I. PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAHAN
panjang = 13.5
lebar = 12
luas = pxl
2 PEMASANGAN BOWPLANK
panjang = 2
lebar = 0.15
tinggi = 1
jumlah Bwp= 19
volume = jumlah bwpplank x (P.L.T)
kebutuhann= 38
lebar = 0.03
panjang = 1
total luas =
Ukuran galian
Panjang = 1.20
lebar = 1.20
tinggi = 1.75
jumlah = 11
Luas galian= lebar x tinggi
ukuran galian
panjang = 1.20
lebar = 1.20
tinggi = 1.75
jumlah 5
b Urugan fondasi batu kali pagar Urugan fondasi batu kali pagar
volume galian
= 39.57
volume fondasi batu kali
= ((0,8+0,3)/2)*0,8 *25,
volume anstampang
= ((1,2*0,1*1,2))*11
= 21.64
volume anstampang
= (1,1*0,1*1,1)
= 32.5
volume =
(a+b)/2*t*p
b urugan pasir fondasi batu kali
volume urugan fondasi batu kali
a = 1.02
b = 1
t = 0.05
p = 45.3
volume =
(a+b)/2*t*p
VI Pekerjaan Plesteran
1 plesteran transram (1pc:3ps)
a plesteran trasram kamarmandi lt.1
panjang = 6.03
lebar = 0.02
tinggi = 1.5
volume
= p*l*t*2
volume = p*l*t*2
volume = p*l*t*2
dinding samping
panjang = 24
lebar = 0.02
tinggi = 3
volume = p*l*t*2
volume = p*l*t*2
volume = p*l*t*2
vol total =
(p1+p2+p3+j1+j2+j3+j4)
vol pintu 2 p2
= 1,86*0,7*0,04
b kasau 5/7
panjang = 176.85
lebar = 0.05
tinggi = 0.07
volume = p*l*t
c gording 8/12
panjang = 16.28
lebar = 0.08
tinggi = 0.12
volume = p*l*t
d murplat 8/12
panjang = 26.5
lebar = 0.06
tinggi = 0.12
volume = p*l*t
e lisplank 3/20
panjang = 33.84
= 67.68
panjang
panjang = 17.24
jumlah = 1
volume total
panjang = 4.5
jumlah = 1
volume
volume total
panjang = 18.08
jumlah = 1
volum
volume total
panjang = 8.76
jumlah = 1
volum
volum total
panjang = 3.92
jumlah = 1
volum
volum total
f. Sepatu-sepatu
jumlah = 4
g. Plat begel
jumlah = 36
h. Mur baut
jumlah = 30
2 penutup atap
a. genteng keramik
panjang =
lebar =
luas atap =
total genteng
volume = p*l*t
b. kusen pintu P1
panjang = 5.12
lebar = 0.06
tinggi = 0.12
jumlah = 6
volume = p*l*t
balok kayu 6/12
volume tot= v*jml
c kusen pintu P2
panjang = 4.42
lebar = 0.06
tinggi = 0.12
jumlah = 2
volume = p*l*t
d kusen jendela J1
panjang = 9.2
lebar = 0.07
tinggi = 0.12
jumlah = 2
volume = p*l*t
e kusen jendela J2
panjang = 4.6
lebar = 0.07
tinggi = 0.12
jumlah = 7
volume = p*l*t
volume = p*l*t
h kusen rooster
panjang = 1
lebar = 0.025
tinggi = 0.12
jumlah = 15
volum = p*l*t
volum = p*l*t
kebutuhan kayu
volum = v*jumlah
j daun pintu P1
panjang = 0.8
lebar = 0.04
tinggi = 2.16
jumlah = 6
volum = p*l*t
kebutuhan kayu
volum = v*jumlah
k daun pintu P2
panjang = 0.7
lebar = 0.04
tinggi = 1.86
jumlah = 2
volum = p*l*t
kebutuhan kayu
volum = v*jumlah
l daun jendela J1
panjang = 1.5
lebar = 1.54
jumlah = 2
volum = p*l
kebutuhan kaca
volum = v*jumlah
volume kayu
panjang = 0.75
lebar = 0.07
tinggi = 1.54
volume = p*l*t
kebutuhan kaca
volume = v*jumlah
kebutuhan kayu
volum = v*jumlah
volum kayu
panjang = 5.2
lebar = 0.06
tinggi = 0.52
volume = p*l*t
kebutuhan kaca
volume = v*jumlah
kebutuhan kayu
volume = v*jumlah
volume tot= v.kayu+v.kaca
o angkur
jumlah angkur
TUNGAN VOLUME VOLUME SATUAN
162 m2
m
m
m
m
m 5.7 m2
buah
umlah bwpplank x (P.L.T)
buah
m 1.14 m2
m
p.l.n
6.498
m
m 25 m2
m 1.27 m2
m
m (𝑝+𝑙)/2.𝑡
m
57.55 m3
Luas x Lebar
1,27 x 45,3
m2
m 1.06 m2
m
m
(𝑝+𝑙)/2.𝑡
Luas x Lebar
39.57 m2
m 2.1 m2
m
m
unit
lebar x tinggi
m 2.1 m2
m
m
unit
lebar x tinggi
m3
((0,8+0,3)/2)*0,8*43, 19.14 m3
m3
asi batu kali type A
m3
m3
(25,5*0,2*(0,8+0,9/2) 6.375 m3
((0,9+0,8)/2)*0,05*25 1.08 m3
m3
m3
((1*0,3*1)+(0,3*0,3*1,3)-(0,4*0,1*1/2)*4)*11
3.71 m3
((1,2*0,1*1,2))*11 1.584 m3
((1,2*0,05*1,2))*11 0.792 m3
m3
m3
m3
*1,3)-(0,1*0,7*1/2)*3) 1.56 m3
(1,1*0,1*1,1)
0.121 m3
(1,1*0,05*1,1) 0.0605 m3
m3
m3
1.697 m3
(a+b)/2*t*p 2.288 m3
asi footplat F1
m
m
m
m
buah
2.557 m3
asi footplat
m
m
m
m
buah
0.945 m3
pasir bawah fondasi
m
m
m
0.362 m3
m3
0.241 m3
an trasram (1pc:3ps)
v lt.1 + v lt.2 0.602 m3
m
m
m
1.62 m3
m
m
m
2.88 m3
nding pagar
4.752 m3
(pu1+p1+p2+j1+j2+j3 2.85 m3
m
m
m
0.868 m3
m3
1,86*0,7*0,015 0.020 m3
4.981 m3
m3
m3
m3
m3
m3
m3
m3
m3
1.43 m3
g bangunan lt.2
0.85 m3
m3
1,86*0,7*0,04 0.052 m3
g k.mandi lt.2
ol trasram lt.2 - vol p2) 0.558 m3
11.003 m3
m
m
m
0.172 m3
m
m
m
0.619 m3
m
m
m
0.156 m3
m
m
m
0.191 m3
m
ml
67.68 ml
m
unit
0.038 m3
m
unit
0.02 m3
m
unit
0.166 m3
0.17 m3
m
unit
0.043 m3
0.04 m3
0.174 m3
0.08 m3
m
unit
0.084 m3
0.08 m3
m
