Anda di halaman 1dari 32

Total Beban Total Beban

Girder 30.8 Girder 40.8


Beban Pier Girder 30.8 Girder 40.8 kN/m
(kN) (kN)
(kN) (kN)
SW + Diaphagm -290.98 -1745.88 448.91 3591.28
Slab & RC Plank -231.3 -1387.8 305.02 2440.16 32.16
SDL -71.15 -426.9 94.25 754 7.37
LL (KEL + UDL) -337.82 -2026.92 378.73 3029.84
Parapet -147.84 -295.68 195.84 391.68
-5883.18 10206.96

Pierhead Pierleg Pcap Total SW Parapet PH


Pier
(kN) (kN) (kN) (kN) (kN)

Pier STA. 1+350 BH-12 2413.32 1035.0291157 3510 -6958.35 7.2


Abutment A1U 343.2 5413.476 3276 9032.68
Abutment A2 312 2608.68 1950 4870.68

659.238
3.3

Reaksi Bot.
SDL PH LL PH Beban Girder Beban Girder Total Beban
Pcap Midas Jumlah Pile
(kN) (kN) Kiri Kanan (kN)
(kN)
19.8 -5883.18 -5883.18 -18697.71 10
1404.5 917.04 11354.22
1404.5 917.04 7192.22
0 0 18.9Slab Eksterior
Slab Eksterior
ABUTMENT A1S SOP STA. 1+350 (KONFIG. PILE 4X3 Eksentrisitas)
MIDAS Kombinasi Layan
Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 LAYAN 1 PONDASI(max) -12824.13 0 3250.17 0
600 LAYAN 1 PONDASI(min) -13581.38 0 3138.91 0

AKSI PADA BOTTOM PILECAP Kombinasi Layan


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 LAYAN 1 PONDASI(max) -3250.17 0 -12824.13 0
600 LAYAN 1 PONDASI(min) -3138.91 0 -13581.38 0

MIDAS Kombinasi Layan Gempa


Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 PONDASI-X-A(max) -12292.09 112.16 4344.43 194.74
600 PONDASI-X-A(min) -12519.26 112.16 4311.06 194.74
600 PONDASI-X-B(max) -12543.89 112.16 3277.59 194.74
600 PONDASI-X-B(min) -12771.07 112.16 3244.21 194.74
600 PONDASI-X-C(max) -12292.09 -112.16 4344.43 -194.74
600 PONDASI-X-C(min) -12519.26 -112.16 4311.06 -194.74
600 PONDASI-X-D(max) -12543.89 -112.16 3277.59 -194.74
600 PONDASI-X-D(min) -12771.07 -112.16 3244.21 -194.74
600 PONDASI-Y-A(max) -12380.25 374.21 3970.89 649.73
600 PONDASI-Y-A(min) -12607.43 374.21 3937.51 649.73
600 PONDASI-Y-B(max) -12455.73 374.21 3651.14 649.73
600 PONDASI-Y-B(min) -12682.9 374.21 3617.76 649.73
600 PONDASI-Y-C(max) -12380.25 -374.21 3970.89 -649.73
600 PONDASI-Y-C(min) -12607.43 -374.21 3937.51 -649.73
600 PONDASI-Y-D(max) -12455.73 -374.21 3651.14 -649.73
600 PONDASI-Y-D(min) -12682.9 -374.21 3617.76 -649.73

AKSI PADA BOTTOM PILECAP Kombinasi Layan Gempa


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 PONDASI-X-A(max) -4344.43 -112.16 -12292.09 -716.14
600 PONDASI-X-A(min) -4311.06 -112.16 -12519.26 -716.14
600 PONDASI-X-B(max) -3277.59 -112.16 -12543.89 -716.14
600 PONDASI-X-B(min) -3244.21 -112.16 -12771.07 -716.14
600 PONDASI-X-C(max) -4344.43 112.16 -12292.09 716.14
600 PONDASI-X-C(min) -4311.06 112.16 -12519.26 716.14
600 PONDASI-X-D(max) -3277.59 112.16 -12543.89 716.14
600 PONDASI-X-D(min) -3244.21 112.16 -12771.07 716.14
600 PONDASI-Y-A(max) -3970.89 -374.21 -12380.25 -2389.37
600 PONDASI-Y-A(min) -3937.51 -374.21 -12607.43 -2389.37
600 PONDASI-Y-B(max) -3651.14 -374.21 -12455.73 -2389.37
600 PONDASI-Y-B(min) -3617.76 -374.21 -12682.9 -2389.37
600 PONDASI-Y-C(max) -3970.89 374.21 -12380.25 2389.37
600 PONDASI-Y-C(min) -3937.51 374.21 -12607.43 2389.37
600 PONDASI-Y-D(max) -3651.14 374.21 -12455.73 2389.37
600 PONDASI-Y-D(min) -3617.76 374.21 -12682.9 2389.37
3 Eksentrisitas)
MIDAS, bukan untuk diolah
Moment-y (kN*m) Moment-z (kN*m)
2312.51 0
414.07 0

