Anda di halaman 1dari 83

No Uraian Pekerjaan

I PEKERJAAN PERSIAPAN
1A Pembersihan Lahan L = P
= 20
= 200

1B Pagar Sementara K = 2P
= 40
= 60

1C Bowplank K = P
= 16
= 55

1D Direksi Keet Dan Gudang L = P


= 4
= 12

1E Keamanan
1F K3
1G Air kerja
1H Listrik kerja
1I Dokumentasi Dan Pelaporan
1K Mob-demob

II PEKERJAAN TANAH
Panjang Galian Pondasi Rumah Area Luar H = 4
= 18
V = 0
P = 18

Panjang Galian Pondasi Pager H = 10


= 20
V = 2
= 22
P = 42

Panjang Galian Pondasi Teras H = 4


= 7
V = 2
= 4
P = 11

Panjang Galian Pondasi Area Dalam H = 3


= 40
v = 8
= 33
= 72
2A Galian Tanah Pondasi
Volume galian pondasi area luar (p1) v = a

= 1

= 1

= 15

Volume galian pondasi pager (p6) v = a

= 0.55

= 1

= 20

Volume galian pondasi area dalam(p2,3,4) v = a

= 1.52

= 1

= 84

Volume galian pondasi teras (p5) v = a

= 1.52

= 1

= 9

TOTAL GALIAN 128.77

Volume galian pondasi setempat V = P


= 1.00
= 1.45
= 5.80
2B Pasir bawah pondasi
pasir bawah pondasi area luar (p1) v = a

= 0.77

= 1

= 0.68

Pasir bawah pondasi pager (p6) v = a

= 0.57

= 1

= 1.18

Pasir bawah pondasi teras (p5) v = a

= 0.99

= 1

= 0.55

Pondasi bawah area dalam (p2,3,4) v = a

= 0.98

= 1

= 3.47

TOTAL 5.89 mᶾ

Pasir bawah pondasi setempat V = P


= 1.00
= 0.05
= 0.20
Urugan Tanah Kembali pondasi menerus = Total galian pondasi
= 134.57
= 61.43

2C ANSTAMPING
Type 1 v = a

= 0.83

= 1

= 2.88

Type 6 v = a

= 0.62

= 1

= 3.00

type2,3,4 v = a

= 1.10

= 1

= 14.98

type 5 v = a

= 1.09

= 1

= 1.42

TOTAL 22.28 mᶾ
III PEK.PONDASI DAN BETON
3A PONDASI BATU KALI
TYPE 1 v = a

= 0.30

= 1

= 6.75

TYPE 6 v = a

= 0.43

= 0

= 7.28

TYPE 2,3,4 v = a

= 0.70

= 0

= 25.65

TYPE 5 v = a

= 0.70

= 0

= 2.98

TOTAL 42.7 mᶾ

Lantai kerja pondasi setempat V = P


= 1.00
= 0.10
= 0.40
Tapak Pondasi setempat V = P

= 1.00

= 0.35
= 1.40

Kolom pedestal V = P

= 0.30

= 0.08
= 0.32

TOTAL PONDASI SETEMPAT 1.72 Total

3B SLOOF
TYPE 1 V = P
= 143
4

Balok struktur 30/35 V = P


= 5
5.25

plat dag V = P
= 5
1.50

4C RING BALOK V = P
= 143
4

5D KOLOM PRAKTIS
Jumlah kolom praktis rumah 30
Jumlah kolom struktur rumah 4
Kolom 15/15 Tinggi 3,8m (rumah) V = P
= 0
= 3

Kolom 15/15 Tinggi 2,3m (Pager belakang) V = P


= 0
= 0

Kolom 15/15 Tinggi 2m (Pager depan) V = P


= 0
= 0.4050
TOTAL = 3.33

Kolom struktur 30/30 V = P


= 0
= 1.3860

6E BEKISTING
Bekisting Sloof L = P
= 143
= 57.36

Bekisting ring balok L = P


= 143
= 57.36

Bekisting Kolom praktis rumah L = K


= 0.60
= 68.40

Bekisting Kolom Praktis Pager Belakang L = K


= 0.60
= 9.66

Bekisting Kolom Praktis Pager Depan L = K


= 0.60
= 10.80
TOTAL BEKISTING KOLOM PRAKTIS

Bekisting Kolom Struktur L = K


= 1.20
= 18.48

Bekisting dag L = p
= 5.00
= 15.00

Bekisting Balok Struktur L PxTx2 +


11 +
= 16.00

Bekisting tapak pondasi struktur L = K


= 4.00
= 1.20

Bekisting Kolom pedstal L = K


= 1.20
= 1.08

TOTAL VOLUME BEKISTING PONDASI SETEMPAT


7F PEMBESIAN
Besi Sloof
Tulangan Pokok = Ø8
Jumlah Tulangan = 4
Panjang Tulangan = Panjang sloof
= 143
= 574

Ʃ Dalam Batang =

Ʃ Dalam Kilo =
=
=

Tulangan Sengkang
Panjang Sloof = 143
Jarak Sengkang = 0.1
Jumlah Sengkang = Panjang Sloof
Jarak Sengkang

Hak = 6 x Db =

Panjang 1 Sengkang = 0.69

Panjang Total Sengkang = 992


Ʃ dalam batang = 83
Ʃ dalam kilo = 219

RING BALOK
Tulangan Pokok = Ø8
Jumlah Tulangan = 4
Panjang Tulangan = Panjang sloof
= 143
= 574

Ʃ Dalam Batang =

Ʃ Dalam Kilo =
=
=

Tulangan Sengkang
Panjang Sloof = 143
Jarak Sengkang = 0.1
Jumlah Sengkang = Panjang Sloof
Jarak Sengkang

Hak = 6 x Db =

Panjang 1 Sengkang = 0.69

Panjang Total Sengkang = 992


Ʃ dalam batang = 83
Ʃ dalam kilo = 219

Kolom 15/15 Tinggi 3,8m (rumah)


Tinggi Kolom = 3.8
Tulangan Pokok = Ø8
Jumlah Tulangan = 4
P.tulangan = 15.2
Ʃ Dalam batang = 1.27 =
Ʃ Dalam Kilo = 6.00 =

Tulangan Sengkang
Jumlah Sengkang Tiap kolom = 32
Tinggi Kolom = 3.8
Hak = 6 x Db =
Selimut Beton = 0.10
P1 SENGKANG = 0.59
P Total Sengkang = 18.7
Ʃ Dalam Batang = 2 =
Ʃ Dalam Kilo = 4 =

Kolom 15/15 Tinggi 2,3m (Pager belakang)


Tinggi Kolom = 2.3
Tulangan Pokok = Ø8
Jumlah Tulangan = 4
P.tulangan = 9.2
Ʃ Dalam batang = 1 =
Ʃ Dalam Kilo = 4 =

Tulangan Sengkang
Jumlah Sengkang Tiap kolom = 19
Tinggi Kolom = 2.3
Hak = 6 x Db =
Selimut Beton = 0.10
P1 SENGKANG = 1
P Total Sengkang = 11
Ʃ Dalam Batang = 1 =
Ʃ Dalam Kilo = 3 =
Kolom 15/15 Tinggi 2m (Pager depan)
Tinggi Kolom = 2.0
Tulangan Pokok = Ø8
Jumlah Tulangan = 4
P.tulangan = 8.0
Ʃ Dalam batang = 1 =
Ʃ Dalam Kilo = 3 =

Tulangan Sengkang
Jumlah Sengkang Tiap kolom = 17
Tinggi Kolom = 2.0
Hak = 6 x Db =
Selimut Beton = 0.10
P1 SENGKANG = 1
P Total Sengkang = 10
Ʃ Dalam Batang = 1 =
Ʃ Dalam Kilo = 2 =

Kolom Struktur 30/30 , Tingg 3,8


Tinggi Kolom = 3.85
Tulangan Pokok = Ø12
Jumlah Tulangan = 4
P.tulangan = 15.4
Ʃ Dalam batang = 1.28 =
Ʃ Dalam Kilo = 13.7 =

Tulangan Sengkang
Jumlah Sengkang Tiap kolom = 32.08
Tinggi Kolom = 3.85
Hak = 6 x Db =
Selimut Beton = 0.40
P1 SENGKANG = 1
P Total Sengkang = 31
Ʃ Dalam Batang = 3 =
Ʃ Dalam Kilo = 12 =

Plat dag
Panjang dag (arah sumbuh y) = 5
Lebar dag (arah sumbuh x) = 3
Arah x
Jarak Tulangan = 0.1
Jumlah Tulangan = Panjang sumbuh y
Jarak Tulangan
Panjang 1 Tulangan = 3
Panjang Total = Jumlah Tulangan
= 50
= 150
Ʃ Dalam Batang = Panjang Total
12
Ʃ Dalam Kilo = Panjang Total
= 150
= 59.25
= 119 Kilo
Arah y
Jarak Tulangan = 0.1
Jumlah Tulangan = Panjang sumbuh x
Jarak Tulangan
Panjang 1 Tulangan = 5
Panjang Total = Jumlah Tulangan
= 30
= 150

Ʃ Dalam Batang = Panjang Total


12
Ʃ Dalam Kilo = Panjang Total
= 150
= 59.25
= 119 Kilo

Balok Struktur
Tulangan pokok
Jumlah Tulangan = 4
P.Tulangan = P.Balok x
= 16 x
= 64
Ʃ Dalam Batang = P.Tulangan =
12
Ʃ Dalam Kilo = p.tulangan x
= 64 x
= 57 Kilo
Tulangan Sengkang
HAK = 6 x
= 6 x
= 48 =
Jumlah Sengkang = Tinggi Kolom
Jarak Sengkang
p.1 Sengkang = P +
= 0.22 +
= 1.08
P.Total Sengkang = J.sengkang x
= 38.50 x
= 41.43 Batang
Ʃ Dalam Batang = p.Total sengkang
12
Ʃ Dalam Kilo = p.Total sengkang
= 41.43
= 16.36 Kilo

PONDASI SETEMPAT
KOLOM PEDESTAL
Tulangan pokok Ø12
Jumlah Tulangan = 4
P.1.Tulangan = Tinggi kolom pedestal
= 1.30
= 1.80
P.Total Tulangan = Jumlah Tulangan
= 4
= 7.20
Ʃ Dalam Batang = P.Total Tulangan
P.SATU BESI
Ʃ Dalam Kilo = P.Total Tulangan
= 7.20
= 6.4 =
Tulangan Sengkang Ø8
Jumlah sengkang = Tinggi Sengkang
Jarak Sengkang
Hak = 6xDb =
P1.SENGKANG = P +
= 0.22 +
= 0.976
P.Total Sengkang = Jumlah Sengkang
= 7.50
= 7.32
Ʃ Dalam Batang P.Total Tulangan
P.SATU BESI
Ʃ Dalam Kilo = P.Total Tulangan
= 7.32
= 2.89 =
TAPAK PONDASI
Arah x = Ø8
Jumlah Tulangan = Panjang Tulangan
Jarak Tulangan
HAK = 6xDb =
P1Tulangan = P +
= 0.92 +
= 2.576
P.Total = Jumlah Tulangan
10
25.76
Ʃ Dalam Batang = P.Total Tulangan
P.SATU BESI
Ʃ Dalam Kilo = P.Total Tulangan
= 25.76
= 10.18 =

Arah y = Ø8
Jumlah Tulangan = Panjang Tulangan
Jarak Tulangan
HAK = 6xDb =
P1Tulangan = P +
= 0.92 +
= 2.576
P.Total = Jumlah Tulangan
10
25.76
Ʃ Dalam Batang = P.Total Tulangan
P.SATU BESI
Ʃ Dalam Kilo = P.Total Tulangan
= 25.76
= 10.18 =

Total Besi Ø 12 =
Total Besi Ø 8 =
Total Besi Ø 6 =
IV
4A Pek.dinding rumah
Dinding belakang (2,3m) L = 17
= 39

Dinding rumah Tinggi, 3,8m L = P


= 90
= 342

Dinding Depan , Tinggi 2m L = P


= 22
= 44

Total Dinding =

KUSEN Panjang x Tinggi


Luas kusen p1 0.9 x 2
Luas kusen p2 0.7 x 2
Luas kusen p3 1.3 x 2
Luas kusen Pl 2.8 x 2
Luas kusen j1 0.5 x 2
Luas kusen j2 0.95 x 2
Luas kusen BV 0.5 x 0.3

TOTAL = 32
TOTAL LUAS DINDING = Luas dinding- Luas Kusen

4B plasteran dinding Luas Total Dinding + Kusen

V PEKERJAAN LANTAI
Timbunan Bawah Lantai P
1 RUANG TIDUR 1 (±0,00) = 3.00 x
2 RUANG TIDUR 2 (±0,00) = 3.50 x
3 DAPUR (± 0,00) = 3.00 x
4 R.MAKAN DAN R.KELUARGA (± 0,00) = 7.00 x
5 RUANG TAMU(± 0,00) = 3.50 x
6 KAMAAR TIDUR UTAMA(± 0,00) = 3.50 x
7 RUANGAN DEPAN GUDANG(± 0,00) = 2.25 x
8 GARASI (-0.02) = 5.00 x
9 TERAS DEPAN(-0.02) = 1.50 x
10 GUDANG(-0.02) = 2.25 x
11 TERAS BELAKANG(-0.02) = 1.95 x
12 TEMPAT CUCI(-0.03) = 1.25 x
13 KAMAR MANDI 1(-0.05) = 1.25 x
14 KAMAR MANDI 2(-0.05) = 1.50 x

