URAIANPEKERJAAN
TAHAP I
PEKERJAAN PERSIAPAN
PEK. GALIAN UNTUK PONDASI.
PEK. ANTI RAYAP UNTUK PONDASI ( 80% )
PEK. COR PONDASI TAPAK + PEDESTAL KOLOM
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI
TAHAP II
PEK. COR TIE BEAM + SLAB ON THE GROUND
PEK. PIPA MEP LT.1 + SPARING PIPA MEP LT.1
PEK. KOLOM LT.1 (SISTEM FREE STANDING)
PEK. COR BALOK & PLAT LT.2, PEK. TANGGA LT.1 KE LT.2
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP III
PEK. KOLOM LT.2 (SISTEM FREE STANDING)
PEK. COR BALOK & PLAT LT.3, PEK. TANGGA LT.2 KE LT.3
PEK. PIPA MEP LT.2 + SPARING PIPA MEP LT.2
PEK. PASANG SEPTIC TANK DAN GROUND TANK
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP IV
PEK COR KOLOM LT.3
PEK. COR RING BALOK
PEK. COR PLAT LANTAI ATAP
PEK. PIPA MEP LT.3 + SPARING PIPA MEP LT.3
PEK. CONNECT PIPA
PEK. PASANGAN BATA LT.3 + OPENING KUSEN
PEK. PASANG GENTENG BITUMEN, AKSESORIS + INCLUDE PLESING DAN BAN-BANAN
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP V
PEK. LISPLANK, RANGKA + PLAFOND OVERSTEK + TERMASUK CAT FINISH
PEK. BATA LT.1 & LT.2 (100%) + KOLOM PRAKTIS
PEK. KERAMIK DINDING KM/WC LT.3 + LT.2 + LT.1 (100%)
PEK. WATERPROOFING KAMAR MANDI & DAK TALANG
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP VI
PEK. PLESTER LT.3 + LT.2 + LT.1 (100%) + CEK SIKUAN
PEK. ACIAN LT.3 + LT.2 + LT.1 (100%) + PAGAR LUAR DALAM
PEK. CAT DASAR DINDING INTERIOR (100%)
PEK. WIRING LISTRIK LT. 2 + 1 (100%)
PEK.PLAFOND LT.3 + LT. 2 + LT.1 (100%)
PEK. SHADOW LINE LT.3 + LT.2 + LT.1
PEK. CAT DASAR DINDING EKSTERIOR (100%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP VII
PEK. KERAMIK LANTAI UMUM + VINYL+ BALKON
PEK. CAT DINDING EKSTERIOR ( LAPIS 1 & 2 )
PEK. BAK KONTROL + TEMPAT SAMPAH
PEK. CAT DINDING INTERIOR ( LAPIS 1 & 2 )
PEK. KUSEN + PINTU + JENDELA (TERMASUK AKSESORIS) LT.2 + LT.1 (100%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP VIII
PEK. AS BUILT DRAWING MEP (DENAH, TAMPAK & POTONGAN) + TERMASUK JILID & SO
PEK. INSTALASI POMPA AIR
PEK. FINISH CARPORT
PEK. MANHOLE PLAFOND
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP IX
PEKERJAAN PASANG SANITAIR+ ELECTRICAL SYSTEM
PEK. TES COMISSIONING MEP
PEK. INSTALASI REFRIGRANT AC
PEK. ANTI RAYAP TAMAN (20%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP X
TARIK KUNCI (TERMASUK MATERIAL YG DIKEMBALIKAN + VO TAMBAH KURANG + TES F
SERAH TERIMA (KELENGKAPAN BAST)
87%
1.29% 1
0.22% 1
0.45% 1
0.82% 2
0.03% 6
SUB TOTAL 2.82%
8.08%
0.02%
6.95% 3
7.74% 3
RANG) 0.03% 5
SUB TOTAL 22.81%
6.51% 3
7.82%
0.02%
0.69% 2
RANG) 0.03% 3
SUB TOTAL 15.08%
6.23% 3
1.70% 2
2.85%
0.03% 2
0.02%
5.51% 4
DAN BAN-BANAN 3.31% 3
RANG) 0.03% 5
SUB TOTAL 19.69%
INISH 0.23% 2
4.76% 3
2.73% 3
RANG) 0.03% 3
SUB TOTAL 7.76%
2.91% 2
2.76% 2
0.61% 1
2
0.95% 2
0.00% 2
0.27% 2
RANG) 0.03% 4
SUB TOTAL 7.53%
5.34% 2
1.32% 1
0.02% 1
0.27% 1
1 (100%) 3.32% 1
RANG) 0.03% 2
SUB TOTAL 10.29%
0.11% 1
RANG) 0.03% 2
SUB TOTAL 0.15%
86.61%
TOTAL 0.00%
KUMULATIF 0.00%
REALISASI
12/30/1899
REALISASI KUMULATIF
DEVIASI
2023
DES JAN
9-15 16-22 23-29 30-5 6-12 13-19 20-26
2 3 4 5 6 7 8
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
FEB
27-2 3-9 10-16 17-23 24-2 3-9 10-16
9 10 11 12 13 14 15
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MAR
APR
17-23 24-30 31-6 7-13 14-20 21-27 28-4
16 17 18 19 20 21 22
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
MEI JUN
5-11 12-18 19-25 26-1 2-8 9-15 16-22
23 24 25 26 27 28 29
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
JUN
23-29
30
0.00%
0.00%
No BAHAN Satuan Harga Satuan
STRUKTUR
1 Besi Beton ex.Polos SPI BJKU diameter 8 kg Rp7,595
2 Besi Beton Ulir ex.SPI BJKU diameter 10 kg Rp9,100
3 Besi Beton Ulir ex. SPI BJKU diameter 13 kg Rp7,600
4 Kawat Bendrat kg Rp15,000
5 Paku Kayu Hanoman uk. 5 cm kg Rp17,000
6 Paku Kayu Hanoman uk. 7 cm kg Rp17,000
7 Paku Kayu Hanoman uk. 10 cm kg Rp17,000
8 Paku Beton Viper uk. 5 cm kg Rp19,000
9 Paku Beton Viper uk. 7 cm kg Rp17,000
10 Hebel Reject 10x20x60 kg Rp250,000
11 Lem Hebel ex. APLUS kg Rp70,000
12 Beton Ready Mix K250 Screening m3 Rp960,000
13 Beton Ready Mix K250 m3 Rp915,000
14 Beton Ready Mix K175 m3 Rp845,000
15 Batu Belah split 1 m3 m3 Rp350,000
16 Kaso Meranti 4x6 m3 Rp3,000,000
17 Multipleks tebal 9mm Lembar Rp98,000
18 Air liter Rp100
19 Bambu steger 6 m batang Rp20,000
20 plastik Cor 60 micron m Rp12,000
ARSITEKTUR
1 Bata Ringan ,ex. PowerBlock ,uk. 10x20x60 cm m3 Rp535,000
2 Mortar Acian Putih MU-200 @20kg sak Rp75,000
3 Mortar Plester MU-301 @40 kg sak Rp85,000
4 Semen Tiga Roda @40kg sak Rp55,000
5 Lem Keramik MU-420 @25 kg sak Rp89,000
6 Semen Warna AM pengisi Nat Keramik bks Rp11,000
7 Pasir cilegon m3 Rp160,000
8 Batu Alam Andesit Bintik Bakar ,uk. 30x30 cm m2 Rp100,000
9 Jotun Essence Easy Primer 18 liter liter Rp640,000
10 Cat Interior Jotun Majestic 20 liter liter Rp1,150,000
11 Cat Plafond Jotaplast 18 liter liter Rp572,000
12 cat tekstur liter Rp130,000
13 cat kanopi Jotun Jotashield 2,5 liter liter Rp290,000
14 cat aksen Jotashield Antifade Colours 2,5 liter liter Rp235,000
15 cat aksen 2 Jotashield Antifade Colours 2,5 liter liter Rp235,000
16 cat lisplang Jotashield Antifade Colours 1 liter liter Rp150,000
17 Benang Kur gulung Rp5,000
18 Gypsum Board JayaBoard 120 x 240 cm, tebal 9 mm Lembar Rp75,000
19 List Gypsum ,uk. 2,2 m x 6 cm batang Rp20,000
20 Drywall Screw 6 inch x 1 inch x 2,5 cm dus Rp89,000
21 Cat Eksterior Jotun Jotashield 20 liter warna Pangolin liter Rp1,800,000
22 Rangka Metal Hollow 40 x 40, tebal 0,7 mm , 6 m batang Rp80,000
23 Rangka Besi Hollow 20 x 40, tebal 0,6 mm, 6 m batang Rp53,000
24 Tepung Gypsum APLUS kg Rp8,000
25 Djabesmen Gelombang 210 x 105 mm lbr Rp57,000
26 Keramik HT 600x600 mm ,ex. Roman m2 Rp225,000
27 Keramik 333x333 mm ,ex. Roman m2 Rp98,000
28 Kermik Lantai 200x200 mm ,ex. Roman m2 Rp85,000
29 Keramik Dinding 200x400 mm ,ex. Roman m2 Rp115,000
30 Plint HT 100x600 mm ,ex. Roman buah Rp25,000
31 StepNose HT 100x600 mm ,ex. Roman buah Rp35,000
Roofing
1 Baja ringan TASO C-75, 6 meter batang Rp85,000
2 Reng 40 TASO, 6 meter batang Rp40,500
3 Baut reng Zolo 10 x 16 mm buah Rp220,000
4 Genteng Beton Mutiara SNI Flat Polos buah Rp7,500
5 Nok Samping Motif Batu Genteng Beton Mutiara buah Rp10,000
6 Alumunium Foil Bubble Double Side m Rp15,000
7 Nusa Board Lisplang GRC 20 cm, 2,4 m lembar Rp33,000
8 Baut Dynabolt 3740 / 10 x 105 mm buah Rp1,500
Mechanical Electrical P
1 Box MCB 12 Group buah Rp200,000
2 Nero LED 8 Inch Slim Recessed Downlight 18 watt Putih Natu buah Rp165,000
3 Lampu Baret LED Phillips 18 Watt 31110 buah Rp200,000
4 Saklar Tunggal Schneider Clipsal Classic 1 Gang Putih buah Rp33,500
5 Saklar Seri Schneider Clipsal Classic 2 Gang Putih buah Rp50,000
6 Stop Kontak Vivace Schuko Putih Schneider buah Rp30,000
7 Outlet Telephone + Outlet Data Schneider buah Rp48,000
8 Outlet Tv Kabel Pieno Schneider E8231TV_WE 1G 750HM W buah Rp118,000
9 Pipa Conduit Boss 20mm Panjang 3 Meter batang Rp14,500
10 kabel nym SUPREME 3x2.5 1 m m Rp28,200
11 kabel ITC 2x2x0,4 isi 4 ,ex. SUPREME m Rp33,000
12 kabel RG6 coaxial ,ex. BELDEN m Rp3,500
13 Kabel CAT ,ex. BELDEN m Rp6,000
14 Pipa HDPe SDR 11 PN 16 ,uk 1 inch m Rp14,700
15 T dus 4 cabang 20 mm boss buah Rp34,000
16 Knee / Elbow Listrik Putih 20mm ex. Clipsal buah Rp5,500
17 lasdop kuning 2,5 buah Rp29,500
18 BOSS clamp pipa listrik PVC 20mm buah Rp1,000
19 Broco Inbow Doos B101 buah Rp7,500
20 ZEHN+ KITCHEN SINK JUMBO BOWL DJUS 850 buah Rp1,600,000
21 pipa WestPex PN 16 1'' Batang Rp95,000
22 pipa WestPex PN 16 3'' Batang Rp860,000
23 pipa WestPex PN 16 4'' Batang Rp1,930,000
24 pipa WestPex PN 16 6'' Batang Rp4,620,000
25 Closet ex. TOTO, TCW075 White Dual Flush Set buah Rp2,755,000
26 Jet Washer ex.Wasser, WE-99JS buah Rp150,000
27 Wastafel ex.TOTO, LW248 JT1 + Keran TX129L buah Rp540,000
28 Shower ex.CERAMAX buah Rp2,920,000
29 Floor Drain ex.CERAMAX FD-A246 buah Rp230,000
30 Penguin Roof Water Tank TB 110 ,1050 liter buah Rp1,700,000
31 Shimizu Mesin Pompa Transfer ZPS 20-12-180 buah Rp1,420,000
32 Shimizu Bit Pompa Booster PB-228 buah Rp940,000
33 Septic Tank Biofil BF 03 buah Rp3,500,000
34 Roofdrain buah Rp200,000
35 Cermin ex.QUEEN, uk.500x700 mm buah Rp280,000
36 Pipa PVC Type D 1" 4m batang Rp25,000
37 Pipa PVC Type D 2" 4m batang Rp41,500
38 Pipa PVC Type D3" 4m batang Rp60,000
39 Pipa PVC Type D 4" 4m batang Rp90,000
40 Pipa PVC Type D 6" 4m batang Rp180,000
41 Pipa PVC Type AW 1" 4m batang Rp30,000
42 Pipa PVC Type AW 2" 4m batang Rp55,000
43 Pipa PVC Type AW 3" 4m batang Rp99,500
44 Pipa PVC Type AW 4" 4m batang Rp168,000
45 Pipa PVC Type AW 6" 4m batang Rp400,000
46 MASPION Ceiling Exhaust Fan Plafond MV-18 EX 10" buah Rp420,000
47 Keran ,ex. buah Rp420,001
48 Paving Block m2 Rp420,002
Link
STRUKTUR
https://www.rumah.com/panduan-properti/harga-besi-beton-71092
https://harga.web.id/harga-besi-beton-per-kilogram.info
https://harga.web.id/harga-besi-beton-per-kilogram.info
https://hargaper.com/harga-kawat-bendrat.html
https://www.sejasa.com/blog/daftar-harga-paku-terbaru/
https://www.sejasa.com/blog/daftar-harga-paku-terbaru/
https://www.sejasa.com/blog/daftar-harga-paku-terbaru/
https://www.sejasa.com/blog/daftar-harga-paku-terbaru/
https://www.sejasa.com/blog/daftar-harga-paku-terbaru/
https://katalogmaterial.com/daftar-harga-bata-ringan-aac/
https://www.epropertyrack.com/lem-bata-ringan-yang-bagus/
Solusi Beton
https://royalindoreadymix.com/harga-beton-ready-mix-tangerang/
https://royalindoreadymix.com/harga-beton-ready-mix-tangerang/
https://harga.web.id/harga-batu-belah-1-truk-per-m3.info
https://www.harga.top/harga-kayu-kaso-per-ikat/
https://hargabangunan.id/ukuran-dan-harga-triplek/?page=all
PDAM
https://harga.web.id/harga-bambu-per-batang-2018-apus-petung-wulung-steger-dll.info
https://ciptaperdana.com/harga-plastik-cor/
ARSITEKTUR
https:://www.rumah.com/panduan-properti/harga-bahan-bangunan-65434
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
https://www.rumah.com/panduan-properti/panduan-memilih-semen-dan-harga-terkini-19706
Mitra 10 Gading Serpong
https://hargaper.com/harga-semen-warna.html/2
https://jayawan.com/pasir-cilegon/
https://berita.99.co/harga-batu-alam/
https://www.rumah.com/panduan-properti/cat-dasar-tembok-51203
Depo Bangunan Alam Sutera
Depo Bangunan Alam Sutera
Depo Bangunan Alam Sutera
Depo Bangunan Alam Sutera
Depo Bangunan Alam Sutera
Depo Bangunan Alam Sutera
Depo Bangunan Alam Sutera
Toko Bangunan Sumber Rejeki
https://www.niagabaja.com/harga-gypsum-jayaboard-tangerang/
https://ruangarsitek.id/harga-list-gypsum/
https://harga.web.id/harga-sekrup-gypsum-per-dus.info
Depo Bangunan Alam Sutera
https://asiatoko.com/harga-hollow-galvanis-4x6-tebal-1-7mm/
https://asiatoko.com/harga-hollow-galvanis-4x6-tebal-1-7mm/
https://indomineral.co.id/produk/harga-gypsum-powder/
https://artikel.rumah123.com/daftar-harga-asbes-terlengkap-terbaru-dari-berbagai-merek-terkemuka-65357