nasi Layan
MY (kN*m) MZ (kN*m) Keterangan:
2312.51 0 FX (+) Aksi ke arah X +
414.07 0 MX (+) Aksi terhadap X+

Moment-y (kN*m) Moment-z (kN*m)


MIDAS, bukan untuk diolah
578.92 716.14
9.39 716.14
-6799.07 716.14
-7368.6 716.14
578.92 -716.14
9.39 -716.14
-6799.07 -716.14
-7368.6 -716.14
-2004.41 2389.37
-2573.94 2389.37
-4215.74 2389.37
-4785.27 2389.37
-2004.41 -2389.37
-2573.94 -2389.37
-4215.74 -2389.37
-4785.27 -2389.37

Layan Gempa
MY (kN*m) MZ (kN*m)
578.92 194.74
9.39 194.74
-6799.07 194.74
-7368.6 194.74
578.92 -194.74
9.39 -194.74
-6799.07 -194.74
-7368.6 -194.74
-2004.41 649.73
-2573.94 649.73
-4215.74 649.73
-4785.27 649.73
-2004.41 -649.73
-2573.94 -649.73
-4215.74 -649.73
-4785.27 -649.73
Z

Y
X

Denah Pilecap Denah Bored Pile 1m

7m
2m 3m

Titik beban
(eksentrisitas 50cm)

13m
Tinggi Pilecap

1.5m
3.5m
ABUTMENT A1U SOP STA. 1+350 (KONFIG. PILE 4X3 Eksentrisitas)
MIDAS Kombinasi Layan
Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 LAYAN 1 PONDASI(max) -15072.24 0 4059.42 0
600 LAYAN 1 PONDASI(min) -15829.49 0 3948.16 0

AKSI PADA BOTTOM PILECAP Kombinasi Layan


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 LAYAN 1 PONDASI(max) -4059.42 0 -15072.24 0
600 LAYAN 1 PONDASI(min) -3948.16 0 -15829.49 0

MIDAS Kombinasi Layan Gempa


Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 PONDASI-X-A(max) -14491.22 133.58 5449.53 279.01
600 PONDASI-X-A(min) -14718.39 133.58 5416.15 279.01
600 PONDASI-X-B(max) -14840.98 133.58 4158.29 279.01
600 PONDASI-X-B(min) -15068.16 133.58 4124.91 279.01
600 PONDASI-X-C(max) -14491.22 -133.58 5449.53 -279.01
600 PONDASI-X-C(min) -14718.39 -133.58 5416.15 -279.01
600 PONDASI-X-D(max) -14840.98 -133.58 4158.29 -279.01
600 PONDASI-X-D(min) -15068.16 -133.58 4124.91 -279.01
600 PONDASI-Y-A(max) -14613.68 445.67 4997.41 930.91
600 PONDASI-Y-A(min) -14840.86 445.67 4964.03 930.91
600 PONDASI-Y-B(max) -14718.52 445.67 4610.4 930.91
600 PONDASI-Y-B(min) -14945.69 445.67 4577.02 930.91
600 PONDASI-Y-C(max) -14613.68 -445.67 4997.41 -930.91
600 PONDASI-Y-C(min) -14840.86 -445.67 4964.03 -930.91
600 PONDASI-Y-D(max) -14718.52 -445.67 4610.4 -930.91
600 PONDASI-Y-D(min) -14945.69 -445.67 4577.02 -930.91

