BILL OF QUANTITY
CILEGON - BANTEN
REKAPITULASI
PEKERJAAN :
LOKASI : CILEGON
TAHUN ANGGARAN :
JUMLAH : 226,589,800.00
PPN 10 % :
JUMLAH TOTAL : 226,589,800.00
DIBULATKAN :
TERBILANG :
Rekapitulasi- page 4 of 68
…………………………….
Rekapitulasi- page 5 of 68
BILL OF QUANTITY
PEKERJAAN : AULA MASJID
LOKASI : CILEGON
TAHUN ANGGARAN :
AULA MASJID
I KEBUTUHAN MATERIAL
1 Besi
- Besi beton ulir SNI Ø19mm 230.00 Batang 229,600.00 52,808,000.00
- Besi beton SNI Ø16mm 168.00 Batang 167,000.00 28,056,000.00
- Besi beton SNI Ø10mm 197.00 Batang 86,400.00 17,020,800.00
- Besi Wiremesh Ulir SNI Ø10mm 27.00 Lembar 957,000.00 25,839,000.00
- Kawat bendrat Ls 18,750.00 -
2 Kayu
- Kaso 4x6cm / Bambu 10.00 Kubik 1,200,000.00 12,000,000.00
- Triplek ukuran 12 mm 80.00 Lembar 123,000.00 9,840,000.00
- Papan Cor 2x20 Lembar 32,000.00 -
- Paku 10cm 20.00 Kg 19,600.00 392,000.00
- Paku 7 cm 20.00 kg 19,600.00 392,000.00
- Paku 5 cm 20.00 kg 19,600.00 392,000.00
- Paku 3 cm 15.00 kg 20,000.00 300,000.00
- Ember Cor/adukan anti Pecah Ls 17,500.00 -
3 Matrial Cor
- Coran K300 1.00 Ls 6,650,000.00 6,650,000.00 Per M³ 950.000
- Concrit Pump 1.00 Ls -
BANGUNAN PENUNJANG
I PEKERJAAN STRUKTUR
A PEKERJAAN TANAH DAN URUGAN
1 Pasangan Bouwplank 86.90 m1 #REF! #REF!
2 Galian Tanah :
- Galian Tanah Pondasi / Sloof 58.65 m3 #REF! #REF!
3 Urugan Pasir :
- Urugan Pasir Dibawah Pondasi / Sloof 1.81 m3 #REF! #REF!
4 Urugan Kembali Bekas Galian 23.46 m3 #REF! #REF!
5 Buangan Tanah Bekas Galian Ke Area Site 35.19 m3 #REF! #REF!
JUMLAH A : #REF!
B PEKERJAAN SUB STRUKTUR DAN PONDASI
B.1 PEKERJAAN PONDASI
1 PDA Test 1.00 ttk 7,500,000.00 7,500,000.00
2 Pengadaan, Pemancangan, Sambung & Potong Tiang Pancang 25 x 25 cm 120.00 m1 #REF! #REF!
3 Pondasi Batu Belah 1 : 5 18.13 m3 #REF! #REF!
4 Anstamping 6.90 m3 #REF! #REF!
B.2 PEKERJAAN PILE CAP
1 Pile Cap Tipe P1 75 x 75 x 60 cm
Beton Bertulang K 300 4.05 m3 #REF! #REF!
B.3 PEKERJAAN SLOOF BETON
1 Sloof Beton TB1 20 x 40 cm
Beton Bertulang K 300 5.31 m3 #REF! #REF!
2 Sloof Beton S 15 x 20 cm
Beton Bertulang K 300 1.71 m3 #REF! #REF!
JUMLAH B : #REF!
C PEKERJAAN STRUKTUR ATAS
C.1 PEKERJAAN KOLOM
C.1.1 LANTAI 1
1 Kolom Tipe K1 30 x 30 cm
Beton Bertulang K 300 4.89 m3 #REF! #REF!
C.1.2 LANTAI 2
1 Kolom Tipe K1 30 x 30 cm
Beton Bertulang K 300 3.38 m3 #REF! #REF!
JUMLAH C.1 : #REF!
C.2 PEKERJAAN BALOK
C.2.1 LANTAI 2
1 Balok Tipe B1 25 x 40
Beton Bertulang K 300 9.48 m3 #REF! #REF!
2 Balok Tipe B2 20 x 30
Beton Bertulang K 300 2.72 m3 #REF! #REF!
C.2.1 ATAP
1 Balok Tipe B1 25 x 40
Beton Bertulang K 300 7.08 m3 #REF! #REF!
2 Balok Tipe B2 20 x 30
Beton Bertulang K 300 1.19 m3 #REF! #REF!
JUMLAH C.2 : #REF!
C.3 PEKERJAAN PLAT
C.3.1 LANTAI 1
1 Plat Lantai Tebal 12 cm
Beton Bertulang K 300 34.63 m3 #REF! #REF!
C.3.1 LANTAI 2
1 Plat Lantai Tebal 12 cm
Beton Bertulang K 300 19.44 m3 #REF! #REF!
JUMLAH C.3 : #REF!
C.4 PEKERJAAN TANGGA
1 Tangga Beton
Beton Bertulang K 300 2.71 m3 #REF! #REF!
JUMLAH C.4 : #REF!
JUMLAH C : #REF!
JUMLAH PEKERJAAN STRUKTUR : #REF!
II PEKERJAAN ARSITEKTUR
A PEKERJAAN DINDING
A.1 LANTAI 1
1 Dinding Bata Ringan Tebal 10 cm Dengan Perekat Jenis Mortar 359.56 m2 #REF! #REF!
2 Plesteran + Acian Dinding Bata Ringan Dengan Perekat Jenis Mortar 575.30 m2 #REF! #REF!
3 Dinding Partisi Gypsum Berikut Rangka 36.00 m2 #REF! #REF!
4 Ringbalk Kusen 10/15 22.80 m1 #REF! #REF!
5 Kolom Praktis 11/11 82.30 m1 #REF! #REF!
A.2 LANTAI 2
1 Dinding Bata Ringan Tebal 10 cm Dengan Perekat Jenis Mortar 335.94 m2 #REF! #REF!
2 Plesteran + Acian Dinding Bata Ringan Dengan Perekat Jenis Mortar 537.50 m2 #REF! #REF!
3 Ringbalk Kusen 10/15 19.70 m1 #REF! #REF!
4 Kolom Praktis 11/11 123.00 m1 #REF! #REF!
JUMLAH A : #REF!
