NO.
URAIAN
REKAPITULASI - 1
NO. URAIAN
14 PEMBANGUNAN GEDUNG R (INCENERATOR)
15 PEMBANGUNAN GEDUNG S (RENCANA PERUMAHAN DINAS)
16 PEMBANGUNAN GEDUNG T (MORTUARY/FORENSIC)
17 PEMBANGUNAN GEDUNG U (MASJID)
18 PEMBANGUNAN GEDUNG V (BENGKEL PRORESA-ORTESA)
19 PEMBANGUNAN GEDUNG W (GUDANG LOGISTIK)
20 PEMBANGUNAN GEDUNG X (BANK DARAH)
21 PEMBANGUNAN GEDUNG Y1 (CONNECTION BRIDGE & SELASAR)
22 PEMBANGUNAN GEDUNG Y2 (RAMP)
REKAPITULASI - 2
NO. URAIAN
23 PEMBANGUNAN GEDUNG Z (POS JAGA) 2 BUAH
24 SITE DEVELOPMENT
25 UTILITAS MEKANIKAL,ELEKTRIKAL DAN PLUMBING
TERBILANG :
DUA RATUS DELAPAN PULUH TUJUH MILYAR TIGA BELAS JUTA LIMA
REKAPITULASI - 3
NO.
URAIAN
REKAPITULASI - 4
BIAYA
11
REKAPITULASI - 5
REKAPITULASI - 6
LOPMENT
S DELAPAN PULUH TUJUH MILYAR TIGA BELAS JUTA LIMA RATUS ENAM PULUH R
A DINAS PU
NG CIPTA KARYA
TENGGARA BARAT
AM HAMBALI
6199303 1 003
MENGETAHUI/ MENYETUJUI
DISYAHKAN :
DIREKTUR RSU PROVINSI NTB
SELAKU PENGGUNA ANGGARAN
BADARUDIN, S. Kep. Ne
NIP. 19691231199003 1 0
REKAPITULASI - 8
JUMLAH HARGA
Rp
16,022,261,000.00
Rp
596,355,000.00
Rp
31,550,998,000.00
Rp
5,251,026,000.00
Rp
55,990,501,000.00
Rp
38,010,572,000.00
Rp
28,094,823,000.00
Rp
7,002,075,000.00
Rp
1,610,330,000.00
Err:509
Rp
9,950,930,000.00
Rp
11,353,320,000.00
Rp
955,254,000.00
REKAPITULASI - 9
JUMLAH HARGA
Rp
729,874,000.00
Rp
1,225,312,000.00
Rp
6,640,680,000.00
Err:509
LAHAN PENGEMBANGAN
Err:509
Rp
1,187,824,000.00
Rp
14,857,905,000.00
Rp
4,536,521,000.00
REKAPITULASI - 10
JUMLAH HARGA
69224000
Rp
8,234,705,000.00
5055901000
Err:509
UAT KOMITMEN
VINSI NTB
DJADJAT SUHARDJA
DIREKTUR UTAMA
S. Kep. Ners
1199003 1 060
REKAPITULASI - 11
JUMLAH HARGA
REKAPITULASI - 12
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI KSLL
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 4.20 M )
2.6. LANTAI DUA / ATAP ( EL. + 8,40 M )
2.7. ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
IV.
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
URAIAN PEKERJAAN
2.4.
2.5.
2.6.
2.7.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Plat Buhul t=12 mm
Pek. Gedung A (Administrasi) - page 17 of 2419
NO.
URAIAN PEKERJAAN
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Memasang dinding partisi gypsum board
10 Plint homogenius tile 10 x 60 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
B.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
Pek. Gedung A (Administrasi) - page 18 of 2419
NO.
URAIAN PEKERJAAN
9 Memasang dinding partisi gypsum board
10 Plint homogenius tile 10 x 60 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
3.2.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
3.3.
3.4.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
NO.
URAIAN PEKERJAAN
6 E (AL-ED/GL-1* uk. 2x900x2150)
7 E (AL-ED/GL-1* uk. 900x2150)
8 M (AL-ED uk. 900x2150)
JENDELA TYPE
1 BV-1
2 BV-2
3 BV-4
4 GLS
5 P4/1
6 P4/2
7 P4/3
8 P4/4
9 P4/5
10 P4/6
11 P4/7
12 W/2E
13 W/3E
14 W/4E
B.
3.5.
LEVEL-1
PINTU TYPE
1 A (AL-ED uk. 2x900x2150)
2 C (AL-ED uk. 750x2150) *Plastic Laminate
3 C (AL-ED uk. 900x2150)
4 E (AL-ED/GL-1* uk. 2x900x2150)
5 E (AL-ED/GL-1* uk. 900x2150)
6 M (AL-ED uk. 2x900x2150)
7 M (AL-ED uk. 900x2150)
JENDELA TYPE
1 BV1
2 BV2
3 BV3
4 GLS-2
5 P4/2
6 P4/8
7 P4/9
8 W/2EA
9 W/3EA
10 W-1EA
11 W-3E
NO.
URAIAN PEKERJAAN
3 Cove ligth wastafel
4 Kaca cermin
5 Meja beton
6 Floor drain
7 Memasang kran dinding 1/2"
8 Memasang meja zink satu lubang
9 Meja granite wastafel under counter
10 Hand Dryer
11 Jet washer
12 Tisue holder
13 Soap dish
B.
3.6.
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Wastafel gantung lengkap dengan aksesoris
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin
6 Meja beton
7 Floor drain
8 Memasang kran dinding 1/2"
9 Memasang meja zink satu lubang
10 Meja granite wastafel under counter
11 Hand Dryer
12 Jet washer
13 Tisue holder
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
B.
LEVEL-1
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
NO.
URAIAN PEKERJAAN
3.7. PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
IV.
4.1.2.
B.
LANTAI - 1
1 Gate Valve :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 40 mm
2 Pemipaan Polypropelyne PN.10 :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
C.
LANTAI - 2
1 Gate Valve :
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
2 Pemipaan Polypropelyne PN.10 :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
NO.
URAIAN PEKERJAAN
A.
LANTAI - 1
1.
Sewage Pitt
a.
Sewage Pitt ukuran 1000 x 1000 x 1200
b.
Pompa Sewage Pump lengkap panel kotrol dan peralatan
- Kapasitas : 150 Lpm / 15 Hari
- Head
: 120 meter
- Type
: Rendam
- Unit
: 2 unit
2 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
- Diameter 150 mm
- Diameter 100 mm
- CO diameter 100 mm
3 Pemipaan Air kotor cair PVC Kelas 10 kg/cm 2
- Diameter 100 mm
- Diameter 80 mm
- Diameter 65 mm
- CO diameter 100 mm
- CO diameter 80 mm
- CO diameter 65 mm
4 Pemipaan Vent PVC Kelas 10 kg/cm2
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
5 Peralatan Bantu ( Fitting-Fitting )
B.
LANTAI - 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
- Diameter 100 mm
- CO diameter 100 mm
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm 2
- Diameter 80 mm
- Diameter 65 mm
- CO diameter 80 mm
- CO diameter 65 mm
3 Pemipaan vent PVC Kelas 10 kg/cm2
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
4 Peralatan Bantu ( Fitting-Fitting )
4.1.3.
NO.
URAIAN PEKERJAAN
2 Pemipaan PVC Kelas 10 kg/cm2 :
- Diameter 100 mm
- Diameter 80 mm
- Peralatan Bantu ( Fitting-Fitting )
3 Roof Drain :
- Diameter 100 mm
- Diameter 80 mm
V.
LANTAI - 1
1 Panel Listrik lengkap grounding
SDP - 1
LP - 1
PP - 1
PP - AC.1
PP - UPS 1
2 Kabel Feeder
Dari SDP
Dari SDP
Dari SDP
Dari SDP
5.2.
1 ke LP - 1, NYY 4 x 6 mm2
1 ke PP - 1, NYY 4 x 16 mm2
1 ke PP - AC.GF, NYY 4 x 50 mm2
ke PP - UPS. GF, NYY 4 x 6 mm2
NO.
URAIAN PEKERJAAN
Saklar hotel
Stop Kontak 200 W / 10 A
Stop Kontak 200 W / 10 A / UPS
Stop Kontak 350 W / 16 A
Stop Kontak 500 W / 16 A
Stop Kontak 1000 W / 16 A
Stop Kontak Lantai 2x200 W / 10 A / 1 Phase
2 Titik instalasi
Instalasi penerangan
Instalasi stop kontak
B.
LANTAI - 1
1 Saklar dan Stop kontak
Saklar tunggal
Saklar ganda
Saklar hotel
Stop Kontak 200 W / 10 A
Stop Kontak 200 W / 10 A / UPS
Stop Kontak 350 W / 16 A
Stop Kontak 500 W / 10 A
Stop Kontak 1000 W / 16 A / 1 Phase
Stop Kontak Lantai 2x200 W / 10 A / 1 Phase
2 Titik instalasi
Instalasi penerangan
Instalasi stop kontak
GARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
GARA BARAT
JUMLAH I.
JUMLAH II.
DAN JENDELA
JUMLAH III.
JUMLAH IV.
GARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
245
35
1
245
1
1
m3
m3
m3
m2
m3
1440
288
720
1200
288
m3
m3
m2
m3
m3
m3
866.4
606.48
1444
259.92
7.2
3.6
m2
1444
(t=12 cm)
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
SAT
VOLUME
m3
kg
m3
m3
kg
m3
m3
m3
7.2
131.04
5.04
2.394
5145.088
18.522
7.938
0.48
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
32
34.425
32.36
1.734
1.8
148.92
10.8
108
108
18.522
m3
m3
m2
m3
m3
m2
m2
m3
m3
m3
m3
14.75
18.225
0.6
1.5
4.9
49
49
0.50225
0.5
0.675
0.6
kg
kg
kg
kg
19700.14032
10620.77184
3138.688
4015.1520192
SAT
unit
bh
bh
bh
bh
kg
bh
bh
men Instant.
& Jendela
& Jendela
VOLUME
48
192
2980
3040
1024
9615.9580263158
518.5500877193
36
m3
m3
m1
m1
14.4716900738
6.7727577273
202.44
72.24
m2
m1
1773.8175
193.2
m2
m2
m2
m1
m1
m1
m1
m1
m2
m1
m1
m2
m1
m1
1175.9215
2351.843
2351.843
334.546
857.092
107.52
315
240.916
701.6736
432.334
19.83
14.15
19.83
19.83
m2
m2
m2
m1
m1
m1
m1
m1
899.8178
1799.6356
1799.6356
346.503
853.006
94.92
273
246.961
SAT
m2
m1
m1
m2
m1
m1
VOLUME
523.5111
183.83
110.19
163.486
110.19
110.19
enius tile 60 x 60 cm
k 20 x 20 cm
eramik 5 x 20 cm
m2
m2
m1
m2
1232.79
18.03
33
21.6
enius tile 60 x 60 cm
m2
966.72
ramik 30 x 30 cm
m2
k 20 x 20 cm
m2
m2
30.35
19.8
m2
m2
m1
m2
m2
689.89
114.51
1126.76
445.8
57.5
m2
m2
m1
m2
m2
1136.12
30.35
899.71
244.32
35.32
61.18
DAN JENDELA
2x900x2150)
900x2150)
750x2150) *Plastic Laminate
900x2150)
unit
unit
unit
unit
unit
1
3
1
2
1
* uk. 2x900x2150)
* uk. 900x2150)
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 2x900x2150)
* uk. 900x2150)
2x900x2150)
900x2150)
SAT
unit
unit
unit
VOLUME
4
4
7
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
4
4
1
4
1
1
1
7
1
4
1
2
2
14
unit
unit
unit
unit
unit
unit
unit
3
5
1
5
1
5
4
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
5
3
4
4
2
8
12
3
23
2
11
set
set
4
2
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
bh
bh
m
bh
bh
bh
m
bh
set
bh
bh
VOLUME
2
2
0.3477
4
4
1
3.477
1
4
4
4
set
set
set
bh
bh
m
bh
bh
bh
m
bh
set
bh
8
3
3
3
3
0.6177
8
8
1
2.7
4
4
8
m
m
m'
m
m
m'
1763.88225
302.4
16.65
587.96075
861.9
1126.76
m
m
m'
m
m
m'
1349.7267
277.2
53.76
449.9089
1201.79
899.71
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
VOLUME
10.666
17.5
Buah
Meter
Meter
Meter
Meter
Ls
eter 32 mm
eter 25 mm
eter 40 mm
aan Polypropelyne PN.10 :
eter 32 mm
eter 25 mm
eter 15 mm
an Bantu ( Fitting-Fitting )
Buah
Buah
Buah
eter 40 mm
eter 32 mm
eter 25 mm
aan Polypropelyne PN.10 :
eter 32 mm
eter 25 mm
eter 15 mm
an Bantu ( Fitting-Fitting )
Buah
Buah
Buah
Meter
Meter
Meter
Ls
Meter
Meter
Meter
Ls
1
6.5
6.5
6.5
6.5
1
3
3
4
6.48
8.868
41.13
1
4
3
3
37.944
33.3
41.13
1
SAT
:
Meter
Meter
Buah
10.89
13.6246
2
Meter
Meter
Meter
Buah
Buah
Buah
10.131
7.4789
13.41
1
1
1
Meter
Meter
Meter
Ls
10.527
2.783
51.75
1
Meter
Buah
48.102
7
Meter
Meter
Buah
Buah
34.5851
36.63
2
7
Meter
Meter
Meter
Ls
10.527
2.783
51.75
1
ntrol - 40 cm
1
1
unit
unit
VOLUME
Buah
SAT
VOLUME
Meter
Meter
Ls
eter 100 mm
eter 80 mm
Buah
Buah
8
4
PP - AC.GF
PP - UPS GF
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
Dari
Dari
Dari
Dari
Dari
Meter
Meter
Meter
Meter
Meter
7
8
7
5
6
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
Meter
Meter
Meter
Meter
8
7
5
6
69.8
21.2
1
N KABEL FEEDER
PP - AC.1
PP - UPS 1
Dari
Dari
Dari
Dari
SDP
SDP
SDP
SDP
1 ke LP - 1, NYY 4 x 6 mm2
1 ke PP - 1, NYY 4 x 16 mm2
1 ke PP - AC.GF, NYY 4 x 50 mm2
ke PP - UPS. GF, NYY 4 x 6 mm2
Buah
Buah
14
14
Saklar hotel
Stop Kontak
Stop Kontak
Stop Kontak
Stop Kontak
Stop Kontak
Stop Kontak
200 W / 10 A
200 W / 10 A / UPS
350 W / 16 A
500 W / 16 A
1000 W / 16 A
Lantai 2x200 W / 10 A / 1 Phase
Instalasi penerangan
Instalasi stop kontak
SAT
Buah
Buah
Buah
Buah
Buah
Buah
Buah
VOLUME
2
96
11
3
4
6
2
Titik
Titik
142
122
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
13
12
2
207
17
4
4
6
3
Titik
Titik
160
241
JUMLAH HARGA
12609180774.595
1956510860.91618
14565691635.5112
1456569163.55112
16022260799.0624
16022261000
JUMLAH HARGA
217208700
217208700
186330000
107710105.3
2555663400
578030846.207533
2241361938.3669
422798117.989635
2302161982.57781
8394056390.44188
1002950527.5388
512413452.9768
419099424.279636
1370333676.25246
56555159.9557961
254088540.54126
11258302.275
3626699083.81976
24045197.7647397
43831957.8715453
19297362.3837867
87174518.0200716
145862626.946667
138179455.366667
284042082.313333
12609180774.595
HARGA SATUAN
(Rp)
JUMLAH HARGA
(Rp)
5 6=4X5
15000000
60000
1418030
1000000
272970
20000000
50000000
JUMLAH I. PEKERJAAN PERSIAP
15000000
14700000
49631050
1000000
66877650
20000000
50000000
217208700
10720
26180
157158
32725
37950
JUMLAH 2.1. PEKERJAAN PEMA
15436800
7539840
113153760
39270000
10929600
186330000
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2. PEKERJAAN TANAH
1769850
41630520
11507958
47254900
3259396.8
1257264
2800066.5
107710105.3
2555663400
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 2.3. PEKERJAAN PONDA
2555663400
2713530.33279167
27248.925
6387884.75263889
6437416.19070724
27248.925
13706168.593034
13706168.593034
9277660.75729167
JUMLAH 2.4. LANTAI DASAR ( EL.
19537418.3961
3570699.132
32194939.1533
15411174.3605531
140198117.0304
253865654.680176
108799566.291504
4453277.1635
578030846.207533
9091515.74085333
9680135.75238518
9381908.85729166
9975088.55261111
8292426.4401
6126956.28798611
7143851.34558333
246240
104940
13706168.593034
JUMLAH 2.5.LANTAI SATU ( EL. +
290928503.707307
333238673.27586
303598570.621958
17296803.5502277
14926367.59218
912426330.406892
77153594.5323
26593920
11333520
253865654.680176
2241361938.3669
9680135.75238518
10451444.5672217
9381908.85729166
8292426.4401
7143851.34558333
246240
40000
11089841.7388299
9680135.75238518
10451444.5672217
8292426.4401
JUMLAH 2.6.LANTAI DUA / ATAP (
142782002.347681
190477577.237615
5629145.314375
12438639.66015
35004871.5933583
12065760
1960000
5569873.01332733
4840067.87619259
7054725.08287464
4975455.86406
422798117.989635
31192.48691625
31192.48691625
31192.48691625
31192.48691625
614496369.179889
331288286.659677
97903484.3741909
125242576.825651
Pek. Gedung A (Administrasi) - page 43 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
488160
188640
23040
20160
17280
31192.48691625
116640
97200
23431680
36218880
68659200
61286400
17694720
299945644.923064
60483682.231579
3499200
6048000
5796000
163800
52416
87524781.56604
39254903.7872727
33159672
3786531.84
204522.654285714
183747.96
JUMLAH 2.7.ATAP
362785863.31845
35500105.872
2302161982.57781
8394056390.44188
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
209500
26420
17760
163760
92550
145380
166628076.55
99247774.5999999
40216515.3
7259648.2
3179811.32
1212825.6
30209374.243125
23479565.0381435
147000619.2
11422264.28
352180.8
2317204
1835266.5
2882885.4
0
0
127504182.26
75944622.32
30773768.76
7519115.1
3164652.26
1070697.6
26181457.677375
24068708.0201604
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
209500
26420
17760
163760
92550
145380
JUMLAH 3.1.PEKERJAAN PASAN
109675575.45
4856788.6
1956974.4
26772467.36
10198084.5
16019422.2
1002950527.5388
222896.08
163466.05
71703.896
38788.2
222896.08
274784058.4632
2947292.8815
2366228.568
837825.12
0
0
215478098.4576
167877.55
10270748.509
163466.05
38788.2
JUMLAH 3.2.PEKERJAAN PASAN
4961194.6175
768006.36
512413452.9768
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
JUMLAH 3.3.PEKERJAAN PASA
97158547.6779343
15675238.2495608
17581917.9696
69756269.688
1549941.25
0
0
160001984.646617
4154602.05112366
14039038.8516
38229815.6352
952068.26
419099424.279636
25480977.72165
12099926.5440488
5605301.57748535
5406114.08296034
5918558.84993495
25480977.72165
36299779.6321463
5605301.57748535
10812228.1659207
5918558.84993495
Pek. Gedung A (Administrasi) - page 45 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
13034849.7522551
6080663.46759816
5778167.90327238
1319332.4960475
2487215.558685
3190170.58301562
485671.0375
5220993.80155375
8312794.92363031
6282635.832385
5905506.90516016
9233397.36616687
5777693.10545969
12335155.1412581
JUMLAH 3.4.PEKERJAAN PASAN
52139399.0090202
24322653.8703926
40447175.3229066
0
5277329.98419
9948862.23474
4656638.915335
1942684.15
3081962.18430375
5220993.80155375
6859735.46672563
62646920.46151
4875512.2999825
26981436.1839
2404794.03292562
11555386.2109194
24670310.2825162
215088530.791981
0
0
0
36299779.6321463
27030570.4148017
5774599.26622056
65174248.7612753
6080663.46759816
62199566.4260914
23112671.6130895
0
6596662.4802375
7461646.676055
12760682.3320625
1942684.15
10441987.6031075
66502359.3890425
75391629.98862
17716520.7154805
212368139.421838
11555386.2109194
135686706.553839
1370333676.25246
2388808.51
2084465.988
9555234.04
4168931.976
1319332.4960475
2487215.558685
4656638.915335
485671.0375
3081962.18430375
5220993.80155375
6859735.46672563
8949560.06593
4875512.2999825
6745359.045975
2404794.03292562
5777693.10545969
12335155.1412581
15363466.4851415
12099926.5440488
5406114.08296034
5774599.26622056
13034849.7522551
6080663.46759816
12439913.2852183
5778167.90327238
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
309074.535
243866.7
3922839.091875
312950.55
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
1297167.212
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
JUMLAH 3.5.PEKERJAAN PASAN
32850.26245
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
32850.26245
38430.833375
34450.538375
42825.079055
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
618149.07
487733.4
1363971.15224494
1251802.2
767178.1425
553501.04
1135247.454
610373.61
1267399.98
291579.75
956381.58
0
0
10377337.696
3049908.444
6253397.964
927223.605
731600.1
2423137.70705119
2503604.4
1534356.285
553501.04
881555.4
2441494.44
1267399.98
583159.5
56555159.9557961
57943994.8433965
11621484.0126
90715.8289269375
25179465.5999871
31823150.4009705
3862000.73566533
0
0
44338876.3307724
10653027.01155
1852060.94304
19267384.2100481
44372599.977239
3083780.64706367
254088540.54126
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
399712.5
399712.5
JUMLAH 3.7.PEKERJAAN RAILLI
107800
790816.479444444
371246.559444444
169130.993888889
110129.34
3279010.67306944
68455.9333333333
39440.6666666667
100980.733333333
69473.34
45554.74
27688.1
697542.380682
100980.733333333
68455.9333333333
39440.6666666667
69473.34
45554.74
27688.1
1852158.282786
JUMLAH 4.1.1PEKERJAAN AIR B
4263333.525
0
0
6994968.75
0
11258302.275
107800
0
5140307.11638889
2413102.63638889
1099351.46027778
715840.71
3279010.67306944
0
0
0
205367.8
118322
403922.933333333
0
450187.2432
403979.43432
1138811.553
697542.380682
0
0
0
403922.933333333
205367.8
118322
0
2636096.41296
1516972.842
1138811.553
1852158.282786
24045197.7647397
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
800000
3003616
800000
3003616
0
0
0
0
0
399700.693333333
171508.450666667
287991
0
4352740.5504
2336734.03695307
575982
171508.450666667
104649.38
67381.1013333333
287991
227007
135531
0
1737552.113704
782662.248082
903580.56888
287991
227007
135531
55231.7333333333
41027.47
26492.95
2681278.91726581
0
581424.4568
114179.44901
1371010.1625
2681278.91726581
0
0
171508.450666667
287991
0
8249899.493968
2015937
104649.38
67381.1013333333
227007
135531
0
3619309.272238
2468169.74184
454014
948717
67381.1013333333
41027.47
26492.95
3990111.3946584
JUMLAH 4.1.2.PEKERJAAN AIR
0
709320.853736
114179.44901
1371010.1625
3990111.3946584
43831957.8715453
780600
1561200
Pek. Gedung A (Administrasi) - page 49 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
171508.450666667
104649.38
1575105.67125333
169400
154000
JUMLAH 4.1.3.PEKERJAAN AIR
23100695.2
11451734.8
12155083.6
12729160.4
11127164.4
0
11971289.8565333
2218566.856
1575105.67125333
0
1355200
616000
19297362.3837867
27785.2666666667
66412.1333333333
179571.333333333
27785.2666666667
JUMLAH 5.1.PEKERJAAN PANEL
23100695.2
11451734.8
12155083.6
12729160.4
11127164.4
0
0
2096097.08
222282.133333333
853827.333333333
609876.666666667
166711.6
0
0
0
20123998.4
11417854.8
11666534
13615461.2
12774410
0
0
222282.133333333
464884.933333333
897856.666666667
166711.6
145862626.946667
29147.8
31858.2
408069.2
446014.8
299442.44
27785.2666666667
121975.333333333
121975.333333333
27785.2666666667
20123998.4
11417854.8
11666534
13615461.2
12774410
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
41344.6
36081.1
36081.1
36081.1
36081.1
36081.1
37436.3
170766.133333333
197562.133333333
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
36081.1
37436.3
37436.3
170766.133333333
197562.133333333
JUMLAH 5.2.PEKERJAAN TITIK
82689.2
3463785.6
396892.1
108243.3
144324.4
216486.6
74872.6
0
24248790.9333333
24102580.2666667
0
0
0
378921.4
382298.4
82689.2
7468787.7
613378.7
144324.4
144324.4
224617.8
112308.9
0
27322581.3333333
47612474.1333333
0
138179455.366667
URAIAN PEKERJAAN
1
II.
III.
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
PEKERJAAN MEKANIKAL
2.1.
2.2.
IV.
PEKERJAAN TELEPHONE
4.2.
4.3.
4.4.
PEKERJAAN MATV
4.5.
4.6.
PEKERJAAN CCTV
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1.
PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
GROUND FLOOR
1 Plint kayu T. 10 cm
2 Vinyl Wallcovering
3 Pemasangan Cover Garda Pintu Lobby D1A
4 Pasangan Batu Adesit
B.
LEVEL-1
1 Plint kayu T. 10 cm
2 Vinyl Wallcovering
3 Pasangan Batu Adesit
1.2.
1.3.
LEVEL-1
PINTU TYPE
1 A (HM uk. 900x2150)
NO.
URAIAN PEKERJAAN
B.
PEKERJAAN SIGNAGE ROOM
GROUND FLOOR
1 Signage room
2 Signage toilet
LEVEL-1
1 Signage room
2 Signage toilet
C.
II.
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Reception P. 5,30 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Kasir/ bendahara P. 2,80 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT & SPRINKLER
A.
GROUND FLOOR
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve, diameter 65 mm :
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan Hydrant BSP Schedule 40 :
Diameter 100 mm
Pemipaan ke Phillar Hydrant BSP Schedule 40 :
Diameter 100 mm
Phillar Hydrant + Hose Rack
Gate valve diameter 100 mm
Peralatan Bantu ( Fitting )
B.
C.
LANTAI - 1
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve diameter 65 mm
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan BSP Schedule 40 :
Diameter 100 mm (di shaff)
Peralatan Bantu ( Fitting-Fitting )
RISER
1 Pemipaan BSP Schedule 40 :
Diameter 65 mm - pipa hydrant
Pek. Gedung A (Administrasi) - page 54 of 2419
NO.
URAIAN PEKERJAAN
2 Gate Valve diameter 50 mm
3 Automatic Air valve ( AAV )
2.2.
NO.
URAIAN PEKERJAAN
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
PEKERJAAN EXHAUST FAN
a.
Exhaust fan type wall mounted kap. 200 cfm
-(EF.GF.5)
b.
Exhaust fan type wall mounted kap. 350 cfm
-(EF.GF.4)
c.
Exhaust fan type wall mounted kap. 600 cfm
-(EF.GF.1),(EF.GF.2),(EF.GF.6),(EF.GF.8.)
d.
Exhaust fan type inline fan kap. 250 cfm
PEKERJAAN DUCTING
a.
Ducting Tidak Berisolasi
-Ducting uk. 10" x 8"
-Ducting uk. 8" x 8"
-Ducting uk. 8" x 6"
b.
Pekerjaan Grill
-Exhaust Air Grill (EAG uk. 8" x 8")
-Intake Air Grille ( IAG 12 " x 10 " )
A.
LEVEL - 1
PEKERJAAN AIR CONDITIONING
1 AC Wall Mounted Split Type Cap. 1. 1/2 PK
-IU.1.2-OU.1.2 (Kap.12000 btu/h)
-IU.1.11-OU.1.11 (Kap.12000 btu/h)
-IU.1.16-OU.1.16 (Kap.12000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Multi Wall Mounted Split Type Cap. 2. 1/2 PK
-IU.1.17 Kap. 9500 btu/h-IU.1.18 Kap. 12000 btu/h-OU.1.17+18 Kap. 21
-IU.1.19 Kap. 9500 btu/h-IU.1.20 Kap. 12000 btu/h-OU.1.19+20 Kap. 21
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Compact Cassete Type Cap. 5 PK
-IU.1.4-OU.1.4 (Kap.37700 btu/h)
-IU.1.5-OU.1.5 (Kap.37700 btu/h)
-IU.1.6-OU.1.6 (Kap.37700 btu/h)
-IU.1.7-OU.1.7 (Kap.37700 btu/h)
-IU.1.9-OU.19 (Kap.37700 btu/h)
-IU.1.22-OU.22 (Kap.37700 btu/h)
-IU.1.23-OU.23 (Kap.37700 btu/h)
Pek. Gedung A (Administrasi) - page 56 of 2419
NO.
URAIAN PEKERJAAN
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
1 AC Compact Cassete Type Cap. 6 PK
-IU.1.1-OU.1.1 (Kap.49000 btu/h)
-IU.1.8-OU.1.8 (Kap.49600 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Multi Compact Cassete Type Cap. 6 PK
-IU.1.13A Kap. 25000 btu/h-IU.1.13B Kap. 25000 btu/h-OU.1.13A+13B K
-Pipa Refrigerant
-Kabel kontrol NYM 3 x 2.5 mm
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Multi Compact Cassete Type Cap. 10 PK
-IU.1.12 Kap. 37700 btu/h-IU.1.13 Kap. 37700 btu/h-OU.1.12+13 Kap. 7
-IU.1.14 Kap. 37700 btu/h-IU.1.13 Kap. 37700 btu/h-OU.1.14+15 Kap. 7
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
3 AC Compact Cassete Type Cap. 3 PK
-IU.1.10-OU.1.10 (Kap.25000 btu/h)
-IU.1.21-OU.1.21 (Kap.25000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
PEKERJAAN EXHAUST FAN
a.
Exhaust fan type wall mounted kap. 200 cfm
-(EF.1.4)
b.
Exhaust fan type wall mounted kap. 350 cfm
-(EF.1.5)
c.
Exhaust fan type wall mounted kap. 600 cfm
-(EF.1.1),(EF.1.2)
d.
Exhaust fan type inline fan kap. 250 cfm
-(EF.1.3),(EF.1.7)
d.
Exhaust fan type Celling fan kap. 150 cfm
PEKERJAAN DUCTING
a.
Ducting Tidak Berisolasi
-Ducting uk. 10" x 8"
-Ducting uk. 8" x 8"
-Ducting uk. 8" x 6"
b.
Pekerjaan Grill
-Exhaust Air Grill (EAG uk. 8" x 8")
Pek. Gedung A (Administrasi) - page 57 of 2419
NO.
URAIAN PEKERJAAN
-Intake Air Grille ( IAG 12 " x 10 " )
III.
LANTAI - 1
1 Rak Kabel
Ukuran 40 cm, termasuk sambungan & penunjangya
2 Fixtures lampu lengkap dengan armature
Lampu TL 2 x 36 W / Louvre M6
Lampu TL 2 x 36 W / Louvre M6 + battere
Lampu TL 1 x 36 W / 84 / TKI / di pasang rata plafond
Lampu TL 1 x 36 W / Dust Proof
Lampu TL 1 x 18 W / Rata plafond
Lampu TL 1 x 18 W / IP-40/Cove wastafel
Lampu Down Light PLC 13 W
Lampu Down Light PLC 11 W / Cover glass
Lampu Spot Light Par 38/80
Wall Lamp PLC 18W
Lighting Panel
IV.
NO.
URAIAN PEKERJAAN
PABX 20 / 200 Extention
MDF 200 Pairs
Testing & Commisioning
2 Instalasi
TBT - GF ( 30 Pairs )
Socket Telephone ( RJ-11 )
Titik instalasi Telephone, ITC 2 x 2 x 0,6 mm2
B.
4.2.
4.3.
LANTAI - 1
1 Instalsi
TBT - 1 ( 20 Pairs )
Socket Telephone ( RJ-11 )
Titik instalasi Telephone, ITC 2 x 2 x 0,6 mm2
LANTAI - 1
1 Instalasi
TBF- 1
Kabel dari MDF ke TB 1
Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
ROR
Fixed Temperature Detector
Smoke Detector
Gas Detector
Titik instalasi :
- Instalasi Detector
NO.
URAIAN PEKERJAAN
Radio Tunner AM/FM
Autorserve Cassete
CD / DVD/MP3 - Playaer
Microphone
Equalizer
Mixer Frame w/ Module
Cabinet Rack
2 Instalasi
MDF
TBS - GF
Klabel dari MDF ke TBS - GF, NYMHY 3 (3 x 2,5 mm2 )
Ceiling Speaker 3 Watt
Titik istalasi Speaker, NYMHY 3 x 1,5 mm2 dalam conduit
B.
4.4.
LANTAI - 1
1 Tata Suara Ruang Rapat
1 x 200 W Power Amplifier
CD / DVD/MP3 - Playaer
Microphone
Desk Microphone
Mixer Frame w/ Module
Cabinet Rack
Box Speaker
1 Instalasi
TBS - 1
Klabel dari CTB-S ke TB-S 2, NYMHY 3 (3 x 2,5 mm2 )
Ceiling Speaker 3 Watt
Titik istalasi Speaker, NYMHY 3 x 1,5 mm2 dalam conduit
PEKERJAAN MATV
A.
GROUND FLOOR
1 Sentral MATV
Antena UHF 17 Element lengkap tiang/ dudukan
Antena VHF 22 Element lengkap tiang / dudukan
Satelite Receiver & Modulator
Activ Combiner
Booster sinyal & P.supply
Spliter 4 way
Selective Programmable 8 channel for local program
Headend Amplifier ( Booster )
TV Monitor
CD Player
Cabinet Rack 19 ( 1,8 M)
Coaxial Cable
2 Instalasi
Spliter 4 way
Pek. Gedung A (Administrasi) - page 60 of 2419
NO.
URAIAN PEKERJAAN
B.
4.5.
LANTAI - 1
1 Instalasi
Spliter 4 way
Socket TV ( RCA )
Titik instalasi, coaxial cable dalam condui
4.6.
Socket TV ( RCA )
Titik instalasi, coaxial cable dalam condui
LANTAI - 1
1 Instalasi
THB-1 ( HUB Managable 1 X 32 port
Kabel UTP- Cat 5e - 0,6 mm2
SocketData ( RG-45 )
Titik Instalasi Socket Data, UTP - Cat 5e dalam conduit
PEKERJAAN CCTV
A.
PERALATAN UTAMA DAN INSTALASI CCTV
1 Video Wib server Cam Plug
2 Digiplex key Pad
3 PC Computer with Printer
4 Bivar
5 21 " LCD TV Monitor
6 Rack CCTV
B.
GROUND FLOOR
1 Fixed Dome Camera
2 Instalasi Camera
C.
LANTAI - 1
1 Fixed Dome Camera
2 Instalasi Camera
ARA BARAT
TU DAN JENDELA
N LAIN-LAIN
JUMLAH I.
JUMLAH II.
AN ARUS LEMAH
JUMLAH II.
TOTAL PEK. NO
ARA BARAT
SAT
2
VOLUME
3
u T. 10 cm
covering
gan Cover Garda Pintu Lobby D1A
Batu Adesit
m1
m
m
m
427.08
95.27
6.93
169.34
u T. 10 cm
covering
Batu Adesit
m1
m
m
454.708
805.394
204.0499
unit
unit
1
1
unit
TU DAN JENDELA
N LAIN-LAIN
EA DROP OFF
asi Bawah Sirtu Kelas A tbl 20 cm
asi Atas Agregrat Kelas A Tbl 10 cm
p Pengikat
ukaan Aspal
m3
m3
m
m
7.776
3.888
38.88
38.88
SAT
VOLUME
bh
bh
20
6
bh
bh
16
6
n P. 5,30 m
unit
u+aksesories
ndahara P. 2,80 m
unit
Set
Buah
Buah
2
2
5
Set
Buah
Buah
2
2
5
Meter
Ls
8
1
Meter
20
u+aksesories
Schedule 40 :
mm - pipa hydrant
Meter
61.957
Meter
Unit
Buah
Ls
22.1
1
1
1
ameter 50 mm
valve ( AAV )
DITIONING
ted Split Type Cap. 1. 1/2 PK
F.6 (Kap.12000 btu/h)
GF.10 (Kap.12000 btu/h)
NYM 3 x 4 mm
SAT
Buah
Buah
unit
m
m
m
NYM 3 x 4 mm
unit
m
m
m
unit
unit
VOLUME
4
2
15
81
30
5
70
234
75
3
71
224
45
6
46
198
90
1
1
NYM 3 x 4 mm
SAT
m
m
m
VOLUME
26
53
30
unit
unit
unit
unit
Berisolasi
DITIONING
ted Split Type Cap. 1. 1/2 PK
(Kap.12000 btu/h)
11 (Kap.12000 btu/h)
16 (Kap.12000 btu/h)
m
m
m
14
1.8
4.8
bh
bh
6
2
unit
m
NYM 3 x 4 mm
m
m
Mounted Split Type Cap. 2. 1/2 PK
unit
9500 btu/h-IU.1.18 Kap. 12000 btu/h-OU.1.17+18 Kap. 21500 btu/h
9500 btu/h-IU.1.20 Kap. 12000 btu/h-OU.1.19+20 Kap. 21500 btu/h
m
NYM 3 x 4 mm
m
m
unit
65
80
45
2
32
87
30
7
NYM 3 x 4 mm
SAT
m
m
m
unit
VOLUME
m
NYM 3 x 4 mm
m
m
pact Cassete Type Cap. 6 PK
unit
25000 btu/h-IU.1.13B Kap. 25000 btu/h-OU.1.13A+13B Kap. 50000 btu/h
m
NYM 3 x 2.5 mm
m
NYM 3 x 4 mm
m
m
pact Cassete Type Cap. 10 PK
unit
37700 btu/h-IU.1.13 Kap. 37700 btu/h-OU.1.12+13 Kap. 75400 btu/h
37700 btu/h-IU.1.13 Kap. 37700 btu/h-OU.1.14+15 Kap. 75400 btu/h
m
NYM 3 x 4 mm
m
m
Cassete Type Cap. 3 PK
unit
10 (Kap.25000 btu/h)
21 (Kap.25000 btu/h)
m
NYM 3 x 4 mm
m
m
92
290
105
2
24.7
56
30
1
14.5
14.5
30
15
2
54.5
81
30
2
18
99
30
unit
unit
unit
unit
unit
Berisolasi
m
m
m
15
2
5
bh
SAT
bh
VOLUME
2
AN ARUS LEMAH
N FIXTURE ARMATUR PENERANGAN
Meter
72
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
58
6
5
8
1
1
2
56
12
4
12
6
1
Meter
72
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
46
16
5
1
1
3
43
8
12
6
1
g & Commisioning
SAT
Unit
Unit
Lot
GF ( 30 Pairs )
Telephone ( RJ-11 )
stalasi Telephone, ITC 2 x 2 x 0,6 mm2
Buah
Buah
Titik
1
23
23
1 ( 20 Pairs )
Telephone ( RJ-11 )
stalasi Telephone, ITC 2 x 2 x 0,6 mm2
Buah
Buah
Titik
1
17
17
Unit
Unit
Unit
Meter
1
1
1
15
Buah
Buah
Buah
Buah
38
3
2
1
Unit
44
Unit
Meter
1
20
Buah
Buah
Buah
Buah
39
3
1
1
asi Detector
Titik
44
0 W Power Amplifier
Unit
20 / 200 Extention
Temperature Detector
Detector
asi Detector
dari MDF ke TB 1
d Shelded 18,2 PAR + NYM 2 x 2,5 mm2
Temperature Detector
Detector
VOLUME
1
1
1
Tunner AM/FM
erve Cassete
VD/MP3 - Playaer
Frame w/ Module
ang Rapat
0 W Power Amplifier
VD/MP3 - Playaer
Microphone
Frame w/ Module
t Rack 19 ( 1,8 M)
SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Meter
Buah
Titik
Unit
Unit
Unit
Set
Unit
Unit
Buah
VOLUME
1
1
1
2
1
1
1
1
1
45
38
38
1
1
1
1
1
1
4
Buah
Meter
Buah
Titik
1
60
41
41
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Meter
1
1
1
1
2
1
1
1
1
1
1
60
Buah
TV ( RCA )
stalasi, coaxial cable dalam condui
SAT
Buah
Titik
TV ( RCA )
stalasi, coaxial cable dalam condui
Buah
Buah
Titik
Set
Unit
Unit
Meter
Buah
Titik
1
23
96
96
Unit
Meter
Buah
Titik
1
18
32
32
with Printer
VOLUME
10
10
3
10
10
1
1
Set
Unit
Set
Set
Unit
Set
1
1
1
1
1
1
Unit
Titik
1
1
Unit
Titik
1
1
JUMLAH HARGA
6=4X5
481926334.989
17209221.975
29585256.6312
528720813.5952
49598711.5649813
904886874.869333
954485586.434315
154398873.333333
154398873.333333
40674136.8
90670165.3333333
56104645.4266667
22665310.5333333
78102723.46
30688606
318905587.553333
1956510860.91618
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
82900
398210
67932
133110
35404932
37937466.7
470768.76
22540847.4
0
0
82900
398210
133110
JUMLAH 1.1. PEKERJA
37695293.2
320715944.74
27161082.189
481926334.989
3011602.275
5162812.875
3011602.275
5162812.875
0
0
0
9034806.825
0
3011602.275
17209221.975
104040
113220
10098
8044.74
809015.04
440199.36
392610.24
312779.4912
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
450202.5
525937.5
450202.5
525937.5
3344962.5
1767150
JUMLAH 1.3.PEKERJAA
1108800
154000
591066.666666667
313351.573333333
313351.573333333
1375680
253459.066666667
3319600.65330133
1108800
154000
591066.666666667
313351.573333333
798774.592
155862.666666667
9004050
3155625
0
7203240
3155625
0
0
0
3344962.5
0
0
0
1767150
0
29585256.6312
2217600
308000
2955333.33333333
0
19414323.4290133
0
6925069.77066667
1375680
253459.066666667
3319600.65330133
0
0
0
2217600
308000
2955333.33333333
0
2506812.58666667
798774.592
0
0
3117253.33333333
Pek. Gedung A (Administrasi) - page 74 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
177567.866666667
107800
JUMLAH 2.1.PEKERJAAN HYDRA
710271.466666667
215600
49598711.5649813
5528825.72
11057651.44
0
0
2557557.2
823284
3258151.6
0
42980080
0
0
0
0
0
11935266.9333333
2378376
8145379
0
50760996
0
0
0
12105770.7466667
2276736
4887227.4
0
110913528
0
0
0
0
0
0
7843175.41333333
2012472
9774454.8
0
0
24444233
23572670
170503.813333333
10164
108605.053333333
8596016
170503.813333333
10164
108605.053333333
16920332
170503.813333333
10164
108605.053333333
18485588
170503.813333333
10164
108605.053333333
24444233
23572670
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
170503.813333333
10164
108605.053333333
55666.6666666667
588260.266666667
626205.866666667
445096.666666667
1953680.256
1736604.672
1519529.088
945435.26
998084.78
5528825.72
170503.813333333
10164
108605.053333333
8596016
170503.813333333
10164
108605.053333333
24444233
4433099.14666667
538692
3258151.6
0
0
55666.6666666667
0
588260.266666667
0
2504823.46666667
0
890193.333333334
0
0
0
27351523.584
3125888.4096
7293739.6224
0
5672611.56
1996169.56
0
0
0
16586477.16
0
0
0
11082747.8666667
813120
4887227.4
17192032
0
0
5456122.02666667
884268
3258151.6
0
171109631
0
0
0
0
0
0
0
Pek. Gedung A (Administrasi) - page 76 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
170503.813333333
10164
108605.053333333
26560886
170503.813333333
10164
108605.053333333
29216974.6
170503.813333333
6591.2
10164
108605.053333333
23039060
170503.813333333
10164
108605.053333333
18485588
170503.813333333
10164
108605.053333333
55666.6666666667
588260.266666667
626205.866666667
445096.666666667
1169102.58666667
1953680.256
1736604.672
1519529.088
945435.26
15686350.8266667
2947560
11403530.6
53121772
0
0
4211444.18933333
569184
3258151.6
29216974.6
0
2472305.29333333
95572.4
304920
1629075.8
46078120
0
0
9292457.82666667
823284
3258151.6
36971176
0
0
3069068.64
1006236
3258151.6
0
0
55666.6666666667
0
588260.266666667
0
1252411.73333333
0
890193.333333334
0
4676410.34666667
0
0
0
29305203.84
3473209.344
7597645.44
0
5672611.56
Pek. Gedung A (Administrasi) - page 77 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
998084.78
452373.333333333
276475.466666667
521766.666666667
132146.666666667
124445.333333333
117917.066666667
103502.666666667
89519.4666666667
272409.866666667
340169.866666667
516345.866666667
261568.266666667
179578.666666667
68992
452373.333333333
276475.466666667
521766.666666667
132146.666666667
117917.066666667
103502.666666667
89519.4666666667
272409.866666667
516345.866666667
261568.266666667
179578.666666667
68992
JUMLAH 3.1.PEKERJAAN RAK K
1996169.56
0
904886874.869333
32570880
0
0
16035577.0666667
3130600
660733.333333333
995562.666666667
117917.066666667
103502.666666667
179038.933333333
15254952.5333333
4082038.4
2065383.46666667
3138819.2
1077472
68992
0
0
0
32570880
0
0
12717871.4666667
8348266.66666667
660733.333333333
117917.066666667
103502.666666667
268558.4
11713624.2666667
4130766.93333333
3138819.2
1077472
68992
154398873.333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
10875920
389840
563288
56133.3333333333
201415.5
498793.386666667
780600
201415.5
498793.386666667
JUMLAH 4.1.PEKERJAAN TELEP
62898800
169400
240240
87472
10875920
389840
563288
0
56133.3333333333
4632556.5
11472247.8933333
0
0
0
780600
3424063.5
8479487.57333333
40674136.8
62898800
169400
240240
1312080
0
2833761.33333333
233882
463551.733333333
1352833.33333333
0
7080045.86666667
0
0
0
1666700
612000
0
2908334
233882
231775.866666667
1352833.33333333
0
7080045.86666667
0
90670165.3333333
9049866.66666667
9049866.66666667
74572.6666666667
77960.6666666667
231775.866666667
1352833.33333333
160910.133333333
1666700
30600
74572.6666666667
77960.6666666667
231775.866666667
1352833.33333333
160910.133333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
742082
948750
609950
815816.833333333
1956441.66666667
2413821.66666667
785400
378840
266112
18849.6
153993.766666667
151320.106666667
3569807.26666667
609950
815816.833333333
706860
2413821.66666667
785400
513744
266112
18849.6
153993.766666667
151320.106666667
JUMLAH 4.3.INSTALASI TATA S
1940666.66666667
882381.866666667
1338406.66666667
403318.666666667
220366.666666667
227069.333333333
274120
2864400
1047200
609950
785400
19712
227069.333333333
742082
948750
609950
1631633.66666667
1956441.66666667
2413821.66666667
785400
0
378840
266112
848232
5851763.13333333
5750164.05333333
0
0
0
3569807.26666667
609950
815816.833333333
706860
2413821.66666667
785400
2054976
0
266112
1130976
6313744.43333333
6204124.37333333
56104645.4266667
1940666.66666667
882381.866666667
1338406.66666667
403318.666666667
440733.333333333
227069.333333333
274120
2864400
1047200
609950
785400
1182720
0
908277.333333333
Pek. Gedung A (Administrasi) - page 80 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
84736.6666666667
369236.266666667
227069.333333333
84736.6666666667
369236.266666667
JUMLAH 4.4.PEKERJAAN MATV
10583166.6666667
229874.7
271885.9
21560
15753.1
498793.386666667
271885.9
21560
15753.1
498793.386666667
JUMLAH 4.5.PEKERJAAN DATA L
10571000
306570
8470220
1219900
1389300
396616
2667500
1500000
2667500
1500000
JUMLAH 4.6.PEKERJAAN CCTV
847366.666666667
3692362.66666667
0
0
0
681208
847366.666666667
3692362.66666667
22665310.5333333
10583166.6666667
229874.7
0
271885.9
495880
1512297.6
47884165.12
0
0
0
271885.9
388080
504099.2
15961388.3733333
78102723.46
10571000
306570
8470220
1219900
1389300
396616
0
0
2667500
1500000
0
0
2667500
1500000
30688606
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN PONDASI KSLL
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pemadatan Tanah CBR 4 + test ( 10 ttk)
4 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=12 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
IAYA
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
TENGGARA BARAT
SAT
2
VOLUME
3
Ls
m
Ls
1
59.66
1
337.8994435612
67.5798887122
BR 4 + test ( 10 ttk)
252.2982511924
67.5798887122
283.385
JUMLAH HARGA
24379600
24379600
16212640.5683625
501548942.25
517761582.818363
542141182.818363
54214118.2818363
596355301.100199
596355000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
7500000
60000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
7500000
3579600
13300000
24379600
10720
3622282.03497615
26180
1769241.48648649
32725
8256460.27027027
37950
JUMLAH 2.1.PEKERJAAN PEMA
2564656.77662957
16212640.5683625
1769850
501548942.25
501548942.25
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
2.2.
PEKERJAAN TANAH
2.3.
PEKERJAAN PONDASI KSLL
2.4.
LANTAI DASAR ( EL. + 0,00 M )
2.5.
LANTAI SATU ( EL. + 4.20 M )
2.6.
LANTAI DUA ( EL. + 8.20 M )
2.7.
LANTAI TIGA ( EL. + 12,20 M )
2.8.
LANTAI EMPAT / ATAP ( EL. + 16,20 M )
2.9.
LANTAI DAK ATAP ( EL. + 20,20 M )
2.10.
ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
IV.
PEKERJAAN MEKANIKAL
4.1.
PEKERJAAN AIR BERSIH
4.2.
PEKERJAAN AIR KOTOR
4.3.
PEKERJAAN AIR HUJAN
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
URAIAN PEKERJAAN
2.4.
2.5.
NO.
URAIAN PEKERJAAN
24 KOLOM TYPE K9
25 BALOK TYPE BR (20x30)
26 BALOK TYPE BT (25x45)
2.6.
2.7.
NO.
URAIAN PEKERJAAN
15 KOLOM TYPE K2 (45x45)
16 KOLOM TYPE K2' (45x45)
17 KOLOM TYPE K5 (25x25)
18 KOLOM TYPE K6
19 KOLOM TYPE K7 (0.20x0.40)
20 KOLOM TYPE K8
21 BALOK TYPE BR (20x30)
22 BALOK TYPE BT (25x45)
2.8.
2.9.
2.10.
ATAP
1 KUDA - KUDA RANGKA BAJA
2 - Besi L 50.50.5
3 - Besi L 40.40.4
4 - Plat Buhul t=12 mm
5 - Base plate 16 mm
6 - Angker Bolt 22mm-400mm
7 - Mur + Baut 22 mm
8 - Mur + Baut 16 mm
9 - Mur + Baut 12 mm
Pek. Gedung C (Guest House dan Diklat) - page 94 of 2419
NO.
URAIAN PEKERJAAN
10 - Gording CNP 200.75.3.2
11 - Trekstang 12 mm
12 - Ikatan angin 12 mm
13 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
14 - Listplank 3/30
15 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1.
PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
B.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
NO.
URAIAN PEKERJAAN
C.
LEVEL-2
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
3.2.
D.
LEVEL-3
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
E.
NO.
URAIAN PEKERJAAN
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai homogenius tile 30 x 30 cm
4 Lantai keramik 20 x 20 cm
5 Step noising keramik 5 x 20 cm
6 Floor hardener
3.3.
B.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
4 Step noising keramik 5 x 20 cm
5 Floor hardener
C.
LEVEL-2
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
4 Lantai keramik 30 x 30 cm
5 Step noising keramik 5 x 20 cm
6 Floor hardener
D.
LEVEL-3
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
4 Lantai keramik 30 x 30 cm
5 Step noising keramik 5 x 20 cm
E.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
Pek. Gedung C (Guest House dan Diklat) - page 97 of 2419
NO.
URAIAN PEKERJAAN
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
6 Curtain Box
3.4.
C.
LEVEL-2
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Expose
5 Curtain Box
D.
LEVEL-3
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Curtain Box
E.
NO.
URAIAN PEKERJAAN
B.
LEVEL-1
PINTU TYPE
1 A (AL-ED uk. 2x900x2150)
2 B (AL-ED uk. 900x2150)
3 B (AL-ED uk. 2x900x2150)
4 C (AL-ED uk. 750x2150) *Plastic Laminate
5 C (AL-ED uk. 900x2150)
6 C (AL-ED uk. 2x900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 900x2150)
9 M (AL-ED uk. 2x900x2150)
JENDELA TYPE
1 BV/2E
2 BV/2EB
3 BV/4E
4 W/2EA
5 W/3
6 W/4
C.
LEVEL-2
PINTU TYPE
1 A (AL-ED uk. 900x2150)
2 C (AL-ED uk. 750x2150) *Plastic Laminate
3 C (AL-ED uk. 900x2150)
4 C (AL-ED uk. 2x900x2150)
5 E (AL-ED/GL-1* uk. 900x2150)
6 M (AL-ED uk. 900x2150)
7 M (AL-ED uk. 2x900x2150)
JENDELA TYPE
1 BV/2E
2 BV/2EA
3 BV/2EB
4 BV/2EC
5 BV/4E
6 W/2EA
D.
LEVEL-3
PINTU TYPE
1 A (AL-ED uk. 900x2150)
2 C (AL-ED uk. 750x2150) *Plastic Laminate
3 C (AL-ED uk. 900x2150)
4 E (AL-ED/GL-1* uk. 900x2150)
5 E (AL-ED/GL-1* uk. 2x900x2150)
JENDELA TYPE
1 BV/2E
2 BV/2EA
Pek. Gedung C (Guest House dan Diklat) - page 99 of 2419
NO.
URAIAN PEKERJAAN
3 BV/2EC
3.5.
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Wastafel gantung lengkap dengan aksesoris
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang kran dinding 1/2"
10 Memasang meja zink satu lubang
11 Meja granite wastafel under counter
12 Hand Dryer
13 Jet washer
14 Tisue holder
15 Soap dish
16 Urinoir
17 Penyekat Urinoir
C.
LEVEL-2
1 Monoblock lengkap dengan aksesoris
2 Wastafel under counter lengkap dengan aksesoris
3 Cove ligth wastafel
4 Kaca cermin
5 Meja beton
6 Floor drain
Pek. Gedung C (Guest House dan Diklat) - page 100 of 2419
NO.
URAIAN PEKERJAAN
7 Memasang kran dinding 1/2"
8 Meja granite wastafel under counter
9 Hand Dryer
10 Jet washer
11 Tisue holder
12 Hand shower lengkap dengan aksesories
13 Bak Shower
14 Towel bar
15 Soap dish
D.
3.6.
LEVEL-3
1 Monoblock lengkap dengan aksesoris
2 Wastafel under counter lengkap dengan aksesoris
3 Cove ligth wastafel
4 Kaca cermin
5 Meja beton
6 Floor drain
7 Memasang kran dinding 1/2"
8 Meja granite wastafel under counter
9 Hand Dryer
10 Jet washer
11 Tisue holder
12 Hand shower lengkap dengan aksesories
13 Bak Shower
14 Towel bar
15 Soap dish
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
7 Pengecatan
8 Pengecatan
B.
LEVEL-1
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
NO.
URAIAN PEKERJAAN
7 Pengecatan plafond dustrproff paint
C.
D.
E.
3.7.
LEVEL-2
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
7 Pengecatan
LEVEL-3
1 Pengecatan
2 Pengecetan
3 Pengecatan
4 Pengecatan
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
B.
LEVEL-1
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
3 Railling Teras Dalam
-Timber Handrail W/.Clear Stained Finished 3"
C.
LEVEL-2
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
Pek. Gedung C (Guest House dan Diklat) - page 102 of 2419
NO.
URAIAN PEKERJAAN
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
3 Railling Teras Dalam
-Timber Handrail W/.Clear Stained Finished 3"
4 Railling Guard
-Black steel pipe 2" W/Synthetic enamel paint finish
C.
IV.
LEVEL-3
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Railling Teras Dalam
-Timber Handrail W/.Clear Stained Finished 3"
3 Railling Guard
-Black steel pipe 2" W/Synthetic enamel paint finish
PEKERJAAN MEKANIKAL
4.1.
PEKERJAAN AIR BERSIH
A.
PEKERJAAN SUMBER AIR DAN PENGOLAHAN AIR BERSIH
1. Sumur dangkal (sellow well) lengkap :
Penawaran pekerjaan termasuk pengadaan dan pemasangan
material di-site, lengkap dan berfungsi dengan baik.
PERALATAN UTAMA
Pekerjaan Sellow Well, meliputi :
- Pengadaan dan pemasangan Pompa Sellow Well
Kapasitas : 60 Ltr/Mnt
Type
: Submersible Pump
Daya
: 220V/380V-3-50Hz
Head
: 50 Meter
Karakter.Listrik
Lengkap Johnson Screen min.2 (dua) unit pada pipa isap,
proteksi, instalasi kabel daya/pemipaan (casing), dll
- Kabel jenis waterproof, lengkap Panel Kontrol, dll
- Pemipaan sampai ke Ground Reservoir
- Peralatan penunjang, Gate Valve, Check Valve, Meter air, Bak
Kontrol, dan accessories lainnya.
- Pengeboran dalam 50m' atau sampai mendapatkan
Kapasitas air 600liter/menit (Jernih dan dapat diminum).
- Pekerjaan harus mengikuti/memenuhi Standard DepKes-RI
2. Meter air PAM
3. Water treatment lengkap c/w panel kontrol dan peralatan bantu :
a.
Sand Filter
b.
Carbon Filter
c.
Chemical tank & dosing pump
Pek. Gedung C (Guest House dan Diklat) - page 103 of 2419
NO.
URAIAN PEKERJAAN
4. Pompa air bersih / Delevry Pump C/W panel kontrol :
a.
PAB1. jenis centrifugal
Kapasitas : 220 Ltr/Mnt
Type
: Centrfugal End Suction
Daya
: 3,1 KW
Head
: 35 Meter
Putaran : 1450 RPM
PAB2. jenis centrifugal
Kapasitas : 220 Ltr/Mnt
b.
Type
: Centrfugal End Suction
Daya
: 3,1 KW
Head
: 35 Meter
Putaran : 1450 RPM
c.
Pompa kuras ground, jenis portable sumersible
5. Peralatan / Accsisories dan valve
a.
Gate valve :
diameter 65 mm
diameter 50 mm
diameter 40 mm
b.
Check valve :
diameter 50 mm
c.
Flexible connection :
diameter 65 mm
diameter 50 mm
d.
Strainer :
diameter 65 mm
e.
Foot valve :
diameter 65 mm
f.
Floating valve diameter 50 mm
g.
Water level Control
h.
Pressure switch
6. Pemipaan Polyprophyline PN 10
a.
PPR diameter 65 mm
b.
PPR diameter 50 mm
7. Pipa header diameter 100 mm
8. Fitting : Tee, Elbow, Reducer, dll ( 20 % x harga pipa )
9. Instalasi daya listrik pompa
10. Panel kontrol pompa & instalasinya
A.
SHAFT
1 AAV
2 Water Hammer
3 Pemipaan Polypropelyne PN.10 :
- Diameter 50 mm
- Peralatan Bantu ( Fitting-Fitting )
NO.
URAIAN PEKERJAAN
B.
GROUND FLOOR
1 Gate Valve :
- Diameter 50 mm
2 Pemipaan Polypropelyne PN.10 :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
4 Peralatan Bantu ( Fitting-Fitting )
C.
LEVEL - 1
1 Gate Valve :
- Diameter 50 mm
2 Pemipaan Polypropelyne PN.10 :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
4 Peralatan Bantu ( Fitting-Fitting )
D.
LEVEL - 2
1 Gate Valve :
- Diameter 50 mm
2 Pemipaan Polypropelyne PN.10 :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
- Peralatan Bantu ( Fitting-Fitting )
E.
LEVEL - 3
1 Gate Valve :
- Diameter 50 mm
2 Pemipaan Polypropelyne PN.10 :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
- Peralatan Bantu ( Fitting-Fitting )
F.
LANTAI - ATAP
1 Tanki air
Roof Tank, kapasitas : 10 M3
Floating valve diameter 40 mm
Foot valve diameter 80 mm
Pek. Gedung C (Guest House dan Diklat) - page 105 of 2419
NO.
URAIAN PEKERJAAN
-
Gate valve
Diameter 80 mm
Diameter 65 mm
Diameter 50 mm
2 Pompa Tekan
Package Booster Pump
kapasitas : 200 Lt/ menit
Flexible joint dia. 50 mm
Strainer dia. 65 mm
Gate valve diameter 50 mm
Gate valve diameter 100 mm
Check valve diameter 50 mm
Header
3 Pemipaan Polypropelyne PN.10 :
Pipa distribusi
diameter 50 mm
Pipa pengisi Roof Tank
diameter 50 mm
4 Peralatan Bantu ( Fitting-Fitting )
4.2.
Packaged Bioseptik
a.
Swage treatment Plant / STP
Kapasitas : 40 M3/hari
Type
: Bioseries System Packaged
Konstruksi STP/ Base Plate : Masuk pekerjaan Sipil
b.
Pemipaan PVC kelas AW 10 Kg/cm2
Pek. Gedung C (Guest House dan Diklat) - page 106 of 2419
NO.
URAIAN PEKERJAAN
diameter 150 mm ke drainese
c.
d.
e.
f.
g.
B.
LANTAI - 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
- Diameter 150 mm
- Diameter 100 mm
- CO diameter 150 mm
- CO diameter 100 mm
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2
- Diameter 100 m
- Diameter 80 mm
- Diameter 65 mm
- Diameter 50 mm
- CO diameter 100 mm
- CO diameter 80 mm
- CO diameter 65 mm
4 Pemipaan vent PVC Kelas 10 kg/cm2
- Diameter 50 mm
- Diameter 25 mm
5 Peralatan Bantu ( Fitting-Fitting )
C.
LANTAI - 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
- Diameter 100 mm
- Diameter 100 mm ( di shaft )
- CO diameter 100 mm
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2
- Diameter 65 mm
- Diameter 65 mm ( di shaft )
- Diameter 25 mm
- CO diameter 65 mm
- Grestrap
3 Pemipaan Air kotor vent PVC Kelas 10 kg/cm2
NO.
URAIAN PEKERJAAN
- Diameter 50 mm
- Diameter 25 mm
4 Peralatan Bantu ( Fitting-Fitting )
D.