AKSI PADA BOTTOM PILECAP Kombinasi Layan Gempa


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 PONDASI-X-A(max) -5449.53 -133.58 -14491.22 -962.25
600 PONDASI-X-A(min) -5416.15 -133.58 -14718.39 -962.25
600 PONDASI-X-B(max) -4158.29 -133.58 -14840.98 -962.25
600 PONDASI-X-B(min) -4124.91 -133.58 -15068.16 -962.25
600 PONDASI-X-C(max) -5449.53 133.58 -14491.22 962.25
600 PONDASI-X-C(min) -5416.15 133.58 -14718.39 962.25
600 PONDASI-X-D(max) -4158.29 133.58 -14840.98 962.25
600 PONDASI-X-D(min) -4124.91 133.58 -15068.16 962.25
600 PONDASI-Y-A(max) -4997.41 -445.67 -14613.68 -3210.49
600 PONDASI-Y-A(min) -4964.03 -445.67 -14840.86 -3210.49
600 PONDASI-Y-B(max) -4610.4 -445.67 -14718.52 -3210.49
600 PONDASI-Y-B(min) -4577.02 -445.67 -14945.69 -3210.49
600 PONDASI-Y-C(max) -4997.41 445.67 -14613.68 3210.49
600 PONDASI-Y-C(min) -4964.03 445.67 -14840.86 3210.49
600 PONDASI-Y-D(max) -4610.4 445.67 -14718.52 3210.49
600 PONDASI-Y-D(min) -4577.02 445.67 -14945.69 3210.49
X3 Eksentrisitas)
MIDAS, bukan untuk diolah
Moment-y (kN*m) Moment-z (kN*m)
1419.44 0
-618.08 0

nasi Layan
MY (kN*m) MZ (kN*m) Keterangan:
1419.44 0 FX (+) Aksi ke arah X +
-618.08 0 MX (+) Aksi terhadap X+

Moment-y (kN*m) Moment-z (kN*m)


MIDAS, bukan untuk diolah
-1014.37 962.25
-1625.63 962.25
-11042.33 962.25
-11653.58 962.25
-1014.37 -962.25
-1625.63 -962.25
-11042.33 -962.25
-11653.58 -962.25
-4525.56 3210.49
-5136.82 3210.49
-7531.14 3210.49
-8142.39 3210.49
-4525.56 -3210.49
-5136.82 -3210.49
-7531.14 -3210.49
-8142.39 -3210.49

Layan Gempa
MY (kN*m) MZ (kN*m)
-1014.37 279.01
-1625.63 279.01
-11042.33 279.01
-11653.58 279.01
-1014.37 -279.01
-1625.63 -279.01
-11042.33 -279.01
-11653.58 -279.01
-4525.56 930.91
-5136.82 930.91
-7531.14 930.91
-8142.39 930.91
-4525.56 -930.91
-5136.82 -930.91
-7531.14 -930.91
-8142.39 -930.91
Z

Y
X

Denah Pilecap Denah Bored Pile 1m

7m
2m 3m

Titik beban
(eksentrisitas 50cm)

13m
Tinggi Pilecap

1.5m
3.5m
ABUTMENT A2U SOP STA. 1+350 (KONFIG. PILE 4X3 center)
MIDAS Kombinasi Layan
Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 LAYAN 1 PONDASI(max) -13782.39 0 1414.34 -0.01
600 LAYAN 1 PONDASI(min) -16006.75 0 1237 -0.01

AKSI PADA BOTTOM PILECAP Kombinasi Layan


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 LAYAN 1 PONDASI(max) -1414.34 0 -13782.39 0.02
600 LAYAN 1 PONDASI(min) -1237 0 -16006.75 0.03

MIDAS Kombinasi Layan Gempa


Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 PONDASI-X-A(max) -13009.98 152.94 2405.8 81.36
600 PONDASI-X-A(min) -13677.29 152.94 2352.6 81.36
600 PONDASI-X-B(max) -13308.24 152.94 883.65 81.36
600 PONDASI-X-B(min) -13975.55 152.94 830.45 81.36
600 PONDASI-X-C(max) -13009.98 -152.93 2405.8 -81.39
600 PONDASI-X-C(min) -13677.29 -152.93 2352.6 -81.39
600 PONDASI-X-D(max) -13308.24 -152.93 883.65 -81.39
600 PONDASI-X-D(min) -13975.55 -152.93 830.45 -81.39
600 PONDASI-Y-A(max) -13114.41 510.26 1872.84 271.5
600 PONDASI-Y-A(min) -13781.72 510.26 1819.63 271.5
600 PONDASI-Y-B(max) -13203.81 510.26 1416.62 271.5
600 PONDASI-Y-B(min) -13871.11 510.26 1363.41 271.5
600 PONDASI-Y-C(max) -13114.41 -510.25 1872.84 -271.53
600 PONDASI-Y-C(min) -13781.72 -510.25 1819.63 -271.53
600 PONDASI-Y-D(max) -13203.81 -510.25 1416.62 -271.53
600 PONDASI-Y-D(min) -13871.11 -510.25 1363.41 -271.53