B PEK. KUSEN PINTU DAN JENDELA TERMASUK FINISHING DAN ACCESSORIES
B.1 LANTAI 1
1 PJ1 1.00 unit #REF! #REF!
2 P1 3.00 unit #REF! #REF!
3 P2 2.00 unit #REF! #REF!
4 P3 2.00 unit 1,275,500.00 2,551,000.00
5 P5 1.00 unit #REF! #REF!
6 BV 8.00 unit #REF! #REF!
B.2 LANTAI 2
1 P4 5.00 unit #REF! #REF!
2 P3 5.00 unit 1,275,500.00 6,377,500.00
3 J1 5.00 unit #REF! #REF!
4 BV 6.00 unit #REF! #REF!
JUMLAH B : #REF!
C PEKERJAAN LANGIT - LANGIT
C.1 LANTAI 1
1 Plafon Gypsum Tile Tb. 9 mm Berikut Rangka Hollow Galvanized 199.65 m2 #REF! #REF!
2 Plafond GRC Tb. 6 mm Berikut Rangka Hollow 16.35 m2 #REF! #REF!
3 List Plafon U Channel 170.50 m1 #REF! #REF!
C.2 LANTAI 2
1 Plafon Gypsum Tile Tb. 9 mm Berikut Rangka Hollow Galvanized 107.70 m2 #REF! #REF!
2 Plafond GRC Tb. 6 mm Berikut Rangka Hollow 18.31 m2 #REF! #REF!
3 List Plafon U Channel 93.50 m1 #REF! #REF!
JUMLAH C : #REF!
D PEKERJAAN FINISHING LANTAI DAN DINDING
D.1 LANTAI 1
1 Lantai Keramik 60 x 60 cm 271.65 m2 #REF! #REF!
2 Lantai Keramik 30 x 30 cm 16.35 m2 #REF! #REF!
3 Dinding Keramik 30 x 60 cm 66.42 m2 #REF! #REF!
4 Keramik Tangga 60 x 60 cm 25.00 m2 #REF! #REF!
5 Plint Keramik 170.50 m1 #REF! #REF!
6 Waterproofing 82.77 m2 #REF! #REF!
D.1 LANTAI 2
1 Lantai Keramik 60 x 60 cm 125.70 m2 #REF! #REF!
2 Lantai Keramik 30 x 30 cm 18.31 m2 #REF! #REF!
3 Dinding Keramik 30 x 60 cm 52.52 m2 #REF! #REF!
4 Floor Hardener 18.00 m2 #REF! #REF!
5 Plint Keramik 93.50 m1 #REF! #REF!
6 Waterproofing 70.83 m2 #REF! #REF!
JUMLAH D : #REF!
E PEKERJAAN SANITAIR
E.1 LANTAI 1
1 Closet Jongkok Tipe CE 7 2.00 unit #REF! #REF!
2 Wastafel Lengkap Tipe LW 241 CJ 2.00 unit #REF! #REF!
3 Floor Drain Tipe TX 1 BN 17.00 unit #REF! #REF!
4 Kran Dinding Tipe T 23B 13V7NB 24.00 unit #REF! #REF!
5 Kaca Cermin Diatas Wastafel 1.00 unit #REF! #REF!
6 Kitchen Zink Lengkap 12.00 unit #REF! #REF!
7 Meja Beton 15.60 m2 #REF! #REF!
E.2 LANTAI 2
1 Closet Jongkok Tipe CE 7 5.00 unit #REF! #REF!
2 Kran Dinding Tipe T 23B 13V7NB 7.00 unit #REF! #REF!
3 Floor Drain Tipe TX 1 BN 7.00 unit #REF! #REF!
4 Kitchen Zink Lengkap 1.00 unit #REF! #REF!
5 Meja Beton 1.76 m2 #REF! #REF!
JUMLAH E : #REF!
F PEKERJAAN PENGECATAN
F.1 LANTAI 1
F PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 24.00 m2 #REF! #REF!
2 Insulation Alluminium Foil Primary Foam 24.00 m2 #REF! #REF!
3 Penutup Atap Spandek 24.00 m2 #REF! #REF!
4 Kaca Tempered 12 mm + Rangka 12.94 m2 150,000.00 1,941,000.00
JUMLAH F : #REF!
JUMLAH PEKERJAAN ARSITEKTUR : #REF!
III PEKERJAAN ELEKTRIKAL
A PEKERJAAN INSTALASI DAN ARMATURE
1 Instalasi Penerangan 3.00 ttk #REF! #REF!
2 Instalasi Stop Kontak 2.00 ttk #REF! #REF!
3 Lampu TL 3.00 ttk #REF! #REF!
4 Saklar 1.00 ttk #REF! #REF!
5 Stop Kontak 2.00 ttk #REF! #REF!
JUMLAH A : #REF!
JUMLAH PEKERJAAN ELEKTRIKAL : #REF!
JUMLAH PEKERJAAN BANGUNAN CEK FISIK : #REF!
Harga satuan peralatan didasarkan pada biaya tahunan peralatan yang disebut harga sewa peralatan persatuan
waktu, biaya operasional peralatan, serta biaya mobilisasi dan demobilisasi peralatan.
Tower Crane, type ST60/15 dengan radius 60 m termasuk Genset, dengan standard mesin 150 KVA
C. Biaya Operator
Biaya operator = Rp 2,345,000.00 /bulan
Rp 200.00 /jam /
= Rp 11,725.00 /jam
1 2 3 4 5 6 7
A.3.2.1a Non SNI - PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PONDASI
1 1 JOINT. Potong/pecah kepala tiang pancang 45 x 45
- Pemotongan Tiang Pancang 1.00 bh #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
2 1 JOINT. Sambuangan tiang pancang 40 X 40
1. Bahan : #REF!
- Joint plate Sq. 400 1.00 joint #REF! #REF!
2. Upah : #REF!
- Sambungan las tiang pancang 1.00 joint #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
3 1 M1. Pemancang 45x45cm dengan Doly/Follower ( Hidrolik Hammer )
- Pemancangan 1.000 m1 #REF! #REF!