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Roofing
Roofmart BSD
Roofmart BSD
Roofmart BSD
https://bursabangunan.com/harga-genteng-beton/#Daftar_Harga_Genteng_Beton_Lengkap
https://bursabangunan.com/harga-genteng-beton/#Daftar_Harga_Genteng_Beton_Lengkap
https://biggo.id/s/alumunium+foil+bubble/
https://www.permata-material-bangunan-pku.com/product/plafon/29/listplank-grc-nusa-board
https://ilmubangunan.com/harga-dynabolt/#Harga_Dynabolt
Mechanical Electrical Plumbing
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
https://juraganmaterial.id/transaksi/product/detail/pipa-conduit-boss-20mm-panjang-3-meter
Mitra 10 Gading Serpong
https://jayamapan.com/supreme-telepon/
https://www.bhinneka.com/belden-coaxial-cable-rg-6-9116s-skusku00311822
https://www.bhinneka.com/belden-utp-cable-cat-5e-skusku00007581
https://pipawavin.info/harga-pipa-hdpe-harga-pipa-pe100-2022/
https://www.indotrading.com/kikayuglobalsentosa2/t-dus-tdus-4-cabang-20mm-hitam-boss-7020073-p905618.aspx
https://m.indotrading.com/kikayuglobalsentosa2/knee-elbow-listrik-putih-20mm-merk-clipsal-p905878.aspx
https://www.gudanglistrik.com/produk/613/lasdop-25-4mm
https://m.indotrading.com/kikayuglobalsentosa2/boss-klem-clamp-pipa-listrik-pvc-20mm-hitam-100pcspack-p902652.aspx
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
https://abadimetalutama.com/daftar-harga-pipa-ppr-westpex/
https://abadimetalutama.com/daftar-harga-pipa-ppr-westpex/
https://abadimetalutama.com/daftar-harga-pipa-ppr-westpex/
https://abadimetalutama.com/daftar-harga-pipa-ppr-westpex/
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
https://harga.web.id/harga-septic-tank-biofil.info
https://www.ralali.com/v/wijayasantosa/product/Roof-Drain-Saringan-Talang-Saringan-dak-Cast-Iron-3-inch
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Mitra 10 Gading Serpong
Harga Total
902652.aspx
SUMMARECON BEKASI PROJECT
PT. SERPONG CIPTA KREASI
BILL OF QUANTITY
VOLUME / QTY
NO. JENIS PEKERJAAN SAT. TYPE 7x17
I. PEK. PERSIAPAN
1 Pembersihan lokasi m² 136.00
2 Pekerjaan Bouwplank & Pengukuran m¹ 50.00
3 Gudang & Los Kerja 1.00
4 Air kerja ls 1.00
5 Listrik kerja ls 1.00
6 Alat kerja ls 1.00
7 As built drawing ls 1.00
8 Paket MCK, Container office dan sampah ls 1.00
9 Mob Demob ls 1.00
10 Keamanan ls 1.00
11 Buang puing + Pembersihan Akhir Pekerjaan ls 1.00
SUB TOTAL I
SUB TOTAL II
2 Sloof
- Tulangan kg 878.723
- Bekisting m² 111.946
- Beton m³ 7.463
3 Kolom
Lantai 1
- Tulangan kg 2388.000
- Bekisting m² 149.800
- Beton m³ 9.110
Lantai 2
- Tulangan kg 2225.030
- Bekisting m² 141.40
- Beton m³ 8.560
Lantai 3
- Tulangan kg 2143.210
- Bekisting m² 134.40
- Beton m³ 8.190
4 Balok
Lantai 1
- Tulangan kg 907.23
- Bekisting m² 116.59
- Beton m³ 11.17
Lantai 2
- Tulangan kg 948.13
- Bekisting m² 121.99
- Beton m³ 11.44
Lantai 3
- Tulangan kg 994.15
- Bekisting m² 131.57
- Beton m³ 12.33
Ring Balok & Balok Sopi2
- Tulangan kg 319.800
- Bekisting m² 43.497
- Beton m³ 3.728
5 Pelat Lantai
Lantai 1
- Tulangan kg 490.875
- Bekisting m² 103.757
- Beton m³ 10.664
Lantai 2
- Tulangan kg 323.584
- Bekisting m² 67.808
- Beton m³ 6.274
Lantai 3
- Tulangan kg 287.751
- Bekisting m² 59.721
- Beton m³ 5.465
Lantai Atap
- Tulangan kg 373.237
- Bekisting m² 77.576
- Beton m³ 7.128
Atap
- Tulangan kg 255.427
- Bekisting m² 59.093
- Beton m³ 6.326
6 Tangga
- Tulangan kg 44.346
- Bekisting m² 3.446
- Beton m³ 1.043
SUB TOTAL IV
SUB TOTAL IV
V. PEK. ATAP
Rangka atap termasuk flashing dan accesories
1 pendukung
Rangka Atap baja ringan ex. Bluescope by
- Manunggal incl. alm foil single side m² 263.44
2 Penutup Atap Genteng
- Genteng Bitumen Onduvilla 1060x400x3 mm bh 141.207
SUB TOTAL V
SUB TOTAL VI
SUB TOTAL XI
SUB TOTAL X
SUB TOTAL XI
TOTAL
HARGA
SATUAN JUMLAH (Rp.)
TYPE 7x17
Rp7,000.00 Rp952,000.00
Rp33,368.00 Rp1,668,400.00
Rp276,747.00 Rp276,747.00
Rp122,100.00 Rp122,100.00
Rp122,100.00 Rp122,100.00
Rp1,636,140.00 Rp1,636,140.00
Rp610,500.00 Rp610,500.00
Rp4,578,750.00 Rp4,578,750.00
Rp244,200.00 Rp244,200.00
Rp2,197,800.00 Rp2,197,800.00
Rp305,250.00 Rp305,250.00
Rp12,713,987.00
Rp62,271.00 Rp86,930.32
Rp79,759.00 Rp758,508.09
Rp364,458.00 Rp25,439.17
Rp260,011.00 Rp181,487.68
Rp34,250.00 Rp1,032,226.50
Rp2,084,591.75
Rp11,783.00 Rp4,726,966.31
Rp140,248.00 Rp1,099,544.32
Rp1,334,449.00 Rp1,862,890.80
Rp11,783.00 Rp10,353,993.11
Rp161,688.00 Rp18,100,324.85
Rp1,334,449.00 Rp9,958,992.89
Rp11,783.00 Rp28,137,804.00
Rp164,344.00 Rp24,618,731.20
Rp1,334,449.00 Rp12,156,830.39
Rp11,783.00 Rp26,217,528.49
Rp164,344.00 Rp23,238,241.60
Rp1,334,449.00 Rp11,422,883.44
Rp11,783.00 Rp25,253,443.43
Rp164,344.00 Rp22,087,833.60
Rp1,334,449.00 Rp10,929,137.31
Rp11,783.00 Rp10,689,891.09
Rp164,344.00 Rp19,160,866.96
Rp1,334,449.00 Rp14,905,795.33
Rp11,783.00 Rp11,171,815.79
Rp164,344.00 Rp20,048,324.56
Rp1,334,449.00 Rp15,266,096.56
Rp11,783.00 Rp11,714,069.45
Rp164,344.00 Rp21,622,740.08
Rp1,334,449.00 Rp16,453,756.17
Rp11,783.00 Rp3,768,204.51
Rp164,344.00 Rp7,148,405.23
Rp1,334,449.00 Rp4,975,199.52
Rp11,783.00 Rp5,783,982.42
Rp164,344.00 Rp17,051,832.19
Rp1,334,449.00 Rp14,230,801.67
Rp11,783.00 Rp3,812,791.80
Rp164,344.00 Rp11,143,895.47
Rp1,334,449.00 Rp8,372,623.94
Rp11,783.00 Rp3,390,575.81
Rp164,344.00 Rp9,814,804.46
Rp1,334,449.00 Rp7,292,560.95
Rp11,783.00 Rp4,397,856.03
Rp164,344.00 Rp12,749,080.30
Rp1,334,449.00 Rp9,512,252.72
Rp11,783.00 Rp3,009,693.96
Rp164,344.00 Rp9,711,637.51
Rp1,334,449.00 Rp8,442,138.05
Rp11,783.00 Rp522,530.85
Rp164,344.00 Rp566,315.04
Rp1,334,449.00 Rp1,391,245.65
Rp518,286,929.82
Rp189,132.00 Rp12,113,857.32
Rp189,132.00 Rp8,655,815.11
Rp189,132.00 Rp28,247,431.60
Rp189,132.00 Rp33,970,955.22
Rp31,167.00 Rp3,540,633.53
Rp31,167.00 Rp2,556,831.60
Rp31,167.00 Rp7,521,485.36
Rp31,167.00 Rp1,474,822.44
Rp31,167.00 Rp3,540,633.53
Rp31,167.00 Rp2,556,831.60
Rp31,167.00 Rp7,521,485.36
Rp31,167.00 Rp1,474,822.44
Rp31,167.00 Rp3,372,955.07
Rp31,167.00 Rp2,425,930.20
Rp31,167.00 Rp7,172,414.96
Rp31,167.00 Rp3,312,198.12
Rp31,167.00 Rp2,410,726.93
Rp31,167.00 Rp7,091,686.20
Rp138,961,516.59
Rp6,299,000.00 Rp12,598,000.00
Rp1,099,000.00 Rp3,297,000.00
Rp1,699,000.00 Rp6,796,000.00
Rp1,192,000.00 Rp8,344,000.00
Rp31,035,000.00
Rp85,000.00 Rp22,392,010.61
Rp60,420.00 Rp8,531,715.27
Rp30,923,725.88
Rp48,208.33 Rp2,585,653.96
Rp48,208.33 Rp1,667,973.38
Rp48,208.33 Rp1,943,186.32
Rp48,208.33 Rp1,596,635.90
Rp48,208.33 Rp853,409.23
Rp48,208.33 Rp198,473.71
Rp33.33 Rp2,693.02
Rp33.33 Rp2,197.45
Rp33.33 Rp2,963.58
Rp8,853,186.54
Rp436,756.00 Rp12,022,909.98
Rp350,297.00 Rp1,603,922.39
Rp436,756.00 Rp6,944,420.40
Rp436,756.00 Rp27,196,632.34
Rp350,297.00 Rp621,339.30
Rp436,756.00 Rp4,105,506.40
Rp436,756.00 Rp3,433,797.51
Rp350,297.00 Rp2,004,136.71
Rp436,756.00 Rp10,272,501.12
Rp179,148.00 Rp7,221,418.80
Rp75,426,584.95
Rp1,584,000.00 Rp1,584,000.00
Rp435,210.00 Rp435,210.00
Rp2,676,600.00 Rp2,676,600.00
Rp289,655.00 Rp289,655.00
Rp1,584,000.00 Rp3,168,000.00
Rp435,210.00 Rp870,420.00
Rp2,676,600.00 Rp5,353,200.00
Rp289,655.00 Rp579,310.00
Rp1,584,000.00 Rp1,584,000.00
Rp435,210.00 Rp435,210.00
Rp289,655.00 Rp289,655.00
Rp2,499,002.00 Rp4,998,004.00
Rp259,200.00 Rp518,400.00
Rp303,300.00 Rp2,426,400.00
Rp190,000.00 Rp570,000.00
Rp25,778,064.00
Rp156,750.00 Rp156,750.00
Rp156,750.00 Rp156,750.00
Rp156,750.00 Rp156,750.00
Rp56,050.00 Rp1,177,050.00
Rp149,150.00 Rp3,132,150.00
Rp199,000.00 Rp1,194,000.00
Rp10,000.00 Rp60,000.00
Rp11,000.00 Rp99,000.00
Rp15,000.00 Rp135,000.00
Rp14,000.00 Rp112,000.00
Rp35,000.00 Rp175,000.00
Rp109,000.00 Rp218,000.00
Rp52,000.00 Rp104,000.00
Rp71,000.00 Rp142,000.00
Rp579,000.00 Rp2,316,000.00
Rp40,000.00 Rp1,080,000.00
Rp45,000.00 Rp135,000.00
Rp60,000.00 Rp780,000.00
Rp250,000.00 Rp1,250,000.00
Rp50,000.00 Rp100,000.00
Rp200,000.00 Rp2,600,000.00
Rp250,000.00 Rp750,000.00
Rp33,000.00 Rp66,000.00
Rp50,000.00 Rp100,000.00
Rp50,000.00 Rp100,000.00
Rp9,500,000.00 Rp9,500,000.00
Rp3,000,000.00 Rp30,000,000.00
Rp55,795,450.00
Rp9,831.25 Rp96,031.65
Rp9,831.25 Rp64,532.33
Rp9,831.25 Rp124,201.95
Rp5,000.00 Rp50,000.00
Rp5,000.00 Rp30,000.00
Rp13,750.00 Rp34,292.50
Rp24,875.00 Rp24,825.25
Rp42,000.00 Rp620.51
Rp5,000.00 Rp45,000.00
Rp5,000.00 Rp15,000.00
Rp6,250.00 Rp34,596.88
Rp10,375.00 Rp127,664.38
Rp15,000.00 Rp226,695.00
Rp22,500.00 Rp1,728.20
Rp5,000.00 Rp60,000.00
Rp5,000.00 Rp30,000.00
Rp965,188.63
Rp6,495.00 Rp1,475,689.98
Rp9,400.00 Rp3,203,576.40
Rp5,750.00 Rp653,211.50
Rp6,495.00 Rp1,065,654.13
Rp9,400.00 Rp2,313,429.30
Rp5,750.00 Rp471,709.87
Rp6,495.00 Rp3,134,857.22
Rp9,400.00 Rp6,805,463.70
Rp5,750.00 Rp1,387,638.88
Rp20,511,230.98
Rp41,800.00 Rp5,266,572.19
Rp3,898,400.00 Rp3,898,400.00
Rp1,436,776.00 Rp1,436,776.00
Rp2,536,776.00 Rp2,536,776.00
Rp151,864.00 Rp151,864.00
Rp13,290,388.19
Rp934,625,844.33
Rp4,565,832.17
100%
75.35
109.6
30 minggu
119
https://www.monotaro.id/p104977372.html
https://www.mitra10.com/onduvilla-genteng-antrachite-black-106x40x3mm
https://www.monotaro.id/p108329272.html
https://www.monotaro.id/p105214535.html
https://www.mitra10.com/onduvilla-genteng-antrachite-black-106x40x3mm
https://www.mitra10.com/tidy-1619-white-shiponic-one-piece-toilet
https://www.mitra10.com/toto-lw246j-wastafel-gantung
https://www.mitra10.com/onda-exclusive-rs15-shower-column-set
https://www.mitra10.com/toto-saringan-air-lantai-kamar-mandi-floor-drain-bulat-tx1da
https://www.mitra10.com/schneider-domae-mcb-box-8-modul-transparan
https://www.mitra10.com/schneider-domae-mcb-box-8-modul-transparan
https://www.mitra10.com/schneider-domae-mcb-box-8-modul-transparan
https://www.mitra10.com/panasonic-nlp73412031-frosted-150mm-white-dl-l
https://www.mitra10.com/philips-5798901-59466-150-17w-65k-meson-cd-g3
https://www.monotaro.id/p105212519.html
https://www.monotaro.id/p102058015.html
https://www.monotaro.id/p102058534.html
https://www.monotaro.id/p102058725.html
https://www.monotaro.id/p102059357.html
https://www.monotaro.id/p102046005.html
https://www.monotaro.id/p102046043.html
https://www.monotaro.id/p102059555.html
https://www.asiapetir.com/?gclid=Cj0KCQiAgqGrBhDtARIsAM5s0_km4f1ykBeJ5m9D-HmAX
https://atonergi.com/biaya-pasang-panel-surya-per-meter-terbaru-2023/
https://www.monotaro.id/p104821107.html
https://www.monotaro.id/p104821693.html
https://www.monotaro.id/p104821107.html
https://www.monotaro.id/p104821693.html
https://www.monotaro.id/p104821107.html
https://www.monotaro.id/p104821693.html
142.8
61.9
204.7
rain-bulat-tx1da
m4f1ykBeJ5m9D-HmAXI14v7PVQOG0scxIADp6GmjC1qkUjtqdJL4aAqHIEALw_wcB
NO
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.1
2
2.1
2.2
2.3
3
3.1
3.2
3.3
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
5
5.1
5.2
5.3
5.4
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
8
8.1
8.2
8.3
8.5
8.6
8.7
8.8
8.9
9
9.1
9.2
9.3
10
10.1
10.2
URAIANPEKERJAAN
TAHAP I
PEKERJAAN PERSIAPAN
PEK. GALIAN UNTUK PONDASI.
