genteng Kodok Lokal bh 3,600.00 50,160.00 ü
1130 Genteng Kodok Kamulan bh 5,200.00 6,600.00 ü
1131 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bh 6,100.00 7,920.00 ü
1132 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bh 7,100.00 8,580.00 ü
1133 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bh 7,100.00 10,560.00 ü
1134 Genteng Kodok Karang Pilang (Surabaya) bh 6,600.00 5,280.00 ü
1135 Genteng Kodok Soka bh 4,100.00 6,600.00 ü
1136 Genteng Lestari bh 2,200.00 66,000.00 ü
1137 Genteng Metal 51,150.00 59,400.00 ü
1138 Genteng Metal 80 x 77,6 (Polos) lbr 54,200.00 92,400.00 ü
1139 Genteng Metal 80 x 77,6 (Pasir) lbr 79,700.00 86,460.00 ü
1140 Genteng Morando Abadi isi 18/m2 bh 11,048.00 -
1141 Genteng Morando Jatiwangi isi 18/m2 bh 6,600.00 12,342.00 ü
1142 Genteng Morando Ngalayur isi 20/m2 bh 5,200.00 6,600.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1143 Genteng Morando Metal bh 76,700.00 92,400.00 ü
1144 Genteng Pejaten Mini bh 1,534.00 5,280.00 ü
1145 Genteng Plentong bh 1,636.00 5,280.00 ü
1146 Genteng plentong dicat bh 1,900.00 5,280.00 ü
1147 Genteng Plentong Mantili bh 2,800.00 5,280.00 ü
1148 Genteng Plentong Pejaten / Darmasaba bh 1,800.00 6,600.00 ü
1149 Genteng Plentong Jatiwangi / Surabaya bh 3,500.00 9,240.00 ü
1150 Genteng Portugis bh 2,800.00 13,200.00 ü
1151 Genteng Pres Besar bh 3,500.00 5,280.00 ü
1152 Genteng Pres Besar Cat bh 4,000.00 5,280.00 ü
1153 Genteng Pres Mini bh 3,000.00 2,640.00 ü
1154 Genteng Pres Mini Cat bh 3,100.00 5,280.00 ü
1155 Genteng Terreal bh 13,800.00 15,840.00 ü
1156 Genteng T. Romana bh 13,800.00 15,840.00 ü
1157 Genteng Besar polos Lubang 35 cm bh 3,500.00 5,280.00 ü
1158 Genteng Besar Warna Lubang 35 cm bh 3,800.00 5,280.00 ü
1159 Fiberglas (1.80 x 0.80) M2 lbr 61,000.00 66,000.00 ü
1160 Ijuk kg 4,600.00 5,280.00 ü
1161 Ijuk Bersih bh 18,900.00 18,480.00 ü
1162 Ijuk Lampung bh 16,200.00 15,840.00 ü
1163 Ikut Celedu bh 40,920.00 290,400.00 ü
1164 Ikut Celedu Besar Polos bh 86,900.00 125,400.00 ü
1165 Ikut Celedu Besar Warna bh 112,500.00 138,600.00 ü
1166 Ikut Celedu Kecil Polos bh 76,700.00 93,060.00 ü
1167 Ikut Celedu Kecil Warna bh 102,000.00 125,400.00 ü
1168 Kawat las kg 81,500.00 112,200.00 ü
1169 Kawat Diameter 4 mm kg 35,300.00 125,400.00 ü
1170 Murda / Puntal Paras bh 126,000.00 316,800.00 ü
1171 Murda tanah liat Ex Pejaten bh 146,000.00 171,600.00 ü
1172 Murda Kecil Polos Lubang 25 cm bh 96,500.00 122,760.00 ü
1173 Murda Kecil Warna Lubang 25 cm bh 126,250.00 145,200.00 ü
1174 Profil Aluminium "T" m3 260,000.00 316,800.00 ü
1175 Seng BJLS 0,18 gelombang lbr 126,750.00 145,200.00 ü
1176 Seng BJLS 0,22 gelombang lbr 136,890.00 151,800.00 ü
1177 Seng BJLS 0,30 gelombang lbr 141,960.00 167,640.00 ü
1178 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr 119,652.00 132,000.00 ü
1179 Seng Plat Lebar 0,90 M lbr 61,854.00 73,920.00 ü
1180 Seng Plat 3" x 6" BJLS 28 lbr 88,218.00 99,000.00 ü
1181 Seng Plat Aluminium lbr 65,910.00 76,560.00 ü
1182 Sirap lbr 10,200.00 11,880.00 ü
1183 Subeng Besar Polos lbr 3,535.00 17,160.00 ü
1184 Subeng Besar Warna lbr 4,000.00 8,976.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1185 Subeng Kecil Polos lbr 3,000.00 10,560.00 ü
1186 Subeng Kecil Warna bh 3,800.00 5,793.48 ü
TALI
1187 Tali Ijuk kg 11,700.00 10,560.00 ü
1188 Tali pengikat ikat 31,500.00 25,832.40 ü
1189 Tali pengikat alang-alang ikat 36,000.00 34,320.00 ü
1190 Tali Rafia Gulung 26,000.00 6,270.00 ü
SANITAIR
1191 Bak mandi fibre glass 70x70x66 cm bh 374,440.00 488,400.00 ü
1192 Bak mandi porselin/ keramik bh 369,380.00 509,454.00 ü
1193 Bak mandi keramik 50x50 bh 211,508.00 394,482.00 ü
1194 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 220,616.00 657,360.00 ü
1195 Floor Drain Plastic bh 16,192.00 27,515.40 ü
1196 Floor Drain Stainless bh 126,500.00 92,301.00 ü
1197 Floor drain plastik Setara Alianco bh 14,168.00 40,359.00 ü
1198 Floor drain stainless Setara Wasser bh 166,980.00 257,400.00 ü
1199 Dudukan Kloset dan Perlengkapannya bh 2,833,600.00 2,917,860.00 ü
1200 Kloset duduk INA Komplit bh 1,113,200.00 2,445,564.00 ü
1201 closet duduk INA (putih) STD bh 986,700.00 1,683,000.00 ü
1202 closet duduk INA (warna) bh 1,006,940.00 2,098,800.00 ü
1203 Kloset duduk Amerika Standar Winplus bh 1,568,600.00 3,814,800.00 ü
1204 closet duduk TOTO (putih) STD bh 1,669,800.00 1,815,000.00 ü
1205 closet duduk TOTO (warna) bh 2,024,000.00 2,376,660.00 ü
1206 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 6,628,600.00 2,707,188.00 ü
1207 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 6,780,400.00 8,955,018.60 ü
1208 Kloset duduk " TOTO Type AVANTE CW 823 J bh 10,626,000.00 12,210,000.00 ü
1209 Kloset duduk " TOTO Type CW 660J bh 1,872,200.00 1,151,317.20 ü
1210 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,973,400.00 2,839,716.00 ü
1211 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 1,315,600.00 3,630,000.00 ü
1212Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 2,378,200.00 1,287,706.20 ü
1213 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 3,137,200.00 4,695,768.00 ü
1214 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 3,997,400.00 6,006,396.00 ü
1215 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 4,554,000.00 5,431,800.00 ü
1216 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 571,780.00 667,557.00 ü
1217 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 581,900.00 498,138.96 ü
1218 closet jongkok porselin/ keramik bh 217,580.00 473,626.56 ü
1219 Kloset porselin jongkok TOTO (standar) bh 318,780.00 632,148.00 ü
1220 Kloset porselin jongkok Ina (standar) bh 119,416.00 391,281.00 ü
1221 Kran biasa Setara Onda bh 25,300.00 76,230.00 ü
1222 Kran SunEi PI/3 JHR bh 217,580.00 126,720.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1223 Kran TOTO T 205 LCSC bh 278,300.00 352,440.00 ü
1224 Kran TOTO T 205 MC bh 389,620.00 514,668.00 ü
1225 Kran TOTO T 23 B13 bh 399,740.00 389,400.00 ü
1226 Kran TOTO T 23 B13V7NB bh 379,500.00 393,360.00 ü
1227 Kran TOTO T 26 - 13 bh 399,740.00 525,360.00 ü
1228 Kran TOTO TX 109 LH bh 996,820.00 1,173,480.00 ü
1229 Penyekat Urinoir " TOTO " Type A 100 " bh 1,442,100.00 2,079,330.00 ü
1230 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 379,500.00 736,560.00 ü
1231 Soap holder " TOTO " Type S 6 N " bh 166,980.00 208,560.00 ü
1232 Seal tape bh 4,048.00 7,378.80 ü
1233 Urinoir TOTO (STD) bh 3,137,200.00 3,818,100.00 ü
1234 Urinoir " TOTO U 57 M bh 1,669,800.00 4,116,720.96 ü
1235 Urinoir " TOTO U 57 M BODI bh 1,012,000.00 2,079,620.40 ü
1236 Urinoir INA (STD) bh 617,320.00 3,796,980.00 ü
1237 Wastagel KIA Standard bh 860,200.00 547,800.00 ü
1238 Wastagel KIA Warna bh 516,120.00 657,360.00 ü
1239 Wastafel TOTO (putih) bh 437,184.00 971,124.00 ü
1240 Wastafel TOTO (warna) bh 480,700.00 1,816,056.00 ü
1241 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 1,619,200.00 2,145,957.00 ü
1242 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 1,771,000.00 1,305,117.00 ü
1243 Wastafel INA (putih) bh 253,000.00 1,265,220.00 ü
1244 Wastafel INA (warna) bh 278,300.00 1,265,220.00 ü
TANAMAN
1497 Pohon Lianglio / Salix Babylonica pohon 752,000.00 120,120.00 ü
1498 Palem Ekor Tupai / Wodyetia Bifurcata pohon 76,000.00 358,050.00 ü
1499 Pohon Hias pohon 57,000.00 -
1500 Pohon Jepun / Plumeria Rubra pohon 450,000.00 346,500.00 ü
1501 Pohon Pudak / Pandanus Tectorius pohon 252,000.00 462,000.00 ü
1502 Pohon Ketapag Kencana / Terminalia Molineti pohon 152,000.00 369,600.00 ü
1503 Pohon Sente Batang Hitam / Alokasia 'black' pohon 61,500.00 16,170.00 ü
1504 Pohon Dadap Merah / Erythrina Crista Galli pohon 351,000.00 323,400.00 ü
1505 Pohon Jepun Pagoda / Plumeria 'pagoda' pohon 351,000.00 369,600.00 ü
1506 Pohon Tabebuya / Chrysotricha sp pohon 505,000.00 300,300.00 ü
1507 Rumput (Sekelas rumput mutiara) m2 23,000.00 -
1508 Semak Jempiring / Gardenia Jasminioides polybag 5,500.00 1,963.50 ü
1509 Semak Spathyphilum / Spathyphylum sp polybag 7,700.00 2,079.00 ü
1510 Semak Reulia Besar / Reulia Malacosperma Giant polybag 253,000.00 924.00 ü
1511 Semak Anturium Bunga / Anthurium Andreanum polybag 11,500.00 9,240.00 ü
1512 Semak Hemigrapis / Hemigrapis sp polybag 2,600.00 1,155.00 ü
1513 Semak Puring / Codeaium variegatum polybag 6,500.00 2,079.00 ü
1514 Semak Pakis Bulu / Nephrolepis biserrata polybag 7,650.00 3,003.00 ü
1515 Tanaman rumput mutiara/jepang m2 26,000.00 5,500.00 ü
1516 Tanaman perdu m2 33,500.00 -
1517 Lili Bangkok / Hymenocalis litoralis polybag 3,700.00 2,079.00 ü
1518 Jempiring / Gardenia jasminioides polybag 11,500.00 1,617.00 ü
1519 Kaki Laba-laba / Oxmosilum Liniare Yellow polybag 23,500.00 3,696.00 ü
1520 Semak Bawang-bawangan / Ornithogalum umbrellatum polybag 3,700.00 1,085.70 ü
1521 Semak Kebang Kertas Daun Kecil / Bogenvile small leave polybag 18,500.00 3,696.00 ü
1522 Semak Lily Paris / Hymenocallis Speciosa polybag 3,000.00 924.00 ü
1523 Semak Daun Philodendron / Philodendron sp polybag 7,600.00 3,003.00 ü
1524 Semak Bunga Yolanda / Yolanda white flower polybag 9,000.00 2,310.00 ü
1525 Semak Karembusa Putih / Tebermontana carembusa 'white' polybag 7,500.00 3,465.00 ü
1526 Semak Simbang Darah / Excoecaria Cochinechinensis polybag 7,900.00 1,848.00 ü
1527 Semak Bromelia / Bromelia sp polybag 51,000.00 34,650.00 ü
1528 Pupuk Kandang m3 15,900.00 37,422.00
LAIN - LAIN
1529 Air Bersih ltr 150.00 132.00 ü
1530 Bak Cuci Aluminium 2 Lubang bh 850,000.00 640,200.00 ü
1531 Belanja Foto Copy Lembar - -
1532 Cangkul bh 120,000.00 129,360.00 ü
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1533 Cangkul Gigi bh 175,000.00 221,067.00 ü
1534 Ember bh 25,000.00 36,590.40 ü
1535 Ember Hitam bh 20,000.00 -
1536 Gerinding bh 585,000.00 748,440.00 ü
1537 Helm Proyek bh 55,000.00 111,295.80 ü
1538 Hammer 3 kg bh 255,000.00 145,200.00 ü
1539 Instalasi Tata Suara Titik - 543,840.00 ü
1540 Isi Bay Fresh Ruangan bh 75,000.00 -
1541 Isi Staples No 30. Pack 75,000.00 -
1542 Isi Sabun Hand Soap bh 22,000.00 -
1543 Isi Kapur Barus Kg 51,000.00 -
1544 Kapi bh 20,000.00 25,080.00 ü
1545 Keni 2" bh 10,500.00 22,107.36 ü
1546 Keranjang Sampah bh 55,000.00 151,800.00 ü
1547 Keset bh 50,000.00 -
1548 Lap Kanebo bh 115,000.00 -
1549 Lap Pel / Alat Pengepelan bh 245,000.00 -
1550 Linggis bh 120,000.00 125,400.00 ü
1551 Masker bh 16,500.00 76,560.00 ü
1552 Ompreng Besar (bak Adonan) bh 450,000.00 706,200.00 ü
1553 Panyong bh 135,000.00 129,360.00 ü
1554 Pembersih Ban ltr 55,000.00 -
1555 Pembersih Lantai Galon 78,000.00 -
1556 Pembersih Lantai Toilet bh 35,000.00 -
1557 Pembersih Kaca Galon 75,000.00 -
1558 Pembersih Toilet Galon 55,000.00 -
1559 Pengelasan cm 27,000.00 25,080.00 ü
1560 Pengharum Mobil Cair Ltr 55,000.00 -
1561 Pengharum Ruangan bh 35,000.00 -
1562 Sabun bh 15,000.00 -
1563 Sabit bh 55,500.00 91,476.00 ü
1564 Sapu lidi Ikat 15,000.00 9,900.00 ü
1565 Sapu Ijuk bh 45,000.00 -
1566 Sapu Bulu Ayam Super bh 65,000.00 -
1567 Shampo Mobil bh 45,000.00 -
1568 Sepatu Karet Ltr 150,000.00 184,503.00 ü
1569 Sikat baja bh 30,500.00 46,042.92 ü
1570 Sikat Ban bh 25,000.00 -
1571 Skop bh 165,000.00 112,200.00
1572 Tempat Sampah Tutup bh 275,500.00 -
1573 Tissue Gulung bh 56,000.00 -
1574 Tissue Kotak Pack 40,500.00 -
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1575 Water mur Bh 265,000.00 85,800.00 ü
1576 Pipa Tremi dan Casing pelindung Ls 148,000.00 178,200.00 ü
1577 Pelumas (Oli) Ltr 48,500.00 46,200.00 ü
1578 Ramset m 14,500.00 19,800.00 ü
1579 Pembuangan lumpur eks. Bor m3 135,500.00 132,000.00 ü
1580 Mobilisasi dan demobilisasi alat bor auger ZKL28 unit 174,240,000.00 174,240,000.00
1581 Mobilisasi dan demobilisasi alat bor auger ZKL28 Unit 178,200,000.00 178,200,000.00
1582 Service Crane kapasitas 50 ton bln 15,000,000.00 - ü
1583 Excavator PC200 bln 123,420,000.00 123,420,000.00
1584 Pengadaan rail beam untuk pemancangan ls 22,440,000.00 22,440,000.00
1585 Pemotongan kepala tiang pancang turap m' 125,400.00 125,400.00
1586 Galian tanah untuk capping beam m3 138,600.00 138,600.00
1587 Pembuangan tanah galian m3 125,400.00 125,400.00
1588 Pekerjaan Cetakan/Tutup Kepala Kolom bh 330,000.00 330,000.00
1589 Waterstop lebar 150 mm m 73,000.00 -
1590 Waterstop lebar 200 mm m 88,400.00 -
1591 Storox-100 kg 54,000.00 -
1592 Phenol Film 12 mm Lbr 195,000.00 -
1593 Sewa Scafolding Set 65,000.00 -
1594 Screening kg 200.00 -
1595 Pek. Pembuatan papan nama proyek ls 1,320,000.00 1,320,000.00
BIDANG UMUM
1596 Jaring Sungai M2 170,000.00
1597 Tali Seling M1 9,500.00
1598 Tali M1 5,600.00
1599 Sekop Datar Bh 145,000.00
1600 Selang Air M1 8,000.00
1601 Terpal M2 9,500.00
Rambu-Rambu K3
1818 Rambu Petunjuk 0 -
1819 Rambu Larangan Bh 150,000.00
1820 Rambu Peringatan Bh 150,000.00
1821 Rambu Kewajiban Bh 150,000.00
1822 Rambu Informasi Bh 150,000.00
1823 Rambu Pekerjaan Sementara Bh 150,000.00
1824 Tongkat Pengatur Lalu Lintas (Warning Light Stck) Bh 150,000.00
1825 Kerucut Lalu Lintas (Traffic Cone) Bh 60,000.00
1826 Lampu Putar (Rotary Lamp) Bh 125,000.00
Pengendalian Resiko K3
1827 Alat Pemadam Api Ringan (APAR) Bh 550,000.00
1828 Sirine Bh 450,000.00
1829 Bendera K3 uk 90 x 135 cm Bh 65,000.00
1830 Lampu Darurat (Emergency Lamp) Bh 170,000.00
BAHAN TAMBAHAN
1831 Err:509 Err:509 Err:509
1832 Err:509 Err:509 Err:509
1833 Err:509 Err:509 Err:509
1834 Err:509 Err:509 Err:509
1835 Err:509 Err:509 Err:509
1836 Err:509 Err:509 Err:509
1837 Err:509 Err:509 Err:509
HARGA SK LEBIH HARGA SK LEBIH
HARGA SATUAN
NO NAMA BARANG SAT. HARGA WALIKOTA TINGGI DARI RENDAH DARI
2020 (Rp)
WALIKOTA WALIKOTA
1 2 3 4
1838 Err:509 Err:509 Err:509
1839 Err:509 Err:509 Err:509
1840 Err:509 Err:509 Err:509
1841 Err:509 Err:509 Err:509
1842 Err:509 Err:509 Err:509
1843 Err:509 Err:509 Err:509
1844 Err:509 Err:509 Err:509
1845 Err:509 Err:509 Err:509
1846 Err:509 Err:509 Err:509
1847 Err:509 Err:509 Err:509
1848 Err:509 Err:509 Err:509
1849 Err:509 Err:509 Err:509
1850 Err:509 Err:509 Err:509
1851 Err:509 Err:509 Err:509
1852 Err:509 Err:509 Err:509
1853 Err:509 Err:509 Err:509
1854 Err:509 Err:509 Err:509
1855 Err:509 Err:509 Err:509
1856 Err:509 Err:509 Err:509
1857 Err:509 Err:509 Err:509
1858 Err:509 Err:509 Err:509
1859 Err:509 Err:509 Err:509
1860 Err:509 Err:509 Err:509
1861 Err:509 Err:509 Err:509
1862 Err:509 Err:509 Err:509
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
ü
ü
ü
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TIDAK ADA PADA SAMA DENGAN
WALIKOTA PERWALI
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
kebutuhan tenaga = Koefisien x Volume
kerja Durasi
= HS x 1 + Profit
HS
100
DAFTAR HARGA SATUAN UPAH
PADA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA DENPASAR TAHUN 2023
HARGA 2023
NO NAMA KODE SATUAN
( Rp )
1 2 3 4
1 Pekerja L.01 Hari 119,985.85
2 Tukang Gali Hari 119,000.00
3 Tukang batu/tembok Hari 124,000.00
4 Tukang Kayu Hari 124,000.00
5 Tukang besi/besi beton Hari 124,000.00
6 Tukang Cat/pelitur Hari 124,000.00
7 Tukang pipa L.02 Hari 124,000.00
8 Tukang pipa/operator pompa Hari 124,000.00
9 Tukang Style Bali Hari 172,000.00
10 Tukang Listrik Hari 124,000.00
11 Tukang Las Hari 124,000.00
12 Tukang aluminium Hari 124,000.00
13 Kepala Tukang Hari 129,000.00
14 Kepala Tukang Style Bali L.03 Hari 193,000.00
15 Mandor Style Bali Hari 215,000.00
16 Mandor L.04 Hari 140,000.00
17 Juru Ukur L.05 Hari 174,000.00
18 Pembantu Juru Ukur L.06 Hari 145,000.00
19 Mekanik alat berat L.07 Hari 134,000.00
20 Operator alat berat L.08 Hari 129,000.00
21 Pembantu operator L.09 Hari 124,000.00
22 Supir truk L.10 Hari 118,000.00
23 Kernet truk L.11 Hari 108,000.00
24 Juru gambar (drafter) L.12 Hari 225,000.00
25 Operator printer/plotter L.13 Hari 120,000.00
26 Tukang Masak Aspal Hari 118,000.00
27 Tukang Cor Aspal Hari 118,000.00
28 Pekerja Pembantu Tukang Aspal Hari 120,000.00
29 Penjaga Api Hari 120,000.00
30 Sopir SIM A Hari 120,000.00
31 Sopir SIM B1 Hari 120,000.00
32 Sopir SIM B2 Hari 120,000.00
33 Operator Hari 120,000.00
34 Operator Semi Terampil Hari 120,000.00
35 Pembantu Operator Hari 120,000.00
36 Pembantu Sopir Hari 120,000.00
37 Mekanik Terampil Hari 120,000.00
38 Masinis Hari 124,000.00
39 Pembantu Masinis Hari 120,000.00
Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
SEMEN
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
80 PC. Tiga Roda 50 Kg Zak 65,000.00
81 PC Tiga Roda 40 Kg Zak 51,000.00
82 PC. Tonasa 50 Kg / Busoa 50 Kg Zak 48,000.00
83 PC. Gresik 40 Kg Zak 52,000.00
84 PC. Gresik 50 Kg Zak 67,000.00
85 PC Rajawali 40 Kg Zak 48,000.00
86 PC Holcim 40 Kg Zak 48,000.00
87 C Conch 40 Kg Zak 48,000.00
88 Semen Gresik Kg 1,500.00
89 Semen Tiga Roda Kg 1,500.00
90 Semen Bosowa Kg 1,300.00
91 Semen Holcim Kg 1,300.00
92 Semen Conch Kg 1,300.00
93 Semen Warna MU 408/ Nat Kg 16,000.00
94 Semen Tipe V Kg 1,500.00
95 Semen Portland Kg 1,500.00
Mortar Utama
96 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg Zak 126,675.00
97 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg Zak 93,232.80
98 Plester premium (MU-100)@ 40 kg Zak 92,219.40
99 Finish Plesteran/ Render (MU 290)@ 40 kg Zak 161,637.30
100 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) Zak 72,964.80
101 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) Zak 145,929.60
102 Acian Putih (MU-270)@25 kg Zak 176,331.60
103 Perata Lantai (MU-440)@40kg Zak 93,232.80
104 Perata Lantai Expose (MU 445) 40 kg Zak 173,291.40
105 Self Leveling Floor /Underlayment (MU-410) @25kg Zak 148,969.80
106 Primer Self Leveling Floor (MU-L410) @ 5lt Set 76,005.00
107 Floor Hardener (MU 700) 25 kg Zak 141,876.00
108 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg Zak 124,648.20
109 Cerafix/Perekat Keramik (MU-420)@25 kg Zak 89,179.20
110 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg Zak 390,159.00
111 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg Zak 245,242.80
112 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg Zak 301,993.20
113 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg Zak 304,020.00
114 Colorfill/ Pengisi nat interior & eksterior (MU-408C) Kg 11,700.00
115 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) Kg 20,500.00
116 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg Set 35,400.00
117 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg Set 90,400.00
118 FixGrout/Perbaikan struktur beton (MU-800)@20kg Zak 84,000.00
119 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg Zak 253,500.00
120 SkimRep/Perbaikan permukaan acian(MU-840)@25kg Zak 238,149.00
121 DryShield/Pelapis kedap air (MU-600)@3kg Set 102,353.40
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
122 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml Set 40,536.00
Uzin
123 Beton Instan (UZ K300) 50 kg Zak 111,430.00
124 Plester dinding instan (UZ Plester) 50 Kg Zak 81,040.00
125 Plester Finish tanpa Aci (UZ Render) 50 kg Zak 121,560.00
126 Acian diatas beton (UZ SC100) 40 kg Zak 102,313.00
127 Acian dinding instan interior (UZ SC 50) 40 kg Zak 119,534.00
128 Acian dinding instan eksterior (UZ SC 75) 40 kg Zak 126,625.00
129 Perekat Bata Ringan (UZ TB20) 50 kg Zak 101,300.00
Bostik
Perekat Keramik & Batu Alam
130 Fix Crete 25kg Zak 77,500.00
131 Fix all 20kg Zak 91,440.00
132 Super Fix all 20kg Zak 66,500.00
133 Super Fix all trade/white 20kg Zak 269,240.00
134 Asaflex 45 kg (15lt +30 kgp) Set 1,473,200.00
135 Mortar Fix 100kg Set 1,762,760.00
136 Mortar Fix 50 kg Set 1,727,200.00
137 Mortar Fix 5 kg Set 1,117,600.00
138 Renofix 25 kg Zak 355,600.00
139 Grout ( Semen Nat) 20 kg Zak 350,520.00
140 Grout ( Semen Nat) 1 kg Zak 21,500.00
141 Liquid Grout Adictive (LGA) 20 Lt Pail 970,280.00
142 Mega Lastic Acrilic Base 20Lt Pail 970,280.00
Wall System
143 Skim Plas 25 Kg Zak 72,100.00
144 Skim Crete 25 Kg Zak 80,340.00
145 Fix. Plas 40 kg Zak 66,950.00
146 Fix T. 40 kg Zak 77,250.00
Waterproofing
147 Ultra Coat RC2 20 Lt Pail 871,250.00
148 Boscosem Slury 33 Kg Set 533,000.00
149 Damplix 2 20 kg Set 978,875.00
150 Damplix 3 45 kg Set 2,818,750.00
151 Damplix 3E 35 kg Set 1,486,250.00
152 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m Roll 1,142,875.00
153 Indo primer ( lapisan primer WP membran) 20 Lt Pail 973,750.00
154 Integral Kristalisasi (Waterproofing kristal) 20 kg Pail 1,998,750.00
155 Sika Top Seal Set 20 kg + cairan Set 312,625.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
Sealent
156 No More Nail (320 GR) Bh 85,100.00
157 Seal n Flex 1 (600 ML) Bh 115,500.00
158 Boscosil 313 (300 ML) Bh 64,500.00
159 Boscosil 616 (300 ML) Bh 40,000.00
160 Fil A Gap (300 ML) Bh 49,500.00
161 Boscosil Mastic (300 ML) khusus R. Pendingin Bh 56,300.00
162 Bostik Z Bond 6S (300 ML) Bh 149,500.00
163 Bostik Z PU Contrcuction (600 ML) Bh 134,500.00
164 Quelyd Super Express (250 GR) Bh 48,500.00
165 Expanda Foam (340 GR) Bh 188,450.00
166 Barel Gun Bh 546,480.00
167 Flash Band Roll 195,000.00
BAMBU
168 Bambu Ukuran 8"- 10" panjang 4 m Btg 13,500.00
169 Bambu Ukuran 3"-6" panjang 4 m Btg 9,000.00
170 Gedeg kulit kelas I M2 17,500.00
171 Gedeg kulit kelas II M2 12,400.00
172 Gedeg Biasa M 2
10,000.00
KAYU
173 Kayu jati Balok Ex Bojonegoro M3 9,718,500.00
174 Kayu jati papan ex Bojonegoro M3 12,276,000.00
175 Kayu jati Usuk M3 7,850,000.00
176 Kayu jati Reng M3 9,800,000.00
177 Kayu merbau Balok M 3
9,462,750.00
178 Kayu merbau papan M3 9,104,700.00
179 Kayu kamper balok M3 6,850,000.00
180 Kayu kamper usuk/reng M 3
5,950,000.00
181 Kayu kamper papan M3 7,250,000.00
182 Kayu Profil 4/5 kamper M 1
5,845,000.00
183 List Kayu M1 50,000.00
184 List profil 2/4 kamper M1 50,000.00
185 Kayu kruing balok M 3
5,626,500.00
186 Kayu kruing papan M3 5,933,400.00
187 Kayu Usuk Kruing M 3
5,370,750.00
188 Kayu Reng Kruing M3 5,150,000.00
189 Kayu Papan Meranti M3 5,831,100.00
190 Kayu Balok Meranti M 3
6,150,000.00
191 Kayu Usuk Meranti M3 5,250,000.00
192 Kayu Reng Meranti M 3
5,000,000.00
193 Kayu Bangkirai Papan M3 11,253,000.00
194 Kayu Bangkirai Balok M3 10,750,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
195 Kayu Begisting 5/7 M3 2,625,000.00
196 Kayu Seseh Balok M 3
4,250,565.00
197 Kayu Dolken / Skapolding Btg 10,500.00
198 Kayu Seseh Dolken D 20 Panjang 3 m Btg 245,520.00
199 Kayu Seseh Dolken D 8-10 Panjang 4m Btg 12,500.00
200 Kayu Usuk Albesia 5/7 Panjang 4 m Btg 68,541.00
201 Kayu Reng mekanis Uk 2 x 3 x 400 cm M3 4,731,375.00
202 Kayu Reng mekanis Uk 3 x 5 x 400 cm M3 5,831,100.00
203 Kayu Usuk mekanis Uk 4 x 6 x 400 cm M3 5,831,100.00
204 Kayu Usuk mekanis Uk 5 x 7 x 400 cm M 3
6,905,250.00
205 Kayu Balok mekanis Uk. 6 x 12 x 400 cm M3 6,905,250.00
206 Kayu Balok mekanis Uk. 6 x 15 x 400 cm M 3
6,905,250.00
207 Kayu Balok mekanis Uk. 6 x 20 x 400 cm M3 6,905,250.00
208 Kayu Kelas III lokal M3 2,150,000.00
209 Kayu 7/7, Kelas III M 3
3,800,000.00
210 Kayu Cempaka lokal M3 3,350,000.00
211 Kayu Bakar M 3
900,000.00
212 Papan Bakesting M3 1,580,000.00
213 Papan Kayu Ulin M3 5,432,130.00
214 Papan Kayu, Kelas II M 3
13,861,650.00
215 Balok Kayu Ulin M3 5,524,200.00
216 Lem Aica Aibond Kg 67,500.00
217 Lem Kayu setara Fox Ltr 18,200.00
218 Minyak bekisting setara Calform NX*R Ltr 47,500.00
219 Jaro bubut Bh 36,500.00
220 Kayu Perancah M3 48,500.00
Flooring/ Lantai
221 Parket Jati lokal Uk. 1,2 x 5 x 20 cm M2 261,000.00
222 Parket Jati lokal Uk. 1,2 x 5 x 25 cm M 2
278,500.00
223 Parket Jati lokal Uk. 1,2 x 5 x 30 cm M2 321,500.00
224 Jati Eksport Uk. 1,2 x 5 x 20 cm M 2
289,500.00
225 Jati Eksport Uk. 1,2 x 5 x 25 cm M2 400,000.00
226 Jati Eksport Uk. 1,2 x 5 x 30 cm M2 419,980.00
227 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm M 2
535,000.00
228 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm M2 550,000.00
229 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm M 2
352,000.00
230 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm M2 355,000.00
231 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm M2 524,216.00
232 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm M 2
546,480.00
233 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm M2 543,000.00
234 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm M 2
556,600.00
235 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm M2 422,004.00
236 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm M2 657,800.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
237 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm M2 698,280.00
Lambersering
238 Lambersering Bangkirai Uk. 1 x 9 x 200 cm M2 495,000.00
239 Lambersering Kruing Uk. 2 x 9 x 200 cm M 2
411,000.00
Lis Kayu
240 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm Btg 28,500.00
241 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm Btg 30,500.00
242 Lis Plapond Uk. 0,8 x 5 x 400 cm Btg 22,500.00
243 Lis Plapond Uk.1 x 3 x 400 cm Btg 20,000.00
244 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm Btg 33,500.00
245 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm Btg 52,500.00
246 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm Btg 58,812.00
247 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm Btg 68,200.00
248 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm Btg 86,190.00
249 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm Btg 106,500.00
250 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm Btg 126,750.00
251 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm Btg 131,820.00
252 Lis Kaca Uk. 1,5 x 3 cm M1 17,000.00
253 Lis Dowel Kecil Uk. 1 x 2 cm M1 6,500.00
254 Lis Dowel Besar Uk. 1,3 x 3 cm M 1
7,700.00
255 Lis Kusen M1 6,700.00
CONWOOD
Flooring/Deck Application
256 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs 83,000.00
257 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs 138,500.00
258 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs 175,000.00
259 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs 170,000.00
260 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs 260,000.00
261 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs 335,000.00
262 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs 495,000.00
Decorative Stair
263 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs 95,000.00
264 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs 195,000.00
265 Conwood Handrail (85 x 3050 x 30 mm) Pcs 151,000.00
Ceiling Application
266 Celling Border (50 X 3050 X 11 mm) Pcs 45,000.00
267 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs 65,000.00
268 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs 78,000.00
269 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs 130,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
270 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs 520,000.00
Eave/lisplank
271 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs 180,000.00
Wall Application
272 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs 87,000.00
273 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs 105,000.00
274 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs 185,500.00
275 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs 225,000.00
Moulding Application
276 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs 42,000.00
277 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs 42,000.00
278 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs 67,500.00
279 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs 61,500.00
Decorative Application
280 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs 115,500.00
281 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs 47,000.00
282 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs 68,000.00
283 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs 58,000.00
284 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs 47,000.00
285 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs 52,000.00
286 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs 39,500.00
287 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs 54,500.00
288 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs 57,000.00
289 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs 45,000.00
Planks
290 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs 96,000.00
291 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs 97,000.00
BESI
292 Mour + Bout Bh 12,500.00
293 Besi strip Kg 16,380.00
294 Besi strip 30x3 mm M1 22,680.00
295 Baja Strip (0,2 x 2) cm / Plat Strip Kg 20,160.00
296 Besi Beton U24 (Polos) Kg 12,500.00
297 Besi Beton Ulir U 32 Kg 13,200.00
298 Besi Ulir 13,0x 12 sni (Ts-40) Kg 13,300.00
299 Besi Ulir 16,0x 12 sni (Ts-40) Kg 13,400.00
300 Besi Ø5 (3,8 x 6,0) Btg 8,619.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
301 Besi Ø6 (5,0 x 12) Btg 22,815.00
302 Besi Ø6 (5,2 x 12) Btg 24,336.00
303 Besi Ø6 (5,7 x 12) Btg 38,000.00
304 Besi Ø8 (6,5 x 12) Btg 39,500.00
305 Besi Ø8 (6,7 x 12) Btg 40,200.00
306 Besi Ø8 (6,9 x 12) SNI Btg 48,700.00
307 Besi Ø8 (7,1 x 12) SNI Btg 52,000.00
308 Besi Ø8 (7,4 x 12) SNI Btg 53,400.00
309 Besi Ø8 (7,6 x 12) SNI Btg 54,000.00
310 Besi Ø8 (7,7 x 12) SNI Btg 54,700.00
311 Besi Ø8 (7,8 x 12) SNI Btg 55,600.00
312 Besi Ø8 SNI U 24 Btg 56,000.00
313 Besi Ø10 (8,4 x 12) SNI Btg 57,400.00
314 Besi Ø10 (8,6 x 12) SNI Btg 60,800.00
315 Besi Ø10 (8,9 x 12) SNI Btg 65,400.00
316 Besi Ø10 (9,2 x 12) SNI Btg 70,100.00
317 Besi Ø10 (9,4 x 12) SNI Btg 74,600.00
318 Besi Ø10 (9,6 x 12) SNI Btg 75,000.00
319 Besi Ø10 (9,8 x 12) SNI Btg 75,200.00
320 Besi Ø10 SNI U 24 Btg 90,000.00
321 Besi Ø10 Ulir (9,5 x 12) SNI Btg 91,200.00
322 Besi Ø10 Ulir (9,7 x 12) SNI Btg 86,697.00
323 Besi Ø12 (11,5 x 12) SNI Btg 113,500.00
324 Besi Ø13 Ulir (11,5 x 12) SNI Btg 126,000.00
325 Besi Ø13 Ulir (11,7 x 12) SNI Btg 130,200.00
326 Besi Ø13 Ulir (12,0 x 12) SNI Btg 135,200.00
327 Besi Ø13 Ulir (12,5 x 12) SNI Btg 140,400.00
328 Besi Ø13 Ulir (12,7 x 12) SNI Btg 145,000.00
329 Besi Ø16 Ulir (14 x 12) SNI Btg 185,100.00
330 Besi Ø16 Ulir (14,5 x 12) SNI Btg 190,000.00
331 Besi Ø16 Ulir (15,0 x 12) SNI Btg 201,400.00
332 Besi Ø16 Ulir (15,5 x 12) SNI Btg 215,000.00
333 Besi Ø16 Ulir (15,7 x 12) SNI Btg 225,000.00
334 Wiremesh M6@50m Roll 5,034,960.00
335 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m Lbr 650,000.00
336 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m Lbr 900,000.00
337 Wermes Diameter 8 (U 50) Lbr 969,384.00
338 Beugel Besi O8 Kg 15,210.00
339 Beugel penguat /plaat Kg 18,252.00
340 Kawat Beton RRT Kg 20,280.00
341 Kawat berduri Kg 86,190.00
342 Kawat Ayak / Kuasa 5 X 5 cm M2 25,350.00
343 Kawat Harmonika 3 X 3 cm M2 30,420.00
344 Kawat Nyamuk M 2
30,420.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
345 Kawat Jaring M2 30,420.00
346 Kawat Bronjong Kg 54,756.00
347 Besi / Baja profil Kg 22,000.00
348 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 Kg 23,310.00
349 Baja WF (150 x 12 GG) Btg 2,457,000.00
350 Baja WF (200 x 12 GG) Btg 3,150,000.00
351 Besi Baja WF 200 x 100 x 4,5 x 7 Kg 23,375.00
352 Besi Baja WF 200 x 100 x 5,5x8 Kg 20,790.00
353 Besi Baja WF 250 x 125 x 5 x 7 Kg 22,680.00
354 Besi Baja C 100 x 50 x 3,2 Kg 25,200.00
355 Baja Ringan Type C- 75, 0.8 M1 25,200.00
356 Baja Ringan Type C- 75, 0.6 M 1
24,570.00
357 Reng Baja M1 20,160.00
358 Profil Canal "C" Tipe C71.075 Btg 108,360.00
359 Profil Canal "C" Tipe C81.075 Btg 120,960.00
360 Profil Canal "C" Tipe C81.065 Btg 113,400.00
361 Profil "Omega / reng Tipe AA Btg 57,960.00
362 Profil "Omega / reng Tipe A Btg 69,300.00
363 Profil "Omega / reng Tipe AB Btg 81,900.00
364 Profil Aluminium Kaca 3/4 M1 22,680.00
365 Profil Aluminium L 3 cm lis Kaca M1 22,680.00
366 Profil Aluminium 4" M 1
27,720.00
367 Besi Plat Kg 30,240.00
368 Besi plat 3 X 6 tebal 1,2 mm Btg 119,700.00
369 Besi plat 4 X 8 tebal 1,8 mm Btg 31,500.00
370 Baja Plat Hitam L = 10 Lbr 365,400.00
371 Baja Plat Hitam L = 8 Lbr 648,900.00
372 Baut Galvanis 3/4 x 2 " Bh 13,230.00
373 Baut Galvanis 3/4 x 2 1/2 " Bh 13,356.00
374 Baut Galvanis 3/4 x 3 " Bh 15,120.00
375 Baut Galvanis 3/4 x 3 1/2 " Bh 17,010.00
376 Baut Galvanis 3/4 x 4 " Bh 18,270.00
377 Baut Galvanis 3/4 x 4 1/2 " Bh 19,152.00
378 Baut Galvanis 3/4 x 5 " Bh 11,970.00
379 Baut Galvanis 3/4 x 5 1/2 " Bh 12,600.00
380 Baut Galvanis 3/4 x 6 " Bh 22,680.00
381 Plat Siku Panjang 30 cm Bh 27,720.00
382 Plat Siku Panjang 40 cm Bh 19,530.00
383 Plat Siku Panjang 50 cm Bh 20,790.00
384 Plat Siku Panjang 60 cm Bh 23,940.00
385 Plat Aluminium 2mm M2 39,060.00
386 Besi siku / engsel M 1
43,470.00
387 Besi Siku L.30.30.3 mm Btg 42,840.00
388 Baut UNC 5/8 x 2" Bh 2,898.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
389 Baut UNC 5/8 x 2 1/2" Bh 3,150.00
390 Baut UNC 5/8 x 3" Bh 3,150.00
391 Baut UNC 5/8 x 3 1/2" Bh 3,906.00
392 Baut UNC 5/8 x 4" Bh 4,410.00
393 Baut UNC 5/8 x 4 1/2" Bh 5,040.00
394 Baut UNC 5/8 x 5" Bh 5,418.00
395 Baut UNC 5/8 x 5 1/2" Bh 5,670.00
396 Baut UNC 5/8 x 6" Bh 5,922.00
397 Baut UNC 3/4 x 2" Bh 6,300.00
398 Baut UNC 3/4 x 2 1/2" Bh 7,308.00
399 Baut UNC 3/4 x 3" Bh 11,970.00
400 Baut UNC 3/4 x 3 1/2" Bh 12,852.00
401 Baut UNC 3/4 x 4" Bh 13,986.00
402 Baut UNC 3/4 x 4 1/2" Bh 14,616.00
403 Baut UNC 3/4 x 5" Bh 15,120.00
404 Baut UNC 3/4 x 5 1/2" Bh 16,380.00
405 Baut UNC 3/4 x 6" Bh 8,820.00
406 Baut CB 3/8 x 5" Bh 3,150.00
407 Baut CB 3/8 x 3" Bh 1,953.00
408 Baut CB 3/8 x 2" Bh 1,701.00
409 Behel 7/8 Bh 6,552.00
410 Baut Baja A325 16 x 50 Bh 10,710.00
411 Baut Baja A325 16 x 60 Bh 12,222.00
412 Baut Baja A325 16 x 70 Bh 12,726.00
413 Baut Baja A325 16 x 80 Bh 14,490.00
414 Baut Baja A325 16 x 90 Bh 15,561.00
415 Baut Baja A325 16 x 100 Bh 17,010.00
416 Baut Baja A325 16 x 110 Bh 19,530.00
417 Baut Baja A325 16 x 120 Bh 21,420.00
418 Baut Baja A325 16 x 130 Bh 22,680.00
419 Baut Baja A325 16 x 140 Bh 25,704.00
420 Baut Baja A325 16 x 150 Bh 25,830.00
421 Baut Baja A325 19 x 50 Bh 17,010.00
422 Baut Baja A325 19 x 60 Bh 18,900.00
423 Baut Baja A325 19 x 70 Bh 20,790.00
424 Baut Baja A325 19 x 80 Bh 21,829.50
425 Baut Baja A325 19 x 90 Bh 24,570.00
426 Baut Baja A325 19 x 100 Bh 26,460.00
427 Baut Baja A325 19 x 110 Bh 26,460.00
428 Baut Baja A325 19 x 120 Bh 30,240.00
429 Baut Baja A325 19 x 130 Bh 31,500.00
430 Baut Baja A325 19 x 140 Bh 34,272.00
431 Baut Baja A325 19 x 150 Bh 35,280.00
432 Baut Galvanis 3/8 x 2 " Bh 2,520.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
433 Baut Galvanis 3/8 x 2 1/2 " Bh 2,646.00
434 Baut Galvanis 3/8 x 3 " Bh 2,835.00
435 Baut Galvanis 3/8 x 3 1/2 " Bh 3,402.00
436 Baut Galvanis 3/8 x 4 " Bh 3,528.00
437 Baut Galvanis 3/8 x 4 1/2 " Bh 3,654.00
438 Baut Galvanis 3/8 x 5 " Bh 3,780.00
439 Baut Galvanis 3/8 x 5 1/2 " Bh 4,032.00
440 Baut Galvanis 3/8 x 6 " Bh 4,788.00
441 Baut Galvanis 5/8 x 2 " Bh 6,426.00
442 Baut Galvanis 5/8 x 2 1/2 " Bh 7,232.40
443 Baut Galvanis 5/8 x 3 " Bh 7,812.00
444 Baut Galvanis 5/8 x 3 1/2 " Bh 8,820.00
445 Baut Galvanis 5/8 x 4 " Bh 9,576.00
446 Baut Galvanis 5/8 x 4 1/2 " Bh 10,332.00
447 Baut Galvanis 5/8 x 5 " Bh 10,899.00
448 Baut Galvanis 5/8 x 5 1/2 " Bh 12,411.00
449 Baut Galvanis 5/8 x 6 " Bh 12,000.00
450 Besi Pipa Galvanis Ljr 125,000.00
451 Besi tangga D 19, enamel cat Bh 96,000.00
452 Handle Besi Ø 12, enamel cat Bh 98,000.00
453 Angker diameter 12mm Bh 111,000.00
454 Skruf Fixer 5 cm Bh 20,000.00
455 Dynabolt Bh 5,500.00
456 Rapidrant Gln 102,000.00
457 Sealant Tube 46,000.00
458 Silicon Kg 45,000.00
459 Elektrode 0,6 % Bh 120,000.00
460 Elektrode 2 % Bh 318,000.00
461 Besi Square tube M1 79,000.00
462 Besi Hollow (50 x 50 x 3) mm Kg 9,000.00
BESI PAGAR
463 Pagar Setara BRC T.90 diameter 6mm M1 270,000.00
464 Pagar Setara BRC T.120 diameter 6mm M1 290,000.00
465 Pagar Setara BRC T.150 diameter 6mm M 1
291,500.00
466 Pagar Setara BRC T.175 diameter 7mm M1 490,000.00
467 Pagar Setara BRC T.190 diameter 7mm M 1
695,000.00
468 Pagar HotDip Galvanized T.90 diameter 6mm M1 243,000.00
469 Pagar HotDip Galvanized T.120 diameter 6mm M1 267,000.00
470 Pagar HotDip Galvanized T.150 diameter 7mm M 1
296,000.00
471 Pagar HotDip Galvanized T.175 diameter 7mm M1 320,000.00
472 Pagar HotDip Galvanized T.190 diameter 7mm M 1
250,000.00
CAT
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
473 Cat Marka Jalan Kg 62,000.00
474 Glas Bit Kg 39,200.00
475 Cat besi Kg 58,580.00
476 Cat Menie besi Kg 41,200.00
477 Cat menie Kayu Kg 30,500.00
478 Cat Dasar Tembok Setara Emco Kg 37,000.00
479 Cat Setara weldon biasa Kg 33,500.00
480 Cat Setara weldon warna Kg 35,500.00
481 Cat Setara weldon warna tua Kg 41,700.00
482 Cat Setara emco Lux Biasa Kg 35,400.00
483 Cat Setara emco Lux Warna Kg 38,000.00
484 Cat Setara emco Lux Warna Tua Kg 41,000.00
485 Cat tembok Setara Decolith Kg 39,200.00
486 Cat tembok Setara Dulux Exterior Kg 147,500.00
487 Cat tembok Setara Dulux Interior Kg 112,500.00
488 Cat tembok Setara Vinilex Kg 47,500.00
489 Cat Galvanis Kg 57,400.00
490 Cat Kayu Emco Kg 67,500.00
491 Cat Baja Chromate (anti karat) Kg 62,000.00
492 Cat Kansteen Kg 70,500.00
493 Kalkarium Kg 13,250.00
494 Kapur sirih Kg 15,500.00
495 Kapur padam M3 11,500.00
496 Amplas Lbr 16,500.00
497 Kuas Bh 14,500.00
Cat KCA
498 Cat Natural@25 kg Pail 437,000.00
499 Cat Flakes@25 kg Pail 762,500.00
500 Cat Genteng @25kg Pail 315,500.00
Stone Coating
501 Clear gloss air Kg 76,500.00
502 Black gloss air Kg 67,500.00
503 Clear gloss solvent Kg 75,975.00
504 Black gloss solvent Kg 90,500.00
505 Clear doft solvent Kg 86,200.00
506 Black doft solvent Kg 46,500.00
507 Dempul / Plamir Ltr 43,052.50
508 Dempul / Plamir Altik Ltr 42,500.00
509 Dempul Impra Kayu Ltr 17,000.00
510 Kuas untuk mengecat Bh 12,500.00
