Pondasi Tapak Beton Type Bujursangkar input data by.

harry s

Project :
Client :
Engineer Checked Approved

Name
Date

Data Struktur : Pu

Mu
1 Dimensi Kolom b = 300 mm b
h = 300 mm Muka Tanah
Type Kolom αs = 30
2 Dimensi Pondasi B = 1.20 m ha
L = 1.20 m B=L
ht = 0.30 m
3 Mutu Beton fc' = 21.7 Mpa ht
4 Mutu Baja fy' = 320 Mpa
5 Besi tulangan D = 16
(dipakai) L
6 BJ Beton γc = 24 KN/m3
L
Data Tanah :

6 Daya dukung tanah σt = 150 Kpa Dgn Lantai kerja


7 Berat tanah γt = 13.20 KN/m3
8 Tebal tanah diatas ha = 1.70 m
pondasi
h
B
Data Beban :
B=L
9 Beban P ultimate Pult = 250 KN
10 Beban M ultimate Mult = 18.25 KNm

Result
Cek Status Pondasi :

Tegangan yang terjadi pada tanah σmaks = 266.61917 > 150 Tidak OK!
σmin = 139.88306 < 150 OK!

Kontrol gaya geser 1 arah Ø.Vc = 151.629


Vu = 71.107 < 151.629 OK!

Kontrol gaya geser 2 arah Ø.Vc = 522.613


Vu = 238.355 < 522.613 OK!

Penulangan Pondasi
Arah X = Y D 16 - 228
by.harry s SKEMA HITUNGAN PONDASI

Data : tebal fondasi (ht, d, ds), mutu bahan Notasi :


Mutu Bahan (Fc, Fy)
Beban (Pu, Mu) σ
Daya dukung tanah (σt) σt
Pult
B,L
Mu,x
Penentuan Dimensi Pondasi Mu,y
q
Pult Mu,x Mu,y
σ = + + + q ≤ σt ht
2 2
B x L 1/6 B x L 1/6 B x L
ha
γc
γt
Vu
Vc
Menghitung tegangan tanah didasar fondasi Ø
βc
Pult Mu,x Mu,y
σmaks = + + + q ≤ σt bo
B x L 1/6 B x L2 1/6 B x L2 αs

Pult Mu,x Mu,y


σmin = - - + q ≤ σt
B x L 1/6 B x L2 1/6 B x L2
σmin
σmaks
σa
σx
a
Kontrol gaya geser 1 arah
fc'
σmaks + σa fy
Vu = a x B ds
2
Dimana D
L - a x σmaks - σmin a'
σa = σmin + Mu
L K, Kmaks
fc' s
Vc = x B x d As
6
Syarat :

Vu ≤ Ø Vc dengan Ø = 0.75

Kontrol gaya geser 2 arah

σmaks + σmin
Vu = B2 - b + d h + d x
2

Dipilih nilai Vc terkecil dari :

2 fc' bo d
Vc1 = 1 + x
βc 6

αs d fc' bo d
Vc2 = 2 + x
bo 12

1
Vc3 = x fc' bo d
3
Syarat :

Vu ≤ Ø Vc dengan Ø = 0.75

Hitung Penulangan Fondasi

1) ds = 75 + D + D/2
dimana
d = h - ds

2) σx = σmin + B - x x σmaks - σmin B

σmaks - σx
3) Mu = 0.5 σx x 2 + x 2
3
Mu
4) K = , b = 1000
Ø x b x d2

382.5 x 0.85 x 600 + fy - 225 x β1 fc'


5) Kmaks =
600 + fy 2

2 x K
6) a' = 1 - 1 - d
0.85 x fc'

0.85 x fc' x a x b
7) As(1) =
fy

8) fc' ≤ 31.36 Mpa


maka

1.4 x b x d
As(2) ≥ Pilih "As" yang
fy terbesar

fc' > 31.36 Mpa


maka

fc' x b x d
As(3) =
4 fy

9) Jarak tulangan

0.25 x phi x D 2
s = S
As terpilih
Pilih "s" yang
s ≤ 2 x ht terkecil

s ≤ 450

Cek Kuat Dukung Fondasi

Pu = Ø x 0.85 x fc' x A ..... ( Ø = 0,7 )