AKSI PADA BOTTOM PILECAP Kombinasi Layan Gempa


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 PONDASI-X-A(max) -2405.8 -152.94 -13009.98 -820.41
600 PONDASI-X-A(min) -2352.6 -152.94 -13677.29 -820.41
600 PONDASI-X-B(max) -883.65 -152.94 -13308.24 -820.41
600 PONDASI-X-B(min) -830.45 -152.94 -13975.55 -820.41
600 PONDASI-X-C(max) -2405.8 152.93 -13009.98 820.46
600 PONDASI-X-C(min) -2352.6 152.93 -13677.29 820.46
600 PONDASI-X-D(max) -883.65 152.93 -13308.24 820.46
600 PONDASI-X-D(min) -830.45 152.93 -13975.55 820.46
600 PONDASI-Y-A(max) -1872.84 -510.26 -13114.41 -2737.31
600 PONDASI-Y-A(min) -1819.63 -510.26 -13781.72 -2737.31
600 PONDASI-Y-B(max) -1416.62 -510.26 -13203.81 -2737.31
600 PONDASI-Y-B(min) -1363.41 -510.26 -13871.11 -2737.31
600 PONDASI-Y-C(max) -1872.84 510.25 -13114.41 2737.36
600 PONDASI-Y-C(min) -1819.63 510.25 -13781.72 2737.36
600 PONDASI-Y-D(max) -1416.62 510.25 -13203.81 2737.36
600 PONDASI-Y-D(min) -1363.41 510.25 -13871.11 2737.36
E 4X3 center)
MIDAS, bukan untuk diolah
Moment-y (kN*m) Moment-z (kN*m)
4567.12 0
2507.94 -0.03

nasi Layan
MY (kN*m) MZ (kN*m) Keterangan:
4567.12 -0.01 FX (+) Aksi ke arah X +
2507.94 -0.01 MX (+) Aksi terhadap X+

Moment-y (kN*m) Moment-z (kN*m)


MIDAS, bukan untuk diolah
6110.38 820.41
5492.62 820.41
-1881.45 820.41
-2499.21 820.41
6110.38 -820.46
5492.62 -820.46
-1881.45 -820.46
-2499.21 -820.46
3312.12 2737.31
2694.36 2737.31
916.81 2737.31
299.05 2737.31
3312.12 -2737.36
2694.36 -2737.36
916.81 -2737.36
299.05 -2737.36

Layan Gempa
MY (kN*m) MZ (kN*m)
6110.38 81.36
5492.62 81.36
-1881.45 81.36
-2499.21 81.36
6110.38 -81.39
5492.62 -81.39
-1881.45 -81.39
-2499.21 -81.39
3312.12 271.5
2694.36 271.5
916.81 271.5
299.05 271.5
3312.12 -271.53
2694.36 -271.53
916.81 -271.53
299.05 -271.53
Z

Y
X

Denah Pilecap (Detail Di CAD) Denah Bored Pile 0.8m

3.5m 3.5m 2m 3m

3.5m

Titik beban
(center)

13m
Tinggi Pilecap

1.5m
ABUTMENT A2S SOP STA. 1+350 (KONFIG. PILE 4X3 center)
MIDAS Kombinasi Layan
Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 LAYAN 1 PONDASI(max) -15398.97 0 2221.19 0
600 LAYAN 1 PONDASI(min) -17623.33 0 2043.85 0

AKSI PADA BOTTOM PILECAP Kombinasi Layan


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 LAYAN 1 PONDASI(max) -2221.19 0 -15398.97 -0.01
600 LAYAN 1 PONDASI(min) -2043.85 0 -17623.33 0