511 Lem Fox (Rajawali Kuning) Gln 156,500.00
512 Lem Wall Paper Kg 83,500.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
513 Mild Zak 12,500.00
514 Minyak cat Ltr 22,500.00
515 Melamine Lack / Imfra Ltr 88,500.00
516 Okear / Veap Kg 27,000.00
517 Plamir kayu Kg 33,500.00
518 Plamir tembok setara wall Putty Kg 36,500.00
519 Politur ultra Ltr 67,400.00
520 Politur Jadi Ltr 71,500.00
521 vernis Ltr 42,039.50
522 Residu / Teer Ltr 46,500.00
523 Roll Bh 29,000.00
524 Sending Seaker Ltr 87,118.00
525 Soda Api Kg 12,000.00
526 Thiner A Spesial Ltr 31,200.00
527 Thiner B Ltr 12,500.00
528 Teack Oil Ltr 69,500.00
529 Wall Paper Setara Silk House M2 785,075.00
530 Wood Filler Ltr 47,500.00
531 Cat Scotlight Ltr 75,975.00
532 Mowilex Kg 80,500.00
KACA
533 Bingkai Nako Silver Daun 49,500.00
534 Bingkai Nako Coklat Daun 53,000.00
535 Glass Block Bh 33,000.00
536 Kaca 2 mm bening M2 107,000.00
537 Kaca 3 mm bening M2 132,000.00
538 Kaca 5 mm bening M2 112,500.00
539 Kaca 6 mm bening M2 265,000.00
540 Kaca 8 mm bening M 2
319,000.00
541 Kaca 10 mm bening M2 342,000.00
542 Kaca 12 mm bening M 2
595,000.00
543 Kaca Cermin 3 mm M2 205,000.00
544 Kaca Cermin 5 mm M2 370,000.00
545 Kaca Es/Kapur 3 mm M 2
237,000.00
546 Kaca Es/Kapur 5 mm M2 236,000.00
547 Kaca Nako Bening M 2
137,000.00
548 Kaca Nako Rayben M2 180,000.00
549 Kaca ryben 3 mm M2 120,000.00
550 Kaca ryben 5 mm M 2
196,500.00
551 Kaca asahi tebal 3 mm polos clear M2 103,000.00
552 Kaca asahi tebal 3 mm ryben dark grey M 2
120,000.00
553 Kaca asahi tebal 3 mm cermin mirror M2 183,500.00
554 Kaca asahi tebal 3 mm es mislet M2 200,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
555 Kaca asahi tebal 3 mm biru dark blue M2 297,500.00
556 Kaca asahi tebal 3 mm one way M 2
425,000.00
557 Kaca asahi tebal 5 mm polos clear M2 122,500.00
558 Kaca asahi tebal 5 mm ryben dark grey M2 152,500.00
559 Kaca asahi tebal 5 mm cermin mirror M 2
261,000.00
560 Kaca asahi tebal 5 mm es mislet M2 271,000.00
561 Kaca asahi tebal 6 mm polos clear M 2
187,000.00
562 Kaca asahi tebal 8 mm polos clear M2 380,000.00
563 Kaca asahi tebal 10 mm polos clear M2 421,000.00
564 Kaca asahi tebal 12 mm polos clear M 2
432,000.00
565 Kaca tempered asahimas tebal 3mm polos clear M2 247,000.00
566 Kaca tempered asahimas tebal 3mm ryben dark grey M 2
289,000.00
567 Kaca tempered asahimas tebal 3mm sanergy clear M2 318,500.00
568 Kaca tempered asahimas tebal 4mm polos clear M2 249,500.00
569 Kaca tempered asahimas tebal 4mm sanergy clear M 2
798,000.00
570 Kaca tempered asahimas tebal 5mm polos clear M2 275,000.00
571 Kaca tempered asahimas tebal 5mm ryben dark grey M 2
271,000.00
572 Kaca tempered asahimas tebal 5mm stopsol M2 519,000.00
573 Kaca tempered asahimas tebal 5mm warna M2 449,000.00
574 Kaca tempered asahimas tebal 5mm sanergy clear M 2
951,500.00
575 Kaca tempered asahimas tebal 6mm polos clear M2 376,500.00
576 Kaca tempered asahimas tebal 6mm ryben dark grey M 2
482,500.00
577 Kaca tempered asahimas tebal 6mm stopsol M2 579,000.00
578 Kaca tempered asahimas tebal 6mm warna M2 546,500.00
579 Kaca tempered asahimas tebal 6mm diamon M 2
739,000.00
580 Kaca tempered asahimas tebal 6mm sanergy clear M2 1,240,000.00
581 Kaca tempered asahimas tebal 8mm polos clear M2 500,000.00
582 Kaca tempered asahimas tebal 8mm stopsol M2 1,368,000.00
583 Kaca tempered asahimas tebal 8mm warna M2 912,000.00
584 Kaca tempered asahimas tebal 8mm diamon M 2
1,256,000.00
585 Kaca tempered asahimas tebal 8mm sanergy clear M2 1,617,000.00
586 Kaca tempered asahimas tebal 10mm polos clear M 2
617,000.00
587 Kaca tempered asahimas tebal 10mm diamon M2 1,817,000.00
588 Kaca tempered asahimas tebal 12mm polos clear M2 700,000.00
589 Kaca tempered asahimas tebal 12mm diamon M 2
2,317,000.00
590 Kaca tempered asahimas tebal 15mm polos clear M2 5,419,000.00
591 Kaca tempered asahimas tebal 15mm diamon M 2
6,921,000.00
592 Kaca tempered asahimas tebal 19mm polos clear M2 6,217,000.00
593 Kaca tempered asahimas tebal 19mm diamon M2 9,700,000.00
594 Kaca tebal 3+3 mm laminet biasa M 2
422,000.00
595 Kaca tebal 4+4 mm laminet biasa M2 518,000.00
596 Kaca tebal 5+5 mm laminet biasa M 2
573,000.00
597 Kaca tebal 6+6 mm laminet biasa M2 717,000.00
598 Kaca tebal 8+8 mm laminet biasa M2 917,500.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
599 Kaca tebal 10+10 mm laminet biasa M2 1,217,500.00
600 Kaca tebal 12+12 mm laminet biasa M 2
1,116,500.00
601 Kaca tebal 3+3 mm laminet tempered M2 1,417,500.00
602 Kaca tebal 4+4 mm laminet tempered M2 1,422,500.00
603 Kaca tebal 5+5 mm laminet tempered M 2
1,437,500.00
604 Kaca tebal 6+6 mm laminet tempered M2 1,861,000.00
605 Kaca tebal 8+8 mm laminet tempered M 2
1,965,000.00
606 Kaca tebal 10+10 mm laminet tempered M2 2,354,000.00
607 Kaca tebal 12+12 mm laminet tempered M2 2,968,000.00
608 Ongkos polin kaca tempered tebal 5mm M 1
36,500.00
609 Ongkos polin kaca tempered tebal 6mm M1 38,700.00
610 Ongkos polin kaca tempered tebal 8mm M 1
43,600.00
611 Ongkos polin kaca tempered tebal 10mm M1 44,600.00
612 Ongkos polin kaca tempered tebal 12mm M1 54,000.00
613 Ongkos polin kaca tempered tebal 19mm M 1
68,900.00
PIPA
614 Pipa Galvanis 1" M1 125,000.00
615 Pipa Galvanis 1,5 BSA M 1
480,000.00
616 Pipa Galvanis 2" M1 337,590.00
617 Pipa Galvanis 3" M 1
416,361.00
618 Pipa Maspion AW 1/2 M1 7,672.50
619 Pipa Maspion AW 3/4 M1 8,951.25
620 Pipa Maspion AW 1 M 1
11,508.75
621 Pipa Maspion AW 1-1/2 M1 22,250.25
622 Pipa Maspion AW 1-1/4 M 1
16,623.75
623 Pipa Maspion AW 2 M1 30,690.00
624 Pipa Maspion AW 2-1/2 M1 40,920.00
625 Pipa Maspion AW 3 M 1
57,543.75
626 Pipa Maspion AW 4 M1 86,955.00
627 Pipa Maspion AW 5 M 1
138,105.00
628 Pipa Maspion AW 6 M1 179,025.00
629 Pipa Maspion AW 8 M1 281,325.00
630 Pipa Maspion AW 10 M 1
398,970.00
631 Pipa Maspion AW 12 M1 575,949.00
632 Pipa Maspion AW 14 M 1
810,216.00
633 Pipa Maspion AW 16 M1 1,015,327.50
634 Pipa Maspion C 3/4 M1 3,785.10
635 Pipa Maspion C 5/8 M 1
2,056.23
636 Pipa Maspion C 1 M1 5,524.20
637 Pipa Maspion C 1-1/2 M 1
8,695.50
638 Pipa Maspion C 1-1/4 M1 6,854.10
639 Pipa Maspion C 2 M1 12,787.50
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
640 Pipa Maspion C 2-1/2 M1 16,572.60
641 Pipa Maspion C 3 M 1
19,181.25
642 Pipa Maspion C 3-1/2 M1 21,738.75
643 Pipa Maspion C 4 M1 24,756.60
644 Pipa Maspion D 1/2 M 1
11,764.50
645 Pipa Maspion D 1-1/2 M1 13,299.00
646 Pipa Maspion D 1-1/4 M 1
11,253.00
647 Pipa Maspion D 2 M1 15,345.00
648 Pipa Maspion D 2-1/2 M1 23,017.50
649 Pipa Maspion D 3 M 1
33,247.50
650 Pipa Maspion D 4 M1 46,035.00
651 Pipa Maspion D 5 M 1
76,725.00
652 Pipa Maspion D 6 M1 92,070.00
653 Pipa Maspion D 8 M1 163,680.00
654 Pipa Maspion D 10 M1 290,276.25
655 Pipa Maspion D 12 M1 383,625.00
656 Pipa Maspion D 14 M 1
525,822.00
657 Pipa Maspion D 16 M1 664,950.00
658 Pipa / selang spiral sel kran M1 24,296.25
659 Pipa langgeng warna abu - abu AW 1/2 M 1
7,391.17
660 Pipa langgeng warna abu - abu AW 3/4 M1 8,914.42
661 Pipa langgeng warna abu - abu AW 1 M 1
11,212.08
662 Pipa langgeng warna abu - abu AW 1 1/4 M1 15,866.73
663 Pipa langgeng warna abu - abu AW 1 1/2 M1 20,664.60
664 Pipa langgeng warna abu - abu AW 2 M 1
31,099.20
665 Pipa langgeng warna abu - abu AW 2 1/2 M1 39,359.92
666 Pipa langgeng warna abu - abu AW 3 M 1
51,313.68
667 Pipa langgeng warna abu - abu AW 4 M1 69,052.50
668 Pipa langgeng warna abu - abu AW 5 M1 102,300.00
669 Pipa langgeng warna abu - abu AW 6 M1 173,424.07
670 Pipa langgeng warna abu - abu AW 8 M1 269,281.22
671 Pipa langgeng warna abu - abu AW 10 M 1
383,625.00
672 Pipa langgeng warna abu - abu AW 12 M1 547,638.50
673 Pipa langgeng warna abu - abu AW 16 M1 966,735.00
674 Pipa langgeng warna abu - abu D 1 1/4 M 1
9,718.50
675 Pipa langgeng warna abu - abu D 1 1/2 M1 11,283.69
676 Pipa langgeng warna abu - abu D 2 M1 14,833.50
677 Pipa langgeng warna abu - abu D 2 1/2 M1 21,892.20
678 Pipa langgeng warna abu - abu D 3 M1 31,845.99
679 Pipa langgeng warna abu - abu D 4 M 1
46,035.00
680 Pipa langgeng warna abu - abu D 5 M1 73,656.00
681 Pipa langgeng warna abu - abu D 6 M 1
65,472.00
682 Pipa langgeng warna abu - abu D 8 M1 158,309.25
683 Pipa langgeng warna abu - abu D 10 M1 276,210.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
684 Pipa langgeng warna abu - abu D 12 M1 376,464.00
685 Pipa langgeng warna abu - abu D 14 M 1
493,904.40
686 Pipa langgeng warna abu - abu D 16 M1 639,886.50
687 Pipa langgeng warna abu - abu D 20 M1 1,101,658.47
688 Pipa langgeng warna abu - abu C 5/8 M1 2,066.46
689 Pipa langgeng warna abu - abu C 1/2 M1 3,421.93
690 Pipa langgeng warna abu - abu C 3/4 M 1
3,703.26
691 Pipa langgeng warna abu - abu C 1 M1 5,161.04
692 Pipa langgeng warna abu - abu C 1 1/4 M1 6,838.75
693 Pipa langgeng warna abu - abu C 1 1/2 M 1
8,184.00
694 Pipa langgeng warna abu - abu C 2 M1 12,337.38
695 Pipa langgeng warna abu - abu C 2 1/2 M1 15,728.62
696 Pipa langgeng warna abu - abu C 3 M1 19,160.79
697 Pipa langgeng warna abu - abu C 4 M1 24,419.01
698 Pipa langgeng warna abu - abu C 5 M 1
33,042.90
699 Pipa winlon warna abu - abu AW 1/2 M1 6,317.03
700 Pipa winlon warna abu - abu AW 3/4 M 1
7,928.25
701 Pipa winlon warna abu - abu AW 1 M1 10,485.75
702 Pipa winlon warna abu - abu AW 1 1/4 M1 15,268.27
703 Pipa winlon warna abu - abu AW 1 1/2 M 1
18,168.48
704 Pipa winlon warna abu - abu AW 2 M1 25,984.20
705 Pipa winlon warna abu - abu AW 2 1/2 M 1
33,912.45
706 Pipa winlon warna abu - abu AW 3 M1 47,569.50
707 Pipa winlon warna abu - abu AW 4 M1 73,528.13
708 Pipa winlon warna abu - abu AW 5 M 1
116,622.00
709 Pipa winlon warna abu - abu AW 6 M1 146,851.65
710 Pipa winlon warna abu - abu AW 8 M 1
233,192.85
711 Pipa winlon warna abu - abu AW 10 M1 331,707.75
712 Pipa winlon warna abu - abu AW 12 M1 558,813.75
713 Pipa winlon warna abu - abu D 1 1/4 M 1
8,900.10
714 Pipa winlon warna abu - abu D 1 1/2 M1 10,076.55
715 Pipa winlon warna abu - abu D 2 M1 13,053.48
716 Pipa winlon warna abu - abu D 2 1/2 M1 18,644.18
717 Pipa winlon warna abu - abu D 3 M1 27,621.00
718 Pipa winlon warna abu - abu D 4 M 1
38,372.73
719 Pipa winlon warna abu - abu D 6 M1 60,996.37
720 Pipa winlon warna abu - abu D 8 M 1
134,050.85
721 Pipa winlon warna abu - abu D 10 M1 248,691.30
722 Pipa winlon warna abu - abu D 12 M1 338,357.25
723 Pipa winlon warna abu - abu C 5/8 M 1
1,739.10
724 Pipa winlon warna abu - abu C 1/2 M1 3,094.58
725 Pipa winlon warna abu - abu C 3/4 M 1
3,324.75
726 Pipa winlon warna abu - abu C 1 M1 4,731.38
727 Pipa winlon warna abu - abu C 1 1/4 M1 5,984.55
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
728 Pipa winlon warna abu - abu C 1 1/2 M1 7,800.37
729 Pipa winlon warna abu - abu C 2 M 1
10,495.98
730 Pipa winlon warna abu - abu C 2 1/2 M1 13,196.70
731 Pipa winlon warna abu - abu C 3 M1 16,344.47
732 Pipa winlon warna abu - abu C 4 M 1
21,483.00
733 Pipa wavin warna putih AW 1/2 M1 7,161.00
734 Pipa wavin warna putih AW 3/4 M 1
9,207.00
735 Pipa wavin warna putih AW 1 M1 12,276.00
736 Pipa wavin warna putih AW 1 1/4 M1 26,598.00
737 Pipa wavin warna putih AW 1 1/2 M 1
28,644.00
738 Pipa wavin warna putih AW 2 M1 35,805.00
739 Pipa wavin warna putih AW 2 1/2 M 1
40,920.00
740 Pipa wavin warna putih AW 3 M1 54,219.00
741 Pipa wavin warna putih AW 4 M1 88,489.50
742 Pipa wavin warna putih AW 5 M 1
131,199.75
743 Pipa wavin warna putih AW 6 M1 160,994.63
744 Pipa wavin warna putih AW 8 M 1
272,501.63
745 Pipa wavin warna putih AW 10 M1 476,462.25
746 Pipa wavin warna putih AW 12 M1 673,901.25
747 Pipa wavin warna putih D 1 1/4 M 1
10,102.13
748 Pipa wavin warna putih D 1 1/2 M1 12,020.25
749 Pipa wavin warna putih D 2 M 1
17,902.50
750 Pipa wavin warna putih D 2 1/2 M1 23,529.00
751 Pipa wavin warna putih D 3 M1 30,178.50
752 Pipa wavin warna putih D 4 M 1
46,546.50
753 Pipa wavin warna putih D 5 M1 71,482.13
754 Pipa wavin warna putih D 6 M 1
89,512.50
755 Pipa wavin warna putih D 8 M1 134,396.63
756 Pipa wavin warna putih D 10 M1 250,507.12
757 Pipa wavin warna putih D 12 M 1
351,400.50
758 Pipa langgeng warna putih AW 1/2 M1 5,495.56
759 Pipa langgeng warna putih AW 3/4 M 1
7,527.23
760 Pipa langgeng warna putih AW 1 M1 10,741.50
761 Pipa langgeng warna putih AW 1 1/4 M1 11,339.95
762 Pipa langgeng warna putih AW 1 1/2 M 1
17,723.48
763 Pipa langgeng warna putih AW 2 M1 22,685.02
764 Pipa langgeng warna putih AW 2 1/2 M 1
33,247.50
765 Pipa langgeng warna putih AW 3 M1 44,628.37
766 Pipa langgeng warna putih AW 4 M1 73,911.75
767 Pipa langgeng warna putih AW 5 M 1
122,248.50
768 Pipa langgeng warna putih AW 6 M1 171,608.25
769 Pipa langgeng warna putih AW 8 M 1
288,486.00
770 Pipa langgeng warna putih AW 10 M1 445,772.25
771 Pipa langgeng warna putih AW 12 M1 628,377.75
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
772 Pipa langgeng warna putih AW 14 M1 860,343.00
773 Pipa langgeng warna putih AW 16 M 1
1,075,684.50
774 Pipa langgeng warna putih D 1 1/4 M1 9,667.35
775 Pipa langgeng warna putih D 1 1/2 M1 10,971.68
776 Pipa langgeng warna putih D 2 M1 14,322.00
777 Pipa langgeng warna putih D 2 1/2 M1 19,089.18
778 Pipa langgeng warna putih D 3 M 1
24,117.23
779 Pipa langgeng warna putih D 4 M1 37,927.73
780 Pipa langgeng warna putih D 5 M1 52,684.50
781 Pipa langgeng warna putih D 6 M 1
80,637.97
782 Pipa langgeng warna putih D 8 M1 141,787.80
783 Pipa langgeng warna putih D 10 M1 233,499.75
784 Pipa langgeng warna putih D 12 M1 327,871.50
785 Pipa langgeng warna putih D 14 M1 548,839.50
786 Pipa langgeng warna putih D 16 M 1
710,473.50
787 Pipa langgeng warna putih D 20 M1 1,125,300.00
788 Pipa langgeng warna putih C 5/8 M1 2,173.88
789 Pipa setara warna putih C 1/2 M1 3,529.35
790 Pipa langgeng warna putih C 3/4 M1 4,194.30
791 Pipa langgeng warna putih C 1 M 1
5,319.60
792 Pipa langgeng warna putih C 1 1/4 M1 7,058.70
793 Pipa langgeng warna putih C 1 1/2 M 1
8,715.96
794 Pipa langgeng warna putih C 2 M1 12,772.15
795 Pipa langgeng warna putih C 2 1/2 M1 16,178.74
796 Pipa langgeng warna putih C 3 M 1
20,460.00
797 Pipa langgeng warna putih C 4 M1 25,401.09
798 Pipa winlon warna putih AW 1/2 M 1
4,398.90
799 Pipa winlon warna putih AW 3/4 M1 5,856.67
800 Pipa winlon warna putih AW 1 M1 8,158.42
801 Pipa winlon warna putih AW 1 1/4 M 1
11,355.30
802 Pipa winlon warna putih AW 1 1/2 M1 14,731.20
803 Pipa winlon warna putih AW 2 M 1
20,306.55
804 Pipa winlon warna putih AW 2 1/2 M1 27,109.50
805 Pipa winlon warna putih AW 3 M1 37,339.50
806 Pipa winlon warna putih AW 4 M 1
62,254.66
807 Pipa winlon warna putih AW 5 M1 92,555.92
808 Pipa winlon warna putih AW 6 M 1
132,938.85
809 Pipa winlon warna putih AW 8 M1 208,487.40
810 Pipa winlon warna putih AW 10 M1 300,506.25
811 Pipa winlon warna putih D 1 1/4 M 1
7,033.12
812 Pipa winlon warna putih D 1 1/2 M1 8,567.63
813 Pipa winlon warna putih D 2 M 1
11,457.60
814 Pipa winlon warna putih D 2 1/2 M1 15,549.60
815 Pipa winlon warna putih D 3 M1 19,385.85
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
816 Pipa winlon warna putih D 4 M1 31,713.00
817 Pipa winlon warna putih D 5 M 1
46,546.50
818 Pipa winlon warna putih D 6 M1 66,136.95
819 Pipa winlon warna putih D 8 M1 112,670.15
820 Pipa winlon warna putih D 10 M1 212,221.35
821 Pipa winlon warna putih C 5/8 M1 1,611.23
822 Pipa winlon warna putih C 1/2 M 1
2,982.04
823 Pipa winlon warna putih C 3/4 M1 3,263.37
824 Pipa winlon warna putih C 1 M1 4,833.67
825 Pipa winlon warna putih C 1 1/4 M 1
5,626.50
826 Pipa winlon warna putih C 1 1/2 M1 7,033.12
827 Pipa winlon warna putih C 2 M 1
9,874.00
828 Pipa winlon warna putih C 2 1/2 M1 12,434.56
829 Pipa winlon warna putih C 3 M1 15,498.45
830 Pipa winlon warna putih C 4 M 1
20,649.25
831 Pipa vilano warna putih AW 1/2 M1 4,092.00
832 Pipa vilano warna putih AW 3/4 M 1
5,626.50
833 Pipa vilano warna putih AW 1 M1 7,365.60
834 Pipa vilano warna putih AW 1 1/4 M1 10,690.35
835 Pipa vilano warna putih AW 3 M1 33,400.95
836 Pipa vilano warna putih AW 4 M1 47,058.00
837 Pipa vilano warna putih AW 5 M 1
80,049.75
838 Pipa vilano warna putih AW 6 M1 114,576.00
839 Pipa vilano warna putih D 1 1/4 M1 6,666.89
840 Pipa vilano warna putih D 1 1/2 M 1
7,928.25
841 Pipa vilano warna putih D 2 M1 10,255.57
842 Pipa vilano warna putih D 2 1/2 M1 14,066.25
843 Pipa vilano warna putih D 3 M1 18,030.38
844 Pipa vilano warna putih D 4 M1 27,876.75
845 Pipa vilano warna putih D 5 M 1
36,725.70
846 Pipa vilano warna putih D 6 M1 64,449.00
BAHAN LISTRIK
961 Coaxial cable 5C - 75 ohm commscof M1 25,500.00
962 Box Panel (3 mm) (400 x 600) Bh 867,000.00
963 Figting lampu Broco Bh 15,300.00
964 Inbow dos plastik clipsal E 157 P OB Biji 8,160.00
965 Kabel NYM 2 x 1.5 mm Suprime NYM M1 9,996.00
966 Kabel NYY 2 x 1.5 mm M1 12,036.00
967 Kabel NYM 2 x 2.5 mm M1 14,280.00
968 Kabel NYY 3 x 1.5 mm M1 14,994.00
969 Kabel NYM 3 x 2.5 mm M1 18,564.00
970 Kabel NYY 3 x 2.5 mm M 1
21,420.00
971 Kabel NYM 4 mm M1 25,500.00
972 Kabel NYY 2 x 2,5 mm M 1
16,524.00
973 Kabel Twisteed 2 x 16 mm M1 9,690.00
974 Kabel telephone M1 4,794.00
975 Klem clipsal 20 mm Biji 2,550.00
976 Casing Lampu Bawah Air Bh 87,720.00
977 Casing Lampu Tangga Bh 91,800.00
978 Kap Lampu 14 Inchi Aluminium Bh 122,400.00
979 Fitting Gantung E27 Bh 10,200.00
980 Lampu Son 150 Watt Setara Philips Set 86,700.00
981 Lampu Mercury (halaman) Bh 561,000.00
982 Lampu Mercury 125 Watt Setara Philips Set 61,200.00
983 Lampu Mercury 250 Watt Setara Philips Set 67,320.00
984 Lampu Mercury 400 Watt Setara Philips Set 153,000.00
985 Lampu pijar 10 Watt Setara Philips Bh 9,180.00
986 Lampu pijar 15 Watt Setara Philips Bh 10,200.00
987 Lampu pijar 25 Watt Setara Philips Bh 12,240.00
988 Lampu pijar 40 Watt Setara Philips Bh 15,810.00
989 Lampu TL 20 Watt Komplit (Ballast Philips) Bh 155,040.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
990 Lampu TL 25 Watt Komplit (Ballast Philips) Bh 188,700.00
991 Lampu LED (5 Watt) Setara Philips Bh 61,200.00
992 Lampu LED (7 Watt) Setara Philips Bh 76,500.00
993 Lampu LED (10) Setara Philips Bh 86,700.00
994 Lampu LED (13 Watt) Setara Philips Bh 95,880.00
995 Lampu Sorot LED (5 Watt) Setara Philips Bh 255,000.00
996 Lampu Sorot LED (7 Watt) Setara Philips Bh 326,400.00
997 Lampu Sorot LED (10 Watt) Setara Philips Bh 382,500.00
998 Lampu Sorot LED (13 Watt) Setara Philips Bh 504,900.00
999 Lampu Sorot LED (25 Watt) Setara Philips Bh 984,300.00
1,000 Lampu Sorot LED (100 Watt) Setara Philips (ip65) Bh 2,004,300.00
1,001 Lampu Sorot Cahaya RGB (LED) 100 watt setara Philips (ip65) Bh 3,315,000.00
1,002 Lampu Sorot Bawah Cahaya Warm White (bolam) 400 watt setara Philips Bh 4,335,000.00
1,003 Lampu Sorot Bawah Cahaya Warm White (LED) 10 watt setara Philips (ip65) Bh 361,080.00
1,004 Lampu Sorot Bawah Cahaya Warm White (LED) 30 watt setara Philips (ip65) Bh 504,900.00
1,005 Lampu Esensial (5 Watt) Setara Philips Bh 40,800.00
1,006 Lampu Esensial (8 Watt) Setara Philips Bh 41,820.00
1,007 Lampu Esensial (11 Watt) Setara Philips Bh 51,000.00
1,008 Lampu Esensial (14 Watt) Setara Philips Bh 57,630.00
1,009 Lampu Esensial (18 Watt) Setara Philips Bh 60,180.00
1,010 Scot Light M2 66,300.00
1,011 Magnet Contactor 80 A SN - 50 Bh 1,683,000.00
1,012 MCB 3 phase 40 A MG Bh 453,900.00
1,013 MCB 3 phase 63 A MG Bh 576,300.00
1,014 Panel MDP Unit 37,230,000.00
1,015 Panel SDP Unit 19,380,000.00
1,016 Pipa clipsal 20 mm Btg 12,240.00
1,017 Pipa flexible clipsal 20 mm M1 4,590.00
1,018 Saklar ganda Setara Broco Bh 18,360.00
1,019 Saklar tunggal Setara Broco Bh 15,300.00
1,020 SL 18 Watt Komplit Bh 229,500.00
1,021 Sock clipsal 20 mm Biji 2,040.00
1,022 Steker Bh 15,300.00
1,023 Stop Kontak Bh 26,520.00
1,024 Stop Kontak Khusus (Kedap Air) Bh 35,700.00
1,025 Travo max 50 watt Bh 149,940.00
1,026 Tee dos clipsal 20 mm Bh 8,160.00
1,027 Time Switch Bh 596,700.00
1,028 T Foring Bh 11,220.00
MARMER / GRANIT
1,029 Marmer (30 x 30) M2 380,000.00
1,030 Marmer (40 x 40) M2 425,000.00
1,031 Granit (30 x 30) Tekstur Kasar Tebal 3 cm M2 500,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,032 Batu Andesit (30 x 30 x 5 cm) M2 465,000.00
1,033 Roster Keramik (12 x 11 x 24) Bh 56,100.00
1,034 Batu Granit M2 596,000.00
1,035 Batu Teraso M2 340,000.00
1,036 Teraso M 2
340,000.00
GRANIT TILE
1,037 Essenza 40 x 40 M2 400,000.00
1,038 Essenza 60 x 60 M2 475,000.00
1,039 Granito 40 x 40 cm M 2
437,000.00
1,040 Nero Granito 30 x 60 cm M2 390,000.00
1,041 Nero Granito 40 x 40 cm M 2
430,000.00
1,042 Nero Granito 60 x 60 cm M2 443,000.00
1,043 Setara Ex Cina 60 x 60 cm M2 225,000.00
1,044 Setara Ex Cina 80 x 80 cm M 2
240,000.00
KERAMIK
1,045 Keramik Asia Tile 20 x 20 kelas I warna muda M2 70,000.00
1,046 Keramik Setara Asia Tile 20 x 20 kelas I warna tua M2 75,000.00
1,047 Keramik Setara Asia Tile 20 x 25 kelas I M 2
75,000.00
1,048 Keramik Setara Asia Tile 30 x 30 kelas I warna muda M2 80,000.00
1,049 Keramik Setara Asia Tile 30 x 30 kelas I warna tua M 2
85,000.00
1,050 Keramik Setara Asia Tile 40 x 40 kelas I M2 85,000.00
1,051 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum M2 149,000.00
1,052 Keramik Setara ARWANA ( warna putih) M2 58,000.00
1,053 Keramik Setara ARWANA ( warna tua) M2 66,300.00
1,054 Keramik Setara Diamond 10/20 cm (Warna Muda) M 2
72,500.00
1,055 Keramik Setara Diamond 20/20 cm (Kelas I Warna Muda) M2 76,500.00
1,056 Keramik Setara Diamond 30/30 cm (Kelas I Warna Muda) M2 77,520.00
1,057 Keramik Setara Diamond 10/20 cm (Warna tua) M 2
81,600.00
1,058 Keramik Setara Diamond 20/20 cm (Kelas I Warna Tua) M2 73,500.00
1,059 Keramik Setara Diamond 30/30 cm (Kelas I Warna Tua) M 2
71,500.00
1,060 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna muda) M2 70,000.00
1,061 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna tua) M2 71,000.00
1,062 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna tua) M 2
72,500.00
1,063 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna muda) M2 68,000.00
1,064 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm M 2
70,000.00
1,065 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm M2 72,500.00
1,066 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm M2 76,500.00
1,067 Keramik Setara KIA 20/20 cm warna muda M 2
71,400.00
1,068 Keramik Setara KIA 30/30 cm warna muda M2 76,500.00
1,069 Keramik Setara KIA 20/20 cm warna tua M 2
66,300.00
1,070 Keramik Setara KIA 30/30 cm warna tua M2 69,360.00
1,071 Keramik Setara Mulia Warna Putih M2 112,200.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,072 Keramik Setara Mulia Warna Tua M2 66,300.00
1,073 Keramik Setara Mulia 20 x 20 cm Warna Tua M 2
61,200.00
1,074 Keramik Setara Mulia 20 x 20 cm Warna Muda M2 63,240.00
1,075 Keramik Setara Mulia 30 x 30 cm Warna Putih M2 63,240.00
1,076 Keramik Setara Mulia 30 x 30 Warna Marbel M 2
71,400.00
1,077 Keramik Setara Mulia 30 x 30 Warna Impresso M2 76,500.00
1,078 Keramik Setara Mulia 40 x 40 cm kelas I M 2
79,560.00
1,079 Keramik Setara ROMAN 20/20 cm M2 86,700.00
1,080 Keramik Setara ROMAN 30/30 cm M2 89,760.00
1,081 Tegel PC abu - abu 20/20 cm M 2
96,900.00
1,082 Tegel PC Warna 20/20 cm M2 96,900.00
1,083 Tegel PC Warna 30/30 cm M 2
96,900.00
1,084 Tegel 30 x 30 TB PC M2 96,900.00
1,085 Tegel 30 x 30 TB PC Kuning M2 98,430.00
1,086 Tegel 30 x 30 Warna Merah M 2
98,430.00
1,087 Tegel Bata 20 x 20 Merah M2 98,430.00
1,088 Tegel Bata 20 x 20 PC M 2
98,430.00
1,089 Tegel B/TB 20 x 20 Kuning M2 98,430.00
1,090 Tegel Mozaik Porselint 30/30 cm M2 120,360.00
1,091 Tegel Wafel 20/20 cm Warna M2 125,460.00
1,092 Ubin PC Warna M2 90,000.00
1,093 Ubin PC Warna 20 / 20 Cm M 2
94,860.00
1,094 Batu Lahar 30/30 Bh 137,700.00
1,095 Porselint 11/11 cm Bh 91,800.00
1,096 Porselen M2 99,960.00
ATAP
1,097 Alang-alang panjang 2,4 meter Lbr 29,000.00
1,098 Alluminium foil M2 Double Roll 283,920.00
1,099 Akustik 60 cm x 120 cm Lbr 78,500.00
1,100 Asbes Bubungan Lbr 60,000.00
1,101 Asbes Gelombang 1,80 m x 0,80 m Lbr 30,927.00
1,102 Asbes Gelombang 1,80 m x 1,05 m Lbr 52,728.00
1,103 Asbes Gelombang 2,10 m x 1,05 m Lbr 68,952.00
1,104 Asbes Gelombang 2,4 m x 1,05 m Lbr 83,148.00
1,105 Asbes Rata 2 m x 1 m x 4 mm Lbr 77,064.00
1,106 Bentala tanah liat Ex Pejaten Bh 81,000.00
1,107 Bentala Ex Kapal Bh 100,000.00
1,108 Bentala Besar polos Lubang 24 cm Bh 91,000.00
1,109 Bentala Besar Warna Lubang 25 cm Bh 122,500.00
1,110 Bentala Besar polos Lubang 90 cm Bh 214,500.00
1,111 Bentala Besar Warna Lubang 90 cm Bh 219,500.00
1,112 Bubungan Besar Bh 8,600.00
1,113 Bubungan Kecil Bh 7,100.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,114 Bubungan Bambe Kecil Bh 12,200.00
1,115 Bubungan Bulat Karang Pilang Bh 29,600.00
1,116 Bubungan Bulat Jati Wangi Bh 21,400.00
1,117 Bubungan Bulat Ngalayur isi 3,5/m Bh 18,400.00
1,118 Bubungan Besar Good Year Bh 22,500.00
1,119 Bubungan Beton Cisangkan Bh 21,400.00
1,120 Bubungan Gerard Lbr 18,400.00
1,121 Bubungan Karang Pilang isi 3,5/m Bh 28,600.00
1,122 Bubungan Pletong Jatiwangi Bh 33,700.00
1,123 Bubungan SL Utama Bh 18,400.00
1,124 Bubungan SL Ngalayur Bh 20,400.00
1,125 Bubungan Segi Tiga Karang Pilang Bh 22,500.00
1,126 Bubungan Aspal Bh 82,000.00
1,127 Bubungan Utama isi 3,5/m Bh 11,700.00
1,128 Genteng Bambe Bh 5,012.00
1,129 Genteng Bambe Karang Pilang Bh 8,100.00
1,130 Genteng Bambe Kecil Bh 6,138.00
1,131 Genteng Beton Cisangkan Bh 12,276.00
1,132 Genteng Gemini Bh 6,600.00
1,133 Genteng Gerard Polos M2 358,100.00
1,134 Genteng Good Year Bh 5,600.00
1,135 Genteng Kanmuri (glazur) isi 14/m2 Bh 4,200.00
1,136 Genteng Kodok Lokal Bh 3,600.00
1,137 Genteng Kodok Kamulan Bh 5,200.00
1,138 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 Bh 6,100.00
1,139 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 Bh 7,100.00
1,140 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 Bh 7,100.00
1,141 Genteng Kodok Karang Pilang (Surabaya) Bh 6,600.00
1,142 Genteng Kodok Soka Bh 4,100.00
1,143 Genteng Lestari Bh 2,200.00
1,144 Genteng Metal M2 51,150.00
1,145 Genteng Metal 80 x 77,6 (Polos) Lbr 54,200.00
1,146 Genteng Metal 80 x 77,6 (Pasir) Lbr 79,700.00
1,147 Genteng Morando Abadi isi 18/m2 Bh 11,048.00
1,148 Genteng Morando Jatiwangi isi 18/m2 Bh 6,600.00
1,149 Genteng Morando Ngalayur isi 20/m2 Bh 5,200.00
1,150 Genteng Morando Metal Bh 76,700.00
1,151 Genteng Pejaten Mini Bh 1,534.00
1,152 Genteng Plentong Bh 1,636.00
1,153 Genteng plentong dicat Bh 1,900.00
1,154 Genteng Plentong Mantili Bh 2,800.00
1,155 Genteng Plentong Pejaten / Darmasaba Bh 1,800.00
1,156 Genteng Plentong Jatiwangi / Surabaya Bh 3,500.00
1,157 Genteng Portugis Bh 2,800.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,158 Genteng Pres Besar Bh 3,500.00
1,159 Genteng Pres Besar Cat Bh 4,000.00
1,160 Genteng Pres Mini Bh 3,000.00
1,161 Genteng Pres Mini Cat Bh 3,100.00
1,162 Genteng Terreal Bh 13,800.00
1,163 Genteng T. Romana Bh 13,800.00
1,164 Genteng Besar polos Lubang 35 cm Bh 3,500.00
1,165 Genteng Besar Warna Lubang 35 cm Bh 3,800.00
1,166 Fiberglas (1.80 x 0.90) M2 Lbr 61,000.00
1,167 Ijuk Kg 4,600.00
1,168 Ijuk Bersih Bh 18,900.00
1,169 Ijuk Lampung Bh 16,200.00
1,170 Ikut Celedu Bh 40,920.00
1,171 Ikut Celedu Besar Polos Bh 86,900.00
1,172 Ikut Celedu Besar Warna Bh 112,500.00
1,173 Ikut Celedu Kecil Polos Bh 76,700.00
1,174 Ikut Celedu Kecil Warna Bh 102,000.00
1,175 Kawat las Kg 81,500.00
1,176 Kawat Diameter 4 mm Kg 35,300.00
1,177 Murda / Puntal Paras Bh 126,000.00
1,178 Murda tanah liat Ex Pejaten Bh 146,000.00
1,179 Murda Kecil Polos Lubang 25 cm Bh 96,500.00
1,180 Murda Kecil Warna Lubang 25 cm Bh 126,250.00
1,181 Profil Aluminium "T" M3 260,000.00
1,182 Seng BJLS 0,18 gelombang Lbr 126,750.00
1,183 Seng BJLS 0,22 gelombang Lbr 136,890.00
1,184 Seng BJLS 0,30 gelombang Lbr 141,960.00
1,185 Seng Zincalume Panjang 6m Tebal 0,5 mm Lbr 119,652.00
1,186 Seng Plat Lebar 0,90 M Lbr 61,854.00
1,187 Seng Plat 3" x 6" BJLS 28 Lbr 88,218.00
1,188 Seng Plat Aluminium Lbr 65,910.00
1,189 Sirap Lbr 10,200.00
1,190 Subeng Besar Polos Lbr 3,535.00
1,191 Subeng Besar Warna Lbr 4,000.00
1,192 Subeng Kecil Polos Lbr 3,000.00
1,193 Subeng Kecil Warna Bh 3,800.00
1,194 Plastic Aerator Bh 270,000.00
TALI
1,195 Tali Ijuk Kg 11,700.00
1,196 Tali pengikat Ikat 31,500.00
1,197 Tali pengikat alang-alang Ikat 36,000.00
1,198 Tali Rafia Gulung 26,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
SANITAIR
1,199 Bak mandi fibre glass 70x70x66 cm Bh 374,440.00
1,200 Bak mandi porselin/ keramik Bh 369,380.00
1,201 Bak mandi keramik 50x50 Bh 211,508.00
1,202 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " Bh 220,616.00
1,203 Floor Drain Plastic Bh 16,192.00
1,204 Floor Drain Stainless Bh 126,500.00
1,205 Floor drain plastik Setara Alianco Bh 14,168.00
1,206 Floor drain stainless Setara Wasser Bh 166,980.00
1,207 Dudukan Kloset dan Perlengkapannya Bh 2,833,600.00
1,208 Kloset duduk INA Komplit Bh 1,113,200.00
1,209 closet duduk INA (putih) STD Bh 986,700.00
1,210 closet duduk INA (warna) Bh 1,006,940.00
1,211 Kloset duduk Amerika Standar Winplus Bh 1,568,600.00
1,212 closet duduk TOTO (putih) STD Bh 1,669,800.00
1,213 closet duduk TOTO (warna) Bh 2,024,000.00
1,214 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT Bh 6,628,600.00
1,215 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT Bh 6,780,400.00
1,216 Kloset duduk " TOTO Type AVANTE CW 823 J Bh 10,626,000.00
1,217 Kloset duduk " TOTO Type CW 660J Bh 1,872,200.00
1,218 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT Bh 1,973,400.00
1,219 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA Bh 1,315,600.00
1,220 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT Bh 2,378,200.00
1,221 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT Bh 3,137,200.00
1,222 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT Bh 3,997,400.00
1,223 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT Bh 4,554,000.00
1,224 Kloset jongkok " TOTO Type CE 6 COMPLIT Bh 571,780.00
1,225 Kloset jongkok " TOTO Type CE 7 COMPLIT Bh 581,900.00
1,226 closet jongkok porselin/ keramik Bh 217,580.00
1,227 Kloset porselin jongkok TOTO (standar) Bh 318,780.00
1,228 Kloset porselin jongkok Ina (standar) Bh 119,416.00
1,229 Kran biasa Setara Onda Bh 25,300.00
1,230 Kran SunEi PI/3 JHR Bh 217,580.00
1,231 Kran TOTO T 205 LCSC Bh 278,300.00
1,232 Kran TOTO T 205 MC Bh 389,620.00
1,233 Kran TOTO T 23 B13 Bh 399,740.00
1,234 Kran TOTO T 23 B13V7NB Bh 379,500.00
1,235 Kran TOTO T 26 - 13 Bh 399,740.00
1,236 Kran TOTO TX 109 LH Bh 996,820.00
1,237 Penyekat Urinoir " TOTO " Type A 100 " Bh 1,442,100.00
1,238 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) Bh 379,500.00
1,239 Soap holder " TOTO " Type S 6 N " Bh 166,980.00
1,240 Seal tape Bh 4,048.00
1,241 Urinoir TOTO (STD) Bh 3,137,200.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,242 Urinoir " TOTO U 57 M Bh 1,669,800.00
1,243 Urinoir " TOTO U 57 M BODI Bh 1,012,000.00
1,244 Urinoir INA (STD) Bh 617,320.00
1,245 Wastagel KIA Standard Bh 860,200.00
1,246 Wastagel KIA Warna Bh 516,120.00
1,247 Wastafel TOTO (putih) Bh 437,184.00
1,248 Wastafel TOTO (warna) Bh 480,700.00
1,249 Wastafel Komplit " TOTO Tx " Type L 521V1A " Bh 1,619,200.00
1,250 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " Bh 1,771,000.00
1,251 Wastafel INA (putih) Bh 253,000.00
1,252 Wastafel INA (warna) Bh 278,300.00
PAKU
1,287 Paku Beton Kg 30,360.00
1,288 Paku Usuk Kg 15,686.00
1,289 Paku Reng Kg 15,180.00
1,290 Paku List Kg 20,240.00
1,291 Paku Seng Ulir Bh 2,530.00
1,292 Paku 2-4 cm Kg 23,276.00
1,293 Paku Pancing 60 x 230 Kg 20,240.00
1,294 Paku 5-12 cm Kg 18,216.00
1,295 Paku 2 cm (30 kg) 3/4 inch SQ Dus 460,460.00
1,296 Paku 2,5 cm (30 kg) 1 inch SQ Dus 465,520.00
1,297 Paku 3 cm (30 kg) 1 1/4 inch SQ Dus 470,580.00
1,298 Paku 4 cm (30 kg) 1 1/2 inch SQ Dus 465,520.00
1,299 Paku 5 cm (30 kg) 2 inch SQ Dus 455,400.00
1,300 Paku 7,10,12 cm (3,4,5) inch SQ Dus 455,400.00
1,301 Paku 5 -12 cm (27kg) 2,3,4,5 inch Dus 440,220.00
1,302 Paku skrup 1/2" Kg 49,588.00
1,303 Paku skrup 2" Kg 50,600.00
1,304 Paku skrup 3.5" Kg 45,540.00
1,305 Bendrat 20 kg Roll 232,667.00
1,306 Sekrup Kalisiboard Bh 328.90
BETON CETAK
1,307 Paving Arahan 30 x 30 tebal 6 cm (K225) M2 115,000.00
1,308 Paving Arahan 20 x 20 tebal 6 cm (K225) M 2
90,000.00
1,309 Paving 10 x 20 cm tebal 6 cm K225 (Polos) M 2
85,000.00
1,310 Paving 10 x 20 cm tebal 6 cm K225 (Warna) M2 110,000.00
1,311 Paving 20 x 20 cm tebal 6 cm K225 (Polos) M2 90,000.00
1,312 Paving 20 x 20 cm tebal 6 cm K225 (Warna) M2 115,000.00
1,313 Paving 10 x 20 cm tebal 6 cm K250 (Polos) M2 90,000.00
1,314 Paving 10 x 20 cm tebal 6 cm K250 (Warna) M 2
105,000.00
1,315 Paving 20 x 20 cm tebal 6 cm K250 (Polos) M2 95,000.00
1,316 Paving 20 x 20 cm tebal 6 cm K250 (Warna) M 2
103,000.00
1,317 Paving 10 x 20 cm tebal 6 cm K350 (Polos) M2 95,000.00
1,318 Paving 10 x 20 cm tebal 6 cm K350 (Warna) M 2
130,000.00
1,319 Paving 20 x 20 cm tebal 6 cm K350 (Polos) M 2
95,000.00
1,320 Paving 20 x 20 cm tebal 6 cm K350 (Warna) M2 130,000.00
1,321 Paving 10 x 20 cm tebal 8 cm K225 (Polos) M2 95,000.00
1,322 Paving 10 x 20 cm tebal 8 cm K225 (Warna) M2 110,000.00
1,323 Paving 20 x 20 cm tebal 8 cm K225 (Polos) M2 100,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,324 Paving 20 x 20 cm tebal 8 cm K225 (Warna) M2 130,000.00
1,325 Paving 10 x 20 cm tebal 8 cm K250 (Polos) M 2
100,000.00
1,326 Paving 10 x 20 cm tebal 8 cm K250 (Warna) M2 115,000.00
1,327 Paving 20 x 20 cm tebal 8 cm K250 (Polos) M 2
120,000.00
1,328 Paving 20 x 20 cm tebal 8 cm K250 (Warna) M 2
130,000.00
1,329 Paving 10 x 20 cm tebal 8 cm K350 (Polos) M2 110,000.00
1,330 Paving 10 x 20 cm tebal 8 cm K350 (Warna) M 2
140,000.00
1,331 Paving 20 x 20 cm tebal 8 cm K350 (Polos) M2 105,000.00
1,332 Paving 20 x 20 cm tebal 8 cm K350 (Warna) M 2
140,000.00
1,333 Paving 20 x 20 cm tebal 8 cm K400 (Polos) M 2
200,000.00
1,334 Paving 20 x 20 cm tebal 8 cm K400 (Warna) M2 250,000.00
1,335 Paving Tiga Berlian tebal 6 Cm K225 (Polos) M 2
85,000.00
1,336 Paving Tiga Berlian tebal 6 cm K225 (Warna) M2 97,000.00
1,337 Paving segi enam xexagon 6 cm K225 pc M 2
96,000.00
1,338 Paving segi enam xexagon 6 cm K225 merah M 2
105,000.00
1,339 Paving segi enam xexagon 6 cm K225 hitam M2 119,000.00
1,340 Paving segi enam xexagon 6 cm K300 pc M 2
110,000.00
1,341 Paving segi enam xexagon 6 cm K300 merah M2 105,000.00
1,342 Paving segi enam xexagon 6 cm K300 hitam M 2
146,000.00
1,343 Paving segi enam xexagon 6 cm K350 pc M 2
156,000.00
1,344 Paving segi enam xexagon 6 cm K350 merah M2 158,000.00
1,345 Paving segi enam xexagon 6 cm K350 hitam M 2
160,000.00
1,346 Paving segi enam xexagon 6 cm K400 pc M2 178,000.00
1,347 Paving segi enam xexagon 6 cm K400 merah M 2
165,000.00
1,348 Paving segi enam xexagon 6 cm K400 hitam M 2
160,000.00
1,349 Paving bujur sangkar tanpa tias 6 cm K225 pc M2 160,000.00
1,350 Paving bujur sangkar tanpa tias 6 cm K225 merah M 2
175,000.00
1,351 Paving bujur sangkar tanpa tias 6 cm K225 hitam M2 185,000.00
1,352 Paving bujur sangkar tanpa tias 8 cm K225 pc M 2
205,000.00
1,353 Paving bujur sangkar tanpa tias 8 cm K225 merah M 2
210,000.00
1,354 Paving bujur sangkar tanpa tias 8 cm K225 hitam M2 215,000.00
1,355 Box Culvert Type 600x600x1200 K 350 Bh 2,091,000.00
1,356 Box Culvert Type 800x800x1200 K 350 Bh 2,985,000.00
1,357 Box Culvert Type 1000x1000X1200 K 350 Bh 4,013,000.00
1,358 Box Culvert Type 1200x1200X1200 K 350 Bh 5,374,000.00
1,359 Box Culvert Type 1500x1500x1200 K 350 Bh 8,523,000.00
1,360 Box Culvert Type 2000x2000x1200 K 350 Bh 13,611,000.00
1,361 Box Culvert Type 3000x2000x1200 K 350 Bh 21,879,000.00
1,362 Box Culvert Type 3000x2500x1200 K 350 Bh 23,342,000.00
1,363 Box Culvert Type 3000x3000x1200 K 350 Bh 24,894,000.00
1,364 Saluran Berbentuk U Type 300x300x1200 K350 Bh 336,000.00
1,365 Saluran Berbentuk U Type 300x400x1200 K350 Bh 396,000.00
1,366 Saluran Berbentuk U Type 300x500x1200 K350 Bh 456,000.00
1,367 Saluran Berbentuk U Type 400x400x1200 K350 Bh 620,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,368 Saluran Berbentuk U Type 400x600x1200 K350 Bh 741,000.00
1,369 Saluran Berbentuk U Type 400x700x1200 K350 Bh 790,000.00
1,370 Saluran Berbentuk U Type 500x500x1200 K350 Bh 649,000.00
1,371 Saluran Berbentuk U Type 500x600x1200 K350 Bh 650,000.00
1,372 Saluran Berbentuk U Type 500x700x1200 K350 Bh 682,000.00
1,373 Saluran Berbentuk U Type 600x600x1200 K350 Bh 684,000.00
1,374 Saluran Berbentuk U Type 600x700x1200 K350 Bh 746,000.00
1,375 Saluran Berbentuk U Type 700x700x1200 K350 Bh 750,000.00
1,376 Saluran Berbentuk U Type 600x800x1200 K350 Bh 810,000.00
1,377 Saluran Berbentuk U Type 800x800x1200 K350 Bh 1,385,000.00
1,378 Saluran Berbentuk U Type 800x1000x1200 K350 Bh 1,728,000.00
1,379 Saluran Berbentuk U Type 1000x1000x1200 K350 Bh 1,808,000.00
1,380 Bentala Exs Kapal (Paras) Bh 25,000.00
1,381 Bentala Exs Kapal (Terakota) Bh 30,000.00
1,382 Kanstein Segi Lima P40 Bh 55,000.00
1,383 Kanstein Segi Lima P50 Bh 55,000.00
1,384 Kanstein 40x28x15/12 cm Bh 30,000.00
1,385 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) M1 98,000.00
1,386 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) Bh 49,000.00
1,387 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) M1 88,000.00
1,388 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) Bh 44,000.00
1,389 Kansteen K.250 Bh 45,000.00
1,390 Kansteen Pendek K.250 Bh 34,500.00
1,391 Kansteen Jalan Masuk K.250 Bh 80,000.00
1,392 Kansteen Jalan Masuk 15x40x50 K.300 Bh 85,000.00
1,393 Kansteen Segilima P.50, T.20, L.15 K.250 Bh 49,000.00
