RAB Rumah 1 Lantai
RAB Rumah 1 Lantai
LANTAI I
I PEKERJAAN PERSIAPAN
panjang
1 Pembersihan lokasi = 7.00 x
2 Pengukuran dan pasang bouplank = 2.00 x
Type A = 1.00 x
Type B =
Tangga =
= - x
Balok panjang
4 Balok 1 (15/20) = 56.00 x
5 Balok 2 (15/30) = - x
6 Balok 3 (8/45) = - x
7 Balok Tangga (15/25) = - x
8 Balok Tangga (15/35) = - x
sisi
5 Plesteran + Acian Trasraam = 2.00 x
= 1.00 x
sisi
6 Plesteran + Acian dinding = 2.00 x
J1 = 1.00 x
dikurangi kaca = 1.00 x
J2 = 1.00 x
= 1.00 x
J4 = 1.00 x
= 1.00 x
LANTAI 2
I PEKERJAAN PEMBETONAN
1 Kolom struktur banyak
Kolom 1 (15/20) = 23.00 x
sisi
4 Plesteran + Acian Trasraam = 1.00 x
J2 = 2.00 x
= 2.00 x
J3 = 3.00 x
= 3.00 x
V PEKERJAAN SANITAIR
1 Instalasi air bersih pipa PVC AW 3/4" = 2.00 m'
2 Instalasi air kotor pipa PVC AW 3" = 3.00 m'
3 Instalasi air kotoran pipa PVC AW 4" = 2.00 m'
4 Klosed jongkok = 1.00 unit
5 Kran air = 1.00 bh
6 Floor drain = 1.00 bh
lebar
14.00 = 98.00 m2
( 7.00 + 14.00 ) = 42.00 m'
kedalaman
0.15 = - m3
= m3
= m3
= m3
Jumlah = - m3
lebar tebal
0.95 x 0.10 = 3.90 m3
0.85 x 0.10 = 3.57 m3
0.65 x 0.10 = - m3
Jumlah = m3
Tebal
0.05 = 4.90 m3
- = - m3
Jumlah = 4.90 m3
lebar tebal
0.90 x 0.20 = 7.38 m3
0.80 x 0.20 = 6.72 m3
0.60 x 0.20 = - m3
Jumlah = 14.10 m3
Tinggi Banyak
0.40 x 2.00 = 5.20 m2
0.30 x 2.00 = 2.10 m2
0.20 x 2.00 = 1.40 m2
Jumlah = 8.70 m2
lebar tinggi
0.20 x 0.35 = m3
0.15 x 0.20 = 2.49 m3
0.30 x 0.55 = m3
Jumlah = 2.49 m3
lebar tinggi
0.15 x 0.20 = 1.68 m3
0.15 x 0.30 = - m3
0.08 x 0.45 = - m3
0.15 x 0.25 = - m3
0.15 x 0.35 = - m3
Jumlah = 1.68 m3
lebar tinggi
0.15 x 0.20 = - m3
lebar tinggi
0.15 x 0.20 = - m3
0.15 x 0.30 = - m3
Jumlah = - m3
lebar tinggi
0.15 x 0.20 = m3
0.15 x 0.20 = 0.54 m3
Jumlah = 0.54 m3
tebal
0.12 = - m3
tebal banyak
0.12 = - m3
1.00 x 9.00 = - m3
0.12 = - m3
0.12 = - m3
1.00 x 6.00 = - m3
Jumlah = - m3
= 7.22 m3
tebal banyak
0.05 = - m3
tinggi
0.50 = - m2
1.75 = - m2
4.00 = - m2
0.90 = - m2
Jumlah = - m2
tinggi banyak
0.40 = 1.14 m2
2.91 = 0.99 m2
0.80 = 2.68 m2
0.35 x 2.00 = 3.79 m2
4.10 = 11.69 m2
0.83 = 2.08 m2
2.91 = 0.41 m2
0.35 = 0.08 m2
Jumlah = m2
tinggi banyak
2.96 x 4.00 = m2
luas
- = - m2
- = - m2
Jumlah = - m2
luas
353.97 = 707.94 m2
Lebar Tinggi
0.72 x 2.26 = 13.02 m2
0.72 x 2.21 = - m2
Jumlah = 13.02 m2
Lebar Tinggi
0.50 x 2.51 = - m2
Lebar Tinggi
0.62 x 2.02 = 5.01 m2
0.44 x 1.84 = 3.24 m2
= 1.77 m2
0.62 x 2.02 = 1.25 m2
0.44 x 1.84 = 0.81 m2
= 0.44 m2
0.62 x 2.02 = 1.25 m2
0.44 x 1.84 = 0.81 m2
= 0.44 m2
0.62 x 1.12 = 0.69 m2
0.44 x 0.94 = 0.41 m2
= 0.28 m2
Jumlah = 2.94 m2
Lebar Tinggi
0.45 x 1.85 = 3.33 m2
0.30 x 0.12 = - m2
0.45 x 1.85 = 0.83 m2
0.45 x 1.85 = 0.83 m2
0.45 x 0.95 = 0.43 m2
Jumlah = 5.42 m2
Lebar Tinggi
0.62 x 0.25 = 0.62 m2
= 2.00 unit
Lantai - Void = 78.00 m2
= 78.00 m2
T. Panjang
21.40 = - m'
9.40 = - m'
6.40 = - m'
11.40 = - m'
9.40 = - m'
16.40 = - m'
6.40 = - m'
13.40 = - m'
12.40 = - m'
9.40 = - m'
13.85 = - m'
3.50 = - m'
Jumlah = - m'
unit
unit
lebar banyak
1.50 x 2.00 = 4.50 m2
0.50 x 1.00 = - m2
0.50 x 1.00 = - m2
Jumlah = 4.50 m2
tinggi banyak
1.80 x 1.00 = 9.90 m2
1.80 x 1.00 = 9.90 m2
0.90 x 2.00 = - m2
Jumlah = 19.80 m2
= - m2
lebar sisi
3.50 x 2.00 = 42.00 m2
3.50 x 2.00 = 31.50 m2
0.75 x 2.00 = - m2
3.50 x 2.00 = - m2
Jumlah = 73.50 m2
lebar sisi
3.50 x 2.00 = 42.00 m2
3.50 x 2.00 = 31.50 m2
0.75 x 2.00 = - m2
3.50 x 2.00 = - m2
Jumlah = 73.50 m2
sisi
2.00 = 7.00 m'
1.00 = - m'
1.00 = - m'
Jumlah = 7.00 m'
sisi
2.00 = 14.00 m'
1.00 = - m'
2.00 = - m'
Jumlah = 14.00 m'
luas
- = - m2
707.94 = 707.94 m2
= 78.00 m2
sisi
2.00 = - m2
T. sisi
0.22 = - m2
jumlah
1.00 unit = 4.00 unit
1.00 unit = - unit
1.00 unit = - unit
Jumlah = 4.00 unit
jumlah
3.00 = 12.00 bh
3.00 = - bh
- = - bh
Jumlah = 12.00 bh
jumlah
2.00 = 8.00 bh
1.00 = - bh
- = - bh
Jumlah = 8.00 bh
jumlah
2.00 = 8.00 bh
2.00 = 2.00 bh
1.00 = 1.00 bh
2.00 = 2.00 bh
Jumlah = 13.00 bh
jumlah
4.00 = 16.00 bh
4.00 = 4.00 bh
2.00 = 2.00 bh
4.00 = 4.00 bh
Jumlah = 26.00 bh
jumlah
4.00 = 16.00 bh
4.00 = 4.00 bh
2.00 = 2.00 bh
4.00 = 4.00 bh
Jumlah = 26.00 bh