Syarat : Pult ≤ Pu

Referensi : Asroni, A., Buku Kolom Fondasi & Balok T Beton Bertulang,
= Tegangan yang terjadi pada dasar fondasi ........... (Kpa) atau KN/m2
= Daya dukung tanah ........... (Kpa) atau KN/m2
= Beban axial terfaktor pada kolom........... KN
= Panjang dan lebar fondasi m
= Momen terfaktor kolom searah sumbu X ........... KNm
= Momen terfaktor kolom searah sumbu Y ........... KNm
= Beban terbagi rata akibat beban sendiri fondasi
ditambah beban tanah diatas fondasi ........... (KN/m2)
= Tebal fondasi ≥ 150 mm mm
(lihat pasal 17.7 SNI 03-2847-2002)
= Tebal tanah diatas fondasi ........... mm
= Berat per volume beton ........... KN/m3
= Berat per volume tanah ........... KN/m3
= Gaya geser pons terfaktor........... KN
= Gaya geser yang sanggup ditahan oleh beton........... KN
= Faktor keamanan = 0,7 (lihat SNI)
= Rasio dari sisi panjang terhadap sisi pendek pada
kolom, daerah beban terpusat / atau daerah reaksi
= Keliling penampang krisis dari fondasi ........... mm
= Suatu konstanta yang digunakan untuk menghitung
Vc , yang nilai tergantung pada letak fondasi,
40 = Kolom dalam
30 = Kolom tepi
20 = Kolom sudut
= Tegangan tanah minimum ........... (Kpa) atau KN/m2
= Tegangan tanah maksimum ........... (Kpa) atau KN/m2
= Tegangan tanah sejarak "a" dari tepi fondasi .......... (Kpa) atau KN/m2
= Tegangan tanah sejarak "x" dari tepi fondasi .......... (Kpa) atau KN/m2
= Jarak dari area bidang yang menerima tekanan mm
keatas dari tanah (area keruntuhan)
= Kuat tekan beton ........... Mpa
= Mutu beton ........... Mpa
= decking mm
minimal = 75 mm (berhubungan dengan tanah)
= Diameter tulangan ........... mm
= Tinggi blok tegangan beton teka persegi ekivalen mm
= Momen yang terjadi padafondasi
= Faktor momen pikul
= Jarak tulangan ........... mm
= Luas besi tulangan yang dibutuhkan ........... mm2
Job No. Sheet No
hasil perhitungan 1 by.harry s

Program Hitung Pondasi Tapak


Part
Job Title Ref
0 Enginner 0.00 Date
Client. 0 File Date/time 6/18/2020 16:01

Analisa

q = Berat Fondasi + Berat Tanah


= ht x γc + ha x γt
= 0.30 x 24 + 1.70 x 13.20
= 29.64 KN/m2

Cek Fondasi Terhadap Tegangan Izin Tanah

Tegangan yang terjadi pada tanah

Pult Mult
σmaks = + + q ≤ σt
B x L 1/6 B x L2

250 18.25
= + + 29.64 ≤ 150
1.20 x 1.20 1/6 1.20 x 1.20 2

= 173.61111 + 63.368 + 29.64

= 266.619 ≤ 150 Not Save

Pult Mult
σmin = - + q ≤ σt
B x L 1/6 B x L2

250 18.25
= - + 29.64 ≤ 150
1.20 x 1.20 1/6 1.20 x 1.20 2

= 173.61111 - 63.368 + 29.64

= 139.883 ≤ 150 Save!

Kontrol Tegangan Geser 1 Arah

0.30
ds = 75 + D/2
= 75 + 8.00
= 83.00 mm

d = ht - ds
= 300 - 83.00
0.30 = 217.00

L = 1.20 a = B/2 - b/2 - d


= 600 - 150 - 217.00
1.20 = 233.00 mm
= 0.233 m

σa = σmin + B - a x σmaks - σmin b

= 139.883 + 1.20 - 0.233 x 266.619 - 139.883 1.20


1.20
0.3 = 242.011 KN/m2

Gaya tekan ke atas dari tanah (Vu)

Vu = a x B x σmaks + σa 2
0.3
= 0.233 x 1.20 x 266.619 + 242.011 2

= 71.107 KN
Job No. Sheet No
hasil perhitungan 1 by.harry s

Program Hitung Pondasi Tapak


Part
Job Title Ref
0 Enginner 0.00 Date
Client. 0 File Date/time 6/18/2020 16:01

0.30 0.217 0.233 Gaya geser yang dapat ditahan oleh beton (Ø.Vc)

fc'
Ø.Vc = Ø x x B x d
6
21.7
= 0.75 x x 1.20 x 217.00
6
0.217
= 151.629 KN
1.20
Ø.Vc = 151.629 > Vu = 71.107 ......... Save!