LANTAI - 3
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
- Diameter 100 mm
- Diameter 100 mm ( di shaft )
- CO diameter 100 mm
2 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2
- Diameter 65 mm
- Diameter 65 mm ( di shaft )
- Diameter 25 mm
- CO diameter 65 mm
3 Pemipaan Air kotor vent PVC Kelas 10 kg/cm2
- Diameter 50 mm
- Diameter 25 mm
4 Roof Drain :
- Diameter 100 mm
5 Peralatan Bantu ( Fitting-Fitting )
4.3.
V.
NO.
URAIAN PEKERJAAN
B.
LANTAI - 1
1 Panel
2 Kabel
-
C.
1
1
1
1
ke
ke
ke
ke
LP - 1, NYY 4 x 10 mm2
PP - 1, NYY 4 x 25 mm2
PP - AC.1, NYY 4 x 10 mm2
PP - UPS. 1, NYY 4 x 10 mm2
LANTAI - 2
1 Panel Listrik lengkap grounding
SDP - 2
-
LP - 2
PP - 2
PP - AC.2
PP - UPS 2
2 Kabel
D.
LANTAI - 3
1 Panel
-
Feeder
Dari SDP
Dari SDP
Dari SDP
Dari SDP
2
2
2
2
ke
ke
ke
ke
LP - 2, NYY 4 x 10 mm2
PP - 2, NYY 4 x 25 mm2
PP - AC.2, NYY 4 x 10 mm2
PP - UPS. 2, NYY 4 x 10 mm2
2 Kabel Feeder
Dari SDP - 3 ke LP - 3, NYY 4 x 10 mm2
Dari SDP - 3 ke PP - 3, NYY 4 x 25 mm2
Pek. Gedung C (Guest House dan Diklat) - page 109 of 2419
NO.
URAIAN PEKERJAAN
E.
LANTAI - ATAP
1 Panel Listrik lengkap grounding
PP - BP
PP - LF
2 Kabel Feeder
Dari MDP - C ke LF, FRC ( 4 x 16 mm2 )
5.2.
C.
LANATI 1
1 Saklar dan Stop kontak
Saklar tunggal
Saklar ganda
Saklar hotel
Stop Kontak 200 W / 10
Stop Kontak 200 W / 10
Stop Kontak 350 W / 16
Stop Kontak 500 W / 10
2 Titik instalasi
Instalasi penerangan
Instalasi stop kontak
LANTAI - 2
1 Saklar
-
A
A
A
A
NO.
URAIAN PEKERJAAN
Stop Kontak 200 W / 10 A / UPS
Stop Kontak 350 W / 16 A
Stop Kontak 500 W / 16 A
2 Titik instalasi
Instalasi penerangan
Instalasi stop kontak
D.
LANTAI - 3
1 Saklar dan Stop kontak
Saklar tunggal
Saklar ganda
Saklar hotel
Stop Kontak 200 W / 10
Stop Kontak 200 W / 10
Stop Kontak 350 W / 16
Stop Kontak 500 W / 16
2 Titik instalasi
Instalasi penerangan
Instalasi stop kontak
A
A / UPS
A
A
AN DIKLAT)
ARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AN DIKLAT)
ARA BARAT
JUMLAH I.
16,20 M )
JUMLAH II.
DAN JENDELA
JUMLAH III.
JUMLAH IV.
AN DIKLAT)
ARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
228
35
1
228
1
1
m3
m3
m3
m2
m3
1680
336
756
1260
336
m3
m3
m2
m3
m3
m3
697.8
488.46
1384.38
209.34
18.45
9.225
m2
1163
(t=13 cm)
(t=12 cm)
hene Sheet 3000
ngkap kawat ayam
SAT
VOLUME
m3
kg
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
18.45
87.36
5.733
3.4398
7391.744
5.832
32.076
11.664
5.832
2.916
0.45
0.576
0.288
1.44
1.728
1.2
1.8
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
29.64
47.88
32.01
0.9
0.45
0.54
26.55
4.018
0.78
139.425
2.907
24.225
24.225
5.229
3.4398
5.508
30.294
11.016
5.508
0.425
0.544
0.272
1.36
(t=13 cm)
(t=13 cm)
(t=12 cm)
hene Sheet 3000
ngkap kawat ayam
SAT
m3
m3
m3
VOLUME
1.632
1.2
1.8
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
29.64
47.88
29.04
0.9
0.45
0.54
26.55
6.202
10.14
148.408
5.229
3.4398
5.508
30.294
11.016
5.508
0.425
0.544
0.272
1.36
1.632
1.2
1.8
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
27.36
47.19
24.3
0.45
0.54
26.55
6.202
10.14
119.288
26.88
224
224
3.4398
5.508
SAT
m3
m3
m3
m3
m3
m3
m3
m3
VOLUME
30.294
11.016
0.425
0.544
0.272
1.36
0.75
1.125
16,20 M )
(t=13 cm)
A (t=12 cm)
hene Sheet 3000
ngkap kawat ayam
P SA (t=12 cm)
hene Sheet 3000
ngkap kawat ayam
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
13.68
26.4
27
0.45
0.54
3.54375
10.92
9.828
40.32
336
336
5.508
7.128
m3
m3
m3
m3
m3
m2
m2
3.96
3.66
1.3725
0.78
8.784
73.2
73.2
kg
kg
kg
unit
bh
bh
bh
bh
7583.66504
3861.5675
1373.4279048
44
176
132
1280
4076
men Instant.
& Jendela
& Jendela
SAT
kg
bh
bh
VOLUME
5260.1883157895
283.6110526316
32
m3
m3
m1
7.916404671
3.7048810909
203.7
m2
m1
970.326
125.58
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
m1
1756.79
3513.58
3513.58
618.66
1237.32
279
279
196.603
558.198
132.9
42.7
119.54
19.6
19.6
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
m1
2261.88
4523.76
4523.76
608.085
1216.17
292.5
292.5
191.1855
400.384
132.9
75.021
651.12965
51.921
51.921
SAT
& Jendela
& Jendela
& Jendela
VOLUME
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
2544.3555
5088.711
5088.711
651.64
1303.28
373.5
373.5
175.197
499.884
30.9
138.9
310.89
132.6
132.6
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
2209.8485
4419.697
4419.697
590.18
1180.36
351
351
154.264
389.354
81.27
132.6
285.09
132.6
132.6
m2
m2
m2
m1
m1
m1
m1
m1
m1
199.305
398.61
398.61
6.1
12.2
18
18
1.98
14.9
enius tile 60 x 60 cm
enius tile 30 x 60 cm
enius tile 30 x 30 cm
k 20 x 20 cm
eramik 5 x 20 cm
SAT
m2
m2
m2
m2
m1
m2
VOLUME
877.2499
16.47
97.04
22.485
93.2
79.795
enius tile 60 x 60 cm
enius tile 30 x 60 cm
k 20 x 20 cm
eramik 5 x 20 cm
m2
m2
m2
m1
m2
692.0605
16.47
52.3634
93.2
79.795
enius tile 60 x 60 cm
enius tile 30 x 60 cm
k 20 x 20 cm
k 30 x 30 cm
eramik 5 x 20 cm
m2
m2
m2
m2
m1
m2
589.851
16.47
69.6008
415.7625
93.2
79.795
enius tile 60 x 60 cm
enius tile 30 x 60 cm
k 20 x 20 cm
k 30 x 30 cm
eramik 5 x 20 cm
m2
m2
m2
m2
m1
344.3285
38.6625
66.3608
415.7625
129.2
enius tile 60 x 60 cm
m2
m2
24.33
25.5975
m2
m2
m1
m2
m2
m1
917.0991
34.6938
760.85
52.92
41.13
82.535
m2
m2
989.813575
40.0184
SAT
m1
m2
m2
m1
VOLUME
933.421
51.081225
41.13
85.75
m2
m2
m1
m2
m1
957.0135
118.2008
1204.28
41.13
85.75
m2
m2
m1
m1
708.251
118.2008
1012.88
14.2
m2
m1
m2
24.33
20.3
25.5975
DAN JENDELA
2x900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
2x900x2150)
* uk. 2x900x2150)
900x2150)
2x900x2150)
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
1
2
1
4
3
2
3
5
7
unit
unit
unit
unit
unit
unit
unit
6
1
3
3
7
18
3
2x900x2150)
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
2x900x2150)
* uk. 2x900x2150)
900x2150)
2x900x2150)
900x2150)
750x2150) *Plastic Laminate
900x2150)
2x900x2150)
* uk. 900x2150)
900x2150)
2x900x2150)
900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 900x2150)
* uk. 2x900x2150)
SAT
VOLUME
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
12
2
5
2
1
1
1
2
unit
unit
unit
unit
unit
unit
6
1
4
3
3
6
unit
unit
unit
unit
unit
unit
unit
16
18
5
1
16
3
2
unit
unit
unit
unit
unit
unit
6
32
2
4
5
2
unit
unit
unit
unit
unit
16
18
2
16
2
unit
unit
5
32
an dinding 1/2"
eja zink satu lubang
wastafel under counter
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
unit
set
set
set
bh
bh
m
bh
bh
bh
m
bh
set
bh
bh
set
set
set
bh
bh
m
bh
unit
bh
bh
m
bh
set
bh
bh
bh
bh
set
set
bh
bh
m
bh
VOLUME
4
2
3
2
2
4
0.1353
2
2
1
1.353
2
2
2
2
8
8
5
5
10
0.33825
8
6
2
7
3.3825
5
8
8
8
2
2
18
2
2
4
0.1353
18
an dinding 1/2"
wastafel under counter
SAT
bh
m
bh
set
bh
set
bh
bh
bh
VOLUME
18
1.353
2
18
18
16
16
16
18
set
set
bh
bh
m
bh
bh
m
bh
set
bh
set
bh
bh
bh
18
2
2
4
0.1353
18
18
1.353
2
18
18
16
16
16
18
m
m
m'
m
m
m'
m
m
3513.58
117.54
135.17
388.141125
936.3441
760.85
41.13
15.4488
m
m
m'
m
m
m'
4523.76
117.54
135.17
452.376
1029.831975
933.421
an dinding 1/2"
wastafel under counter
SAT
m
VOLUME
m
m
m'
m
m
m'
m
5088.711
117.54
135.17
638.7591
1075.2143
1204.28
41.13
m
m
m
m'
4419.697
571.8577
826.4518
1012.88
m
m
m'
m
m'
398.61
55.695
19.1
49.9275
20.3
Tangga Utama
ail W/.Clear Stained Finished 3"
ailling W/.Black Matt Paint Finished 10 x 40 mm
Tangga Darurat
pe 2" W/Synthetic enamel paint finish
20.3
17.5
Tangga Utama
ail W/.Clear Stained Finished 3"
ailling W/.Black Matt Paint Finished 10 x 40 mm
Tangga Darurat
pe 2" W/Synthetic enamel paint finish
20.3
17.5
88.3
20.3
41.13
Tangga Utama
ail W/.Clear Stained Finished 3"
SAT
VOLUME
17.5
88.3
65.6
20.3
88.3
65.6
Tangga Utama
ail W/.Clear Stained Finished 3"
ailling W/.Black Matt Paint Finished 10 x 40 mm
unit
unit
unit
1
1
ow Well, meliputi :
dan pemasangan Pompa Sellow Well
bmersible Pump
20V/380V-3-50Hz
SAT
VOLUME
unit
unit
buah
buah
buah
2
5
2
buah
buah
buah
2
2
buah
buah
buah
buah
buah
2
2
1
1
20 Ltr/Mnt
ntrfugal End Suction
20 Ltr/Mnt
ntrfugal End Suction
diameter 50 mm
hyline PN 10
ter 100 mm
, Reducer, dll ( 20 % x harga pipa )
meter
meter
buah
Ls
titik
unit
Buah
Buah
25
85
1
1
4
1
1
4
ypropelyne PN.10 :
ntu ( Fitting-Fitting )
Meter
Ls
39.375
1
SAT
Buah
VOLUME
ypropelyne PN.10 :
tu ( Fitting-Fitting )
Meter
Meter
Meter
Ls
Buah
3.2
34.24
46.2
1
ypropelyne PN.10 :
tu ( Fitting-Fitting )
Meter
Meter
Meter
Ls
Buah
5.41
71.6317
146.25
1
ypropelyne PN.10 :
ntu ( Fitting-Fitting )
Meter
Meter
Meter
Ls
Buah
5.43
27.988
210
1
ypropelyne PN.10 :
ntu ( Fitting-Fitting )
ank, kapasitas : 10 M3
g valve diameter 40 mm
alve diameter 80 mm
Meter
Meter
Meter
Ls
Unit
Buah
Buah
5.43
27.988
196
1
1
1
1
SAT
ter 80 mm
ter 65 mm
ter 50 mm
ge Booster Pump
tas : 200 Lt/ menit
e joint dia. 50 mm
er dia. 65 mm
alve diameter 50 mm
alve diameter 100 mm
valve diameter 50 mm
VOLUME
Buah
Buah
Buah
2
2
3
Unit
Buah
Buah
Buah
Buah
Buah
Buah
2
2
2
2
3
1
ypropelyne PN.10 :
er 50 mm
engisi Roof Tank
er 50 mm
tu ( Fitting-Fitting )
Meter
193.33
Meter
Ls
60.56
1
unit
unit
1
2
m
m
m
26.83
26.83
26.3
bh
bh
ls
1
1
1
unit
meter
19.56
SAT
VOLUME
er 150 mm ke drainese
Meter
Buah
8.4
3
Meter
Buah
25.564
3
Meter
Titik
Ls
83.64
1
1
Meter
Meter
Buah
Buah
60.0997
104.19
3
20
Meter
Meter
Meter
Meter
Buah
Buah
Buah
50.825
93.989
8.43
18.12
4
18
2
Meter
Meter
Ls
63
223.2917
1
Meter
Meter
Buah
46.536
34
18
Meter
Meter
Meter
Buah
Buah
46.536
34
9.28
18
1
tu ( Fitting-Fitting )
0 mm ( di shaft )
5 mm ( di shaft )
:
Pek. Gedung C (Guest House dan Diklat) - page 131 of 2419
SAT
Meter
Meter
Ls
tu ( Fitting-Fitting )
46.536
34
18
Meter
Meter
Meter
Buah
46.536
34
9.28
18
Meter
Meter
55.25
197
tu ( Fitting-Fitting )
C Kelas 10 kg/cm2
Meter
Meter
Buah
5 mm ( di shaft )
55.25
243.418
1
0 mm ( di shaft )
VOLUME
Buah
Ls
8
1
ntu ( Fitting-Fitting )
Meter
Ls
Buah
337.194
1
18
engkap grounding
Unit
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
1
Meter
Meter
8
7
SAT
Meter
Meter
VOLUME
5
6
engkap grounding
DP
DP
DP
DP
1
1
1
1
ke
ke
ke
ke
LP - 1, NYY 4 x 10 mm2
PP - 1, NYY 4 x 25 mm2
PP - AC.1, NYY 4 x 10 mm2
PP - UPS. 1, NYY 4 x 10 mm2
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
Meter
Meter
Meter
Meter
8
7
5
6
Unit
Unit
Unit
Unit
Unit
Meter
Meter
Meter
Meter
8
7
5
6
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
Meter
Meter
8
7
engkap grounding
DP
DP
DP
DP
2
2
2
2
ke
ke
ke
ke
LP - 2, NYY 4 x 10 mm2
PP - 2, NYY 4 x 25 mm2
PP - AC.2, NYY 4 x 10 mm2
PP - UPS. 2, NYY 4 x 10 mm2
engkap grounding
DP - 3 ke LP - 3, NYY 4 x 10 mm2
DP - 3 ke PP - 3, NYY 4 x 25 mm2
SAT
Meter
Meter
VOLUME
5
40
engkap grounding
Unit
Unit
1
1
Meter
ontak
ontak
ontak
ontak
200
200
350
500
W
W
W
W
/
/
/
/
10
10
16
10
A
A / UPS
A
A
Buah
Buah
Buah
Buah
Buah
Buah
Buah
asi penerangan
si stop kontak
Titik
Titik
ontak
ontak
ontak
ontak
Buah
Buah
Buah
Buah
Buah
Buah
Buah
200
200
350
500
W
W
W
W
/
/
/
/
10
10
16
10
A
A
A
A
asi penerangan
si stop kontak
Titik
Titik
ontak 200 W / 10 A
Buah
Buah
Buah
Buah
14
18
2
45
28
2
3
205
78
13
15
2
24
28
4
38
172
94
11
41
2
73
SAT
Buah
Buah
Buah
asi penerangan
si stop kontak
Titik
Titik
ontak
ontak
ontak
ontak
Buah
Buah
Buah
Buah
Buah
Buah
Buah
200
200
350
500
W
W
W
W
/
/
/
/
10
10
16
16
asi penerangan
si stop kontak
A
A / UPS
A
A
Titik
Titik
VOLUME
44
2
10
160
129
6
38
2
53
44
2
6
135
105
JUMLAH HARGA
25199924678.1505
3482801050.54014
28682725728.6906
2868272572.86906
31550998301.5597
31550998000
JUMLAH HARGA
106674716
106674716
199602228
101123687.00625
2383335900
1307478325.8472
2933759275.55041
3021990146.07736
2844726975.48906
1338071295.62011
173462228.06448
1076137730.71685
15379687792.3717
2986057990.60318
813210118.453842
668507543.572636
1931132108.15467
305356454.37232
858866268.936494
225911951.1
7789042435.19314
355890130.407907
855364835.872292
165208230.705408
1376463196.98561
325327824.066667
222728713.533333
548056537.6
25199924678.1505
Pek. Gedung C (Guest House dan Diklat) - page 137 of 2419
HARGA SATUAN
(Rp)
JUMLAH HARGA
(Rp)
5 6=4X5
7500000
60000
567212
1000000
163782
14000000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
7500000
13680000
19852420
1000000
37342296
14000000
13300000
106674716
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
18009600
8796480
118811448
41233500
12751200
199602228
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
33529290
9268528.5
45303835.5
2625123.6
3221739
7175170.40625
101123687.00625
2049300
2383335900
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 2.3.PEKERJAAN PONDAS
2683307.06279167
27248.925
6606260.01543842
6773438.4124591
27248.925
16279326.3603621
15884203.8253827
15884203.8253827
15884203.8253827
13611890.1784691
12509750.0064533
8895799.803
11220442.083125
9400272.30065
9850199.25816667
9759822.04511111
8167539.40851852
JUMLAH 2.4.LANTAI DASAR ( EL.
8432611.06637607
8541057.64294445
8791759.36888889
10970597.3510222
9139409.00155555
10252646.4846667
9624911.26438519
9171717.21242857
7382979.37807692
5735842.80429487
6126956.28798611
246240
104940
6606260.01543842
6773438.4124591
14178569.6411232
13783447.1061438
13783447.1061438
13783447.1061438
12509750.0064533
8895799.803
11220442.083125
9400272.30065
2383335900
49507015.3085062
2380466.088
37873688.6685085
23299273.4511768
201417077.8752
94941031.333632
509501721.902976
185273353.419264
92636676.709632
39692271.760416
5629387.502904
5123980.686528
3231487.31994
13536392.112936
17021144.318112
11711786.4541333
14701570.9353333
1307478325.8472
249942592.007387
408945839.94418
281424217.398133
9873537.61592
4112734.0507
5536429.10172
255541394.069427
36851959.759538
5758723.9149
799719882.988812
17811061.9291756
5965164
2542171.5
34544133.6207275
23299273.4511768
78095561.5833067
417555746.63352
151838453.32128
75919226.66064
5316643.75274267
4839315.092832
3051960.24661
12784370.328884
Pek. Gedung C (Guest House dan Diklat) - page 140 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
9850199.25816667
9759822.04511111
8167539.40851852
JUMLAH 2.5.LANTAI SATU ( EL. +
16075525.189328
11711786.4541333
14701570.9353333
2933759275.55041
8432611.06637607
8541057.64294445
8791759.36888889
10970597.3510222
9139409.00155555
10252646.4846667
9624911.26438519
9171717.21242857
7382979.37807692
5735842.80429487
6606260.01543842
6773438.4124591
14178569.6411232
13783447.1061438
13783447.1061438
13783447.1061438
12509750.0064533
8895799.803
11220442.083125
9400272.30065
9850199.25816667
9759822.04511111
8167539.40851852
JUMLAH 2.6.LANTAI DUA ( EL. +
249942592.007387
408945839.94418
255312692.072533
9873537.61592
4112734.0507
5536429.10172
255541394.069427
56882990.151482
74863410.8937
851244958.899793
34544133.6207275
23299273.4511768
78095561.5833067
417555746.63352
151838453.32128
75919226.66064
5316643.75274267
4839315.092832
3051960.24661
12784370.328884
16075525.189328
11711786.4541333
14701570.9353333
3021990146.07736
8541057.64294445
8791759.36888889
10970597.3510222
9139409.00155555
10252646.4846667
9624911.26438519
9171717.21242857
7382979.37807692
5735842.80429487
6126956.28798611
246240
104940
6773438.4124591
11866942.6093149
233683337.11096
414883124.617867
266585515.62984
4112734.0507
5536429.10172
255541394.069427
56882990.151482
74863410.8937
684217216.438727
164692585.021067
55157760
23506560
23299273.4511768
65363119.8921067
Pek. Gedung C (Guest House dan Diklat) - page 141 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11471820.0743355
11471820.0743355
12509750.0064533
8895799.803
11220442.083125
9400272.30065
9759822.04511111
8167539.40851852
JUMLAH 2.7.LANTAI TIGA ( EL.
347527317.33192
126373569.93888
5316643.75274267
4839315.092832
3051960.24661
12784370.328884
7319866.53383333
9188481.83458333
2844726975.48906
8541057.64294445
8791759.36888889
10970597.3510222
9139409.00155555
10252646.4846667
9624911.26438519
7382979.37807692
5735842.80429487
6126956.28798611
246240
104940
11866942.6093149
11471820.0743355
JUMLAH 2.8.LANTAI EMPAT / ATAP
116841668.55548
232102447.338667
296206128.4776
4112734.0507
5536429.10172
34108279.293165
80622134.8086
56371863.08061
247038877.5316
82736640
35259840
65363119.8921067
81771133.4898635
1338071295.62011
8791759.36888889
10970597.3510222
9624911.26438519
7382979.37807692
6126956.28798611
246240
104940
JUMLAH 2.9.LANTAI DAK ATAP (
34815367.1008
40152386.3047413
13210190.7103687
5758723.9149
53819184.03367
18024768
7681608
173462228.06448
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
15840
236553372.537423
120451893.719966
42840631.9508867
21479040
33200640
3041280
29491200
64563840
Pek. Gedung C (Guest House dan Diklat) - page 142 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
31192.48691625
116640
97200
164078355.217274
33080393.1789474
3110400
6048000
5796000
163800
47878415.450208
21473490.8029091
33366060
204522.654285714
183747.96
JUMLAH 2.10.ATAP
198453649.04244
23075068.8168
1076137730.71685
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
163760
92550
145380
248937143
148273076
60082218
13424922
4590457.2
3147120
26756874.329625
19160839.9823761
14747591.16
2658000
758352
19575870.4
1813980
2849448
0
0
320508396
190902672
77356296
13195444.5
4511990.7
3299400
28051561.7971875
18632852.8682196
10578145.28
2658000
1332372.96
106628991.484
4805288.55
7548274.98
0
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
163760
92550
145380
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
163760
92550
145380
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
163760
92550
145380
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
JUMLAH 3.1.PEKERJAAN PASAN
0
360535174.35
214743604.2
87016958.0999999
14140588
4835168.8
4213080
35819686.6025625
17074620.8470489
13206935.28
618000
2466864
50911346.4
12272130
19277388
0
0
313135532.45
186511213.4
75576818.7
12806906
4379135.6
3959280
33661874.156625
15034500.079049
10286732.68
1625400
2354976
46686338.4
12272130
19277388
0
0
28241518.5
16821342
6816231
132370
45262
203040
1726249.95675
192969.9097425
393658
2986057990.60318
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
222896.08
211788.28
180037.55
163466.05
71703.896
38788.2
222896.08
211788.28
163466.05
167877.55
71703.896
195535563.890392
3488152.9716
17470843.852
3675534.13425
6682803.1072
3095104.419
0
0
154257572.57284
3488152.9716
8559638.16257
6682803.1072
3095104.419
0
0
131475475.68408
3488152.9716
11377367.85284
69797189.881875
6682803.1072
3095104.419
0
0
76749472.88228
8188264.3755
10847737.85084
69797189.881875
9264143.3632
222896.08
38788.2
JUMLAH 3.2.PEKERJAAN PASAN
0
5423061.6264
992880.9495
813210118.453842
222896.08
211788.28
163466.05
71703.896
38788.2
222896.08
211788.28
163466.05
167877.55
71703.896
38788.2
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
140831.940857143
140831.940857143
136889.688669643
129156846.211339
4749223.48076686
11872272.966
8280623.1312
1108679.715
11623564.2386443
0
0
139397366.853997
5478106.31705724
Pek. Gedung C (Guest House dan Diklat) - page 145 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
15603.96
156474.36
26955.5
140831.940857143
140831.940857143
136889.688669643
15603.96
26955.5
140831.940857143
140831.940857143
136889.688669643
15603.96
140831.940857143
140831.940857143
15603.96
26955.5
JUMLAH 3.3.PEKERJAAN PASA
17086770.34515
13915596.5289
12099926.5440488
12253497.9982524
5406114.08296034
5774599.26622056
12432894.6291779
13034849.7522551
5778167.90327238
12439913.2852183
1963293.30571
2211555.99346
5958383.4908675
5886399.75369875
8519333.68198
14738564.801455
12312774.4092925
14565063.94716
7992901.989891
1108679.715
12076338.9285
0
0
134778068.631487
16180470.7125027
18791536.9488
1108679.715
12076338.9285
0
0
99744362.9440123
16180470.7125027
15804939.0048
1999813.56017143
0
0
3426441.12105429
316760.388
689993.41125
668507543.572636
17086770.34515
13915596.5289
24199853.0880975
12253497.9982524
21624456.3318414
17323797.7986617
24865789.2583558
39104549.2567652
28890839.5163619
87079392.996528
0
11779759.83426
2211555.99346
17875150.4726025
17659199.2610963
59635335.77386
265294166.42619
36938323.2278775
0
Pek. Gedung C (Guest House dan Diklat) - page 146 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
12099926.5440488
5683385.01374712
12253497.9982524
5406114.08296034
5774599.26622056
12432894.6291779
13034849.7522551
5778167.90327238
12439913.2852183
1963293.30571
2211555.99346
5958383.4908675
2211555.99346
7259769.70924562
8519333.68198
5605301.57748535
5406114.08296034
5774599.26622056
12432894.6291779
6080663.46759816
5778167.90327238
12439913.2852183
1963293.30571
2211555.99346
2211555.99346
2211555.99346
5958383.4908675
5886399.75369875
5605301.57748535
5406114.08296034
5774599.26622056
6080663.46759816
13034849.7522551
1963293.30571
2211555.99346
0
0
12099926.5440488
68200620.1649655
24506995.9965048
27030570.4148017
11549198.5324411
12432894.6291779
13034849.7522551
5778167.90327238
24879826.5704366
0
11779759.83426
2211555.99346
23833533.96347
6634667.98038
21779309.1277369
51116002.09188
0
0
0
89684825.2397657
97310053.4932862
28872996.3311028
12432894.6291779
97290615.4815705
17334503.7098171
24879826.5704366
0
11779759.83426
70769791.79072
4423111.98692
8846223.97384
29791917.4543375
11772799.5073975
0
0
0
89684825.2397657
97310053.4932862
11549198.5324411
97290615.4815705
26069699.5045101
0
9816466.52855
70769791.79072
Pek. Gedung C (Guest House dan Diklat) - page 147 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2211555.99346
JUMLAH 3.4.PEKERJAAN PASAN
8846223.97384
1931132108.15467
2388808.51
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
4777617.02
3049908.444
4168931.976
618149.07
975466.8
530760.129130688
625901.1
383589.07125
553501.04
441757.206
1220747.22
633699.99
145789.875
478190.79
0
0
10377337.696
8133089.184
10422329.94
1545372.675
2438667
1326900.32282672
2503604.4
1606049.0325
383589.07125
3874507.28
1104393.015
3051868.05
2534799.96
583159.5
1912763.16
4120993.8
1868054.265
0
0
10330254
4168931.976
618149.07
975466.8
530760.129130688
5633109.9
1297167.212
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
2060496.9
934027.1325
573903
2084465.988
309074.535
243866.7
3922839.091875
312950.55
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
191794.535625
326502
610373.61
316849.995
72894.9375
702707.1975
1297167.212
681324.6825
239095.395
4228646.75947787
2084465.988
309074.535
243866.7
3922839.091875
312950.55
191794.535625
326502
610373.61
316849.995
72894.9375
702707.1975
1297167.212
681324.6825
239095.395
JUMLAH 3.5.PEKERJAAN PASAN
32850.26245
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
38430.833375
43611.881555
32850.26245
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
3452301.64125
441757.206
1220747.22
5703299.91
1312108.875
11243315.16
20754675.392
10901194.92
4303717.11
0
0
76115641.6706016
4168931.976
618149.07
975466.8
530760.129130688
5633109.9
3452301.64125
441757.206
1220747.22
5703299.91
1312108.875
11243315.16
20754675.392
10901194.92
4303717.11
305356454.37232
115422025.139071
4517160.1548975
736459.975738987
16622174.3626216
34571782.2501002
2607834.19692833
1580660.17671375
673751.235766884
0
0
148606703.260812
4517160.1548975
736459.975738987
19373037.9625847
38023550.096477
3199326.02212137
Pek. Gedung C (Guest House dan Diklat) - page 149 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
38430.833375
32850.26245
42825.079055
36922.091195
3427.5273666667
1580660.17671375
0
0
167165491.882202
4517160.1548975
736459.975738987
27354908.9546006
39699160.4387681
4127702.65712933
1580660.17671375
0
0
145188206.399478
24489851.2107105
30514328.7278719
3471673.91914933
32850.26245
38430.833375
5448.39813375
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
0
13094443.1151945
2140405.26482062
104064.404354625
1843427.70813836
69578.8055433333
858866268.936494
32850.26245
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
38430.833375
573903
399712.5
573903
399712.5
399712.5
573903
11650230.9
0
0
6994968.75
0
0
0
11650230.9
0
0
6994968.75
0
35294613.75
0
0
0
11650230.9
0
Pek. Gedung C (Guest House dan Diklat) - page 150 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
399712.5
399712.5
399712.5
573903
399712.5
399712.5
JUMLAH 3.7.PEKERJAA
0
6994968.75
0
35294613.75
0
26221140
0
0
11650230.9
0
0
35294613.75
0
26221140
0
225911951.1
574000
81312000
574000
81312000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
37252710
37252710
37252710
37252710
3428945.696
3428945.696
152496.666666667
143687.866666667
100980.733333333
304993.333333333
718439.333333333
201961.466666667
342550.56
685101.12
356780.16
339704.64
713560.32
679409.28
351088.32
702176.64
532515.72
520420.56
703270.92
204000
1065031.44
1040841.12
703270.92
204000
265892.273888889
169130.993888889
790816.479444444
4659000
437322.233333333
6500000
6647306.84722222
14376134.4805556
790816.479444444
4659000
1749288.93333333
6500000
107800
223608
107800
894432
169130.993888889
2330836.50953125
6659532.884375
2330836.50953125
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
143687.866666667
143687.866666667
110129.34
45554.74
37503.95
1275711.73646
352413.888
1559794.2976
1732682.49
1275711.73646
143687.866666667
431063.6
110129.34
45554.74
37503.95
3270370.5601553
595799.7294
3263163.469258
5484952.6875
3270370.5601553
143687.866666667
718439.333333333
110129.34
45554.74
37503.95
3412086.257762
598002.3162
1274986.06312
7875829.5
3412086.257762
143687.866666667
718439.333333333
110129.34
45554.74
37503.95
3228316.902762
598002.3162
1274986.06312
7350774.2
3228316.902762
31519176
442869.24
532515.72
31519176
442869.24
532515.72
Pek. Gedung C (Guest House dan Diklat) - page 153 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
178245.466666667
152496.666666667
143687.866666667
356490.933333333
304993.333333333
431063.6
1957366.224
3914732.448
339704.64
351088.32
143687.866666667
268366.266666667
342550.56
471240
679409.28
702176.64
287375.733333333
536732.533333333
1027651.68
471240
169130.993888889
32698095.0485389
169130.993888889
15029233.8134575
10242572.9899111
15029233.8134575
355890130.407907
650000
5274895.824
650000
10549791.648
399700.693333333
171508.450666667
104649.38
10723969.6021333
4601571.73138667
2752278.694
0
362527
287991
5855522.335104
0
0
619780000
0
0
0
7818145.5616
362527
287991
5855522.335104
619780000
399700.693333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
171508.450666667
287991
0
1440670.9856
863973
67381.1013333333
135531
0
1722530.47448533
406593
55231.7333333333
281808
886753.492017067
0
4619582.176
281808
886753.492017067
399700.693333333
171508.450666667
362527
287991
24021891.7591253
17869465.47496
1087581
5759820
171508.450666667
104649.38
67381.1013333333
55231.7333333333
287991
227007
135531
8716917.00513333
9835890.57682
568022.68424
1000799.008
1151964
4086126
271062
55231.7333333333
26492.95
13585728.4703587
3479599.2
5915655.843515
13585728.4703587
171508.450666667
171508.450666667
287991
7981317.260224
5831287.32266666
5183838
67381.1013333333
67381.1013333333
26492.95
135531
750000
3135646.931648
2290957.44533333
245854.576
2439558
750000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
55231.7333333333
26492.95
5186784.8877944
3051553.26666667
6448860.9031
5186784.8877944
171508.450666667
171508.450666667
287991
7981317.260224
5831287.32266666
5183838
67381.1013333333
67381.1013333333
26492.95
135531
3135646.931648
2290957.44533333
245854.576
2439558
55231.7333333333
26492.95
3051553.26666667
5219111.15
193123.333333333
4940834.9371744
1544986.66666667
4940834.9371744
855364835.872292
399700.693333333
26955335.117568
134776675.58784
26955335.117568
193123.333333333
JUMLAH 4.3.PEKERJAAN AIR HU
3476220
165208230.705408
26677024
19407775.2
11504587.6
11606227.6
12729160.4
11127164.4
26677024
19407775.2
11504587.6
11606227.6
12729160.4
11127164.4
0
0
222282.133333333
853827.333333333
27785.2666666667
121975.333333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
121975.333333333
27785.2666666667
19831614
11346029.2
11587254.8
12729160.4
11127164.4
42014.8666666667
94871.3333333333
42014.8666666667
42014.8666666667
19831614
11346029.2
11587254.8
12338185.2
11127164.4
42014.8666666667
94871.3333333333
42014.8666666667
42014.8666666667
20115189.6
11346029.2
11587254.8
12338185.2
11127164.4
42014.8666666667
94871.3333333333
609876.666666667
166711.6
0
0
0
19831614
11346029.2
11587254.8
12729160.4
11127164.4
0
0
336118.933333333
664099.333333333
210074.333333333
252089.2
0
0
0
19831614
0
11346029.2
0
11587254.8
0
12338185.2
0
11127164.4
0
0
336118.933333333
664099.333333333
210074.333333333
252089.2
0
0
0
20115189.6
11346029.2
11587254.8
12338185.2
11127164.4
0
0
336118.933333333
664099.333333333
Pek. Gedung C (Guest House dan Diklat) - page 157 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
42014.8666666667
42014.8666666667
11371100.4
13539081.6
66412.1333333333
JUMLAH 5.1.PEKERJAAN PANEL
29147.8
31858.2
41344.6
36081.1
37436.3
37436.3
171601.1
170766.133333333
197562.133333333
29147.8
31858.2
41344.6
36081.1
37436.3
37436.3
171601.1
170766.133333333
197562.133333333
29147.8
31858.2
41344.6
36081.1
210074.333333333
1680594.66666667
0
0
0
11371100.4
13539081.6
0
0
332060.666666667
0
325327824.066667
408069.2
573447.6
82689.2
1623649.5
1048216.4
74872.6
514803.3
0
35007057.3333333
15409846.4
0
0
0
378921.4
477873
82689.2
865946.4
1048216.4
149745.2
6520841.8
0
29371774.9333333
18570840.5333333
0
0
0
320625.8
1306186.2
82689.2
2633920.3
Pek. Gedung C (Guest House dan Diklat) - page 158 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
37436.3
37436.3
171601.1
170766.133333333
197562.133333333
29147.8
31858.2
41344.6
36081.1
37436.3
37436.3
171601.1
170766.133333333
197562.133333333
JUMLAH 5.2.PEKERJAAN TITIK
1647197.2
74872.6
1716011
0
27322581.3333333
25485515.2
0
0
0
174886.8
1210611.6
82689.2
1912298.3
1647197.2
74872.6
1029606.6
0
23053428
20744024
0
222728713.533333
URAIAN PEKERJAAN
2
II.
III.
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
PEKERJAAN MEKANIKAL
2.1.
2.2.
2.3.
PEKERJAAN ELEVATOR
IV.
PEKERJAAN TELEPHONE
4.2.
4.3.
4.4.
PEKERJAAN MATV
4.5.
4.6.
PEKERJAAN CCTV
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
GROUND FLOOR
LEVEL-1
1 Plint kayu T. 10 cm
2 Vinyl Sheet
3 Curve shape v.s base/ skirting
4 Vinyl Wallcovering
5 Pemasangan Cover Garda Pintu Lift
6 Pemasangan Granite Garda Pintu Lift
C.
LEVEL-2
1 Plint kayu T. 10 cm
2 Pemasangan Cover Garda Pintu Lift
3 Pemasangan Granite Garda Pintu Lift
D.
LEVEL-3
1 Plint kayu T. 10 cm
1.2.
NO.
URAIAN PEKERJAAN
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 2x900x2150)
JENDELA TYPE
1 CW/3E
2 CW/4
3 CW/6
B.
C.
D.
E.
LEVEL-1
PINTU TYPE
1 A (HM uk.
2 A (HM uk.
3 A (HM uk.
4 C (HM uk.
JENDELA TYPE
1 CW/3E
2 CW/4
3 CW/6
LEVEL-2
PINTU TYPE
1 A (HM uk.
2 A (HM uk.
3 A (HM uk.
4 C (HM uk.
JENDELA TYPE
1 CW/3E
2 CW/4
3 CW/6
LEVEL-3
PINTU TYPE
1 A (HM uk.
2 A (HM uk.
3 A (HM uk.
4 C (HM uk.
JENDELA TYPE
1 CW/4
2 CW/6
NO.
II.
URAIAN PEKERJAAN
1.3.
PEKERJAAN FURNITURE DAN LAIN-LAIN
A.
PEKERJAAN JALAN AREA DROP OFF
1 Lapisan Pondasi Bawah Sirtu Kelas A tbl 20 cm
2 Lapisan Pondasi Atas Agregrat Kelas A Tbl 10 cm
3 Lapisan Resap Pengikat
4 Lapisan Permukaan Aspal
B.
C.
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Receptionis P. 8,45 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja R. Administrasi P.2,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT & SPRINKLER
A.
GROUND FLOOR
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve, diameter 65 mm :
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan Hydrant BSP Schedule 40 :
Diameter 65 mm
Pemipaan ke Phillar Hydrant BSP Schedule 40 :
Diameter 100 mm
Peralatan Bantu ( Fitting )
NO.
URAIAN PEKERJAAN
B.
LANTAI - 1
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve diameter 65 mm
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan BSP Schedule 40 :
Diameter 65 mm
Peralatan Bantu ( Fitting-Fitting )
2.2.
C.
LANTAI - 2
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve diameter 65 mm
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan BSP Schedule 40 :
Diameter 65 mm
Peralatan Bantu ( Fitting-Fitting )
D.
LANTAI - 3
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve diameter 65 mm
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan BSP Schedule 40 :
Diameter 65 mm
Peralatan Bantu ( Fitting-Fitting )
E.
MACHINE ROOM
1 Instalasi Hydrant
Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
Control Valve diameter 65 mm
Fire Extinguisher @ 6 kg ( Dry Chemical Multy Purpose )
Pemipaan BSP Schedule 40 :
Diameter 65 mm
Peralatan Bantu ( Fitting-Fitting )
F.
RISER
1 Pemipaan BSP Schedule 40 :
Diameter 100 mm - pipa
2 Gate Valve diameter 50 mm
3 Automatic Air valve ( AAV )
NO.
URAIAN PEKERJAAN
-IU.GF.6-OU.GF.6 (Kap.18000
-IU.GF.7-OU.GF.7 (Kap.18000
-IU.GF.8-OU.GF.8 (Kap.18000
-IU.GF.8-OU.GF.8 (Kap.18000
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
btu/h)
btu/h)
btu/h)
btu/h)
LEVEL-1
1 AC Multi Compact Cassete Type Cap. 6 PK
-IU.1.1 Kap. 25000 btu/h-IU.1.2. Kap. 25000 btu/h-OU.1+2 Kap. 50000 btu
-IU.1.4 Kap. 25000 btu/h-IU.1.15. Kap. 25000 btu/h-OU.14+15 Kap. 50000
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Wall Mounted Split Type Cap. 1. 1/2 PK
-IU.1.3-OU.1.3 (Kap. 12000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
3 AC Wall Mounted Split Type Cap. 2 PK
-IU.1.8-OU.1.8 (Kap.18000 btu/h)
-IU.1.9-OU.1.9 (Kap.18000 btu/h)
-IU.1.10-OU.1.10 (Kap.18000 btu/h)
-IU.1.11-OU.1.11 (Kap.18000 btu/h)
-IU.1.12-OU.1.12 (Kap.18000 btu/h)
Pek. Gedung C (Guest House dan Diklat) - page 165 of 2419
NO.
URAIAN PEKERJAAN
-IU.1.13-OU.1.13 (Kap.18000
-IU.1.14-OU.1.14 (Kap.18000
-IU.1.15-OU.1.15 (Kap.18000
-IU.1.16-OU.1.16 (Kap.18000
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
btu/h)
btu/h)
btu/h)
btu/h)
LEVEL 2
1 AC Wall Mounted Split Type Cap. 1. 1/2 PK
-IU.2.18-OU.2.18 (Kap. 9500 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Wall Mounted Split Type Cap. 2 PK
-IU.2.1-OU.2.1 (Kap.18000 btu/h)
-IU.2.2-OU.2.2 (Kap.18000 btu/h)
-IU.2.3-OU.2.3 (Kap.18000 btu/h)
-IU.2.6-OU.2.6 (Kap.18000 btu/h)
-IU.2.7-OU.2.7 (Kap.18000 btu/h)
-IU.2.9-OU.2.9 (Kap.18000 btu/h)
-IU.2.8-OU.2.8 (Kap.18000 btu/h)
-IU.2.9-OU.2.9 (Kap.18000 btu/h)
-IU.2.10-OU.2.10 (Kap.18000 btu/h)
-IU.2.11-OU.2.11 (Kap.18000 btu/h)
-IU.2.14-OU.2.14 (Kap.18000 btu/h)
-IU.2.15-OU.2.15 (Kap.18000 btu/h)
-IU.2.16-OU.2.16 (Kap.18000 btu/h)
-IU.2.17-OU.2.17 (Kap.18000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
Pek. Gedung C (Guest House dan Diklat) - page 166 of 2419
NO.
URAIAN PEKERJAAN
3 AC Compact Cassete Type Cap. 3 PK
-IU.2.4-OU.2.4 (Kap.25000 btu/h)
-IU.2.5-OU.2.5 (Kap.25000 btu/h)
-IU.2.12-OU.2.12 (Kap.25000 btu/h)
-IU.2.13-OU.2.13 (Kap.25000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
4 PEKERJAAN EXHAUST FAN
a.
Exhaust fan type wall mounted kap. 100 cfm
b.
Exhaust fan type inline fan kap. 100 cfm
5 PEKERJAAN DUCTING
a.
Ducting Tidak Berisolasi
-Ducting uk. 10" x 8"
-Ducting uk. 8" x 8"
-Ducting uk. 8" x 6"
-Ducting uk. 6" x 6"
b.
Pekerjaan Grill
-Exhaust Air Grill (EAG uk. 8" x 8")
-Intake Air Grille ( IAG 12 " x 10 " )
D.
LEVEL 3
1 AC Wall Mounted Split Type Cap. 2 PK
-IU.3.1-OU.3.1 (Kap.18000 btu/h)
-IU.3.2-OU.3.2 (Kap.18000 btu/h)
-IU.3.3-OU.3.3 (Kap.18000 btu/h)
-IU.3.6-OU.3.6 (Kap.18000 btu/h)
-IU.3.7-OU.3.7 (Kap.18000 btu/h)
-IU.3.8-OU.3.8 (Kap.18000 btu/h)
-IU.3.9-OU.3.9 (Kap.18000 btu/h)
-IU.3.10-OU.3.10 (Kap.18000 btu/h)
-IU.3.11-OU.3.11 (Kap.18000 btu/h)
-IU.3.14-OU.3.14 (Kap.18000 btu/h)
-IU.3.15-OU.3.15 (Kap.18000 btu/h)
-IU.3.16-OU.3.16 (Kap.18000 btu/h)
-IU.MS.1-OU.MS.1(Kap.18000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Compact Cassete Type Cap. 3 PK
-IU.3.4-OU.3.4 (Kap.25000 btu/h)
-IU.3.5-OU.3.5 (Kap.25000 btu/h)
Pek. Gedung C (Guest House dan Diklat) - page 167 of 2419
NO.
URAIAN PEKERJAAN
-IU.3.12-OU.3.12 (Kap.25000 btu/h)
-IU.3.13-OU.3.13 (Kap.25000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
PEKERJAAN EXHAUST FAN
a.
Exhaust fan type wall mounted kap. 100 cfm
PEKERJAAN DUCTING
a.
Ducting Tidak Berisolasi
-Ducting uk. 6" x 6"
b.
Pekerjaan Grill
-Exhaust Air Grill (EAG uk. 8" x 8")
2.3.
III.
PEKERJAAN ELEVATOR
1 Passangers Elevator
Kapasitas : 10 orang
Kecepatan 30 Mpm
Lintasan : 4 Lantai
Pemasangan
NO.
URAIAN PEKERJAAN
B.
LANTAI - 1
1 Rak Kabel
Ukuran 40 cm, termasuk sambungan & penunjangya
2 Fixtures lampu lengkap dengan armature
Lampu TL 2 x 36 W / Louvre M6
Lampu TL 2 x 36 W / Louvre M6 + battere
Lampu TL 1 x 36 W / 84 / TKI / di pasang rata plafond
Lampu TL 1 x 36 W / dipasang pada cove
Lampu TL 1 x 18 W / IP-40/Cove wastafel
Lampu Down Light PLC 13 W
Lampu Down Light PLC 13 W + battere
Lampu Down Light PLC 2 x 13 W
Lampu Down Light PLC 2 x 13 W + battere
Lampu Down Light PLC 11 W / Cover glass
Wall Lamp PLC 18W
Lighting Panel
C.
LANTAI - 2
1 Rak Kabel
Ukuran 40 cm, termasuk sambungan & penunjangya
2 Fixtures lampu lengkap dengan armature
Lampu TL 2 x 36 W / Louvre M6
Lampu TL 2 x 36 W / Louvre M6 + battere
Lampu TL 1 x 36 W / 84 / TKI / di pasang rata plafond
Lampu TL 1 x 36 W / Dust Proof
Lampu TL 1 x 36 W / dipasang pada cove
Lampu TL 1 x 18 W / IP-40/Cove wastafel
Lampu Down Light PLC 13 W
Lampu Down Light PLC 13 W + battere
Lampu Down Light PLC 2 x 13 W
Lampu Down Light PLC 2 x 13 W + battere
Lampu Down Light PLC 11 W / Cover glass
Wall Lamp PLC 18W
Lighting Panel
D.
LANTAI - 3
1 Rak Kabel
Ukuran 40 cm, termasuk sambungan & penunjangya
2 Fixtures lampu lengkap dengan armature
Lampu TL 1 x 36 W / 84 / TKI / di pasang rata plafond
Lampu TL 1 x 36 W / dipasang pada cove
Lampu Down Light PLC 13 W
Pek. Gedung C (Guest House dan Diklat) - page 169 of 2419
NO.
URAIAN PEKERJAAN
-
IV.
13 W + battere
2 x 13 W
2 x 13 W + battere
11 W / Cover glass
LANTAI - 1
1 Instalsi
TBT-1 ( 20 Pairs )
Kabel dari CTBT-C ke TBT-1, ITC 20 Pairs ( 2x 0,6 mm2)
Socket Telephone ( RJ-11 )
Titik instalasi Telephone, ITC 2 x 2 x 0,6 mm2
Hand set analog
C.
LANTAI - 2
1 Instalsi
TBT-2 ( 30 Pairs )
Kabel dari CTBT-C ke TBT-2, ITC 30 Pairs ( 2x 0,6 mm2)
Socket Telephone ( RJ-11 )
Titik instalasi Telephone, ITC 2 x 2 x 0,6 mm2
Hand set analog
D.
LANTAI - 3
1 Instalsi
TBT-3 ( 20 Pairs )
Kabel dari CTBT-C ke TBT-3, ITC 20 Pairs ( 2x 0,6 mm2)
Socket Telephone ( RJ-11 )
Titik instalasi Telephone, ITC 2 x 2 x 0,6 mm2
Hand set analog
Pek. Gedung C (Guest House dan Diklat) - page 170 of 2419
NO.
URAIAN PEKERJAAN
4.2.
LANTAI - 1
1 Instalasi
TBF-1
Kabel dari MDF ke TBF-1
Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
ROR
Fixed Temperature Detector
Smoke Detector
Titik instalasi :
- Instalasi Detector
C.
LANTAI - 2
1 Instalasi
TBF- 2
Kabel dari MDF ke TBF-2
Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
ROR
Fixed Temperature Detector
Smoke Detector
Titik instalasi :
- Instalasi Detector
D.
LANTAI - 3
1 Instalasi
TBF- 3
Kabel dari MDF ke TBF-3
Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
ROR
Fixed Temperature Detector
Smoke Detector
Pek. Gedung C (Guest House dan Diklat) - page 171 of 2419
NO.
URAIAN PEKERJAAN
-
4.3.
Titik instalasi :
- Instalasi Detector
LANTAI - 1
1 Instalasi
TBS-1
Klabel dari MDF ke TBS-1, NYMHY 3 (3 x 2,5 mm2 )
Ceiling Speaker 3 Watt
Volume Control
Titik istalasi Speaker, NYMHY 3 x 1,5 mm2 dalam conduit
C.
LANTAI - 2
1 Instalasi
TBS-2
Klabel dari MDF ke TBS-2, NYMHY 3 ( 3x 2,5 mm2 )
Ceiling Speaker 3 Watt
Volume Control
Titik istalasi Speaker, NYMHY 3 x 1,5 mm2 dalam conduit
D.
LANTAI - 3
1 Instalasi
TBS-3
Klabel dari MDF ke TBS-3, NYMHY 3 ( 3x 2,5 mm2 )
Ceiling Speaker 3 Watt
Volume Control
Titik istalasi Speaker, NYMHY 3 x 1,5 mm2 dalam conduit
NO.
URAIAN PEKERJAAN
4.4.
4.5.
PEKERJAAN MATV
A.
LANTAI - 1
1 Sentral MATV (GROUMD FLOOR)
Antena UHF 17 Element lengkap tiang/ dudukan
Antena VHF 22 Element lengkap tiang / dudukan
Satelite Receiver & Modulator
Activ Combiner
Booster sinyal & P.supply
Spliter 4 way
Headend Amplifier ( Booster )
TV Monitor
CD Player
Cabinet Rack 19 ( 1,8 M)
Coaxial Cable
2 Instalasi
Spliter 4 way
Socket TV ( RCA )
Titik instalasi, coaxial cable dalam condui
B.
LANTAI - 1
1 Instalasi
Spliter 4 way
Socket TV ( RCA )
Titik instalasi, coaxial cable dalam condui
C.
LANTAI - 2
1 Instalasi
Spliter 4 way
Socket TV ( RCA )
Titik instalasi, coaxial cable dalam condui
D.
LANTAI - 3
1 Instalasi
Spliter 4 way
Socket TV ( RCA )
Titik instalasi, coaxial cable dalam condui
NO.
URAIAN PEKERJAAN
-
4.6.
B.
LANTAI - 1
1 Instalasi
THB-1 ( HUB Managable 1 X 32 port )
Kabel UTP- Cat 5e - 0,6 mm2
SocketData ( RG-45 )
Titik Instalasi Socket Data, UTP - Cat 5e dalam conduit
C.
LANTAI - 2
1 Instalasi
THB-2 ( HUB Managable 1 x 12 port )
Kabel UTP- Cat 5e - 0,6 mm2
SocketData ( RG-45 )
Titik Instalasi Socket Data, UTP - Cat 5e dalam conduit
PEKERJAAN CCTV
A.
PERALATAN UTAMA DAN INSTALASI CCTV
1 Video Wib server Cam Plug
2 Digiplex key Pad
3 PC Computer with Printer
4 Bivar
5 21 " LCD TV Monitor
6 Rack CCTV
B.
LANTAI - GF
1 Fixed Dome Camer
2 Instalasi Camera
C.
LANTAI - 1
1 Fixed Dome Camer
2 Instalasi Camera
D.
LANTAI - 2
1 Fixed Dome Camer
2 Instalasi Camera
E.
LANTAI - 3
1 Fixed Dome Camer
2 Instalasi Camera
A
E DAN DIKLAT)
GGARA BARAT
TU DAN JENDELA
N LAIN-LAIN
JUMLAH I.
JUMLAH II.
JUMLAH II.
