ANALISA & SIMULASI BUDIDAYA LELE ARYO - SITE PANDANSARI

I. Belanja Material & Jasa


No Jenis Fungsi Jumlah Satuan Harga Satuan Total Harga Remarks
1 Kabel Listrik Eterna/Setara u/Outdoor Instalasi Listrik 2 roll 375,000 750,000
2 Rumah Lampu 12 unit 10,000 120,000
3 Stop Kontak / Terminal 2 unit 15,000 30,000
4 Kolam Diameter 5 x 2 Meter Kolam Tandon Terpaulin 1 unit 7,500,000 7,500,000
5 Saklar 4 unit 10,000 40,000
6 Hebel 6 kubik 650,000 3,900,000
7 Mortar 5 sak 150,000 750,000
8 Batu Kali 15 kubik 350,000 5,250,000
9 Wiremesh 4 lembar 550,000 2,200,000 SNI
10 Semen 40 sak 62,000 2,480,000
11 Kawat 2 kg 20,000 40,000
12 Pasir 4 engkel 750,000 3,000,000
13 Bambu Tiang Lampu / Stand Cor 10 batang 20,000 200,000
14 Selotape Kabel 2 buah 7,500 15,000
15 Lampu LED 9watt 6 unit 45,000 270,000
16 Paralon 1.5" Distribusi Air 14 batang 84,000 1,176,000
17 Knee 1.5" Distribusi Air 12 buah 9,000 108,000
18 T Distribusi Air 8 buah 9,000 72,000
19 Sok 2 > 1.5 " 1 buah 12,000 12,000
20 Stop Kran (opsional) 12 buah 42,500 510,000
21 Submersible Pump 1 unit 1,050,000 1,050,000
22 Drum 200l 2 buah 350,000 700,000
23 Upah SDM pekerjaan sipil 1 paket 8,500,000 8,500,000
24 Terpal Kolam Semi Karet Wadah Budidaya 3x5x0,6M 12 unit 720,000 8,640,000
TOTAL 47,313,000
II. Belanja Kebutuhan Budidaya - Segmen Pembenihan
No Jenis Fungsi Jumlah Satuan Harga Satuan Total Harga Remarks
1 Induk Lele Sangkuriang Produksi Benih 4 paket 2,150,000 8,600,000
2 Serokan Ikan 8 buah 30,000 240,000
3 Cacing Sutra 500 liter 35,000 17,500,000
4 Fengli-1 15 sak 215,000 3,225,000
5 PF-500 25 sak 215,000 5,375,000
6 PF-800 25 sak 195,000 4,875,000
7 PF-1000 25 sak 185,000 4,625,000
8 781-1 80 sak 282,000 22,560,000
9 PF 128 Pakan Induk 4 sak 215,000 860,000
10 Probiotik Opsional 4 botol 30,000 120,000
11 Obat & Vitamin Opsional 1 paket 150,000 150,000
12 Hapa/Waring untuk sortasi 2 buah 125,000 250,000
13 Bak Sortir 10 buah 40,000 400,000
14
15
TOTAL 68,780,000
Sewa Kolam 50,000,000 / 2 Tahun
TOTAL BIAYA 166,093,000

III. Simulasi Budidaya - Segmen Pembenihan, Durasi 60-75 Hari


Pembenihan 25 pasang induk dengan asumsi daya tetas 20,000 ekor larva / induk 500,000 ekor
Survival Ratio 85% 425,000 ekor
Asumsi Harga Panen Terendah Rp. 200
Hasil Panen per siklus Rp. 85,000,000
Biaya Pakan Rp. 58,160,000
Biaya Operasional (Listrik, air, lingkungan
dll) Rp. 2,085,000
Upah SDM 1 Tim Rp. 6,000,000
Pendapatan Rp. 18,755,000