PASIR BAWAH LANTAI P


1 RUANG TIDUR 1 (±0,00) = 3.00 x
2 RUANG TIDUR 2 (±0,00) = 3.50 x
3 DAPUR (± 0,00) = 3.00 x
4 R.MAKAN DAN R.KELUARGA (± 0,00) = 7.00 x
5 RUANG TAMU(± 0,00) = 3.50 x
6 KAMAAR TIDUR UTAMA(± 0,00) = 3.50 x
7 RUANGAN DEPAN GUDANG(± 0,00) = 2.25 x
8 GARASI (-0.02) = 5.00 x
9 TERAS DEPAN(-0.02) = 1.50 x
10 GUDANG(-0.02) = 2.25 x
11 TERAS BELAKANG(-0.02) = 1.95 x
12 TEMPAT CUCI(-0.03) = 1.25 x
13 KAMAR MANDI 1(-0.05) = 1.25 x
14 KAMAR MANDI 2(-0.05) = 1.50 x

Lapisan Spesi P
1 RUANG TIDUR 1 (±0,00) = 3.00 x
2 RUANG TIDUR 2 (±0,00) = 3.50 x
3 DAPUR (± 0,00) = 3.00 x
4 R.MAKAN DAN R.KELUARGA (± 0,00) = 7.00 x
5 RUANG TAMU(± 0,00) = 3.50 x
6 KAMAAR TIDUR UTAMA(± 0,00) = 3.50 x
7 RUANGAN DEPAN GUDANG(± 0,00) = 2.25 x
8 GARASI (-0.02) = 5.00 x
9 TERAS DEPAN(-0.02) = 1.50 x
10 GUDANG(-0.02) = 2.25 x
11 TERAS BELAKANG(-0.02) = 1.95 x
12 TEMPAT CUCI(-0.03) = 1.25 x
13 KAMAR MANDI 1(-0.05) = 1.25 x
14 KAMAR MANDI 2(-0.05) = 1.50 x

Keramik 20/20
KAMAR MANDI DEPAN L = P
= 1.50
= 2.63
KAMAR MANDI BELAKANG L = P
= 1.25
= 2.19
TOTAL 4.81 m²
Keramik 40/40 P
RUANG TIDUR 1 = 3.00 x
RUANG TIDUR 2 = 3.50 x
DAPUR = 3.00 x
R.MAKAN DAN R.KELUARGA = 7.00 x
RUANG TAMU = 3.50 x
KAMAAR TIDUR UTAMA = 3.50 x
RUANGAN DEPAN GUDANG = 2.25 x
GARASI = 5.00 x
TERAS DEPAN = 1.50 x
GUDANG = 2.25 x
TERAS BELAKANG = 1.95 x
TEMPAT CUCI = 1.25 x

Dinding Keramik
KAMAR MANDI DEPAN L = K
= 6.50
= 9.75
= 8.70
KAMAR MANDI BELAKANG L = K
= 6.00
= 4.95
= 3.44
TEMPAT CUCI L = K
= 3.75
= 2.70
= 1.19
TOTAL = 13.3

Plint
RUANG TIDUR 1 = 3.00 +
RUANG TIDUR 2 = 3.50 +
DAPUR = 3.00 +
R.MAKAN DAN R.KELUARGA = 7.00 +
RUANG TAMU = 3.50 +
KAMAAR TIDUR UTAMA = 3.50 +
RUANGAN DEPAN GUDANG = 2.25 +
GARASI = 5.00 +
GUDANG = 2.25 +

INSTALASI LISTRIK
SAKLAR GANDA = 6 Bh
SAKLAR TUNGGAL = 5 Bh
LAMPU CFL = 15 Bh
LAMPU HIAS = 1 Bh
STOPKONTAK = 7 Bh
MCB = 1 Bh
KWH METER = 1 Bh
JUNCTION BOX = 14 Bh
ELBOW = 10 Bh
KABEL LISTRIK = panjang kabel
= 100
= 110 m

SANITASI
PIPA AIR BERSIH 2" = 44 m
PIPA LIMNAH CAIR 3" = 33 m
PIPA LIMBAH PADAT 4" = 33 m
Wastafel = 1 Bh
PDAM = 1 Unit
PENYAMBUNG PIPA = 18 Bh
Closed duduk = 2 Bh
Bak Mandi Fiber glass = 2 Bh
Floor Drain = 2 Bh
Kran Air = 3 Bh
SEPTICTANK BIOTECH = ꙥ x
= ꙥ x
= 1.24 mᶾ
Galian Septictank = P x
= 2.2 x
= 7.70 mᶾ
Urugan Pasir Septictank = P x
= 2.2 x
= 0.73 mᶾ
Lantai Kerja = P x
= 2.2 x
= 0.24 mᶾ
Urugan Kembali = V.galian -
= 7.70 -
= 5.48 mᶾ

engsel p1 = 18
p2 = 6
p3 = 6
PL = 12
J1 = 8
J2 = 12
TOTAL 62

Handle pintu p1 = 6
p2 = 2
p3 = 2
PL = 2
J1 = 8
J2 = 6
TOTAL 26

Kunci p1 = 6
p2 = 2
p3 = 1
PL = 1
J1 = 4
J2 = 3
TOTAL 17

PENGECATAN Luas Total Dinding + Kusen

PLAFOND+RANGKA FLAPOND P x
RUANG TIDUR 1 = 3.00 x
RUANG TIDUR 2 = 3.50 x
DAPUR = 3.00 x
R.MAKAN DAN R.KELUARGA = 7.00 x
RUANG TAMU = 3.50 x
KAMAAR TIDUR UTAMA = 3.50 x
RUANGAN DEPAN GUDANG = 2.25 x
GARASI = 5.00 x
TERAS DEPAN = 1.50 x
GUDANG = 2.25 x
TERAS BELAKANG = 1.95 x
TEMPAT CUCI = 1.25 x
KAMAR MANDI DEPAN = 1.25 x
KAMAR MANDI BELAKANG = 1.50 x

PEK. List Plafond


RUANG TIDUR 1 = 3.00 +
RUANG TIDUR 2 = 3.50 +
DAPUR = 3.00 +
R.MAKAN DAN R.KELUARGA = 7.00 +
RUANG TAMU = 3.50 +
KAMAAR TIDUR UTAMA = 3.50 +
RUANGAN DEPAN GUDANG = 2.25 +
GARASI = 5.00 +
TERAS DEPAN = 1.50 +
GUDANG = 2.25 +
TERAS BELAKANG = 1.95 +
TEMPAT CUCI = 1.25 +
KAMAR MANDI 1 = 1.25 +
KAMAR MANDI 2 = 1.50 +

PEK. ATAP
Penutup Atap P x
I = 1.50 x
II = 5.00 x
III = 8.50 x
IV = 0.65 x

Lisplamk Lisplank Depan +


23.11 +
25.34 m²

Jurai dalam = 23.10 m


Jurai luar = 23.09 m
Nok = 17.00 m
Volum

x L
x 10

+ 2L L = K x T
+ 20 = 60 x 3
= 180

+ P + L + L
+ 16 + 12 + 12

x L
x 3

+ 3 + 5 + 3 + 2

+ 10

+ 4 + 5 + 4 + 2

2 1 1

3 4 2 1 3 2 1 3

12 4 4 1 5
+ b x t x Panjang Pondasi
2

+ 1x 1 x 18
2

x 1x 18

+ b x t x Panjang Pondasi
2

+ 0.84 x 0.67 x 42
2

x 0.67 x 42

+ b x t x Panjang Pondasi
2

+ 0.95 x 0.95 x 72.0


2

x 0.95 x 72

+ b x t x Panjang Pondasi
2

+ 0.95 x 0.67 x 11.4


2

x 0.67 x 11

mᶾ

x L x T
x 1 x 1
+ b x t x Panjang Pondasi
2

+ 0.75 x 0.05 x 18.0


2

x 0.05 x 18

+ b x t x Panjang Pondasi
2

+ 0.55 x 0.05 x 42.0


2

x 0.05 x 42

+ b x t x Panjang Pondasi
2

+ 0.95 x 0.05 x 11.4


2

x 0.05 x 11

+ b x t x Panjang Pondasi
2

+ 0.95 x 0.05 x 72.0


2

x 0.05 x 72

x L x T
x 1 x 0

mᶾ
- Total pasir bawah pondasi - Batu Kosong -
- 6.09 - 22.28 -

+ b x t x Panjang Pondasi
2

+ 0.77 x 0.20 x 18.0


2

x 0.20 x 18

+ b x t x Panjang Pondasi
2

+ 0.57 x 0.12 x 42.0


2

x 0.12 x 42

+ b x t x Panjang Pondasi
2

+ 0.98 x 0.20 x 72.0


2

x 0.20 x 72

+ b x t x Panjang Pondasi
2

+ 0.99 x 0.12 x 11.4


2

x 0.12 x 11
+ b x t x Panjang Pondasi
2

+ 0.70 x 0.75 x 18.0


2

x 0.75 x 18

+ b x t x Panjang Pondasi
2

+ 0.20 x 0.55 x 42.0


2

x 0.55 x 42

+ b x t x Panjang Pondasi
2

+ 0.25 x 0.75 x 72.0


2

x 0.75 x 72

+ b x t x Panjang Pondasi
2

+ 0.25 x 0.55 x 11.4


2

x 0.55 x 11

x L x T
x 1 x 0
x L x T1+T2
2

x 1 x 1
2

x L x T

x 0.30 x 1

X L X T
x 0 x 0

X L X T
x 3 x 0

X L X T
x 3 x 0

X L X T
x 0 x 0

x L x T x JUMLAH KOLOM
x 0 x 4 x 30

x L x T x JUMLAH KOLOM
x 0 x 2 x 7

x L x T x JUMLAH KOLOM
x 0 x 2 x 9

x L x T x JUMLAH KOLOM
x 0 x 4 x 4

x T x jumlah sisi
x 0 x 2

x T x jumlah sisi
x 0 x 2

x T x Jumlah Kolom
x 4 x 30

x T x Jumlah Kolom
x 2 x 7

x T x Jumlah Kolom
x 2 x 9

KOLOM PRAKTIS = 88.86

x T x Jumlah Kolom
x 4 x 4

x L
x 3

PxL
4.8

x Tinggi tapak pondasi


x 0

x Tinggi pedestal
x 1
KISTING PONDASI SETEMPAT = 2.28 = 9.12

x Jumlah Tulangan
x 4

Panjang Tulangan = 574 = 47.8


12 12

Panjang Tulangan x Berat Besi Per kilo


574 x 0.395
227

= 143.4 = 1,434
0.1

36 = 0.04

x Jumlah Tulangan
x 4

Panjang Tulangan = 574 = 47.8


12 12

Panjang Tulangan x Berat Besi Per kilo


574 x 0.395
227
= 143.4 = 1,434
0.1

36 = 0.04

38 batang
180 kilo

36 = 0.036

47 batang
124 kilo

5 batang
25 kilo

36 = 0.036

7 batang
18 kilo
6 batang
28 kilo

36 = 0.036

7 batang
20 kilo

0.88776

5 batamg
55 kilo

48 = 0.048

10 batang
49 kilo

= 5 = 50
0.1

x P.1. Tulangan
x 3
= 150 = 12.5 25 Batang
12
x 0.395
x 0.395

= 3 = 30
0.1

x P.1. Tulangan
x 5

= 150 = 12.5 25 Batang


12
x 0.395
x 0.395

Jumlah Tulangan
4

64 = 5.33 Batang
12
0.88776
0.88776

Diameter Besi
8
0.048
= 3.85 = 38.50
0.1
L + P + L + HAK +
0.27 + 0.22 + 0.27 + 0.048 +

p.1.sengkang
1.08

= 41.43 = 3.45
12
x 0.395
x 0.395

+ Setengah ukuran lebar pondasi


+ 0.5

x P1.Tulangan
x 1.8

= 7.2 = 0.6 = 2.40


12
x Berat Besi Per kilo
x 0.88776
25.57

= 0.9 = 7.5
0.12
48 = 0.048
P + L + L + HAK +
0.22 + 0.22 + 0.22 + 0.048 +

x P1.sengkang
x 0.976

= 7.3 = 0.6 = 2.44


12
x Berat Besi Per kilo
x 0.395
11.57

= 1 = 10
0.1
48 = 0.048
P + L + L + HAK +
0.92 + 0.32 + 0.32 + 0.048 +

x P1.Tulangan
x 2.576

= 25.76 = 2.1 = 8.59


12
x Berat Besi Per kilo
x 0.395
40.70

= 1 = 10
0.1
48 = 0.048
P + L + L + HAK +
0.92 + 0.32 + 0.32 + 0.048 +

x P1.Tulangan
x 2.576

= 25.76 = 2.1 = 8.59


12
x Berat Besi Per kilo
x 0.395
40.70

137.07
1,082.95
600.08

x 2.3

x T
x 3.8

x T
x 2

425.1

x Junlah
x 6 = 11.6
x 2 = 3.01
x 1 = 2.8
x 1 = 5.9
x 4 3.4
x 3 4.8
x 3 0.45
Luas dinding- Luas Kusen = 393.11

x 2 = 786

L T
3.00 x 0.10 = 0.90
3.00 x 0.10 = 1.05
3.00 x 0.10 = 0.90
4.00 x 0.10 = 2.80
3.00 x 0.10 = 1.05
2.75 x 0.10 = 0.96
1.25 x 0.10 = 0.28
3.00 x 0.08 = 1.20
3.00 x 0.08 = 0.36
1.75 x 0.08 = 0.32
4.00 x 0.08 = 0.62
1.25 x 0.05 = 0.08
1.75 x 0.05 = 0.11
1.75 x 0.05 = 0.13
TOTAL 10.76

L T
3.00 x 0.15 = 1.35
3.00 x 0.15 = 1.58
3.00 x 0.15 = 1.35
4.00 x 0.15 = 4.20
3.00 x 0.15 = 1.58
2.75 x 0.15 = 1.44
1.25 x 0.15 = 0.42
3.00 x 0.15 = 2.25
3.00 x 0.15 = 0.67
1.75 x 0.15 = 0.59
4.00 x 0.15 = 1.17
1.25 x 0.15 = 0.23
1.75 x 0.15 = 0.33
1.75 x 0.15 = 0.39
TOTAL 17.56