TOTAL PEK. NON ST
E DAN DIKLAT)
GGARA BARAT
SAT
2
VOLUME
3
pital Skirting
m1
m1
m
m
m
18.55
18.55
13.9986
2.178036
8.976656
m1
m
m1
m
m
m
64.89
336.4893
257.83
188.2665
2.178036
8.976656
u T. 10 cm
gan Cover Garda Pintu Lift
gan Granite Garda Pintu Lift
m1
m
m
385.65
2.178036
8.976656
u T. 10 cm
m1
385.65
unit
unit
2
3
u T. 10 cm
TU DAN JENDELA
00x1250) SHF-2
00x2150)
00x2150)
SAT
unit
unit
m
m
m
unit
unit
unit
unit
m
m
m
unit
unit
unit
unit
m
m
m
unit
unit
unit
unit
m
m
unit
m
m
VOLUME
3
1
18.06
29.82
23.31
3
2
4
1
25.8
28.4
22.2
3
3
3
1
25.8
28.4
22.2
2
2
3
1
28.4
22.2
1
24.5
19.425
SAT
N LAIN-LAIN
EA DROP OFF
asi Bawah Sirtu Kelas A tbl 20 cm
asi Atas Agregrat Kelas A Tbl 10 cm
p Pengikat
ukaan Aspal
m3
m3
m
m
VOLUME
4.5675
2.28375
22.8375
22.8375
bh
bh
17
2
bh
bh
16
4
bh
bh
24
2
bh
bh
24
2
nis P. 8,45 m
unit
u+aksesories
nistrasi P.2,4 m
unit
Set
Buah
Buah
2
2
6
u+aksesories
Meter
10.6
Meter
Ls
67.1733
1
SAT
Set
Buah
Buah
Set
Buah
Buah
Set
Buah
Buah
Set
Buah
Buah
Schedule 40 :
0 mm - pipa
ameter 50 mm
valve ( AAV )
Meter
Ls
Meter
Ls
Meter
Ls
VOLUME
2
2
6
10.6
1
2
2
6
11.2
1
2
2
5
10.8
1
1
1
1
Meter
Ls
24.93
1
Meter
Buah
Buah
36
2
2
unit
F.6
F.7
F.8
F.8
SAT
(Kap.18000
(Kap.18000
(Kap.18000
(Kap.18000
VOLUME
btu/h)
btu/h)
btu/h)
btu/h)
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
m
m
m
unit
m
m
m
unit
m
m
m
NYM 3 x 4 mm
unit
m
m
m
unit
41
182
60
7
84
263
105
1
8
42
15
54
85
15
1
12
38
15
9
13
14
15
16
SAT
(Kap.18000
(Kap.18000
(Kap.18000
(Kap.18000
btu/h)
btu/h)
btu/h)
btu/h)
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
VOLUME
m
m
m
unit
m
m
m
unit
m
m
m
unit
108
375
135
1
12
45
15
2
48
143
30
m
m
m
12
16
15
unit
14
m
m
m
180
631
210
NYM 3 x 4 mm
SAT
unit
m
m
m
VOLUME
4
48
179
60
XHAUST FAN
st fan type wall mounted kap. 100 cfm
st fan type inline fan kap. 100 cfm
unit
unit
g Tidak Berisolasi
ng uk. 10" x 8"
ng uk. 8" x 8"
ng uk. 8" x 6"
ng uk. 6" x 6"
m
m
m
m
1
2
8
36.53
bh
bh
18
1
unit
13
NYM 3 x 4 mm
m
m
m
unit
16
1
180
631
195
4
SAT
VOLUME
12 (Kap.25000 btu/h)
13 (Kap.25000 btu/h)
NYM 3 x 4 mm
m
m
m
48
179
60
unit
16
24
bh
16
Berisolasi
gers Elevator
Kapasitas : 10 orang
Kecepatan 30 Mpm
Lintasan : 4 Lantai
Pemasangan
Unit
Unit
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
111
33
16
5
16
1
12
1
76
11
18
3
8
5
1
SAT
VOLUME
Meter
99
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
27
15
3
44
2
44
15
2
3
11
5
1
Meter
99
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
4
3
3
2
12
1
68
15
6
19
21
5
1
Meter
99
Buah
Buah
Buah
1
12
25
SAT
Buah
Buah
Buah
Buah
Buah
Buah
Buah
13 W + battere
2 x 13 W
2 x 13 W + battere
11 W / Cover glass
VOLUME
11
4
16
21
8
5
1
15 / 200 Extention
200 Pairs
g & Commisioning
Unit
Unit
Lot
1
1
1
F ( 20 Pairs )
dari CTBT-C ke TBT-GF, ITC 20 Pairs ( 2x 0,6 mm2)
Telephone ( RJ-11 )
stalasi Telephone, ITC 2 x 2 x 0,6 mm2
et analog
Buah
Meter
Buah
Titik
Titik
1
75
14
14
14
20 Pairs )
dari CTBT-C ke TBT-1, ITC 20 Pairs ( 2x 0,6 mm2)
Telephone ( RJ-11 )
stalasi Telephone, ITC 2 x 2 x 0,6 mm2
et analog
Buah
Meter
Buah
Titik
Buah
1
80
14
14
14
30 Pairs )
dari CTBT-C ke TBT-2, ITC 30 Pairs ( 2x 0,6 mm2)
Telephone ( RJ-11 )
stalasi Telephone, ITC 2 x 2 x 0,6 mm2
et analog
Buah
Meter
Buah
Titik
Buah
1
85
21
21
21
20 Pairs )
dari CTBT-C ke TBT-3, ITC 20 Pairs ( 2x 0,6 mm2)
Telephone ( RJ-11 )
stalasi Telephone, ITC 2 x 2 x 0,6 mm2
et analog
Buah
Meter
Buah
Titik
Buah
1
90
16
16
16
Temperature Detector
Detector
asi Detector
Temperature Detector
Detector
asi Detector
Temperature Detector
Detector
asi Detector
Temperature Detector
Detector
SAT
VOLUME
Unit
Unit
Unit
Meter
1
1
1
75
Buah
Buah
Buah
20
2
2
Unit
24
Unit
Meter
1
80
Buah
Buah
Buah
38
1
2
Titik
41
unit
Meter
1
85
Buah
Buah
Buah
38
3
1
Titik
42
unit
Meter
1
90
Buah
Buah
Buah
36
1
1
SAT
VOLUME
asi Detector
Titik
38
0 W Power Amplifier
Tunner AM/FM
VD/MP3 - Playaer
Unit
Unit
Unit
Unit
Unit
Unit
Unit
4
1
1
2
1
1
1
Frame w/ Module
Unit
Unit
Meter
Buah
Bh
Titik
1
1
75
23
3
23
Buah
Meter
Buah
Bh
Titik
1
80
39
4
39
Buah
Meter
Buah
Bh
Titik
1
85
41
4
41
Buah
Meter
Buah
Bh
Titik
1
90
38
4
38
(GROUMD FLOOR)
a UHF 17 Element lengkap tiang/ dudukan
a VHF 22 Element lengkap tiang / dudukan
e Receiver & Modulator
nd Amplifier ( Booster )
t Rack 19 ( 1,8 M)
SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Meter
VOLUME
1
1
7
1
2
2
1
1
1
1
1150
TV ( RCA )
stalasi, coaxial cable dalam condui
Buah
Buah
Titik
2
8
8
TV ( RCA )
stalasi, coaxial cable dalam condui
Buah
Buah
Titik
2
6
6
TV ( RCA )
stalasi, coaxial cable dalam condui
Buah
Buah
Titik
4
16
16
TV ( RCA )
stalasi, coaxial cable dalam condui
Buah
Buah
Titik
4
16
16
Set
Unit
1
1
Unit
SAT
Meter
Buah
Titik
Unit
Meter
Buah
Titik
1
1053
32
32
Unit
Meter
Buah
Titik
1
92
4
4
AN INSTALASI CCTV
ver Cam Plug
with Printer
VOLUME
920
12
12
Set
Unit
Set
Set
Unit
Set
1
1
1
1
2
1
Unit
Titik
2
2
Unit
Titik
2
2
Unit
Titik
1
1
Unit
Titik
1
1
JUMLAH HARGA
6=4X5
294456418.784116
190900539.9675
51236287.44975
536593246.201366
71790269.520992
1122002852.98445
908600000
2102393122.50545
347899710.266667
347899710.266667
67778403.7333333
128006861.2
77012270.2066667
104104366.666667
70265163.76
48747906
495914971.566667
3482801050.54014
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
76590
502950
67932
67932
265410
1420744.5
9329722.5
950952.8952
147958.341552
2382494.26896
0
0
82900
275084.311425
148590
398210
67932
265410
5379381
92562927.3923802
38310959.7
74969602.965
147958.341552
2382494.26896
0
0
82900
67932
265410
31970385
147958.341552
2382494.26896
0
0
82900
JUMLAH 1.1.PEKERJA
31970385
294456418.784116
3011602.275
1714766.625
6023204.55
5144299.875
Pek. Gedung C (Guest House dan Diklat) - page 191 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2964394.125
6921547.875
221314.5
221314.5
221314.5
3011602.275
1714766.625
2964394.125
6921547.875
221314.5
221314.5
221314.5
3011602.275
1714766.625
2964394.125
6921547.875
221314.5
221314.5
221314.5
3011602.275
1714766.625
2964394.125
6921547.875
221314.5
221314.5
6921547.875
221314.5
221314.5
JUMLAH 1.2.PEKERJA
8893182.375
6921547.875
0
3996939.87
6599598.39
5158840.995
0
0
0
9034806.825
3429533.25
11857576.5
6921547.875
0
5709914.1
6285331.8
4913181.9
0
0
0
9034806.825
5144299.875
8893182.375
6921547.875
0
5709914.1
6285331.8
4913181.9
0
0
0
6023204.55
3429533.25
8893182.375
6921547.875
0
6285331.8
4913181.9
0
0
0
6921547.875
0
5422205.25
4299034.1625
190900539.9675
Pek. Gedung C (Guest House dan Diklat) - page 192 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
104040
113220
10098
8044.74
475202.7
258566.175
230613.075
183721.74975
450202.5
525937.5
7653442.5
1051875
0
7203240
2103750
0
10804860
1051875
0
10804860
1051875
0
0
0
5333006.25
0
0
0
3029400
0
450202.5
525937.5
450202.5
525937.5
450202.5
525937.5
5333006.25
1514700
JUMLAH 1.3.PEKERJAA
51236287.44975
1108800
154000
591066.666666667
2217600
308000
3546400
155862.666666667
1652144.26666667
313351.573333333
772414.426666667
21048859.240992
772414.426666667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1108800
154000
591066.666666667
155862.666666667
607200
1108800
154000
591066.666666667
155862.666666667
607200
1108800
154000
591066.666666667
155862.666666667
548093.333333333
1108800
154000
591066.666666667
2217600
308000
3546400
0
1652144.26666667
607200
2217600
308000
3546400
0
1745661.86666667
607200
2217600
308000
2955333.33333333
0
1683316.8
548093.333333333
155862.666666667
185386.666666667
1108800
154000
591066.666666667
0
3885656.28
185386.666666667
313351.573333333
177567.866666667
107800
JUMLAH 2.1.PEKERJAAN HYDRA
0
11280656.64
355135.733333333
215600
71790269.520992
7872440.84
31489763.36
Pek. Gedung C (Guest House dan Diklat) - page 194 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
170503.813333333
10164
108605.053333333
16137704
170503.813333333
10164
108605.053333333
23572670
170503.813333333
10164
108605.053333333
16137704
170503.813333333
10164
108605.053333333
5528825.72
170503.813333333
10164
108605.053333333
7872440.84
0
0
0
0
6990656.34666667
1849848
6516303.2
0
112963928
0
0
0
0
0
0
0
14322320.32
2673132
11403530.6
0
23572670
0
1364030.50666667
426888
1629075.8
0
0
16137704
0
0
9207205.92
863940
1629075.8
0
5528825.72
0
2046045.76
386232
1629075.8
0
70851967.56
0
0
0
0
0
Pek. Gedung C (Guest House dan Diklat) - page 195 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
170503.813333333
10164
108605.053333333
19367823.2
170503.813333333
10164
108605.053333333
24444233
170503.813333333
10164
108605.053333333
3900248
170503.813333333
10164
108605.053333333
7872440.84
170503.813333333
10164
108605.053333333
0
0
0
0
18414411.84
3811500
14661682.2
0
19367823.2
0
2046045.76
457380
1629075.8
0
48888466
0
0
8184183.04
1453452
3258151.6
0
0
3900248
0
2046045.76
162624
1629075.8
0
110214171.76
0
0
0
0
0
0
0
0
0
0
0
0
0
0
30690686.4
6413484
22807061.2
Pek. Gedung C (Guest House dan Diklat) - page 196 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
19367823.2
170503.813333333
10164
108605.053333333
55666.6666666667
494551.786666667
1953680.256
1736604.672
1519529.088
1302453.504
945435.26
1222617.55
7872440.84
170503.813333333
10164
108605.053333333
19367823.2
0
77471292.8
0
0
0
0
8184183.04
1819356
6516303.2
0
0
890666.666666667
494551.786666667
0
0
0
1953680.256
3473209.344
12156232.704
47578626.50112
0
17017834.68
1222617.55
0
0
102341730.92
0
0
0
0
0
0
0
0
0
0
0
0
0
30690686.4
6413484
21177985.4
0
77471292.8
0
0
Pek. Gedung C (Guest House dan Diklat) - page 197 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
0
8184183.04
1819356
6516303.2
0
0
18705641.3866667
0
0
0
31258884.096
0
15126964.16
0
1122002852.98445
434500000
869000000
19800000
JUMLAH 2.3.PEKERJAAN ELEVA
39600000
908600000
326872.883333333
36282890.05
0
0
9123690.4
8348266.66666667
517513.333333333
6045563.73333333
117917.066666667
1284905.6
103502.666666667
20703149.8666667
5694711.73333333
6123057.6
1743383.2
6135360
897893.333333334
68992
170503.813333333
10164
108605.053333333
1169102.58666667
1302453.504
945435.26
276475.466666667
521766.666666667
103502.666666667
377847.733333333
117917.066666667
107075.466666667
103502.666666667
272409.866666667
517701.066666667
340169.866666667
581127.733333333
766920
179578.666666667
68992
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
326872.883333333
276475.466666667
521766.666666667
103502.666666667
107075.466666667
103502.666666667
272409.866666667
517701.066666667
340169.866666667
581127.733333333
516345.866666667
179578.666666667
68992
326872.883333333
276475.466666667
521766.666666667
103502.666666667
117917.066666667
107075.466666667
103502.666666667
272409.866666667
517701.066666667
340169.866666667
581127.733333333
516345.866666667
179578.666666667
68992
326872.883333333
103502.666666667
107075.466666667
272409.866666667
0
0
0
32360415.45
0
0
7464837.6
7826500
310508
4711320.53333333
207005.333333333
11986034.1333333
7765516
680339.733333333
1743383.2
5679804.53333333
897893.333333334
68992
0
0
0
32360415.45
0
0
1105901.86666667
1565300
310508
235834.133333333
1284905.6
103502.666666667
18523870.9333333
7765516
2041019.2
11041426.9333333
10843263.2
897893.333333334
68992
0
0
0
32360415.45
0
0
103502.666666667
1284905.6
6810246.66666667
Pek. Gedung C (Guest House dan Diklat) - page 199 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
517701.066666667
340169.866666667
581127.733333333
516345.866666667
766920
179578.666666667
68992
JUMLAH 3.1.PEKERJAAN RAK K
5694711.73333333
1360679.46666667
9298043.73333333
10843263.2
6135360
897893.333333334
68992
347899710.266667
10875920
740696
1161661.6
10875920
740696
1161661.6
0
215147.166666667
1524875
220543.4
6983107.41333333
3012060.33333333
0
0
0
215147.166666667
1626533.33333333
220543.4
6983107.41333333
3012060.33333333
0
0
0
215147.166666667
1728191.66666667
330815.1
10474661.12
4518090.5
0
0
0
215147.166666667
1829850
252049.6
7980694.18666667
3442354.66666667
215147.166666667
20331.6666666667
15753.1
498793.386666667
215147.166666667
215147.166666667
20331.6666666667
15753.1
498793.386666667
215147.166666667
215147.166666667
20331.6666666667
15753.1
498793.386666667
215147.166666667
215147.166666667
20331.6666666667
15753.1
498793.386666667
215147.166666667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
62898800
169400
240240
87472
74572.6666666667
77960.6666666667
231775.866666667
160910.133333333
240240
87472
74572.6666666667
77960.6666666667
231775.866666667
160910.133333333
240240
87472
74572.6666666667
77960.6666666667
231775.866666667
160910.133333333
240240
87472
74572.6666666667
77960.6666666667
231775.866666667
0
67778403.7333333
62898800
169400
240240
6560400
0
1491453.33333333
155921.333333333
463551.733333333
0
3861843.2
0
0
0
240240
6997760
0
2833761.33333333
77960.6666666667
463551.733333333
0
6597315.46666667
0
0
0
240240
7435120
0
2833761.33333333
233882
231775.866666667
0
6758225.6
0
0
0
240240
7872480
0
2684616
77960.6666666667
231775.866666667
Pek. Gedung C (Guest House dan Diklat) - page 201 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
160910.133333333
3569807.26666667
742082
609950
815816.833333333
1956441.66666667
2413821.66666667
785400
378840
266112
18849.6
153993.766666667
258720
151320.106666667
266112
18849.6
153993.766666667
258720
151320.106666667
266112
18849.6
153993.766666667
258720
151320.106666667
266112
18849.6
153993.766666667
258720
151320.106666667
0
6114585.06666667
0
128006861.2
14279229.0666667
742082
609950
1631633.66666667
1956441.66666667
2413821.66666667
785400
0
378840
266112
1413720
3541856.63333333
776160
3480362.45333333
0
0
0
266112
1507968
6005756.9
1034880
5901484.16
0
0
0
266112
1602216
6313744.43333333
1034880
6204124.37333333
0
0
0
266112
1696464
5851763.13333333
1034880
5750164.05333333
0
Pek. Gedung C (Guest House dan Diklat) - page 202 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 4.3.INSTALASI TATA S
3877866.66666667
3536133.33333333
4855533.33333333
3952733.33333333
2702733.33333333
302866.666666667
4583300
3888900
4520100
5555500
10100
302866.666666667
158333.333333333
253416.666666667
302866.666666667
158333.333333333
253416.666666667
302866.666666667
158333.333333333
253416.666666667
302866.666666667
158333.333333333
253416.666666667
JUMLAH 4.4.PEKERJAAN MATV
77012270.2066667
3877866.66666667
3536133.33333333
33988733.3333333
3952733.33333333
5405466.66666667
605733.333333333
4583300
3888900
4520100
5555500
11615000
0
605733.333333333
1266666.66666667
2027333.33333333
0
0
0
605733.333333333
950000
1520500
0
0
0
1211466.66666667
2533333.33333333
4054666.66666667
0
0
0
1211466.66666667
2533333.33333333
4054666.66666667
0
104104366.666667
Existing
229874.7
271885.9
229874.7
0
271885.9
Pek. Gedung C (Guest House dan Diklat) - page 203 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
21560
15753.1
498793.386666667
271885.9
21560
15753.1
498793.386666667
271885.9
21560
15753.1
498793.386666667
JUMLAH 4.5.PEKERJAAN DATA L
10571000
306570
8470220
1219900
1389300
396616
2667500
1500000
2667500
1500000
2667500
1500000
2667500
1500000
JUMLAH 4.6.PEKERJAAN CCTV
19835200
189037.2
5985520.64
0
0
0
271885.9
22702680
504099.2
15961388.3733333
0
0
0
271885.9
1983520
63012.4
1995173.54666667
0
70265163.76
10571000
306570
8470220
1219900
2778600
396616
0
0
5335000
3000000
0
0
5335000
3000000
0
0
2667500
1500000
0
0
2667500
1500000
0
48747906
Pek. Gedung C (Guest House dan Diklat) - page 204 of 2419
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN WATERPROOFING
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
PEKERJAAN PLAFOND
3.3.
3.4.
PEKERJAAN PENGECATAN
IV.
PEKERJAAN MEKANIKAL/PLUMBING
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR, BEKAS DAN VENT
4.3. PEKERJAAN PIPA TALANG HUJAN (RWP)
V.
PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN INSTALASI LISTRIK
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN WATERPROOFING
Lantai Satu
a.
Water Proofing Sheet
Lantai Dua
a.
III.
3.1.
PEKERJAAAN ARSITEK
PEKERJAAN PASANGAN DINDING BATA, PLESTERAN, BETON PRAKTIS
A.
Lantai Satu
B.
a.
b.
c.
d.
e.
f.
g.
h.
Lantai Dua
a.
b.
NO.
URAIAN PEKERJAAN
C.
3.2.
c.
d.
e.
f.
g.
Beton Balok Latei 15/15
h.
Meja Beton Wastafel + Pantry
Lantai Atap
a.
b.
c.
d.
e.
f.
g.
PEKERJAAN PLAFOND
A.
Lantai Satu
B.
C.
a.
b.
c.
Plafond GRC
List Plafond Gypsum
Lantai Dua
a.
b.
c.
Plafond GRC
List Plafond Gypsum
3.3.
Exposed ( P3 )
B.
a.
b.
Keramik Tile 20 x 20 - CT - 1
c.
d.
Homogeneous 60 x 60 (HT-1)
Lantai Dua
Pek. Gedung F1 (Fasilitas Umum) - page 208 of 2419
NO.
URAIAN PEKERJAAN
C.
3.4.
a.
b.
Keramik Tile 20 x 20 - CT - 1
c.
d.
d.
Homogeneous 60 x 60 (HT-1)
Lantai Atap
a.
Stepnoshing Tangga + Samping (10 x 30) CT - 7
PEKERJAAN PENGECATAN
A.
Lantai Satu
a.
Cat Emulsion Paint (P - 1)
-
e.
Plafond Gypsum
List Plafond
Cat Exterior Weathershield P - 7
-
B.
b.
Dinding Interior
Plafond Gypsum
List Plafond
Cat Exterior Weathershield P - 7
-
Cat Dinding
Lantai Atap
a.
Cat Dust Proof - P - 3
b.
Dinding
Cat Exterior Weathershield P - 7
-
IV.
4.1.
Dinding Interior
Lantai Dua
a.
Cat Emulsion Paint (P - 1)
-
C.
Dinding Interior
Cat Dinding
PEKERJAAN MEKANIKAL/PLUMBING
PEKERJAAN AIR BERSIH
A.
Lantai Satu
a.
Gate Valve :
Pek. Gedung F1 (Fasilitas Umum) - page 209 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 50 mm
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
b.
Pemipaan PolyPropilyn (PPr) Class PN 10 :
- Diameter 50 mm
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
- Diameter 20 mm
- Diameter 15 mm
c.
Matrial Bantu ( Fitting )
B.
Lantai Dua
a.
Gate Valve :
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
b.
Pemipaan PolyPropilyn (PPr) Class PN 10 :
- Diameter 50 mm
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
c.
Matrial Bantu ( Fitting )
C.
NO.
URAIAN PEKERJAAN
- Diameter 25 mm
i.
Automatic Air Vent
j.
Header Diameter 200 mm
k.
Header Diameter 100 mm
l.
Pemipaan Polyprophilyn :
- Diameter 80 mm
- Diameter 50 mm
- Diameter 40 mm
m.
Instalasi Daya Listrik
n.
Matrial Bantu ( Fitting )
4.2.
4.3.
Lantai Dua
a.
Clean Out
b.
Pemipaan PVC, Class AW :
- Diameter 100 mm
- Diameter 80 mm
- Diameter 65 mm
- Diameter 50 mm
- Diameter 40 mm
- Diameter 25 mm
c.
Matrial Bantu ( Fitting )
Roof Drain :
- Diameter 150 mm
Pek. Gedung F1 (Fasilitas Umum) - page 211 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 80 mm
b.
Bak Kontrol
c.
Pemipaan PVC, AW / Class 10 kg/cm2 :
- Diameter 150 mm
- Diameter 80 mm
d.
Matrial Bantu ( Fitting )
V.
5.1.
PEKERJAAN ELEKTRIKAL
PEKERJAAN INSTALASI LISTRIK
A.
Lantai Satu
a.
Panel
- LP-LG.2
- SDP LG2
- PP-LG.2
- PP-AC.LG.2
b.
Kabel
- Dari SDP ke LP-LG.2, NYY 4 x 16 mm2
- Dari SDP ke PP-LG.2, NYY 4 x 16 mm2
- Dari SDP ke PP-AC.LG.2, NYY 4 x 25 mm2
c.
Instalasi Penerangan & Daya
- TL 2 x 36 W,Dust Proof TCW097 236 IC MS
- TL 1 x 36 W,Inbow TMS/136 MARK II IC MS pakai Reflektor
- TL 1 x 36 W,Inbow TMS/136 MARK II IC lengkapi Battery Charge
- TLE Baret 22 W,Opal BCW Sealer IP45
- Down Light PLC 18 W,FBS 1451
- Architectural Strret,FBF203 1xPLC 13 Watt
- Saklar tunggal
- Saklar Ganda
- Saklar Hotel
- Titik Instalasi penerangan dalam konduit
- Instalasi Outlet Daya & stopk kontak 10 A/200 W,1 Phase
- Instalasi Outlet Daya & stopk kontak 10 A/500 W,1 Phase
- Instalasi Outlet Daya & stopk kontak 10 A/1000 W,1 Phase
d.
Rak Kabel 50 cm
e.
Matrial Bantu
B.
Lantai Dua
a.
Panel
- SDP LG1
- LP-LG.1
- PP-AC.LG.1
- PP.LG.1
Pek. Gedung F1 (Fasilitas Umum) - page 212 of 2419
NO.
URAIAN PEKERJAAN
b.
Kabel
- Dari SDP ke LP-LG.1, NYY 4 x 16 mm2
- Dari SDP ke PP-LG.1, NYY 4 x 16 mm2
- Dari SDP ke PP-AC.LG.1, NYY 4 x 25 mm2
c.
Instalasi Penerangan & Daya
- TL 2 x 36 W,M6 louvre TBS369 236 IC MS
- TL 1 x 36 W,Inbow TMS/136 MARK II IC lengkapi Battery Charge
- TL 1 x 36 W,Dust Proof TCW097 236 IC MS
- TLE Baret 22 W,Opal BCW Sealer IP45
- Down Light PLC 18 W,FBS 1451
- Arcitectural Street Lighting FBF203 1xPLC 13 Watt
- Saklar tunggal
- Saklar Ganda
- Saklar Hotel
- Salkar Moudule
- Titik Instalasi penerangan dalam konduit
- Instalasi Outlet Daya & stopk kontak 10 A/200 W,1 Phase
- Instalasi Outlet Daya & stopk kontak 10 A/350 W,1 Phase
- Instalasi Outlet Daya & stopk kontak 10 A/1000 W,1 Phase
d.
Rak Kabel 50 cm
e.
Matrial Bantu
C.
Atap
a.
Panel
- PP-LF.A
- PP-BP.A
- PP-LP. AT
- PP-DW. A
b.
Kabel
- Dari SDP ke PP-LF.A, FRC 4 x 6 mm2
- Dari SDP ke PP-BP, NYY 4 x 6 mm2
- Dari SDP ke PP-DW, NYY 4 x 10 mm2
c.
Instalasi Penerangan & Daya
- TL 1 x 36 W,Inbow TMS/136 MARK II IC MS pakai Reflektor
- TL 1 x 36 W,Inbow TMS/136 MARK II IC lengkapi Battery Charge
- Saklar tunggal
- Saklar Ganda
- Saklar Hotel
- Instalasi Outlet Daya & stopk kontak 10 A/200 W,1 Phase
- Titik Instalasi penerangan dalam konduit
- Instalasi Outlet Daya & stopk kontak 10 A/16A, 1 Phase
- Instalasi Outlet Daya & stopk kontak 10 A/1000 W,1 Phase
d.
Matrial Bantu
AYA
RAWAT JALAN)
ENGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
RAWAT JALAN)
ENGGARA BARAT
JUMLAH I.
JUMLAH II.
JUMLAH III.
JUMLAH V.
TOTAL PEK. STANDA
RAWAT JALAN)
ENGGARA BARAT
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
1
200
60
1
249.85
1
m2
125
m1
125
m2
1430.49
2445.03
2445.03
550.68
216
438.048
43.4893333333
3
0
0
m2
1559.391
m2
1401.897
: 3Ps (Exterior)
m
m'
m'
m'
m'
buah
SAT
: 3Ps (Exterior)
m2
m'
m'
1401.897
554.4
216
m3
9.85608
0.97851
3
0
m2
1367.44875
m2
1854.29625
m2
m'
m'
1854.29625
69.6
557.7
m3
0.8112
m3
2.7378
m2
811.29
m2
m'
230.61
955.92
0
0
m2
792.45
m2
m'
145.2
945.6
0
0
m2
426
m2
531.21
163.05
694.26
520.98
m
buah
: 3Ps (Exterior)
m
CT & HT ( t=3 cm )
VOLUME
m
m
CT & HT ( t=3 cm )
+ Samping (10 x 30) CT - 7
SAT
VOLUME
m2
212.43
m2
174.12
m2
m'
386.55
260.7
m2
m'
551.1
0
0
177.6
m2
2373.78
m
m'
811.29
955.92
0
m2
189.45
0
0
0
m2
1186.44
m
m'
792.45
945.6
0
m2
512.97
0
0
0
m2
533.43
0
m2
649.29375
shield P - 7
shield P - 7
shield P - 7
SAT
Buah
Buah
Buah
Buah
Buah
n (PPr) Class PN 10 :
Meter
Meter
Meter
Meter
Meter
Meter
Ls
Buah
Buah
Buah
Buah
n (PPr) Class PN 10 :
(3 pompa paralel)
m, Head : 20 m
eter 50 mm
Meter
Meter
Meter
Meter
Meter
Ls
Unit
Unit
Unit
Buah
Buah
Buah
Buah
Buah
Buah
Buah
VOLUME
3
3
3
3
30
0
39
15
36
75
18
87
1
0
0
0
3
3
3
30
0
45
30
45
69
84
1
0
0
0
3
0
3
0
3
0
6
0
6
0
3
12
0
6
24
3
SAT
Buah
Buah
Ls
Ls
Meter
Meter
Meter
Titik
Ls
Buah
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Ls
Buah
Meter
Meter
Meter
Meter
Meter
Meter
Ls
Buah
VOLUME
3
3
1
1
0
6
24
48
3
1
5
15
65.74
1
24
22
6
25
1
5
12
6
16
19
6
21
1
SAT
Buah
Buah
VOLUME
5
9
Class 10 kg/cm2 :
Meter
Meter
Ls
Unit
Unit
Unit
Unit
32
90
1
1
1
1
1
, NYY 4 x 16 mm2
, NYY 4 x 16 mm2
G.2, NYY 4 x 25 mm2
Meter
Meter
Meter
22
62
22
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Titik
Titik
Titik
Titik
Meter
Ls
2
3
12
8
19
13
18
8
2
50
11
3
8
56
1
Unit
Unit
Unit
Unit
1
1
1
1
SAT
VOLUME
, NYY 4 x 16 mm2
, NYY 4 x 16 mm2
G.1, NYY 4 x 25 mm2
Meter
Meter
Meter
18
58
19
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Titik
Titik
Titik
Titik
Meter
Ls
10
2
1
10
28
19
19
9
2
5
60
12
2
4
50
1
FRC 4 x 6 mm2
NYY 4 x 6 mm2
NYY 4 x 10 mm2
Unit
Unit
Unit
Unit
1
1
1
1
Meter
Meter
Meter
72
37
37
Buah
Buah
Buah
Buah
Buah
Titik
Titik
Titik
Titik
Ls
2
11
4
2
1
3
13
3
2
1
JUMLAH HARGA
3198145852.49193
1575513830.88318
4773659683.3751
477365968.33751
5251025651.71261
5251026000
JUMLAH HARGA
201283354.5
201283354.5
58866750
58866750
1024779430.08985
318456615.748373
493578956.4237
261583381.347513
2098398383.60944
511052837.5437
32390033.00299
22906098.5358
566348969.08249
273248395.3
273248395.3
3198145852.49193
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
15000000
60000
1418030
1000000
272970
20000000
JUMLAH I. PEKERJAAN PERSIAP
15000000
12000000
85081800
1000000
68201554.5
20000000
201283354.5
0
235467
29433375
0
235467
JUMLAH 2.1. PEKERJAAN WATE
JUMLAH II. PEKERJAAN STRUKT
29433375
58866750
260150104.5
###
141700
202700433
42200
103180266
17100
11280
3710
95902.775375
97459.550375
784567.818375
41810013
6211670.4
801360
42010018.947468
4238450.87277517
2353703.455125
141700
220965704.7
42200
59160053.4
Pek. Gedung F1 (Fasilitas Umum) - page 225 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
17100
11280
3710
23972438.7
6253632
801360
95902.775375
945225.42631803
97459.550375
784567.818375
95365.1446374413
2353703.455125
141700
193767487.875
42200
78251301.75
17100
11280
3710
31708465.875
785088
2069067
95902.775375
77796.3313842
97459.550375
266824.757016675
1024779430.08985
###
140831.940857143
114255545.297991
136889.688669643
15603.96
31568131.1041063
14916137.4432
140831.940857143
111602271.532243
136889.688669643
15603.96
19876382.7948321
14755104.576
26955.5
11483043
318456615.748373
###
167877.55
89178233.3355
163466.05
26653139.4525
40000
27770400
222896.08
116124399.7584
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
167877.55
35662227.9465
163466.05
28462708.626
40000
71703.896
15462000
18693205.6872
222896.08
122838029.688
71703.896
12734611.9296
493578956.4237
###
32850.26245
77979295.998561
36922.091195
3427.5273666667
29954523.3655915
3276441.960344
42825.079055
8113211.22696975
32850.26245
38974865.381178
36922.091195
3427.5273666667
29258911.1674777
3241069.87792
42825.079055
21967980.8028433
38430.833375
20500159.4472262
43611.881555
28316922.1194018
261583381.347513
###
Pek. Gedung F1 (Fasilitas Umum) - page 227 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
274271.91
170435.76
142305.196
97799.3027
55528.9086
101156
42955
29040
20988
20460
19140
2000000
170435.76
142305.196
97799.3027
55528.9086
101156
42955
29040
20988
19140
2000000
90000000
60000000
0
594000
0
214500
0
180180
0
765397.6
96195
0
644479.583
274271.91
97799.3027
822815.73
511307.28
426915.588
293397.9081
1665867.258
0
3945084
644325
1045440
1574100
368280
1665180
2000000
511307.28
426915.588
293397.9081
1665867.258
0
4552020
1288650
1306800
1448172
1607760
2000000
270000000
0
180000000
0
1782000
0
1287000
0
1081080
0
2296192.8
1154340
0
3866877.498
6582525.84
293397.9081
Pek. Gedung F1 (Fasilitas Umum) - page 228 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
55528.9086
694980
1500000
1500000
0
122704.9956
76956
55440
550000
500000
166586.7258
2084940
1500000
1500000
0
736229.9736
1846944
2661120
1650000
500000
511052837.5437
123759.768
0
275158.07
213140.7135
119965.56
71585.657
47508.7327
39235.5084
28992.084
1500000
618798.84
0
4127371.05
14011870.50549
119965.56
1718055.768
1045192.1194
235413.0504
724802.1
1500000
123759.768
0
213140.7135
119965.56
71585.657
47508.7327
39235.5084
28992.084
1500000
618798.84
0
2557688.562
719793.36
1145370.512
902665.9213
235413.0504
608833.764
1500000
32390033.00299
104000.4922
520002.461
Pek. Gedung F1 (Fasilitas Umum) - page 229 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
91900.4922
380028
0
245951.5454
101509.9129
1500000
459502.461
3420252
0
7870449.4528
9135892.161
1500000
22906098.5358
4995540
29172000
3433188
3749988
0
14943
18216
63492
0
756250
230263
1003090
327910
447700
1213300
35695
53966
38720
143939.4
209202.95
227473.95
230982.95
171600
1000000
4995540
29172000
3433188
3749988
0
328746
1129392
1396824
0
1512500
690789
12037080
2623280
8506300
15772900
642510
431728
77440
7196970
2301232.45
682421.85
1847863.6
9609600
1000000
29172000
7458000
5940000
6000000
29172000
7458000
5940000
6000000
Pek. Gedung F1 (Fasilitas Umum) - page 230 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
18216
18216
63492
0
925045
1003090
601370
327910
447700
1213300
35695
53966
38720
127655
143939.4
209202.95
217672.95
230982.95
171600
1000000
0
0
4752000
4620000
1976849
1976849
0
82632
43032
27527.5
0
230263
1003090
35695
53966
38720
209202.95
143939.4
209202.95
230982.95
1000000
0
327888
1056528
1206348
0
9250450
2006180
601370
3279100
12535600
23052700
678205
485694
77440
638275
8636364
2510435.4
435345.9
923931.8
8580000
1000000
4752000
4620000
1976849
1976849
0
5949504
1592184
1018517.5
0
460526
11033990
142780
107932
38720
627608.85
1871212.2
627608.85
461965.9
1000000
273248395.3
URAIAN PEKERJAAN
1
PEKERJAAN SIPIL
1.1 PEKERJAAN WATER PROOFING
II.
III.
IV.
PEKERJAAN ARSITEKTUR
2.1.
2.2.
2.3.
2.4.
2.5.
PEKERJAAN SANITAIR
3.2.
PEKERJAAN SPRINKLER
3.3.
PEKERJAAN ELEKTRIKAL
4.1.
4.2.
4.3.
PEKERJAAN MATV
4.4.
NO.
URAIAN PEKERJAAN
1
II.
2.1.
1.2.
Lantai Dua
1.5.
a.
Watter Proofing Sheet KM/WC
Lantai Atap
a.
b.
PEKERJAAN ARSITEKTUR
PEKERJAAN RAILLING, CRASH RAIL & TRIM
A.
Lantai Satu
a.
Railling Tangga Darurat
Railling Pipa BSP 2"
Hand Railling Pipa BSP 2"
B.
Lantai Dua
a.
Railling Tangga Darurat
Railling Pipa BSP 2"
Hand Railling Pipa BSP 2"
2.2.
2.3.
NO.
URAIAN PEKERJAAN
A.
Lantai Satu
a.
Pekerjaan Plint/Skirting
Hospital Plin (HS-1)
Ceramic Tile Skirting 10 x 20 CT-6
b.
Pekerjaan Pelapisan Dinding
B.
Lantai Dua
a.
Pekerjaan Plint/Skirting
Hospital Plin (HS-1)
Ceramic Tile Skirting 10 x 20 CT-6
b.
Pekerjaan Pelapisan Dinding
-
2.4.
B.
b.
Jendela Aluminium
- Type W 2E
Lantai Dua
a
Pintu Aluminium
- Type B ( MJS ) 2 DAUN ( 2x90x215 )
NO.
URAIAN PEKERJAAN
- Type C ( EQS ) 1 DAUN ( 90x215 )
- Type C ( TOI ) 1 DAUN ( 75x215 )
- Type M ( D2 ) 2 DAUN ( 2x90x280 )
- Type M ( ADO ) 1 DAUN ( 90x215 )
b.
2.5.
PEKERJAAN SANITAIR
A.
Lantai Satu
a.
Water Closet (CW702J/SW784JP)
b.
Wastafel meja (L 521 V1A)
c.
Countertop/meja marble
e.
Paper Holder (S20)
f.
Towel Bar (TX 5W)
g.
Soap Dish (S 11N)
h.
Kaca Cermin
i.
Floor Drain (TX 1B)
j.
Jet Washer
k.
Cover Lampu diatas watafel (tidak termasuk lampu)
l.
Sink
m.
Kran Sink
q.
Spoel Hock
B.
Lantai Dua
a.
Water Closet (CW702J/SW784JP)
b.
Wastafel meja (L 521 V1A)
c.
Countertop/meja marble
e.
Cover Lampu diatas watafel (tidak termasuk lampu)
f.
Paper Holder (S20)
g.
Towel Bar (TX 5W)
h.
Soap Dish (S 11N)
i.
Kaca Cermin
j.
Floor Drain (TX 1B)
k.
Jet Washer
l.
Sink
m.
Kran Sink
p.
Spoel Hock
Pek. Gedung F1 (Fasilitas Umum) - page 235 of 2419
NO.
URAIAN PEKERJAAN
III.
3.1.
3.2.
B.
Lantai Dua
a.
Fire Hose Cabinet Type B
b.
Control Valve Diameter 65 mm
c.
Pemipaan BSP Schedule 40 :
- Diameter 65 mm
e.
Gate Valve :
f.
- Diameter 65 mm
Fire Extinguisher @ 6 kg
f.
Matrial Bantu ( Fitting )
C.
PEKERJAAN SPRINKLER
A.
Lantai Satu
a.
Head Sprinkler
b.
Water Flow Switch
c.
Indicating Valve :
- Diameter 80 mm
e.
Sigt Glass Diameter 50 mm
Pek. Gedung F1 (Fasilitas Umum) - page 236 of 2419
NO.
URAIAN PEKERJAAN
f.
Test Valve Diameter 50 mm
g.
Drain Valve Diameter 50 mm
h.
Plat Orifice :
- Diameter 80 mm
- Diameter 50 mm
i.
Flushing Valve :
- Diameter 40 mm
j.
Pemipaan BSP Schedule 40 :
- Diameter 100 mm
- Diameter 80 mm
- Diameter 65 mm
- Diameter 50 mm
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
k.
Gate Valve :
- Diameter 50 mm
l.
Matrial Bantu ( Fitting )
B.
Lantai Dua
a.
Head Sprinkler
b.
Water Flow Switch
c.
Indicating Valve :
- Diameter 80 mm
e.
Sigt Glass Diameter 50 mm
f.
Test Valve Diameter 50 mm
g.
Drain Valve Diameter 50 mm
h.
Plat Orifice :
- Diameter 80 mm
- Diameter 50 mm
i.
Flushing Valve :
- Diameter 40 mm
j.
Pemipaan BSP Schedule 40 :
- Diameter 100 mm
- Diameter 80 mm
- Diameter 65 mm
- Diameter 50 mm
- Diameter 40 mm
- Diameter 32 mm
- Diameter 25 mm
k.
Gate Valve :
- Diameter 50 mm
l.
Matrial Bantu ( Fitting )
C.
NO.
URAIAN PEKERJAAN
a.
Head Sprinkler
b.
Indicating Valve :
- Diameter 50 mm
c.
Sigt Glass Diameter 50 mm
d.
Test Valve Diameter 50 mm
e.
Drain Valve Diameter 50 mm
f.
Plat Orifice :
- Diameter 50 mm
g.
Flushing Valve :
- Diameter 40 mm
h.
Pemipaan BSP Schedule 40 :
- Diameter 50 mm
- Diameter 40 mm
- Diameter 25 mm
i.
Gate Valve :
- Diameter 50 mm
j.
Automatic Air Vent
k.
Matrial Bantu ( Fitting )
3.3.
NO.
URAIAN PEKERJAAN
h.
Matrial Bantu
B.
Lantai Dua
a.
Indoor Indoor.LG1.C1 + Outdoor LG.C1 Kapasitas :42144 BTUH
Lengkap Pipa Refrigrant.
b.
Exhaust Fan centrifigal In line,EF LG1.1 Kapasitas : 4000 cfm
c.
Exhaust Fan centrifigal In line,EF LG1.2 Kapasitas : 2700 cfm
d.
Exhaust Fan centrifigal In line,EF LG1.3 Kapasitas : 2300 cfm
e.
Instalasi Daya Listrik, beban AC
Instalasi Daya Listrik, beban Exhaust Fan
Ducting Exhaust Tanpa Isolasi :
22" x 18"
16" x 14"
14" x 12"
14" x 10"
12" x 10"
10" x 10"
10" x 8"
8" x 8"
8" x 6"
6" x 4"
f.
Grille Allumunium
G.100 20" x 16"
G.100 24" x 16"
G.100 8" x 8"
g.
Peralatan Bantu
C.
Atap
a.
Indoor Indoor.B.L.Atp + Outdoor B.L.Atp Kapasitas :12.000 BTUH
Lengkap Pipa Refrigrant.
b.
Matrial Bantu
IV.
PEKERJAAN ELEKTRIKAL
4.1.
Lantai Satu
a.
Terminal Box ( 20 ) Pairs
Pek. Gedung F1 (Fasilitas Umum) - page 239 of 2419
NO.
URAIAN PEKERJAAN
b.
Kabel Tuvur Ke Terminal Box, R-V (PE)V 20 Pair
c.
Instalasi Telephone
- Socket Telephone
- Titik Instalasi Outlat telephone
- Pesawat Telephonr Standart
d.
Matrial Bantu
C.
4.2.
Lantai Dua
a.
Terminal Box ( 30 ) Pairs
b.
Kabel Tuvur Ke Terminal Box, R-V (PE)V 30 Pair
c.
Instalasi Telephone
- Socket Telephone
-Titik Instalasi Outlat telephone
- Pesawat Telephonr Standart
d.
Matrial Bantu
Lantai Satu
a.
Terminal Box Fire
b.
Kabel tuvur
c.
ROR
d.
Fixed Temperatur Ditector
e.
Smoke Detector
f.
Manual Station
g.
Audible bell
h.
Visual Alarm
i.
Telephone emergency & instalasi
j.
Exit Lamp
k.
Titik Instalasi Detector & Monitor
C.
Lantai Dua
a.
Terminal Box Fire
b.
Kabel tuvur
c.
ROR
d.
Fixed Temperatur Ditector
Pek. Gedung F1 (Fasilitas Umum) - page 240 of 2419
NO.
URAIAN PEKERJAAN
e.
Smoke Detector
f.
Manual Station
g.
Audible bell
h.
Visual Alarm
i.
Telephone emergency & instalasi
j.
Exit Lamp
k.
Titik Instalasi Detector & Monitor
4.3.
PEKERJAAN MATV
1 Peralatan Utama
- Antena Parabola 16 feet, lengkap dengan dudukan
- Antena UHF & VHF 41 Element, lengkap tiang & kabel
- RF Booster
- Satelite Receiver & Modulator
- Monitor TV 14 "
2
Kabel tuvur, Coaxial Cable RG-58 ke Spliter
3
Testing & commisioning u/ Pekerjaan MATV
4
Instalasi Sistem & Peralatan bantu
5 Lantai Satu
Spliter 1 / 2 conector
- Socket Antena TV
- Titik Instalasi Socket TV, Coaxial Cable
- Material Bantu
6
4.4.
Lantai Dua
Spliter 1 / 2 conector
- Socket Antena TV
- Titik Instalasi Socket TV, Coaxial Cable
- Material Bantu
NO.
URAIAN PEKERJAAN
j.
Instalasi Carcall System
- Power Amplifier 1 x 120 W
- Paging Microphone
- Horn Speaker 15 W
k.
Testing & Commisioning
l.
Peralatan bantu. Wiring, dll
B.
Lantai Satu
a.
Terminal Box ( TB-S.3)
b.
Kabel tuvur, ke Terminal Box
c.
Ceiling Speaker 3 W (khusus paging)
d.
Ceiling Speaker 6 W
f.
Titik instalasi Ceiling Speaker
C.
Lantai Dua
a.
Terminal Box ( TB-S.2)
b.
Kabel tuvur, ke Terminal Box
c.
Ceiling Speaker 3 W (khusus paging)
d.
Ceiling Speaker 6 W
f.
Titik instalasi Ceiling Speaker
A
WAT JALAN)
GGARA BARAT
JUMLAH I.
JUMLAH II.
JUMLAH III.
ND SYSTEM
JUMLAH IV.
TOTAL PEK. NON ST
WAT JALAN)
GGARA BARAT
SAT
2
VOLUME
3
m2
5.58
m2
4.26
m2
305
t Plat Atap
m2
305
m'
14
m'
14
m2
290.76
ed (1:3:5) t.5cm
SAT
VOLUME
Skirting 10 x 20 CT-6
m'
m'
250
158.51
m2
ls
18.415
1
Skirting 10 x 20 CT-6
m'
m'
245
147.27
m2
ls
18.415
1
I ) 1 DAUN ( 75x215 )
unit
YER 2 DAUN
unit
C ) 1 DAUN ( 90x280 )
unit
unit
unit
4
8
unit
unit
unit
unit
unit
5
5
5
6
8
unit
15
unit
2 ) 2 DAUN ( 2x90x280 )
DO ) 1 DAUN ( 90x215 )
) 1 DAUN ( 90x215 ) HM
F-2 ) 2 DAUN ( 2x60x125 ) HM
F ) 1 DAUN ( 60x125 ) HM
L ) 1 DAUN ( 90x215 ) HM
R ) 2 DAUN ( 2x90x215 ) HM
S ) 2 DAUN ( 2x90x215 )
S ) 1 DAUN ( 90x215 )
I ) 1 DAUN ( 75x215 )
SAT
unit
unit
2 ) 2 DAUN ( 2x90x280 )
DO ) 1 DAUN ( 90x215 )
unit
unit
6
3
) 1 DAUN ( 90x215 ) HM
F-2 ) 2 DAUN ( 2x60x125 ) HM
F ) 1 DAUN ( 60x125 ) HM
L ) 2 DAUN ( 2x90x215 ) HM
unit
unit
unit
unit
6
5
3
5
J/SW784JP)
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
12
12
2
10
2
8
12
12
12
10
1
12
2
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
10
2
2
2
10
10
10
2
10
10
1
1
2
J/SW784JP)
VOLUME
4
8
er 65 mm
er 65 mm
er 65 mm
SAT
Buah
Buah
Meter
VOLUME
1
1
22.5
Buah
Buah
Ls
2
2
1
Buah
Buah
1
1
Meter
21
Buah
Buah
Ls
1
2
1
Buah
Buah
1
1
Meter
Buah
Buah
Buah
Ls
1
2
2
1
Buah
Buah
25
1
Buah
Buah
1
1
SAT
Buah
Buah
VOLUME
1
1
Buah
Buah
1
1
Buah
Meter
Meter
Meter
Meter
Meter
Meter
Meter
32
32
32
32
14
78
120
Buah
Ls
1
1
Buah
Buah
30
1
Buah
Buah
Buah
Buah
1
1
1
1
Buah
Buah
1
1
Buah
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Buah
Ls
20
10
8
28
4
16
110
1
1
SAT
Buah
VOLUME
25
Buah
Buah
Buah
Buah
1
1
1
1
Buah
Buah
Meter
Meter
Meter
12
6
45
Buah
Buah
Ls
1
1
1
Unit
Unit
Unit
Titik
1
1
1
5
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Buah
Buah
Buah
Buah
6
6
8
15
3
6
8
6
3.8
4
2
6
2.6
5
9
3
1
9
SAT
Ls
VOLUME
1
Unit
Unit
Unit
Unit
Unit
Meter
1
1
1
8
5
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
10
5
12
3.8
4
2
6
12
2.6
5
Buah
Buah
Buah
Ls
5
1
9
1
Unit
Ls
Unit
Unit
Meter
Ls
Unit
1
1
40
1
telephone
telephone
y & instalasi
r & Monitor
SAT
Meter
Buah
Titik
Buah
Ls
VOLUME
40
5
5
3
1
Unit
Meter
1
38
Buah
Titik
Buah
Ls
4
4
24
1
Unit
Unit
Unit
Meter
Ls
Ls
1
1
1
40
1
1
Unit
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Titik
Buah
Titik
1
68
40
1
1
3
3
3
1
1
19
Unit
Meter
Buah
Buah
1
59
38
2
y & instalasi
r & Monitor
RG-58 ke Spliter
Pekerjaan MATV
Coaxial Cable
Coaxial Cable
SAT
Buah
Buah
Buah
Buah
Titik
Buah
Titik
Unit
Unit
Buah
Buah
Buah
Meter
Ls
Ls
VOLUME
1
2
2
2
2
1
19
1
2
1
7
1
205
1
1
Unit
Buah
Titik
Ls
4
4
1
1
Unit
Buah
Titik
Ls
4
4
2
1
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
2
1
1
1
SAT
Unit
Buah
Buah
Ls
Ls
VOLUME
1
1
5
1
1
khusus paging)
Unit
Meter
Buah
Buah
Titik
1
60
11
4
15
khusus paging)
Unit
Meter
Buah
Buah
Titik
1
55
11
4
15
JUMLAH HARGA
6=4X5
43167500
43167500
11191950
11278057.032
69373983.6
437624580.531579
137429366.167
666897937.330579
31383315.81
75382038.006
87644378.8
194409732.616
237651615.5566
219354960
140430815
73601270.38
671038660.9366
1575513830.88318
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
125000
697500
0
0
125000
532500
0
12500
3812500
125000
38125000
0
43167500
399712.5
399712.5
38788.2
5595975
0
0
0
0
5595975
0
0
11191950
11278057.032
0
0
11278057.032
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
76590
17760
19147500
2815137.6
0
163760
10000000
3015640.4
10000000
0
0
0
18764550
2615515.2
0
76590
17760
163760
10000000
2866099.52
10145184
4342867
5654075.48
2842873.86
4600000
3852500
2027631.57894737
4485000
4485000
4657825
5121240.22
3015640.4
10000000
0
0
69373983.6
20062696.64
0
10145184
0
4342867
0
22616301.92
22742990.88
0
0
23000000
19262500
10138157.8947368
26910000
35880000
0
0
69867375
0
0
0
20484960.88
0
Pek. Gedung F1 (Fasilitas Umum) - page 256 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2854820.24
2866099.52
5654075.48
2842873.86
4600000
3852500
2027631.57894737
4485000
2388808.51
2084465.988
3500000
72894.9375
681324.6825
239095.395
243866.7
312950.55
316849.995
309074.535
553501.04
369157.635
217712.88
2388808.51
2084465.988
3500000
309074.535
72894.9375
681324.6825
239095.395
243866.7
312950.55
316849.995
553501.04
369157.635
217712.88
11419280.96
22928796.16
0
33924452.88
8528621.58
0
0
0
27600000
19262500
6082894.73684211
22425000
0
0
437624580.531579
28665702.12
25013591.856
7000000
728949.375
1362649.365
1912763.16
2926400.4
3755406.6
3802199.94
3090745.35
553501.04
4429891.62
435425.76
0
0
23888085.1
4168931.976
7000000
618149.07
728949.375
6813246.825
2390953.95
487733.4
3129505.5
3168499.95
553501.04
369157.635
435425.76
Pek. Gedung F1 (Fasilitas Umum) - page 257 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2508000
373296
0
137544
0
519901.91
1122000
2128959.36
0
0
137429366.167
2508000
373296
0
3094740
0
1039803.82
2244000
2128959.36
0
0
2508000
373296
0
2888424
0
519901.91
2244000
2128959.36
0
0
2508000
373296
0
550176
0
137544
1389960
2244000
2128959.36
0
31383315.81
27621
1914000
0
574860
2178000
690525
1914000
0
574860
2178000
2508000
373296
137544
519901.91
1122000
2128959.36
2508000
373296
137544
137544
694980
1122000
2128959.36
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
201300
201300
0
231000
165000
0
185930.778
0
218545.2852
186123.96
136007.1504
73369.9956
53131.32
52140
35419.9956
298740.0108
4076677.44
27621
1914000
574860
2178000
201300
201300
231000
165000
185930.778
218545.2852
186123.96
136007.1504
73369.9956
53131.32
52140
35419.9956
298740.0108
4076677.44
201300
201300
0
231000
165000
0
185930.778
0
6993449.1264
5955966.72
4352228.8128
2347839.8592
743838.48
4066920
4250399.472
0
298740.0108
4076677.44
828630
1914000
0
574860
2178000
201300
201300
0
231000
165000
0
185930.778
0
4370905.704
1861239.6
1088057.2032
2054359.8768
212525.28
834240
3896199.516
0
298740.0108
4076677.44
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
27621
450516
2178000
201300
201300
165000
185930.778
73369.9956
53131.32
35419.9956
298740.0108
694980
2756677.44
JUMLAH 3.2.PEKERJAAN SPRINK
551397
3773385
3833280
248028
300000
262207
175000
165000
155000
150000
155000
150000
155001
155001
100914
91718
73326
64130
290400
325000
350000
375000
690525
0
450516
2178000
201300
201300
0
330000
0
185930.778
0
880439.9472
318787.92
1593899.802
0
298740.0108
694980
2756677.44
75382038.006
551397
3773385
3833280
1240140
0
1800000
1573242
1400000
2475000
465000
900000
1240000
900000
589003.8
620004
201828
550308
190647.6
320650
0
2613600
975000
350000
3375000
Pek. Gedung F1 (Fasilitas Umum) - page 260 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5448872
5448872
7876000
15752000
0
3092760
551397
663927
1984224
1240140
0
1750000
825000
1800000
589003.8
620004
201828
650364
1020000
190647.6
320650
0
2000000
450000
2613600
5448872
3092760
551397
663927
248028
248028
175000
165000
150000
155001
155001
100914
108394
85000
73326
64130
400000
450000
290400
5448872
9186804
1306800
JUMLAH 3.3.PEKERJAAN TATA
9186804
0
1306800
0
87644378.8
195000248
11846868.5566
43560
2750000
195000248
11846868.5566
1742400
2750000
592900
592900
Pek. Gedung F1 (Fasilitas Umum) - page 261 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
48840
107800
141636
330000
437393
666468
87912
107800
141636
605000
1566158
1953600
0
539000
708180
990000
437393
666468
3340656
0
431200
566544
14520000
1566158
237651615.5566
157149960
6050000
330000
61776
2200000
2090000
157149960
6050000
330000
2471040
2200000
2090000
592900
61776
264000
264000
660000
528000
528000
143000
1210000
935000
153516
592900
4200768
10560000
264000
660000
1584000
1584000
429000
1210000
935000
2916804
0
0
592900
3644784
10032000
528000
592900
61776
264000
264000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
660000
528000
528000
143000
1210000
935000
153516
660000
1056000
1056000
286000
2420000
935000
2916804
219354960
78000000
1440000
1125000
5400000
1300000
23595
5500000
3300000
78000000
2880000
1125000
37800000
1300000
4836975
5500000
3300000
356070
83160
225000
750000
1424280
332640
225000
750000
356070
83160
225000
750000
1424280
332640
450000
750000
8962370.78
10890000
1985881.04
2420000
6073716
1741131.92
3707924
4187700
6600000
140430815
8962370.78
10890000
1985881.04
2420000
6073716
3482263.84
3707924
4187700
6600000
Pek. Gedung F1 (Fasilitas Umum) - page 263 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2750000
1582847.2
495000
2200000
1650000
0
2750000
1582847.2
2475000
2200000
1650000
220000
51744
121176
132814.44
149754
220000
3104640
1332936
531257.76
2246310
242000
51744
121176
132814.44
149754
242000
2845920
1332936
531257.76
2246310
73601270.38
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 265 of 2419
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI KSLL
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 4.60 M )
2.6. LANTAI DUA ( EL. + 8.80 M )
2.7. LANTAI TIGA ( EL. + 13,00 M )
2.8. LANTAI EMPAT / ATAP ( EL. + 17,20 M )
2.9. ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
IV.
V.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 266 of 2419
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=12 cm (120 kg/m3) K300
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 267 of 2419
NO.
URAIAN PEKERJAAN
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
2.4.
2.5.
2.6.
NO.
URAIAN PEKERJAAN
3 BALOK TYPE B3 (35x55)
4 BALOK TYPE BA (25x45)
5 BALOK TYPE BA1 (20x35)
6 BALOK TYPE BL (20x70)
7 PLAT LANTAI DUA S1 (t=13 cm)
8 TANGGA (4 unit)
9 KOLOM TYPE K1 (55x55)
10 KOLOM TYPE K2 (55x55)
11 KOLOM TYPE K3 (45x45)
12 KOLOM TYPE K4 (45x45)
13 KOLOM TYPE K5
14 KOLOM TYPE K6
15 BALOK TYPE BR (20x30)
16 BALOK TYPE BT (25x45)
2.7.
2.8.
NO.
URAIAN PEKERJAAN
8 - Pasangan screed lengkap kawat ayam
2.9.
ATAP
1 KUDA - KUDA RANGKA BAJA
2 - Besi L 90.90.9
3 - Besi L 80.80.8
4 - Besi L 60.60.6
5 - Besi L 50.50.5
6 - Plat Buhul t=12 mm
7 - Base plate 16 mm
8 - Angker Bolt 22mm-400mm
9 - Mur + Baut 22 mm
10 - Mur + Baut 19 mm
11 - Mur + Baut 16 mm
12 - Gording CNP 200.75.3.2
13 - Trekstang 12 mm
14 - Ikatan angin 12 mm
15 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Talang jurai dalam
16 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
12 Border keramik 5 x 20 cm
13 Border keramik 20 x 40 cm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 270 of 2419
NO.
URAIAN PEKERJAAN
B.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Memasang dinding partisi gypsum board
10 Plint homogenius tile 10 x 60 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
C.
LEVEL-2
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
12 Border keramik 5 x 20 cm
13 Border keramik 20 x 40 cm
D.
LEVEL-3
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
12 Border keramik 5 x 20 cm
13 Border keramik 20 x 40 cm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 271 of 2419
NO.
URAIAN PEKERJAAN
3.2.
3.3.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 20 x 20 cm
3 Step noising keramik 5 x 20 cm
4 Floor hardener
C.
LEVEL-2
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 20 x 20 cm
3 Step noising keramik 5 x 20 cm
4 Floor hardener
D.
LEVEL-3
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 20 x 20 cm
3 Floor hardener
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
C.
LEVEL-2
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 272 of 2419
NO.
URAIAN PEKERJAAN
5 Expose
D.
3.4.
LEVEL-3
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
LEVEL-1
PINTU TYPE
1 D2
2 B (AL-ED uk. 900x2150)
3 B (AL-ED uk. 2x900x2150)
4 C (AL-ED uk. 750x2150) *Plastic Laminate
5 C (AL-ED uk. 900x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 M (AL-ED uk. 900x2150)
8 M (AL-ED uk. 2x900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA TYPE
1 BV/1
2 BV/2
3 BV/3
4 W/3
5 W/4
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 273 of 2419
NO.
URAIAN PEKERJAAN
3.5.
C.
LEVEL-2
PINTU TYPE
1 D2
2 B (AL-ED uk. 900x2150)
3 B (AL-ED uk. 2x900x2150)
4 C (AL-ED uk. 750x2150) *Plastic Laminate
5 C (AL-ED uk. 900x2150)
6 E (AL-ED/GL-1* uk. 2x900x2150)
7 M (AL-ED uk. 900x2150)
8 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA TYPE
1 BV/1
2 BV/2
3 BV/3
4 W/3EA
D.
LEVEL-3
PINTU TYPE
1 D2
2 B (AL-ED uk. 900x2150)
3 B (AL-ED uk. 2x900x2150)
4 C (AL-ED uk. 750x2150) *Plastic Laminate
5 C (AL-ED uk. 900x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 M (AL-ED uk. 900x2150)
8 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA TYPE
1 BV/1
2 BV/2
3 BV/3
4 W/3EA
NO.
URAIAN PEKERJAAN
11 Meja granite wastafel under counter
12 Hand Dryer
13 Jet washer
14 Tisue holder
15 Soap dish
B.
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Wastafel gantung lengkap dengan aksesoris
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang kran dinding 1/2"
10 Memasang meja zink satu lubang
11 Meja granite wastafel under counter
12 Hand Dryer
13 Jet washer
14 Tisue holder
15 Soap dish
C.
LEVEL-2
1 Monoblock lengkap dengan aksesoris
2 Wastafel gantung lengkap dengan aksesoris
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang kran dinding 1/2"
10 Memasang meja zink satu lubang
11 Meja granite wastafel under counter
12 Hand Dryer
13 Jet washer
14 Tisue holder
15 Soap dish
D.
LEVEL-3
1 Monoblock lengkap dengan aksesoris
2 Wastafel gantung lengkap dengan aksesoris
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 275 of 2419
NO.
URAIAN PEKERJAAN
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang kran dinding 1/2"
10 Memasang meja zink satu lubang
11 Meja granite wastafel under counter
12 Hand Dryer
13 Jet washer
14 Tisue holder
15 Soap dish
3.6.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecatan dinding enamel/ Epoxi paint
3 Pengecatan dinding dustrproff paint
4 Pengecatan plint Int Semi Gloss
5 Pengecetan Watershiel (Exterior)
6 Pengecatan plafond emulsion paint
7 Pengecatan list plafond emulsion paint
8 Pengecatan plafond enamel/ Epoxi paint
9 Pengecatan plafond dustrproff paint (Expose)
10 Pengecatan plafond Watershiel (Exterior)
B.
C.
LEVEL-1
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecatan
5 Pengecetan
6 Pengecatan
7 Pengecatan
8 Pengecatan
9 Pengecatan
10 Pengecatan
LEVEL-2
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecatan
5 Pengecetan
6 Pengecatan
7 Pengecatan
8 Pengecatan
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 276 of 2419
NO.
URAIAN PEKERJAAN
9 Pengecatan plafond dustrproff paint (Expose)
10 Pengecatan plafond Watershiel (Exterior)
D.
3.7.
IV.
LEVEL-3
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
7 Pengecatan
8 Pengecatan
9 Pengecatan
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
B.
LEVEL-1
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
C.
LEVEL-2
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
SHAFT
1 AAV
2 Pemipaan Polypropelyne PN.10 :
a.
Diameter 50 mm
b.
Diameter 40 mm
c.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 277 of 2419
NO.
URAIAN PEKERJAAN
B.
GROUND FLOOR
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
c.
GV diameter 25 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 20 mm
e.
PPR diameter 15 mm
C.
LEVEL 1
1 Gate Valve :
a.
GV diameter 50 mm
b.
GV diameter 32 mm
PPR diameter 50 mm
b.
PPR diameter 40 mm
c.
PPR diameter 32 mm
d.
PPR diameter 25 mm
e.
PPR diameter 20 mm
PPR diameter 15 mm
D.
LEVEL 2
1 Gate Valve :
a.
GV diameter 50 mm
b.
GV diameter 32 mm
c.
GV diameter 25 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 278 of 2419
NO.
URAIAN PEKERJAAN
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 50 mm
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 20 mm
e.
PPR diameter 15 mm
E.
LEVEL 3
1 Gate Valve :
a.
GV diameter 32 mm
b.
GV diameter 25 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
F.
TOP FLOOR
1 Tanki Air bersih
a.
b.
d.
2 Pompa Tekan
a.
b.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 279 of 2419
NO.
URAIAN PEKERJAAN
c.
d.
PPR diameter 50 mm
4.2.
STERILISASI TANK
Dimension 400 x 1500 mm
Material FRP lined Mild Steel
Media Trubul plate lined mild steel
Operating 4 bars
Capacity 4 m3
Pipe conection 2"
STERILISASI OZONE
Material Stainless Steel
Daya 220 V 50 Hz
Working 70 max
SEWAGE PUMP
Type Submersible
Kapasitas 4 m3/h
Material SS
PANEL CONTROL
Type outdoor
Material Omron/merlin/telemenique
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 280 of 2419
NO.
URAIAN PEKERJAAN
e
INJECTOR
Ukuran "
Material PVC
PRE STERILISASI
Type Sediment
ukuran 10"
Material PVC/plastic
3 Bak kontrol
4 Submersible Swage Pump 300 Lpm - Head 40 meter
5 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
c.
CO diameter 100 mm
d.
a.
b.
PVC diameter 80 mm
c.
d.
PVC diameter 65 mm
e.
PVC diameter 50 mm
f.
CO diameter 100 mm
CO diameter 65 mm
CO diameter 50 mm
i.
a.
PVC diameter 50 mm
PVC diameter 32 mm
c.
PVC diameter 25 mm
d.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 281 of 2419
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
c.
a.
b.
PVC diameter 80 mm
c.
PVC diameter 65 mm
PVC diameter 50 mm
CO diameter 100 mm
CO diameter 80 mm
CO diameter 65 mm
CO diameter 50 mm
i.
PVC diameter 40 mm
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
C.
LEVEL 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
c.
b.
PVC diameter 80 mm
c.
PVC diameter 65 mm
d.
PVC diameter 50 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 282 of 2419
NO.
URAIAN PEKERJAAN
e.
CO diameter 100 mm
f.
CO diameter 80 mm
CO diameter 65 mm
CO diameter 50 mm
i.
D.
a.
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
d.
LEVEL 3
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
c.
a.
b.
PVC diameter 80 mm
c.
PVC diameter 65 mm
d.
PVC diameter 50 mm
e.
CO diameter 100 mm
f.
CO diameter 80 mm
CO diameter 65 mm
CO diameter 50 mm
i.
a.
PVC diameter 50 mm
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
d.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 283 of 2419
NO.
URAIAN PEKERJAAN
4 Pemipaan buangan Op PVC Kelas 10 kg/cm2
a.
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
e.
CO diameter 65 mm
E.
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
Diameter 50 mm
4.3.
b.
V.
RD diameter 100 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 284 of 2419
NO.
URAIAN PEKERJAAN
5.1.
GROUND FLOOR
1 Panel Listrik
a.
MDP - I
b.
SDP - I GF
c.
LP - IGF
d.
PP - IGF
e.
PP - AC.IGF
f.
g.
PP-Penumatic
PP - AB
PP- STP
2 Kabel Feeder
B.
a.
b.
c.
d.
e.
f.
g.
i.
j.
LEVEL 1
1 Panel Listrik
a.
SDP - 1
b.
LP - I1
c.
PP - I1
d.
PP - AC.I1
e.
PP - UPS I1
2 Kabel Feeder
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 285 of 2419
NO.
URAIAN PEKERJAAN
C.
a.
b.
c.
d.
e.
LEVEL 2
1 Panel Listrik
a.
SDP - I.2
b.
LP - I.2
c.
PP - I.2
d.
PP - AC.I.2
e.
PP - UPS.I,2
2 Kabel Feeder
D.
a.
b.
c.
d.
e.
LEVEL 3
1 Panel Listrik
a.
SDP - 3
b.
LP - I3.
c.
PP - I3
d.
PP - AC.I3
e.
PP - UPS.I3
2 Kabel Feeder
a.
b.
c.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 286 of 2419
NO.
URAIAN PEKERJAAN
E.
d.
e.
LEVEL ROOF
1 Panel Listrik
a.
PP - LF
b.
PP - BP
2 Kabel Feeder
5.2.
a.
b.
GROUND FLOOR
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
h.
i.
2 Titik instalasi
a.
b.
B.
LEVEL 1
1 Saklar dan Stop kontak
a.
Saklar tunggal
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 287 of 2419
NO.
URAIAN PEKERJAAN
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
2 Titik instalasi
C.
a.
b.
LEVEL 2
1 Saklar & Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
h.
i.
2 Titik instalasi
D.
a.
b.
LEVEL 3
1 Saklar & Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 288 of 2419
NO.
URAIAN PEKERJAAN
e.
f.
g.
2 Titik instalasi
a.
b.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 289 of 2419
AYA
U dan CSSD)
ENGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 290 of 2419
AYA
U dan CSSD)
ENGGARA BARAT
JUMLAH I.
+ 17,20 M )
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V.
TOTAL PEK. STANDA
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 291 of 2419
U dan CSSD)
ENGGARA BARAT
SAT
2
VOLUME
3
Ls
m
1
230
m
Ls
m
Ls
Ls
35
1
230
1
1
2250
450
1008
R 4 + test ( 10 ttk)
1680
450
556.7952
389.75664
R 4 + test ( 5 ttk)
1851
167.03856
22.725
11.3625
1887
ng tanah sedalam 20 cm
SAT
VOLUME
(t=13 cm)
m
Kg
22.725
116.48
m
Kg
11.466
7881.6
37.6915
5.3845
40.5405
3.6855
5.46
1.456
1.95
1.35
44.1
49.68
54.285
56.79
6.755
232.232
10.458
29.645
4.235
32.076
2.916
4.32
1.152
1.95
1.35
44.1
49.68
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 293 of 2419
SAT
VOLUME
54.285
57.74625
5.74
232.232
10.458
29.645
4.235
32.076
2.916
4.32
1.152
1.95
1.35
41.16
49.68
54.285
60.39
9.24
8.16
242.892
29.645
32.076
4.32
1.152
1.839
26.46
35.208
36.63
13.71375
2.16
A (t=12 cm)
52.872
440.6
(t=13 cm)
(t=13 cm)
+ 17,20 M )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 294 of 2419
SAT
Kg
Kg
Kg
Kg
Kg
unit
Bh
Bh
Bh
Bh
Kg
Bh
Bh
men Instant.