- Handling tiang di lokasi proyek 1.000 m1 #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
4 1 M1. Pengadaan tiang pancang 45x45 cm ( Tiang pancang pabrikasi )
- Tiang pancang 45x45 cm 1.00 m1 #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
5 1 JOINT. Potong/pecah kepala tiang pancang 25 x 25
- Pemotongan Tiang Pancang 1.00 bh #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
6 1 JOINT. Sambuangan tiang pancang 25 X 25
1. Bahan : #REF!
- Joint plate Sq. 250 1.00 joint #REF! #REF!
2. Upah : #REF!
- Sambungan las tiang pancang 1.00 joint #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
7 1 M1. Pemancang 25x25cm dengan Doly/Follower ( Hidrolik Hammer )
- Pemancangan 1.000 m1 #REF! #REF!
- Handling tiang di lokasi proyek 1.000 m1 #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
8 1 M1. Pengadaan tiang pancang 25x25 cm ( Tiang pancang pabrikasi )
- Tiang pancang 25x25 cm 1.00 m1 #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
9 1 JOINT. Potong/pecah kepala tiang pancang 30 x 30
- Pemotongan Tiang Pancang 1.00 bh #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
10 1 JOINT. Sambuangan tiang pancang 30 X 30
1. Bahan : Rp -
- Joint plate Sq. 250 1.00 joint Rp - Rp -
2. Upah : #REF!
- Sambungan las tiang pancang 1.00 joint #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Pondasi Non Standar / 18 - 68
Jumlah : #REF!
Dibulatkan : #REF!
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1 1 m³ Kusen PinMembuat & memasang Kusen Pintu dan Kusen Jendela.Kayu Jati Kelas I
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Balok Kayu Jati Kelas I 1.1000 m³ Rp - Rp -
Paku 10 cm 1.2500 kg #REF! #REF!
Lem Kayu 1.0000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 7.0000 org/hr #REF! #REF!
Tukang Kayu 21.0000 org/hr #REF! #REF!
Kepala Tukang 2.1000 org/hr #REF! #REF!
Mandor 0.3500 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.2 1 m³ Kusen Pi Membuat & memasang Kusen Pintu dan Kusen Jendela.Kayu Jati Kelas II
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Balok Kayu Kmape Samarinda 1.2000 m³ #REF! #REF!
Paku 10 cm 1.2500 kg #REF! #REF!
Lem Kayu 1.0000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 6.0000 org/hr #REF! #REF!
Tukang Kayu 18.0000 org/hr #REF! #REF!
Kepala Tukang 1.8000 org/hr #REF! #REF!
Mandor 0.3000 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.4 1 m² Pintu Kla Membuat & memasang Pintu Klamp sederhana. Kayu Kelas III gudang sementara
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu Borneo 0.0400 m³ #REF! #REF!
Paku 5cm -7 cm 0.0500 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.3500 org/hr #REF! #REF!
Tukang Kayu 1.0500 org/hr #REF! #REF!
Kepala Tukang 0.1050 org/hr #REF! #REF!
Mandor 0.0180 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.5 1 m² Membuat & memasang Daun Pintu Panel. Kayu Jati Kelas I
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu Jati Kelas I 0.0400 m³ Rp - Rp -
Lem Kayu 0.5000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 1.0000 org/hr #REF! #REF!
Tukang Kayu 3.0000 org/hr #REF! #REF!
Kepala Tukang 0.3000 org/hr #REF! #REF!
Mandor 0.0500 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
Tukang Kayu 3.0000 org/hr #REF! #REF!
Kepala Tukang 0.3000 org/hr #REF! #REF!
Mandor 0.0500 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.6 1 m² Membuat & memasang Pintu dan Jendela Kaca. Kayu jati Kelas I
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu 0.0240 m³ Rp - Rp -
Lem Kayu 0.3000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.8000 org/hr #REF! #REF!
Tukang Kayu 2.4000 org/hr #REF! #REF!
Kepala Tukang 0.2400 org/hr #REF! #REF!
Mandor 0.0400 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
6.a 1 m² Membuat & memasang Pintu dan Jendela Kaca.Kayu Kamper Samarinda Kelas II
SNI-2839-2008
Bahan #REF!
Papan Kayu 0.0240 m³ #REF! #REF!
Lem Kayu 0.3000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.8000 org/hr #REF! #REF!
Tukang Kayu 2.4000 org/hr #REF! #REF!
Kepala Tukang 0.2400 org/hr #REF! #REF!
Mandor 0.0400 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.7 1 m² Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kelas I
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu Jati 0.0640 m³ Rp - Rp -
Lem Kayu 0.5000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 1.0000 org/hr #REF! #REF!
Tukang Kayu 3.0000 org/hr #REF! #REF!
Kepala Tukang 0.3000 org/hr #REF! #REF!
Mandor 0.0500 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
7.a 1 m² Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kelas II
SNI-2839-2008
Bahan #REF!
Papan Kayu Kamper Samarinda 0.0640 m³ #REF! #REF!
Lem Kayu 0.5000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 1.0000 org/hr #REF! #REF!
Tukang Kayu 3.0000 org/hr #REF! #REF!
Kepala Tukang 0.3000 org/hr #REF! #REF!
Mandor 0.0500 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.8 1 m² Membuat & memasang Daun Pintu Kayu Lapis (Plywood) Rangkap.Rangka Tertutup Kayu Kelas II (lebar Sampai 90 cm)
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu Kamper Samarinda 0.0250 m³ #REF! #REF!
Paku 1 cm - 2.5 cm 0.0300 kg #REF! #REF!
Lem Kayu 0.5000 kg #REF! #REF!
Plywood Tebal 4mm Uk.90x220cm 1.0000 Lembar #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.7000 org/hr #REF! #REF!
Tukang Kayu 2.1000 org/hr #REF! #REF!
Kepala Tukang 0.2100 org/hr #REF! #REF!
Mandor 0.0350 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.9 1 m² Membuat & memasang Pintu Plywood Rangkap.Rangka Expose Kayu Kamper Samarinda
#REF!
NO. URAIAN KOEF SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kaamper Samarinda 0.0256 m³ #REF! #REF!