L T
3.00 x 0.03 = 0.27
3.00 x 0.03 = 0.32
3.00 x 0.03 = 0.27
4.00 x 0.03 = 0.84
3.00 x 0.03 = 0.32
2.75 x 0.03 = 0.29
1.25 x 0.03 = 0.08
3.00 x 0.03 = 0.45
3.00 x 0.03 = 0.14
1.75 x 0.03 = 0.12
4.00 x 0.03 = 0.23
1.25 x 0.03 = 0.05
1.75 x 0.03 = 0.07
1.75 x 0.03 = 0.08
TOTAL 3.51

x L
x 1.75

x L
x 1.75

L
3.00 = 9 m²
3.00 = 11 m²
3.00 = 9 m²
4.00 = 28 m²
3.00 = 11 m²
2.75 = 10 m²
1.25 = 3 m²
3.00 = 15 m²
3.00 = 5 m²
1.75 = 4 m²
4.00 = 8 m²
1.25 = 2 m²
Total 112 m²

x T
x 1.50


x T
x 1.50

x T
x 1.50

K x
3.00 + 3.00 + 3.00 = 12.0 x
3.00 + 3.50 + 3.00 = 13.0 x
3.00 + 3.00 + 3.00 = 12.0 x
4.00 + 7.00 + 4.00 = 22.0 x
3.00 + 3.50 + 3.00 = 13.0 x
2.75 + 3.50 + 2.75 = 12.5 x
1.25 + 2.25 + 1.25 = 7.0 x
3.00 + 5.00 + 3.00 = 16.0 x
1.75 + 2.25 + 1.75 = 8.0 x

+ westle 10%
+ 10

r² x t
0.36 x 1.10

L x T
2.20 x 1.59

L x T
2.20 x 0.15

L x T
2.20 x 0.05

V.pasir urug - V.lantai kerja - V.septictank


0.73 - 0.24 - 1.24
x 2 = 786

L
3.00 = 9.00 m²
3.00 = 10.50 m²
3.00 = 9.00 m²
4.00 = 28.00 m²
3.00 = 10.50 m²
2.75 = 9.63 m²
1.25 = 2.81 m²
3.00 = 15.00 m²
3.00 = 4.50 m²
1.75 = 3.94 m²
4.00 = 7.80 m²
1.25 = 1.56 m²
1.75 = 2.19 m²
1.75 = 2.63 m²
TOTAL = 117.05

3.00 + 3.00 + 3.00 = 12.0


3.00 + 3.50 + 3.00 = 13.0
3.00 + 3.00 + 3.00 = 12.0
4.00 + 7.00 + 4.00 = 22.0
3.00 + 3.50 + 3.00 = 13.0
2.75 + 3.50 + 2.75 = 12.5
1.25 + 2.25 + 1.25 = 7.0
3.00 + 5.00 + 3.00 = 16.0
3.00 + 1.50 + 3.00 = 9.0
1.75 + 2.25 + 1.75 = 8.0
4.00 + 1.95 + 4.00 = 11.9
1.25 + 1.25 + 1.25 = 5.0
1.75 + 1.25 + 1.75 = 6.0
1.75 + 1.50 + 1.75 = 6.5
TOTAL 154

L
5.15 = 7.73
7.91 = 39.55
9.85 = 83.73
5.85 = 3.80
TOTAL = 135 = 164.56 m²

Lisplank Belakang x lebar lisplank


11.15 x 0.20
Volume

+ 1

+ 4 + 4

3 6 3 3 3
Total pondasi batu kali - volume pondasi setempat -
42.65 1.72 -
HAK
0.048
HAK
0.048

HAK
0.048
HAK
0.048
T
0.1 = 1.20
0.1 = 1.30
0.1 = 1.20
0.1 = 2.20
0.1 = 1.30
0.1 = 1.25
0.1 = 0.70
0.1 = 1.60
0.1 = 0.80
TOTAL 11.55
Jumlah Total Satuan

1 200 m²

1 180 m²

1 55 m

1 12 m²

1 1 Ls
1 1 Ls
1 1 Ls
1 1 Ls
1 1 Ls
1 1 Ls
voleme lantai kerja
0.40
DAFTAR ANALISA PEKERJAAN KOTA PALEMBANG
TAHUN ANGGARAN 2019
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

B
A C D = Koefisien Bahan x C E = Koefisien Tenaga x C
1 2 3

I PEKERJAAN PERSIAPAN
1.1 1 M2 Membersihkan Lapangan dan Perataan
a. Tenaga
0.100 Oh Pekerja 77,000.00 7,700.00
0.050 Oh Mandor 130,000.00 6,500.00
14,200.00
Jumlah

1.2 1 M' Pengukuran dan Pemasangan Bouwplank


a. Bahan
0.012 M3 Kayu 5/7 kelas IV 1,777,000.00 21,324.00
0.020 Kg Paku Biasa 2" - 5" 17,000.00 340.00
0.007 M3 Kayu Papan 3/20 3,909,000.00 27,363.00
49,027.00

b. Tenaga
0.100 Oh Tukang Kayu 106,000.00 10,600.00
0.100 Oh Pekerja 77,000.00 7,700.00
0.010 Oh Kepala Tukang 130,000.00 1,300.00
0.005 Oh Mandor 130,000.00 650.00
20,250.00
Jumlah

1.3 1 M2 Pembuatan Gudang Semen dan Alat - Alat


a. Bahan
1.700 Btg Kayu Gelam dia. 6-8 cm 9,000.00 15,300.00
0.210 M3 Kayu 1,777,000.00 373,170.00
0.300 Kg Paku Biasa 2" - 5" 17,000.00 5,100.00
10.500 Kg Semen Portland 1,420.00 14,910.00
0.030 M3 Pasir Beton 109,000.00 3,270.00
0.050 M3 Koral Beton 558,000.00 27,900.00
1.500 Lbr Seng Gelombang BJLS 8,000.00 12,000.00
451,650.00
b. Tenaga
2.000 Oh Tukang Kayu 106,000.00 212,000.00
1.000 Oh Pekerja 77,000.00 77,000.00
0.200 Oh Kepala Tukang 130,000.00 26,000.00
0.050 Oh Mandor 130,000.00 6,500.00
321,500.00
Jumlah

1.4 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter


a. Bahan
1.250 Btg Kayu Gelam dia. 6-8 cm 9,000.00 11,250.00
2.500 Kg Semen Portland 1,420.00 3,550.00
0.005 M3 Pasir Beton 109,000.00 545.00
0.009 M3 Koral Beton 558,000.00 5,022.00
0.072 M3 Kayu 5/7 kelas IV 1,777,000.00 127,944.00
0.060 Kg Paku Biasa 2" - 5" 17,000.00 1,020.00
0.400 Lt Teer/Residu 53,000.00 21,200.00
170,531.00

b. Tenaga
0.200 Oh Tukang Kayu 106,000.00 21,200.00
0.400 Oh Pekerja 77,000.00 30,800.00
0.020 Oh Kepala Tukang 130,000.00 2,600.00
0.020 Oh Mandor 130,000.00 2,600.00
57,200.00
Jumlah
II PEKERJAAN TANAH
2.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter
a. Tenaga
0.400 Oh Pekerja 77,000.00 30,800.00
- - Tukang Gali - -
- - Kepala Tukang - -
0.040 Oh Mandor 130,000.00 5,200.00
36,000.00
Jumlah

2.2 1 M Urugan Pasir


3

a. Bahan
1.200 M3 Pasir Urug 77,000.00 92,400.00
92,400.00

b. Tenaga
0.300 Oh Pekerja 77,000.00 23,100.00
- - Tukang Gali - -
- - Kepala Tukang - -
0.010 Oh Mandor 130,000.00 1,300.00
24,400.00
Jumlah

2.3 1 M3 Urugan Kembali


SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

a. Tenaga
0.192 Oh Pekerja 77,000.00 14,784.00
- - Tukang Gali - -
- - Kepala Tukang - -
0.019 Oh Mandor 130,000.00 2,470.00
17,254.00
Jumlah

III PEKERJAAN PONDASI


3.1 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 414,000.00 455,400.00
202.000 Kg Semen Portland 1,420.00 286,840.00
0.485 M3 Pasir Pasang 109,000.00 52,865.00
795,105.00
b. Tenaga
1.500 Oh Pekerja 77,000.00 115,500.00
0.600 Oh Tukang Batu 106,000.00 63,600.00
0.060 Oh Kepala Tukang 130,000.00 7,800.00
0.075 Oh Mandor 130,000.00 9,750.00
196,650.00
Jumlah

IV PEKERJAAN BETON BERTULANG


4.1 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr
a. Bahan
232.000 Kg Semen Portland 1,420.00 329,440.00
0.520 M3 Pasir Beton 109,000.00 56,680.00
0.780 M3 Koral Beton 558,000.00 435,240.00
821,360.00
b. Tenaga
1.650 Oh Pekerja 77,000.00 127,050.00
0.250 Oh Tukang Batu 106,000.00 26,500.00
0.025 Oh Kepala Tukang 130,000.00 3,250.00
0.080 Oh Mandor 130,000.00 10,400.00
167,200.00
Jumlah

4.2 1 Kg Pembesian dengan Besi Polos atau Besi Ulir


a. Bahan
1.050 Kg Besi Beton ( Polos / Ulir ) 22,000.00 23,100.00
0.015 Kg Kawat Beton 21,000.00 315.00
23,415.00

b. Tenaga
0.007 Oh Pekerja 77,000.00 539.00
0.007 Oh Tukang Besi 106,000.00 742.00
0.001 Oh Kepala Tukang 130,000.00 91.00
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

0.000 Oh Mandor 130,000.00 39.00


1,411.00
Jumlah

4.3 1 M2 Pasang Bekisting Untuk Sloof


a. Bahan
0.045 M3 Kayu Kls. IV 1,777,000.00 79,965.00
0.300 Kg Paku Biasa 2" - 5" 17,000.00 5,100.00
85,065.00

b. Tenaga
0.300 Oh Pekerja 77,000.00 23,100.00
0.260 Oh Tukang Kayu 106,000.00 27,560.00
0.026 Oh Kepala Tukang 130,000.00 3,380.00
0.005 Oh Mandor 130,000.00 650.00
54,690.00
Jumlah

4.4 1 M Pasang Bekisting Untuk Kolom (Untuk bangunan gedung)


2

a. Bahan
0.040 M3 Kayu Kls. IV 1,777,000.00 71,080.00
0.400 Kg Paku Biasa 2" - 5" 17,000.00 6,800.00
0.015 M3 Balok Kayu Kls. IV 1,777,000.00 26,655.00
2.000 Btg Kayu Gelam dia. 6-8 cm 9,000.00 18,000.00
122,535.00
b. Tenaga
0.300 Oh Pekerja 77,000.00 23,100.00
0.330 Oh Tukang Kayu 106,000.00 34,980.00
0.033 Oh Kepala Tukang 130,000.00 4,290.00
0.006 Oh Mandor 130,000.00 780.00
63,150.00
Jumlah

4.5 1 M Pasang Bekisting Untuk Balok (Untuk bangunan gedung)


2

a. Bahan
0.040 M3 Kayu Kls. IV 1,777,000.00 71,080.00
0.400 Kg Paku Biasa 2" - 5" 17,000.00 6,800.00
0.018 M3 Balok Kayu Kls. IV 1,777,000.00 31,986.00
2.000 Btg Kayu Gelam dia. 6-8 cm 9,000.00 18,000.00
127,866.00
b. Tenaga
0.320 Oh Pekerja 77,000.00 24,640.00
0.330 Oh Tukang Kayu 106,000.00 34,980.00
0.033 Oh Kepala Tukang 130,000.00 4,290.00
0.006 Oh Mandor 130,000.00 780.00
64,690.00
Jumlah

4.6 1 M2 Pasang Bekisting Untuk Lantai, plat dak (untuk bangunan gedung)
a. Bahan
0.040 M3 Kayu Kls. IV 1,777,000.00 71,080.00
0.400 Kg Paku Biasa 2" - 5" 17,000.00 6,800.00
0.015 M3 Balok Kayu Kls. IV 1,777,000.00 26,655.00
6.000 Btg Kayu Gelam dia. 6-8 cm 9,000.00 54,000.00
158,535.00
b. Tenaga
0.320 Oh Pekerja 77,000.00 24,640.00
0.330 Oh Tukang Batu 106,000.00 34,980.00
0.033 Oh Kepala Tukang 130,000.00 4,290.00
0.006 Oh Mandor 130,000.00 780.00
64,690.00
Jumlah

V PEKERJAAN DINDING
5.1 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps
a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,000.00 70,000.00
11.500 Kg Semen Portland 1,420.00 16,330.00
0.043 M3 Pasir Pasang 109,000.00 4,687.00
91,017.00
b. Tenaga
0.320 Oh Pekerja 77,000.00 24,640.00
0.100 Oh Tukang Batu 106,000.00 10,600.00
0.010 Oh Kepala Tukang 130,000.00 1,300.00
0.015 Oh Mandor 130,000.00 1,950.00
38,490.00
Jumlah

5.2 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm


a. Bahan
5.200 Kg Semen Portland 1,420.00 7,384.00
0.020 M3 Pasir Pasang 109,000.00 2,180.00
9,564.00
b. Tenaga
0.200 Oh Pekerja 77,000.00 15,400.00
0.150 Oh Tukang Batu 106,000.00 15,900.00
0.015 Oh Kepala Tukang 130,000.00 1,950.00
0.010 Oh Mandor 130,000.00 1,300.00
34,550.00
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

Jumlah

5.3 1 M2 Plesteran Ciprat 1 Pc : 2 Ps


a. Bahan
4.320 Kg Semen Portland 1,420.00 6,134.40
0.016 M3 Pasir Pasang 109,000.00 1,744.00
7,878.40
b. Tenaga
0.250 Oh Pekerja 77,000.00 19,250.00
0.100 Oh Tukang Batu 106,000.00 10,600.00
0.010 Oh Kepala Tukang 130,000.00 1,300.00
0.015 Oh Mandor 130,000.00 1,950.00
33,100.00
Jumlah