unit
0.038 m3
0.04 m3
4 kuda-kuda 0.504 m3
m
m
99.4 m2
99.4 m2
m
m
m
unit
0.061 m3
0.061 m3
0.037 m3
0.221 m3
0.032 m3
0.064 m2
0.077 m3
0.155 m3
0.039 m3
0.270 m3
0.091 m3
0.091 m3
0.016 m3
0.131 m3
0.003 m3
0.045 m3
0.173 m3
0.1728 m3
0.069 m3
0.415 m3
0.052 m3
0.104 m3
2.31 m3
4.62 m3
0.006 m3
0.081 m3
0.04
0.566
0.001
0.162
0.008
1.298
v.kayu+v.kaca 0.163
92
III PEKERJAAN PASANGAN
NO ITEM PEKERJAAN
1 Pasangan Fondasi Batu Kali
a. Fondasi Batu Kali Pagar
IV PEKERJAAN BETON
NO ITEM PEKERJAAN
1 sloof
2 Ringbalk
3 Footplat B
4 Footplat A
5 Kolom Praktis Lantai 1
8 Kolom Struktur
9 Balok Induk
10 Balok Anak
11 Plat Lantai A
12 Plat Lantai B
13 Plat Lantai C
14 Tangga
15 Penutup Bak Kontrol dan Septic Tank
a. Penutup Bak Kontrol
b. Penutup Septictank
V PEKERJAAN BETON
No ITEM PEKERJAAN
1 Trasram (1PC:2PS)
a. Trasram Kamar Mandi Lantai 1
VOLUME = ((t*a)+(0.5*(b-a)*t))*p
16.5
VOLUME = 19.932
VOLUME = 6.975
VOLUME = 9.6036
VOLUME
Panjang = 117.5
Lebar = 0.15
Tinggi = 0.25
VOLUME = 4.40625
Panjang = 47.5
Lebar = 0.15
Tinggi = 0.2
VOLUME = 1.425
Area Fondasi
Panjang = 1
Lebar = 0.7
Tinggi = 0.3
Jumlah = 5
VOLUME = 0.21
Area Kolom
Panjang = 0.3
Lebar = 0.3
Tinggi = 1.75
VOLUME = 0.1575
Area Fondasi
Panjang = 1
Lebar = 1
Tinggi = 0.3
Jumlah = 11
VOLUME = 0.3
Area Kolom
Panjang = 0.3
Lebar = 0.3
Tinggi = 1.3
VOLUME = 0.117
Panjang = 0.15
Lebar = 0.15
Tinggi = 3.6
Jumlah= = 11
VOLUME = 0.891
Panjang = 0.15
Lebar = 0.15
Tinggi = 3.6
Jumlah = 5
VOLUME = 0.405
Panjang = 0.3
Lebar = 0.3
Tinggi = 3.6
Jumlah = 17
VOLUME = 5.508
Panjang = 0.3
Lebar = 0.3
Tinggi = 3.6
Jumlah = 11
VOLUME = 3.564
Panjang = 40.1
Lebar = 0.2
Tinggi = 0.25
VOLUME = 2.005
Panjang = 29.5
Lebar = 0.2
Tinggi = 0.15
VOLUME = 0.885
Panjang = 4.5
Lebar = 3
Tinggi = 0.1
Jumlah = 1
VOLUME = 1.35
Panjang = 5
Lebar = 2
Tinggi = 0.1
Jumlah = 1
VOLUME = 1
Panjang = 3
Lebar = 3.5
Tinggi = 0.1
Jumlah = 1
VOLUME = 1.05
Volume Bordes
Panjang = 1.8
Lebar = 0.75
Tinggi = 0.12
Volume = 0.162
Volume = 0.162
Volume = 0.62208
Septic Tank
Volume Pekerjaan Penutup Bak Kontrol
Panjang = 0.55
Lebar = 0.55
Tinggi = 0.1
Jumlah = 1
Volume = 0.03025
Volume = 0.05625
VOLUME
Panjang = 4.22
Lebar = 0.12
Tinggi = 1.5
Volume = 0.760
Panjang = 5.53
Lebar = 0.12
Tinggi = 1.5
Volume = 0.995
Dinding Kanan
Panjang = 11.1
Lebar = 0.12
Tinggi = 1.5
Volume = 1.998
Dinding Kiri
Panjang = 5.03
Lebar = 0.12
Tinggi = 1.5
Volume = 0.9054
Volume = 18.736
Volume = 3.246
Volume = 2.506
Volume = 0.760
Volume = 13.859
Volume = 1.689
Volume = 2.743
Volume = 0.179
VOLUME
Dimensi 1
Panjang = 3
Lebar = 1.43
Luas = 4.290
Dimensi 2
Panjang = 4.35
Lebar = 2.85
Luas = 12.398
Dimensi 3
Panjang = 3.35
Lebar = 2.85
Luas = 9.548
Dimensi 4
Panjang = 1.85
Lebar = 1.35
Luas = 2.498
Dimensi 5
Panjang = 4.18
Lebar = 1.85
Luas = 7.733
Dimensi 6
Panjang = 2.18
Lebar = 0.85
Luas = 1.853
Dimensi 7
Panjang = 2.85
Lebar = 2.35
Luas = 6.6975
Dimensi 1
Panjang = 7.85
Lebar = 1.85
Luas = 14.523
Dimensi 2
Panjang = 2.85
Lebar = 1.35
Luas = 3.848
Dimensi 3
Panjang = 2.85
Lebar = 1.5
Luas = 4.275
Dimensi 4
Panjang = 2.85
Lebar = 2.85
Luas = 8.123
Dimensi 5
Panjang = 2.85
Lebar = 1.35
Luas = 3.848
Volume
Volume Total
Kusen pintu P1
Panjang
Lebar
tinggi
Jumlah
Volume
Kusen Pintu P2
Panjang
Lebar
tinggi
Jumlah
Volume
Volume total
Kusen Jendela J1
Panjang
Lebar
tinggi
Jumlah
Volume
Volume total
Kusen Jendela J2
Panjang
Lebar
tinggi
Jumlah
Volume
Volume
Volume total
Volume
kusen rooster
Panjang
Lebar
Tinggi
Jumlah
Volume
Daun pintu PU1
Panjang
Lebar
Tinggi
Jumlah
Volume
Kebutuhan Kayu
Daun pintu P1
Panjang
Lebar
Tinggi
Jumlah
Volume
Kebutuhan Kayu
Daun pintu P2
Panjang
Lebar
Tinggi
Jumlah
Volume
Kebutuhan Kayu
Daun jendela J1
Panjang
Lebar
Jumlah
Volume
Kebutuhan Kayu
Daun jendela J2
Panjang
Lebar
Tinggi
Jumlah
Volume
Volume Kayu
Panjang
Lebar
tinggi
Volume
Kebutuhan Kaca
Volume
Kebutuhan Kayu
Volume
Volume Total
Volume
Volume Kayu
Panjang
Lebar
Tinggi
Volume
Kebutuhan Kaca
Volume
Kebutuhan Kayu
Volume
Volume Total
Angkur
Jumlah Angkur
Volume Total
Lampu
a. Lampu TL Jumlah
b. Lampu Plafond 40 Watt Jumlah
c. Lampu Gantung Jumlah
d. Stop Kontak Jumlah
e. Sakelar Tunggal Jumlah
f. Sakelar Ganda Jumlah
g. Meteran PLN Jumlah
h. Kabel Jumlah
i. Lampu Taman Jumlah
j. Sekring Listrik Jumlah
PEKERJAAN LANTAI