Paku 1 cm - 2.5 cm 0.0300 kg #REF! #REF!
Lem Kayu 0.5000 kg #REF! #REF!
Plywood Tebal 4mm Uk.90x220cm 1.0000 Lembar #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.8000 org/hr #REF! #REF!
Tukang Kayu 2.4000 org/hr #REF! #REF!
Kepala Tukang 0.2400 org/hr #REF! #REF!
Mandor 0.0400 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.12 1 m² Pasang Teakwood Rangkap Lapis Formika.Rangka Expose Kayu Kamper Samarinda
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu 0.0250 m³ #REF! #REF!
Paku 1 cm - 2.5 cm 0.0300 kg #REF! #REF!
Lem Kayu 0.8000 kg #REF! #REF!
Teakwood Tebal 4mm Uk.90x220cm 1.0000 Lembar #REF! #REF!
Formika 0.5000 Lembar #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.8500 org/hr #REF! #REF!
Tukang Kayu 2.5500 org/hr #REF! #REF!
Kepala Tukang 0.2550 org/hr #REF! #REF!
Mandor 0.0430 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
#REF!
NO. URAIAN KOEF SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.13 1 m³ Psang Kuda-kuda Konvensional. Kayu Kamper Medan
SNI-2839-2008
Bahan #REF!
Balok Kayu 1.1000 m³ #REF! #REF!
Besi Strip Tebal 5mm 15.0000 kg #REF! #REF!
Paku 12 cm 5.6000 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 4.0000 org/hr #REF! #REF!
Tukang Kayu 12.0000 org/hr #REF! #REF!
Kepala Tukang 1.2000 org/hr #REF! #REF!
Mandor 0.2000 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
Pekerja 0.1200 org/hr #REF! #REF!
Tukang Kayu 0.1200 org/hr #REF! #REF!
Kepala Tukang 0.0120 org/hr #REF! #REF!
Mandor 0.0060 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
A.4.6.1.23 1 m² Pasang Rangka Dinding Pemisah/partisi (60x120) cm. Kayu Kamper Samarinda
Permen PU No. 11/PRT/M/2013
Bahan #REF!
Papan Kayu 0.0280 m³ #REF! #REF!
Paku 5 cm dan 7 cm 0.1500 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.1500 org/hr #REF! #REF!
Tukang Kayu 0.4500 org/hr #REF! #REF!
Kepala Tukang 0.0450 org/hr #REF! #REF!
Mandor 0.0080 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
#VALUE! 1 m² Pasang D Pasang Dinding Pemisah/partisi Teakwood Rangkap. Rangka Kayu Kamper Samarinda
SNI-2839-2008
#REF!
NO. URAIAN KOEF SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
Bahan #REF!
Balok Kayu Uk.6x12 cm 0.0280 m³ #REF! #REF!
Paku 5 cm dan10 cm 0.1500 kg #REF! #REF!
Teakwood Tebal 4mm Uk.120x240cm 0.8600 Lembar #REF! #REF!
Lem Kayu 0.5600 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.1500 org/hr #REF! #REF!
Tukang Kayu 0.4500 org/hr #REF! #REF!
Kepala Tukang 0.0450 org/hr #REF! #REF!
Mandor 0.0080 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
#VALUE! 1 m² Pasang Dinding Pemisah/partisi Plywood Rangkap. Rangka Kayu Kamper Samarinda
SNI-2839-2008
Bahan #REF!
Balok Kayu Uk.6x12 cm 0.0280 m³ #REF! #REF!
Paku 5 cm dan10 cm 0.1500 kg #REF! #REF!
Plywood Tebal 4mm Uk.120x240cm 0.8600 Lembar #REF! #REF!
Lem Kayu 0.5600 kg #REF! #REF!
Tenaga Kerja #REF!
Pekerja 0.2000 org/hr #REF! #REF!
Tukang Kayu 0.6000 org/hr #REF! #REF!
Kepala Tukang 0.0600 org/hr #REF! #REF!
Mandor 0.0100 org/hr #REF! #REF!
Jumlah #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
#VALUE! 1 M' Cope lampu kayu Kamper Samarinda finish cat Duco
SNI-2839-2008
1. Bahan : - Cope lampu kayu Kamper Samarinda 2x20 cm 0.010 m3 Rp 10,245,890.00 Rp 98,360.54 Rp 98,360.54
1 2 3.0000 4 5 6 7
6.F SNI-3434-2008 PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU
- Kepala tukang 0.025 hari Rp 150,000.00 Rp 3,750.00
- Mandor 0.013 hari Rp 114,000.00 Rp 1,425.00
3. Terpasang : Cat Kayu/besi Duco non keuntungan 0.400 m2 Rp 72,064.27 Rp 28,825.71 Rp 28,825.71
Jumlah Rp 166,986.25
Overhead + Profit : Rp 16,698.63
Jumlah : Rp 183,684.88
Dibulatkan : Rp 183,700.00
#VALUE! 1 M' Plin kayu kamper Samarinda ukuran 10 x 100mm finish melamik
SNI-2839-2008
1. Bahan : - Papan kayu Kamper Samarinda 2x10 cm 0.002 m3 Rp 10,245,890.00 Rp 24,590.14 Rp 24,590.14
Jumlah Rp 58,420.14
Overhead + Profit : Rp 5,842.01
3. Terpasang : Finish Melamik 0.144 m2 #REF! #REF!
Jumlah : #REF!
Dibulatkan : #REF!
ANALISA HARGA SATUAN
Beton/Hal. 27 Dari 68
NO URAIAN KOEF SATUAN HARGA SATUAN JUMLAH HARGA
Beton/Hal. 28 Dari 68
NO URAIAN KOEF SATUAN HARGA SATUAN JUMLAH HARGA
Beton/Hal. 29 Dari 68
NO URAIAN KOEF SATUAN HARGA SATUAN JUMLAH HARGA
Beton/Hal. 30 Dari 68
NO URAIAN KOEF SATUAN HARGA SATUAN JUMLAH HARGA
Dibulatkan #REF!
1 m3 P3 Beton Bertulang K 300 0.952
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 156.051 kg #REF! #REF!
3 Bekisting 5.926 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Tangga Beton Bertulang K 300
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D13 219.777 kg #REF! #REF!