MIDAS Kombinasi Layan Gempa


Elem Load Axial (kN) Shear-y (kN) Shear-z (kN) Torsion (kN*m)
600 PONDASI-X-A(max) -14639.74 166.12 3399.98 106.33
600 PONDASI-X-A(min) -15307.04 166.12 3346.78 106.33
600 PONDASI-X-B(max) -14911.09 161.47 1805.37 88.46
600 PONDASI-X-B(min) -15578.4 161.47 1752.17 88.46
600 PONDASI-X-C(max) -14640.29 -161.47 3399.66 -88.46
600 PONDASI-X-C(min) -15307.59 -161.47 3346.46 -88.46
600 PONDASI-X-D(max) -14911.64 -166.12 1805.05 -106.33
600 PONDASI-X-D(min) -15578.95 -166.12 1751.85 -106.33
600 PONDASI-Y-A(max) -14734.11 547.2 2842.02 327.63
600 PONDASI-Y-A(min) -15401.41 547.2 2788.81 327.63
600 PONDASI-Y-B(max) -14815.44 545.81 2364.08 322.28
600 PONDASI-Y-B(min) -15482.75 545.81 2310.88 322.28
600 PONDASI-Y-C(max) -14735.94 -545.81 2840.95 -322.28
600 PONDASI-Y-C(min) -15403.25 -545.81 2787.75 -322.28
600 PONDASI-Y-D(max) -14817.27 -547.2 2363.02 -327.63
600 PONDASI-Y-D(min) -15484.58 -547.2 2309.81 -327.63

AKSI PADA BOTTOM PILECAP Kombinasi Layan Gempa


Elem Load FX (kN) FY (kN) FZ (kN) MX (kN*m)
600 PONDASI-X-A(max) -3399.98 -166.12 -14639.74 -1067
600 PONDASI-X-A(min) -3346.78 -166.12 -15307.04 -1067
600 PONDASI-X-B(max) -1805.37 -161.47 -14911.09 -1060.25
600 PONDASI-X-B(min) -1752.17 -161.47 -15578.4 -1060.25
600 PONDASI-X-C(max) -3399.66 161.47 -14640.29 1060.25
600 PONDASI-X-C(min) -3346.46 161.47 -15307.59 1060.25
600 PONDASI-X-D(max) -1805.05 166.12 -14911.64 1066.99
600 PONDASI-X-D(min) -1751.85 166.12 -15578.95 1067
600 PONDASI-Y-A(max) -2842.02 -547.2 -14734.11 -3549.73
600 PONDASI-Y-A(min) -2788.81 -547.2 -15401.41 -3549.73
600 PONDASI-Y-B(max) -2364.08 -545.81 -14815.44 -3547.71
600 PONDASI-Y-B(min) -2310.88 -545.81 -15482.75 -3547.71
600 PONDASI-Y-C(max) -2840.95 545.81 -14735.94 3547.71
600 PONDASI-Y-C(min) -2787.75 545.81 -15403.25 3547.71
600 PONDASI-Y-D(max) -2363.02 547.2 -14817.27 3549.73
600 PONDASI-Y-D(min) -2309.81 547.2 -15484.58 3549.73
4X3 center)
MIDAS, bukan untuk diolah
Moment-y (kN*m) Moment-z (kN*m)
3196.29 0
871.1 0

nasi Layan
MY (kN*m) MZ (kN*m) Keterangan:
3196.29 0 FX (+) Aksi ke arah X +
871.1 0 MX (+) Aksi terhadap X+

Moment-y (kN*m) Moment-z (kN*m)


MIDAS, bukan untuk diolah
4585.55 1067
3887.99 1067
-5778.94 1060.25
-6476.5 1060.25
4584.56 -1060.25
3887 -1060.25
-5779.93 -1066.99
-6477.49 -1067
957.69 3549.73
260.13 3549.73
-2148.76 3547.71
-2846.32 3547.71
954.38 -3547.71
256.82 -3547.71
-2152.07 -3549.73
-2849.63 -3549.73

Layan Gempa
MY (kN*m) MZ (kN*m)
4585.55 106.33
3887.99 106.33
-5778.94 88.46
-6476.5 88.46
4584.56 -88.46
3887 -88.46
-5779.93 -106.33
-6477.49 -106.33
957.69 327.63
260.13 327.63
-2148.76 322.28
-2846.32 322.28
954.38 -322.28
256.82 -322.28
-2152.07 -327.63
-2849.63 -327.63
Z

Y
X

Denah Pilecap (Detail Di CAD) Denah Bored Pile 0.8m

3.5m 3.5m 2m 3m

Titik beban
(center)

13m
Tinggi Pilecap

1.5m

Anda mungkin juga menyukai