RAB - KOMINFO - PUPR No.1 2022 - FINAL - TKDN
RAB - KOMINFO - PUPR No.1 2022 - FINAL - TKDN
A. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
B. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
III. Err:504 Err:504
IV. Err:504 Err:504
V. Err:504 Err:504
VI. Err:504 Err:504
VII. Err:504 Err:504
VIII. Err:504 Err:504
IX. Err:504 Err:504
X. Err:504 Err:504
XI. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
C. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
III. Err:504 Err:504
IV. Err:504 Err:504
V. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
D. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
III. Err:504 Err:504
IV. Err:504 Err:504
V. Err:504 Err:504
VI. Err:504 Err:504
VII. Err:504 Err:504
VIII. Err:504 Err:504
IX. Err:504 Err:504
X. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
E. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
III. Err:504 Err:504
IV. Err:504 Err:504
V. Err:504 Err:504
VI. Err:504 Err:504
VII. Err:504 Err:504
VIII. Err:504 Err:504
IX. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
F. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
III. Err:504 Err:504
IV. Err:504 Err:504
V. Err:504 Err:504
VI. Err:504 Err:504
VII. Err:504 Err:504
VIII. Err:504 Err:504
IX. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
G. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
III. Err:504 Err:504
IV. Err:504 Err:504
V. Err:504 Err:504
VI. Err:504 Err:504
VII. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
H. Err:504
I. Err:504 Err:504
II. Err:504 Err:504
REAL COAST Err:504
PPN (11 %) Err:504
JUMLAH HARGA Err:504
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN : #REF!
A. Err:504 Err:504
B. Err:504 Err:504
C. Err:504 Err:504
D. Err:504 Err:504
E. Err:504 Err:504
F. Err:504 Err:504
G. Err:504 Err:504
H. Err:504 Err:504
TOTAL Err:504
PEMBULATAN Err:504
Terbilang : Empat Milyar Empat Ratus Satu Juta Empat Ratus Ribu Rupiah
Mataram, 2023
Disetujui, Dibuat oleh,
Pejabat Pembuat Komitmen Konsultan Individu
Prasarana Strategis dan
Bina Penataan Bangunan
2. U P A H
2.1. Upah Pekerja
NO URAIAN SATUAN HARGA SATUAN KET.
1 2 3 5 6 ###
1 Pekerja.
Pekerja OH Rp 100,000.00 ###
2 Tukang
Tukang batu OH Rp 115,000.00 ###
Tukang kayu OH Rp 120,000.00 ###
Tukang besi beton OH Rp 115,000.00 ###
Tukang las OH Rp 120,000.00 ###
Tukang pelitur OH Rp 115,000.00 ###
Tukang cat OH Rp 115,000.00 ###
Tukang pipa PVC OH Rp 115,000.00 ###
Tukang pipa besi OH Rp 115,000.00 ###
Tukang listrik OH Rp 115,000.00 ###
Tukang Allumunium OH Rp 115,000.00 ###
3 Kepala tukang
Kepala tukang batu OH Rp 120,000.00 ###
Kepala tukang kayu OH Rp 125,000.00 ###
Kepala tukang besi beton OH Rp 120,000.00 ###
Kepala tukang las OH Rp 125,000.00 ###
Kepala tukang cat OH Rp 120,000.00 ###
Kepala tukang pipa PVC OH Rp 120,000.00 ###
Kepala tukang listrik OH Rp 120,000.00 ###
Kepala Tukang Allumunium OH Rp 120,000.00 ###
4 Pekerja ahli
Mandor OH Rp 120,000.00 ###
Page 10 of 76
II. PEKERJAAN SIPIL / BANGUNAN
( Belum termasuk ongkos angkut )
1. HARGA SATUAN BAHAN
1.1. Bahan Pasangan dan Tanah
NO URAIAN SATUAN HARGA SATUAN KET.
1 2 3 5 6 ###
1 Batu
Batu belah uk. 15 -20 cm m³ Rp 220,000.00 ###
Batu pecah uk. 5 7 cm m³ Rp 300,000.00 ###
Batu pecah uk. 3 5 cm m³ Rp 375,000.00 ###
Batu pecah uk. 2 3 cm m³ Rp 405,000.00 ###
Batu paras m³ Rp 260,000.00 ###
Batu kali alam m³ Rp 235,000.00 ###
2 Kerikil ###
Kerikil alam uk. 2/3 cm m³ Rp 405,000.00 ###
Kerikil Beton (kg) kg Rp 300.00 ###
Kerikil sungai royalti m³ Rp 385,000.00 ###
Kerikil pecah 1/2 cm m³ Rp 395,000.00 ###
Kerikil alam 1 cm m³ Rp 395,000.00 ###
3 Koral beton m³ Rp 220,000.00 ###
4 Agregate ###
Agregate 2-3 (stone crusher) m³ Rp 430,000.00 ###
Agregate 1-2 (stone crusher) m³ Rp 530,000.00 ###
Agregate klas B (20% : 80% agg.ksr) m³ Rp 270,000.00 ###
5 Bata ###
Bata merah klas 1 buah Rp 1,100.00 ###
Bata merah klas 2 buah Rp 900.00 ###
6 Pasir ###
Pasir beton (PB) m³ Rp 220,000.00 ###
Pasir beton (PB) (kg) kg Rp 157.14 ###
Pasir pasang m³ Rp 195,000.00 ###
Pasir urug m³ Rp 175,000.00 ###
7 Sirtu m³ Rp 175,000.00 ###
8 Tanah ###
Tanah urug biasa m³ Rp 140,000.00 ###
Tanah urug pilihan m³ Rp 180,000.00 ###
Tanah liat (Tl) m³ Rp 235,000.00 ###
9 Semen ###
Semen merah m³ Rp 260,000.00 ###
Semen warna kg Rp 19,000.00 ###
Semen PC. Merk Tiga Roda zak (50 kg) Rp 75,000.00 ###
Semen PC. Merk Gresik zak (50 kg) Rp 75,000.00 ###
Semen PC. Merk Tonasa zak (50 kg) Rp 75,000.00 ###
Semen PC. Merk Bosowa zak (50 kg) Rp 74,000.00 ###
Semen PC. Merk Holcim zak (50 kg) Rp 74,000.00 ###
PC. Mortar Tiga Roda zak (50 kg) Rp 75,000.00 ###
Portland Cement ( kg ) kg Rp 1,500.00 ###
12 List plafon (profil) 4/4 cm m Rp 29,000.00 ###
16 Air liter Rp 900.00 ###
###
###
Page 11 of 76
1.2. Bahan Atap ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Sirap kalimantan buah Rp 7,700.00 ###
2 Genteng ###
Genteng lokal buah Rp 3,500.00 ###
Genteng beton/pres buah Rp 8,000.00 ###
Genteng karang pilang/kodok buah Rp 5,000.00 ###
Genteng pejaten (sudah dicat) buah Rp 4,000.00 ###
Genteng kaca buah Rp 21,000.00 ###
Genteng keramik buah Rp 23,000.00 ###
3 Bubungan ###
Bubungan genteng lokal buah Rp 4,000.00 ###
Bubungan genteng beton buah Rp 8,000.00 ###
Bubungan genteng silang buah Rp 5,500.00 ###
Bubungan genteng pejaten buah Rp 5,500.00 ###
Bubungan genteng keramik buah Rp 20,000.00 ###
Bubungan karang pilang buah Rp 12,500.00 ###
Bubungan metalroof (lapis buriran) m1 Rp 137,000.00 ###
Bubungan metal (tanpa lapir buriran) m1 Rp 110,000.00 ###
Bubungan asbes gelombang 92 cm buah Rp 46,500.00 ###
Bubungan asbes gelombang 105 cm buah Rp 98,000.00 ###
4 Atap ###
Genteng metalroof (lapis buriran) lembar Rp 61,500.00
Atap metalroof 3,5 mm (lapis buriran) m² Rp 348,000.00 ###
Atap metal 3,5,mm (tanpa lapis buriran) m² Rp 303,000.00 ###