1,394 Kansteen Bulat P.50, T.30, LA.10 LB.15 K.250 Bh 83,000.00
1,395 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Bh 36,000.00
1,396 Kansteen Jumbo P.50, T.30, L.15 K.250 Bh 80,000.00
1,397 Kansteen Jumbo 15x30x50 K.300 Bh 55,000.00
1,398 Kansteen Jumbo Mini 15x20x50 K.300 Bh 41,000.00
1,399 Kansteen Persegi T 15, P50, L 20 K 225 Bh 50,000.00
1,400 Kasnteen Kursi K225 Bh 120,000.00
1,401 Kansteen Kursi T 15, L 40, P 50 K 225 Bh 48,000.00
1,402 Kansteen Kursi T 10, L 40, P 50 K 225 Bh 40,000.00
1,403 Kansteen Jumbo 15 x 30 x 50 K.300 M1 110,000.00
1,404 Kansteen Jumbo Mini 15 x 20 x 50 K.300 M1 82,000.00
1,405 Kansteen Kursi (Jalan Masuk) 15 x 40 x 60 K.300 Bh 99,000.00
1,406 Kansteen kotak (P:50,t.20,La.10,Lb.16cm) K225 M1 73,000.00
1,407 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) M 1
105,000.00
1,408 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) M1 95,000.00
1,409 Tutup Got (Grill) (P:45, L:24, T:9 cm) Bh 67,000.00
1,410 Tutup Got (Grill) (P:30, L:24, T:9 cm) Bh 40,000.00
1,411 Plat Penutup 600 x 1200 Bh 541,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1,412 Plat Penutup 800 x 1200 Bh 580,000.00
1,413 Plat Penutup 1000 x 1200 Bh 897,000.00
1,414 Frame Manhole 600x600 Bh 543,200.00
1,415 Frame Manhole 800x800 Bh 675,400.00
1,416 Frame Manhole 1000x1000 Bh 763,200.00
1,417 Cover manhole 600x600 Bh 502,000.00
1,418 Cover manhole 800x800 Bh 729,000.00
1,419 Cover manhole 1000x1000 Bh 1,040,000.00
1,420 Grass Block 36 X 54 cm tebal 9 cm K 225 M2 105,000.00
1,421 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 M 2
83,000.00
1,422 Beton Cetak Greas Blok K.250 Bh 20,500.00
1,423 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) Bh 47,500.00
1,424 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) Bh 52,500.00
BUIS BETON
1468 Buis beton Diameter 25 x 75 Bh 45,000.00
1469 Buis beton Diameter 30 x 75 Bh 55,000.00
1470 Buis beton Diameter 50 x 75 Bh 115,000.00
1471 Buis Beton diameter 80 cm Biji 170,000.00
1472 Buis Beton diameter 25 cm Biji 45,000.00
1473 Buis Beton diameter 50 cm Biji 95,000.00
1474 Buis Beton diameter 100 cm Biji 235,000.00
TALANG
1483 Talang Karet L = 0.50 M1 21,880.80
1484 Talang Karet L = 0.90 M 1
9,623.50
1485 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran M 1
14,182.00
1486 Pipa Talang PVC Setara Maspion 6" Kotak M1 16,714.50
TANAMAN
1515 Pohon Lianglio / Salix Babylonica Phn 752,000.00
1516 Palem Ekor Tupai / Wodyetia Bifurcata Phn 76,000.00
1517 Pohon Hias Phn 57,000.00
1518 Pohon Jepun / Plumeria Rubra Phn 450,000.00
1519 Pohon Pudak / Pandanus Tectorius Phn 252,000.00
1520 Pohon Ketapag Kencana / Terminalia Molineti Phn 152,000.00
1521 Pohon Sente Batang Hitam / Alokasia 'black' Phn 61,500.00
1522 Pohon Dadap Merah / Erythrina Crista Galli Phn 351,000.00
1523 Pohon Jepun Pagoda / Plumeria 'pagoda' Phn 351,000.00
1524 Pohon Tabebuya / Chrysotricha sp Phn 505,000.00
1525 Rumput (Sekelas rumput mutiara) M2 23,000.00
1526 Semak Jempiring / Gardenia Jasminioides Polybag 5,500.00
1527 Semak Spathyphilum / Spathyphylum sp Polybag 7,700.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1528 Semak Reulia Besar / Reulia Malacosperma Giant Polybag 253,000.00
1529 Semak Anturium Bunga / Anthurium Andreanum Polybag 11,500.00
1530 Semak Hemigrapis / Hemigrapis sp Polybag 2,600.00
1531 Semak Puring / Codeaium variegatum Polybag 6,500.00
1532 Semak Pakis Bulu / Nephrolepis biserrata Polybag 7,650.00
1533 Tanaman rumput mutiara/jepang M2 26,000.00
1534 Tanaman perdu M2 33,500.00
1535 Lili Bangkok / Hymenocalis litoralis Polybag 3,700.00
1536 Jempiring / Gardenia jasminioides Polybag 11,500.00
1537 Kaki Laba-laba / Oxmosilum Liniare Yellow Polybag 23,500.00
1538 Semak Bawang-bawangan / Ornithogalum umbrellatum Polybag 3,700.00
1539 Semak Kebang Kertas Daun Kecil / Bogenvile small leave Polybag 18,500.00
1540 Semak Lily Paris / Hymenocallis Speciosa Polybag 3,000.00
1541 Semak Daun Philodendron / Philodendron sp Polybag 7,600.00
1542 Semak Bunga Yolanda / Yolanda white flower Polybag 9,000.00
1543 Semak Karembusa Putih / Tebermontana carembusa 'white' Polybag 7,500.00
1544 Semak Simbang Darah / Excoecaria Cochinechinensis Polybag 7,900.00
1545 Semak Bromelia / Bromelia sp Polybag 51,000.00
1546 Pupuk Kandang M3 15,900.00
LAIN - LAIN
1547 Air Bersih Ltr 150.00
1548 Bak Cuci Aluminium 2 Lubang Bh 850,000.00
1549 Belanja Foto Copy Lbr -
1550 Cangkul Bh 120,000.00
1551 Cangkul Gigi Bh 175,000.00
1552 Ember Bh 25,000.00
1553 Ember Hitam Bh 20,000.00
1554 Gerinding Bh 585,000.00
1555 Helm Proyek Bh 55,000.00
1556 Hammer 3 kg Bh 255,000.00
1557 Instalasi Tata Suara Titik -
1558 Isi Bay Fresh Ruangan Bh 75,000.00
1559 Isi Staples No 30. Pack 75,000.00
1560 Isi Sabun Hand Soap Bh 22,000.00
1561 Isi Kapur Barus Kg 51,000.00
1562 Kapi Bh 20,000.00
1563 Keni 2" Bh 10,500.00
1564 Keranjang Sampah Bh 55,000.00
1565 Keset Bh 50,000.00
1566 Lap Kanebo Bh 115,000.00
1567 Lap Pel / Alat Pengepelan Bh 245,000.00
1568 Linggis Bh 120,000.00
1569 Masker Bh 16,500.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1570 Ompreng Besar (bak Adonan) Bh 450,000.00
1571 Panyong Bh 135,000.00
1572 Pembersih Ban Ltr 55,000.00
1573 Pembersih Lantai Gln 78,000.00
1574 Pembersih Lantai Toilet Bh 35,000.00
1575 Pembersih Kaca Gln 75,000.00
1576 Pembersih Toilet Gln 55,000.00
1577 Pengelasan Cm 27,000.00
1578 Pengharum Mobil Cair Ltr 55,000.00
1579 Pengharum Ruangan Bh 35,000.00
1580 Sabun Bh 15,000.00
1581 Sabit Bh 55,500.00
1582 Sapu lidi Ikat 15,000.00
1583 Sapu Ijuk Bh 45,000.00
1584 Sapu Bulu Ayam Super Bh 65,000.00
1585 Shampo Mobil Bh 45,000.00
1586 Sepatu Karet Ps 150,000.00
1587 Sikat baja Bh 30,500.00
1588 Sikat Ban Bh 25,000.00
1589 Skop Bh 165,000.00
1590 Tempat Sampah Tutup Bh 275,500.00
1591 Tissue Gulung Bh 56,000.00
1592 Tissue Kotak Pack 40,500.00
1593 Water mur Bh 265,000.00
1594 Pipa Tremi dan Casing pelindung Ls 148,000.00
1595 Pelumas (Oli) Ltr 48,500.00
1596 Ramset M1 14,500.00
1597 Pembuangan lumpur eks. Bor M3 135,500.00
1598 Mobilisasi dan demobilisasi alat bor auger ZKL28 Unit 174,240,000.00
1599 Mobilisasi dan demobilisasi alat bor auger ZKL28 Unit 178,200,000.00
1600 Service Crane kapasitas 50 ton Bln 15,000,000.00
1601 Excavator PC200 Bln 123,420,000.00
1602 Pengadaan rail beam untuk pemancangan Ls 22,440,000.00
1603 Pemotongan kepala tiang pancang turap M1 125,400.00
1604 Galian tanah untuk capping beam M 3
138,600.00
1605 Pembuangan tanah galian M3 125,400.00
1606 Pekerjaan Cetakan/Tutup Kepala Kolom Bh 330,000.00
1607 Waterstop lebar 150 mm M1 73,000.00
1608 Waterstop lebar 200 mm M1 88,400.00
1609 Storox-100 Kg 54,000.00
1610 Phenol Film 12 mm Lbr 195,000.00
1611 Sewa Scafolding Set 65,000.00
1612 Screening Kg 200.00
1613 Pek. Pembuatan papan nama proyek Ls 1,320,000.00
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
Mengetahui,
PLT. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kota Denpasar
HARGA SURVEY
NO NAMA BAHAN SAT RATA RATA KET
( Rp )
1 2 3 4 5
B. SEMEN
80 PC. Tiga Roda 50 Kg Zak 61,250.00
81 PC. Tiga Roda 40 Kg Zak 57,000.00
82 PC. Tonasa 50 Kg / Busoa 50 Kg Zak 51,625.00
83 PC. Gresik 40 Kg Zak 60,000.00
84 PC. Gresik 50 Kg Zak 67,500.00
85 PC. Rajawali 40 Kg Zak 47,625.00
86 PC. Holcim 40 Kg Zak 47,625.00
87 PC. Conch 40 Kg Zak 51,250.00
88 Semen Gresik Kg 2,025.00
B.2. Uzin
123 Beton Instan (UZ K300) 50 kg Zak 106,982.50
124 Plester dinding instan (UZ Plester) 50 Kg Zak 93,135.00
125 Plester Finish tanpa Aci (UZ Render) 50 kg Zak 133,405.00
126 Acian diatas beton (UZ SC100) 40 kg Zak 109,653.25
127 Acian dinding instan interior (UZ SC 50) 40 kg Zak 125,658.50
128 Acian dinding instan eksterior (UZ SC 75) 40 kg Zak 133,162.50
129 Perekat Bata Ringan (UZ TB20) 50 kg Zak 124,300.00
B.3. Bostik
B.3.1. Perekat Keramik & Batu Alam
130 Fix Crete 25kg Zak 112,925.00
131 Fix all 20kg Zak 96,400.00
132 Super Fix all 20kg Zak 119,375.00
133 Super Fix all trade/white 20kg Zak 229,363.75
B.3.3. Waterproofing
147 Ultra Coat RC2 20 Lt Pail 905,175.00
148 Boscosem Slury 33 Kg Set 504,550.00
149 Damplix 2 20 kg Set 1,007,568.75
150 Damplix 3 45 kg Set 2,853,625.00
151 Damplix 3E 35 kg Set 1,512,125.00
152 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m Roll 1,177,693.75
153 Indo primer ( lapisan primer WP membran) 20 Lt Pail 920,937.50
154 Integral Kristalisasi (Waterproofing kristal) 20 kg Pail 2,054,737.50
155 Sika Top Seal Set 20 kg + cairan Set 362,381.25
B.3.4. Sealent
156 No More Nail (320 GR) Bh 92,175.00
157 Seal n Flex 1 (600 ML) Bh 127,750.00
158 Boscosil 313 (300 ML) Bh 84,250.00
159 Boscosil 616 (300 ML) Bh 60,000.00
160 Fil A Gap (300 ML) Bh 69,125.00
161 Boscosil Mastic (300 ML) khusus R. Pendingin Bh 75,800.00
162 Bostik Z Bond 6S (300 ML) Bh 169,000.00
163 Bostik Z PU Contrcuction (600 ML) Bh 154,500.00
164 Quelyd Super Express (250 GR) Bh 68,125.00
165 Expanda Foam (340 GR) Bh 208,212.50
166 Barel Gun Bh 573,820.00
167 Flash Band Roll 195,550.00
C. BAMBU
168 Bambu Ukuran Ø 8 - 10 panjang 4 m Btg 13,250.00
169 Bambu Ukuran Ø 6 - 8 panjang 4 m Btg 8,500.00
170 Gedeg kulit kelas I M2 45,000.00
171 Gedeg kulit kelas II M2 37,750.00
172 Gedeg Biasa M2 85,000.00
D. KAYU
173 Kayu jati Balok Ex Bojonegoro M3 9,785,875.00
174 Kayu jati papan Ex Bojonegoro M3 12,944,000.00
175 Kayu jati Usuk M3 7,937,500.00
176 Kayu jati Reng M3 9,500,000.00
177 Kayu merbau Balok M3 9,490,687.50
D.2. Lambersering
238 Lambersering Bangkirai Uk. 1 x 9 x 200 cm M2 505,000.00
239 Lambersering Kruing Uk. 2 x 9 x 200 cm M2 411,000.00
E. CONWOOD
E.1. Flooring/Deck Application
256 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs 96,100.00
257 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs 165,770.00
258 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs 215,880.00
259 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs 205,640.00
260 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs 290,940.00
261 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs 377,987.50
262 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs 594,795.00
E.4. Eave/lisplank
271 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs 185,140.00
E.8. Planks
290 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs 111,400.00
291 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs 112,925.00
F. BESI
292 Mour + Bout Bh 12,750.00
293 Besi strip Kg 16,035.00
294 Besi strip 30x3 mm M1 25,170.00
295 Baja Strip (0,2 x 2) cm / Plat Strip Kg 23,290.00
296 Besi Beton U24 (Polos) Kg 12,937.50
297 Besi Beton Ulir U 32 Kg 14,501.25
298 Besi Ulir 13,0 x 12 SNI (Ts-40) Kg 14,062.50
299 Besi Ulir 16,0 x 12 SNI (Ts-40) Kg 18,902.50
300 Besi Ø5 (3,8 x 6,0) Btg 26,529.75
301 Besi Ø6 (5,0 x 12) Btg 32,453.75
302 Besi Ø6 (5,2 x 12) Btg 26,809.00
303 Besi Ø6 (5,7 x 12) Btg 33,500.00
304 Besi Ø8 (6,5 x 12) Btg 48,750.00
305 Besi Ø8 (6,7 x 12) Btg 43,675.00
306 Besi Ø8 (6,9 x 12) SNI Btg 47,650.00
307 Besi Ø8 (7,1 x 12) SNI Btg 51,800.00
308 Besi Ø8 (7,4 x 12) SNI Btg 52,350.00
309 Besi Ø8 (7,6 x 12) SNI Btg 53,350.00
310 Besi Ø8 (7,7 x 12) SNI Btg 55,525.00
311 Besi Ø8 (7,8 x 12) SNI Btg 58,150.00
312 Besi Ø8 SNI U 24 Btg 59,750.00
G. BESI PAGAR
463 Pagar BRC T.90 diameter 6mm M1 269,625.00
464 Pagar BRC T.120 diameter 6mm M1 288,750.00
465 Pagar BRC T.150 diameter 6mm M1 292,125.00
466 Pagar BRC T.175 diameter 7mm M1 472,500.00
467 Pagar BRC T.190 diameter 7mm M1 704,500.00
H. CAT
473 Cat Marka Jalan Kg 69,250.00
474 Glas Bit Kg 75,800.00
475 Cat Besi Kg 75,975.00
476 Cat Menie besi Kg 51,875.00
477 Cat Menie Kayu Kg 54,375.00
478 Cat Dasar Tembok "Emco" Kg 34,075.00
479 Cat Tembok "Weldon" biasa Kg 39,750.00
480 Cat Tembok "Weldon" warna Kg 44,750.00
481 Cat Tembok "Weldon" warna tua Kg 47,800.00
482 Cat Tembok "Emco Lux" Biasa Kg 71,350.00
483 Cat Tembok "Emco Lux" Warna Kg 59,487.50
484 Cat Tembok "Emco Lux" Warna Tua Kg 86,000.00
485 Cat Tembok "Decolith" Kg 60,550.00
486 Cat Tembok "Dulux" Exterior Kg 126,825.00
487 Cat Tembok "Dulux" Interior Kg 111,000.00
488 Cat Tembok "Vinilex" Kg 54,700.00
489 Cat Galvanis Kg 56,100.00
490 Cat Kayu Emco Kg 77,750.00
491 Cat Baja Chromate (anti karat) Kg 51,000.00
492 Cat Kansteen Kg 85,725.00
493 Kalkarium Kg 15,937.50
494 Kapur sirih Kg 18,375.00
495 Kapur padam M3 12,375.00
496 Amplas Lbr 5,125.00
497 Kuas Bh 14,500.00
I. Cat KCA
498 Cat Natural@25 kg Pail 518,875.00
499 Cat Flakes@25 kg Pail 623,875.00
500 Cat Genteng @25kg Pail 308,875.00
J. KACA
533 Bingkai Nako Silver Daun 48,000.00
534 Bingkai Nako Coklat Daun 46,875.00
535 Glass Block Bh 30,750.00
536 Kaca 2 mm bening M2 106,750.00
537 Kaca 3 mm bening M2 118,500.00
538 Kaca 5 mm bening M2 128,750.00
539 Kaca 6 mm bening M2 232,500.00
540 Kaca 8 mm bening M2 296,000.00
541 Kaca 10 mm bening M2 355,750.00
542 Kaca 12 mm bening M2 583,750.00
543 Kaca Cermin 3 mm M2 212,750.00
544 Kaca Cermin 5 mm M2 358,000.00
545 Kaca Cermin 8 mm M2 572,800.00
546 Kaca Es/Kapur 3 mm M2 244,250.00
547 Kaca Es/Kapur 5 mm M2 252,500.00
548 Kaca Wireglass 5 mm M2 220,000.00
549 Kaca Patri M2 642,400.00
550 Kaca Nako Bening M2 140,500.00
551 Kaca Nako Rayben M2 185,000.00
552 Kaca ryben 3 mm M2 128,500.00
553 Kaca ryben 5 mm M2 211,625.00
554 Kaca asahi tebal 3 mm polos clear M2 132,000.00
555 Kaca asahi tebal 3 mm ryben dark grey M2 156,250.00
556 Kaca asahi tebal 3 mm cermin mirror M2 217,250.00
557 Kaca asahi tebal 3 mm es mislet M2 191,250.00
558 Kaca asahi tebal 3 mm biru dark blue M2 257,875.00
559 Kaca asahi tebal 3 mm one way M2 362,250.00
560 Kaca asahi tebal 5 mm polos clear M2 160,500.00
561 Kaca asahi tebal 5 mm ryben dark grey M2 185,750.00
562 Kaca asahi tebal 5 mm cermin mirror M2 302,750.00
K. PIPA
617 Pipa Galvanis Ø 1/2" M1 52,375.00
618 Pipa Galvanis Ø 3/4" M1 78,500.00
619 Pipa Galvanis Ø 1" M1 104,750.00
620 Pipa Galvanis Ø 1,5" M1 231,250.00
621 Pipa Galvanis Ø 2" M1 210,647.50
622 Pipa Galvanis Ø 3" M1 279,840.25
623 Pipa Maspion AW 1/2 M1 7,980.63
624 Pipa Maspion AW 3/4 M1 10,144.06
625 Pipa Maspion AW 1 M1 12,189.69
626 Pipa Maspion AW 1-1/2 M1 21,718.81
627 Pipa Maspion AW 1-1/4 M1 17,405.94
628 Pipa Maspion AW 2 M1 32,485.00
629 Pipa Maspion AW 2-1/2 M1 36,980.00
630 Pipa Maspion AW 3 M1 56,854.69
631 Pipa Maspion AW 4 M1 83,613.75
632 Pipa Maspion AW 5 M1 131,463.75
633 Pipa Maspion AW 6 M1 176,943.75
634 Pipa Maspion AW 8 M1 271,956.25
635 Pipa Maspion AW 10 M1 383,367.50
636 Pipa Maspion AW 12 M1 550,362.25
637 Pipa Maspion AW 14 M1 797,554.00
638 Pipa Maspion AW 16 M1 1,055,081.88
639 Pipa Maspion C 3/4 M1 4,901.28
640 Pipa Maspion C 5/8 M1 5,607.81
641 Pipa Maspion C 1 M1 7,437.30
642 Pipa Maspion C 1-1/2 M1 9,751.38
643 Pipa Maspion C 1-1/4 M1 7,943.53
644 Pipa Maspion C 2 M1 13,196.88
645 Pipa Maspion C 2-1/2 M1 16,893.15
646 Pipa Maspion C 3 M1 19,795.31
647 Pipa Maspion C 3-1/2 M1 23,665.94
648 Pipa Maspion C 4 M1 24,157.90
649 Pipa Maspion D 1/2 M1 12,816.13
650 Pipa Maspion D 1-1/2 M1 13,543.50
651 Pipa Maspion D 1-1/4 M1 12,125.75
652 Pipa Maspion D 2 M1 16,430.00
653 Pipa Maspion D 2-1/2 M1 24,004.38
654 Pipa Maspion D 3 M1 36,186.88
655 Pipa Maspion D 4 M1 47,446.25
656 Pipa Maspion D 5 M1 77,118.75
657 Pipa Maspion D 6 M1 91,080.00
658 Pipa Maspion D 8 M1 158,857.50
659 Pipa Maspion D 10 M1 237,881.56
L. BAHAN LISTRIK
966 Coaxial cable 5C - 75 ohm commscof M1 25,125.00
967 Box Panel (3 mm) (400 x 600) Bh 858,000.00
968 Figting lampu Broco Bh 13,250.00
969 Inbow dos plastik clipsal E 157 P OB Bj 8,515.00
970 Kabel NYM 2 x 1.5 mm Suprime NYM M1 12,425.00
M. MARMER / GRANITE
1,038 Marmer (30 x 30) M2 247,500.00
1,039 Marmer (40 x 40) M2 277,500.00
1,040 Marmer (60 x 640) M2 696,300.00
1,041 Granit (30 x 30) Tekstur Kasar Tebal 3 cm M2 563,750.00
1,042 Batu Andesit (30 x 30 x 5 cm) M2 514,500.00
1,043 Roster Keramik (12 x 11 x 24) Bh 60,662.50
1,044 Batu Granit M2 590,250.00
1,045 Batu Teraso M2 328,750.00
1,046 Teraso M2 412,500.00
1,047 Teraso Cor M3 935,000.00
1,048 Serbuk Granit Abu-Abu, @ 13 Kg Karung 175,000.00
1,049 Serbuk Granit Orange, @ 13 Kg Karung 175,000.00
1,050 Serbuk Granit Putih, @ 13 Kg Karung 155,000.00
1,051 Serbuk Granit Hijau, @ 13 Kg Karung 175,000.00
1,052 Serbuk Terraso, @ 45 Kg Zak 365,000.00
1,053 Ubin Granit uk. 30 x 30 Polished M2 284,900.00
1,054 Ubin Granit uk. 40 x 40 Polished M2 354,200.00
1,055 Ubin Granit uk. 40 x 40 Unpolished M2 204,600.00
1,056 Ubin Granit uk. 60 x 60 Polished M2 434,500.00
1,057 Ubin Granit uk. 60 x 60 Unpolished M2 245,300.00
N. GRANITE TILE
1,058 Essenza 40 x 40 M2 386,250.00
1,059 Essenza 60 x 60 M2 443,150.00
1,060 Granito 40 x 40 cm M2 432,250.00
1,061 Nero Granito 30 x 60 cm M2 365,500.00
1,062 Nero Granito 40 x 40 cm M2 433,750.00
1,063 Nero Granito 60 x 60 cm M2 420,198.00
1,064 Granite Ex Cina 60 x 60 cm M2 232,418.00
1,065 Granite Ex Cina 80 x 80 cm M2 233,830.00
O. KERAMIK
1,066 Keramik Asia Tile 20 x 20 kelas I warna muda M2 74,125.00
1,067 Keramik Asia Tile 20 x 20 kelas I warna tua M2 75,900.00
1,068 Keramik Asia Tile 20 x 25 kelas I M2 73,900.00
P. ATAP
1,137 Alang-alang panjang 2,4 meter Lbr 30,625.00
1,138 Alluminium foil M2 Double Roll 359,250.00
1,139 Akustik 60 cm x 120 cm Lbr 77,000.00
1,140 Asbes Bubungan Lbr 59,000.00
1,141 Nok Paten ( Permanen ) 92 cm Lbr 46,800.00
1,142 Nok Paten ( Permanen ) 105 cm Lbr 50,400.00
1,143 Nok Paten ( Permanen ) 108 cm Lbr 54,360.00
1,144 Nok Stel Rata 92 cm Lbr 43,200.00
1,145 Nok Stel Rata 105 cm Lbr 49,680.00
1,146 Nok Genteng Metal Berpasir Lbr 27,000.00
1,147 Nok Genteng Metal Berpasir Lbr 19,500.00
1,148 Nok Genteng Metal Polos Lbr 16,000.00
1,149 Nok Genteng Metal Berpasir Samping Lbr 35,000.00
1,150 Nok Genteng Metal Berpasir Samping Pumarof Lbr 55,000.00
1,151 Nok Genteng Metal Prima Lbr 45,000.00
1,152 Asbes Gelombang Kecil 1,80 m x 0,80 m Lbr 33,625.00
1,153 Asbes Gelombang Kecil 1,80 m x 1,05 m Lbr 52,057.00
1,154 Asbes Gelombang Kecil 2,10 m x 1,05 m Lbr 68,363.00
1,155 Asbes Gelombang Kecil 2,4 m x 1,05 m Lbr 78,412.00
1,156 Asbes Gelombang Kecil 1,5 m x 1,05 m Lbr 45,000.00
1,157 Asbes Gelombang Kecil 2,7 m x 1,05 m Lbr 80,000.00
1,158 Asbes Gelombang Besar 1,5 m x 1,05 m Lbr 90,000.00
1,159 Asbes Gelombang Besar 1,8 m x 1,05 m Lbr 115,000.00
1,160 Asbes Gelombang Besar 2,0 m x 1,05 m Lbr 120,000.00
1,161 Asbes Gelombang Besar 2,25 m x 1,05 m Lbr 125,000.00
1,162 Asbes Gelombang Besar 2,5 m x 1,05 m Lbr 140,000.00
1,163 Asbes Gelombang Besar 3,0 m x 1,05 m Lbr 160,000.00
1,164 Asbes Rata 2 m x 1 m x 4 mm Lbr 76,053.50
1,165 Bentala tanah liat Ex Pejaten Bh 79,875.00
1,166 Bentala Ex Kapal Bh 96,750.00
1,167 Bentala Besar polos Lubang 24 cm Bh 86,250.00
1,168 Bentala Besar Warna Lubang 25 cm Bh 117,875.00
1,169 Bentala Besar polos Lubang 90 cm Bh 210,375.00
Q. TALI
1,256 Tali Ijuk Kg 21,500.00
1,257 Tali pengikat Ikat 12,875.00
1,258 Tali pengikat alang-alang Ikat 26,250.00
1,259 Tali Rafia Gulung 26,250.00
R. SANITAIR
1,260 Bak mandi fibre glass 70x70x66 cm Bh 357,457.50
1,261 Bak mandi porselin/ keramik Bh 367,415.00
1,262 Bak mandi keramik 50x50 Bh 197,004.00
1,263 Bak Terasso Unit 750,000.00
1,264 Bathtub Porselin Unit 4,810,000.00
1,265 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " Bh 364,058.00
1,266 Floor Drain Plastic Bh 15,750.00
1,267 Floor Drain Stainless Bh 41,375.00
1,268 Floor drain plastik "Alianco" Bh 36,500.00
1,269 Floor drain stainless "Wasser" Bh 144,625.00
1,270 Dudukan Kloset dan Perlengkapannya Bh 2,436,800.00
T. PAKU
1,356 Paku Beton Kg 17,375.00
1,357 Paku Usuk Kg 25,500.00
1,358 Paku Reng Kg 29,500.00
1,359 Paku List Kg 26,500.00
1,360 Paku Seng Ulir Bh 1,675.00
1,361 Paku 2-4 cm Kg 26,500.00
1,362 Paku Pancing 60 x 230 Kg 20,875.00
1,363 Paku 5-12 cm Kg 24,922.50
1,364 Paku 2 cm (30 kg) 3/4 inch SQ Dus 770,175.00
1,365 Paku 2,5 cm (30 kg) 1 inch SQ Dus 769,350.00
1,366 Paku 3 cm (30 kg) 1 1/4 inch SQ Dus 767,875.00
1,367 Paku 4 cm (30 kg) 1 1/2 inch SQ Dus 763,575.00
1,368 Paku 5 cm (30 kg) 2 inch SQ Dus 734,375.00
1,369 Paku 7,10,12 cm (3,4,5) inch SQ Dus 732,750.00
1,370 Paku 5 -12 cm (27kg) 2,3,4,5 inch Dus 672,750.00
1,371 Paku skrup 1/2" Kg 52,500.00
1,372 Paku skrup 2" Kg 50,500.00
U. BETON CETAK
1,376 Paving Arahan 30 x 30 tebal 6 cm (K225) M2 119,375.00
1,377 Paving Arahan 20 x 20 tebal 6 cm (K225) M2 90,000.00
1,378 Paving 10 x 20 cm tebal 6 cm K225 (Polos) M2 82,000.00
1,379 Paving 10 x 20 cm tebal 6 cm K225 (Warna) M2 109,750.00
1,380 Paving 20 x 20 cm tebal 6 cm K225 (Polos) M2 81,250.00
1,381 Paving 20 x 20 cm tebal 6 cm K225 (Warna) M2 108,750.00
1,382 Paving 10 x 20 cm tebal 6 cm K250 (Polos) M2 88,000.00
1,383 Paving 10 x 20 cm tebal 6 cm K250 (Warna) M2 113,000.00
1,384 Paving 20 x 20 cm tebal 6 cm K250 (Polos) M2 87,750.00
1,385 Paving 20 x 20 cm tebal 6 cm K250 (Warna) M2 113,750.00
1,386 Paving 10 x 20 cm tebal 6 cm K350 (Polos) M2 94,500.00
1,387 Paving 10 x 20 cm tebal 6 cm K350 (Warna) M2 124,000.00
1,388 Paving 20 x 20 cm tebal 6 cm K350 (Polos) M2 91,250.00
1,389 Paving 20 x 20 cm tebal 6 cm K350 (Warna) M2 121,500.00
1,390 Paving 10 x 20 cm tebal 8 cm K225 (Polos) M2 94,500.00
1,391 Paving 10 x 20 cm tebal 8 cm K225 (Warna) M2 125,500.00
1,392 Paving 20 x 20 cm tebal 8 cm K225 (Polos) M2 95,000.00
1,393 Paving 20 x 20 cm tebal 8 cm K225 (Warna) M2 129,250.00
1,394 Paving 10 x 20 cm tebal 8 cm K250 (Polos) M2 100,750.00
1,395 Paving 10 x 20 cm tebal 8 cm K250 (Warna) M2 122,250.00
1,396 Paving 20 x 20 cm tebal 8 cm K250 (Polos) M2 118,500.00
1,397 Paving 20 x 20 cm tebal 8 cm K250 (Warna) M2 124,250.00
1,398 Paving 10 x 20 cm tebal 8 cm K350 (Polos) M2 135,750.00
1,399 Paving 10 x 20 cm tebal 8 cm K350 (Warna) M2 112,750.00
1,400 Paving 20 x 20 cm tebal 8 cm K350 (Polos) M2 137,000.00
1,401 Paving 20 x 20 cm tebal 8 cm K350 (Warna) M2 118,000.00
1,402 Paving 20 x 20 cm tebal 8 cm K400 (Polos) M2 166,500.00
1,403 Paving 20 x 20 cm tebal 8 cm K400 (Warna) M2 152,500.00
1,404 Paving Tiga Berlian tebal 6 Cm K225 (Polos) M2 110,250.00
1,405 Paving Tiga Berlian tebal 6 cm K225 (Warna) M2 80,500.00
1,406 Paving segi enam xexagon 6 cm K225 pc M2 107,500.00
1,407 Paving segi enam xexagon 6 cm K225 merah M2 109,750.00
1,408 Paving segi enam xexagon 6 cm K225 hitam M2 92,000.00
1,409 Paving segi enam xexagon 6 cm K300 pc M2 114,000.00
1,410 Paving segi enam xexagon 6 cm K300 merah M2 112,750.00
1,411 Paving segi enam xexagon 6 cm K300 hitam M2 100,250.00
1,412 Paving segi enam xexagon 6 cm K350 pc M2 130,750.00
1,413 Paving segi enam xexagon 6 cm K350 merah M2 131,250.00
1,414 Paving segi enam xexagon 6 cm K350 hitam M2 107,500.00
1,415 Paving segi enam xexagon 6 cm K400 pc M2 138,750.00
1,416 Paving segi enam xexagon 6 cm K400 merah M2 135,500.00
1,417 Paving segi enam xexagon 6 cm K400 hitam M2 97,125.00
1,418 Paving bujur sangkar tanpa tias 6 cm K225 pc M2 124,000.00
W. BUIS BETON
1,545 Buis Beton Diameter 25 x 75 cm Bh 48,750.00
1,546 Buis Beton Diameter 30 x 75 cm Bh 58,750.00
1,547 Buis Beton Diameter 50 x 75 cm Bh 115,000.00
1,548 Buis Beton Diameter 80 cm Bj 173,250.00
1,549 Buis Beton Diameter 25 cm Bj 47,500.00
1,550 Buis Beton Diameter 50 cm Bj 94,000.00
1,551 Buis Beton Diameter 100 cm Bj 232,500.00
Y. TALANG
1,560 Talang Karet L = 0.50 M1 18,250.00
1,561 Talang Karet L = 0.90 M1 24,750.00
1,562 Pipa Talang PVC Maspion 6" Setengah Lingkaran M1 68,750.00
1,563 Pipa Talang PVC Maspion 6" Kotak M1 94,750.00
AB. TANAMAN
1,592 Pohon Lianglio / Salix Babylonica Phn 752,000.00
1,593 Palem Ekor Tupai / Wodyetia Bifurcata Phn 76,000.00
1,594 Pohon Hias Phn 53,750.00
1,595 Pohon Jepun / Plumeria Rubra Phn 487,500.00
1,596 Pohon Pudak / Pandanus Tectorius Phn 250,250.00
1,597 Pohon Ketapag Kencana / Terminalia Molineti Phn 151,000.00
1,598 Pohon Sente Batang Hitam / Alokasia 'black' Phn 62,275.00
1,599 Pohon Dadap Merah / Erythrina Crista Galli Phn 351,000.00
1,600 Pohon Jepun Pagoda / Plumeria 'pagoda' Phn 351,000.00
1,601 Pohon Tabebuya / Chrysotricha sp Phn 507,500.00
1,602 Rumput (Sekelas rumput mutiara) M2 23,750.00
1,603 Semak Jempiring / Gardenia Jasminioides Polybag 6,125.00
1,604 Semak Spathyphilum / Spathyphylum sp Polybag 7,550.00
1,605 Semak Reulia Besar / Reulia Malacosperma Giant Polybag 253,000.00
1,606 Semak Anturium Bunga / Anthurium Andreanum Polybag 10,750.00
1,607 Semak Hemigrapis / Hemigrapis sp Polybag 2,975.00
1,608 Semak Puring / Codeaium variegatum Polybag 6,950.00
1,609 Semak Pakis Bulu / Nephrolepis biserrata Polybag 7,662.50
1,610 Tanaman rumput mutiara/jepang M2 25,750.00
1,611 Tanaman perdu M2 34,625.00
1,612 Lili Bangkok / Hymenocalis litoralis Polybag 4,100.00
1,613 Jempiring / Gardenia jasminioides Polybag 10,675.00
1,614 Kaki Laba-laba / Oxmosilum Liniare Yellow Polybag 24,525.00
Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
HARGA SATUAN
NO NAMA BARANG SAT.
( Rp )
1 2 3 4
A. BIDANG UMUM
1 Jaring Sungai M2 170,000.00
2 Tali Seling M1 9,500.00
3 Tali M1 5,600.00
4 Sekop Datar Bh 145,000.00
5 Selang Air M1 8,000.00
6 Terpal M2 9,500.00
7 Lampu Senter Kepala :
- Bebe Sunrei Headlamp Kids Bh 187,000.00
- Luby Senter Kepala L 2880 20 Watt Dimmer Bh 85,000.00
- Luby Senter Kepala L 2868 45 Watt Bh 180,000.00
- LED Senter Kepala Headlamp Cob Bh 95,000.00
- LED Paket Headlamp Jangkauan 170 m Plus Helm Bh 190,000.00
- LED Senter Headlamp Xhp 70 Bh 128,000.00
- LED Headlamp Flashlight Senter Kepala Rechargeable Bh 458,900.00
8 Sarung Tangan Las :
- Sarung Tangan Las Kulit CALDWELL 14 Inch Bh 105,000.00
- Sarung Tangan Las Kulit 14" PROHEX ( GERMANY ) Bh 65,000.00
- Sarung Tangan Las Kulit 14" ELYSSION Bh 55,000.00
- Sarung Tangan Las Kulit 14" MERAH YUTAKA Bh 62,500.00
- Sarung Tangan Las Kulit 16" WELDING GLOVE KRISBOW Bh 145,000.00
9 Rompi Pelampung :
- Krisbow Rompi Pelampung Dewasa L / XL Bh 956,000.00
- Krisbow Rompi Pelampung Dewasa Merah Bh 390,500.00
10 Rompi Kerja Lapangan :
- Rompi Safety Vest Kerja K3 HSE Lapangan Bh 275,000.00
- Rompi Kerja Lapangan Mark Bh 130,000.00
- Rompi Tactical Outdoor Multifungsi Bh 175,000.00
- Rompi Safety Kegiatan Lapangan Bh 114,000.00
- Rompi Tactikal Crew Kerja Lapangan Bh 71,000.00
1 2 3 4
7 Precast untuk sumur resapan Diameter : 60 Bj 500,000.00
8 Precast untuk sumur resapan Diameter : 80 Bj 750,000.00
9 Precast untuk sumur resapan Diameter : 100 Bj 1,200,000.00
10 Batu alam bintik bakar M2 160,000.00
11 Batu lis bolder bintik bakar 30X60X5 M2 300,000.00
1 2 3 4
1 2 3 4
43 PCI Girder L=12m Bh 54,519,300.00
44 PCI Girder L=17m Bh 60,418,000.00
45 PCI Girder L=21m Bh 71,813,500.00
46 PCI Girder L=26m Bh 107,174,100.00
47 PCI Girder L=32m Bh 156,233,100.00
48 PCI Girder L=36m Bh 177,503,700.00
49 PCI Girder L=41m Bh 258,932,300.00
1 2 3 4
50 Beton Struktur Fc' 30 MPa M3 2,200,000.00
51 Beton Struktur Fc' 15 MPa M3 1,455,000.00
52 Cerucuk M1 18,500.00
53 Elastomer Bh 825,000.00
54 Bahan pengawet: kreosot Ltr 8,750.00
55 Mata Kucing Bh 96,000.00
56 Anchorage Bh 860,000.00
57 Anti strpping agent Kg 76,000.00
58 Bahan Modifikasi Kg 1,450.00
59 Beton Struktur Fc' 50 MPa M3 1,940,000.00
60 Beton Struktur Fc' 40 MPa M3 1,843,000.00
61 Ducting (Kabel prestress) M1 214,000.00
62 Ducting (Strand prestress) M1 112,000.00
63 Beton Fc' 35 MPa M3 1,825,000.00
64 Multipleks 12 mm Lbr 181,000.00
65 Elastomer jenis 1 Bh 1,325,000.00
66 Elastomer jenis 2 Bh 1,706,000.00
67 Elastomer jenis 3 Bh 1,952,000.00
68 Expansion Tipe Joint Asphaltic Plug M1 1,156,000.00
69 Expansion Join Tipe Rubber M1 1,325,000.00
70 Expansion Join Baja Siku M1 3,025,000.00
71 Kerb Type A Bh 45,500.00
72 Paving Block Bh 40,500.00
73 Mini Timber Pile Bh 35,500.00
74 Expansion Joint Tipe Torma M1 1,455,000.00
75 Strip Bearing Bh 256,000.00
76 Agregat Pecah Mesin 20-30 mm M3 241,000.00
77 Joint Socket Pile 35x35 Set 686,000.00
78 Joint Socket Pile 16x16x16 Set 76,000.00
79 Mikro Pile 16x16x16 M1 71,000.00
80 Matras Concrete Bh 456,000.00
81 Assetilline Botol 265,500.00
82 Oxygen Botol 115,000.00
83 Batu Bara Kg 1,350.00
84 Joint Sealent Kg 45,500.00
85 Expansion Cap Kg 17,000.00
86 Polytene 125 mikron Kg 27,000.00
87 Curing Compound Ltr 46,000.00
88 Kayu Acuan Kg 4,300,000.00
89 Additive Kg 87,000.00
90 Casing M2 169,000.00
91 Pasir Tailing M3 265,000.00
92 Polimer 45,000.00
93 Batubara Kg 1,300.00
1 2 3 4
94 Kerb jenis 1 Bh 37,000.00
95 Kerb jenis 2 Bh 47,000.00
96 Kerb jenis 3 Bh 48,000.00
97 Bahan Modifikasi Kg 1,500.00
98 Aditif anti pengelupasan Ltr 77,000.00
99 Asbuton yang diproses Kg 34,000.00
100 Elastomer Alam Kg 37,000.00
101 Elastomer Sintesis Kg 37,000.00
1 2 3 4
102 Anchorage Bh 256,000.00
- Hidup Bh 870,000.00
- Mati Bh 555,000.00
103 Kabel Prategang Kg 192,256.00
- Selongsong M' 17,000.00
- Baja Prategang Kg 66,500.00
- Grouting M2 6,759.16
104 Epoxy coated Kg 15,000.00
105 Cairan Perekat (Epoxy Resin) Kg 83,000.00
106 Epoxy Bahan Penutup (sealant) Kg 166,000.00
107 Alat Penyuntik Anti Gravitasi Kg 176,000.00
108 Polymer Mortar Kg 75,000.00
109 Pipa Galvanis Dia 8" M1 180,000.00
110 Baut Angkur Kg 26,000.00
111 Kayu Kelas 1 Kg 5,500,000.00
112 Timbunan/urugan Porous M3 247,000.00
113 Fibre jenis e-glass M2 65,000.00
114 Aspal Emulsi Modifikasi Polimer 1h Ltr 14,600.00
115 Aspal Emulsi Modifikasi Polimer 2h Ltr 12,500.00
116 Serat Selulosa Kg 24,000.00
117 Zeolit Kg 7,000.00
118 Wax Kg 34,000.00
119 Asbuton B 5/20 Kg 975.00
120 CPHMA Ton 950,000.00
121 Asbuton B 50/20 Kg 1,200.00
122 Pasir Kasar M3 215,000.00
123 Pipa Porus diameter 5" M1 78,000.00
124 Pipa Porus diameter 6" M1 112,000.00
125 Pipa Porus diameter 8" M1 145,000.00
126 Backer rod 3/8 inci Kg 11,500.00
127 Cairan Perekat (Epoxy Resin) 2 komponen Ltr 355,000.00
128 Semen alumina Kg 14,500.00
129 Pasir Kasar M3 215,000.00
130 AK-2 (10/20) M3 237,500.00
131 Super plastiziser, maks 0,3 % Sm Kg 45,500.00
132 Curing compound (pigmen putih) Ltr 40,000.00
133 Besi Tulangan Polos BJTP 280 Kg 10,200.00
134 Besi Tulangan Ulir BJTS 420 Kg 13,700.00
135 Concrete Grouting Non srinkage HWR Kg 6,850.00
136 Plastik membrane polyethylene 125 mikron Kg 63,500.00
137 Mortar semen cepat mengeras (RSC) Kg 4,320.00
138 Mortar pre-packed untuk stiching Kg 7,500.00
139 Termoplastik (sealant tuang panas) Kg 30,000.00
140 Backer rod 1 1/6 inci M1 16,700.00
1 2 3 4
141 Termoseting (sealant tuang dingin) Kg 65,555.00
142 Bahan grouting tersedia jenis preformed Kg 24,900.00
143 Plastizier' Kg 45,000.00
144 Rapid Setting Material (Beton Semen Fast Track < 24 jam) M3 3,550,000.00
145 Thermocouple Bh 27,000.00
146 Beton Struktur fc' 45 MPa M3 1,950,000.00
1 2 3 4
147 Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Kg 17,500.00
148 Baja Struktur Grade 485 (Kuat Leleh 485 MPa) Kg 18,500.00
149 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤ 2,5 inch) Kg 22,000.00
150 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat > 2,5 - 4,0 inch) Kg 19,000.00
152 Bahan turap kayu tanpa pengawetan M3 1,350,000.00
153 Berat H Beam per m' Kg 8,800.00
154 Strand 1/2 inci Kg 20,500.00
155 Perancah/ formwoks Kg 46,000.00
156 Bahan Turap Kayu dengan pengawetan M3 1,100,000.00
157 Kreosot Kg 11,500.00
158 Bonding Agent Ltr 45,000.00
159 Cat akhir protektif beton Kg 16,700.00
160 Cat akhir dekoratif beton Kg 22,000.00
161 Baut Mutu Tinggi A490 Tipe 1 diameter M25 Bh 20,000.00
162 Elektroda Las SAW Kg 15,500.00
163 Baut dan Mur Bh 13,700.00
164 Perkerasan beton fast track <8 jam Kg 3,285,167.00
166 Karet Pengisi Sambungan Strip Seal M1 1,275,000.00
167 Karet Pengisi Sambungan Compression Seal M1 1,275,000.00
168 Sambungan siar muai tipe modular M1 45,000.00
169 Sambungan siar muai tipe finger plate M1 3,650,000.00
170 Landasan logam berongga (Pot Bearing) Bh 3,500,000.00
171 Landasan logam jenis Spherical Bh 4,650,000.00
172 Lem PVC Kg 250,000.00
173 Tiang sandaran baja M1 155,000.00
174 Deck Drain Bh 115,000.00
175 Pipa Baja M1 450,000.00
176 Sambungan Pipa PVC Bh 15,000.00
177 Sambungan Pipa Baja Bh 36,000.00
178 Baja Tulangan (Furnished) Kg 13,850.00
179 Turap Beton Kg 1,850,000.00
180 Tiang Pancang Kayu M3 1,100,000.00
181 Plat sepatu tiang pancang / plat sambung Kg 15,700.00
182 Beton struktur memadat sendiri, fc'30 MPa M3 1,897,667.00
183 Beton struktur memadat sendiri, fc’25 Mpa M3 1,875,678.00
184 Beton struktur memadat sendiri, fc’20 MPa M3 1,596,627.00
185 Beton Fc' 35 MPa M3 1,850,000.00
186 BjTS 280 Kg 13,400.00
187 Asphaltic plug Kg 43,000.00
188 Asphaltic plug Moveable Kg 45,600.00
189 accelerator Kg 17,700.00
190 Insulasi M2 350,000.00
191 Anyaman Kawat Baja Dilas Kg 33,000.00
192 Curing membrane Kg 265,000.00
1 2 3 4
193 Sambungan siar muai tipe Karet (Preformed T-shape) Kg 42,500.00
194 Bridging Plate PL 125 x 6 Kg 15,760.00
195 Perletakan logam tipe fixed 150 Ton Bh 1,750,000.00
196 Perletakan logam tipe movable 150 Ton Bh 2,150,000.00
197 Elastomer bearing pad; (450x400x45) mm3 Bh 1,150,000.00
198 Baja Tulangan Angkur Kg 13,750.00
199 BjTS 420 Kg 13,750.00
1 2 3 4
200 Grauting berbahan dasar semen Kg 355,000.00
201 Graut berbahan dasar Cellular Plastic Kg 351,000.00
202 BTA 60/43/5/36 9cm T=10 (K-350) Bh 687,000.00
203 Tutup BTA 50/1/8,5/30 1cm T=10 (K-350) Bh 145,750.00
204 Frame Manhole 108. 16.5. 108 mm (Precast K-350) Bh 765,000.00
205 Cover Manhole 87. 43.5. 9,5 cm (Precast K-350) Bh 565,000.00
206 Plat Penutup 400 x 1200 K 350 Unit 465,000.00
207 Plat Penutup 1200 x 1200 x 1200 K 350 Unit 1,350,000.00
208 Frame Manhole 1200 x 1200 Unit 455,000.00
209 Cover Manhole 1200 x 1200 Unit 655,000.00
210 Saluran Berbentuk U Type 400x500x1200 K350 Bh 563,400.00
211 Saluran Berbentuk U Type 1200x1200x1200 K350 Bh 2,967,000.00
212 Aspal Modifikasi Kg 8,500.00
213 Beton K-175 M3 1,447,109.04
214 Grill Baja Tutup Manhole Bh 475,000.00
215 Agregat B M3 400,000.00
216 Manhole Composite Grill 30cm x 60cm Gully Gratings Set 3,934,850.00
217 Manhole Composite Grill (40cm x 100cm) x 2 Gully Gratings Set 10,409,000.00
218 Manhole Composite Grill 60cm x 60cm (1 Bukaan) Gully Gratings Set 3,896,575.00
219 Manhole Cover Composite 76cm x 56cm x 4cm Set 2,837,600.00
220 Manhole Cover Composite 38cm x 38cm x 2cm Set 1,065,600.00
221 Bronjong dengan kawat dilapisi galvanis Kg 38,000.00
222 Cat dasar beton Kg 58,000.00
223 Cat akhir protektif baja Kg 42,000.00
224 Baja untuk pelat buhul dan pelat ganjal Kg 24,500.00
225 Baut mutu tinggi A325 Tipe 1 diameter M25 Bh 75,000.00
226 Baut Biasa Grade A diameter M25 Bh 65,000.00
227 Baut Biasa Grade B diameter M25 Bh 55,000.00
228 Baut Biasa Grade C untuk anchor bolts diameter M25 Bh 40,000.00
229 Elektroda Las SMAW Kg 65,000.00
230 Elektroda Las GMAW Kg 53,000.00
231 Elektroda Las FCAW Kg 65,000.00
232 Baja Struktur Titik leleh 2500 kg/cm2 Kg 19,500.00
233 Baja Struktur Titik leleh 2800 kg/cm2 Kg 23,000.00
234 Baja Struktur Titik leleh 3500 kg/cm2 Kg 27,000.00
235 Pelat Baja (Klem) Kg 24,500.00
236 Bahan Baja Profil Kg 23,500.00
237 Bahan anti rayap Kg 73,500.00
238 Pelat Baja Galvanis Kg 24,500.00
239 Cat Anti Karat Kg 43,000.00
240 Concrete Grouting Kg 5,800.00
243 Cat akhir protektif kayu Kg 40,000.00
244 Agregat Pecah Kasar M3 165,000.00
245 Agg. Halus LP A M3 212,000.00
1 2 3 4
246 Agregat Lolos # 1 " M3 175,500.00
247 Lolos screen1 ukuran ( 0 - 5) M3 145,000.00
248 Lolos screen2 ukuran ( 0 - 5) M3 175,000.00
249 Lolos screen2 ukuran ( 5 - 9,5) M3 165,000.00
250 Lolos screen2 ukuran ( 9.5 - 19,0) M3 150,000.00
1 2 3 4
251 Gravel M3 420,000.00
252 S i r t u (4 ≤ PI ≤10 ; LL ≤ 35 %) M3 125,000.00
253 S i r t u (4 ≤ PI ≤15 ; LL ≤ 35 %) M3 130,000.00
254 Arg. Kelas S (analisis) M3 166,000.00
255 Baja Tulangan BJTP 24 (epoxy coated) Kg 15,000.00
259 Bahan Curing M3 218,888.00
260 Bahan anti rayap Kg 50,000.00
261 Cat akhir protektif baja Kg 541,000.00
262 FRP jenis E-glass untuk daerah kering M2 583,000.00
263 FRP jenis E-glass untuk daerah basah M2 750,000.00
264 FRP jenis carbon untuk daerah kering M2 541,000.00
265 FRP jenis carbon untuk daerah basah M2 790,000.00
266 Baja Grade 250 Kg 75,000.00
267 Baja Grade 345 Kg 65,000.00
D. BAHAN K3
D.1. Alat Pelindung Diri
1 Topi Pelindung (safety Helmet) Bh 55,000.00
2 Pelindung Mata (Goggles, Spectacles) Bh 95,000.00
3 Tameng Mata (face Shield) Bh 215,000.00
4 Masker Selam (Breathing Apparatus) Bh 350,000.00
5 Pelindung Telinga (Ear Plug, Ear Muff) Bh 250,000.00
6 Pelindung Pernafasan dan Mulut (Masker) Bh 45,000.00
7 Sarung Tangan (Safety Gloves) Bh 40,000.00
8 Penunjang Seluruh Tubuh (Full Body Harness) Bh 130,000.00
9 Jaket Pelampung (Life Vest) Bh 150,000.00
10 Celemek (Apron/Coverralls) Bh 90,000.00
11 Pelindung Jatuh (Fall Arrester) Bh 990,000.00
12 Rompi Proyek Bh 58,000.00
13 Sepatu Proyek Ps 195,000.00
1 2 3 4
13 Kerucut Lalu Lintas (Traffic Cone) Bh 125,000.00
14 Lampu Putar (Rotary Lamp) Bh 97,000.00
1 2 3 4
E. BAHAN TAMBAHAN
1 Screw Dynabolt 10 x 0,77 Biji 2,500.00
2 Screw 12 x 20 (kuda-kuda) Biji 350.00
3 Screw 8x1/2 (reng) Biji 250.00
4 Paku Beton P = 3 cm Kotak 30,000.00
5 Axis-75 0,75 mm (Galvalum AZ-100) M1 41,000.00
6 AXIS-75 0,55 mm (Galvalum AZ-100) M1 27,500.00
7 AXIS-60 0,55 mm (Galvalum AZ-100) M1 22,000.00
8 Plat Diafragma Biji 5,200.00
9 Plat kaki/Footplate Biji 21,500.00
10 Reng Axis 0,45 mm @6,0 M/lonjor M1 8,000.00
11 Reng Axis 0,40mm @6,0 M/lonjor M1 7,500.00
12 Talang 3 m Lbr 200,000.00
13 Penutup atap UPVC M1 198,000.00
14 Nok atap PVC Pcs 155,000.00
15 Cobalt Stone RTM Flame ; Uk. 10 x 10 T=3 cm M2 215,000.00
16 Cobalt Stone RTM Flame ; Uk. 10 x 10 T=5 cm M2 295,000.00
17 Andesit Grey Flamed 40 x 40 x 1,5 cm M2 205,000.00
18 Andesit Grey Flamed 40 x 40 x 3 cm M2 345,000.00
19 Andesit Grey Flamed 30 x 30 x 2 cm M2 220,000.00
20 Andesit Grey Flamed 30 x 30 x 5 cm M2 435,000.00