Keramik Lt1
Kamar Mandi
Keramik Dinding 20 x 25 cm
Panjang
Tinggi
Luas
Lantai 20 x 20 cm
Panjang
Tinggi
Luas
Ruangan Lainnya
Lantai ruang tidur 40 x 40 cm
Panjang
Tinggi
Luas
Garasi 40 x40 cm
Panjang
Tinggi
Luas
Total Keramik
20 x 25 cm
20 x 20 cm
40 x 40 cm
Keramik Lantai 2
Kamar Mandi
Keramik Dinding 20 x 25 cm
Panjang
Tinggi
Luas
Lantai 20 x 20 cm
Panjang
Tinggi
Luas
Ruangan Lainnya
Lantai Balkon 40 x 40 cm
Panjang
Tinggi
Luas
Lantai Duduk 40 x 40 cm
Panjang
Tinggi
Luas
Tangga 40 x 40 cm
Panjang
Tinggi
Luas
Bordes 40 x 40 cm
Panjang
Tinggi
Luas
Ruang Tidur 40 x 40 cm
Panjang
Tinggi
Luas
Ruang Tidur 40 x 40 cm
Panjang
Tinggi
Luas
Total Keramik
20 x 25 cm
20 x 20 cm
40 x 40 cm
Rabat Beton
Rabat Beton Lantai 1
Luas
Tebal Lapisan Rabat
Volume
Volume Total
Pasir Urug
Pasir Urug Lantai 1
Luas
Tebal Lapisan Rabat
Volume
Volume
Volume Total
Spesi
Spesi Lantai 1
Luas
Tebal Spesi
Volume
Spesi Lantai 2
Luas
Tebal Spesi
Volume
Volume Total
SATUAN
6.32 m
0.08 m
0.12 m
1 unit
0.061 m³
0.061 m³
5.12 m
0.06 m
0.12 m
6.0000 unit
0.037 m³
4.42 m
0.06 m
0.12 m
2 unit
0.032 m³
0.064 m³
9.2 m
0.07 m
0.12 m
2 unit
0.077 m³
0.155 m³
4.6 m
0.07 m
0.12 m
7 unit
0.039 m³
7.6 m
0.1 m
0.12 m
1 unit
0.091 m³
0.091 m³
2.28 m
0.06 m
0.12 m
8 unit
0.016 m³
1m
0.025 m
0.12 m
15 unit
0.003 m³
2m
0.04 m
2.16 m
1 unit
0.173 m³
0.173 unit
0.8 m
0.04 m
2.16 m
6 unit
0.069 m³
0.415 unit
0.7 m
0.04 m
1.86 m
2 unit
0.052 m³
0.104 m³
1.5 m
1.54 m
2m
2.310 m³
4.620 unit
0.75 m
0.005 m
1.54 m
7 unit
0.006 m³
0.75 m
0.07 m
1.65 m
0.087 m³
0.040 m³
0.606 m³
0.647 m³
0.5 m
0.005 m
0.4 m
8 unit
0.001 m³
0.52 m
0.06 m
0.52 m
0.016 m³
0.008 m³
0.130 m³
0.138 m³
92 unit
92.0 m³
Ls
2 buah
9 buah
2 buah
7 buah
9 buah
2 buah
1 buah
76.52 m
3 buah
2 buah
6.03 m
1.5 m
8.308 m²
1.28 m
1.78 m
1.9999 m²
2.7 m
3.2 m
8.64 m²
2.7 m
4.2 m
11.34 m²
40 x 40 cm
4.28 m
2.7 m
11.56 m²
a 40 x 40 cm
1.93 m
3.43 m
6.43 m²
m³
3m
1.5 m
4.5 m²
5.93 m
2.85 m
16.9 m²
8.308 m²
1.9999 m²
59.37 m²
5.42 m
1.5 m
7.393 m²
1.75 m
1.35 m
2.084 m²
2.85 m
0.87 m
2.201 m²
4.78 m
1.87 m
8.6601 m²
0.95 m
0.3 m
8.08 m²
0.95 m
1m
1.9 m²
2.85 m
2.35 m
6.7 m²
3m
2.85 m
12.04 m²
7.393 m²
2.084 m²
39.57 m²
69.67 m²
0.1 m
6.967 m³
49.05 m²
0.1 m
4.905 m³
11.87 m³
69.67 m²
0.05 m
3.48 m³
49.05 m²
0.05 m
2.45 m³
5.94 m³
69.67 m²
0.03 m
2.09 m³
49.05 m²
0.03 m
1.4715 m³
3.56 m³
X PEKERJAAN PENGECATAN
No ITEM PEKERJAAN VOLUME
1 Pengecatan Dinding
LUAS TOTAL
2 Pengecatan Dinding
a. Kusen Pintu PU1
Panjang
Lebar
Tinggi
Jumlah
Luas
VOLUME TOTAL
b. Kusen Pintu P1
Panjang
Lebar
Tinggi
Jumlah
Luas
VOLUME TOTAL
c. Kusen Pintu P2
Panjang
Lebar
Tinggi
Jumlah
Luas
VOLUME TOTAL
Luas
VOLUME TOTAL
Luas
VOLUME TOTAL
f. Kusen Rooster
Panjang
Lebar
Jumlah
Luas
VOLUME TOTAL
Luas
VOLUME TOTAL
h. Daun Pintu P1
Panjang
Lebar
Jumlah
Luas
VOLUME TOTAL
i. Daun Pintu P2
Panjang
Lebar
Jumlah
Luas
VOLUME TOTAL
j. Daun Jendela J1
Panjang
Lebar
Tebal
Jumlah
Luas
VOLUME TOTAL
k. Daun Jendela J2
Panjang
Lebar
Tebal
Jumlah
Luas
VOLUME TOTAL
Luas
VOLUME TOTAL
3 Pengecatan Plafond
Lantai 1
Lantai 2
VOLUME TOTAL
2 Handle Pintu
Jumlah
3 Kunci Tanam
Jumlah
4 Grendel
Jumlah
VOLUME TOTAL
VOLUME TOTAL
3 Water Pump
4 Kran Air
5 Kloset Duduk
6 Sumur Resapan
7 Septictank
8 Bak Kontrol
9 Floor Drain
VOLUME
= 576.54
= 6.32
= 0.08
= 0.12
= 1
= 1.0112
= 1.0112
= 5.12
= 0.06
= 0.12
= 6
= 0.614
= 3.6864
= 4.42
= 0.06
= 0.12
= 2
= 0.53
= 1.061
= 7.6
= 0.1
= 0.12
= 1
= 1.52
= 1.520
= 2.28
= 0.06
= 0.12
= 8
= 0.27
= 2.189
= 0.25
= 0.25
= 15
= 0.13
= 1.875
= 2.16
= 2
= 1
= 8.64
= 8.64
= 2.16
= 0.8
= 6
= 3.456
= 20.736
= 1.86
= 0.7
= 2
= 2.604
= 5.208
= 9.2
= 0.06
= 0.12
= 2
= 2.208
= 4.416
= 4.6
= 0.06
= 0.12
= 7
= 1.104
= 7.728
= 0.52
= 0.52
= 0.08
= 8
= 0.083
= 0.666
= 58.736
= 45.016
= 34.615
= 79.631
VOLUME
= 20
= 28
= 48
= 10
= 9
= 2
VOLUME
= 14.07
= 6.9
= 20.97
= 13.08
= 5.6
= 18.68
2
NO ITEM PEKERJAAN SATUAN
I PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAHAN m²
2 PEMASANGAN BOWPLANK m²
II PEKERJAAN TANAH
1 Galian Tanah
a. galian Pondasi Batu Kali m²
b. Galian Pondasi Batu Kali Pagar m²
c. Galian Pondasi Foot Plat F1 m²
d. Galian pondasi foot plat F2 m²
TOTAL
VI PEKERJAAN PLESTERAN
1 Pelesteran Trasraam
a. Pelesteran Trasraam kamar mandi Lt. 1 m³
b. Pelesteran Trasraam kamar mandi Lt. 2 m³
TOTAL