Atap Bitumin selulose warna (200x97x3 mm ) lembar Rp 238,800.00
Nok/ Ridge Ounduline lembar Rp 150,000.00
Atap U-PVC 10 mm m1 Rp 185,000.00
5 Asbes ###
Asbes type genteng (tyluq) lembar Rp 76,000.00 ###
Asbes gelombang 92 x 180 lembar Rp 54,000.00 ###
Asbes gelombang 105 x 240 lembar Rp 182,000.00 ###
6 Ijuk kg Rp 31,000.00 ###
7 Seng ###
Seng gelombang besar BJLS 20 lembar Rp 73,000.00 ###
Seng gelombang besar BJLS 25 lembar Rp 88,000.00 ###
Seng gelombang besar BJLS 30 lembar Rp 99,000.00 ###
Seng gelombang kecil BJLS 20 lembar Rp 84,000.00 ###
Seng plat BJLS 18 lebar 90 cm m³ Rp 35,000.00 ###
Seng plat BJLS 20 lebar 90 cm m³ Rp 46,000.00 ###
Seng plat BJLS 25 lebar 90 cm m³ Rp 69,000.00 ###
Seng plat BJLS 28 lebar 90 cm m³ Rp 84,000.00 ###
Seng plat BJLS 30 lebar 90 cm m³ Rp 99,000.00 ###
Seng spandek 3 mm lebar 70 cm m³ Rp 82,000.00 ###
Seng spandek 3,5 mm lebar 70 cm m³ Rp 99,000.00 ###
Seng spandek 4 mm lebar 70 cm m³ Rp 118,000.00 ###
8 Union Pesona TCT 0.45mm lebar 990mm m² Rp 235,000.00
Bubungan Zincalume 0,45 mm m1 Rp 87,000.00
###
###
Page 12 of 76
1.3. Bahan Kayu ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Papan ###
Papan kayu klas I m³ Rp 25,000,000.00 ###
Papan kayu klas II m³ Rp 18,000,000.00 ###
Papan kayu klas III m³ Rp 5,000,000.00 ###
Papan kayu bekisting m³ Rp 4,000,000.00 ###
2 Balok ###
Balok Kayu klas I m³ Rp 24,000,000.00 ###
Balok Kayu klas II m³ Rp 17,500,000.00 ###
Balok Kayu klas III m³ Rp 6,500,000.00 ###
Kayu Usuk 5/7 Kelas III m³ Rp 5,000,000.00 ###
Kayu Usuk 3/4 Kelas III m³ Rp 5,000,000.00 ###
Balok Kayu bekisting m³ Rp 4,000,000.00 ###
Dolken/perancah dia. 7cm 4m batang Rp 10,000.00 ###
3 Lumbersering ###
4 Lumbersering klas I m² Rp 550,000.00 ###
Lumbersering klas II m² Rp 475,000.00 ###
###
###
1.4. Bahan Bambu ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Bambu ###
Bambu dia.12,5 cm, p 6 m batang Rp 10,000.00 ###
Bambu dia.10 cm, p 6 m batang Rp 10,000.00 ###
Bambu dia.7 cm, p 6 m batang Rp 10,000.00 ###
2 Bedek ###
Bedek kulitan m³ Rp 53,000.00 ###
Bedek biasa m³ Rp 50,500.00 ###
Bedek pagar m³ Rp 41,500.00 ###
3 Bilik bambu m³ Rp 43,500.00 ###
###
###
1.5. Bahan Cetak ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Paving blok ###
Pres type bata t = 8 cm buah Rp 4,000.00 ###
Biasa type bata t = 6 cm buah Rp 3,500.00 ###
Pres type berlian t = 8 cm buah Rp 3,500.00 ###
Pres grass blok t = 6 cm buah Rp 3,500.00 ###
2 Batako buah Rp 4,000.00 ###
3 Roster pejaten10 x 20 x 40 cm buah Rp 77,500.00 ###
###
###
Page 13 of 76
1.6. Bahan Lantai ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
1 Tegel ###
Tegel abu abu uk. 20 x 20 cm m² Rp 40,000.00 ###
Tegel bergaris abu uk. 20 x 20 cm m² Rp 60,000.00 ###
Tegel warna uk. 20 x 20 cm m² Rp 45,000.00 ###
Tegel bergaris warna uk. 20 x 20 cm m² Rp 57,000.00 ###
Tegel traso klas I uk. 30 x 30 cm m² Rp 58,000.00 ###
Tegel traso klas II uk. 30 x 30 cm m² Rp 52,000.00 ###
2 Keramik ###
Keramik dinding m² Rp 88,000.00 ###
Keramik dinding Motif m² Rp 114,000.00 ###
Keramik kw I (motif) m² Rp 114,000.00 ###
Keramik kw I (motif) Anti Slip m² Rp 114,000.00 ###
Keramik kw II (motif) m² Rp 96,000.00 ###
Keramik kw I (polos) m² Rp 96,000.00 ###
Keramik kw II (polos) m² Rp 70,000.00 ###
Homogenous tile 60x60cm' matte m² Rp 250,000.00 ###
Homogenous tile 60x60cm' polished m² Rp 230,000.00 ###
Plint Homogeneus 10 x 60 m' Rp 25,000.00 ###
Keramik cutting uk. 30 x 50 cm m² Rp 190,000.00 ###
Keramik Artistik 5/20 m² Rp 380,000.00 ###
Keramik Artistik 10/20 m² Rp 200,000.00 ###
List Keramik Dinding 10/40 m' Rp 7,500.00 ###
###
###
Page 14 of 76
1.6. Bahan Lantai ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Marmer ###
2 Marmer 100/100 m² Rp 459,000.00 ###
3 Marmer m² Rp 390,000.00 ###
4 Beton grid pracetak m² Rp 96,000.00 ###
5 Porselin ###
6 Porselin 11/11 m² Rp 86,000.00 ###
7 Porselin 10/20 m² Rp 86,000.00 ###
8 Porselin 20/20 m² Rp 92,000.00 ###
9 Ubin Keramik ###
10 Ubin Keramik 30/30 m² Rp 96,000.00 ###
11 Ubin Keramik 33/33 m² Rp 96,000.00 ###
12 Ubin Keramik 40/40 m² Rp 96,000.00 ###
13 Ubin Keramik 20/20 m² Rp 96,000.00 ###
14 Ubin Keramik 10/33 m² Rp 96,000.00 ###
15 Ubin Keramik Artistik 10/20 m² Rp 53,000.00 ###
16 Ubin Keramik Artistik 10/10 m² Rp 105,000.00 ###
17 Ubin Abu-abu 20/20 m² Rp 57,000.00 ###
18 Ubin Abu-abu 30/30 m² Rp 57,000.00 ###
19 Ubin Abu-abu 40/40 m² Rp 43,000.00 ###
20 Ubin Warna 20/20 m² Rp 50,000.00 ###
21 Ubin Warna 30/30 m² Rp 50,000.00 ###
22 Ubin Warna 40/40 m² Rp 50,000.00 ###
23 Ubin Teraso 30/30 m² Rp 62,000.00 ###
24 Ubin Teraso 40/40 m² Rp 62,000.00 ###
25 Ubin Granit 30/30 m² Rp 192,000.00 ###
26 Ubin Granit 40/40 m² Rp 192,000.00 ###
27 Ubin Teralux Kerang 30/30 m² Rp 210,000.00 ###
28 Ubin Teralux Kerang 40/40 m² Rp 208,000.00 ###
29 Ubin Teralux Marmer 30/30 m² Rp 225,000.00 ###
30 Ubin Teralux Marmer 40/40 m² Rp 225,000.00 ###
31 Ubin Teralux Marmer 60/60 m² Rp 225,000.00 ###
32 Mozaik ###
33 Mozaik 30/30 m² Rp 34,000.00 ###
34 Lantai Geranit KW I m² Rp 193,000.00 ###
35 Lantai Geranit KW I 60 X 60 buah Rp 69,000.00 ###
36 Lantai Geranit KW I 15 X 60 buah Rp 17,370.00 ###
37 Teraso cor m² Rp 695,000.00 ###
38 Batu ###
39 Batu teraso (kerikil sikat) kg Rp 8,000.00 ###
40 Batu granit (kerikil sikat) kg Rp 16,000.00 ###
41 Batu hias buah Rp 4,000.00 ###
42 Karpet m² Rp 124,000.00 ###
43 Underlayer/rubber corrugated m² Rp 134,000.00 ###
44 Parguet m² Rp 172,000.00 ###
45 Gymfloor (lantai kayu) m² Rp 172,000.00 ###
46 Vinyl ###
47 Vinyl 30/30 m² Rp 243,000.00 ###
48 Vinyl karet 30/30 m² Rp 265,000.00 ###
49 Batu Hias buah Rp 5,000.00 ###
50 Batu Alam m² Rp 115,000.00 ###
###
###
Page 15 of 76
1.7. Bahan Besi ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Besi Beton Ulir kg Rp 22,000.00 ###
2 Besi Beton Polos kg Rp 20,000.00 ###
3 Besi Profil Siku ST 33 Kg Rp 26,000.00 ###