21 Andesit Alur 20 x 40 1,8 cm M2 245,000.00
22 Batu Andesit Grey Flamed (30 x 30 x 5 cm ) M2 435,000.00
23 Batu Andesit Grey Flamed (30 x 30 x 1,5 cm ) M2 210,000.00
24 Batu Candi Hitam (Ukuran 30 x 30 x 2 cm ) Cirebon M2 235,000.00
25 Batu Candi Hitam (Ukuran 30 x 30 x 3 cm ) Cirebon M2 330,000.00
26 Batu Candi Hitam (Ukuran 30 x 30 x 5 cm ) Cirebon M2 430,000.00
27 Batu Putih Jogya/Palimanan (30 x 30 x 2) cm M2 215,000.00
28 Batu Putih Jogya/Palimanan (30 x 30 x 3) cm M2 325,000.00
29 Batu Putih Jogya/Palimanan (30 x 30 x 5) cm M2 425,000.00
F. BIDANG PLP
F.1. PIPA DAN ACCESSORIES ( UNTUK SR )
1 2 3 4
1 Pipa PE Ø 20 mm SDR 11 PN 16 Pralon M1 8,000.00
2 Pipa PE Ø 25 mm SDR 13,6 PN 12,5 Pralon M1 9,000.00
3 Pipa PE Ø 32 mm SDR 13,6 PN 12,5 Pralon M1 14,750.00
4 Pipa PVC SC VP ( 10 kg / cm ) Ø 1/2 " M1 4,350.00
5 Pipa PVC SC S 10 Ø 1" M1 10,100.00
6 Pipa PVC SC S 10 Ø 1 1/2" M1 24,100.00
7 PVC Pipa SC.S 10 ( Paralon ) Ø 2" M1 39,300.00
1 2 3 4
8 PVC Pipa R-R S 12,5 Bell Bend ( Paralon ) Ø 3" M1 72,400.00
9 PVC Pipa R-R S 12,5 Bell Bend ( Paralon ) Ø 4" M1 105,950.00
10 PVC Pipa R-R S 12,5 Bell Bend ( Paralon ) Ø 6" M1 226,500.00
11 Bend PVC 90⁰ x 1 1/2'' mm Bh 48,000.00
12 Bend PVC 90⁰ x 2'' mm Bh 56,000.00
13 Bend PVC 45⁰ x 2'' mm Bh 49,600.00
14 Bend PVC 22,5⁰ x 2'' mm Bh 45,900.00
15 PVC Bend ( R - R ) 90 °Ø 4" Bh 205,200.00
16 PVC Bend ( R - R ) 22,5 °Ø 4" Bh 64,550.00
17 PVC Bend ( R - R ) 45 °Ø 4" Bh 129,100.00
18 PVC Tee ( R - R ) Ø10" x 4" Bh 5,604,375.00
19 CI Tee ( FL - FL ) Ø10" x 4" Bh 3,600,000.00
20 CI Tee ( FL - FL ) Ø12" x 6" Bh 5,700,000.00
21 CI Gilbout Joint Std Jis Ø 10" Bh 1,800,000.00
22 PVC Tapper Core Ø 4" Bh 114,000.00
23 CI Gilbout Joint Std Jis Ø 12" Bh 1,985,362.50
24 PVC Bend ( R - R ) 90 °Ø 6" Bh 1,490,000.00
25 PVC Tapper Core Ø 6" Bh 995,000.00
26 GI Gate Valve ( FL - FL ) Ø 6" Bh 7,950,000.00
27 PVC Bend ( R - R ) 45 °Ø 6" Bh 1,385,000.00
28 PVC Tapper core Ø 6" Bh 995,000.00
29 PVC Bend ( R - R ) 22,5 °Ø 6" Bh 692,500.00
30 PVC Tapper core Ø 10" Bh 2,873,500.00
31 Bs Flang Ø 4" Bh 158,000.00
32 Reducer 3'' x 2'' Bh 97,050.00
33 Reducer 6'' x 2'' Bh 253,350.00
34 Reducer 6'' x 4'' Bh 506,700.00
35 4" x 45 " BS Bend FL - FL Bh 725,000.00
36 4" BS Flange Bh 158,000.00
37 GWI Pipa Riser / Medium SII 4" M1 401,250.00
38 GWI Pipa Riser / Medium SII 5" M1 518,000.00
39 GWI Pipa Riser / Medium SII 6" M1 616,950.00
40 GWI Pipa Riser / Medium SII 8" M1 931,250.00
41 Tee GIP Ø 250 x 63 mm Bh 1,540,000.00
42 Tee GIP Ø 200 x 63 mm Bh 781,000.00
43 Tee GIP Ø 110 x 63 mm Bh 198,000.00
44 Tee GIP Ø 90 x 63 mm Bh 121,000.00
45 Tee GIP Ø 63 mm Bh 69,606.00
46 Tape Core Ø 300 mm Bh 2,949,375.00
47 Tape Core Ø 250 mm Bh 2,359,500.00
48 Tape Core Ø 200 mm Bh 3,146,000.00
49 Tape Core Ø 110 mm Bh 2,359,500.00
50 Tape Core Ø 90 mm Bh 1,769,625.00
51 Tape Core Ø 63 mm Bh 1,327,218.75
1 2 3 4
52 Giboult Joint Ø 10'' Bh 1,050,000.00
53 Giboult Joint Ø 8'' Bh 890,000.00
54 Giboult Joint Ø 6'' Bh 725,000.00
55 Giboult Joint Ø 4'' Bh 429,000.00
56 Giboult Joint Ø 3'' Bh 297,000.00
57 Giboult Joint Ø 2'' Bh 247,500.00
1 2 3 4
58 Karet Packing Ø 12'' Bh 77,000.00
59 Karet Packing Ø 10'' Bh 62,000.00
60 Karet Packing Ø 8'' Bh 42,400.00
61 Karet Packing Ø 6'' Bh 33,000.00
62 Karet Packing Ø 4'' Bh 23,500.00
63 Karet Packing Ø 3'' Bh 19,600.00
64 Karet Packing Ø 2'' Bh 12,500.00
65 Mur/Baut Bh 18,540.00
66 Bronze Gate Valve Ø 1 1/2'' Bh 357,450.00
67 Gate Valve Ø 8'' Bh 12,610,000.00
68 Gate Valve Ø 4'' Bh 4,970,000.00
69 Gate Valve Ø 3'' Bh 2,007,599.40
70 Gate Valve Ø 2'' Bh 970,000.00
71 TS Drat Dalam Ø 2'' Bh 24,375.00
72 TS Drat Luar Ø 2'' Bh 24,375.00
73 End Cap dia 63 mm Bh 51,590.00
74 Reduction Fitting 25 mm x 20 mm Bh 7,810.00
75 PVC Tee ( SC ) Ø 1" x 1/2" Bh 10,500.00
76 PVC Valve Socket Ø 1/2" Bh 4,000.00
77 PVC Valve Socket Ø 3/4" Bh 4,600.00
78 Reduser 3"-11/2" Bh 148,500.00
79 Reduser 2"- 1 1/2" Bh 120,000.00
80 Female Adaftor 20 mm x 1/2 " Bh 14,500.00
81 Female Adaftor 25 mm x 3/4 " Bh 19,000.00
82 Female Adaftor 32 mm x 1 " Bh 24,750.00
83 Male Adaftor 20 mm Bh 15,400.00
84 Male Adaftor 25 mm x 3/4 " Bh 18,000.00
85 Male Adaftor 32 mm x 1" Bh 24,750.00
86 Bronze Gate Valve Kitz Ø 1/2 " Bh 150,000.00
87 Bronze Gate Valve Kitz Ø 3/4 " Bh 128,000.00
88 Brass Bib Cock Taho Ø 1/2" Bh 23,000.00
89 CI Gilbout Joint Std Sll Ø6" Bh 635,000.00
90 PVC Tee Ø 6" x 1 1/2" Bh 65,000.00
91 PVC End Cap 1 1/2" Bh 12,250.00
92 PVC End Cap 2" Bh 12,750.00
93 CI Gilbout Joint Std Sll Ø2" Bh 98,500.00
94 PVC Tee Ø 2" x 1 1/2" Bh 49,500.00
95 CI Gilbout Joint Std Sll Ø 1 " Bh 64,000.00
96 CI Gilbout Joint Std Sll Ø1 1/2" Bh 96,000.00
97 PVC Tee Ø 2" x 2" Bh 66,000.00
98 PVC Tee Ø 11/2" x 11/ 2" Bh 55,000.00
99 CI Gilbout Joint Std Sll Ø1" Bh 112,500.00
100 Bronze Gate Valve Kitz Ø3" Bh 1,341,400.00
101 CI Gilbout Joint Std Sll Ø 3" Bh 360,000.00
1 2 3 4
102 PVC Tee Ø 3" Bh 42,460.00
103 Elbow Ø 3" Bh 34,265.00
104 PVC End Cap 3" Bh 85,300.00
105 PVC End Cap 1" Bh 6,500.00
106 PVC Tee Ø 4" x 2" Bh 1,635,187.50
107 PVC Tee Ø 3" x 2" Bh 1,308,150.00
108 PVC Tee Ø 3" x 11/2" Bh 1,190,150.00
1 2 3 4
109 PVC Tee Ø 2" x 2" Bh 817,593.75
110 PVC Tee Ø 11/2" x11/ 2" Bh 11,440.00
111 Bend PVC 11/2" 90° Bh 38,600.00
112 GI Pipa medium I SII Ø 1/2 " Bh 33,550.00
113 GI Bend MF Ø 1/2 " Bh 12,250.00
114 GI Elbow Ø 1/2 " Bh 5,775.00
115 GI Elbow Ø 3/4 " Bh 8,250.00
116 GI Tee Ø 3/4" - 3/4 " Bh 10,560.00
117 GI Tee Ø 3/4" - 1/2 " Bh 10,230.00
118 GI Tee Ø 1/2" - 1/2 " Bh 6,600.00
119 GI Plug Ø 1/2 " Bh 3,950.00
120 GI Plug Ø 3/4 " Bh 5,460.00
121 GI Cap Ø 3/4 " Bh 5,760.00
122 GI Cap Ø 2 " Bh 23,200.00
123 Pipa GWI Riser / Medium SII 1" M1 80,950.00
124 Water Meter Lengkap Brass Meter Coupling ( LINFLOW ) Ø 1/2 " Bh 506,000.00
125 Mour + baut 5/8 x 3 " Bh 6,000.00
126 PT. PE Tape Roll 3,190.00
127 Bak Water meter lengkap tutup Bh 242,000.00
128 Clamp saddle Ø 1.5 " Bh 25,300.00
129 Clamp saddle Ø 2 " Bh 30,300.00
130 Clamp saddle Ø 3 " Bh 34,150.00
131 Clamp saddle Ø 4 " Bh 44,275.00
132 Clamp saddle Ø 6 " Bh 74,600.00
133 Ferrule Cutter Compressor Ø 25 mm x 1 1/4" Bh 99,000.00
134 Lockable Valve Magnetic Bh 109,400.00
135 Plat Pelanggan berlogo PDAM Bh 7,500.00
136 Air ( Vt = 2,5 V ) M3 7,530.00
137 Seney pipa Ø 1/2 " Bh 3,500.00
138 Pipa Selubung Valve D 6" setara Maspion M1 90,825.00
139 Single Air Valve 1/2" Bh 775,000.00
140 GI Coupling 1/2" Bh 5,200.00
141 CI Tapping Saddle 4"x 1/2" Bh 99,250.00
142 GI Double Nipple 1/2" Bh 5,250.00
143 CI Tee ( FL - FL ) Ø10" x 6" Bh 2,198,000.00
144 PVC End Cap Ø 6" Bh 143,750.00
145 BS Bend ( FL - FL ) 45 °Ø 6" Bh 1,175,000.00
146 BS Flange Ø 6" Bh 265,000.00
147 Pipa GI Ø 2" M1 182,950.00
148 Ø2" Bronze Gate Valve Bh 568,000.00
149 Ø2" Air Valve Bh 2,350,000.00
150 Ø2" BS Flange Bh 85,000.00
151 PVC Tee ( R - R ) Ø 6" x Ø 4" Bh 1,180,000.00
152 BS Plat Cap Ø 6" Bh 425,000.00
1 2 3 4
153 Stube Flange Ø 4 " Bh 2,300,000.00
154 Restrained Coupling Ø 4" Bh 3,500,000.00
155 CI Tee ( FL - FL ) Ø10" x 3" Bh 2,050,000.00
156 PVC Bend ( R - R ) 90 °Ø 3" Bh 103,500.00
157 CI Tee ( FL - FL ) Ø3" x 2" Bh 850,000.00
158 PVC Tapper Core Ø 3" Bh 457,500.00
1 2 3 4
159 PVC Bend ( R - R ) 90 °Ø 2" Bh 107,500.00
160 PVC Tapper Core Ø 2" Bh 345,000.00
161 PVC Tee Ø2" x 2" Bh 67,500.00
162 Kanstein Kursi (P:50, L:10,T:40 K-250) Bh 58,000.00
163 Kanstein Segi Lima (P:50,L:15, T:20 cm K-250) Bh 55,000.00
164 Kanstein Segi Lima (P:50,L:15, T:20 cm K-300 Bh 65,000.00
165 Tee 75 x 75 mm Bh 23,200.00
166 Tee 150 x 150 mm Bh 122,100.00
167 Tee Y 75x75 mm Bh 21,000.00
168 Tee Y 100 x 50 mm Bh 33,400.00
169 Tee Y 100 x 75 mm Bh 45,700.00
170 Tee Y 100 x 100 mm Bh 52,400.00
171 Tee Y 150 x 150 mm Bh 186,780.00
172 CI Giboult Joint Ø 1''( Std PVC/SII ) Bh 70,000.00
173 CI Giboult Joint Ø 11/2''( Std PVC/SII ) Bh 240,000.00
174 PVC Valve Soket 11/2" Bh 12,800.00
175 PVC Bend ( R - R ) 45 °Ø 2" Bh 95,000.00
176 PVC Tee SC 2"x2" Bh 65,050.00
177 PVC Tee R-R 6x2 Bh 1,312,300.00
178 PVC Tee R-R 3x2 Bh 346,500.00
179 PVC Tee R-R 4x2 Bh 534,900.00
180 Bronze Gate Valve Ø 1" Bh 245,250.00
181 PVC Valve Soket 1" Bh 7,200.00
182 PVC Tee SC 11/2"x1" Bh 34,050.00
183 PVC Tee SC 11/2"x11/2" Bh 35,825.00
184 PVC Tee SC 2"x11/2" Bh 57,850.00
185 PVC Bend ( R - R ) 45 °Ø 11/2" Bh 19,000.00
186 CI Tee F-F 8x2 Bh 1,929,375.00
187 PVC Tee R-R 8x2 Bh 2,729,000.00
188 CI Gate valve 2" Bh 2,367,600.00
189 BS Bend FL-FL 2x45° Bh 372,000.00
190 GWI pipa riser/medium SII Ø2 M1 205,000.00
191 PVC Tee R-R 3x11/2 Bh 345,000.00
192 CI Tee FL-FL 10"x2" Bh 2,200,000.00
193 GI Gate Valve Ø 6" Bh 9,922,500.00
194 CI plat Cap 6" Bh 470,600.00
195 PVC Tee R-R 4x4 Bh 741,400.00
1 2 3 4
6 Rangka Pintu Aluminium Alexindo M1 125,000.00
7 Kusen & Pintu PVC Toilet Maspion Unit 1,500,000.00
8 Handle Pintu type HRE7501 Bh 521,000.00
9 Door Stoper Karet "Dekson" Bh 142,000.00
10 Door Closer "Dekson" 105 Ho Heavy Duty Original Bh 850,000.00
11 Plint Keramik 10/30 cm Roman Bh 12,000.00
12 Plint Granite tile 10/40 cm Bh 15,000.00
1 2 3 4
13 Genteng Keramik Jatiwangi Bh 8,500.00
14 Genteng Keramik Kanmuri Bh 13,500.00
15 Nok Genteng Keramik Jatiwangi Bh 15,000.00
16 Nok Genteng Keramik Glazur Bh 27,500.00
17 Seng Plat BJLS 30 (L 90 cm) M1 45,000.00
18 Shower Set Type TX423 SZ Toto Unit 250,000.00
19 Kitchen Zink Hwaco 1 L Unit 450,000.00
20 Kran Zink T 30 AR13NV7N Toto Bh 382,500.00
21 Kran Dinding T 23 B13NV7N Toto Bh 45,700.00
22 List Profil 5 cm Gypsum M1 11,500.00
23 Rangka Plafond Metal Furing M2 55,000.00
24 Stop Kran Ø 1" Onda Bh 75,000.00
25 Klep Ø 3/4" Onda Bh 114,000.00
26 Tangki Air 1000 Liter Bh 1,900,000.00
27 Tangki Air 500 Liter Bh 850,000.00
28 Pelampung Otomatis Bh 350,000.00
29 Roof Drain Metal Bh 120,000.00
30 Mesin Jet Pump Kapasitas 250 watt Groundfos Unit 4,125,000.00
31 Mesin Pompa Tekanan Kapasitas 150 watt Groundfos Unit 705,000.00
32 Box panel PVC isi 4 MCB Legran Bh 210,000.00
33 MCB 6 A Legran Bh 60,000.00
34 MCB 4 A Legran Bh 60,000.00
35 Kabel NYM 2 x 2,5 mm2 M1 20,525.00
36 Kabel NYM 3 x 2,5 mm3 M1 23,075.00
37 Kabel Telephone 4 x 0,5 mm M1 4,323.50
38 Isolasi Bh 12,000.00
39 Outlet TV Broco Bh 48,000.00
40 Outlet Telephone Broco Bh 65,000.00
41 Fitting Plafond + Lampu SL Panasonic Bh 180,000.00
42 Lampu TL 2 x 18 watt Grille Panasonic Bh 205,000.00
43 Lampu TL 2 x 36 watt Grille Panasonic Bh 325,000.00
H. PATOK
1 Patok Beton KS Bh 52,000.00
2 Beton Path Box Bh 270,000.00
3 Patok Beton CP Bh 90,000.00
4 Patok Beton BM Bh 120,000.00
5 Patok Kayu Bh 11,500.00
6 Buku Ukur Ls 60,000.00
7 Solar Ltr 7,500.00
8 Anti Stripping Agent / bahan anti pengelupasan Kg 30,000.00
9 Air Kerja M3 20,000.00
I. LAIN - LAIN
1 2 3 4
1 Batu larva hitam 20 cm - 45 cm M3 350,000.00
2 Batu paras krobokan tebal 3 cm M2 145,000.00
3 Isolasi 3 mm Rubber Kotak 65,000.00
4 Kawat Seling 6 mm (3 x 37 IWRC x 1000M) M1 10,500.00
5 Kawat Seling 8mm (3 x 37 IWRC x 1000M) M1 12,000.00
6 Kawat Seling 9 mm (3 x 37 IWRC x 1000M) M1 17,500.00
7 Kawat Seling 10 mm (3 x 37 IWRC x 1000M) M1 23,500.00
8 Lampu Lampion Bh 120,000.00
1 2 3 4
9 Baja Hollow 20 x 20 x 1.2 mm x 6 m M1 14,500.00
10 Baja Hollow 20 x 20 x 1.7 mm x 6 m M1 20,000.00
11 Baja Hollow 40 x 40 x 2 mm x 6 m M1 43,000.00
12 Baja Hollow 40 x 40 x 2,3 mm x 6 m M1 48,500.00
13 Baja Hollow 50 x 50 x 2 mm x 6 m M1 49,500.00
14 Baja Hollow 50 x 50 x 2,3 mm x 6 m M1 61,000.00
15 Baja Hollow 50 x 50 x 2,5 mm x 6 m M1 72,500.00
16 Baja Hollow 50 x 50 x 2,7 mm x 6 m M1 81,000.00
17 Baja Hollow 50 x 50 x 2,8 mm x 6 m M1 81,500.00
18 Baja Hollow 50 x 50 x 3 mm x 6 m M1 96,000.00
19 Baja Hollow 60 x 60 x 2 mm x 6 m M1 80,000.00
20 Baja Hollow 60 x 60 x 2,3 mm x 6 m M1 94,000.00
21 Baja Hollow 60 x 60 x 2,5 mm x 6 m M1 96,000.00
22 Baja Hollow 60 x 60 x 2,8 mm x 6 m M1 100,000.00
23 Baja Hollow 60 x 60 x 3 mm x 6 m M1 110,000.00
24 Baja Hollow 60 x 60 x 3,2 mm x 6 m M1 112,500.00
25 Baja Hollow 75 x 75 x 2 mm x 6 m M1 90,000.00
26 Baja Hollow 75 x 75 x 2,3 mm x 6 m M1 117,000.00
27 Baja Hollow 75 x 75 x 2,5 mm x 6 m M1 126,000.00
28 Baja Hollow 75 x 75 x 3,2 mm x 6 m M1 142,000.00
29 Baja Hollow 100 x 100 x 3,2 mm x 6 m M1 250,000.00
30 Baja Hollow 100 x 100 x 4,5 mm x 6 m M1 270,000.00
31 Baja Hollow 125 x 125 x 3,2 mm x 6 m M1 367,000.00
32 Baja Hollow 125 x 125 x 4,5 mm x 6 m M1 425,000.00
33 Baja Hollow 150 x 150 x 4,5 mm x 6 m M1 542,000.00
34 Baja Hollow 150 x 150 x 5 mm x 6 m M1 625,000.00
35 Pompa Air Mancur ex YAMAno Bh 1,200,000.00
36 Nossel Air mancur M3 250,000.00
37 Lampu RGB Unit 850,000.00
38 Pipa HDPE 4" M1 165,000.00
39 Akrilik Bening Lbr 1,250,000.00
40 Pompa Air 3 HP Bh 6,500,000.00
41 Pompa Air disel 5 kw Bh 5,500,000.00
42 Pompa Air Sanyo 250 watt Bh 5,300,000.00
43 MCB 2 AMPERE Unit 75,000.00
44 Batu Alam Andesit Bintik Bakar tebal 5 cm M2 325,000.00
45 Bata pres stick Bh 5,500.00
J. ALAT KERJA
1 Cangkul + Pati Bh 100,000.00
2 Panyong + Pati Bh 150,000.00
3 Ompereng Kecil Bh 45,000.00
4 Sekrop Datar Bh 145,000.00
5 Sekrop Lancip Bh 156,000.00
1 2 3 4
6 Rambu - Rambu Pengaman Kerja (Barner) Bh 100,000.00
7 Kleser 10 mm Bh 18,000.00
8 Kleser 12 mm Bh 21,000.00
9 Ketel Aspal Bh 110,000.00
1 2 3 4
10 Palu Besar 2 Kg Bh 125,000.00
11 Palu Besar 5 Kg Bh 315,000.00
12 Palu Besar 12 Kg Bh 625,000.00
13 Terpal Ukuran 4x6 Bh 650,000.00
14 Gergaji Kayu Bh 60,000.00
15 Betel Bh 25,000.00
16 Garu Kayu Bh 30,000.00
17 Mata Jack Hammer Pipih Bh 120,000.00
18 Sikat Baja Bh 10,000.00
19 Garu Besi Bh 50,000.00
20 Sarung Tangan Ps 25,000.00
21 Kasut Plesteran Bh 17,000.00
22 Kapak Bh 135,000.00
23 Pisau Gerinda Bh 5,000.00
24 Elektorda Kecil Ktk 45,000.00
25 Sabit Besar Bh 55,000.00
26 Ban Luar Vespa Bh 135,000.00
27 Ban Dalam Vespa Bh 54,000.00
28 Tali Tambang M1 8,000.00
29 Meteran 3M Bh 37,000.00
30 Laher Roda Kereta Dorong Bh 25,000.00
31 Cetok Bh 10,000.00
32 Cat Semprot Bh 45,000.00
33 Pisau Mesin Potong Rumput Bh 125,000.00
HARGA SATUAN
NO NAMA BARANG SATUAN
( Rp )
1 2 3 4
MOBILISASI PERALATAN
1 Asphalt Finisher Unit 1,200,000.00
2 Compressor 4000-6500 L/M Unit 175,000.00
3 Concrete Mixer 0.3-0.6 M3 Unit 175,000.00
4 Dump Truck 3-4 M3 Unit 150,000.00
5 Excavator 80-140 Hp Unit 1,200,000.00
6 Tandem Roller 6-8 T Unit 1,200,000.00
7 Tire Roller 8-10 T Unit 1,200,000.00
8 Concrete Vibrator Unit 100,000.00
9 Water Tangker 3000-4500 L Unit 150,000.00
10 Pedestrian Roller Unit 200,000.00
11 Tamper Unit 100,000.00
12 Jack Hammer Unit 50,000.00
13 Asphalt Sprayer Unit 200,000.00
Catatan :
Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
HARGA SATUAN
NO NAMA BARANG SATUAN KETERANGAN
( Rp )
1 2 3 4 5
Catatan :
Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
DAFTAR HARGA SEWA
SCAFOLDING
KOTA DENPASAR TAHUN 2023
HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 78,174.34
B. BAHAN
Dolken Kayu Ø 8-10 / 400 cm Btg 1.250 14,375.00 17,968.75
Semen Portland Kg 5.000 2,025.00 10,125.00
Pasir Beton M3 0.005 355,000.00 1,775.00
Koral Beton M3 0.009 398,750.00 3,588.75
Kayu 5/7 M3 0.072 6,888,812.50 495,994.50
Paku Biasa 2"- 5" Kg 0.060 25,500.00 1,530.00
Residu Ltr 0.400 97,000.00 38,800.00
JUMLAH HARGA BAHAN 569,782.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 647,956.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 647,956.34
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.400 124,000.00 49,600.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 78,977.17
B. BAHAN
Dolken Kayu Ø 8-10 / 400 cm Btg 1.250 14,375.00 17,968.75
Semen Portland Kg 2.500 2,025.00 5,062.50
Seng Gelombang Lbr 1.200 135,062.50 162,075.00
Pasir Beton M3 0.005 355,000.00 1,775.00
Koral Beton M3 0.009 398,750.00 3,588.75
Kayu 5/7 M3 0.072 6,888,812.50 495,994.50
D. Jumlah (A + B + C) 790,315.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 790,315.42
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 66,577.17
B. BAHAN
Dolken Kayu Ø 8-10 / 400 cm Btg 1.00 14,375.00 14,375.00
Semen Portland Kg 2.000 2,025.00 4,050.00
Kawat Duri M1 25.000 86,547.50 2,163,687.50
Pasir Beton M3 0.005 355,000.00 1,775.00
Koral Beton M3 0.009 398,750.00 3,588.75
Paku Biasa 2"-5" Kg 0.060 25,500.00 1,530.00
JUMLAH HARGA BAHAN 2,189,006.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,255,583.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,255,583.42
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Kayu Usuk 5/7 cm M3 0.012 6,888,812.50 82,665.75
Paku 2" - 3" Kg 0.020 25,500.00 510.00
Kayu Papan 3/20 cm M3 0.007 5,920,275.00 41,441.93
JUMLAH HARGA BAHAN 124,617.68
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 151,006.26
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 15,100.63
F. Harga Satuan Pekerjaan (D+E) 166,106.89
A. TENAGA
Pekerja L.01 OH 2.000 119,985.85 239,971.69
Tukang Kayu L.02 OH 2.000 124,000.00 248,000.00
Tukang Batu L.02 OH 1.000 124,000.00 124,000.00
Kepala Tukang L.03 OH 0.300 129,000.00 38,700.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 657,671.69
B. BAHAN
Dolken Kayu Ø 8 - 10 / 400 cm Btg 1.250 14,375.00 17,968.75
Kayu M3 0.180 6,242,500.00 1,123,650.00
Paku Biasa Kg 0.850 25,500.00 21,675.00
Besi Strip Kg 1.100 16,035.00 17,638.50
Semen Portland Kg 35.000 2,025.00 70,875.00
Pasir Pasang M3 0.150 386,250.00 57,937.50
Pasir Beton M3 0.100 355,000.00 35,500.00
Koral Beton M3 0.150 398,750.00 59,812.50
Bata Merah Bh 30.000 1,262.50 37,875.00
Seng Plat Lbr 0.250 61,838.50 15,459.63
Jendela Nako Bh 0.200 46,875.00 9,375.00
Kaca Polos M2 0.080 128,750.00 10,300.00
Kunci Tanam Bh 0.150 247,950.00 37,192.50
Plywood 4 mm Lbr 0.060 84,688.50 5,081.31
JUMLAH HARGA BAHAN 1,520,340.69
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,178,012.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 217,801.24
F. Harga Satuan Pekerjaan (D+E) 2,395,813.61
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Kayu L.02 OH 1.500 124,000.00 186,000.00
Kepala Tukang L.03 OH 0.150 129,000.00 19,350.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 332,335.85
B. BAHAN
Dolken Kayu Ø 8 - 10 / 400 cm Btg 3.000 14,375.00 43,125.00
Kayu M3 0.276 6,242,500.00 1,722,930.00
D. Jumlah (A + B + C) 2,328,100.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 232,810.08
F. Harga Satuan Pekerjaan (D+E) 2,560,910.93
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Kayu L.02 OH 2.000 124,000.00 248,000.00
Kepala Tukang L.03 OH 0.200 129,000.00 25,800.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 400,785.85
B. BAHAN
Dolken Kayu Ø 8 - 10 / 400 cm Btg 1.700 14,375.00 24,437.50
Kayu Meranti M3 0.210 6,242,500.00 1,310,925.00
Paku Biasa Kg 0.300 25,500.00 7,650.00
Semen Portland Kg 10.500 2,025.00 21,262.50
Pasir Beton M3 0.030 355,000.00 10,650.00
Koral Beton M3 0.050 398,750.00 19,937.50
Seng Gelombang BJLS 30 Lbr 1.500 141,240.00 211,860.00
Seng Pelat Lbr 0.250 87,679.50 21,919.88
JUMLAH HARGA BAHAN 1,628,642.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,029,428.22
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 202,942.82
F. Harga Satuan Pekerjaan (D+E) 2,232,371.04
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Kayu L.02 OH 2.000 124,000.00 248,000.00
Kepala Tukang L.03 OH 0.200 129,000.00 25,800.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 400,785.85
B. BAHAN
Dolken Kayu Ø 8 - 10 / 400 cm Btg 1.250 14,375.00 17,968.75
Kayu M3 0.186 6,242,500.00 1,161,105.00
Paku Biasa Kg 0.300 25,500.00 7,650.00
Semen Portland Kg 18.000 2,025.00 36,450.00
Pasir Beton M3 0.030 355,000.00 10,650.00
Koral Beton M3 0.050 398,750.00 19,937.50
Seng Gelombang Lbr 1.500 141,240.00 211,860.00
Plywood 4 mm Lbr 1.350 84,688.50 114,329.48
JUMLAH HARGA BAHAN 1,579,950.73
C. PERALATAN
D. Jumlah (A + B + C) 1,980,736.57
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 198,073.66
F. Harga Satuan Pekerjaan (D+E) 2,178,810.23
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 18,998.58
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 18,998.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 1,899.86
F. Harga Satuan Pekerjaan (D+E) 20,898.44
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Kayu L.02 OH 2.000 124,000.00 248,000.00
Kepala Tukang L.03 OH 0.200 129,000.00 25,800.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 400,785.85
B. BAHAN
Bambu Ø 6 - 8 / 600 cm Btg 1.250 8,500.00 10,625.00
Tali Ijuk Kg 0.186 21,500.00 3,999.00
JUMLAH HARGA BAHAN 14,624.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 415,409.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 41,540.98
F. Harga Satuan Pekerjaan (D+E) 456,950.83
A. TENAGA
Tukang Kayu L.01 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.04 OH 0.030 129,000.00 3,870.00
JUMLAH HARGA TENAGA KERJA 41,070.00
B. BAHAN
Kayu Papan Kelas III M3 0.036 5,920,275.00 213,129.90
D. Jumlah (A + B + C) 343,634.90
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 34,363.49
F. Harga Satuan Pekerjaan (D+E) 377,998.39
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 120,685.85
B. BAHAN
Batu Kali M3 0.150 450,000.00 67,500.00
Batu Pecah 5 - 7 cm M3 0.090 446,250.00 40,162.50
Pasir Pasang M3 0.010 386,250.00 3,862.50
JUMLAH HARGA BAHAN 111,525.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 232,210.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 23,221.08
F. Harga Satuan Pekerjaan (D+E) 255,431.93
A. TENAGA
Pekerja L.01 OH 13.334 119,985.85 1,599,891.27
Mandor L.04 OH 0.666 140,000.00 93,240.00
JUMLAH HARGA TENAGA KERJA 1,693,131.27
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,693,131.27
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 169,313.13
F. Harga Satuan Pekerjaan (D+E) 1,862,444.39
A. TENAGA
Pekerja L.01 OH 0.667 119,985.85 80,030.56
Mandor L.04 OH 0.033 140,000.00 4,662.00
JUMLAH HARGA TENAGA KERJA 84,692.56
D. Jumlah (A + B + C) 84,692.56
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 8,469.26
F. Harga Satuan Pekerjaan (D+E) 93,161.81
A. TENAGA
Pekerja L.01 OH 0.042 119,985.85 5,039.41
Tukang Besi L.02 OH 0.004 124,000.00 496.00
Kepala Tukang L.03 OH 0.002 129,000.00 258.00
Mandor L.04 OH 0.042 140,000.00 5,880.00
JUMLAH HARGA TENAGA KERJA 11,673.41
B. BAHAN
Kawat Jaring Lbr 0.1434 27,855.00 3,994.41
JUMLAH HARGA BAHAN 3,994.41
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 15,667.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 1,566.78
F. Harga Satuan Pekerjaan (D+E) 17,234.59
A. TENAGA
Pekerja L.01 OH 0.375 119,985.85 44,994.69
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.019 140,000.00 2,660.00
JUMLAH HARGA TENAGA KERJA 64,702.69
B. BAHAN
Panel Beton Pracetak Lbr 0.986 114,000.00 112,404.00
Kolom Beton Pracetak Btg 0.525 186,300.00 97,807.50
Semen Portland Kg 45.00 2,025.00 91,125.00
Pasir Beton M3 0.074 355,000.00 26,270.00
Koral Beton M3 0.146 398,750.00 58,217.50
JUMLAH HARGA BAHAN 385,824.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 450,526.69
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 45,052.67
F. Harga Satuan Pekerjaan (D+E) 495,579.36
Tukang Kayu[10];Kepala Tukang [1];Mandor [0,5];Paku 2" - 3"[2];Kayu Papan 3/20 cm[0,7];
Pekerja[10];Tukang Kayu[10];Kepala Tukang [1];Mandor [0,5];Kayu Usuk 5/7 cm[1,2];Paku 2" - 3"[2];Kayu Papan 3/20 cm
Pekerja[10];
Tukang Kayu[10];
Kepala Tukang [1];
Mandor [0,5];
A. TENAGA
Pekerja L.01 OH 0.750 119,985.85 89,989.38
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 93,489.38
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 93,489.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 93,489.38
A. TENAGA
Pekerja L.01 OH 0.900 119,985.85 107,987.26
Mandor L.04 OH 0.045 140,000.00 6,300.00
JUMLAH HARGA TENAGA KERJA 114,287.26
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 114,287.26
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 114,287.26
A. TENAGA
Pekerja L.01 OH 1.050 119,985.85 125,985.14
Mandor L.04 OH 0.067 140,000.00 9,380.00
JUMLAH HARGA TENAGA KERJA 135,365.14
D. Jumlah (A + B + C) 135,365.14
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 135,365.14
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Mandor L.04 OH 0.032 140,000.00 4,480.00
JUMLAH HARGA TENAGA KERJA 124,465.85
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 124,465.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 124,465.85
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Mandor L.04 OH 0.060 140,000.00 8,400.00
JUMLAH HARGA TENAGA KERJA 188,378.77
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 188,378.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 188,378.77
A. TENAGA
Pekerja L.01 OH 1.200 119,985.85 143,983.01
Mandor L.04 OH 0.045 140,000.00 6,300.00
JUMLAH HARGA TENAGA KERJA 150,283.01
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 150,283.01
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 6,699.29
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 6,699.29
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,699.29
A. TENAGA
Pekerja L.01 OH 0.330 119,985.85 39,595.33
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 40,995.33
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 40,995.33
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 40,995.33
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 66,992.92
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 66,992.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 66,992.92
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 66,992.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 66,992.92
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 37,395.75
B. BAHAN
Pasir Urug M3 1.200 218,750.00 262,500.00
JUMLAH HARGA BAHAN 262,500.00
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) 299,895.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 299,895.75
A. TENAGA
Pekerja L.01 OH 0.800 119,985.85 95,988.68
Tukang Batu L.02 OH 0.400 124,000.00 49,600.00
Kepala Tukang L.03 OH 0.040 129,000.00 5,160.00
Mandor L.04 OH 0.080 140,000.00 11,200.00
JUMLAH HARGA TENAGA KERJA 161,948.68
B. BAHAN
Kapur Padam M3 0.135 12,375.00 1,670.63
Pasir Pasang M3 0.400 386,250.00 154,500.00
D. Jumlah (A + B + C) 456,764.30
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 456,764.30
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 20,097.88
B. BAHAN
Ijuk Kg 6.000 4,575.00 27,450.00
JUMLAH HARGA BAHAN 27,450.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 47,547.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 47,547.88
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 33,496.46
B. BAHAN
Sirtu M3 1.200 300,000.00 360,000.00
JUMLAH HARGA BAHAN 360,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 393,496.46
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 393,496.46
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Mandor L.04 OH 0.040 140,000.00 5,600.00
JUMLAH HARGA TENAGA KERJA 53,594.34
B. BAHAN
Pasir Pasang M3 1.200 386,250.00 463,500.00
D. Jumlah (A + B + C) 517,094.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 517,094.34
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 202.000 2,025.00 409,050.00
Pasir Pasang M3 0.485 386,250.00 187,331.25
JUMLAH HARGA BAHAN 1,196,381.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,489,535.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 148,953.50
F. Harga Satuan Pekerjaan (D+E) 1,638,488.52
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 163.000 2,025.00 330,075.00
Pasir Pasang M3 0.520 386,250.00 200,850.00
JUMLAH HARGA BAHAN 1,130,925.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 136.000 2,025.00 275,400.00
Pasir Pasang M3 0.544 386,250.00 210,120.00
JUMLAH HARGA BAHAN 1,085,520.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,378,673.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 137,867.38
F. Harga Satuan Pekerjaan (D+E) 1,516,541.15
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 117.000 2,025.00 236,925.00
Pasir Pasang M3 0.561 386,250.00 216,686.25
JUMLAH HARGA BAHAN 1,053,611.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,346,765.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 134,676.50
F. Harga Satuan Pekerjaan (D+E) 1,481,441.52
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 91.000 2,025.00 184,275.00
Pasir Pasang M3 0.584 386,250.00 225,570.00
JUMLAH HARGA BAHAN 1,009,845.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,302,998.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 130,299.88
F. Harga Satuan Pekerjaan (D+E) 1,433,298.65
6 A.3.1.1.6. PEMASANGAN 1M3 PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Kapur Kg 0.170 12,375.00 2,103.75
Semen Portland M3 0.170 2,025.00 344.25
Pasir Pasang M3 0.340 386,250.00 131,325.00
JUMLAH HARGA BAHAN 733,773.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,026,926.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 102,692.68
F. Harga Satuan Pekerjaan (D+E) 1,129,619.45
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 61.000 2,025.00 123,525.00
Kapur M3 0.147 12,375.00 1,819.13
Pasir Pasang M3 0.492 386,250.00 190,035.00
JUMLAH HARGA BAHAN 915,379.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,208,532.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 120,853.29
F. Harga Satuan Pekerjaan (D+E) 1,329,386.18
A. TENAGA
Pekerja L.01 OH 1.500 119,985.85 179,978.77
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 293,153.77
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Semen Portland Kg 41.000 2,025.00 83,025.00
Kapur M3 0.131 12,375.00 1,621.13
Pasir Pasang M3 0.523 386,250.00 202,008.75
JUMLAH HARGA BAHAN 886,654.88
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,179,808.64
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 117,980.86
A. TENAGA
Pekerja L.01 OH 0.780 119,985.85 93,588.96
Tukang Batu L.02 OH 0.390 124,000.00 48,360.00
Kepala Tukang L.03 OH 0.039 129,000.00 5,031.00
Mandor L.04 OH 0.039 140,000.00 5,460.00
JUMLAH HARGA TENAGA KERJA 152,439.96
B. BAHAN
Batu Belah M3 1.200 500,000.00 600,000.00
Pasir Urug M3 0.432 218,750.00 94,500.00
JUMLAH HARGA BAHAN 694,500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 846,939.96
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 84,694.00
F. Harga Satuan Pekerjaan (D+E) 931,633.96
10 A.3.1.1.10. PASANGAN 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3.400 119,985.85 407,951.88
Tukang Batu L.02 OH 0.850 124,000.00 105,400.00
Kepala Tukang L.03 OH 0.085 129,000.00 10,965.00
Mandor L.04 OH 0.170 140,000.00 23,800.00
JUMLAH HARGA TENAGA KERJA 548,116.88
B. BAHAN
Batu Belah M3 0.480 500,000.00 240,000.00
Semen Portland Kg 194.000 2,025.00 392,850.00
Pasir Beton M3 0.312 355,000.00 110,760.00
Koral Beton M3 0.468 390,000.00 182,520.00
Besi Beton Kg 126.000 12,937.50 1,630,125.00
Kawat Beton Kg 1.800 24,070.00 43,326.00
JUMLAH HARGA BAHAN 2,599,581.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 3,147,697.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 314,769.79
A. TENAGA
Pekerja L.01 OH 2.400 119,985.85 287,966.03
Tukang Batu L.02 OH 0.800 124,000.00 99,200.00
Kepala Tukang L.03 OH 0.080 129,000.00 10,320.00
Mandor L.04 OH 0.119 140,000.00 16,660.00
JUMLAH HARGA TENAGA KERJA 414,146.03
B. BAHAN
Batu Belah M3 0.4500 500,000.00 225,000.00
Semen Portland Kg 194.0000 2,025.00 392,850.00
Pasir Beton M3 0.3120 355,000.00 110,760.00
Koral Beton M3 0.4680 390,000.00 182,520.00
JUMLAH HARGA BAHAN 911,130.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,325,276.03
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 10 %xD 132,527.60
F. Harga Satuan Pekerjaan (D+E) 1,457,803.63
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 247.00 2,025.00 500,175.00
Pasir Beton Kg 869.00 253.57 220,353.57
Kerikil ( Maks. 30 mm ) Kg 999.00 295.37 295,075.00
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,058,603.57
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,305,912.22
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,305,912.22
2 A.4.1.1.2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 276.00 2,025.00 558,900.00
Pasir Beton Kg 828.00 253.57 209,957.14
Kerikil ( Maks. 30 mm ) Kg 1,012.00 295.37 298,914.81
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,110,771.96
C. PERALATAN
D. Jumlah (A + B + C) 1,358,080.60
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,358,080.60
A. TENAGA
Pekerja L.01 OH 1.6500 119,985.85 197,976.65
Tukang Batu L.02 OH 0.2750 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.0280 129,000.00 3,612.00
Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 299.00 2,025.00 605,475.00
Pasir Beton Kg 799.00 253.57 202,603.57
Kerikil ( Maks. 30 mm ) Kg 1,017.00 295.37 300,391.67
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,151,470.24
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,398,778.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,398,778.88
4 A.4.1.1.4 MEMBUAT 1 M³ LANTAI KERJA BETON MUTU F'C = 7,4 MPA SLUMP (3-6)CM, W/C =0.87
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 119,985.85 143,983.01
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.060 140,000.00 8,400.00
JUMLAH HARGA TENAGA KERJA 179,763.01
B. BAHAN
Semen Portland Kg 230.00 2,025.00 465,750.00
Pasir Beton Kg 893.00 253.57 226,439.29
Kerikil ( Maks. 30 mm ) Kg 1,027.00 295.37 303,345.37
Air Ltr 200.00 200.00 40,000.00
JUMLAH HARGA BAHAN 1,035,534.66
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,215,297.67
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,215,297.67
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 326.00 2,025.00 660,150.00
Pasir Beton Kg 760.00 253.57 192,714.29
Kerikil ( Maks. 30 mm ) Kg 1,029.00 295.37 303,936.11
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,199,800.40
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,447,109.04
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,447,109.04
6 A.4.1.1.6 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 352.00 2,025.00 712,800.00
Pasir Beton Kg 731.00 253.57 185,360.71
Kerikil ( Maks. 30 mm ) Kg 1,031.00 295.37 304,526.85
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,245,687.57
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,492,996.21
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,492,996.21
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 371.00 2,025.00 751,275.00
Pasir Beton Kg 698.00 253.57 176,992.86
Kerikil ( Maks. 30 mm ) Kg 1,047.00 295.37 309,252.78
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,280,520.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,527,829.28
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,527,829.28
8 A.4.1.1.8 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 384.00 2,025.00 777,600.00
Pasir Beton Kg 692.00 253.57 175,471.43
Kerikil ( Maks. 30 mm ) Kg 1,039.00 295.37 306,889.81
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,302,961.24
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,550,269.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,550,269.89
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 406.00 2,025.00 822,150.00
Pasir Beton Kg 684.00 253.57 173,442.86
Kerikil ( Maks. 30 mm ) Kg 1,026.00 295.37 303,050.00
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,341,642.86
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,588,951.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,588,951.50
10 A.4.1.1.10 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 119,985.85 197,976.65
Tukang Batu L.02 OH 0.275 124,000.00 34,100.00
Kepala Tukang L.03 OH 0.028 129,000.00 3,612.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 247,308.65
B. BAHAN
Semen Portland Kg 413.00 2,025.00 836,325.00
Pasir Beton Kg 681.00 253.57 172,682.14
Kerikil ( Maks. 30 mm ) Kg 1,021.00 295.37 301,573.15
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,353,580.29
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,600,888.94
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,600,888.94
A. TENAGA
Pekerja L.01 OH 2.100 119,985.85 251,970.28
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.105 140,000.00 14,700.00
JUMLAH HARGA TENAGA KERJA 314,585.28
B. BAHAN
Semen Portland Kg 439.00 2,025.00 888,975.00
Pasir Beton Kg 670.00 253.57 169,892.86
Kerikil ( Maks. 30 mm ) Kg 1,006.00 295.37 297,142.59
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA BAHAN 1,399,010.45
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,713,595.73
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,713,595.73
12 A.4.1.1.12 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.100 119,985.85 251,970.28
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.105 140,000.00 14,700.00
JUMLAH TENAGA KERJA 314,585.28
B. BAHAN
Semen Portland Kg 448.00 2,025.00 907,200.00
Pasir Beton Kg 667.00 253.57 169,132.14
Kerikil ( Maks. 30 mm ) Kg 1,000.00 295.37 295,370.37
Air Ltr 215.00 200.00 43,000.00
JUMLAH HARGA TENAGA KERJA 1,414,702.51
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,729,287.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,729,287.79
A. TENAGA
Pekerja L.01 OH 2.100 119,985.85 251,970.28
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.105 140,000.00 14,700.00
JUMLAH HARGA TENAGA KERJA 314,585.28
B. BAHAN
Semen Portland Kg 400.000 2,025.00 810,000.00
Pasir Beton M3 0.480 355,000.00 170,400.00
Kerikil ( 2 cm / 3 cm ) M3 0.800 398,750.00 319,000.00
Strorox - 100 Kg 1.200 58,320.00 69,984.00
Air Ltr 210.000 200.00 42,000.00
JUMLAH HARGA BAHAN 1,411,384.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,725,969.28
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,725,969.28
Catatan : Semen yang digunakan di AHSP ini. jenis OPC. Direkomendasikan semen yang
digunakan adalah jenis PCC.