& Jendela
VOLUME
440.6
13891.164
12869.4384
16168.131
4969.062
4080.795768
54
216
3786
2656
3274
12335.9305263158
665.2584210526
34
18.56515626
m
m
m
8.6885018182
207.9
58.8
m
m
2275.56
201.6
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
m1
m1
3401.0947
6802.1894
6802.1894
961.04
1922.08
1323
1323
211.288
515.6445
162
440.625425
84.3
84.3
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 295 of 2419
SAT
& Jendela
& Jendela
& Jendela
VOLUME
m2
m2
m2
m1
m1
m1
m1
m1
m2
m1
m1
m2
m1
m1
3231.9353
6463.8706
6463.8706
971.23
1942.46
1239
1239
212.894
36.618
508.60835
204.3178
499.05327
129.4652
129.4652
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
3312.5377
6625.0754
6625.0754
709.87
1419.74
1113
1113
175.791
302.17615
170.6982
437.84363
124.9982
124.9982
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
3446.52098
6893.04196
6893.04196
930.3
1860.6
1201.2
1201.2
244.508
326.4182
131.8
341.9575
64.7
64.7
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 296 of 2419
SAT
VOLUME
enius tile 60 x 60 cm
k 20 x 20 cm
eramik 5 x 20 cm
m2
m2
m1
m2
1075.1266
87.5154
133.152
104.8701
enius tile 60 x 60 cm
k 20 x 20 cm
eramik 5 x 20 cm
m2
m2
m1
m2
1009.8403
119.5559
133.152
95.4709
enius tile 60 x 60 cm
k 20 x 20 cm
eramik 5 x 20 cm
m2
m2
m1
m2
673.4991
98.5648
133.152
83.1008
enius tile 60 x 60 cm
k 20 x 20 cm
m2
m2
m2
892.1155
83.6996
10.6
m2
m2
m1
m2
m2
1355.2042
87.5154
1517.1648
129.96
56.235
m2
m2
m1
m2
m2
1403.8877
119.5559
1455.6569
128.88
73.9
m2
m2
m1
m2
1436.3097
98.5648
1317.9225
94.68
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 297 of 2419
SAT
m2
m2
m2
m1
m2
m2
VOLUME
90.835
1123.9112
75.3671
1282.6978
125.64
74.305
TU DAN JENDELA
900x2150)
900x2150) *Slidding Door
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 900x2150)
* uk. 2x900x2150)
900x2150)
2x900x2150)
400/800 x 2150) Without Louver
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 900x2150)
900x2150)
2x900x2150)
400/800 x 2150) Without Louver
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
23
1
14
12
9
2
1
15
2
2
unit
unit
unit
4
2
2
unit
unit
unit
unit
unit
unit
unit
unit
unit
2
12
11
19
8
1
25
2
6
unit
unit
unit
unit
unit
4
2
2
1
1
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 298 of 2419
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 2x900x2150)
900x2150)
400/800 x 2150) Without Louver
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 900x2150)
900x2150)
400/800 x 2150) Without Louver
bical toilet
an dinding 1/2"
eja zink satu lubang
SAT
VOLUME
unit
unit
unit
unit
unit
unit
unit
unit
1
11
8
17
9
1
16
7
unit
unit
unit
unit
6
2
2
25
unit
unit
unit
unit
unit
unit
unit
unit
1
6
4
4
9
1
18
6
unit
unit
unit
unit
8
2
2
38
set
set
set
bh
bh
m
bh
unit
bh
bh
17
13
9
9
18
0.60885
17
12
17
1
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 299 of 2419
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
m
bh
set
bh
bh
VOLUME
6.0885
9
17
17
17
set
set
set
bh
bh
m
bh
unit
bh
bh
m
bh
set
bh
bh
22
13
11
11
22
0.74415
22
12
22
2
7.4415
11
22
22
22
set
set
set
bh
bh
m
bh
unit
bh
bh
m
bh
set
bh
bh
22
15
6
6
12
0.4059
22
12
22
2
4.059
6
22
22
22
set
set
set
bh
bh
13
4
7
7
14
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 300 of 2419
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
m
bh
unit
bh
bh
m
bh
set
bh
bh
VOLUME
0.47355
13
12
13
1
4.7355
7
13
13
13
m
m
m
m'
m
m
m'
m
m
m
6121.97046
915.176995
197.7
119.9
680.21894
1014.6323
1517.1648
446.8323
37.49
680.21894
m
m
m
m'
m
m
m'
m
m
m
5817.48354
833.09375
187.545
119.9
646.38706
951.8743
1455.6569
571.5693
73.9
646.38706
m
m
m
m'
m
m
m'
m
5962.56786
961.871875
249.795
119.9
662.50754
662.4494
1317.9225
872.4251
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 301 of 2419
SAT
m
m
m
m
m
m
m
m'
m
m
m
VOLUME
90.835
662.50754
6203.737764
692.8325
195.085
689.304196
817.5091
1282.6978
400.2442
55.83
689.304196
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
34.68
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
34.68
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
34.68
Bh
ter 50 mm
15
ter 40 mm
10
Ls
ypropelyne PN.10 :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 302 of 2419
SAT
VOLUME
meter 40 mm
Bh
meter 32 mm
Bh
12
meter 25 mm
Bh
ameter 40 mm
ameter 32 mm
54
ameter 25 mm
82
ameter 20 mm
108
ameter 15 mm
115
Ls
meter 50 mm
Bh
meter 32 mm
Bh
ameter 50 mm
ameter 40 mm
21
ameter 32 mm
30
ameter 25 mm
41
ameter 20 mm
55
ameter 15 mm
237
Ls
meter 50 mm
Bh
meter 32 mm
Bh
meter 25 mm
Bh
ypropelyne PN.10 :
ypropelyne PN.10 :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 303 of 2419
SAT
VOLUME
ypropelyne PN.10 :
ameter 50 mm
ameter 40 mm
17
ameter 32 mm
ameter 25 mm
58
ameter 20 mm
62
ameter 15 mm
153
Ls
meter 32 mm
Bh
meter 25 mm
Bh
ameter 40 mm
16
ameter 32 mm
22
ameter 25 mm
72
ameter 25 mm
91
ameter 15 mm
74
Ls
Unit
g valve diamater 40 mm
Bh
alve diameter 80 mm
Bh
alve diameter 65 mm
Bh
alve diameter 50 mm
Bh
ypropelyne PN.10 :
e Joint diameter 65 mm
Bh
1
2
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 304 of 2419
SAT
VOLUME
alve diameter 50 mm
Bh
alve diameter 65 mm
Bh
valve diameter 50 mm
Bh
ameter 50 mm
102
iameter 100 mm
Unit
iameter 200 mm
Unit
Ls
Unit
Unit
ypropelyne PN.10 :
ISASI TANK
ing 4 bars
onection 2"
ISASI OZONE
al Stainless Steel
220 V 50 Hz
g 70 max
ubmersible
tas 4 m3/h
CONTROL
al Omron/merlin/telemenique
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 305 of 2419
SAT
VOLUME
ERILISASI
al PVC/plastic
Unit
Unit
25
ameter 100 mm
124
meter 100 mm
Bh
Ls
ameter 100 mm
55
ameter 80 mm
14
ameter 80 mm buamgan Op
10
ameter 65 mm
67
ameter 50 mm
109
meter 100 mm
Bh
meter 65 mm
Bh
meter 50 mm
Bh
Ls
ameter 50 mm
75
ameter 32 mm
104
ameter 25 mm
18
Ls
m
Unit
1
40
6
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 306 of 2419
SAT
VOLUME
ameter 100 mm
132
meter 100 mm
Bh
14
Ls
ameter 100 mm
52
ameter 80 mm
25
ameter 65 mm
53
ameter 50 mm
138
meter 100 mm
Bh
meter 80 mm
Bh
meter 65 mm
Bh
meter 50 mm
Bh
Ls
ameter 40 mm
34
ameter 32 mm
81
ameter 25 mm
46
Ls
ameter 100 mm
129
meter 100 mm
Bh
13
Ls
ameter 100 mm
72
ameter 80 mm
21
ameter 65 mm
49
ameter 50 mm
45
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 307 of 2419
SAT
VOLUME
meter 100 mm
Bh
meter 80 mm
Bh
meter 65 mm
Bh
meter 50 mm
Bh
Ls
ter 50 mm
58
ter 32 mm
40
ter 25 mm
50
Ls
ameter 100 mm
56
meter 100 mm
Bh
Ls
ameter 100 mm
ameter 80 mm
20
ameter 65 mm
ameter 50 mm
78
meter 100 mm
Bh
meter 80 mm
Bh
meter 65 mm
Bh
meter 50 mm
Bh
Ls
ameter 50 mm
20
ameter 32 mm
16
ameter 25 mm
40
Ls
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 308 of 2419
SAT
VOLUME
ameter 80 mm
25
ameter 65 mm
11
ameter 50 mm
36
meter 80 mm
Bh
meter 65 mm
Bh
Ls
:
m
128
128
ter 50 mm
128
Ls
Bh
Bh
ameter 150 mm
90
ameter 100 mm
192
Ls
meter 100 mm
Bh
12
ter 100 mm
ter 80 mm
C Kelas 10 kg/cm2
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 309 of 2419
SAT
VOLUME
BEL FEEDER
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
250
30
10
10
10
10
10
35
35
Unit
Unit
Unit
Unit
Unit
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 310 of 2419
SAT
VOLUME
35
10
10
10
10
Unit
Unit
Unit
Unit
Unit
40
10
10
10
10
Unit
Unit
Unit
Unit
Unit
40
10
10
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 311 of 2419
SAT
VOLUME
10
10
Unit
Unit
42
10
Bh
65
Bh
22
Bh
group ( 6 modul )
Bh
ontak 200 W / 10 A
Bh
13
Bh
19
ontak 350 W / 16 A
Bh
10
ontak 500 W / 16 A
Bh
14
ontak 2X250 W / 16 A
Bh
Ttk
203
Ttk
56
Bh
56
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 312 of 2419
SAT
VOLUME
Bh
33
Bh
ontak 200 W / 16 A
Bh
126
Bh
58
ontak 350 W / 16 A
Bh
12
ontak 500 W / 16 A
Bh
Ttk
262
Ttk
203
Bh
74
Bh
26
Bh
group ( 6 modul )
Bh
ontak 200 W / 16 A
Bh
213
Bh
60
ontak 350 W / 16 A
Bh
15
ontak 500 W / 16 A
Bh
ontak 2X250 W / 16 A
Bh
Ttk
276
Ttk
298
Bh
51
Bh
26
Bh
Bh
69
ontak 200 W / 16 A
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 313 of 2419
SAT
VOLUME
Bh
17
ontak 350 W / 16 A
Bh
ontak 500 W / 16 A
Bh
19
Ttk
186
Ttk
112
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 314 of 2419
JUMLAH HARGA
35657936601.4852
15242518453.7548
50900455055.24
5090045505.524
55990500560.764
55990501000
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 315 of 2419
JUMLAH HARGA
107122280
107122280
266371764
109624229.537025
3867029100
1613888230.61141
4207903517.86604
4201352480.81333
3934296123.53203
1449689271.33135
3056645001.02746
22706799718.7186
4635733453.13581
917391378.700841
971187860.710801
2696729944.8072
453846080.089906
1409691046.24463
41586088.5
11126165852.1892
159352324.918667
512020567.11258
98034184.6528
769407076.684047
621746926.093333
326694747.8
948441673.893333
35657936601.4852
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 316 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
7500000
60000
7500000
13800000
567212
1000000
163782
14000000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
19852420
1000000
37669860
14000000
13300000
107122280
10720
24120000
26180
11781000
157158
158415264
32725
54978000
37950
JUMLAH 2.1.PEKERJAAN PEMA
17077500
266371764
48050
26754009.36
18975
7395632.244
32725
60573975
12540
2094663.5424
174620
3968239.5
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
8837709.890625
109624229.537025
2049300
3867029100
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 317 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3867029100
2683307.06279167
27248.925
60978153.0019406
3173954.784
6606260.01543842
27248.925
75747377.3370169
214765127.28
11209137.9542526
422489223.202713
11209137.9542526
60355603.3146734
15135730.0785706
613610065.250292
15135730.0785706
55782733.204572
11286348.8191667
61623464.55265
10511468.059125
15304697.494086
9759822.04511111
19031652.9879667
8167539.40851852
JUMLAH 2.4.LANTAI DASAR ( EL.
11026178.2015
1613888230.61141
8435463.15473016
372003925.1236
8743607.98544445
434382444.71688
8196329.54266667
444937749.22366
9406069.42651852
534170682.731987
9171717.21242857
61954949.769955
7635603.56197222
45813621.3718333
5735842.80429487
1332046246.12701
6606260.01543842
69088267.241455
10220611.013645
302990013.499507
10220611.013645
43284287.6427867
13611890.1784691
436614989.364576
13611890.1784691
39692271.760416
11286348.8191667
48757026.8988
10511468.059125
12109211.204112
9759822.04511111
19031652.9879667
8167539.40851852
JUMLAH 2.5.LANTAI SATU ( EL. +
11026178.2015
4207903517.86604
8435463.15473016
372003925.1236
8743607.98544445
434382444.71688
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 318 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8196329.54266667
444937749.22366
9406069.42651852
543165236.621095
9171717.21242857
52645656.79934
7635603.56197222
45813621.3718333
5735842.80429487
1332046246.12701
6606260.01543842
69088267.241455
10220611.013645
302990013.499507
9484330.26143723
40166138.6571867
13611890.1784691
436614989.364576
12542566.1093333
36574122.774816
11286348.8191667
48757026.8988
10511468.059125
12109211.204112
9759822.04511111
19031652.9879667
8167539.40851852
JUMLAH 2.6.LANTAI DUA ( EL. +
11026178.2015
4201352480.81333
8025579.28797279
330332843.49296
8338507.30044444
414257042.68608
7817534.09695238
424374838.45306
9406069.42651852
568032532.667453
9171717.21242857
84746667.04284
7635603.56197222
62306525.0656933
5735842.80429487
1393190330.42079
8103803.85104762
240237265.164307
10537583.4797037
338003527.694976
11286348.8191667
48757026.8988
10511468.059125
12109211.204112
9759822.04511111
JUMLAH 2.7.LANTAI TIGA ( EL.
17948312.7409593
3934296123.53203
7932926.35921088
209905231.46472
8338507.30044444
293582165.034048
8791759.36888889
322042145.6824
9406069.42651852
128992484.597918
7635603.56197222
16492903.69386
6126956.28798611
323944432.858402
246240
108493344
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 319 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
104940
JUMLAH 2.8.LANTAI EMPAT / ATAP
46236564
1449689271.33135
31192.48691625
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
15840
31192.48691625
116640
97200
433299951.321483
401429788.911485
504324214.677716
154997401.421035
127290168.601228
26360640
40746240
87229440
61194240
51860160
384788351.541874
77595742.2315789
3304800
0
6048000
112282065.06048
5796000
163800
52416
50358556.5381818
34054020
3082060.8
0
204522.654285714
183747.96
JUMLAH 2.9.ATAP
465403571.1864
37043588.736
3056645001.02746
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
92550
145380
481935118.99
287052392.68
116317438.74
20854568
7130916.8
14923440
126879371.821125
20592033.479633
13623327.69
2877120
72156819.598
7801965
12255534
0
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 320 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
209500
26420
17760
163760
92550
145380
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
92550
145380
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
92550
145380
JUMLAH 3.1.PEKERJAAN PASAN
0
457965232.01
272775339.32
110532187.26
21075691
7206526.6
13975920
118823538.689625
20748553.5175352
7671471
13437432.607
3628684.128
81724963.4952
11982004.26
18821650.776
0
0
469386592.09
279578181.88
113288789.34
15404179
5267235.4
12554640
106739788.992375
17132511.8199716
7983493.883
3031600.032
71701272.8488
11568583.41
18172238.316
0
0
488372022.866
290886370.712
117871017.516
20187510
6902826.00000001
13549536
115198413.78045
23829639.7430905
8623968.844
2340768
55998960.2
5987985
9406086
4635733453.13581
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 321 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
222896.08
163466.05
71703.896
38788.2
222896.08
163466.05
71703.896
38788.2
222896.08
163466.05
71703.896
38788.2
222896.08
163466.05
38788.2
JUMLAH 3.2.PEKERJAAN PASAN
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
140831.940857143
136889.688669643
15603.96
156474.36
239641504.643728
14305796.75217
9547517.160192
4067722.41282
0
0
225089444.296024
19543330.727195
9547517.160192
3703144.36338
0
0
150120309.273528
16111998.52504
9547517.160192
3223330.45056
0
0
198849047.85724
13682042.99858
411154.92
917391378.700841
190856037.743752
11979955.8597993
23673778.852608
20335407.8256
1515842.5425
0
0
197712229.53647
16365969.929619
22714012.041324
20166415.5168
1992011.45
0
0
202278282.722941
13492504.7857856
20564809.9731
14814992.4048
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 322 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
26955.5
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
JUMLAH 3.3.PEKERJAAN PASA
13106496.4668
5683385.01374712
7388400.51787126
12253497.9982524
5406114.08296034
5774599.26622056
6080663.46759816
13034849.7522551
5778167.90327238
12439913.2852183
9381120.85110891
1226196.21080688
2116923.05506
3016488.4815725
18723699.7034656
5683385.01374712
12253497.9982524
5406114.08296034
5774599.26622056
6080663.46759816
5778167.90327238
12439913.2852183
9381120.85110891
1226196.21080688
2116923.05506
3016488.4815725
8920496.45353625
5500544.5384725
2448502.8425
0
0
158282595.647081
10316978.8549338
20015165.163288
19659438.5904
2002928.4275
971187860.710801
13106496.4668
130717855.316184
7388400.51787126
171548971.975534
64873368.9955241
51971393.3959851
12161326.9351963
13034849.7522551
86672518.5490857
24879826.5704366
18762241.7022178
0
4904784.8432275
4233846.11012
6032976.963145
0
0
0
37447399.4069312
68200620.1649655
134788477.980777
102716167.576247
46196794.1297645
6080663.46759816
144454197.581809
24879826.5704366
56286725.1066534
0
4904784.8432275
4233846.11012
6032976.963145
8920496.45353625
5500544.5384725
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 323 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1226196.21080688
2116923.05506
3016488.4815725
8920496.45353625
JUMLAH 3.4.PEKERJAAN PASAN
0
0
0
18723699.7034656
62517235.1512184
98027983.9860194
91903939.4103258
51971393.3959851
13034849.7522551
92450686.452358
65667845.9577623
0
7357177.26484125
4233846.11012
6032976.963145
223012411.338406
0
0
0
18723699.7034656
34100310.0824827
49013991.9930097
21624456.3318414
51971393.3959851
6080663.46759816
104007022.258903
56286725.1066534
0
9809569.686455
4233846.11012
6032976.963145
338978865.234378
2696729944.8072
2388808.51
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
40609744.67
13216269.924
18760193.892
2781670.815
4389600.6
2388420.58108809
5320159.35
3212098.065
3260507.105625
553501.04
18723699.7034656
5683385.01374712
12253497.9982524
5406114.08296034
5774599.26622056
13034849.7522551
5778167.90327238
9381120.85110891
1226196.21080688
2116923.05506
3016488.4815725
8920496.45353625
18723699.7034656
5683385.01374712
12253497.9982524
5406114.08296034
5774599.26622056
6080663.46759816
5778167.90327238
9381120.85110891
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 324 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
326502
610373.61
316849.995
72894.9375
239095.395
2388808.51
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
2388808.51
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
2388808.51
1016636.148
2084465.988
309074.535
243866.7
1987907.427
5493362.49
5386449.915
1239213.9375
4064621.715
0
0
52553787.22
13216269.924
22929125.868
3399819.885
5365067.4
2919180.71021878
6884912.1
3212098.065
4219479.78375
1107002.08
2429664.633
6714109.71
6970699.89
1603688.625
5260098.69
0
0
52553787.22
15249542.22
12506795.928
1854447.21
2926400.4
1592280.38739206
6884912.1
3212098.065
4219479.78375
1107002.08
1325271.618
3662241.66
6970699.89
1603688.625
5260098.69
0
0
31054510.63
4066544.592
14591261.916
2163521.745
3414133.8
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 325 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
JUMLAH 3.5.PEKERJAAN PASAN
1857660.45195741
4068357.15
3212098.065
2493328.963125
553501.04
1546150.221
4272615.27
4119049.935
947634.1875
3108240.135
453846080.089906
32850.26245
34450.538375
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
34450.538375
38430.833375
43611.881555
201108336.322147
31528340.1861647
7597775.7582375
653262.936236625
29130429.8802083
37462346.3099926
5200123.87174336
15393613.2983395
1440771.94322875
29665627.8427476
0
0
191105861.087555
28700528.2043477
7207510.64531438
653262.936236625
27681576.944629
35145189.7107768
4989303.86122716
19690870.1036219
2840038.5864125
28190155.8994047
0
0
195871919.076935
33137003.9415207
9599830.02290813
653262.936236625
28371937.7750336
24459017.158873
4517215.43589575
30055514.3868632
32850.26245
34450.538375
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
34450.538375
38430.833375
43611.881555
32850.26245
34450.538375
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
34450.538375
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 326 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
38430.833375
43611.881555
32850.26245
34450.538375
38430.833375
42825.079055
36922.091195
3427.5273666667
34450.538375
38430.833375
43611.881555
JUMLAH 3.6.PEKERJAAN PENGE
399712.5
399712.5
3490864.74961812
28893200.3637744
0
0
203794413.718376
23868452.6286972
7497279.12896187
29519506.6866432
30184145.5429424
4396481.81266313
13788628.1714712
2145593.42732625
30061852.9513165
1409691046.24463
13862029.5
0
0
0
0
13862029.5
0
0
0
0
13862029.5
0
0
41586088.5
107800
215600
265892.273888889
3988384.10833333
110129.34
1101293.4
1781387.12791667
1781387.12791667
399712.5
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 327 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
100980.733333333
100980.733333333
68455.9333333333
821471.2
45554.74
45554.74
110129.34
220258.68
69473.34
3751560.36
45554.74
3735488.68
37503.95
4050426.6
27688.1
3184131.5
5229653.037
5229653.037
143687.866666667
143687.866666667
68455.9333333333
273823.733333333
169130.993888889
676523.975555555
110129.34
2312716.14
69473.34
2084200.2
45554.74
1867744.34
37503.95
2062717.25
27688.1
6562079.7
5448093.56194444
5448093.56194444
143687.866666667
143687.866666667
68455.9333333333
205367.8
39440.6666666667
39440.6666666667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 328 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
169130.993888889
507392.981666667
110129.34
1872198.78
69473.34
625260.06
45554.74
2642174.92
37503.95
2325244.9
27688.1
4236279.3
4272992.82958333
4272992.82958333
68455.9333333333
273823.733333333
39440.6666666667
157762.666666667
110129.34
1762069.44
69473.34
1528413.48
45554.74
3279941.28
37503.95
3412859.45
27688.1
2048919.4
4211271.0675
4211271.0675
46039000
46039000
442869.24
885738.48
178245.466666667
534736.4
152496.666666667
304993.333333333
143687.866666667
574751.466666667
1957366.224
1957366.224
356780.16
713560.32
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 329 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
143687.866666667
143687.866666667
152496.666666667
304993.333333333
359626.08
359626.08
169130.993888889
17251361.3766667
471240
471240
570416
570416
6037976.48183333
6037976.48183333
159352324.918667
800000
800000
157690000
157690000
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 330 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
212520
212520
5274895.824
10549791.648
399700.693333333
9992517.33333333
171508.450666667
21267047.8826667
287991
2303928
10940847.8256
10940847.8256
171508.450666667
9432964.78666666
104649.38
1465091.32
104649.38
1046493.8
67381.1013333333
4514533.78933333
55231.7333333333
6020258.93333333
287991
575982
135531
406593
125367
501468
7867769.92026667
7867769.92026667
55231.7333333333
4142380
36182.63
3762993.52
26492.95
476873.1
2766880.732
2766880.732
11827.2
473088
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 331 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
171508.450666667
22639115.488
287991
4031874
7923690.4208
7923690.4208
171508.450666667
8918439.43466666
104649.38
2616234.5
67381.1013333333
3571198.37066667
55231.7333333333
7621979.2
287991
1439955
227007
227007
135531
406593
125367
376101
221760
221760
41027.47
1394933.98
36182.63
2930793.03
26492.95
1218675.7
22511886.0484467
22511886.0484467
171508.450666667
22124590.136
287991
3743883
7743606.5476
7743606.5476
171508.450666667
12348608.448
104649.38
2197636.98
67381.1013333333
3301673.96533333
55231.7333333333
2485428
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 332 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
287991
575982
227007
227007
135531
406593
125367
125367
7116671.58766667
7116671.58766667
55231.7333333333
3203440.53333333
36182.63
1447305.2
26492.95
1324647.5
1627761.00666667
1627761.00666667
171508.450666667
9604473.23733333
287991
2015937
3361565.63306667
3361565.63306667
171508.450666667
1543576.056
104649.38
2092987.6
67381.1013333333
606429.912
55231.7333333333
4308075.2
287991
575982
227007
227007
135531
135531
125367
250734
2992874.0688
2992874.0688
55231.7333333333
1104634.66666667
36182.63
578922.08
26492.95
1059718
960146.161333333
960146.161333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 333 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
104649.38
2616234.5
67381.1013333333
741192.114666667
55231.7333333333
1988342.4
227007
454014
135531
406593
1871019.15513333
1871019.15513333
171508.450666667
21953081.6853333
104649.38
13395120.64
55231.7333333333
7069661.86666667
14846252.4672
14846252.4672
512020567.11258
462000
1848000
212520
850080
399700.693333333
35973062.4
171508.450666667
32929622.528
24115939.7248
24115939.7248
193123.333333333
2317480
98034184.6528
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 334 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
21548608.4
21548608.4
18495725.6
18495725.6
11608938
11608938
11764786
11764786
11713288.4
11713288.4
11053983.6
11053983.6
11287819.4
11287819.4
12147630
12147630
7823200
7823200
1087791.1
271947775
121975.333333333
3659260
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
94871.3333333333
948713.333333333
42014.8666666667
420148.666666667
27785.2666666667
277852.666666667
42014.8666666667
1470520.33333333
27785.2666666667
972484.333333333
19357927.6
19357927.6
11709561.6
11709561.6
11923344.4
11923344.4
11923344.4
11923344.4
11219995.6
11219995.6
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 335 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
179571.333333333
6284996.66666667
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
94871.3333333333
948713.333333333
27785.2666666667
277852.666666667
13518370.8
13518370.8
11709561.6
11709561.6
11923344.4
11923344.4
11897595.6
11897595.6
11219995.6
11219995.6
179571.333333333
7182853.33333333
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
94871.3333333333
948713.333333333
27785.2666666667
277852.666666667
13518370.8
13518370.8
11709561.6
11709561.6
11923344.4
11923344.4
192548.4
192548.4
389840
389840
179571.333333333
7182853.33333333
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 336 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
94871.3333333333
948713.333333333
27785.2666666667
277852.666666667
6707243.4
6707243.4
10948278
10948278
303101.48
12730262.16
27785.2666666667
277852.666666667
621746926.093333
29147.8
1894607
31858.2
700880.4
41344.6
289412.2
214967.5
214967.5
36081.1
469054.3
36081.1
685540.9
36081.1
360811
36081.1
505135.4
37436.3
74872.6
170766.133333333
34665525.0666667
197562.133333333
11063479.4666667
29147.8
1632276.8
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 337 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
31858.2
1051320.6
41344.6
165378.4
36081.1
4546218.6
36081.1
2092703.8
36081.1
432973.2
36081.1
252567.7
170766.133333333
44740726.9333333
197562.133333333
40105113.0666667
29147.8
2156937.2
31858.2
828313.2
41344.6
165378.4
214967.5
429935
36081.1
7685274.3
36081.1
2164866
36081.1
541216.5
36081.1
288648.8
37436.3
74872.6
170766.133333333
47131452.8
197562.133333333
58873515.7333333
29147.8
1486537.8
31858.2
828313.2
41344.6
165378.4
36081.1
2489595.9
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 338 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
36081.1
613378.7
36081.1
252567.7
36081.1
685540.9
170766.133333333
31762500.8
197562.133333333
22126958.9333333
326694747.8
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 339 of 2419
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
1.4.
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT & SPRINKLER
2.2.
PEKERJAAN PENGKONDISIAN UDARA
2.3.
PEKERJAAN ELEVATOR
2.4.
PEKERJAAN GAS MEDIS
2.5.
PEKERJAAN PNEUMATIC TUBE
III.
IV.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 340 of 2419
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
GROUND FLOOR
LEVEL-1
LEVEL-2
NO.
URAIAN PEKERJAAN
D.
LEVEL-3
1.2.
LEVEL-3
1.3.
LEVEL-1
PINTU TYPE
1 A (HM uk. 900x2150) *Fire Door
2 C (HM uk. 900x2150)
JENDELA TYPE
1 CW/2
2 CW/3
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 342 of 2419
NO.
URAIAN PEKERJAAN
3 GLB/4
1.4.
C.
LEVEL-2
PINTU TYPE
1 A (HM uk. 900x2150) *Fire Door
2 C (HM uk. 900x2150)
JENDELA TYPE
1 GLB/4
D.
LEVEL-3
PINTU TYPE
1 A (HM uk. 900x2150) *Fire Door
2 B (HM uk. 900x2150)
3 B* (HM uk. 900x2150) *Hermatic Door
4 B* (HM uk. 2x900x2150) *Hermatic Door
5 B** (HM uk. 2x900x2150) **Hermatic Slidding Door
6 C (HM uk. 900x2150)
JENDELA TYPE
1 GLB/4
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Staff base P. 4,23 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P.4,23 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-1
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 343 of 2419
NO.
URAIAN PEKERJAAN
1 Meja Administration P. 4,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P. 7,7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Meja Staff base P. 4,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-2
1 Meja Administration Office P. 5.45 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P. 2,588 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Meja Staff base P. 4,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-3
1 Meja Nurse Station P. 8,95 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
II.
PEKERJAAN MEKANIKAL
2.1.
GROUND FLOOR
1 Instalasi Hydrant
a.
b.
c.
NO.
URAIAN PEKERJAAN
- BSP Sch.40 diameter 65 mm
-Material bantu & fitting-fitting 35% dari harga pipa (SNI)
e
Siamesse Connebtion
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
l.
m.
n.
NO.
URAIAN PEKERJAAN
B.
o.
r.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 346 of 2419
NO.
URAIAN PEKERJAAN
Diameter 50 mm
C.
l.
m.
n.
q.
LEVEL 2
1 Instalasi Hydrant
a.
b.
c.
d.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 347 of 2419
NO.
URAIAN PEKERJAAN
Diameter 80 mm
Diameter 50 mm
l.
m.
n.
D.
LEVEL 3
1 Instalasi Hydrant
a.
b.
c.
d.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 348 of 2419
NO.
URAIAN PEKERJAAN
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
l.
m.
n.
E.
RISER
2 Pipa di Shaft
a.
b.
50 mm ( Test )
40 mm ( Flusing )
c.
2.2.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 349 of 2419
NO.
URAIAN PEKERJAAN
-
Dran
3 Multy Split ( IU + OU )
-
Dran
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 350 of 2419
NO.
URAIAN PEKERJAAN
2 Exhaust Fan ( EF GF.2 ) , Kapasitas : 400 CFM - Wall Fan
3 Exhaust Fan ( EF GF.3 ) , Kapasitas : 300 CFM - Wall Fan
4 Exhaust Fan ( EF GF.4 ) , Kapasitas : 2000 CFM - Inline Fan
5 Exhaust Fan ( EF GF.5 ) , Kapasitas : 1450 CFM - Inline Fan
6 Exhaust Fan ( EF GF.6 ) , Kapasitas : 900 CFM - Wall Fan
7 Exhaust Fan ( EF GF.7 ) , Kapasitas : 800 CFM - Wall Fan
8 Exhaust Fan ( EF GF.8 ) , Kapasitas : 500 CFM - Wall Fan
9 Exhaust Fan ( EF GF.9 ) , Kapasitas : 400 CFM - Wall Fan
10 Intake Fan ( IF GF.1 ) , Kapasitas : 1800 CFM - Inline Fan
11 Intake Fan ( IF GF.2 ) , Kapasitas : 1800 CFM - Inline Fan
12 Intake Fan ( IF FA.01 ) , Kapasitas : 2740 CFM - Inline Fan
13 Exhaust Fan ( EF C.GF1 S/D EF C.GF8 ) , Kapasitas : 100 CFM - Ceiling Fan
14 Booster Fan ( BF 01 & BF 02) , Kapasitas :
15 Exhaust Fan ( EF R 01 & EF R.02 ) , Kapasitas : 2750 CFM - Inline Fan
16 Ceiling Fan ( EF G .1 & EF G.2 ) - Gantung
17 Instalasi daya listrik Fan, NYM 3 x 2,5 mm2
16" x 14 "
14" x 10 "
10" x 8 "
Grille ( G )
2 Ducting Exhaust
-
26" x 16 "
20" x 14 "
18" x 16 "
18" x 14 "
16" x 14 "
14" x 12 "
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 351 of 2419
NO.
URAIAN PEKERJAAN
B.
14" x 10 "
12" x 10 "
10" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
6" x 6 "
LEVEL 1
Pekerjaan Unit AC
1 Single Split ( IU + OU )
-
Dran
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 352 of 2419
NO.
URAIAN PEKERJAAN
-
3 Multy Split ( IU + OU )
-
Dran
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 353 of 2419
NO.
URAIAN PEKERJAAN
C.
26" x 16 "
20" x 14 "
18" x 16 "
18" x 14 "
16" x 14 "
14" x 12 "
14" x 10 "
12" x 10 "
10" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
6" x 6 "
LEVEL 2
Pekerjaan Unit AC
1 Single Split ( IU + OU )
-
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 354 of 2419
NO.
URAIAN PEKERJAAN
-
Dran
2 Multy Split ( IU + OU )
-
Dran
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 355 of 2419
NO.
URAIAN PEKERJAAN
8 Intake Fan ( EF 2.1 ) , Kapasitas : 1800 CFM/1,9 Inwg - Inline
9 Exhaust Fan ( EF C.2.1 S/D EF C.2.7 ) , Kapasitas : 100 CFM - Ceiling Fan
10 Ceiling Fan ( EF G .1 ) - Gantung
11 Instalasi daya listrik Fan, NYM 3 x 2,5 mm2
C.
26" x 16 "
20" x 14 "
18" x 16 "
18" x 14 "
16" x 14 "
14" x 12 "
14" x 10 "
12" x 10 "
10" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
6" x 6 "
LEVEL 3
Pekerjaan Unit AC
1 Single Split ( IU + OU )
-
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 356 of 2419
NO.
URAIAN PEKERJAAN
-
Dran
2 Single Split ( IU + OU )
-
Dran
3 Multy Split ( IU + OU )
-
Dran
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 357 of 2419
NO.
URAIAN PEKERJAAN
Pekerjaan Unit Fan
1 Exhaust Fan ( EF 3.1 ) , Kapasitas : 400 CFM - Wall Fan
2 Exhaust Fan ( EF 3.2 ) , Kapasitas : 1700 CFM - Inline Fan
3 Exhaust Fan ( EF 3.3 ) , Kapasitas : 400 CFM - Wall Fan
4 Exhaust Fan ( EF 3.4 ) , Kapasitas : 900 CFM - Inline Fan
5 Exhaust Fan ( EF 3.5 ) , Kapasitas : 2000 CFM - Inline Fan
6 Exhaust Fan ( EF 3.6 ) , Kapasitas : 750 CFM - Wall Fan
7 Exhaust Fan ( EF 3.7 ) , Kapasitas : 1450 CFM - Inline Fan
8 Exhaust Fan ( EF 3.8 ) , Kapasitas : 500 CFM - Inline Fan
9 Exhaust Fan ( EF 3.9 ) , Kapasitas : 900 CFM - Wall Fan
10 Exhaust Fan ( EF 3.10 ) , Kapasitas : 1700 CFM - Inline Fan
11 Exhaust Fan ( EF 3.11 ) , Kapasitas : 400 CFM - Wall Fan
12 Intake Fan ( EF 3.1 ) , Kapasitas : 3600 CFM/1,9 Inwg - Inline
13 Ceiling Fan ( EF G .1 ) - Gantung
14 Pressurized Fan ( SPF A.1 s/d SPF A4 ) kapasitas : 6000 CFM
15 Instalasi daya listrik Fan, NYM 3 x 2,5 mm2
16 Instalasi daya listrik Fan, NYY 4 x 4 mm2
28" x 18 "
24" x 16 "
20" x 10 "
18" x 14 "
16" x 14 "
14" x 12 "
10" x 8 "
Grille ( G )
1 Ducting Exhaust
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 358 of 2419
NO.
URAIAN PEKERJAAN
-
28" x 18 "
24" x 18 "
24" x 16 "
22" x 18 "
22" x 16 "
20" x 16 "
20" x 14 "
18" x 14 "
16" x 14 "
14" x 12 "
14" x 10 "
12" x 10 "
10" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
6" x 6 "
2.3.
32" x 20 "
30" x 20 "
28" x 18 "
24" x 16 "
16" x 14 "
PEKERJAAN ELEVATOR
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 359 of 2419
NO.
URAIAN PEKERJAAN
1 Hospital Bed Elevator ( No.1 )
a.
Kapasitas : 750 Kg
b.
Kecepatan 30 Mpm
c.
Lintasan : 5 Lantai
Kapasitas : 1000 Kg
b.
Kecepatan 30 Mpm
c.
Lintasan : 5 Lantai
3 Dumb Waiter
a.
Kapasitas : 200 Kg
b.
Kecepatan 30 Mpm
c.
Lintasan : 5 Lantai
4 Pemasangan
2.4.
GROUND FLOOR
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
b.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 360 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
b.
c.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
b.
B.
LEVEL 1
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
2 Instalasi Suction :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 361 of 2419
NO.
URAIAN PEKERJAAN
a.
b.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
C.
LEVEL 2
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 362 of 2419
NO.
URAIAN PEKERJAAN
3 Zone Valve / Box Valve
4 Bedhead single unit, aluminium, 1,2mtr, with lamp and socket
D.
LEVEL 3
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm ( Riser )
- Diameter 25 mm ( Riser )
- Diameter 25 mm
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm ( Riser )
- Diameter 25 mm ( Riser )
- Diameter 25 mm
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 363 of 2419
NO.
URAIAN PEKERJAAN
b.
Pemipaan Tembaga :
- Diameter 32 mm ( Riser )
- Diameter 25 mm ( Riser )
- Diameter 25 mm
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
b.
Pemipaan Tembaga :
- Diameter 32 mm ( Riser )
- Diameter 25 mm ( Riser )
- Diameter 25 mm
- Diameter 20 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 10 mm
d.
E.
PERLENGKAPAN
1 Perlengkapan Outlet Oksigen
a.
b.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 364 of 2419
NO.
URAIAN PEKERJAAN
2 Perlengkapan Outlet Vacuum
a.
Suction Attachement
b.
Suction Jar
c.
Suction tubing
d.
Bacterial filter
2.5.
GROUND FLOOR
1 Sentral
a.
Blower Operatioan
b.
c.
d.
Control Sistem
- Panel Control
- Kabel
- Power Supply
b.
c.
3 Instalasi sistem
4 Accessories & Alat Bantu
5 Testing & Commisioning
B.
LEVEL.1
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 365 of 2419
NO.
URAIAN PEKERJAAN
1 Diverter & Instlalation
C.
a.
b.
c.
LEVEL.2
1 Diverter & Instlalation
D.
a.
b.
c.
LEVEL.3
1 Diverter & Instlalation
III.
a.
b.
c.
GROUND FLOOR
1 Rak Kabel
a.
b.
c.
Lampu TL 2 x 36 W / Louvre M6
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 366 of 2419
NO.
URAIAN PEKERJAAN
B.
d.
e.
Lampu TL 1 x 36 W / Louvre M6
g.
h.
i.
j.
k.
l.
m.
n.
LEVEL 1
1 Rak Kabel
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
Lampu TL 1 x 36 W / Louvre M6
g.
h.
i.
j.
Lampu TL 1 x 18 W / Balk
k.
l.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 367 of 2419
NO.
URAIAN PEKERJAAN
C.
m.
n.
LEVEL 2
1 Rak Kabel
a.
D.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
Lampu TL 1 x 36 W / Louvre M6
g.
h.
i.
j.
Lampu TL 1 x 18 W / Balk
k.
l.
m.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 368 of 2419
NO.
URAIAN PEKERJAAN
3.2.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
Lampu TL 1 x 36 W / Louvre M6
g.
h.
i.
j.
k.
l.
m.
PEKERJAAN UPS
1.2.1.GROUND FLOOR
1.
Portable UPS,
a.
1.2.2.LEVEL 1
1 Portable UPS,
a.
1.2.3.LEVEL 2
1 Portable UPS,
a.
1.2.4.LEVEL 3
1 Portable UPS,
a.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 369 of 2419
NO.
URAIAN PEKERJAAN
3.3.
1 Air Terminal lengkap menara ( Electro Statis ) Radiuas 80 M lengkap tiang & peng
2 Obstraction Lamp & Instalasi
3 Coaxial Cable 2 x 35 mm
4 Grounding sistem
Alat bantu & Testing Commisioning
IV.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
1 Sentral Telephone
a.
b.
c.
2 Instalasi
B.
a.
TB-T GF ( 40 Pairs )
b.
c.
d.
e.
LEVEL 1
1 Instalsi
a.
TB-T ( 30 Pairs )
b.
c.
d.
e.
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 370 of 2419
NO.
URAIAN PEKERJAAN
C.
LEVEL 2
1 Instalsi
D.
a.
TB-T ( 30 Pairs )
b.
c.
d.
e.
LEVEL 3
1 Instalsi
4.2.
a.
TB-T ( 30 Pairs )
b.
c.
d.
e.
GROUND FLOOR
1 Instalasi
a.
MDF'
b.
TB.F- GF
c.
d.
ROR
e.
f.
Smoke Detector
g.
h.
Bell Alarm
j.
Indicator Lamp
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 371 of 2419
NO.
URAIAN PEKERJAAN
l.
Flow Switch
m.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
LEVEL 1
1 Instalasi
a.
TB.F- 1
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
C.
LEVEL 2
1 Instalasi
a.
TB.F- 2
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 372 of 2419
NO.
URAIAN PEKERJAAN
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
D.
LEVEL 3
1 Instalasi
a.
TB.F- 3
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
4.3.
GROUND FLOOR
1 Sentral Tata Suara
a.
b.
c.
d.
Autorserve Cassete
e.
CD / DVD/MP3 - Playaer
f.
Microphone
g.
Equalizer
h.
i.
Cabinet Rack
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 373 of 2419
NO.
URAIAN PEKERJAAN
2 Instalasi
B.
a.
MDF
b.
TB-S.GF
c.
d.
e.
Volume Control
f.
LEVEL 1
1 Instalasi
C.
a.
TB-1
b.
c.
d.
Volume Control
e.
LEVEL 2
1 Instalasi
D.
a.
TB-S 2
b.
c.
d.
Volume Control
e.
LEVEL 3
1 Instalasi
a.
TB-S 2
b.
c.
d.
Volume Control
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 374 of 2419
NO.
URAIAN PEKERJAAN
e.
4.4.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Sentral MATV
a.
b.
c.
d.
Activ Combiner
e.
f.
Spliter 4 way
g.
h.
i.
TV Monitor
j.
CD Player
k.
l.
Coaxial Cable
2 Instalasi
B.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 1
1 Instalasi
C.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 2
1 Instalasi
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 375 of 2419
NO.
URAIAN PEKERJAAN
D.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 3
1 Instalasi
4.5.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
GROUND FLOOR
1 Peralatan Utama
a.
b.
2 Instalasi
B.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 1
1 Instalasi
C.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 2
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 376 of 2419
NO.
URAIAN PEKERJAAN
1 Instalasi
D.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 3
1 Instalasi
4.6.
a.
b.
c.
SocketData ( RG-45 )
d.
PEKERJAAN CCTV
A.
B.
GROUND FLOOR
1 Fixed Dome Camer
2 Instalasi Camera
C.
LEVEL 1
1 Fixed Dome Camer
2 Instalasi Camera
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 377 of 2419
NO.
URAIAN PEKERJAAN
D.
LEVEL 2
1 Fixed Dome Camer
2 Instalasi Camera
E.
LEVEL 3
1 Fixed Dome Camer
2 Instalasi Camera
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 378 of 2419
A
dan CSSD)
NGGARA BARAT
TU DAN JENDELA
N LAIN-LAIN
JUMLAH I.
JUMLAH II.
JUMLAH III.
JUMLAH IV.