4 Besi Plat kg Rp 27,000.00 ###
5 Besi profil siku ST 37 Kg Rp 27,000.00 ###
6 Besi Baja WF dan Sejenisnya ST 37 Kg Rp 19,600.00 ###
7 Besi Black steel (S40) Kg Rp 33,000.00 ###
8 Alluminium Kuzen tebal 1,35 mm (natural) m1 Rp 158,000.00 ###
9 Alluminium Kuzen tebal 1,35 mm (Warna) m1 Rp 165,000.00 ###
10 Besi canal C Kg Rp 27,000.00 ###
11 Kawat Ikat Beton kg Rp 33,000.00 ###
12 Kawat Nyamuk Besi m² Rp 33,000.00 ###
13 Kawat Nyamuk Plastik m² Rp 26,000.00 ###
14 Kawat Saringan Pasir m² Rp 32,000.00 ###
15 Kawat Duri rol Rp 158,000.00 ###
16 Kawat Bronjong 3 mm kg Rp 42,000.00 ###
17 Kawat Bronjong 4 mm kg Rp 42,000.00 ###
18 Kawat 3 mm (gulungan) kg Rp 23,000.00 ###
19 Kawat Las kg Rp 78,000.00 ###
20 Jaring kawat baja dilas Kg Rp 26,000.00 ###
21 Besi Angkur Ø 8 mm Kg Rp 33,000.00 ###
22 Besi strip tebal 5 mm Kg Rp 33,000.00 ###
23 Besi strip 2 x 3 mm Kg Rp 33,000.00 ###
24 Baja strip (0,2 x 2) cm Kg Rp 33,000.00 ###
25 Baja strip Kg Rp 33,000.00 ###
26 Besi list kaca (1 x 1) cm m1 Rp 324,000.00 ###
27 Pintu gulung besi m2 Rp 771,000.00 ###
28 Pintu lipat baja Folding door m2 Rp 324,000.00 ###
29 Sunscreen alluminium m2 Rp 463,000.00 ###
30 Rolling door alluminium m2 Rp 701,000.00 ###
31 Alumunium strip m1 Rp 65,000.00 ###
32 Alumunium voil Lbr Rp 139,000.00 ###
33 Pintu Alumunium m1 Rp 159,000.00 ###
34 Hollow 20.40 mm Aluminium m1 Rp 29,166.67
35 Back Mullion 50.100 mm m1 Rp 225,000.00
36 Transom 50.75 mm m1 Rp 115,000.00
37 Profile Aluminium 50.150 mm m1 Rp 200,000.00
38 Profil kaca alluminium m1 Rp 66,000.00 ###
39 Hollow Galvanis 40.40.2 mm m1 Rp 40,000.00 ###
40 Hollow Galvanis 40.40.1,4 mm m1 Rp 33,333.33
41 Hollow Galvanis 40.60.1,4 mm m1 Rp 50,000.00
42 Hollow Galvanis 40.80.1,4 mm m1 Rp 54,166.67
43 Hollow Galvanis 50.100.1,4 mm m1 Rp 75,000.00
44 Shadow line dari U chanel aluminium m1 Rp 6,500.00
45 Expanded Metal Mesh T. 3 mm m1 Rp 260,416.67
46 Expanded Metal Mesh T. 5 mm m1 Rp 868,055.56
47 Besi Strip Ukuran 2 cm x 5 mm m1 Rp 11,634.62
48 Shadow line dari U chanel aluminium m1 Rp 6,500.00
49 Rangka metal hollow 35.35.0,3 mm m1 Rp 13,800.00 ###
50 Rangka metal hollow 35.20.0,3 mm m1 Rp 8,500.00 ###
51 Rangka C-7575 Galv =1 m' m1 Rp 12,000.00 ###
52 Reng Baja Ringan m1 Rp 10,000.00
53 Jendela nako (rangka + kaca 5 mm) m2 Rp 295,000.00 ###
Page 16 of 76
54 Kawat 4 mm (gulungan) kg Rp 23,000.00 ###
55 Pagar BRC 120x240 cm buah Rp 494,000.00 ###
56 Tiang BRC 1.5"x120 cm buah Rp 116,000.00 ###
57 Knop Tiang BRC 1.5" buah Rp 11,000.00 ###
58 Pintu BRC 120x100 cm Swing Tunggal buah Rp 712,000.00 ###
59 Mur Baut BRC M8x80 buah Rp 4,000.00 ###
60 Pintu Intake Irigasi 400 x 400 x 1700 unit Rp 8,122,000.00 ###
61 Pintu Penstock 500 x 1.700 x 2.990 unit Rp 110,000.00 ###
62 Trash rack 1.800 x 2.000 unit Rp 118,000.00 ###
63 Besi siku L 5 x 5 Kg Rp 27,000.00
64 Connector las Kg Rp 30,000.00
###
###
###
Page 17 of 76
1.8. Bahan Langit-langit ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Eternit 100 x 100 Cm lembar Rp 30,000.00 ###
2 Triplek 120x240x 2 mm lembar Rp 80,000.00 ###
3 Triplek 120x240x 3 mm lembar Rp 85,000.00 ###
4 Triplek 120x240x 6 mm lembar Rp 130,000.00 ###
5 Triplek 120x240x 9 mm lembar Rp 205,000.00 ###
6 Triplek 120x240x 12 mm lembar Rp 265,000.00 ###
7 Triplek 120x240x 18 mm lembar Rp 365,000.00 ###
8 Triplek lapis aluminium lembar Rp 175,000.00 ###
9 Multipleks 120 x 240 x 12 mm lembar Rp 270,000.00 ###
10 Multipleks 120 x 240 x 18 mm lembar Rp 380,000.00 ###
11 Multipleks 120 x 240 x 4 mm lembar Rp 115,000.00 ###
12 Multipleks 120 x 240 x 6 mm lembar Rp 120,000.00 ###
13 Multipleks 120 x 240 x 9 mm lembar Rp 205,000.00 ###
14 Calsiboard 120x240x3,5 mm lembar Rp 100,000.00 ###
15 Calsiboard 120x240x6 mm lembar Rp 120,000.00 ###
16 Calsiplank 0,8x20cm m1 Rp 17,000.00 ###
17 Calsiplank 0,8x30cm m1 Rp 27,000.00
18 Gypsum board 1200 x 2400 x 6 mm lembar Rp 96,000.00 ###
19 Gypsum board 1200 x 2400 x 9 mm lembar Rp 145,000.00 ###
20 Akustik 30/30 lembar Rp 25,000.00 ###
21 Akustik 30/60 lembar Rp 50,000.00 ###
22 Akustik 30/60 lembar Rp 50,000.00 ###
23 Akustik 60/120 lembar Rp 200,000.00 ###
24 Asbes semen (Eternit) lembar Rp 30,000.00 ###
25 Sungkai 120x240x 3 mm lembar Rp 175,000.00 ###
26 Mega Teakwood 120x240x 3 mm lembar Rp 170,000.00 ###
27 Formika Putih 120 x 240 Cm lembar Rp 240,000.00 ###
28 Formika Warna 120 x 240 Cm lembar Rp 270,000.00 ###
29 Gypsum m1 Rp 22,000.00 ###
30 List Gypsum Profil m1 Rp 39,000.00 ###
31 List Kayu Profil m1 Rp 9,000.00 ###
32 GRC ( 6 mm ) lembar 118,000.00 ###
33 GRC ( 9 mm ) lembar 203,490.00 ###
34 GRC ( 12 mm ) lembar 238,170.00 ###
35 Lem Kayu kg Rp 50,000.00 ###
36 Lem kg Rp 38,000.00 ###
37 Lem Vinyl kg Rp 38,000.00 ###
38 Connector bolt bh Rp 3,500.00
39 Spigot bh Rp 5,000.00
40 Silent tube Rp 25,000.00
41 ACP - PVDF 0,5 m2 Rp 632,600.00
41 ACP - 4 mm PVDF (Outdoor) m2 Rp 479,166.67
41 Plafond PVC T= 8 mm lembar Rp 20,500.00
###
###
###
Page 18 of 76
1.9. Bahan Pipa ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
PIPA GI ###
1 Pipa GI Ø ½" m1 Rp 43,500.00 ###
2 Pipa GI Ø ¾" m1 Rp 49,500.00 ###
3 Pipa GI Ø 1" m1 Rp 58,000.00 ###
4 Pipa GI Ø 1 ½" m1 Rp 87,000.00 ###
5 Pipa GI Ø 2" m1 Rp 145,000.00 ###
6 Pipa GI Ø 3" m1 Rp 245,000.00 ###
7 Pipa GI Ø 4" m1 Rp 394,000.00 ###
8 Pipa GI Ø 6" m1 Rp 640,000.00 ###
9 Pipa GI Ø 8" m1 Rp 1,072,500.00 ###
10 Pipa GI Ø 10" m1 Rp 1,511,500.00 ###
11 Pipa GI Ø 12" m1 Rp 1,879,500.00 ###
12 Pipa GI Ø 14" m1 Rp 2,312,000.00 ###
13 Pipa GI Ø 16" m1 Rp 2,744,500.00 ###
###
###
###
1.9. Bahan Pipa ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
PIPA VPC ###
1 Pipa PVC Ø ½" m1 Rp 7,500.00 ###
2 Pipa PVC Ø ¾" m1 Rp 10,000.00 ###
3 Pipa PVC Ø 1" m1 Rp 15,000.00 ###
4 Pipa PVC Ø 1 1/4" m1 Rp 50,000.00 ###
5 Pipa PVC Ø 1 ½" m1 Rp 44,500.00 ###
6 Pipa PVC Ø 2" m1 Rp 108,000.00 ###