a. Kasau m³
b. Balok Gording m³
c. Lisplank m³
d. Balok Nok m³
e. Papan Rutter m³
f. Muurplat m³
3 PENUTUP ATAP m²
VOLUME
162
6.50
25
57.55
39.57
27.72
35.32
160.17
19.14
11.22
3.71
1.56
35.63
1.70
2.29
2.56
0.94
7.49
0.36
0.24
0.60
4.500
1.902
0.487
3.556
11.003
21.448
0.17
0.04
0.08
0.08
0.04
4.00
36.00
30.00
0.619
0.156
0.191
0.038
0.020
0.191
0.172
99.4
NO ITEM PEKERJAAN SATUAN VOLUME
III PEKERJAAN PASANGAN
1 Pasangan Fondasi Batu Kali
a. Fondasi Batu Kali Pagar 16.5
b. Fondasi Batu Kali 19.932
TOTAL 36.432
IV PEKERJAAN BETON
1 sloof 4.40625
2 Ringbalok 1.425
3 Footplat B 1.8375
4 Footplat A 4.587
5 Kolom Praktis Lantai 1 0.891
6 Kolom Praktis Lantai 2 0.405
7 Kolom Struktur Lantai 1 5.508
8 Kolom Struktur 3.564
9 Balok Induk 2.005
10 Balok Anak 0.885
11 Plat Lantai A 1.35
12 Plat Lantai B 1
13 Plat Lantai C 1.05
14 TANGGA 1.33
15 Penutup Bak Kontrol dan Septic Tank
a. Penutup Bak Kontrol 0.03025
b. Penutup Septictank 0.05625
V PEKERJAAN DINDING
1 Trasram (1PC:2PS)
a. Trasram Kamar Mandi Lantai 1 0.7596
b. Trasram Kamar Mandi Lantai 2 0.9954
TOTAL 1.755
o. Angkur buah 92
2 Lampu
a. Lampu TL buah 2
b. Lampu Plafond 40 Watt buah 9
c. Lampu Gantung buah 2
d. Stop Kontak buah 7
e. Sakelar Tunggal buah 9
f. Sakelar Ganda buah 2
g. Meteran PLN buah 1
h. Kabel m 76.52
i. Lampu Taman buah 3
j. Sekring Listrik buah 2
B Ruangan Lainnya
a. Lantai ruang tidur 40 x 40 cm m³ 8.64
b. Lantai Ruang Tamu 40 x 40 cm m³ 11.34
c. Lantai Ruang Makan 40 x 40 cm m³ 11.56
d. Lantai Ruang Keluarga 40 x 40 cmm³ 6.43
e. Lantai Teras Depan 40 x 40 cm m³ 4.50
f. Garasi 40 x40 cm m³ 16.90
59.37
2 Keramik Lt2
A Kamar Mandi
a. Keramik Dinding 20 x 25 cm m³ 7.39
b. Lantai 20 x 20 cm m³ 2.08
B Ruangan Lainnya
a. Lantai Balkon 40 x 40 cm m³ 2.20
b. Lantai Duduk 40 x 40 cm m³ 8.66
c. Tangga 40 x 40 cm m³ 8.08
d. Bordes 40 x 40 cm m³ 1.90
e. Ruang Tidur 40 x 40 cm m³ 6.70
f. Ruang Tidur 40 x 40 cm m³ 6.70
34.24
3 Rabat Beton
a. Rabat Beton Lantai 1 m³ 6.967
b. Rabat Beton Lantai 2 m³ 4.905
TOTAL 11.872
4 Pasir Urug
a. Pasir Urug Lantai 1 m³ 3.48
b. Pasir Urug Lantai 2 m³ 2.45
TOTAL 5.94
5 Spesi
a. Spesi Lantai 1 m³ 2.09
b. Spesi Lantai 2 m³ 1.47
TOTAL 3.56
X PEKERJAAN PENGECATAN
1 Pengecatan Dinding 576.54
2 Pengecatan Kusen
a. Kusen Pintu PU1 1.0112
b. Kusen Pintu P1 3.6864
c. Kusen Pintu P2 1.061
d. Kusen Pintu Garasi PG 1.52
e. Kusen Boven Light BV 2.189
f. Kusen Rooster 1.875
g. Daun Pintu Utama PU1 8.64
h. Daun Pintu P1 20.736
i. Daun Pintu P2 5.208
j. Daun Jendela J1 4.416
k. Daun Jendela J2 7.728
l. Daun Bouven Light BV 0.666
TOTAL 58.7366
2 m2 PEMASANGAN BOWPLANK
m3 0.01200 Kayu Kaso 5 / 7 (borneo/meranti)
3
m 0.00700 Kayu Papan 3 / 20 borneo/meranti
kg 0.02000 Paku Biasa 2" - 5"
oh 0.10000 Pekerja
oh 0.10000 Tukang kayu
oh 0.01000 Kepala tukang
oh 0.00500 Mandor
7 m3 1.00000 SLOOF
m3 1.00000 1 m3 Membuat beton mutu f’c = 28,8 MPa
kg 152.00000 1 Kg Pembesian dengan Besi Polos atau Besi
m2 13.33330 1 m2 Pasang Bekisting untuk Sloof (2x paka
16 m3 1.00000 TANGGA
m3 1.00000 1 m3 Membuat beton mutu f’c = 28,8 MPa
kg 219.00000 1 Kg Pembesian dengan Besi Polos atau Besi
m2 26.70000 1 m2 Pasang Bekisting untuk Plat
V. PEKERJAAN DINDING
1 M3 1.00000 DINDING TRASRAM 1PC:2PS
X. PEKERJAAN PENGECATAN
1 m2 1.00000 PENGECATAN KUSEN KAYU
kg 0.20000 Cat meni
kg 0.15000 Plamir
kg 0.17000 Cat dasar
kg 0.26000 Cat penutup
oh 0.07000 Pekerja
oh 0.00900 Tukang Cat
oh 0.00600 Kepala tukang
oh 0.00250 Mandor
6 m2 1.00 SPESI
kg 3.2500 Portland Cement
oh 0.2000 Pekerja
oh 0.1000 Tukang batu
oh 0.0100 Kepala tukang
oh 0.0100 Mandor
HARGA SATUAN ANALISA HARGA JUMLAH TOTAL
I. PEKERJAAN PERSIAPAN
Rp 60,000.00 Rp 6,000.00
Rp 6,000.00 Rp 6,000.00
Rp 3,500,000.00 Rp 42,000.00
Rp 3,500,000.00 Rp 24,500.00
Rp 25,000.00 Rp 500.00
Rp 60,000.00 Rp 6,000.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 850.00
Rp 100,000.00 Rp 500.00
Rp 81,850.00 Rp 81,850.00
Rp 25,000.00 Rp 7,500.00
Rp 61,000.00 Rp 91,500.00
Rp 110.05 Rp 110.05
Rp 75,000.00 Rp 150,000.00
Rp 70,000.00 Rp 70,000.00
Rp 85,000.00 Rp 2,550.00
Rp 100,000.00 Rp 50,000.00
Rp 371,660.05 Rp 371,660.05
TOTAL= Rp 459,510.05
II. PEKERJAAN TANAH
Rp 60,000.00 Rp 45,000.00
Rp 100,000.00 Rp 2,500.00
Rp 47,500.00 Rp 47,500.00
Rp 60,000.00 Rp 11,520.00
Rp 100,000.00 Rp 1,900.00