TOTAL PEK. NON ST
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 379 of 2419
dan CSSD)
NGGARA BARAT
SAT
2
VOLUME
3
pital Skirting
u T. 10 cm
pital Skirting
u T. 10 cm
pital Skirting
m1
m1
m
m1
m
m1
m
m
m
397.08368
12.3
484.4298
341.9507
21.7693
245.33368
120.085
2.178036
8.976656
m1
m1
m
m1
m
m1
m
m
298.16318
13.0595
571.5693
342.775
12.3701
397.47868
2.178036
8.976656
m1
m
m1
m1
m
m
280.70241
938.8576
490.7875
489.59776
2.178036
8.976656
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 380 of 2419
pital Skirting
u T. 10 cm
SAT
VOLUME
m1
m1
m
m1
m
m1
m
m
m
448.84604
12.45
752.5379
469.95
10.6
288.08424
586.23
2.178036
8.976656
m2
52.9225
m2
352.2937
unit
unit
unit
unit
unit
unit
unit
8
2
6
1
3
3
1
TU DAN JENDELA
m2
m2
unit
unit
m2
m2
26
2
5
1
26
2
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 381 of 2419
SAT
bh
VOLUME
3
unit
unit
6
1
bh
unit
unit
unit
unit
unit
unit
4
6
40
18
18
1
bh
bh
bh
69
17
bh
bh
54
22
bh
bh
53
22
bh
bh
58
13
N LAIN-LAIN
e P. 4,23 m
u+aksesories
ase P.4,23 m
unit
unit
u+aksesories
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 382 of 2419
SAT
unit
ration P. 4,4 m
VOLUME
1
u+aksesories
ase P. 7,7 m
unit
u+aksesories
e P. 4,4 m
unit
unit
u+aksesories
ase P. 2,588 m
unit
u+aksesories
e P. 4,4 m
unit
unit
Set
l Valve, diameter 65 mm :
Bh
Bh
12
29
u+aksesories
u+aksesories
ation P. 8,95 m
u+aksesories
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 383 of 2419
SAT
m
Sch.40 diameter 65 mm
Ls
VOLUME
19
1
40
45
Ls
Unit
sse Connebtion
Unit
Bh
Bh
Unit
31
hedule 40 , diameter 80 mm
51
hedule 40 , diameter 65 mm
25
hedule 40 , diameter 50 mm
43
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
16
hedule 40 , diameter 25 mm
409
Bh
Bh
158
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
ter 100 mm
ing Valve :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 384 of 2419
SAT
Flow Switch
VOLUME
Bh
Bh
Unit
Ls
Set
l Valve diameter 65 mm
Bh
Bh
10
eter 65 mm
12
Ls
an Bantu ( Fitting-Fitting )
Ls
33
hedule 40 , diameter 80 mm
54
hedule 40 , diameter 65 mm
26
hedule 40 , diameter 50 mm
46
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
16
hedule 40 , diameter 25 mm
437
Bh
Bh
169
ter 80 mm
Bh
ter 80 mm
Bh
ng Valve Diameter 40 mm
ter 100 mm
ing Valve :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 385 of 2419
SAT
VOLUME
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
12
Ls
31
hedule 40 , diameter 80 mm
50
hedule 40 , diameter 65 mm
25
hedule 40 , diameter 50 mm
42
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
16
hedule 40 , diameter 25 mm
405
Bh
Bh
157
Bh
Flow Switch
ng Valve Diameter 40 mm
ter 100 mm
ing Valve :
ter 80 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 386 of 2419
SAT
VOLUME
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
12
Ls
32
hedule 40 , diameter 80 mm
51
hedule 40 , diameter 65 mm
26
hedule 40 , diameter 50 mm
43
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
17
hedule 40 , diameter 25 mm
415
Bh
Bh
172
Bh
Flow Switch
ng Valve Diameter 40 mm
ter 100 mm
ing Valve :
ter 80 mm
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 387 of 2419
SAT
VOLUME
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
Flow Switch
ng Valve Diameter 40 mm
40
20
Sch.40 diameter
50 mm ( Test )
20
Sch.40 diameter
40 mm ( Flusing )
20
ameter 100 mm
Bh
ameter 50 mm
Bh
ameter 40 mm
Bh
Bh
Ls
Unit
Unit
IU + OU )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 388 of 2419
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
Unit
144
48
100
60
468
156
360
120
Unit
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 389 of 2419
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
195
12
Bh
Bh
14
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 390 of 2419
SAT
VOLUME
12
18
41
32
53
39
Bh
14
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
270
-90
IU + OU )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 391 of 2419
SAT
VOLUME
140
160
+ IU 1.10 / OU 1.9/10, Kap.( 11 940 +13 200 BTU/h ) Wall type /Unit
288
96
120
60
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
EF G .1 ) - Gantung
Unit
320
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 392 of 2419
SAT
VOLUME
29
20
45
39
Bh
14
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
IU + OU )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 393 of 2419
SAT
VOLUME
Unit
Unit
Unit
270
90
60
240
360
120
280
120
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 394 of 2419
SAT
VOLUME
Unit
Unit
EF G .1 ) - Gantung
Unit
270
29
20
45
39
Bh
14
Bh
Unit
Unit
Unit
Unit
IU + OU )
270
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 395 of 2419
SAT
VOLUME
90
60
240
IU + OU )
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
216
54
180
324
108
360
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 396 of 2419
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
EF G .1 ) - Gantung
Unit
Unit
260
100
15
35
27
36
92
207
Bh
18
Bh
36
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 397 of 2419
SAT
VOLUME
12
35
31
35
46
39
Bh
14
Bh
Bh
18
Bh
28
16
16
16
16
Bh
16
e Pressurized Fan
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 398 of 2419
SAT
VOLUME
Unit
Unit
Unit
Unit
Bh
meter 20 mm
85
meter 15 mm
29
meter 10 mm
meter 10 mm
Bh
Ls
Bh
meter 20 mm
85
meter 15 mm
20
aan Tembaga :
an Bantu ( Fitting )
on ( Vacum )
aan Tembaga :
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 399 of 2419
SAT
VOLUME
meter 10 mm
meter 10 mm
Bh
Ls
an Bantu ( Fitting )
us Oxid ( NA )
aan Tembaga :
meter 20 mm
85
meter 15 mm
18
Bh
an Bantu ( Fitting )
Ls
prress Air ( CA )
aan Tembaga :
meter 20 mm
85
meter 15 mm
18
Bh
Ls
Unit
Unit
Bh
14
meter 20 mm
63
meter 15 mm
61
meter 10 mm
70
meter 10 mm
Bh
14
Ls
an Bantu ( Fitting )
aan Tembaga :
an Bantu ( Fitting )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 400 of 2419
SAT
VOLUME
Bh
14
meter 20 mm
63
meter 15 mm
61
meter 10 mm
70
meter 10 mm
Bh
14
Ls
Unit
aan Tembaga :
an Bantu ( Fitting )
Bh
14
Bh
26
meter 20 mm
40
meter 15 mm
137
meter 10 mm
130
meter 10 mm
Bh
26
an Bantu ( Fitting )
Ls
Bh
26
meter 20 mm
40
meter 15 mm
137
meter 10 mm
130
meter 10 mm
Bh
26
Ls
aan Tembaga :
aan Tembaga :
an Bantu ( Fitting )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 401 of 2419
SAT
Unit
VOLUME
5
Bh
26
Bh
36
meter 32 mm ( Riser )
meter 25 mm ( Riser )
20
meter 25 mm
26
meter 20 mm
44
meter 15 mm
180
meter 10 mm
80
meter 10 mm
Bh
36
an Bantu ( Fitting )
Ls
Bh
36
meter 32 mm ( Riser )
meter 25 mm ( Riser )
20
meter 25 mm
26
meter 20 mm
44
meter 15 mm
180
meter 10 mm
80
meter 10 mm
Bh
36
Ls
Bh
36
aan Tembaga :
aan Tembaga :
an Bantu ( Fitting )
us Oxid ( N2O )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 402 of 2419
SAT
VOLUME
aan Tembaga :
meter 32 mm ( Riser )
meter 25 mm ( Riser )
20
meter 25 mm
26
meter 20 mm
44
meter 15 mm
180
meter 10 mm
80
meter 10 mm
Bh
36
Ls
Bh
36
meter 32 mm ( Riser )
meter 25 mm ( Riser )
20
meter 25 mm
26
meter 20 mm
44
meter 15 mm
180
meter 10 mm
80
meter 10 mm
Bh
36
Ls
Unit
Bh
Bh
an Bantu ( Fitting )
press Air ( CA )
aan Tembaga :
an Bantu ( Fitting )
Outlet Oksigen
Unit
Ls
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 403 of 2419
SAT
Outlet Vacuum
VOLUME
Ls
Outlet N2O
Ls
Outlet CA
Ls
Operatioan
Set
Unit
Unit
Set
er Horizontal ( DV-H )
Unit
Unit
n Attachement
d Absorber
Alat Bantu
mmisioning
38
Ls
Ls
Ls
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 404 of 2419
SAT
VOLUME
er Verttkal ( DV-V )
Unit
Unit
60
er Verttkal ( DV-V )
Unit
Unit
48
er Verttkal ( DV-V )
Unit
er Horizontal( DV-H )
Unit
Unit
45
24
154
Bh
27
Bh
TL 2 x 36 W / Louvre M6
Bh
36
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 405 of 2419
SAT
VOLUME
TL 2 x 36 W / Louvre M6 + battere
Bh
29
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / IP-20 / Balk
Bh
10
TL 1 x 18 W / IP-40/Cove wastafel
Bh
10
Bh
60
Bh
24
Bh
35
Bh
Bh
17
Bh
10
144
TL 2 x 36 W / Louvre M6
Bh
16
TL 2 x 36 W / Louvre m6 + battere
Bh
23
Bh
66
Bh
24
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / Balk
Bh
Bh
13
Bh
65
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 406 of 2419
SAT
VOLUME
Bh
23
Bh
Bh
Bh
23
124
TL 2 x 36 W / Louvre M6
Bh
12
TL 2 x 36 W / Louvre m6 + battere
Bh
21
Bh
67
Bh
23
TL 1 x 36 W / Louvre M6
Bh
11
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / Balk
Bh
Bh
Bh
57
Bh
18
Bh
Bh
22
Bh
18
170
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 407 of 2419
SAT
VOLUME
TL 2 x 36 W / Louvre M6
Bh
TL 2 x 36 W / Louvre m6 + battere
Bh
Bh
85
Bh
53
TL 1 x 36 W / Louvre M6
Bh
13
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
Bh
65
Bh
33
Bh
Bh
13
Unit
Unit
Unit
Unit
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 408 of 2419
SAT
VOLUME
Bh
25
Ttk
Commisioning
Ls
12 / 100 Extention
Unit
Unit
Lot
F ( 40 Pairs )
Bh
20
Bh
35
Ttk
35
et analog
Ttk
35
Bh
24
Bh
29
Ttk
29
et analog
Bh
29
g & Commisioning
Telephone ( RJ-11 )
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 409 of 2419
SAT
VOLUME
Bh
24
Bh
31
Ttk
31
et analog
Bh
31
Bh
24
Bh
24
Ttk
24
et analog
Bh
24
Unit
Unit
30
Bh
77
Bh
Bh
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 410 of 2419
SAT
Bh
dari CTB-A ke TB F 1A
VOLUME
1
Unit
90
Unit
34
Bh
67
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
86
Temperature Detector
Detector
l Breack Glass
unit
34
Bh
76
Bh
Bh
Bh
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 411 of 2419
SAT
Ttk
unit
VOLUME
84
34
Bh
74
Bh
Bh
10
Bh
Bh
Bh
Bh
Ttk
90
0 W Power Amplifier
Unit
0 W Power Amplifier
Unit
Tunner AM/FM
Unit
erve Cassete
Unit
VD/MP3 - Playaer
Unit
Unit
Unit
Unit
Unit
Temperature Detector
Detector
l Breack Glass
Frame w/ Module
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 412 of 2419
SAT
VOLUME
Unit
Unit
20
Bh
65
Bh
Ttk
74
Bh
34
Bh
57
Bh
12
Ttk
69
Bh
34
Bh
37
Bh
Ttk
43
Bh
34
Bh
65
Bh
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 413 of 2419
SAT
VOLUME
Ttk
Unit
Unit
Unit
Unit
Unit
Unit
Unit
nd Amplifier ( Booster )
Unit
Unit
Unit
Unit
t Rack 19 ( 1,8 M)
TV ( RCA )
TV ( RCA )
70
100
Bh
Bh
25
Ttk
25
Bh
Bh
16
Ttk
16
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 414 of 2419
SAT
VOLUME
Bh
Bh
23
Ttk
23
Bh
Bh
Ttk
rame ( Server )
Set
Unit
Unit
20
Data ( RG-45 )
Bh
31
Ttk
31
TV ( RCA )
TV ( RCA )
Unit
24
Data ( RG-45 )
Bh
26
Ttk
26
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 415 of 2419
SAT
VOLUME
Unit
28
Data ( RG-45 )
Bh
23
Ttk
23
Unit
28
Data ( RG-45 )
Bh
12
Ttk
12
Set
Unit
Set
Set
Unit
Set
Unit
Ttk
Unit
Ttk
AN INSTALASI CCTV
with Printer
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 416 of 2419
SAT
VOLUME
Unit
Ttk
Unit
10
Ttk
10
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 417 of 2419
JUMLAH HARGA
6=4X5
1894875217.65367
30279861.58824
1645097885.75
176957772.75
3747210737.74191
642269376.204667
5501123928.736
1229900000
445358382.5344
1416002500
9234654187.47507
563204378.5
297836000
13436931.2
874477309.7
126150632.257778
101841878
913600874.706667
50019152.8
50811695.0733333
143751986
1386176218.83778
15242518453.7548
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 418 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
76590
82900
275084.311425
148590
219278.07
502950
67932
67932
265410
30412639.0512
1019670
133259037.96675
50810454.513
4773530.089251
123390574.356
8157614.22
147958.341552
2382494.26896
0
0
76590
82900
275084.311425
148590
219278.07
502950
67932
265410
22836317.9562
1082632.55
157229747.322169
50932937.25
2712491.653707
199911902.106
147958.341552
2382494.26896
0
0
76590
275084.311425
148590
502950
67932
265410
21498997.5819
258264996.422128
72926114.625
246243193.392
147958.341552
2382494.26896
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 419 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
0
76590
82900
275084.311425
148590
219278.07
502950
67932
67932
265410
JUMLAH 1.1.PEKERJA
34377118.2036
1032105
207011370.042715
69829870.5
2324347.542
144891968.508
39823776.36
147958.341552
2382494.26896
1894875217.65367
74725.2
3954644.397
0
0
74725.2
JUMLAH 1.2.PEKERJA
3011602.275
1807331.625
12773970
2389796.8875
21077050.5
23184755.55
5162812.875
221314.5
221314.5
3011602.275
5162812.875
221314.5
221314.5
26325217.19124
0
30279861.58824
24092818.2
3614663.25
76643820
2389796.8875
63231151.5
69554266.65
5162812.875
0
5754177
442629
0
0
0
15058011.375
5162812.875
0
5754177
442629
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 420 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
485671.0375
3011602.275
5162812.875
485671.0375
3011602.275
2389796.8875
12773970
21077050.5
23184755.55
5162812.875
485671.0375
JUMLAH 1.3.PEKERJA
450202.5
525937.5
450202.5
525937.5
450202.5
525937.5
450202.5
525937.5
2669658.75
2669658.75
1457013.1125
0
0
0
18069613.65
5162812.875
0
1942684.15
0
0
0
12046409.1
14338781.325
510958800
379386909
417325599.9
5162812.875
0
1942684.15
1645097885.75
31063972.5
8940937.5
0
24310935
11570625
0
23860732.5
11570625
0
26111745
6837187.5
0
0
0
2669658.75
0
0
0
2669658.75
0
0
0
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 421 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2776950
4859662.5
2776950
3439631.25
1633351.5
2776950
5648568.75
JUMLAH 1.4.PEKERJAA
2776950
0
0
0
4859662.5
0
0
2776950
0
0
0
0
6879262.5
0
0
0
1633351.5
0
0
2776950
0
0
0
0
5648568.75
0
0
0
176957772.75
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
7092800
313351.573333333
9087195.62666667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 422 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
155862.666666667
2961390.66666667
4217005.20266667
4217005.20266667
313351.573333333
12534062.9333333
313351.573333333
14100820.8
9322209.30666666
9322209.30666666
114532.733333333
229065.466666667
1375680
1375680
253459.066666667
506918.133333333
296221.2
296221.2
457072
914144
313351.573333333
9713898.77333333
191779.133333333
9780735.8
155862.666666667
3896566.66666667
135534.666666667
5827990.66666667
693195.8
4159174.8
104496.92
1671950.72
52457.24
21455011.16
253459.066666667
253459.066666667
271058.333333333
42827216.6666667
228369.533333333
228369.533333333
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 423 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
361049.04
361049.04
147057.533333333
294115.066666667
457072
457072
19776865.0053333
19776865.0053333
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
5910666.66666667
155862.666666667
1870352
654623.2
654623.2
374070.4
374070.4
313351.573333333
10340601.92
191779.133333333
10356073.2
155862.666666667
4052429.33333333
135534.666666667
6234594.66666667
693195.8
4159174.8
104496.92
1671950.72
52457.24
22923813.88
253459.066666667
253459.066666667
271058.333333333
45808858.3333333
228369.533333333
228369.533333333
136215.933333333
136215.933333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 424 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
20908523.482
20908523.482
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
4728533.33333333
155862.666666667
1870352
654623.2
654623.2
313351.573333333
9713898.77333333
191779.133333333
9588956.66666667
155862.666666667
3896566.66666667
135534.666666667
5692456
693195.8
4159174.8
104496.92
1671950.72
52457.24
21245182.2
253459.066666667
253459.066666667
271058.333333333
42556158.3333333
228369.533333333
228369.533333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 425 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
19588865.0393333
19588865.0393333
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
4137466.66666667
155862.666666667
1870352
2365172.04
2365172.04
313351.573333333
10027250.3466667
191779.133333333
9780735.8
155862.666666667
4052429.33333333
135534.666666667
5827990.66666667
693195.8
4159174.8
104496.92
1776447.64
52457.24
21769754.6
253459.066666667
253459.066666667
271058.333333333
46622033.3333333
228369.533333333
228369.533333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 426 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
20087824.1153333
20087824.1153333
313351.573333333
12534062.9333333
313351.573333333
6267031.46666667
135534.666666667
2710693.33333333
693195.8
13863916
253459.066666667
506918.133333333
177567.866666667
177567.866666667
147057.533333333
147057.533333333
107800
215600
12381496.3066667
12381496.3066667
642269376.204667
3746568.32
3746568.32
3746568.32
3746568.32
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 427 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3992740.4
3992740.4
3900248
3900248
3746568.32
3746568.32
17685173
17685173
17240498
17240498
23821688
23821688
170503.813333333
24552549.12
108605.053333333
5213042.56
6591.2
659120
11704
702240
8951756
8951756
7158826.4
7158826.4
10090124
10090124
7685321.6
7685321.6
11513084
11513084
7528796
7528796
10090124
10090124
12082268
12082268
6105836
6105836
14430152
14430152
12864896
12864896
14572448
14572448
16137704
16137704
170503.813333333
79795784.64
108605.053333333
16942388.32
6591.2
2372832
11704
1404480
588260.266666667
588260.266666667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 428 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
588260.266666667
588260.266666667
540150.666666667
540150.666666667
1461337.24
1461337.24
1092790.6
1092790.6
683801.866666667
683801.866666667
683801.866666667
683801.866666667
588260.266666667
588260.266666667
588260.266666667
588260.266666667
1382362.96
1382362.96
1382362.96
1382362.96
1445101.56
1445101.56
1169102.58666667
9352820.69333333
1445101.56
2890203.12
1445101.56
2890203.12
1169102.58666667
2338205.17333333
6591.2
1285284
3256133.76
19536802.56
2604907.008
31258884.096
1953680.256
11722081.536
1022379.01333333
4089516.05333333
2021581.1
16172648.8
4558587.264
13675761.792
3690284.928
7380569.856
3690284.928
11070854.784
3473209.344
24312465.408
3256133.76
29305203.84
2821982.592
39507756.288
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 429 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2604907.008
31258884.096
2387831.424
42980965.632
2170755.84
10853779.2
1953680.256
80100890.496
1736604.672
55571349.504
1519529.088
80535041.664
1302453.504
50795686.656
945435.26
13236093.64
1022275.1
1022275.1
1003987.6
9035888.4
3900248
3900248
5528825.72
5528825.72
5528825.72
5528825.72
11441936
11441936
23821688
23821688
23821688
23821688
11441936
11441936
17685173
17685173
19367823.2
19367823.2
19367823.2
19367823.2
19367823.2
19367823.2
24444233
24444233
24444233
24444233
23821688
23821688
23821688
23821688
170503.813333333
46036029.6
108605.053333333
-9774454.8
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 430 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
6591.2
922768
11704
1872640
14430152
14430152
11513084
11513084
7685321.6
7685321.6
10090124
10090124
6105836
6105836
12082268
12082268
7685321.6
7685321.6
11513084
11513084
170503.813333333
49105098.24
108605.053333333
10426085.12
6591.2
790944
11704
702240
588260.266666667
588260.266666667
588260.266666667
588260.266666667
540150.666666667
540150.666666667
1461337.24
1461337.24
1092790.6
1092790.6
588260.266666667
588260.266666667
588260.266666667
588260.266666667
1382362.96
1382362.96
1169102.58666667
8183718.10666667
1169102.58666667
1169102.58666667
6591.2
2109184
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 431 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
4558587.264
13675761.792
3690284.928
7380569.856
3690284.928
11070854.784
3473209.344
10419628.032
3256133.76
29305203.84
2821982.592
14109912.96
2604907.008
23444163.072
2387831.424
14326988.544
2170755.84
10853779.2
1953680.256
56656727.424
1736604.672
34732093.44
1519529.088
68378808.96
1302453.504
50795686.656
945435.26
13236093.64
1033658.78
1033658.78
11441936
11441936
11441936
11441936
10090124
10090124
19367823.2
19367823.2
19367823.2
19367823.2
19367823.2
19367823.2
19367823.2
19367823.2
23572670
23572670
23572670
23572670
23572670
23572670
23572670
23572670
23572670
23572670
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 432 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
23572670
23572670
24444233
24444233
24444233
24444233
170503.813333333
46036029.6
108605.053333333
9774454.8
6591.2
395472
11704
2808960
5714522
5714522
6105836
6105836
7685321.6
7685321.6
7685321.6
7685321.6
7685321.6
7685321.6
7685321.6
7685321.6
7685321.6
7685321.6
12082268
12082268
12082268
12082268
12082268
12082268
170503.813333333
61381372.8
108605.053333333
13032606.4
10164
2845920
11704
1404480
588260.266666667
588260.266666667
588260.266666667
588260.266666667
540150.666666667
540150.666666667
1461337.24
1461337.24
1092790.6
1092790.6
588260.266666667
588260.266666667
588260.266666667
588260.266666667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 433 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1382362.96
1382362.96
1169102.58666667
8183718.10666667
1169102.58666667
1169102.58666667
6591.2
1779624
4558587.264
13675761.792
3690284.928
7380569.856
3690284.928
11070854.784
3473209.344
10419628.032
3256133.76
29305203.84
2821982.592
14109912.96
2604907.008
23444163.072
2387831.424
14326988.544
2170755.84
10853779.2
1953680.256
56656727.424
1736604.672
34732093.44
1519529.088
68378808.96
1302453.504
50795686.656
945435.26
13236093.64
1033658.78
1033658.78
7872440.84
7872440.84
23572670
23572670
23572670
23572670
23572670
23572670
170503.813333333
46036029.6
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 434 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
108605.053333333
9774454.8
6591.2
395472
11704
2808960
28278228
28278228
21376872
21376872
21376872
21376872
25147716
25147716
25147716
25147716
20167356
20167356
21376872
21376872
28278228
28278228
28278228
28278228
170503.813333333
36828823.68
108605.053333333
5864672.88
16016
2882880
11513084
11513084
5714522
5714522
7685321.6
7685321.6
7685321.6
7685321.6
10090124
10090124
12082268
12082268
10090124
10090124
5714522
5714522
6105836
6105836
170503.813333333
55243235.52
108605.053333333
11729345.76
11704
4213440
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 435 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
588260.266666667
588260.266666667
1382362.96
1382362.96
588260.266666667
588260.266666667
55666.6666666667
55666.6666666667
1461337.24
1461337.24
640435.466666667
640435.466666667
1092790.6
1092790.6
670456.746666666
670456.746666666
683801.866666667
683801.866666667
1382362.96
1382362.96
588260.266666667
588260.266666667
1495616.64
1495616.64
1169102.58666667
1169102.58666667
1952386.8
7809547.2
6591.2
1713712
21009.2666666667
2100926.66666667
4992738.432
39941907.456
4341511.68
65122675.2
3256133.76
113964681.6
3473209.344
93776652.288
3256133.76
117220815.36
2821982.592
259622398.464
1953680.256
404411812.992
762608
13726944
2021581.1
72776919.6
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 436 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
4992738.432
19970953.728
4558587.264
13675761.792
4341511.68
17366046.72
4341511.68
17366046.72
3690284.928
14761139.712
3907360.512
11722081.536
3690284.928
7380569.856
3473209.344
41678512.128
3256133.76
26049070.08
2821982.592
11287930.368
2604907.008
91171745.28
2387831.424
14326988.544
2170755.84
10853779.2
1953680.256
60564087.936
1736604.672
60781163.52
1519529.088
69898338.048
1302453.504
50795686.656
945435.26
13236093.64
1033658.78
1033658.78
1003987.6
18071776.8
1033658.78
8269270.24
5643965.184
158031025.152
5426889.6
86830233.6
4992738.432
79883814.912
4341511.68
69464186.88
3256133.76
52098140.16
2445235.1
39123761.6
5501123928.736
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 437 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
500500000
500500000
515900000
515900000
159500000
159500000
18000000
54000000
1229900000
1001000
3003000
39281.0293333333
3338887.49333333
23097.4
669824.6
17787.2533333333
106723.52
52193.5333333333
156580.6
823087.122666667
823087.122666667
1001000
3003000
39281.0293333333
3338887.49333333
23097.4
461948
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 438 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
17787.2533333333
88936.2666666666
52193.5333333333
156580.6
760167.098666667
760167.098666667
39281.0293333333
3338887.49333333
23097.4
415753.2
1001000
3003000
750928.138666667
750928.138666667
39281.0293333333
3338887.49333333
23097.4
415753.2
1001000
3003000
750928.138666667
750928.138666667
999152
4995760
138600
277200
1001000
14014000
39281.0293333333
2474704.848
23097.4
1408941.4
17787.2533333333
1245107.73333333
52193.5333333333
730709.466666667
1025750.79626667
1025750.79626667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 439 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1001000
14014000
39281.0293333333
2474704.848
23097.4
1408941.4
17787.2533333333
1245107.73333333
52193.5333333333
730709.466666667
1025750.79626667
1025750.79626667
999152
4995760
261800
3665200
1001000
26026000
39281.0293333333
1571241.17333333
23097.4
3164343.8
17787.2533333333
2312342.93333333
52193.5333333333
1357031.86666667
1409585.58133333
1409585.58133333
1001000
26026000
39281.0293333333
1571241.17333333
23097.4
3164343.8
17787.2533333333
2312342.93333333
52193.5333333333
1357031.86666667
1409585.58133333
1409585.58133333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 440 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
999152
4995760
261800
6806800
1001000
36036000
51710.464
258552.32
45542.0533333333
910841.066666667
45542.0533333333
1184093.38666667
39281.0293333333
1728365.29066667
23097.4
4157532
17787.2533333333
1422980.26666667
52193.5333333333
1878967.2
1698594.1888
1698594.1888
1001000
36036000
51710.464
258552.32
45542.0533333333
910841.066666667
45542.0533333333
1184093.38666667
39281.0293333333
1728365.29066667
23097.4
4157532
17787.2533333333
1422980.26666667
52193.5333333333
1878967.2
1698594.1888
1698594.1888
1001000
36036000
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 441 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
51710.464
258552.32
45542.0533333333
910841.066666667
45542.0533333333
1184093.38666667
39281.0293333333
1728365.29066667
23097.4
4157532
17787.2533333333
1422980.26666667
52193.5333333333
1878967.2
1698594.1888
1698594.1888
1001000
36036000
51710.464
258552.32
45542.0533333333
910841.066666667
45542.0533333333
1184093.38666667
39281.0293333333
1728365.29066667
23097.4
4157532
17787.2533333333
1422980.26666667
52193.5333333333
1878967.2
1698594.1888
1698594.1888
999152
4995760
138600
1247400
7551360
67962240
1093400
1093400
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 442 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1004080
1004080
924000
924000
887040
887040
445358382.5344
141240000
141240000
110000000
110000000
27500000
27500000
38500000
38500000
27500000
27500000
59400000
178200000
1017500
38665000
82500000
82500000
33000000
33000000
5500000
5500000
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 443 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
27500000
27500000
59400000
178200000
1017500
61050000
27500000
27500000
59400000
118800000
1017500
48840000
27500000
27500000
27500000
55000000
59400000
118800000
1017500
45787500
1017500
24420000
1416002500
326872.883333333
50338424.0333333
212533.333333333
5738400
474744.533333333
1424233.6
276475.466666667
9953116.8
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 444 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
521766.666666667
15131233.3333333
124445.333333333
1120008
377847.733333333
1133543.2
132146.666666667
1057173.33333333
372017.066666667
2976136.53333333
117917.066666667
117917.066666667
89519.4666666667
895194.666666667
89519.4666666667
895194.666666667
272409.866666667
16344592
517701.066666667
12424825.6
340169.866666667
11905945.3333333
340169.866666667
1360679.46666667
516345.866666667
8777879.73333333
272409.866666667
2724098.66666667
326872.883333333
47069695.2
276475.466666667
4423607.46666667
521766.666666667
12000633.3333333
212533.333333333
14027200
474744.533333333
11393868.8
124445.333333333
248890.666666667
377847.733333333
755695.466666667
132146.666666667
792880
372017.066666667
2976136.53333333
117917.066666667
353751.2
89519.4666666667
447597.333333333
89519.4666666667
1163753.06666667
272409.866666667
17706641.3333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 445 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
517701.066666667
11907124.5333333
581127.733333333
1162255.46666667
581127.733333333
581127.733333333
516345.866666667
11875954.9333333
326872.883333333
40532237.5333333
276475.466666667
3317705.6
521766.666666667
10957100
212533.333333333
14239733.3333333
474744.533333333
10919124.2666667
124445.333333333
1368898.66666667
214967.5
644902.5
132146.666666667
660733.333333333
372017.066666667
2976136.53333333
117917.066666667
117917.066666667
89519.4666666667
447597.333333333
89519.4666666667
358077.866666667
272409.866666667
15527362.4
517701.066666667
9318619.2
581127.733333333
581127.733333333
516345.866666667
11359609.0666667
272409.866666667
4903377.6
326872.883333333
55568390.1666667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 446 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
276475.466666667
829426.4
521766.666666667
2608833.33333333
212533.333333333
18065333.3333333
474744.533333333
25161460.2666667
124445.333333333
1617789.33333333
377847.733333333
1511390.93333333
132146.666666667
528586.666666667
372017.066666667
2976136.53333333
117917.066666667
235834.133333333
272409.866666667
17706641.3333333
517701.066666667
17084135.2
581127.733333333
1162255.46666667
516345.866666667
6712496.26666667
563204378.5
36036000
36036000
89628000
89628000
136136000
136136000
36036000
36036000
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 447 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
297836000
8377600
8377600
174944
349888
50512
1262800
1694000
1694000
1752643.2
1752643.2
13436931.2
10875920
10875920
389840
389840
2500000
2500000
282028.266666667
282028.266666667
34336.6222222222
686732.444444444
201415.5
7049542.5
498793.386666667
17457768.5333333
215147.166666667
7530150.83333333
211521.2
211521.2
25752.4666666667
618059.2
201415.5
5841049.5
498793.386666667
14465008.2133333
215147.166666667
6239267.83333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 448 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
211521.2
211521.2
25752.4666666667
618059.2
201415.5
6243880.5
498793.386666667
15462594.9866667
215147.166666667
6669562.16666667
211521.2
211521.2
25752.4666666667
618059.2
201415.5
4833972
498793.386666667
11971041.28
215147.166666667
5163532
126150632.257778
169400
169400
240240
240240
87472
2624160
74572.6666666667
5742095.33333333
77960.6666666667
155921.333333333
231775.866666667
1158879.33333333
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 449 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
83160
83160
160910.133333333
14481912
240240
240240
87472
2974048
74572.6666666667
4996368.66666667
77960.6666666667
311842.666666667
231775.866666667
1854206.93333333
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
160910.133333333
13838271.4666667
240240
240240
87472
2974048
74572.6666666667
5667522.66666667
77960.6666666667
233882
231775.866666667
231775.866666667
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 450 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
160910.133333333
13516451.2
240240
240240
87472
2974048
74572.6666666667
5518377.33333333
77960.6666666667
155921.333333333
231775.866666667
2317758.66666667
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
160910.133333333
14481912
101841878
6350677.66666667
6350677.66666667
3569807.26666667
3569807.26666667
742082
742082
948750
948750
609950
609950
815816.833333333
1631633.66666667
1956441.66666667
1956441.66666667
2413821.66666667
2413821.66666667
785400
785400
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 451 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
378840
378840
266112
266112
18849.6
376992
153993.766666667
10009594.8333333
258720
2328480
151320.106666667
11197687.8933333
266112
266112
18849.6
640886.4
153993.766666667
8777644.7
258720
3104640
151320.106666667
10441087.36
266112
266112
18849.6
640886.4
153993.766666667
5697769.36666667
258720
1552320
151320.106666667
6506764.58666667
266112
266112
18849.6
640886.4
153993.766666667
10009594.8333333
258720
1293600
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 452 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11713288.4
819930188
913600874.706667
1940666.66666667
1940666.66666667
882381.866666667
882381.866666667
1338406.66666667
1338406.66666667
403318.666666667
403318.666666667
220366.666666667
220366.666666667
227069.333333333
227069.333333333
274120
274120
2864400
2864400
1047200
1047200
609950
609950
785400
785400
19712
1971200
227069.333333333
1816554.66666667
84736.6666666667
2118416.66666667
369236.266666667
9230906.66666667
227069.333333333
1362416
84736.6666666667
1355786.66666667
369236.266666667
5907780.26666667
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 453 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
227069.333333333
1589485.33333333
84736.6666666667
1948943.33333333
369236.266666667
8492434.13333333
227069.333333333
454138.666666667
84736.6666666667
593156.666666667
369236.266666667
2584653.86666667
50019152.8
Existing
229874.7
229874.7
271885.9
271885.9
21560
431200
15753.1
488346.1
498793.386666667
15462594.9866667
271885.9
271885.9
21560
517440
15753.1
409580.6
498793.386666667
12968628.0533333
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 454 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
271885.9
271885.9
21560
603680
15753.1
362321.3
498793.386666667
11472247.8933333
271885.9
271885.9
21560
603680
15753.1
189037.2
498793.386666667
5985520.64
50811695.0733333
10571000
10571000
306570
306570
8470220
42351100
1219900
1219900
1389300
1389300
396616
396616
2667500
8002500
1500000
4500000
2667500
8002500
1500000
4500000
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 455 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2667500
13337500
1500000
7500000
2667500
26675000
1500000
15000000
143751986
Pek. Gedung I (IBS, ICU, PICU dan CSSD) - page 456 of 2419
LINGKUP PEKERJAAN :
LANTAI GROUND FLOOR
1 Semua item pekerjaan dilantai ini selesei dan bisa difungsikan
LANTAI SATU
1 Pekerjaan dinding, plester dan aci selesei
2 Pekerjaan plafond selesei
3 pekerjaan pintu belum dilaksanakan, untuk jendela sudah semua
4 Pekerjaan MEP hanya instalasinya saja, unitnya belum terpasang
LANTAI DUA
1 Pekerjaan dinding, plester dan aci selesei
2 Pekerjaan plafond belum selesei
3 pekerjaan pintu belum dilaksanakan, untuk jendela sudah semua
4 Pekerjaan MEP hanya instalasinya saja, unitnya belum terpasang
Nomor
Lampiran
:
:
007/WSN-SPH/RSUPNTB/IV/2013
1 (satu) berkas
Matara
Kepada Yth.:
Pokja Jasa Konstruksi Tim 10
Jl. Pejanggik No. 12
di
Mataram
Perihal
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam D
Pengadaan untuk melaksanakan pekerjaan tersebut.
Penawaran ini berlaku selama 60 (enam puluh) hari kalender sejak batas akhir pem
Dokumen Penawaran.
Jangka waktu pelaksanaan pekerjaan ini adalah 180 (seratus delapan puluh) hari kalender.
d.
e.
f.
g.
h.
i.
j.
k.
l.
Daftar peralatan inti (minimal) mencakup jenis, kapasitas, komposisi, tahun pembelia
alat), kepemilikan (milik, sewa jangka pendek/ jangka panjang) jumlah dan jenis pe
minimal yang ditentukan dalam LDP;
Spesifikasi teknis pekerjaan yang ditawarkan;
Daftar personil inti (minimal) sesuai yang ditentukan dalam LDP;
Struktur Organisasi Proyek;
Daftar pekerjaan yang akan disubkontrakkan;
Daftar Pengalaman Perusahaan kurun waktu 10 tahun terakhir;
Daftar Pekerjaan yang sedang dilaksanakan;
Dukungan Redymix;
Dukungan dari pemegang hak paten Pondasi Konstruksi Sarang Laba-Laba (KSLL)
Katama Surya Bumi
3. Dokumen penawaran biaya meliputi :
a. Surat penawaran yang didalamnya mencantumkan;
1) bermaterai Rp. 6000 (disampaikan saat pembuktian kualifikasi);
2) bertanggal;
3) masa berlaku penawaran;
4) harga penawaran (angka dan huruf);
5) jangka waktu pelaksanaan pekerjaan;
b. Rencana Anggaran Biaya terdiri dari :
1) Rekapitulasi harga penawaran;
2) Rincian rencana anggaran biaya;
3) Analisa Harga Satuan;
4) Daftar Upah dan bahan;
4. Data Kualifikasi
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tund
semua ketentuan yang tercantum dalam Dokumen Pengadaan.
PT. WIGA NUSANTARA SEJATI
YUSEP SUPRIATNA
Direktur Utama
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
DUA PULUH TIGA MILYAR DUA PULUH TIGA JUTA RUPIAH
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI KSLL
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 4.20 M )
2.6. LANTAI DUA ( EL. + 8.20 M )
2.7. LANTAI TIGA / ATAP ( EL. + 12,20 M )
2.8. ATAP
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PASANGAN SANITAIR
3.6. PEKERJAAN PENGECATAN
3.7. PEKERJAAN RAILLING
IV.
V.
PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN PANEL DAN KABEL FEEDER
5.2. PEKERJAAN TITIK INSTALASI DAYA DAN PENERANGAN
BILL OF QUANTITY
PEMBANGUNAN GEDUNG K (IRNA 1 & IRJ TAMBAHAN ) TAHAP I
RUMAH SAKIT UMUM PROVINSI NUSA TENGGARA BARAT
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
8 Biaya Pengurusan IMB
JUMLAH I.PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
JUMLAH 2.1.PEKERJAAN PEMATANGAN LAHAN
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
JUMLAH 2.2.PEKERJAAN TANAH
2.3.
NO.
URAIAN PEKERJAAN
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=12 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
JUMLAH 2.3.PEKERJAAN PONDASI KSLL
2.4.
NO.
URAIAN PEKERJAAN
2.5.
2.6.
2.7.
NO.
URAIAN PEKERJAAN
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 100.100.10
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
NO.
URAIAN PEKERJAAN
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
JUMLAH 2.8.ATAP
III.
PEKERJAAAN ARSITEK
3.1.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Benang sudut
6 Kolom praktis 12/12
7 Balok praktis 12/12
8 Plint homogenius tile 10 x 60 cm cutting size
9 Plint keramik 10 x 30 cm
NO.
URAIAN PEKERJAAN
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
12 Border keramik 5 x 20 cm
13 Border keramik 20 x 40 cm
C.
LEVEL-2
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Benang sudut
6 Kolom praktis 12/12
7 Balok praktis 12/12
8 Plint homogenius tile 10 x 60 cm cutting size
9 Plint keramik 10 x 30 cm
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
12 Border keramik 5 x 20 cm
13 Border keramik 20 x 40 cm
JUMLAH 3.1.PEKERJAAN PASANGAN DINDING
NO.
URAIAN PEKERJAAN
3.2.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
5 Step noising keramik 5 x 20 cm
C.
LEVEL-2
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Lantai keramik 20 x 20 cm
JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI
3.3.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
NO.
URAIAN PEKERJAAN
C.
LEVEL-2
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND
3.4.
NO.
URAIAN PEKERJAAN
11 M (AL-ED uk. 2x900x2150)
12 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type W/1
2 Type W/1E
3 Type W/2E
4 Type W/3C
5 Type W/3E
6 Type LV/2
7 Type GLS
B.
LEVEL-1
PINTU
1 B (AL-ED uk. 900x2150)
2 B (AL-ED uk. 2x900x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 C (AL-ED uk. 900x2150)
5 C (AL-ED uk. 1000x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 2x900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type W/1EA
2 Type W/2EA
3 Type W/3EA
4 Type BV/2
5 Type LV/3
6 Type GLS
C.
LEVEL-2
PINTU
1 B (AL-ED uk. 900x2150)
2 B (AL-ED uk. 2x900x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 C (AL-ED uk. 900x2150)
5 C (AL-ED uk. 1000x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 2x900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type W/1EA
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 473 of 2419
NO.
URAIAN PEKERJAAN
2 Type
3 Type
4 Type
5 Type
W/2EA
W/3EA
LV/3
GLS
NO.
URAIAN PEKERJAAN
B.
LEVEL-1
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Wastafel gantung lengkap dengan aksesoris
5 Cove ligth wastafel
6 Kaca cermin+bingkai
7 Meja beton
8 Floor drain
9 Memasang cubical toilet
10 Memasang meja zink satu lubang
11 Meja marmer wastafel under counter
12 Memasang kran dinding 1/2"
13 Jet washer
14 Tisue holder
15 Hand shower lengkap dengan aksesories
16 Towel bar
17 Soap holder
18 Hand railling penyandang cacat
19 Hand dryer
C.
LEVEL-2
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Wastafel gantung lengkap dengan aksesoris
5 Cove ligth wastafel
6 Kaca cermin+bingkai
7 Meja beton
8 Floor drain
9 Memasang cubical toilet
10 Memasang meja zink satu lubang
11 Meja marmer wastafel under counter
12 Memasang kran dinding 1/2"
13 Jet washer
14 Tisue holder
15 Hand shower lengkap dengan aksesories
16 Towel bar
17 Soap holder
18 Hand railling penyandang cacat
19 Hand dryer
JUMLAH 3.5.PEKERJAAN PASANGAN SANITAIR
NO.
URAIAN PEKERJAAN
3.6.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecatan dinding enamel/ Epoxi paint
3 Pengecatan dinding dustrproff paint
4 Pengecatan plint Int Semi Gloss
5 Pengecetan dinding Watershield (Exterior)
6 Pengecatan plafond emulsion paint
7 Pengecatan list plafond emulsion paint
8 Pengecatan plafond enamel/ Epoxi paint
B.
LEVEL-1
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
NO.
URAIAN PEKERJAAN
C.
LEVEL-2
1 Pengecatan
2 Pengecatan
3 Pengecetan
4 Pengecatan
5 Pengecatan
3.7.
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
B.
C.
LEVEL-1
1 Railling Guard
-Black steel pipe 2" W/Synthetic
2 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic
-Black steel pipe 2" W/Synthetic
3 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic
LEVEL-2
1 Railling Guard
-Black steel pipe 2" W/Synthetic enamel paint finish
JUMLAH 3.7.PEKERJAAN RAILLING
IV.
SHAFT
1 AAV
2 Gate valve diameter 50 mm
3 Pemipaan Polypropelyne PN.10 :
B.
a.
Diameter 65 mm
b.
GROUND FLOOR
NO.
URAIAN PEKERJAAN
1 Gate Valve :
a.
GV diameter 40 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
LEVEL 1
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
NO.
URAIAN PEKERJAAN
D.
LEVEL 2
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
TOP FLOOR
1 Tanki Air bersih
a.
b.
c.
2 Pompa Tekan
a.
: 12 meter
Pompa
: 2 Unit
b.
c.
PPR diameter 65 mm
b.
PPR diameter 50 mm
NO.
URAIAN PEKERJAAN
3 Submersible Swage Pump 300 Lpm - Head 60 meter
4 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
c.
CO diameter 150 mm
d.
CO diameter 100 mm
b.
PVC diameter 80 mm
c.
PVC diameter 65 mm
d.
PVC diameter 50 mm
e.
CO diameter 100 mm
f.
CO diameter 80 mm
f.
CO diameter 65 mm
g.
CO diameter 50 mm
Diameter 32 mm
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
e.
CO diameter 65 mm
f.
CO diameter 50 mm
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
C.
LEVEL 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
e.
CO diameter 65 mm
f.
CO diameter 50 mm
4.
a.
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
NO.
URAIAN PEKERJAAN
D.
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
Diameter 50 mm
NO.
URAIAN PEKERJAAN
4.3.
Diameter 100 mm
Diameter 100 mm
JUMLAH 4.3.PEKERJAAN AIR HUJAN
V.
PEKERJAAN ELEKTRIKAL
5.1.
GROUND FLOOR
1 Panel Listrik
a.
MDP - K
b.
SDP - K GF
c.
LP - KGF
d.
PP - KGF
e.
PP - AC.KGF
f.
g.
PP-Penumatic
PP - AB
PP- STP
2 Kabel Feeder
a.
b.
c.
d.
e.
f.
g.
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Panel Listrik
a.
SDP - 1
b.
LP - K1
c.
PP - K1
d.
PP - AC.K1
e.
PP - UPS K1
f.
PP - OK 1.1
g.
PP - OK 1.2
2 Kabel Feeder
a.
b.
c.
d.
e.
f.
g.
NO.
URAIAN PEKERJAAN
C.
LEVEL 2
1 Panel Listrik
a.
SDP - 2
b.
LP - K2.
c.
PP - K2
d.
PP - AC.K2
e.
PP - UPS.K2
2 Kabel Feeder
D.
a.
b.
c.
d.
e.
LEVEL ROOF
1 Panel Listrik
a.
PP - LF
b.
PP - BP
2 Kabel Feeder
a.
b.
5.2.
GROUND FLOOR
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
h.
NO.
URAIAN PEKERJAAN
2 Titik instalasi
a.
b.
B.
LEVEL 1
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
2 Titik instalasi
a.
b.
NO.
URAIAN PEKERJAAN
C.
LEVEL 2
1 Saklar & Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
2 Titik instalasi
a.
b.
JUMLAH HARGA
21,658,541,095.20
3,024,063,630.53
JUMLAH A+B
24,682,604,725.73
PPN 10%
2,468,260,472.57
TOTAL
27,150,865,198.30
DIBULATKAN
27,150,800,000.00
YUSEP SUPRIATNA
Direktur Utama
JUMLAH HARGA
JUMLAH I.
JUMLAH II.
262,175,100.00
262,175,100.00
186,330,000.00
75,940,397.42
3,814,157,160.00
940,595,180.92
3,714,815,436.73
3,323,896,352.03
1,128,784,535.33
3,305,369,875.74
16,489,888,938.16
JUMLAH III.
1,065,744,485.73
531,075,256.25
407,661,743.68
1,345,952,840.71
290,888,256.00
299,671,602.93
51,199,973.55
3,992,194,158.85
JUMLAH IV.
93,171,905.10
207,771,829.91
31,259,233.61
332,202,968.62
JUMLAH V.
355,849,547.53
226,230,382.03
582,079,929.57
21,658,541,095.20
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
6=4X5
ls
m'
m2
Ls
m'
Ls
Ls
Ls
1.0000
260.0000
35.0000
1.0000
260.0000
1.0000
1.0000
1.0000
12,083,200.00
75,520.00
567,212.00
770,960.00
163,782.00
18,750,000.00
21,600,000.00
126,900,000.00
12,083,200.00
19,635,200.00
19,852,420.00
770,960.00
42,583,320.00
18,750,000.00
21,600,000.00
126,900,000.00
262,175,100.00
m3
m3
m3
m2
m3
EMATANGAN LAHAN
1,440.0000
288.0000
720.0000
1,200.0000
288.0000
10,720.00
26,180.00
157,158.00
32,725.00
37,950.00
15,436,800.00
7,539,840.00
113,153,760.00
39,270,000.00
10,929,600.00
186,330,000.00
m3
m3
m2
m3
m3
m3
321.0060
224.7042
1,651.3000
96.3018
1.7850
0.8925
48,050.00
18,975.00
32,725.00
12,540.00
174,620.00
777,796.25
15,424,338.30
4,263,762.20
54,038,792.50
1,207,624.57
311,696.70
694,183.15
75,940,397.42
m2
1,692.0000
2,254,230.00
3,814,157,160.00
SAT
m3
kg
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
R ( EL. + 0,00 M )
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3,814,157,160.00
5.6000
87.3600
2.6775
2.5200
2.5200
5,145.0880
6.5340
45.9270
2.9160
7.2900
1.7280
0.7200
0.6750
2,683,307.06
27,248.93
6,426,811.12
6,387,884.75
6,387,884.75
27,248.93
9,501,430.13
11,190,959.62
12,858,040.63
12,024,500.13
11,484,370.27
9,759,822.05
8,167,539.41
15,026,519.55
2,380,466.09
17,207,786.76
16,097,469.58
16,097,469.58
140,198,117.03
62,082,344.48
513,967,202.64
37,494,046.48
87,658,605.93
19,844,991.83
7,027,071.87
5,513,089.10
940,595,180.92
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
17.1000
2.0250
15.4350
45.1935
52.1625
64.7719
5.0085
7.2240
178.4400
15.0000
150.0000
150.0000
2.6775
2.5200
2.5200
6.1710
43.3755
2.7540
1.6320
0.7200
0.6750
7,348,257.89
8,241,415.02
8,512,723.33
8,791,759.37
9,335,661.85
8,271,787.51
9,171,717.21
7,635,603.56
6,126,956.29
7,143,851.35
246,240.00
104,940.00
6,426,811.12
6,387,884.75
6,387,884.75
9,605,303.10
11,315,094.23
13,009,633.04
11,597,943.82
9,759,822.05
8,167,539.41
125,655,209.91
16,688,865.41
131,393,884.67
397,330,377.04
486,971,461.30
535,779,186.53
45,936,545.66
55,159,600.13
1,093,294,080.03
107,157,770.18
36,936,000.00
15,741,000.00
17,207,786.76
16,097,469.58
16,097,469.58
59,274,325.42
490,797,869.83
35,828,529.40
18,927,844.31
7,027,071.87
5,513,089.10
3,714,815,436.73
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
5.4000
2.0250
11.0250
47.6685
46.9125
66.5719
3.8885
8.3040
177.9900
6.2618
44.0134
2.7945
1.6560
0.7200
7,348,257.89
8,241,415.02
8,512,723.33
8,791,759.37
9,335,661.85
8,271,787.51
9,171,717.21
7,635,603.56
6,126,956.29
8,920,037.49
10,496,159.52
11,992,183.52
10,859,658.50
9,759,822.05
39,680,592.60
16,688,865.41
93,852,774.77
419,089,981.48
437,959,236.59
550,668,404.04
35,664,222.38
63,406,051.98
1,090,536,949.70
55,855,044.73
461,971,405.15
33,512,156.86
17,983,594.47
7,027,071.87
3,323,896,352.03
m3
6.6150
8,512,723.33
56,311,664.86
( EL. + 4.20 M )
SAT
m3
m3
m3
m3
m3
m3
m3
m2
m2
ATAP ( EL. + 12,20 M )
kg
kg
kg
kg
kg
unit
bh
bh
bh
bh
VOLUME
HARGA SATUAN
JUMLAH HARGA
14.9985
42.4875
34.8750
3.7125
8.3040
1.0500
11.0700
110.7000
110.7000
(Rp)
8,791,759.37
9,095,047.50
9,625,158.69
8,271,787.51
7,635,603.56
6,126,956.29
7,143,851.35
246,240.00
104,940.00
(Rp)
131,863,202.89
386,425,830.72
335,677,409.25
30,709,011.13
63,406,051.98
6,433,304.10
79,082,434.40
27,258,768.00
11,616,858.00
1,128,784,535.33
16,739.6544
17,575.7904
17,091.2112
4,412.1980
6,698.2625
62.0000
248.0000
4,492.0000
3,388.0000
2,416.0000
31,192.49
31,192.49
31,192.49
31,192.49
31,192.49
488,160.00
188,640.00
23,040.00
23,040.00
15,840.00
522,151,450.85
548,232,612.09
533,117,381.74
137,627,428.39
208,935,464.77
30,265,920.00
46,782,720.00
103,495,680.00
78,059,520.00
38,269,440.00
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
11,953.4211
644.6268
24.0000
(Rp)
31,192.49
116,640.00
97,200.00
(Rp)
372,856,929.79
75,189,274.86
2,332,800.00
m3
m3
m1
m1
17.9895
8.4191
233.1000
97.4400
6,048,000.00
5,796,000.00
163,800.00
52,416.00
108,800,450.64
48,797,050.91
38,181,780.00
5,107,415.04
m2
m1
2,205.0000
194.0400
168,486.21
183,747.96
371,512,102.50
35,654,454.16
3,305,369,875.74
m2
1,077.3574
141,700.00
152,661,536.50
m2
2,154.7147
42,200.00
90,928,960.34
m2
2,154.7147
17,100.00
36,845,621.37
m1
408.6000
21,700.00
8,866,620.00
m1
481.3380
11,280.00
5,429,492.64
m1
4.0772
95,902.78
391,016.33
m1
1.3205
97,459.55
128,693.39
m1
155.6500
26,420.00
4,112,273.00
m1
m1
12.5000
17,760.00
222,000.00
m2
45.6650
163,760.00
7,478,100.40
m1
12.5000
92,550.00
1,156,875.00
m1
12.5000
145,380.00
1,817,250.00
m2
m2
m2
m1
m1
m1
m1
m1
1,113.0272
2,226.0544
2,226.0544
442.6400
536.4520
4.5441
1.4371
21.5000
141,700.00
42,200.00
17,100.00
21,700.00
11,280.00
95,902.78
97,459.55
26,420.00
157,715,954.24
93,939,495.68
38,065,530.24
9,605,288.00
6,051,178.56
435,788.35
140,061.07
568,030.00
m1
kg
bh
bh
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
m1
127.1262
(Rp)
17,760.00
m2
m1
238.0235
96.6996
163,760.00
92,550.00
38,978,723.45
8,949,547.98
m1
96.6996
145,380.00
14,058,187.85
m2
m2
m2
m1
m1
m1
m1
m1
975.9051
1,951.8102
1,951.8102
372.8900
355.6910
3.0129
1.2103
527.0030
141,700.00
42,200.00
17,100.00
21,700.00
11,280.00
95,902.78
97,459.55
26,420.00
138,285,752.67
82,366,390.44
33,375,954.42
8,091,713.00
4,012,194.48
288,946.62
117,957.24
13,923,419.26
m1
m1
220.3006
m2
m1
411.2763
139.6000
163,760.00
92,550.00
67,350,605.25
12,919,980.00
m1
139.6000
145,380.00
20,295,048.00
ASANGAN DINDING
(Rp)
2,257,761.31
1,065,744,485.73
SAT
m2
VOLUME
568.9314
m2
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
222,896.08
126,812,578.85
m2
5.8200
163,466.05
951,372.41
m2
65.0750
38,788.20
2,524,142.12
m1
27.8760
71,703.90
1,998,817.80
m2
136.8449
110,542.50
15,127,177.36
m2
535.6526
222,896.08
119,394,864.78
m2
m2
64.3543
163,466.05
10,519,743.22
m2
16.4414
38,788.20
637,732.31
m1
37.2222
71,703.90
2,668,976.76
m2
1,039.3364
222,896.08
231,664,009.36
m2
m2
163,466.05
ASANGAN LANTAI
18,775,841.28
531,075,256.25
m2
600.0075
140,831.94
84,500,220.75
m2
18.5625
136,889.69
2,541,014.85
m1
609.7000
15,603.96
9,513,734.41
m2
48.0000
156,474.36
7,510,769.28
m2
15.5993
26,955.50
420,486.93
m2
479.7398
140,831.94
67,562,687.14
m2
64.3543
136,889.69
8,809,440.09
m1
673.3261
15,603.96
10,506,553.53
m2
72.0000
156,474.36
11,266,153.92
m2
21.1350
26,955.50
569,704.49
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
m2
1,021.0360
140,831.94
143,794,481.57
m2
206.4121
136,889.69
28,255,688.11
m1
1,355.0826
15,603.96
21,144,654.69
m2
72.0000
156,474.36
11,266,153.92
m2
ASANGAN PLAFOND
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
407,661,743.68
1.0000
2.0000
2.0000
2.0000
6.0000
16,112,851.57
5,683,385.01
12,253,498.00
5,406,114.08
5,774,599.27
5,918,558.85
6,080,663.47
7,904,862.51
13,034,849.75
5,778,167.90
Tidak Dikerjakan
5,683,385.01
24,506,996.00
10,812,228.17
11,549,198.53
Tidak Dikerjakan
Tidak Dikerjakan
Tidak Dikerjakan
Tidak Dikerjakan
34,669,007.42
SAT
unit
unit
unit
unit
unit
unit
unit
unit
unit
VOLUME
4.0000
12.0000
2.0000
23.0000
1.0000
unit
unit
unit
unit
unit
unit
unit
unit
unit
1.0000
2.0000
14.0000
2.0000
unit
unit
unit
unit
unit
unit
2.0000
22.0000
unit
unit
unit
unit
unit
unit
unit
unit
unit
1.0000
2.0000
7.0000
2.0000
unit
2.0000
2.0000
4.0000
13.0000
1.0000
2.0000
4.0000
8.0000
HARGA SATUAN
JUMLAH HARGA
(Rp)
12,439,913.29
9,381,120.85
(Rp)
49,759,653.14
112,573,450.21
4,952,875.84
4,952,875.84
8,631,253.41
10,425,794.23
12,890,506.77
4,540,042.15
485,671.04
Tidak Dikerjakan
9,905,751.68
198,518,828.44
Tidak Dikerjakan
Tidak Dikerjakan
Tidak Dikerjakan
485,671.04
5,683,385.01
5,683,385.01
12,253,498.00
24,506,996.00
5,406,114.08
75,685,597.16
5,774,599.27
11,549,198.53
5,918,558.85 Tidak Dikerjakan
6,080,663.47 Tidak Dikerjakan
13,034,849.75
26,069,699.50
12,439,913.29
49,759,653.14
9,381,120.85
121,954,571.06
4,634,471.77
9,268,943.54
7,325,219.18
161,154,821.97
10,425,794.23 Tidak Dikerjakan
11,587,862.40 Tidak Dikerjakan
5,143,850.31 Tidak Dikerjakan
485,671.04
485,671.04
5,683,385.01
5,683,385.01
12,253,498.00
24,506,996.00
5,406,114.08
37,842,798.58
5,774,599.27
11,549,198.53
5,918,558.85 Tidak Dikerjakan
6,080,663.47 Tidak Dikerjakan
13,034,849.75
26,069,699.50
12,439,913.29
49,759,653.14
9,381,120.85
75,048,966.81
4,634,471.77
9,268,943.54
SAT
VOLUME
unit
unit
unit
unit
22.0000
1.0000
HARGA SATUAN
(Rp)
(Rp)
7,325,219.18
161,154,821.97
10,425,794.23 Tidak Dikerjakan
5,143,850.31 Tidak Dikerjakan
485,671.04
485,671.04
set
set
set
bh
bh
m
bh
unit
bh
m
bh
set
bh
bh
bh
JUMLAH HARGA
1,345,952,840.71
2.0000
15.0000
15.0000
0.3132
2.0000
1.0000
2.0000
2.0000
2,388,808.51
2,084,465.99
1,016,636.15
309,074.54
243,866.70
3,922,839.09
312,950.55
267,674.84
553,501.04
326,502.00
191,794.54
316,850.00
72,894.94
681,324.68
610,373.61
Tidak
Tidak
Tidak
Tidak
Tidak
Tidak
Tidak
4,777,617.02
Dikerjakan
15,249,542.22
Dikerjakan
3,658,000.50
1,228,633.20
625,901.10
Dikerjakan
553,501.04
Dikerjakan
Dikerjakan
633,699.99
145,789.88
Dikerjakan
Dikerjakan
SAT
bh
set
set
set
bh
bh
m
bh
unit
bh
m
bh
set
bh
set
bh
bh
bh
bh
bh
set
set
set
bh
m
m
bh
unit
bh
m
bh
set
bh
set
bh
bh
bh
bh
ASANGAN SANITAIR
VOLUME
14.0000
15.0000
13.0000
4.0000
17.0000
17.0000
0.7867
15.0000
1.0000
7.7840
15.0000
15.0000
15.0000
14.0000
14.0000
15.0000
14.0000
13.0000
10.0000
7.0000
4.0000
7.0000
11.0000
0.5214
10.0000
1.0000
10.0000
10.0000
10.0000
10.0000
10.0000
10.0000
10.0000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1,297,167.21
18,160,340.97
2,388,808.51
35,832,127.65
2,084,465.99
27,098,057.84
1,016,636.15
4,066,544.59
309,074.54
5,254,267.10
243,866.70
4,145,733.90
3,922,839.09
3,086,175.97
312,950.55
4,694,258.25
267,674.84 Tidak Dikerjakan
553,501.04
553,501.04
326,502.00
2,541,478.51
191,794.54
2,876,918.03
316,850.00
4,752,749.93
72,894.94
1,093,424.06
702,707.20
9,837,900.77
1,297,167.21
18,160,340.97
681,324.68
10,219,870.24
573,903.00
8,034,642.00
610,373.61
7,934,856.93
1,297,167.21
2,388,808.51
2,084,465.99
1,016,636.15
309,074.54
243,866.70
3,922,839.09
312,950.55
267,674.84
553,501.04
326,502.00
191,794.54
316,850.00
72,894.94
702,707.20
1,297,167.21
681,324.68
573,903.00
610,373.61
Tidak Dikerjakan
23,888,085.10
14,591,261.92
4,066,544.59
2,163,521.75
2,682,533.70
2,045,222.37
3,129,505.50
Tidak Dikerjakan
553,501.04
Tidak Dikerjakan
Tidak Dikerjakan
3,168,499.95
728,949.38
7,027,071.98
12,971,672.12
6,813,246.83
5,739,030.00
6,103,736.10
290,888,256.00
SAT
VOLUME
m
m
m
m'
m
m
m
m
1,352.1625
m
m
m'
m
m
m
1,450.2395
38.0650
29.3000
204.7855
637.2291
673.3261
50.5425
29.3000
193.6100
666.5700
609.7000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
32,850.26
44,418,893.00
34,450.54 Tidak Dikerjakan
38,430.83
1,942,390.40
5,448.40
159,638.07
42,825.08
8,291,363.56
36,922.09
24,611,158.33
3,427.53
2,089,763.44
37,895.59 Tidak Dikerjakan
32,850.26
38,430.83
5,448.40
42,825.08
36,922.09
3,427.53
47,640,747.53
1,462,869.67
159,638.07
8,769,955.23
23,527,830.94
2,307,843.63
SAT
m
m
m
m
m
VOLUME
2,231.1811
195.4860
1,299.4481
1,355.0826
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
32,850.26
73,294,883.72
38,430.83 Tidak Dikerjakan
42,825.08
8,371,703.40
36,922.09
47,978,341.25
3,427.53
4,644,582.70
299,671,602.93
8.8410
399,712.50
3,533,858.21
3.3000
399,712.50
1,319,051.25
49.6300
399,712.50
19,837,731.38
8.8410
399,712.50
3,533,858.21
3.3000
399,712.50
1,319,051.25
54.1800
399,712.50
21,656,423.25
51,199,973.55
Bh
1.0000
107,800.00
107,800.00
Bh
3.0000
143,687.87
431,063.60
50.4000
265,892.27
13,400,970.60
1.0000
2,680,194.12
2,680,194.12
Ls
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Bh
2.0000
100,980.73
201,961.47
11.2000
110,129.34
1,233,448.61
43.4000
69,473.34
3,015,142.96
42.7000
45,554.74
1,945,187.40
77.0000
27,688.10
2,131,983.70
Ls
1.0000
1,665,152.53
1,665,152.53
Bh
4.0000
100,980.73
403,922.93
Bh
1.0000
68,455.93
68,455.93
15.4000
110,129.34
1,695,991.84
46.2000
69,473.34
3,209,668.31
65.8000
45,554.74
2,997,501.89
201.6000
27,688.10
5,581,920.96
1.0000
2,357,818.23
2,357,818.23
Ls
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Bh
4.0000
100,980.73
403,922.93
Bh
1.0000
68,455.93
68,455.93
8.4000
110,129.34
925,086.46
42.0000
69,473.34
2,917,880.28
74.9000
45,554.74
3,412,050.03
141.4000
27,688.10
3,915,097.34
Ls
1.0000
2,049,005.53
2,049,005.53
Unit
1.0000
Bh
2.0000
Bh
2.0000
Set
1.0000
Bh
4.0000
Bh
2.0000
60.0000
265,892.27
15,953,536.43
82.0000
169,130.99
13,868,741.50
Unit
1.0000
471,240.00
471,240.00
Ls
1.0000
6,058,703.59
6,058,703.59
93,171,905.10
Unit
1.0000
Unit
3.0000
212,520.00
212,520.00
-
SAT
Unit
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
6.0000
5,274,895.82
31,649,374.94
40.6000
399,700.69
16,227,848.15
97.3000
171,508.45
16,687,772.25
Bh
3.0000
362,527.00
1,087,581.00
Bh
6.0000
287,991.00
1,727,946.00
91.7000
171,508.45
15,727,324.93
33.6000
104,649.38
3,516,219.17
62.3000
67,381.10
4,197,842.61
35.0000
55,231.73
1,933,110.67
Bh
4.0000
287,991.00
1,151,964.00
Bh
1.0000
227,007.00
227,007.00
Bh
5.0000
135,531.00
677,655.00
Bh
1.0000
125,367.00
125,367.00
24.5000
36,182.63
886,474.44
Ttk
12.0000
281,808.00
3,381,696.00
1.0000
9,589,252.81
9,589,252.81
Ls
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
21.0000
171,508.45
3,601,677.46
Bh
13.0000
287,991.00
3,743,883.00
18.2000
104,649.38
1,904,618.72
76.3000
67,381.10
5,141,178.03
42.0000
55,231.73
2,319,732.80
Bh
4.0000
227,007.00
908,028.00
Bh
13.0000
135,531.00
1,761,903.00
Bh
7.0000
125,367.00
877,569.00
5.6000
55,231.73
309,297.71
46.2000
36,182.63
1,671,637.51
44.8000
26,492.95
1,186,884.16
1.0000
4,447,905.04
4,447,905.04
51.1000
171,508.45
8,764,081.83
Bh
11.0000
287,991.00
3,167,901.00
16.8000
104,649.38
1,758,109.58
60.2000
67,381.10
4,056,342.30
33.6000
55,231.73
1,855,786.24
Bh
1.0000
227,007.00
227,007.00
Bh
12.0000
135,531.00
1,626,372.00
Bh
2.0000
125,367.00
250,734.00
4.2000
55,231.73
231,973.28
64.4000
36,182.63
2,330,161.37
56.0000
26,492.95
1,483,605.20
Unit
1.0000
199,910.33
199,910.33
Ls
1.0000
4,853,693.72
4,853,693.72
Ls
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
100.8000
171,508.45
17,288,051.83
100.8000
104,649.38
10,548,657.50
100.8000
55,231.73
5,567,358.72
1.0000
6,680,813.61
6,680,813.61
Ls
207,771,829.91
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Bh
4.0000
212,520.00
850,080.00
144.0000
171,508.45
24,697,216.90
Ls
1.0000
4,939,443.38
4,939,443.38
Bh
4.0000
193,123.33
772,493.33
31,259,233.61
Unit
1.0000
21,164,409.20
21,164,409.20
Unit
1.0000
18,495,725.60
18,495,725.60
Unit
1.0000
11,450,379.60
11,450,379.60
Unit
1.0000
11,844,065.20
11,844,065.20
Unit
1.0000
11,713,288.40
11,713,288.40
Unit
1.0000
11,212,542.00
11,212,542.00
Unit
1.0000
Unit
1.0000
12,147,630.00
Unit
1.0000
12,147,630.00
100.0000
735,207.00
73,520,700.00
30.0000
121,975.33
3,659,260.00
10.0000
42,014.87
420,148.67
10.0000
66,412.13
664,121.33
10.0000
410,094.52
4,100,945.20
10.0000
27,785.27
277,852.67
10.0000
30.0000
42,014.87
30.0000
1,260,446.00
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Unit
1.0000
19,357,927.60
19,357,927.60
Unit
1.0000
11,529,658.80
11,529,658.80
Unit
1.0000
11,923,344.40
11,923,344.40
Unit
1.0000
11,897,595.60
11,897,595.60
Unit
1.0000
11,313,165.60
11,313,165.60
Unit
1.0000
- Tidak Dikerjakan
Unit
1.0000
- Tidak Dikerjakan
35.0000
179,571.33
6,284,996.67
10.0000
42,014.87
420,148.67
10.0000
94,871.33
948,713.33
10.0000
42,014.87
420,148.67
10.0000
42,014.87
420,148.67
10.0000
10.0000
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Unit
1.0000
13,518,370.80
13,518,370.80
Unit
1.0000
11,529,658.80
11,529,658.80
Unit
1.0000
11,923,344.40
11,923,344.40
Unit
1.0000
12,377,336.40
12,377,336.40
Unit
1.0000
11,313,165.60
11,313,165.60
40.0000
179,571.33
7,182,853.33
10.0000
42,014.87
420,148.67
10.0000
117,917.07
1,179,170.67
10.0000
42,014.87
420,148.67
10.0000
42,014.87
420,148.67
Unit
1.0000
6,707,243.40
6,707,243.40
Unit
1.0000
10,948,278.00
10,948,278.00
42.0000
266,296.80
11,184,465.60
10.0000
27,785.27
277,852.67
355,849,547.53
Bh
34.0000
29,147.80
991,025.20
Bh
13.0000
31,858.20
414,156.60
Bh
8.0000
41,344.60
330,756.80
Bh
1.0000
214,967.50
214,967.50
Bh
76.0000
36,081.10
2,742,163.60
Bh
43.0000
36,081.10
1,551,487.30
Bh
1.0000
36,081.10
36,081.10
Bh
4.0000
36,081.10
144,324.40
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Ttk
142.0000
170,766.13
24,248,790.93
Ttk
124.0000
197,562.13
24,497,704.53
Bh
78.0000
29,147.80
2,273,528.40
Bh
22.0000
31,858.20
700,880.40
Bh
2.0000
41,344.60
82,689.20
Bh
123.0000
36,081.10
4,437,975.30
Bh
55.0000
36,081.10
1,984,460.50
Bh
16.0000
36,081.10
577,297.60
Bh
3.0000
36,081.10
108,243.30
Ttk
199.0000
170,766.13
33,982,460.53
Ttk
197.0000
197,562.13
38,919,740.27
SAT
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Bh
78.0000
29,147.80
2,273,528.40
Bh
22.0000
31,858.20
700,880.40
Bh
2.0000
41,344.60
82,689.20
Bh
144.0000
36,081.10
5,195,678.40
Bh
64.0000
36,081.10
2,309,190.40
Bh
11.0000
36,081.10
396,892.10
Bh
2.0000
36,081.10
72,162.20
Ttk
195.0000
170,766.13
33,299,396.00
Ttk
221.0000
197,562.13
43,661,231.47
226,230,382.03
TENAGA KERJA
Koordinator Pelaksana
Pelaksana Struktur
Pelaksana Arsitektur
Pelaksana Elektrikal
Pelaksana Mekanikal
Cost Estimator
Surveyor (Juru ukur)
Ass. Surveyor
Pelaksana Lapangan
Logistik
Administrasi Keuangan
Mandor Struktur
Mandor Arsitektur
Mandor Elektrikal
Mandor Mekanikal
Kepala Tukang kayu
Kepala Tukang batu
Kepala Tukang besi
Tukang kayu
Tukang batu
Tukang besi
Tukang almunium
Tukang plafond
Tukang plumbing
Tukang listrik
Pekerja
Harian lepas
10
MINGGU KE
11
12
13
14
15
16
17
PT. WIG
MINGGU KE
18
19
20
21
22
23
24
YUSEP SUPRIATNA
Direktur Utama
JADWAL MATERIAL
PEMBANGUNAN GEDUNG K (IRNA dan IRJ TAMBAHAN) TAHAP 1 RSUP NTB
NO.
JENIS MATERIAL
PEKERJAAN STANDAR
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
5
6
7
8
9
III.
1
Material Pondasi
Pasir beton
Split / Batu pecah
Semen (PC)
Besi beton
- Ulir
- Polos
Kayu (Balok)
Multiplek 9 mm
Paku
Ready mix
K-175
K-225
Material Struktur
Pasir beton
Split / Batu pecah
Semen (PC)
Besi beton
- Ulir
- Polos
Kayu (Balok)
Multiplek 9 mm
Paku
Ready Mix
- K-225
- K-250
- K-300
Water Proofing Membran
Material Arsitektur
Mat. Pekerjaan Dinding
Batu Bata Merah
Bata Ringan / hebel
Pasir Pasang
Semen (PC)
Keramik Dinding
Keramik 20 x 20 cm
Floor hardener
Step noising keramik 5 x 20 cm
3 Mat. Pekerjaan Pasangan Plafond
Rangka Metal Furing
Rangka Hollow
Plapond gypsum 9 mm
Plapond grc 9 mm
List plafond gypsum
Acustic Tile 60 x 60 cm
4 Mat. Pekerjaan Pasangan Pintu dan Jendela
5 Mat. Pekerjaan Sanitair
6 Mat. Pekerjaan Pengecatan
7 Mat.Pekerjaan Railling
IV.
1
2
3
V. Material Elektrikal
1 Mat. Panel dan Kabel Feeder
2 Mat. Instalasi Daya dan Penerangan
II.
Pekerjaan Arsitektur
Material Pelapis Dinding dan Lantai
Material Plafond
Material Pintu dan Jendela
Material Furniture
Pekerjaan Mekanikal
Material Hydrant & Sprinkel
Material Pengkondisian Udara & Exhaust fan
Material Pekerjaan Elevator
Material Pekerjaan Gas Medis
(Tidak Dikerjakan)
(Tidak Dikerjakan)
(Tidak Dikerjakan)
III.
IV.
(Tidak Dikerjakan)
10
MINGGU KE
11
12
13
14
15
16
17
18
19
20
21
YUSEP SUPRIATNA
Direktur Utama
22
23
24
YUSEP SUPRIATNA
JADWAL PERALATAN
PEMBANGUNAN GEDUNG K (IRNA dan IRJ TAMBAHAN) TAHAP 1 RSUP NTB
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
JENIS ALAT
Theodolite
Waterpass
Excavator
Bulldozer
Dump truck
Pick up
Concrete Mixer
Concrete Vibrator
Genset
Mini Vibro
Vibro Roller
Mesin Gilas
Stamper
Pompa Air
Lift Kerja
Concrete Pump
Mobile Crane
Bucket cor
Scafollding
Pipe Support
Mesin Las
Gunting besi
Whell Cutter
Tabung Oksigen + Blender
Tabung Asiteline
Mesin Throwel
10
11
MINGGU KE
12
13
14
15
MINGGU KE
16
17
18
19
20
21
22
23
24
YUSEP SUPRIATNA
Direktur Utama
METODE PELAKSANAAN
PEMBANGUNAN GEDUNG K (IRNA 1 DAN IRJ TAMBAHAN) TAHAP I RSUP NTB
A.
UMUM
Nusa Tenggara Barat adalah salah satu provinsi dari 33 provinsi di Indonesia. Nu
Tenggara dibagi menjadi 2 yaitu : Nusa Tenggara Barat dan Nusa Tenggara Timur.
Mataram adalah ibukota Provinsi Nusa Tenggara Barat. Kota ini mempunyai luas wilay
61,30 km dan berbatasan dengan :
Batas Utara
: Kabupaten Lombok Barat
Batas Selatan
: Kabupaten Lombok Barat
Batas Timur
: Kabupaten Lombok Barat
Batas Barat
: Selat Lombok
Kota Mataram terdiri 3 kecamatan dan 23 kelurahan.
Kecamatan Mataram, Kecamatan Cakranegara dan Kecamatan Ampenan.
Demikian sekilas tentang kota dimana akan dilaksanakan pembangunan Gedung K (IRNA
dan IRJ TAMBAHAN) Tahap 1 RSUP Nusa Tengagara Barat.
B.
PELAKSANAAN
Aspek teknologi sangat berperan dalam suatu proyek konstruksi. Penggunaan metode ya
tepat, praktis, cepat dan aman sangat membantu dalam penyelesaian pekerjaan pada sua
proyek konstruksi. Sehngga target waktu, biaya dan mutu sebagaimana ditetapkan dap
tercapai.
Pembangunan Gedung
Sesuai dengan item pekerjaan yang terdapat dalam Bill of Quantity Pembangunan Gedung
(IRNA dan IRJ TAMBAHAN) RSUP Nusa Tenggara Barat akan dijelaskan dalam metode ini.
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
8 Biaya Pengurusan IMB
1 Pengukuran (Uitzet)
As dan peil bangunan menentukan letak/posisi dan orientasi bangunan
Posisi As bangunan diukur dari titik acuan yang telah ditentukan
Seiring pembersihan lokasi dibuat papan nama proyek, papan nama proy
ini dipasang pada tempat yang mudah dilihat dengan mencantumkan da
data proyek antara lain nama proyek, pekerjaan, lokasi, nilai proyek, wak
pelaksanaan, pengawas pelaksana proyek, dll.
2 Pemasangan Bouwplank
Kantor proyek di bangun sebagai tempat bekerja bagi para staf baik staf d
kontraktor, pengawas, maupun pemilik proyek di lapangan. Pembuat
direksi keet tidak perlu di bangun secara permanen karena hanya bersi
sementara, namun tetap mengutamakan kenyaman yang mengacu pa
spesifikasi teknis dokumen pelelangan yakni Direksi keet dilengkapi deng
ketentuan dalam dokumen kontrak.
Kantor proyek di bangun sebagai tempat bekerja bagi para staf baik staf d
kontraktor, pengawas, maupun pemilik proyek di lapangan. Pembuat
direksi keet tidak perlu di bangun secara permanen karena hanya bersi
sementara, namun tetap mengutamakan kenyaman yang mengacu pa
spesifikasi teknis dokumen pelelangan yakni Direksi keet dilengkapi deng
ketentuan dalam dokumen kontrak.
Khusus untuk Direksi Keet dapat juga di sewa / kontrak jangka pendek ses
dengan kebutuhan. Namun hal ini perlu mendapat persetujuan dari direk
pengawas.
Lokasi Direksi Keet sebaiknya dekat dari lokasi pekerjaan.
Letak direksi keet dibuat pada tempat yang mudah dijangkau dan mud
dicapai dalam proses bongkar muat material yang akan digunakan.
Barak kerja dibuat untuk tempat tinggal sementara tenaga kerja sela
proyek berlangsung.
Gudang Material dan peralatan
Papan nama proyek ini didirikan pada lokasi yang mudah terlihat o
masyarakat yang melintas di area lokasi pekerjaan.
Papan nama proyek ini dipasang dengan 2 (dua) buah kaki yang terbuat d
kaso 5/7, dan pada bagian bawah diberi adukan secukupnya agar dap
berdiri kokoh.
Papan nama proyek ini berisikan informasi mengenai proyek yang seda
dilaksanakan seperti :
:PEMBANGUNAN
Lokasi
Waktu Pelaksanaan
Sumber Dana
Biaya
: APBD 2013
Rp.
: 23.023.000.000,2013
PT. WIGA NUSANTARA SEJATI
Tahun Anggaran
:PT. PANDU PERSADA
Kontraktor Pelaksana :
Konsultan Perencana
:
Konsultan
Pengawas
:
5 Pagar proyek
Jalan kerja berfungsi untuk jalur lalu lintas kendaraan proyek, dan
perhitungkan sehingga stagnasi dan kemacetan dapat terhindarkan, ja
kerja di buat dengan menggunakan perkerasan sirtu (jika diperlukan) kare
mempertimbangkan stabilitas tanah di lingkungan proyek.