VI PEKERJAAN LANTAI
6.1 1 M3 Urugan Tanah
a. Bahan
1.200 M3 Tanah Urug 59,000.00 70,800.00
70,800.00
b. Tenaga
0.300 Pekerja 77,000.00 23,100.00
0.033 Mandor 130,000.00 4,290.00
27,390.00
Jumlah

6.2 1 M3 Urugan Pasir


a. Bahan
1.200 M3 Pasir Urug 77,000.00 92,400.00
92,400.00

b. Tenaga
0.300 Oh Pekerja 77,000.00 23,100.00
Oh Tukang Gali - -
Oh Kepala Tukang - -
0.010 Oh Mandor 130,000.00 1,300.00
24,400.00
Jumlah

6.3 1 M Plesteran Siar Adukan 1 Pc : 2 Ps


2

a. Bahan
4.320 Kg Semen Portland 1,420.00 6,134.40
0.016 M3 Pasir Pasang 109,000.00 1,744.00
7,878.40
b. Tenaga
0.150 Oh Pekerja 77,000.00 11,550.00
0.070 Oh Tukang Batu 106,000.00 7,420.00
0.007 Oh Kepala Tukang 130,000.00 910.00
0.008 Oh Mandor 130,000.00 1,040.00
20,920.00
Jumlah

6.4 1 m Pasang Lantai Keramik Warna Ukuran 40 x 40 cm


2

a. Bahan
6.250 Bh Keramik Warna 40 x 40 cm mutu C 9,000.00 56,250.00
6.250 Bh Keramik Warna 40 x 40 cm mutu B 12,000.00 75,000.00
11.380 Kg Semen Portland 1,420.00 16,159.60
0.042 M3 Pasir Pasang 109,000.00 4,578.00
1.500 Kg Semen Warna 14,000.00 21,000.00
Mutu C 97,987.60
Mutu B 116,737.60
b. Tenaga
0.620 Oh Pekerja 77,000.00 47,740.00
0.350 Oh Tukang Batu 106,000.00 37,100.00
0.035 Oh Kepala Tukang 130,000.00 4,550.00
0.030 Oh Mandor 130,000.00 3,900.00
93,290.00
Mutu C , Jumlah
Mutu B , Jumlah

6.5 1 m' Pasang Plint Keramik


a. Bahan
3.000 Bh Plint Keramik Putih 10 x 30 cm 1,666.67 5,000.00
3.000 Bh Plint Keramik Warna 10 x 30 cm 1,666.67 5,000.00
2.500 Bh Plint Keramik Warna 10 x 40 cm mutu C 3,600.00 9,000.00
2.500 Bh Plint Keramik Warna 10 x 40 cm mutu B 4,800.00 12,000.00
0.850 Kg Semen Portland 1,420.00 1,207.00
0.002 M3 Pasir Pasang 109,000.00 239.80
0.080 Kg Semen Warna 14,000.00 1,120.00
Plint keramik putih 10 X 30 cm 7,566.80
Plint keramik Warna 10 X 30 cm 7,566.80
Plint keramik Warna 10 X 40 cm, mutu C 11,566.80
Plint keramik Warna 10 X 40 cm, mutu B 14,566.80
b. Tenaga
0.090 Oh Pekerja 77,000.00 6,930.00
0.090 Oh Tukang Batu 106,000.00 9,540.00
0.009 Oh Kepala Tukang 130,000.00 1,170.00
0.005 Oh Mandor 130,000.00 585.00
18,225.00
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

Plint keramik putih 10 X 30 cm


Plint keramik Warna 10 X 30 cm
Plint keramik Warna 10 X 40 cm, mutu C
Plint keramik Warna 10 X 40 cm, mutu B

6.6 1 m2 Pasang Lantai Keramik Ukuran 20 x 20 cm


a. Bahan
25.000 Bh Ubin Keramik 20 x 20 cm 2,000.00 50,000.00
11.380 Kg Semen Portland 1,420.00 16,159.60
0.042 M3 Pasir Pasang 109,000.00 4,578.00
1.500 Kg Semen Warna 14,000.00 21,000.00
91,737.60

b. Tenaga
0.620 Oh Pekerja 77,000.00 47,740.00
0.350 Oh Tukang Batu 106,000.00 37,100.00
0.035 Oh Kepala Tukang 130,000.00 4,550.00
0.030 Oh Mandor 130,000.00 3,900.00
93,290.00
Jumlah

VII PEKERJAAN PINTU JENDELA ALUMUNIUM


7.1 1 m2 Pasang Pintu Aluminium
a. Bahan
1.000 M2 Pintu Alluminium 758,000.00 758,000.00
758,000.00

b. Tenaga
1.050 Oh Tukang Besi Konstruksi 106,000.00 111,300.00
1.050 Oh Pekerja 77,000.00 80,850.00
0.105 Oh Kepala Tukang 130,000.00 13,650.00
0.005 Oh Mandor 130,000.00 676.00
206,476.00
Jumlah

7.2 1 m Pasang Pintu/ Jendela Kaca Rangka Aluminium Naatural 4'


2

a. Bahan
4.400 M' Aluminium Naatural 4 197,000.00 866,800.00
4.500 M' Profil Aluminium T 15,000.00 67,500.00
0.270 Tube Sealent 9,000.00 2,430.00
936,730.00

b. Tenaga
0.085 Oh Pekerja 77,000.00 6,545.00
0.085 Oh Tukang Kayu 106,000.00 9,010.00
0.0085 Oh Kepala Tukang 130,000.00 1,105.00
0.005 Oh Mandor 130,000.00 650.00
17,310.00
Jumlah

7.3 1 m2 Pasang Pintu Lipat


a. Bahan
1.000 M2 Pintu Lipat 450,000.00 450,000.00
450,000.00
b. Tenaga
1.050 Oh Tukang Besi Konstruksi 106,000.00 111,300.00
1.050 Oh Pekerja 77,000.00 80,850.00
0.105 Oh Kepala Tukang 130,000.00 13,650.00
0.005 Oh Mandor 130,000.00 676.00
206,476.00
Jumlah

VIII PEKERJAAN PLAFOND


8.1 1 M2 Langit-langit Plywood + Rangka Kayu Kls. II
a. Bahan
0.012 M3 Balok Kayu Kls. II 7,701,000.00 92,412.00
0.060 Kg Paku Biasa 2" - 5" 17,000.00 1,020.00
0.360 Lbr Plywood 4' x 8' x 3 mm 49,000.00 17,640.00
0.360 Lbr Plywood 4' x 8' x 4 mm 80,000.00 28,800.00
0.360 Lbr Plywood 4' x 8' x 6 mm 104,000.00 37,440.00
0.360 Lbr Plywood 4' x 8' x 9 mm 148,000.00 53,280.00
0.360 Lbr Plywood 4' x 8' x 12 mm 189,000.00 68,040.00
Tebal 3 mm 111,072.00
Tebal 4 mm 122,232.00
Tebal 6 mm 130,872.00
Tebal 9 mm 146,712.00
Tebal 12 mm 161,472.00

b. Tenaga
0.270 Oh Pekerja 77,000.00 20,790.00
0.400 Oh Tukang Kayu 106,000.00 42,400.00
0.040 Oh Kepala Tukang 130,000.00 5,200.00
0.014 Oh Mandor 130,000.00 1,755.00
70,145.00
1 M2 Plywood tebal 3 mm, rangka kayu kls. II
1 M2 Plywood tebal 4 mm, rangka kayu kls. II
1 M2 Plywood tebal 6 mm, rangka kayu kls. II
1 M2 Plywood tebal 9 mm, rangka kayu kls. II
1 M2 Plywood tebal 12 mm, rangka kayu kls. II
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

8.2 1 M' Pasang List Plafond Kayu Profil


a. Bahan
1.050 M' Kayu Profil kecil 2,000.00 2,100.00
1.050 M' Kayu Profil sedang 4,000.00 4,200.00
1.050 M' Kayu Profil besar 8,000.00 8,400.00
Kayu Profil kecil 2,100.00
Kayu Profil sedang 4,200.00
Kayu Profil besar 8,400.00
b. Tenaga
0.021 Oh Pekerja 77,000.00 1,617.00
0.021 Oh Tukang Kayu 106,000.00 2,226.00
0.002 Oh Kepala Tukang 130,000.00 260.00
0.001 Oh Mandor 130,000.00 130.00
4,233.00
Kayu Profil kecil
Kayu Profil sedang
Kayu Profil Besar

IX PEKERJAAN ATAP
9.1 1 M2 Rangka Atap baja Ringan "GigaSteel"
a. Bahan
2.100 M' - Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) 26,000.00 54,600.00
1.200 M' - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 22,000.00 26,400.00
6.200 M' - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 22,000.00 136,400.00
30.000 Bh - Screw / Dynabolt 2,000.00 60,000.00
0.030 M' - Valery Gutter Talang Jurai 148,000.00 4,440.00
0.700 M' - Strap Bracing 14,000.00 9,800.00
1.100 M2 - Alunium Foil Model Karung 21,000.00 23,100.00
314,740.00
b. Tenaga
0.100 Oh Tukang Terampil 106,000.00 10,600.00
0.100 Oh Tukang biasa 77,000.00 7,700.00
0.050 Oh Kepala Tukang 130,000.00 6,500.00
0.010 Oh Mandor 130,000.00 1,300.00
26,100.00
Jumlah

9.2 1 M Pasang Atap Genteng Beton


2

a. Bahan
11.000 Bh Genteng Beton 6,000.00 66,000.00
0.030 Kg Paku Biasa 2" - 5" 17,000.00 510.00
66,510.00
b. Tenaga
0.200 Oh Pekerja 77,000.00 15,400.00
0.100 Oh Tukang Kayu 106,000.00 10,600.00
0.010 Oh Kepala Tukang 130,000.00 1,300.00
0.010 Oh Mandor 130,000.00 1,300.00
28,600.00
Jumlah

9.3 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kls. II


a. Bahan
0.007 M3 Kayu Kls. II 7,701,000.00 55,447.20
0.050 Kg Paku Biasa 2" - 5" 17,000.00 850.00
56,297.20
b. Tenaga
0.100 Oh Pekerja 77,000.00 7,700.00
0.200 Oh Tukang Kayu 106,000.00 21,200.00
0.025 Oh Kepala Tukang 130,000.00 3,250.00
0.005 Oh Mandor 130,000.00 650.00
32,800.00
Jumlah

9.4 1 M' Pasang Bubung Genteng Keramik KIA Natural atau sejenis
a. Bahan
3.000 Bh Genteng Bubung Keramik KIA Natural atau sejenis 23,000.00 69,000.00
8.000 Kg Semen Portland 1,420.00 11,360.00
0.032 M3 Pasir Pasang 109,000.00 3,488.00
83,848.00

b. Tenaga
0.400 Oh Pekerja 77,000.00 30,800.00
0.200 Oh Tukang Kayu 106,000.00 21,200.00
0.020 Oh Kepala Tukang 130,000.00 2,600.00
0.002 Oh Mandor 130,000.00 260.00
54,860.00
Jumlah

9.5 1 M Pasang Nok Genteng Beton


'

a. Bahan
3.500 Bh Nok Genteng Beton 7,000.00 24,500.00
0.050 Kg Paku Biasa 2" - 5" 17,000.00 850.00
10.800 Kg Semen Abu-abu 1,420.00 15,336.00
0.032 M3 Pasir Pasang 109,000.00 3,488.00
1.000 Kg Semen Warna 14,000.00 14,000.00
58,174.00
b. Tenaga
0.400 Oh Pekerja 77,000.00 30,800.00
0.200 Oh Tukang Kayu 106,000.00 21,200.00
0.020 Oh Kepala Tukang 130,000.00 2,600.00
0.020 Oh Mandor 130,000.00 2,600.00
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

57,200.00
Jumlah

X PEKERJAAN PENGECATAN
10.1 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat
Dasar, 2 Lapis Cat Penutup )
a. Bahan
0.200 Kg Cat Meni 43,000.00 8,600.00
0.150 Kg Plamir 20,000.00 3,000.00
0.170 Kg Cat Dasar 37,000.00 6,290.00
0.260 Kg Cat Penutup 2 Kali 97,000.00 25,220.00
43,110.00
b. Tenaga
0.070 Oh Pekerja 77,000.00 5,390.00
0.009 Oh Tukang Cat 106,000.00 954.00
0.006 Oh Kepala Tukang 130,000.00 780.00
0.003 Oh Mandor 130,000.00 325.00
7,449.00
Jumlah

XI PEKERJAAN SANITASI
11.1 Memasang 1 Buah Kloset Duduk
Me Bahan
1.000 Bh Kloset Duduk ex toto 2,665,000.00 2,665,000.00
Perlengkapan ( 6 % Harga Kloset ) 159,900.00
2,824,900.00
b. Tenaga
3.300 Oh Pekerja 77,000.00 254,100.00
1.100 Oh Tukang Batu 106,000.00 116,600.00
0.001 Oh Kepala Tukang 130,000.00 130.00
0.160 Oh Mandor 130,000.00 20,800.00
391,630.00
Jumlah

11.2 Memasang 1 Buah Bak Fibreglass Volume 1 m Air


3

a. Bahan
1.000 Bh Bak Fibreglass 213,000.00 213,000.00
Perlengkapan ( 12 % Harga Bak Fibreglass ) 25,560.00
238,560.00
b. Tenaga
3.000 Oh Pekerja 77,000.00 231,000.00
4.500 Oh Tukang Batu 106,000.00 477,000.00
0.900 Oh Kepala Tukang 130,000.00 117,000.00
0.900 Oh Mandor 130,000.00 117,000.00
942,000.00
Jumlah