lebar tinggi
0.15 x 0.20 = - m3
0.15 x 0.20 = - m3
0.15 x 0.20 = 3.12 m3
0.15 x 0.20 = 0.20 m3
0.15 x 0.20 x 2.00 = 0.34 m3
0.15 x 0.20 x 2.00 = 0.17 m3
Jumlah = 3.83 m3
lebar tebal
2.43 x 0.10 = - m3
lebar tebal
0.68 x 0.10 = - m3
= 6.78 m3
tinggi
1.75 = 12.25 m2
1.10 = 1.65 m2
Jumlah = 13.90 m2
tinggi
3.50 = 364.00 m2
1.15 = 5.18 m2
2.35 : 2.00 = 4.82 m2
1.00 : 2.00 = 2.07 m2
2.35 : 2.00 = 9.58 m2
0.91 : 2.00 = 1.37 m2
Jumlah = 387.00 m2
lebar tinggi
0.82 x 2.26 = 3.71 m2
0.82 x 2.26 = 1.85 m2
1.38 x 2.12 = 2.93 m2
0.72 x 2.12 = 1.53 m2
2.04 x 2.12 = 4.32 m2
0.72 x 0.57 = 0.41 m2
Jumlah = 14.75 m2
Jumlah = 372.25 m2
luas
12.25 = 12.25 m2
372.25 = 744.50 m2
tinggi
2.84 = 3.69 m2
0.47 = 0.96 m2
2.84 = 5.31 m2
Jumlah = m2
Lebar Tinggi
0.72 x 2.21 = 6.36 m2
Lebar Tinggi
0.62 x 2.02 = 5.01 m2
0.44 x 1.84 = 3.24 m2
= 1.77 m2
0.62 x 2.02 = 2.50 m2
0.44 x 1.84 = 1.62 m2
= 0.89 m2
0.62 x 2.02 = 3.76 m2
0.44 x 1.84 = 2.43 m2
= 1.33 m2
Jumlah = 3.99 m3
Lebar Tinggi
0.62 x 0.25 = 0.31 m2
= 1.00 unit
= 56.50 m2
= 56.50 m2
T. Panjang
28.40 = 28.40 m'
6.40 = 6.40 m'
12.40 = 12.40 m'
11.40 = 11.40 m'
Jumlah = 58.60 m'
unit
= 34.00 m2
lebar
1.50 = 3.00 m2
tinggi banyak
1.75 x 2.00 = 24.50 m2
1.10 x 2.00 = 3.30 m2
Jumlah = 27.80 m2
lebar sisi
4.28 x 2.00 = 48.36 m2
3.00 x 2.00 = 27.00 m2
3.28 x 2.00 = 18.11 m2
Jumlah = 93.47 m2
lebar sisi
4.28 x 2.00 = 48.36 m2
3.00 x 2.00 = 27.00 m2
3.28 x 2.00 = 18.11 m2
Jumlah = 93.47 m2
= 4.28 m'
= 3.00 m'
= 3.28 m'
Jumlah = 10.56 m'
sisi
2.00 = 8.56 m'
2.00 = 7.50 m'
2.00 = 8.06 m'
Jumlah = 24.12 m'
luas
12.25 = 12.25 m2
ing induk + Gewel = 744.50 m2
= 56.50 m2
lebar sisi
0.60 x 2.00 = 4.80 m2
0.60 x 2.00 = 1.80 m2
0.60 x 2.00 = 3.00 m2
Jumlah = 9.60 m2
T. sisi
0.22 = 5.31 m2
jumlah
1.00 unit = 4.00 unit
Jumlah = 4.00 unit
jumlah
3.00 = 12.00 bh
Jumlah = 12.00 bh
jumlah
1.00 = 4.00 bh
Jumlah = 4.00 bh
jumlah
2.00 = 4.00 bh
1.00 = 2.00 bh
3.00 = 3.00 bh
Jumlah = 9.00 bh
jumlah
4.00 = 8.00 bh
2.00 = 4.00 bh
6.00 = 6.00 bh
Jumlah = 18.00 bh
jumlah
4.00 = 8.00 bh
2.00 = 4.00 bh
6.00 = 6.00 bh
Jumlah = 18.00 bh
DAFTAR STANDARISASI HARGA SATUAN BAHAN & UPAH KERJA
NO. NAMA BAHAN SAT KET
HPS 2021 EE 2022
I. BAHAN PASIR
V. PORTLAND CEMENT ( PC )
1 Porselein 11 x 11 cm Kw I M² 110,000.00
2 Porselein 15 x 15 cm Kw I M² 62,000.00
3 Keramik 10 x 20 cm Kw I M² 70,600.00
4 Keramik 20 x 20 cm Kw I M² 83,200.00
5 Keramik 20 x 25 cm Kw I M² 89,000.00
6 Keramik 30 x 30 cm Kw I M² 90,100.00
7 Keramik 40 x 40 cm Kw I M² 116,000.00
1 Kabel NYA / NGA 1000 1,50 mm ex. Supreme M' 206,300.00 226,930.00
2 Kabel NYA / NGA 1000 2,50 mm M' 30,700.00 33,770.00
3 Kabel NYA / NGA 1000 4,00 mm M' 0.00 0.00
4 Kabel NYM Uk 2 x 2.5 mm M' 947,750.00 1,042,525.00
5 Kabel NYM Uk 4 x 6 mm M' 0.00 0.00
6 Kabel BC 4 mm M' 7,800.00 8,580.00
7 Kabel BC 6 mm M' 10,100.00 11,110.00
8 Kabel BC 10 mm M' 16,750.00 18,425.00
9 Kabel BC ( Penangkal Petir ) 16 mm M' 27,900.00 30,690.00
10 Kabel BC ( Penangkal Petir ) 25 mm M' 33,450.00 36,795.00
X BAHAN ALUMINIUM
1 Skrup/Ripet bh 275.00
2 Aluminium Putih Uk. 3 x 8, Profil 3" m1 69,300.00
3 Karet Kusen Aluminium m 33,000.00
4 Aluminium Putih Uk. 4 x 10, Profil 4" m1 82,500.00
5 Baja Plat kg 15,840.00
6 Sunscreen ( sirip aluminium ) m 19,272.00
7 Cat Besi sunshading (ex.Nippe) m2
8 Sealant tube 23,760.00
9 Pintu alumunium m2 528,000.00
NO. NAMA BAHAN SAT KET
HPS 2021 EE 2022
47 1,00 M2 Acian
Bahan :
3.250 Kg Semen ( Pc ) @ Rp. 1,550.00 5,037.50
Upah :
0.200 Oh Pekerja @ Rp. 100,000.00 20,000.00
0.100 Oh Tukang Batu @ Rp. 125,000.00 12,500.00
0.010 Oh Kepala Tukang Batu @ Rp. - -
0.010 Oh Mandor @ Rp. 150,000.00 1,500.00
5,037.50 34,000.00
Jumlah 39,037.50
Upah :
0.005 Oh Mandor @ Rp. 150,000.00 780.00
0.105 Oh Kepala Tukang besi @ Rp. 0.00 -
1.050 Oh Tukang besi @ Rp. 125,000.00 131,250.00
1.050 Oh Pekerja Terampil @ Rp. 100,000.00 105,000.00
580,800.00 237,030.00
Jumlah 817,830.00
98 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Strausz Dia. 30 cm )
Bahan :
336.000 Kg Semen ( Pc ) @ Rp. 1,550.00 520,800.00