7 Pipa PVC Ø 3" m1 Rp 159,500.00 ###
8 Pipa PVC Ø 4" m1 Rp 87,500.00 ###
9 Pipa PVC Ø 6" m1 Rp 352,500.00 ###
10 Pipa PVC Ø 8" m1 Rp 474,500.00 ###
11 Pipa PVC Ø 10" m1 Rp 879,000.00 ###
12 Pipa PVC Ø 12" m1 Rp 1,458,500.00 ###
14 Pipa PVC Dia. 2" Tipe D m1 Rp 32,500.00 ###
15 Pipa PVC Dia. 2 ½" Tipe D m1 Rp 49,000.00 ###
16 Pipa PVC Dia. 3" Tipe D m1 Rp 28,500.00 ###
17 Pipa PVC Dia. 4" Tipe D m1 Rp 32,500.00 ###
18 Waterstop PVC b = 150 mm (Talang b = 15 cm) m1 Rp 37,000.00 ###
19 Waterstop PVC b = 200 mm (Talang b = 20 cm) m1 Rp 32,500.00 ###
20 Waterstop PVC b = 230-320 mm (Talang b = 23-32 cm) m1 Rp 37,000.00 ###
21 Pipa Galvanized 1 1/4" m1 Rp 100,500.00 ###
22 Pipa Penstock Ø 370 mm, Tebal 5 mm m1 Rp 2,256,000.00 ###
PIPA HDPE ###
1 Pipa HDPE Ø ¾ " m1 Rp 15,500.00 ###
2 Pipa HDPE Ø 1" m1 Rp 22,500.00 ###
3 Pipa HDPE Ø 1¼ " m1 Rp 36,500.00 ###
4 Pipa HDPE Ø 1½ " m1 Rp 56,000.00 ###
5 Pipa HDPE Ø 2 " m1 Rp 88,000.00 ###
6 Pipa HDPE Ø 2½ " m1 Rp 123,000.00 ###
7 Pipa HDPE Ø 3 " m1 Rp 177,500.00 ###
Page 19 of 76
8 Pipa HDPE Ø 4 " m1 Rp 268,000.00 ###
9 Pipa HDPE Ø 4½ " m1 Rp 338,000.00 ###
10 Pipa HDPE Ø 5 " m1 Rp 391,000.00 ###
11 Pipa HDPE Ø 6 " m1 Rp 553,000.00 ###
12 Pipa HDPE Ø 7 " m1 Rp 644,000.00 ###
13 Pipa HDPE Ø 8 " m1 Rp 858,500.00 ###
14 Pipa HDPE Ø 9 " m1 Rp 1,007,000.00 ###
15 Pipa HDPE Ø 10 " m1 Rp 1,232,000.00 ###
PIPA TIDAK BERTEKANAN ###
1 Pipa GI Ø 3" m1 Rp 98,000.00 ###
2 Pipa PVC Ø 3" m1 Rp 52,500.00 ###
3 Pipa PVC Ø 4" m1 Rp 86,000.00 ###
4 Pipa Screen Ø 4" bh Rp 27,000.00 ###
5 Pipa PVC Ø 6" m1 Rp 88,000.00 ###
6 Bend 90 o Pipa PVC AW Ø 3" bh Rp 158,000.00 ###
7 Reducer PVC Ø 6"4" bh Rp 50,500.00 ###
8 Kran Ø 3" bh Rp 534,500.00 ###
9 Lem PVC kg Rp 158,000.00 ###
Kran ###
1 Dia ½" Buah Rp 67,000.00 ###
2 Dia ¾" Buah Rp 102,500.00 ###
3 Mata gergaji besi Buah Rp 114,000.00 ###
4 Stang gergaji besi Buah Rp 47,500.00 ###
5 Betel besar Buah Rp 28,500.00 ###
6 Betel kecil Buah Rp 14,500.00 ###
7 Bend Section Ø 370 mm, Tebal 5 mm Buah Rp 3,323,500.00 ###
8 Expantion Join Ø 370 mm Set Rp 368,000.00 ###
Pipa PPRN
1 Pipa PPR dia, 32 mm m1 Rp 56,000.00
2 Pipa PPR dia, 25 mm m1 Rp 38,000.00
3 Pipa PPR dia, 20 mm m1 Rp 31,000.00
Pipa Stainless
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
###
###
Page 20 of 76
1.10. Bahan Kaca ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Kaca Polos 3 mm m² Rp 124,000.00 ###
2 Kaca Polos 5 mm m² Rp 155,000.00 ###
3 Kaca Polos 8 mm m² Rp 170,000.00 ###
4 Kaca Polos 10 mm m² Rp 303,000.00 ###
5 Kaca Riben Tebal 3 mm m² Rp 119,000.00 ###
6 Kaca Riben Tebal 5 mm m² Rp 198,000.00 ###
7 Kaca Raiben 10 mm m² Rp 337,000.00 ###
8 Kaca Raiben 12 mm m² Rp 379,000.00 ###
9 Kaca Buram 3 mm m² Rp 160,000.00 ###
10 Kaca Buram 5 mm m² Rp 228,000.00 ###
11 Kaca Buram bermotif 3 mm m² Rp 211,000.00 ###
12 Kaca Buram bermotif 5 mm m² Rp 261,000.00 ###
13 Kaca Cermin 5 mm m² Rp 127,000.00 ###
14 Kaca Wire Glass 5 mm m² Rp 253,000.00 ###
15 Kaca Wire Glass 8 mm m² Rp 253,000.00 ###
16 Glass Blok buah Rp 43,000.00 ###
17 Kerangka Nako 5 mm m² Rp 120,000.00 ###
18 Kerangka Es 3 mm m² Rp 127,000.00 ###
19 Kaca tempered reflektif stopsol 5 mm m² Rp 295,000.00
20 Kaca tempered reflektif stopsol 8 mm-Euro Grey m² Rp 900,000.00
###
###
1.11. Bahan Fhinising ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Ampelas lembar Rp 5,000.00 ###
2 Plamir Kayu kg Rp 30,500.00 ###
3 Spiritus liter Rp 17,500.00 ###
4 Soda Api kg Rp 19,800.00
5 Minyak Cat liter Rp 36,000.00 ###
6 Residu liter Rp 19,000.00 ###
7 Teak Oil liter Rp 44,000.00 ###
8 Melamin lembar Rp 98,500.00 ###
9 Aluminium Pintu Kamar Mandi lembar Rp 159,000.00 ###
10 Meni Besi kg Rp 35,000.00 ###
11 Meni Kayu kg Rp 30,500.00 ###
12 Cat Kayu Mutu Menengah kg Rp 64,500.00 ###
13 Cat Kayu Mutu Tinggi kg Rp 96,500.00 ###
14 Cat Tembok Mutu Menengah Kg Rp 71,500.00 ###
15 Cat Tembok Mutu Tinggi kg/ kaleng Rp 130,000.00 ###
16 Cat Dasar Tembok Mutu Tinggi Kg Rp 130,000.00 ###
17 Cat Dasar Kayu Kg Rp 32,000.00 ###
18 Cat Dasar Tembok Mutu Menengah Kg Rp 71,500.00 ###
19 Cat Dasar alkali 1 x Kg Rp 56,000.00 ###
20 Cat Exterior jenis Weathershield ( Cat dasar 1 x ) liter Rp 130,000.00 ###
21 Cat Exterior jenis Weathershield ( Cat penutup 2 x ) liter Rp 130,000.00 ###
22 Cat Besi kg Rp 41,500.00 ###
23 Cat Besi Khusus Galvanis kg Rp 90,000.00
24 Cat genteng Kg Rp 75,000.00 ###
25 Kuas bh Rp 12,500.00 ###
Page 21 of 76
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
26 Plamir Kayu liter Rp 24,500.00 ###
27 Plamir Tembok kg Rp 12,000.00 ###
28 Tepung Gypsum Kg Rp 23,000.00 ###
29 Teer liter Rp 8,500.00 ###
30 Politur liter Rp 68,500.00 ###
31 Cat Marka Jalan Scalato kg Rp 10,500.00 ###
32 Minyak Cat liter Rp 50,500.00 ###
33 Aqua Proff kg Rp 68,500.00 ###
34 Cat Marka Jalan Biasa kg Rp 82,000.00 ###
35 Cairan Pengupas Cat kg Rp 243,000.00 ###
36 Cairan Pengeras Cat (Hardner) kg Rp 224,000.00 ###
37 Roll cat buah Rp 15,500.00 ###
38 Kape buah Rp 8,000.00 ###
39 Sikat Baja buah Rp 21,500.00 ###
###
###
1.12. Bahan Kunci ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Kunci pintu mutu menengah buah Rp 133,500.00 ###
2 Kunci pintu mutu Tinggi buah Rp 375,000.00 ###
3 Yale Kecil buah Rp 73,000.00 ###
4 Yale Besar buah Rp 131,000.00 ###
5 Kuda Terbang Kecil buah Rp 75,000.00 ###
6 Kuda Terbang Besar buah Rp 93,000.00 ###
7 Royal stel Rp 62,500.00 ###
8 Haag Angin Besar stel Rp 25,000.00 ###
9 Haag Angin Kecil stel Rp 15,000.00 ###
10 Grendel Besar buah Rp 16,000.00 ###
11 Grendel Kecil buah Rp 50,000.00 ###
12 Engsel Stainless ps Rp 100,000.00 ###
13 Engsel Casement 12" ps Rp 140,000.00 ###
14 Expagnolet buah Rp 71,000.00 ###
15 Kunci Tanam Biasa buah Rp 115,000.00 ###
16 Kunci Tanam Biasa Mutu Menengah buah Rp 191,000.00 ###
17 Kunci Tanam Antik buah Rp 306,000.00 ###
18 Kunci Silinder buah Rp 54,000.00 ###