Rp 13,420.00 Rp 13,420.00
Rp 150,000.00 Rp 180,000.00
Rp 60,000.00 Rp 18,000.00
Rp 100,000.00 Rp 1,000.00
Rp 199,000.00 Rp 199,000.00
TOTAL= Rp 259,920.00
PEKERJAAN PASANGAN PONDASI
Rp 250,000.00 Rp 300,000.00
Rp 1,250.00 Rp 203,750.00
Rp 190,000.00 Rp 98,800.00
Rp 60,000.00 Rp 90,000.00
Rp 70,000.00 Rp 52,500.00
Rp 80,000.00 Rp 6,000.00
Rp 100,000.00 Rp 7,500.00
Rp 758,550.00 Rp 758,550.00
Rp 250,000.00 Rp 300,000.00
Rp 150,000.00 Rp 64,800.00
Rp 60,000.00 Rp 46,800.00
Rp 70,000.00 Rp 27,300.00
Rp 80,000.00 Rp 3,120.00
Rp 100,000.00 Rp 3,900.00
Rp 445,920.00 Rp 445,920.00
TOTAL= Rp 1,204,470.00
IV. PEKERJAAN BETON
MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Rp 1,250.00 Rp 548,750.00
Rp 135.71 Rp 90,928.57
Rp 185.19 Rp 186,296.30
-
Rp 60,000.00 Rp 126,000.00
Rp 70,000.00 Rp 24,500.00
Rp 80,000.00 Rp 2,800.00
Rp 100,000.00 Rp 10,500.00
Rp 989,774.87 Rp 989,774.87
Rp 10,000.00 Rp 105,000.00
Rp 12,000.00 Rp 1,800.00
Rp 60,000.00 Rp 4,200.00
Rp 70,000.00 Rp 4,900.00
Rp 80,000.00 Rp 560.00
Rp 100,000.00 Rp 400.00
Rp 116,860.00 Rp 11,686.00
Rp 75,000.00 Rp 3,375.00
Rp 11,000.00 Rp 3,300.00
Rp 5,800.00 Rp 580.00
Rp 60,000.00 Rp 31,200.00
Rp 75,000.00 Rp 19,500.00
Rp 85,000.00 Rp 2,210.00
Rp 100,000.00 Rp 2,600.00
Rp 62,765.00 Rp 62,765.00
OM (menggunakan plywood)
Rp 75,000.00 Rp 3,000.00
Rp 11,000.00 Rp 4,400.00
Rp 5,800.00 Rp 1,160.00
Rp 1,050,000.00 Rp 15,750.00
Rp 80,000.00 Rp 28,000.00
Rp 13,000.00 Rp 26,000.00
Rp 60,000.00 Rp 39,600.00
Rp 75,000.00 Rp 24,750.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
Rp 148,765.00 Rp 148,765.00
OK (menggunakan plywood)
Rp 75,000.00 Rp 3,000.00
Rp 11,000.00 Rp 4,400.00
Rp 5,800.00 Rp 1,160.00
Rp 1,050,000.00 Rp 18,900.00
Rp 80,000.00 Rp 28,000.00
Rp 13,000.00 Rp 26,000.00
Rp 60,000.00 Rp 39,600.00
Rp 75,000.00 Rp 24,750.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
Rp 151,915.00 Rp 151,915.00
TAI (menggunakan plywood)
Rp 75,000.00 Rp 3,000.00
Rp 11,000.00 Rp 4,400.00
Rp 5,800.00 Rp 1,160.00
Rp 1,050,000.00 Rp 15,750.00
Rp 80,000.00 Rp 28,000.00
Rp 13,000.00 Rp 78,000.00
Rp 60,000.00 Rp 39,600.00
Rp 75,000.00 Rp 24,750.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
Rp 200,765.00 Rp 200,765.00
GGA (menggunakan plywood)
Rp 75,000.00 Rp 2,250.00
Rp 11,000.00 Rp 4,400.00
Rp 5,800.00 Rp 870.00
Rp 1,050,000.00 Rp 15,750.00
Rp 80,000.00 Rp 28,000.00
Rp 13,000.00 Rp 26,000.00
Rp 60,000.00 Rp 39,600.00
Rp 75,000.00 Rp 24,750.00
Rp 85,000.00 Rp 2,805.00
Rp 100,000.00 Rp 3,300.00
Rp 147,725.00 Rp 147,725.00
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,776,272.00
Rp 59,137.50 Rp 788,498.03
Rp 3,554,544.90 Rp 3,554,544.90
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,906,116.31
Rp 111,185.00 Rp 2,038,387.96
Rp 4,934,279.14 Rp 4,934,279.14
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 2,076,088.02
Rp 148,765.00 Rp 2,895,457.82
Rp 5,961,320.71 Rp 5,961,320.71
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 2,020,158.82
Rp 148,765.00 Rp 2,748,879.67
Rp 5,758,813.36 Rp 5,758,813.36
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,800,223.63
Rp 90,032.50 Rp 1,636,952.91
Rp 4,426,951.40 Rp 4,426,951.40
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,729,182.09
Rp 109,610.00 Rp 1,461,463.01
Rp 4,180,419.98 Rp 4,180,419.98
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,864,746.71
Rp 111,185.00 Rp 1,741,935.40
Rp 4,596,456.97 Rp 4,596,456.97
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,827,047.67
Rp 111,185.00 Rp 1,681,117.20
Rp 4,497,939.74 Rp 4,497,939.74
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,480,227.06
Rp 147,725.00 Rp 2,462,088.26
Rp 4,932,090.18 Rp 4,932,090.18
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 2,559,234.00
Rp 147,725.00 Rp 3,944,257.50
Rp 7,493,266.37 Rp 7,493,266.37
EPTICTANK
Rp 989,774.87 Rp 989,774.87
Rp 11,686.00 Rp 1,480,227.06
Rp 147,725.00 Rp 2,462,088.26
Rp 4,932,090.18 Rp 4,932,090.18
TOTAL= Rp 55,268,172.92
V. PEKERJAAN DINDING
Rp 750.00 Rp 52,500.00
Rp 1,250.00 Rp 23,687.50
Rp 190,000.00 Rp 7,220.00
Rp 60,000.00 Rp 18,000.00
Rp 70,000.00 Rp 7,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 1,500.00
Rp 110,707.50 Rp 110,707.50
Rp 750.00 Rp 52,500.00
Rp 1,250.00 Rp 14,375.00
Rp 190,000.00 Rp 8,170.00