0.540 M3 Pasir Beton ( Jawa ) @ Rp. 285,714.00 154,285.56
0.810 M3 Batu Pecah 2/3 ( Lokal ) @ Rp. 833,500.00 675,135.00
Upah :
1.650 Oh Pekerja @ Rp. 100,000.00 165,000.00
0.275 Oh Tukang Batu @ Rp. 125,000.00 34,375.00
0.028 Oh Kepala Tukang Batu @ Rp. - -
0.083 Oh Mandor @ Rp. 150,000.00 12,450.00
1,350,220.56 211,825.00
Jumlah 1,562,045.56
Pekerjaan Pembesian :
Bahan :
110.000 Kg Besi Beton Polos @ Rp. 15,500.00 1,705,000.00
1.500 Kg Kawat Beton @ Rp. 18,400.00 27,600.00
Jumlah 1,732,600.00
Upah :
0.770 Oh Pekerja @ Rp. 100,000.00 77,000.00
0.770 Oh Tukang Besi @ Rp. 125,000.00 96,250.00
0.077 Oh Kepala Tukang Besi @ Rp. - -
0.044 Oh Mandor @ Rp. 150,000.00 6,600.00
Jumlah 179,850.00
Pek. Pembesian = 1,732,600.00 + 179,850.00 1,912,450.00
99 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Sloof 15/20 )
Bahan :
336.000 Kg Semen ( Pc ) @ Rp. 1,550.00 520,800.00
0.540 M3 Pasir Beton ( Jawa ) @ Rp. 285,714.00 154,285.56
0.810 M3 Batu Pecah Mesin 2/3 (Jawa) @ Rp. 399,000.00 323,190.00
Upah :
1.650 Oh Pekerja @ Rp. 100,000.00 165,000.00
0.275 Oh Tukang Batu @ Rp. 125,000.00 34,375.00
0.028 Oh Kepala Tukang Batu @ Rp. - -
0.083 Oh Mandor @ Rp. 150,000.00 12,450.00
998,275.56 211,825.00
Jumlah 1,210,100.56
Pekerjaan Pembesian :
Bahan :
120.000 Kg Besi Beton Polos @ Rp. 15,500.00 1,860,000.00
1.700 Kg Kawat Beton @ Rp. 18,400.00 31,280.00
Jumlah 1,891,280.00
Upah :
0.791 Oh Pekerja @ Rp. 100,000.00 79,100.00
0.791 Oh Tukang Besi @ Rp. 125,000.00 98,875.00
0.079 Oh Kepala Tukang Besi @ Rp. - -
0.045 Oh Mandor @ Rp. 150,000.00 6,780.00
Jumlah 184,755.00
Pek. Pembesian = 1,891,280.00 + 184,755.00 2,076,035.00
Pekerjaan Begesting ( 1 kali Pakai ) :
Bahan :
3.900 Kg Paku @ Rp. 15,950.00 62,205.00
0.585 M3 Kayu Begisting @ Rp. 4,025,000.00 2,354,625.00
1.300 Ltr Minyak Begesting @ Rp. 3,300.00 4,290.00
Upah :
6.760 Oh Pekerja @ Rp. 100,000.00 676,000.00
3.380 Oh Tukang Kayu @ Rp. 125,000.00 422,500.00
0.338 Oh Kepala Tukang Kayu @ Rp. - -
0.338 Oh Mandor @ Rp. 150,000.00 50,700.00
2,421,120.00 1,149,200.00
Jumlah 3,570,320.00
Jadi untuk 1,00 M3 Pekerjaan Beton Bertulang : Rp. 1,210,100.56
Rp. 2,076,035.00
Rp. 3,570,320.00
Rp. 6,856,455.56
100 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Kolom Praktis 11 x 11 CM)
Bahan :
330.000 Kg Semen ( Pc ) @ Rp. 1,550.00 511,500.00
0.495 M3 Pasir Beton ( Jawa ) @ Rp. 285,714.00 141,428.43
0.743 M3 Batu Pecah Mesin 2/3 (Jawa) @ Rp. 399,000.00 296,257.50
0.825 Kg Paku @ Rp. 15,950.00 13,158.75
0.165 M3 Kayu Begisting @ Rp. 4,025,000.00 664,125.00
247.000 Kg Besi Beton Polos @ Rp. 15,500.00 3,828,500.00
3.713 Kg Kawat Beton @ Rp. 18,400.00 68,310.00
Upah :
14.850 Oh Pekerja @ Rp. 100,000.00 1,485,000.00
1.650 Oh Tukang Batu @ Rp. 125,000.00 206,250.00
1.650 Oh Tukang Kayu @ Rp. 125,000.00 206,250.00
1.650 Oh Tukang Besi @ Rp. 125,000.00 206,250.00
0.495 Oh Kepala Tukang @ Rp. - -
0.743 Oh Mandor @ Rp. 150,000.00 111,375.00
5,523,279.68 2,215,125.00
Jumlah 7,738,404.68
101 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Rink Balok 11 x 15 CM)
Bahan :
333.000 Kg Semen ( Pc ) @ Rp. 1,550.00 516,150.00
0.545 M3 Pasir Beton ( Jawa ) @ Rp. 285,714.00 155,828.42
0.909 M3 Batu Pecah Mesin 2/3 (Jawa) @ Rp. 399,000.00 362,691.00
1.212 Kg Paku @ Rp. 15,950.00 19,331.40
0.182 M3 Kayu Begisting @ Rp. 4,025,000.00 731,745.00
218.000 Kg Besi Beton Polos @ Rp. 15,500.00 3,379,000.00
3.030 Kg Kawat Beton @ Rp. 18,400.00 55,752.00
Upah :
18.00 Oh Pekerja @ Rp. 100,000.00 1,799,820.00
2.000 Oh Tukang Batu @ Rp. 125,000.00 249,975.00
2.000 Oh Tukang Kayu @ Rp. 125,000.00 249,975.00
2.000 Oh Tukang Besi @ Rp. 125,000.00 249,975.00
0.606 Oh Kepala Tukang @ Rp. - -
0.909 Oh Mandor @ Rp. 150,000.00 136,350.00
5,220,497.82 2,686,095.00
Jumlah 7,906,592.82
102 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Kr ( Plat 12 cm, K 250/ 19,3 MPa )
Bahan :
371.000 Kg Semen ( Pc ) @ Rp. 1,550.00 575,050.00
0.499 M3 Pasir Beton ( Jawa ) @ Rp. 285,714.00 142,448.84
0.776 M3 Batu Pecah Mesin 2/3 (Jawa) @ Rp. 399,000.00 309,446.67
Upah :
1.650 Oh Pekerja @ Rp. 100,000.00 165,000.00