σmin σa σmaks
139.883 242.011 266.619

Kontrol Tegangan Geser 2 Arah (Geser Pons)

Dimensi Kolom, b = 300


h = 300

b + d = 300.00 + 217.00 = 517.00 mm = 0.517 m


h + d = 300 + 217.00 = 517.00 mm = 0.517 m

Gaya Tekan Ke Atas (Geser Pons)

σmaks + σmin
Vu = B2 - b + d x h + d x
2

266.619 + 139.883
= 1.20 2 - 0.517 x 0.517 x
2
= 238.35481

hk 300
βc = = = 1.000
Bk 300

bo = 2 x bk + d + hk + d

bo = 2 x 300 + 217.00 + 300 + 217.00

= 2068 mm

Gaya geser yang ditahan oleh beton

2 fc' bo d
Vc1 = 1 + x
βc 6
0.109

2 21.7 2068 217.00


0.30
Vc1 = 1 + x
1.000 6
0.109

Vc1 = 1045225.844 N
= 1045.226 KN

0.342 0.109 0.30 0.109 0.3415


αs d fc' bo d
Vc2 = 2 + x
bo 12

30 217.00 21.7 2068 217.00


Vc2 = 2 + x
0.217 2068 12

0.083 Vc2 = 722594.076 N


1.20 = 722.594 KN
Job No. Sheet No
hasil perhitungan 1 by.harry s

Program Hitung Pondasi Tapak


Part
Job Title Ref
0 Enginner 0.00 Date
Client. 0 File Date/time 6/18/2020 16:01

1
Vc3 = x fc' bo d
3
1
σmin Vc3 = x 21.7 2068 217.00
139.883 σmaks 3
266.619
= 696817.22947 N
= 696.817 KN

Jadi

Vc1 = 1045.226
Vc2 = 722.594 Diambil yang terkecil
Vc3 = 696.817

Vc = 696.817 KN
Ø.Vc = 0.75 x 696.817
= 522.613 KN

Ø.Vc = 522.613 > Vu = 238.355 ......... Save!

Hitungan Penulangan Fondasi

0.30 ds = 75 + 16 + 8
= 99.000 mm
≈ 0.099 m
0.45
0.60 d = ht - ds
= 0.30 - 0.099
= 0.201 m
0.30 0.201 = 201 mm
0.099
B h
1.20 x = -
2 2

1200 300
x = -
2 2
σmin σx σmaks x = 450 mm
139.883 219.093 266.619 = 0.45 m

σx = σmin + B - x x σmaks - σmin B

σx = 139.883 + 1.20 - 0.45 x 266.619 - 139.883 1.20


`
= 219.093 KN/m3

σmaks - σx
Mu = 0.5 σx x 2 + x 2
3
266.619 - 219.093
= 0.5 219.093 0 2 + 0.45 2
3
= 25.391 KNm

Mu
K =
Ø x b x d 2

25391186.719
=
0.8 x 1000 x 201 2

= 0.786 Mpa
Job No. Sheet No
hasil perhitungan 1 by.harry s

Program Hitung Pondasi Tapak


Part
Job Title Ref
0 Enginner 0.00 Date
Client. 0 File Date/time 6/18/2020 16:01

382.5 x 0.85 x 600 + fy - 225 x β1 fc'


Kmaks =
600 + fy 2

382.5 x 0.85 x 600 + 320 - 225 x 0.85 21.7


Kmaks =
600 + 320 2

= 6.075 Mpa

K < Kmaks
K = 0.786 < Kmaks = 6.075 ......... OK!