4 Bekisting 3.333 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
Bangunan Penunjang
1 m3 Sloof 20/40 Beton Bertulang K 300 6.667
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 168.836 kg #REF! #REF!
3 Besi Ø 10 106.420 kg #REF! #REF!
4 Bekisting 10.000 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Sloof 15/20 Beton Bertulang K 300 6.667
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D13 152.824 kg #REF! #REF!
3 Besi Ø 10 113.223 kg #REF! #REF!
4 Bekisting 13.333 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Kolom K1 30/30 Beton Bertulang K 300 11.111
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D19 260.134 kg #REF! #REF!
3 Besi Ø 10 67.582 kg #REF! #REF!
4 Bekisting 6.667 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Kolom K2 15/30 Beton Bertulang K 300 51.020
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D19 179.183 kg #REF! #REF!
3 Besi Ø 10 64.948 kg #REF! #REF!
4 Bekisting 10.000 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Balok B1 25/40 Beton Bertulang K 300 10.000
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 94.548 kg #REF! #REF!
3 Besi Ø 10 64.733 kg #REF! #REF!
4 Bekisting 4.000 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Balok B2 15/20 Beton Bertulang K 300 10.000
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 119.598 kg #REF! #REF!
3 Besi Ø 10 96.027 kg #REF! #REF!
4 Bekisting 5.000 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Balok B2 15/20 Beton Bertulang K 300 10.000
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 119.598 kg #REF! #REF!
3 Besi Ø 10 96.027 kg #REF! #REF!
4 Bekisting 5.000 m2 #REF! #REF!
Beton/Hal. 31 Dari 68
NO URAIAN KOEF SATUAN HARGA SATUAN JUMLAH HARGA
Jumlah #REF!
Dibulatkan #REF!
1 m3 P1 Beton Bertulang K 300 22.222
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 187.443 kg #REF! #REF!
4 Bekisting 5.333 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Plat 12 cm Beton Bertulang K 300 12.500
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D10 222.625 kg #REF! #REF!
4 Bekisting 4.167 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
Lain - lain
1 m3 Sloof 30/50 Beton Bertulang K 300 6.667
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 63.200 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 5.333 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Kolom K1 30/30 Beton Bertulang K 300 11.111
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 140.444 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 3.333 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Kolom K 20/20 Beton Bertulang K 300 25.000
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D13 104.000 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 5.000 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Balok B1 20/50 Beton Bertulang K 300 10.000
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D16 158.000 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 3.500 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Balok B 15/20 Beton Bertulang K 300 33.333
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D12 118.667 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 5.833 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Kolom K 15/30 Beton Bertulang K 300 22.222
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D13 92.444 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 5.000 m2 #REF! #REF!
Jumlah #REF!
Dibulatkan #REF!
1 m3 Balok B 15/25 Beton Bertulang K 300 26.667
1 Beton K 300 1.000 m3 #REF! #REF!
2 Besi D13 110.933 kg #REF! #REF!
3 Besi Ø 10 19.840 kg #REF! #REF!
4 Bekisting 5.333 m2 #REF! #REF!
Beton/Hal. 32 Dari 68
NO URAIAN KOEF SATUAN HARGA SATUAN JUMLAH HARGA
Jumlah #REF!
Dibulatkan #REF!
Beton/Hal. 33 Dari 68
#REF!
NO. URAIAN KOEF SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
1 2 3 4 5 6 7
A.5.1.1. PENETAPAN INDEKS HARGA SATUAN PEKERJAAN INSTALASI AIR
1 Dihitung 1 Uit Toilet Tipe 8 Gedung A Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 4.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 4.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 2.50 Lbr
4 Door hardware stainless steel accessories 4.00 Sets
- Lock Set 4.00 Pcs
- Hinges 8.00 Pcs
- Coat Hook 4.00 Pcs
5 Pedestal Stainless Steel 8.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 1.50 Pcs
- Profile U @ 6,00 m 4.50 Pcs
- Door Stpper 4.50 Pcs
- Corner - Pcs
7 Biaya Pemasangan 4.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
1 Dihitung 1 Uit Toilet Tipe 9 Gedung A Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 5.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 4.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 3.10 Lbr
4 Door hardware stainless steel accessories 5.00 Sets
- Lock Set 5.00 Pcs
- Hinges 10.00 Pcs
- Coat Hook 5.00 Pcs
5 Pedestal Stainless Steel 10.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 1.50 Pcs
- Profile U @ 6,00 m 4.50 Pcs
- Door Stpper 4.50 Pcs
- Corner - Pcs
7 Biaya Pemasangan 5.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
2 Dihitung 1 Uit Toilet Tipe 1 Gedung DFG = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 4.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 2.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 1.90 Lbr
4 Door hardware stainless steel accessories 4.00 Sets
- Lock Set 4.00 Pcs
- Hinges 8.00 Pcs
- Coat Hook 4.00 Pcs
5 Pedestal Stainless Steel 8.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 1.00 Pcs
- Profile U @ 6,00 m 3.00 Pcs
- Door Stpper 3.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 4.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
3 Dihitung 1 Uit Toilet Tipe 2 Gedung DFG = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 4.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 2.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 1.90 Lbr
4 Door hardware stainless steel accessories 4.00 Sets
- Lock Set 4.00 Pcs
- Hinges 8.00 Pcs
- Coat Hook 4.00 Pcs
5 Pedestal Stainless Steel 8.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 1.00 Pcs
- Profile U @ 6,00 m 3.00 Pcs