0.275 Oh Tukang Batu @ Rp. 125,000.00 34,375.00
0.028 Oh Kepala Tukang Batu @ Rp. - -
0.083 Oh Mandor @ Rp. 150,000.00 12,450.00
1,026,945.50 211,825.00
Jumlah 1,238,770.50
Pekerjaan Pembesian :
Bahan :
160.000 Kg Besi Beton Polos @ Rp. 15,500.00 2,480,000.00
2.400 Kg Kawat Beton @ Rp. 18,400.00 44,160.00
Jumlah 2,524,160.00
Upah :
1.071 Oh Pekerja @ Rp. 100,000.00 107,100.00
1.071 Oh Tukang Besi @ Rp. 125,000.00 133,875.00
0.107 Oh Kepala Tukang Besi @ Rp. - -
0.061 Oh Mandor @ Rp. 150,000.00 9,180.00
Jumlah 250,155.00
Pek. Pembesian = 1,697,400.00 + 250,155.00 1,947,555.00
Pekerjaan Begesting ( 1 kali Pakai ) :
Bahan :
0.125 M3 Kayu Balok Klas II @ Rp. 6,325,000.00 790,308.75
3.332 Kg Paku @ Rp. 15,950.00 53,145.40
0.333 M3 Kayu Papan Begesting @ Rp. 4,025,000.00 1,341,130.00
2.916 Lbr Multiplek 1,22 x 2,44 x 9 mm @ Rp. 79,695.00 232,350.77
49.980 Btg Dolken ( Dia 8-10 Cm ) x 4 M @ Rp. 39,100.00 1,954,218.00
1.666 Ltr Minyak Begisting @ Rp. 3,300.00 5,497.80
Upah :
5.498 Oh Pekerja @ Rp. 100,000.00 549,780.00
2.749 Oh Tukang Kayu @ Rp. 125,000.00 343,612.50
0.275 Oh Kepala Tukang Kayu @ Rp. - -
0.275 Oh Mandor @ Rp. 150,000.00 41,233.50
4,376,650.72 934,626.00
Jumlah 5,311,276.72
W-3
161 1,00 M2 Lapis Macadam
Bahan :
6.000 M3 Batu Pecah 5/7 @ Rp. 238,300.00 1,429,800.00
2.000 M3 Batu Pecah 2/3 @ Rp. 833,500.00 1,667,000.00
2.000 M3 Pasir Urug (Lokal) @ Rp. 78,570.80 157,141.60
Upah :
7.500 Oh Pekerja @ Rp. 100,000.00 750,000.00
0.3750 Oh Mandor @ Rp. 150,000.00 56,250.00
Alat :
0.026667 Bln Biaya Mesin Gilas @ Rp. 27,291,500.00 727,782.43
3,253,941.60 1,534,032.43
Untuk 100 M2 Pekerjaan Macadam 4,787,974.03
Untuk 1 M2 Pekerjaan Macadam 1/100 x 4,787,974.03 47,879.74
Jumlah 47,879.74
W-4
162 Biaya Gilas 1 Bulan
Bahan :
1,000.000 Ltr Solar @ Rp. 11,715.00 11,715,000.00
20.000 Ltr Olie @ Rp. 38,500.00 770,000.00
5.000 Kg Gemuk / Stempet @ Rp. 36,300.00 181,500.00
Upah :
24.000 Oh Masinis @ Rp. - -
24.000 Oh Kenek @ Rp. - -
24.000 Oh Penjaga / Waker @ Rp. - -
120.000 Oh Pekerja @ Rp. 100,000.00 12,000,000.00
Alat :
Biaya Pemeliharaan Mesin Gilas @ Rp. 2,625,000.00
12,666,500.00 14,625,000.00
Jumlah 27,291,500.00
W-5
163 1,00 M2 Latasir ( Sand Sheed)
Bahan :
250.000 Kg Aspal @ Rp. 11,055.00 2,763,750.00
1.200 M3 Kerikil Halus + Pasir @ Rp. 310,500.00 372,600.00
0.900 M3 Kayu Bakar @ Rp. 115,000.00 103,500.00
1.840 Set Alat Bantu @ Rp. 192,500.00 354,200.00
Upah :
0.500 Oh Tukang aspal @ Rp. 125,000.00 62,500.00
10.000 Oh Pekerja @ Rp. 100,000.00 1,000,000.00
0.500 Oh Mandor @ Rp. 150,000.00 75,000.00
Alat :
0.000133 Bln Biaya Mesin Gilas @ Rp. 27,291,500.00 3,629.77
3,594,050.00 1,141,129.77
Untuk 100 M2 Pekerjaan Latasir (Sand Sheed) 4,735,179.77
Untuk 1 M2 Pekerjaan Latasir (Sand Sheed) 1/100 x 4,735,179.77 47,351.80
Jumlah 47,351.80
DPUTL
164 1,00 M2 Lapis Penetrasi Tebal 5 cm
Bahan :
450.000 Kg Aspal @ Rp. 11,055.00 4,974,750.00
2.100 M3 Batu Pecah 2/3 @ Rp. 833,500.00 1,750,350.00
5.250 M3 Batu Pecah 3/5 @ Rp. 283,000.00 1,485,750.00
1.200 M3 Abu Batu @ Rp. 310,500.00 372,600.00
0.600 M3 Kayu Bakar @ Rp. 115,000.00 69,000.00
Upah :
2.500 Oh Tukang aspal @ Rp. 125,000.00 312,500.00
6.000 Oh Pekerja @ Rp. 100,000.00 600,000.00
0.300 Oh Mandor @ Rp. 150,000.00 45,000.00
Alat :
0.026667 Bln Biaya Mesin Gilas @ Rp. 27,291,500.00 727,782.43
8,652,450.00 1,685,282.43
Untuk 100 M2 Pekerjaan Lapis Penetrasi 10,337,732.43
Untuk 1 M2 Pekerjaan Lapis Penetrasi 1/100 x 10,337,732.43 103,377.32
Jumlah 103,377.32
DPUTL
165 1,00 M2 Mengaspal Buras
Bahan :
100.000 Kg Aspal @ Rp. 11,055.00 1,105,500.00
1.000 M3 Abu Batu @ Rp. 310,500.00 310,500.00
0.170 M3 Kayu Bakar @ Rp. 115,000.00 19,550.00
Upah :
0.200 Oh Tukang aspal @ Rp. 125,000.00 25,000.00
6.000 Oh Pekerja @ Rp. 100,000.00 600,000.00
0.300 Oh Mandor @ Rp. 150,000.00 45,000.00
Alat :
0.026667 Bln Biaya Mesin Gilas @ Rp. 27,291,500.00 727,782.43
1,435,550.00 1,397,782.43
Untuk 100 M2 Pekerjaan Buras 2,833,332.43
Untuk 1 M2 Pekerjaan Buras 1/100 x 2,833,332.43 28,333.32
Jumlah 28,333.32
DPUTL
166 1,00 M2 Mengaspal Burda