11.3 Memasang Floor Drain


a. Bahan
1.000 Bh Floor Drain 45,000.00 45,000.00
0.025 Bh Seal Tape 4,000.00 100.00
45,100.00

b. Tenaga
0.010 Oh Pekerja 77,000.00 770.00
0.100 Oh Tukang Batu 106,000.00 10,600.00
0.010 Oh Kepala Tukang 130,000.00 1,300.00
0.005 Oh Mandor 130,000.00 650.00
13,320.00
Jumlah

11.4 Memasang 1 Buah Kran Dia. /4" atau /2"


3 1

a. Bahan
1.000 Bh Kran Air 11,000.00 11,000.00
0.025 Bh Seal Tape 4,000.00 100.00
11,100.00

b. Tenaga
0.010 Oh Pekerja 77,000.00 770.00
0.100 Oh Tukang Batu 106,000.00 10,600.00
0.010 Oh Kepala Tukang 130,000.00 1,300.00
0.005 Oh Mandor 130,000.00 650.00
13,320.00
Jumlah

11.5 Memasang 1 Buah Wastafel


a. Bahan
1.000 Bh Wastafel 533,000.00 533,000.00
Perlengkapan ( 12 % Harga Wastafel ) 63,960.00
6.000 Kg Semen Portland 1,420.00 8,520.00
0.010 M3 Pasir Pasang 109,000.00 1,090.00
606,570.00

b. Tenaga
1.200 Oh Pekerja 77,000.00 92,400.00
1.450 Oh Tukang Batu 106,000.00 153,700.00
0.150 Oh Kepala Tukang 130,000.00 19,500.00
0.100 Oh Mandor 130,000.00 13,000.00
278,600.00
Jumlah
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

11.6 Memasang 1 m' Pipa PVC Tipe AW Dia. 2"


SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

a. Bahan
1.200 M' Pipa PVC 2" 19,000.00 22,800.00
Perlengkapan ( 35 % Harga Pipa Galvanis 2" ) 6,650.00
29,450.00

b. Tenaga
0.054 Oh Pekerja 77,000.00 4,158.00
0.090 Oh Tukang Batu 106,000.00 9,540.00
0.009 Oh Kepala Tukang 130,000.00 1,170.00
0.003 Oh Mandor 130,000.00 351.00
15,219.00
Jumlah

11.7 Memasang 1 m' Pipa PVC Tipe AW Dia. 3"


a. Bahan
1.200 M' Pipa PVC 3" 38,000.00 45,600.00
Perlengkapan ( 35 % Harga Pipa PVC 3" ) 13,300.00
58,900.00
b. Tenaga
0.081 Oh Pekerja 77,000.00 6,237.00
0.135 Oh Tukang Batu 106,000.00 14,310.00
0.014 Oh Kepala Tukang 130,000.00 1,755.00
0.004 Oh Mandor 130,000.00 533.00
22,835.00
Jumlah

11.8 Memasang 1 m' Pipa PVC Tipe AW Dia. 4"


a. Bahan
1.200 M' Pipa PVC 4" 61,000.00 73,200.00
Perlengkapan ( 35 % Harga Pipa Galvanis 4" ) 21,350.00
94,550.00

b. Tenaga
0.081 Oh Pekerja 77,000.00 6,237.00
0.135 Oh Tukang Batu 106,000.00 14,310.00
0.014 Oh Kepala Tukang 130,000.00 1,755.00
0.004 Oh Mandor 130,000.00 533.00
22,835.00
Jumlah

11.9 1 M Galian Tanah Biasa Sedalam 1 Meter


3

a. Tenaga
0.400 Oh Pekerja 77,000.00 30,800.00
0.040 Oh Mandor 130,000.00 5,200.00
36,000.00
Jumlah

11.10 1 M Urugan Pasir


3

a. Bahan
1.200 M3 Pasir Urug 77,000.00 92,400.00
92,400.00

b. Tenaga
0.300 Oh Pekerja 77,000.00 23,100.00
0.010 Oh Mandor 130,000.00 1,300.00
24,400.00
Jumlah

11.11 1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm


a. Bahan
10.000 Kg Semen Portland 1,420.00 14,200.00
0.026 M3 Pasir Beton 109,000.00 2,834.00
0.044 M3 Koral Beton 558,000.00 24,552.00
41,586.00
b. Tenaga
1.150 Oh Pekerja 77,000.00 88,550.00
0.020 Oh Tukang Batu 106,000.00 2,120.00
0.002 Oh Kepala Tukang 130,000.00 260.00
0.006 Oh Mandor 130,000.00 780.00
91,710.00
Jumlah

11.12 1 M Urugan Kembali


3

a. Tenaga
0.192 Oh Pekerja 77,000.00 14,784.00
0.019 Oh Mandor 130,000.00 2,470.00
17,254.00
Jumlah

XII PEKERJAAN INSTALASI LISTRIK


12.1 1 Titik Pemasangan Saklar Lampu
a. Bahan
3.000 btg Pipa listrik 5/8" 7,000.00 21,000.00
24.000 m' Kabel NYA 1,5 mm 4,000.00 96,000.00
3.000 Buah T Duss 1,000.00 3,000.00
4.000 Buah L Bow 2,000.00 8,000.00
3.000 Buah Las dop - -
1.000 Buah Saklar Ganda 15,000.00 15,000.00
24.000 Buah Klem biasa - -
1.000 Buah Mangkok 2,000.00 2,000.00
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah
URAIAN
Analisa Satuan Bahan Tenaga
(Rp) (Rp) (Rp)

1 2 3 4 5

1.000 Buah Fitting 10,000.00 10,000.00


155,000.00
b. Upah
1.000 ls Tukang Instalasi listrik 100,000.00 100,000.00
100,000.00
Jumlah

12.2 1 Titik Pemasangan Stop Kontak Biasa


a. Bahan
2.000 btg Pipa listrik 5/8" 7,000.00 14,000.00
15.000 m' Kabel NYA 2,5 mm 6,000.00 90,000.00
1.000 Buah T Duss 1,000.00 1,000.00
1.000 Buah L Bow 2,000.00 2,000.00
2.000 Buah Las dop - -
1.000 Buah Stop kontak biasa 7,000.00 7,000.00
16.000 Buah Klem biasa - -
1.000 Buah Mangkok 2,000.00 2,000.00
116,000.00

b. Upah
1.000 ls Tukang Instalasi listrik 100,000.00 100,000.00
100,000.00
Jumlah

12.3 1 Titik Pemasangan MCB


a. Bahan
3.000 btg Pipa listrik 5/8" 7,000.00 21,000.00
15.000 m' Kabel NYA 2,5 mm 6,000.00 90,000.00
1.000 Buah T Duss 1,000.00 1,000.00
2.000 Buah L Bow 2,000.00 4,000.00
24.000 Buah Klem biasa - -
1.000 Buah MCB 52,000.00 52,000.00
168,000.00

b. Upah
1.000 ls Tukang Instalasi listrik 100,000.00 100,000.00
100,000.00
Jumlah
NALISA PEKERJAAN KOTA PALEMBANG
TAHUN ANGGARAN 2019
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

F=D+E

14,200.00

69,277.00

773,150.00

227,731.00

36,000.00

92,400.00

116,800.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

17,254.00

991,755.00

988,560.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

24,826.00

139,755.00

185,685.00

192,556.00

223,225.00

129,507.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

44,114.00

40,978.40

98,190.00

116,800.00

28,798.40

191,277.60
210,027.60
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

25,791.80
25,791.80
29,791.80
32,791.80

185,027.60

964,476.00

954,040.00

656,476.00

181,217.00
192,377.00
201,017.00
216,857.00
231,617.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

6,333.00
8,433.00
12,633.00

340,840.00

95,110.00

89,097.20

138,708.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

115,374.00

50,559.00

3,216,530.00

1,180,560.00

58,420.00

24,420.00

885,170.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

e
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

44,669.00

81,735.00

117,385.00

36,000.00

116,800.00

133,296.00

17,254.00
SATUAN HARGA
Jumlah
Bahan+Tenaga
(Rp)

255,000.00

216,000.00

268,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
DAFTAR HARGA SATUAN UPAH, BAHAN BANGUNAN DAN PERALATAN
TAHUN 2014

HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
A UPAH
1 Kepala Tukang Oh 130,000.00
2 Tukang Oh 106,000.00
3 Mandor Oh 130,000.00
4 Pekerja Tidak Terlatih Oh 77,000.00
5 Pekerja Terlatih Oh 88,000.00