- Door Stpper 3.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 4.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
4 Dihitung 1 Uit Toilet Tipe 4 Gedung A Lt. 4 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 7.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 5.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 2.50 Lbr
4 Door hardware stainless steel accessories 7.00 Sets
- Lock Set 7.00 Pcs
- Hinges 14.00 Pcs
- Coat Hook 7.00 Pcs
5 Pedestal Stainless Steel 14.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 1.50 Pcs
- Profile U @ 6,00 m 4.50 Pcs
- Door Stpper 4.50 Pcs
- Corner - Pcs
7 Biaya Pemasangan 7.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
1 Dihitung 1 Uit Toilet Tipe 1 Gedung C Lt. Dasar = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 1.00 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
2 Dihitung 1 Uit Toilet Tipe 2 Gedung C Lt. Dasar = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
3 Dihitung 1 Uit Toilet Tipe 2 Gedung C Lt. 1 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
4 Dihitung 1 Uit Toilet Tipe 3 Gedung C Lt. 1 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
5 Dihitung 1 Uit Toilet Tipe 2 Gedung C Lt. 2 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
6 Dihitung 1 Uit Toilet Tipe 3 Gedung C Lt. 2 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
7 Dihitung 1 Uit Toilet Tipe 2 Gedung C Lt. 3 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
8 Dihitung 1 Uit Toilet Tipe 2 Gedung C Lt. 3 = Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
1 Phenilic Board d'Cubic DOOR 3.00 Lbr
2 Phenolic Board d'Cubic DEVIDER 1800x1800x12 1.00 Lbr
3 Phenolic Board d'Cubic FRONTAL 1800x1800x12 0.80 Lbr
4 Door hardware stainless steel accessories 3.00 Sets
- Lock Set 3.00 Pcs
- Hinges 6.00 Pcs
- Coat Hook 3.00 Pcs
5 Pedestal Stainless Steel 6.00 Pcs
6 Alumunium Extrusi
- Head Rail @ 6,00 m 0.67 Pcs
- Profile U @ 6,00 m 2.00 Pcs
- Door Stpper 2.00 Pcs
- Corner - Pcs
7 Biaya Pemasangan 3.00 Pcs
Jumlah
Keuntungan 10 %
Jumlah
Dibulatkan
H. SATUAN TOTAL
Rp Rp
8
946,000.00 3,784,000.00
2,860,000.00 11,440,000.00
2,860,000.00 7,150,000.00
950,000.00 3,800,000.00
200,000.00 1,600,000.00
600,000.00 900,000.00
250,000.00 1,125,000.00
265,000.00 1,192,500.00
315,000.00 -
-
550,000.00 2,200,000.00
33,191,500.00
3,319,150.00
36,510,650.00
36,510,650.00
946,000.00 4,730,000.00
2,860,000.00 11,440,000.00
2,860,000.00 8,866,000.00
950,000.00 4,750,000.00
200,000.00 2,000,000.00
600,000.00 900,000.00
250,000.00 1,125,000.00
265,000.00 1,192,500.00
315,000.00 -
-
550,000.00 2,750,000.00
37,753,500.00
3,775,350.00
41,528,850.00
41,528,850.00
946,000.00 3,784,000.00
2,860,000.00 5,720,000.00
2,860,000.00 5,434,000.00
950,000.00 3,800,000.00
200,000.00 1,600,000.00
600,000.00 600,000.00
250,000.00 750,000.00
265,000.00 795,000.00
315,000.00 -
-
550,000.00 2,200,000.00
24,683,000.00
2,468,300.00
27,151,300.00
27,151,300.00
946,000.00 3,784,000.00
2,860,000.00 5,720,000.00
2,860,000.00 5,434,000.00
950,000.00 3,800,000.00
200,000.00 1,600,000.00
600,000.00 600,000.00
250,000.00 750,000.00
265,000.00 795,000.00
315,000.00 -
-
550,000.00 2,200,000.00
24,683,000.00
2,468,300.00
27,151,300.00
27,151,300.00
946,000.00 6,622,000.00
2,860,000.00 14,300,000.00
2,860,000.00 7,150,000.00
950,000.00 6,650,000.00
200,000.00 2,800,000.00
600,000.00 900,000.00
250,000.00 1,125,000.00
265,000.00 1,192,500.00
315,000.00 -
-
550,000.00 3,850,000.00
44,589,500.00
4,458,950.00
49,048,450.00
49,048,450.00
s ( terpasang ) :
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,860,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,688,000.00
1,568,800.00
17,256,800.00
17,256,800.00
s ( terpasang ) :
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
946,000.00 2,838,000.00
2,860,000.00 2,860,000.00
2,860,000.00 2,288,000.00
950,000.00 2,850,000.00
200,000.00 1,200,000.00
600,000.00 400,000.00
250,000.00 500,000.00
265,000.00 530,000.00
315,000.00 -
-
550,000.00 1,650,000.00
15,116,000.00
1,511,600.00
16,627,600.00
16,627,600.00
#REF!
H. SATUAN BAHAN UPAH TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp Rp
1 3 4 5 6 7 8
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI & KACA
I. PEKERJAAN PENGGANTUNG / PERKUATAN PINTU & JENDELA
A.4.6.2.1. 1 set Pasang kunci tanam antik
A.4.6.2.2. 1 set Pasang kunci tanam biasa mutu menengah 1.0000 set 150,000.00 #REF! #REF!
A.4.6.2.3. 1 set Pasang kunci pintu toilet bulat (Kenobset WC)
Bahan : Kenobset WC 1.0000 set #REF! #REF! -
Upah : Pekerja 0.005 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.050 hari #REF! - #REF!
Mandor 0.0025 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4. 1 set Pasang kunci tanam terpisah Lockcase + Double Cylinder 60mm (Untuk pintu engkel)
Bahan : Lockcase tipe ( untuk pintu singel ) 1.0000 bh #REF! #REF! -
Double Cylinder 60mm normal 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.005 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.050 hari #REF! - #REF!
Mandor 0.0025 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.a 1 set Pasang kunci tanam terpisah Lockcase + Double Cylinder 60mm (Untuk pintu dobel)
Bahan : Lockcase tipe ( untuk pintu dobel ) 1.0000 bh #REF! #REF! -
Double Cylinder 60mm normal 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.005 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.050 hari #REF! - #REF!
Mandor 0.0003 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.b 1 set Pasang kunci tanam terpisah Lockcase + Double Cylinder 60mm (Untuk pintu geser)
Bahan : Lockcase ( untuk pintu geser ) 1.0000 bh #REF! #REF! -
Double Cylinder 60mm normal 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.005 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.050 hari #REF! - #REF!
Mandor 0.0025 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.c 1 set Pasang kunci tanam Alumunium lockcase (Untuk pintu alumunium)
Bahan : Alumunium lockcase 1.0000 set #REF! #REF! -
Upah : Pekerja 0.005 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.005 hari #REF! - #REF!