Bahan :
400.000 Kg Aspal @ Rp. 11,055.00 4,422,000.00
4.000 M3 Batu Pecah 2/3 @ Rp. 833,500.00 3,334,000.00
0.900 M3 Abu Batu @ Rp. 310,500.00 279,450.00
0.600 M3 Kayu Bakar @ Rp. 115,000.00 69,000.00
Upah :
2.000 Oh Tukang aspal @ Rp. 125,000.00 250,000.00
5.000 Oh Pekerja @ Rp. 100,000.00 500,000.00
0.200 Oh Mandor @ Rp. 150,000.00 30,000.00
Alat :
0.026667 Bln Biaya Mesin Gilas @ Rp. 27,291,500.00 727,782.43
8,104,450.00 1,507,782.43
Untuk 100 M2 Pekerjaan Burda 9,612,232.43
Untuk 1 M2 Pekerjaan Burda 1/100 x 9,612,232.43 96,122.32
Jumlah 96,122.32
A1 + G2
167 1,00 M' Pasangan Batu Tepi
Bahan :
0.036 M3 Batu Pecah 10/15 @ Rp. 225,100.00 8,103.60
Upah :
2.250 Oh Pekerja @ Rp. 100,000.00 225,000.00
0.100 Oh Mandor @ Rp. 150,000.00 15,000.00
8,103.60 240,000.00
248,103.60
1/30 dari upah 1/30 x 240,000.00 8,000.00
Untuk memasang 1 m' Batu Tepi 8,103.60 + 8,000.00 16,103.60
A
168 1,00 M2 Pembersihan semak / Damija
Upah :
0.050 Oh Pekerja @ Rp. 100,000.00 5,000.00
0.002 Oh Mandor @ Rp. 150,000.00 300.00
5,300.00
Buis Ø 50 cm
174 1,00 M' Buis Ø 50 cm
Pekerjaan 1,00 M' Buis Ø 50 cm
1.100 M3 Pek. Galian Tanah (Per m') @ Rp. 78,750.00 86,625.00
0.630 M3 Pek. Pasir Urug (Per m') @ Rp. 340,070.40 214,244.35
1.000 Bh Pengad. Buis Beton Ø 50 cm (Per m') @ Rp. 88,880.00 88,880.00
0.200 M3 Pek. Urugan Pudel Putih (Per m') @ Rp. 103,070.40 20,614.08
410,363.43
Pek. Pondasi Gorong-Gorong Buis Beton
0.542 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Pondasi) @ Rp. 887,235.32 481,103.35
0.211 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Cincin) @ Rp. 887,235.32 187,317.56
668,420.91
Buis Ø 40 cm
175 1,00 M' Buis Ø 40 cm
Pekerjaan 1,00 M' Buis Ø 40 cm
1.000 M3 Pek. Galian Tanah (Per m') @ Rp. 78,750.00 78,750.00
0.560 M3 Pek. Pasir Urug (Per m') @ Rp. 340,070.40 190,439.42
1.000 Bh Pengad. Buis Beton Ø 40 cm (Per m') @ Rp. 85,855.00 85,855.00
0.200 M3 Pek. Urugan Pudel Putih (Per m') @ Rp. 103,070.40 20,614.08
375,658.50
Pek. Pondasi Gorong-Gorong Buis Beton
0.525 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Pondasi) @ Rp. 887,235.32 465,479.14
0.202 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Cincin) @ Rp. 887,235.32 179,505.45
644,984.59
Pek. Book Gorong-Gorong Kotak (Uk. 1,00 x 0,60 x 0,3m)
1.349 M2 Pek. Plesteran 1Pc : 3Ps (GK Samping) @ Rp. 69,624.84 93,909.99
0.360 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Book) @ Rp. 887,235.32 319,404.72
3.720 M2 Pek. Plesteran 1Pc : 3Ps (Book) @ Rp. 69,624.84 259,004.42
672,319.12
Untuk Pekerjaan 1,00 m' Buis Ø 40 cm 375,658.50
Pek. Pasangan Batu Belah 1Pc : 4Ps (Pondasi) 465,479.14
Pek. Cincin Gorong-Gorong Buis Beton (per cincin) 179,505.45
Pek. Book Gorong-Gorong Kotak (Uk. 1,00 x 0,60 x 0,3m) 672,319.12
Buis Ø 30 cm
176 1,00 M' Buis Ø 30 cm
Pekerjaan 1,00 M' Buis Ø 30 cm
0.900 M3 Pek. Galian Tanah (Per m') @ Rp. 78,750.00 70,875.00
0.490 M3 Pek. Pasir Urug (Per m') @ Rp. 340,070.40 166,634.50
1.000 Bh Pengad. Buis Beton Ø 30 cm (Per m') @ Rp. 79,695.00 79,695.00
0.200 M3 Pek. Urugan Pudel Putih (Per m') @ Rp. 103,070.40 20,614.08
337,818.58
Pek. Pondasi Gorong-Gorong Buis Beton
0.498 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Pondasi) @ Rp. 887,235.32 441,497.17
0.189 M3 Pek. Pasangan Batu Belah 1Pc : 4Ps (Cincin) @ Rp. 887,235.32 167,514.46
609,011.63
178 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 400/400 - 1000 + Pasang
Bahan :
1.000 M' Material U-Ditch 400/400-1000 @ Rp. 583,700.00 583,700.00
Upah :
1.000 M' Pemasangan Material U-Ditch 400/400-1000 @ Rp. 233,480.00 233,480.00
583,700.00 233,480.00
Jumlah 817,180.00
179 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 400/500 - 1000 + Pasang
Bahan :
1.000 M' Material U-Ditch 400/500-1000 @ Rp. 657,800.00 657,800.00
Upah :
1.000 M' Pemasangan Material U-Ditch 400/500-1000 @ Rp. 263,120.00 263,120.00
657,800.00 263,120.00
Jumlah 920,920.00
180 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 500/500 - 2400 + Pasang
Bahan :
1.000 M' Material U-Ditch 500/500-2400 @ Rp. 1,085,500.00 1,085,500.00