PEK. ANTI RAYAP UNTUK PONDASI ( 80% )
SISTEM SLAB ON GROUND
PEK. COR PONDASI TAPAK + PEDESTAL KOLOM
PEK. PIPA HORIZONTAL MEP LT.1 + SPARING PIPA MEP LT.1
PEK. COR TIE BEAM
PEK PLAT LT.1
BUANG TANAH GALIAN PONDASI
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI
TAHAP II
PEK.
PEK. KOLOM LT.1&(SISTEM
COR BALOK FREE
PLAT LT.2, STANDING)
PEK. TANGGA LT.2 KE LT.1, SPARING ME LT.2 & PIPA
TEGAK AH
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP III
PEK. KOLOM LT.2 (SISTEM FREE STANDING)
PEK. PASANG SEPTIC TANK DAN GROUND TANK
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP IV
PEK. COR BALOK LT.3
PEK COR KOLOM LT.3
PEK TANGGA
PEK. COR RING BALOK
PEK. INST.AIR BERSIH LT.2 + CONNECT PIPA TEGAK & HORISONTAL LT.1
PEK. PASANGAN BATA + PEK. RING BALOK ATAP + PLESTER ACI LT. ATAP + OPENING KU
PEK. PASANG GENTENG BITUMEN, AKSESORIS + INCLUDE PLESING DAN BAN-BANAN
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP V
PEK. LISPLANK, RANGKA + PLAFOND OVERSTEK + TERMASUK CAT FINISH
PEK. BATA LT.1 & LT.2 (100%) + KOLOM PRAKTIS + PIPA TEGAK AH, VENT AK, AK, AB
PEK. KERAMIK DINDING KM/WC LT.2 + LT.1 (100%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP VI
PEK. PLESTER LT.2 + LT.1 (100%) + CEK SIKUAN
PEK. ACIAN LT.2 + LT.1 (100%) + PAGAR LUAR DALAM
PEK. CAT DASAR DINDING INTERIOR (100%)
PEK. WIRING LISTRIK LT. 2 + 1 (100%)
PEK. RANGKA PLAFOND LT. 2 + LT.1 (100%)
PEK. TUTUP PLAFOND LT.2 & LT.1 + SHADOW LINE
PEK. CAT DASAR DINDING EKSTERIOR (100%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP VII
PEK. KERAMIK LANTAI UMUM, KM/WC LT.2 + BALKON
PEK. CAT DINDING EKSTERIOR ( LAPIS 1 & 2 )
PEK. KUSEN +PINTU ALUMINIUM (TERMASUK AKSESORIS) + JENDELA LT.2 + LT.1 (100%
PEK. BAK KONTROL + TEMPAT SAMPAH
PEK. CAT DINDING INTERIOR ( LAPIS 1 & 2 )
PEK. KUSEN +PINTU KAYU (TERMASUK AKSESORIS) LT.2 + LT.1 (100%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP VIII
PEK. KERAMIK LANTAI UMUM, KM/WC LT.1 + TANGGA + DAPUR
PEK. FLEXITILE + WATER PROOFING
PEK. KERAMIK TERAS DAN CARPORT (100%)
PEK. CAT FINISH DINDING INTERIOR, EKSTERIOR (100%) LAPIS 3
PEK. ARMATURE LT.2 DAN LT.1
PEK. AS BUILT DRAWING MEP (DENAH, TAMPAK & POTONGAN) + TERMASUK JILID & SO
PEK. ATAP
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP IX
PEKERJAAN PASANG SANITAIR+ ELECTRICAL SYSTEM
PEK. ANTI RAYAP TAMAN (20%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
TAHAP X
TARIK KUNCI (TERMASUK MATERIAL YG DIKEMBALIKAN + VO TAMBAH KURANG + TES F
SERAH TERIMA (KELENGKAPAN BAST)
100%
5/14/2025 5/18/2025
VENT AK, AK, AB 4.80% 3
5.62% 3 5/21/2025 5/18/2025
RANG) 0.03% 3 5/28/2025 5/18/2025
SUB TOTAL 10.68%
0.22%
0.42%
0.41% 0.00%
0.07%
2.06% 2.06%
3.97%
0.52%
0.01% 0.01% 0.01% 0.01% 0.01%
2.50% 2.50%
0.01% 0.01%
1.78% 1.78%
2.08%
2.30%
0.01% 0.01%
2.51% 2.51% 2.18% 2.61% 2.61% 1.78% 6.16%
23.03% 25.54% 27.72% 30.33% 32.95% 34.73% 40.89%
MAR
APR
17-23 24-30 31-6 7-13 14-20 21-27 28-4
16 17 18 19 20 21 22
1.78%
2.08% 2.08%
0.13% 0.13%
0.85% 0.85%
0.01% 0.01%
2.30% 2.30% 2.30%
1.10% 1.10% 1.10%
0.01% 0.01% 0.01%
0.11%
1.60%
0.01%
7.40% 6.48% 4.26% 0.00% 0.00% 0.00% 1.72%
48.29% 54.77% 59.02% 59.02% 59.02% 59.02% 60.75%
MEI JUN
5-11 12-18 19-25 26-1 2-8 9-15 16-22
23 24 25 26 27 28 29
0.11%
1.60% 1.60%
1.87% 1.87% 1.87%
0.01% 0.01% 0.01%
0.65% 0.65%
0.62% 0.62%
0.30%
0.02% 0.02%
0.36% 0.36%
0.47% 0.47%
0.15% 0.15%
0.01% 0.01% 0.01% 0.01%
1.71% 1.71%
0.88%
1.25%
0.02%
0.27%
2.08%
0.02% 0.02%
1.10% 1.10%
0.94% 0.94%
1.10% 1.10%
0.53%
0.75%
0.07%
1.65% 1.65%
0.01% 0.01% 0.01%
2.96% 2.96%
0.11%
0.02% 0.02%
0.46%
100.00%
No Uraian Pekerjaan Koefisien Satuan
I Pekerjaan Persiapan
1 Pembersihan Lokasi per 1 m3
A TENAGA
Tukang 0.040 OH
Mandor 0.005 OH
B BAHAN
- -
C PERALATAN
- -
B BAHAN
Kayu Kaso 5/7 0.012 m3
Kayu Papan 3/20 0.007 m3
Paku 2"-3" 0.020 kg
3 PERALATAN
- -
B BAHAN - -
Seng gelombang 0.20 mm x 1,8 m x 80 cm 1.500 Lbr
Dolken kayu Ø 6-8/400 cm 1.050 Batang
Paku 5-10 cm 0.020 kg
Multiplex 9mm 1.150 lembar
C PERALATAN
- -
4 Air Kerja
A UPAH
Air Perbulan 1.000 Bln
5 Listrik Kerja
A UPAH
1 Listrik Perbulan 1.000 Bln
6 Alat Kerja
C PERALATAN
Alat Bor 1.000 bh
Alat Gerindra 1.000 bh
Gergaji 1.000 bh
Palu 1.000 bh
Cangkul 1.000 bh
7 As Built Drawing
A UPAH
1 Drafter 1.000 Ls
9 Mob Demob
10 Keamanan
1 Satpam 1.000 bln
B BAHAN
C PERALATAN
- -
2 Urug pasir 10 cm bawah pile cap, tie beam, plat lantai dasar, pondasi + Pemadatan
A TENAGA
Pekerja 0.270 OH
Mandor 0.014 OH
B BAHAN
Pasir Urug 1.150 m3
C PERALATAN
- -
B BAHAN
- -
C PERALATAN
- -
B BAHAN
Semen Portland 230.000 kg
Pasir Beton 893.000 kg
Kerikil (Maks 30 mm) 1027.000 kg
Air 200.000 liter
C PERALATAN
- -
2 Membuat 1 m3 beton mutu f’c = 25MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
A TENAGA
Pekerja 1.650 OH
Tukang Batu 0.275 OH
Kepala Tukang 0.028 OH
Mandor 0.083 OH
B BAHAN
Semen Portland 371.000 kg
Pasir Beton 689.000 kg
Kerikil (Maks 30 mm) 1047.000 kg
Air 215.000 liter
C PERALATAN
- -
B BAHAN
Besi Beton Ulir 13 1.015 kg
Kawat beton 0.015 kg
C PERALATAN
- -
B BAHAN
Besi Beton Polos 8 1.015 kg
Kawat beton 0.015 kg
C PERALATAN
- -
5 Pembesian Besi Polos Ø10
A TENAGA
Pekerja 0.005 OH
Tukang Besi 0.005 OH
Mandor 0.001 OH
B BAHAN
Besi Beton Polos 10 1.015 kg
Kawat beton 0.015 kg
C PERALATAN
- -
B BAHAN
Besi Beton Ulir 10 1.015 kg
Kawat beton 0.015 kg
C PERALATAN
- -
B BAHAN
Besi Beton Ulir 16 1.015 kg
Kawat beton 0.015 kg
C PERALATAN
- -
B BAHAN
Multipleks 9 mm 0.208 kg
Kayu Kelas III (Pinus) 0.020 kg
Paku 5-10 cm 0.300 kg
C PERALATAN
- -
B BAHAN
Multipleks 9 mm 0.208 kg
Kayu Kelas III (Pinus) 0.020 kg
Paku 5-10 cm 0.300 kg
C PERALATAN
- -
B BAHAN
Multipleks 9 mm 0.208 kg
Kayu Kelas III (Pinus) 0.020 kg
Paku 5-10 cm 0.300 kg
C PERALATAN
- -
B BAHAN
Multipleks 9 mm 0.208 kg
Kayu Kelas III (Pinus) 0.020 kg
Paku 5-10 cm 0.300 kg
C PERALATAN
- -
B BAHAN
Multipleks 9 mm 0.208 kg
Kayu Kelas III (Pinus) 0.020 kg
Paku 5-10 cm 0.300 kg
C PERALATAN
- -
Harga Satuan Jumlah
Rp120,000.00 Rp4,800.00
Rp150,000.00 Rp750.00
Jumlah (A + B + C) Rp5,550.00
Overhead (10%) Rp555.00
Sub total Rp6,105.00
PPH (11%) Rp671.55
TOTAL Rp6,777.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp135,000.00 Rp1,350.00
Rp150,000.00 Rp750.00
Rp24,445.00 Rp293.34
Rp4,895.00 Rp34.27
Rp20,000.00 Rp400.00
Jumlah (A + B + C) Rp27,327.61
Overhead (10%) Rp2,732.76
Sub total Rp30,060.37
PPH (11%) Rp3,306.64
TOTAL Rp33,368.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp135,000.00 Rp1,350.00
Rp150,000.00 Rp750.00
-
Rp47,000.00 Rp70,500.00
Rp16,000.00 Rp16,800.00
Rp17,000.00 Rp340.00
Rp97,753.00 Rp112,415.95
Jumlah (A + B + C) Rp226,655.95
Overhead (10%) Rp22,665.60
Sub total Rp249,321.55
PPH (11%) Rp27,425.37
TOTAL Rp276,747.00
Rp100,000.00 Rp100,000.00
Jumlah (A + B + C) Rp100,000.00
Overhead (10%) Rp10,000.00
Sub total Rp110,000.00
PPH (11%) Rp12,100.00
TOTAL Rp122,100.00
Rp100,000.00 Rp100,000.00
Jumlah (A + B + C) Rp100,000.00
Overhead (10%) Rp10,000.00
Sub total Rp110,000.00
PPH (11%) Rp12,100.00
TOTAL Rp122,100.00
Rp659,000.00 Rp659,000.00
Rp489,000.00 Rp489,000.00
Rp95,000.00 Rp95,000.00
Rp43,000.00 Rp43,000.00