Mandor 0.0003 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.d 1 set Pasang kunci pintu toilet terpisah
Bahan : Lockcase tipe ( untuk pintu singel ) 1.0000 bh #REF! #REF! -
Double Cylinder 60mm normal(untuk toilet) 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.060 hari #REF! - #REF!
Tukang kayu 0.600 hari #REF! - #REF!
Kepala tukang 0.060 hari #REF! - #REF!
Mandor 0.0030 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
#REF!
H. SATUAN BAHAN UPAH TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp Rp
1 3 4 5 6 7 8
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI & KACA
A.4.6.2.4.e 1 psg Pasang Lever Handle
Bahan : Lever Handle 1.0000 set #REF! #REF! -
Upah : Pekerja 0.020 hari #REF! - #REF!
Tukang kayu 0.200 hari #REF! - #REF!
Kepala tukang 0.020 hari #REF! - #REF!
Mandor 0.010 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.f 1 Set Corner Lock ( untuk kunci bawah pintu kaca )
Bahan : Corner Lock 1.0000 set #REF! #REF!
Upah : Pekerja 0.050 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.005 hari #REF! - #REF!
Mandor 0.003 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.g 1 bh Pasang Escutcheon
Bahan : Escutcheon 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.020 hari #REF! - #REF!
Tukang kayu 0.200 hari #REF! - #REF!
Kepala tukang 0.020 hari #REF! - #REF!
Mandor 0.010 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.4.h 1 bh Shaft door tipe Art 542 + Anak kunci shaft door tipe Art 543 + Handle shaft door tipe Art RH 8-3 ( untuk pintu shapt )
Bahan : Shaft door tipe Art 542 + Anak kunci shaft door tipe Art 543 + Handle
shaft door tipe Art RH 8-3 ( untuk pintu shapt ) 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.050 hari #REF! - #REF!
Tukang kayu 0.500 hari #REF! - #REF!
Kepala tukang 0.005 hari #REF! - #REF!
Mandor 0.003 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.5 1 bh Engsel pintu (4"x3"x2,5)
Bahan : Engsel 4" 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.015 hari #REF! - #REF!
Tukang kayu 0.150 hari #REF! - #REF!
Kepala tukang 0.015 hari #REF! - #REF!
Mandor 0.00075 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.5a 1 bh Engsel pintu tipe ES-S/S-4x3x2-2BB ( Berikut setel pintu ):
Bahan : Engsel (4"x3"x2,5) with ball beering 1.0000 bh #REF! #REF! -
Upah : Pekerja 0.015 hari #REF! - #REF!
Tukang kayu 0.150 hari #REF! - #REF!
Kepala tukang 0.015 hari #REF! - #REF!
Mandor 0.00075 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.7 1 psg Friction stay jendela tipe 1909-SS-8" ( untuk boven jungkit ) :
Bahan : Friction stay tipe 8" ( untuk boven jungkit ) 1.000 psg #REF! #REF! -
Upah : Pekerja 0.100 hari #REF! - #REF!
Tukang kayu 0.200 hari #REF! - #REF!
Kepala tukang 0.020 hari #REF! - #REF!
Mandor 0.0005 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.7a 1 psg Friction stay jendela tipe 12" ( untuk untuk boven jungkit ) :
Bahan : Friction stay tipe 12" ( untuk boven jungkit ) 1.000 psg #REF! #REF! -
Upah : Pekerja 0.100 hari #REF! - #REF!
Tukang kayu 0.200 hari #REF! - #REF!
Kepala tukang 0.020 hari #REF! - #REF!
Mandor 0.0005 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
#REF!
H. SATUAN BAHAN UPAH TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp Rp
1 3 4 5 6 7 8
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI & KACA
A.4.6.2.7b 1 psg Friction stay jendela tipe 1909-SS-14" ( untuk untuk boven jungkit ) :
Bahan : - Friction stay tipe 1909-SS-14" ( untuk boven/jendela jungkit ) 1.000 psg #REF! #REF! -
Upah : Pekerja 0.100 hari #REF! - #REF!
Tukang kayu 0.200 hari #REF! - #REF!
Kepala tukang 0.020 hari #REF! - #REF!
Mandor 0.0005 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
A.4.6.2.7c 1 psg Friction stay jendela 20" ( untuk jendela jungkit ) :
Bahan : Friction stay tipe 20" ( untuk jendela ) 1.000 psg #REF! #REF! -
Upah : Pekerja 0.100 hari #REF! - #REF!
Tukang kayu 0.200 hari #REF! - #REF!
Kepala tukang 0.020 hari #REF! - #REF!
Mandor 0.0005 hari #REF! - #REF!
Jumlah : #REF! #REF! #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
1 2 3 4 5 6 7
6.R PENETAPAN INDEKS HARGA SATUAN PEKERJAAN TANAMAN
1 1 M3 Pek. Galian lubang tanam pada tanah biasa maks kedalaman 1 M'
Pekerja 0.7500 org #REF! #REF!
Mandor 0.0250 org #REF! #REF!
Jumlah : #REF!
Overhead + Profit : Rp 4,350.00
Jumlah : #REF!
Dibulatkan : #REF!
2 1M3 Urugan Tanah Humus / Timbunan
Bahan : #REF!
Tanah Urug gembur 1.1000 m3 #REF! #REF!
Tenaga : #REF!
Pekerja 0.2500 org #REF! #REF!
Mandor 0.0250 org #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
3 1 M3 Pek. Pemadatan dan pengolahan Tanah urugan
Pekerja 0.5000 org #REF! #REF!
Mandor 0.0500 org #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
4 1 M3 Buangan siasa Pekerjaan keluar Lokasi Max 30 M
Pekerja 0.3300 org #REF! #REF!
Mandor 0.0100 org #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
5 1.lbg. Lubang Tanam dan pengolahan untuk Pohon
Galian Tanah 60x60x60 0.2160 m3 #REF! #REF!
Penimbunan Kembali lubang tanam 0.0648 m3 #REF! #REF!
Tambahan Urugan Tanah Humus perlubang 0.0432 m3 #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
6 1 M2 Penyiraman Tanaman
Bahan : Rp 675.00
Air Baku 0.1500 m3 4,500.00 675.00
Tenaga : #REF!