Upah :
1.000 M' Pemasangan Material U-Ditch 500/500-2400 @ Rp. 434,200.00 434,200.00
1,085,500.00 434,200.00
Jumlah 1,519,700.00
181 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 600/500 - 1000 + Pasang
Bahan :
1.000 M' Material U-Ditch 600/500-1000 @ Rp. 815,100.00 815,100.00
Upah :
1.000 M' Pemasangan Material U-Ditch 600/500-1000 @ Rp. 326,040.00 326,040.00
815,100.00 326,040.00
Jumlah 1,141,140.00
182 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 600/600 - 2400 + Pasang
Bahan :
1.000 M' Material U-Ditch 600/600-2400 @ Rp. 1,357,200.00 1,357,200.00
Upah :
1.000 M' Pemasangan Material U-Ditch 600/600-2400 @ Rp. 542,880.00 542,880.00
1,357,200.00 542,880.00
Jumlah 1,900,080.00
183 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 800/600 - 1000 + Pasang
Bahan :
1.000 M' Material U-Ditch 800/600-1000 @ Rp. 1,107,600.00 1,107,600.00
Upah :
1.000 M' Pemasangan Material U-Ditch 800/600-1000 @ Rp. 443,040.00 443,040.00
1,107,600.00 443,040.00
Jumlah 1,550,640.00
191 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 600/600 - 1000 + Pasang
Bahan :
1.000 M' Material U-Ditch 600/600-1000 @ Rp. 2,171,000.00 2,171,000.00
Upah :
1.000 M' Pemasangan Material U-Ditch 600/600-1000 @ Rp. 868,400.00 868,400.00
2,171,000.00 868,400.00
Jumlah 3,039,400.00
192 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 800/800 - 2400 + Pasang
Bahan :
1.000 M' Material U-Ditch 800/800-2400 @ Rp. 2,610,400.00 2,610,400.00
Upah :
1.000 M' Pemasangan Material U-Ditch 800/800-2400 @ Rp. 1,044,160.00 1,044,160.00
2,610,400.00 1,044,160.00
Jumlah 3,654,560.00
193 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 1000/1000 - 1200 + Pasang
Bahan :
1.000 M' Material U-Ditch 1000/1000-1200 @ Rp. 3,123,900.00 3,123,900.00
Upah :
1.000 M' Pemasangan Material U-Ditch 1000/1000-1200 @ Rp. 1,249,560.00 1,249,560.00
3,123,900.00 1,249,560.00
Jumlah 4,373,460.00
194 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 1500/1000 - 1200 + Pasang
Bahan :
1.000 M' Material U-Ditch 1500/1000-1200 @ Rp. 5,695,300.00 5,695,300.00
Upah :
1.000 M' Pemasangan Material U-Ditch 1500/1000-1200 @ Rp. 2,278,120.00 2,278,120.00
5,695,300.00 2,278,120.00
Jumlah 7,973,420.00
195 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 1500/1200 - 1200 + Pasang
Bahan :
1.000 M' Material U-Ditch 1500/1200-1200 @ Rp. 6,202,300.00 6,202,300.00
Upah :
1.000 M' Pemasangan Material U-Ditch 1500/1200-1200 @ Rp. 2,480,920.00 2,480,920.00
6,202,300.00 2,480,920.00
Jumlah 8,683,220.00
196 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 1500/1500 - 1200 + Pasang
Bahan :
1.000 M' Material U-Ditch 1500/1500-1200 @ Rp. 6,935,500.00 6,935,500.00
Upah :
1.000 M' Pemasangan Material U-Ditch 1500/1500-1200 @ Rp. 2,774,200.00 2,774,200.00
6,935,500.00 2,774,200.00
Jumlah 9,709,700.00
193 1,00 M' Pekerjaan Saluran U-DITCH / U-GUTTER = 1000/800 - 1200 + Pasang menggunakan Alat
Bahan :
1.000 M' Material U-Ditch 1000/800-1200 @ Rp. 2,645,000.00 2,645,000.00
1.000 M' Material Cover 1280 x 1200 x 150 @ Rp. 1,380,000.00 1,380,000.00
Upah :
1.000 M' Pemasangan Material U-Ditch 1000/1000-1200 dan @ Rp. 2,635,417.00 2,635,417.00
Material Cover 1280 x 1200 x 150 4,025,000.00 2,635,417.00
Jumlah 6,660,417.00
REKAPITULASI DAFTAR ANALISA HARGA SATUAN TAHUN ANGGARAN 2013
KETERANGAN
5
RENCANA ANGGARAN BIAYA ( RAB )
A LANTAI I
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 98.00 m2 17,500.00 1,715,000.00
2 Pengukuran dan pasang bouplank 14.00 m' 145,756.50 2,040,591.00
Sub Jumlah I 3,755,591.00
II PEKERJAAN GALIAN & URUGAN
1 Galian tanah pondasi batu kali 46.48 m3 78,750.00 3,660,300.00
2 Galian tanah pondasi Sepatu 7.00 m3 78,750.00 551,250.00
3 Urugan tanah kembali 2.10 m3 22,050.00 46,305.00
4 Urugan tanah bawah lantai - m3 130,500.00 -
5 Urugan pasir pondasi Batu kali - m3 340,070.40 -
6 Urugan pasir pondasi Plat Sepatu - m3 340,070.40 -
7 Urugan pasir bawah lantai 4.90 m3 340,070.40 1,666,344.96
Sub Jumlah II 5,924,199.96
III PEKERJAAN PONDASI
1 Cor lantai kerja pondasi plat 0.22 m3 1,327,079.03 297,265.70