19 Kunci Slot buah Rp 84,500.00 ###
20 Door Holder buah Rp 46,000.00 ###
21 Door Closer buah Rp 650,000.00 ###
22 Door Stop buah Rp 58,500.00 ###
23 Rel Pintu buah Rp 34,500.00 ###
24 Daun Pintu Besi m² Rp 1,253,000.00 ###
25 Handle pintu buah Rp 175,000.00 ###
26 Kunci Pintu Kaca Frameless 10 mm Set Rp 850,000.00
27 Engsel Pintu Kaca Frameless 10 mm Set Rp 1,250,000.00
###
###
###
Page 22 of 76
1.13. Bahan Sanitair ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Kloset Duduk Keramik buah Rp 3,269,000.00 ###
2 closet duduk C 421 J closet body komplit : buah Rp 4,800,000.00 ###
3 Eco-Washer TCW07S : buah Rp 1,250,000.00 ###
4 closet duduk C704L-SW784JP closet body : buah Rp 3,269,000.00 ###
5 Urinal ex. Toto tipe U57M Muslim type urinal buah Rp 2,384,000.00 ###
6 T60P buah Rp 900,000.00 ###
7 Urinal partition w/fittings tipe AW 115J buah Rp 1,250,000.00 ###
8 Closet Jongkok Porselin buah Rp 350,000.00 ###
9 Wastafel buah Rp 2,000,000.00 ###
10 Wastafel setara TOTO type Tipe LW 651 J buah Rp 2,500,000.00 ###
11 Wastafel setara TOTO type Tipe LW 103 JT1 buah Rp 2,500,000.00 ###
12 Wastafel Long Stainless buah Rp 7,000,000.00 ###
13 Urinoir Porselin (kualitas no. 1) buah Rp 2,384,000.00 ###
14 Saringan air besi buah Rp 76,500.00 ###
15 Saringan Air Plastik buah Rp 21,000.00 ###
16 Septictank Kapasitas 1 M3 buah Rp 5,095,000.00 ###
17 Septictank Kapasitas 2 M3 buah Rp 6,743,000.00 ###
18 Bak Fiberglass 1,00 M3 buah Rp 1,022,000.00 ###
19 Bak Fiberglass 0,30 M3 buah Rp 413,000.00 ###
20 Kran Air Dia. 1/2" buah Rp 60,000.00 ###
21 Kran Air Dia. 3/4" buah Rp 80,000.00 ###
22 Stop kran dia. 1" buah Rp 84,500.00
23 Stop kran dia. 1 1/4" buah Rp 145,000.00
24 Stop kran dia. 2" buah Rp 275,000.00
25 Kran dinding T 23B 13V7N buah Rp 325,000.00 ###
26 Kran dinding ex. Toto tipe T 23BQ 13N buah Rp 385,000.00 ###
27 Kran dinding ex. Toto tipe TX 603 KM buah Rp 615,000.00 ###
28 Kran Washtafel ex. Toto TX109LD buah Rp 530,000.00
29 Jet Shower buah Rp 65,000.00
30 Paper holder ex. Toto tipe TX 703 AESV1 buah Rp 445,000.00 ###
31 Grab Bar tipe TX3A3 (Panjang 800 mm) ex. Toto buah Rp 585,000.00 ###
32 Double Robe Hook ex. TOTO Type TS 118 WS buah Rp 125,000.00 ###
33 Floor drain Ex TOTO Type TX 1 BN buah Rp 215,000.00 ###
34 Floor Drain buah Rp 50,000.00 ###
35 Roof Drain buah Rp 200,000.00
36 Seal tape buah Rp 4,000.00 ###
37 Tandon air kap. 5 m3 buah Rp 6,500,000.00
38 Grill Saluran Plastik m Rp 400,000.00
###
###
Page 23 of 76
1.14. Bahan Paku ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Paku 1 cm 2,5 cm kg Rp 26,500.00 ###
2 Paku 5 cm 10 cm kg Rp 25,000.00 ###
3 Paku 5 cm 7 cm kg Rp 24,500.00 ###
4 Paku 5 cm 12 cm kg Rp 23,000.00 ###
5 Paku 10 cm kg Rp 23,000.00 ###
6 Paku 12 cm kg Rp 23,000.00 ###
7 Paku sekrup kg Rp 23,000.00 ###
8 Paku kait Buah Rp 2,500.00 ###
9 Paku Usuk kg Rp 27,000.00 ###
10 Paku Reng kg Rp 30,500.00 ###
11 Paku Eternit kg Rp 37,000.00 ###
12 Paku Seng kg Rp 33,000.00 ###
13 Paku Asbes Kotak Rp 32,500.00 ###
14 Paku Gypsumboard kg Rp 35,000.00 ###
15 Skrup / Piles 1,5 Cm. Doos Kecil Rp 11,500.00 ###
16 Skrup / Piles 2,0 Cm. Doos Kecil Rp 14,000.00 ###
17 Paku hak panjang 15 cm buah Rp 1,500.00
18 Screw SDS 65 mm buah Rp 1,500.00 ###
19 Besi Beugel/ Baut (utk kuda-kuda) buah Rp 36,000.00 ###
20 Skrup/Piles 2 cm doos kecil Rp 12,000.00 ###
21 Paku Skrup 5 cm Kg Rp 27,000.00 ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
Page 24 of 76
1.15. Bahan Listrik ###
###
NO URAIAN SATUAN HARGA SATUAN KET.
###
1 2 3 5 6 ###
###
1 Titik Lampu buah Rp 318,500.00 ###
2 Stop Kontak Tanam buah Rp 245,000.00 ###
3 Stop Kontak Luar buah Rp 242,000.00 ###
4 Saklar ganda buah Rp 32,000.00 ###
5 Saklar tunggal buah Rp 26,000.00 ###
6 Zekering Boxes 1 Group buah Rp 344,000.00 ###
7 Zekering Boxs 2 Group buah Rp 446,000.00 ###
8 Zekering Boxs 3 Group buah Rp 547,000.00 ###
9 Box Skring 2 Grup bh Rp 199,000.00 ###
10 Tiang Utama ( T.Beton 11 Meter ) batang Rp 6,029,000.00 ###
11 Tiang Utama ( T.Besi 9 meter ) m³ Rp 3,566,000.00 ###
12 Isolator Tumpu 20 kV buah Rp 322,500.00 ###
13 Isolator Tarik 20 kV buah Rp 460,000.00 ###
14 Konduktor AAAC 70 mm2 m1 Rp 36,000.00 ###
15 Faktor Pemasangan AAAC 0,035 m1 Rp 36,000.00 ###
16 Faktor Pemasangan LVTC 0,035 m1 Rp 63,500.00 ###
17 Trackschoor set Rp 1,103,000.00 ###
19 a. Type A1 set Rp 581,000.00 ###
20 b. Type A3 set Rp 1,348,000.00 ###
21 Cross Arm A1 UNP. 80 set Rp 942,000.00 ###
22 Cross Cut Out UNP. 80 set Rp 942,000.00 ###
23 Distribusi Tie 70 mm2 buah Rp 31,000.00 ###
24 LVTC 3 x 70 + 50mm2 m1 Rp 73,000.00 ###
25 Suspension Assembly buah Rp 118,000.00 ###
26 Large Angle Assembly buah Rp 170,500.00 ###
27 Fixed Dead End buah Rp 125,500.00 ###
28 Bundel Assembly buah Rp 74,500.00 ###
29 Tap Connector 70/50 mm2 buah Rp 22,500.00 ###
30 Joint Sleve 70 mm2 buah Rp 71,000.00 ###
31 Arde 5 OHM buah Rp 1,170,000.00 ###
32 Arde U/5 OHM pasangan luar buah Rp 1,174,000.00 ###
33 Arde U/3 OHM pasangan luar set Rp 1,669,000.00 ###
34 Trafo 50 kVA / 20 KV (Step Up), 3 Phasa unit Rp 94,466,000.00 ###
35 Fuse Cut Out 20 kV buah Rp 1,366,000.00 ###
36 Lighting Arrester 20 kV buah Rp 1,382,000.00 ###
37 LBS /Sistem interkoneksi + Accesories buah Rp 7,558,000.00 ###
38 Penghalang Panjat buah Rp 103,000.00 ###
39 Tanda Kilat Besar buah Rp 113,500.00 ###
40 Yser Werk U/Trafo 3 Phase, konst. 2 tiang set Rp 2,668,000.00 ###
41 LV Board U/ 2 Jurusan, 3 phase set Rp 12,729,000.00 ###
42 Tap Conector 50 mm2 AL. AL buah Rp 33,500.00 ###
43 DL 5" buah Rp 175,000.00 ###
44 DL 4" buah Rp 140,000.00
45 Lampu Led 10 watt buah Rp 65,000.00 ###
46 Lampu baret Led 10 watt buah Rp 130,000.00
47 Inbowdoos seng buah Rp 15,000.00
Page 25 of 76
1.16. Bahan Tambahan
NO URAIAN SATUAN HARGA SATUAN KET.
1 2 3 5 6 ###
Page 26 of 76
1.17. Bahan Elektrikal
NO URAIAN SATUAN HARGA SATUAN KET.