Pekerja 0.0225 org #REF! #REF!
Mandor 0.0004 org #REF! #REF!
Peralatan 1.0000 Lot #REF! #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
7 1 M2 Pemupukan dan Pendangiran
Bahan : Rp 1,700.00
Pupuk Anorganik 0.1000 kg 3,500.00 350.00
Pupuk Organik 0.3000 m3 4,500.00 1,350.00
Tenaga : #REF!
Pekerja 0.0450 org #REF! #REF!
Tukang Taman terampil 0.0180 org #REF! #REF!
Kepala Tukang 0.0036 org #REF! #REF!
Mandor 0.0004 org #REF! #REF!
2 Biaya finishing
Finishing dasar cat duco 0.08 m2 #REF! - - #REF!
Finishing cat huruf dan Gambar 0.04 m2 #REF! - - #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
2 Tenaga
Tukang besi terampil 0.50 oh #REF! - #REF! #REF!
Pekerja 0.50 oh #REF! - #REF! #REF!
Mandor 0.03 oh #REF! - #REF! #REF!
3 Biaya finishing
Finishing dasar cat duco 0.67 m2 #REF! - - #REF!
Finishing cat huruf dan Gambar 0.16 m2 #REF! - - #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
3 1 bh Signage tipe WB-1 s/d WB-9 ( Wall Mount blade Sign ) ukuran 350x1200 mm
1 Bahan
Plat alumunium t=3mm 0.42 m2 #REF! #REF! - #REF!
Plat stainless steel t=3mm 0.62 m2 #REF! #REF! - #REF!
Rangka Hollow 40x40 2.20 m1 #REF! #REF! - #REF!
Plat baja t=10mm 4.86 kg #REF! #REF! - #REF!
Dynabolt 3.00 bh #REF! #REF! - #REF!
2 Tenaga
Tukang besi terampil 0.75 oh #REF! - #REF! #REF!
Pekerja 0.75 oh #REF! - #REF! #REF!
Mandor 0.04 oh #REF! - #REF! #REF!
3 Biaya finishing
Finishing dasar cat duco 1.31 m2 #REF! - - #REF!
Finishing cat huruf dan Gambar 0.84 m2 #REF! - - #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
4 1 bh Signage tipe HC-1 s/d HC-5 ( Hanging Ceilling Sign ) ) ukuran 860x1800 mm
1 Bahan
Pipa GIV kelas medium A f4" 2.80 m1 #REF! #REF! - #REF!
Acrilck 3.10 m2 280,000.00 866,880.00 - 866,880.00
Plat stainless steel t=3mm 1.06 m2 #REF! #REF! - #REF!
Rangka Hollow 40x40 12.36 m1 #REF! #REF! - #REF!
Plat baja t=10mm 9.72 kg #REF! #REF! - #REF!
Dynabolt 8.00 bh #REF! #REF! - #REF!
2 Tenaga
Tukang besi terampil 1.00 oh #REF! - #REF! #REF!
Pekerja 1.00 oh #REF! - #REF! #REF!
Mandor 0.05 oh #REF! - #REF! #REF!
3 Biaya finishing
Finishing dasar cat duco 8.57 m2 #REF! - - #REF!
Finishing cat huruf dan Gambar 6.19 m2 #REF! - - #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
2 Tenaga
Tukang besi terampil 1.00 oh #REF! - #REF! #REF!
Pekerja 1.00 oh #REF! - #REF! #REF!
Mandor 0.05 oh #REF! - #REF! #REF!
3 Biaya finishing
Finishing dasar cat duco 10.73 m2 #REF! - - #REF!
Finishing cat huruf dan Gambar 8.06 m2 #REF! - - #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
2 Tenaga
Sinage hal-64 dari 68
Tukang besi terampil 0.80 oh #REF! - #REF! #REF!
Pekerja 0.80 oh #REF! - #REF! #REF!
Mandor 0.04 oh #REF! - #REF! #REF!
3 Biaya finishing
Finishing dasar cat duco 4.27 m2 #REF! - - #REF!
Finishing cat huruf dan Gambar 2.45 m2 #REF! - - #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
2 Tenaga
Tukang besi terampil 1.25 oh #REF! - #REF! #REF!
Pekerja 1.25 oh #REF! - #REF! #REF!
Mandor 0.06 oh #REF! - #REF! #REF!
Jumlah : #REF!
Overhead + Profit : #REF!
Jumlah & pembulatan : #REF!
1 2 3 4 5 6 7
HARGA SATUAN PEKERJAAN PERUBAHAN
Jumlah #REF!
Overhead & Profit : #REF!
Jumlah : #REF!
Dibulatkan : #REF!
ANALISA HARGA SATUAN PEKERJAAN
1 2 3 4 5 6
HARGA SATUAN PEKERJAAN PERSIAPAN
1 1 m1 Meja Scurity & Admin ukuran l=600, t=700( Dasar yang dihitung panjang 3000
Noin standar
Bahan
Multiplek 12mm 0.6771 Lembar #REF! #REF!
Multiplek 18mm 0.4722 Lembar #REF! #REF!
Paku 1 cm - 2.5 cm 0.0833 kg #REF! #REF!
Melaminto 0.3069 Lembar #REF! #REF!
HPL motif kayu 1.1493 Lembar #REF! #REF!
Lem Kayu 1.0000 kg #REF! #REF!
Besi hollow stainles 60x60 1.8667 m' Rp 65,000.00 Rp 121,333.33
Besi hollow stainles 40x40 4.0000 m' Rp 45,000.00 Rp 180,000.00
Pipa stainles dia 1/2" 3.0000 m' #REF! #REF!
Skruf 15.0000 bh Rp 350.00 Rp 5,250.00
Rel untuk laci 2.0000 bh Rp 75,000.00 Rp 150,000.00
Handle untuk laci 2.0000 bh Rp 55,000.00 Rp 110,000.00
Kaca polos t=12mm 0.6000 m2 #REF! #REF!
Stainles steel t=2mm 0.1000 m2 #REF! #REF!
Tenaga Kerja
Upah pembuatan + pemasangan 1.0000 m' Rp 475,000.00 Rp 475,000.00
Jumlah
Overhead & Profit :
Jumlah :
Dibulatkan :