Rp 60,000.00 Rp 18,000.00
Rp 70,000.00 Rp 7,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 1,500.00
Rp 102,345.00 Rp 102,345.00
TOTAL= Rp 213,052.50
VI. PEKERJAAN PLESTERAN
Rp 1,250.00 Rp 12,780.00
Rp 190,000.00 Rp 3,800.00
Rp 60,000.00 Rp 18,000.00
Rp 70,000.00 Rp 10,500.00
Rp 80,000.00 Rp 1,200.00
Rp 100,000.00 Rp 1,500.00
Rp 47,780.00 Rp 47,780.00
Rp 1,250.00 Rp 7,800.00
Rp 190,000.00 Rp 4,560.00
Rp 60,000.00 Rp 18,000.00
Rp 70,000.00 Rp 10,500.00
Rp 80,000.00 Rp 1,200.00
Rp 100,000.00 Rp 1,500.00
Rp 43,560.00 Rp 43,560.00
TOTAL= Rp 91,340.00
KERJAAN ATAP DAN PENUTUP ATAP
Rp 9,000,000.00 Rp 9,900,000.00
46,000 Rp 690,000.00
Rp 11,000.00 Rp 61,600.00
Rp 60,000.00 Rp 240,000.00
Rp 75,000.00 Rp 900,000.00
Rp 85,000.00 Rp 102,000.00
Rp 100,000.00 Rp 20,000.00
Rp 11,913,600.00 Rp 11,913,600.00
Rp 9,000,000.00 Rp 9,900,000.00
46,000 Rp 690,000.00
Rp 11,000.00 Rp 33,000.00
Rp 60,000.00 Rp 144,000.00
Rp 75,000.00 Rp 540,000.00
Rp 85,000.00 Rp 61,200.00
Rp 100,000.00 Rp 12,000.00
Rp 11,380,200.00 Rp 11,380,200.00
r) & RENG 2/3 (kamper)
Rp 21,600.00 Rp 302.40
Rp 3,000.00 Rp 10.80
Rp 11,000.00 Rp 2,750.00
Rp 60,000.00 Rp 6,000.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 850.00
Rp 100,000.00 Rp 500.00
Rp 17,913.20 Rp 17,913.20
Rp 10,000,000.00 Rp 72,000.00
Rp 11,000.00 Rp 550.00
Rp 60,000.00 Rp 6,000.00
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 2,125.00
Rp 100,000.00 Rp 500.00
Rp 96,175.00 Rp 96,175.00
Rp 5,250.00 Rp 21,000.00
Rp 1,250.00 Rp 10,000.00
Rp 190,000.00 Rp 6,080.00
Rp 60,000.00 Rp 24,000.00
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 1,700.00
Rp 100,000.00 Rp 200.00
Rp 77,980.00 Rp 77,980.00
NTONG KECIL
Rp 1,800.00 Rp 45,000.00
Rp 60,000.00 Rp 9,000.00
Rp 75,000.00 Rp 5,625.00
Rp 85,000.00 Rp 680.00
Rp 100,000.00 Rp 800.00
Rp 61,105.00 Rp 61,105.00
TOTAL= Rp 23,546,973.20
VIII. PEKERJAAN PLAFOND
ND (Hanya Rangka)
Rp 9,000,000.00 Rp 189,000.00
Rp 11,000.00 Rp 2,420.00
Rp 60,000.00 Rp 11,250.00
Rp 75,000.00 Rp 16,875.00
Rp 85,000.00 Rp 3,187.50
Rp 100,000.00 Rp 500.00
Rp 223,232.50 Rp 223,232.50
Rp 55,000.00 Rp 20,020.00
Rp 23,000.00 Rp 2,530.00
Rp 60,000.00 Rp 6,000.00
Rp 75,000.00 Rp 3,750.00
Rp 85,000.00 Rp 425.00
Rp 100,000.00 Rp 500.00
Rp 33,225.00 Rp 33,225.00
TOTAL= Rp 256,457.50
ERJAAN KUSEN PINTU DAN JENDELA
Rp 31,000,000.00 Rp 34,100,000.00
Rp 27,000.00 Rp 33,750.00
Rp 1,269.00 Rp 1,269.00
Rp 60,000.00 Rp 420,000.00
Rp 75,000.00 Rp 1,575,000.00
Rp 85,000.00 Rp 178,500.00
Rp 100,000.00 Rp 35,000.00
Rp 36,343,519.00 Rp 36,343,519.00
AUN PINTU KAYU
Rp 9,000,000.00 Rp 360,000.00
Rp 1,269.00 Rp 634.50
Rp 60,000.00 Rp 60,000.00
Rp 75,000.00 Rp 225,000.00
Rp 85,000.00 Rp 25,500.00
Rp 100,000.00 Rp 5,000.00
Rp 676,134.50 Rp 676,134.50
AUN JENDELA KAYU
Rp 9,000,000.00 Rp 216,000.00
Rp 1,269.00 Rp 380.70
Rp 60,000.00 Rp 48,000.00
Rp 75,000.00 Rp 180,000.00
Rp 85,000.00 Rp 20,400.00
Rp 100,000.00 Rp 4,000.00
Rp 468,780.70 Rp 468,780.70
TOTAL= Rp 37,488,434.20
X. PEKERJAAN PENGECATAN
Rp 26,000.00 Rp 5,200.00
Rp 26,000.00 Rp 3,900.00
Rp 53,000.00 Rp 9,010.00
Rp 53,000.00 Rp 13,780.00
Rp 60,000.00 Rp 4,200.00
Rp 70,000.00 Rp 630.00
Rp 80,000.00 Rp 480.00
Rp 100,000.00 Rp 250.00
Rp 37,450.00 Rp 37,450.00
Rp 23,000.00 Rp 2,300.00
Rp 18,700.00 Rp 1,870.00
Rp 18,700.00 Rp 4,862.00
Rp 60,000.00 Rp 1,200.00
Rp 70,000.00 Rp 4,410.00
Rp 80,000.00 Rp 504.00
Rp 100,000.00 Rp 250.00
Rp 15,396.00 Rp 15,396.00
Rp 18,700.00 Rp 2,244.00
Rp 18,700.00 Rp 3,366.00
Rp 60,000.00 Rp 1,680.00
Rp 70,000.00 Rp 2,940.00
Rp 80,000.00 Rp 336.00
Rp 100,000.00 Rp 250.00
Rp 10,816.00 Rp 10,816.00
TOTAL= Rp (63,662.00)
AAN KUNCI DAN PENGGANTUNG KUNCI
Rp 130,000.00 Rp 130,000.00
Rp 60,000.00 Rp 600.00
Rp 75,000.00 Rp 37,500.00
Rp 85,000.00 Rp 850.00
Rp 100,000.00 Rp 500.00
Rp 169,450.00 Rp 169,450.00
Rp 22,000.00 Rp 15,000.00
Rp 60,000.00 Rp 900.00
Rp 75,000.00 Rp 11,250.00
Rp 85,000.00 Rp 1,275.00
Rp 100,000.00 Rp 75.00
Rp 28,500.00 Rp 28,500.00
Rp 300.00 Rp 12,000.00
Rp 60,000.00 Rp 600.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 850.00
Rp 100,000.00 Rp 50.00
Rp 21,000.00 Rp 21,000.00
Rp 15,500.00 Rp 15,500.00
Rp 60,000.00 Rp 3,000.00
Rp 75,000.00 Rp 37,500.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 250.00
Rp 60,500.00 Rp 60,500.00
Rp 8,000.00 Rp 8,000.00