1 2 3 5 6 ###
1 Box panel PVC isi 4 MCB bh Rp 452,100.00 ###
2 Kabel NYY 2 x 2,5 mm m1 Rp 7,000.00 ###
3 Kabel NYY 3 x 2,5 mm m1 Rp 13,740.00 ###
4 Kabel NYY 4 x 16 mm m1 Rp 285,000.00
5 Kabel NYY 4 x 6 mm m1 Rp 150,000.00
6 Kabel NYY 4 x 4 mm m1 Rp 135,000.00
7 Kabel NYY 3 x 4 mm m1 Rp 110,000.00
8 Kabel NYFGbY 4 x 70 mm m1 Rp 655,000.00
9 Kabel Tanam NYY 3 x 2.5 mm m1 Rp 25,000.00
10 NYMHY 3x1,5mm m1 Rp 7,300.00
11 Kabel telephone 4 x 0.5 mm m1 Rp 2,100.00 ###
12 Isolasi bh Rp 12,000.00 ###
13 Klem bh Rp 1,000.00
14 T Dus bh Rp 2,000.00
15 Las dop bh Rp 250.00
16 Lbow bh Rp 3,000.00
17 Saklar tunggal bh Rp 26,000.00 ###
18 Saklar ganda bh Rp 32,000.00 ###
19 Stop kontak bh Rp 32,000.00 ###
20 Stop Kontak AC bh Rp 34,000.00 ###
21 Lampu LED Spot (sorot) 8-10 watt bh Rp 384,000.00
22 Lampu LED Neon Flex-Besar (Outdoor) bh Rp 42,500.00
23 Downlight Slim Inbow LED 12 W bh Rp 180,000.00 ###
24 Downlight Slim Inbow LED 18 W bh Rp 210,000.00 ###
25 Lampu TL LED 2x36 watt bh Rp 165,000.00 ###
26 Pipa Listrik 5/8" btg Rp 17,000.00 ###
27 Fitting plafond + lampu SL bh Rp 38,500.00 ###
28 Lampu TL 2 x 18 watt grille bh Rp 250,000.00 ###
29 Lampu TL 2 x 36 watt grille bh Rp 350,000.00 ###
30 Material Bantu Instalasi Listrik Ls. Rp 8,500.00
31 Box Panel 60x40x20 bh Rp 1,100,000.00
32 Box Panel 40x30x20 bh Rp 950,000.00
33 MCCB 150A 3P / 50kA bh Rp 3,250,000.00
34 MCCB 25A 3P / 18kA bh Rp 1,100,000.00
35 MCCB 40A 3P / 18kA bh Rp 1,650,000.00
36 MCCB 32A 3P / 18kA bh Rp 1,250,000.00
37 MCB 35A / 1p / 6kA bh Rp 125,000.00
38 MCB 16A / 1p / 6kA bh Rp 175,000.00
39 MCB 3P/ 16A/18 KA bh Rp 300,000.00
40 MCB 10A / 1p / 6kA bh Rp 175,000.00
41 MCB 6A / 1p / 6kA bh Rp 125,000.00
42 MCB 4A / 1p / 6kA bh Rp 85,000.00
43 Boks Zekring Plastik bh Rp 120,000.00
44 Arde kelas menengah bh Rp 55,000.00
45 Inbowdoos bh Rp 8,500.00
Page 27 of 76
NO URAIAN SATUAN HARGA SATUAN KET.
1 2 3 5 6 ###
Page 28 of 76
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
PERMEN PU NO 1 TAHUN 2022
PEKERJAAN : Perencanaan Renovasi Fasad Gedung Kantor Balai Monitor SFR Kelas II Mataram
LOKASI : Jalan Singosari No. 4 Mataram
TAHUN : 2023
Page 29 of 76
A. 2.2.1.13 Pembongkaran 1 m3 Beton Bertulang
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.33 100,000.00 133,340.00
Mandor L.04 OH 0.67 120,000.00 79,920.00
A TENAGA
Pekerja L.01 OH 0.67 100,000.00 66,670.00
Mandor L.04 OH 0.33 120,000.00 39,960.00
Page 30 of 76
Ls. Bongkar.06 Pembongkaran m2 Aluminium Composite Panel (ACP)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.80 100,000.00 80,000.00
Mandor L.04 OH 0.05 120,000.00 6,000.00
1.7.1.a (c) Penggalian 1 M3 Tanah Biasa Sedalam s.d. 1 m Untuk Volume s.d. 200 m3 Dalam Satu Lokasi
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.75 100,000.00 75,000.00
Mandor L.04 OH 0.03 120,000.00 3,000.00
Page 31 of 76
1.7.2.a (c) Pengurugan Kembali 1 m3 Galian Tanah
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.50 100,000.00 50,000.00
Mandor L.04 OH 0.05 120,000.00 6,000.00
Page 32 of 76
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
Page 33 of 76
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
Page 34 of 76
A.4.1.1.6 Pembuatan 1 m3 Beton Mutu f’c = 16.9 Mpa (K200)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 100,000.00 165,000.00
Tukang Batu L.02 OH 0.28 115,000.00 31,625.00
Kepala Tukang Batu L.03 OH 0.03 120,000.00 3,360.00
Mandor L.04 OH 0.08 120,000.00 9,960.00
Page 35 of 76
A.4.1.1.8 Pembuatan 1 m3 Beton Mutu f’c = 21.7 Mpa (K250)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 100,000.00 165,000.00
Tukang Batu L.02 OH 0.28 115,000.00 31,625.00
Kepala Tukang Batu L.03 OH 0.03 120,000.00 3,360.00
Mandor L.04 OH 0.08 120,000.00 9,960.00
Page 36 of 76
A.4.1.1.15.a Pembesian 10 kg dengan besi ulir
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang Besi Beton L.02 OH 0.07 115,000.00 8,050.00
Kepala Tukang Besi Beton L.03 OH 0.01 120,000.00 840.00
Mandor L.04 OH 0.00 120,000.00 480.00
Page 37 of 76
A.4.1.1.19 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung (2 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.52 100,000.00 52,000.00
Tukang Kayu L.02 OH 0.26 120,000.00 31,200.00
Kepala Tukang Kayu L.03 OH 0.03 125,000.00 3,250.00
Mandor L.04 OH 0.03 120,000.00 3,120.00
A.4.1.1.20 Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung (dua kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.33 120,000.00 39,600.00
Kepala Tukang Kayu L.03 OH 0.03 125,000.00 4,125.00
Mandor L.04 OH 0.03 120,000.00 3,960.00
Page 38 of 76
A.4.1.1.21 Pemasangan 1 m2 Bekisting untuk Balok Bangunan Gedung
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.33 120,000.00 39,600.00
Kepala Tukang Kayu L.03 OH 0.03 125,000.00 4,125.00
Mandor L.04 OH 0.03 120,000.00 3,960.00
Page 39 of 76
A.4.1.1.23 1 m3 Pembuatan Beton Pondasi
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A BAHAN
Beton K175 A.4.1.1.5 m3 1.00 1,452,630.93 1,452,630.93
Begisting Pondasi A.4.1.1.18 m2 2.40 284,086.00 681,806.40
Besi Beton Polos 2.2.6.1.b.(c).a kg 168.35 25,484.80 4,290,253.95
Page 40 of 76
A.4.2.1.3 100 Kg Pekerjaan Perakitan
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.10 100,000.00 10,000.00
Tukang Las L.02 OH 0.10 120,000.00 12,000.00
Kepala Tukang Las L.03 OH 0.001 125,000.00 125.00
Mandor L.04 OH 0.005 120,000.00 600.00
Page 41 of 76
A.4.2.1.20 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm. Modul 60 x 120 cm. untuk Partisi
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.25 100,000.00 25,000.00
Tukang Allumunium L.02 OH 0.25 115,000.00 28,750.00
Kepala Tukang Allumunium L.03 OH 0.03 120,000.00 3,000.00
Mandor L.04 OH 0.01 120,000.00 1,560.00
A.4.2.1.20.b Pemasangan 1 m2 Panel Expanded 5 mm Rangka Besi Hollow Galvanis 50.100 mm . 1,4 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.25 100,000.00 25,000.00
Tukang Las L.02 OH 0.25 120,000.00 30,000.00
Kepala Tukang Las L.03 OH 0.03 125,000.00 3,125.00
Mandor L.04 OH 0.01 120,000.00 1,560.00
Page 42 of 76
A.4.2.1.20.c Pemasangan 1 m2 Dinding Glass Reinforced Concrete (GRC) 12 mm Besi Hollow Galvanis 50.100 mm . 1,4 mm
A.4.2.1.20.d Pemasangan 1 m2 Dinding Glass Reinforced Concrete (GRC) 6 mm Rangka Hollow Aluminium 40.20 mm
Page 43 of 76
A.4.2.1.24 Pemasangan 1 m kusen aluminium (Warna)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.04 100,000.00 4,300.00
Tukang Allumunium L.02 OH 0.04 115,000.00 4,945.00
Kepala Tukang Allumunium L.03 OH 0.00 120,000.00 516.00
Mandor L.04 OH 0.00 120,000.00 252.00
Page 44 of 76
A.4.2.1.24.b Pemasangan 1 m Profile Aluminium 50.150 mm & Asessoris
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.04 100,000.00 4,300.00
Tukang Allumunium L.02 OH 0.04 115,000.00 4,945.00
Kepala Tukang Allumunium L.03 OH 0.00 120,000.00 516.00
Mandor L.04 OH 0.00 120,000.00 252.00
A. 4.4.1.4 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan Mortar tipe O. fc’ 2.4 Mpa ( Setara
Campuran 1SP : 5PP)
Page 45 of 76
A. 4.4.1.8 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan Mortar tipe S. fc’ 12. 5 Mpa ( Setara
Campuran 1SP : 3PP).
