Anda di halaman 1dari 1

KONTRAKTOR WAJIB MENGONTROL

SEMUA UKURAN TERHADAP


ARSITEKTUR DAN KONDISI
LAPANGAN

Catatan
Note
* SATUAN DALAM mm
SPESIFIKASI :
PEDOMAN PERENCANAAN BANGUNAN
BAJA UNTUK GEDUNG 2015
PEDOMAN PERENCANAAN BANGUNAN
BETON UNTUK GEDUNG 2020
* Mutu Beton :
Pilecap K-250 (fc' = 21 MPa)
Kolom K-250 (fc' = 21 MPa)
Balok K-250 (fc' = 21 MPa)

* Mutu Baja : SS-400


PLAT GRC TEBAL 20MM UNTUK DAK * Mutu Baja Tulangan :
ATAP + RANGKA HOLLOW 4X6 T.2,2 MM BJTS 420B (fy = 420 MPa)

- Baut HTB A325 , Angkur A307


* Selimut Beton :
Pelat = 20 mm
Kolom = 25 mm
Pedestal = 40 mm
Pile Cap / Telapak :
Bagian Atas = 30 mm
Bagian Bawah = 50 mm
Sloof / Tiebeam :
Bagian Atas = 25 mm
Bagian Bawah = 40 mm
ATAP SPANDEK LENGKUNG BENDING
SENG GALVALUM 0,45MM
Perubahan
Revision

Perubahan Tanggal Disetujui


No.
Revision Date Approved

01
02

03
04
05

Denah Kunci
Key Plan

ACP SILVER MODUL 60X60 CM


RANGKA BESI HOLLOW

Proyek
Project

GATE

Lokasi
Location

PULOGADUNG

Tipe
Type

Pemilik
Owner

-
TROTOAR TROTOAR
▼+0.20 ▼+0.20 Pemberi Tugas
Client

KONSULTAN GAMBAR
Drafting Consultant

Judul Gambar Skala


Title Scale

TAMPAK SAMPING KIRI 1:100


GATE
Desainer
Designer

EL
Digambar Diperiksa Disetujui
Drawn Checked Approved

SR EL EL
Tanggal Tanggal Tanggal
Date Date Date

10/01/24
17/10/23

No. Gambar Ukuran Halaman


Drawing Number Size Page.

ARS-009 A3 9

Anda mungkin juga menyukai