14 A.4.1.1.14 PEMASANGAN 1 M' PVC WATERSTOP LEBAR 150 MM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Batu L.02 OH 0.030 124,000.00 3,720.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 11,726.15
B. BAHAN
Waterstop Lebar 150 mm M1 1.050 78,670.00 82,603.50
JUMLAH HARGA BAHAN 82,603.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 94,329.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 94,329.65
A. TENAGA
Pekerja L.01 OH 0.070 119,985.85 8,399.01
Tukang Batu L.02 OH 0.035 124,000.00 4,340.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 14,235.01
B. BAHAN
Waterstop Lebar 200 mm M1 1.050 97,118.00 101,973.90
JUMLAH HARGA BAHAN 101,973.90
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 116,208.91
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,208.91
A. TENAGA
Pekerja L.01 OH 0.080 119,985.85 9,598.87
Tukang Batu L.02 OH 0.040 124,000.00 4,960.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 15,634.87
B. BAHAN
Waterstop Lebar 200 mm M1 1.050 97,118.00 101,973.90
JUMLAH HARGA BAHAN 101,973.90
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 117,608.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 117,608.77
A. TENAGA
Pekerja L.01 OH 0.070 119,985.85 8,399.01
Tukang Besi L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 18,542.01
B. BAHAN
Besi Beton (Ulir) Kg 10.500 14,501.25 152,263.13
Kawat Beton Kg 0.150 24,070.00 3,610.50
JUMLAH HARGA BAHAN 155,873.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 174,415.63
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 174,415.63
Harga Satuan Pekerjaan untuk 1 Kg 17,441.56
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Tukang Besi L.02 OH 0.050 124,000.00 6,200.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 13,264.29
B. BAHAN
Besi Beton (Polos / Ulir) Kg 10.500 12,937.50 135,843.75
Kawat Beton Kg 0.100 24,070.00 2,407.00
JUMLAH HARGA BAHAN 138,250.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 151,515.04
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 151,515.04
Harga Satuan Pekerjaan untuk 1 Kg 15,151.50
A. TENAGA
Pekerja L.01 OH 0.070 119,985.85 8,399.01
Tukang Besi L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 18,542.01
B. BAHAN
Besi Beton (Polos) Kg 10.500 12,937.50 135,843.75
Kawat Beton M3 0.150 24,070.00 3,610.50
JUMLAH HARGA BAHAN 139,454.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 157,996.26
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 157,996.26
Harga Satuan Pekerjaan untuk 1 Kg 15,799.63
A. TENAGA
Pekerja L.01 OH 0.0025 119,985.85 299.96
Tukang Besi L.02 OH 0.0025 124,000.00 310.00
Kepala Tukang L.03 OH 0.0025 129,000.00 322.50
Mandor L.04 OH 0.0001 140,000.00 14.00
JUMLAH HARGA TENAGA KERJA 946.46
B. BAHAN
Wiremesh M6 - M8 Kg 1.020 11,473.65 11,703.12
Kawat Bendrat Kg 0.005 24,070.00 120.35
JUMLAH HARGA BAHAN 11,823.47
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 12,769.94
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,769.94
A. TENAGA
Pekerja L.01 OH 0.520 119,985.85 62,392.64
Tukang Kayu L.02 OH 0.260 124,000.00 32,240.00
Kepala Tukang L.03 OH 0.026 129,000.00 3,354.00
Mandor L.04 OH 0.026 140,000.00 3,640.00
JUMLAH HARGA TENAGA KERJA 101,626.64
B. BAHAN
Papan Kayu Kelas III M3 0.040 983,750.00 39,350.00
Paku 5 - 10 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.100 53,125.00 5,312.50
JUMLAH HARGA BAHAN 52,139.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 153,765.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 153,765.89
Catatan: Semua Pekerjaan bekisting termasuk pembongkarannya
A. TENAGA
Pekerja L.01 OH 0.520 119,985.85 62,392.64
Tukang Kayu L.02 OH 0.260 124,000.00 32,240.00
Kepala Tukang L.03 OH 0.026 129,000.00 3,354.00
Mandor L.04 OH 0.026 140,000.00 3,640.00
JUMLAH HARGA TENAGA KERJA 101,626.64
B. BAHAN
Papan Kayu Kelas III M3 0.045 983,750.00 44,268.75
Paku 5 - 10 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.100 53,125.00 5,312.50
JUMLAH HARGA BAHAN 57,058.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 158,684.64
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 158,684.64
A. TENAGA
Pekerja L.01 OH 0.660 119,985.85 79,190.66
Tukang Kayu L.02 OH 0.330 124,000.00 40,920.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.033 140,000.00 4,620.00
JUMLAH HARGA TENAGA KERJA 128,987.66
B. BAHAN
Papan Kayu Kelas III M3 0.040 983,750.00 39,350.00
Paku 5 cm - 12 cm Kg 0.400 24,922.50 9,969.00
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
Balok Kayu Kelas II M3 0.015 4,217,641.25 63,264.62
Plywood Tebal 9 mm Lbr 0.350 110,875.00 38,806.25
Dolken Kayu Ø (8 - 10) cm / 4 m Btg 2.000 11,125.00 22,250.00
JUMLAH HARGA BAHAN 184,264.87
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 313,252.53
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 313,252.53
A. TENAGA
Pekerja L.01 OH 0.660 119,985.85 79,190.66
Tukang Kayu L.02 OH 0.330 124,000.00 40,920.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.033 140,000.00 4,620.00
JUMLAH HARGA TENAGA KERJA 128,987.66
B. BAHAN
Kayu Kelas III M3 0.040 983,750.00 39,350.00
Paku 5 cm - 12 cm Kg 0.400 24,922.50 9,969.00
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
Balok Kayu Kelas II M3 0.018 4,217,641.25 75,917.54
Plywood Tebal 9 mm Lbr 0.350 110,875.00 38,806.25
Dolken Kayu Ø (8 - 10) cm / 4 m Btg 2.000 11,125.00 22,250.00
JUMLAH HARGA BAHAN 196,917.79
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 325,905.45
A. TENAGA
Pekerja L.01 OH 0.660 119,985.85 79,190.66
Tukang Kayu L.02 OH 0.330 124,000.00 40,920.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.033 140,000.00 4,620.00
JUMLAH HARGA TENAGA KERJA 128,987.66
B. BAHAN
Kayu Kelas III M3 0.040 983,750.00 39,350.00
Paku 5 cm - 12 cm Kg 0.400 24,922.50 9,969.00
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
Balok Kayu Kelas II M3 0.015 4,217,641.25 63,264.62
Plywood Tebal 9 mm Lbr 0.350 110,875.00 38,806.25
Dolken Kayu Ø (8 - 10) cm / 4 m Btg 6.000 11,125.00 66,750.00
JUMLAH HARGA BAHAN 228,764.87
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 357,752.53
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 357,752.53
A. TENAGA
Pekerja L.01 OH 0.660 119,985.85 79,190.66
Tukang Kayu L.02 OH 0.330 124,000.00 40,920.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.033 140,000.00 4,620.00
JUMLAH HARGA TENAGA KERJA 128,987.66
B. BAHAN
Kayu Kelas III M3 0.030 983,750.00 29,512.50
Paku 5 cm - 12 cm Kg 0.400 24,922.50 9,969.00
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
Balok Kayu Kelas II M3 0.020 4,217,641.25 84,352.83
Plywood Tebal 9 mm Lbr 0.350 110,875.00 38,806.25
Dolken Kayu Ø (8 - 10) cm / 4 m Btg 3.000 11,125.00 33,375.00
Formite/Penjaga Jarak Bekisting/Spacer Bh 4.000 4,000.00 16,000.00
JUMLAH HARGA BAHAN 222,640.58
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 0.660 119,985.85 79,190.66
Tukang Kayu L.02 OH 0.330 124,000.00 40,920.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.033 140,000.00 4,620.00
JUMLAH HARGA TENAGA KERJA 128,987.66
B. BAHAN
Kayu Kelas III M3 0.030 983,750.00 29,512.50
Paku 5 cm - 12 cm Kg 0.400 24,922.50 9,969.00
Minyak Bekisting Ltr 0.150 53,125.00 7,968.75
Balok Kayu Kelas II M3 0.015 4,217,641.25 63,264.62
Plywood Tebal 9 mm Lbr 0.350 110,875.00 38,806.25
Dolken Kayu Ø (8 - 10) cm / 4 m Btg 2.000 11,125.00 22,250.00
JUMLAH HARGA BAHAN 171,771.12
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 300,758.78
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 300,758.78
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.050 124,000.00 6,200.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 25,962.88
B. BAHAN
Kayu Kelas III (papan) M3 0.0264 983,750.00 25,971.00
Paku 5 cm - 12 cm Kg 0.600 24,922.50 14,953.50
Dolken Kayu Ø (8 - 10) cm / 4 m Btg 0.500 11,125.00 5,562.50
JUMLAH HARGA BAHAN 46,487.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 72,449.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 72,449.88
A. TENAGA
Pekerja L.01 OH 0.180 119,985.85 21,597.45
Tukang Batu L.02 OH 0.020 124,000.00 2,480.00
Tukang Kayu L.02 OH 0.020 124,000.00 2,480.00
Tukang Besi L.02 OH 0.020 124,000.00 2,480.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.009 140,000.00 1,260.00
JUMLAH HARGA TENAGA KERJA 31,071.45
B. BAHAN
Kayu Kelas III M3 0.002 983,750.00 1,967.50
Paku Biasa 5cm - 12cm Kg 0.010 24,922.50 249.23
Minyak bekisting Ltr -
Besi Beton polos Kg 3.000 12,937.50 38,812.50
Kawat Beton Kg 0.450 24,070.00 10,831.50
Semen Portland Kg 4.000 2,025.00 8,100.00
Pasir Beton M3 0.006 355,000.00 2,130.00
Koral Beton M3 0.009 398,750.00 3,588.75
JUMLAH HARGA BAHAN 65,679.47
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 96,750.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 96,750.93
A. TENAGA
Pekerja L.01 OH 0.297 119,985.85 35,635.80
Tukang Batu L.02 OH 0.033 124,000.00 4,092.00
Tukang Kayu L.02 OH 0.033 124,000.00 4,092.00
Tukang Besi L.02 OH 0.033 124,000.00 4,092.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,301.80
B. BAHAN
Kayu Kelas III M3 0.003 983,750.00 2,951.25
Paku Biasa 5 cm - 12 cm Kg 0.020 24,922.50 498.45
Minyak bekisting Ltr -
Besi Beton Polos Kg 3.600 12,937.50 46,575.00
Kawat Beton Kg 0.050 24,070.00 1,203.50
Semen Portland Kg 5.500 2,025.00 11,137.50
Pasir Beton M3 0.009 355,000.00 3,195.00
Koral Beton M3 0.015 398,750.00 5,981.25
D. Jumlah (A + B + C) 122,843.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 122,843.75
A. TENAGA
Pekerja L.01 OH 0.240 119,985.85 28,796.60
Tukang Kayu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.024 140,000.00 3,360.00
JUMLAH HARGA TENAGA KERJA 48,584.60
B. BAHAN
Multiflex 12 mm Lbr 0.203 286,676.25 58,195.28
Kaso 5/7 cm M3 0.009 2,661,250.00 23,951.25
Paku 5 cm dan 7 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 100,248.28
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 148,832.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 148,832.88
Catatan :
Bahan digunakan berulang kali :
Yang ke-1, koefisien 0,353 ( Multiplex ) dan 0,016 ( Kaso )
Yang ke-2, koefisien menjadi 0,203 ( Multiplex ) dan 0,009 ( Kaso )
Yang ke-3, koefisien 0,128 ( Multiplex ) dan 0,005 ( Kaso )
Yang ke-4, koefisien 0,091 ( Multiplex ) dan 0,003 ( Kaso )
32 A.4.1.1.32 PEMASANGAN 1 M2 BEKISTING DINDING BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 X PAKAI*
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 119,985.85 43,194.90
Tukang Kayu L.02 OH 0.180 124,000.00 22,320.00
Kepala Tukang L.03 OH 0.018 129,000.00 2,322.00
Mandor L.04 OH 0.036 140,000.00 5,040.00
JUMLAH HARGA TENAGA KERJA 72,876.90
B. BAHAN
Papan 3/20 cm Kayu Kelas II M3 0.022 1,570,000.00 34,540.00
Kaso 5/7 cm M3 0.009 2,661,250.00 23,951.25
Paku 5 cm dan 7 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 76,593.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 149,469.90
Catatan :
Bahan digunakan berulang kali :
Yang ke-1, koefisien 0,036 ( Papan ) dan 0,016 ( Kaso )
Yang ke-2, koefisien menjadi 0,022 ( Papan ) dan 0,009 ( Kaso )
Yang ke-3, koefisien 0,014 ( Papan ) dan 0,005 ( Kaso )
Yang ke-4, koefisien 0,011 ( Papan ) dan 0,003 ( Kaso )
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 40,487.17
B. BAHAN
Multiplex 12 mm Lbr 0.203 286,676.25 58,195.28
Kaso 5/7 cm M3 0.016 2,661,250.00 42,580.00
Paku 5 cm dan 7 cm Kg 0.250 24,922.50 6,230.63
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 117,630.90
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 158,118.07
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 158,118.07
Catatan :
Bahan digunakan berulang kali :
Yang ke-1, koefisien 0,353 ( Multiplex ) dan 0,029 ( Kaso )
Yang ke-2, koefisien menjadi 0,203 ( Multiplex ) dan 0,016 ( Kaso )
Yang ke-3, koefisien 0,128 ( Multiplex ) dan 0,009 ( Kaso )
Yang ke-4, koefisien 0,091 ( Multiplex ) dan 0,006 ( Kaso )
34 A.4.1.1.34 PEMASANGAN 1 M2 BEKISTING PONDASI DAN SLOOF BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 X PAKAI*
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 60,730.75
B. BAHAN
Papan 3/20 cm Kayu Kelas II M3 0.022 1,570,000.00 34,540.00
Kaso 5/7 cm M3 0.016 2,661,250.00 42,580.00
Paku 5 cm dan 7 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 95,221.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 155,952.50
Catatan :
Bahan digunakan berulang kali :
Yang ke-1, koefisien 0,036 ( Papan ) dan 0,029 ( Kaso )
Yang ke-2, koefisien menjadi 0,022 ( Papan ) dan 0,016 ( Kaso )
Yang ke-3, koefisien 0,014 ( Papan ) dan 0,009 ( Kaso )
Yang ke-4, koefisien 0,011 ( Papan ) dan 0,006 ( Kaso )
A. TENAGA
Pekerja L.01 OH 0.360 119,985.85 43,194.90
Tukang Kayu L.02 OH 0.180 124,000.00 22,320.00
Kepala Tukang L.03 OH 0.018 129,000.00 2,322.00
Mandor L.04 OH 0.036 140,000.00 5,040.00
JUMLAH HARGA TENAGA KERJA 72,876.90
B. BAHAN
Kaso 5/7 cm M3 0.017 2,661,250.00 45,241.25
Paku 5 cm dan 7 cm Kg 0.240 24,922.50 5,981.40
JUMLAH HARGA BAHAN 51,222.65
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 124,099.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 124,099.55
Catatan :
Bahan kaso yang ke-1 sebanyak ( 0,030 ) m3 ; ke-2 menjadi ( 0,017 ) m3 ; ke-3 menjadi ( 0,010 ) m3 dan yang ke-4 menjadi ( 0,006 ) m3
A.4.1.1.36 PEMASANGAN 1 M2 PERANCAH/PENYOKONG BEKISTING PONDASI DAN SLOOF BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks
36 2,0 m *2 kali pakai*
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 40,487.17
B. BAHAN
Kaso 5/7 cm M3 0.019 2,661,250.00 50,563.75
Paku 5 cm dan 7 cm Kg 0.250 24,922.50 6,230.63
JUMLAH HARGA BAHAN 56,794.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 97,281.54
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 97,281.54
Catatan :
* Bahan Kaso yang ke-1 sebanyak 0,035 m3 ; ke-2 menjadi 0,019 ; ke-3menjadi 0,014 dan ke-4 menjadi 0,011 m3 (Kaso)
A. TENAGA
Pekerja L.01 OH 0.360 119,985.85 43,194.90
Tukang Kayu L.02 OH 0.360 124,000.00 44,640.00
Kepala Tukang L.03 OH 0.036 129,000.00 4,644.00
Mandor L.04 OH 0.036 140,000.00 5,040.00
JUMLAH HARGA TENAGA KERJA 97,518.90
B. BAHAN
Multiflex 12 mm Lbr 0.203 286,676.25 58,195.28
Kaso 5/7 cm M3 0.018 2,661,250.00 47,902.50
Paku 5 cm dan 7 cm Kg 0.250 24,922.50 6,230.63
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 122,953.40
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 220,472.31
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 220,472.31
Catatan :
Bahan digunakan berulang kali :
Yang ke-1, koefisien 0,353 ( Multiplex ) dan 0,033 ( Kaso )
Yang ke-2, koefisien menjadi 0,203 ( Multiplex ) dan 0,018 ( Kaso )
Yang ke-3, koefisien 0,128 ( Multiplex ) dan 0,011 ( Kaso )
Yang ke-4, koefisien 0,091 ( Multiplex ) dan 0,007 ( Kaso )
38 A.4.1.1.38 PEMASANGAN 1 M2 BEKISTING BALOK BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 X PAKAI*
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 119,985.85 43,194.90
Tukang Kayu L.02 OH 0.180 124,000.00 22,320.00
Kepala Tukang L.03 OH 0.018 129,000.00 2,322.00
Mandor L.04 OH 0.036 140,000.00 5,040.00
JUMLAH HARGA TENAGA KERJA 72,876.90
B. BAHAN
Papan 3/20 cm Kayu Kelas II M3 0.022 1,570,000.00 34,540.00
Kaso 5/7 cm M3 0.013 2,661,250.00 34,596.25
Paku 5 cm dan 7 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 87,238.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 160,114.90
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 160,114.90
A. TENAGA
Pekerja L.01 OH 0.330 119,985.85 39,595.33
Tukang Kayu L.02 OH 0.330 124,000.00 40,920.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.033 140,000.00 4,620.00
JUMLAH HARGA TENAGA KERJA 89,392.33
B. BAHAN
Multiflex 12 mm Lbr 0.203 286,676.25 58,195.28
Kaso 5/7 cm M3 0.009 2,661,250.00 23,951.25
Paku 5 cm dan 7 cm Kg 0.250 24,922.50 6,230.63
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 99,002.15
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 188,394.48
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 188,394.48
Catatan :
Bahan digunakan berulang kali :
Yang ke-1, koefisien 0,353 ( Multiplex ) dan 0,017 ( Kaso )
Yang ke-2, koefisien menjadi 0,203 ( Multiplex ) dan 0,009 ( Kaso )
Yang ke-3, koefisien 0,128 ( Multiplex ) dan 0,006 ( Kaso )
Yang ke-4, koefisien 0,091 ( Multiplex ) dan 0,004 ( Kaso )
40 A.4.1.1.40 PEMASANGAN 1 M2 BEKISTING KOLOM BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 X PAKAI*
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.340 119,985.85 40,795.19
Tukang Kayu L.02 OH 0.170 124,000.00 21,080.00
Kepala Tukang L.03 OH 0.017 129,000.00 2,193.00
Mandor L.04 OH 0.034 140,000.00 4,760.00
JUMLAH HARGA TENAGA KERJA 68,828.19
B. BAHAN
Papan 3/20 cm Kayu Kelas II M3 0.022 1,570,000.00 34,540.00
Kaso 5/7 cm M3 0.009 2,661,250.00 23,951.25
Paku 5 cm dan 7 cm Kg 0.300 24,922.50 7,476.75
Minyak Bekisting Ltr 0.200 53,125.00 10,625.00
JUMLAH HARGA BAHAN 76,593.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 145,421.19
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 145,421.19
Catatan :
A. TENAGA
Pekerja L.01 OH 0.040 119,985.85 4,799.43
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 5,359.43
B. BAHAN
Minyak Bekisting - - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 5,359.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 5,359.43
42 A.4.1.1.42 PEMBONGKARAN 1 M2 BEKISTING SECARA HATI-HATI ( TERMASUK MEMBERSIHKAN DAN MEMBERESKAN PUING-PUING )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 8,039.15
B. BAHAN
Minyak Bekisting - - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 8,039.15
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 8,039.15
1 A.4.1.2.1 PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 8 CM BETON f'c 14,5 Mpa, SLUMP (120 ± 20)MM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.132 119,985.85 15,838.13
Tukang Batu L.02 OH 0.022 124,000.00 2,728.00
Kepala Tukang L.03 OH 0.002 129,000.00 258.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 19,804.13
B. BAHAN
Semen Portland Kg 26.080 2,025.00 52,812.00
Pasir Beton Kg 60.800 253.57 15,417.14
Koral Beton Kg 82.320 295.37 24,314.89
Air Ltr 17.200 200.00 3,440.00
JUMLAH HARGA BAHAN 95,984.03
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 115,788.16
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 115,788.16
A. TENAGA
Pekerja L.01 OH 0.165 119,985.85 19,797.66
Tukang Batu L.02 OH 0.028 124,000.00 3,472.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 24,776.66
B. BAHAN
Semen Portland Kg 32.600 2,025.00 66,015.00
Pasir Beton Kg 76.000 253.57 19,271.43
Koral Beton Kg 102.900 295.37 30,393.61
Air Ltr 21.500 200.00 4,300.00
AHS Pek. Beton Pracetak - 311
JUMLAH HARGA BAHAN 119,980.04
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 144,756.70
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 144,756.70
A. TENAGA
Pekerja L.01 OH 0.198 119,985.85 23,757.20
Tukang Batu L.02 OH 0.033 124,000.00 4,092.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 29,636.20
B. BAHAN
Semen Portland Kg 39.120 2,025.00 79,218.00
Pasir Beton Kg 91.200 253.57 23,125.71
Koral Beton Kg 123.480 295.37 36,472.33
Air Ltr 25.800 200.00 5,160.00
JUMLAH HARGA BAHAN 143,976.05
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 173,612.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 173,612.25
4 A.4.1.2.4. PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 15 CM BETON f'c 14,5 Mpa, SLUMP (120±20)MM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.248 119,985.85 29,756.49
Tukang Batu L.02 OH 0.041 124,000.00 5,084.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 37,176.49
B. BAHAN
Semen Portland Kg 48.900 2,025.00 99,022.50
Pasir Beton Kg 114.000 253.57 28,907.14
Koral Beton Kg 154.350 295.37 45,590.42
Air Ltr 32.250 200.00 6,450.00
JUMLAH HARGA BAHAN 179,970.06
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 217,146.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 217,146.55
A. TENAGA
Pekerja L.01 OH 0.007 119,985.85 839.90
Tukang Kayu L.02 OH 0.076 124,000.00 9,424.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 11,435.90
B. BAHAN
Lantai Kerja t = 10 cm M3 0.008 1,215,297.67 9,722.38
Besi Hollow (50 x 50 x 3) mm Kg 9.394 8,125.00 76,326.25
Kayu Kaso 5/7 (lebar 5 cm. tinggi 7 cm) M3 0.005 2,661,250.00 13,306.25
Phenol Film 12 mm Lbr 0.080 210,600.00 16,848.00
Minyak Cetakan (Bekisting) Ltr 0.200 53,125.00 10,625.00
Dinabolt Ø 12 mm ( 10 s/d 15 cm ) Bh 3.882 4,750.00 18,439.50
JUMLAH HARGA BAHAN 145,267.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 156,703.28
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 156,703.28
A. TENAGA
Pekerja L.01 OH 0.004 119,985.85 479.94
Tukang Kayu L.02 OH 0.038 124,000.00 4,712.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 5,847.94
B. BAHAN
Kayu Kaso 5/7 (lebar 5 cm. tinggi 7 cm) M3 0.005 2,661,250.00 13,306.25
PheNol film 12 mm Lbr 0.043 210,600.00 9,055.80
Minyak Cetakan (Bekisting) Ltr 0.200 53,125.00 10,625.00
Paku 5 - 7 cm Kg 0.046 24,922.50 1,146.44
Dinabolt Ø 12 mm ( 10 s/d 15 cm ) Bh 0.693 4,750.00 3,291.75
JUMLAH HARGA BAHAN 37,425.24
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 0.004 119,985.85 479.94
Tukang Kayu L.02 OH 0.038 124,000.00 4,712.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 5,847.94
B. BAHAN
Kayu Kaso 5/7 (lebar 5 cm. tinggi 7 cm) M3 0.004 2,661,250.00 10,645.00
PheNol film 12 mm Lbr 0.048 210,600.00 10,108.80
Minyak Cetakan (Bekisting) Ltr 0.200 53,125.00 10,625.00
Paku 5 - 7 cm Kg 0.046 24,922.50 1,146.44
Dinabolt Ø 12 mm ( 10 s/d 15 cm ) Bh 0.693 4,750.00 3,291.75
JUMLAH HARGA BAHAN 35,816.99
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 41,664.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 41,664.93
8 A.4.1.2.8 PEMASANGAN DAN MEMBUKA CETAKAN 1 BUAH KOMPONEN PELAT BETON PRACETAK
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.053 119,985.85 6,359.25
Tukang Kayu L.02 OH 0.018 124,000.00 2,232.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 9,291.25
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 9,291.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 9,291.25
A. TENAGA
Pekerja L.01 OH 0.089 119,985.85 10,678.74
Tukang Kayu L.02 OH 0.030 124,000.00 3,720.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 15,098.74
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 15,098.74
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 15,098.74
10 A.4.1.2.10 PEMASANGAN DAN MEMBUKA CETAKAN 1 BUAH KOMPONEN KOLOM BETON PRACETAK
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.071 119,985.85 8,519.00
Tukang Kayu L.02 OH 0.024 124,000.00 2,976.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 12,195.00
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 12,195.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,195.00
A. TENAGA
Pekerja L.01 OH 0.064 119,985.85 7,679.09
Tukang Batu L.02 OH 0.244 124,000.00 30,256.00
Tukang Vibrator L.02 OH 0.128 124,000.00 15,872.00
Kepala Tukang L.03 OH 0.034 129,000.00 4,386.00
Mandor L.04 OH 0.073 140,000.00 10,220.00
JUMLAH HARGA TENAGA KERJA 68,413.09
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 68,413.09
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 68,413.09
A. TENAGA
Pekerja L.01 OH 0.069 119,985.85 8,279.02
Tukang Batu L.02 OH 0.242 124,000.00 30,008.00
Tukang Vibrator L.02 OH 0.138 124,000.00 17,112.00
Kepala Tukang L.03 OH 0.037 129,000.00 4,773.00
Mandor L.04 OH 0.073 140,000.00 10,220.00
JUMLAH HARGA TENAGA KERJA 70,392.02
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 70,392.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 70,392.02
A. TENAGA
Pekerja L.01 OH 0.061 119,985.85 7,319.14
Tukang Batu L.02 OH 0.213 124,000.00 26,412.00
Tukang Vibrator L.02 OH 0.122 124,000.00 15,128.00
Kepala Tukang L.03 OH 0.033 129,000.00 4,257.00
Mandor L.04 OH 0.073 140,000.00 10,220.00
JUMLAH HARGA TENAGA KERJA 63,336.14
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 63,336.14
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 63,336.14
A.4.1.2.14 PEMASANGAN 1 BUAH KOMPONEN UNTUK PELAT BETON PRACETAK BESERTA INDEKS KENAIKAN LANTAI
14
EREKSI PELAT HINGGA 24 LANTAI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Operator Crane L.08 OH 0.067 129,000.00 8,643.00
Pembantu Operator Crane L.09 OH 0.067 124,000.00 8,308.00
Pekerja L.01 OH 0.067 119,985.85 8,039.05
Tukang Batu L.02 OH 0.067 124,000.00 8,308.00
Tukang Ereksi L.02 OH 0.134 124,000.00 16,616.00
Kepala Tukang L.03 OH 0.067 129,000.00 8,643.00
Mandor L.04 OH 0.067 140,000.00 9,380.00
JUMLAH HARGA TENAGA KERJA 67,937.05
B. BAHAN
Solar Ltr 6.676 9,700.00 64,757.20
JUMLAH HARGA BAHAN 64,757.20
C. PERALATAN
Sewa Crane Unit hari 0.067 9,500,000.00 636,500.00
Sewa Pipe Support Bh hari 1.100 70,200.00 77,220.00
JUMLAH HARGA ALAT 713,720.00
D. Jumlah (A + B + C) 846,414.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 846,414.25
A. TENAGA
Operator Crane OH 0.061 129,000.00 7,869.00
Pembantu Operator Crane OH 0.061 124,000.00 7,564.00
Pekerja OH 0.061 119,985.85 7,319.14
Tukang Batu OH 0.061 124,000.00 7,564.00
Tukang Ereksi OH 0.122 124,000.00 15,128.00
Kepala Tukang OH 0.061 129,000.00 7,869.00
Mandor OH 0.061 140,000.00 8,540.00
JUMLAH HARGA TENAGA KERJA 61,853.14
B. BAHAN
Solar Ltr 6.110 9,700.00 59,267.00
JUMLAH HARGA BAHAN 59,267.00
C. PERALATAN
Sewa Crane Unit hari 0.061 9,500,000.00 579,500.00
Sewa Scafolding Bh hari 1.100 70,200.00 77,220.00
JUMLAH HARGA ALAT 656,720.00
D. Jumlah (A + B + C) 777,840.14
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 777,840.14
A. TENAGA
Operator Crane L.08 OH 0.083 129,000.00 10,707.00
Pembantu Operator Crane L.09 OH 0.083 124,000.00 10,292.00
Pekerja L.01 OH 0.083 119,985.85 9,958.83
Tukang Batu L.02 OH 0.083 124,000.00 10,292.00
Tukang Ereksi L.02 OH 0.166 124,000.00 20,584.00
Kepala Tukang L.03 OH 0.083 129,000.00 10,707.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 84,160.83
B. BAHAN
Solar Ltr 8.277 9,700.00 80,286.90
JUMLAH HARGA BAHAN 80,286.90
C. PERALATAN
Sewa Crane Unit hari 0.083 9,500,000.00 788,500.00
Sewa Scafolding Bh hari 2.200 70,200.00 154,440.00
JUMLAH HARGA ALAT 942,940.00
D. Jumlah (A + B + C) 1,107,387.73
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,107,387.73
A. TENAGA
Pekerja L.01 OH 0.019 119,985.85 2,279.73
Tukang Batu L.02 OH 0.038 124,000.00 4,712.00
JUMLAH HARGA TENAGA KERJA 6,991.73
B. BAHAN
D. Jumlah (A + B + C) 196,991.73
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 196,991.73
A. TENAGA
Pekerja L.01 OH 0.019 119,985.85 2,279.73
Tukang Batu L.02 OH 0.038 124,000.00 4,712.00
JUMLAH HARGA TENAGA KERJA 6,991.73
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Crane Unit Hari 0.019 9,500,000.00 180,500.00
JUMLAH HARGA ALAT 180,500.00
D. Jumlah (A + B + C) 187,491.73
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 187,491.73
A. TENAGA
Pekerja L.01 OH 0.019 119,985.85 2,279.73
Tukang Batu L.02 OH 0.038 124,000.00 4,712.00
JUMLAH HARGA TENAGA KERJA 6,991.73
B. BAHAN
- -
JUMLAH HARGA BAHAN -
C. PERALATAN
Sewa Crane Unit Hari 0.019 9,500,000.00 180,500.00
JUMLAH HARGA ALAT 180,500.00
D. Jumlah (A + B + C) 187,491.73
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 187,491.73
A. TENAGA
JUMLAH HARGA TENAGA KERJA
B. BAHAN
Semen Grout Kg 1,200.00 20,900.00 25,080,000.00
Screening Kg 650.00 216.00 140,400.00
D. Jumlah (A + B + C) 25,290,400.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 25,290,400.00
A. TENAGA
JUMLAH HARGA TENAGA KERJA
B. BAHAN
Semen Grout Kg 1,850.00 20,900.00 38,665,000.00
Air Ltr 400.00 200.00 80,000.00
JUMLAH HARGA BAHAN 38,745,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 38,745,000.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,745,000.00
A. TENAGA
Tukang Batu L.02 OH 0.367 124,000.00 45,508.00
Kepala Tukang L.03 OH 0.074 129,000.00 9,546.00
Mandor L.04 OH 0.037 140,000.00 5,180.00
JUMLAH HARGA TENAGA KERJA 60,234.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 60,234.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 60,234.00
A. TENAGA
Pekerja L.01 OH 0.147 119,985.85 17,637.92
Tukang Batu L.02 OH 0.147 124,000.00 18,228.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 38,500.92
B. BAHAN
Kayu Kaso 5/7 ( lebar 5 cm. tinggi 7 cm ) M3 0.012 2,661,250.00 31,935.00
AHS Pek. Beton Pracetak - 326
Papan Cor M3 0.004 5,920,275.00 23,681.10
Paku 5 - 7 cm Kg 0.264 24,922.50 6,579.54
JUMLAH HARGA BAHAN 62,195.64
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 100,696.56
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 100,696.56
A. TENAGA
Pekerja L.01 OH 0.220 119,985.85 26,396.89
Tukang Kayu L.02 OH 0.022 124,000.00 2,728.00
Tukang Besi L.02 OH 0.220 129,000.00 28,380.00
Mandor L.04 OH 0.011 140,000.00 1,540.00
JUMLAH HARGA TENAGA KERJA 59,044.89
B. BAHAN
- - -
JUMLAH HARGA BAHAN
C. PERALATAN -
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 59,044.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 59,044.89
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Las Konstruksi L.02 OH 0.060 124,000.00 7,440.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 15,833.15
B. BAHAN
Baja Profil Kg 1.150 22,500.00 25,875.00
JUMLAH HARGA BAHAN 25,875.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 41,708.15
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 41,708.15
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Las Konstruksi L.02 OH 0.060 124,000.00 7,440.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 15,833.15
B. BAHAN
Besi Baja IWF Kg 1.150 23,093.75 26,557.81
JUMLAH HARGA BAHAN 26,557.81
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 42,390.96
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 42,390.96
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Las Konstruksi L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.001 129,000.00 129.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 25,227.58
B. BAHAN
Solar Ltr 1.000 9,700.00 9,700.00
Minyak pelumas Ltr 0.100 31,375.00 3,137.50
JUMLAH HARGA BAHAN 12,837.50
C. PERALATAN
Sewa Alat Jam 0.800 - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 38,065.08
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,065.08
4 A.4.2.1.4 PEMBUATAN 1 M2 PINTU BESI PELAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.050 119,985.85 125,985.14
Tukang Las Biasa L.02 OH 1.050 124,000.00 130,200.00
Kepala Tukang L.03 OH 0.105 129,000.00 13,545.00
Mandor L.04 OH 0.052 140,000.00 7,280.00
JUMLAH HARGA TENAGA KERJA 277,010.14
B. BAHAN
Besi Siku L 30.30.3 Kg 15.000 44,045.00 660,675.00
Besi pelat baja Kg 32.800 31,745.00 1,041,236.00
Kawat Las Kg 0.050 80,125.00 4,006.25
JUMLAH HARGA BAHAN 1,705,917.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,982,927.39
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,982,927.39
A. TENAGA
Pekerja L.01 OH 0.040 119,985.85 4,799.43
Tukang Besi Konstruksi L.02 OH 0.020 124,000.00 2,480.00
Kepala Tukang L.03 OH 0.002 129,000.00 258.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 7,817.43
B. BAHAN
Kawat Las Listrik Kg 0.400 80,125.00 32,050.00
Solar Ltr 0.300 9,700.00 2,910.00
Minyak Pelumas Ltr 0.040 31,375.00 1,255.00
JUMLAH HARGA BAHAN 36,215.00
C. PERALATAN
Sewa Alat 0.170 - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 44,032.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 44,032.43
A. TENAGA
Pekerja L.01 OH 0.650 119,985.85 77,990.80
Tukang Las Biasa L.02 OH 0.650 124,000.00 80,600.00
Kepala tukang L.03 OH 0.065 129,000.00 8,385.00
Mandor L.04 OH 0.032 140,000.00 4,480.00
JUMLAH HARGA TENAGA KERJA 171,455.80
B. BAHAN
Besi Scuare tube M1 4.760 77,825.00 370,447.00
Besi Lis Kaca (1 x 1 ) cm M1 4.522 18,625.00 84,222.25
Pengelasan Cm 20.000 4,403.24 88,064.87
JUMLAH HARGA BAHAN 542,734.12
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 714,189.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 714,189.92
A. TENAGA
Pekerja L.01 OH 1.200 119,985.85 143,983.01
Tukang Las L.02 OH 1.200 124,000.00 148,800.00
Kepala Tukang L.03 OH 0.120 129,000.00 15,480.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 309,103.01
B. BAHAN
Pintu Gulung Besi M2 1.000 460,250.00 460,250.00
JUMLAH HARGA BAHAN 460,250.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 769,353.01
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 769,353.01
A. TENAGA
Pekerja L.01 OH 0.440 119,985.85 52,793.77
Tukang L.02 OH 0.440 124,000.00 54,560.00
Kepala tukang L.03 OH 0.044 129,000.00 5,676.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 116,109.77
B. BAHAN
Pintu Lipat M2 1.000 999,500.00 999,500.00
JUMLAH HARGA BAHAN 999,500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,115,609.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,115,609.77
A. TENAGA
Pekerja L.01 OH 0.080 119,985.85 9,598.87
Tukang L.02 OH 0.800 124,000.00 99,200.00
Kepala Tukang L.03 OH 0.080 129,000.00 10,320.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 119,678.87
B. BAHAN
Sunscreen alluminium M2 1.000 248,250.00 248,250.00
JUMLAH HARGA BAHAN 248,250.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 367,928.87
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 367,928.87
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Aluminium L.02 OH 1.000 124,000.00 124,000.00
Kepala Tukang L.03 OH 0.100 129,000.00 12,900.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 263,885.85
B. BAHAN
Rolling door alluminium M2 1.000 453,250.00 453,250.00
JUMLAH HARGA BAHAN 453,250.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 717,135.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 717,135.85
A. TENAGA
Pekerja L.01 OH 0.043 119,985.85 5,159.39
Tukang Aluminium L.02 OH 0.043 124,000.00 5,332.00
Kepala Tukang L.03 OH 0.0043 129,000.00 554.70
Mandor L.04 OH 0.0021 140,000.00 294.00
JUMLAH HARGA TENAGA KERJA 11,340.09
B. BAHAN
Profil Alluminium 4 Inch M1 1.100 27,091.50 29,800.65
Skrup Fixer Bh 2.000 19,500.00 39,000.00
Sealant Tube 0.060 44,625.00 2,677.50
JUMLAH HARGA BAHAN 71,478.15
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 82,818.24
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 82,818.24
A. TENAGA
Pekerja L.01 OH 0.085 119,985.85 10,198.80
Tukang Aluminium L.02 OH 0.085 124,000.00 10,540.00
Kepala Tukang L.03 OH 0.0085 129,000.00 1,096.50
Mandor L.04 OH 0.0042 140,000.00 588.00
JUMLAH HARGA TENAGA KERJA 22,423.30
B. BAHAN
Profil Alluminium M1 4.400 27,091.50 119,202.60
Alluminium Strip M1 14.600 86,437.50 1,261,987.50
JUMLAH HARGA BAHAN 1,381,190.10
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,403,613.40
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,403,613.40
A. TENAGA
Pekerja L.01 OH 0.085 119,985.85 10,198.80
Tukang Alluminium L.02 OH 0.085 124,000.00 10,540.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 22,599.80
B. BAHAN
Pintu Alluminium M1 4.400 27,091.50 119,202.60
Profil Kaca M1 4.500 18,625.00 83,812.50
Sealant Tube 0.270 44,625.00 12,048.75
JUMLAH HARGA BAHAN 215,063.85
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 237,663.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 237,663.65
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 92,430.05
B. BAHAN
Venetions Blinds dan Vertikal Blinds (Tirai) M2 1.000 446,250.00 446,250.00
D. Jumlah (A + B + C) 538,680.05
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 538,680.05
A. TENAGA
Pekerja L.01 OH 1.670 119,985.85 200,376.36
Tukang Las L.02 OH 1.670 124,000.00 207,080.00
Kepala Tukang L.03 OH 0.167 129,000.00 21,543.00
Mandor L.04 OH 0.083 140,000.00 11,620.00
JUMLAH HARGA TENAGA KERJA 440,619.36
B. BAHAN
Besi Strip Kg 6.177 16,035.00 99,048.19
Pengelasan Cm 27.080 4,403.24 119,239.83
JUMLAH HARGA BAHAN 218,288.03
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 658,907.39
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 658,907.39
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Kawat Nyamuk M2 1.100 31,355.00 34,490.50
Pengelasan Cm 11.110 4,403.24 48,920.03
Baja Strip ( 0,2 x 2 ) cm Kg 1.716 23,290.00 39,965.64
JUMLAH HARGA BAHAN 123,376.17
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 149,764.76
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 149,764.76
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 51,517.17
B. BAHAN
Jendela Nako ( Rangka + Kaca 5 mm ) M2 1.100 48,000.00 52,800.00
Paku Skrup 1 cm - 2,5 cm Kg 0.100 52,500.00 5,250.00
Besi Strip M1 7.000 16,035.00 112,245.00
JUMLAH HARGA BAHAN 170,295.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 221,812.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 221,812.17
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 51,517.17
B. BAHAN
Seng Pelat M1 1.050 61,838.50 64,930.43
Paku 1 cm - 2,5 cm Kg 0.015 26,500.00 397.50
Papan Kayu Kelas II atau III M3 0.019 5,920,275.00 112,485.22
JUMLAH HARGA BAHAN 177,813.15
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 229,330.32
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 229,330.32
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang L.02 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.03 OH 0.030 129,000.00 3,870.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 60,187.88
B. BAHAN
Seng Pelat M1 1.050 61,838.50 64,930.43
Paku 1 cm - 2,5 cm Kg 0.010 26,500.00 265.00
Besi Strip Kg 0.500 16,035.00 8,017.50
JUMLAH HARGA BAHAN 73,212.93
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 133,400.80
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 133,400.80
20 A.4.2.1.20 PEMASANGAN 1 M2 RANGKA BESI HOLLOW 40.40 MM, MODUL 60 X 120 CM, UNTUK PARTISI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Besi L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 66,041.46
B. BAHAN
Rangka Metal Hollow 40.40 mm Btg 0.875 28,566.00 24,995.25
Assesoris ( Perkuatan, Las dll ) Ls 1.000 28,566.00 28,566.00
JUMLAH HARGA BAHAN 53,561.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 119,602.71
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 119,602.71
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang Besi L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 92,430.05
B. BAHAN
Rangka Metal Hollow 40 x 40 mm Btg 1.000 28,566.00 28,566.00
Assesoris ( Perkuatan, Las dll ) Ls 1.000 28,566.00 28,566.00
JUMLAH HARGA BAHAN 57,132.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 149,562.05
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 149,562.05
22 A.4.2.1.22 PEMASANGAN 1 M2 ATAP PELANA RANGKA ATAP BAJA RINGAN ( CANAI DINGIN ) PROFIL C75
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.734 119,985.85 88,069.61
Tukang Besi L.02 OH 0.734 124,000.00 91,016.00
Kepala Tukang L.03 OH 0.073 129,000.00 9,417.00
Mandor L.04 OH 0.037 140,000.00 5,180.00
JUMLAH HARGA TENAGA KERJA 193,682.61
B. BAHAN
Baja Ringan Canai Dingin C75 Btg 0.873 169,800.00 148,235.40
JUMLAH HARGA BAHAN 148,235.40
C. PERALATAN
Aksesoris % 10.000 148,235.40 14,823.54
JUMLAH HARGA ALAT 14,823.54
D. Jumlah (A + B + C) 356,741.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 356,741.55
A. TENAGA
Pekerja L.01 OH 0.7604 119,985.85 91,237.24
Tukang Besi L.02 OH 0.7604 124,000.00 94,289.60
Kepala Tukang L.03 OH 0.0760 129,000.00 9,804.00
Mandor L.04 OH 0.0380 140,000.00 5,320.00
JUMLAH HARGA TENAGA KERJA 200,650.84
B. BAHAN
Baja Ringan Canai Dingin C75 Btg 0.873 169,800.00 148,235.40
JUMLAH HARGA BAHAN 148,235.40
C. PERALATAN
Aksesoris % 10.000 148,235.40 14,823.54
JUMLAH HARGA ALAT 14,823.54
D. Jumlah (A + B + C) 363,709.78
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 363,709.78
A.4.4.1.1. PEMASANGAN 1 M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE M,
1
f'c : 17,2 Mpa ( SETARA CAMPURAN 1SP : 2PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 103,571.51
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 140.000 1,175.00 164,500.00
Semen Portland Kg 43.5 2,025.00 88,087.50
Pasir Pasang M3 0.08 386,250.00 30,900.00
JUMLAH HARGA BAHAN 283,487.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 387,059.01
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 387,059.01
A.4.4.1.2 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE S,
2
f'c : 12,5 Mpa ( SETARA CAMPURAN 1 SP : 3PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 103,571.51
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 140.000 1,175.00 164,500.00
Semen Portland Kg 32.950 2,025.00 66,723.75
Pasir Pasang M3 0.091 386,250.00 35,148.75
JUMLAH HARGA BAHAN 266,372.50
C. PERALATAN
D. Jumlah (A + B + C) 369,944.01
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 369,944.01
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 103,571.51
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 140.000 1,175.00 164,500.00
Semen Portland Kg 26.550 2,025.00 53,763.75
Pasir Pasang M3 0.093 386,250.00 35,921.25
JUMLAH HARGA BAHAN 254,185.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 357,756.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 357,756.51
A.4.4.1.4. PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE O,
4
f'c : 2,4 Mpa ( SETARA CAMPURAN 1SP : 5PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 103,571.51
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 140.000 1,175.00 164,500.00
Semen Portland Kg 22.200 2,025.00 44,955.00
Pasir Pasang M3 0.102 386,250.00 39,397.50
JUMLAH HARGA BAHAN 248,852.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 352,424.01
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 352,424.01
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 103,571.51
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 140.000 1,175.00 164,500.00
Semen Portland Kg 18.500 2,025.00 37,462.50
Pasir Pasang M3 0.122 386,250.00 47,122.50
JUMLAH HARGA BAHAN 249,085.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 352,656.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 352,656.51
6 A.4.4.1.6 PEMASANGAN 1M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 3KP : 10PP
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 103,571.51
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 140.000 1,175.00 164,500.00
Semen Portland Kg 10.080 2,025.00 20,412.00
Kapur Padam M3 0.0275 12,375.00 340.31
Pasir Pasang M3 0.0925 386,250.00 35,728.13
JUMLAH HARGA BAHAN 220,980.44
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 324,551.94
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 324,551.94
A. TENAGA
Pekerja L.01 OH 0.3000 119,985.85 35,995.75
Tukang Batu L.02 OH 0.1000 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.0100 129,000.00 1,290.00
Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 18.950 2,025.00 38,373.75
Pasir Pasang M3 0.038 386,250.00 14,677.50
JUMLAH HARGA BAHAN 135,301.25
C. PERALATAN - - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 187,087.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 187,087.00
A.4.4.1.8 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU DENGAN MORTAR TYPE S,
8
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 14.370 2,025.00 29,099.25
Pasir Pasang M3 0.040 386,250.00 15,450.00
JUMLAH HARGA BAHAN 126,799.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 178,585.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 178,585.00
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 11.500 2,025.00 23,287.50
Pasir Pasang M3 0.043 386,250.00 16,608.75
JUMLAH HARGA BAHAN 122,146.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 173,932.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 173,932.00
A.4.4.1.10 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU MORTAR TYPE O,
10
f'c : 2,4 Mpa ( SETARA CAMPURAN 1SP : 5PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 9.680 2,025.00 19,602.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
JUMLAH HARGA BAHAN 119,233.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 171,019.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 171,019.00
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 8.320 2,025.00 16,848.00
Pasir Pasang M3 0.049 386,250.00 18,926.25
JUMLAH HARGA BAHAN 118,024.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 169,810.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 169,810.00
12 A.4.4.1.12 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU CAMPURAN 1SP : 8PP
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 6.500 2,025.00 13,162.50
Pasir Pasang M3 0.050 386,250.00 19,312.50
JUMLAH HARGA BAHAN 114,725.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 166,510.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 166,510.75
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 4.500 2,025.00 9,112.50
Kapur Padam M3 0.015 12,375.00 185.63
Pasir Pasang M3 0.050 386,250.00 19,312.50
JUMLAH HARGA BAHAN 110,860.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 162,646.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 162,646.38
14 A.4.4.1.14 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU CAMPURAN 1SM : 1KP : 1PP
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Merah Kg 0.018 16,739.50 301.31
Kapur Padam M3 0.018 12,375.00 222.75
Pasir Pasang M3 0.018 386,250.00 6,952.50
JUMLAH HARGA BAHAN 89,726.56
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 141,512.31
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 141,512.31
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Merah 5 x 11 x 22 cm Bh 70.000 1,175.00 82,250.00
Semen Merah Kg 0.014 16,739.50 234.35
Kapur Padam M3 0.014 12,375.00 173.25
Pasir Pasang M3 0.028 386,250.00 10,815.00
JUMLAH HARGA BAHAN 93,472.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 145,258.36
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 145,258.36
A.4.4.1.16 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB20 DENGAN MORTAR TYPE S,
16
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 65,050.05
B. BAHAN
HB-20 Bh 12.500 2,750.00 34,375.00
Semen Portland Kg 30.320 2,025.00 61,398.00
Pasir Pasang M3 0.728 386,250.00 281,190.00
Besi Angker Ø 8 mm Kg 0.280 12,937.50 3,622.50
JUMLAH HARGA BAHAN 380,585.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 445,635.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 65,050.05
B. BAHAN
HB-20 Bh 12.500 2,750.00 34,375.00
Semen Portland Kg 24.260 2,025.00 49,126.50
Pasir Pasang M3 0.772 386,250.00 298,185.00
Besi Angker Ø 8 mm Kg 0.280 12,937.50 3,622.50
JUMLAH HARGA BAHAN 385,309.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 450,359.05
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 450,359.05
A.4.4.1.18 PEMASANGAN 1M2 DINDING CONBLOCK (BATAKO) HB15 DENGAN MORTAR TYPE S,
18
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.320 119,985.85 38,395.47
Tukang Batu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.016 140,000.00 2,240.00
JUMLAH HARGA TENAGA KERJA 57,063.47
B. BAHAN
HB-15 Bh 12.500 2,750.00 34,375.00
Semen Portland Kg 22.740 2,025.00 46,048.50
Pasir Pasang M3 0.550 386,250.00 212,437.50
Besi Angker Ø 8 mm Kg 0.280 12,937.50 3,622.50
JUMLAH HARGA BAHAN 296,483.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 353,546.97
A. TENAGA
Pekerja L.01 OH 0.320 119,985.85 38,395.47
Tukang Batu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.016 140,000.00 2,240.00
JUMLAH HARGA TENAGA KERJA 57,063.47
B. BAHAN
HB-15 Bh 12.500 2,750.00 34,375.00
Semen Portland Kg 18.200 2,025.00 36,855.00
Pasir Pasang M3 0.582 386,250.00 224,797.50
Besi Angker Ø 8 mm Kg 0.280 12,937.50 3,622.50
JUMLAH HARGA BAHAN 299,650.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 356,713.47
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 356,713.47
A.4.4.1.20 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB10 DENGAN MORTAR TYPE S,
20
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
HB-10 Bh 12.500 2,750.00 34,375.00
Semen Portland Kg 15.160 2,025.00 30,699.00
Pasir Pasang M3 0.364 386,250.00 140,595.00
Besi Angker Ø 8 mm Kg 0.280 12,937.50 3,622.50
JUMLAH HARGA BAHAN 209,291.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 261,077.25
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
HB-15 Bh 12.500 2,750.00 34,375.00
Semen Portland Kg 12.130 2,025.00 24,563.25
Pasir Pasang M3 0.388 386,250.00 149,865.00
Besi Angker Ø 8 mm Kg 0.280 12,937.50 3,622.50
JUMLAH HARGA BAHAN 212,425.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 264,211.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 264,211.50
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Rooster Bh 30.000 3,125.00 93,750.00
Semen Portland Kg 11.000 2,025.00 22,275.00
Pasir Pasang M3 0.035 386,250.00 13,518.75
JUMLAH HARGA BAHAN 129,543.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 181,329.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Bata Rooster Bh 30.000 3,125.00 93,750.00
Semen Portland Kg 11.000 2,025.00 22,275.00
Pasir Pasang M3 0.035 386,250.00 13,518.75
JUMLAH HARGA BAHAN 129,543.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 181,329.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 181,329.50
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Batu Bata Bh 70.000 1,400.00 98,000.00
Semen Portland Kg 14.000 2,025.00 28,350.00
Pasir Pasang M3 0.032 386,250.00 12,360.00
JUMLAH HARGA BAHAN 138,710.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 197,340.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 197,340.75
A. TENAGA
Pekerja L.01 OH 0.670 119,985.85 80,390.52
Tukang Batu L.02 OH 1.300 124,000.00 161,200.00
Kepala Tukang L.03 OH 0.130 129,000.00 16,770.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 258,780.52
B. BAHAN
Bata Ringan Tebal 7,5 cm Bh 8.400 11,171.88 93,843.75
Mortar Siap Pakai ( Semen Instan ) Kg 0.473 3,581.88 1,694.23
JUMLAH HARGA BAHAN 95,537.98
C. PERALATAN
Peralatan % 10.000 95,537.98 9,553.80
JUMLAH HARGA ALAT 9,553.80
D. Jumlah (A + B + C) 363,872.29
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 363,872.29
26 A.4.4.1.26 PEMASANGAN 1 M2 DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.671 119,985.85 80,510.50
Tukang Batu L.02 OH 1.300 124,000.00 161,200.00
Kepala Tukang L.03 OH 0.130 129,000.00 16,770.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 258,900.50
B. BAHAN
Bata Ringan Tebal 10 cm Bh 8.400 10,109.38 84,918.75
Mortar Siap Pakai ( Semen Instan ) Kg 0.063 3,581.88 225.66
JUMLAH HARGA BAHAN 85,144.41
C. PERALATAN
Peralatan % 10.000 85,144.41 8,514.44
JUMLAH HARGA ALAT 8,514.44
D. Jumlah (A + B + C) 352,559.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 352,559.35
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 15.504 2,025.00 31,395.60
Pasir Pasang M3 0.016 386,250.00 6,180.00
JUMLAH HARGA BAHAN 37,575.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 96,206.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 96,206.35
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 10.224 2,025.00 20,703.60
Pasir Pasang M3 0.020 386,250.00 7,725.00
JUMLAH HARGA BAHAN 28,428.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 87,059.35
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 7.776 2,025.00 15,746.40
Pasir Pasang M3 0.023 386,250.00 8,883.75
JUMLAH HARGA BAHAN 24,630.15
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 83,260.90
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 83,260.90
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 6.240 2,025.00 12,636.00
Pasir Pasang M3 0.024 386,250.00 9,270.00
JUMLAH HARGA BAHAN 21,906.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 80,536.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 80,536.75
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 5.184 2,025.00 10,497.60
Pasir Pasang M3 0.026 386,250.00 10,042.50
JUMLAH HARGA BAHAN 20,540.10
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 79,170.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 79,170.85
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 4.416 2,025.00 8,942.40
Pasir Pasang M3 0.027 386,250.00 10,428.75
JUMLAH HARGA BAHAN 19,371.15
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 78,001.90
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 78,001.90
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 3.936 2,025.00 7,970.40
Pasir Pasang M3 0.028 386,250.00 10,815.00
JUMLAH HARGA BAHAN 18,785.40
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 77,416.15
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 77,416.15
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 3.456 2,025.00 6,998.40
Pasir Pasang M3 0.029 386,250.00 11,201.25
JUMLAH HARGA BAHAN 18,199.65
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 76,830.40
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 76,830.40
