Anda di halaman 1dari 17

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG

BIDANG SUMBER DAYA AIR

GAMBAR RENCANA

PEKERJAAN
DESAIN PERENCANAAN UNTUK KEGIATAN
KONTRAKTUAL

NAMA PAKET
Rehabilitasi Jaringan Irigasi DI. Kampung Jati
Kec. Meranti
LOKASI DI. Kampung Jati Kec. Meranti

T.A 2021
LAYOUT PEKERJAAN
BKJ.2 .Ka
65.25 Ha 125.81l/det

BKJ.2 .Ka
9.53 Ha 33.87 l/det

Sal. Sekunder
Kampung Jati
L = 150 m
Bendung
Kampung Jati (BKJ)
Sal. Primer Kampung Jati

BKJ.1

A = 134 Ha

Sal. Sekunder
Q = 330 l/det L = 80 mtr
L = 8 mtr
BKJ.5

Kmp Jati
9.30 Ha 33.50 l/det
BKJ.3
13.22 Ha 39.96 l/det Sal. Sekunder Kmp Jati
Sal. Sekunder Kmp Jati BKJ.5
BKJ.3 34.05 Ha 74.33 l/det

L = 314 mtr BKJ.5 L = 378 mtr

BKJ.4

L = 40 mtr
SKEMA JARINGAN
BKJ.4
2.65 Ha 22.52 l/det

DAK 2017 DAK 2020 (Gagal Tender)

DAK 2022 (Rencana)

SKEMA JARINGAN
Sal. Sekunder
Kampung Jati
L = 150 m
Bendung
Kampung Jati (BKJ)
Sal. Primer Kampung Jati

BKJ.1

A = 134 Ha

Sal. Sekunder
Q = 330 l/det L = 80 mtr
L = 8 mtr

Kmp Jati
Sal. Sekunder Kmp Jati
Sal. Sekunder Kmp Jati
BKJ.3
L = 314 mtr BKJ.5 L = 378 mtr

BKJ.4

L = 40 mtr
SKEMA BANGUNAN

DAK 2017 DAK 2020 (Gagal Tender)

DAK 2022 (Rencana)

SKEMA BANGUNAN
1. Penanganan Saluran Primer BKJ.0 - BKJ. 1 (Hm. 0+00 s/d Hm. 0+08) sep. 8 mtr
2. Penanganan Saluran Sekunder BKJ. 1 - BKJ. 2 ( Hm. 0+00 s/d Hm. 1+50 )sep. 150 mtr
.0)
KJ
(B
TI
L
JA
G
UN
IP
a 0 MP
TL +0 KA
.0 G Hm 0+08
Hm DUN 8
BE
N +0 ri)
.0 i NA AN
A
Hm . 1 (K CA NA ENC
TM TA
REN ENCA
BK
J
G UL R A NR
G AI R R
TA N U K A ALU ING
RS IST
R R M
DA
SA EKS
R AN
AL U
RS
SA
DA
16

15
0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100 14

0 10 20 30 40 50 60 70 80 90 100 0.20 0.20


1.00

SH = 1 : 1000

0.20 0.30

0.90
Rencana

1.00
bidang persamaan / reference level

0.70
E ksisting

+ 11.00 meter
PATOK HEKTOMETER
Hm 0 Hm 0+68
HECTOMETER STONE
NOMOR PROFIL
P 1a P2

P0
PROFILE NUMBER

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE

60.0
0.0

8.0
150.0
ACCUMULATED DISTANCE

ELEVASI TANGGUL KIRI

13.90 14.00 16.18 16.20

13.90 14.00 16.18 14.30

13.870 13.92 16.18 14.26


LEFT BANK LEVEL
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE

13.998 14.598 14.898

13.986 14.586 14.886


ELEVASI TANGGUL
14.00 15.20 16.20
BANK LEVEL
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
ELEVASI DASAR SALURAN
RENCANA / DESIGN

BED LEVEL
TRASE SALURAN R X Y L
ALIGNMENT TL a
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
BED LEVEL SIDE DRAIN LEFT SIDE
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN
BED LEVEL SIDE DRAIN RIGHT SIDE
TIPE BANGUNAN
TYPE OF STRUCTURE
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
CANAL DIMENSION AND ADDITIONAL DATA Q = 330 l/dtk i = 0.0002
m I A

POTONGAN MEMANJANG

Anda mungkin juga menyukai