2 x K
a' = 1 - 1 - d
0.85 x fc'

2 x 0.786
= 1 - 1 - 201
0.85 x 21.7

= 8.751 mm

0.85 x fc' x a' x b


As(1) =
fy

0.85 x 21.7 x 8.751 x 1000


=
320
= 504.436 mm2

Jika
fc' ≤ 31.36 Mpa
maka
1.4 x b x d
As ≥ ........... (R.1)
fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

Jika
fc' > 31.36 Mpa
maka
fc' x b x d
As = ........... (R.2)
4 fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

fc' = 21.7 < 31.36


maka yang dipakai adalah pers ..................... (R.1)

1.4 x b x d fc' x b x d
As(2) = ....... (R.1) As(2') = ....... (R.2)
fy 4 fy

1.4 x 1000 x 201 0 x 0 x 0


= =
320 4 0

= 879.375 mm2 ........... As dipakai = #DIV/0! mm2 ........... As tidak Dipakai!

Dipilih yang terbesar dari As(1) dan As(2)......... Sehingga,

As(1) = 504.436 mm2


As = 879.375 mm2
As(2) = 879.375 mm2
Job No. Sheet No
hasil perhitungan 1 by.harry s

Program Hitung Pondasi Tapak


Part
Job Title Ref
0 Enginner 0.00 Date
Client. 0 File Date/time 6/18/2020 16:01
Jarak tulangan,

0.25 x phi x D 2 x S
s =
As

0.25 x 3.14 x 16 2 x 1000


=
879.375

= 228.526 mm

s ≤ 2 x ht
≤ 2 x 300
≤ 600

s ≤ 450 mm

Dipilih (s) yang terkecil = 228.526 mm

Jadi dipakai tulangan = D 16 - 228


Job Title Ref
0
kontrol Enginner Date by.harry s
Client. 0 File Date/time 6/18/2020 16:01

Cek Panjang Penyaluran Tegangan Tulangan

9 x fy x α β x γ x λ
Panjang penyaluran tegangan (λd) = db
c + Ktr
10 fc'
db

9 x 320 x 1 1 x 0.8 x 1
= 16
75 + 0
10 21.7
16

9 x 320 x 1 1 x 0.8 x 1
= 16

10 21.7 2.5

= 316.543 mm > 300 mm


≈ 317 mm

B Bk
Panjang Tersedia (λt) = - - 75
2 2

1200 300
= - - 75
2 2

= 375

Panjang Tersedia (λt) > Panjang penyaluran tegangan (λd)


375 > 317 ....... OK!

Kuat Dukung Fondasi

Pu = Ø x 0.85 x fc' x A

= 0.7 x 0.85 x 21.7 x 90000

= 1162035 N

= 1162.035 KN

Pu,k = 250 KN

Pu = 1162.035 > Pu,k = 250 ....... OK!


Job Title Ref
0
kontrol Enginner Date by.harry s
Client. 0 File Date/time 6/18/2020 16:01

SKSNI 03-2847-2002
Job Title Ref
0
kontrol Enginner Date by.harry s
Client. 0 File Date/time 6/18/2020 16:01
Part
Job Title Ref
0 Enginner Date by.harry s
Client. 0 File Date/time 6/18/2020 16:01

Program Hitung Pondasi Tapak DESAIN PENULANGAN PONASI

1.20

1.20 1

D 16 - 228

DETAIL PONDASI
Non Scale

300

D 16 - 228

Lfoot=`120cm-2xselimutBtn(3cm)=`114cm 6 tulangan

300 1200 201 114/5= 22.8

POTONGAN 1-1 99
Non Scale

SNI 03-2847-2002 (Pasal 17.4.3)

SNI 03-2847-2002 (Pasal 17.7)

SNI 03-2847-2002 (Pasal 9.7.1)


by.harry s KONTROL PROGRAM
75 + 0

16

4.688
2.5
2.5

1.4 x b x d
As(2) = ....... (R.1)
fy

1.4 x 1000 x 201


=
320

= 879.375 mm2

Status :

Tegangan yang terjadi pada tanah σmaks = 266.619


σmaks = 139.883
σt = 150

Kontrol gaya geser 1 arah Vu = 71.1065


Ø.Vc = 151.629

Kontrol gaya geser 1 arah Vu = 238.355


Ø.Vc = 522.613
fc' x b x d
As(2') = ....... (R.2)
4 fy

0 x 0 x 0
=
4 0

= #DIV/0! mm2