Rp 60,000.00 Rp 1,200.00
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 1,700.00
Rp 100,000.00 Rp 100.00
Rp 26,000.00 Rp 26,000.00
TOTAL= Rp 305,450.00
XII. PEKERJAAN LISTRIK
PANEL & PANEL KONTROL + KWH 1300 VA
Rp 140,000.00 Rp 140,000.00
Rp 55,000.00 Rp 165,000.00
Rp 55,000.00 Rp 55,000.00
Rp 52,500.00 Rp 15,750.00
Rp 39,000.00 Rp 39,000.00
Rp 10,000.00 Rp 30,000.00
Rp 13,000.00 Rp 39,000.00
Rp 57,500.00 Rp 57,500.00
Rp 45,000.00 Rp 45,000.00
Rp 3,000.00 Rp 6,000.00
Rp 45,100.00 Rp 153,791.00
Rp 60,000.00 Rp 180,000.00
Rp 130,000.00 Rp 32,500.00
Rp 70,000.00 Rp 105,000.00
Rp 100,000.00 Rp 50,000.00
Rp 85,000.00 Rp 42,500.00
Rp 40,000.00 Rp 40,000.00
Rp 12,000.00 Rp 12,000.00
Rp 850.00 Rp 1,105,000.00
Rp 2,313,041.00 Rp 2,313,041.00
Rp 150,000.00 Rp 150,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 158,910.00 Rp 158,910.00
Rp 19,000.00 Rp 19,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 27,910.00 Rp 27,910.00
Rp 23,000.00 Rp 23,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 31,910.00 Rp 31,910.00
Rp 6,000.00 Rp 6,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 14,910.00 Rp 14,910.00
ANTUNG BULAT
Rp 2,910,000.00 Rp 2,910,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 2,918,910.00 Rp 2,918,910.00
Rp 16,000.00 Rp 16,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 24,910.00 Rp 24,910.00
Rp 150,000.00 Rp 150,000.00
Rp 70,000.00 Rp 4,410.00
Rp 100,000.00 Rp 4,500.00
Rp 158,910.00 Rp 158,910.00
TOTAL= Rp 5,649,411.00
XIII. PEKERJAAN SANITASI
Rp 4,250.00 Rp 5,100.00
Rp 4,250.00 Rp 1,487.50
Rp 60,000.00 Rp 2,160.00
Rp 70,000.00 Rp 4,200.00
Rp 80,000.00 Rp 480.00
Rp 100,000.00 Rp 180.00
Rp 13,607.50 Rp 13,607.50
Rp 6,000.00 Rp 7,200.00
Rp 6,000.00 Rp 2,100.00
Rp 60,000.00 Rp 2,160.00
Rp 70,000.00 Rp 4,200.00
Rp 80,000.00 Rp 480.00
Rp 100,000.00 Rp 180.00
Rp 16,320.00 Rp 16,320.00
Rp 190,000.00 Rp 190,000.00
Rp 3,000.00 Rp 75.00
Rp 60,000.00 Rp 600.00
Rp 70,000.00 Rp 7,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 500.00
Rp 198,975.00 Rp 198,975.00
Rp 1,950,000.00Rp 1,950,000.00
Rp 1,950,000.00Rp 117,000.00
Rp 60,000.00Rp 198,000.00
Rp 70,000.00Rp 77,000.00
Rp 80,000.00Rp 80.00
Rp 100,000.00Rp 16,000.00
Rp 2,358,080.00 Rp 2,358,080.00
Rp 1,750,000.00 Rp 1,750,000.00
Rp 1,750,000.00 Rp 1,750,000.00
Rp 3,500,000.00 Rp 3,500,000.00
Rp 3,500,000.00 Rp 3,500,000.00
Rp 5,500,000.00 Rp 5,500,000.00
Rp 5,500,000.00 Rp 5,500,000.00
SANGAN BATU BATA UKURAN (30 x 30 )cm, t = 35 cm
Rp 750.00 Rp 65,250.00
Rp 1,250.00 Rp 55,000.00
Rp 190,000.00 Rp 13,300.00
Rp 190,000.00 Rp 13,300.00
Rp 15,000.00 Rp 24,000.00
Rp 250,000.00 Rp 15,000.00
Rp 60,000.00 Rp 192,000.00
Rp 70,000.00 Rp 71,050.00
Rp 80,000.00 Rp 120.00
Rp 100,000.00 Rp 1,600.00
Rp 450,620.00 Rp 450,620.00
Rp 75,000.00 Rp 75,000.00
Rp 60,000.00 Rp 600.00
Rp 70,000.00 Rp 7,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 500.00
Rp 83,900.00 Rp 83,900.00
TOTAL= Rp 13,871,502.50
XIV. PEKERJAAN LANTAI
KURAN (40 x 40) cm
Rp 40,000.00 Rp 42,432.00
Rp 1,250.00 Rp 12,250.00
Rp 190,000.00 Rp 8,550.00
Rp 60,000.00 Rp 15,000.00
Rp 70,000.00 Rp 8,750.00
Rp 80,000.00 Rp 1,040.00
Rp 100,000.00 Rp 1,300.00
Rp 89,322.00 Rp 89,322.00
BU-ABU UKURAN (20 x 20) cm
Rp 40,000.00 Rp 42,400.00
Rp 1,250.00 Rp 13,000.00
Rp 190,000.00 Rp 8,550.00
Rp 60,000.00 Rp 16,200.00
Rp 70,000.00 Rp 9,450.00
Rp 80,000.00 Rp 1,120.00
Rp 100,000.00 Rp 1,400.00
Rp 92,120.00 Rp 92,120.00
Rp 150,000.00 Rp 180,000.00
Rp 60,000.00 Rp 18,000.00
Rp 100,000.00 Rp 1,000.00
Rp 199,000.00 Rp 199,000.00
Rp 46,500.00 Rp 49,290.00
Rp 180.00 Rp 1,674.00
Rp 190,000.00 Rp 3,420.00
Rp 11,340.00 Rp 21,999.60
Rp 60,000.00 Rp 54,000.00
Rp 70,000.00 Rp 31,500.00
Rp 80,000.00 Rp 3,600.00
Rp 100,000.00 Rp 4,500.00
Rp 169,983.60 Rp 169,983.60
Rp 180.00 Rp 2,001.60
Rp 190,000.00 Rp 5,700.00
Rp 60,000.00 Rp 21,600.00
Rp 70,000.00 Rp 12,600.00
Rp 80,000.00 Rp 1,440.00
Rp 100,000.00 Rp 1,800.00
Rp 45,141.60 Rp 45,141.60
Rp 180.00 Rp 585.00
Rp 60,000.00 Rp 12,000.00
Rp 70,000.00 Rp 7,000.00
Rp 80,000.00 Rp 800.00
Rp 100,000.00 Rp 1,000.00
Rp 21,385.00 Rp 21,385.00
TOTAL= Rp 616,952.20
NO URAIAN
I PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAHAN DAN PERALATAN
2 PEMASANGAN BOWPLANK
3 LOS KERJA DAN DIREKSI KEET
II PEKERJAAN TANAH