Rp54,000.00 Rp54,000.00
Jumlah (A + B + C) ###
Overhead (10%) Rp134,000.00
Sub total ###
PPH (11%) Rp162,140.00
TOTAL ###
Rp500,000.00 Rp500,000.00
Jumlah (A + B + C) Rp500,000.00
Overhead (10%) Rp50,000.00
Sub total Rp550,000.00
PPH (11%) Rp60,500.00
TOTAL Rp610,500.00
Rp3,500,000.00 ###
Rp250,000.00 Rp250,000.00
Jumlah (A + B + C) ###
Overhead (10%) Rp375,000.00
Sub total ###
PPH (11%) Rp453,750.00
TOTAL ###
Rp200,000.00 Rp200,000.00
Jumlah (A + B + C) Rp200,000.00
Overhead (10%) Rp20,000.00
Sub total Rp220,000.00
PPH (11%) Rp24,200.00
TOTAL Rp244,200.00
Rp1,800,000.00 ###
Jumlah (A + B + C) ###
Overhead (10%) Rp180,000.00
Sub total ###
PPH (11%) Rp217,800.00
TOTAL ###
Rp250,000.00 Rp250,000.00
Jumlah (A + B + C) Rp250,000.00
Overhead (10%) Rp25,000.00
Sub total Rp275,000.00
PPH (11%) Rp30,250.00
TOTAL Rp305,250.00
Rp120,000.00 Rp48,000.00
Rp150,000.00 Rp3,000.00
- -
Jumlah (A + B + C) Rp51,000.00
Overhead (10%) Rp5,100.00
Sub total Rp56,100.00
PPH (11%) Rp6,171.00
TOTAL Rp62,271.00
asi + Pemadatan
Rp120,000.00 Rp32,400.00
Rp150,000.00 Rp2,100.00
Rp155,173.00 Rp178,448.95
- -
Jumlah (A + B + C) Rp212,948.95
Overhead (10%) Rp21,294.90
Sub total Rp234,243.84
PPH (11%) Rp25,766.82
TOTAL Rp260,011.00
Rp120,000.00 Rp26,400.00
Rp150,000.00 Rp1,650.00
- -
- -
Jumlah (A + B + C) Rp28,050.00
Overhead (10%) Rp2,805.00
Sub total Rp30,855.00
PPH (11%) Rp3,394.05
TOTAL Rp34,250.00
m, w/c = 0,87
Rp120,000.00 Rp144,000.00
Rp125,000.00 Rp25,000.00
Rp130,000.00 Rp2,600.00
Rp150,000.00 Rp9,000.00
Rp1,136.00 Rp261,280.00
Rp191.07 Rp170,625.51
Rp268.00 Rp275,236.00
Rp50.00 Rp10,000.00
- -
Jumlah (A + B + C) Rp897,741.51
Overhead (10%) Rp89,774.15
Sub total Rp987,515.66
PPH (11%) Rp108,626.72
TOTAL ###
0) mm, w/c = 0,58
Rp120,000.00 Rp198,000.00
Rp125,000.00 Rp34,375.00
Rp130,000.00 Rp3,640.00
Rp150,000.00 Rp12,450.00
Rp1,136.00 Rp421,456.00
Rp191.07 Rp131,647.23
Rp268.00 Rp280,596.00
Rp50.00 Rp10,750.00
- -
Jumlah (A + B + C) ###
Overhead (10%) Rp109,291.42
Sub total ###
PPH (11%) Rp132,242.62
TOTAL ###
Rp120,000.00 Rp600.00
Rp125,000.00 Rp625.00
Rp150,000.00 Rp150.00
Rp7,864.00 Rp7,981.96
Rp19,509.00 Rp292.64
- -
Jumlah (A + B + C) Rp9,649.60
Overhead (10%) Rp964.96
Sub total Rp10,614.55
PPH (11%) Rp1,167.60
TOTAL Rp11,783.00
Rp120,000.00 Rp600.00
Rp125,000.00 Rp625.00
Rp150,000.00 Rp150.00
Rp8,945.00 Rp9,079.18
Rp19,509.00 Rp292.64
- -
Jumlah (A + B + C) Rp10,746.81
Overhead (10%) Rp1,074.68
Sub total Rp11,821.49
PPH (11%) Rp1,300.36
TOTAL Rp13,122.00
Rp120,000.00 Rp600.00
Rp125,000.00 Rp625.00
Rp150,000.00 Rp150.00
Rp7,541.00 Rp7,654.11
Rp19,509.00 Rp292.64
- -
Jumlah (A + B + C) Rp9,321.75
Overhead (10%) Rp932.17
Sub total Rp10,253.92
PPH (11%) Rp1,127.93
TOTAL Rp11,382.00
Rp120,000.00 Rp600.00
Rp125,000.00 Rp625.00
Rp150,000.00 Rp150.00
Rp8,851.00 Rp8,983.77
Rp19,509.00 Rp292.64
- -
Jumlah (A + B + C) Rp10,651.40
Overhead (10%) Rp1,065.14
Sub total Rp11,716.54
PPH (11%) Rp1,288.82
TOTAL Rp13,006.00
Rp120,000.00 Rp600.00
Rp125,000.00 Rp625.00
Rp150,000.00 Rp150.00
Rp8,842.00 Rp8,974.63
Rp19,509.00 Rp292.64
- -
Jumlah (A + B + C) Rp10,642.27
Overhead (10%) Rp1,064.23
Sub total Rp11,706.49
PPH (11%) Rp1,287.71
TOTAL Rp12,995.00
Rp120,000.00 Rp15,000.00
Rp125,000.00 Rp15,625.00
Rp130,000.00 Rp1,690.00
Rp150,000.00 Rp600.00
Rp32,921.00 Rp6,847.57
Rp3,500,000.00 Rp70,000.00
Rp17,000.00 Rp5,100.00
- -
Jumlah (A + B + C) Rp114,862.57
Overhead (10%) Rp11,486.26
Sub total Rp126,348.82
PPH (11%) Rp13,898.37
TOTAL Rp140,248.00
Rp120,000.00 Rp15,960.00
Rp125,000.00 Rp16,625.00
Rp130,000.00 Rp17,290.00
Rp150,000.00 Rp600.00
Rp32,921.00 Rp6,847.57
Rp3,500,000.00 Rp70,000.00
Rp17,000.00 Rp5,100.00
- -
Jumlah (A + B + C) Rp132,422.57
Overhead (10%) Rp13,242.26
Sub total Rp145,664.82
PPH (11%) Rp16,023.13
TOTAL Rp161,688.00
Rp120,000.00 Rp24,000.00
Rp125,000.00 Rp25,000.00
Rp130,000.00 Rp2,600.00
Rp150,000.00 Rp1,050.00
Rp32,921.00 Rp6,847.57
Rp3,500,000.00 Rp70,000.00
Rp17,000.00 Rp5,100.00
- -
Jumlah (A + B + C) Rp134,597.57
Overhead (10%) Rp13,459.76
Sub total Rp148,057.32
PPH (11%) Rp16,286.31
TOTAL Rp164,344.00
Rp120,000.00 Rp15,960.00
Rp125,000.00 Rp16,625.00
Rp130,000.00 Rp17,290.00
Rp150,000.00 Rp600.00
Rp32,921.00 Rp6,847.57
Rp3,500,000.00 Rp70,000.00
Rp17,000.00 Rp5,100.00
- -
Jumlah (A + B + C) Rp132,422.57
Overhead (10%) Rp13,242.26
Sub total Rp145,664.82
PPH (11%) Rp16,023.13
TOTAL Rp161,688.00
Rp120,000.00 Rp24,000.00
Rp125,000.00 Rp25,000.00
Rp130,000.00 Rp2,600.00
Rp150,000.00 Rp1,050.00
Rp32,921.00 Rp6,847.57
Rp3,500,000.00 Rp70,000.00
Rp17,000.00 Rp5,100.00
- -
Jumlah (A + B + C) Rp134,597.57
Overhead (10%) Rp13,459.76
Sub Total Rp148,057.32
PPH (11%) Rp16,286.31
TOTAL Rp164,344.00
Tie Beam Pelat Lt. 1
Lokasi Tipe Lebar Panjang Volume (m2) Lokasi Tipe
A1-16 0.2 15.247 3.049 1-3/A-C
B3-16 0.2 10.047 2.009 1-3/D-G
C3-16 0.2 10.047 2.009 3-4/A-C
D1-3 0.2 5.200 1.040 3-4/C-G
G1-17 0.2 16.847 3.369 4-6/A-C
1A-G 0.2 6.850 1.370 4-6/C-G
3A-G 0.2 6.850 1.370 6-9/A-C
TB 200/400 S120
4A-G 0.2 6.850 1.370 6-9/C-G
6A-G 0.2 6.850 1.370 9-12/A-C
9A-G 0.2 6.850 1.370 9-12/C-G
12A-G 0.2 6.850 1.370 12-16/A-C
13C-G 0.2 2.925 0.585 12-13/C-G
15C-G 0.2 2.925 0.585 13-15/C-G
16A-G 0.2 6.850 1.370 15-16/C-G
22.238
Pelat Lt. 1
Lx Ly Volume (m2)
5.075 5.2 26.390
1.775 5.2 9.230
3.925 1.08 4.239
2.925 1.08 3.159
3.925 2.017 7.917
2.925 2.017 5.900
3.925 1.725 6.771
2.925 1.725 5.046
3.925 0.925 3.631
2.925 0.925 2.706
3.925 4.2 16.485
2.925 0.575 1.682
2.925 1.8 5.265
2.925 1.825 5.338
103.757 125.995
ukuran
Tipe
No Posisi Tulangan Bekisting (m2)
pondasi panjang Lebar tebal tinggi pasir urug
Atas
1 PT1 0.8 0.8 0.2 0.1 0.64
bawah
Atas
2 PT2 0.6 0.6 0.2 0.1 0.48
bawah
Atas
3 PT3 0.7 0.7 0.2 0.1 0.56
bawah
Volume Volume
Bekistin volume beton Volume lantai Volume
No Tipe pondasi Galian pasir urug
g (m2) (m3) kerja (m3) Tulangan (Kg)
(m3) (m3)
1.58
0.128 0.128 0.064 0.0064
1.58
1.58
0.072 0.072 0.036 0.0036
1.58
1.58
0.098 0.098 0.049 0.0049
1.58
Banyak Pondasi
2
14
Kebutuhan Tulangan
Diameter Banyak Panjang Tulangan Total (kg)
Volume Tulangan
Tulangan (m)
0.016 17 7.288 23.03008
43.53216
0.016 17 6.488 20.50208
0.016 6 2.864 9.05024
16.20448
0.016 6 2.264 7.15424
0.016 8 3.732 11.79312
21.37424
0.016 8 3.032 9.58112
KOLOM
Tipe K6 K45
Dimensi H 150 V 650 H 150
Tulangan ∑ 20 D 16 ∑ 14
Sengkang d 10 J 150 d 10
TIE BEAM
Tipe TB 200/400
Dimensi H 200 V 400
Tul. Atas ∑ 2 D 10
Tul. Bawah ∑ 2 D 10
Tul. Pggng ∑ 2 D 10
Sengkang d 10 J 150
3.900
11.197 0.896 13.44 6 0.01 0.62
0.150
0.000 10.047 0.804 12.06 6 0.01 0.62
1.950
7.797 0.624 9.36 6 0.01 0.62
0.300
0.000 5.200 0.416 6.24 6 0.01 0.62
5.200
11.197 0.896 13.44 6 0.01 0.62
0.450
Dimensi Kolom
Tipe Lokasi Jumlah
Lebar (m) Panjang (m)
REKAPITULASI
Lt 1 Lt 2 Lt 3 Atap TOTAL
Tulangan 2388 2225.03 2143.21 315.83 7072.07
Bekisting 149.8 141.4 134.4 19.04 444.64
Beton 9.11 8.56 8.19 1.11 26.97
tinggi total
lebar (mm) panjang (mm)
(mm)
K6 3 13 5278
K45 3 9 213.5
K35 3 7 112
K45 K35
150 V 450 H 150 V 350
14 D 13 ∑ 10 D 16
10 J 150 d 10 J 150
ensi Kolom
Vol. Tul.
Volume Beton Kebutuhan Jumlah tul. Diameter tul.