B BAHAN/MATERIAL
1 Aluminium Foil m2 21,000.00
2 Alumunium profil natural 4" M' 197,000.00
3 Alcubond m2 770,000.00
4 Amplas Biasa Lbr 4,000.00
5 Amplas Niken Lbr 7,000.00
6 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 50,000.00
7 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 71,000.00
8 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 98,000.00
9 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 73,000.00
10 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 74,000.00
11 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 90,000.00
12 Atap Aluminium Gelombang tebal 0,5 mm Lbr 118,000.00
13 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 94,000.00
14 Atap Genteng Beton Lokal buah 4,000.00
15 Atap Genteng Beton buah 6,000.00
16 Atap Genteng Beton Cisangkan buah 8,000.00
17 Atap Genteng Buleleng buah 2,000.00
18 Atap Genteng Keramik biasa berglazur buah 9,000.00
19 Atap Genteng Keramik Berglazur Natural buah 14,000.00
20 Atap Genteng Keramik sejenis Berglazur warna buah 20,000.00
21 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 37,000.00
22 Atap Genteng Metal Warna (120 cm X 76 cm) m2 47,000.00
23 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) m2 189,000.00
24 Atap Genteng Metal Zincalume berpasir (77cmX100cm) m2 100,000.00
25 Atap Genteng Metal Zincalume berpasir biasa m2 71,000.00
26 Atap Genteng Kodok buah 1,000.00
27 Atap Onduline m2 69,000.00
28 Asbes polos 100 x 100 tbl = 4 mm Lbr 28,000.00
29 Asbes Gelombang Kecil, lebar 80 cm m2 29,000.00
30 Asbes Gelombang Kecil, lebar 105 cm m2 37,000.00
31 Asbes Gelombang Besar, lebar 105 cm m2 41,000.00
32 Asbes Gelombang motif genteng m2 39,000.00
33 Aquaproof kg 308,000.00
34 Bak Cuci Stainless Steel buah 228,000.00
35 Bak Cuci Teraso buah 385,000.00
36 Bak Fibreglass buah 213,000.00
37 Bak Teraso buah 213,000.00
38 Bambu dia. 6-8 cm/6m Btg 59,000.00
39 Batako buah 3,000.00
40 Batu Andesit hitam kecoklatan m2 225,000.00
41 Batu alam kecoklatan (Sangarong) m2 219,000.00
42 Batu Bata lobang m3 606,000.00
43 Batu Bata Kecil buah 1,000.00
44 Batu Bata Lobang buah -
45 Batu Candi hitam m2 266,000.00
46 Batu Kali m3 414,000.00
47 Batu Kali tempel m2 110,000.00
48 Batu Karang Pilang m2 703,000.00
49 Batu Kerikil m3 473,000.00
50 Batu Koral beton pecah split 0 s/d 5 mm m3 558,000.00
51 Batu Koral Jagung m3 473,000.00
52 Batu Krokos m3 444,000.00
53 Batu Palimanan kuning/hijau m2 199,000.00
54 Batu Palimanan kuning/hijau + bevel m2 199,000.00
55 Batu Pecah 0.5 - 1 (screen) m3 325,000.00
56 Batu Abu 0.00 - 0.5 (filler) m3 325,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
57 Batu Pecah 1.3 - 1.9 (spilt) m3 462,000.00
58 Batu Pecah 2/3 m3 558,000.00
59 Batu Pecah 3/5 m3 462,000.00
60 Batu Pecah 5/7 m3 462,000.00
61 Batu Marmer m2 355,000.00
62 Batu Roster / Terawang biasa buah 5,000.00
63 Besi dia. 5 mm Batang 26,000.00
64 Besi dia. 6 mm KS Batang 29,000.00
65 Besi dia. 8 mm KS TI Batang 60,000.00
66 Besi dia. 10 mm KS TI Batang 94,000.00
67 Besi dia. 12 mm KS TI Batang 130,000.00
68 Besi dia. 14 mm KS TI Batang 219,000.00
69 Besi dia. 16 mm KS TI Batang 231,000.00
70 Besi dia. 19 mm KS TI Batang 325,000.00
71 Besi Beton Polos kg 22,000.00
72 Besi Baja Profil WF, I dan H kg 20,000.00
73 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 17,000.00
74 Besi Beam Clamp dan Plat Siku m2 126,000.00
75 Besi Hollow baja 20 X 40, tb. 2mm Batang 165,000.00
76 Besi Hollow baja 40 X 40, tb. 2mm Batang 189,000.00
77 Besi Hollow baja 30 X 60, tb. 2mm Batang 225,000.00
78 Besi Hollow Plafond 2 X 4 Batang 29,000.00
79 Besi Strip kg 11,000.00
80 Besi Strip 2 X 3 M' 5,000.00
81 Beton Ready Mix K - 125 m3 947,000.00
82 Beton Ready Mix K - 175 m3 1,007,000.00
83 Beton Ready Mix K - 225 m3 1,066,000.00
84 Beton Ready Mix K - 250 m3 1,125,000.00
85 Beton Ready Mix K - 275 m3 1,184,000.00
86 Beton Ready Mix K - 300 m3 1,244,000.00
87 Beton Ready Mix K - 350 m3 1,303,000.00
88 Beton Ready Mix K - 400 m4 1,362,000.00
89 Bubungan Asbes Gelombang Besar m' 28,000.00
90 Bubungan Asbes Gelombang Kecil m' 27,000.00
91 Bubungan/Nok Genteng Beton Buah 7,000.00
92 Bubungan Genteng Buleleng Buah 6,000.00
93 Bubungan/ Nok genteng Keramik biasa berglazur Buah 11,000.00
94 Bubungan/Nok genteng Keramik sejenis berglazur Buah 23,000.00
95 Bubungan gtg Keramik sejenis warna berglazur Buah 29,000.00
96 Bubungan/Nok Genteng Metal/aluminium M' 35,000.00
97 Bubungan Genteng Kodok Buah 4,000.00
98 Cat Dasar kg 37,000.00
99 Cat Antara kg 29,000.00
100 Cat Kayu dan Besi Anti Rayap kg 53,000.00
101 Cat Khusus Glossy dan Quick Drying kg 35,000.00
102 Cat Minyak warna (biasa) mutu C kg 47,000.00
103 Cat Minyak mutu B kg 56,000.00
104 Cat Minyak Semprot kg 49,000.00
105 Cat Meni Besi kg 43,000.00
106 Cat Meni Besi /kayu/ Flincote kg 49,000.00
107 Cat Penutup kg 97,000.00
108 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 14,000.00
109 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 30,000.00
110 Cat Tembok mutu B, Anti Lumut dan Jamur kg 32,000.00
111 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 112,000.00
112 Closed Duduk Setara (sejenis standar KIA) unit 651,000.00
113 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,665,000.00
114 Closed Duduk Halmar unit 3,791,000.00
115 Closed Duduk mutu C unit 2,221,000.00
116 Closed Duduk mutu A unit 5,213,000.00
117 Closed Duduk mutu B unit 3,222,000.00
118 Closed Duduk standar unit 2,725,000.00
119 Closet Duduk / Monoblok bh 639,000.00
120 Closet Jongkok Porselen / biasa buah 189,000.00
121 Closet Jongkok Teraso buah 37,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
122 Closed Jongkok Standart / sejenis (mutu B) unit 213,000.00
123 Closed Jongkok sejenis ( mutu A) Unit 319,000.00
124 Shower Spray TX 403 SV 3 buah 385,000.00
125 Coneblock biasa tebal 6 cm buah 2,000.00
126 Coneblock warna tebal 6 cm buah 2,000.00
127 Coneblock biasa tebal 8 cm buah 2,000.00
128 Coneblock warna tebal 8 cm buah 3,000.00
129 Cornice (bubuk Semen putih utk gypsum) kg 8,000.00
130 Dempul Jadi kg 23,000.00
131 Dempul Ross Polac kg 33,000.00
132 Dempul Isamu kg 56,000.00
133 Dolken Kayu dia. 8 - 10/400 cm m3 343,000.00
134 Door Closer buah 284,000.00
135 Door Holder buah 236,000.00
136 Door Stoper buah 355,000.00
137 Door Stop buah 26,000.00
138 Ember hitam buah 7,000.00
139 Engsel Biasa buah 21,000.00
140 Engsel Kuningan 4" buah 35,000.00
141 Engsel Pintu buah 21,000.00
142 Epoxi kg 59,000.00
143 Eternit 100 x 100 tebal 2,7 mm Lbr 27,000.00
144 Eternit 100 x 100 tebal 3,5 mm Lbr 31,000.00
145 Filler m2 1,000.00
146 Fitting plafond listrik buah 10,000.00
147 Floor Drain buah 45,000.00
148 Glass Block buah 28,000.00
149 Grendel/Slot Tanam 4" buah 88,000.00
150 Grendel biasa buah 18,000.00
151 Gypsum Board ( 120 x 240 x 9 ) mm lbr 74,000.00
152 Hordeng Horizontal Blind (aluminium) m2 109,000.00
153 Hordeng Vertikal Blind m3 112,000.00
154 Ijuk Kg 10,000.00
155 Jendela Aluminium + Kaca Reyband 5 mm m2 971,000.00
156 Jendela Aluminium + Kaca Reyband 8 mm m2 1,094,000.00
157 Jendela Besi m2 355,000.00
158 Jendela Bingkai Nako 100 cm X 70 cm Unit 106,000.00
159 Jendela Bingkai Nako m2 159,000.00
160 Kabel NYA 1,5 mm m' 4,000.00
161 Kabel NYA 2,5 mm m' 6,000.00
162 Kabel NYA 4.0 mm m' 7,000.00
163 Kabel NYM 2 X 1,5 mm m' 11,000.00
164 Kabel NYM 2 X 2,5 mm m' 15,000.00
165 Kabel NYM 2 X 4,0 mm m' 21,000.00
166 Kaca Cermin 3 mm m2 146,000.00
167 Kaca Cermin 5 mm m2 385,000.00
168 Kaca Patri m2 1,895,000.00
169 Kaca Bening 3 mm m2 77,000.00
170 Kaca Bening 4 mm m2 88,000.00
171 Kaca Bening 5 mm m2 130,000.00
172 Kaca Bening 8 mm m2 236,000.00
173 Kaca Bening 10 mm m2 274,000.00
174 Kaca Buram 12 mm m2 462,000.00
175 Kaca Rayband 5 mm m2 167,000.00
176 Kaca Buram/Es 5 mm m2 127,000.00
177 Bingkai Kaca Nako Set 16,000.00
178 Kaca Naco 6 daun Set 6,000.00
179 Kaca Naco 8 daun Set 73,000.00
180 Kaca Naco Rayben 5 mm, 6 daun Set 63,000.00
181 Kaca Naco Rayben 5 mm, 8 daun Set 72,000.00
182 Kait angin Jendela Buah 17,000.00
183 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 65,000.00
184 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 68,000.00
185 Kapur kg 7,000.00
186 Karpet tebal 6 mm m2 88,000.00
187 Kawat Beton kg 21,000.00
188 Kawat Burung m2 23,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
189 Kawat Duri m' 17,000.00
190 Kawat Harmonika m2 46,000.00
191 Kawat Jaring pagar lbr 33,000.00
192 Kawat Kassa m2 17,000.00
193 Kawat Las Dos 118,000.00
194 Kawat Nyamuk m2 21,000.00
195 Kawat Seng Polos kg 22,000.00
196 Kayu Gelam dia. 6-8 btg 9,000.00
197 Kayu Gelam dia. 10-12 btg 10,000.00
198 Kayu Hek btg 10,000.00
199 Kayu Lis 1/3 m' 12,000.00
200 Kayu Lis 1/4 m' 13,000.00
201 Kayu Lis Profil kecil m' 2,000.00
202 Kayu Lis Profil sedang m' 4,000.00
203 Kayu Lis Profil besar m' 8,000.00
204 Kayu Mosaik 30 x 30 cm Buah 7,000.00
205 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 65,000.00
206 Kayu Kelas I (Unglen, Jati) m3 9,774,000.00
207 Kayu Kelas II (Petanang dan sejenis) m3 7,701,000.00
208 Kayu Kelas III (Meranti dan sejenis) m3 3,909,000.00
209 Kayu Papan 3/20 Kls. III m3 3,909,000.00
210 Kayu Kelas IV (Racuk dan sejenis) m3 1,777,000.00
211 Kayu Papan kelas IV keping 19,000.00
212 Kayu Racuk m3 1,954,000.00
213 Kayu Reng btg 35,000.00
214 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 68,000.00
Keramik lantai/dinding 20 x 20/25 cm putih polos buah 2,000.00
215 Keramik lantai 20 x 20 cm warna, mutu C Kotak 61,000.00
Keramik lantai 20 x 20 cm warna, mutu C buah 2,000.00
216 Keramik lantai 20 x 20 cm warna, mutu B Kotak 73,000.00
Keramik lantai 20 x 20 cm warna, mutu B buah 2,000.00
217 Keramik dinding 20 x 25 cm warna Kotak 80,000.00
Keramik dinding 20 x 25 cm warna buah 4,000.00
218 Keramik lantai 20 x 25 cm warna, mutu B Kotak 55,000.00
Keramik lantai 20 x 25 cm warna, mutu B buah 2,000.00
219 Keramik lantai 30 x 30 cm warna Kotak 56,000.00
Keramik lantai 30 x 30 cm warna buah 5,000.00
220 Keramik lantai 30 x 30 cm putih polos Kotak 56,000.00
Keramik lantai 30 x 30 cm putih polos buah 5,000.00
221 Keramik lantai 40 x 40 cm warna mutu C Kotak 61,000.00
Keramik lantai 40 x 40 cm warna mutu C buah 9,000.00
222 Keramik lantai 40 x 40 cm warna mutu B Kotak 77,000.00
Keramik lantai 40 x 40 cm warna mutu B buah 12,000.00
223 Keramik lantai motif kayu (kasar) mutu A Kotak 59,000.00
224 Klem Talang Paralon Buah 3,000.00
225 Klem kabel listrik biasa Buah -
226 Klem kabel listrik Buah 3,000.00
227 Korosin Ltr 2,000.00
228 Kran Air buah 11,000.00
229 Kuas 3"-4" buah 14,000.00
230 Kunci Gembok buah 10,000.00
231 Kunci Lemari buah 9,000.00
232 Kunci Pintu Kamar Tidur (Hotel) buah 473,000.00
233 Kunci Pintu KM/WC (lux) buah 414,000.00
234 Kunci Selot buah 15,000.00
235 Kunci Tanam biasa mutu C buah 29,000.00
236 Kunci Tanam 2 slaag biasa buah 77,000.00
237 Kunci Tanam 2 slaag mutu B buah 106,000.00
238 Kunci Tanam Kamar Mandi buah 31,000.00
239 L.bow listrik buah 2,000.00
240 Lampu CFL buah 53,000.00
241 Lampu Down Light buah 50,000.00
242 Lampu Hologen 50 watt buah 14,000.00
243 Lampu Hologen 150 watt buah 29,000.00
244 Lampu Hologen Box buah 118,000.00
245 Lampu TL 10 Watt buah 53,000.00
246 Lampu TL 20 Watt buah 82,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
247 Lampu TL 40 Watt (bambu) buah 124,000.00
248 Lampu Pijar 25 Watt Putih buah 14,000.00
249 Lampu Pijar 40 Watt Putih buah 14,000.00
250 Lantai Granit 30/30 Buah 24,000.00
251 Lantai Granit 40/40 Buah 52,000.00
252 Lantai Granit 60/60 Buah 138,000.00
253 Lantai Kayu Panil Gracewood m2 385,000.00
254 Las dop listrik Buah -
255 Lem Kayu ltr 23,000.00
256 Lem Vinyl Kg 10,000.00
257 List Gypsum Besar m' 26,000.00
258 List Gypsum Kecil m' 14,000.00
259 Mangkok Saklar listrik Buah 2,000.00
260 MCB Buah 52,000.00
261 MCB Box isi 4 grup Buah 29,000.00
262 MCB Box isi 8 grup Buah 65,000.00
263 Melamic Clear kg 71,000.00
264 Melamic Gloss/dop (Finishing) kg 71,000.00
265 Mill kg 39,000.00
266 Minyak Bekisting liter 14,000.00
267 Minyak Cat liter 7,000.00
268 Minyak solar untuk industri / Minyak aspal liter 6,000.00
269 Minyak Gardan liter 19,000.00
270 Minyak Hidrolik liter 30,000.00
271 Minyak Selinder liter 23,000.00
272 Mozaik kayu lantai Uk. 30 x 30 cm buah 8,000.00
273 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 408,000.00
274 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 444,000.00
275 Paku Biasa bermacam ukuran 2" - 5" kg 17,000.00
276 Paku Biasa 1/2" - 1" kg 21,000.00
277 Paku Sumbat buah -
278 Paku Beton buah -
279 Paku Gypsum kg 29,000.00
280 Paku Seng,Asbes kg 26,000.00
281 Paku Asbes buah -
282 Paku Sekrup 3,5" Kg 53,000.00
283 Paku Sekrup 3,5" buah -
284 Parquet Jati m2 456,000.00
285 Pasir Beton / Pasang m3 109,000.00
286 Pasir Urug m3 77,000.00
287 Pewarna nat Bks 11,000.00
288 Pintu Alluminium m2 758,000.00
289 Pintu Besi Baja m2 2,310,000.00
290 Pintu Lipat m2 450,000.00
291 Pintu PVC lengkap + pemasangan Unit 248,000.00
292 Pipa besi medium 2 mm & 1/2", pjg 6 m M' 21,000.00
293 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 27,000.00
294 Pipa besi medium 2 mm & 1", pjg 6 m M' 34,000.00
295 Pipa besi medium 2 mm & 1,5", pjg 6 m M' 49,000.00
296 Pipa besi medium 2 mm & 2", pjg 6 m M' 62,000.00
297 Pipa besi medium 2 mm & 2,5", pjg 6 m M' 81,000.00
298 Pipa besi medium 2 mm & 3", pjg 6 m M' 128,000.00
299 Pipa besi medium 2 mm & 4", pjg 6 m M' 167,000.00
300 Pipa paralon listrik 5/8" Btg 7,000.00
301 Pipa PVC & 1/2" mutu A (Wavin dan sejenis) M' 4,000.00
302 Pipa PVC biasa & 1/2" mutu B M' 4,000.00
303 Pipa PVC & 3/4" mutu A (Wavin dan sejenis) M' 6,000.00
304 Pipa PVC & 3/4" mutu B M' 5,000.00
305 Pipa PVC & 1" mutu A (Wavin dan sejenis) M' 8,000.00
306 Pipa PVC & 1" mutu B M' 5,000.00
307 Pipa PVC & 1.5" mutu A (Wavin dan sejenis) M' 15,000.00
308 Pipa PVC & 1.5" mutu B M' 9,000.00
309 Pipa PVC & 2" mutu A ( Wavin dan sejenis) M' 19,000.00
310 Pipa PVC & 2" mutu B M' 12,000.00
311 Pipa PVC & 3" mutu A (Wavin dan sejenis) M' 38,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
312 Pipa PVC & 3" mutu B M' 20,000.00
313 Pipa PVC & 4" mutu A ( Wavin dan sejenis) M' 61,000.00
314 Pipa PVC & 4" mutu B M' 35,000.00
315 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) M' 146,000.00
316 Pipa Stainless 2", tebal 1 mm M' 88,000.00
317 Pipa Stainless 2", tebal 0.8 mm M' 79,000.00
318 Pipa Stainless 2,5", tebal 1 mm M' 112,000.00
319 Pipa Stainless 2,5", tebal 1.2 mm M' 99,000.00
320 Plamir Tembok kg 9,000.00
321 Plamir Kayu kg 20,000.00
322 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 2,014,000.00
323 Plint keramik 10 x 30 cm warna buah 4,000.00
324 Plint keramik 10 x 40 cm warna buah 15,000.00
325 Plint Ubin PC Abu-abu 15 x 20 cm buah -
326 Plint Ubin PC Abu-abu 10 x 30 cm buah 1,000.00
327 Plint Ubin PC Abu-abu 10 x 40 cm buah 1,000.00
328 Plywood warna/Jabarwood Lbr 130,000.00
329 Plywood Jati 3 mm Lbr 130,000.00
330 Plywood Sungkay 3 mm/ megatick Lbr 130,000.00
331 Plywood 3 mm Lbr 49,000.00
332 Plywood 4 mm Lbr 80,000.00
333 Plywood 6 mm Lbr 104,000.00
334 Plywood 9 mm Lbr 148,000.00
335 Plywood 12 mm Lbr 189,000.00
336 Plywood 20 mm Lbr 248,000.00
337 Politur dasar ltr 58,000.00
338 Politur Jadi ltr 62,000.00
339 Porselin Putih Uk. 10 x 10 cm buah -
340 Porselin Warna Uk. 10 x 10 cm buah 1,000.00
341 Profil allumunium T m2 15,000.00
342 Rangka Atap baja ringan untuk atap genteng, genteng m2 337,000.00
keramik, beton, dll + pemasangan -
343 Rangka Atap baja ringan untuk atap seng metal, atap m2 256,000.00
asbes, aluminium, sirap, dll + pemasangan -
344 Rangka Atap baja ringan bentuk joglo/bertumpuk/ m2 333,000.00
khusus + pemasangan -
345 Rangka Atap baja ringan "Pryda" untuk atap Pelana, m2 302,000.00
Metal dan keramik + pemasangan -
346 Rangka Atap baja ringan "Pryda" untuk atap Perisai, m2 333,000.00
Metal dan keramik + pemasangan -
347 Rangka Atap baja ringan "Pryda" untuk atap Joglo, m2 388,000.00
Metal dan keramik + pemasangan -
348 Rel Pintu Dorong Unit 284,000.00
349 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) m2 693,000.00
350 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) m2 746,000.00
351 Sanding Sealer Impra (Cat dasar) Kg 45,000.00
352 Seal Tape buah 4,000.00
353 Sealant tube 9,000.00
354 Semen ( 50 kg ) Zak 73,000.00
355 Semen Portland ( PC ) kg 1,420.00
356 Semen Putih (40 kg) Zak 100,000.00
357 Semen Putih Kg 2,000.00
358 Semen Merah m3 45,000.00
359 Semen Nat kg 14,000.00
360 Seng Gelombang, lebar 70 cm m2 8,000.00
361 Seng Plat 120 cm X 240 cm lbr 125,000.00
362 Seng Plat 33 cm M' 15,000.00
363 Seng Plat 38 cm M' 21,000.00
364 Seng Plat 45 cm M' 23,000.00
365 Seng Plat 55 cm M' 30,000.00
366 Seng Plat 88 cm M' 39,000.00
367 Seng Plat 92 cm M' 41,000.00
368 Sabun Kg 13,000.00
369 Soda Api Kg 35,000.00
370 Soft Board ( 120 x 240 ) mm lbr 79,000.00
371 Saklar Tunggal biasa Buah 7,000.00
372 Saklar Ganda biasa Buah 15,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)
373 Saklar Tunggal National Buah 20,000.00
374 Saklar Ganda National Buah 35,000.00
375 Scafolding tg 1,77 m X 1,77 m Unit 947,000.00
376 Roda Scafolding 4 buah Unit 414,000.00
377 RANGKA ATAP Gigasteel -
- Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) M' 26,000.00
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) M' 22,000.00
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) M' 22,000.00
- Screw / Dynabolt Buah 2,000.00
- Valery Gutter Talang Jurai M' 148,000.00
- Strap Bracing M' 14,000.00
378 Stop Kontak biasa Buah 20,000.00
379 Stop kontak AC Buah 88,000.00
380 Sunscreen Aluminium M2 444,000.00
381 T.Duss listrik Buah 1,000.00
382 Talang Paralon, pjg 4 m btg 56,000.00
383 Tali Ijuk Kg 13,000.00
384 Tali Air m' 65,000.00
385 Ijuk m3 28,000.00
386 Tanah Liat/Urug m3 59,000.00
387 Tanah Puru m3 65,000.00
388 Tanah Sirtu m3 94,000.00
389 Taekwood 3 mm m2 42,000.00
390 Taekwood 4 mm biasa m2 47,000.00
391 Ter / Residu liter 53,000.00
392 Textil Tape roll 8,000.00
393 Thinner biasa Liter 14,000.00
394 Thinner Cat Glossy (Cobra dan sejenis) Liter 41,000.00
395 Urinoir buah 1,658,000.00
396 Urinoir mutu A unit 1,954,000.00
397 Vernis ltr 29,000.00
398 Vernis Batu Kg 77,000.00
399 Wallpaper m2 331,000.00
400 Wastafel biasa buah 313,000.00
401 Wastafel Halmar unit 331,000.00
402 Wastafel mutu A unit 533,000.00
403 Wood Filler Impra (dempul) Klg 379,000.00
404 Wood Stain Impra (cat pewarna) Klg 71,000.00

