No Deskripsi Pekerjaan Total Rupiah

I PEKERJAAN PABRIKASI DAN PENGADAAN


a Baja WF 200x100x5.5x8, Include Pemotongan Dan Welding Sambungan Rp 45,600,000.00
b Castellated Honeycomb 675x200x9x14, Include Pemotongan Dan Welding Sambungan Rp 13,200,000.00
c Plate PL 16mm, 705x300x16mm, Include Pemotongan Dan Welding Sambungan Rp 25,674,000.00
d Plate PL 9mm, Penutup Lubang Castellated Honeycomb, Include Pemotongan Dan Welding Rp 14,432,000.00
Sambungan
e Baut HTB M16, Sambungan WF 200x100x5.5x8, Eexample isi per ktk/12pcs Rp 1,440,000.00
f Baut HTB M24, Sambungan Castellated Honeycomb 675x200x9x14, Example isi per Rp 6,120,000.00
ktk/12pcs
Angkur Baut 2X5 M24 Ex Hilti HAS U-8.8, Chemical Anchor Ex Hilti Hit HY-200 (Lmin
g Rp 7,200,000.00
= 300mm)

Total Rp 113,666,000.00
Grand Total Rp 113,600,000.00

Seratus Tiga Belas Juta Enam Ratus Ribu Rupiah

NB :
a Harga diatas tidak termasuk PPN11%, PPH3% dan Pajak Lainya yang dikenakan dalam pekerjaan ini

System Pembayaran yaitu Pembayaran Pertama Dp 30% pada saat mau mulai kerja, Pembayaran Kedua Termyn 60% Pada
b
saat progress dilapangan mencapai 70% dan Pembayaran 100% Jika Pekerjaan sudah selesai 100% di Lapangan.

c Jangka Waktu Pemeliharaan selama 30 ( Tiga Puluh ) Hari Kalender dari Serah Terima Pekerjaan ke Pemberi Kerja
d Pekerjaan akan Dimulai Setelah Diterimanya Surat Perintah Kerja (SPK)

Bill Of Quantity diatas Wajib dilampirkan di Surat Perjanjian Borongan ( Kontrak ), dan apabila ada penambahan volume
e
pekerjaan dilapangan akan dihitung sebagai pekerjaan tambah dan wajib dibayarkan pada saat pekerjaan selesai.

f Spesifikasi Material mengikuti spesifikasi pemberi kerja

Demikian Penawaran Harga Pekerjaan yang kami ajukan atas perhatian dan kerja samanya kami ucapkan terima kasih.

Batam, 26 Januari 2024


PT. FAJAR NUR ALAM

( HERLIN HERAWATI )
Direktur
PEKERJAAN PABRIKASI DAN PENGADAAN BAJA HONEYCOM BEAM
PT. CIPTA INDAH BANGUN PERTIWI

No Deskripsi Pekerjaan Satuan Volume Harga Satuan Total Rupiah

A B C D E H=F+G

I PEKERJAAN PABRIKASI DAN PENGADAAN


a Baja WF 200x100x5.5x8, Include Pemotongan Dan Welding kg 1,824.00 25,000.00 45,600,000
Sambungan
b Castellated Honeycomb 675x200x9x14, Include Pemotongan kg 528.00 25,000.00 13,200,000
Dan Welding Sambungan
c Plate PL 16mm, 705x300x16mm, Include Pemotongan Dan kg 1,167.00 22,000.00 25,674,000
Welding Sambungan
d Plate PL 9mm Dim 1500x6000mm, Penutup Lubang kg 656.00 22,000.00 14,432,000
Castellated Honeycomb, Include Pemotongan Dan Welding
Sambungan

e Baut HTB M16, Dim. 1500x6000mm, Sambungan WF Box 6.00 240,000.00 1,440,000
200x100x5.5x8, Eexample isi per ktk/12pcs
f Baut HTB M24, Sambungan Castellated Honeycomb Box 6.00 1,020,000.00 6,120,000
675x200x9x14, Example isi per ktk/12pcs
g Angkur Baut 2X5 M24 Ex Hilti HAS U-8.8, Chemical Anchor Pcs 20.00 360,000.00 7,200,000
Ex Hilti Hit HY-200 (Lmin = 300mm)