Berat besi Utama Total
Total (m3) Bekisting utama 1 kolom utama (m)
(kg)
Tinggi (m)
LANTAI 1
3.5 8.87 145.60 16 0.016 1.58 2296.89
3.5 0.24 4.20 14 0.013 1.04 51.03
LANTAI 2
3.5 7.85 128.80 16 0.016 1.58 2031.87
3.5 0.71 12.60 14 0.013 1.04 153.09
LANTAI 3
3.5 8.19 134.40 16 0.016 1.58 2120.21
ATAP
1.4 0.82 13.44 16 0.016 1.58 212.02
1.4 0.29 5.60 10 0.016 1.58 88.34
kebutuhan
balsa 3mm x
volume
3mm x
1000mm
205842 22.8713333333
5764.5 0.6405
2352 0.26133333333
23.7731666667
≈ 24
Jarak sengkang (m) Jumlah tul. skg 1 kolom Panjang sengkang (m)
REKAPITULASI
LOKASI BETON(M3) BEKISTING(M2) BESI(KG)
LT1 10.664 103.757 490.875
LT2 6.274 67.808 323.584
LT3 5.465 59.721 287.751
LT ATAP 7.128 77.576 373.237
ATAP 6.326 59.093 255.427
TOTAL 35.858 367.955 1730.875
S120
Pengurangan Sloof
Beton(m3) Bekisting (m2)
Kiri Kanan Atas Bawah
PELAT LT1
0.1 0.1 0.1 0.1 2.925 26.390
0.1 0.1 0.1 0.1 0.945 9.230
0.1 0.1 0.1 0.1 0.393 4.239
0.1 0.1 0.1 0.1 0.288 3.159
0.1 0.1 0.1 0.1 0.812 7.917
0.1 0.1 0.1 0.1 0.594 5.900
0.1 0.1 0.1 0.1 0.682 6.771
0.1 0.1 0.1 0.1 0.499 5.046
0.1 0.1 0.1 0.1 0.324 3.631
0.1 0.1 0.1 0.1 0.237 2.706
0.1 0.1 0.1 0.1 1.788 16.485
0.1 0.1 0.1 0.1 0.123 1.682
0.1 0.1 0.1 0.1 0.523 5.265
0.1 0.1 0.1 0.1 0.531 5.338
PELAT LT.2
0.15 0.15 0.15 0.15 0.069 1.125
0.15 0.15 0.15 0.15 0.210 2.800
0.15 0.15 0.15 0.15 0.220 2.925
0.15 0.15 0.15 0.15 1.217 12.156
0.15 0.15 0.15 0.15 0.445 5.033
0.15 0.15 0.15 0.15 0.924 9.518
0.15 0.15 0.15 0.15 0.338 3.941
0.15 0.15 0.15 0.15 0.158 2.340
0.15 0.15 0.15 0.15 0.408 4.978
0.15 0.15 0.15 0.15 1.237 12.390
0.15 0.15 0.15 0.15 1.047 10.603
PELAT LT.3
0.15 0.15 0.15 0.15 0.774 8.164
0.15 0.15 0.15 0.15 0.561 6.084
0.15 0.15 0.15 0.15 0.747 7.917
0.15 0.15 0.15 0.15 0.273 3.278
0.15 0.15 0.15 0.15 0.374 4.306
0.15 0.15 0.15 0.15 0.360 4.290
0.15 0.15 0.15 0.15 0.330 3.859
0.15 0.15 0.15 0.15 0.480 5.338
0.15 0.15 0.15 0.15 0.798 8.380
0.15 0.15 0.15 0.15 0.768 8.105
PELAT LT.ATAP
0.15 0.15 0.15 0.15 0.774 8.164
0.15 0.15 0.15 0.15 0.561 6.084
0.15 0.15 0.15 0.15 0.845 8.800
0.15 0.15 0.15 0.15 0.541 5.900
0.15 0.15 0.15 0.15 0.740 7.751
0.15 0.15 0.15 0.15 0.176 2.451
0.15 0.15 0.15 0.15 0.940 9.656
0.15 0.15 0.15 0.15 0.087 1.682
0.15 0.15 0.15 0.15 0.798 8.380
0.15 0.15 0.15 0.15 0.153 2.070
0.15 0.15 0.15 0.15 0.266 3.195
0.15 0.15 0.15 0.15 0.768 8.105
0.15 0.15 0.15 0.15 0.480 5.338
PELAT ATAP
0.15 0.15 0.15 0.15 3.792 35.106
0.15 0.15 0.15 0.15 2.534 23.987
114.312
42.744
22.374
16.944
37.611
28.484
32.863
24.888
19.854
15.036
73.110
10.725
25.812
26.119
6.754
15.320
15.959
55.174
24.379
44.246
19.551
13.496
24.607
55.811
48.287
38.636
29.260
37.611
16.619
21.167
21.226
19.191
26.119
39.530
38.392
38.636
29.260
41.270
28.484
36.280
13.030
44.815
10.725
39.530
11.131
16.300
37.658
26.119
150.721
104.706
KOLOM
Tipe K6 K45
Dimensi H 150 V 650 H 150
Tulangan ∑ 20 D 16 ∑ 14
Sengkang d 10 J 150 d 10
BALOK
Tipe B 150/400 B 200/400
Dimensi H 150 V 450 H 200
Tul. Atas ∑ 3 D 16 ∑ 2
Tul. Bawah ∑ 3 D 16 ∑ 2
Tul. Pggng ∑ - D - ∑ -
Sengkang d 10 J 150 d 10
REKAPITULASI
Lt 1 Lt 2 Lt 3 Atap TOTAL
Tulangan 907.23 948.13 994.15 258.36 3107.87
Bekisting 116.59 121.99 131.57 32.99 403.14
Beton 11.17 11.44 12.33 3.09 38.04
3.900
0.150 6.097 0.915 9.76 4 0.013 1.04
0.900
0.300 3.797 0.570 6.08 4 0.013 1.04
0.650
10.247 1.537 16.40 4 0.013 1.04
0.150
0.650
5.797 0.870 9.28 4 0.013 1.04
0.300
3.250 2.272 0.000 3.64 4 0.013 1.04
0.150 1.410 0.212 2.26 4 0.013 1.04
4.875
1.997 0.300 3.20 4 0.013 1.04
0.450
1.625 1.900 0.869 3.04 4 0.013 1.04
0.300
6.400 0.960 10.24 4 0.013 1.04
0.150
0.150
6.250 0.937 10.00 4 0.013 1.04
0.450
0.300
6.400 0.960 10.24 4 0.013 1.04
0.150
0.225
5.025 0.754 8.04 4 0.013 1.04
0.300
0.225 1.075 0.161 1.72 4 0.013 1.04
0.300
6.250 0.938 10.00 4 0.013 1.04
0.300
0.150
1.325 0.199 2.12 4 0.013 1.04
0.300
0.225 3.700 0.555 5.92 4 0.013 1.04
0.150
2.550 0.382 4.08 4 0.013 1.04
0.225
0.600 6.250 0.938 10.00 4 0.013 1.04
0.300
6.400 0.960 10.24 4 0.013 1.04
0.150
0.300
6.400 0.960 10.24 4 0.013 1.04
0.150
0.450
6.250 0.937 10.00 4 0.013 1.04
0.150
0.150
4.775 0.716 7.64 4 0.013 1.04
0.150
0.075 1.550 0.232 2.48 4 0.013 1.04
0.150 3.775 0.566 6.04 4 0.013 1.04
0.300 6.550 0.982 10.48 4 0.013 1.04
0.150
2.625 0.394 4.20 4 0.013 1.04
0.150
0.225 3.700 0.555 5.92 4 0.013 1.04
0.150
2.550 0.382 4.08 4 0.013 1.04
0.225
0.450 6.400 0.960 10.24 4 0.013 1.04
3mm x
tinggi (mm) volume 1000mm
5039.22 302353.2 33.5948
≈ 34
B 300/450 B 300/500
300 V 450 H 300 V 500
4 D 13 ∑ 2 D 13
4 D 13 ∑ 2 D 13
- D - ∑ - D -
10 J 150 d 10 J 150
Vol. Tul. Jarak sengkang (m) Jumlah tul. skg 1 balok Panjang sengkang (m)
Utama Total Panjang skg Bengkokan
(kg) Tumpuan Lapangan Tumpuan Lapangan
by dimensi (m)
BALOK
Tipe RING BALOK
Dimensi H 300 V 400
Tul. Atas ∑ 2 D 13
Tul. Bawah ∑ 2 D 13
Tul. Pggng ∑ - D -
Sengkang d 10 J 150
0.150
5.400 0.648 7.56 4 0.013 1.04
0.150
0.225
5.325 0.639 7.46 4 0.013 1.04
0.150
0.150 6.700 0.804 9.38 4 0.013 1.04
0.450 6.400 0.768 8.96 4 0.013 1.04
3.728 43.497
Vol. Tul. Jarak sengkang (m) Jumlah tul. skg 1 balok Panjang sengkang (m)
Utama Total Panjang skg Bengkokan
(kg) Tumpuan Lapangan Tumpuan Lapangan
by dimensi (m)
Ukuran
Judul Anak Tangga Panjang Panjang Miring Lebar Antrede
Tul. Utama 1-10 - 2.9025 0.965
Tul. Pembagi 1-10 - 2.9025 0.965
B BAHAN
Bata Merah Biasa 0.035 m3
Semen Tiga Roda @50kg 0.050 zak
Pasir Pasang 0.022 m3
C PERALATAN
Alat Bantu Pas. Bata 1.000 Ls
Steger Pasangan Bata dan Plasteran 1.000 Ls
B BAHAN
Rooster 0.035 m3
Semen Portland 0.050 zak
Pasir Pasang 0.015 m3
C PERALATAN
- -
C PERALATAN
- -
4 Pekerjaan 1 m2 Acian Semen Biasa
A TENAGA
Pekerja 0.071 OH
Tukang Batu 0.071 OH
Mandor 0.007 OH
B BAHAN
Semen Tiga Roda 50 kg 0.059 zak
C PERALATAN
- -
B BAHAN
HT 300x600 mm Matte ex. Roman 0.035 dus
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.648 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Roman Floor Tile Uk.60x60 cm glossy 1.100 dus
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.233 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Roman Floor Tile Uk.33x33 cm 1.100 dus
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.389 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Finish Vinyl 3 mm, 152,4x914,4 mm 0.035 m2
Lem Vinyl 0.176 kg
C PERALATAN
Alat Bantu Potong Vinyl 1.000 Ls
B BAHAN
Keramik Asia Tile Alpha Grey 20x20 0.035 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.648 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
10 Pasang K.M 250x400 Signature Keramik Dinding Kw.1 Diamond Beige 25x40 Cm Warna Beige M
A TENAGA
Pekerja 0.100 OH
Tukang Batu 0.100 OH
B BAHAN
Signature Keramik Dinding Kw.1 Diamond Beige 25 0.035 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.648 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Keramik plint, uk.10x60 cm 0.110 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.065 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
D Biaya Koordinasi Turun Material
Keramik plint, uk.10x60 cm 0.110 m3
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 kg
B BAHAN
Keramik plint, uk.10x40 cm 0.110 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.052 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Kayu plint H=100 mm 0.110 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.052 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
14 Plafond Gypsum 9 mm
A TENAGA
Pekerja 0.100 OH
Tukang Gali 0.100 OH
B BAHAN
Gypsum Polos 9 mm, ex. Elephant 0.365 lbr
Hollow 20/40 Galvanis 0.625 btg
C PERALATAN
Alat dan material bantu pasang plafond gypsum 1.000 Ls
B BAHAN
List gypsum 6x6 0.365 m'
Compound gypsum 0.150 kg
C PERALATAN
Alat bantu pas.list gypsum 1.000 Ls
B BAHAN
Cat dasar undercoat 0.004 pail
Cat Mowillex Emulsion 0.013 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
B BAHAN
Cat dasar undercoat 0.004 pail
Cat Mowillex Weathercoat 0.013 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
D Biaya Koordinasi Turun Material
Cat Mowillex Weathercoat 1.000 m'
B BAHAN
Cat Plafond Interior Putih Cendana ex.Mowillex 0.018 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
B BAHAN
Cat Plafond Eksterior Weathercoat ex.Mowillex 0.018 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
B BAHAN
Semen Tiga Roda 50kg 0.018 pail
C PERALATAN
Alat Bantu Finishing Lubang Dinding 1.000 Ls
Rp120,000.00 Rp4,320.00
Rp125,000.00 Rp8,875.00
Rp150,000.00 Rp1,050.00
Rp600,000.00 Rp21,000.00
Rp70,000.00 Rp3,500.00
Rp257,000.00 Rp5,654.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp1,750.00
Rp50,000.00 Rp8,750.00
Jumlah (A + B + C + D) Rp154,899.00
Overhead (10%) Rp15,489.90
Sub total Rp170,388.90
PPH (11%) Rp18,742.78
TOTAL Rp189,132.00
Rp120,000 Rp18,000.00
Rp125,000 Rp16,250.00
Rp130,000 Rp1,430.00
Rp150,000 Rp300.00
Rp600,000 Rp21,000.00
Rp70,000 Rp3,500.00
- -
- -
Jumlah (A + B + C + D) Rp60,480.00
Overhead (10%) Rp6,048.00
Sub total Rp66,528.00
PPH (11%) Rp7,318.08
TOTAL Rp73,847.00
Rp120,000.00 Rp8,520.00
Rp125,000.00 Rp8,875.00
Rp150,000.00 Rp1,050.00
Rp70,000.00 Rp4,130.00
- -
Rp50,000.00 Rp2,950.00
Jumlah (A + B + C + D) Rp25,525.00
Overhead (10%) Rp2,552.50
Sub total Rp28,077.50
PPH (11%) Rp3,088.53
TOTAL Rp31,167.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp98,000.00 Rp3,430.00
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp9,720.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp170,458.00
Overhead (10%) Rp17,045.80
Sub total Rp187,503.80
PPH (11%) Rp20,625.42
TOTAL Rp208,130.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp179,000.00 Rp196,900.00
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp3,495.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp357,703.00
Overhead (10%) Rp35,770.30
Sub total Rp393,473.30
PPH (11%) Rp43,282.06
TOTAL Rp436,756.00 ### ###
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp112,500.00 Rp123,750.00
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp5,835.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp286,893.00
Overhead (10%) Rp28,689.30
Sub total Rp315,582.30
PPH (11%) Rp34,714.05
TOTAL Rp350,297.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp98,000.00 Rp3,430.00
Rp142,000.00 Rp24,992.00
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp146,722.00
Overhead (10%) Rp14,672.20
Sub total Rp161,394.20
PPH (11%) Rp17,753.36
TOTAL Rp179,148.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp56,548.00 Rp1,979.18
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp9,720.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp169,007.18
Overhead (10%) Rp16,900.72
Sub total Rp185,907.90
PPH (11%) Rp20,449.87
TOTAL Rp206,358.00
40 Cm Warna Beige Marble
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp70,218.00 Rp2,457.63
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp9,720.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp169,485.63
Overhead (10%) Rp16,948.56
Sub total Rp186,434.19
PPH (11%) Rp20,507.76
TOTAL Rp206,942.00