1 GALIAN TANAH
2 URUGAN TANAH KEMBALI
3 URUGAN PASIR DI BAWAH PONDASI
IV PEKERJAAN BETON
1 SLOOF
2 RING BALOK
3 FOOTPLAT TYPE A
4 FOOTPLAT TYPE B
5 KOLOM PRAKTIS
6 KOLOM STRUKTUR 30x30
7 BALOK INDUK
8 BALOK ANAK
9 PLAT BETON TEBAL 10cm
10 TANGGA
11 PENUTUP BAK KONTROL DAN SEPTICTANK
V PEKERJAAN DINDING
1 DINDING TRASRAM 1PC:2PS
2 DINDING 1PC:4PS
VI PEKERJAAN PLESTERAN
1 PLESTERAN DINDING TRASRAM 1PC:2PS
2 PLESTERAN DINDING 1PC:4PS
X PEKERJAAN PENGECATAN
1 PENGECATAN KUSEN KAYU
2 PENGECATAN TEMBOK
3 PENGECATAN PLAFOND
TOTAL
VOLUME HARGA SATUAN (Rp)
162 Rp 6,000.00
6.50 Rp 81,850.00
25 Rp 371,660.05
JUMLAH
160.17 Rp 47,500.00
35.63 Rp 13,420.00
7.49 Rp 199,000.00
JUMLAH
36.432 Rp 758,550.00
16.579 Rp 445,920.00
JUMLAH
4.40625 Rp 3,554,544.90
1.425 Rp 4,934,279.14
4.587 Rp 5,961,320.71
1.8375 Rp 5,758,813.36
1.296 Rp 4,426,951.40
3.564 Rp 4,180,419.98
2.005 Rp 4,596,456.97
0.885 Rp 4,497,939.74
3.4 Rp 4,932,090.18
1.33 Rp 7,493,266.37
0.0865 Rp 4,932,090.18
JUMLAH
1.755 Rp 110,707.50
35.90 Rp 102,345.00
JUMLAH
0.60 Rp 47,780.00
21.44826 Rp 43,560.00
JUMLAH
0.410 Rp 11,913,600.00
0.214288 Rp 11,380,200.00
0.172488 Rp 17,913.20
0.1908 Rp 96,175.00
0.058 Rp 77,980.00
99.4 Rp 61,105.00
JUMLAH
79.631 Rp 256,457.50
JUMLAH
0.465 Rp 36,343,519.00
0.294 Rp 676,134.50
2.453567 Rp 468,780.70
58.7366 Rp 37,450.00
576.54 Rp 15,396.00
79.631 Rp 10,816.00
20 Rp 28,500.00
28 Rp 21,000.00
10 Rp 60,500.00
2 Rp 26,000.00
9 Rp 169,450.00
JUMLAH
1 Rp 2,313,041.00
2 Rp 24,910.00
9 Rp 14,910.00
2 Rp 2,918,910.00
7 Rp 158,910.00
9 Rp 27,910.00
2 Rp 31,910.00
1 Rp 140,000.00
76.52 Rp 45,100.00
3 Rp 158,910.00
2 Rp 3,000.00
JUMLAH
20.97 Rp 13,607.50
18.68 Rp 16,320.00
1 Rp 5,500,000.00
4 Rp 198,975.00
2 Rp 2,358,080.00
1 Rp 1,750,000.00
1 Rp 3,500,000.00
1 Rp 450,620.00
2 Rp 83,900.00
JUMLAH
93.61 Rp 89,322.00
4.08 Rp 92,120.00
5.94 Rp 199,000.00
15.70 Rp 169,983.60
11.872 Rp 45,141.60
3.56 Rp 21,385.00
JUMLAH
JUMLAH (Rp)
Rp 972,000.00
Rp 531,861.30
Rp 9,291,501.25
Rp 10,795,362.55
Rp 7,607,862.44
Rp 478,114.34
Rp 1,489,844.84
Rp 9,575,821.62
Rp 27,635,493.60
Rp 7,392,729.31
Rp 35,028,222.91
Rp 15,662,213.45
Rp 7,031,347.78
Rp 27,344,578.09
Rp 10,581,819.54
Rp 5,737,329.02
Rp 14,899,016.79
Rp 9,215,896.22
Rp 3,980,676.67
Rp 16,769,106.62
Rp 9,955,403.83
Rp 426,625.80
Rp 121,604,013.81
Rp 194,291.66
Rp 3,673,976.72
Rp 3,868,268.38
Rp 28,782.67
Rp 934,286.21
Rp 963,068.88
Rp 4,884,576.00
Rp 2,438,640.30
Rp 3,089.81
Rp 18,350.19
Rp 4,522.84
Rp 6,073,837.00
Rp 13,423,016.14
Rp 20,421,967.18
Rp 20,421,967.18
Rp 16,899,736.34
Rp 198,783.54
Rp 1,150,184.86
Rp 18,248,704.73
Rp 2,199,685.67
Rp 8,876,409.84
Rp 861,288.90
Rp 11,937,384.41
Rp 570,000.00
Rp 588,000.00
Rp 605,000.00
Rp 52,000.00
Rp 1,525,050.00
Rp 3,340,050.00
Rp 2,313,041.00
Rp 49,820.00
Rp 134,190.00
Rp 5,837,820.00
Rp 1,112,370.00
Rp 251,190.00
Rp 63,820.00
Rp 140,000.00
Rp 3,451,052.00
Rp 476,730.00
Rp 6,000.00
Rp 13,836,033.00
Rp 285,349.28
Rp 304,857.60
Rp 5,500,000.00
Rp 795,900.00
Rp 4,716,160.00
Rp 1,750,000.00
Rp 3,500,000.00
Rp 450,620.00
Rp 167,800.00
Rp 17,470,686.88
Rp 8,361,530.67
Rp 376,208.87
Rp 1,181,264.00
Rp 2,668,912.50
Rp 535,921.08
Rp 76,164.82
Rp 13,200,001.94
Rp 293,712,602.42
NO URAIAN HARGA
I PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAHAN DAN PERALATAN Rp 972,000.00
2 PEMASANGAN BOWPLANK Rp 531,861.30
3 LOS KERJA DAN DIREKSI KEET Rp 9,291,501.25
II PEKERJAAN TANAH
1 GALIAN TANAH Rp 7,607,862.44
2 URUGAN TANAH KEMBALI Rp 478,114.34
3 URUGAN PASIR DI BAWAH PONDASI Rp 1,489,844.84
IV PEKERJAAN BETON
1 SLOOF Rp 15,662,213.45
2 RING BALOK Rp 7,031,347.78
3 FOOTPLAT TYPE A Rp 27,344,578.09
4 FOOTPLAT TYPE B Rp 10,581,819.54
5 KOLOM PRAKTIS Rp 5,737,329.02
6 KOLOM STRUKTUR 30x30 Rp 14,899,016.79
7 BALOK INDUK Rp 9,215,896.22
8 BALOK ANAK Rp 3,980,676.67
9 PLAT BETON TEBAL 10cm Rp 16,769,106.62
10 TANGGA Rp 9,955,403.83
11 PENUTUP BAK KONTROL DAN SEPTICTANK Rp 426,625.80
V PEKERJAAN DINDING
1 DINDING TRASRAM 1PC:2PS Rp 194,291.66
2 DINDING 1PC:4PS Rp 3,673,976.72
VI PEKERJAAN PLESTERAN
1 PLESTERAN DINDING TRASRAM 1PC:2PS Rp 28,782.67
2 PLESTERAN DINDING 1PC:4PS Rp 934,286.21
Rp 963,068.88
X PEKERJAAN PENGECATAN
1 PENGECATAN KUSEN KAYU Rp 2,199,685.67
2 PENGECATAN TEMBOK Rp 8,876,409.84
3 PENGECATAN PLAFOND Rp 861,288.90