SUB BILL NO. I : PEKERJAAN PABRIKASI DAN PENGADAAN 113,666,000.00


BACKUP VOLUME - PENAWARAN HARGA PEKERJAAN
PT. FAJAR NUR ALAM

PEKERJAAN PABRIKASI DAN PENGADAAN BAJA


PT. CIPTA INDAH BANGUN PERTIWI

Ukuran Jumlah
No Item P L T Keterangan
Komulatif Volume Satuan
(m) (m) (m)

1 PEKERJAAN PABRIKASI DAN PENGADAAN

- Baja WF 200x100x5.5x8 0.80 2.20 2.00 3.52 Kg


Jumlah Total 3.52 Kg
- Castellated Honeycomb 675x200x9x14 1.00 1.00 Kg
Jumlah Total 1.00 Kg
- Plate PL 16mm, 705x300x16mm 1.00 1.00 ls
Jumlah Total 1.00 ls
- Plate PL 9mm Dim 1500x6000mm, Penutup Lubang 2.67 3.30 8.81 m2
Castellated Honeycomb 1.55 3.30 5.12 m2
Jumlah Total 13.93 m2
- Pekerjaan Plasteran Dinding 2.67 3.30 8.81 m2
1.55 3.30 5.12 m2
Jumlah Total 13.93 m2
- Pekerjaan Acian Dinding 2.67 3.30 8.81 m2
2.67 0.30 0.80 m2
1.55 0.30 2.00 0.46 m2
Jumlah Total 10.08 m2
- Pekerjaan Waterproofing Lantai 1.25 1.60 2.00 4.00 m2
Jumlah Total 4.00 m2
- Pekerjaan Keramik Dinding & Lantai Uk. 30x30cm 2.67 3.20 2.00 17.09 m2
1.55 3.20 4.00 19.84 m2
1.25 1.60 2.00 4.00 m2
Jumlah 40.93 m2
Openingan Pintu 3.52 m2
Jumlah Total 37.41 m2
- Pekerjaan Pengecatan Dinding 2.67 3.30 8.81 m2
2.67 0.30 0.80 m2
1.55 0.30 2.00 0.46 m2
Jumlah Total 10.08 m2
- Pemasangan Pintu Toilet Almunium 2.00 2.00 Ls
Jumlah Total 2.00 Ls
PEKERJAAN SALURAN AREA BAWAH RAMP
2
L=15cm
- Pekerjaan Pembongkaran 13.80 0.23 3.17 m2
Jumlah Total 3.17 m2
- Pekerjaan Galian Saluran 13.80 0.23 0.25 0.79 m3
Jumlah Total 0.79 m3
- Pembuangan Tanah & Puing Bekas Bongkaran 1.00 1.00 ls
Jumlah Total 1.00 ls
- Pekerjaan Bekisting 13.80 0.20 2.00 5.52 m2
Jumlah Total 5.52 m2
- Beton Adukan Site Mix, Saluran 13.80 0.20 0.08 2.00 0.44 m3
13.80 0.31 0.05 1.00 0.21 m3
Jumlah Total 0.66 m3

3 PEKERJAAN PEMBOBOKAN BETON

- Pekerjaan Pembobokan Beton Pembuatan Tali Air 2.50 0.05 0.13 m2


3.50 0.05 0.18 m2
2.20 0.05 0.11 m2
4.70 0.03 0.14 m2
8.00 0.03 0.24 m2
Jumlah Total 0.79 m2
BACKUP VOLUME - PENAWARAN HARGA PEKERJAAN
PT. FAJAR NUR ALAM

4 PEKERJAAN KANSTEEN CAR STOPER

Pekerjaan Pemasangan Kanteen Car Stoper Area


- 45.00 45.00 Pcs
Podium
Jumlah Total 45.00 Pcs
Pekerjaan Pengecatan Kanteen Car Stoper Area
- 0.60 45.00 27.00 m'
Podium
Jumlah Total 27.00 m'
PEKERJAAN PANGGUNG AREA RUANG
5
TUNGGU / KANTIN

- Pemasangan Hollow 50 x 50 x 2.8 mm x 6 m + Welded 102.00 4.40 448.80 kg

Jumlah Total 448.80 kg

- Pemasangan Hollow 20 x 40 x 2.8 mm x 6 m + Welded 132.00 2.64 348.48 kg

Jumlah Total 348.48 kg


- Dynabolt M8 1.00 1.00 ls
Jumlah Total 1.00 ls
- Pemasangan Triplek phenolic film 12mm + Bolt 74.88 74.88 m2
Jumlah Total 74.88 m2