A. 4.4.1.10 Pemasangan 1m2 Dinding Bata Merah (5x11x22)cm Tebal ½ Batu dengan Mortar tipe O. fc’ 2.4 Mpa ( Setara
Campuran 1SP : 5PP)
Page 46 of 76
3.2 HARGA SATUAN PEKERJAAN PLESTERAN
Page 47 of 76
3.2.2.(c) Pemasangan 1 m2 acian
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.20 100,000.00 20,000.00
Tukang Batu L.02 OH 0.10 115,000.00 11,500.00
Kepala Tukang Batu L.03 OH 0.01 120,000.00 1,200.00
Mandor L.04 OH 0.01 120,000.00 1,200.00
Page 48 of 76
A.4.4.3.68.a Pemasangan 1 M2 Aluminium Composite Panel Porporasi
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.80 100,000.00 80,000.00
Tukang Allumunium L.02 OH 0.80 115,000.00 92,000.00
Kepala Tukang Allumunium L.03 OH 0.08 120,000.00 9,600.00
Mandor L.04 OH 0.05 120,000.00 6,000.00
A TENAGA
Pekerja L.01 OH 0.15 100,000.00 15,000.00
Tukang Kayu L.02 OH 0.75 120,000.00 90,000.00
Kepala Tukang Kayu L.03 OH 0.08 125,000.00 10,000.00
Mandor L.04 OH 0.01 120,000.00 720.00
Page 49 of 76
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
Page 50 of 76
A.4.7.1.5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang Cat L.02 OH 0.11 115,000.00 12,075.00
Kepala Tukang Cat L.03 OH 0.00 120,000.00 480.00
Mandor L.04 OH 0.00 120,000.00 360.00
A.4.7.1.5.a Pengecatan 1 m2 bidang kayu Lama (1 lapis cat dasar, 3 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang Cat L.02 OH 0.11 115,000.00 12,075.00
Kepala Tukang Cat L.03 OH 0.00 120,000.00 480.00
Mandor L.04 OH 0.00 120,000.00 360.00
Page 51 of 76
3.3.10.(c) Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang Cat L.02 OH 0.06 115,000.00 7,245.00
Kepala Tukang Cat L.03 OH 0.01 120,000.00 756.00
Mandor L.04 OH 0.00 120,000.00 360.00
Jumlah Upah Tenaga Kerja 10,361.00
B BAHAN
Plamir Tembok Kg 0.10 12,000.00 1,200.00
Cat Dasar Tembok Mutu Menengah Kg 0.10 71,500.00 7,150.00
Cat Tembok Mutu Menengah Kg 0.26 71,500.00 18,590.00
A.4.7.1.10.a Pengecatan 1 m2 Tembok Lama ( 1 lapis cat dasar, 1 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.01 100,000.00 666.67
Tukang Cat L.02 OH 0.02 115,000.00 2,415.00
Kepala Tukang Cat L.03 OH 0.00 120,000.00 252.00
Mandor L.04 OH 0.00 120,000.00 120.00
Page 52 of 76
A.4.7.1.22 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat terakhir
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.40 100,000.00 40,000.00
Tukang Cat L.02 OH 0.70 115,000.00 80,500.00
Kepala Tukang Cat L.03 OH 0.07 120,000.00 8,400.00
Mandor L.04 OH 0.02 120,000.00 2,400.00
A.4.7.1.3.14 Pengecatan 1 m2 cat tembok baru Exterior warna standar jenis Weathershield Pro ( 1 lapis cat dasar, 2
lapis cat penutup )
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang Cat L.02 OH 0.06 115,000.00 7,245.00
Kepala Tukang Cat L.03 OH 0.01 120,000.00 756.00
Mandor L.04 OH 0.00 120,000.00 360.00
Page 53 of 76
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
Page 54 of 76
Ls. Elektrik.02 Pek. instalasi titik Stop Kontak
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Upah L.02 OH 1.00 75,000.00 75,000.00
Page 55 of 76
Ls. Elektrik.04 Titik instalasi saklar tunggal
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Upah OH 1.00 10,000.00 10,000.00
Page 57 of 76
REKAPITULASI ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
PERMEN PU NO 1 TAHUN 2022
Pekerjaan : Perencanaan Renovasi Fasad Gedung Kantor Balai Monitor SFR Kelas II Mataram
Lokasi : Jalan Singosari No. 4 Mataram
T.A. : 2023
KELOMPOK
LEVEL 1 PEKERJAAN JENIS PEKERJAAN (SUB LEVEL 2) JUMLAH HARGA KET.
(LEVEL 2)
1 2 3 4 5
Divisi 4 A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.67 Pemasangan 1 M2 Aluminium Composite Panel (ACP) 4 mm PVDF (Outdoor) Rp 1,086,543.33
A.4.4.3.68.a Pemasangan 1 M2 Aluminium Composite Panel Porporasi Rp 1,138,720.00
Pekerjaan : Perencanaan Renovasi Fasad Gedung Kantor Balai Monitor SFR Kelas II Mataram
Lokasi : Jalan Singosari No. 4 Mataram
T.A. : 2023
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA
(Rp.)
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lapangan (Awal + Akhir) 1.000 Unit Ls 2,500,000.00
JUMLAH
II PEKERJAAN PEMBONGKARAN
1 Bongkar Pasang Outdoor AC dan Asessoris 1.000 Unit Ls 1,000,000.00
2 Bongkar Pipa Air Talang dan Asessoris 44.000 m1 Ls. Bongkar.05 9,438.00
3 Bongkar Dinding Aluminium Composite Panel (ACP) & Rangka 81.600 m2 Ls. Bongkar.06 94,600.00
6 Bongkar dan Pasang Kembali Kusen & Daun Jendela Aluminium 8.000 bh Ls 280,000.00
JUMLAH
III PEKERJAAN PENGECATAN DAN LAIN-LAIN
1 Pek. Pengikisan / Kupas Cat Lama (50%) 406.915 m2 3.3.1. (c) 17,985.00
3 Pek. Pipa PVC 4" AW dan Asessoris (Ketinggian ± 10 m) 44.000 m1 A.5.1.1.32 177,485.00
Pipa PVC
JUMLAH
B PEKERJAAN FASAD
JUMLAH
V PEKERJAAN PASANGAN
1 Pas. Batu Kali 1pc : 5ps 11.633 m3 2.1.1.c.(a) 930,963.00
2 Pas. Dinding 1/2 Bata 1pc : 5ps
3 Pas. Rollag 1 Bata 3.750 m2 A. 4.4.1.4 325,809.00
JUMLAH
VI PEKERJAAN STRUKTUR BETON
1 Beton Foot Plate 0.432 m3 A.4.1.1.23 6,424,691.28
Besi Beton Polos 168.346 Kg
JUMLAH
VII PEKERJAAN PLESTERAN & LANTAI
1 Pek. Plesteran Dinding 1pc : 5ps 80.995 m2 3.2.1 (c).a 70,065.60
JUMLAH
VIII PEKERJAAN BAJA
1 Rangka Besi Baja 2,297.029 Kg A.4.2.1.1 40,535.00
Besi Baja WF dan Sejenisnya ST 37
2 Plat Landas tebal 10 mm 11.775 Kg A.4.2.1.1 40,535.00
Plat Baja
3 Baut Angkur Ø 16 mm 16.000 bh Ls 50,000.00
JUMLAH
IX PEKERJAAN FASAD SISI A (REPETISI)
1 Pek. Panel Expanded Metal Mesh 5 mm 126.750 m2 A.4.2.1.20.b 1,690,160.76
Rangka Metal Hollow GI 50x100.1.4 mm
Hollow Galvanis 50.100.1,4 mm
Besi Strip Ukuran 2 cm x 5 mm
Expanded Metal Mesh T. 5 mm
2 Pek. Lampu LED Sorot Lantai (Warm White) 16.000 bh Ls. Elektrik.06 433,400.00
5 Cat Besi Mutu Tinggi (RAL 5013-RAL 7074) 253.500 m2 A.4.7.1.22 174,526.00
JUMLAH
X PEKERJAAN FASAD SISI B (REFLEKTIF)
1 Rangka Vertikal Back Mullion 50.100 mm dan Transom 50.75 mm 108.600 m1 A.4.2.1.24.a 425,648.30
Aluminium Rod Bar
2 Rangka Profile Aluminium 50.150 mm 56.500 m1 A.4.2.1.24.b 256,248.30
Aluminium Rod Bar
3 Backpan Span GRC 6 mm Rangka Hollow Aluminium 20x40 mm 96.066 m2 A.4.2.1.20.d 394,624.54
GRC 6 mm-GRC Board
Aluminium Rod Bar
4 Kaca Tempered Reflektif (stopsol) T. 8 mm-Euro Grey 96.066 m2 A.4.6.2.17.c 1,113,030.60
Kaca Stopsol 8 mm
5 Lampu LED Neonflex-Besar (Outdoor-Warm White) 125.950 m1 Ls. Elektrik.07 52,250.00
6 Instalasi Titik Lampu 1.000 titik Ls. Elektrik.01 277,750.00
Instalasi / Kabel
7 Saklar Tunggal 1.000 bh Ls. Elektrik.04 49,092.31
8 Cat Dinding Backpan Span GRC 6 mm 96.066 m2 A.4.7.1.3.14 58,339.60
Cat Exterior
9 Atap uPVC 10 mm-Warna Putih Rangka Metal Hollow 40.40 mm 30.250 m2 A.4.5.2.42.a 469,575.33
Atap uPVC
JUMLAH
XI PEKERJAAN FASAD SISI C (VERTIKAL GRC)
1 Penutup Fasad GRC 12 mm 334.850 m2 A.4.2.1.20.c 800,891.21
Rangka Metal Hollow GI 50x100.1.4 mm
GRC 12 mm-GRC Board
Hollow Galvanis 50.100.1,4 mm
2 Cutting GRC (Motif Lokal) 64.750 m2 Ls 500,000.00
3 Cat Dinding GRC (Ekterior-RAL 7035) 334.850 m2 A.4.7.1.3.14 58,339.60
Cat Exterior
4 Pek. Lampu LED Sorot Lantai (Warm White) 12.000 bh Ls. Elektrik.06 433,400.00
5 Instalasi Titik Lampu 12.000 titik Ls. Elektrik.03 272,250.00
Instalasi / Kabel
6 Saklar Tunggal 1.000 bh Ls. Elektrik.04 49,092.31
7 Logo SDPPI Bahan Metal Cutting Laser, Stainless Steel 0.6 mm 1.000 bh Ls 11,000,000.00
8 Logo Lumbung & Papan Narasi Bahan Plat Steinless Steel 1.000 bh Ls 10,000,000.00
Tebal 0.6 mm - finish Grafir
JUMLAH
XII PEKERJAAN FRAME FASAD GENERAL
1 Pek. Frame Fasad Aluminium Composite Panel (Outdoor) 169.895 m2 A.4.4.3.67 1,086,543.33
(ACP 4 mm PVDF-Doof) Rangka Metal Hollow 40.40 mm
ACP Outdoor
JUMLAH
JUMLAH HARGA (Rp.)