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 78,454.34
B. BAHAN
Semen Portland Kg 13.632 2,025.00 27,604.80
Pasir Pasang M3 0.027 386,250.00 10,428.75
JUMLAH HARGA BAHAN 38,033.55
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 116,487.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,487.89
A. TENAGA
Pekerja L.01 OH 0.260 119,985.85 31,196.32
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 60,396.32
B. BAHAN
Semen Portland Kg 10.368 2,025.00 20,995.20
Pasir Pasang M3 0.031 386,250.00 11,973.75
JUMLAH HARGA BAHAN 32,968.95
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 93,365.27
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 93,365.27
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 78,454.34
B. BAHAN
Semen Portland Kg 8.320 2,025.00 16,848.00
Pasir Pasang M3 0.032 386,250.00 12,360.00
JUMLAH HARGA BAHAN 29,208.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 107,662.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 107,662.34
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 78,454.34
B. BAHAN
Semen Portland Kg 6.912 2,025.00 13,996.80
Pasir Pasang M3 0.035 386,250.00 13,518.75
JUMLAH HARGA BAHAN 27,515.55
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 105,969.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 105,969.89
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 78,454.34
B. BAHAN
Semen Portland Kg 5.888 2,025.00 11,923.20
Pasir Pasang M3 0.036 386,250.00 13,905.00
JUMLAH HARGA BAHAN 25,828.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 104,282.54
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 104,282.54
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 29,449.88
B. BAHAN
Semen Portland Kg 5.184 2,025.00 10,497.60
Pasir Pasang M3 0.026 386,250.00 10,042.50
JUMLAH HARGA BAHAN 20,540.10
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 49,989.98
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 49,989.98
A. TENAGA
Pekerja L.01 OH 0.080 119,985.85 9,598.87
Tukang Batu L.02 OH 0.400 124,000.00 49,600.00
Kepala Tukang L.03 OH 0.040 129,000.00 5,160.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 64,918.87
B. BAHAN
Semen Portland Kg 0.500 2,025.00 1,012.50
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 6,033.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 70,952.62
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 70,952.62
A. TENAGA
Pekerja L.01 OH 0.450 119,985.85 53,993.63
Tukang Batu L.02 OH 0.225 124,000.00 27,900.00
Kepala Tukang L.03 OH 0.023 129,000.00 2,967.00
Mandor L.04 OH 0.023 140,000.00 3,220.00
JUMLAH HARGA TENAGA KERJA 88,080.63
B. BAHAN
Semen Portland Kg 10.000 2,025.00 20,250.00
Serbuk Batu Granit Kg 15.000 13,461.54 201,923.08
JUMLAH HARGA BAHAN 222,173.08
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 310,253.71
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 310,253.71
A. TENAGA
Pekerja L.01 OH 0.450 119,985.85 53,993.63
Tukang Batu L.02 OH 0.225 124,000.00 27,900.00
Kepala Tukang L.03 OH 0.023 129,000.00 2,967.00
Mandor L.04 OH 0.023 140,000.00 3,220.00
JUMLAH HARGA TENAGA KERJA 88,080.63
B. BAHAN
Semen Portland Kg 10.000 2,025.00 20,250.00
Serbuk Batu Traso Kg 15.000 8,111.11 121,666.67
JUMLAH HARGA BAHAN 141,916.67
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 229,997.30
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 229,997.30
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 51,785.75
B. BAHAN
Semen Portland Kg 4.320 2,025.00 8,748.00
Pasir Pasang M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 11,065.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 62,851.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 62,851.25
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 29,449.88
B. BAHAN
Semen Portland Kg 3.108 2,025.00 6,293.70
JUMLAH HARGA BAHAN 6,293.70
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 35,743.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 35,743.58
A. TENAGA
Pekerja L.01 OH 0.070 119,985.85 8,399.01
Tukang Batu L.02 OH 0.035 124,000.00 4,340.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 13,815.01
B. BAHAN
Semen Portland Kg 1.600 2,025.00 3,240.00
JUMLAH HARGA BAHAN 3,240.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 17,055.01
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 17,055.01
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 58,630.75
B. BAHAN
Semen Portland Kg 6.340 2,025.00 12,838.50
Pasir Pasang M3 0.012 386,250.00 4,635.00
JUMLAH HARGA BAHAN 17,473.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 76,104.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 76,104.25
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 39,087.17
B. BAHAN
Semen Portland Kg 3.250 2,025.00 6,581.25
JUMLAH HARGA BAHAN 6,581.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 45,668.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 45,668.42
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 78,454.34
B. BAHAN
Semen MU-301 Kg 2.000 2,864.58 5,729.16
JUMLAH HARGA BAHAN 5,729.16
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 84,183.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 84,183.50
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Batu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.022 140,000.00 3,080.00
JUMLAH HARGA TENAGA KERJA 78,454.34
B. BAHAN
Semen MU-200 Kg 3.500 4,388.93 15,361.27
JUMLAH HARGA BAHAN 15,361.27
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 93,815.61
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 93,815.61
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 48,993.46
B. BAHAN
Ubin Abu - Abu 40 x 40 cm Bh 6.630 14,592.76 96,750.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
JUMLAH HARGA BAHAN 133,976.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 182,969.71
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 182,969.71
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 48,993.46
B. BAHAN
Ubin Abu - Abu 30 x 30 cm Bh 11.870 8,150.80 96,750.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
JUMLAH HARGA BAHAN 134,381.25
C. PERALATAN
- - -
D. Jumlah (A + B + C) 183,374.71
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 183,374.71
A. TENAGA
Pekerja L.01 OH 0.270 119,985.85 32,396.18
Tukang Batu L.02 OH 0.135 124,000.00 16,740.00
Kepala Tukang L.03 OH 0.014 129,000.00 1,806.00
Mandor L.04 OH 0.014 140,000.00 1,960.00
JUMLAH HARGA TENAGA KERJA 52,902.18
B. BAHAN
Ubin Abu - Abu 20 x 20 cm Bh 26.500 3,584.91 95,000.00
Semen Portland Kg 10.400 2,025.00 21,060.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
JUMLAH HARGA BAHAN 133,441.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 186,343.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 186,343.43
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 48,993.46
B. BAHAN
Ubin Warna 40 x 40 cm Bh 6.630 14,592.76 96,750.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 0.600 16,739.50 10,043.70
JUMLAH HARGA BAHAN 144,019.95
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 193,013.41
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 193,013.41
A. TENAGA
Pekerja L.01 OH 0.260 119,985.85 31,196.32
Tukang Batu L.02 OH 0.130 124,000.00 16,120.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 50,813.32
B. BAHAN
Ubin Warna 30 x 30 cm Bh 11.870 8,150.80 96,750.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 0.600 16,739.50 10,043.70
JUMLAH HARGA BAHAN 144,424.95
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 195,238.27
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 195,238.27
A. TENAGA
Pekerja L.01 OH 0.270 119,985.85 32,396.18
Tukang Batu L.02 OH 0.135 124,000.00 16,740.00
Kepala Tukang L.03 OH 0.014 129,000.00 1,806.00
Mandor L.04 OH 0.014 140,000.00 1,960.00
JUMLAH HARGA TENAGA KERJA 52,902.18
B. BAHAN
Ubin Warna 20 x 20 cm Bh 26.500 3,584.91 95,000.00
Semen Portland Kg 10.400 2,025.00 21,060.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.000 16,739.50 16,739.50
JUMLAH HARGA BAHAN 150,180.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 203,082.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 48,993.46
B. BAHAN
Ubin Teraso 40 x 40 cm Bh 6.630 62,217.19 412,500.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.300 16,739.50 21,761.35
JUMLAH HARGA BAHAN 471,487.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 520,481.06
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 520,481.06
A. TENAGA
Pekerja L.01 OH 0.260 119,985.85 31,196.32
Tukang Batu L.02 OH 0.130 124,000.00 16,120.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 50,813.32
B. BAHAN
Ubin Teraso 30 x 30 cm Bh 11.870 34,751.47 412,500.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.500 16,739.50 25,109.25
JUMLAH HARGA BAHAN 475,240.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 526,053.82
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 48,993.46
B. BAHAN
Ubin Granit 40 x 40 cm Bh 6.630 53,423.83 354,200.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.300 16,739.50 21,761.35
JUMLAH HARGA BAHAN 413,187.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 462,181.06
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 462,181.06
A. TENAGA
Pekerja L.01 OH 0.260 119,985.85 31,196.32
Tukang Batu L.02 OH 0.130 124,000.00 16,120.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 50,813.32
B. BAHAN
Ubin Granit 30 x 30 cm Bh 11.870 24,001.68 284,900.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.500 16,739.50 25,109.25
JUMLAH HARGA BAHAN 347,640.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 398,453.82
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.130 124,000.00 16,120.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 49,613.46
B. BAHAN
Ubin Teralux 40 x 40 cm Bh 6.630 41,855.20 277,500.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.300 16,739.50 21,761.35
JUMLAH HARGA BAHAN 336,487.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 386,101.06
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 386,101.06
A. TENAGA
Pekerja L.01 OH 0.260 119,985.85 31,196.32
Tukang Batu L.02 OH 0.130 124,000.00 16,120.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 50,813.32
B. BAHAN
Ubin Teralux 30 x 30 cm Bh 11.870 20,850.88 247,500.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.500 16,739.50 25,109.25
JUMLAH HARGA BAHAN 310,240.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 361,053.82
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.240 119,985.85 28,796.60
Tukang Batu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.012 140,000.00 1,680.00
JUMLAH HARGA TENAGA KERJA 46,904.60
B. BAHAN
Ubin Teralux Marmer 60 x 60 CM Bh 3.100 89,516.13 277,500.00
Semen Portland Kg 9.600 2,025.00 19,440.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.500 16,739.50 25,109.25
JUMLAH HARGA BAHAN 339,430.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 386,335.10
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 386,335.10
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 48,993.46
B. BAHAN
Ubin Teralux Marmer 40 x 40 CM Bh 6.630 41,855.20 277,500.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.300 16,739.50 21,761.35
JUMLAH HARGA BAHAN 336,487.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 385,481.06
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.260 119,985.85 31,196.32
Tukang Batu L.02 OH 0.130 124,000.00 16,120.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 50,813.32
B. BAHAN
Ubin Teralux Marmer 30 x 30 CM Bh 11.870 20,850.88 247,500.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna/Semen Grouting Kg 1.500 16,739.50 25,109.25
JUMLAH HARGA BAHAN 310,240.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 361,053.82
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 361,053.82
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Keramik 20 x 20 Bh 26.500 2,797.17 74,125.00
Semen Portland Kg 10.400 2,025.00 21,060.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen warna/semen grouting Kg 1.620 16,739.50 27,117.99
JUMLAH HARGA BAHAN 139,684.24
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 276,489.33
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin PC Bh 5.300 1,900.00 10,070.00
Semen Portland Kg 1.650 2,025.00 3,341.25
Pasir Pasang M3 0.004 386,250.00 1,545.00
JUMLAH HARGA BAHAN 14,956.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 38,775.98
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,775.98
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin PC Bh 3.530 2,931.82 10,349.32
Semen Portland Kg 1.240 2,025.00 2,511.00
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 14,019.07
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 37,838.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,838.79
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin PC Bh 2.650 3,870.00 10,255.50
Semen Portland Kg 1.240 2,025.00 2,511.00
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 13,925.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 37,744.98
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,744.98
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Warna Bh 5.300 1,900.00 10,070.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 15,211.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 39,030.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 39,030.93
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Warna Bh 3.530 2,931.82 10,349.32
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 15,490.52
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 39,310.24
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 39,310.24
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Warna Bh 2.650 3,870.00 10,255.50
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 15,396.70
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 39,216.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Teraso Bh 3.530 12,500.00 44,125.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 49,266.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 73,085.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 73,085.93
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Teraso Bh 2.650 16,500.00 43,725.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 48,866.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 72,685.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Granit Bh 3.530 11,075.76 39,097.42
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 44,238.62
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 68,058.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 68,058.35
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Ubin Granit Bh 2.650 17,350.00 45,977.50
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 51,118.70
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 74,938.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Teralux Kerang Bh 3.530 7,500.00 26,475.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 31,616.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 55,435.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 55,435.93
28 A.4.4.3.28 PEMASANGAN 1 M' PLINT UBIN TERALUX KERANG UKURAN 40 S/D < 50 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Teralux Kerang Bh 2.630 11,100.00 29,193.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 34,334.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 58,153.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Teralux Marmer Bh 3.530 7,500.00 26,475.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 31,616.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 55,435.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 55,435.93
30 A.4.4.3.30 PEMASANGAN 1 M' PLINT UBIN TERALUX MARMER UKURAN 40 S/D < 50 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Teralux Marmer Bh 2.650 11,100.00 29,415.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 34,556.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 58,375.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 23,819.73
B. BAHAN
Plint Teralux Marmer Bh 1.700 16,696.75 28,384.48
Semen Portland Kg 1.140 2,025.00 2,308.50
Semen Warna Kg 0.100 16,739.50 1,673.95
Pasir Pasang M3 0.003 386,250.00 1,158.75
JUMLAH HARGA BAHAN 33,525.68
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 57,345.40
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 57,345.40
A. TENAGA
Pekerja L.01 OH 0.360 119,985.85 43,194.90
Tukang Batu L.02 OH 0.180 124,000.00 22,320.00
Kepala Tukang L.03 OH 0.018 129,000.00 2,322.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 70,356.90
B. BAHAN
Teraso Cor M3 0.036 935,000.00 33,660.00
Semen Warna Kg 0.100 16,739.50 1,673.95
JUMLAH HARGA BAHAN 35,333.95
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 105,690.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 105,690.85
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Ubin Keramik Bh 106.000 12,100.00 1,282,600.00
Semen Portland Kg 8.190 2,025.00 16,584.75
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 3.200 16,739.50 53,566.40
JUMLAH HARGA BAHAN 1,370,132.40
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,506,937.49
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,506,937.49
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Ubin Keramik Bh 53.000 15,400.00 816,200.00
Semen Portland Kg 8.190 2,025.00 16,584.75
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 2.750 16,739.50 46,033.63
JUMLAH HARGA BAHAN 896,199.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,033,004.72
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Ubin Keramik Doos 1.050 75,900.00 79,695.00
Semen Portland Kg 10.400 2,025.00 21,060.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 0.500 16,739.50 8,369.75
JUMLAH HARGA BAHAN 126,506.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 263,311.09
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 263,311.09
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Ubin Keramik Doos 1.050 46,000.00 48,300.00
Semen Portland Kg 10.000 2,025.00 20,250.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 0.500 16,739.50 8,369.75
JUMLAH HARGA BAHAN 94,301.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 231,106.09
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 1.050 119,985.85 125,985.14
Tukang Batu L.02 OH 0.523 124,000.00 64,852.00
Kepala Tukang L.03 OH 0.053 129,000.00 6,837.00
Mandor L.04 OH 0.053 140,000.00 7,420.00
JUMLAH HARGA TENAGA KERJA 205,094.14
B. BAHAN
Ubin Keramik Bh 33.000 1,659.09 54,750.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 4.370 16,739.50 73,151.62
JUMLAH HARGA BAHAN 165,127.87
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 370,222.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 370,222.00
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Ubin Keramik Doos 1.050 75,900.00 79,695.00
Semen Portland Kg 10.400 2,025.00 21,060.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 0.500 16,739.50 8,369.75
JUMLAH HARGA BAHAN 126,506.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 263,311.09
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 1.050 119,985.85 125,985.14
Tukang Batu L.02 OH 0.525 124,000.00 65,100.00
Kepala Tukang L.03 OH 0.053 129,000.00 6,837.00
Mandor L.04 OH 0.053 140,000.00 7,420.00
JUMLAH HARGA TENAGA KERJA 205,342.14
B. BAHAN
Ubin Keramik Bh 33.000 1,681.82 55,500.00
Semen Portland Kg 9.800 2,025.00 19,845.00
Pasir Pasang M3 0.045 386,250.00 17,381.25
Semen Warna Kg 4.370 16,739.50 73,151.62
JUMLAH HARGA BAHAN 165,877.87
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 371,220.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 371,220.00
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Ubin Keramik Bh 11.870 11,745.16 139,415.00
Semen Portland Kg 14.150 2,025.00 28,653.75
Pasir Pasang M3 0.039 386,250.00 15,063.75
Semen Warna Kg 2.000 16,739.50 33,479.00
JUMLAH HARGA BAHAN 216,611.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 353,416.59
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 27,173.73
B. BAHAN
Plint Keramik Bh 10.600 3,300.00 34,980.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Pasir Pasang M3 0.003 386,250.00 1,158.75
Semen Warna Kg 0.050 16,739.50 836.98
JUMLAH HARGA BAHAN 39,284.23
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 66,457.95
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 66,457.95
A. TENAGA
Pekerja L.01 OH 0.090 119,985.85 10,798.73
Tukang Batu L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 27,173.73
B. BAHAN
Plint Keramik Bh 5.300 5,500.00 29,150.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Pasir Pasang M3 0.003 386,250.00 1,158.75
Semen Warna Kg 0.025 16,739.50 418.49
JUMLAH HARGA BAHAN 33,035.74
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 60,209.46
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.750 119,985.85 89,989.38
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.038 140,000.00 5,320.00
JUMLAH HARGA TENAGA KERJA 197,984.38
B. BAHAN
Interval Cove Artistik Bh 5.300 18,700.00 99,110.00
Semen Portland Kg 1.140 2,025.00 2,308.50
Pasir Pasang M3 0.003 386,250.00 1,158.75
Semen Warna Kg 0.100 16,739.50 1,673.95
JUMLAH HARGA BAHAN 104,251.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 302,235.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 302,235.58
A. TENAGA
Pekerja L.01 OH 0.900 119,985.85 107,987.26
Tukang Batu L.02 OH 0.450 124,000.00 55,800.00
Kepala Tukang L.03 OH 0.045 129,000.00 5,805.00
Mandor L.04 OH 0.045 140,000.00 6,300.00
JUMLAH HARGA TENAGA KERJA 175,892.26
B. BAHAN
Keramik Dinding Bh 52.000 1,650.00 85,800.00
Semen Portland Kg 9.300 2,025.00 18,832.50
Pasir Pasang M3 0.018 386,250.00 6,952.50
Semen Warna Kg 2.750 16,739.50 46,033.63
JUMLAH HARGA BAHAN 157,618.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 333,510.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.900 119,985.85 107,987.26
Tukang Batu L.02 OH 0.450 124,000.00 55,800.00
Kepala Tukang L.03 OH 0.045 129,000.00 5,805.00
Mandor L.04 OH 0.045 140,000.00 6,300.00
JUMLAH HARGA TENAGA KERJA 175,892.26
B. BAHAN
Keramik Dinding Bh 26.000 3,300.00 85,800.00
Semen Portland Kg 9.300 2,025.00 18,832.50
Pasir Pasang M3 0.018 386,250.00 6,952.50
Semen Warna Kg 1.940 16,739.50 32,474.63
JUMLAH HARGA BAHAN 144,059.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 319,951.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 319,951.89
A. TENAGA
Pekerja L.01 OH 1.300 119,985.85 155,981.60
Tukang Batu L.02 OH 0.650 124,000.00 80,600.00
Kepala Tukang L.03 OH 0.065 129,000.00 8,385.00
Mandor L.04 OH 0.065 140,000.00 9,100.00
JUMLAH HARGA TENAGA KERJA 254,066.60
B. BAHAN
Marmer Bh 1.060 696,300.00 738,078.00
Semen Portland Kg 12.440 2,025.00 25,191.00
Pasir Pasang M3 0.025 386,250.00 9,656.25
Semen Warna Kg 0.650 16,739.50 10,880.68
Paku 12 cm Bh 3.030 24,922.50 75,515.17
JUMLAH HARGA BAHAN 859,321.10
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Batu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 195,435.85
B. BAHAN
Bata Pelapis Bh 63.000 4,175.00 263,025.00
Semen Portland Kg 12.440 2,025.00 25,191.00
Pasir Pasang M3 0.025 386,250.00 9,656.25
Semen Warna Kg 2.750 16,739.50 46,033.63
JUMLAH HARGA BAHAN 343,905.88
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 539,341.72
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 539,341.72
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Batu Paras M2 1.100 275,000.00 302,500.00
Semen Portland Kg 11.750 2,025.00 23,793.75
Pasir Pasang M3 0.035 386,250.00 13,518.75
JUMLAH HARGA BAHAN 339,812.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 476,617.59
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 136,805.09
B. BAHAN
Batu Tempel Hitam M2 1.100 225,500.00 248,050.00
Semen Portland Kg 11.750 2,025.00 23,793.75
Pasir Pasang M3 0.035 386,250.00 13,518.75
JUMLAH HARGA BAHAN 285,362.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 422,167.59
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 422,167.59
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Batu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 39,652.88
B. BAHAN
Vynil Bh 11.870 50,000.00 593,500.00
Lem Karet Kg 0.350 53,900.00 18,865.00
JUMLAH HARGA BAHAN 612,365.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 652,017.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 652,017.88
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang Batu L.02 OH 0.175 124,000.00 21,700.00
Kepala Tukang L.03 OH 0.017 129,000.00 2,193.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 66,168.05
B. BAHAN
Wallpaper Bh 2.200 285,312.50 627,687.50
Lem Karet M1 0.250 31,000.00 7,750.00
JUMLAH HARGA BAHAN 635,437.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 701,605.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 701,605.55
A. TENAGA
Pekerja L.01 OH 0.120 119,985.85 14,398.30
Tukang Batu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 31,666.30
B. BAHAN
Floor Harderner Kg 5.000 80,300.00 401,500.00
JUMLAH HARGA BAHAN 401,500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 433,166.30
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 433,166.30
A. TENAGA
Pekerja L.01 OH 0.800 119,985.85 95,988.68
Tukang Batu L.02 OH 0.800 124,000.00 99,200.00
Kepala Tukang L.03 OH 0.080 129,000.00 10,320.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 206,068.68
B. BAHAN
Vynil Bh 3.100 25,000.00 77,500.00
Lem Karet Kg 0.080 53,900.00 4,312.00
JUMLAH HARGA BAHAN 81,812.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 287,880.68
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 287,880.68
A. TENAGA
Pekerja L.01 OH 0.120 119,985.85 14,398.30
Tukang Batu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 31,666.30
B. BAHAN
Papan Kayu Kelas I M3 0.003 11,338,250.00 34,014.75
Paku Skrup 5 cm Kg 0.050 50,500.00 2,525.00
JUMLAH HARGA BAHAN 36,539.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 68,206.05
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 68,206.05
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.500 124,000.00 62,000.00
Kepala tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH HARGA TENAGA KERJA 98,628.46
B. BAHAN
Paving Block Natural Tebal 6 cm M2 1.010 81,250.00 82,062.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 99,812.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 198,440.96
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 198,440.96
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Batu L.02 OH 0.500 124,000.00 62,000.00
Kepala tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH HARGA TENAGA KERJA 98,628.46
B. BAHAN
Paving Block Berwarna Tebal 6 cm M2 1.010 108,750.00 109,837.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 127,587.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 226,215.96
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 226,215.96
A. TENAGA
Tukang Batu L.02 OH 0.500 119,985.85 59,992.92
Pekerja L.01 OH 0.500 124,000.00 62,000.00
Kepala tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH HARGA TENAGA KERJA 128,624.92
B. BAHAN
Paving Block Natural Tebal 8 cm M2 1.010 95,000.00 95,950.00
Pasir Beton M3 0.080 355,000.00 28,400.00
JUMLAH HARGA BAHAN 124,350.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 252,974.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 252,974.92
A. TENAGA
Tukang Batu L.02 OH 0.500 119,985.85 59,992.92
Pekerja L.01 OH 0.500 124,000.00 62,000.00
Kepala tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH HARGA TENAGA KERJA 128,624.92
B. BAHAN
Paving Block Berwarna Tebal 8 cm M2 1.010 125,500.00 126,755.00
Pasir Beton M3 0.080 355,000.00 28,400.00
JUMLAH HARGA BAHAN 155,155.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 283,779.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 283,779.92
A. TENAGA
Pekerja L.01 OH 0.030 119,985.85 3,599.58
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 13,742.58
B. BAHAN
Serat Semen Lbr 1.100 76,053.50 83,658.85
Paku Tripleks Kg 0.010 26,500.00 265.00
JUMLAH HARGA BAHAN 83,923.85
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 97,666.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 97,666.43
A. TENAGA
Pekerja L.01 OH 0.120 119,985.85 14,398.30
Tukang Kayu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 31,666.30
B. BAHAN
Akustik 30 x 30 cm Lbr 12.000 12,500.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 0.120 119,985.85 14,398.30
Tukang Kayu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 31,666.30
B. BAHAN
Akustik 30 x 60 cm Lbr 5.800 27,000.00 156,600.00
JUMLAH HARGA BAHAN 156,600.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 188,266.30
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 188,266.30
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Akustik 60 x 120 cm Lbr 1.500 101,400.00 152,100.00
JUMLAH HARGA BAHAN 152,100.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 178,488.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 178,488.58
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Kayu Lapis / Tripleks Lbr 0.375 81,000.00 30,375.00
Paku Tripleks Kg 0.030 26,500.00 795.00
JUMLAH HARGA BAHAN 31,170.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 57,558.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 57,558.58
A. TENAGA
Pekerja L.01 OH 0.800 119,985.85 95,988.68
Tukang Kayu L.02 OH 0.800 124,000.00 99,200.00
Kepala Tukang L.03 OH 0.080 129,000.00 10,320.00
Mandor L.04 OH 0.040 140,000.00 5,600.00
JUMLAH HARGA TENAGA KERJA 211,108.68
B. BAHAN
Kayu Papan Kamper M3 0.015 10,312,500.00 154,687.50
Paku Tripleks Kg 0.010 26,500.00 265.00
JUMLAH HARGA BAHAN 154,952.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 366,061.18
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 366,061.18
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 75,343.58
B. BAHAN
Papan Gypsum 120 x 240 x 9 mm Lbr 0.364 84,721.00 30,838.44
Paku Sekrup Kg 0.011 52,500.00 577.50
JUMLAH HARGA BAHAN 31,415.94
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 106,759.53
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 106,759.53
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Tukang Kayu L.02 OH 0.050 124,000.00 6,200.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 13,264.29
B. BAHAN
List Kayu Profil M1 1.050 5,984.38 6,283.59
Paku List Kg 0.010 26,500.00 265.00
JUMLAH HARGA BAHAN 6,548.59
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 19,812.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 19,812.89
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Tukang Kayu L.02 OH 0.050 124,000.00 6,200.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 13,264.29
B. BAHAN
List Gypsum 2/5 cm M1 1.050 15,625.00 16,406.25
Paku List Kg 0.010 26,500.00 265.00
JUMLAH HARGA BAHAN 16,671.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 29,935.54
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 29,935.54
10 A.4.5.1.10 PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UK. (60 x 120) CM, BERIKUT RANGKA ALUMINIUM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Besi L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 131,942.92
B. BAHAN
Profil Aluminium "T" M1 3.600 43,333.33 156,000.00
Kawat Ø 4 mm Kg 0.150 37,200.00 5,580.00
Ramset M1 1.050 37,580.00 39,459.00
Akustik 60 cm x 120 cm Lbr 1.500 101,400.00 152,100.00
JUMLAH HARGA BAHAN 353,139.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 485,081.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 485,081.92
A. TENAGA
Pekerja L.01 OH 0.180 119,985.85 21,597.45
Tukang Kayu L.02 OH 0.320 124,000.00 39,680.00
Kepala Tukang L.03 OH 0.032 129,000.00 4,128.00
Mandor L.04 OH 0.009 140,000.00 1,260.00
JUMLAH HARGA TENAGA KERJA 66,665.45
B. BAHAN
Kamper Usuk 4/6 cm M3 0.023 8,275,000.00 190,325.00
Paku Biasa 2" - 5" Kg 0.060 26,500.00 1,590.00
Papan Serat Semen ( Asbes ) Lbr 1.100 76,053.50 83,658.85
JUMLAH HARGA BAHAN 275,573.85
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 342,239.30
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 342,239.30
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Kayu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 86,010.75
B. BAHAN
Papan Gypsum Board (120 x 240 x 9) mm Lbr 0.364 84,721.00 30,838.44
Kayu Kruing Usuk M3 0.023 6,232,187.50 143,340.31
Paku Biasa 2" - 5" Kg 0.060 26,500.00 1,590.00
Paku Sekrup Kg 0.011 52,500.00 577.50
JUMLAH HARGA BAHAN 176,346.26
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 262,357.01
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Kayu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 86,010.75
B. BAHAN
Gypsum Board (120 x 240 x 9) mm Lbr 0.364 84,721.00 30,838.44
Rangka Metal Hollow (40 x 40 mm) M1 4.000 28,566.00 114,264.00
Paku Sekrup Kg 0.110 52,500.00 5,775.00
Assesoris ( Perkuatan, Las dll ) Ls 1.000 28,566.00 28,566.00
JUMLAH HARGA BAHAN 179,443.44
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 265,454.20
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 265,454.20
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Kayu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 86,010.75
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.364 75,361.25 27,431.50
Kayu Kruing Usuk M3 0.023 6,232,187.50 143,340.31
Paku Sekrup Kg 0.110 52,500.00 5,775.00
JUMLAH HARGA BAHAN 176,546.81
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 262,557.56
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Tukang Kayu L.02 OH 0.350 124,000.00 43,400.00
Kepala Tukang L.03 OH 0.035 129,000.00 4,515.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 86,010.75
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.364 75,361.25 27,431.50
Rangka Metal Hollow (40 x 40 mm) M1 4.000 28,566.00 114,264.00
Paku Sekrup Kg 0.110 52,500.00 5,775.00
JUMLAH HARGA BAHAN 147,470.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 233,481.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 233,481.25
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.0075 129,000.00 967.50
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 29,385.38
B. BAHAN
Genteng Palentong Bh 25.000 1,812.50 45,312.50
JUMLAH HARGA BAHAN 45,312.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 74,697.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 74,697.88
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 29,449.88
B. BAHAN
Genteng Kodok Bh 25.000 7,100.00 177,500.00
JUMLAH HARGA BAHAN 177,500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 206,949.88
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 29,449.88
B. BAHAN
Genteng Palentong Besar (Morando) Bh 12.000 8,100.00 97,200.00
JUMLAH HARGA BAHAN 97,200.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 126,649.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 126,649.88
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 75,654.34
B. BAHAN
Bubungan Palentong Bh 5.000 30,250.00 151,250.00
Semen Portland Kg 8.000 2,025.00 16,200.00
Pasir Pasang M3 0.032 386,250.00 12,360.00
JUMLAH HARGA BAHAN 179,810.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 255,464.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 255,464.34
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 75,654.34
B. BAHAN
Genteng Bubung Kodok Glazuur Bh 5.000 26,375.00 131,875.00
Semen Portland Kg 8.000 2,025.00 16,200.00
Pasir Pasang M3 0.032 386,250.00 12,360.00
JUMLAH HARGA BAHAN 160,435.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 236,089.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 236,089.34
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 75,654.34
B. BAHAN
Genteng Bubung Palentong Bh 4.000 30,250.00 121,000.00
Semen Portland Kg 8.000 2,025.00 16,200.00
Pasir Pasang M3 0.032 386,250.00 12,360.00
JUMLAH HARGA BAHAN 149,560.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 225,214.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 225,214.34
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.067 124,000.00 8,308.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 26,989.02
B. BAHAN
Rooflight 90 cm x 180 cm Lbr 0.600 61,500.00 36,900.00
Paku Biasa 1/2"-1" Kg 0.050 26,500.00 1,325.00
JUMLAH HARGA BAHAN 38,225.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 65,214.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 65,214.02
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 28,250.02
B. BAHAN
Serat Semen Gelombang 92 x 250 cm Lbr 0.500 78,412.00 39,206.00
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 41,711.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 69,961.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 69,961.02
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 28,250.02
B. BAHAN
Serat Semen Gelombang 92 x 225 cm Lbr 0.600 68,363.00 41,017.80
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 43,522.80
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 71,772.82
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,772.82
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 92 x 200 cm Lbr 0.600 52,057.00 31,234.20
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 33,739.20
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 61,100.22
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 61,100.22
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 92 x 180 cm Lbr 0.750 33,625.00 25,218.75
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 27,723.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 55,084.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 55,084.77
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 105 x 300 cm Lbr 0.350 160,000.00 56,000.00
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 58,505.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 85,866.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 85,866.02
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 105 x 240 cm Lbr 0.440 140,000.00 61,600.00
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 64,105.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 91,466.02
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 91,466.02
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 105 x 210 cm Lbr 0.510 68,363.00 34,865.13
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 37,370.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 64,731.15
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 64,731.15
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 105 x 150 cm Lbr 0.800 52,057.00 41,645.60
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 44,150.60
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 71,511.62
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,511.62
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 108 x 300 cm Lbr 0.370 117,618.00 43,518.66
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 46,023.66
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 73,384.68
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 73,384.68
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 108 x 270 cm Lbr 0.380 94,887.84 36,057.38
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 38,562.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 65,923.40
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 65,923.40
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 108 x 240 cm Lbr 0.460 86,253.20 39,676.47
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 42,181.47
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 69,542.49
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 69,542.49
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 108 x 210 cm Lbr 0.490 68,363.00 33,497.87
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 36,002.87
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 63,363.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 63,363.89
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 108 x 180 cm Lbr 0.570 52,057.00 29,672.49
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 32,177.49
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 59,538.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 59,538.51
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Bubungan Setel Gelombang Lbr 2.400 59,000.00 141,600.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 146,150.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 173,965.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 173,965.81
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Bubungan Setel Gelombang Lbr 2.100 59,000.00 123,900.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 128,450.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 156,265.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 156,265.81
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Bubungan Setel Gelombang Lbr 2.000 59,000.00 118,000.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 122,550.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 150,365.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 150,365.81
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Nok Paten 92 cm Lbr 1.100 46,800.00 51,480.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 56,030.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 83,845.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 83,845.81
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Nok Paten 105 cm Lbr 1.200 50,400.00 60,480.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 65,030.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 92,845.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 92,845.81
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Nok Paten 108 cm Lbr 1.200 54,360.00 65,232.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 69,782.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 97,597.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 97,597.81
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 32,835.58
B. BAHAN
Nok Stel Rata 92 cm Lbr 1.100 43,200.00 47,520.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 52,070.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 84,905.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 84,905.58
A. TENAGA
Pekerja L.01 OH 0.084 119,985.85 10,078.81
Tukang Kayu L.02 OH 0.125 124,000.00 15,500.00
Kepala Tukang L.03 OH 0.013 129,000.00 1,677.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 27,815.81
B. BAHAN
Nok Stel Rata 105 cm Lbr 1.100 49,680.00 54,648.00
Paku Skrup 3,5" Kg 0.100 45,500.00 4,550.00
JUMLAH HARGA BAHAN 59,198.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 87,013.81
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 87,013.81
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 39,087.17
B. BAHAN
Genteng Beton Lbr 11.000 11,444.00 125,884.00
Paku Biasa 2"-5" Kg 0.030 24,922.50 747.68
JUMLAH HARGA BAHAN 126,631.68
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 165,718.84
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 165,718.84
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 62,984.17
B. BAHAN
Genteng Aspal Ukuran 80 x 100 cm Bh 1.500 78,120.00 117,180.00
Plywood 6 mm Lbr 0.350 101,853.50 35,648.73
Paku Biasa 1/2"-1" Kg 0.030 26,500.00 795.00
Plastic Aerator Bh 0.500 271,125.00 135,562.50
JUMLAH HARGA BAHAN 289,186.23
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 352,170.39
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 352,170.39
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 37,827.17
B. BAHAN
Genteng Metal Lbr 1.300 75,550.00 98,215.00
Paku Biasa 1/2"-1" Kg 0.200 26,500.00 5,300.00
JUMLAH HARGA BAHAN 103,515.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 141,342.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 141,342.17
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 37,827.17
B. BAHAN
Genteng Metal Lbr 2.000 75,550.00 151,100.00
Paku biasa 1/2"-1" Kg 0.200 26,500.00 5,300.00
JUMLAH HARGA BAHAN 156,400.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 194,227.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 194,227.17
A. TENAGA
Pekerja L.01 OH 0.166 119,985.85 19,917.65
Tukang Kayu L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 55,262.65
B. BAHAN
Sirap Kayu Bh 30.000 10,800.00 324,000.00
Paku Biasa 1/2"-1" Kg 0.200 26,500.00 5,300.00
JUMLAH HARGA BAHAN 329,300.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 384,562.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 384,562.65
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 78,174.34
B. BAHAN
Nok Genteng Beton Bh 3.500 20,100.00 70,350.00
Paku Biasa 1/2"-1" Kg 0.050 26,500.00 1,325.00
Semen Portland Kg 10.800 2,025.00 21,870.00
Pasir Pasang M3 0.032 386,250.00 12,360.00
Semen Warna Kg 1.000 16,739.50 16,739.50
JUMLAH HARGA BAHAN 122,644.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 200,818.84
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.125 119,985.85 14,998.23
Tukang Kayu L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 50,063.23
B. BAHAN
Nok Genteng Aspal Bh 2.00 82,125.00 164,250.00
Paku Biasa 1/2"-1" Kg 0.05 26,500.00 1,325.00
Kayu Balok Borneo M3 0.0035 9,490,687.50 33,217.41
JUMLAH HARGA BAHAN 198,792.41
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 248,855.64
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 248,855.64
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 52,351.46
B. BAHAN
Nok Genteng Metal Pj : 100 cm Bh 1.100 45,000.00 49,500.00
Paku Biasa 1/2"-1" Kg 0.050 26,500.00 1,325.00
JUMLAH HARGA BAHAN 50,825.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 103,176.46
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 103,176.46
A. TENAGA
Pekerja L.01 OH 0.125 119,985.85 14,998.23
Tukang Kayu L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 50,063.23
B. BAHAN
Seng Pelat 3" x 6" (90 X 180) cm Lbr 0.400 87,679.50 35,071.80
Paku Biasa 1/2"-1" (1,5 - 2,5) cm Kg 0.050 26,500.00 1,325.00
JUMLAH HARGA BAHAN 36,396.80
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 86,460.03
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 86,460.03
A. TENAGA
Pekerja L.01 OH 0.120 119,985.85 14,398.30
Tukang Kayu L.02 OH 0.600 124,000.00 74,400.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 90,412.30
B. BAHAN
Seng Gelombang 3" x 6" Lbr 0.700 135,062.50 94,543.75
Paku Biasa 1/2" - 1" Kg 0.020 26,500.00 530.00
JUMLAH HARGA BAHAN 95,073.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 185,486.05
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 185,486.05
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 28,420.88
B. BAHAN
Seng Pelat 3" x 6" BJLS 28 Lbr 0.300 87,679.50 26,303.85
Paku Biasa 1/2" - 1" Kg 0.040 26,500.00 1,060.00
JUMLAH HARGA BAHAN 27,363.85
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 55,784.73
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 55,784.73
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.080 129,000.00 10,320.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 38,457.88
B. BAHAN
Alluminum Gelombang 95 x 180 cm Lbr 0.750 141,240.00 105,930.00
Paku Pancing 6 x 230 Kg 0.020 20,875.00 417.50
JUMLAH HARGA BAHAN 106,347.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 144,805.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 144,805.38
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 1.000 124,000.00 124,000.00
Kepala Tukang L.03 OH 0.100 129,000.00 12,900.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 155,898.58
B. BAHAN
Nok Standart Bh 1.200 45,000.00 54,000.00
Paku Pancing 6 x 230 Kg 0.020 20,875.00 417.50
JUMLAH HARGA BAHAN 54,417.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 210,316.08
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 210,316.08
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 81,762.88
B. BAHAN
Aluminium Foil M2 1.050 3,592.50 3,772.13
JUMLAH HARGA BAHAN 3,772.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 85,535.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 85,535.00
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Kayu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Serat Semen Gelombang 105 x 270 cm Lbr 0.420 88,213.50 37,049.67
Paku Pancing 6 x 230 Kg 0.120 20,875.00 2,505.00
JUMLAH HARGA BAHAN 39,554.67
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 66,915.69
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 66,915.69
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 29,449.88
B. BAHAN
Genteng Palentong Dicat Bh 25.000 1,975.00 49,375.00
JUMLAH HARGA BAHAN 49,375.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 78,824.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 78,824.88
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 9,499.29
B. BAHAN
Murda / Puntal Paras Lbr 1.000 141,500.00 141,500.00
Semen Portland Kg 0.013 2,025.00 26.33
JUMLAH HARGA BAHAN 141,526.33
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 151,025.62
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 151,025.62
1 A.4.6.1.1 PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU KELAS I
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 7.000 119,985.85 839,900.92
Tukang Kayu L.02 OH 21.000 124,000.00 2,604,000.00
Kepala Tukang L.03 OH 2.100 129,000.00 270,900.00
Mandor L.04 OH 0.350 140,000.00 49,000.00
JUMLAH HARGA TENAGA KERJA 3,763,800.92
B. BAHAN
Balok Kayu M3 1.100 10,862,500.00 11,948,750.00
Paku 10 Cm Kg 1.250 24,922.50 31,153.13
Lem Kayu Kg 1.000 35,425.00 35,425.00
JUMLAH HARGA BAHAN 12,015,328.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 15,779,129.04
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 15,779,129.04
2 A.4.6.1.2 PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU KELAS II ATAU III
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 6.000 119,985.85 719,915.07
Tukang Kayu L.02 OH 18.000 124,000.00 2,232,000.00
Kepala Tukang L.03 OH 1.800 129,000.00 232,200.00
Mandor L.04 OH 0.300 140,000.00 42,000.00
JUMLAH HARGA TENAGA KERJA 3,226,115.07
B. BAHAN
Balok Kayu Kruing M3 1.200 6,394,125.00 7,672,950.00
Paku 10 Cm Kg 1.250 24,922.50 31,153.13
Lem Kayu Kg 1.000 35,425.00 35,425.00
JUMLAH HARGA BAHAN 7,739,528.13
C. PERALATAN
- - -
D. Jumlah (A + B + C) 10,965,643.20
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 10,965,643.20
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang Kayu L.02 OH 1.050 124,000.00 130,200.00
Kepala Tukang L.03 OH 0.105 129,000.00 13,545.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 188,260.05
B. BAHAN
Papan Kayu Kamper M3 0.040 9,012,500.00 360,500.00
Paku 5-7 Cm Kg 0.050 24,922.50 1,246.13
JUMLAH HARGA BAHAN 361,746.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 550,006.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 550,006.17
4 A.4.6.1.4 PEMBUATAN DAN PEMASANGAN 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 119,985.85 41,995.05
Tukang Kayu L.02 OH 1.050 124,000.00 130,200.00
Kepala Tukang L.03 OH 0.105 129,000.00 13,545.00
Mandor L.04 OH 0.018 140,000.00 2,520.00
JUMLAH HARGA TENAGA KERJA 188,260.05
B. BAHAN
Papan Kayu Kruing M3 0.040 7,313,350.00 292,534.00
Paku 5-7 Cm Kg 0.050 24,922.50 1,246.13
JUMLAH HARGA BAHAN 293,780.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 482,040.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 482,040.17
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Kayu L.02 OH 3.000 124,000.00 372,000.00
Kepala Tukang L.03 OH 0.300 129,000.00 38,700.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 537,685.85
B. BAHAN
Papan Kayu Kamper M3 0.040 9,012,500.00 360,500.00
Lem Kayu Kg 0.500 35,425.00 17,712.50
JUMLAH HARGA BAHAN 378,212.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 915,898.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 915,898.35
A. TENAGA
Pekerja L.01 OH 0.800 119,985.85 95,988.68
Tukang Kayu L.02 OH 2.400 124,000.00 297,600.00
Kepala Tukang L.03 OH 0.240 129,000.00 30,960.00
Mandor L.04 OH 0.040 140,000.00 5,600.00
JUMLAH HARGA TENAGA KERJA 430,148.68
B. BAHAN
Papan Kayu Kamper M3 0.024 9,012,500.00 216,300.00
Lem Kayu Kg 0.300 35,425.00 10,627.50
JUMLAH HARGA BAHAN 226,927.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 657,076.18
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 657,076.18
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Kayu L.02 OH 3.000 124,000.00 372,000.00