2 Pondasi batu kali 33.20 m3 852,243.10 28,294,471.05
3 Pondasi batu kosong (anstampeng) 14.10 m3 474,685.34 6,693,063.35
4 Pondasi beton plat sepatu 1.12 m3 5,209,045.56 5,834,131.03
5 Kolom struktur Pondasi 0.26 m3 8,485,366.56 2,227,408.72
6 Pondasi bata merah (Rollag) 8.70 m2 297,226.41 2,585,869.79
Sub Jumlah III 45,932,209.65
IV PEKERJAAN PEMBETONAN
1 Beton Sloof 2.49 m3 6,440,930.56 16,037,917.09
2 Kolom struktur 0.84 m3 9,596,937.23 8,061,427.27
3 Kolom Praktis 1.41 m3 7,738,404.68 10,896,060.71
4 Balok 1 (15/20) 1.68 m3 8,485,366.56 14,255,415.82
5 Balok 2 (15/30) - m3 8,485,366.56 -
6 Balok 3 (8/45) - m3 6,075,287.23 -
7 Balok Tangga (15/25) - m3 7,334,797.56 -
8 Balok Tangga (15/35) - m3 7,334,797.56 -
9 Balok Plat Atap - m3 7,334,797.56 -
10 Balok Plat Kanopi - m3 7,334,797.56 -
11 Ring Balk 0.54 m3 7,906,592.82 4,231,608.47
12 Pelat Lantai t 12 cm - m3 6,075,287.23 -
13 Pelat kanopi t 10 cm - m3 6,075,287.23 -
14 Pelat Meja Dapur t 10 cm - m3 7,334,797.56 -
15 Pelat tangga t 12 cm - m3 6,075,287.23 -
16 Rabat Beton - m3 1,419,866.28 -
17 Menbongkar cetakan beton - m3 400,000.00 -
Sub Jumlah IV 53,482,429.37
V PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan dinding trasraam - m2 154,980.66 -
2 Pasangan dinding bata merah 353.97 m2 142,612.35 50,480,249.32
3 Pasangan batu alam templek - m2 336,963.44 -
4 Pasangan batu alam Palimanan Putih 20/40 - m2 336,963.44 -
5 Plesteran + Acian Trasraam - m2 111,599.52 -
6 Plesteran + Acian dinding 707.94 m2 106,567.28 75,442,880.71
Sub Jumlah V 125,923,130.02
VI PEKERJAAN KUSEN PINTU & JENDELA
1 Kusen Aluminium Profil 4" 52.34 m1 102,732.10 5,376,998.11
2 Daun Pintu Aluminium 13.02 m2 817,830.00 10,646,183.81
3 Daun Jendela kaca Aluminium 2.94 m2 666,405.50 1,957,632.80
4 Pasang Pintu PVC 2.00 unit 240,000.00 480,000.00
Sub Jumlah VI 18,460,814.72
VII PEKERJAAN PENUTUP PLAFOND
1 Pasang Plafond calsiboard + rangka Hollow 4x4 78.00 m2 154,077.40 12,018,037.20
2 List Gypsum profil - m' 10,551.68 -
Sub Jumlah VII 12,018,037.20
VIII PEKERJAAN SANITAIR
1 Instalasi air bersih pipa PVC AW 3/4" 20.00 m' 34,174.38 683,487.50
2 Instalasi air kotor pipa PVC AW 3" 20.00 m' 87,374.94 1,747,498.75
3 Instalasi air kotoran pipa PVC AW 4" 20.00 m' 106,385.69 2,127,713.75
4 Klosed jongkok 2.00 unit 507,632.41 1,015,264.82
5 Kran air 4.00 bh 124,760.00 499,040.00
6 Floor drain 2.00 bh 38,780.00 77,560.00
7 Mesin Pompa 1.00 bh 750,000.00 750,000.00
8 Resapan + Septictank 1.00 unit 4,500,000.00 4,500,000.00
Sub Jumlah VIII 11,400,564.82
IX PEKERJAAN INSTALASI LISTRIK
1 Meteran PLN 1.00 bh -
2 Box sekering 1.00 bh 36,720.00 36,720.00
3 MCB 1.00 bh 159,445.00 159,445.00
4 Lampu downlight 10.00 bh 42,900.00 429,000.00
5 Saklar ganda 5.00 bh 24,530.00 122,650.00
6 Saklar tunggal 5.00 bh 18,425.00 92,125.00
7 Stop kontak 220 V 5.00 bh 177,870.00 889,350.00
8 Kabel NYA 75.00 m' 33,770.00 2,532,750.00
Sub Jumlah IX 4,262,040.00
X PEKERJAAN PENUTUP LANTAI & DINDING
1 Keramik lantai motif 40/40 74.10 m2 312,900.67 23,185,939.57
2 Keramik lantai motif anti slip 20/20 4.50 m2 241,030.35 1,084,636.55
3 Keramik dinding warna 20/30 19.80 m2 242,718.34 4,805,823.09
4 Pasangan Paving Stone - m2 150,792.91 -
Sub Jumlah X 29,076,399.22
XI PEKERJAAN RANGKA & PENUTUP ATAP
1 Pasang Rangka Galvalum 73.50 m2 158,400.00 11,642,400.00
2 Pasang Genteng Beton Flat 73.50 m2 70,575.00 5,187,262.50
3 Pasang Genteng Bubungan 7.00 m' 104,093.71 728,655.98
4 Pasang lisplank 14.00 m' 161,545.00 2,261,630.00
Sub Jumlah X 19,819,948.48
XII PEKERJAAN PENGECATAN
1 Cat dinding interior dan ekterior dinding trasram - m2 22,986.46 -
2 Cat dinding interior dan ekterior dinding 707.94 m2 22,986.46 16,272,956.34
3 Cat interior plafon 78.00 m2 22,986.46 1,792,943.88
4 Cat eksterior kanopi - m2 22,986.46 -
5 Cat lisplank kayu - m2 44,272.55 -
Sub Jumlah XI 18,065,900.22
XII PEKERJAAN PASANG PENGUNCI
1 Kunci Pintu 4.00 unit 199,165.00 796,660.00
2 Engsel Pintu 12.00 bh 44,892.50 538,710.00
3 Grendel Pintu 8.00 bh 57,785.00 462,280.00
4 Grendel jendela 13.00 bh 39,415.00 512,395.00