C PERALATAN
1 Compresor jam 132,000.00
2 Concrete Mixer jam 211,000.00
3 Concrete Pump jam 135,000.00
4 Concrete Vibrator jam 47,000.00
5 Dump Truck 3,5 ton jam 369,000.00
6 Excavator jam 1,025,000.00
7 Filter jam
8 Genset jam 414,000.00
9 Grader jam
10 Loader jam
11 Pneumatic Tired Roller jam
12 Tandem Roller jam
13 Flatbed Truck 3,5 ton jam 266,000.00
14 Water Tank Truck jam
15 Generator jam
16 Alat Bantu jam 88,000.00
17 Roller 3 roda jam
18 Sprayer, Selfprof jam 165,000.00
19 Buldozer jam
20 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 112,000.00
21 Stone Crusher (Pemecah batu) jam
22 Pengaduk beton/Molen jam 118,000.00
23 Stemper jam 177,000.00
24 Roller, Vibrator Pneu jam
25 Water Pump jam 296,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
KENAIKAN HARGA PERBULAN 0,28% DARI ANGGARAN DANA TAHUN 2014 SMT 1
HARGA PAKAI
NO URAIAN SATUAN TAHUN 2019
(Rp.)

D SERVICE
1 AC Window/Split/Multi Ls 71,000.00
2 Dispenser Ls 59,000.00
3 Kulkas/Freezer Ls 59,000.00
4 Kompor Gas 2T Ls 59,000.00
5 Kompor Gas 4T Ls 88,000.00
6 Mesin Cuci Ls 59,000.00
7 Pompa Air Ls 59,000.00
8 Instalasi listrik Ls 100,000.00
Catatan : Harga satuan diatas belum termasuk PPn 10%.
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : RUMAH TINGGAL TYPE 100 m 2
LOKASI : PALEMBANG
TAHUN ANGGARAN : 2019

NO URAIAN PEKERJAAN VOLUME H. SATUAN JUMLAH HARGA


(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi Kerja 200 m² Rp 14,200.00 Rp 2,840,000.00
2 Pek. Pemasangan Bowplank 55.40 m Rp 69,277.00 Rp 3,837,945.80
3 Air Kerja 1.00 Ls Rp -
4 Biaya P3K 1.00 Ls Rp -
5 Pembuatan Gudang dan Direksi Keet 12.00 m² Rp 773,150.00 Rp 9,277,800.00
6 Pagar Pengaman 180.00 m² Rp 227,731.00 Rp 40,991,580.00
7 Listrik Kerja 1.00 Ls Rp -
8 Keamanan 1.00 Ls Rp -
9 Dokumentasi dan Pelaporan 1.00 Ls Rp -
JUMLAH Rp 56,947,325.80
II PEKERJAAN TANAH
1 Pek. Galian Pondasi 134.57 mᶾ Rp 36,000.00 Rp 4,844,474.28
2 Pek. Urugan Pasir Dibawah Pondasi 6.09 mᶾ Rp 116,800.00 Rp 710,949.92
3 Pek. Urugan Tanah Kembali 61.43 mᶾ Rp 17,254.00 Rp 1,059,836.61
JUMLAH Rp 6,615,260.81
III PEKERJAAN PONDASI
1. Pek. Anstampang Pondasi 22.28 mᶾ Rp 991,755.00 Rp 22,093,841.85
2. Pek. Pondasi Batu Kali 42.65 mᶾ Rp 991,755.00 Rp 42,303,061.59
JUMLAH Rp 64,396,903.43
IV PEKERJAAN BETON BERTULANG
1 Pek. Beton
a Pek. Sloof 15/20 4.30 mᶾ Rp 988,560.00 Rp 4,252,785.12
b Pek. Ring Balok 15/20 4.30 mᶾ Rp 988,560.00 Rp 4,252,785.12
c Pek. Kolom 15/15 3.33 mᶾ Rp 988,560.00 Rp 3,294,129.06
d Pek. Atap Garasi 1.50 mᶾ Rp 988,560.00 Rp 1,482,840.00
e Kolom 30/30 1.39 mᶾ Rp 988,560.00 Rp 1,370,144.16
f Balok 30/35 5.25 mᶾ Rp 988,560.00 Rp 5,189,940.00
g Pondasi Setempat 1.72 mᶾ Rp 988,560.00 Rp 1,704,277.44
h Lantai Kerja 0.40 mᶾ Rp 988,560.00 Rp 395,424.00
2 Pek. Tulangan Rp 21,942,324.90
a Tulangan Ǿ 12 137.07 Kg Rp 24,826.00 Rp 3,402,903.39
b Tulangan Ǿ 6 600.08 Kg Rp 24,826.00 Rp 14,897,523.25
c Tulangan Ǿ 8 1,082.95 Kg Rp 24,826.00 Rp 26,885,255.55
3 Pek. Bekisting Rp 45,185,682.19
a Pek. Bekisting Sloof 57.36 mᶾ Rp 139,755.00 Rp 8,016,346.80
b Pek. Bekisting Kolom 88.86 mᶾ Rp 185,685.00 Rp 16,499,969.10
c Pek. Bekisting Balok 57.36 mᶾ Rp 192,556.00 Rp 11,045,012.16
d Pek. Bekisting Plat 15.00 mᶾ Rp 223,225.00 Rp 3,348,375.00
e Pek. Bekisting kolom 30/30 18.48 mᶾ Rp 185,685.00 Rp 3,431,458.80
f Pek. Bekisting Balok 30/35 16.00 mᶾ Rp 192,556.00 Rp 3,080,896.00
g Pek. Bekisting Pondasi Setempat 9.12 mᶾ Rp 185,685.00 Rp 1,693,447.20