6 Listrik Kerja dan Air Kerja
Perhitungan sumber daya dalam hal ini adalah menyangkut kebutuhan lis
proyek dan air kerja.
Perhitungan listrik kerja
Kebutuhan air kerja yang di butuhkan untuk keperluan proyek , dan bisa
peroleh dari sumur atau PDAM .Air kerja di perlukan untuk memen
kebutuhan-kebutuhan;
- Batchting Plan untuk pembuatan Mortar (Beton Molen)
- Pengetean peralatan mekanikal
- Perawatan Plesteran.
- Perawatan Beton
- Dll
7 Mobilisasi dan Demobilisasi
Mobilisasi Peralatan
Pada saat mobilisasi alat berat diangkut menggunakan mobil trailer, tra
yang digunakan harus memiliki perlengkapan yang memadai.
Demobilisasi
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI KSLL
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 4.20 M )
2.6. LANTAI DUA ( EL. + 8.20 M )
2.7. LANTAI TIGA / ATAP ( EL. + 12,20 M )
2.8. ATAP
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
1 Pembersihan lahan
Agar sisa-sisa akar dapat terbuang dan juga tanah humus sebagai lapis
permukaan dapat terbuang maka dilakukan stripping dan gubbing. Tan
hasil stripping ini dikumpulkan lalu dimuat ke atas dump truck deng
menggunakan excavator lalu dibuang kelokasi yang ditunjuk o
pengawas/direksi.
3 Pengadaan tanah urug
Setelah kondisi lahan bersih, lalu tanah urugan didatangkan dari luar lok
pekerjaan, digelar dan dipadatkan dengan mini vibro.
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
Pemadatan dilakukan kondisi tanah urug dan tanah dasar benar-benar pad
yang dapat dibuktikan dengan hasil test CBR lapangan.
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
Pembuangan hasil stripping dan grubbing dengan dump truck ke luar lok
pekerjaan.
2.2. PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
1 Galian Tanah
Meliputi pekerjaan penggalian (Cut) dan penimbungan (Fill).
Ruang Lingkup
Dasar galian harus mencapai tanah keras, dan jika pada galian terdapat ak
akar kayu, kotoran-kotoran dan bagian-bagian tanah yang longgar (tid
padat), maka bagian ini harus dikeluarkan seluruhnya kemudian lubang ya
terjadi diisi dengan pasir urug.
Pemadatan dilakukan kondisi tanah urug dan tanah dasar benar-benar pad
yang dapat dibuktikan dengan hasil test CBR lapangan.
4 Urugan Kembali Ex. Galian
Urugan Kembali dilakukan setelah pondasi dan sloof selesai dilaksanakan.
5 Pasir Urug t. = 10 cm
Mendirikan bangunan yang relatif berat diatas tanah yang daya dukungnya rend
serta rawan terhadap getaran dan guncangan gempa adalah suatu tentangan ya
harus dipikirkan.
Dari tantangan inilah timbul suatu ide untuk mengembangkan Konstruksi Sara
Laba-Laba (KSLL).
Konstruksi Sarang Laba-Laba (KSLL) ini ditemukan oleh Ir. Ryiantori dan Ir. Sucip
pada tahun 1975. Diaplikasikan diproyek pada tahun 1978 oleh PT. Dasa Guna, l
dikembangkan oleh PT. Katama Surya Bumi sebagai pemegang lisensi dengan h
paten nomor 7191.
batu karang yang tebal sehingga memiliki kekakuan dan daya dukung yang cuk
tinggi.
Konstruksi Sarang Laba-Laba (KSLL) terdiri dari 2 bagian :
1.
Konstruksi Beton
a. Konstruksi beton pipih yang dibawahnya terdiri dari rib-rib yang pipih
b. Penempatan rib-rib yang sedemikian sehingga membentuk segitiga
Rib Konstruksi berfungsi sebagai penyebar beban struktur bangunan
Rib Sattlement berfungsi sebagai tumpuan utama struktur bangunan
2.
Rongga yang ada diantara rib-rib tersebut dapat disi tanah / pasir sehing
dapat dipadatkan dengan optimal.
Rongga yang ada diantara rib-rib tersebut dapat disi tanah / pasir sehing
dapat dipadatkan dengan optimal.
2.4. LANTAI
DASAR
( EL. Lantai
+ 0,00Dasar
M ) (El. 0+00) adalah pekerjaan struktur beton terd
Pekerjaan
Struktur
dari :
Plat lantai, tangga, kolom dan balok.
2.5. LANTAI
SATU
( EL. +Lantai
4.20 M
)
Pekerjaan
Struktur
Dasar
(El. 0+00) adalah pekerjaan struktur beton terd
dari :
Balok, Plat lantai, tangga dan kolom .
2.6. LANTAI
DUA
( EL. + Lantai
8.20 MDasar
)
Pekerjaan
Struktur
(El. 0+00) adalah pekerjaan struktur beton terd
dari :
Balok, Plat lantai dan kolom.
2.7. LANTAI
TIGA
/ ATAP (Lantai
EL. + Dasar
12,20 M
) 0+00) adalah pekerjaan struktur beton terd
Pekerjaan
Struktur
(El.
dari :
Balok, Plat lantai, Waterproofing dan Screed
PEKERJAAN BETON
Penjelasan Umum
Meliputi pekerjaan beton yang bertulang dan tidak bertulang dan pelaksanaan ya
benar untuk menghasilkan beton yang bermutu baik. Maka perlu penyedian tena
kerja yang terampil, alat bantu yang memadai sesuai dengan fungsinya d
material/bahan berdasarkan standart peraturan beton bertulang PB1 1971 d
SK.SKNI.T-15.1991-03
RUANG
LingkupLINGKUP
pekerjaan beton meliputi penyediaan semua pemasangan, Sloef. Kolo
kolom praktis dan semua komponen-konponenya yang ditunjuk oleh gamb
rencana.
Semen yang digunakan harus berkualitas baik dan pada saat digunakan ha
dalam keadaan fresh (belum Mulai mengeras)
Yang digunakan harus memenuhi syarat-syarat PBI 1971. Air tawar yang dipa
harus bersih, tidak mengandung minyak, asam alkali bahan-bahan organis d
bahan-bahan lain yang dapat menurungkan mutu beton.
Kerikil/Batu Pecah
Kerikil/batu pecah yang dipakai harus memenuhi syarat-syarat PBI 1971.
Kerikil/batu pecah harus mempunyai gradasi yang baik, tidak porous, memen
syarat kekerasannya.
Pasir yang dipakai dapat berupa pasir alam, atau pasir buatan yang dihasilkan o
alat-alat pemecah batu. Pasir harus terdiri dari butir-butir yang tajam d
mempunyai gradasi yang baik, tidak porous cukup syarat kekerasannya.
Baja tulangan yang digunakan adalah baja yang kualitasnya sesuai deng
ditentukan dalam PBI 71.
Besi beton harus bersih dari dari lapisan minyak lemak, karat dan bebas dari cac
cacat seperti serpih dan sebagainya, serta berpenampang bulat.
Dimensi dan ukuran penempang bulat besi beton / baja tulangan harus ses
dengan petujuk gambar kerja (memenuhi batas toleransi minimal) seperti yang
syaratkan dalam PBI 71.
Besi beton / baja tulangan yang tidak memenuhi syarat harus segera dikeluark
dari lokasi pekerjaan dalam waktu 24 jam setelah ada perintah tertulis dari Direks
Kawat pengikat harus terbuat daru baja lunak dengan diameter minimal 1mm d
tidak bersepuh seng.
Material lain yang digunakan diutamakan produksi dalam negeri.
Kayu
Kayu yang digunakan harus bersifat baik dengan ketentuan bahwa segala sifat d
kekurangan-kekurangan yang berhubungan dengan pemakainya tidak akan merus
atau mengurangi nilai konstruksi.
Kualitas dan ukuran kayu yang digunakan disesuaikan dengan gambar kerja ya
ada. Demikian pula dengan mutu dan kelas kuat kayu yang apabila tidak ditentuk
lain, maka harus mengikuti syarat-syarat dan ketentuan-ketentuan dalam PPKI NI-
Dihindarkan adanya cacat-cacat kayu antara lain yang berupa putih kayu, peca
pecah, mata kayu yang melintang. Syarat-syarat kelembaban dan toleransi ukur
kayu yang dipakai harus memenuhi syarat-syarat dan ketentuan dalam PPKI.
Pengecoran Beton
Beton tidak bertulang/beton tumbuk/ rabat beton dibuat dengan adukan. 1PC :
Psr : 5krl dipergunakan untuk lantai kerja, lantai alas keramik untuk lantai ker
lantai alas keramik, neut-kusen dan rabat beton, ukuran disesuaikan deng
gambar.
Semua pekerjaan konstruksi beton pada bangunan dikerjakan dengan mutu beton
-225. Semua pekerjaan konstruksi beton harus memenuhi syarat-syarat PBI 1971
Adukan beton harus benar-benar rata dan matang dengan menggunakan Ready M
pada K-225.
Untuk beton konstruksi bermutu K-175 dapat dilakukan dengan cara manual.
Besi beton bekas dan yang sudah berkarat tidak diperkenankan dipakai dal
konstruksi. Besi beton harus bebas dari sisik, karat dan lain-lain lapisan yang dap
mengurangi daya lekatnya pada beton.
Ikatan besi beton harus rapih dan kuat, bahan untuk pengikat adalah kawat bet
dengan diameter minimum 1mm.
Untuk mendapatkan jaminan akan kualitas besi yang diminta, maka disamp
adanya sertifikat dari pabrik, juga diminta harus ada sertifikat dari laboratorium.
Bekisting dan Acuan
Pembukaan bekisting ataupun acuan harus teratur dan beton sudah berum
minimal 14 (empat belas) hari.
PEKERJAAN COR BETON KOLOM
Proses pelaksanaan pekerjaan ini sebagai berikut :
Melakukan Kontrol Kualitas. Ada 2 kontrol kualitas yang dilakukan. Kontrol kuali
pertama yaitu Kontrol Kualitas Sebelum dilakukan pengecoran meliputi kont
kualitas terhadap posisi dan kondisi bekisting, posisi dan penempatatan pembesi
jarak antar tulangan, panjang penjangkaran, ketebalan beton decking (Beton tah
ukuran baja tulangan yang digunakan, posisi penempatan water stop.
Curing (perawatan) dilakukan sehari (24 jam) setelah pengecoran selesai dilakuk
dengan dibasahi air dan dijaga/dikontrol untuk tetap dalam keadaan basah.
11
22
33
44
Dari hasil pengukuran tersebut maka bekisting balok dan pelat dapat difabrik
pada posisi yang benar diatas perancah yang telah disiapkan. Pengaturan le
balok dan pelat dapat dilakukan dengan mengatur ketinggian perancah (Scafoldin
Proses pemasangan bekisting ini dibantu oleh surveyor untuk mengontrol le
balok dan pelat.
Pekerjaan Pembesian
Agar pengecoran pelat lantai mencapai level yang benar dan tidak terj
perbedaan tinggi finishing cor, maka perlu dibuat alat bantu leveling pengecor
Leveling pengecoran dibuat dari besi siku L.50.50.5 yang ditumpukan pa
beberapa titik besi beton. Besi beton ini ditancapkan hingga posisi besi siku tid
lagi bergeser. Penempatan besi siku diukur dengan waterpass dan diukur pada le
sesuai gambar desain.
Pekerjaan Kontrol Kualitas
Kontrol kualitas yang dilakukan sama dengan kontrol kualitas yang dilakukan pa
pekerjaan kolom.
Pengecoran beton
Pengecoran dilakukan dengan Ready Mix truck yang dibantu dengan pengguna
Concrete Pump. Dalam hal ini pengecoran dilakukan secara sekaligus balok d
pelat seluruh lantai. Untuk mempercepat proses pengecoran dipakai Concrete Pum
atau dengan mobile crane. Pengecoran dibantu dengan alat vibrator unt
meratakan dan memadatkan campuran. Selanjutnya finishing lantai cor ini ada
rata namun dibiarkan kasar karena selanjutnya akan dilakukan pekerjaan lantai.
Pekerjaan curing
Sama hal nya dengan pekerjaan kolom, Curing (Perawatan) dilakukan sehari sete
dilakukan pengecoran.
Pas. Bekisting
balok
Pas.
Horrybe
am
Pas.
Bekisting plat
Pas. Besi
beton
Pengecoran
PEKERJAAN WATERPROOFING
Hose Concrete
Pump
Waterproofing Membrane
Bahan dan peralatan yang diperlukan :
- primer coating
waterproofing membrane
screed
Semen (PC) untuk acian halus
Kawat ayam
Kape
Sikat kawat
Kompor (Blender)
Cutter
Alat bantu (sapu, sekop, sendok semen dll)
Pelaksanaan :
Bersihkan lokasi yang akan dipasang waterproofing membrane
Pastikan bidang struktur beton benar-benar bersih dan kering
Labur permukaan struktur beton dengan primer coating, untuk lantai naik 20
pada dinding.
Cek kembali laburan primer coating apa sudah rata? Jika ya lanjutkan
Untuk di toilet dapat langsung dipasang screed. Tapi untuk lokasi yang terbu
terlebih dahulu dipasang kawat ayam.
Lalu lakukan pengacian halus.
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PASANGAN SANITER
3.6. PEKERJAAN PENGECATAN
3.7. PEKERJAAN RAILLING
3.1. PEKERJAAN PASANGAN DINDING
Pekerjaan ini sama dari ground floor, Level 1 dan Level 2.
A. Pekerjaan pasangan batu bata / bata ringan
Setelah pekerjaan struktur lantai satu selesai, maka pekerjaan dinding dap
segera dimulai. Sebelum dinding dipasang, batu bata yang digunak
terlebih dahulu di rendam di dalam air sebentar.
Pasang acuan kayu (profil) secara vertikal pada setiap ujung dinding ya
akan dipasang.
Di ukur dan di tandai jarak setiap ketinggian pasangan bata / bata ringan d
di kontrol kesetimbangan horisontalnya antara ujung satu dengan ya
lainnya.
Di ukur dan di tandai jarak setiap ketinggian pasangan bata / bata ringan d
di kontrol kesetimbangan horisontalnya antara ujung satu dengan ya
lainnya.
Basahi bata yang akan di pasang sampai tidak menyerap air.
Tinggi pemasangan dinding batu bata /bata ringan dalam satu hari supa
tidak lebih dari 1 meter, untuk menjaga keruntuhan.
Pasir pasang yang akan digunakan terlebih dahulu diayak. Hal ini unt
menghilangkan sampah-sampah yang ada pada pasir.
Siapkan material yang akan di pakai pada lokasi yang terdekat atau strate
dari dinding yang akan di plester.
Siram permukaan bata / bata ringan
merata ( curing ).
basah seca
mengos
Lanjutkan dengan curing selama 7 hari : pagi, siang dan sore samp
permukaan plesteran benar benar basah seluruhnya.
Setelah cukup usia curing, keringkan bidang tersebut selama 1 hari.
C.
Acian Semen
Setelah plesteran kering,lakukan penyiraman untuk dilakukan peng acian.
Setelah kering gosok dengan kertas sak semen sampai halus dan rata.
D.
Kolom Praktis
Balok praktis
Setelah pasangan bata / bata ringan telah mencapai elevasi yang ditentuk
kemudian pasang tulangan balok praktis jangan lupa memasang bet
decking pada bagian bawah dan samping.
Plint keramik
Ukur 11 cm dari atas lantai, marking dengan benang sipat, kemudian lakuk
pemotongan dengan mesin potong keramik, bobok sesuai kebutuh
pemasangan plint.
Pasang plint keramik, dan finish bagian atasnya dengan tali air.
H.
Keramik dinding
Siapkan peralatan dan bahan bahan yang akan digunakan.
Pahami gambar kerja, pola pemasangan dan lain lain.
Sortir keramik agar menghasilkan keseragaman :
- ukuran / dimensi.
- presisi.
- warna / corak.
Rendam keramik yang akan dipasang kedalam bak air ( ember ) selam
1 jam.
Membuat lot pada dinding di tiap pojok ruangan dan kesikuannya serta ga
pertengahan dinding untuk pembagian keramik.
Mengukur jarak-jarak dinding untuk lebar dan tinggi ruangan, serta bagia
bagian yang terpasang pada ruangan tersebut.
Pemasangan keramik harus padat dan rata sehingga tidak ada keram
dengan spesi kosong
Tentukan garis dasar pasangan serta peil dari lantai. Penentuan peil ini unt
seluruh kesatuan
Pasang benang arah horizontal dan vertikal pada lantai sesuai elevasi pad
shop drawing. Kedudukan benang harus datar dan siku , apabila
dindin
yang ada adalah
dinding keramik, maka kedudukan nad lantai ha
disesuaikan dengan yang ada pada dinding.
Pasang keramik
telah terpasang
sebagai
Cek kesikuan keramik dengan besi siku dan kerataan elevasi keram
dengan waterpass.
Isi bagian / daerah permukaan lantai yang lain nya dengan adukan / spesi.
Setelah itu pasang keramik berikutnya
usahakan supaya tidak ada las lasan
Jika keramik sudah terpasang semua, ketuk per mukaan keramik dengan pa
karet untuk mendatarkan / meratakan permukaan keramik supaya tida
rusak / cacat.
keramik
dan adukla
Setelah adukan rata , isi sela sela nad dengan bahan cor nad dengan
menggunakan
sendok spesi ( sekop ). Pengisian nad dilakukan apabil
kedudukan keramik telah kuat atau spesi telah kering
Kemudian rapikan nad tersebut dengan cape.
Diamkan dan tunggu sampai nad tersebut benar -benar kering.
Setelah
kering,
bersihkan
permukaan
pasangan keramik
yang sudah
dipasang nad dari sisa sisa bahan cor nad dengan menggunakan kain
lap basah sampai bersih
Pasangan Floor Hardener
Pada saat pengecoran lantai, dilakukan perataan pada beton, tunggu sam
setengah kering, lalu taburkan floor hardener sesuai dengan takaran yang te
ditentukan gosok dengan roskam sampai rata.
Kemudian gosok dengan throwel sampai benar-benar rata dan keras.
Step nozing
Setelah keramik tangga dipasang baik yang horizontal maupun yang verti
barulah dipasang step nozing pada bagian pinggir anak tangga. Dimana ukuran st
nozing sudah disiapkan pada saat pemasangan keramik yang horizontal pada an
tangga tersebut.
3.3. PEKERJAAN PASANGAN PLAFOND
Dalam proyek ini plafond yang digunakan ada empat jenis yaitu plafond gypsu
rangka metal furing, plafond GRC rangka hollow, flafond akustic rangka metal furin
dan plafond beton ekspose.
Adapun cara pelaksanaan Plafond Gypsum yaitu :
Rangka metal furing dipasang terlebih dahulu sesuai dengan gambar kerja (Sh
Drawing).
Memperhatikan ruangan, dan mencari sisi dari ruang yang siku terlebih dahulu.
Pasang alat bantu (Scafolding), jika bisa scafolding yang digunakan memiliki ro
supaya tidak merusak keramik.
Kemudian pasang papan gypsum sesuai dengan gambar kerja.
Pemasangan diatur pertemuan antar papan pertigaan.
Rangka hollow dipasang terlebih dahulu sesuai dengan gambar kerja (Sh
Drawing).
Memperhatikan ruangan, dan mencari sisi dari ruang yang siku terlebih dahulu.
Pasang alat bantu (Scafolding), jika bisa scafolding yang digunakan memiliki ro
supaya tidak merusak keramik.
Kemudian pasang papan GRC sesuai dengan gambar kerja.
Pemasangan diatur pertemuan antar papan pertigaan dan diberi resin.
Pemasangan plafond Akustic
Rangka metal furing dipasang dengan gantungannya.
Stel sampai rangka tersebut benar-benar rata. Setelah rata masukkan papan akus
secara berurutan.
Plafond beton expose
Sedangkan untuk plafond beton ekspose, dilakukan oleh orang yang mengerti ak
pekerjaan tersebut. Pekerjaan ini bertujuan mempercantik tampilan dari beto
dengan menggunakan bahan semen portland dan pasir pasang.
List plafond
Pemasangan lsit plafond gypsum terlebih dahulu dibuat marking, lalu dib
(dilaburi) compound pada lokasi yang akan dipasang listnya. Selanjutnya tempelk
list plafond gypsum tersebut. Untuk memperkuat penempelan awal maka sebaikn
dipasang sekrup beberapa buah.
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
Pekerjaan sanitair yang dilakukan meliputi pekerjaan pemasangan pipa air ber
dan air kotor, pipa buangan air hujan, pemasangan kran air, Floor Drain,Kloset, d
lain sebagainya. Pemasangan ini berdasarkan persetujuan pemilik dan dilihat o
konsultan pengawas.
3.6. PEKERJAAN PENGECATAN
Pada permukaan dinding luar dan dalam, gypsum dilakukan pekerjaan pengecat
dengan cat air dengan terlebih dahulu membersihkan permukaan dari kotora
kotoran, dinding-dinding diratakan/dihaluskan dengan plamir, sebelum dicat deng
cat air dilakukan pengecatan dengan cat dasar.
Untuk bahan-bahan dari kayu seperti : piri-piri, lisplank, Kozen kayu dan Pintu pa
dilakukan pengecatan dengan cat minyak, sebelum dicat permukaan bahan -bah
tersebut dibersihkan terlebih dahulu lalu diberi alkali kemudian dicat dengan
dasar untuk kemudian baru di cat dengan cat minyak.
Untuk bahan-bahan dari Besi seperti : railing tangga, penutup besi, pagar, dan l
sebagainy. sebelum dicat permukaan bahan-bahan tersebut dibersihkan terle
dahulu lalu diberi minayk cat kemudian dicat dengan cat dasar untuk kemud
baru di cat dengan cat minyak.
3.7. PEKERJAAN RAILLING
Pekerjaan railling dipabrikasi di work shop sampai pengecatan.
Pemasangan dilokasi dengan menggunakan dynabolt.
IV.
9. Sparing Clean out harus dipasang bersamaan dengan sparing closet (bila ada), di mana letak sparing clean out berada di samping atau dekat dengan sparing closet,
fungsinya adalah untuk pembersihan apabila closet terjadi penyumbatan.
10. Fan out dipasang bila dalam instalasi saluran kotor banyak percabangan dengan
saluran pembuangannya lewat shaft. Fungsinya untuk mengurangi tekanan udara
pada pipa pada saat closet di gelontor dengan air.
11. Floor drain supaya diletakkan jauh dari pintu dan dekat dengan kurasan bak.
Saluran Air Hujan.
1. Pipa diletakkan persis dibawah lobang talang yang telah diberi torong talang.
2. Pipa saluran air hujan dapat dipasang menempel di dinding luar dengan menggu
nakan klem atau dapat ditanam di dinding bila berukuran < 2 .
3. Bila saluran pembuang air hujan berupa saluran tertutup harus dibuat bak kontrol
pada pertemuan pipa air hujan dengan saluran pembuang.
4. Bila terdapat sambungan, arah shock harus sebelah atas, dan penyambungannya
harus benar-benar kuat.
V.
PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN PANEL DAN KABEL FEEDER
Pekerjaan Panel
Yang dimaksud pekerjaan Panel pada Ground Floor adalah pekerjaan pengada
dan pemasangan panel MDP-K, SDP-K GF, LP-K GF, PP-K GF, PP-AC GF, PP-UPS K
dan PP-AB beserta pengkabelannya, termasuk proses penyambungan ke instal
existing
a. Proses Pelaksanaan.
a.1. Handling.
Untuk material material Panel ini perlu dirakit terlebih dahulu sebelum dilakuk
pemasangan.
a.2. Pemasangan / Pelaksanaan.
Untuk material material Panel ini perlu dirakit terlebih dahulu sebelum dilakuk
pemasangan.
a.2. Pemasangan / Pelaksanaan.
Untuk material material Panel ini perlu dirakit terlebih dahulu sebelum dilakuk
pemasangan.
a.2. Pemasangan / Pelaksanaan.
Yang dimaksud pekerjaan Panel pada Level Roof adalah pekerjaan pengadaan d
pemasangan panel PP-LF dan PP-BP beserta pengkabelannya, termasuk pros
penyambungan ke instalasi existing
Yang dimaksud pekerjaan Panel pada Level Roof adalah pekerjaan pengadaan d
pemasangan panel PP-LF dan PP-BP beserta pengkabelannya, termasuk pros
penyambungan ke instalasi existing
a. Proses Pelaksanaan.
a.1. Handling.
Untuk material material Panel ini perlu dirakit terlebih dahulu sebelum dilakuk
pemasangan.
a.2. Pemasangan / Pelaksanaan.
Teknis pelaksanaan pekerjaan ini sesuai dengan gambar desain, RKS dan spesifik
teknis pekerjaan elektrikal dan mekanikal.
Untuk pekerjaan instalasi listrik, telepon, ducting, dan fire alarm dilakukan sebelu
plesteran dan dinding dan pemasangan plafond.
Instalasi Stop Kontak dan Saklar-Saklar dipasang pada dinding dengan rapi ses
penempatannya pada gambar-gambar rencana, setelah semua instalasi titik api d
instalasi stop kontak dan saklar terpasang barulah diberi lampu-lampu ses
dengan spesifikasi teknis dan gambar-gambar rencana.
Semua hantaran (kabel) yang ditarik dalam pipa / cabelduct harus diusahakan tid
tampak dari luar (tertanam).
Lekukan/belokan pipa harus beradius > 3 kali diameter pipa dan harus rata (unt
memudahkan penarikan kabel).
Jaringan arde harus dipasang tersendiri/terpisah dengan arde penangkal petir.
- tidak boleh ada sambungan
- dihubungkan dengan elektroda pentanahan
- ditanam sampai minimal mencapai air tanah
Pada hantaran di atas langit-langit, harus diklem pada bagian bawah plat / ba
atau pada balok kayu rangka langit-langit.
Stop kontak dan saklar. Pemasangan stop kontak setinggi > 40 cm dari lantai, sak
dipasang setinggi
150 cm dari lantai (bila tidak ditentukan spesifikasinya). Pemasangan stop kon
dan saklar harus rata dengan dinding.
Box / kotak Panel bodynya harus diarde, untuk menghindari adanya arus.
PEKERJAAN NON STANDAR
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN LANTAI
1.2. PEKERJAAN PASANGAN PLAFOND
1.3. PEKERJAAN PASANGAN PINTU DAN JENDELA
1.4. PEKERJAAN FURNITURE DAN LAIN-LAIN
II.
PEKERJAAN MEKANIKAL
2.1. PEKERJAAN HYDRANT & SPRINKLER
I.
PERSYARATAN TEKNIS UMUM
1.1.
PERATURAN DAN STANDARD
a.
b.
PERATURAN-PERATURAN
Perda Pemda setempat
Penanggulangan Bahaya Kebakaran Dalam Wilayah Setempat
a.
National Fire Codes,
1. NFPA-10, Standard for Portable Fire Extinguisher
2. NFPA-13, Standard for The Installation of Sprinkler Systems
b.
c.
d.
e.
f.
2.2.
Pompa fire Hydrant merupakan satu kesatuan yang terdiri dari pom
pembantu jockey pump, pompa utama penggerak electric dan pompa uta
penggerak engine.
a.
Jockey Pump
Type pompa
: Centrifugal multi stage pump
Kapasitas
: 56 L/men.
Head pompa
: 85 m
Putaran pompa
: 2.900 rpm
Daya pompa
: 3.0 kW
Karakteristik listrik
: 380 V, 3 phase, 50 Hz, Variable Speed Drived
Jumlah
: 1 (satu) unit.
Lengkap dengan panel kontrol Jockey Pump
b.
Electric Fire Pump
Type pompa
Kapasitas
Head pompa
Putaran pompa
: 2850 l/men
: 85 m
: 2.900 rpm
Daya pompa
: +75 kW
Karakteristik listrik
: 380 V, 3 phase, 50 Hz, Star Delta Start
Jumlah
: 1 (satu) unit.
Lengkap dengan Panel Kontrol Electric Fire Pump.
c.
Diesel Fire Hydrant Pump
Type pompa
: Centrifugal End Suction
Kapasitas
: 2850 L/men
Head pompa
: 85 m
Putaran pompa
: 2.900 rpm
Type Engine
: Diesel
Putaran
: 2.900 rpm
Sistem Coupling
: Direct Connected
Daya
: + 90 HP
Jumlah
: 1 (satu) unit
Power
: Accu 24 volt, 80 Amp, 2 buah type maintenance free
Lengkap dengan Panel Kontrol Engine Fire Pump.
Perlengkapan Engine
:
- Flexible coupling
- coupling guard
- Heat exchanger loop
- Batteries
- Battery rack
- Battery cable
- Silencer
- Flexible ex hose connector
- Cooling water heater + thermostat.
Perlengkapan pemipaan / pompa, antara lain :
- Coumpond suction gauge
- Discharge pressure gauge
- Automatic air release Valve
- Main relief Valve
- Enclosed waste cone
- 165 gallon fuel tank
- Fuel system accessories
- Fitting package
- Setiap pompa dan sambungan pipa harus digrounding dan untuk pompa harus
dilengkapi variable speed drived.
- dan lain-lain.
2.2.2. FIRE PUMP CONTROLLER
Khusus pompa penggerak engine akan bekerja secara automatic bila salur
daya listrik terputus pada saat terjadi kebakaran.
Fire Pump Controller harus standard NFPA-20.
2.2.3. FIGHTING FIXTURES
a.
Hydrant Pillar
Jenis two-way, terbuat dari baja tuang diberi penguat pondasi beton
secukupnya.
Hydrant Pillar dicat merah dengan cat Duco ex Dana Paints atau cat I
(jenis
exterior coating)
b.
Seluruh BOX dan pintu dicat merah dengan cat duco ex Dana Paints d
diberi tulisan HYdrant dengan warna merah.
Panjang fire hose tidak kurang dari 30 M' mudah digulung, tah
terhadap
tekanan dan penyambungan dengan sistem quick coupling.
Seamese Connection
Lokasi seamese connection mudah dilihat dan dekat dengan jalan lalu
mobil
agar mudah untuk dipakai bila diperlukan (lihat gamb
perencanaan).
Material Pipa yang digunakan Black Steel Pipe Sch. 40, atau ASTM A
dan harus diusahakan semuanya berasal dari satu merk.
Valve - valve
Working Pressure : 300 psi (15 bar)
Gate Valve :
Tipe bronze body, non rising stem, screwed bonnet, solid wedge disk, screw
end untuk valve sampai dengan diameter 50 mm atau bisa digunakan tipe Butter
untuk diameter 15 mm sampai dengan diameter 25 mm.
Tipe flanged or lugged body, stainless steel disk, stainless steel shaft, ha
wheel operated with position indicator untuk valve lebih besar dari diameter 50 m
dengan body material cast iron untuk tekanan 150 psi dan carbon steel unt
tekanan 300 psi.
Check Valve :
Material bronze body, swing type, Y pattern, screwed cup, metal disk, screw
end untuk valve sampai dengan diameter 50 mm.
Swing silent type dengan stainless steel disk dengan body material cast ir
untuk tekanan 300 psi dan carbon steel untuk tekanan 300 psi.
2.3.
SYARAT-SYARAT PEMASANGAN
2.3.1. PEMASANGAN UNIT POMPA
a.
Seluruh unit pompa harus dipasang dan didudukkan diatas fondasi deng
kuat dan kokoh.
b.
Metoda dan persyaratan instalasi pompa, pemipaan serta peralat
pemipaannya harus mengikuti dan mengacu kepada Standard NFPA-20.
2.3.2. INSTALASI PEMIPAAN
a.
Sistem Penyambungan Pipa
Sedangkan untuk sambungan flanged harus dilengkapi ring dari karet seca
homogen.
b.
Penumpu Pipa
c.
2.4.
SYARAT-SYARAT PENERIMAAN
2.4.1. M A T E R I A L
a.
Kontraktor harus menjamin seluruh unit peralatan yang didatangkan ada
baru (New Product), bebas dari defective material, improver material d
menjamin terhadap kualitas atau mutu barang sesuai dengan tuju
spesifikasi.
b.
Setiap material atau peralatan yang tidak memenuhi spesifikasi harus diga
dengan yang sesuai dan dalam jangka waktu tidak lebih dari 1 (satu) ming
setelah ditanda tangani berita acara penerimaan barang.
c.
Tidak dikerjakan
Jenis jenis gas medis yang biasa dipergunakan untuk keperluan rumah sakit ada
sebagai berikut :
Oxygen ( O2 )
Nitrous Oxide ( N O )
Medical Compressed Air ( Breathing Air )
Vacum ( Suction )
Oxygen tersedia dalam bentuk gas dan cair ( liquid ) yang dikemas dalam tabu
baja ( cylinder ) volume 6m . Oxygen cair ( liquid ) dikemas dalam tabung b
( cryogenic liquid storage unit ) .
Ruangan-ruangan yang menggunakan oxygen medis di rumah sakit:
Bagian Anestesi
Bagian Penyadaran/ Penyembuhan ( RR )
Bagian Bersalin
Ruang Anak
Ruang Rawat Inap
Jika arah saklar tidak diganti dan sisi cadangan yang dipakai telah kosong maka s
yang lain tidak akan menyalurkan gas secara otomatis.
Sistem otomatic changeover device oxygen terdiri atas:
Type : Doble Row ( 10+ 10 ) .
Manifold ( Dilengkapi dengan preassure switch Regulator dan lampu monitor )
Rangka penyangga
Symetrical header
2.2 NITROUS OXIDE ( N20 )
Ruangan-ruangan yang menggunakan nitrous oxide pada rumah sakit:
ICU dan ICCU
Kamar-kamar operasi
Kamar-kamar kerja
Kamar-kamar endoscopy
Kamar bedah gigi
Jika arah saklar tiadak diganti dan sisi cadangan yang dipakai telah kosong maka s
yang lain tidak akan menyalurkan gas secara otomatis.
Sistem otomatic change over device nitrous oxide terdiri atas:
type : Single Row( 3+ 3 )
Manifold ( Dilengkapi dengan preassure switch Regulator dan lampu monitor ) .
Rangka penyangga
Symetrical header
2.3 MEDICAL COMPRESSED AIR ( BREATHING AIR )
Medical Compressed Air yang dipakai di rumah sakit diadakan melalui pemasang
sentral compressed air. Compressed air yang dihasilkan harus bersi kering beb
minyak dan bebas bakteri.
Sistem
Compressed
Air terdiri
atas:
1.
Oil Free
Compressor
: L unit
yang bekerja dengan menekan udara sampai 7
cm .
Motor : 2.2 KW induction motor 3 Phase 200/ 220 Volt 50/ 60Hz. Tekan
maksimum : 10 kg/ cm . Putaran mesin : 1450 Rpm.
2. Air cooled after cooler.
Tekanan maksimum saat operasi : 10 kg/ cm .
3. Receiver Tank.
Kapasitas : 500 Literyang dilengkapi dengan lubang pembersih
Tebal plat : 6mm
4. Medical Air Unit
Kapasitas flow : 720 l/ min untuk type compressor Motor 2.2 KW
Unit ini terdiri atas Air Dryer Filter udara Filter bakteri dan Regulator udara. Air dry
berfungsi untuk menghindari kondensasi pada jalur pipa dimana bakteri dap
berkembang dan mengkontaminasi udara yang dihasilkan. Filter uda
menghilangkan particulat uap oil dan uap air dari udara tekan yang dihasilkan. Fil
bakteri menghilangkan bakteri ( 3 micron-0.01 micron ) . Regulator uda
menurunkan tekanan menjadi konstan 4.0 kg/ cm .
2.4 VACUM ( SUCTION )
Vacum yang dipasang di rumah sakit bekerja pada tekanan -53 Kpa sampai deng
-80 Kpa.
Ruangan-ruangan yang menggunakan Vacum pada rumah sakit:
ICU dan ICCU
Kamar-kamar operasi
Kamar-kamar Endoscopy
Kamar bedah gigi
Unit Gawat Darurat
Ruang Tindakan
Ruang Persiapan
Ruang Puli Sadar ( Recovery )
Ruang Hemodialisa
Vacum disuplai melalui sentral gas medis yang terdiri atas:
Tanki penampung ini mempertahankan tingkat vakum -50 Kpa sampai -80 K
Terdapat tipe vertical dan horizontal yang dirangkai bersama pompa dan pa
control pada satu rangka.
Tebal plat untuk recervoir tank adalah 6mm.
3. Vacuum Line Bacterial Filter
Digunakan untuk menghilangkan bakteri dan kontaminasi lain pada sisi mas
pompa vakum. Menghindarkan terkontaminasinya pompa dan udara sekitar.
Type Vacum Line Filter disesuakan dengan Motor Vacum Pump Oil Rotary Vane. P
penyambung Untuk Vacum line filter ke jalur mesin adalah diameter 1 .
Vacum line filter mampu membersikan/ menyaring partikel sampai 0.01 micro.
3 PELAYANAN GAS MEDIS DENGAN SISTEM SETRAL/ INSTALASI RUANG SENTRAL
Untuk menentukan ukuran ruang sentral gas medis di rumah sakit lebih dah
harus diketahui jenis dan kapasitas gas medis yang akan dipasang. Dal
pembangunan rumah sakit baru penentuan ruang sentral tidak ada masalah kare
telah diperhitungkan dalam perencanaan bangunan. Pada rumah sakit ya
pengembangannya secara bertahap kadang-kadang sedikit kesulitan karena ha
menyesuaikan dengan kondisi lahan yang tersedia.
Jenis gas medis yang dipasang pada system sentral adalah:
a. Oxygen
b. Nitrous Oxide
c. Compressede Air
d. Vacum ( Suction )
Sedangkan untuk jenis gas medis lainnya biasanya diadakan dengan syste
portable ( setempat ) .
Kapasitas sentral gas medis pada umumnya dihitung menurut outlet gas medis ya
dipasang. Untuk menentukan jumlah outlet yang akan dipasang disesuaikan deng
banyaknya pelayanan yang ada di rumah sakit. Lokasi ruang sentral diupayak
penempatannya di tempat yang strategis mudah dijangkau sarana transport
terutama untuk keperluan penggiriman tabung-tabung gas isi dan pengmbi
tabung kosong.
Penempatan ruang sentral harus cukup aman bagi kegiatan pelayanan/ perawat
terutama dipikirkan bahaya ledakan atau kebakaran pada tabung-tabung gas
yang bertekanan tinggi.
Ruang sentral harus diupayakan jauh dari daerah sumber panas olie dan sejenisn
Khusus terhadap olie dan sejenisnya harus sangat hati-hati karena b
menimbulkan ledakan apabila terjadi gesekan terutama pada gas oxygen. Pa
bangunan sentral gas medis perlu diberi petunjuk atau papan nama yang je
dengan tulisan:
Ruang sentral harus diupayakan jauh dari daerah sumber panas olie dan sejenisn
Khusus terhadap olie dan sejenisnya harus sangat hati-hati karena b
menimbulkan ledakan apabila terjadi gesekan terutama pada gas oxygen. Pa
bangunan sentral gas medis perlu diberi petunjuk atau papan nama yang je
dengan tulisan:
Pemasangan pipa pada instalasi pipa diatas plafond harus dilengkapi dudukan d
gantungan pipa yang diikat kuat pada dek beton atau kuda-kuda kayu. Masin
masing pipa harus diberi klem penguat dengan jarak yang cukup ( 10-25 cm ) . Jar
dudukan atau penumpu satu sama lain rata-rata 1-2 meter balok vertical maup
horizontal. Untuk menghindari penurunan tekanan ( preasure drop ) pemasang
pipa pada instalasi diatur menurut diameter yang disesuaikan dengan panja
instalasi pipa dan jumlah outlet. Pemasangan pipa tembaga pada instalasi di dal
dinding ( tembok atu partisi ) harus dilengkapi pipa pelindung ( PVC atau condu
untuk menghindari benturan-benturan yang mungkin terjadi dan unt
mempermudah perawatan/ maintenanace instalasi pipa di dinding. Ukuran pipa P
tersebut biasanya 10-16 mm. Semua penyambungan pipa untuk instalasi gas me
harus menggunakan fiting-fiting yang sesuai seperti elbow socket tee dan reduc
Untuk membedakan jenis gas pada instalasi pipa harus dipasang tulisan/ stiker ya
menyatakan jenis dan arah aliran gas dengan jarak yang cukup ( 2 mete
ataupun dengan memberi warna dengan mengecat pipa sesuai dengan gasn
masing-masing.
a. MAIN VALVE DAN ZONE VALVE
Seluruh jaringan instalasi pipa pada tiap jenis gas harus dilengkapi pemasangan:
a. 1 ( satu ) unit kran induk ( main valve ) yang dipasang di ruang sentral
b. 1 ( satu ) unit kran distribusi yang dipasang di setiap
c. Sesuai dengan kebutuhan kran pembagi ( zone valve ) dipasang sesuai deng
pembagian instalasi.
d. Sesuai kebutuhan kran darurat ( emergency valve ) dipasang pada ruang oper
bedah
Test keempat : Keseluruhan maion valve sampai dengaan outlet setelah sebelumn
seluruh jaringan instalasi di blow off.
Test kelima : Uji coba dan blow off ulang.
Multi safe guard alarm system adalah sebuah perangkat yang memonitor tekan
gas dalam instalasi gas. Peralatan ini dipasang untuk memantau seluruh jaring
instalasi gas medis. Alarm gas medis pada umumnya dipasang pada setiap zo
sehingga instalasi yang dipantau adalah sebatas zoneyang telah ditentukan. J
ada gas yang tekanannya di atas atau di bawah tekanan gas yang telah diijink
atau ditentukan maka alarm akan berbunyi dan lampu peringatan akan meny
apabila hal ini terjadi maka dapat segera dilakukan tindakan yang perlu unt
menormalkan kembali tekanan gas.
c. OUTLET
Pemasangan outlet gas medis di diding ( tembok atau partisi ) yang standa
dipasang dalam box mounting dilengkapi panel plat stainlees steel dikuatkan deba
skrup baja. Kontruksi outlet gas medis masing-masing produk berbeda ukuran ty
dan system koneksinya namun cara kerjanya pada dasarnya sama. Semua out
harus tertutup rapat secara otomatis pada saat tidak dipakai dan gas baru terbu
atau mengalir setelah alat perlengkapan outlet ( conector ) dipasang.
Untuk menghindari kesalahan pemasangan setiap outlet gas medis diberi nama g
warna yang berbeda ukuran drat/ skrup atau tusuk yang berbeda pula. Deng
demikian conector gas yang satu tidak akan bisa masuk ke outlet yang lain.
Untuk menghindari kesalahan pemasangan setiap outlet gas medis diberi nama g
warna yang berbeda ukuran drat/ skrup atau tusuk yang berbeda pula. Deng
demikian conector gas yang satu tidak akan bisa masuk ke outlet yang lain.
Pada umumnya pemasangan outlet gas medis ditempatkan sebelah kanan pender
( pasien ) dengan ketinggian berkisar 120-150 cm di atas permukaan lantai. Nam
penempatan outlet ini bisa saja berubah tergantung kebutuhan user.
Pada ruang-ruang khusus seperti ICU/ ICCU ruang perawatan VIP/ VVIP outlet g
medis dipasang dalam panel ( wall duct system ) yang dilengkapi lampu baca nu
call lampu periksa dan stop kontak listrik.
Pada ruangan operasi/ bedah dan emergency outlet gas medis dipasang at
digantung di plafond. Outlet yang digantung di plafond disebut ceiling cotilomn at
ceiling outlet dengan berbagai type.
Tekanan gas yang keluar dari outlet harus memenuhi standard tekan medis yaitu:
a. Oxygen = 4 -5 kg/ cm
b. Nitrous Oxide = 4 5 kg/ cm
c. Compressed Air = 4 5 kg/ cm
d. Suction ( Vacum ) = 20 60 cm Hg
III.
Untuk material material pekerjaan ini tidak terlalu berat maka bisa menggunak
tenaga manusia.
a.2. Pemasangan / Pelaksanaan.
Yang dimaksud pekerjaan Fire Alarm Telpon dan Sound System adalah pekerja
pemasangan instalasi sistem deteksi dini untuk kebakaran dalam gedung d
sistem komunikasi dengan orang lain
a. Proses Pelaksanaan.
a.1. Handling.
Untuk material material fire alarm, telpon dan Soun System (conduit, kabel, klem
karena dimensinya tidak terlalu besar dan tidak terlalu berat maka untuk pekerja
yang dekat dengan gudang, pengangkutannya dapat menggunakan tena
manusia. Tetapi untuk yang lokasinya jauh maka pengangkutannya dap
menggunakan bantuan mobil pengangkut.
a.2. Pemasangan / Pelaksanaan.
Pada saat pengecoran plat lantai, pekerjaan instalasi Fire Alarm, Telpon dan Sou
System dapat segera dimulai dengan pemasangan sparing conduit bersama
dengan pembesian plat lantai.
Setelah bekisting plat lantai dibongkar, maka pekerjaan wiring kabel untuk F
Alarm dan Telpon dapat segera dimulai sesuai shop drawing yang disetujui.
Test tahanan kontinuitas.
Pada saat pekerjaan bata (dinding), sparing dan wiring Fire Alarm dan Telp
dipasang pada dinding dimana titik Fire Alarm (bell, manual station, dll) dan t
outlet Telpon nanti diletakkan.
Setelah dinding dilakukan finishing, ceiling sudah terpasang dan kondisi keaman
sudah terjamin (ruangan terkunci) maka titik Fire Alarm dan Detector, Outlet Telp
dapat segera dipasang.
Setelah itu dilanjutkan dengan connection instalasi ke terminal box Fire Alarm d
TB Telpon di masing masing lantai.
Connection terminal box per lantai dengan MDF Fire Alarm, MDF Telpon, dan M
Sound System
Test fungsi.
b. Pengetesan.
Untuk pekerjaan ini dilakukan test kontinuitas.
3. TESTING DAN COMMISIONING.
Sesuai dengan standart yang ada dalam elemen elemen ISO 9001, ma
pekerjaan Inspection and Test adalah suatu item yang harus menjadikan conce
bagi pelaksanaan pekerjaan ini. Didalam pelaksanaan nantinya kami merencanak
Tahap Pekerjaan Inspection and Test sebagai berikut :
1.
Inspection
halIncoming
ini diperlukan
untuk memastikan bahwa barang yang dikirim / yang kami teri
Adalah inspeksi yang dilakukan pada saat pelaksanaan pekerjaan . Dengan demik
maka apabila terdapat kesalahan dalam proses pekerjaan dapat dideteksi sejak di
3. Final Inspection
Adalah inspeksi yang dilakukan pada saat pekerjaan telah selesai. Hal ini unt
memastikan bahwa semua pekerjaan atau peralatan yang dipasang sesuai deng
rencana.
Adalah inspeksi yang dilakukan pada saat pekerjaan telah selesai. Hal ini unt
memastikan bahwa semua pekerjaan atau peralatan yang dipasang sesuai deng
rencana.
Pada tahap ini pelaksanaan Partial Test maupun General Testing dan Commision
dilakukan oleh Kontraktor dengan disaksikan oleh Konsultan / Owner.
4.4.
4.5.
4.6.
4.7.
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
MATV
DATA LAN
NURSE CALL
CCTV
PEKERJAAN M/E
FLOWCHART PLUMBING
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PABRIKASI
MARKING
- Jalur pipa
- Titik Sanitary
BOBOKAN
NOTE
Dalam pekerjaan bobokan
harus koordinasi dengan Sipil
untuk start point keramik
dinding & lantai toilet
PERBAIKAN
Pemasangan :
- Pompa
- Tangki
TEST
PIPA
INSTALASI
- Pas. gantungan
- Pasang pipa
- Cat Finish
TEST
PIPA
PERBAIKAN
TEST COMMISIONING
- Pemasangan Valve
- Pemasangan Aks.
Sanitary
FINISH
TEST COMMISIONING
FINISH
PEKERJAAN M/E
FLOWCHART SPRINKLER & HYDRANT
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PEK. PABRIKASI
- Gantungan Pipa
- Pembuatan Ulir Pipa
- Pengecatan Dasar
PEK. MARKING
- Jalur pipa
PEK. BOBOKAN
- Jalur pipa tembus dinding
PEK. INSTALASI
- Pasang Gantungan
- Pas. Pipa Riser & Pipa Utama
- Pengecatan Finish
TEST PIPA
PEK. MARKING
- Titik Sprinkler
- Titik Box Hydrant
PEK. PEMASANGAN
- Pipa Droper Sprinkler
- Pipa ke Box Hydrant
- Box Hydrant Sanitary
TEST PIPA
PEK. PEMASANGAN
- Titik Sprinkler
- Valve Sanitary
TEST
FLASHING
FINISH
TEST
COMMISIONING
FINISH
TEST
COMMISIONING
PEKERJAAN M/E
FLOWCHART ELEKTRONIK
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PEK. PABRIKASI
- Cable Tray
- Penggantung Kabel Tray
- Dudukan Equiptment
PEK. MARKING
- Jalur pipa
- Titik Peralatan (Outlet
Telpon, Speaker, dll)
PEMASANGAN ALAT
PEK. BOBOKAN
- Outlet Telpon
- Outlet Speaker
- Dll
PEK. INSTALASI
- Conduit, Kabel
- Grouping & Labelling
PAS. CEILING
PEK. MARKING
- Aksesori di Ceiling
PEK. PEMASANGAN
- Aksesori di Ceiling
CONNECTION
NO
TEST
CONTINUITAS
YES
CONNECTION
NO
FINISH
TEST
COMMISIONING
YES
PEKERJAAN M/E
FLOWCHART ELEKTRIKAL
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PEK. PABRIKASI
PEK. MARKING
- Cable Ladder
- Penggantung Kbl Ladder
- Dudukan Equiptment
PEMASANGAN ALAT
PEK. BOBOKAN
- Panel
- Stop Kontak
- Saklar
PEK. INSTALASI
TEST
FUNGSI
- Conduit, Kabel
- Grouping & Labelling
PAS. CEILING
TEST
MERGER
KABEL
PEK. MARKING
- Titik Lampu
YES
CONNECTION
PEK. PEMASANGAN
CONNECTION
- Lampu
TEST
NYALA
NO
YES
CONNECTION
FINISH
NO
TEST
COMMISIONING
YES
FINISH
TEST
COMMISIONING
PEKERJAAN M/E
FLOWCHART GAS MEDIK
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PEK. PABRIKASI
- Penggantung Pipa
PEK. MARKING
- Jalur pipa dalam dinding
- Titik Outlet Gas
PEK. BOBOKAN
- Jalur pipa tembus dinding
PEK. PEMASANGAN
- Conduit (dlm Dinding)
- Pasang Pipa
- Labelling Pipa
PAS. MESIN
- Vakum
- Compressor
- O2
- N 2O
NO
NO
TEST
BOCOR
YES
YES
FLASHING
PAS. OUTLET
- FLASHING
- Tambahan Chemical
FINISH
TEST
COMMISIONING
PEKERJAAN M/E
FLOWCHART PIPA AC
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PEK. PABRIKASI
- Gantungan Pipa
- Pipa
PEK. MARKING
- Jalur pipa
PEK. BOBOKAN
- Jalur pipa tembus dinding
PEK. INSTALASI
- Pasang Gantungan
- Pasang Pipa
NO
TEST PIPA
YES
PEK. MARKING
- Pasang Equipment
PEK. PEMASANGAN
- Isolasi Pipa
- Valves
- Alat Ukur
- FLASHING
- Tambahan Chemical
FINISH
TEST
COMMISIONING
PEKERJAAN M/E
FLOWCHART DUCTING
START
PERSIAPAN
-
Lahan kerja
Alat dan Fasilitas kerja
Material yang disetujui
Shop Drawing yang di acc
Tenaga kerja
PEK. PABRIKASI
PEK. MARKING
- Gantungan Ducting
- Ducting
- Jalur Ducting
PEK. BOBOKAN
SETTING DUCTING
ISOLASI DUCTING
PEK. PEMASANGAN
- Pemasangan Ducting
PEK. PEMASANGAN
YES
TEST
COMMISIO
NING
YES
FINISH
CONNECTING
NO
NO
V.
PENUTUP
Demikian uraian ini kami sampaikan, kiranya Panitia Pengadaan Barang / Jasa Pokja J
Konstruksi Tim 10 Provinsi NTB dapat mengerti dan memahaminya sehingga dapat mempercaya
pekerjaan ini kepada kami untuk pelaksanaannya.
Kami sadari bahwa metode ini jauh dari kesempurnaan, semoga segala kekurangan kami ya
terdapat dalam tulisan dapat dimaklumi,
Atas perhatian serta kerja samanya kami ucapkan terima kasih.
YUSEP SUPRIATNA
Direktur Utama
Pembangunan Gedung K
i bangun sebagai tempat bekerja bagi para staf baik staf dari
gawas, maupun pemilik proyek di lapangan. Pembuatan
ak perlu di bangun secara permanen karena hanya bersifat
mun tetap mengutamakan kenyaman yang mengacu pada
s dokumen pelelangan yakni Direksi keet dilengkapi dengan
m dokumen kontrak.
yek ini dipasang dengan 2 (dua) buah kaki yang terbuat dari
pada bagian bawah diberi adukan secukupnya agar dapat
us mencapai tanah keras, dan jika pada galian terdapat akaroran-kotoran dan bagian-bagian tanah yang longgar (tidak
gian ini harus dikeluarkan seluruhnya kemudian lubang yang
gan pasir urug.
a-Laba (KSLL) ini ditemukan oleh Ir. Ryiantori dan Ir. Sucipto
likasikan diproyek pada tahun 1978 oleh PT. Dasa Guna, lalu
Katama Surya Bumi sebagai pemegang lisensi dengan hak
digunakan adalah jenis-jenis yang memenuhi ketentuanatau menurut standart Portland cemen yang digariskan oleh
sia.
h dari dari lapisan minyak lemak, karat dan bebas dari cacatn sebagainya, serta berpenampang bulat.
acat-cacat kayu antara lain yang berupa putih kayu, pecahg melintang. Syarat-syarat kelembaban dan toleransi ukuran
s memenuhi syarat-syarat dan ketentuan dalam PPKI.
Hose Concrete
Pump
gan dinding batu bata /bata ringan dalam satu hari supaya
1 meter, untuk menjaga keruntuhan.
basah secara
mengosok
jarak dinding untuk lebar dan tinggi ruangan, serta bagianpasang pada ruangan tersebut.
agai
mik
besi
siku
keramik berikutnya
k ada las lasan
n pasangan
pai bersih.
keramik
dan aduklah
rsihkan
permukaan
pasangan keramik
yang sudah
sa sisa bahan cor nad dengan menggunakan kain /
sih
dipasang bersamaan dengan sparing closet (bila ada), di ut berada di samping atau dekat dengan sparing closet,
us dilaksanakan sebelum pengecoran. Pemasangan sparingelintas di plat, balok, kolom beton harus dipasang terlebih
ecoran, kabel diusahakan dimasukkan bersamaan dengan
harus beradius > 3 kali diameter pipa dan harus rata (untuk
n kabel).
asang tersendiri/terpisah dengan arde penangkal petir.
ar dicat merah dengan cat Duco ex Dana Paints atau cat ICI,
coating)
X dan pintu dicat merah dengan cat duco ex Dana Paints dan
Ydrant dengan warna merah.
ipa yang digunakan Black Steel Pipe Sch. 40, atau ASTM A 53
hakan semuanya berasal dari satu merk.
Tidak dikerjakan
iganti dan sisi cadangan yang dipakai telah kosong maka sisi
enyalurkan gas secara otomatis.
diganti dan sisi cadangan yang dipakai telah kosong maka sisi
enyalurkan gas secara otomatis.
Dryer Filter udara Filter bakteri dan Regulator udara. Air dryer
hindari kondensasi pada jalur pipa dimana bakteri dapat
engkontaminasi udara yang dihasilkan. Filter udara
at uap oil dan uap air dari udara tekan yang dihasilkan. Filter
n bakteri ( 3 micron-0.01 micron ) . Regulator udara
menjadi konstan 4.0 kg/ cm .
sus seperti ICU/ ICCU ruang perawatan VIP/ VVIP outlet gas
panel ( wall duct system ) yang dilengkapi lampu baca nurse
stop kontak listrik.
Tidak dikerjakan
ial fire alarm, telpon dan Soun System (conduit, kabel, klem),
k terlalu besar dan tidak terlalu berat maka untuk pekerjaan
gudang, pengangkutannya dapat menggunakan tenaga
uk yang lokasinya jauh maka pengangkutannya dapat
mobil pengangkut.
box per lantai dengan MDF Fire Alarm, MDF Telpon, dan MDF
MARKING
- Jalur pipa
- Titik Sanitary
BOBOKAN
INSTALASI
- Pas. gantungan
- Pasang pipa
- Cat Finish
PERBAIKAN
- Pemasangan Valve
- Pemasangan Aks.
Sanitary
PEK. MARKING
- Jalur pipa
PEK. BOBOKAN
- Jalur pipa tembus dinding
PEK. INSTALASI
- Pasang Gantungan
- Pas. Pipa Riser & Pipa Utama
- Pengecatan Finish
TEST PIPA
PEK. MARKING
- Titik Sprinkler
- Titik Box Hydrant
PEK. PEMASANGAN
- Pipa Droper Sprinkler
- Pipa ke Box Hydrant
- Box Hydrant Sanitary
TEST PIPA
PEK. PEMASANGAN
- Titik Sprinkler
- Valve Sanitary
TEST
COMMISIONING
TEST
COMMISIONING
PEMASANGAN ALAT
- Outlet Telpon
- Outlet Speaker
- Dll
PEMASANGAN ALAT
- Panel
- Stop Kontak
- Saklar
TEST
FUNGSI
YES
NO
PEK. MARKING
- Pasang Equipment
YUSEP SUPRIATNA
Direktur Utama
JADWAL PELAK
I
3
Bobot
(%)
Uraian Kegiatan
No.
1.0622
0.53
PEKERJAAN PERSIAPAN
0.53
I.
0.38
PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN
2.2.
PEKERJAAN TANAH
0.3077
2.3.
15.4528
2.4.
3.8108
2.5.
15.0503
2.6.
13.4666
2.7.
4.5732
2.8.
ATAP
13.3915
PEKERJAAAN ARSITEK
3.1.
4.3178
3.2.
2.1516
3.3.
1.6516
3.4.
5.4530
3.5.
1.1785
3.6.
PEKERJAAN PENGECATAN
1.2141
3.7.
PEKERJAAN RAILLING
0.2074
0.3775
4.2.
0.8418
4.3.
0.1266
PEKERJAAN ELEKTRIKAL
5.1.
1.4417
5.2.
0.9166
0.05
0.7549
3.86
0.05
2.1.
0.38
PEKERJAAN STRUKTUR
PEKERJAAAN ARSITEK
1.1.
2.4221
1.2.
0.0000
1.3.
0.2566
1.4.
0.0000
``
PEKERJAAN MEKANIKAL
2.1. PEKERJAAN HYDRANT & SPRINKLER
1.3003
2.2.
5.0938
2.3.
PEKERJAAN ELEVATOR
0.0000
2.4.
0.9234
1.1911
3.2.
PEKERJAAN UPS
0.0000
3.3.
0.0533
0.0717
4.2.
0.1341
4.3.
0.1305
4.4.
PEKERJAAN MATV
0.0313
4.5.
0.0369
4.6.
0.4834
4.7.
PEKERJAAN CCTV
0.1232
PERSIAPAN PHO
3.91
5.78
0.96
1.87
0.91
100.00
0.91
0.000.01
0.000.01
0.000.01
0.48
0.48
0.48
0.10
0.10
0.10
0.10
0.10
0.10
0.01
0.01
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.36
0.36
0.36
0.36
0.48
0.48
0.48
3.35
3.35
3.35
3.35
1.52
1.52
1.52
3.37
3.37
3.37
3.37
3.01
21
20
19
18
17
16
15
14
13
23
0.24
0.24
0.24
0.36
0.36
0.48
0.48
12
0.15
0.61
0.61
0.61
0.61
0.24
0.24
0.24
0.24
3.01
11
22
0.15
0.07
0.15
0.15
0.15
0.15
0.61
0.61
0.61
0.61
0.48
3.01
0.15
0.15
0.15
0.07
0.07
0.15
0.15
0.15
0.15
0.15
0.15
0.61
0.48
10
IV
0.10
0.01
0.10
0.09
0.04
0.64
III
0.000.01
0.01
0.10
0.09
3.01
0.48
0.64
0.64
0.05
0.05
II
0.01
3.01
0.48
3.86
0.64
0.05
0.05
0.64
3.86
0.64
3.86
PELAKSANAAN PEKERJAAN
EDUNG K (IRNA dan IRJ TAMBAHAN) TAHAP 1 RSUP NTB
BULAN KE
V
VI
YUSEP SUPRIATNA
0.01
0.01
5.41
3.82
0.39
0.15
95.49
99.31
99.70
99.85
0.05
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.01
8.26
0.00
0.01
90.08
0.05
0.01
0.01
0.00
8.67
0.00
81.81
0.05
0.01
0.01
0.01
5.55
0.01
0.01
0.01
73.14
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.01
0.01
7.25
0.00
0.00
0.00
0.01
67.58
0.05
0.05
0.00
0.00
0.01
0.24
0.24
0.24
0.24
0.01
6.76
60.34
0.05
0.00
0.01
0.24
0.01
6.41
53.57
0.05
0.01
0.01
0.01
0.00
0.08
0.08
0.08
0.08
0.000.08
0.000.08
0.000.08
0.000.08
0.08
9.07
0.00
0.01
47.17
0.05
0.01
0.01
0.01
5.32
0.00
38.10
0.00
0.01
3.95
32.78
0.05
0.08
4.43
28.83
0.01
4.20
24.40
0.01
0.71
20.20
0.01
0.69
19.48
0.00
0.01
4.55
18.80
0.00
0.08
4.55
14.25
0.05
0.000.08
3.91
9.70
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.35
0.35
0.35
0.35
0.35
0.35
0.35
Direktur Utama
KE
Persentase
24
VI
100%
90%
80%
0.15
70%
60%
50%
50%
40%
30%
20%
10%
100.00
0.15
0%
NO.
1
URAIAN PEKERJAAN
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN LANTAI
1.2. PEKERJAAN PASANGAN PLAFOND
1.3. PEKERJAAN PASANGAN PINTU DAN JENDELA
1.4. PEKERJAAN FURNITURE DAN LAIN-LAIN
JUMLAH I.
II.
PEKERJAAN MEKANIKAL
2.1. PEKERJAAN HYDRANT & SPRINKLER
2.2. PEKERJAAN PENGKONDISIAN UDARA & EXHAUST FAN
2.3. PEKERJAAN ELEVATOR
2.4. PEKERJAAN GAS MEDIS
JUMLAH II.PEKERJAAN MEKANIKAL
III.
IV.
BILL OF QUANTITY
PEMBANGUNAN GEDUNG K (IRNA 1 & IRJ TAMBAHAN ) TAHAP I
RUMAH SAKIT UMUM PROVINSI NUSA TENGGARA BARAT
NO.