Rp120,000 Rp12,000.00
Rp125,000 Rp12,500.00
Rp300,000 Rp33,000.00
Rp108,000 Rp540.00
Rp15,000 Rp975.00
Rp50,000 Rp50,000.00
Rp30,000 Rp3,300.00
Rp30,000 Rp150.00
Jumlah (A + B + C + D) Rp112,465.00
Overhead (10%) Rp11,246.50
Sub total Rp123,711.50
PPH (11%) Rp13,608.27
TOTAL Rp137,320.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp55,000.00
Rp108,000.00 Rp540.00
Rp15,000.00 Rp780.00
Rp50,000.00 Rp50,000.00
Rp30,000.00 Rp3,300.00
Rp30,000.00 Rp150.00
Jumlah (A + B + C + D) Rp79,270.00
Overhead (10%) Rp7,927.00
Sub total Rp87,197.00
PPH (11%) Rp9,591.67
TOTAL Rp96,789.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp115,000.00 Rp12,650.00
Rp108,000.00 Rp540.00
Rp15,000.00 Rp780.00
Rp50,000.00 Rp50,000.00
Rp30,000.00 Rp3,300.00
Rp30,000.00 Rp150.00
Jumlah (A + B + C + D) Rp91,920.00
Overhead (10%) Rp9,192.00
Sub total Rp101,112.00
PPH (11%) Rp11,122.32
TOTAL Rp112,235.00
Rp120,000.00 Rp12,000.00
Rp100,000.00 Rp10,000.00
Rp48,838.00 Rp17,825.87
Rp104,000.00 Rp65,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp31,250.00
Jumlah (A + B + C + D) Rp236,075.87
Overhead (10%) Rp23,607.59
Sub total Rp259,683.46
PPH (11%) Rp28,565.18
TOTAL Rp288,249.00
Rp120,000.00 Rp7,200.00
Rp100,000.00 Rp6,000.00
Rp21,000.00 Rp7,665.00
Rp4,250.00 Rp637.50
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp7,500.00
Jumlah (A + B + C + D) Rp109,002.50
Overhead (10%) Rp10,900.25
Sub total Rp119,902.75
PPH (11%) Rp13,189.30
TOTAL Rp133,093.00
Rp120,000.00 Rp3,960.00
Rp120,000.00 Rp8,040.00
Rp1,039,990.00 Rp4,159.96
Rp1,249,990.00 Rp16,249.87
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Jumlah (A + B + C + D) Rp112,409.83
Overhead (10%) Rp11,240.98
Sub total Rp123,650.81
PPH (11%) Rp13,601.59
TOTAL Rp137,253.00
Rp120,000.00 Rp3,960.00
Rp120,000.00 Rp8,040.00
Rp1,039,990.00 Rp4,159.96
Rp2,189,750.00 Rp28,466.75
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Jumlah (A + B + C + D) Rp124,626.71
Overhead (10%) Rp12,462.67
Sub total Rp137,089.38
PPH (11%) Rp15,079.83
TOTAL Rp152,170.00
Rp120,000.00 Rp5,040.00
Rp120,000.00 Rp9,960.00
Rp532,000.00 Rp9,576.00
Rp30,000.00 Rp30,000.00
Jumlah (A + B + C) Rp54,576.00
Overhead (10%) Rp5,457.60
Sub total Rp60,033.60
PPH (11%) Rp6,603.70
TOTAL Rp66,638.00
Rp120,000.00 Rp5,040.00
Rp120,000.00 Rp9,960.00
Rp972,000.00 Rp17,496.00
Rp30,000.00 Rp30,000.00
Jumlah (A + B + C) Rp62,496.00
Overhead (10%) Rp6,249.60
Sub total Rp68,745.60
PPH (11%) Rp7,562.02
TOTAL Rp76,308.00
Rp120,000.00 Rp12,600.00
Rp120,000.00 Rp12,600.00
Rp70,000.00 Rp1,260.00
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Jumlah (A + B + C + D) Rp106,460.00
Overhead (10%) Rp10,646.00
Sub total Rp117,106.00
PPH (11%) Rp12,881.66
TOTAL Rp129,988.00
UKURAN Pengurangan (m2)
No Arah Lokasi Tipe
PANJANG TINGGI BALOK JENDELA
LT 1
1 V 7-11 / A BATA MERAH 2.2 3.5 0.5 -
2 V 11-16 / A BATA MERAH 4.525 1.2 - -
3 V 3-17 / G BATA MERAH 11.647 3.5 0.5 -
3 V 13-16 / C BATA MERAH 3.725 3.5 - -
4 H A-C / 9 BATA MERAH 3.925 3.5 - -
5 H A-B / 16 BATA MERAH 1.85 1.2 0.5 -
6 H C-G / 16 BATA MERAH 2.925 3.5 0.45 -
7 H C-G / 15 BATA MERAH 2.925 3.5 0.5 -
8 H C-G / 13 BATA MERAH 2.925 3.5 0.5
LT 2
1 V 2-17 / G BATA MERAH 12.647 3.5 0.5 -
2 V 4-11 / E BATA MERAH 4.442 3.5 0.5 -
3 V 13-15 / E BATA MERAH 1.8 3.5 0.5 -
4 V 6-12 / C BATA MERAH 2.65 3.5 0.5 5
5 V 3-6 / B BATA MERAH 3.097 3.5 0.5 -
6 V 12-16 / B BATA MERAH TERTUTUP PINTU
7 H B-G / 3 BATA MERAH 5.725 3.5 0.5 6.156
8 H B-C / 6 BATA MERAH TERTUTUP JENDELA
9 H B-C / 12 BATA MERAH TERTUTUP JENDELA
10 H B-G / 16 BATA MERAH 5.725 3.5 0.5 0.72
LT 3
1 V 2-17 / G BATA MERAH 12.647 3.5 0.5 -
2 V 2-4 / D BATA MERAH 2 3.5 0.5 -
3 V 2-7 / A BATA MERAH 4.332 3.5 0.5 -
4 V 4-11 / E BATA MERAH 4.442 3.5 0.5 -
5 V 6-12 / C BATA MERAH 2.65 3.5 0.5 -
6 V 11-16 / A BATA MERAH 4.525 3.5 0.5 -
7 V 11-16 / C BATA MERAH 4.525 3.5 0.5 -
8 V 13-15 / D BATA MERAH 1.8 3.5 0.5 -
9 H A-G / 16 BATA MERAH 6.85 3.5 0.5 -
10 H D-G / 15 BATA MERAH 1.775 3.5 0.5 -
11 H A-C / 14 BATA MERAH 3.925 3.5 0.5 -
12 H D-G / 15 BATA MERAH 1.775 3.5 0.5 -
13 H A-C / 12 BATA MERAH 3.925 3.5 0.5 -
14 H A-D / 6 BATA MERAH 5.075 3.5 0.5 -
15 H D-G / 4 BATA MERAH 1.775 3.5 0.5 -
16 H A-G / 16 BATA MERAH 6.85 3.5 0.5 -
4 6.7
3.8 5.4
Pengurangan (m2) PLESTER ACI
Bata (m2)
KOLOM PINTU LUAR DALAM LUAR DALAM
LT 1
2.4 - 4.200 7.700 7.700 7.260 7.000
1.95 - 3.480 5.430 5.430 4.525 5.190
16.275 - 18.666 40.765 40.765 38.435 40.064
5.075 3.6 4.362 13.038 13.038 12.293 12.338
2.0125 - 11.725 13.737 13.737 12.952 13.038
0.9 - 0.395 2.220 2.220 1.850 1.980
0.45 - 8.471 10.237 10.237 9.653 9.538
2.4 - 6.375 10.237 10.237 9.653 9.538
2.4 6.375 10.237 10.237 9.653 9.538
64.050 113.602 113.602 106.273 108.222
LT 2
16.275 - 18.774 44.265 44.265 41.735 43.564
1.95 - 11.376 15.547 15.547 14.659 14.847
0.45 1.575 4.275 6.300 6.300 5.940 5.600
0.45 - 2.500 9.275 9.275 8.745 8.575
0.45 - 8.841 10.840 10.840 10.220 10.140
UTUP PINTU 0 0
7.8 - 3.219 20.037 20.037 18.893 19.338
TUP JENDELA 0 0
TUP JENDELA 0 0
0.9 - 15.555 20.037 20.037 18.893 19.338
45.766 82.036 82.036 77.349 77.837
LT 3
16.275 - 21.666 44.265 44.265 41.735 43.564
0.45 1.8 3.990 7.280 7.280 6.864 6.580
4.65 - 8.346 15.162 15.162 14.296 14.462
4.125 - 9.201 15.547 15.547 14.659 14.847
0.45 - 7.500 9.275 9.275 8.745 8.575
4.65 - 8.925 15.838 15.838 14.933 15.138
3.9 3.4 6.275 15.838 15.838 14.933 15.138
0.45 1.7 3.250 6.300 6.300 5.940 5.600
0.9 - 19.650 23.975 23.975 22.605 23.275
1.95 - 3.375 6.212 6.212 5.858 5.512
0.45 - 11.325 13.737 13.737 12.952 13.038
1.95 - 3.375 6.212 6.212 5.858 5.512
1.95 - 9.825 13.737 13.737 12.952 13.038
2.4 1.7 11.125 17.763 17.763 16.748 17.063
1.95 - 3.375 6.212 6.212 5.858 5.512
0.9 1.5 18.150 23.975 23.975 22.605 23.275
149.353 241.329 241.329 227.538 230.129
7.700 7.700
5.430 5.430
40.765 40.765
13.038 13.038
13.737 13.737
2.220 2.220
10.237 10.237
10.237 10.237
10.237 10.237
113.602 113.602
44.265 44.265
15.547 15.547
6.300 6.300
9.275 9.275
10.840 10.840
20.037 20.037
20.037 20.037
82.036 82.036
44.265 44.265
7.280 7.280
15.162 15.162
15.547 15.547
9.275 9.275
15.838 15.838
15.838 15.838
6.300 6.300
23.975 23.975
6.212 6.212
13.737 13.737
6.212 6.212
13.737 13.737
17.763 17.763
6.212 6.212
23.975 23.975
241.329 241.329
26.800 26.800
20.520 20.520
484.287 436.967
BALOK
Tipe B 300/500
Dimensi H 300 V 500
Tul. Atas ∑ 2 D 13
Tul. Bawah ∑ 2 D 13
Tul. Pggng ∑ - D -
Sengkang d 10 J 150
List Plafond
18.11
8.38
19.12
16.51
9.18
9.49
80.79
16.84
11.14
13.28
11.29
7.26
6.12
65.92
11.66
11.58
18.24
3.92
7.69
9.49
7.15
9.57
9.62
88.91
18.07
14.02
14.10
10.90
9.57
66.66
15-16 16-17
1925 1600
Panjang 4 3.8 WTP
Lebar 6.7 5.4 2MM
Overstek 0.3 0.3 ATAP
Kemiringan 5 0.284 5 0.284 3
Volume
BELAKANG DEPAN
VOLUME 101.56 M2 VOLUME 78.05 M2 179.62
KASO 67.71 BH KASO 52.03 BH 119.74
RENG 81.25 BH RENG 62.44 BH 143.69
GENTENG 33.85 BH GENTENG 26.02 BH 59.87
Un WTP 2 MM Un WTP 2 MM 4
0.424
141.207
LANTAI
LT 1
No Tipe Luasan (m2) Ukuran (m2) Kebutuhan Keping Kebutuhan Dus
1 HT 60 X 60 CM 27.53 0.36 76.465972222222 20
LT 2
No Tipe Luasan (m2) Ukuran (m2) Kebutuhan Keping Kebutuhan Dus
1 HT 60 X 60 CM 62.27 0.36 172.97118055556 44
LT 3
No Tipe Luasan (m2) Ukuran (m2) Kebutuhan Keping Kebutuhan Dus
1 HT 60 X 60 CM 7.86 0.36 21.839027777778 6
11
6
utuhan Dus
utuhan Dus
Lokasi Jenis Spesifikasi Volume
Alumunium Louvre Amare Collection 26.7
L Shape Window
Tpk
Kaca
Depan
Railing Kaca
B BAHAN
Bata Merah Biasa 0.035 m3
Semen Tiga Roda @50kg 0.050 zak
Pasir Pasang 0.022 m3
C PERALATAN
Alat Bantu Pas. Bata 1.000 Ls
Steger Pasangan Bata dan Plasteran 1.000 Ls
B BAHAN
Rooster 0.035 m3
Semen Portland 0.050 zak
Pasir Pasang 0.015 m3
C PERALATAN
- -
C PERALATAN
- -
4 Pekerjaan 1 m2 Acian Semen Biasa
A TENAGA
Pekerja 0.071 OH
Tukang Batu 0.071 OH
Mandor 0.007 OH
B BAHAN
Semen Tiga Roda 50 kg 0.059 zak
C PERALATAN
- -
B BAHAN
HT 300x600 mm Matte ex. Roman 0.035 dus
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.648 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Roman Floor Tile Uk.60x60 cm glossy 1.100 dus
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.233 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Roman Floor Tile Uk.33x33 cm 1.100 dus
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.389 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Finish Vinyl 3 mm, 152,4x914,4 mm 0.035 m2
Lem Vinyl 0.176 kg
C PERALATAN
Alat Bantu Potong Vinyl 1.000 Ls
B BAHAN
Keramik Asia Tile Alpha Grey 20x20 0.035 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.648 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
10 Pasang K.M 250x400 Signature Keramik Dinding Kw.1 Diamond Beige 25x40 Cm Warna Beige M
A TENAGA
Pekerja 0.100 OH
Tukang Batu 0.100 OH
B BAHAN
Signature Keramik Dinding Kw.1 Diamond Beige 25 0.035 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.176 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.648 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Keramik plint, uk.10x60 cm 0.110 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.065 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
D Biaya Koordinasi Turun Material
Keramik plint, uk.10x60 cm 0.110 m3
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 kg
B BAHAN
Keramik plint, uk.10x40 cm 0.110 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.052 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
B BAHAN
Kayu plint H=100 mm 0.110 m2
Perekat Keramik Lantai (PRO688) @40kg ex.Poweb 0.005 zak
Nat Keramik (PRO678) 1bks @1kg ex. PowerBond 0.052 bks
C PERALATAN
Alat Bantu Potong Keramik 1.000 Ls
14 Plafond Gypsum 9 mm
A TENAGA
Pekerja 0.100 OH
Tukang Gali 0.100 OH
B BAHAN
Gypsum Polos 9 mm, ex. Elephant 0.365 lbr
Hollow 20/40 Galvanis 0.625 btg
C PERALATAN
Alat dan material bantu pasang plafond gypsum 1.000 Ls
B BAHAN
List gypsum 6x6 0.365 m'
Compound gypsum 0.150 kg
C PERALATAN
Alat bantu pas.list gypsum 1.000 Ls
B BAHAN
Cat dasar undercoat 0.004 pail
Cat Mowillex Emulsion 0.013 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
B BAHAN
Cat dasar undercoat 0.004 pail
Cat Mowillex Weathercoat 0.013 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
D Biaya Koordinasi Turun Material
Cat Mowillex Weathercoat 1.000 m'
B BAHAN
Cat Plafond Interior Putih Cendana ex.Mowillex 0.018 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
B BAHAN
Cat Plafond Eksterior Weathercoat ex.Mowillex 0.018 pail
C PERALATAN
Alat bantu pengecatan 1.000 Ls
B BAHAN
Semen Tiga Roda 50kg 0.018 pail
C PERALATAN
Alat Bantu Finishing Lubang Dinding 1.000 Ls
Rp120,000.00 Rp4,320.00
Rp125,000.00 Rp8,875.00
Rp150,000.00 Rp1,050.00
Rp600,000.00 Rp21,000.00
Rp70,000.00 Rp3,500.00
Rp257,000.00 Rp5,654.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp1,750.00
Rp50,000.00 Rp8,750.00
Jumlah (A + B + C + D) Rp154,899.00
Overhead (10%) Rp15,489.90
Sub total Rp170,388.90
PPH (11%) Rp18,742.78
TOTAL Rp189,132.00
Rp120,000 Rp18,000.00
Rp125,000 Rp16,250.00