5 Engsel Jendela 26.00 bh 34,420.00 894,920.00
6 Kait angin 26.00 bh 38,732.50 1,007,045.00
Sub Jumlah XII 4,212,010.00
REKAPITULASI ANGGARAN BIAYA ( RAB )
A LANTAI I
I PEKERJAAN PERSIAPAN 3,755,591.00
II PEKERJAAN GALIAN & URUGAN 5,924,199.96
III PEKERJAAN PONDASI 45,932,209.65
IV PEKERJAAN PEMBETONAN 53,482,429.37
V PEKERJAAN PASANGAN & PLESTERAN 125,923,130.02
VI PEKERJAAN KUSEN PINTU & JENDELA 18,460,814.72
VII PEKERJAAN PENUTUP PLAFOND 12,018,037.20
VIII PEKERJAAN SANITAIR 11,400,564.82
IX PEKERJAAN INSTALASI LISTRIK 4,262,040.00
X PEKERJAAN PENUTUP LANTAI & DINDING 29,076,399.22
XI PEKERJAAN RANGKA & PENUTUP ATAP 19,819,948.48
XII PEKERJAAN PENGECATAN 18,065,900.22
XII PEKERJAAN PASANG PENGUNCI 4,212,010.00
Jumlah Lantai 1 352,333,274.66
1 Total 352,333,274.66
2 Dibulatkan 352,333,000.00
Terbilang :
RENCANA ANGGARAN BIAYA ( RAB )
A LANTAI 2
I PEKERJAAN PEMBETONAN
1 Kolom struktur 2.55 m3 9,596,937.23 24,500,980.74
2 Kolom Praktis 0.39 m3 7,738,404.68 3,046,996.84
3 Balok 15/20 3.83 m3 7,906,592.82 30,271,181.25
4 Pelat atap KM/WC t 10 cm - m3 6,075,287.23 -
5 Pelat kanopi t 10 cm - m3 6,075,287.23 -
6 Menbongkar cetakan beton 6.78 m3 400,000.00 2,710,140.00
Sub Jumlah I 60,529,298.84
II PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan dinding trasraam 13.90 m2 154,980.66 2,154,231.15
2 Pasangan dinding bata merah 372.25 m2 142,612.35 53,087,723.52
3 Pasangan batu alam palimanan - m2 336,963.44 -
4 Plesteran + Acian Trasraam 12.25 m2 111,599.52 1,367,094.12
5 Plesteran + Acian dinding 744.50 m2 106,567.28 79,339,758.55
Sub Jumlah II 135,948,807.34
III PEKERJAAN KUSEN PINTU & JENDELA
1 Kusen Kayu 6/15 0.78 m' 102,732.10 80,303.63
2 Daun Pintu panil kayu 6.36 m' 817,830.00 5,205,324.38
3 Daun Jendela kaca kayu 3.99 m' 666,405.50 2,655,759.20
4 Pasang kaca bening 5 mm 7.49 m2 #REF! #REF!
5 Pasang kaca Es 5 mm 0.31 m2 #REF! #REF!
Pasang Pintu PVC 1.00 unit 240,000
Sub Jumlah III #REF!
IV PEKERJAAN PENUTUP PLAFOND
1 Pasang Plafond calsiboard + rangka hollow 56.50 m2 154,077.40 8,705,373.10
2 List Gypsum profil 58.60 m' 10,551.68 618,328.45
Sub Jumlah IV 9,323,701.55
V PEKERJAAN SANITAIR
1 Instalasi air bersih pipa PVC AW 3/4" 2.00 m' 34,174.38 68,348.75
2 Instalasi air kotor pipa PVC AW 3" 3.00 m' 87,374.94 262,124.81
3 Instalasi air kotoran pipa PVC AW 4" 2.00 m' 106,385.69 212,771.38
4 Klosed jongkok 1.00 unit 507,632.41 507,632.41
5 Kran air 1.00 bh 124,760.00 124,760.00
6 Floor drain 1.00 bh 38,780.00 38,780.00
Sub Jumlah V 1,214,417.35
VI PEKERJAAN INSTALASI LISTRIK
1 Lampu downlight 8.00 bh 42,900.00 343,200.00
2 Saklar ganda 2.00 bh 24,530.00 49,060.00
3 Saklar tunggal 4.00 bh 18,425.00 73,700.00
4 Stop kontak 220 V 3.00 bh 177,870.00 533,610.00
5 Kabel NYA 25.00 m' 33,770.00 844,250.00
Sub Jumlah VI 1,843,820.00
VII PEKERJAAN PENUTUP LANTAI & DINDING
1 Keramik lantai motif 40/40 34.00 m2 312,900.67 10,638,622.75
2 Keramik lantai motif anti slip 20/20 3.00 m2 241,030.35 723,091.04
3 Keramik dinding warna 20/30 27.80 m2 242,718.34 6,747,569.80
Sub Jumlah VII 18,109,283.58
VIII PEKERJAAN RANGKA & PENUTUP ATAP
1 Pasang Rangka Galvalum 93.47 m2 158,400.00 14,805,584.64
2 Pasang Genteng 93.47 m2 70,575.00 6,596,617.02
3 Pasang Genteng Bubungan 10.56 m' 104,093.71 1,099,229.60
4 Pasang Lisplank 24.12 m' 161,545.00 3,896,465.40
Sub Jumlah VIII 26,397,896.66
IX PEKERJAAN PENGECATAN
1 Cat dinding interior dan ekterior dinding trasram 12.25 m2 22,986.46 281,584.14
2 Cat dinding interior dan ekterior dinding 744.50 m2 22,986.46 17,113,509.12
3 Cat interior plafon 56.50 m2 22,986.46 1,298,734.99
4 Cat eksterior kanopi 9.60 m2 22,986.46 220,670.02
5 Cat lisplank kayu 5.31 m2 44,272.55 234,927.86
Sub Jumlah IX 19,149,426.12
X PEKERJAAN PASANG PENGUNCI
1 Kunci Pintu 4.00 unit 199,165.00 796,660.00
2 Engsel Pintu 12.00 bh 44,892.50 538,710.00
3 Grendel Pintu 4.00 bh 57,785.00 231,140.00
4 Grendel jendela 9.00 bh 39,415.00 354,735.00
5 Engsel Jendela 18.00 bh 34,420.00 619,560.00
6 Kait angin 18.00 bh 38,732.50 697,185.00
- Sub Jumlah X 3,237,990.00