NO NAMA PAKET HPS

1 Rekonstruksi Jalan Denanyar - Sendangrejo (PIK). 440,465,000.00

2 Rehabilitasi Ruas Jalan Jatipelem - Tanggungan. 1,716,676,000.00

3 Peningkatan Jalan Kalianyar - Selorejo. 4,349,269,000.00

4 Peningkatan Jalan Keplaksari - Rejosopinggir. 1,064,588,000.00


KEBUTUHAN KABUPATEN JOMBANG
ALAT KAPASITAS JUMLAH PERSONIL
Dump Truck (DT) Min. 3,5 Ton (bak) 3 Unit
Truck Mixer Min 5 m3 3 Unit Pelaksana (TS028/045)
Vibrator Roller 6 - 8 ton 1 Unit
Excavator Backhoe Pc 40 - Pc 100 1 Unit
Vibrator Concrete - 2 unit
Petugas Keselamatan Konstruksi

Excavator Backhoe PC 45 - 100 1 Unit


Vibrator Concrete - 2 unit Pelaksana (TS028/045)
Asphalt Finisher 10 Ton 1 Unit
Tandem Roller 8,1 Ton 1 Unit
Pneumatic Tire Roller 9 Ton 1 Unit Petugas Keselamatan Konstruksi
Asphalt Distributor 4000 Liter 1 Unit
Pedestrian Roller 4 Ton 1 Unit
Concrete Cutter - 1 Unit Pelaksana (TS028/045)
Asphalt Finisher 10 Ton 1 Unit
Tandem Roller 8,1 Ton 1 Unit
Pneumatic Tire Roller 9 Ton 1 Unit Petugas Keselamatan Konstruksi
Asphalt Distributor 4000 Liter 1 Unit
Pedestrian Roller 4 Ton 1 Unit
Concrete Cutter - 1 Unit Pelaksana (TS028/045)
Asphalt Finisher 10 Ton 1 Unit
Tandem Roller 8,1 Ton 1 Unit
Pneumatic Tire Roller 9 Ton 1 Unit Petugas Keselamatan Konstruksi
Asphalt Distributor 4000 Liter 1 Unit
BANG
PENGALAMAN DUKUNGAN Tujuan Personil Utama Kurang
Kosong
1 Tahun

2 Tahun

2 Tahun

1 Tahun