Rp130,000 Rp1,430.00
Rp150,000 Rp300.00
Rp600,000 Rp21,000.00
Rp70,000 Rp3,500.00
- -
- -
Jumlah (A + B + C + D) Rp60,480.00
Overhead (10%) Rp6,048.00
Sub total Rp66,528.00
PPH (11%) Rp7,318.08
TOTAL Rp73,847.00
Rp120,000.00 Rp8,520.00
Rp125,000.00 Rp8,875.00
Rp150,000.00 Rp1,050.00
Rp70,000.00 Rp4,130.00
- -
Rp50,000.00 Rp2,950.00
Jumlah (A + B + C + D) Rp25,525.00
Overhead (10%) Rp2,552.50
Sub total Rp28,077.50
PPH (11%) Rp3,088.53
TOTAL Rp31,167.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp98,000.00 Rp3,430.00
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp9,720.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp170,458.00
Overhead (10%) Rp17,045.80
Sub total Rp187,503.80
PPH (11%) Rp20,625.42
TOTAL Rp208,130.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp179,000.00 Rp196,900.00
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp3,495.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp357,703.00
Overhead (10%) Rp35,770.30
Sub total Rp393,473.30
PPH (11%) Rp43,282.06
TOTAL Rp436,756.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp112,500.00 Rp123,750.00
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp5,835.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp286,893.00
Overhead (10%) Rp28,689.30
Sub total Rp315,582.30
PPH (11%) Rp34,714.05
TOTAL Rp350,297.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp98,000.00 Rp3,430.00
Rp142,000.00 Rp24,992.00
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp146,722.00
Overhead (10%) Rp14,672.20
Sub total Rp161,394.20
PPH (11%) Rp17,753.36
TOTAL Rp179,148.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp56,548.00 Rp1,979.18
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp9,720.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp169,007.18
Overhead (10%) Rp16,900.72
Sub total Rp185,907.90
PPH (11%) Rp20,449.87
TOTAL Rp206,358.00
40 Cm Warna Beige Marble
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp70,218.00 Rp2,457.63
Rp108,000.00 Rp19,008.00
Rp15,000.00 Rp9,720.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp55,000.00
Rp50,000.00 Rp8,800.00
Jumlah (A + B + C + D) Rp169,485.63
Overhead (10%) Rp16,948.56
Sub total Rp186,434.19
PPH (11%) Rp20,507.76
TOTAL Rp206,942.00
Rp120,000 Rp12,000.00
Rp125,000 Rp12,500.00
Rp300,000 Rp33,000.00
Rp108,000 Rp540.00
Rp15,000 Rp975.00
Rp50,000 Rp50,000.00
Rp30,000 Rp3,300.00
Rp30,000 Rp150.00
Jumlah (A + B + C + D) Rp112,465.00
Overhead (10%) Rp11,246.50
Sub total Rp123,711.50
PPH (11%) Rp13,608.27
TOTAL Rp137,320.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp55,000.00
Rp108,000.00 Rp540.00
Rp15,000.00 Rp780.00
Rp50,000.00 Rp50,000.00
Rp30,000.00 Rp3,300.00
Rp30,000.00 Rp150.00
Jumlah (A + B + C + D) Rp79,270.00
Overhead (10%) Rp7,927.00
Sub total Rp87,197.00
PPH (11%) Rp9,591.67
TOTAL Rp96,789.00
Rp120,000.00 Rp12,000.00
Rp125,000.00 Rp12,500.00
Rp115,000.00 Rp12,650.00
Rp108,000.00 Rp540.00
Rp15,000.00 Rp780.00
Rp50,000.00 Rp50,000.00
Rp30,000.00 Rp3,300.00
Rp30,000.00 Rp150.00
Jumlah (A + B + C + D) Rp91,920.00
Overhead (10%) Rp9,192.00
Sub total Rp101,112.00
PPH (11%) Rp11,122.32
TOTAL Rp112,235.00
Rp120,000.00 Rp12,000.00
Rp100,000.00 Rp10,000.00
Rp48,838.00 Rp17,825.87
Rp104,000.00 Rp65,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp31,250.00
Jumlah (A + B + C + D) Rp236,075.87
Overhead (10%) Rp23,607.59
Sub total Rp259,683.46
PPH (11%) Rp28,565.18
TOTAL Rp288,249.00
Rp120,000.00 Rp7,200.00
Rp100,000.00 Rp6,000.00
Rp21,000.00 Rp7,665.00
Rp4,250.00 Rp637.50
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Rp50,000.00 Rp7,500.00
Jumlah (A + B + C + D) Rp109,002.50
Overhead (10%) Rp10,900.25
Sub total Rp119,902.75
PPH (11%) Rp13,189.30
TOTAL Rp133,093.00
Rp120,000.00 Rp3,960.00
Rp120,000.00 Rp8,040.00
Rp1,039,990.00 Rp4,159.96
Rp1,249,990.00 Rp16,249.87
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Jumlah (A + B + C + D) Rp112,409.83
Overhead (10%) Rp11,240.98
Sub total Rp123,650.81
PPH (11%) Rp13,601.59
TOTAL Rp137,253.00
Rp120,000.00 Rp3,960.00
Rp120,000.00 Rp8,040.00
Rp1,039,990.00 Rp4,159.96
Rp2,189,750.00 Rp28,466.75
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Jumlah (A + B + C + D) Rp124,626.71
Overhead (10%) Rp12,462.67
Sub total Rp137,089.38
PPH (11%) Rp15,079.83
TOTAL Rp152,170.00
Rp120,000.00 Rp5,040.00
Rp120,000.00 Rp9,960.00
Rp532,000.00 Rp9,576.00
Rp30,000.00 Rp30,000.00
Jumlah (A + B + C) Rp54,576.00
Overhead (10%) Rp5,457.60
Sub total Rp60,033.60
PPH (11%) Rp6,603.70
TOTAL Rp66,638.00
Rp120,000.00 Rp5,040.00
Rp120,000.00 Rp9,960.00
Rp972,000.00 Rp17,496.00
Rp30,000.00 Rp30,000.00
Jumlah (A + B + C) Rp62,496.00
Overhead (10%) Rp6,249.60
Sub total Rp68,745.60
PPH (11%) Rp7,562.02
TOTAL Rp76,308.00
Rp120,000.00 Rp12,600.00
Rp120,000.00 Rp12,600.00
Rp70,000.00 Rp1,260.00
Rp30,000.00 Rp30,000.00
Rp50,000.00 Rp50,000.00
Jumlah (A + B + C + D) Rp106,460.00
Overhead (10%) Rp10,646.00
Sub total Rp117,106.00
PPH (11%) Rp12,881.66
TOTAL Rp129,988.00
PIPA AIR BERSIH
Panjang Pipa (mm)
No Lokasi Keperluan
Horizontal Vertikal TOTAL
LANTAI 1
10 150 160
Closet
1155 150 1305
1 Kamar Mandi
Washtafel 1090 800 1890
Shower 462.5 100 562.5
2 Dapur luar Washtafel 5050.5 800 5850.5
LANTAI 2
2399 150 2549
Closet
1 Toilet 10 150 160
Washtafel 0 800 800
2 Dapur dalam Washtafel 3751 800 4551
LANTAI 3
903 150 1053
Closet
10 150 160
1 Kamar Mandi
Washtafel 1255 800 2055
Shower 492 100 592
857 150 1007
Closet
Kamar Mandi 10 150 160
2
(master) Washtafel 1465 800 2265
Shower 6413 100 6513
TOTAL (m) 41.383
REKAPITULASI
LT1 LT2 LT3 Atap
PAB 9.768 6.564 12.633
PAK 2.494 0.998 0.015
PABK, PAH 5.536 12.305 15.113 0.077
elbow 10 9 12
tee 6 3 6
Panjang Pipa
out take tandon out take tandon Pemakaian air
katup PDAM Meteran air >> >> titik >> titik keperluan
>> Meteran air in take tandon keperluan hor bersih
ver
10 150
1155 150
1090 1750 800
462.5 100
5050.5 800
Sumber air
2399 150 bersih:
10 150
3500 Penampung air
0 800 bersih:
350 150 500 3751 800
Distribusi Air
150 bersih:
903
10 150 uk. pipa
1255 800
492 100 Kemiringan pipa
3500
857 150
10 150
1465 800
6413 100
bikin per lantai
dimensi 50 mm
hor
1650
ver
150 3500 3500
dimensi 25 mm
hor ver
9525 22400
TOTAL D (in)
38.715 1/2 to 3/3
3.507 2
33.030 1
SNI 03-7065-2005: Tata cara perencanaan sistem plambing
PDAM
sumber air (in >> penampung air >> ins. pipa rumah
take) (out take)
20 mm 20 mm
bersih 2.5%
kotor 2.5%
hujan 1.0%
1070
kali
Panjang kabel (m)
No Jenis Penerangan Saklar Lokasi Horizontal Vertikal
LANTAI 1
Downlight Kamar Mandi 1.81 4.08
Downlight Ganda Hallway 2 2.02 4.08
Downlight Laundry 1.81 4.08
Downlight Ganda Kitchen 2.55 4.08
Downlight Tunggal Art Bedroom 2.02 4.08
Downlight Tunggal Hallway 1 1.64 4.08
1 Downlight Tunggal Tangga 2.14 4.08
Barret Outdoor Carport 2.11 4.08
2 Barret Ganda Outdoor Carport 3.68 4.08
JUMLAH
LANTAI 2
Downlight Tangga 1.80 7.58
Downlight Ganda Hallway 1 3.25 7.58
Downlight Toilet 0.56 7.58
Downlight Ganda Hallway 2/Kitchen 1.85 7.58
Downlight Tunggal Dinning Room 2.33 7.58
1 Downlight Tunggal Living Room 2.61 7.58
Barret Balcon (left 1) 4.25 7.58
Barret Ganda Balcon (left 2) 8.30 7.58
Barret Balcon (right) 4.00 7.58
2 Barret Ganda Balcon (mid) 2.24 7.58
JUMLAH
LANTAI 3
Downlight Kamar Mandi 1.50 11.08
Downlight Ganda Ruang Belajar 0.34 11.08
Master
Downlight Bedroom 1.38 11.08
Master
Downlight Ganda Bedroom 3.71 11.08
Kamar Mandi
Downlight Tunggal (master) 1.32 11.08
Downlight Tunggal Kamar 1 1.68 11.08
Downlight Tunggal Kamar 2 1.68 11.08
1 Downlight Tunggal Hallway 2.16 11.08
JUMLAH
Lt 1 Lt 2 Lt 3
Pjg kabel 56.79 107.27 102.70
Downlight 21
lamp Barret 6
ganda 9
saklar tunggal 9
ang kabel (m)
TOTAL
MCB lt 1 ke saklar Hallway 1 0.28 m
5.89 MCB lt 2 ke saklar Living Roo 0.28 m
6.10 MCB lt 3 ke saklar Hallway 0.28 m
5.89
6.63 ffl ke saklar 1.2 m
6.10 bottom plat ke plafond 0.7 m
5.72 t plat 0.12 m
6.22
6.19 ffl lt 1 ke ffl lt 2 3.5 m
7.76 ffl lt 2 ke ffl lt 3 3.5 m
56.79
9.38
10.83
8.14
9.43
9.91
10.19
11.83
15.88
11.58
9.82
107.27
12.58
11.42
12.46
14.79
12.40
12.76
12.76
13.24
102.70
BILL OF QUANTITY
Lokasi : BEKASI
Paket : Struktur, Arsitektur dan M/E
KONTRAKTOR : PT. AA JUNET MANDIRI
NO. JENIS PEKERJAAN Sat.
I. PEK. PERSIAPAN
1 Pembersihan lokasi m²
2 Pekerjaan Bouwplank & Pengukuran m¹
3 Gudang & los kerja m²
4 Air kerja ls
5 Listrik kerja ls
6 Alat kerja ls
7 As built drawing ls
8 Paket MCK, Container office dan sampah ls
9 Mobilisasi & Demobilisasi ls
10 Keamanan ls
11 Buang puing + Pembersihan Akhir Pekerjaan ls
SUB TOTAL I
SUB TOTAL II
2 Beton K - 300
- Kolom, Screening m³
3 Besi Beton
- Kolom Praktis, Balok Praktis kg
- Pondasi
Pondasi Tapak kg
- Kolom, Screening kg
- Balok, Ring Balok & Sopi-sopi kg
- Pelat Lantai
S.1A, Lx=Ly, atau Ø8-150, t=120mm, 2 lapis kg
- Tangga kg
- Meja beton dapur kg
4 Bekisting
- Kolom Praktis, Balok Praktis m²
- Pondasi
Pondasi Tapak m²
- Sloof m²
- Kolom, Screening m²
- Balok, Ring Balok & Sopi-sopi m²
- Pelat Lantai
S.1A, Lx=Ly, atau Ø8-150, t=120mm, 2 lapis m²
- Tangga m²
- Meja beton dapur m²
SUB TOTAL IV
V. PEK. ATAP
1 Rangka atap termasuk flashing dan accesories pendukung
- Rangka Atap baja ringan ex. Bluescope by Manunggal incl. alm foil single m²
- Lisplank 0.8x30, 0.8x10 wood plank ex. Elephant / setara, compound sambu m¹
2 Penutup Atap Genteng
- Genteng Beton Flat Excellence Ex. Cisangkan/Cengkareng Permai m²
- Nok genteng +papan ruiter + cat genteng Beton Flat Excellence Ex. Cisa m¹
- Nok ujung Flat Excellence Ex. Cisangkan/Cengkareng Permai bh
- Genteng tepi Flat Excellence Ex. Cisangkan/Cengkareng Permai m¹
- Flashing m¹
SUB TOTAL V
SUB TOTAL VI
SUB TOTAL X
SUB TOTAL XI
SUB
JA
SUB
PP
T
di
Luas
Har
NOTE
- RAB ini merupakan acuan dasar untuk mendapatkan Harga Final sesuai SPK, bukan menjadi acuan di dalam pel
- Pelaksanaan di Lapangan Berdasarkan Gambar For Tender
UANTITY
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
n, belakang
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
0
0
#NAME?
nci, kaca, handle, engsel, casement, rambuncis + cat + pasang) ex. Dekkson/setara Fin. Duco PU
1.00 #NAME? #NAME?
incl. Kunci, kaca, engsel + pasang) ex. Dekkson / setara
1.00 #NAME? #NAME?
7.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
3.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
1.00 #NAME? #NAME?
#NAME?
#NAME? -
#NAME? -
#NAME? -
-
#NAME? -
#NAME? -
-
-
#NAME? -
-
-
#NAME? -
-
-
-
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
-
-
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
-
-
-
-
-
#NAME? -
#NAME? -
#NAME? -
-
-
-
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
-
-
-
-
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
#NAME? -
-
#NAME? -
#NAME? -
-
#NAME? -
#NAME? -
#NAME? -
-
-
-
#NAME? -
-
#NAME? -
#NAME? -
0
Rp1,301,984
C. Material
#NAME? 0.004 m3 #NAME? #NAME?
#NAME? 0.002 m3 #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
3 Gudang & Los Kerja
A. Upah
Mandor 0.020 Org #NAME? #NAME?
Pekerja 0.100 Org #NAME? #NAME?
