Pondasi Tapak Beton Type Bujursangkar

Project : PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet)


Client : Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN)
Engineer Checked Approved
Name Trias
Date 28/07/2011 10:57

Data Struktur : Pu

Mu
1 Dimensi Kolom b = 0 mm b
h = 0 mm Muka Tanah
Type Kolom αs = 0
2 Dimensi Pondasi B = 1,27 m ha
L = 1,27 m B=L
ht = 0,60 m
3 Mutu Beton fc' = 30 Mpa ht
4 Mutu Baja fy' = 240 Mpa
5 Besi tulangan D = 19
(dipakai) L
6 BJ Beton γc = 24 KN/m3
L
Data Tanah :

6 Daya dukung tanah σt = 80 Kpa


7 Berat tanah γt = 20,00 KN/m3
8 Tebal tanah diatas ha = 0,00 m
pondasi
h
B
Data Beban :
B=L
9 Beban P ultimate Pult = 105 KN
10 Beban
B b M ultimate
lti t M lt
Mult = 0 KN
KNm

Result
Cek Status Pondasi :

Tegangan yang terjadi pada tanah σmaks = 79,50013 < 80 OK!


σmin = 79,50013 < 80 OK!

Kontrol gaya geser 1 arah Ø.Vc = 447,797


Vu = 12,116 < 447,797 OK!

Kontrol gaya geser 2 arah Ø.Vc = #DIV/0!


Vu = 107,140 #DIV/0! #DIV/0! #DIV/0!

Penulangan Pondasi
Arah X = Y D 19 ‐ 98

Author : Lutfi Andrian, WS


WEB : www.kampustekniksipil.co.cc
E‐mail : lutfi.andrian@rocketmail.com
CR 2011
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Trias Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

Analisa

q = Berat Fondasi + Berat Tanah


= ht x γc + ha x γt
= 0,60 x 24 + 0,00 x 20,00
= 14,4 KN/m2

Cek Fondasi Terhadap Tegangan Izin Tanah

Tegangan yang terjadi pada tanah

Pult Mult
σmaks = + + q ≤ σt
2
B x L 1/6 B x L

105 0
= + + 14,4 ≤ 80
2
1,27 x 1,27 1/6 1,27 x 1,27

= 65,10013 + 0 + 14,4

= 79,500 ≤ 105 Save!

Pult Mult
σmin = ‐ + q ≤ σt
B x L 1/6 B x L2

105 0
= ‐ + 14,4 ≤ 80
2
1,27 x 1,27 1/6 1,27 x 1,27

= 65,10013
, ‐ 0 + 14,4
,

= 79,500 ≤ 105 Save!

Kontrol Tegangan Geser 1 Arah

0,00
ds = 75 + D/2
= 75 + 9,50
= 85,00 mm

d = ht ‐ ds
= 600 ‐ 85,00
0,60 = 515,00

L = 1,27 a = B/2 ‐ b/2 ‐ d


= 635 ‐ 0 ‐ 515,00
1,27 = 120,00 mm
= 0,12 m

σa = σmin + B ‐ a x σmaks ‐ σmin b

= 79,500 + 1,27 ‐ 0,12 x 79,500 ‐ 79,500 1,27


1,27
0 = 79,500 KN/m2

Gaya tekan ke atas dari tanah (Vu)

Vu = a x B x σmaks + σa 2
0
= 0,12 x 1,27 x 79,500 + 79,500 2

= 12,116 KN
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Trias Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

0,00 0,515 0,120 Gaya geser yang dapat ditahan oleh beton (Ø.Vc)

fc'
Ø.Vc = Ø x x B x d
6
30
= 0,75 x x 1,27 x 515,00
6
0,515
= 447,797 KN
1,27
Ø.Vc = 447,797 > Vu = 12,116 ......... Save!

σmin σa σmaks
79,500 79,500 79,500

Kontrol Tegangan Geser 2 Arah (Geser Pons)

Dimensi Kolom, b = 0
h = 0

b + d = 0,00 + 515,00 = 515,00 mm = 0,515 m


h + d = 0 + 515,00 = 515,00 mm = 0,515 m

Gaya Tekan Ke Atas (Geser Pons)

σmaks + σmin
2
Vu = B ‐ b + d x h + d x
2

79,500 + 79,500
2
= 1,27 ‐ 0,515 x 0,515 x
2
= 107,1403

hk 0
βc = = = #DIV/0!
Bk 0

bo = 2 x bk + d + hk + d

bo = 2 x 0 + 515,00 + 0 + 515,00

= 2060 mm

Gaya geser yang ditahan oleh beton

2 fc' bo d
Vc1 = 1 + x
βc 6
0,258
2 30 2060 515,00
0,00
Vc1 = 1 + x
#DIV/0! 6
0,258
Vc1 = #DIV/0! N
= #DIV/0! KN

0,378 0,258 0,00 0,258 0,378


αs d fc' bo d
Vc2 = 2 + x
bo 12

0 515,00 30 2060 515,00


Vc2 = 2 + x
0,515 2060 12

0,085 Vc2 = 484232,384 N


1,27 = 484,232 KN
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Trias Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

1
Vc3 = x fc' bo d
3
1
σmin Vc3 = x 30 2060 515,00
79,500 σmaks 3
79,500
= 1936929,538 N
= 1936,930 KN

Jadi

Vc1 = #DIV/0!
Vc2 = 484,232 Diambil yang terkecil
Vc3 = 1936,930

Vc = #DIV/0! KN
Ø.Vc = 0,75 x #DIV/0!
= #DIV/0! KN

Ø.Vc = #DIV/0! > Vu = 107,140 ......... #DIV/0!