URAIAN PEKERJAAN
SAT
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN LANTAI
A. GROUND FLOOR
B.
C.
m1
2 Bumper Guard
m1
3 Plint kayu T. 10 cm
m1
4 Vinyl Sheet
m1
6 Carpet
7 Medical track+Gordeng
m1
LEVEL-1
1 Plint Hospital Skirting
m1
2 Bumper Guard
m1
3 Plint kayu T. 10 cm
m1
4 Vinyl Sheet
m1
6 Carpet
7 Vinyl Wallcovering
8 Medical track+Gordeng
m1
LEVEL-2
NO.
URAIAN PEKERJAAN
SAT
m1
2 Bumper Guard
m1
3 Plint kayu T. 10 cm
m1
4 Vinyl Sheet
m1
6 Carpet
7 Vinyl Wallcovering
8 Medical track+Gordeng
m1
NO.
URAIAN PEKERJAAN
SAT
m2
C.
unit
unit
unit
unit
unit
unit
unit
m
LEVEL-1
PINTU
1 A (HM uk. 900x2150)
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 900x2150)
JENDELA
1 Type CW/3
unit
unit
unit
unit
LEVEL-2
PINTU
1 A (HM uk. 900x2150)
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 900x2150)
JENDELA
1 Type CW/3
unit
unit
unit
unit
NO.
URAIAN PEKERJAAN
SAT
bh
bh
bh
bh
bh
bh
NO.
URAIAN PEKERJAAN
B.
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Pendaftaran P. 2,85m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-1
1 Meja Nurse Station P. 5,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P. 2,65 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Lemari Dibawah Zink P.7,3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-2
1 Meja Nurse Station P. 5,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P. 2,65 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Lemari Dibawah Zink P.7,3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
SAT
unit
unit
unit
unit
unit
unit
unit
PEKERJAAN MEKANIKAL
2.1. PEKERJAAN HYDRANT & SPRINKLER
NO.
URAIAN PEKERJAAN
A.
SAT
GROUND FLOOR
1 Instalasi Hydrant
a.
Set
b.
Bh
c.
Bh
e.
f.
- Diameter 150 mm
- Diameter 100 mm
- Diameter 65 mm
Instalasi Hydrant
Ls
NO.
URAIAN PEKERJAAN
SAT
2 Instalasi Sprinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Bh
j.
Bh
k.
Indicating Valve :
Diameter 80 mm
l..
B.
Bh
Plat Orifice :
Diameter 80 mm
Bh
Diameter 50 mm
Bh
m.
Bh
n.
Bh
o.
Bh
p.
Bh
q.
Bh
r.
Ls
LEVEL 1
1 Instalasi Hydrant
a.
Set
b.
Bh
NO.
URAIAN PEKERJAAN
c.
d.
e.
SAT
Bh
- Diameter 65 mm
Ls
2 Instalasi Srinkler
a.
b.
c.
d.
NO.
URAIAN PEKERJAAN
e.
f.
g.
h.
Bh
i.
Bh
j.
Indicating Valve :
Diameter 80 mm
k.
C.
SAT
Bh
Plat Orifice :
Diameter 80 mm
Bh
Diameter 50 mm
Bh
l..
Bh
m.
Bh
n.
Bh
o.
Bh
p.
Bh
q.
Ls
LEVEL 2
1 Instalasi Hydrant
a.
Set
b.
Bh
c.
Bh
d.
e.
- Diameter 65 mm
Ls
2 Instalasi Srinkler
NO.
URAIAN PEKERJAAN
SAT
a.
b.
c.
d.
e.
f.
g.
h.
i.
Diameter 100 mm
Bh
Bh
NO.
URAIAN PEKERJAAN
j.
Indicating Valve :
Diameter 80 mm
k.
SAT
Bh
Plat Orifice :
Diameter 80 mm
Bh
Diameter 50 mm
Bh
l..
Bh
m.
Bh
n.
Bh
o.
Bh
p.
Bh
q.
Ls
2 Riser
a.
b.
Bh
c.
Bh
Unit
b.
Unit
NO.
URAIAN PEKERJAAN
SAT
c.
Unit
d.
Unit
e.
Unit
c.
d.
Dran
e.
2 Single Split ( IU + OU )
a.
b.
c.
NO.
URAIAN PEKERJAAN
SAT
c.
d.
Dran
e.
Unit
Unit
Unit
Unit
Ttk
24" x 12 "
22" x 16 "
22" x 10 "
20" x 10 "
18" x 12 "
18" x 10 "
16" x 10 "
16" x 8 "
14" x 10 "
14" x 8 "
12" x 10 "
12" x 10 " ( FA )
12" x 8 " ( FA )
10" x 8 " ( FA )
12" x 8 "
NO.
URAIAN PEKERJAAN
SAT
10" x 8 "
10" x 6 "
8" x 8 "
8" x 6 "
Bh
Bh
Bh
Bh
Bh
NO.
URAIAN PEKERJAAN
SAT
12" x 10 "
12" x 8 "
10" x 8 "
8" x 8 "
8" x 6 "
6" x 6 "
B.
Bh
LEVEL 1
Pekerjaan Unit AC
1 Single Split ( IU + OU )
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Dran
k.
Unit
Unit
Ttk
NO.
URAIAN PEKERJAAN
SAT
12" x 8 "
f.
10" x 8 "
g.
8" x 8 "
h.
8" x 6 "
h.
6" x 6 "
i.
Bh
NO.
URAIAN PEKERJAAN
C.
SAT
LEVEL 2
Pekerjaan Unit AC
1 Single Split ( IU + OU )
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Dran
k.
Unit
Unit
Ttk
12" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
NO.
URAIAN PEKERJAAN
SAT
Unit
Kapasitas : 1000 Kg
Kecepatan 30 Mpm
Lintasan : 3 Lantai
2 Pemasangan
Unit
JUMLAH 2.3.PEKERJAAN ELEVATOR
NO.
URAIAN PEKERJAAN
SAT
GOUND FLOOR
1 Peralatan Utama
a.
Unit
b.
Unit
c.
Set
d.
Lot
2 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
c.
d.
Bh
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
Ball Valve :
- Diameter 25 mm
Bh
- Diameter 15 mm
Bh
Ls
3 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
c.
d.
Bh
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
Ball Valve :
- Diameter 25 mm
Bh
- Diameter 15 mm
Bh
Ls
Unit
NO.
URAIAN PEKERJAAN
SAT
B.
LEVEL 1
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
Bh
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
NO.
URAIAN PEKERJAAN
c.
d.
SAT
Ball Valve :
- Diameter 32 mm
Bh
- Diameter 25 mm
Bh
- Diameter 10 mm
Bh
Ls
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
c.
d.
Bh
- Diameter 32 mm
- Diameter 25 mm
- Diameter 10 mm
Ball Valve :
- Diameter 32 mm
Bh
- Diameter 25 mm
Bh
- Diameter 15 mm
Bh
Ls
Unit
C.
LEVEL 2
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
c.
Bh
- Diameter 32 mm
- Diameter 25 mm
- Diameter 10 mm
Ball Valve :
- Diameter 32 mm
Bh
NO.
URAIAN PEKERJAAN
d.
SAT
- Diameter 25 mm
Bh
- Diameter 10 mm
Bh
Ls
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
Bh
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
NO.
URAIAN PEKERJAAN
c.
d.
SAT
Ball Valve :
- Diameter 32 mm
Bh
- Diameter 25 mm
Bh
- Diameter 15 mm
Bh
Ls
Unit
D.
PERLENGKAPAN
1 Perlengkapan Outlet Oksigen
a.
b.
Suction Attachement
b.
Suction Jar
c.
Suction tubing
d.
Bacterial filter
Ls
Ls
NO.
III.
URAIAN PEKERJAAN
SAT
GROUND FLOOR
1 Rak Kabel
a.
b.
B.
a.
Bh
b.
Bh
c.
Lampu TL 2 x 36 W / Louvre M6
Bh
d.
Bh
e.
Bh
g.
Lampu TL 1 x 36 W / Louvre M6
Bh
h.
Bh
j.
Bh
k.
Bh
l.
Bh
m.
Bh
n.
Bh
o.
Bh
p.
Bh
q.
Bh
LEVEL 1
1 Rak Kabel
a.
b.
NO.
URAIAN PEKERJAAN
SAT
a.
Lampu TL 2 x 36 W / Louvre M6
Bh
b.
Bh
c.
Bh
d.
Bh
e.
Bh
f.
Lampu TL 1 x 36 W / Louvre M6
Bh
g.
Bh
h.
Bh
j.
Lampu TL 1 x 18 W / Balk
Bh
k.
Bh
NO.
URAIAN PEKERJAAN
C.
SAT
l.
Bh
m.
Bh
n.
Bh
o.
Bh
q.
Lampu Exit
Bh
LEVEL 2
1 Rak Kabel
a.
b.
Bh
b.
Bh
c.
Lampu TL 2 x 36 W / Louvre M6
Bh
d.
Bh
e.
Bh
f.
Bh
g.
Bh
h.
Lampu TL 1 x 36 W / Louvre M6
Bh
j.
Lampu TL 1 x 18 W / Balk
Bh
k.
Bh
l.
Bh
m.
Bh
n.
Bh
o.
Bh
p.
Lampu Exit
Bh
NO.
URAIAN PEKERJAAN
A.
GROUND FLOOR
1.
Portable UPS,
a.
B.
SAT
Unit
LEVEL 1
1 Portable UPS,
a.
C.
Unit
LEVEL 2
1 Portable UPS,
a.
Unit
NO.
URAIAN PEKERJAAN
SAT
Bh
3 Coaxial Cable 2 x 35 mm
4 Grounding sistem
Ttk
Ls
GROUND FLOOR
1 Sentral Telephone
a.
Unit
b.
Unit
c.
Lot
2 Instalasi
B.
a.
TB-T GF ( 20 Pairs )
Bh
b.
c.
Bh
d.
Ttk
e.
Ttk
LEVEL 1
1 Instalsi
a.
TB-T ( 20 Pairs )
Bh
b.
c.
Bh
d.
Ttk
NO.
URAIAN PEKERJAAN
e.
C.
SAT
Bh
LEVEL 2
1 Instalsi
a.
TB-T ( 20 Pairs )
Bh
b.
c.
Bh
d.
Ttk
e.
Bh
JUMLAH 4.1.PEKERJAAN TELEPHONE
NO.
URAIAN PEKERJAAN
SAT
GROUND FLOOR
1 Instalasi
a.
MDF'
Unit
b.
TB.F- GF
Unit
c.
ROR
Bh
e.
Bh
f.
Bh
g.
Bell Alarm
Bh
h.
Indicator Lamp
Bh
i.
Flow Switch
Bh
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
Unit
LEVEL 1
1 Instalasi
a.
TB.F- 1
Unit
b.
ROR
Bh
d.
Bh
e.
Smoke Detector
Bh
f.
Bh
g.
Bell Alarm
Bh
h.
Indicator Lamp
Bh
i.
Flow Switch
Bh
NO.
URAIAN PEKERJAAN
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
C.
SAT
Ttk
LEVEL 2
1 Instalasi
a.
TB.F- 2
unit
b.
ROR
Bh
d.
Bh
NO.
URAIAN PEKERJAAN
SAT
e.
Smoke Detector
Bh
f.
Bh
g.
Bell Alarm
Bh
h.
Indicator Lamp
Bh
i.
Flow Switch
Bh
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
Ttk
GROUND FLOOR
1 Sentral Tata Suara
a.
Unit
b.
Unit
c.
Unit
d.
Autorserve Cassete
Unit
e.
CD / DVD/MP3 - Playaer
Unit
f.
Microphone
Unit
g.
Equalizer
Unit
h.
Unit
i.
Cabinet Rack
Unit
2 Instalasi
a.
MDF
Unit
b.
TB-S.GF
Unit
c.
d.
Bh
e.
Ttk
NO.
URAIAN PEKERJAAN
B.
SAT
LEVEL 1
1 Instalasi
a.
TB-S
Bh
b.
c.
Bh
d.
Ttk
NO.
URAIAN PEKERJAAN
C.
SAT
LEVEL 2
1 Instalasi
a.
TB-S 2
Bh
b.
c.
Bh
d.
Coulumn Speaker 20 W
Bh
e.
Volume Control
Bh
f.
Ttk
GROUND FLOOR
1 Sentral MATV
a.
Unit
b.
Unit
c.
Unit
d.
Activ Combiner
Unit
e.
Unit
f.
Spliter 4 way
Unit
g.
Unit
h.
Unit
i.
TV Monitor
Unit
j.
CD Player
Unit
k.
Unit
l.
Coaxial Cable
2 Instalasi
a.
Spliter 4 way
Bh
b.
Socket TV ( RCA )
Bh
c.
Ttk
NO.
URAIAN PEKERJAAN
B.
SAT
LEVEL 1
1 Instalasi
a.
Spliter 4 way
Bh
b.
Socket TV ( RCA )
Bh
c.
Ttk
NO.
URAIAN PEKERJAAN
C.
SAT
LEVEL 2
1 Instalasi
a.
Spliter 4 way
Bh
b.
Socket TV ( RCA )
Bh
c.
Ttk
GROUND FLOOR
1 Peralatan Utama
a.
Set
b.
Unit
2 Instalasi
B.
a.
Unit
b.
c.
SocketData ( RG-45 )
Bh
d.
Ttk
LEVEL 1
1 Instalasi
C.
a.
Unit
b.
c.
SocketData ( RG-45 )
Bh
d.
Ttk
LEVEL 2
1 Instalasi
a.
Unit
b.
NO.
URAIAN PEKERJAAN
SAT
c.
SocketData ( RG-45 )
Bh
d.
Ttk
GROUND FLOOR
1 Ruang ( Resusitasi- Firs Aid & Isolasi )
a.
Unit
b.
Unit
c.
Coridoor Light
Bh
NO.
URAIAN PEKERJAAN
SAT
d.
Bh
e.
Bh
f.
Bh
g.
Titik instalasi
Bh
B.
a.
Unit
b.
Unit
c.
Coridoor Light
Bh
d.
Bh
e.
Bh
f.
Bh
g.
Titik instalasi
Bh
LEVEL.1
1 Ruang Observation
a.
Unit
b.
Unit
c.
Coridoor Light
Bh
d.
Bh
e.
Bh
f.
Bh
g.
Titik instalasi
Bh
JUMLAH 4.6.PEKERJAAN NURSE CALL
Set
Unit
NO.
URAIAN PEKERJAAN
B.
SAT
Set
4 Bivar
Set
Unit
6 Rack CCTV
Set
GROUND FLOOR
1 Fixed Dome Camer
Unit
2 Instalasi Camera
Ttk
NO.
URAIAN PEKERJAAN
C.
D.
SAT
LEVEL 1
1 Fixed Dome Camer
Unit
2 Instalasi Camera
Ttk
LEVEL 2
1 Fixed Dome Camer
Unit
2 Instalasi Camera
Ttk
JUMLAH 4.7.PEKERJAAN CCTV
JUMLAH HARGA
3
597,832,290.86
63,333,961.76
661,166,252.62
320,947,482.78
1,257,284,828.71
227,924,206.25
1,806,156,517.74
293,996,557.20
13,146,487.20
307,143,044.40
17,707,165.59
33,108,798.80
32,220,858.25
7,717,871.33
9,118,868.51
119,312,253.28
30,412,000.00
JUMLAH IV.
249,597,815.77
3,024,063,630.53
VOLUME
4
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
6=4X5
307.9500
76,590.00
23,585,890.50
289.3500
502,950.00
145,528,582.50
28.7500
82,900.00
2,383,375.00
43.1850
275,084.31
11,879,515.99
37.5000
148,590.00
5,572,125.00
48.6336
219,278.07
10,664,281.95
60.9500
302,890.00
18,461,145.50
133,110.00
795,066.03
417.9500
76,590.00
32,010,790.50
276.3499
502,950.00
138,990,182.21
275,084.31
10,239,243.26
26.1499
148,590.00
3,885,613.64
398,210.00
23,919,365.69
104.5000
302,890.00
31,652,005.00
6.3800
133,110.00
849,241.80
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
246.1990
76,590.00
18,856,381.41
50.6994
502,950.00
25,499,263.23
275,084.31
14,771,917.49
40.9000
148,590.00
6,077,331.00
398,210.00
34,220,176.35
119.0000
302,890.00
36,043,910.00
14.6262
133,110.00
1,946,886.83
597,832,290.86
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
N PASANGAN PLAFOND
1.0000
5.0000
51.2500
1.0000
5.0000
50.0000
1.0000
4.0000
35.6250
3,011,602.28
1,714,766.63
2,964,394.13
2,389,796.89
12,773,970.00
4,301,634.40
5,162,812.88
221,314.50
Tidak
Tidak
Tidak
Tidak
Tidak
3,011,602.28
8,573,833.13
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
11,342,368.13
3,011,602.28
3,011,602.28
1,714,766.63
8,573,833.13
2,964,394.13 Tidak Dikerjakan
5,162,812.88 Tidak Dikerjakan
221,314.50
11,065,725.00
3,011,602.28
3,011,602.28
1,714,766.63
6,859,066.50
2,964,394.13 Tidak Dikerjakan
5,162,812.88 Tidak Dikerjakan
221,314.50
7,884,329.06
63,333,961.76
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
22.0000
2.0000
23.0000
10.0000
16.0000
5.0000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
1.0000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2.0000
1,108,800.00
2,217,600.00
2.0000
201,283.87
402,567.73
4.0000
591,066.67
2,364,266.67
19.6000
475,975.57
9,329,121.24
85.4000
313,351.57
26,760,224.36
16.8000
155,862.67
2,618,492.80
1.0000
5,875,743.43
5,875,743.43
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
29.4000
475,975.57
13,993,681.86
14.0000
313,351.57
4,386,922.03
14.0000
191,779.13
2,684,907.87
8.4000
155,862.67
1,309,246.40
8.4000
135,534.67
1,138,491.20
43.4000
693,195.80
30,084,697.72
63.7000
104,496.92
6,656,453.80
82.6000
52,457.24
4,332,968.02
1.0000
253,459.07
253,459.07
84.0000
271,058.33
22,768,900.00
1.0000
228,369.53
228,369.53
1.0000
136,215.93
136,215.93
1.0000
114,532.73
114,532.73
1.0000
177,567.87
177,567.87
1.0000
177,567.87
177,567.87
1.0000
174,944.00
174,944.00
1.0000
361,049.04
361,049.04
2.0000
147,057.53
294,115.07
1.0000
19,376,210.67
19,376,210.67
2.0000
1,108,800.00
2,217,600.00
2.0000
201,283.87
402,567.73
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
6.0000
591,066.67
3,546,400.00
9.8000
155,862.67
1,527,454.13
1.0000
305,490.83
305,490.83
9.8000
313,351.57
3,070,845.42
6.3000
191,779.13
1,208,208.54
23.8000
155,862.67
3,709,531.47
135,534.67
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
4.2000
693,195.80
2,911,422.36
55.3000
104,496.92
5,778,679.68
132.3000
52,457.24
6,940,092.85
1.0000
253,459.07
253,459.07
100.0000
271,058.33
27,105,833.33
1.0000
228,369.53
228,369.53
1.0000
136,215.93
136,215.93
1.0000
114,532.73
114,532.73
1.0000
177,567.87
177,567.87
1.0000
177,567.87
177,567.87
1.0000
174,944.00
174,944.00
1.0000
361,049.04
361,049.04
2.0000
147,057.53
294,115.07
1.0000
7,085,634.09
7,085,634.09
2.0000
1,108,800.00
2,217,600.00
2.0000
201,283.87
402,567.73
6.0000
591,066.67
3,546,400.00
9.8000
155,862.67
1,527,454.13
1.0000
305,490.83
305,490.83
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
9.8000
313,351.57
3,070,845.42
14.0000
191,779.13
2,684,907.87
12.6000
155,862.67
1,963,869.60
21.7000
135,534.67
2,941,102.27
9.8000
693,195.80
6,793,318.84
43.4000
104,496.92
4,535,166.33
137.9000
52,457.24
7,233,853.40
1.0000
253,459.07
253,459.07
86.0000
271,058.33
23,311,016.67
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
228,369.53
228,369.53
1.0000
136,215.93
136,215.93
1.0000
114,532.73
114,532.73
1.0000
177,567.87
177,567.87
1.0000
177,567.87
177,567.87
1.0000
174,944.00
174,944.00
1.0000
361,049.04
361,049.04
2.0000
147,057.53
294,115.07
1.0000
8,766,919.11
8,766,919.11
25.2000
313,351.57
7,896,459.65
8.4000
313,351.57
2,632,153.22
16.8000
693,195.80
11,645,689.44
8.4000
135,534.67
1,138,491.20
1.0000
147,057.53
147,057.53
3.0000
107,800.00
323,400.00
320,947,482.78
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
1.0000
33,045,144.00
33,045,144.00
1.0000
21,376,872.00
21,376,872.00
63.0000
170,503.81
10,741,740.24
28.0000
108,605.05
3,040,941.49
70.0000
2.0000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
100.8000
170,503.81
17,186,784.38
37.8000
108,605.05
4,105,271.02
126.0000
183,539.99
23,126,038.32
1.0000
751,700.99
751,700.99
1.0000
55,666.67
55,666.67
1.0000
55,666.67
55,666.67
1.0000
55,666.67
55,666.67
2.0000
1,169,102.59
2,338,205.17
4.0000
183,539.99
734,159.95
1.4000
3,907,360.51
5,470,304.72
2.1000
3,690,284.93
7,749,598.35
0.7000
3,473,209.34
2,431,246.54
2.1000
3,256,133.76
6,837,880.90
2.1000
3,256,133.76
6,837,880.90
4.2000
3,039,058.18
12,764,044.34
6.3000
2,821,982.59
17,778,490.33
3.5000
2,604,907.01
9,117,174.53
11.2000
2,604,907.01
29,174,958.49
5.6000
2,387,831.42
13,371,855.97
24.5000
2,387,831.42
58,501,869.89
4.2000
2,387,831.42
10,028,891.98
8.4000
2,170,755.84
18,234,349.06
11.9000
1,953,680.26
23,248,795.05
16.1000
2,170,755.84
34,949,169.02
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
48.3000
1,953,680.26
94,362,756.36
11.2000
1,736,604.67
19,449,972.33
61.6000
1,736,604.67
106,974,847.80
49.7000
1,519,529.09
75,520,595.67
6.0000
1,072,078.70
6,432,472.20
12.0000
1,022,275.10
12,267,301.20
22.0000
2,604,907.01
57,307,954.18
1.0000
1,306,867.10
1,306,867.10
3.0000
1,242,833.90
3,728,501.70
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3.5000
2,387,831.42
8,357,409.98
1.4000
2,170,755.84
3,039,058.18
4.2000
1,953,680.26
8,205,457.08
9.8000
1,736,604.67
17,018,725.79
4.2000
1,519,529.09
6,382,022.17
7.7000
1,302,453.50
10,028,891.98
6.0000
945,435.26
5,672,611.56
5,528,825.72
5,528,825.72
3,900,248.00
7,800,496.00
2.0000
5,528,825.72
11,057,651.44
2.0000
5,528,825.72
11,057,651.44
145.6000
21,009.27
3,058,949.23
54.6000
27,785.27
1,517,075.56
126.0000
54,600.00
6,879,600.00
1,169,102.59
18,705,641.39
16.0000
183,539.99
2,936,639.79
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8.4000
2,170,755.84
18,234,349.06
5.6000
1,953,680.26
10,940,609.43
35.0000
1,736,604.67
60,781,163.52
97.3000
1,519,529.09
147,850,180.26
7.7000
1,302,453.50
10,028,891.98
5.0000
874,998.74
4,374,993.70
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5,528,825.72
5,528,825.72
1.0000
3,992,740.40
3,992,740.40
2.0000
3,900,248.00
7,800,496.00
3,992,740.40
7,985,480.80
145.6000
31,858.20
4,638,553.92
54.6000
41,344.60
2,257,415.16
182.0000
183,539.99
33,404,277.57
1,169,102.59
15,198,333.63
13.0000
183,539.99
2,386,019.83
8.4000
2,387,831.42
20,057,783.96
2.8000
179,571.33
502,799.73
11.9000
210,067.00
2,499,797.30
42.0000
502,708.89
21,113,773.30
1,257,284,828.71
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
- Tidak Dikerjakan
1.0000
- Tidak Dikerjakan
-
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
9,979,200.00
9,979,200.00
1.0000
1.0000
1,013,320.00
1,013,320.00
1.0000
12.0000
1,001,000.00
12,012,000.00
15.0000
45,542.05
683,130.80
25.0000
23,097.40
577,435.00
66.0000
17,787.25
1,173,958.72
1.0000
101,658.33
101,658.33
12.0000
52,193.53
626,322.40
1.0000
486,904.90
486,904.90
12.0000
1,001,000.00
12,012,000.00
15.0000
39,281.03
589,215.44
25.0000
23,097.40
577,435.00
66.0000
17,787.25
1,173,958.72
1.0000
52,193.53
52,193.53
12.0000
52,193.53
626,322.40
1.0000
468,121.83
468,121.83
1.0000
999,152.00
999,152.00
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
12.0000
261,800.00
3,141,600.00
31.0000
1,001,000.00
31,031,000.00
8.4000
51,710.46
434,367.90
74.2000
45,542.05
3,379,220.36
81.2000
23,097.40
1,875,508.88
175.7000
17,787.25
3,125,220.41
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
149,767.93
149,767.93
2.0000
101,658.33
203,316.67
36.0000
52,193.53
1,878,967.20
1.0000
1,675,989.93
1,675,989.93
31.0000
1,001,000.00
31,031,000.00
4.9000
51,710.46
253,381.27
74.2000
45,542.05
3,379,220.36
175.7000
17,787.25
3,125,220.41
1.0000
149,767.93
149,767.93
2.0000
101,658.33
203,316.67
36.0000
52,193.53
1,878,967.20
1.0000
1,300,888.15
1,300,888.15
1.0000
999,152.00
999,152.00
31.0000
261,800.00
8,115,800.00
25.0000
1,001,000.00
25,025,000.00
2.1000
51,710.46
108,591.97
128.1000
45,542.05
5,833,937.03
175.7000
17,787.25
3,125,220.41
1.0000
149,767.93
149,767.93
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2.0000
101,658.33
203,316.67
36.0000
52,193.53
1,878,967.20
1.0000
1,791,831.49
1,791,831.49
25.0000
1,001,000.00
25,025,000.00
2.1000
51,710.46
108,591.97
121.8000
45,542.05
5,547,022.10
14.0000
23,097.40
323,363.60
99.4000
17,787.25
1,768,052.98
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
149,767.93
149,767.93
2.0000
101,658.33
203,316.67
39.0000
52,193.53
2,035,547.80
1.0000
1,527,687.74
1,527,687.74
1.0000
3,992,740.40
3,992,740.40
25.0000
261,800.00
6,545,000.00
1.0000
1,093,400.00
1,093,400.00
1.0000
1,004,080.00
1,004,080.00
227,924,206.25
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
77.7000
326,872.88
25,398,023.04
77.7000
258,096.48
20,054,096.76
20.0000
212,533.33
4,250,666.67
13.0000
474,744.53
6,171,678.93
11.0000
136,889.87
1,505,788.53
12.0000
377,847.73
4,534,172.80
3.0000
132,146.67
396,440.00
4.0000
124,445.33
497,781.33
4.0000
372,017.07
1,488,068.27
1.0000
89,519.47
89,519.47
4.0000
89,519.47
358,077.87
1.0000
117,917.07
117,917.07
38.0000
272,409.87
10,351,574.93
7.0000
517,701.07
3,623,907.47
12.0000
340,169.87
4,082,038.40
5.0000
581,127.73
2,905,638.67
8.0000
516,345.87
4,130,766.93
56.7000
258,096.48
14,634,070.61
84.0000
261,568.27
21,971,734.40
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7.0000
212,533.33
1,487,733.33
6.0000
474,744.53
2,848,467.20
18.0000
212,533.33
3,825,600.00
15.0000
474,744.53
7,121,168.00
1.0000
132,146.67
132,146.67
6.0000
136,889.87
821,339.20
4.0000
372,017.07
1,488,068.27
3.0000
117,917.07
353,751.20
6.0000
89,519.47
537,116.80
16.0000
89,519.47
1,432,311.47
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
36.0000
89,519.47
3,222,700.80
48.0000
272,409.87
13,075,673.60
8.0000
517,701.07
4,141,608.53
23.0000
516,345.87
11,875,954.93
2.0000
386,848.00
773,696.00
84.0000
326,872.88
27,457,322.20
84.0000
258,096.48
21,680,104.60
17.0000
212,533.33
3,613,066.67
16.0000
474,744.53
7,595,912.53
10.0000
276,475.47
2,764,754.67
6.0000
521,766.67
3,130,600.00
1.0000
132,146.67
132,146.67
4.0000
372,017.07
1,488,068.27
3.0000
117,917.07
353,751.20
6.0000
124,445.33
746,672.00
6.0000
89,519.47
537,116.80
11.0000
89,519.47
984,714.13
50.0000
369,236.27
18,461,813.33
39.0000
272,409.87
10,623,984.80
9.0000
517,701.07
4,659,309.60
18.0000
516,345.87
9,294,225.60
2.0000
386,848.00
773,696.00
293,996,557.20
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
1.0000
1.0000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
8,377,600.00
8,377,600.00
2.0000
174,944.00
349,888.00
20.0000
50,512.00
1,010,240.00
1.0000
1,694,000.00
1,694,000.00
1.0000
1,714,759.20
1,714,759.20
13,146,487.20
1.0000
1.0000
1.0000
- Tidak Dikerjakan
1.0000
192,548.40
192,548.40
14.0000
20,331.67
284,643.33
8.0000
201,415.50
1,611,324.00
8.0000
498,793.39
3,990,347.09
8.0000
1.0000
192,548.40
192,548.40
16.8000
20,331.67
341,572.00
5.0000
201,415.50
1,007,077.50
5.0000
498,793.39
2,493,966.93
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5.0000
1.0000
192,548.40
192,548.40
19.6000
20,331.67
398,500.67
10.0000
201,415.50
2,014,155.00
10.0000
498,793.39
4,987,933.87
10.0000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
1.0000
240,240.00
240,240.00
30.0000
87,472.00
2,624,160.00
46.0000
74,572.67
3,430,342.67
1.0000
77,960.67
77,960.67
1.0000
271,076.67
271,076.67
1.0000
165,371.07
165,371.07
1.0000
84,736.67
84,736.67
1.0000
83,160.00
83,160.00
50.0000
160,910.13
8,045,506.67
1.0000
240,240.00
240,240.00
24.0000
87,472.00
2,099,328.00
21.0000
74,572.67
1,566,026.00
1.0000
77,960.67
77,960.67
4.0000
231,775.87
927,103.47
1.0000
271,076.67
271,076.67
1.0000
165,371.07
165,371.07
1.0000
84,736.67
84,736.67
1.0000
83,160.00
83,160.00
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
30.0000
160,910.13
4,827,304.00
1.0000
240,240.00
240,240.00
24.0000
87,472.00
2,099,328.00
13.0000
74,572.67
969,444.67
1.0000
77,960.67
77,960.67
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3.0000
231,775.87
695,327.60
1.0000
271,076.67
271,076.67
1.0000
165,371.07
165,371.07
1.0000
84,736.67
84,736.67
1.0000
83,160.00
83,160.00
19.0000
160,910.13
3,057,292.53
33,108,798.80
1.0000
1.0000
1.0000
1.0000
1.0000
2.0000
1.0000
1.0000
1.0000
1.0000
378,840.00
378,840.00
1.0000
266,112.00
266,112.00
14.0000
18,849.60
263,894.40
28.0000
153,993.77
4,311,825.47
28.0000
151,320.11
4,236,962.99
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
266,112.00
266,112.00
24.0000
18,849.60
452,390.40
20.0000
153,993.77
3,079,875.33
20.0000
151,320.11
3,026,402.13
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
266,112.00
266,112.00
24.0000
18,849.60
452,390.40
15.0000
516,541.67
7,748,125.00
3.0000
1,481,804.67
4,445,414.00
2.0000
20.0000
3,026,402.13
32,220,858.25
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
100.0000
2.0000
227,069.33
454,138.67
6.0000
84,736.67
508,420.00
6.0000
369,236.27
2,215,417.60
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
227,069.33
227,069.33
4.0000
84,736.67
338,946.67
4.0000
369,236.27
1,476,945.07
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1.0000
227,069.33
227,069.33
5.0000
84,736.67
423,683.33
5.0000
369,236.27
1,846,181.33
7,717,871.33
1.0000 Existing
1.0000
1.0000
271,885.90
271,885.90
14.0000
21,560.00
301,840.00
8.0000
15,753.10
126,024.80
8.0000
498,793.39
3,990,347.09
1.0000
271,885.90
271,885.90
17.0000
21,560.00
366,520.00
2.0000
15,753.10
31,506.20
2.0000
498,793.39
997,586.77
1.0000
271,885.90
271,885.90
20.0000
21,560.00
431,200.00
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
4.0000
15,753.10
63,012.40
4.0000
498,793.39
1,995,173.55
9,118,868.51
3.0000
7,830,785.60
23,492,356.80
3.0000
399,857.33
1,199,572.00
3.0000
152,533.33
457,600.00
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3.0000
91,494.33
274,483.00
19.0000
138,926.33
2,639,600.33
3.0000
321,878.33
965,635.00
31.0000
498,793.39
15,462,594.99
2.0000
7,830,785.60
15,661,571.20
2.0000
399,857.33
799,714.67
2.0000
152,533.33
305,066.67
2.0000
91,494.33
182,988.67
16.0000
138,926.33
2,222,821.33
2.0000
321,878.33
643,756.67
24.0000
498,793.39
11,971,041.28
3.0000
7,830,785.60
23,492,356.80
3.0000
399,857.33
1,199,572.00
3.0000
152,533.33
457,600.00
3.0000
91,494.33
274,483.00
18.0000
138,926.33
2,500,674.00
2.0000
321,878.33
643,756.67
29.0000
498,793.39
14,465,008.21
119,312,253.28
1.0000
1.0000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5.0000
1.0000
1.0000
1.0000
2.0000
2,667,500.00
5,335,000.00
2.0000
1,134,000.00
2,268,000.00
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
4.0000
2,667,500.00
10,670,000.00
4.0000
1,134,000.00
4,536,000.00
2.0000
2,667,500.00
5,335,000.00
2.0000
1,134,000.00
2,268,000.00
30,412,000.00
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
DUA PULUH TUJUH MILYAR TUJUH RATUS LIMA PULUH JUTA RUPIAH
MENGETAHUI/ MENYETUJUI :
KEPALA DINAS PU
PROVINSI NUSA TENGGARA BARAT
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 794 of 2419
KEPALA DINAS PU
PROVINSI NUSA TENGGARA BARAT
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI KSLL
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 4.20 M )
2.6. LANTAI DUA ( EL. + 8.20 M )
2.7. LANTAI TIGA / ATAP ( EL. + 12,20 M )
2.8. ATAP
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PASANGAN SANITER
3.6. PEKERJAAN PENGECATAN
3.7. PEKERJAAN RAILLING
IV.
V.
PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN PANEL DAN KABEL FEEDER
5.2. PEKERJAAN TITIK INSTALASI DAYA DAN PENERANGAN
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
URAIAN PEKERJAAN
2.4.
2.5.
2.6.
NO.
URAIAN PEKERJAAN
4 BALOK TYPE B3 (30x55)
5 BALOK TYPE B4 (30x50)
6 BALOK TYPE BA (25x45)
7 BALOK TYPE BA1 (20x35)
8 BALOK TYPE BL (20x60)
9 PLAT LANTAI DUA S1 (t=12 cm)
10 KOLOM TYPE K0 (55x55)
11 KOLOM TYPE K1 (45x45)
12 KOLOM TYPE K1' (45x45)
13 KOLOM TYPE K6
14 BALOK TYPE BR (20x30)
2.7.
2.8.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 100.100.10
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Jurai dalam
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 799 of 2419
NO.
URAIAN PEKERJAAN
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 30 cm
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
C.
LEVEL-2
1 Dinding bata ringan
2 Plesteran
3 Acian semen
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 800 of 2419
NO.
URAIAN PEKERJAAN
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 30 cm
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
GROUND FLOOR
3.3.
B.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
5 Step noising keramik 5 x 20 cm
C.
LEVEL-2
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Lantai keramik 20 x 20 cm
4 Step noising keramik 5 x 20 cm
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 801 of 2419
NO.
URAIAN PEKERJAAN
4 Acustic Tile 60 x 60 cm
5 Expose
B.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
C.
LEVEL-2
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Expose
3.4.
LEVEL-1
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 802 of 2419
NO.
URAIAN PEKERJAAN
PINTU
1 B (AL-ED uk. 900x2150)
2 B (AL-ED uk. 2x900x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 C (AL-ED uk. 900x2150)
5 C (AL-ED uk. 1000x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 2x900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type W/1EA
2 Type W/2EA
3 Type W/3EA
4 Type BV/2
5 Type LV/3
6 Type GLS
C.
3.5.
LEVEL-2
PINTU
1 B (AL-ED uk. 900x2150)
2 B (AL-ED uk. 2x900x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 C (AL-ED uk. 900x2150)
5 C (AL-ED uk. 1000x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 2x900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type W/1EA
2 Type W/2EA
3 Type W/3EA
4 Type LV/3
5 Type GLS
NO.
URAIAN PEKERJAAN
8 Memasang cubical toilet
9 Memasang meja zink satu lubang
10 Meja marmer wastafel under counter
11 Memasang kran dinding 1/2"
12 Jet washer
13 Tisue holder
14 Soap holder
15 Hand dryer
B.
LEVEL-1
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Wastafel gantung lengkap dengan aksesoris
5 Cove ligth wastafel
6 Kaca cermin+bingkai
7 Meja beton
8 Floor drain
9 Memasang cubical toilet
10 Memasang meja zink satu lubang
11 Meja marmer wastafel under counter
12 Memasang kran dinding 1/2"
13 Jet washer
14 Tisue holder
15 Hand shower lengkap dengan aksesories
16 Towel bar
17 Soap holder
18 Hand railling penyandang cacat
19 Hand dryer
C.
LEVEL-2
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Wastafel gantung lengkap dengan aksesoris
5 Cove ligth wastafel
6 Kaca cermin+bingkai
7 Meja beton
8 Floor drain
9 Memasang cubical toilet
10 Memasang meja zink satu lubang
11 Meja marmer wastafel under counter
12 Memasang kran dinding 1/2"
13 Jet washer
14 Tisue holder
15 Hand shower lengkap dengan aksesories
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 804 of 2419
NO.
URAIAN PEKERJAAN
16 Towel bar
17 Soap holder
18 Hand railling penyandang cacat
19 Hand dryer
3.6.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecatan dinding enamel/ Epoxi paint
3 Pengecatan dinding dustrproff paint
4 Pengecatan plint Int Semi Gloss
5 Pengecetan dinding Watershield (Exterior)
6 Pengecatan plafond emulsion paint
7 Pengecatan list plafond emulsion paint
8 Pengecatan plafond enamel/ Epoxi paint
B.
C.
3.7.
LEVEL-1
1 Pengecatan
2 Pengecatan
3 Pengecatan
4 Pengecetan
5 Pengecatan
6 Pengecatan
LEVEL-2
1 Pengecatan
2 Pengecatan
3 Pengecetan
4 Pengecatan
5 Pengecatan
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
B.
LEVEL-1
1 Railling Guard
-Black steel pipe 2" W/Synthetic enamel paint finish
2 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 805 of 2419
NO.
URAIAN PEKERJAAN
C.
LEVEL-2
1 Railling Guard
-Black steel pipe 2" W/Synthetic enamel paint finish
IV.
SHAFT
1 AAV
2 Gate valve diameter 50 mm
3 Pemipaan Polypropelyne PN.10 :
B.
a.
Diameter 65 mm
b.
GROUND FLOOR
1 Gate Valve :
a.
GV diameter 40 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
LEVEL 1
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
LEVEL 2
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 806 of 2419
NO.
URAIAN PEKERJAAN
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
TOP FLOOR
1 Tanki Air bersih
a.
b.
c.
2 Pompa Tekan
a.
b.
c.
PPR diameter 65 mm
b.
PPR diameter 50 mm
4.2.
b.
c.
CO diameter 150 mm
d.
CO diameter 100 mm
b.
PVC diameter 80 mm
c.
PVC diameter 65 mm
d.
PVC diameter 50 mm
NO.
URAIAN PEKERJAAN
e.
CO diameter 100 mm
f.
CO diameter 80 mm
f.
CO diameter 65 mm
g.
CO diameter 50 mm
Diameter 32 mm
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
e.
CO diameter 65 mm
f.
CO diameter 50 mm
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
C.
LEVEL 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
e.
CO diameter 65 mm
NO.
URAIAN PEKERJAAN
f.
CO diameter 50 mm
4.
a.
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
D.
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
Diameter 50 mm
4.3.
Diameter 100 mm
V.
Diameter 100 mm
PEKERJAAN ELEKTRIKAL
5.1.
GROUND FLOOR
1 Panel Listrik
a.
MDP - K
b.
SDP - K GF
c.
LP - KGF
d.
PP - KGF
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 809 of 2419
NO.
URAIAN PEKERJAAN
e.
PP - AC.KGF
f.
g.
PP-Penumatic
PP - AB
PP- STP
2 Kabel Feeder
B.
a.
b.
c.
d.
e.
f.
g.
LEVEL 1
1 Panel Listrik
a.
SDP - 1
b.
LP - K1
c.
PP - K1
d.
PP - AC.K1
e.
PP - UPS K1
f.
PP - OK 1.1
g.
PP - OK 1.2
2 Kabel Feeder
C.
a.
b.
c.
d.
e.
f.
g.
LEVEL 2
1 Panel Listrik
a.
SDP - 2
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 810 of 2419
NO.
URAIAN PEKERJAAN
b.
LP - K2.
c.
PP - K2
d.
PP - AC.K2
e.
PP - UPS.K2
2 Kabel Feeder
D.
a.
b.
c.
d.
e.
LEVEL ROOF
1 Panel Listrik
a.
PP - LF
b.
PP - BP
2 Kabel Feeder
5.2.
a.
b.
GROUND FLOOR
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
h.
2 Titik instalasi
a.
b.
B.
LEVEL 1
1 Saklar dan Stop kontak
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 811 of 2419
NO.
URAIAN PEKERJAAN
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
2 Titik instalasi
C.
a.
b.
LEVEL 2
1 Saklar & Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
2 Titik instalasi
a.
b.
AYA
J TAMBAHAN)
ENGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
DINAS PU
TENGGARA BARAT
PEJABAT PEMBUAT K
RSU PROVINSI
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 813 of 2419
DINAS PU
TENGGARA BARAT
UGIYANTO, MM
22198703 1 003
PEJABAT PEMBUAT K
RSU PROVINSI
SUHERMAN, ST
NIP. 196903081990
AYA
J TAMBAHAN)
ENGGARA BARAT
JUMLAH I.
12,20 M )
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V.
TOTAL PEK. STANDA
J TAMBAHAN)
ENGGARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
260
35
1
260
1
1
m3
m3
m3
m2
m3
1440
288
720
1200
288
m3
m3
m2
m3
m3
m3
321.006
224.7042
1651.3
96.3018
1.785
0.8925
m2
1692
(t=12 cm)
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
SAT
VOLUME
m3
kg
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
5.6
87.36
2.6775
2.52
2.52
5145.088
6.534
45.927
2.916
7.29
1.728
0.72
0.675
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
17.1
2.025
15.435
45.1935
52.1625
64.771875
5.0085
7.224
178.44
15
150
150
2.6775
2.52
2.52
6.171
43.3755
2.754
1.632
0.72
0.675
m3
m3
m3
5.4
2.025
11.025
(t=12 cm)
SAT
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
VOLUME
47.6685
46.9125
66.571875
3.8885
8.304
177.99
6.26175
44.013375
2.7945
1.656
0.72
12,20 M )
(t=12 cm)
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
kg
kg
kg
kg
kg
unit
bh
bh
bh
bh
kg
bh
bh
m3
m3
m1
m1
6.615
14.9985
42.4875
34.875
3.7125
8.304
1.05
11.07
110.7
110.7
16739.6544
17575.7904
17091.2112
4412.198
6698.26248
62
248
4492
3388
2416
11953.4210526316
644.6268421053
24
17.9894925
8.4190909091
233.1
97.44
SAT
m2
m1
VOLUME
2205
194.04
GAN DINDING
ata ringan
aktis 12/12
ktis 12/12
ogenius tile 10 x 60 cm cutting size
mik 10 x 30 cm
mik 10 x 20 cm
eramik 20 x 25 cm
ramik 5 x 20 cm
ramik 20 x 40 cm
& Jendela
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
m1
m2
m2
m2
m1
m1
m1
m1
m1
m1
mik 10 x 30 cm
m1
10 x 20 cm
m1
eramik 20 x 25 cm
m2
k 5 x 20 cm
m1
ramik 20 x 40 cm
m1
m2
m2
m2
3045.911088
5787.231066
5787.231066
234.971
997.65
299
480
320.345
337.9198
56.101
66.9
182.965
43.5
43.5
2677.436
5087.1284
5087.1284
195.03
896.5
330
433.3333333333
467.1476
130.7851
55.0999
230.3502
583.725645
178.25
178.25
2277.5025
4327.25475
4327.25475
& Jendela
SAT
m1
m1
m1
m1
m1
m1
VOLUME
183.205
813.55
487
463.3333333333
359.99
144.2848
mik 10 x 30 cm
m1
23.9126
10 x 20 cm
m1
eramik 20 x 25 cm
m2
k 5 x 20 cm
m1
ramik 20 x 40 cm
m1
142.05
m2
m2
m2
m2
m1
1242.0122
60.1449
44.3975
115.8207
133.152
ing keramik 5 x 20 cm
m2
m2
m2
m2
m1
1164.1779
58.0875
127.6765
67.1871
133.152
mogenius tile 60 x 60 cm
ramik 30 x 30 cm
ramik 20 x 20 cm
ing keramik 5 x 20 cm
m2
m2
m2
m1
1185.6539
12.0111
113.3915
9.0225
gypsum 9 mm
grc 9 mm
nd gypsum
m2
m2
m1
1347.6428
43.3025
1321.6473
194.1502
510.625645
142.05
GAN LANTAI
mogenius tile 60 x 60 cm
ramik 30 x 30 cm
ramik 20 x 20 cm
ing keramik 5 x 20 cm
mogenius tile 60 x 60 cm
ramik 30 x 30 cm
ramik 20 x 20 cm
SAT
VOLUME
le 60 x 60 cm
m2
m2
45.36
60.1449
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
m2
m2
m1
m2
m2
1101.9472
127.6765
1385.038
109.62
58.0875
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
m2
m2
m1
m2
m2
1130.2272
113.3915
1245.8633
102.06
4.0037
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
2
1
4
5
1
4
1
8
14
1
23
unit
unit
unit
unit
unit
unit
unit
1
3
36
2
2
2
2
TU DAN JENDELA
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
1000x2150)
* uk. 900x2150)
* uk. 900x2800)
* uk. 2x900x2150)
900x2150)
2x900x2150)
400/800 x 2150) Without Louver
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
1000x2150)
* uk. 900x2150)
* uk. 2x900x2150)
2x900x2150)
400/800 x 2150) Without Louver
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
1000x2150)
* uk. 900x2150)
* uk. 2x900x2150)
2x900x2150)
400/800 x 2150) Without Louver
SAT
VOLUME
unit
unit
unit
unit
unit
unit
unit
unit
unit
2
2
21
10
1
2
5
6
20
unit
unit
unit
unit
unit
unit
4
33
6
1
3
2
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
2
17
10
1
1
5
6
11
unit
unit
unit
unit
unit
4
31
7
3
1
set
set
set
bh
bh
m
bh
9
2
30
32
32
0.845
5
bical toilet
eja zink satu lubang
wastafel under counter
an dinding 1/2"
bical toilet
eja zink satu lubang
wastafel under counter
an dinding 1/2"
penyandang cacat
bical toilet
eja zink satu lubang
wastafel under counter
an dinding 1/2"
SAT
unit
bh
m
bh
set
bh
bh
bh
VOLUME
6
2
1.15
9
32
32
5
5
bh
set
set
set
bh
bh
m
bh
unit
bh
m
bh
set
bh
set
bh
bh
bh
bh
22
30
22
4
26
26
1.896
30
4
1
11.425
30
30
30
22
22
30
22
3
bh
set
set
set
bh
m
m
bh
unit
bh
m
bh
set
bh
set
14
22
14
4
18
18
1.3474
22
4
1
7.425
22
22
22
14
penyandang cacat
SAT
bh
bh
bh
bh
VOLUME
14
22
14
4
m
m
m
m'
m
m
m
m
4873.45774
55.79
160.69585
83.925
1218.364435
1417.5877
1321.6473
17.3025
m
m
m'
m
m
m
4016.154
154.819715
83.925
1338.718
1287.7112
1385.038
m
m
m
m
m
3416.25375
65.93591
1138.75125
1255.6298
1245.8633
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
8.841
70.9
8.841
SAT
m
VOLUME
77.4
Bh
Bh
ter 65 mm
72
an Bantu ( Fitting-Fitting )
Ls
meter 40 mm
Bh
ameter 40 mm
16
ameter 32 mm
62
ameter 25 mm
61
ameter 15 mm
110
tu ( Fitting-Fitting )
Ls
meter 40 mm
Bh
meter 32 mm
Bh
ameter 40 mm
22
ameter 32 mm
66
ameter 25 mm
94
ameter 15 mm
288
tu ( Fitting-Fitting )
Ls
meter 40 mm
Bh
meter 32 mm
Bh
ameter 50 mm
ypropelyne PN.10 :
ypropelyne PN.10 :
ypropelyne PN.10 :
SAT
VOLUME
ypropelyne PN.10 :
ameter 40 mm
12
ameter 32 mm
60
ameter 25 mm
107
ameter 15 mm
202
tu ( Fitting-Fitting )
Ls
Unit
g valve diamater 40 mm
Bh
alve diameter 80 mm
Bh
Set
e Joint diameter 80 mm
Bh
alve diameter 80 mm
Bh
ameter 65 mm
ameter 50 mm
296
iameter 150 mm
Unit
tu ( Fitting-Fitting )
Ls
Unit
Unit
Unit
ank, kapasitas 10 M3
ge Booster Pump
ypropelyne PN.10 :
ameter 150 mm
58
ameter 100 mm
139
meter 150 mm
Bh
Bh
ameter 100 mm
131
ameter 80 mm
48
ameter 65 mm
89
ameter 50 mm
50
meter 100 mm
SAT
VOLUME
meter 100 mm
Bh
meter 80 mm
Bh
meter 65 mm
Bh
Bh
35
listrik Pompa
Ttk
12
tu ( Fitting-Fitting )
Ls
meter 50 mm
ter 32 mm
:
m
30
Bh
18
ameter 80 mm
26
ameter 65 mm
109
ameter 50 mm
60
meter 80 mm
Bh
meter 65 mm
Bh
19
Bh
10
ter 50 mm
ter 32 mm
66
ter 25 mm
64
tu ( Fitting-Fitting )
Ls
ameter 100 mm
meter 100 mm
meter 50 mm
:
m
73
Bh
15
ameter 80 mm
24
ameter 65 mm
86
ameter 50 mm
48
meter 80 mm
Bh
meter 65 mm
Bh
17
ameter 100 mm
meter 100 mm
SAT
meter 50 mm
VOLUME
Bh
ter 50 mm
ter 32 mm
92
ter 25 mm
80
tu ( Fitting-Fitting )
Unit
Ls
:
m
144
144
ter 50 mm
144
tu ( Fitting-Fitting )
Ls
Bh
ter 100 mm
144
tu ( Fitting-Fitting )
Ls
ter 100 mm
Bh
Unit
Unit
Unit
Unit
ter 100 mm
ter 80 mm
C Kelas 10 kg/cm
BEL FEEDER
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
100
30
10
10
10
10
10
30
30
Unit
Unit
Unit
Unit
Unit
Unit
Unit
35
10
10
10
10
10
10
Unit
SAT
VOLUME
Unit
Unit
Unit
Unit
40
10
10
10
10
Unit
Unit
42
10
Bh
49
Bh
19
Bh
11
group ( 4 modul )
Bh
ontak 200 W / 10 A
Bh
108
Bh
61
ontak 350 W / 16 A
Bh
ontak 500 W / 16 A
Bh
Ttk
203
Ttk
177
SAT
VOLUME
Bh
112
Bh
32
Bh
ontak 200 W / 16 A
Bh
176
Bh
78
ontak 350 W / 16 A
Bh
23
ontak 500 W / 16 A
Bh
Ttk
284
Ttk
281
Bh
112
Bh
32
Bh
ontak 200 W / 16 A
Bh
205
Bh
91
ontak 350 W / 16 A
Bh
16
ontak 500 W / 16 A
Bh
Ttk
279
Ttk
315
JUMLAH HARGA
22187168973.7941
3353579368.32653
25540748342.1207
2554074834.21207
28094823176.3327
28094823000
MATARAM,
JANUARI 2013
KONSULTAN PERENCANA
PT. PANDU PERSADA
DJADJAT SUHARDJA
DIREKTUR UTAMA
SUHERMAN, ST. MT
NIP. 19690308199003 1 009
JUMLAH HARGA
197643921.818182
197643921.818182
186330000
75940397.420125
3152196000
940595180.923602
3714815436.72519
3323896352.02509
1128784535.3268
3384830225.94336
15907388128.3642
2366599932.15909
308234106.739978
438058195.008084
1614309247.56984
102485972.844259
384449636.427359
3533858.2125
5217670948.96112
160731042.628
167318123.814133
31259233.6085333
359308400.050667
212545526.6
292612048
505157574.6
22187168973.7941
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
15000000
60000
567212
1000000
163782
15000000
88608181.8181818
JUMLAH I.PEKERJAAN PERSIAPA
15000000
15600000
19852420
1000000
42583320
15000000
88608181.8181818
197643921.818182
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
15436800
7539840
113153760
39270000
10929600
186330000
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
15424338.3
4263762.195
54038792.5
1207624.572
311696.7
694183.153125
75940397.420125
1863000
3152196000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 2.3.PEKERJAAN PONDAS
3152196000
2683307.06279167
27248.925
6426811.11551471
6387884.75263889
6387884.75263889
27248.925
9501430.13212121
11190959.6237366
12858040.6319671
12024500.1278519
11484370.2706944
9759822.04511111
8167539.40851852
JUMLAH 2.4.LANTAI DASAR ( EL.
15026519.5516333
2380466.088
17207786.7617906
16097469.57665
16097469.57665
140198117.0304
62082344.48328
513967202.639352
37494046.482816
87658605.93204
19844991.82776
7027071.87248
5513089.10075
940595180.923602
7348257.88937778
8241415.0192
8512723.33491157
8791759.36888889
9335661.85102222
8271787.50851852
9171717.21242857
7635603.56197222
6126956.28798611
7143851.34558333
246240
104940
6426811.11551471
6387884.75263889
6387884.75263889
9605303.09910873
11315094.2311983
13009633.0442702
11597943.8199346
9759822.04511111
8167539.40851852
JUMLAH 2.5.LANTAI SATU ( EL. +
125655209.90836
16688865.41388
131393884.67436
397330377.03788
486971461.303947
535779186.528323
45936545.6584485
55159600.1316873
1093294080.02824
107157770.18375
36936000
15741000
17207786.7617906
16097469.57665
16097469.57665
59274325.4246
490797869.82534
35828529.40392
18927844.3141333
7027071.87248
5513089.10075
3714815436.72519
7348257.88937778
8241415.0192
8512723.33491157
39680592.60264
16688865.41388
93852774.7674
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 836 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8791759.36888889
9335661.85102222
8271787.50851852
9171717.21242857
7635603.56197222
6126956.28798611
8920037.4859025
10496159.5230703
11992183.5234997
10859658.4980676
9759822.04511111
JUMLAH 2.6.LANTAI DUA ( EL. +
419089981.47588
437959236.58608
550668404.043656
35664222.3805285
63406051.9786173
1090536949.69865
55855044.72735
461971405.148715
33512156.85642
17983594.4728
7027071.87248
3323896352.02509
8512723.33491157
8791759.36888889
9095047.5016
9625158.68805333
8271787.50851852
7635603.56197222
6126956.28798611
7143851.34558333
246240
104940
JUMLAH 2.7.LANTAI TIGA / ATAP
56311664.86044
131863202.89428
386425830.72423
335677409.24586
30709011.125375
63406051.9786173
6433304.10238542
79082434.3956075
27258768
11616858
1128784535.3268
31192.48691625
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
15840
31192.48691625
116640
97200
6048000
5796000
163800
52416
522151450.854547
548232612.094752
533117381.738866
137627428.386904
208935464.769008
30265920
46782720
103495680
78059520
38269440
372856929.788638
75189274.8631579
2332800
0
108800450.64
48797050.9090909
38181780
5107415.04
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 837 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
204522.654285714
183747.96
JUMLAH 2.8.ATAP
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
21312
17760
163760
92550
145380
0
450972452.7
35654454.1584
3384830225.94336
431605601.09875
244221150.99575
98961651.232875
5098870.7
3701281.5
3372720
46033332.18
31220679.6648794
8927841.116
1195624.512
1188144
29962348.4
4025925
6324030
0
0
141700
379392681.2
42200
214676818.48
17100
86989895.64
21700
4232151
3710
3326015
11280
3722400
95902.775375
41557869.3291667
97459.550375
45527995.0547604
26420 Tidak Dikerjakan
0
322722104.25
182610150.45
73996056.2249999
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 838 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
21700
3975548.5
3710
3018270.5
11280
5493360
95902.775375
44434952.5904167
97459.550375
35084463.5394963
26420 Tidak Dikerjakan
222896.08
167877.55
163466.05
38788.2
71703.896
276839650.692176
10096978.456995
7257483.954875
4492476.47574
9547517.160192
0
0
222896.08 Tidak Dikerjakan
167877.55 Tidak Dikerjakan
163466.05 Tidak Dikerjakan
38788.2 Tidak Dikerjakan
71703.896 Tidak Dikerjakan
0
0
222896.08 Tidak Dikerjakan
167877.55 Tidak Dikerjakan
163466.05 Tidak Dikerjakan
71703.896 Tidak Dikerjakan
JUMLAH 3.2.PEKERJA
308234106.739978
140831.940857143
136889.688669643
15603.96
189791151.106154
5927665.74361721
20622931.603308
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 839 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
156474.36
26955.5
7097676.9696
1621235.85195
0
0
140831.940857143
136889.688669643
15603.96
156474.36
26955.5
155189362.898094
17477596.3354297
21612077.55048
17152719.3432
1565777.60625
0
0
16112851.56855
5683385.01374712
12253497.9982524
5406114.08296034
5774599.26622056
5918558.84993495
6080663.46759816
7904862.5078776
13034849.7522551
5778167.90327238
12439913.2852183
9381120.85110891
4952875.83860369
4952875.83860369
8631253.41039827
10425794.231369
12890506.7670005
4540042.145386
485671.0375
16112851.56855
11366770.0274942
12253497.9982524
21624456.3318414
28872996.3311028
5918558.84993495
24322653.8703926
7904862.5078776
104278798.01804
80894350.6458133
12439913.2852183
215765779.575505
0
4952875.83860369
14858627.5158111
310725122.774338
20851588.462738
25781013.5340011
9080084.290772
971342.075
0
0
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 840 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
5683385.01374712 Tidak
12253497.9982524 Tidak
5406114.08296034 Tidak
5774599.26622056 Tidak
5918558.84993495 Tidak
6080663.46759816 Tidak
13034849.7522551 Tidak
12439913.2852183 Tidak
9381120.85110891 Tidak
4634471.76936906
7325219.18029
10425794.231369
11587862.4025725
5143850.308696
485671.0375
5683385.01374712 Tidak
12253497.9982524 Tidak
5406114.08296034 Tidak
5774599.26622056 Tidak
5918558.84993495 Tidak
6080663.46759816 Tidak
13034849.7522551 Tidak
12439913.2852183 Tidak
9381120.85110891 Tidak
4634471.76936906
7325219.18029
10425794.231369
5143850.308696
485671.0375
JUMLAH 3.4.PEKERJA
2388808.51
2084465.988
1016636.148
309074.535
243866.7
3922839.091875
312950.55
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
0
18537887.0774762
241732232.94957
62554765.388214
11587862.4025725
15431550.926088
971342.075
0
0
0
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
0
18537887.0774762
227081794.58899
72980559.619583
15431550.926088
485671.0375
1614309247.56984
21499276.59
4168931.976
30499084.44
9890385.12
7803734.4
3314799.03263437
1564752.75
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 841 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
267674.83875
553501.04
326502
191794.535625
316849.995
72894.9375
681324.6825
610373.61
1297167.212 Tidak
2388808.51 Tidak
2084465.988 Tidak
1016636.148 Tidak
309074.535 Tidak
243866.7 Tidak
3922839.091875 Tidak
312950.55 Tidak
267674.83875 Tidak
553501.04 Tidak
326502 Tidak
191794.535625 Tidak
316849.995 Tidak
72894.9375 Tidak
702707.1975 Tidak
1297167.212 Tidak
681324.6825 Tidak
573903 Tidak
610373.61 Tidak
1606049.0325
1107002.08
375477.3
1726150.820625
10139199.84
2332638
3406623.4125
3051868.05
0
0
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
0
0
1297167.212 Tidak
2388808.51 Tidak
2084465.988 Tidak
1016636.148 Tidak
309074.535 Tidak
243866.7 Tidak
3922839.091875 Tidak
312950.55 Tidak
267674.83875 Tidak
553501.04 Tidak
326502 Tidak
191794.535625 Tidak
316849.995 Tidak
72894.9375 Tidak
702707.1975 Tidak
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 842 of 2419
HARGA SATUAN
(Rp)
JUMLAH HARGA
(Rp)
1297167.212 Tidak
681324.6825 Tidak
573903 Tidak
610373.61 Tidak
JUMLAH 3.5.PEKERJA
32850.26245
34450.538375
38430.833375
5448.39813375
42825.079055
36922.091195
3427.5273666667
37895.5922125
32850.26245 Tidak
38430.833375 Tidak
5448.39813375 Tidak
42825.079055
36922.091195 Tidak
3427.5273666667 Tidak
32850.26245 Tidak
38430.833375 Tidak
42825.079055
36922.091195 Tidak
3427.5273666667 Tidak
JUMLAH 3.6.PEKERJA
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
102485972.844259
160094365.797984
1921995.53594125
6175675.43540399
457256.813374969
52176553.2466754
52340302.3363103
4529982.28983111
655688.484256781
0
0
Dikerjakan
Dikerjakan
Dikerjakan
57330704.1823515
Dikerjakan
Dikerjakan
0
0
Dikerjakan
Dikerjakan
48767112.30523
Dikerjakan
Dikerjakan
384449636.427359
399712.5
3533858.2125
0
0
0
0
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
399712.5 Tidak Dikerjakan
0
JUMLAH 3.7.PEKERJAA
3533858.2125
107800
215600
143687.866666667
574751.466666667
265892.273888889
19144243.72
3828848.744
3828848.744
100980.733333333
302942.2
110129.34
1762069.44
69473.34
4307347.08
45554.74
2778839.14
27688.1
3045691
2378789.332
2378789.332
100980.733333333
504903.666666667
68455.9333333333
136911.866666667
110129.34
2422845.48
69473.34
4585240.44
45554.74
4282145.56
27688.1
7974172.8
3368311.76
3368311.76
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
110129.34 Tidak Dikerjakan
69473.34 Tidak Dikerjakan
45554.74 Tidak Dikerjakan
27688.1 Tidak Dikerjakan
0 Tidak Dikerjakan
31519176
31519176
442869.24
885738.48
178245.466666667
356490.933333333
1957366.224
1957366.224
371721.24
1486884.96
178245.466666667
356490.933333333
265892.273888889
1595353.64333333
169130.993888889
50062774.1911111
471240
471240
10425873.5668889
10425873.5668889
160731042.628
212520
212520
5274895.824
31649374.944
399700.693333333
23182640.2133333
171508.450666667
23839674.6426667
362527
1450108
287991
2303928
171508.450666667
22467607.0373333
104649.38
5023170.24
67381.1013333333
5996918.01866667
55231.7333333333
2761586.66666667
PEK SIPIL
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
287991
1439955
227007
227007
135531
948717
125367
250734
36182.63
1266392.05
281808
3381696
13595159.5310667
13595159.5310667
171508.450666667
5145253.52
2720883.88
67381.1013333333
7344540.04533333
55231.7333333333
3313904
441853.866666667
36182.63
2388053.58
26492.95
1695548.8
4270897.7784
4270897.7784
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
125367 Tidak Dikerjakan
55231.7333333333 Tidak Dikerjakan
36182.63 Tidak Dikerjakan
26492.95 Tidak Dikerjakan
199910.333333333 Tidak Dikerjakan
0 Tidak Dikerjakan
167318123.814133
212520
850080
171508.450666667
24697216.896
4939443.3792
4939443.3792
193123.333333333
772493.333333333
31259233.6085333
21164409.2
21164409.2
18495725.6
18495725.6
11450379.6
11450379.6
11844065.2
11844065.2
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 847 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11713288.4
11713288.4
11212542
11212542
11287819.4
11287819.4
12147630
12147630
7823200
7823200
735207
73520700
121975.333333333
3659260
42014.8666666667
420148.666666667
66412.1333333333
664121.333333333
410094.52
4100945.2
27785.2666666667
277852.666666667
27785.2666666667
277852.666666667
42014.8666666667
1260446
27785.2666666667
833558
6284996.66666667
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
42014.8666666667
420148.666666667
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
94871.3333333333
948713.333333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11529658.8 Tidak Dikerjakan
11923344.4 Tidak Dikerjakan
12377336.4 Tidak Dikerjakan
11313165.6 Tidak Dikerjakan
179571.333333333 Tidak Dikerjakan
42014.8666666667 Tidak Dikerjakan
117917.066666667 Tidak Dikerjakan
42014.8666666667 Tidak Dikerjakan
42014.8666666667 Tidak Dikerjakan
212545526.6
29147.8
1428242.2
31858.2
605305.8
41344.6
454790.6
214967.5
214967.5
36081.1
3896758.8
36081.1
2200947.1
36081.1
72162.2
36081.1
216486.6
170766.133333333
34665525.0666667
197562.133333333
34968497.6
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
29147.8 Tidak Dikerjakan
31858.2 Tidak Dikerjakan
41344.6 Tidak Dikerjakan
36081.1 Tidak Dikerjakan
36081.1 Tidak Dikerjakan
36081.1 Tidak Dikerjakan
36081.1 Tidak Dikerjakan
170766.133333333
48497581.8666667
197562.133333333
55514959.4666667
47643751.2
197562.133333333
62232072
292612048
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN LANTAI
1.2. PEKERJAAN PASANGAN PLAFOND
1.3. PEKERJAAN PASANGAN PINTU DAN JENDELA
1.4. PEKERJAAN FURNITURE DAN LAIN-LAIN
II.