7
2,500,000.00
4,144,800.55
3,500,000.00
250,000.00
16,000,000.00
37,332,504.00
63,727,304.55
1,000,000.00
415,272.00
7,719,360.00
8,563,104.00
1,970,522.40
2,240,000.00
1,733,004.07
240,403.73
23,881,666.21
7,318,366.27
47,478,516.67
7,809,340.00
62,606,222.94
904,675.20
216,503.47
649,503.36
357,033.60
2,127,715.63
10,829,427.10
1,221,783.75
12,051,210.85
2,775,466.63
1,858,728.23
26,294,304.12
30,928,498.98
5,674,963.27
2,934,705.26
8,609,668.53
93,110,083.49
477,299.63
800,000.00
450,000.00
968,254.81
4,545,024.00
100,350,661.92
214,227,876.96
6,934,400.00
4,356,000.00
49,092.31
44,242,341.00
269,809,710.27
46,225,405.38
14,478,028.95
37,910,001.22
106,924,397.62
6,580,887.50
277,750.00
49,092.31
5,604,452.01
14,204,653.83
232,254,668.83
268,178,421.11
32,375,000.00
19,535,015.06
5,200,800.00
3,267,000.00
49,092.31
11,000,000.00
10,000,000.00
349,605,328.48
184,598,279.62
184,598,279.62
1,340,550,936.81
REKAPITULASI RENCANA ANGGARAN BIAYA
Pekerjaan : Perencanaan Renovasi Fasad Gedung Kantor Balai Monitor SFR Kelas II Mataram
Lokasi : Jalan Singosari No. 4 Mataram
T.A. : 2023
JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp)
1 2 3
A PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN 63,727,304.55
II PEKERJAAN PEMBONGKARAN 23,881,666.21
III PEKERJAAN PENGECATAN DAN LAIN-LAIN 62,606,222.94
B PEKERJAAN FASAD
IV PEKERJAAN TANAH & PASIR 2,127,715.63
V PEKERJAAN PASANGAN 12,051,210.85
VI PEKERJAAN STRUKTUR BETON 30,928,498.98
VII PEKERJAAN PLESTERAN & LANTAI 8,609,668.53
VIII PEKERJAAN BAJA 100,350,661.92
IX PEKERJAAN FASAD SISI A (REPETISI) 269,809,710.27
X PEKERJAAN FASAD SISI B (REFLEKTIF) 232,254,668.83
XI PEKERJAAN FASAD SISI C (VERTIKAL GRC) 349,605,328.48
XII PEKERJAAN FRAME FASAD GENERAL 184,598,279.62
TOTAL 1,340,550,936.81
PPN 11 % 147,460,603.05
JUMLAH SETELAH PPN 1,488,011,539.86
DIBULATKAN 1,488,000,000.00
#NAME?
Pekerjaan : Perencanaan Renovasi Fasad Gedung Kantor Balai Monitor SFR Kelas II Mataram
Lokasi : Jalan Singosari No. 4 Mataram
T.A. : 2023
1 2 3 4 5 6 7
A PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lapangan (Awal + Akhir) 1.000 Unit Ls 2,500,000.00 2,500,000.00
100.00% 2,500,000.00 - Perkiraan Sendiri
2 Pek. Pengukuran dan Bouwplng 33.550 m2 A. 2.2.1.4 123,541.00 4,144,800.55
100.00% 4,144,800.55 - Perkiraan Sendiri
3 Pek. Air dan Listrik Kerja 1.000 Unit Ls 3,500,000.00 3,500,000.00
100.00% 3,500,000.00 - Perkiraan Sendiri
4 Papan nama Proyek 1.000 Unit Ls 250,000.00 250,000.00
100.00% 250,000.00 - Perkiraan Sendiri
5 Direksi Keet dan SMK3 (terlampir) 1.000 Unit Ls 16,000,000.00 16,000,000.00
100.00% 16,000,000.00 - Perkiraan Sendiri
6 Sewa Scaffolding 50 set x 90 hari 90.000 hari A. 2.2.1.1 414,805.60 37,332,504.00
100.00% 37,332,504.00 - Perkiraan Sendiri
JUMLAH 63,727,304.55 63,727,304.55 -
II PEKERJAAN PEMBONGKARAN
1 Bongkar Pasang Outdoor AC dan Asessoris 1.000 Unit Ls 1,000,000.00 1,000,000.00
100.00% 1,000,000.00 - Perkiraan Sendiri
2 Bongkar Pipa Air Talang dan Asessoris 44.000 m1 Ls. Bongkar.05 9,438.00 415,272.00
100.00% 415,272.00 - Perkiraan Sendiri
3 Bongkar Dinding Aluminium Composite Panel (ACP) & Rangka 81.600 m2 Ls. Bongkar.06 94,600.00 7,719,360.00
100.00% 7,719,360.00 - Perkiraan Sendiri
4 Bongkar Keramik Dinding 81.600 m2 Ls. Bongkar.07 104,940.00 8,563,104.00
100.00% 8,563,104.00 - Perkiraan Sendiri
5 Bongkar Dinding 1/2 Bata (Ketinggian 10 m) 16.800 m3 A. 2.2.1.14 117,293.00 1,970,522.40
100.00% 1,970,522.40 - Perkiraan Sendiri
6 Bongkar dan Pasang Kembali Kusen & Daun Jendela Aluminium 8.000 bh Ls 280,000.00 2,240,000.00
100.00% 2,240,000.00 - Perkiraan Sendiri
7 Bongkar Trasram Kanstin Taman 14.775 m2 A. 2.2.1.14 117,293.00 1,733,004.07
100.00% 1,733,004.07 - Perkiraan Sendiri
8 Bongkar Beton Plat Sunscreen 1.025 m3 A. 2.2.1.13 234,586.00 240,403.73
100.00% 240,403.73 - Perkiraan Sendiri
JUMLAH 23,881,666.21 23,881,666.21 -
III PEKERJAAN PENGECATAN DAN LAIN-LAIN
1 Pek. Pengikisan / Kupas Cat Lama (50%) 406.915 m2 3.3.1. (c) 17,985.00 7,318,366.27
100.00% 7,318,366.27 - Perkiraan Sendiri
2 Pek. Pegecatan Dinding Mutu Tinggi (Eksterior) 813.830 m2 A.4.7.1.3.14 58,339.60 47,478,516.67
100.00% 47,478,516.67 - Perkiraan Sendiri
3 Pek. Pipa PVC 4" AW dan Asessoris (Ketinggian ± 10 m) 44.000 m1 A.5.1.1.32 177,485.00 7,809,340.00
Pipa PVC_Wavin Rucika 89.80% 7,012,787.32 796,552.68 Sertifikat TKDN
JUMLAH 62,606,222.94 61,809,670.26 796,552.68
B PEKERJAAN FASAD
71.42
KETERSEDIAAN KK /
DOUMEN PENDUKUNG
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
ada
ada
ada
Tidak ada
Tidak ada
ada
ada
Tidak ada
Tidak ada
Tidak ada
Tidak ada
ada
Tidak ada
ada
Tidak ada
ada
ada
ada
ada
ada
Tidak ada
ada
Tidak ada
ada
ada
ada
Tidak ada
ada
Tidak ada
ada
Tidak ada
Tidak ada
Tidak ada
ada
Pekerjaan : Perencanaan Renovasi Fasad Gedung Kantor Balai Monitor SFR Kelas II Mataram
Lokasi : Jalan Singosari No. 4 Mataram
T.A. : 2023
KODE
NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA
ANALISA
8 Rambu dan Perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas : 1.00 set ls 1,000,000.00 1,000,000.00
a Rambu Petunjuk;
b Rambu Larangan;
c Rambu Peringatan;
d Rambu Kewajiban;
e Rambu Informasi;
### : ###
### : ###
### : ###
### : ###
### : ###
#REF!
NO JENIS TENAGA JUMLAH SAT. MINGGU KE - KET.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
2 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
3 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
4 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
5 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
6 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
7 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
8 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
9 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
10 #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
###
###
###
###
REKAPITULASI JADWAL PENGGUNAAN MATERIAL
### : #REF!
### : #REF!
### : #REF!
### : #REF!
### : #REF!
#REF!
NO JENIS TENAGA JUMLAH SAT. MINGGU KE - KET.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
12 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
15 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
17 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
###
###
###
###