JUMLAH Rp 173,165,717.25
V PEKERJAAN PASANGAN DINDING DAN PLESTERAN
1 Pek. Pasangan Dinding Batu Bata ad 1:4 393.11 mᶾ Rp 129,507.00 Rp 50,910,496.77
2 Pek. Plesteran Dinding 786.22 mᶾ Rp 44,114.00 Rp 34,683,309.08
JUMLAH Rp 85,593,805.85
VI PEKERJAAN LANTAI
1 Pek. Timbunan Tanah 10.76 m² Rp 98,190.00 Rp 1,056,671.69
2 Pek. Urugan Pasir 17.56 m² Rp 116,800.00 Rp 2,050,716.00
3 Pek. Siar Adukan/ Spesi 3.51 m² Rp 28,798.40 Rp 101,125.58
4 Pek. Lantai Keramik 40/40 112.24 m² Rp 210,027.60 Rp 23,572,972.76
5 Pek. Lantai Keramik 20/20 wc 4.81 m² Rp 185,027.60 Rp 890,445.33
6 Pek. Dinding Keramik 13.33 m² Rp 185,027.60 Rp 2,466,417.91
7 Pek. Plint keramik 10 x 40 11.55 m² Rp 32,791.80 Rp 378,745.29
JUMLAH Rp 30,517,094.54
VII PEKERJAAN PINTU JENDELA ALUMUNIUM DAN PERLENGKAPAN
1 Pek. Pintu Alumunium (P1,P2,P3) 17.42 m² Rp 964,476.00 Rp 16,796,349.54
2 Pek. Pintu Lipat 5.88 m² Rp 656,476.00 Rp 3,860,078.88
3 Pek. Jendela 8.25 m² Rp 954,040.00 Rp 7,866,059.80
4 Pek. Perlengkapan Pintu
Engsel 62.00 Bh Rp 7,000.00 Rp 434,000.00
Handle 10.00 Bh Rp 252,000.00 Rp 2,520,000.00
Kunci 8.00 Bh Rp 29,000.00 Rp 232,000.00
6 Handle pintu wc 2.00 Bh Rp 50,000.00 Rp 100,000.00
7 Kunci pintu wc 2.00 Bh Rp 414,000.00 Rp 828,000.00
8 Handle jendela 14.00 Bh Rp 13,000.00 Rp 182,000.00
9 Kunci jendela 7.00 Bh Rp 15,000.00 Rp 105,000.00
10 Boven 0.45 m² Rp 250,000.00 Rp 112,500.00
JUMLAH Rp 31,708,488.22
VIII PEKERJAAN PLAFOND
1 Pek. Plafond + Rangka Plafond Plywood 117.05 m² Rp 231,617.00 Rp 27,110,769.85
2 Pek. List Plafond 153.90 m² Rp 12,633.00 Rp 1,944,218.70
JUMLAH Rp 29,054,988.55
IX PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ringan Rp -
2 Pek. Penutup Atap Beton 164.56 m² Rp 95,110.00 Rp 15,651,631.30
3 Pek. Listplank 2/20 25.34 m² Rp 89,097.20 Rp 2,257,723.05
4 Pek. Jurai Dalam 23.10 m Rp 115,374.00 Rp 2,665,139.40
5 Pek. Jurai Luar 23.09 m Rp 115,374.00 Rp 2,663,985.66
6 Pek. Nok Genteng Beton 17.00 m Rp 115,374.00 Rp 1,961,358.00
JUMLAH Rp 25,199,837.41
X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 786.22 Rp 50,559.00 Rp 39,750,496.98
JUMLAH Rp 39,750,496.98
XI PEKERJAAN SANITASI
1 Pas. Closed Duduk 2.00 Bh Rp 3,216,530.00 Rp 6,433,060.00
2 Pas. Bak Mandi Fiber Glass 2.00 Bh Rp 1,180,560.00 Rp 2,361,120.00
3 Pas. Floor Drain 2.00 Bh Rp 58,420.00 Rp 116,840.00
4 Pas. Kran Air 3.00 Bh Rp 24,420.00 Rp 73,260.00
5 Pas. Wastafel 1.00 Bh Rp 885,170.00 Rp 885,170.00
6 Pas. Pipa PVC Air Bersih 2" 44.00 m Rp 44,669.00 Rp 1,965,436.00
7 Pas. Pipa PVC Air Kotor/Limbah Cair 3" 33.00 m Rp 81,735.00 Rp 2,697,255.00
8 Pas. Pipa PVC Air Kotor/Limbah Cair 4" 33.00 m Rp 117,385.00 Rp 3,873,705.00
9 Pas. Penyambung Pipa 18.00 Bh Rp 3,500.00 Rp 63,000.00
10 Pas. Septictank Biotech 1.24 mᶾ Rp 2,500,000.00 Rp 3,111,428.57
11 Pek. Galian Septictank 7.70 mᶾ Rp 36,000.00 Rp 277,041.60
12 Pek. Urugan Pasir 0.73 mᶾ Rp 116,800.00 Rp 84,796.80
13 Pek. Lantai Kerja 0.24 mᶾ Rp 133,296.00 Rp 32,257.63
14 Pek. Urugan Kembali 5.48 mᶾ Rp 17,254.00 Rp 94,604.17
JUMLAH Rp 22,068,974.78
XII PEKERJAAN INSTALASI LISTRIK
1 Titik Pemasangan Saklar 11.00 Bh Rp 255,000.00 Rp 2,805,000.00
2 Titik Pemasangan Stop kontak Biasa 7.00 Bh Rp 216,000.00 Rp 1,512,000.00
3 Titik Pemasangan MCB 1.00 Bh Rp 268,000.00 Rp 268,000.00
4 Kabel Listrik 110.00 m Rp 6,000.00 Rp 660,000.00
5 Juctiun 14.00 Bh Rp 162,500.00 Rp 2,275,000.00
6 Elbow 10.00 Bh Rp 2,000.00 Rp 20,000.00
7 Lampu CFL 15.00 Bh Rp 53,000.00 Rp 795,000.00
8 Pemasangan Lampu Hias 1.00 Bh Rp 250,000.00 Rp 250,000.00
9 KWH Meter 1.00 Bh Rp 200,000.00 Rp 200,000.00
JUMLAH Rp 8,585,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : RUMAH TINGGAL TYPE 100 m²


LOKASI : PALEMBANG
TAHUN ANGGARAN: 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
I PEKERJAAN PERSIAPAN 56,947,326
II PEKERJAAN TANAH 6,615,261
III PEKERJAAN PONDASI 64,396,903
IV PEKERJAAN BETON BERTULANG 173,165,717
V PEKERJAAN PASANGAN DINDING DAN PLESTERAN 85,593,806
VI PEKERJAAN LANTAI 30,517,095
VII PEKERJAAN PINTU JENDELA ALUMUNIUM DAN PERLENGKAPAN 31,708,488
VIII PEKERJAAN PLAFOND 29,054,989
IX PEKERJAAN ATAP 25199837.406959
X PEKERJAAN PENGECATAN 39,750,497
XI PEKERJAAN SANITASI 22,068,975
XII PEKERJAAN INSTALASI LISTRIK 8,585,000
TOTAL 573,603,894
DIBULATKAN 573,700,000
PPN 10% 57,370,000
TOTAL 631,070,000
RENCANA ANGGARAN PELAKSANAAN (RAP)

BIAYA PEKERJAAN LUMPSUMP


NO ITEM PEKERJAAN HARGA SAT VOLUME SATUAN
1
2
3
4
5

BIAYA RENCANA UPAH PEKERJAAN


NO ITEM PEKERJAAN VOLUME SAT HARSAT
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi Kerja 200 m² 14,200
2 Pek. Pemasangan Bowplank 55.4 m 20,250
3 Air Kerja 1 Ls
4 Biaya P3K 1 Ls
5 Pembuatan Gudang dan Direksi Keet 12 m² 321,500
6 Pagar Pengaman 180 m² 57,200
7 Listrik Kerja 1 Ls
8 Keamanan 1 Ls
9 Dokumentasi dan Pelaporan 1 Ls
JUMLAH
II PEKERJAAN TANAH
1 Pek. Galian Pondasi 134.56873 mᶾ 36,000
2 Pek. Urugan Pasir Dibawah Pondasi 6.0869 mᶾ 24,400
3 Pek. Urugan Tanah Kembali 61.42556 mᶾ 17,254
JUMLAH
III PEKERJAAN PONDASI
1. Pek. Anstampang Pondasi 22.27752 mᶾ 196,650
2. Pek. Pondasi Batu Kali 42.65475 mᶾ 196,650
JUMLAH
IV PEKERJAAN BETON BERTULANG
1 Pek. Beton
a Pek. Sloof 15/20 4.302 mᶾ 167,200
b Pek. Ring Balok 15/20 4.302 mᶾ 167,200
c Pek. Kolom 15/15 3.33225 mᶾ 167,200
d Pek. Atap Garasi 1.5 mᶾ 167,200
e Kolom 30/30 1.386 mᶾ 167,200
f Balok 30/35 5.25 mᶾ 167,200
g Pondasi Setempat 1.724 mᶾ 167,200
h Lantai Kerja 0.4 mᶾ 167,200
2 Pek. Tulangan
a Tulangan Ǿ 12 137.070144 Kg 1,411
b Tulangan Ǿ 6 600.0774693 Kg 1,411
c Tulangan Ǿ 8 1082.947537 Kg 1,411
3 Pek. Bekisting
a Pek. Bekisting Sloof 57.36 mᶾ 54,690
b Pek. Bekisting Kolom 88.86 mᶾ 63,150
c Pek. Bekisting Balok 57.36 mᶾ 64,690
d Pek. Bekisting Plat 15 mᶾ 64,690
e Pek. Bekisting kolom 30/30 18.48 mᶾ 63,150
f Pek. Bekisting Balok 30/35 16 mᶾ 64,690
g Pek. Bekisting Pondasi Setempat 9.12 mᶾ 63,150
JUMLAH
V PEKERJAAN PASANGAN DINDING DAN PLESTERAN
1 Pek. Pasangan Dinding Batu Bata ad 1:4 393.11 mᶾ 38,490
2 Pek. Plesteran Dinding 786.22 mᶾ 34,550
JUMLAH
VI PEKERJAAN LANTAI
1 Pek. Timbunan Tanah 10.7615 m² 27,390
2 Pek. Urugan Pasir 17.5575 m² 24,400
3 Pek. Siar Adukan/ Spesi 3.5115 m² 20,920
4 Pek. Lantai Keramik 40/40 112.2375 m² 93,290
5 Pek. Lantai Keramik 20/20 wc 4.8125 m² 93,290
6 Pek. Dinding Keramik 13.33 m² 93,290
7 Pek. Plint keramik 10 x 40 11.55 m² 18,225
JUMLAH
VII PEKERJAAN PINTU JENDELA ALUMUNIUM DAN PERLENGKAPAN
1 Pek. Pintu Alumunium (P1,P2,P3) 17.415 m² 206,476
2 Pek. Pintu Lipat 5.88 m² 206,476
3 Pek. Jendela 8.245 m² 17,310
4 Pek. Perlengkapan Pintu
Engsel 62 Bh
Handle 10 Bh
Kunci 8 Bh
6 Handle pintu wc 2 Bh
7 Kunci pintu wc 2 Bh
8 Handle jendela 14 Bh
9 Kunci jendela 7 Bh
10 Boven 0.45 m²
JUMLAH
VIII PEKERJAAN PLAFOND
1 Pek. Plafond + Rangka Plafond Plywood 117.05 m² 70,145
2 Pek. List Plafond 153.9 m² 4,233
JUMLAH
IX PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ringan
2 Pek. Penutup Atap Beton 164.56 m² 28,600
3 Pek. Listplank 2/20 25.34 m² 32,800
4 Pek. Jurai Dalam 23.1 m 57,200
5 Pek. Jurai Luar 23.09 m 57,200
6 Pek. Nok Genteng Beton 17 m 57,200
JUMLAH
X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 786.22 7,449
JUMLAH
XI PEKERJAAN SANITASI
1 Pas. Closed Duduk 2 Bh 391,630
2 Pas. Bak Mandi Fiber Glass 2 Bh 942,000
3 Pas. Floor Drain 2 Bh 13,320
4 Pas. Kran Air 3 Bh 13,320
5 Pas. Wastafel 1 Bh 278,600
6 Pas. Pipa PVC Air Bersih 2" 44 m 15,219
7 Pas. Pipa PVC Air Kotor/Limbah Cair 3" 33 m 22,835
8 Pas. Pipa PVC Air Kotor/Limbah Cair 4" 33 m 22,835
9 Pas. Penyambung Pipa 18 Bh
10 Pas. Septictank Biotech 1.244571429 mᶾ
11 Pek. Galian Septictank 7.6956 mᶾ 36,000
12 Pek. Urugan Pasir 0.726 mᶾ 24,400
13 Pek. Lantai Kerja 0.242 mᶾ 91,710
14 Pek. Urugan Kembali 5.483028571 mᶾ 17,254
JUMLAH
XII PEKERJAAN INSTALASI LISTRIK
1 Titik Pemasangan Saklar 11 Bh 100,000
2 Titik Pemasangan Stop kontak Biasa 7 Bh 100,000
3 Titik Pemasangan MCB 1 Bh 100,000
4 Kabel Listrik 110 m
5 Juctiun 14 Bh
6 Elbow 10 Bh
7 Lampu CFL 15 Bh
8 Pemasangan Lampu Hias 1 Bh
9 KWH Meter 1 Bh
JUMLAH
TOTAL

REKAPITULASI BIAYA RENCANA UPAH DALAM HOK (HARI ORANG KERJA)


VOLUME HARGA
NO URAIAN JUMLAH
HOK SATUAN
1 Pekerja 980.06 77,000 75,464,714.54
2 Mandor 58.03 130,000 7,543,812.42
3 Kepala Tukang 60.00 130,000 7,800,150.24
4 Tukang Batu 279.65 106,000 29,642,430.37
5 Tukang Besi 12.74 106,000 1,350,510.60
6 Tukang Besi Konstruksi 24.46 106,000 2,592,733.50
7 Tukang biasa 0.00 77,000 -
8 Tukang Cat 7.08 106,000 750,053.88
9 Tukang Gali 0.00 - -
10 Tukang Instalasi listrik 19.00 100,000 1,900,000.00
11 Tukang Kayu 228.01 106,000 24,168,982.79
12 Tukang Terampil 0.00 106,000 -
JUMLAH 151,213,388

REKAPITULASI BIAYA RENCANA UPAH PEKERJAAN


NO URAIAN JUMLAH
1 PEKERJAAN PERSIAPAN 18,115,850
2 PEKERJAAN TANAH 6,052,831
3 PEKERJAAN PONDASI 12,768,931
4 PEKERJAAN BETON BERTULANG 22,486,843
5 PEKERJAAN PASANGAN DINDING DAN PLESTERAN 42,294,705
6 PEKERJAAN LANTAI 13,170,270
7 PEKERJAAN PINTU JENDELA ALUMUNIUM DAN PERLENGKAPAN 4,952,579
8 PEKERJAAN PLAFOND 8,861,931
9 PEKERJAAN ATAP 9,152,135
10 PEKERJAAN PENGECATAN 5,856,553
11 PEKERJAAN SANITASI 5,600,760
12 PEKERJAAN INSTALASI LISTRIK 1,900,000
JUMLAH 151,213,388

REKAPITULASI BIAYA RENCANA UPAH PEKERJAAN =


REKAPITULASI BIAYA RENCANA UPAH DALAM HOK (HARI ORANG KERJA) =
=
BIAYA UPAH

BIAYA UPAH

2,840,000
1,121,850
-
-
3,858,000
10,296,000
-
-
-
18,115,850
-
4,844,474
148,520
1,059,837
6,052,831
-
4,380,874 12,768,931
8,388,057
12,768,931
-
-
719,294
719,294
557,152
250,800
231,739
877,800
288,253
66,880

193,406
846,709
1,528,039

3,137,018
5,611,509
3,710,618
970,350
1,167,012
1,035,040
575,928
22,486,843
15,130,804
27,163,901
42,294,705
-
294,757
428,403
73,461
10,470,636
448,958
1,243,556
210,499
13,170,270
-
3,595,780
1,214,079
142,721
-
-
-
-
-
-
-
-
-
4,952,579
-
8,210,472
651,459
8,861,931
-
-
4,706,515
831,152
1,321,320
1,320,748
972,400
9,152,135
-
5,856,553
5,856,553
-
783,260
1,884,000
26,640
39,960
278,600
669,636
753,555
753,555
-
-
277,042
17,714
22,194
94,604
5,600,760
-
1,100,000
700,000
100,000
-
-
-
-
-
-
1,900,000
302,426,777

151,213,388
151,213,388
-

Anda mungkin juga menyukai