Hitungan Penulangan Fondasi

0,00 ds = 75 + 19 + 9,5
= 103,500 mm
≈ 0,105 m
0,64
0,64 d = ht ‐ ds
= 0,60 ‐ 0,105
= 0,495 m
0 60
0,60 0 495
0,495 = 495 mm
0,105
B h
1,27 x = ‐
2 2

1270 0
x = ‐
2 2
σmin σx σmaks x = 635 mm
79,500 79,500 79,500 = 0,635 m

σx = σmin + B ‐ x x σmaks ‐ σmin B

σx = 79,500 + 1,27 ‐ 0,635 x 79,500 ‐ 79,500 1,27


`
= 79,500 KN/m3

σmaks ‐ σx
2 2
Mu = 0,5 σx x + x
3
79,500 ‐ 79,500
2 2
= 0,5 79,500 1 + 0,635
3
= 16,028 KNm

Mu
K =
2
Ø x b x d

16028220,000
=
2
0,8 x 1000 x 495

= 0,082 Mpa
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Trias Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

382,5 x 0,85 x 600 + fy ‐ 225 x β1 fc'


Kmaks =
2
600 + fy

382,5 x 0,85 x 600 + 240 ‐ 225 x 0,85 30


Kmaks =
2
600 + 240

= 8,968 Mpa

K < Kmaks
K = 0,082 < Kmaks = 8,968 ......... OK!

2 x K
a' = 1 ‐ 1 ‐ d
0,85 x fc'

2 x 0,082
= 1 ‐ 1 ‐ 495
0,85 x 30

= 1,590 mm

0,85 x fc' x a' x b


As(1) =
fy

0,85 x 30 x 1,590 x 1000


=
240
= 168,918 mm2

Jika
fc' ≤ 31,36 Mpa
maka
1,4 x b x d
As ≥ ........... (R.1)
fy ....... SNI 03‐2847‐2002 (Pasal 12.5.1)

Jika
fc' > 31,36 Mpa
maka
fc' x b x d
As = ........... (R.2)
4 fy ....... SNI 03‐2847‐2002 (Pasal 12.5.1)

fc' = 30 < 31,36


maka yang dipakai adalah pers ..................... (R.1)

1,4 x b x d fc' x b x d
As(2) = ....... (R.1) As(2') = ....... (R.2)
fy 4 fy

1,4 x 1000 x 495 0 x 0 x 0


= =
240 4 0

= 2887,500 mm2 ........... As dipakai = #DIV/0! mm2 ........... As tidak Dipakai!

Dipilih yang terbesar dari As(1) dan As(2)......... Sehingga,

As(1) = 168,918 mm2


As = 2887,500 mm2
As(2) = 2887,500 mm2
Job No. Sheet No
1
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Trias Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57
Jarak tulangan,

2
0,25 x phi x D x S
s =
As

2
0,25 x 3,14 x 19 x 1000
=
2887,500

= 98,142 mm

s ≤ 2 x ht
≤ 2 x 600
≤ 1200

s ≤ 450 mm

Dipilih (s) yang terkecil = 98,142 mm

Jadi dipakai tulangan = D 19 ‐ 98


Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

Cek Panjang Penyaluran Tegangan Tulangan

9 x fy x α β x γ x λ
Panjang penyaluran tegangan (λd) = db
c + Ktr
10 fc'
db

9 x 240 x 1 1 x 0,8 x 1
= 19
75 + 0
10 30
19

9 x 240 x 1 1 x 0,8 x 1
= 19

10 30 2,5

= 239,771 mm > 300 mm


≈ 240 mm

B Bk
Panjang Tersedia (λt) = ‐ ‐ 75
2 2

1270 0
= ‐ ‐ 75
2 2

= 560

Panjang Tersedia (λt) > Panjang penyaluran tegangan (λd)


560 > 240 ....... OK!

Kuat Dukung Fondasi

Pu = Ø x 0,85 x fc' x A

= 0,7 x 0,85 x 30 x 0

= 0 N

= 0 KN

Pu,k = 105 KN

Pu = 0 > Pu,k = 105 ....... NOK!


Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

SKSNI 03‐2847‐2002
Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57
Job No. Sheet No
3
Program Hitung Pondasi Tapak
Part
Job Title Ref
PONDASI NO. 1A (Pondasi Setempat Untuk Tower 6 Palet) Enginner Date
Client. Nobi (Terima Beban Sentris P = 100 kN +/‐ 5 kN) File Date/time 28/07/2011 10:57

1,27

1,27

D 19 ‐ 98

DETAIL PONDASI
Non Scale

D 19 ‐ 98

600 495

105
1270

POTONGAN 1‐1
Non Scale

SNI 03‐2847‐2002 (Pasal 17.4.3)

SNI 03‐2847‐2002 (Pasal 17.7)

SNI 03‐2847‐2002 (Pasal 9.7.1)