Kepala Tukan 0.010 Org #NAME? #NAME?
Tukang Kayu 0.100 Org #NAME? #NAME?
B. Alat
Paku Kayu Uk 0.135 Kg #NAME? #NAME?
Paku Kayu Uk 0.135 Kg #NAME? #NAME?
C. Material
#NAME? 0.347 m2 #NAME? #NAME?
#NAME? 0.125 m3 #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
4 Air Kerja
A. Upah
Air Bulanan 1.000 Bln ### ###
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
5 Listrik Kerja
A. Upah
Listrik Bulan 1.000 Bln ### ###
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
6 Alat Kerja
Palu 1 Bh #REF! #VALUE!
Cangkul 1 Bh #REF! #VALUE!
Sekop 1 Bh #REF! #VALUE!
Bor 1 Bh #REF! #VALUE!
Gergaji 1 Bh #REF! #VALUE!
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
7 As Built Drawing
Drafter 1 Ls ### ###
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
8 Paket MCK, Container Office, dan Sampah
Container Of 1 Bln #NAME? #NAME?
Paket MCK 1 Bh #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
9 Mobilisasi dan Demobilisasi
Operasional 1 bln 560000 ###
Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
10 Keamanan
Security 1 Bln ### ###
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
11 Buang Puing & Pembersihan Akhir Perjalanan
Buang Puing 1 ls 2400000 ###
Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
II Pek. Tanah dan Pondasi
1 Galian Tanah Manual s/d 1.2 m
A. Upah
Tukang Gali 0.4 Org #NAME? #NAME?
Mandor 0.02 Org #NAME? #NAME?
B. Alat
Pengki 0.4 Bh #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
2 Lantai Kerja
A. Upah
Pekerja 1.2 Org #NAME? #NAME?
Tukang Gali 0.2 Org #NAME? #NAME?
Mandor 0.06 Org #NAME? #NAME?
B. Bahan
Pasir Rangka 1.1 Bh #NAME? #NAME?
Semen 3 Rod 1 Kg #NAME? #NAME?
Benang Kur 1 Rol #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
3 Pekerjaan Pasir Urug Pondasi
A. Upah
Pekerja 0.2 Org #NAME? #NAME?
Mandor 0.01 Org #NAME? #NAME?
B. Material
Pasir Urug 0.251 m3 #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
4 Pemadatan Tanah
A. Upah
Pekerja 0.02 Org #NAME? #NAME?
Mandor 0.001 Org #NAME? #NAME?
B. Alat
Mesin Stampe 0.2 Hr #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
5 Plastik Cor Bawah Pelat Lt. Dasar
A. Upah
Pekerja 0.02 Org #NAME? #NAME?
Mandor 0.001 Org #NAME? #NAME?
B. Alat
Plastik Cor 0.2 m #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
6 Urugan dan Pemadatan kembali Galian Tanah Pondasi
A. Upah
Pekerja 0.02 Org #NAME? #NAME?
Mandor 0.001 Org #NAME? #NAME?
B. Alat
Plastik Cor 0.2 m #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
III Pek. Beton
1 Beton Ready Mix K 250
A. Material
Beton K 250 1.1 m3 #NAME? #NAME?
#NAME?
B. Upah
Tukang Gali 0.286 Org #NAME? #NAME?
Mandor 0.029 Org #NAME? #NAME?
C. Alat
Concrete Pum 0.014 Hari #REF! #VALUE!
Vibrator Elec 0.143 Hari #REF! #VALUE!
Operational 0.014 Truck #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
2 Beton Ready Mix K 300 Screening
A. Material
Beton K 300 1.1 m3 #NAME? #NAME?
#NAME?
B. Upah
Pekerja 0.286 Org #NAME? #NAME?
Mandor 0.029 Org #NAME? #NAME?
C. Alat
Vibrator Elec 0.143 Hari #NAME? #NAME?
Operational 0.014 Truck #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
3 Besi Beton
A. Material
Besi Beton 1.015 Kg #NAME? #NAME?
Kawat Beton 0.015 Kg #NAME? #NAME?
B. Upah
Pekerja 0.005 Org #NAME? #NAME?
Tukang Besi 0.005 Org #NAME? #NAME?
Kepala Tukan 0.005 Org #NAME? #NAME?
Mandor 0.001 Org #NAME? #NAME?
B. Upah
Pekerja 0.036 Org #NAME? #NAME?
Tukang Batu 0.071 Org #NAME? #NAME?
Kepala Tukan 0.0071 Org #NAME? #NAME?
Mandor 0.007 Org #NAME? #NAME?
C. Alat
Benang 0.25 m #NAME? #NAME?
B. Upah
Pekerja 0.113 Org #NAME? #NAME?
Tukang Kayu 0.113 Org #NAME? #NAME?
Kepala Tukan 0.013 Org #NAME? #NAME?
Mandor 0.004 Org #NAME? #NAME?
C. Alat
Bambu 4 bh #NAME? #NAME?
Benang 0.25 Rol #NAME? #NAME?
B. Upah
Pekerja 0.2 Org #NAME? #NAME?
Tukang Kayu 0.2 Org #NAME? #NAME?
Kepala Tukan 0.02 Org #NAME? #NAME?
Mandor 0.007 Org #NAME? #NAME?
C. Alat
Benang 0.25 m #NAME? #NAME?
B. Upah
Pekerja 0.2 Org #NAME? #NAME?
Tukang Kayu 0.2 Org #NAME? #NAME?
Kepala Tukan 0.02 Org #NAME? #NAME?
Mandor 0.007 Org #NAME? #NAME?
C. Alat
Bambu 4 bh #NAME? #NAME?
Benang 0.25 Rol #NAME? #NAME?
B. Upah
Pekerja 0.079 Org #NAME? #NAME?
Tukang Batu 0.065 Org #NAME? #NAME?
Mandor 0.003 Org #NAME? #NAME?
C. Alat
Kuas 0.2 bh #NAME? #NAME?
B. Upah
Pekerja 0.071 Org #NAME? #NAME?
Tukang Batu 0.065 Org #NAME? #NAME?
Mandor 0.002 Org #NAME? #NAME?
C. Alat
Sendok Seme 1 bh #NAME? #NAME?
B. Upah
Pekerja 0.15 OH #NAME? #NAME?
Tukang Atap 0.125 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.085 OH #NAME? #NAME?
Tukang Atap 0.125 OH #NAME? #NAME?
Mandor 0.025 OH #NAME? #NAME?
B. Upah
Pekerja 0.085 OH #NAME? #NAME?
Tukang Atap 0.125 OH #NAME? #NAME?
Mandor 0.025 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Atap 0.125 OH #NAME? #NAME?
Mandor 0.025 OH #NAME? #NAME?
B. Upah
Pekerja 0.2 OH #NAME? #NAME?
Tukang Batu 0.2 OH #NAME? #NAME?
B. Upah
Pekerja 0.2 OH #NAME? #NAME?
Tukang Batu 0.2 OH #NAME? #NAME?
B. Upah
Pekerja 0.06 OH #NAME? #NAME?
Tukang Batu 0.06 OH #NAME? #NAME?
B. Upah
Pekerja 0.2 OH #NAME? #NAME?
Tukang Batu 0.2 OH #NAME? #NAME?
B. Upah
Pekerja 0.2 OH #NAME? #NAME?
Tukang Batu 0.2 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Batu 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Batu 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Batu 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Batu 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Batu 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.35 OH #NAME? #NAME?
Tukang Batu 0.15 OH #NAME? #NAME?
Mandor 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Pipa 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Pipa 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Pipa 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
B. Upah
Pekerja 1 OH #NAME? #NAME?
Tukang Listri 1 OH #NAME? #NAME?
B. Upah
Pekerja 0.083 OH #NAME? #NAME?
Tukang Listri 0.042 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Listri 0.05 OH #NAME? #NAME?
Mandor 0.006 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Tukang Listri 0.05 OH #NAME? #NAME?
Mandor 0.006 OH #NAME? #NAME?
B. Upah
Pekerja 0.083 OH #NAME? #NAME?
Tukang Listri 0.042 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
B. Upah
Pekerja 0.067 OH #NAME? #NAME?
Tukang Listri 0.033 OH #NAME? #NAME?
Mandor 0.002 OH #NAME? #NAME?
B. Upah
Pekerja 0.067 OH #NAME? #NAME?
Tukang Listri 0.033 OH #NAME? #NAME?
Mandor 0.002 OH #NAME? #NAME?
B. Upah
Pekerja 0.067 OH #NAME? #NAME?
Tukang Listri 0.033 OH #NAME? #NAME?
Mandor 0.002 OH #NAME? #NAME?
B. Upah
Pekerja 0.067 OH #NAME? #NAME?
Tukang Listri 0.033 OH #NAME? #NAME?
Mandor 0.002 OH #NAME? #NAME?
C. Biaya Koordinasi Turun Material
#NAME? 0.275 Bh #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
9 Pemasangan Outlet TV
A. Material
#NAME? 1 Bh #NAME? #NAME?
B. Upah
Pekerja 0.059 OH #NAME? #NAME?
Tukang Listri 0.029 OH #NAME? #NAME?
Mandor 0.002 OH #NAME? #NAME?
B. Upah
Pekerja 0.059 OH #NAME? #NAME?
Tukang Listri 0.029 OH #NAME? #NAME?
Mandor 0.002 OH #NAME? #NAME?
B. Upah
Pekerja 0.143 OH #NAME? #NAME?
Tukang Listri 0.024 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
B. Upah
Pekerja 0.143 OH #NAME? #NAME?
Tukang Listri 0.024 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
B. Upah
Pekerja 0.143 OH #NAME? #NAME?
Tukang Listri 0.024 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
B. Upah
Pekerja 0.143 OH #NAME? #NAME?
Tukang Listri 0.024 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
B. Upah
Pekerja 0.143 OH #NAME? #NAME?
Tukang Listri 0.024 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
C. Alat
B. Upah
Pekerja 0.143 OH #NAME? #NAME?
Tukang Listri 0.024 OH #NAME? #NAME?
Mandor 0.005 OH #NAME? #NAME?
C. Alat
Alat dan Mater 1 Ls #NAME? #NAME?
B. Upah
Pekerja 0.018 OH #NAME? #NAME?
Tukang Pipa 0.035 OH #NAME? #NAME?
Mandor 0.004 OH #NAME? #NAME?
B. Upah
Pekerja 0.018 OH #NAME? #NAME?
Tukang Pipa 0.035 OH #NAME? #NAME?
Mandor 0.004 OH #NAME? #NAME?
B. Upah
Pekerja 0.018 OH #NAME? #NAME?
Tukang Pipa 0.035 OH #NAME? #NAME?
Mandor 0.004 OH #NAME? #NAME?
B. Upah
Pekerja 0.018 OH #NAME? #NAME?
Tukang Pipa 0.035 OH #NAME? #NAME?
Mandor 0.004 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Mandor 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Mandor 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.1 OH #NAME? #NAME?
Mandor 0.1 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
C. Biaya Koordinasi Turun Material
#NAME? 0.275 m #NAME? #NAME?
#NAME? 0.25 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
14 Pipa PVC Type AW 2" 4m
A. Material
#NAME? 1 m #NAME? #NAME?
#NAME? 0.25 Ls #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.8 OH #NAME? #NAME?
Tukang Batu 0.4 OH #NAME? #NAME?
Mandor 0.05 OH #NAME? #NAME?
C. Biaya Koordinasi Turun Material
#NAME? 1 Ls #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
19 Pipa Reff. 1/4",3/4"
A. Material
1 m Rp0.00
#NAME? 0.25 Ls #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.036 OH #NAME? #NAME?
Kepala Tukan 0.07 OH #NAME? #NAME?
Mandor 0.007 OH #NAME? #NAME?
B. Upah
Pekerja 0.033 OH #NAME? #NAME?
Tukang Batu 0.067 OH #NAME? #NAME?
C. Alat
Cat Roller 1 Ls Rp0.00
B. Upah
Pekerja 0.033 OH #NAME? #NAME?
Tukang Batu 0.067 OH #NAME? #NAME?
C. Alat
Cat Roller 1 Ls Rp0.00
C. Alat
Cat Roller 1 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
4 Cat Plafond Exterior
A. Material
#NAME? 0.018 L #NAME? #NAME?
B. Upah
Pekerja 0.042 OH #NAME? #NAME?
Tukang Batu 0.083 OH #NAME? #NAME?
C. Alat
Cat Roller 1 Ls #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
5 Cat Listplank
A. Material
#NAME? 1 L #NAME? #NAME?
B. Upah
Pekerja 0.042 OH #NAME? #NAME?
Tukang Batu 0.083 OH #NAME? #NAME?
C. Alat
Kuas 1 Ls #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
XIII Pek. Lain Lain
1 Railing Tangga
1 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
2 Anti Rayap
1 Ls #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
3 Biofil Septictank
#NAME? 1 Ls #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
4 Sumur Resapan
#NAME? 1 Ls #NAME? #NAME?
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
5 Box Surat
1 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
6 No. Rumah
1 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
7 Rooftank
1 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
8 Dudukan Pompa
1 Ls Rp0.00
Overhead (10%)
Sub Total
PPH (11%)
Jumlah
RJAAN belum ada harga/tidak valid
Total
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
###
#ERROR!
###
#ERROR!
###
###
#ERROR!
###
#ERROR!
###
#VALUE!
#ERROR!
#VALUE!
#ERROR!
#VALUE!
###
#ERROR!
###
#ERROR!
###
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
###
#ERROR!
###
#ERROR!
###
###
#ERROR!
###
#ERROR!
###
###
#ERROR!
###
#ERROR!
###
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
ndasi
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#VALUE!
#VALUE!
#ERROR!
#VALUE!
#ERROR!
#VALUE!
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
g
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
n
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
man
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
n
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
n
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
an
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
oman
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
ice + taman +carport)
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
"
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
"
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#VALUE!
#ERROR!
#VALUE!
#ERROR!
#VALUE!
#VALUE!
#ERROR!
#VALUE!
#ERROR!
#VALUE!
#VALUE!
#VALUE!
#ERROR!
#VALUE!
#ERROR!
#VALUE!
#VALUE!
#ERROR!
#VALUE!
#ERROR!
#VALUE!
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#VALUE!
Rp0.00
#ERROR!
Rp0.00
#ERROR!
Rp0.00
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
#NAME?
#ERROR!
#NAME?
#ERROR!
#NAME?
Rp0.00
#ERROR!
Rp0.00
#ERROR!
Rp0.00
Rp0.00
#ERROR!
Rp0.00
#ERROR!
Rp0.00
Rp0.00
#ERROR!
Rp0.00
#ERROR!
Rp0.00
Rp0.00
#ERROR!
Rp0.00
#ERROR!
Rp0.00
HARGA DASAR SATUAN UPAH