Kepala Tukang L.03 OH 0.300 129,000.00 38,700.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 537,685.85
B. BAHAN
Papan Kayu Kamper M3 0.064 9,012,500.00 576,800.00
Lem Kayu Kg 0.500 35,425.00 17,712.50
JUMLAH HARGA BAHAN 594,512.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,132,198.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,132,198.35
8 A.4.6.1.8 PEMBUATAN 1 M2 DAUN PINTU PLYWOOD RANGKAP, RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 119,985.85 83,990.09
Tukang Kayu L.02 OH 2.100 124,000.00 260,400.00
Kepala Tukang L.03 OH 0.210 129,000.00 27,090.00
Mandor L.04 OH 0.035 140,000.00 4,900.00
JUMLAH HARGA TENAGA KERJA 376,380.09
B. BAHAN
Papan Kayu Kamper M3 0.025 9,012,500.00 225,312.50
Paku 1 - 2,5 Cm Kg 0.030 24,922.50 747.68
Lem Kayu Kg 0.500 35,425.00 17,712.50
Plywood 4 mm ( 90 X 220 cm ) Lbr 1.000 84,688.50 84,688.50
JUMLAH HARGA BAHAN 328,461.18
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 704,841.27
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 704,841.27
A. TENAGA
Pekerja L.01 OH 0.800 119,985.85 95,988.68
Tukang Kayu L.02 OH 2.400 124,000.00 297,600.00
Kepala Tukang L.03 OH 0.240 129,000.00 30,960.00
Mandor L.04 OH 0.040 140,000.00 5,600.00
JUMLAH HARGA TENAGA KERJA 430,148.68
B. BAHAN
Papan Kayu Kamper M3 0.0256 9,012,500.00 230,720.00
Paku 1 - 2,5 Cm Kg 0.030 24,922.50 747.68
Lem Kayu Kg 0.500 35,425.00 17,712.50
Plywood 4 mm ( 90 X 220 cm ) Lbr 1.000 84,688.50 84,688.50
JUMLAH HARGA BAHAN 333,868.68
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 764,017.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 764,017.35
A. TENAGA
Pekerja L.01 OH 0.670 119,985.85 80,390.52
Tukang Kayu L.02 OH 2.000 124,000.00 248,000.00
Kepala Tukang L.03 OH 0.200 129,000.00 25,800.00
Mandor L.04 OH 0.335 140,000.00 46,900.00
JUMLAH HARGA TENAGA KERJA 401,090.52
B. BAHAN
Papan Kayu Kamper M3 0.060 9,012,500.00 540,750.00
Paku 1 - 2,5 Cm Kg 0.150 24,922.50 3,738.38
JUMLAH HARGA BAHAN 544,488.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 945,578.89
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 945,578.89
A. TENAGA
Pekerja L.01 OH 0.800 119,985.85 95,988.68
Tukang Kayu L.02 OH 2.400 124,000.00 297,600.00
Kepala Tukang L.03 OH 0.240 129,000.00 30,960.00
Mandor L.04 OH 0.040 140,000.00 5,600.00
JUMLAH HARGA TENAGA KERJA 430,148.68
B. BAHAN
Papan Kayu Jati M3 0.025 12,944,000.00 323,600.00
Paku 1 - 2,5 Cm Kg 0.030 24,922.50 747.68
Lem Kayu Kg 0.300 35,425.00 10,627.50
Teakwood 4 mm ( 90 x 220 cm ) Lbr 1.000 124,906.25 124,906.25
JUMLAH HARGA BAHAN 459,881.43
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 890,030.10
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 890,030.10
12 A.4.6.1.12 PEMBUATAN 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE, KAYU KELAS II
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.850 119,985.85 101,987.97
Tukang Kayu L.02 OH 2.550 124,000.00 316,200.00
Kepala Tukang L.03 OH 0.255 129,000.00 32,895.00
Mandor L.04 OH 0.043 140,000.00 6,020.00
JUMLAH HARGA TENAGA KERJA 457,102.97
B. BAHAN
Papan Kayu Kamper M3 0.025 9,012,500.00 225,312.50
Paku 1 - 2,5 Cm Kg 0.030 24,922.50 747.68
Lem Kayu Kg 0.800 35,425.00 28,340.00
Teakwood 4 mm ( 90 x 220 cm ) Lbr 1.000 124,906.25 124,906.25
Formika ( 120 x 240 cm ) Lbr 0.500 123,750.00 61,875.00
JUMLAH HARGA BAHAN 441,181.43
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 898,284.39
A. TENAGA
Pekerja L.01 OH 4.000 119,985.85 479,943.38
Tukang Kayu L.02 OH 12.000 124,000.00 1,488,000.00
Kepala Tukang L.03 OH 1.200 129,000.00 154,800.00
Mandor L.04 OH 0.200 140,000.00 28,000.00
JUMLAH HARGA TENAGA KERJA 2,150,743.38
B. BAHAN
Balok Kayu Kamper M3 1.100 9,012,500.00 9,913,750.00
Besi Strip Tebal 5 mm Kg 15.000 16,035.00 240,525.00
Paku 12 Cm Kg 5.600 24,922.50 139,566.00
JUMLAH HARGA BAHAN 10,293,841.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 12,444,584.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,444,584.38
A. TENAGA
Pekerja L.01 OH 6.700 119,985.85 803,905.17
Tukang Kayu L.02 OH 20.100 124,000.00 2,492,400.00
Kepala Tukang L.03 OH 2.010 129,000.00 259,290.00
Mandor L.04 OH 0.335 140,000.00 46,900.00
JUMLAH HARGA TENAGA KERJA 3,602,495.17
B. BAHAN
Balok Kayu Kamper M3 1.200 9,012,500.00 10,815,000.00
Besi Strip Tebal 5 mm Kg 15.000 16,035.00 240,525.00
Paku 12 Cm Kg 5.600 24,922.50 139,566.00
JUMLAH HARGA BAHAN 11,195,091.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 14,797,586.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 14,797,586.17
A. TENAGA
Pekerja L.01 OH 2.400 119,985.85 287,966.03
Tukang Kayu L.02 OH 7.200 124,000.00 892,800.00
Kepala Tukang L.03 OH 0.720 129,000.00 92,880.00
Mandor L.04 OH 0.120 140,000.00 16,800.00
JUMLAH HARGA TENAGA KERJA 1,290,446.03
B. BAHAN
Balok Kayu Kamper M3 1.100 9,012,500.00 9,913,750.00
Besi Strip Tebal 5 mm Kg 15.000 16,035.00 240,525.00
Paku 12 Cm Kg 3.000 24,922.50 74,767.50
JUMLAH HARGA BAHAN 10,229,042.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 11,519,488.53
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 11,519,488.53
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Kaso - Kaso 5 x 7 cm M3 0.014 8,275,000.00 115,850.00
Reng 2 x 3 cm M3 0.0036 8,275,000.00 29,790.00
Paku 5 cm dan 10 cm Kg 0.250 24,922.50 6,230.63
JUMLAH HARGA BAHAN 151,870.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 178,259.21
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 178,259.21
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Kaso - Kaso 5 x 7 cm M3 0.014 8,275,000.00 115,850.00
Reng 2 x 3 cm Kg 0.0057 8,275,000.00 47,167.50
Paku 5 cm dan 10 cm Kg 0.250 24,922.50 6,230.63
JUMLAH HARGA BAHAN 169,248.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 195,636.71
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 195,636.71
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Kaso - Kaso 5 x 7 cm M3 0.0105 8,275,000.00 86,887.50
Paku 5 cm dan 10 cm Kg 0.250 24,922.50 6,230.63
JUMLAH HARGA BAHAN 93,118.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 119,506.71
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 119,506.71
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 26,388.58
B. BAHAN
Reng Kamper 2 x 3 cm M3 0.004 8,275,000.00 29,790.00
Paku 5 cm dan 10 cm Kg 0.250 24,922.50 6,230.63
JUMLAH HARGA BAHAN 36,020.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 62,409.21
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 62,409.21
A. TENAGA
Pekerja L.01 OH 0.120 119,985.85 14,398.30
Tukang Kayu L.02 OH 0.120 124,000.00 14,880.00
Kepala Tukang L.03 OH 0.012 129,000.00 1,548.00
Mandor L.04 OH 0.006 140,000.00 840.00
JUMLAH HARGA TENAGA KERJA 31,666.30
B. BAHAN
Balok Kayu Kamper M3 0.165 9,012,500.00 1,487,062.50
Paku 5 cm dan 10 cm Kg 0.200 24,922.50 4,984.50
JUMLAH HARGA BAHAN 1,492,047.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,523,713.30
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,523,713.30
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.03 OH 0.030 129,000.00 3,870.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH HARGA TENAGA KERJA 69,567.88
B. BAHAN
Kaso - Kaso 5 x 7 cm M3 0.0154 8,275,000.00 127,435.00
Paku 7 cm dan 10 cm Kg 0.200 24,922.50 4,984.50
JUMLAH HARGA BAHAN 132,419.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 201,987.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 201,987.38
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.03 OH 0.030 129,000.00 3,870.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 66,467.17
B. BAHAN
Kaso - Kaso 5 x 7 cm M3 0.0163 8,275,000.00 134,882.50
Paku 7 cm dan 10 cm Kg 0.250 24,922.50 6,230.63
JUMLAH HARGA BAHAN 141,113.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 207,580.29
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 207,580.29
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 40,078.58
B. BAHAN
Papan Kayu Kamper M3 0.0108 9,012,500.00 97,335.00
Paku 5 cm dan 7 cm Kg 0.100 24,922.50 2,492.25
JUMLAH HARGA BAHAN 99,827.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 139,905.83
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 139,905.83
24 A.4.6.1.24 PEMASANGAN 1 M' LISPLANK UKURAN 3 X 30 CM, KAYU KELAS I ATAU KELAS II
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 40,078.58
B. BAHAN
Papan Kayu Kamper M3 0.011 9,012,500.00 99,137.50
Paku 5 cm dan 7 cm Kg 0.050 24,922.50 1,246.13
JUMLAH HARGA BAHAN 100,383.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 140,462.21
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 140,462.21
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.450 124,000.00 55,800.00
Kepala Tukang L.03 OH 0.045 129,000.00 5,805.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 80,722.88
B. BAHAN
Balok Kayu Kamper M3 0.028 9,012,500.00 252,350.00
Paku 5 cm dan 7 cm Kg 0.150 24,922.50 3,738.38
JUMLAH HARGA BAHAN 256,088.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 336,811.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 336,811.25
26 A.4.6.1.26 PEMASANGAN 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.450 124,000.00 55,800.00
Kepala Tukang L.03 OH 0.045 129,000.00 5,805.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 80,722.88
B. BAHAN
Balok Kayu Kamper M3 0.028 9,012,500.00 252,350.00
Paku 5 cm dan 10 cm Kg 0.150 24,922.50 3,738.38
Plywood 4 mm ( 90 x 220 cm ) Lbr 0.860 84,688.50 72,832.11
Lem Kayu Kg 0.560 35,425.00 19,838.00
JUMLAH HARGA BAHAN 348,758.49
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 429,481.36
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 429,481.36
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Kayu L.02 OH 0.450 124,000.00 55,800.00
Kepala Tukang L.03 OH 0.045 129,000.00 5,805.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 80,722.88
B. BAHAN
Balok Kayu Kamper M3 0.028 9,012,500.00 252,350.00
Paku 5 cm dan 10 cm Kg 0.150 24,922.50 3,738.38
Teakwood 4 mm ( 90 x 220 cm ) Lbr 0.860 124,906.25 107,419.38
Lem Kayu Kg 0.560 35,425.00 19,838.00
JUMLAH HARGA BAHAN 383,345.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 464,068.63
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 464,068.63
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.600 124,000.00 74,400.00
Kepala Tukang L.03 OH 0.060 129,000.00 7,740.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 107,537.17
B. BAHAN
Rangka Hollow Btg 1.500 28,566.00 42,849.00
Paku 5 cm dan 10 cm Kg 0.150 24,922.50 3,738.38
Teakwood 4 mm ( 90 x 220 cm ) Lbr 0.860 124,906.25 107,419.38
Lem Kayu Kg 0.560 35,425.00 19,838.00
JUMLAH HARGA BAHAN 173,844.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 281,381.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Kayu L.02 OH 0.600 124,000.00 74,400.00
Kepala Tukang L.03 OH 0.060 129,000.00 7,740.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH HARGA TENAGA KERJA 107,537.17
B. BAHAN
Rangka Hollow Btg 1.500 28,566.00 42,849.00
Paku 5 cm dan 10 cm Kg 0.150 24,922.50 3,738.38
Plywood 4 mm ( 120 x 240 cm ) Lbr 0.860 84,688.50 72,832.11
Lem Kayu Kg 0.560 35,425.00 19,838.00
JUMLAH HARGA BAHAN 139,257.49
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 246,794.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 246,794.65
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Tukang Kayu L.02 OH 1.800 124,000.00 223,200.00
Kepala Tukang L.03 OH 0.180 129,000.00 23,220.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 322,611.51
B. BAHAN
Papan Kayu Kamper M3 0.007 9,012,500.00 63,087.50
Paku 5 cm dan 10 cm Kg 0.100 24,922.50 2,492.25
Paku Skrup 10 cm Kg 0.150 45,500.00 6,825.00
JUMLAH HARGA BAHAN 72,404.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 395,016.26
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 395,016.26
A. TENAGA
Pekerja L.01 OH 0.025 119,985.85 2,999.65
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 13,471.65
B. BAHAN
Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs 4.000 87,485.00 349,940.00
Paku 1 Cm dan 2,5 Cm Kg 0.050 24,922.50 1,246.13
JUMLAH HARGA BAHAN 351,186.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 364,657.77
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 364,657.77
32 A.4.6.1.32 PEMASANGAN 1 M2 LAMBRIZIRING DARI PLYWOOD ( KAYU LAPIS ) UKURAN 120 X 240 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.025 119,985.85 2,999.65
Tukang Kayu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 13,471.65
B. BAHAN
Plywood 4 mm ( 120 x 240 cm ) Lbr 0.400 84,688.50 33,875.40
Paku 1 cm dan 2,5 cm Kg 0.050 24,922.50 1,246.13
JUMLAH HARGA BAHAN 35,121.53
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 48,593.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 48,593.17
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.050 124,000.00 6,200.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 19,543.58
B. BAHAN
Bilik Bambu M2 1.500 45,000.00 67,500.00
Kaso - Kaso 5 x 7 cm M3 0.014 8,275,000.00 115,850.00
Paku Kg 0.012 24,922.50 299.07
List Kayu 2/4 cm M1 4.000 10,000.00 40,000.00
JUMLAH HARGA BAHAN 223,649.07
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 243,192.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 243,192.65
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Kayu L.02 OH 0.600 124,000.00 74,400.00
Kepala Tukang L.03 OH 0.060 129,000.00 7,740.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 89,759.15
B. BAHAN
Kunci Tanam Antik Bh 1.000 403,000.00 403,000.00
JUMLAH HARGA BAHAN 403,000.00
C. PERALATAN
D. Jumlah (A + B + C) 492,759.15
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 492,759.15
A. TENAGA
Pekerja L.01 OH 0.010 119,985.85 1,199.86
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 70,349.86
B. BAHAN
Kunci Tanam Biasa Bh 1.000 247,950.00 247,950.00
JUMLAH HARGA BAHAN 247,950.00
C. PERALATAN
D. Jumlah (A + B + C) 318,299.86
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.005 119,985.85 599.93
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 69,469.93
B. BAHAN
Kunci Tanam KM Bh 1.000 230,000.00 230,000.00
JUMLAH HARGA BAHAN 230,000.00
C. PERALATAN
D. Jumlah (A + B + C) 299,469.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 299,469.93
A. TENAGA
Pekerja L.01 OH 0.005 119,985.85 599.93
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 69,469.93
B. BAHAN
Kunci Silinder Bh 1.000 94,075.00 94,075.00
JUMLAH HARGA BAHAN 94,075.00
C. PERALATAN
D. Jumlah (A + B + C) 163,544.93
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 163,544.93
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH HARGA TENAGA KERJA 22,446.79
B. BAHAN
Engsel Pintu Ps 1.000 49,520.00 49,520.00
JUMLAH HARGA BAHAN 49,520.00
C. PERALATAN
D. Jumlah (A + B + C) 71,966.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,966.79
A. TENAGA
Pekerja L.01 OH 0.010 119,985.85 1,199.86
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.0005 140,000.00 70.00
JUMLAH HARGA TENAGA KERJA 14,959.86
B. BAHAN
Engsel Jendela Ps 1.000 66,975.00 66,975.00
JUMLAH HARGA BAHAN 66,975.00
C. PERALATAN
D. Jumlah (A + B + C) 81,934.86
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 81,934.86
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Tukang Kayu L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.0005 140,000.00 70.00
JUMLAH HARGA TENAGA KERJA 39,448.58
B. BAHAN
Engsel Angin Bh 1.000 65,950.00 65,950.00
JUMLAH HARGA BAHAN 65,950.00
C. PERALATAN
D. Jumlah (A + B + C) 105,398.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 105,398.58
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 23,454.79
B. BAHAN
Spring Knip Bh 1.000 72,000.00 72,000.00
JUMLAH HARGA BAHAN 72,000.00
C. PERALATAN
D. Jumlah (A + B + C) 95,454.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 95,454.79
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 23,454.79
B. BAHAN
Kait Angin Ps 1.000 57,150.00 57,150.00
JUMLAH HARGA BAHAN 57,150.00
C. PERALATAN
D. Jumlah (A + B + C) 80,604.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 80,604.79
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 69,064.29
B. BAHAN
Door Closer Set 1.000 275,000.00 275,000.00
JUMLAH HARGA BAHAN 275,000.00
C. PERALATAN
D. Jumlah (A + B + C) 344,064.29
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 344,064.29
A. TENAGA
Pekerja L.01 OH 0.020 119,985.85 2,399.72
Tukang Besi L.02 OH 0.200 124,000.00 24,800.00
Kepala Tukang L.03 OH 0.020 129,000.00 2,580.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 29,919.72
B. BAHAN
Kunci Slot Bh 1.000 308,850.00 308,850.00
JUMLAH HARGA BAHAN 308,850.00
C. PERALATAN
D. Jumlah (A + B + C) 338,769.72
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 338,769.72
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Tukang Kayu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 69,064.29
B. BAHAN
Door Holder Bh 1.000 63,400.00 63,400.00
JUMLAH HARGA BAHAN 63,400.00
C. PERALATAN
D. Jumlah (A + B + C) 132,464.29
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 132,464.29
A. TENAGA
Pekerja L.01 OH 0.010 119,985.85 1,199.86
Tukang Kayu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 15,589.86
B. BAHAN
Door Stop Bh 1.000 36,000.00 36,000.00
JUMLAH HARGA BAHAN 36,000.00
C. PERALATAN
D. Jumlah (A + B + C) 51,589.86
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 51,589.86
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Kayu L.02 OH 0.600 124,000.00 74,400.00
Kepala Tukang L.03 OH 0.060 129,000.00 7,740.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 89,759.15
B. BAHAN
Rel Pintu Dorong Set 1.000 378,250.00 378,250.00
JUMLAH HARGA BAHAN 378,250.00
C. PERALATAN
D. Jumlah (A + B + C) 468,009.15
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 468,009.15
A. TENAGA
Pekerja L.01 OH 0.025 119,985.85 2,999.65
Tukang Kayu L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH HARGA TENAGA KERJA 37,406.65
B. BAHAN
Kunci Lemari Set 1.000 33,600.00 33,600.00
JUMLAH HARGA BAHAN 33,600.00
C. PERALATAN
D. Jumlah (A + B + C) 71,006.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,006.65
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH HARGA TENAGA KERJA 22,446.79
B. BAHAN
Kaca Polos Tebal 3 mm M2 1.100 118,500.00 130,350.00
Slicon Sealant 300 ml Tube 0.050 44,625.00 2,231.25
JUMLAH HARGA BAHAN 132,581.25
C. PERALATAN
D. Jumlah (A + B + C) 155,028.04
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 155,028.04
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH HARGA TENAGA KERJA 22,446.79
B. BAHAN
Kaca Polos Tebal 5 mm M2 1.100 128,750.00 141,625.00
Slicon Sealant 300 ml Tube 0.050 44,625.00 2,231.25
JUMLAH HARGA BAHAN 141,625.00
C. PERALATAN
D. Jumlah (A + B + C) 164,071.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 164,071.79
A. TENAGA
Pekerja L.01 OH 0.017 119,985.85 2,039.76
Tukang Kayu L.02 OH 0.170 124,000.00 21,080.00
Kepala Tukang L.03 OH 0.017 129,000.00 2,193.00
Mandor L.04 OH 0.0009 140,000.00 126.00
JUMLAH HARGA TENAGA KERJA 25,438.76
B. BAHAN
Kaca Polos Tebal 8 mm M2 1.100 296,000.00 325,600.00
Slicon Sealant 300 ml Tube 0.070 44,625.00 3,123.75
JUMLAH HARGA BAHAN 325,600.00
C. PERALATAN
D. Jumlah (A + B + C) 351,038.76
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 351,038.76
A. TENAGA
Pekerja L.01 OH 0.025 119,985.85 2,999.65
Tukang Kayu L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH HARGA TENAGA KERJA 37,406.65
B. BAHAN
Kaca Buram Tebal 12 mm M2 1.100 583,750.00 642,125.00
Slicon Sealant 300 ml Tube 0.070 44,625.00 3,123.75
JUMLAH HARGA BAHAN 642,125.00
C. PERALATAN
D. Jumlah (A + B + C) 679,531.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 679,531.65
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 23,454.79
B. BAHAN
Kaca Cermin 5 mm M2 1.100 358,000.00 393,800.00
JUMLAH HARGA BAHAN 393,800.00
C. PERALATAN
D. Jumlah (A + B + C) 417,254.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 417,254.79
A. TENAGA
Pekerja L.01 OH 0.017 119,985.85 2,039.76
Tukang Kayu L.02 OH 0.170 124,000.00 21,080.00
Kepala Tukang L.03 OH 0.017 129,000.00 2,193.00
Mandor L.04 OH 0.009 140,000.00 1,260.00
JUMLAH HARGA TENAGA KERJA 26,572.76
B. BAHAN
Kaca Cermin 8 mm M2 1.100 572,800.00 630,080.00
JUMLAH HARGA BAHAN 630,080.00
C. PERALATAN
D. Jumlah (A + B + C) 656,652.76
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 656,652.76
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 23,454.79
B. BAHAN
Kaca Wireglassed 5 mm M2 1.100 220,000.00 242,000.00
JUMLAH HARGA BAHAN 242,000.00
C. PERALATAN
D. Jumlah (A + B + C) 265,454.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 265,454.79
A. TENAGA
Pekerja L.01 OH 0.075 119,985.85 8,998.94
Tukang Kayu L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 30,093.94
B. BAHAN
Kaca Patri 5 mm M2 1.100 642,400.00 706,640.00
Slicon Sealant 300 ml Tube 0.050 44,625.00 2,231.25
JUMLAH HARGA BAHAN 708,871.25
C. PERALATAN
D. Jumlah (A + B + C) 738,965.19
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 738,965.19
A. TENAGA
Pekerja L.01 OH 0.160 119,985.85 19,197.74
Tukang Kayu L.02 OH 0.160 124,000.00 19,840.00
Kepala Tukang L.03 OH 0.160 129,000.00 20,640.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 60,797.74
B. BAHAN
Kaca Tempered Tebal 5 mm Bh 1.100 270,000.00 297,000.00
JUMLAH HARGA BAHAN 297,000.00
C. PERALATAN
D. Jumlah (A + B + C) 357,797.74
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 357,797.74
A. TENAGA
Pekerja L.01 OH 0.160 119,985.85 19,197.74
Tukang Kayu L.02 OH 0.160 124,000.00 19,840.00
Kepala Tukang L.03 OH 0.160 129,000.00 20,640.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 60,797.74
B. BAHAN
Kaca Tempered Tebal 6 mm Bh 1.100 346,875.00 381,562.50
JUMLAH HARGA BAHAN 381,562.50
C. PERALATAN
D. Jumlah (A + B + C) 442,360.24
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 442,360.24
A. TENAGA
Pekerja L.01 OH 0.160 119,985.85 19,197.74
Tukang Kayu L.02 OH 0.160 124,000.00 19,840.00
Kepala Tukang L.03 OH 0.160 129,000.00 20,640.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 60,797.74
B. BAHAN
Kaca Tempered Tebal 12 mm Bh 1.100 651,250.00 716,375.00
JUMLAH HARGA BAHAN 716,375.00
C. PERALATAN
D. Jumlah (A + B + C) 777,172.74
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 777,172.74
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 19,117.88
B. BAHAN
Kapi Bh 0.050 10,000.00 500.00
JUMLAH HARGA BAHAN 500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 19,617.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 19,617.88
A. TENAGA
Pekerja L.01 OH 0.020 119,985.85 2,399.72
Tukang Cat L.02 OH 0.030 124,000.00 3,720.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 6,646.72
B. BAHAN
Plamir Tembok Kg 0.100 47,750.00 4,775.00
Amplas Lbr 0.500 5,125.00 2,562.50
Kapi Bh 0.050 10,000.00 500.00
JUMLAH HARGA BAHAN 7,837.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 14,484.22
A. TENAGA
Pekerja L.01 OH 0.020 119,985.85 2,399.72
Tukang Cat L.02 OH 0.063 124,000.00 7,812.00
Kepala Tukang L.03 OH 0.0063 129,000.00 812.70
Mandor L.04 OH 0.0025 140,000.00 350.00
JUMLAH HARGA TENAGA KERJA 11,374.42
B. BAHAN
Plamir Tembok Kg 0.100 47,750.00 4,775.00
Cat dasar Kg 0.100 34,075.00 3,407.50
Cat Penutup 2x Kg 0.260 54,700.00 14,222.00
JUMLAH HARGA BAHAN 22,404.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 33,778.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 33,778.92
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Cat L.02 OH 0.050 124,000.00 6,200.00
Kepala Tukang L.03 OH 0.005 129,000.00 645.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 14,464.15
B. BAHAN
Cat Tembok Vinilex Kg 0.240 54,700.00 13,128.00
Kuas Bh 0.015 14,500.00 217.50
JUMLAH HARGA BAHAN 13,345.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 27,809.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 27,809.65
A. TENAGA
Pekerja L.01 OH 0.040 119,985.85 4,799.43
Tukang Cat L.02 OH 0.030 124,000.00 3,720.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 9,186.43
B. BAHAN
Cat Tembok Vinilex Kg 0.470 54,700.00 25,709.00
Roll Bh 0.010 37,500.00 375.00
JUMLAH HARGA BAHAN 26,084.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 35,270.43
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 35,270.43
6 A.4.7.1.6 PENGECATAN 1 M2 PLAFOND 2 LAPIS, DGN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.080 119,985.85 9,598.87
Tukang Cat L.02 OH 0.060 124,000.00 7,440.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 18,372.87
B. BAHAN
Plamir Tembok Kg 0.100 47,750.00 4,775.00
Cat Tembok Vinilex Kg 0.240 54,700.00 13,128.00
Amplas Lbr 0.500 5,125.00 2,562.50
Kuas Bh 0.015 14,500.00 217.50
Kapi Bh 0.050 10,000.00 500.00
JUMLAH HARGA BAHAN 21,183.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 39,555.87
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Cat L.02 OH 0.040 124,000.00 4,960.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 13,095.15
B. BAHAN
Plamir Tembok Kg 0.100 47,750.00 4,775.00
Cat Tembok Vinilex Kg 0.470 54,700.00 25,709.00
Amplas Lbr 0.500 5,125.00 2,562.50
Roll Bh 0.010 37,500.00 375.00
Kapi Bh 0.050 10,000.00 500.00
JUMLAH HARGA BAHAN 33,921.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 47,016.65
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 47,016.65
A. TENAGA
Pekerja L.01 OH 0.015 119,985.85 1,799.79
Tukang Cat L.02 OH 0.160 124,000.00 19,840.00
Kepala Tukang L.03 OH 0.014 129,000.00 1,806.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 24,145.79
B. BAHAN
Waterprofing Dumplix 3 Kg 0.450 63,413.89 28,536.25
JUMLAH HARGA BAHAN 28,536.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 52,682.04
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 52,682.04
A. TENAGA
Pekerja L.01 OH 0.010 119,985.85 1,199.86
Tukang Cat L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 15,589.86
B. BAHAN
Wall Paper M2 1.100 570,625.00 627,687.50
Perekat Kg 0.200 31,000.00 6,200.00
JUMLAH HARGA BAHAN 633,887.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 649,477.36
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 649,477.36
A. TENAGA
Pekerja L.01 OH 0.075 119,985.85 8,998.94
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 9,558.94
B. BAHAN
Meni Kg 0.170 54,375.00 9,243.75
Minyak Cat Ltr 0.100 37,250.00 3,725.00
Kuas Bh 0.015 14,500.00 217.50
JUMLAH HARGA BAHAN 13,186.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 22,745.19
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 22,745.19
A. TENAGA
Tukang Cat L.02 OH 0.110 124,000.00 13,640.00
Kepala Tukang L.03 OH 0.011 129,000.00 1,419.00
JUMLAH HARGA TENAGA KERJA 15,059.00
B. BAHAN
Dempul Kayu Kg 0.150 47,750.00 7,162.50
Plamir Kayu Kg 0.008 53,750.00 430.00
Minyak Cat Ltr 0.100 37,250.00 3,725.00
Amplas Lbr 1.000 5,125.00 5,125.00
Kuas Bh 0.015 14,500.00 217.50
JUMLAH HARGA BAHAN 16,660.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 31,719.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 31,719.00
A. TENAGA
Tukang Cat L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 1,032.00
JUMLAH HARGA TENAGA KERJA 10,332.00
B. BAHAN
Cat Dasar Kg 0.170 77,750.00 13,217.50
Minyak Cat Ltr 0.100 37,250.00 3,725.00
Amplas Lbr 1.000 5,125.00 5,125.00
Kuas Bh 0.015 14,500.00 217.50
JUMLAH HARGA BAHAN 22,285.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 32,617.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 32,617.00
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Cat L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 39,652.88
B. BAHAN
Cat Kayu Emco Kg 0.300 77,750.00 23,325.00
Minyak Cat Ltr 0.200 37,250.00 7,450.00
Kuas Bh 0.020 14,500.00 290.00
JUMLAH HARGA BAHAN 31,065.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 70,717.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 70,717.88
14 A.4.7.1.14 PEKERJAAN 1 M2 MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 119,985.85 35,995.75
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 38,095.75
B. BAHAN
Amplas Lbr 0.500 5,125.00 2,562.50
Sikat Baja Bh 0.050 25,200.00 1,260.00
Soda Api Kg 0.050 38,000.00 1,900.00
JUMLAH HARGA BAHAN 5,722.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 43,818.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 43,818.25
A. TENAGA
Pekerja L.01 OH 0.075 119,985.85 8,998.94
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 9,558.94
B. BAHAN
Meni Kg 0.100 51,875.00 5,187.50
Minyak Cat Kg 0.100 37,250.00 3,725.00
Amplas Bh 0.500 5,125.00 2,562.50
Kuas Bh 0.015 14,500.00 217.50
JUMLAH HARGA BAHAN 11,692.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 21,251.44
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 21,251.44
16 A.4.7.1.16 PENGECATAN 1 M2 CAT PENUTUP, 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Cat L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.015 129,000.00 1,935.00
Mandor L.04 OH 0.008 140,000.00 1,120.00
JUMLAH HARGA TENAGA KERJA 39,652.88
B. BAHAN
Cat Warna Zingkronasi Kg 0.200 51,000.00 10,200.00
Minyak Cat Kg 0.100 37,250.00 3,725.00
Kuas Bh 0.020 14,500.00 290.00
JUMLAH HARGA BAHAN 14,215.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 53,867.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 53,867.88
A. TENAGA
Pekerja L.01 OH 0.020 119,985.85 2,399.72
Tukang Cat L.02 OH 0.150 124,000.00 18,600.00
Kepala Tukang L.03 OH 0.001 129,000.00 129.00
Mandor L.04 OH 0.001 140,000.00 140.00
JUMLAH HARGA TENAGA KERJA 21,268.72
B. BAHAN
Cat Warna Zingkronasi Kg 0.400 51,000.00 20,400.00
Minyak Cat Kg 0.100 37,250.00 3,725.00
JUMLAH HARGA BAHAN 24,125.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 45,393.72
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 45,393.72
A. TENAGA
Tukang Cat L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
JUMLAH HARGA TENAGA KERJA 13,690.00
B. BAHAN
Teak Oil Ltr 0.300 62,500.00 18,750.00
Amplas Lbr 0.500 5,125.00 2,562.50
Kuas Bh 0.015 14,500.00 217.50
JUMLAH HARGA BAHAN 21,530.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 35,220.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 35,220.00
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Tukang Cat L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.025 129,000.00 3,225.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 66,041.46
B. BAHAN
Wood Filler Kg 0.100 62,625.00 6,262.50
Politur Jadi Ltr 0.200 103,750.00 20,750.00
Amplas Lbr 1.000 5,125.00 5,125.00
Kuas Bh 0.020 14,500.00 290.00
JUMLAH HARGA BAHAN 32,427.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 98,468.96
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 98,468.96
A. TENAGA
Tukang Cat L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
JUMLAH HARGA TENAGA KERJA 13,690.00
B. BAHAN
Vernis Ltr 0.300 63,250.00 18,975.00
Amplas Lbr 0.500 5,125.00 2,562.50
Kuas Bh 0.020 14,500.00 290.00
JUMLAH HARGA BAHAN 21,827.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 35,517.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 35,517.50
A. TENAGA
Tukang Cat L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
JUMLAH HARGA TENAGA KERJA 13,690.00
B. BAHAN
Residu / Teer Ltr 0.350 97,000.00 33,950.00
Minyak Tanah Ltr 0.030 14,625.00 438.75
Kuas Bh 0.020 14,500.00 290.00
JUMLAH HARGA BAHAN 34,678.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 48,368.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 48,368.75
22 A.4.7.1.22 PENGECATAN 1 M2 PERMUKAAN BAJA GALVANIS SECARA SEMPROT SISTEM 3 LAPIS CAT TERAKHIR
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 119,985.85 47,994.34
Tukang Cat L.02 OH 0.700 124,000.00 86,800.00
Kepala Tukang L.03 OH 0.070 129,000.00 9,030.00
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 146,624.34
B. BAHAN
Cat Dasar Kg 0.300 77,750.00 23,325.00
Pengencer / Minyak Cat Ltr 0.010 37,250.00 372.50
JUMLAH HARGA BAHAN 23,697.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 170,321.84
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 170,321.84
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 1.100 124,000.00 136,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.160 140,000.00 22,400.00
JUMLAH HARGA TENAGA KERJA 220,082.92
B. BAHAN
Kloset Duduk / Monoblok Unit 1.000 6,848,050.00 6,848,050.00
Perlengkapan Ls 6% 6,848,050.00 410,883.00
JUMLAH HARGA BAHAN 7,258,933.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 7,479,015.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 7,479,015.92
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Batu L.02 OH 1.500 124,000.00 186,000.00
Kepala Tukang L.03 OH 0.150 129,000.00 19,350.00
Mandor L.04 OH 0.160 140,000.00 22,400.00
JUMLAH HARGA TENAGA KERJA 347,735.85
B. BAHAN
Kloset Jongkok Porselen Unit 1.000 304,390.00 304,390.00
Pas. Bata ( 1Pc : 3Ps ) M2 0.036 178,585.00 6,429.06
JUMLAH HARGA BAHAN 310,819.06
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Batu L.02 OH 1.500 124,000.00 186,000.00
Kepala Tukang L.03 OH 0.150 129,000.00 19,350.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 332,335.85
B. BAHAN
Kloset Jongkok Teraso Unit 1.000 1,619,200.00 1,619,200.00
Pas. Bata ( 1Pc : 3Ps ) M2 0.036 178,585.00 6,429.06
JUMLAH HARGA BAHAN 1,625,629.06
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,957,964.91
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,957,964.91
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Batu L.02 OH 1.000 124,000.00 124,000.00
Kepala Tukang L.03 OH 0.100 129,000.00 12,900.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 263,885.85
B. BAHAN
Urinoir Lengkap Unit 1.000 3,072,350.00 3,072,350.00
Semen Portland Kg 6.000 2,025.00 12,150.00
Pasir Pasang M3 0.010 386,250.00 3,862.50
JUMLAH HARGA BAHAN 3,088,362.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 3,352,248.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,352,248.35
A. TENAGA
Pekerja L.01 OH 1.200 119,985.85 143,983.01
Tukang Batu L.02 OH 1.450 124,000.00 179,800.00
Kepala Tukang L.03 OH 0.150 129,000.00 19,350.00
Mandor L.04 OH 0.060 140,000.00 8,400.00
JUMLAH HARGA TENAGA KERJA 351,533.01
B. BAHAN
Wastafel Lengkap Unit 1.200 1,550,850.00 1,861,020.00
Semen Portland Kg 6.000 2,025.00 12,150.00
Pasir Pasang M3 0.010 386,250.00 3,862.50
JUMLAH HARGA BAHAN 1,877,032.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,228,565.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,228,565.51
A. TENAGA
Pekerja L.01 OH 3.000 119,985.85 359,957.54
Tukang Batu L.02 OH 4.500 124,000.00 558,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.900 140,000.00 126,000.00
JUMLAH HARGA TENAGA KERJA 1,050,407.54
B. BAHAN
Bak Teraso Unit 1.000 750,000.00 750,000.00
Perlengkapan Ls 12% 750,000.00 90,000.00
JUMLAH HARGA BAHAN 840,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,890,407.54
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,890,407.54
A. TENAGA
Pekerja L.01 OH 3.000 119,985.85 359,957.54
Tukang Batu L.02 OH 4.500 124,000.00 558,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.900 140,000.00 126,000.00
JUMLAH HARGA TENAGA KERJA 1,050,407.54
B. BAHAN
Bak Air Fibreglass Unit 1.000 357,457.50 357,457.50
Perlengkapan Ls 12% 357,457.50 42,894.90
JUMLAH HARGA BAHAN 400,352.40
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,450,759.94
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,450,759.94
A. TENAGA
Pekerja L.01 OH 6.000 119,985.85 719,915.07
Tukang Batu L.02 OH 3.000 124,000.00 372,000.00
Kepala Tukang L.03 OH 0.300 129,000.00 38,700.00
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 1,134,815.07
B. BAHAN
Bata Merah Bh 150.000 1,175.00 176,250.00
Semen Portland Kg 120.000 2,025.00 243,000.00
Pasir Pasang M3 0.300 386,250.00 115,875.00
Porselin 11 x 11 cm Bh 360.000 1,386.56 499,162.50
JUMLAH HARGA BAHAN 1,034,287.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,169,102.57
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,169,102.57
A. TENAGA
Pekerja L.01 OH 0.075 119,985.85 8,998.94
Tukang Batu L.02 OH 0.750 124,000.00 93,000.00
Kepala Tukang L.03 OH 0.075 129,000.00 9,675.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 112,093.94
B. BAHAN
Bathtub Porselen Unit 1.000 4,810,000.00 4,810,000.00
JUMLAH HARGA BAHAN 4,810,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 4,922,093.94
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,922,093.94
A. TENAGA
Pekerja L.01 OH 3.500 119,985.85 419,950.46
Tukang Batu L.02 OH 4.500 124,000.00 558,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.180 140,000.00 25,200.00
JUMLAH HARGA TENAGA KERJA 1,009,600.46
B. BAHAN
Beton Camp. ( 1Pc : 2Ps : 3Krl ) M3 0.900 1,447,109.04 1,302,398.14
Besi Tulangan Kg 180.000 15,799.63 2,843,932.67
Kayu Bekisting M2 8.000 148,832.88 1,190,663.05
Ubin Porselen 20 x 20 cm Bh 500.000 4,470.00 2,235,000.00
JUMLAH HARGA BAHAN 7,571,993.86
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 8,581,594.32
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 8,581,594.32
A. TENAGA
Pekerja L.01 OH 3.000 119,985.85 359,957.54
Tukang Batu L.02 OH 4.500 124,000.00 558,000.00
Kepala Tukang L.03 OH 0.045 129,000.00 5,805.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 925,862.54
B. BAHAN
Bak Air Fibreglass Unit 1.000 1,104,543.68 1,104,543.68
Perlengkapan Ls 12% 1,104,543.68 132,545.24
JUMLAH HARGA BAHAN 1,237,088.92
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,162,951.45
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,162,951.45
12 A.5.1.1.12 PEMASANGAN 1 BUAH BAK KONTROL PAS. BATA 30 X 30 CM, TINGGI 35 CM DENGAN TUTUP BETON
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.160 119,985.85 259,169.43
Tukang Batu L.02 OH 0.720 124,000.00 89,280.00
Kepala Tukang L.03 OH 0.072 129,000.00 9,288.00
Mandor L.04 OH 0.110 140,000.00 15,400.00
JUMLAH HARGA TENAGA KERJA 373,137.43
B. BAHAN
Bata Merah Bh 40.000 1,175.00 47,000.00
Semen Portland Kg 44.000 2,025.00 89,100.00
Pasir Pasang M3 0.070 386,250.00 27,037.50
Pasir Beton M3 0.060 355,000.00 21,300.00
Kerikil M3 0.070 357,750.00 25,042.50
Besi Tulangan Kg 1.600 15,799.63 25,279.40
JUMLAH HARGA BAHAN 234,759.40
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 607,896.83
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 3.200 119,985.85 383,954.71
Tukang Batu L.02 OH 1.150 124,000.00 142,600.00
Kepala Tukang L.03 OH 0.011 129,000.00 1,419.00
Mandor L.04 OH 0.016 140,000.00 2,240.00
JUMLAH HARGA TENAGA KERJA 530,213.71
B. BAHAN
Bata Merah Bh 70.000 1,175.00 82,250.00
Semen Portland Kg 77.000 2,025.00 155,925.00
Pasir Pasang M3 0.130 386,250.00 50,212.50
Pasir Beton M3 0.090 355,000.00 31,950.00
Kerikil M3 0.020 357,750.00 7,155.00
Besi Tulangan Kg 2.600 15,799.63 41,079.03
JUMLAH HARGA BAHAN 368,571.53
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 898,785.23
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 898,785.23
14 A.5.1.1.14 PEMASANGAN 1 BUAH BAK KONTROL PAS. BATA 60 X 60 CM, TINGGI 65 CM DENGAN TUTUP BETON
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3.200 119,985.85 383,954.71
Tukang Batu L.02 OH 1.150 124,000.00 142,600.00
Kepala Tukang L.03 OH 0.011 129,000.00 1,419.00
Mandor L.04 OH 0.016 140,000.00 2,240.00
JUMLAH HARGA TENAGA KERJA 530,213.71
B. BAHAN
Bata Merah Bh 123.000 1,175.00 144,525.00
Semen Portland Kg 114.000 2,025.00 230,850.00
Pasir Pasang M3 1.184 386,250.00 457,320.00
Pasir Beton M3 0.120 355,000.00 42,600.00
Kerikil M3 0.033 357,750.00 11,805.75
Besi Tulangan Kg 4.850 15,799.63 76,628.19
JUMLAH HARGA BAHAN 963,728.94
C. PERALATAN
- - -
D. Jumlah (A + B + C) 1,493,942.64
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,493,942.64
A. TENAGA
Pekerja L.01 OH 0.054 119,985.85 6,479.24
Tukang Pipa L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.027 140,000.00 3,780.00
JUMLAH HARGA TENAGA KERJA 22,580.24
B. BAHAN
Pipa Galvanis Ø 1/2" M1 1.200 52,375.00 62,850.00
Perlengkapan Ls 35% 52,375.00 18,331.25
JUMLAH HARGA BAHAN 81,181.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 103,761.49
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 103,761.49
A. TENAGA
Pekerja L.01 OH 0.054 119,985.85 6,479.24
Tukang Pipa L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.027 140,000.00 3,780.00
JUMLAH HARGA TENAGA KERJA 22,580.24
B. BAHAN
Pipa Galvanis Ø 3/4" M1 1.200 78,500.00 94,200.00
Perlengkapan Ls 35% 78,500.00 27,475.00
JUMLAH HARGA BAHAN 121,675.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 144,255.24
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 144,255.24
A. TENAGA
Pekerja L.01 OH 0.054 119,985.85 6,479.24
Tukang Pipa L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.027 140,000.00 3,780.00
JUMLAH HARGA TENAGA KERJA 22,580.24
B. BAHAN
Pipa Galvanis Ø 1" M1 1.200 104,750.00 125,700.00
Perlengkapan Ls 35% 104,750.00 36,662.50
JUMLAH HARGA BAHAN 162,362.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 184,942.74
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 184,942.74
A. TENAGA
Pekerja L.01 OH 0.108 119,985.85 12,958.47
Tukang Pipa L.02 OH 0.180 124,000.00 22,320.00
Kepala Tukang L.03 OH 0.018 129,000.00 2,322.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 38,300.47
B. BAHAN
Pipa Galvanis Ø 1 ½" M1 1.200 231,250.00 277,500.00
Perlengkapan Ls 35% 231,250.00 80,937.50
JUMLAH HARGA BAHAN 358,437.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 396,737.97
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 396,737.97
A. TENAGA
Pekerja L.01 OH 0.135 119,985.85 16,198.09
Tukang Pipa L.02 OH 0.225 124,000.00 27,900.00
Kepala Tukang L.03 OH 0.023 129,000.00 2,967.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 48,045.09
B. BAHAN
Pipa Galvanis Ø 3" M1 1.200 279,840.25 335,808.30
Perlengkapan Ls 35% 279,840.25 97,944.09
JUMLAH HARGA BAHAN 433,752.39
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 481,797.48
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 481,797.48
A. TENAGA
Pekerja L.01 OH 0.135 119,985.85 16,198.09
Tukang Pipa L.02 OH 0.225 124,000.00 27,900.00
Kepala Tukang L.03 OH 0.023 129,000.00 2,967.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 48,045.09
B. BAHAN
Pipa Galvanis Ø 4" M1 1.200 421,295.00 505,554.00
Perlengkapan Ls 35% 421,295.00 147,453.25
JUMLAH HARGA BAHAN 653,007.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 701,052.34
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 701,052.34
A. TENAGA
Pekerja L.01 OH 0.036 119,985.85 4,319.49
Tukang Pipa L.02 OH 0.060 124,000.00 7,440.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 12,813.49
B. BAHAN
Pipa PVC AW Ø ½" M1 1.200 7,980.63 9,576.75
Perlengkapan Ls 35% 7,980.63 2,793.22
JUMLAH HARGA BAHAN 12,369.97
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 25,183.46
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 25,183.46
A. TENAGA
Pekerja L.01 OH 0.036 119,985.85 4,319.49
Tukang Pipa L.02 OH 0.060 124,000.00 7,440.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 12,813.49
B. BAHAN
Pipa PVC AW Ø 3/4" M1 1.200 10,144.06 12,172.88
Perlengkapan Ls 35% 10,144.06 3,550.42
JUMLAH HARGA BAHAN 15,723.30
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 28,536.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 28,536.79
A. TENAGA
Pekerja L.01 OH 0.036 119,985.85 4,319.49
Tukang Pipa L.02 OH 0.060 124,000.00 7,440.00
Kepala Tukang L.03 OH 0.006 129,000.00 774.00
Mandor L.04 OH 0.002 140,000.00 280.00
JUMLAH HARGA TENAGA KERJA 12,813.49
B. BAHAN
Pipa PVC AW Ø 1" M1 1.200 12,189.69 14,627.63
Perlengkapan Ls 35% 12,189.69 4,266.39
JUMLAH HARGA BAHAN 18,894.02
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 31,707.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 31,707.51
A. TENAGA
Pekerja L.01 OH 0.054 119,985.85 6,479.24
Tukang Pipa L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 19,220.24
B. BAHAN
Pipa PVC AW Ø 1 ½" M1 1.200 21,718.81 26,062.58
Perlengkapan Ls 35% 21,718.81 7,601.58
JUMLAH HARGA BAHAN 33,664.16
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 52,884.40
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 52,884.40
A. TENAGA
Pekerja L.01 OH 0.054 119,985.85 6,479.24
Tukang Pipa L.02 OH 0.090 124,000.00 11,160.00
Kepala Tukang L.03 OH 0.009 129,000.00 1,161.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 19,220.24
B. BAHAN
Pipa PVC AW Ø 2" M1 1.200 32,485.00 38,982.00
Perlengkapan Ls 35% 32,485.00 11,369.75
JUMLAH HARGA BAHAN 50,351.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 69,571.99
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 69,571.99
A. TENAGA
Pekerja L.01 OH 0.081 119,985.85 9,718.85
Tukang Pipa L.02 OH 0.135 124,000.00 16,740.00
Kepala Tukang L.03 OH 0.0135 129,000.00 1,741.50
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 28,760.35
B. BAHAN
Pipa PVC AW Ø 2½" M1 1.200 36,980.00 44,376.00
Perlengkapan Ls 35% 36,980.00 12,943.00
JUMLAH HARGA BAHAN 57,319.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 86,079.35
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 86,079.35
A. TENAGA
Pekerja L.01 OH 0.081 119,985.85 9,718.85
Tukang Pipa L.02 OH 0.135 124,000.00 16,740.00
Kepala Tukang L.03 OH 0.0135 129,000.00 1,741.50
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 28,760.35
B. BAHAN
Pipa PVC AW Ø 3" M1 1.200 56,854.69 68,225.63
Perlengkapan Ls 35% 56,854.69 19,899.14
JUMLAH HARGA BAHAN 88,124.77
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 116,885.12
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,885.12
A. TENAGA
Pekerja L.01 OH 0.081 119,985.85 9,718.85
Tukang Pipa L.02 OH 0.135 124,000.00 16,740.00
Kepala Tukang L.03 OH 0.0135 129,000.00 1,741.50
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 28,760.35
B. BAHAN
Pipa PVC AW Ø 4" M1 1.200 83,613.75 100,336.50
Perlengkapan Ls 35% 83,613.75 29,264.81
JUMLAH HARGA BAHAN 129,601.31
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 158,361.67
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 158,361.67
A. TENAGA
Pekerja L.01 OH 0.030 119,985.85 3,599.58
Tukang Batu L.02 OH 0.300 124,000.00 37,200.00
Kepala Tukang L.03 OH 0.030 129,000.00 3,870.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 46,769.58
B. BAHAN
Bak Cuci Piring Stainlessteel Unit 1.000 1,482,500.00 1,482,500.00
Water Drain Bh 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 1,567,500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,614,269.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,614,269.58
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Tukang Batu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 77,949.29
B. BAHAN
Bak Cuci Piring Teraso Unit 1.000 1,105,000.00 1,105,000.00
Waterdrain Bh 1.000 85,000.00 85,000.00
Semen Portland Kg 20.000 2,025.00 40,500.00
Pasir Pasang M3 0.050 386,250.00 19,312.50
JUMLAH HARGA BAHAN 1,249,812.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,327,761.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,327,761.79
A. TENAGA
Pekerja L.01 OH 0.010 119,985.85 1,199.86
Tukang Pipa L.02 OH 0.400 124,000.00 49,600.00
Kepala Tukang L.03 OH 0.040 129,000.00 5,160.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 56,659.86
B. BAHAN
Kran air Bh 1.000 22,825.00 22,825.00
Seal tape Bh 0.025 3,887.00 97.18
JUMLAH HARGA BAHAN 22,922.18
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 79,582.03
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 79,582.03
A. TENAGA
Pekerja L.01 OH 0.010 119,985.85 1,199.86
Tukang Batu L.02 OH 0.100 124,000.00 12,400.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 15,589.86
B. BAHAN
Floor Drain Stainless Bh 1.000 144,625.00 144,625.00
JUMLAH HARGA BAHAN 144,625.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 160,214.86
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 160,214.86
A. TENAGA
Pekerja L.01 OH 0.080 119,985.85 9,598.87
Tukang Batu L.02 OH 0.040 124,000.00 4,960.00
Kepala Tukang L.03 OH 0.004 129,000.00 516.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 15,634.87
B. BAHAN
Pipa Tanah Ø 20 cm M1 1.600 308,858.00 494,172.80
Semen Portland Kg 35.000 2,025.00 70,875.00
Pasir Pasang M3 0.014 386,250.00 5,407.50
Pasir Urug M3 0.014 261,250.00 3,657.50
JUMLAH HARGA BAHAN 574,112.80
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 589,747.67
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 589,747.67
A. TENAGA
Pekerja L.01 OH 0.060 119,985.85 7,199.15
Tukang Batu L.02 OH 0.030 124,000.00 3,720.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.003 140,000.00 420.00
JUMLAH HARGA TENAGA KERJA 11,726.15
B. BAHAN
Pipa Tanah Ø 15 cm M1 1.600 183,904.00 294,246.40
Semen Portland Kg 26.250 2,025.00 53,156.25
Pasir Pasang M3 0.013 386,250.00 5,021.25
Pasir Urug M3 0.011 261,250.00 2,873.75
JUMLAH HARGA BAHAN 355,297.65
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 367,023.80
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
A. TENAGA
Pekerja L.01 OH 0.140 119,985.85 16,798.02
Tukang Batu L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.007 140,000.00 980.00
JUMLAH HARGA TENAGA KERJA 27,361.02
B. BAHAN
Pipa Beton Ø 15 cm M1 1.100 64,998.38 71,498.21
Bata Merah M3 0.027 1,175.00 31.72
Semen Portland Kg 9.300 2,025.00 18,832.50
Pasir Pasang M3 0.056 386,250.00 21,630.00
Pasir Urug M3 0.024 261,250.00 6,270.00
JUMLAH HARGA BAHAN 118,262.44
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 145,623.46
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 145,623.46
A. TENAGA
Pekerja L.01 OH 0.380 119,985.85 45,594.62
Tukang Batu L.02 OH 0.190 124,000.00 23,560.00
Kepala Tukang L.03 OH 0.019 129,000.00 2,451.00
Mandor L.04 OH 0.019 140,000.00 2,660.00
JUMLAH HARGA TENAGA KERJA 74,265.62
B. BAHAN
Pipa Beton Ø 30 cm M1 1.100 78,331.38 86,164.51
Bata Merah M3 0.550 1,175.00 646.25
Semen Portland Kg 10.300 2,025.00 20,857.50
Pasir Pasang M3 0.061 386,250.00 23,561.25
Pasir Urug M3 0.069 261,250.00 18,026.25
JUMLAH HARGA BAHAN 149,255.76
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
1 A.6.1.1.1 PEMASANGAN 1 BUAH TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Biaya Pasang Ls 1.000 65,000.00 65,000.00
JUMLAH HARGA TENAGA KERJA 65,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme M1 8.000 24,200.00 193,600.00
Pipa Clipsal 20 mm hitam Btg 3.000 17,625.00 52,875.00
Tee dos clipsal 20 mm hitam Bh 2.000 8,665.00 17,330.00
Klem clipsal 20 mm hitam Biji 15.000 2,225.00 33,375.00
Sock clipsal 20 mm hitam Biji 3.000 2,100.00 6,300.00
Inbow dos plastik clipsal E 157 P Biji 1.000 8,515.00 8,515.00
JUMLAH HARGA BAHAN 311,995.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 376,995.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 376,995.00
A. TENAGA
Biaya Pasang Ls 1.000 65,000.00 65,000.00
JUMLAH HARGA TENAGA KERJA 65,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme M1 10.000 24,200.00 242,000.00
Pipa Clipsal 20 mm hitam Btg 3.000 17,625.00 52,875.00
Tee dos clipsal 20 mm hitam Bh 1.000 8,665.00 8,665.00
Klem clipsal 20 mm hitam Biji 15.000 2,225.00 33,375.00
Sock clipsal 20 mm hitam Biji 4.000 2,100.00 8,400.00
Inbow dos plastik clipsal E 157 P Biji 1.000 8,515.00 8,515.00
Pipa flexible clipsal 20 mm hitam M1 1.000 4,772.50 4,772.50
JUMLAH HARGA BAHAN 358,602.50
C. PERALATAN
D. Jumlah (A + B + C) 423,602.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 423,602.50
A. TENAGA
Biaya Pasang Ls 1.000 65,000.00 65,000.00
JUMLAH HARGA TENAGA KERJA 65,000.00
B. BAHAN
Kabel Telephone M1 25.000 4,323.50 108,087.50
Pipa Clipsal 20 mm hitam Btg 8.000 4,772.50 38,180.00
Tee dos clipsal 20 mm hitam Bh 1.000 8,665.00 8,665.00
Klem clipsal 20 mm hitam Biji 25.000 2,225.00 55,625.00
Sock clipsal 20 mm hitam Biji 5.000 2,100.00 10,500.00
Inbow dos plastik clipsal E 157 P Biji 1.000 8,515.00 8,515.00
JUMLAH HARGA BAHAN 229,572.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 294,572.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 294,572.50
A. TENAGA
Biaya Pasang Ls 1.000 65,000.00 65,000.00
JUMLAH HARGA TENAGA KERJA 65,000.00
B. BAHAN
Coaxial cable 5C-75 ohm commscof M1 20.000 25,125.00 502,500.00
Pipa Clipsal 20 mm hitam Btg 6.000 2,100.00 12,600.00
Tee dos clipsal 20 mm hitam Bh 2.000 8,665.00 17,330.00
Klem clipsal 20 mm hitam Biji 20.000 2,225.00 44,500.00
Sock clipsal 20 mm hitam Biji 6.000 2,100.00 12,600.00
Inbow dos plastik clipsal E 157 P Biji 1.000 8,515.00 8,515.00
JUMLAH HARGA BAHAN 598,045.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 663,045.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 663,045.00
A. TENAGA
Biaya Pasang Ls 1.000 65,000.00 65,000.00
JUMLAH HARGA TENAGA KERJA 65,000.00
B. BAHAN
Lampu Philip 18 watt Bh 1.000 48,420.00 48,420.00
JUMLAH HARGA BAHAN 48,420.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 113,420.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 113,420.00
A. TENAGA
Biaya Pasang Ls 1.000 75,000.00 75,000.00
JUMLAH HARGA TENAGA KERJA 75,000.00
B. BAHAN
Pipa Listrik 5/8” Btg 3.000 17,625.00 52,875.00
Kabel NYM 3 x 2.5 mm ex. Supreme M1 15.000 24,200.00 363,000.00
T Dus Bh 1.000 8,665.00 8,665.00
L Bow Bh 2.000 3,500.00 7,000.00
Klem Biasa Bh 24.000 2,225.00 53,400.00
MCCB ( Boks MCB ) Bh 1.000 174,900.00 174,900.00
MCB 6 Ampere / 220 V Bh 2.000 251,900.00 503,800.00
JUMLAH HARGA BAHAN 1,163,640.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,238,640.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,238,640.00
A. TENAGA
Biaya Pasang Ls 1.000 65,000.00 65,000.00
JUMLAH HARGA TENAGA KERJA 65,000.00
B. BAHAN
Pipa listrik 5/8” Btg 3.00 17,625.00 52,875.00
Kabel NYM 3 x 2.5 mm ex. Supreme M1 8.00 24,200.00 193,600.00
T Dus Bh 3.00 8,665.00 25,995.00
L Bow Bh 4.00 3,500.00 14,000.00
Las Dop Bh 3.00 -
Klem Bh 24.00 2,225.00 53,400.00
Mongkok Bh 1.00 8,515.00 8,515.00
Saklar Bh 1.00 16,000.00 16,000.00
Fitting Bh 1.00 11,375.00 11,375.00
JUMLAH HARGA BAHAN 375,760.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 440,760.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 440,760.00
A. TENAGA
Pekerja L.01 OH 0.4220 119,985.85 50,634.03
Mandor L.04 OH 0.0211 140,000.00 2,954.00
JUMLAH HARGA TENAGA KERJA 53,588.03
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 53,588.03
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 53,588.03
2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M'
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 119,985.85 71,991.51
Mandor L.04 OH 0.030 140,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 76,191.51
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 76,191.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 76,191.51
1 2 3
A.1.1.1 HARGA SATUAN PEKERJAAN PERSIAPAN
(PERMEN PUPR NO. 1 TH. 2022 TENTANG ANALISA HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM)
1 A.2.2.1.1 PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER Rp. 647,956.34
2 A.2.2.1.2 PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 790,315.42
3 A.2.2.1.3 PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER Rp. 2,255,583.42
4 A.2.2.1.4 PENGUKURAN DAN PEMASANGAN 1 M' BOUWPLANK Rp. 166,106.89
A.2.2.1.5 PEMBUATAN 1 M2 KANTOR SEMENTARA/RUMAH JAGA/GUDANG SEMEN DAN PERALATAN LANTAI
5 Rp. 2,395,813.61
PLESTERAN, DINDING SETENGAH TEMBOK
6 A.2.2.1.6 PEMBUATAN 1 M2 RUMAH JAGA ( KONSTRUKSI KAYU ) Rp. 2,560,910.93
7 A. 2.2.1.7 PEMBUATAN 1 M2 GUDANG SEMEN DAN PERALATAN Rp. 2,232,371.04
8 A. 2.2.1.8. PEMBUATAN 1 M2 BEDENG PEKERJA Rp. 2,178,810.23
9 A.2.2.1.9 PEMBERSIHAN 1 M2 LAPANGAN DAN PENGUPASAN TANAH ( STRIPING ) S/D TANAMAN Ø 2 CM Rp. 20,898.44
10 A.2.2.1.10 PEMBUATAN 1 M2 STEGER / PERANCAH DARI BAMBU S/D TINGGI 6 METER Rp. 456,950.83
11 A.2.2.1.11. PEMBUATAN 1 BUAH KOTAK ADUKAN UKURAN 40 CM X 50 CM X 25 CM Rp. 377,998.39
12 A.2.2.1.12. PEMBUATAN 1 M2 JALAN SEMENTARA Rp. 255,431.93
13 A.2.2.1.13. PEMBONGKARAN 1 M3 BETON BERTULANG Rp. 1,862,444.39
14 A.2.2.1.14 PEMBONGKARAN 1 M3 DINDING TEMBOK BATA Rp. 93,161.81
15 A.2.2.1.15. PEMASANGAN 1 M2 PAGAR BRC GALVANIS Rp. 17,234.59
16 A.2.2.1.16. PEMASANGAN 1 M2 PANEL BETON PRACETAK 5 X 50 X 240 CM UNTUK PAGAR Rp. 495,579.36
1 2 3
5 A.3.1.1.5 PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 8PP Rp. 1,433,298.65
6 A.3.1.1.6. PEMASANGAN 1M3 PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP Rp. 1,129,619.45
7 A.3.1.1.7. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 3KP : 10PP Rp. 1,329,386.18
8 A.3.1.1.8 PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1/4SP : 1KP : 4PP Rp. 1,297,789.51
9 A.3.1.1.9. PEMASANGAN 1 M3 BATU KOSONG (AANSTAMPING) UNTUK PONDASI GEDUNG Rp. 931,633.96
10 A.3.1.1.10. PASANGAN 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH Rp. 3,462,467.66
11 A.3.1.1.11. PEMASANGAN 1 M3 PONDASI SUMURAN, DIAMETER 100 CM Rp. 1,457,803.63
1 2 3
1 2 3
A.4.1.1.42 PEMBONGKARAN 1 M2 BEKISTING SECARA HATI-HATI ( TERMASUK MEMBERSIHKAN DAN
42 Rp. 8,039.15
MEMBERESKAN PUING-PUING )
1 2 3
6 A.4.1.2.6 PEMBUATAN 1 M2 BEKISTING UNTUK BALOK BETON PRACETAK ( 10 - 12 KALI PAKAI ) Rp. 43,273.18
7 A.4.1.2.7 PEMBUATAN 1 M2 BEKISTING UNTUK KOLOM BETON PRACETAK ( 10 - 12 KALI PAKAI ) Rp. 41,664.93
8 A.4.1.2.8 PEMASANGAN DAN MEMBUKA CETAKAN 1 BUAH KOMPONEN PELAT BETON PRACETAK Rp. 9,291.25
9 A.4.1.2.9 PEMASANGAN DAN MEMBUKA CETAKAN 1 BUAH KOMPONEN BALOK BETON PRACETAK Rp. 15,098.74
10 A.4.1.2.10 PEMASANGAN DAN MEMBUKA CETAKAN 1 BUAH KOMPONEN KOLOM BETON PRACETAK Rp. 12,195.00
11 A.4.1.2.11 PENUANGAN / MENEBAR BETON 1 M3 UNTUK PELAT BETON PRACETAK Rp. 68,413.09
12 A.4.1.2.12 PENUANGAN / MENEBAR BETON 1 M3 UNTUK BALOK BETON PRACETAK Rp. 70,392.02
13 A.4.1.2.13 PENUANGAN / MENEBAR BETON 1 M3 UNTUK KOLOM BETON PRACETAK Rp. 63,336.14
A.4.1.2.14 PEMASANGAN 1 BUAH KOMPONEN UNTUK PELAT BETON PRACETAK BESERTA INDEKS KENAIKAN
14 Rp. 846,414.25
LANTAI EREKSI PELAT HINGGA 24 LANTAI
A.4.1.2.15 PEMASANGAN 1 BUAH KOMPONEN BALOK BETON PRACETAK BESERTA INDEKS KENAIKAN LANTAI
15 Rp. 777,840.14
EREKSI PELAT HINGGA 24 LANTAI
16 A.4.1.2.16. EREKSI 1 BUAH KOMPONEN UNTUK KOLOM PRACETAK Rp. 1,107,387.73
17 A.4.1.2.17 PEMINDAHAN UNTUK 1 BUAH KOMPONEN PELAT BETON PRACETAK ( ± 20 M' ) Rp. 196,991.73
18 A.4.1.2.18 PEMINDAHAN UNTUK 1 BUAH KOMPONEN BALOK BETON PRACETAK ( ± 20 M' ) Rp. 187,491.73
19 A.4.1.2.19 PEMINDAHAN UNTUK 1 BUAH KOMPONEN KOLOM BETON PRACETAK ( ± 20 M' ) Rp. 187,491.73
20 A.4.1.2.20 BAHAN 1 M3 GROUT CAMPURAN Rp. 25,290,400.00
21 A.4.1.2.21 BAHAN 1 M3 GROUT (TIDAK CAMPURAN ) Rp. 38,745,000.00
22 A.4.1.2.22 UPAH 1 TITIK PEKERJAAN GROUT PADA JOINT BETON PRCETAK Rp. 60,234.00
23 A.4.1.2.23 PEMASANGAN 1 TITIK BEKISTING JOINT PRACETAK Rp. 100,696.56
24 A.4.1.2.24 UPAH 1 TITIK JOINT DENGAN SLING Rp. 59,044.89
1 2 3
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
(PERMEN PUPR NO. 1 TH. 2022 TENTANG ANALISA HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM)
A.4.4.1.1. PEMASANGAN 1 M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE M,
1 Rp. 387,059.01
f'c : 17,2 Mpa ( SETARA CAMPURAN 1SP : 2PP )
A.4.4.1.2 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE S,
2 Rp. 369,944.01
f'c : 12,5 Mpa ( SETARA CAMPURAN 1 SP : 3PP )
A.4.4.1.3. PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE N,
3 Rp. 357,756.51
f'c : 5,2 Mpa ( SETARA CAMPURAN 1SP : 4PP )
A.4.4.1.4. PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU DENGAN MORTAR TYPE O,
4 Rp. 352,424.01
f'c : 2,4 Mpa ( SETARA CAMPURAN 1SP : 5PP )
1 2 3
5 A.4.4.1.5 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1 BATU CAMPURAN 1SP : 6PP Rp. 352,656.51
6 A.4.4.1.6 PEMASANGAN 1M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 3KP : 10PP Rp. 324,551.94
A.4.4.1.7 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22) CM TEBAL 1/2 BATU MORTAR TYPE M,
7 Rp. 187,087.00
f'c : 17,7 Mpa ( SETARA CAMPURAN 1SP : 2PP )
A.4.4.1.8 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU DENGAN MORTAR TYPE S,
8 Rp. 178,585.00
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
A.4.4.1.9 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU DENGAN MORTAR TYPE N,
9 Rp. 173,932.00
f'c : 5,2 Mpa ( SETARA CAMPURAN 1SP : 4PP )
A.4.4.1.10 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU MORTAR TYPE O,
10 Rp. 171,019.00
f'c : 2,4 Mpa ( SETARA CAMPURAN 1SP : 5PP )
11 A.4.4.1.11 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU CAMPURAN 1SP : 6PP Rp. 169,810.00
12 A.4.4.1.12 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU CAMPURAN 1SP : 8PP Rp. 166,510.75
13 A.4.4.1.13 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 )CM TEBAL 1/2 BATU CAMPURAN 1SP : 3KP : 10PP Rp. 162,646.38
14 A.4.4.1.14 PEMASANGAN 1M2 DINDING BATA MERAH ( 5 X 11 X 22 ) CM TEBAL 1/2 BATU CAMPURAN 1SM : 1KP : 1PP Rp. 141,512.31
15 A.4.4.1.15 PEMASANGAN 1M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1/2 BATU CAMPURAN 1SM : 1KP : 2PP Rp. 145,258.36
A.4.4.1.16 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB20 DENGAN MORTAR TYPE S,
16 Rp. 445,635.55
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
A.4.4.1.17 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB20 DENGAN MORTAR TYPE N,
17 Rp. 450,359.05
f'c : 5,2 Mpa ( SETARA CAMPURAN 1SP : 4PP )
A.4.4.1.18 PEMASANGAN 1M2 DINDING CONBLOCK (BATAKO) HB15 DENGAN MORTAR TYPE S,
18 Rp. 353,546.97
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
A.4.4.1.19 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB15 DENGAN MORTAR TYPE N,
19 Rp. 356,713.47
f'c : 5,2 Mpa ( SETARA CAMPURAN 1SP : 4PP )
A.4.4.1.20 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB10 DENGAN MORTAR TYPE S,
20 Rp. 261,077.25
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
A.4.4.1.21 PEMASANGAN 1M2 DINDING CONBLOCK ( BATAKO ) HB10 DENGAN MORTAR TYPE N,
21 Rp. 264,211.50
f'c : 5,2 Mpa ( SETARA CAMPURAN 1SP : 4PP )
A.4.4.1.22 PEMASANGAN 1 M2 DINDING TERAWANG ( ROOSTER ) 12 X 11 X 24 DENGAN MORTAR TYPE S,
22 Rp. 181,329.50
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
A.4.4.1.23 PEMASANGAN 1 M2 DINDING TERAWANG ( ROOSTER ) 12 X 11 X 24 DENGAN MORTAR TYPE N,
23 Rp. 181,329.50
f'c : 5,2 Mpa ( SETARA CAMPURAN 1SP : 4PP )
A.4.4.1.24 PEMASANGAN 1 M2 DINDING BATA BERONGGA EKSPOSE 12 X 11 X 24 DENGAN MORTAR TYPE S,
24 Rp. 197,340.75
f'c : 12,5 Mpa ( SETARA CAMPURAN 1SP : 3PP )
25 A.4.4.1.25 PEMASANGAN 1 M2 DINDING BATA RINGAN TEBAL 7,5 CM DENGAN MORTAR SIAP PAKAI Rp. 363,872.29
26 A.4.4.1.26 PEMASANGAN 1 M2 DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI Rp. 352,559.35
1 2 3
14 A.4.4.2.14 PEMASANGAN 1 M2 BERAPEN 1SP : 5PP TEBAL 15 MM Rp. 49,989.98
15 A.4.4.2.15 PEMASANGAN 1 M' PLESTERAN SKONING 1SP : 3PP LEBAR 10 CM Rp. 70,952.62
16 A.4.4.2.16 PEMASANGAN 1 M2 PLESTERAN GRANIT 1SP : 2 GRANIT TEBAL 10 MM Rp. 310,253.71
17 A.4.4.2.17 PEMASANGAN 1M2 PLESTERAN TRASO 1SP : 2 TRASO TEBAL 10 MM Rp. 229,997.30
18 A.4.4.2.18 PEMASANGAN 1 M2 PLESTERAN CIPRAT ( KAMPROTAN ) 1SP : 2PP Rp. 62,851.25
19 A.4.4.2.19 PEMASANGAN FINISHING 1 M2 DINDING SIAR PASANGAN BATA MERAH Rp. 35,743.58
20 A.4.4.2.20 PEMASANGAN FINISHING 1 M2 DINDING SIAR PASANGAN CONBLOCK EKSPOSE Rp. 17,055.01
21 A.4.4.2.21 PEMASANGAN 1 M2 FINISHING SIAR PASANGAN BATU KALI, CAMPURAN 1SP : 2PP Rp. 76,104.25
22 A.4.4.2.22 PEMASANGAN 1 M2 ACIAN Rp. 45,668.42
23 A.4.4.2.23 PEMASANGAN 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM Rp. 84,183.50
24 A.4.4.2.24 PEMASANGAN 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM Rp. 93,815.61
1 2 3
1 2 3
46 A.4.4.3.46 PEMASANGAN 1 M2 DINDING MARMER 100 CM X 100 CM Rp. 1,113,387.70
47 A.4.4.3.47 PEMASANGAN 1 M2 DINDING BATA PELAPIS ( SUPER ) 3 CM X 7 CM X 24 CM Rp. 539,341.72
48 A.4.4.3.48 PEMASANGAN 1 M2 DINDING BATU PARAS Rp. 476,617.59
49 A.4.4.3.49 PEMASANGAN 1 M2 DINDING BATU TEMPEL HITAM Rp. 422,167.59
50 A.4.4.3.50 PEMASANGAN 1 M2 LANTAI VYNIL UKURAN 30 CM X 30 CM Rp. 652,017.88
51 A.4.4.3.51 PEMASANGAN 1 M2 WALLPAPER LEBAR 50 CM Rp. 701,605.55
52 A.4.4.3.52 PEMASANGAN 1 M2 FLOOR HARDERNER Rp. 433,166.30
53 A.4.4.3.53 PEMASANGAN 1 M' PLINT VYNIL UKURAN 15 CM X 30 CM Rp. 287,880.68
54 A.4.4.3.54 PEMASANGAN 1 M' PLINT KAYU TEBAL 2 CM LEBAR 10 CM Rp. 68,206.05
55 A.4.4.3.55 PEMASANGAN 1 M2 PAVING BLOCK ( BLOCK BETON ) NATURAL TEBAL 6 CM Rp. 198,440.96
1 2 3
56 A.4.4.3.56 PEMASANGAN 1 M2 PAVING BLOCK ( BLOCK BETON ) BERWARNA TEBAL 6 CM Rp. 226,215.96
57 A.4.4.3.57 PEMASANGAN 1 M2 PAVING BLOCK ( BLOCK BETON ) NATURAL TEBAL 8 CM Rp. 252,974.92
58 A.4.4.3.58 PEMASANGAN 1 M2 PAVING BLOCK ( BLOCK BETON ) BERWARNA TEBAL 8 CM Rp. 283,779.92
1 2 3
24 A.4.5.2.24 PEMASANGAN 1 M' NOK / BUBUNG PATEN ( PERMANEN ) 92 CM Rp. 83,845.81
25 A.4.5.2.25 PEMASANGAN 1 M' NOK / BUBUNG PATEN ( PERMANEN ) 105 CM Rp. 92,845.81
26 A.4.5.2.26 PEMASANGAN 1 M' NOK / BUBUNG PATEN ( PERMANEN ) 108 CM Rp. 97,597.81
27 A.4.5.2.27 PEMASANGAN 1 M' NOK / BUBUNG STEL RATA 92 CM Rp. 84,905.58
28 A.4.5.2.28 PEMASANGAN 1 M' NOK / BUBUNG STEL RATA 105 CM Rp. 87,013.81
29 A.4.5.2.29 PEMASANGAN 1 M2 GENTENG BETON Rp. 165,718.84
30 A.4.5.2.30 PEMASANGAN 1 M2 GENTENG ASPAL 80 CM X 100 CM Rp. 352,170.39
31 A.4.5.2.31 PEMASANGAN 1 M2 ATAP GENTENG METAL UKURAN 80 CM X 100 CM (ATAP PELANA) Rp. 141,342.17
32 A.4.5.2.32 PEMASANGAN 1 M2 ATAP GENTENG METAL UKURAN 80 CM X 100 CM (ATAP JURAI) Rp. 194,227.17
33 A.4.5.2.33 PEMASANGAN 1 M2 ATAP SIRAP KAYU Rp. 384,562.65
1 2 3
1 2 3
32 A.4.6.1.32 PEMASANGAN 1 M2 LAMBRIZIRING DARI PLYWOOD ( KAYU LAPIS ) UKURAN 120 X 240 CM Rp. 48,593.17
33 A.4.6.1.33 PEMASANGAN 1 M2 DINDING BILIK, RANGKA KAYU KELAS III ATAU IV Rp. 243,192.65
1 2 3
1 2 3
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DAN PERPIPAAN DALAM GEDUNG
(PERMEN PUPR NO. 1 TH. 2022 TENTANG ANALISA HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM)
1 A.4.5.1.1 PEMASANGAN 1 BUAH KLOSET DUDUK / MONOBLOK Rp. 7,479,015.92
2 A.5.1.1.2 PEMASANGAN 1 BUAH KLOSET JONGKOK PORSELEN Rp. 658,554.91
3 A.5.1.1.3 PEMASANGAN 1 BUAH KLOSET JONGKOK TERASO Rp. 1,957,964.91
4 A.5.1.1.4 PEMASANGAN 1 BUAH URINOIR Rp. 3,352,248.35
5 A.5.1.1.5 PEMASANGAN 1 BUAH WASHTAFEL Rp. 2,228,565.51
6 A.5.1.1.6 PEMASANGAN 1 BUAH BAK MANDI TERASO, VOLUME 0,30 M3 Rp. 1,890,407.54
7 A.5.1.1.7 PEMASANGAN 1 BUAH BAK FIBREGLASS, VOLUME 0,30 M3 Rp. 1,450,759.94
8 A.5.1.1.8 PEMASANGAN 1 BUAH BAK MANDI PASANGAN BATA, VOLUME 0,30 M3 Rp. 2,169,102.57
1 2 3
A.6.3.1. HARGA SATUAN PEKERJAAN ANGKUT MATERIAL DAN / ATAU HASIL GALIAN
(PERMEN PUPR NO. 1 TH. 2022 TENTANG ANALISA HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM)
1 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M' Rp. 53,588.03
2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M' Rp. 76,191.51
A. TENAGA
Pekerja L.01 OH 0.017 119,985.85 2,039.76
Tukang Kayu L.02 OH 0.002 124,000.00 248.00
Kepala Tukang L.03 OH 0.250 129,000.00 32,250.00
Mandor L.04 OH 0.013 140,000.00 1,820.00
JUMLAH HARGA TENAGA KERJA 36,357.76
B. BAHAN
Kayu Balok Seseh M3 0.035 4,217,641.25 147,617.44
Paku 10 cm Kg 0.200 24,922.50 4,984.50
Main Frame Bh 2.000 7,500.00 15,000.00
End Frame Bh 2.000 5,500.00 11,000.00
Cros Brace Bh 4.000 4,500.00 18,000.00
Join Pen Bh 4.000 1,500.00 6,000.00
U Head Bh 4.000 4,500.00 18,000.00
Jack Base Bh 4.000 4,500.00 18,000.00
JUMLAH HARGA BAHAN 238,601.94
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 274,959.70
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 274,959.70
A. TENAGA
Pekerja L.01 OH 0.070 119,985.85 8,399.01
Tukang Besi L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 18,542.01
B. BAHAN
Besi Polos Kg 10.500 12,937.50 135,843.75
Kawat Beton Kg 0.150 24,070.00 3,610.50
JUMLAH HARGA BAHAN 139,454.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
A. TENAGA
Pekerja L.01 OH 0.070 119,985.85 8,399.01
Tukang Besi L.02 OH 0.070 124,000.00 8,680.00
Kepala Tukang L.03 OH 0.007 129,000.00 903.00
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 18,542.01
B. BAHAN
Besi Ulir Kg 10.500 14,501.25 152,263.13
Kawat Beton Kg 0.150 24,070.00 3,610.50
JUMLAH HARGA BAHAN 155,873.63
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 174,415.63
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 174,415.63
Harga Satuan Pekerjaan untuk 1 Kg 17,441.56
A. TENAGA
Pekerja L.01 OH 0.050 119,985.85 5,999.29
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 9,499.29
B. BAHAN
Murda / Puntal Paras Bh 1.000 141,500.00 141,500.00
Semen Portland Kg 0.013 2,025.00 26.33
JUMLAH HARGA BAHAN 141,526.33
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 151,025.62
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 151,025.62
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 172,000.00 172,000.00
JUMLAH HARGA TENAGA KERJA 172,000.00
B. BAHAN
Bata Gosok Bh 110.000 4,175.00 459,250.00
Semen Portland Kg 8.400 2,025.00 17,010.00
JUMLAH HARGA BAHAN 476,260.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 648,260.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 648,260.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 172,000.00 172,000.00
JUMLAH HARGA TENAGA KERJA 172,000.00
B. BAHAN
Paras Kerobokan Bh 13.750 18,125.00 249,218.75
Semen Portland Kg 8.400 2,025.00 17,010.00
JUMLAH HARGA BAHAN 266,228.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 438,228.75
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 438,228.75
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 215,000.00 215,000.00
JUMLAH HARGA TENAGA KERJA 215,000.00
B. BAHAN
Bata Press Bh 55.000 4,000.00 220,000.00
D. Jumlah (A + B + C) 443,505.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 443,505.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 215,000.00 215,000.00
JUMLAH HARGA TENAGA KERJA 215,000.00
B. BAHAN
Batu Paras Bh 18.333 14,727.54 270,004.91
Semen Portland Kg 4.200 2,025.00 8,505.00
JUMLAH HARGA BAHAN 278,509.91
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 493,509.91
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 493,509.91
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 215,000.00 215,000.00
JUMLAH HARGA TENAGA KERJA 215,000.00
B. BAHAN
Batu Palimanan Bh 12.500 21,300.00 266,250.00
Semen Portland Kg 4.200 2,025.00 8,505.00
JUMLAH HARGA BAHAN 274,755.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 489,755.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 489,755.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 215,000.00 215,000.00
JUMLAH HARGA TENAGA KERJA 215,000.00
B. BAHAN
Batu Candi M2 1.200 237,500.00 285,000.00
Pasir Pasang M3 0.025 386,250.00 9,656.25
Semen Portland Kg 4.200 2,025.00 8,505.00
JUMLAH HARGA BAHAN 303,161.25
C. PERALATAN
D. Jumlah (A + B + C) 518,161.25
E. Harga Satuan Pekerjaan (D+E) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 518,161.25
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 375,000.00 375,000.00
JUMLAH HARGA TENAGA KERJA 375,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 30.000 6,350.00 190,500.00
Semen 40 Kg Gresik Zak 1.000 60,000.00 60,000.00
Kayu Cempaka M3 0.980 3,428,750.00 3,360,175.00
Ijuk Kg 90.000 4,575.00 411,750.00
JUMLAH HARGA BAHAN 4,022,425.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 4,397,425.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,397,425.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 322,000.00 322,000.00
JUMLAH HARGA TENAGA KERJA 322,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 26.000 6,350.00 165,100.00
Semen 40 Kg Gresik Zak 1.000 60,000.00 60,000.00
Kayu Cempaka M3 0.760 3,428,750.00 2,605,850.00
Genteng Plentong Bh 90.000 1,812.50 163,125.00
Bubungan Mini Bh 20.000 7,350.00 147,000.00
JUMLAH HARGA BAHAN 3,141,075.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 3,463,075.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 3,463,075.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 375,000.00 375,000.00
JUMLAH HARGA TENAGA KERJA 375,000.00
B. BAHAN
Bata Gosok Exs. Tulikup Bh 150.000 4,175.00 626,250.00
Paras Silekarang Bh 100.000 12,151.22 1,215,121.51
Semen 40 Kg Gresik Zak 1.000 60,000.00 60,000.00
Kayu Cempaka M3 0.980 3,428,750.00 3,360,175.00
Ijuk Kg 98.000 4,575.00 448,350.00
JUMLAH HARGA BAHAN 5,709,896.51
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 6,084,896.51
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,084,896.51
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 322,000.00 322,000.00
JUMLAH HARGA TENAGA KERJA 322,000.00
B. BAHAN
Bata Gosok Exs. Tulikup Bh 125.000 4,175.00 521,875.00
Paras Silekarang Bh 82.000 12,151.22 996,399.64
Kayu Cempaka M3 0.765 3,428,750.00 2,622,993.75
Semen 40 Kg Gresik Zak 1.000 60,000.00 60,000.00
Genteng Plentong Bh 90.000 1,812.50 163,125.00
Bubungan Mini Bh 20.000 7,350.00 147,000.00
JUMLAH HARGA BAHAN 4,511,393.39
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 4,833,393.39
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,833,393.39
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 857,000.00 857,000.00
JUMLAH HARGA TENAGA KERJA 857,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 65.000 6,350.00 412,750.00
Semen 40 Kg Gresik Zak 1.200 60,000.00 72,000.00
Kayu Cempaka M3 1.850 3,428,750.00 6,343,187.50
Ijuk Kg 315.000 4,575.00 1,441,125.00
JUMLAH HARGA BAHAN 8,269,062.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 9,126,062.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 9,126,062.50
12 XVI.12 PEMBUATAN 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190 CM X 190 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 750,000.00 750,000.00
JUMLAH HARGA TENAGA KERJA 750,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 65.000 6,350.00 412,750.00
Semen 40 Kg Gresik Zak 1.200 60,000.00 72,000.00
Kayu Cempaka M3 1.400 3,428,750.00 4,800,250.00
Genteng Plentong Bh 110.000 1,812.50 199,375.00
Bubungan Mini Bh 40.000 7,350.00 294,000.00
JUMLAH HARGA BAHAN 5,778,375.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 6,528,375.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,528,375.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 803,000.00 803,000.00
JUMLAH HARGA TENAGA KERJA 803,000.00
B. BAHAN
Bata Exs. Tulikup Bh 305.000 4,175.00 1,273,375.00
Paras Silakarang Bh 210.000 12,151.22 2,551,755.18
Semen 40 Kg Gresik Zak 1.200 60,000.00 72,000.00
Kayu Cempaka M3 1.880 3,428,750.00 6,446,050.00
Ijuk Kg 315.000 4,575.00 1,441,125.00
JUMLAH HARGA BAHAN 11,784,305.18
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 12,587,305.18
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,587,305.18
14 XVI.14 PEMBUATAN 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190 CM X 190 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 803,000.00 803,000.00
JUMLAH HARGA TENAGA KERJA 803,000.00
B. BAHAN
Bata Exs. Tulikup Bh 305.000 4,175.00 1,273,375.00
Paras Silakarang Bh 210.000 12,151.22 2,551,755.18
Semen 40 Kg Gresik Zak 1.430 60,000.00 85,800.00
Kayu Cempaka M3 1.880 3,428,750.00 6,446,050.00
Genteng Plentong Bh 110.000 1,812.50 199,375.00
Bubungan Mini Bh 40.000 7,350.00 294,000.00
JUMLAH HARGA BAHAN 10,850,355.18
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 11,653,355.18
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 11,653,355.18
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 1,659,000.00 1,659,000.00
JUMLAH HARGA TENAGA KERJA 1,659,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 230.000 6,350.00 1,460,500.00
Semen 40 Kg Gresik Zak 4.000 60,000.00 240,000.00
Kayu Cempaka M3 3.240 3,428,750.00 11,109,150.00
Ijuk Kg 470.000 4,575.00 2,150,250.00
JUMLAH HARGA BAHAN 14,959,900.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 16,618,900.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 16,618,900.00
16 XVI.16 PEMBUATAN 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200 CM X 200 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 1,659,000.00 1,659,000.00
JUMLAH HARGA TENAGA KERJA 1,659,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 230.000 6,350.00 1,460,500.00
Semen 40 Kg Gresik Zak 4.000 60,000.00 240,000.00
Kayu Cempaka M3 3.000 3,428,750.00 10,286,250.00
Genteng Plentong Bh 225.000 1,812.50 407,812.50
Bubungan Mini Bh 75.000 7,350.00 551,250.00
JUMLAH HARGA BAHAN 12,945,812.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 14,604,812.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 14,604,812.50
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 1,659,000.00 1,659,000.00
JUMLAH HARGA TENAGA KERJA 1,659,000.00
B. BAHAN
Bata Exs. Tulikup Bh 525.000 4,175.00 2,191,875.00
Paras Silakarang Bh 350.000 12,151.22 4,252,925.29
Semen 40 Kg Gresik Zak 5.500 60,000.00 330,000.00
Kayu Cempaka M3 3.240 3,428,750.00 11,109,150.00
Ijuk Kg 470.000 4,575.00 2,150,250.00
JUMLAH HARGA BAHAN 20,034,200.29
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 21,693,200.29
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 21,693,200.29
18 XVI.18 PEMBUATAN 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200 CM X 200 CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 1,659,000.00 1,659,000.00
JUMLAH HARGA TENAGA KERJA 1,659,000.00
B. BAHAN
Bata Exs. Tulikup Bh 525.000 4,175.00 2,191,875.00
Paras Silakarang Bh 350.000 12,151.22 4,252,925.29
Semen 40 Kg Gresik Zak 5.500 60,000.00 330,000.00
Kayu Cempaka M3 3.000 3,428,750.00 10,286,250.00
Genteng Plentong Bh 225.000 1,812.50 407,812.50
Bubungan Mini Bh 75.000 7,350.00 551,250.00
JUMLAH HARGA BAHAN 18,020,112.79
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 18,020,112.79
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 18,020,112.79
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 322,000.00 322,000.00
JUMLAH HARGA TENAGA KERJA 322,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 20.000 6,350.00 127,000.00
Semen 40 Kg Gresik Zak 0.750 60,000.00 45,000.00
Kayu Cempaka M3 0.630 3,428,750.00 2,160,112.50
Ijuk Kg 75.000 4,575.00 343,125.00
JUMLAH HARGA BAHAN 2,675,237.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,997,237.50
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,997,237.50
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 322,000.00 322,000.00
JUMLAH HARGA TENAGA KERJA 322,000.00
B. BAHAN
Batu Hitam Singaraja 20 x 40 cm Bh 21.000 6,350.00 133,350.00
Semen 40 Kg Gresik Zak 0.750 60,000.00 45,000.00
Kayu Cempaka M3 0.630 3,428,750.00 2,160,112.50
Genteng Plentong Bh 75.000 1,812.50 135,937.50
Bubungan Mini Bh 16.000 7,350.00 117,600.00
JUMLAH HARGA BAHAN 2,592,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 2,914,000.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,914,000.00
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 322,000.00 322,000.00
JUMLAH HARGA TENAGA KERJA 322,000.00
B. BAHAN
Bata Exs. Tulikup Bh 100.000 4,175.00 417,500.00
Paras Silakarang Bh 75.000 12,151.22 911,341.13
Semen 40 Kg Gresik Zak 0.850 60,000.00 51,000.00
Kayu Cempaka M3 0.615 3,428,750.00 2,108,681.25
Ijuk Kg 75.000 4,575.00 343,125.00
JUMLAH HARGA BAHAN 3,831,647.38
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 4,153,647.38
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,153,647.38
A. TENAGA
Upah Kerja ( Lumpsum ) Ls 1.000 322,000.00 322,000.00
JUMLAH HARGA TENAGA KERJA 322,000.00
B. BAHAN
Bata Exs. Tulikup Bh 100.000 4,175.00 417,500.00
Paras Silakarang Bh 75.000 12,151.22 911,341.13
Semen 40 Kg Gresik Zak 0.850 60,000.00 51,000.00
Kayu Cempaka M3 0.600 3,428,750.00 2,057,250.00
Genteng Plentong Bh 70.000 1,812.50 126,875.00
Bubungan Mini Bh 16.000 7,350.00 117,600.00
JUMLAH HARGA BAHAN 3,681,566.13
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 4,003,566.13
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 4,003,566.13
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 10 x 20 cm Tebal 6 cm K225 M2 1.050 82,000.00 86,100.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 103,850.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 198,342.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 198,342.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 10 x 20 cm Tebal 6 cm K250 M2 1.050 88,000.00 92,400.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 110,150.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 204,642.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 204,642.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 10 x 20 cm Tebal 6 cm K350 M2 1.050 94,500.00 99,225.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 116,975.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 211,467.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 211,467.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 10 x 20 cm Tebal 8 cm K225 M2 1.050 125,500.00 131,775.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 149,525.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 244,017.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 244,017.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 10 x 20 cm Tebal 8 cm K250 M2 1.050 100,750.00 105,787.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 123,537.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 218,030.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 218,030.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 10 x 20 cm Tebal 8 cm K350 M2 1.050 135,750.00 142,537.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 160,287.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 254,780.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 254,780.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 20 x 20 cm Tebal 6 cm K250 M2 1.050 87,750.00 92,137.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 109,887.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 204,380.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 204,380.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 20 x 20 cm Tebal 6 cm K350 M2 1.050 91,250.00 95,812.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 113,562.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 208,055.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 208,055.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 20 x 20 cm Tebal 8 cm K225 M2 1.050 95,000.00 99,750.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 117,500.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 211,992.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 211,992.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 20 x 20 cm Tebal 8 cm K250 M2 1.050 124,250.00 130,462.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 148,212.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 242,705.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 242,705.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving 20 x 20 cm Tebal 8 cm K350 M2 1.050 118,000.00 123,900.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 141,650.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 236,142.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 236,142.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K225 PC M2 1.050 107,500.00 112,875.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 130,625.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 225,117.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 225,117.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K225 Merah M2 1.050 109,750.00 115,237.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 132,987.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 227,480.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 227,480.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K225 Hitam M2 1.050 92,000.00 96,600.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 114,350.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 208,842.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 208,842.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K300 PC M2 1.050 114,000.00 119,700.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 137,450.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 231,942.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 231,942.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K300 Merah M2 1.050 112,750.00 118,387.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 136,137.50
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 230,630.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 230,630.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
D. Jumlah (A + B + C) 217,505.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 217,505.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K350 PC M2 1.050 130,750.00 137,287.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 155,037.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 249,530.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 249,530.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K350 Merah M2 1.050 131,250.00 137,812.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 155,562.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 250,055.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 250,055.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K350 Hitam M2 1.050 107,500.00 112,875.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 130,625.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 225,117.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 225,117.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K400 PC M2 1.050 138,750.00 145,687.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 163,437.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 257,930.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 257,930.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K400 Merah M2 1.050 135,500.00 142,275.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 160,025.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 254,517.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 254,517.92
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Segi Enam Xexagon 6 cm K400 Hitam M2 1.050 97,125.00 101,981.25
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 119,731.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 214,224.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 214,224.17
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Bujur Sangkar Tanpa Tias 6 cm K225 PC M2 1.050 124,000.00 130,200.00
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 147,950.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 242,442.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 242,442.92
25 XVII.25 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 6 CM K225 MERAH
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Bujur Sangkar Tanpa Tias 6 cm K225 Merah M2 1.050 127,750.00 134,137.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 151,887.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 246,380.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 246,380.42
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Bujur Sangkar Tanpa Tias 6 cm K225 Hitam M2 1.050 114,125.00 119,831.25
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 137,581.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 232,074.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 232,074.17
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Bujur Sangkar Tanpa Tias 8 cm K225 PC M2 1.050 119,125.00 125,081.25
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 142,831.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 237,324.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 237,324.17
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Bujur Sangkar Tanpa Tias 8 cm K225 Merah M2 1.050 155,125.00 162,881.25
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 180,631.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 275,124.17
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 275,124.17
29 XVII.29 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 8 CM K225 HITAM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Bujur Sangkar Tanpa Tias 8 cm K225 Hitam M2 1.050 156,375.00 164,193.75
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 181,943.75
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 276,436.67
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 276,436.67
A. TENAGA
Pekerja L.01 OH 0.500 119,985.85 59,992.92
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 94,492.92
B. BAHAN
Paving Tiga Berlian tebal 6 cm K225 PC M2 1.050 110,250.00 115,762.50
Pasir Beton M3 0.050 355,000.00 17,750.00
JUMLAH HARGA BAHAN 133,512.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 228,005.42
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 228,005.42
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Tukang Batu L.02 OH 0.500 124,000.00 62,000.00
Kepala Tukang L.03 OH 0.050 129,000.00 6,450.00
Mandor L.04 OH 0.050 140,000.00 7,000.00
JUMLAH HARGA TENAGA KERJA 195,435.85
B. BAHAN
Grass Block Lobang M2 1.000 78,500.00 78,500.00
D. Jumlah (A + B + C) 273,935.85
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 273,935.85
A. TENAGA
Pekerja L.01 OH 0.625 119,985.85 74,991.15
Tukang Batu L.02 OH 0.250 124,000.00 31,000.00
Kepala Tukang L.03 OH 0.010 129,000.00 1,290.00
Mandor L.04 OH 0.031 140,000.00 4,340.00
JUMLAH HARGA TENAGA KERJA 111,621.15
B. BAHAN
Koral Sikat Zak 1.200 43,750.00 52,500.00
Semen Portland Kg 9.280 2,025.00 18,792.00
Pasir Pasang M3 0.200 386,250.00 77,250.00
JUMLAH HARGA BAHAN 148,542.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 148,542.00
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 148,542.00
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Bulat Bh 2.000 24,500.00 49,000.00
( P : 50,T : 30, La : 10, Lb : 15 cm K225 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 55,570.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 215,224.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 215,224.55
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Jumbo (P: 50,L: 15,T: 30 cm K225) Bh 2.000 33,500.00 67,000.00
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 73,570.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 233,224.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 233,224.55
35 XVII.35 PEMASANGAN 1 M' KANSTEIN KOTAK ( P : 50, t.20, La.10, Lb.16 CM ) K225
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Kotak Bh 2.000 35,706.25 71,412.50
( P : 50, T : 20, La : 10, Lb : 16 cm K225 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 77,982.50
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 237,637.05
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 237,637.05
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Kursi Bh 2.000 47,125.00 94,250.00
( P : 50, L : 10, T : 40 cm, Lb : 17,5 cm K225 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 100,820.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 260,474.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 260,474.55
37 XVII.37 PEMASANGAN 1 M' KANSTEIN KURSI ( P.50, L.10, T.40 CM, Lb 17,5 CM K300 )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Kursi Bh 2.000 51,562.50 103,125.00
( P : 50, L : 10, T : 40 cm, Lb : 17,5 cm K300 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 109,695.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 269,349.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 269,349.55
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Segi Lima Jumbo Bh 2.000 47,000.00 94,000.00
( P : 50, L : 15, T : 20 cm K225 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 100,570.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 260,224.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 260,224.55
39 XVII.39 PEMASANGAN 1 M' KANSTEIN SEGI LIMA JUMBO ( P : 40, L : 10, T : 20 CM K225 )
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Segi Lima Jumbo Bh 2.000 41,687.50 83,375.00
( P : 40, L : 10, T : 20 cm K225 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 89,945.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 249,599.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 249,599.55
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Segi Lima Jumbo Bh 2.000 50,625.00 101,250.00
( P : 50, L : 15, T : 40 cm K225 )
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 107,820.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 267,474.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 267,474.55
A. TENAGA
Pekerja L.01 OH 0.150 119,985.85 17,997.88
Tukang Cat L.02 OH 0.030 124,000.00 3,720.00
Kepala Tukang L.03 OH 0.003 129,000.00 387.00
Mandor L.04 OH 0.015 140,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 24,204.88
B. BAHAN
Cat Kg 0.284 75,975.00 21,576.90
Thiner Ltr 0.071 46,875.00 3,328.12
JUMLAH HARGA BAHAN 24,905.02
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 49,109.90
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 49,109.90
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 967.50
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 37,064.67
B BAHAN
Buis Beton Diameter 80 cm Bh 1.000 173,250.00 173,250.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 178,451.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 215,515.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 215,515.92
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang Batu L.03 OH 0.008 129,000.00 967.50
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 37,064.67
B BAHAN
Buis Beton Diameter 50 x 75 cm Bh 1.000 115,000.00 115,000.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 120,201.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 157,265.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 157,265.92
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang Batu L.03 OH 0.008 129,000.00 967.50
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 37,064.67
B BAHAN
Buis Beton Diameter 25 cm Bh 1.000 47,500.00 47,500.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 52,701.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 89,765.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 89,765.92
A. TENAGA
Pekerja L.01 OH 0.100 119,985.85 11,998.58
Mandor L.04 OH 0.005 140,000.00 700.00
JUMLAH HARGA TENAGA KERJA 12,698.58
B. BAHAN
- - -
JUMLAH HARGA BAHAN -
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 12,698.58
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 12,698.58
A. TENAGA
Pekerja L.01 OH 0.250 119,985.85 29,996.46
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH HARGA TENAGA KERJA 33,496.46
B. BAHAN
Limestone M3 1.200 225,000.00 270,000.00
JUMLAH HARGA BAHAN 270,000.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 303,496.46
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 303,496.46
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
### Kepala Tukang L.03 OH 0.008 129,000.00 967.50
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 37,064.67
B. BAHAN
Buis Beton Diameter 100 cm Bh 1.000 232,500.00 232,500.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 237,701.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 274,765.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 274,765.92
1 M' Pasangan Buis Beton Diameter 100 cm = 2 x 274,765.92 549,531.84
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 967.50
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 37,064.67
B. BAHAN
Buis Beton Diameter 80 cm Bh 1.000 173,250.00 173,250.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 178,451.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 215,515.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 215,515.92
1 M' Pasangan Buis Beton Diameter 80 cm = 2 x 215,515.92 431,031.84
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 20,000.00
Tukang Batu L.02 OH 0.075 124,000.00 8,625.00
Kepala Tukang L.03 OH 0.008 129,000.00 900.00
Mandor L.04 OH 0.020 140,000.00 2,600.00
JUMLAH HARGA TENAGA KERJA 32,125.00
B. BAHAN
Buis Beton Diameter 50 cm Bh 1.000 94,000.00 94,000.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 99,201.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 131,326.25
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 131,326.25
1 M' Pasangan Buis Beton Diameter 50 cm = 1.33 x 131,326.25 174,663.91
A. TENAGA
Pekerja L.01 OH 0.200 119,985.85 23,997.17
Tukang Batu L.02 OH 0.075 124,000.00 9,300.00
Kepala Tukang L.03 OH 0.008 129,000.00 967.50
Mandor L.04 OH 0.020 140,000.00 2,800.00
JUMLAH HARGA TENAGA KERJA 37,064.67
B. BAHAN
Buis Beton Diameter 25 cm Bh 1.000 47,500.00 47,500.00
Semen 40 Kg Zak 0.003 60,000.00 180.00
Pasir Pasang M3 0.013 386,250.00 5,021.25
JUMLAH HARGA BAHAN 52,701.25
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 89,765.92
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 89,765.92
1 M' Pasangan Buis Beton Diameter 25 cm = 1,33 x 89,765.92 119,388.67
1 M' Pasangan 1/2 Buis Beton Diameter 25 cm = 0,5 x 119,388.67 59,694.34
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Segi Lima (P:50, L:15, T:20 cm K-225) Bj 2.000 46,375.00 92,750.00
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 99,320.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 258,974.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 258,974.55
A. TENAGA
Pekerja L.01 OH 0.950 119,985.85 113,986.55
Tukang Batu L.02 OH 0.350 124,000.00 43,400.00
Mandor L.04 OH 0.016 140,000.00 2,268.00
JUMLAH HARGA TENAGA KERJA 159,654.55
B. BAHAN
Kanstein Kursi K-225 Bj 2.000 47,125.00 94,250.00
Semen Portland Kg 2.100 2,025.00 4,252.50
Pasir Urug M3 0.006 386,250.00 2,317.50
JUMLAH HARGA BAHAN 100,820.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 260,474.55
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 260,474.55
53 XVII.53 PEMASANGAN 1 M3 PONDASI SIKLOP, 60% BETON CAMP. 1SP : 2PB : 3KR DAN 40% BATU BELAH TANPA BESI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3.400 119,985.85 407,951.88
Tukang Batu L.02 OH 0.850 124,000.00 105,400.00
Kepala Tukang L.03 OH 0.085 129,000.00 10,965.00
Mandor L.04 OH 0.170 140,000.00 23,800.00
JUMLAH HARGA TENAGA KERJA 548,116.88
B. BAHAN
Batu Belah M3 0.480 500,000.00 240,000.00
Semen Portland Kg 194.000 2,025.00 392,850.00
Pasir Beton M3 0.312 355,000.00 110,760.00
Koral Beton M3 0.468 398,750.00 186,615.00
JUMLAH HARGA BAHAN 930,225.00
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 1,478,341.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,478,341.88
A. TENAGA
Pekerja L.01 OH 0.081 119,985.85 9,718.85
Tukang Pipa L.02 OH 0.135 124,000.00 16,740.00
Kepala Tukang L.03 OH 0.014 129,000.00 1,741.50
Mandor L.04 OH 0.004 140,000.00 560.00
JUMLAH HARGA TENAGA KERJA 19,041.50
B. BAHAN
Pipa PVC Type AW Ø 6 " M1 1.200 176,943.75 212,332.50
Perlengkapan Ls 35% 176,943.75 61,930.31
JUMLAH HARGA BAHAN 274,262.81
C. PERALATAN
- - -
JUMLAH HARGA ALAT -
D. Jumlah (A + B + C) 293,304.31
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 293,304.31
55 XVII.55 PEMASANGAN 1 M3 LAPIS PONDASI KELAS BAWAH KELAS C (LIMESTONE) MENGGUNAKAN BURUH
HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 119,985.85 119,985.85
Mandor L.04 OH 0.050 140,000.00 7,000.00
Operator Alat Berat L.08 OH 0.017 129,000.00 2,154.30
Sopir L.13 OH 0.017 120,000.00 2,004.00
JUMLAH HARGA TENAGA KERJA 131,144.15
B. BAHAN
Limestone M3 1.250 225,000.00 281,250.00
-
JUMLAH HARGA BAHAN 281,250.00
C. PERALATAN
Mesin Gilas 3 Roda 6 - 8 Ton Jam 0.083 302,037.00 25,159.68
Truck Tangki Air Jam 0.083 253,386.00 21,107.05
JUMLAH HARGA ALAT 46,266.74
D. Jumlah (A + B + C) 458,660.88
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 458,660.88
A. TENAGA
Pekerja L.01 OH 0.142 119,985.85 16,978.00
Mandor L.04 OH 0.004 140,000.00 602.00
Operator Alat Berat L.08 OH 0.004 129,000.00 554.70
Sopir L.13 OH 0.002 120,000.00 264.00
JUMLAH HARGA TENAGA KERJA 18,398.70
B. BAHAN
Aspal Penetrasi 60/70 Kg 4.479 14,777.10 66,180.72
Batu Pecah 3-4 cm M3 0.040 437,500.00 17,500.00
Batu Pecah 2-3 cm M3 0.022 497,500.00 11,044.50
Batu Pecah 1-2 cm M3 0.011 526,250.00 5,841.38
Pasir Beton M3 0.003 355,000.00 887.50
Minyak Tanah Industri Ltr 0.322 9,775.00 3,142.66
JUMLAH HARGA BAHAN 104,596.76
C. PERALATAN
Mesin Gilas 3 Roda 6 - 8 Ton Jam 0.011 302,037.00 3,262.00
Dump Truck Jam 0.011 387,651.00 4,186.63
JUMLAH HARGA ALAT 7,448.63
D. Jumlah (A + B + C) 130,444.09
E. Biaya Umum dan Keuntungan ( Maks. 15% ) 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 130,444.09
A. TENAGA
Pekerja L.01 OH 0.022 119,985.85 2,675.68
Mandor L.04 OH 0.002 140,000.00 322.00
Operator Alat Berat L.08 OH 0.007 129,000.00 864.30
Sopir L.13 OH 0.005 120,000.00 540.00
JUMLAH HARGA TENAGA KERJA 4,401.98
B. BAHAN
Aspal Penetrasi 60/70 Kg 3.381 14,777.10 49,955.46
Batu Pecah 1-2 cm M3 0.020 526,250.00 10,525.00
Pasir Beton M3 0.010 355,000.00 3,550.00
Minyak Tanah Industri Ltr 0.322 9,775.00 3,150.48
JUMLAH HARGA BAHAN 67,180.95
C. PERALATAN
Mesin Gilas 3 Roda 6 - 8 Ton Jam 0.011 302,037.00 3,382.81
Dump truck Jam 0.022 387,651.00 8,644.62
JUMLAH HARGA ALAT 12,027.43
1 2 3
1 2 3
6 XVII.6 PEMASANGAN 1 M2 PAVING 10 X 20 CM TEBAL 8 CM K350 Rp. 254,780.42
7 XVII.7 PEMASANGAN 1 M2 PAVING 20 X 20 CM TEBAL 6 CM K250 Rp. 204,380.42
8 XVII.8 PEMASANGAN 1 M2 PAVING 20 X 20 CM TEBAL 6 CM K350 Rp. 208,055.42
9 XVII.9 PEMASANGAN 1 M2 PAVING 20 X 20 CM TEBAL 8 CM K225 Rp. 211,992.92
10 XVII.10 PEMASANGAN 1 M2 PAVING 20 X 20 CM TEBAL 8 CM K250 Rp. 242,705.42
11 XVII.11 PEMASANGAN 1 M2 PAVING 20 X 20 CM TEBAL 8 CM K350 Rp. 236,142.92
12 XVII.12 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K225 PC Rp. 225,117.92
13 XVII.13 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K225 MERAH Rp. 227,480.42
14 XVII.14 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K225 HITAM Rp. 208,842.92
15 XVII.15 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K300 PC Rp. 231,942.92
1 2 3
16 XVII.16 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K300 MERAH Rp. 230,630.42
17 XVII.17 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K300 HITAM Rp. 217,505.42
18 XVII.18 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K350 PC Rp. 249,530.42
19 XVII.19 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K350 MERAH Rp. 250,055.42
20 XVII.20 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K350 HITAM Rp. 225,117.92
21 XVII.21 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K400 PC Rp. 257,930.42
22 XVII.22 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K400 MERAH Rp. 254,517.92
23 XVII.23 PEMASANGAN 1 M2 PAVING SEGI ENAM XEXAGON 6 CM K400 HITAM Rp. 214,224.17
24 XVII.24 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 6 CM K225 PC Rp. 242,442.92
25 XVII.25 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 6 CM K225 MERAH Rp. 246,380.42
26 XVII.26 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 6 CM K225 HITAM Rp. 232,074.17
27 XVII.27 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 8 CM K225 PC Rp. 237,324.17
28 XVII.28 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 8 CM K225 MERAH Rp. 275,124.17
29 XVII.29 PEMASANGAN 1 M2 PAVING BUJUR SANGKAR TANPA TIAS TEBAL 8 CM K225 HITAM Rp. 276,436.67
30 XVII.30 PEMASANGAN 1 M2 PAVING TIGA BERLIAN TEBAL 6 CM K225 PC Rp. 228,005.42
31 XVII.31 PEMASANGAN 1 M2 GRASS BLOCK Rp. 273,935.85
32 XVII.32 PEMASANGAN 1 M2 KORAL SIKAT Rp. 148,542.00
33 XVII.33 PEMASANGAN 1 M' KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 215,224.55
34 XVII.34 PEMASANGAN 1 M' KANSTEIN JUMBO ( P : 50, L : 15, T : 30 CM K225 ) Rp. 233,224.55
35 XVII.35 PEMASANGAN 1 M' KANSTEIN KOTAK ( P : 50, t.20, La.10, Lb.16 CM ) K225 Rp. 237,637.05
36 XVII.36 PEMASANGAN 1 M' KANSTEIN KURSI ( P.50, L.10, T.40 CM, Lb 17,5 CM K225 ) Rp. 260,474.55
37 XVII.37 PEMASANGAN 1 M' KANSTEIN KURSI ( P.50, L.10, T.40 CM, Lb 17,5 CM K300 ) Rp. 269,349.55
38 XVII.38 PEMASANGAN 1 M' KANSTEIN SEGI LIMA JUMBO ( P : 50, L : 15, T : 20 CM K225 ) Rp. 260,224.55
39 XVII.39 PEMASANGAN 1 M' KANSTEIN SEGI LIMA JUMBO ( P : 40, L : 10, T : 20 CM K225 ) Rp. 249,599.55
40 XVII.40 PEMASANGAN 1 M' KANSTEIN SEGI LIMA JUMBO ( P : 50, L : 15, T : 40 CM K225 ) Rp. 267,474.55
41 XVII.41 PENGECATAN 1 M2 KANSTEIN Rp. 49,109.90
42 XVII.42 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 80 CM Rp. 215,515.92
43 XVII.43 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 50 X 75 CM Rp. 157,265.92
44 XVII.44 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 25 CM Rp. 89,765.92
45 XVII.45 PEMBONGKARAN 1 M2 PAVING LAMA Rp. 12,698.58
46 XVII.46 PENGURUGAN 1 M3 DENGAN LIMESTONE Rp. 303,496.46
47 XVII.47 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 100 CM Rp. 274,765.92
48 XVII.48 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 80 CM Rp 215,515.92
49 XVII.49 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 50 CM Rp. 131,326.25
50 XVII.50 PEMASANGAN 1 BUAH BUIS BETON DIAMETER 25 CM Rp. 89,765.92
51 XVII.51 PEMASANGAN 1 M' KANSTEIN SEGI LIMA ( P : 50 : 15, T : 20 ) K-225 Rp. 258,974.55
52 XVII.52 PEMASANGAN 1 M' KANSTEIN KURSI K-225 Rp 260,474.55
XVII.53 PEMASANGAN 1 M3 PONDASI SIKLOP, 60% BETON CAMP. 1SP : 2PB : 3KR DAN 40% BATU
53 Rp. 1,478,341.88
BELAH TANPA BESI
54 XVII.54 PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMATER 6 " Rp 293,304.31
XVII.55 PEMASANGAN 1 M3 LAPIS PONDASI KELAS BAWAH KELAS C (LIMESTONE)
55 Rp. 458,660.88
MENGGUNAKAN BURUH
56 XVII.56 PEMASANGAN 1 M2 LAPIS PENETRASI MACADAM (LAPEN) Rp 130,444.09
1 2 3
57 XVII.57 PEMASANGAN 1 M2 LABURAN ASPAL DUA LAPIS (BURDA) Rp 83,610.36