PEKERJAAN MEKANIKAL
2.1. PEKERJAAN HYDRANT & SPRINKLER
2.2. PEKERJAAN PENGKONDISIAN UDARA & EXHAUST FAN
2.3. PEKERJAAN ELEVATOR
2.4. PEKERJAAN GAS MEDIS
III.
IV.
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN LANTAI
A.
GROUND FLOOR
LEVEL-1
LEVEL-2
NO.
URAIAN PEKERJAAN
1.2. PEKERJAAN PASANGAN PLAFOND
A.
GROUND FLOOR
1.3.
1.4.
LEVEL-1
PINTU
1 A (HM uk. 900x2150)
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 900x2150)
JENDELA
1 Type CW/3
C.
LEVEL-2
PINTU
1 A (HM uk. 900x2150)
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 900x2150)
JENDELA
1 Type CW/3
NO.
URAIAN PEKERJAAN
LEVEL-2
1 Signage room
2 Signage toilet
B.
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Pendaftaran P. 2,85m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-1
1 Meja Nurse Station P. 5,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P. 2,65 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Lemari Dibawah Zink P.7,3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-2
1 Meja Nurse Station P. 5,4 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Base P. 2,65 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Lemari Dibawah Zink P.7,3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
II.
PEKERJAAN MEKANIKAL
2.1.
GROUND FLOOR
1 Instalasi Hydrant
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 854 of 2419
NO.
URAIAN PEKERJAAN
a.
b.
c.
e.
f.
Instalasi Hydrant
2 Instalasi Sprinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
Indicating Valve :
Diameter 80 mm
l..
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
m.
n.
o.
p.
q.
r.
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
C.
l..
m.
n.
o.
p.
q.
LEVEL 2
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 856 of 2419
NO.
URAIAN PEKERJAAN
1 Instalasi Hydrant
a.
b.
c.
d.
e.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
l..
m.
n.
o.
p.
q.
2 Riser
a.
NO.
URAIAN PEKERJAAN
- Pipa Sprinkler diameter 100 mm
- Pipa Flashing diameter 40 mm
- Pipa Test diameter 50 mm
2.2.
b.
c.
b.
c.
d.
e.
c.
d.
Dran
e.
2 Single Split ( IU + OU )
a.
b.
c.
c.
d.
Dran
e.
NO.
URAIAN PEKERJAAN
10 Instalasi daya listrik, NYM 3 x 2,5 mm2 + conduit
Pekerjaan Instalasi Ducting & Grille
1 Ducting FCU
-
24" x 12 "
22" x 16 "
22" x 10 "
20" x 10 "
18" x 12 "
18" x 10 "
16" x 10 "
16" x 8 "
14" x 10 "
14" x 8 "
12" x 10 "
12" x 10 " ( FA )
12" x 8 " ( FA )
10" x 8 " ( FA )
12" x 8 "
10" x 8 "
10" x 6 "
8" x 8 "
8" x 6 "
12" x 10 "
12" x 8 "
10" x 8 "
8" x 8 "
8" x 6 "
6" x 6 "
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 859 of 2419
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
Pekerjaan Unit AC
1 Single Split ( IU + OU )
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Dran
k.
12" x 8 "
f.
10" x 8 "
g.
8" x 8 "
h.
8" x 6 "
h.
6" x 6 "
i.
C.
LEVEL 2
Pekerjaan Unit AC
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 860 of 2419
NO.
URAIAN PEKERJAAN
1 Single Split ( IU + OU )
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Dran
k.
2.3.
12" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
PEKERJAAN ELEVATOR
1 Hospital Bed Elevator
-
Kapasitas : 1000 Kg
Kecepatan 30 Mpm
Lintasan : 3 Lantai
2 Pemasangan
NO.
URAIAN PEKERJAAN
2.4.
GOUND FLOOR
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 15 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 15 mm
d.
B.
LEVEL 1
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 862 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 10 mm
c.
Ball Valve :
- Diameter 32 mm
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 32 mm
- Diameter 15 mm
d.
C.
LEVEL 2
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 32 mm
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 863 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 32 mm
- Diameter 15 mm
d.
D.
PERLENGKAPAN
1 Perlengkapan Outlet Oksigen
a.
b.
III.
a.
Suction Attachement
b.
Suction Jar
c.
Suction tubing
d.
Bacterial filter
GROUND FLOOR
1 Rak Kabel
a.
b.
b.
c.
Lampu TL 2 x 36 W / Louvre M6
d.
e.
NO.
URAIAN PEKERJAAN
B.
g.
Lampu TL 1 x 36 W / Louvre M6
h.
j.
k.
l.
m.
n.
o.
p.
q.
LEVEL 1
1 Rak Kabel
a.
b.
C.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
f.
Lampu TL 1 x 36 W / Louvre M6
g.
h.
j.
Lampu TL 1 x 18 W / Balk
k.
l.
m.
n.
o.
q.
Lampu Exit
LEVEL 2
1 Rak Kabel
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 865 of 2419
NO.
URAIAN PEKERJAAN
a.
b.
3.2.
a.
b.
c.
Lampu TL 2 x 36 W / Louvre M6
d.
e.
f.
g.
h.
Lampu TL 1 x 36 W / Louvre M6
j.
Lampu TL 1 x 18 W / Balk
k.
l.
m.
n.
o.
p.
Lampu Exit
PEKERJAAN UPS
A.
GROUND FLOOR
1.
Portable UPS,
a.
B.
LEVEL 1
1 Portable UPS,
a.
C.
LEVEL 2
1 Portable UPS,
a.
NO.
URAIAN PEKERJAAN
3.3.
IV.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
1 Sentral Telephone
a.
b.
c.
2 Instalasi
B.
a.
TB-T GF ( 20 Pairs )
b.
c.
d.
e.
LEVEL 1
1 Instalsi
C.
a.
TB-T ( 20 Pairs )
b.
c.
d.
e.
LEVEL 2
1 Instalsi
a.
TB-T ( 20 Pairs )
b.
NO.
URAIAN PEKERJAAN
4.2.
c.
d.
e.
GROUND FLOOR
1 Instalasi
a.
MDF'
b.
TB.F- GF
c.
d.
ROR
e.
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
LEVEL 1
1 Instalasi
a.
TB.F- 1
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 868 of 2419
NO.
URAIAN PEKERJAAN
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
C.
LEVEL 2
1 Instalasi
a.
TB.F- 2
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
4.3.
GROUND FLOOR
1 Sentral Tata Suara
a.
b.
c.
d.
Autorserve Cassete
e.
CD / DVD/MP3 - Playaer
f.
Microphone
g.
Equalizer
h.
i.
Cabinet Rack
2 Instalasi
a.
MDF
b.
TB-S.GF
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 869 of 2419
NO.
URAIAN PEKERJAAN
B.
c.
d.
e.
LEVEL 1
1 Instalasi
C.
a.
TB-S
b.
c.
d.
LEVEL 2
1 Instalasi
4.4.
a.
TB-S 2
b.
c.
d.
Coulumn Speaker 20 W
e.
Volume Control
f.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Sentral MATV
a.
b.
c.
d.
Activ Combiner
e.
f.
Spliter 4 way
g.
h.
i.
TV Monitor
j.
CD Player
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 870 of 2419
NO.
URAIAN PEKERJAAN
k.
l.
Coaxial Cable
2 Instalasi
B.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 1
1 Instalasi
C.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 2
1 Instalasi
4.5.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
GROUND FLOOR
1 Peralatan Utama
a.
b.
2 Instalasi
B.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 1
1 Instalasi
a.
NO.
URAIAN PEKERJAAN
C.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 2
1 Instalasi
4.6.
a.
b.
c.
SocketData ( RG-45 )
d.
GROUND FLOOR
1 Ruang ( Resusitasi- Firs Aid & Isolasi )
a.
b.
c.
Coridoor Light
d.
e.
f.
g.
Titik instalasi
B.
a.
b.
c.
Coridoor Light
d.
e.
f.
g.
Titik instalasi
LEVEL.1
1 Ruang Observation
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 872 of 2419
NO.
URAIAN PEKERJAAN
4.7.
a.
b.
c.
Coridoor Light
d.
e.
f.
g.
Titik instalasi
PEKERJAAN CCTV
A.
B.
GROUND FLOOR
1 Fixed Dome Camer
2 Instalasi Camera
C.
LEVEL 1
1 Fixed Dome Camer
2 Instalasi Camera
D.
LEVEL 2
1 Fixed Dome Camer
2 Instalasi Camera
AYA
J TAMBAHAN)
ENGGARA BARAT
NG DAN LANTAI
TU DAN JENDELA
N LAIN-LAIN
JUMLAH I.
JUMLAH II.PEKERJAA
J TAMBAHAN)
ENGGARA BARAT
SAT
2
VOLUME
3
pital Skirting
u T. 10 cm
rack+Gordeng
llumunium Composite Panel
Batu Adesit
pital Skirting
u T. 10 cm
covering
rack+Gordeng
Batu Adesit
pital Skirting
u T. 10 cm
covering
rack+Gordeng
Batu Adesit
m1
m1
m1
m
m1
m
m1
m
m
644.6475
644.6475
38.55
93.7199
76.6
57.6561
60.95
61.82
5.973
m1
m1
m1
m
m1
m
m
m1
m
782.1727
634.4728
44.1
27.4048
22.5
9.0225
58.435
177.65
6.38
m1
m1
m1
m
m1
m
m
m1
m
698.2983
556.1982
44.4
27.4048
22.5
9.0225
58.435
283.95
14.62615
SAT
VOLUME
m2
33.2324
unit
unit
unit
unit
unit
unit
unit
4
9
1
1
3
2
1
TU DAN JENDELA
x1250) SHF-1
00x1250) SHF-2
x1250) SHF-1
00x1250) SHF-2
x1250) SHF-1
00x1250) SHF-2
unit
unit
unit
unit
m
unit
unit
unit
unit
91.728
3
8
1
1
74.88
3
11
1
1
52.416
bh
bh
56
9
bh
bh
38
30
N LAIN-LAIN
ran P. 2,85m
SAT
bh
bh
VOLUME
22
22
unit
ation P. 5,4 m
unit
u+aksesories
ase P. 2,65 m
unit
u+aksesories
ah Zink P.7,3 m
unit
ation P. 5,4 m
unit
u+aksesories
ase P. 2,65 m
unit
u+aksesories
ah Zink P.7,3 m
unit
u+aksesories
u+aksesories
u+aksesories
SAT
VOLUME
Set
l Valve, diameter 65 mm :
Bh
Bh
eter 150 mm
28
eter 100 mm
122
eter 65 mm
24
si Hydrant
Ls
42
20
hedule 40 , diameter 80 mm
20
hedule 40 , diameter 65 mm
12
hedule 40 , diameter 50 mm
12
hedule 40 , diameter 40 mm
62
hedule 40 , diameter 32 mm
91
hedule 40 , diameter 25 mm
118
Bh
Bh
120
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
ter 100 mm
ing Valve :
Flow Switch
ng Valve Diameter 40 mm
SAT
VOLUME
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
14
an Bantu ( Fitting-Fitting )
Ls
14
hedule 40 , diameter 80 mm
hedule 40 , diameter 65 mm
34
hedule 40 , diameter 50 mm
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
79
hedule 40 , diameter 25 mm
189
Bh
Bh
100
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
ter 100 mm
ing Valve :
Flow Switch
ng Valve Diameter 40 mm
SAT
VOLUME
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
14
an Bantu ( Fitting-Fitting )
Ls
14
hedule 40 , diameter 80 mm
20
hedule 40 , diameter 65 mm
18
hedule 40 , diameter 50 mm
31
hedule 40 , diameter 40 mm
14
hedule 40 , diameter 32 mm
62
hedule 40 , diameter 25 mm
197
Bh
Bh
86
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
ter 100 mm
ing Valve :
Flow Switch
ng Valve Diameter 40 mm
36
SAT
VOLUME
12
Flashing diameter 40 mm
24
Test diameter 50 mm
12
ng valve diameter 40 mm
Bh
Bh
Unit
Unit
Unit
Unit
Unit
90
40
100
e ( FCU + CU )
U + OU )
144
54
180
Unit
Unit
Unit
Unit
Unit
SAT
listrik, NYM 3 x 2,5 mm2 + conduit
VOLUME
Ttk
16
35
12
17
23
69
16
88
71
Bh
32
Bh
12
Bh
32
Bh
14
11
10 " ( FA )
SAT
VOLUME
Bh
Unit
Unit
Unit
Unit
U + OU )
208
78
180
Unit
Unit
25
Ttk
27
12
50
139
11
Bh
SAT
VOLUME
U + OU )
Unit
Unit
Unit
Unit
208
78
260
Unit
Unit
17
Ttk
380
12
17
60
Unit
Unit
SAT
VOLUME
Bh
12
meter 25 mm
15
meter 15 mm
25
meter 10 mm
66
meter 25 mm
Bh
meter 15 mm
Bh
12
an Bantu ( Fitting )
Ls
Bh
12
meter 25 mm
15
meter 15 mm
25
meter 10 mm
66
meter 25 mm
Bh
meter 15 mm
Bh
12
Ls
Unit
aan Tembaga :
aan Tembaga :
an Bantu ( Fitting )
Bh
12
Bh
52
meter 32 mm
12
meter 25 mm
106
meter 15 mm
116
aan Tembaga :
SAT
VOLUME
meter 10 mm
251
meter 32 mm
Bh
meter 10 mm
Bh
52
an Bantu ( Fitting )
Ls
Bh
52
meter 32 mm
meter 25 mm
106
meter 10 mm
251
meter 32 mm
Bh
meter 15 mm
Bh
52
Ls
Unit
aan Tembaga :
an Bantu ( Fitting )
Bh
52
Bh
55
meter 32 mm
meter 25 mm
183
meter 10 mm
251
meter 32 mm
Bh
meter 10 mm
Bh
52
an Bantu ( Fitting )
Ls
Bh
55
aan Tembaga :
aan Tembaga :
meter 32 mm
SAT
VOLUME
meter 25 mm
174
meter 15 mm
20
meter 10 mm
142
meter 32 mm
Bh
meter 15 mm
Bh
55
Ls
Unit
an Bantu ( Fitting )
Bh
55
Outlet Oksigen
Ls
Ls
Outlet Vacuum
n Attachement
111
111
Bh
29
Bh
18
TL 2 x 36 W / Louvre M6
Bh
15
TL 2 x 36 W / Louvre M6 + battere
Bh
17
Bh
SAT
VOLUME
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
TL 1 x 18 W / IP-40/ Balk
Bh
TL 1 x 36 W / Dust Proof
Bh
Bh
54
Bh
10
Bh
17
Bh
Bh
11
81
120
TL 2 x 36 W / Louvre M6
Bh
10
TL 2 x 36 W / Louvre m6 + battere
Bh
Bh
25
Bh
21
Bh
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / Balk
Bh
Bh
23
Bh
52
Bh
68
Bh
12
Bh
33
Bh
SAT
VOLUME
120
120
Bh
24
Bh
23
TL 2 x 36 W / Louvre M6
Bh
14
TL 2 x 36 W / Louvre M6 + battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 18 W / Balk
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
15
Bh
71
Bh
55
Bh
13
Bh
25
Bh
Unit
Unit
Unit
SAT
VOLUME
1
Bh
20
Ttk
Commisioning
Ls
12 / 100 Extention
Unit
Unit
Lot
F ( 20 Pairs )
Bh
20
Bh
11
Ttk
11
et analog
Ttk
11
Bh
24
Bh
Ttk
et analog
Bh
Bh
28
g & Commisioning
Telephone ( RJ-11 )
SAT
Telephone ( RJ-11 )
VOLUME
Bh
14
Ttk
14
et analog
Bh
14
Unit
Unit
30
Bh
46
Bh
Bh
Bh
Bh
Bh
Temperature Detector
l Breack Glass
dari CTB-A ke TB F 1A
Unit
50
Unit
34
Bh
30
Bh
Bh
Bh
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
SAT
Ttk
unit
VOLUME
44
34
Bh
19
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
29
0 W Power Amplifier
Unit
0 W Power Amplifier
Unit
Tunner AM/FM
Unit
erve Cassete
Unit
VD/MP3 - Playaer
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Temperature Detector
Detector
l Breack Glass
Frame w/ Module
SAT
VOLUME
20
Bh
40
Ttk
40
Bh
34
Bh
28
Ttk
28
Bh
34
Speaker 3 Watt
Bh
22
mn Speaker 20 W
Bh
Bh
Ttk
29
Unit
Unit
Unit
Unit
Unit
Unit
Unit
nd Amplifier ( Booster )
Unit
Unit
Unit
SAT
t Rack 19 ( 1,8 M)
Unit
VOLUME
1
100
Bh
Bh
Ttk
Bh
Bh
Ttk
Bh
Bh
Ttk
rame ( Server )
Set
Unit
Unit
20
Data ( RG-45 )
Bh
11
Ttk
11
TV ( RCA )
TV ( RCA )
TV ( RCA )
Unit
SAT
VOLUME
24
Data ( RG-45 )
Bh
Ttk
Unit
28
Data ( RG-45 )
Bh
Ttk
Unit
Unit
Coridoor Light
Bh
Bh
Bh
19
Bh
Titik instalasi
Bh
31
Unit
Unit
Coridoor Light
Bh
Bh
Bh
16
Bh
Titik instalasi
Bh
24
SAT
VOLUME
Unit
Unit
Coridoor Light
Bh
Bh
Bh
18
Bh
Titik instalasi
Bh
29
AN INSTALASI CCTV
with Printer
Set
Unit
Set
Set
Unit
Set
Unit
Ttk
Unit
Ttk
Unit
Ttk
JUMLAH HARGA
6=4X5
452852290.036547
2483297.73648
133394678.4555
7194825
595925091.228527
301065871.098667
1423165747.988
472300000
69625149.088
2266156768.17467
180198795.916667
36036000
13146487.2
229381283.116667
34736302.7066667
26938394.1333333
40868308.9466667
21762279.4666667
11082112.4333333
44491842.12
82236986
262116225.806667
3353579368.32653
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
76590
502950
82900
275084.311425
148590
219278.07
302890
67932
133110
49373552.025
324225460.125
3195795
25780874.1583199
11381994
12642718.331727
18461145.5
4199556.24
795066.03
0
0
76590 Tidak
502950 Tidak
82900 Tidak
275084.311425 Tidak
148590 Tidak
219278.07 Tidak
398210 Tidak
302890 Tidak
133110
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
849241.8
0
0
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
74725.2
JUMLAH 1.2.PEKERJA
2483297.73648
0
2483297.73648
3011602.275
1714766.625
2964394.125
2389796.8875
12773970
4301634.3975
5162812.875
12046409.1
15432899.625
2964394.125
2389796.8875
38321910
8603268.795
5162812.875
0
20300736.456
0
0
0
221314.5
3011602.275 Tidak
1714766.625 Tidak
2964394.125 Tidak
5162812.875 Tidak
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
0
16572029.76
0
0
0
221314.5
3011602.275 Tidak
1714766.625 Tidak
2964394.125 Tidak
5162812.875 Tidak
Dikerjakan
Dikerjakan
Dikerjakan
Dikerjakan
0
11600420.832
221314.5
JUMLAH 1.3.PEKERJA
133394678.4555
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
450202.5 Tidak Dikerjakan
525937.5 Tidak Dikerjakan
1798706.25
7194825
JUMLAH 1.4.PEKERJAA
7194825
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1108800
3326400
201283.866666667
603851.6
591066.666666667
3546400
475975.573333333
13327316.0533333
313351.573333333
38228891.9466667
155862.666666667
3740704
8393919.18933333
8393919.18933333
475975.573333333
19990974.08
313351.573333333
6267031.46666667
191779.133333333
3835582.66666667
155862.666666667
1870352
135534.666666667
1626416
693195.8
42978139.6
104496.92
9509219.72
52457.24
6189954.32
253459.066666667
253459.066666667
271058.333333333
32527000
228369.533333333
228369.533333333
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
27680300.956
27680300.956
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2182077.33333333
436415.466666667
436415.466666667
313351.573333333
4386922.02666667
191779.133333333
1726012.2
155862.666666667
5299330.66666667
135534.666666667
693195.8
4159174.8
104496.92
8255256.68
52457.24
9914418.36
253459.066666667
253459.066666667
271058.333333333
27105833.3333333
228369.533333333
228369.533333333
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
10122334.42
10122334.42
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1108800 Tidak Dikerjakan
201283.866666667 Tidak Dikerjakan
591066.666666667 Tidak Dikerjakan
155862.666666667 Tidak Dikerjakan
0 Tidak Dikerjakan
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
313351.573333333 Tidak Dikerjakan
693195.8 Tidak Dikerjakan
135534.666666667 Tidak Dikerjakan
147057.533333333 Tidak Dikerjakan
107800 Tidak Dikerjakan
301065871.098667
15345343.2
108605.053333333
4344202.13333333
24509.2666666667
2450926.66666667
24552549.12
108605.053333333
5864672.88
8612.8
1550304
751700.986666667
751700.986666667
55666.6666666667
55666.6666666667
55666.6666666667
55666.6666666667
55666.6666666667
55666.6666666667
1169102.58666667
2338205.17333333
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 904 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
9290.4
37161.6
3907360.512
7814721.024
3690284.928
11070854.784
3473209.344
3473209.344
3256133.76
9768401.28
3256133.76
9768401.28
3039058.176
18234349.056
2821982.592
25397843.328
2604907.008
13024535.04
2604907.008
41678512.128
2387831.424
19102651.392
2387831.424
83574099.84
2387831.424
14326988.544
2170755.84
26049070.08
1953680.256
33212564.352
2170755.84
49927384.32
1953680.256
134803937.664
1736604.672
27785674.752
1736604.672
152821211.136
1519529.088
107886565.248
1072078.7
34306518.4
1022275.1
12267301.2
2604907.008
83357024.256
1306867.1
2613734.2
2387831.424
11939157.12
2170755.84
4341511.68
1953680.256
11722081.536
1736604.672
24312465.408
1519529.088
9117174.528
1302453.504
14326988.544
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 905 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
945435.26
7563482.08
2170755.84
26049070.08
1953680.256
15629442.048
1736604.672
86830233.6
1519529.088
211214543.232
1302453.504
14326988.544
874998.74
6124991.18
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5528825.72 Tidak Dikerjakan
7872440.84 Tidak Dikerjakan
23608244 Tidak Dikerjakan
5528825.72 Tidak Dikerjakan
3992740.4 Tidak Dikerjakan
3900248 Tidak Dikerjakan
5528825.72 Tidak Dikerjakan
3992740.4 Tidak Dikerjakan
31858.2 Tidak Dikerjakan
41344.6 Tidak Dikerjakan
11508 Tidak Dikerjakan
1423165747.988
454300000
454300000
18000000
18000000
472300000
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 907 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1001000
12012000
45542.0533333333
683130.8
23097.4
577435
17787.2533333333
1173958.72
101658.333333333
101658.333333333
52193.5333333333
626322.4
486904.904
486904.904
1001000
12012000
39281.0293333333
589215.44
23097.4
577435
17787.2533333333
1173958.72
52193.5333333333
52193.5333333333
52193.5333333333
626322.4
468121.832
468121.832
999152
999152
261800
3141600
620525.568
45542.0533333333
4827457.65333333
23097.4
2679298.4
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 908 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
17787.2533333333
4464600.58666667
149767.933333333
149767.933333333
52193.5333333333
2714063.73333333
2394271.328
2394271.328
361973.248
45542.0533333333
4827457.65333333
17787.2533333333
4464600.58666667
149767.933333333
149767.933333333
52193.5333333333
2714063.73333333
1858411.648
1858411.648
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
45542.0533333333 Tidak Dikerjakan
23097.4 Tidak Dikerjakan
17787.2533333333 Tidak Dikerjakan
149767.933333333 Tidak Dikerjakan
52193.5333333333 Tidak Dikerjakan
0 Tidak Dikerjakan
3992740.4 Tidak Dikerjakan
261800 Tidak Dikerjakan
1093400
1093400
1004080
1004080
69625149.088
326872.883333333
36282890.05
258096.483333333
28648709.65
212533.333333333
6163466.66666667
474744.533333333
8545401.6
136889.866666667
2053348
377847.733333333
6423411.46666667
132146.666666667
528586.666666667
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 910 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
124445.333333333
746672
372017.066666667
2232102.4
89519.4666666667
179038.933333333
89519.4666666667
447597.333333333
117917.066666667
235834.133333333
272409.866666667
14710132.8
517701.066666667
5177010.66666667
340169.866666667
5782887.73333333
581127.733333333
4067894.13333333
516345.866666667
5679804.53333333
258096.483333333
20905815.15
261568.266666667
31388192
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
326872.883333333 Tidak Dikerjakan
258096.483333333 Tidak Dikerjakan
212533.333333333 Tidak Dikerjakan
474744.533333333 Tidak Dikerjakan
276475.466666667 Tidak Dikerjakan
521766.666666667 Tidak Dikerjakan
132146.666666667 Tidak Dikerjakan
372017.066666667 Tidak Dikerjakan
117917.066666667 Tidak Dikerjakan
124445.333333333 Tidak Dikerjakan
89519.4666666667 Tidak Dikerjakan
89519.4666666667 Tidak Dikerjakan
369236.266666667 Tidak Dikerjakan
272409.866666667 Tidak Dikerjakan
517701.066666667 Tidak Dikerjakan
516345.866666667 Tidak Dikerjakan
386848 Tidak Dikerjakan
180198795.916667
36036000
36036000
36036000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8377600
8377600
174944
349888
50512
1010240
1694000
1694000
1714759.2
1714759.2
13146487.2
10875920
10875920
389840
389840
2500000
2500000
20331.6666666667
20331.6666666667
20331.6666666667
406633.333333333
201415.5
2215570.5
498793.386666667
5486727.25333333
215147.166666667
2366618.83333333
3491553.70666667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
201415.5 Tidak Dikerjakan
498793.386666667
6983107.41333333
34736302.7066667
169400
169400
240240
240240
87472
2624160
74572.6666666667
3430342.66666667
77960.6666666667
77960.6666666667
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
83160
83160
160910.133333333
8045506.66666667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
160910.133333333
7080045.86666667
4666393.86666667
26938394.1333333
6350677.66666667
6350677.66666667
3569807.26666667
3569807.26666667
742082
742082
948750
948750
609950
609950
815816.833333333
1631633.66666667
1956441.66666667
1956441.66666667
2413821.66666667
2413821.66666667
785400
785400
378840
378840
266112
266112
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 915 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
18849.6
376992
153993.766666667
6159750.66666667
151320.106666667
6052804.26666667
4236962.98666667
4388283.09333333
40868308.9466667
1940666.66666667
1940666.66666667
882381.866666667
882381.866666667
1338406.66666667
1338406.66666667
403318.666666667
403318.666666667
220366.666666667
220366.666666667
227069.333333333
227069.333333333
274120
274120
2864400
2864400
1047200
1047200
609950
609950
Pek. Gedung K (IRNA 1 IRJ Tambahan) - page 916 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
785400
785400
19712
1971200
227069.333333333
681208
84736.6666666667
762630
369236.266666667
3323126.4
1846181.33333333
2584653.86666667
21762279.4666667
Existing
229874.7
229874.7
271885.9
271885.9
21560
431200
15753.1
173284.1
498793.386666667
5486727.25333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
21560 Tidak Dikerjakan
15753.1 Tidak Dikerjakan
498793.386666667
1496380.16
2992760.32
11082112.4333333
7830785.6
23492356.8
399857.333333333
1199572
152533.333333333
457600
91494.3333333333
274483
138926.333333333
2639600.33333333
321878.333333333
965635
498793.386666667
15462594.9866667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7830785.6 Tidak Dikerjakan
399857.333333333 Tidak Dikerjakan
152533.333333333 Tidak Dikerjakan
91494.3333333333 Tidak Dikerjakan
138926.333333333 Tidak Dikerjakan
321878.333333333 Tidak Dikerjakan
498793.386666667 Tidak Dikerjakan
44491842.12
10571000
10571000
306570
306570
8470220
42351100
1219900
1219900
1389300
1389300
396616
396616
2667500
8002500
1500000
4500000
9000000
4500000
82236986
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI KSLL
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 4.60 M )
2.6. LANTAI DUA ( EL. + 8.80 M )
2.7. LANTAI TIGA ( EL. + 13,00 M )
2.8. LANTAI EMPAT / ATAP ( EL. + 17,20 M )
2.9. ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
IV.
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
4.3. PEKERJAAN AIR HUJAN
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=12 cm (120 kg/m3) K300
Pek. Gedung J (IRNA Utama) - page 922 of 2419
NO.
URAIAN PEKERJAAN
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
2.4.
2.5.
NO.
URAIAN PEKERJAAN
19 KOLOM TYPE K4
20 KOLOM TYPE K5
21 BALOK TYPE BR (20x30)
22 BALOK TYPE BT (25x45)
2.6.
2.7.
NO.
URAIAN PEKERJAAN
2.8.
2.9.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
NO.
URAIAN PEKERJAAN
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
C.
LEVEL-2
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
Pek. Gedung J (IRNA Utama) - page 926 of 2419
NO.
URAIAN PEKERJAAN
D.
LEVEL-3
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint homogenius tile 10 x 30 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
13 Border keramik 5 x 20 cm
14 Border keramik 20 x 40 cm
E.
ROOF DACK/ATAP
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Benang sudut
5 Kolom praktis 12/12
6 Balok praktis 12/12
GROUND FLOOR
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
5 Step noising keramik 5 x 20 cm
C.
LEVEL-2
1 Lantai homogenius tile 60 x 60 cm
Pek. Gedung J (IRNA Utama) - page 927 of 2419
NO.
URAIAN PEKERJAAN
3.3.
LEVEL-3
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
5 Step noising keramik 5 x 20 cm
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Curtain Box
6 Expose
B.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Curtain Box
6 Expose
C.
LEVEL-2
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Curtain Box
6 Expose
D.
LEVEL-3
Pek. Gedung J (IRNA Utama) - page 928 of 2419
NO.
URAIAN PEKERJAAN
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
5 Curtain Box
6 Expose
3.4.
LEVEL-1
PINTU
1 D2 uk. 2x900x2150
2 B (AL-ED uk. 900x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 C (AL-ED uk. 900x2150)*Plastic Laminate
5 C (AL-ED uk. 900x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type BV/1
2 Type W/2EA
3 Type W/3EA
C.
LEVEL-2
PINTU
1 D2 uk. 2x900x2150
2 B (AL-ED uk. 900x2150)
Pek. Gedung J (IRNA Utama) - page 929 of 2419
NO.
URAIAN PEKERJAAN
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 C (AL-ED uk. 900x2150)*Plastic Laminate
5 C (AL-ED uk. 900x2150)
6 E (AL-ED/GL-1* uk. 900x2150)
7 E (AL-ED/GL-1* uk. 2x900x2150)
8 M (AL-ED uk. 900x2150)
9 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type BV/1
2 Type BV/2
3 Type W/2EA
4 Type W/3EA
D.
3.5.
LEVEL-3
PINTU
1 B (AL-ED uk. 900x2150)
2 C (AL-ED uk. 750x2150) *Plastic Laminate
3 C (AL-ED uk. 900x2150)*Plastic Laminate
4 C (AL-ED uk. 900x2150)
5 E (AL-ED/GL-1* uk. 900x2150)
6 E (AL-ED/GL-1* uk. 2x900x2150)
7 M (AL-ED uk. 900x2150)
8 S* (AL-ED uk. 400/800 x 2150) Without Louver
JENDELA
1 Type BV/1
2 Type BV/2
3 Type W/2EA
4 Type W/3EA
NO.
URAIAN PEKERJAAN
15 Soap holder
16 Hand railling penyandang cacat
B.
LEVEL-1
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin+bingkai
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang meja zink satu lubang
10 Meja marmer wastafel under counter
11 Jet washer
12 Tisue holder
13 Hand shower lengkap dengan aksesories
14 Towel bar
15 Soap holder
16 Hand railling penyandang cacat
C.
LEVEL-2
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin+bingkai
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang meja zink satu lubang
10 Meja marmer wastafel under counter
11 Jet washer
12 Tisue holder
13 Hand shower lengkap dengan aksesories
14 Towel bar
15 Soap holder
16 Hand railling penyandang cacat
D.
LEVEL-3
1 Bak Shower
2 Monoblock lengkap (kran dan aksesoris)
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin+bingkai
6 Meja beton
Pek. Gedung J (IRNA Utama) - page 931 of 2419
NO.
URAIAN PEKERJAAN
7 Floor drain
8 Memasang cubical toilet
9 Memasang meja zink satu lubang
10 Meja marmer wastafel under counter
11 Jet washer
12 Tisue holder
13 Hand shower lengkap dengan aksesories
14 Towel bar
15 Soap holder
16 Hand railling penyandang cacat
3.6.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecatan plint Int Semi Gloss
3 Pengecetan dinding Watershield (Exterior)
4 Pengecatan plafond emulsion paint
5 Pengecatan list plafond emulsion paint
6 Pengecatan plafond Watershiel (Exterior)
7 Pengecatan list plafond Watershiel (Exterior)
B.
C.
D.
E.
LEVEL-1
1 Pengecatan
2 Pengecatan
3 Pengecetan
4 Pengecatan
5 Pengecatan
LEVEL-2
1 Pengecatan
2 Pengecatan
3 Pengecetan
4 Pengecatan
5 Pengecatan
LEVEL-3
1 Pengecatan
2 Pengecatan
3 Pengecetan
4 Pengecatan
5 Pengecatan
ROOF DAK/ATAP
1 Pengecetan dinding Watershield (Exterior)
2 Pengecatan list plang GRC
Pek. Gedung J (IRNA Utama) - page 932 of 2419
NO.
URAIAN PEKERJAAN
3.7.
IV.
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
3 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
B.
LEVEL-1
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
3 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
C.
LEVEL-2
1 Hand Railling Tangga Utama
-Timber Handrail W/.Clear Stained Finished 3"
-Steel Plate Railling W/.Black Matt Paint Finished 10 x 40 mm
2 Hand Railling Tangga Darurat
-Black steel pipe 2" W/Synthetic enamel paint finish
3 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN AIR BERSIH
A.
SHAFT
1 AAV
2 Gate valve diameter 50 mm
3 Pemipaan Polypropelyne PN.10 :
a.
b.
B.
Diameter 50 mm
Peralatan Bantu ( Fitting-Fitting )
GROUND FLOOR
1 Gate Valve :
a.
GV diameter 40 mm
Pek. Gedung J (IRNA Utama) - page 933 of 2419
NO.
URAIAN PEKERJAAN
b.
GV diameter 32 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 20 mm
e.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
C.
LEVEL 1
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 20 mm
e.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
D.
LEVEL 2
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
E.
LEVEL 3
1 Gate Valve :
a.
GV diameter 40 mm
b.
GV diameter 32 mm
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
Pek. Gedung J (IRNA Utama) - page 934 of 2419
NO.
URAIAN PEKERJAAN
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
F.
TOP FLOOR
1 Tanki Air bersih
a.
Roof Tank, kapasitas 10 M3
b.
Floating valve diamater 40 mm
2 Pompa Tekan
a.
Package Booster Pump
b.
Flexible Joint diameter 65 mm
c.
Gate valve diameter 65 mm
d.
Check valve diameter 65 mm
3 Pemipaan Polypropelyne PN.10 :
c.
PPR diameter 65 mm
a.
PPR diameter 50 mm
4 Pipa header diameter 150 mm
5 Gate valve diameter 65 mm
6 Peralatan Bantu ( Fitting-Fitting )
4.2.
b.
c.
d.
e.
PVC diameter 80 mm
CO diameter 150 mm
CO diameter 100 mm
b.
PVC diameter 80 mm
c.
PVC diameter 65 mm
d.
e.
f.
PVC diameter 50 mm
CO diameter 100 mm
CO diameter 65 mm
a.
Diameter 32 mm
6 Instalasi daya listrik Pompa
7 Peralatan Bantu ( Fitting-Fitting )
Pek. Gedung J (IRNA Utama) - page 935 of 2419
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
c.
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
e.
PVC diameter 50 mm
CO diameter 65 mm
b.
Diameter 32 mm
4 Peralatan Bantu ( Fitting-Fitting )
C.
LEVEL 2
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
d.
e.
f.
PVC diameter 50 mm
CO diameter 80 mm
CO diameter 65 mm
CO diameter 50 mm
4.
D.
a.
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
Portable Grease Trap
5 Peralatan Bantu ( Fitting-Fitting )
LEVEL 3
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
PVC diameter 80 mm
b.
PVC diameter 65 mm
NO.
URAIAN PEKERJAAN
c.
d.
e.
f.
PVC diameter 50 mm
CO diameter 80 mm
CO diameter 65 mm
CO diameter 50 mm
4.
E.
a.
Diameter 50 mm
b.
Diameter 32 mm
c.
Diameter 25 mm
Portable Grease Trap
5 Peralatan Bantu ( Fitting-Fitting )
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
a.
Diameter 50 mm
4 Peralatan Bantu ( Fitting-Fitting )
4.3.
b.
PVC diameter 100 mm
4 Peralatan Bantu ( Fitting-Fitting )
5 Roof Drain :
a.
RD diameter 100 mm
V.
NO.
URAIAN PEKERJAAN
f.
g.
i.
k.
2 Kabel Feeder
B.
C.
a.
b.
c.
d.
e.
f.
g.
LEVEL 1
1 Panel Listrik
a.
SDP - 1 J
b.
LP - J1
c.
PP - J1
d.
PP - AC.J1
e.
PP - UPS J1
2 Kabel Feeder
a.
b.
c.
d.
e.
LEVEL 2
1 Panel Listrik
a.
SDP - 2
b.
LP - J2.
c.
PP - J2
d.
PP - AC.J2
e.
PP - UPS.J2
2 Kabel Feeder
a.
b.
c.
d.
NO.
URAIAN PEKERJAAN
e.
D.
E.
5.2.
LEVEL 3
1 Panel Listrik
a.
SDP - 3
b.
LP - J3.
c.
PP - J3
d.
PP - AC.J3
e.
PP - UPS.J3
2 Kabel Feeder
a.
b.
c.
d.
e.
LEVEL ROOF
1 Panel Listrik
a.
PP - LF
b.
PP - BP
2 Kabel Feeder
a.
b.
LEVEL 1
1 Saklar dan Stop kontak
Pek. Gedung J (IRNA Utama) - page 939 of 2419
NO.
URAIAN PEKERJAAN
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
Stop Kontak 200 W / 16 A
e.
Stop Kontak 200 W / 16 A / UPS
f.
Stop Kontak 350 W / 16 A
g.
Stop Kontak 500 W / 16 A
2 Titik instalasi
a.
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
b.
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
C.
LEVEL 2
1 Saklar & Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
Stop Kontak 200 W / 16 A
e.
Stop Kontak 200 W / 16 A / UPS
f.
Stop Kontak 350 W / 16 A
g.
Stop Kontak 500 W / 16 A
2 Titik instalasi
a.
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
b.
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
D.
LEVEL 3
1 Saklar & Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
Stop Kontak 200 W / 16 A
e.
Stop Kontak 200 W / 16 A / UPS
f.
Stop Kontak 350 W / 16 A
g.
Stop Kontak 500 W / 16 A
2 Titik instalasi
a.
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
b.
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
AYA
ENGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
ANAN UNGGULAN/IRNA UTAMA)
ENGGARA BARAT
JUMLAH I.
+ 17,20 M )
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V.
TOTAL PEK. STANDA
SAT
2
VOLUME
3
Ls
m
1
228
m
Ls
m
Ls
Ls
35
1
228
1
1
1440
288
735
R 4 + test ( 10 ttk)
1225
288
358.3632
250.85424
R 4 + test ( 5 ttk)
1384.38
107.50896
18.45
9.225
1450
ng tanah sedalam 20 cm
SAT
VOLUME
m
Kg
18.45
87.36
5.733
m
Kg
2.8665
6819.584
32.307
27.64125
0.56875
3.822
1.456
10.769
10.135125
1.839
1.0125
37.8
32.94
32.05125
7.56
5.841
10.38
45.2925
10.5
3.6
(t=13 cm)
141.284
(t=12 cm)
33.792
281.6
281.6
5.229
2.6145
25.41
21.87
0.45
(t=13 cm)
(t=13 cm)
SAT
VOLUME
3.024
1.152
1.839
1.0125
37.8
32.94
32.05125
38.82375
8.8305
139.5238
5.229
2.6145
25.41
21.87
0.45
3.024
1.152
1.839
1.0125
35.28
30.195
32.05125
38.82375
8.8305
139.5238
2.6145
25.41
21.87
0.45
3.024
1.152
1.839
0.3375
SAT
VOLUME
+ 17,20 M )
m
35.28
27.4725
13.725
8.1
12.133125
3.64
A (t=12 cm)
49.92
416
416
Kg
Kg
Kg
Kg
Unit
Bh
Bh
Bh
Bh
Kg
Bh
Bh
11238.444
8843.814
3168.746
2790.12048
28
112
1860
1208
2054
7530.6552631579
406.0742105263
18
11.333380275
m
m
5.3040272727
170.1
m
m
1389.15
106.05
GAN DINDING
ata ringan
m2
m2
m2
m1
2320.84352
4641.68704
4641.68704
821.4
SAT
aktis 12/12
ktis 12/12
ogenius tile 10 x 60 cm cutting size
ogenius tile 10 x 30 cm cutting size
mik 10 x 20 cm
eramik 20 x 25 cm
ramik 5 x 20 cm
ramik 20 x 40 cm
m1
m1
m1
m1
m1
m1
m1
m2
m1
m1
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
eramik 20 x 25 cm
m2
k 5 x 20 cm
m1
ramik 20 x 40 cm
m1
& Jendela
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
eramik 20 x 25 cm
m2
k 5 x 20 cm
m1
ramik 20 x 40 cm
m1
& Jendela
VOLUME
1335.5
1642.8
572.45
165.21
270.7459385
52.8
132.9601
338.108785
104.96
95.96
2255.45924
4510.91848
4510.91848
724.4
1123
1448.8
484.9
153.75
181.8327
52.8
153.9001
406.99457
141.8
128.3
2253.62424
4507.24848
4507.24848
687.7
1091.4
1375.4
444.07
156.2
181.8327
52.8
153.9001
406.99457
141.8
128.3
SAT
VOLUME
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
eramik 20 x 25 cm
m2
k 5 x 20 cm
m1
ramik 20 x 40 cm
m1
128.3
m2
m2
m2
m1
m1
m1
133.96
267.92
267.92
320.8
0.64056
2.2608
& Jendela
2246.82424
4493.64848
4493.64848
702.5
1114.2
1405
452.87
159.94
181.8327
52.8
153.9001
406.99457
141.8
GAN LANTAI
mogenius tile 60 x 60 cm
mogenius tile 30 x 60 cm
ramik 20 x 20 cm
m2
m2
m2
m2
m1
1064.436
17.16
73.666
82.0424
114.4
ing keramik 5 x 20 cm
m2
m2
m2
m2
m1
877.0275
17.16
84.2851
82.0424
114.4
mogenius tile 60 x 60 cm
m2
877.0275
ing keramik 5 x 20 cm
mogenius tile 60 x 60 cm
mogenius tile 30 x 60 cm
ramik 20 x 20 cm
mogenius tile 30 x 60 cm
ramik 20 x 20 cm
SAT
VOLUME
m2
m2
m2
m1
17.16
84.2851
82.0424
114.4
m2
m2
m2
m2
m1
877.0275
17.16
84.2851
82.0424
114.4
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
m2
m2
m1
m2
m2
m2
953.2364
172.9194
1036.8267
43.2
92.85
52.91565075
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
m2
m2
m1
m2
m2
m2
832.54805
84.2851
961.1059
43.2
92.85
52.91565075
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
m2
m2
m1
m2
m2
m2
832.54805
84.2851
961.1059
43.2
92.85
52.91565075
ing keramik 5 x 20 cm
mogenius tile 60 x 60 cm
mogenius tile 30 x 60 cm
ramik 20 x 20 cm
ing keramik 5 x 20 cm
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
SAT
VOLUME
m2
m2
m1
m2
m2
m2
832.54805
84.2851
961.1059
43.2
92.85
52.91565075
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
1
5
13
3
5
1
12
12
unit
unit
unit
12
16
6
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
2
20
3
3
1
1
7
16
unit
unit
unit
12
15
4
unit
unit
1
2
TU DAN JENDELA
900x2150)
750x2150) *Plastic Laminate
900x2150)*Plastic Laminate
900x2150)
* uk. 2x900x2150)
900x2150)
400/800 x 2150) Without Louver
900x2150)
750x2150) *Plastic Laminate
900x2150)*Plastic Laminate
900x2150)
* uk. 900x2150)
* uk. 2x900x2150)
900x2150)
400/800 x 2150) Without Louver
900x2150)
900x2150)
750x2150) *Plastic Laminate
900x2150)*Plastic Laminate
900x2150)
* uk. 900x2150)
* uk. 2x900x2150)
900x2150)
400/800 x 2150) Without Louver
bical toilet
eja zink satu lubang
wastafel under counter
SAT
unit
unit
unit
unit
unit
unit
unit
VOLUME
20
3
3
1
1
7
16
unit
unit
unit
unit
12
8
28
6
unit
unit
unit
unit
unit
unit
unit
unit
2
20
3
3
1
1
7
16
unit
unit
unit
unit
12
8
30
6
bh
set
set
bh
m
m
bh
unit
bh
m
set
bh
set
bh
10
17
10
10
12
2.73
17
6
1
8.4
17
17
10
10
penyandang cacat
bical toilet
eja zink satu lubang
wastafel under counter
penyandang cacat
bical toilet
eja zink satu lubang
wastafel under counter
penyandang cacat
SAT
bh
bh
VOLUME
10
67
bh
set
set
bh
m
m
bh
unit
bh
m
set
bh
set
bh
bh
bh
16
24
18
18
18
1.05
24
6
1
13.2
24
24
16
16
16
107.2
bh
set
set
bh
m
m
bh
unit
bh
m
set
bh
set
bh
bh
bh
16
24
18
18
18
1.05
24
6
1
13.2
24
24
16
16
16
107.2
bh
set
set
bh
m
m
16
24
18
18
18
1.05
penyandang cacat
SAT
bh
unit
bh
m
set
bh
set
bh
bh
bh
m
m'
m
m
m
m
m
1772.48833
149.6
870.35992
1068.1780507474
973.6815
99.2534
112.4452
m
m'
m
m
m
2183.69816
149.6
654.69924
969.0420507474
967.9059
m
m'
m
m
m
2183.69816
149.6
652.86424
969.0420507474
967.9059
m
m'
m
m
m
2183.69816
149.6
646.06424
969.0420507474
967.9059
m
m1
267.92
bical toilet
eja zink satu lubang
wastafel under counter
VOLUME
24
6
1
13.2
24
24
16
16
16
107.2
SAT
VOLUME
Tangga Utama
ail W/.Clear Stained Finished 3"
ailling W/.Black Matt Paint Finished 10 x 40 mm
Tangga Darurat
pe 2" W/Synthetic enamel paint finish
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
8.8204308285
22.740861657
17.640861657
Tangga Utama
ail W/.Clear Stained Finished 3"
ailling W/.Black Matt Paint Finished 10 x 40 mm
Tangga Darurat
pe 2" W/Synthetic enamel paint finish
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
8.8204308285
0
0
22.740861657
0
17.640861657
Tangga Utama
ail W/.Clear Stained Finished 3"
ailling W/.Black Matt Paint Finished 10 x 40 mm
Tangga Darurat
pe 2" W/Synthetic enamel paint finish
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
m
m
m
m
8.8204308285
0
0
22.740861657
0
17.640861657
0
Bh
Bh
2
11
ter 50 mm
an Bantu ( Fitting-Fitting )
m
Ls
176
1
meter 40 mm
Bh
ameter 50 mm
ypropelyne PN.10 :
meter 32 mm
SAT
Bh
VOLUME
6
ypropelyne PN.10 :
ameter 40 mm
ameter 32 mm
42
ameter 25 mm
33
ameter 20 mm
24
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
84
1
meter 40 mm
meter 32 mm
ypropelyne PN.10 :
Bh
Bh
1
6
ameter 40 mm
ameter 32 mm
52
ameter 25 mm
25
ameter 20 mm
36
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
119
1
meter 40 mm
meter 32 mm
ypropelyne PN.10 :
Bh
Bh
5
2
ameter 40 mm
ameter 32 mm
52
ameter 25 mm
25
ameter 25 mm
36
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
119
1
meter 40 mm
meter 32 mm
ypropelyne PN.10 :
Bh
Bh
5
2
ameter 40 mm
ameter 32 mm
52
ameter 25 mm
25
SAT
VOLUME
ameter 25 mm
36
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
119
1
ank, kapasitas 10 M3
g valve diamater 40 mm
Unit
Bh
1
1
ge Booster Pump
e Joint diameter 65 mm
alve diameter 65 mm
valve diameter 65 mm
ypropelyne PN.10 :
Set
Bh
Bh
Bh
1
1
1
1
ameter 65 mm
24
ameter 50 mm
iameter 150 mm
ameter 65 mm
tu ( Fitting-Fitting )
m
Unit
Bh
Ls
148
1
1
1
Unit
Unit
2
4
ameter 150 mm
101
ameter 100 mm
82
ameter 80 mm
meter 150 mm
meter 100 mm
m
Bh
Bh
82
3
14
ameter 100 mm
123
ameter 80 mm
30
ameter 65 mm
40
ameter 50 mm
meter 100 mm
meter 65 mm
m
Bh
Bh
44
2
10
m
Ttk
Ls
104
4
1
ter 32 mm
listrik Pompa
tu ( Fitting-Fitting )
SAT
VOLUME
ameter 150 mm
ameter 100 mm
meter 100 mm
m
Bh
80
15
ameter 80 mm
ameter 65 mm
79
ameter 50 mm
meter 65 mm
m
Bh
12
12
m
Ls
121
1
m
Bh
73
15
ameter 80 mm
24
ameter 65 mm
86
ameter 50 mm
meter 80 mm
meter 65 mm
meter 50 mm
m
Bh
Bh
Bh
48
1
17
3
ter 50 mm
ter 32 mm
92
ter 25 mm
m
Unit
Ls
80
1
1
m
Bh
73
15
ameter 80 mm
24
ameter 65 mm
86
ter 32 mm
tu ( Fitting-Fitting )
ameter 100 mm
meter 100 mm
tu ( Fitting-Fitting )
ameter 100 mm
meter 100 mm
SAT
VOLUME
m
Bh
Bh
Bh
48
1
17
3
ter 50 mm
ter 32 mm
92
ter 25 mm
m
Unit
Ls
80
1
1
ameter 50 mm
meter 80 mm
meter 65 mm
meter 50 mm
tu ( Fitting-Fitting )
:
m
128
128
m
Ls
128
1
Bh
Bh
2
2
ameter 150 mm
48
ameter 100 mm
tu ( Fitting-Fitting )
m
Ls
351
1
meter 100 mm
Bh
15
ter 100 mm
ter 80 mm
ter 50 mm
tu ( Fitting-Fitting )
C Kelas 10 kg/cm2
BEL FEEDER
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
SAT
Unit
Unit
Unit
Unit
VOLUME
1
1
1
1
340
30
10
10
10
10
10
25
25
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
35
10
10
10
10
Unit
Unit
Unit
Unit
Unit
1
1
1
1
1
40
10
10
10
SAT
m
Unit
Unit
Unit
Unit
Unit
VOLUME
10
1
1
1
1
1
40
10
10
10
10
Unit
Unit
1
1
42
10
group ( 6 modul )
ontak 200 W / 10 A
ontak 200 W / 10 A / UPS
ontak 350 W / 16 A
ontak 500 W / 16 A
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
48
18
18
1
116
28
10
5
Ttk
Ttk
184
159
ontak
ontak
ontak
ontak
200
200
350
500
W
W
W
W
/
/
/
/
16
16
16
16
A
A / UPS
A
A
SAT
Bh
Bh
Bh
Bh
Bh
Bh
Bh
VOLUME
51
25
34
106
28
18
5
Ttk
Ttk
170
157
ontak
ontak
ontak
ontak
Bh
Bh
Bh
Bh
Bh
Bh
Bh
51
25
34
106
28
18
5
Ttk
Ttk
170
157
ontak
ontak
ontak
ontak
Bh
Bh
Bh
Bh
Bh
Bh
Bh
51
25
34
106
28
18
5
Ttk
Ttk
186
157
200
200
350
500
200
200
350
500
W
W
W
W
W
W
W
W
/
/
/
/
/
/
/
/
16
16
16
16
16
16
16
16
A
A / UPS
A
A
A
A / UPS
A
A
JUMLAH HARGA
26906774963.4477
7648290154.20424
34555065117.6519
3455506511.76519
38010571629.4171
38010572000
JUMLAH HARGA
106674716
106674716
189505495
79028218.22865
2971485000
1388768384.88761
3442423713.94231
2803334310.96295
2585879390.77756
1315724110.53146
1665067558.6444
16441216182.975
3208677662.11842
937169692.796865
690497371.598133
2444062093.06063
945566192.586725
574094663.220731
63609453.8816171
8863677129.26312
157649960.016
316325166.5768
99508009.3568
573483135.9496
639286767.693334
282437031.566667
921723799.26
26906774963.4477
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
7500000
60000
7500000
13680000
567212
1000000
163782
14000000
13300000
JUMLAH I. PEKERJAAN PERSIAP
19852420
1000000
37342296
14000000
13300000
106674716
10720
15436800
26180
7539840
157158
115511130
32725
40088125
37950
JUMLAH 2.1. PEKERJAAN PEMA
10929600
189505495
48050
17219351.76
18975
4759959.204
32725
45303835.5
12540
1348162.3584
174620
3221739
777796.25
JUMLAH 2.2. PEKERJAAN TANAH
2049300
7175170.40625
79028218.22865
2971485000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2971485000
2683307.06279167
27248.925
49507015.3085063
2380466.088
6606260.01543842
37873688.6685085
6606260.01543842
27248.925
18936844.3342542
185826332.9472
11209137.9542526
362133619.88804
15135730.0785706
418370499.03429
12509750.0064533
7114920.31617034
11286348.8191667
43136425.186855
10511468.059125
15304697.494086
9170233.15588696
98754240.8557467
12156898.7431209
123211688.373873
9759822.04511111
17948312.7409593
8167539.40851852
JUMLAH 2.4.LANTAI DASAR ( EL.
8269633.651125
1388768384.88761
8435463.15473016
318860507.2488
8743607.98544445
288014447.04054
8196329.54266667
262702607.254395
9063959.23574603
68523531.82224
8791759.36888889
51352666.47368
9335661.85102222
96904170.0136106
9406069.42651852
426024399.50059
9171717.21242857
96303030.7305
7635603.56197222
27488172.8231
5735842.80429487
810382814.761996
6126956.28798611
207042106.883627
246240
69341184
104940
29551104
6606260.01543842
34544133.6207275
6606260.01543842
17272066.8103638
10220611.013645
259705725.85672
13611890.1784691
297692038.20312
12509750.0064533
5629387.502904
Pek. Gedung J (IRNA Utama) - page 965 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
12156898.7431209
36762461.7991975
10511468.059125
12109211.204112
9759822.04511111
17948312.7409593
8167539.40851852
JUMLAH 2.5.LANTAI SATU ( EL. +
8269633.651125
3442423713.94231
8435463.15473016
318860507.2488
8743607.98544445
288014447.04054
8196329.54266667
262702607.254395
9406069.42651852
365178887.897798
9171717.21242857
80990848.8443505
5735842.80429487
800286584.257877
6606260.01543842
34544133.6207275
6606260.01543842
17272066.8103638
10220611.013645
259705725.85672
13611890.1784691
297692038.20312
12509750.0064533
5629387.502904
11286348.8191667
34129918.82916
10511468.059125
12109211.204112
9759822.04511111
17948312.7409593
8167539.40851852
JUMLAH 2.6.LANTAI DUA ( EL. +
8269633.651125
2803334310.96295
8423302.37287075
297174107.71488
8791759.36888889
265467174.1436
7817534.09695238
250561739.724945
9406069.42651852
365178887.897798
9171717.21242857
80990848.8443505
5735842.80429487
800286584.257877
6606260.01543842
17272066.8103638
8103803.85104762
205917655.85512
10537583.4797037
230456950.70112
12509750.0064533
5629387.502904
11286348.8191667
34129918.82916
10511468.059125
12109211.204112
9759822.04511111
17948312.7409593
8167539.40851852
JUMLAH 2.7.LANTAI TIGA ( EL.
2756544.550375
2585879390.77756
Pek. Gedung J (IRNA Utama) - page 966 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8743607.98544445
308474489.72648
8196329.54266667
225173663.36091
8791759.36888889
120666897.338
8338507.30044444
67541909.1336
9406069.42651852
114125016.110627
7635603.56197222
27793596.9655789
6126956.28798611
305857657.896267
246240
102435840
104940
JUMLAH 2.8.LANTAI EMPAT / ATAP
43655040
1315724110.53146
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
15840
31192.48691625
116640
97200
350555017.429008
275860552.484749
98841068.1459195
87030796.5671612
13668480
21127680
42854400
27832320
32535360
234899865.766842
47364495.9157895
1749600
0
6048000
68544283.9032
5796000
163800
30742142.0727273
27862380
0
204522.654285714
183747.96
JUMLAH 2.9.ATAP
284112645.201
19486471.158
1665067558.6444
141700
42200
17100
21700
328863526.784
195879193.088
79372848.384
17824380
Pek. Gedung J (IRNA Utama) - page 967 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3710
11280
95902.775375
97459.550375
26420
20000
17760
163760
92550
145380
4954705
18530784
54899543.7634188
16101292.3174538
7153107.69517
1056000
2361371.376
55368694.6316
9714048
13950664.8
0
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
0
319598574.308
190360759.856
77136706.008
15719480
4166330
16342464
46503255.7793375
14984405.8701563
4804019.934
1056000
2733265.776
163760
66649430.7832
92550
13123590
145380
18652254
0
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
0
319338554.808
190205885.856
77073949.008
14923090
4049094
15514512
42587545.4607762
15223181.768575
4804019.934
1056000
2733265.776
163760
66649430.7832
92550
13123590
145380
18652254
0
Pek. Gedung J (IRNA Utama) - page 968 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
20000
17760
0
318374994.808
189631965.856
76841389.008
15244250
4133682
15848400
43431489.8840762
15587680.4869775
4804019.934
1056000
2733265.776
163760
66649430.7832
92550
13123590
145380
18652254
0
141700
42200
17100
11280
95902.775375
97459.550375
JUMLAH 3.1.PEKERJA
222896.08
211788.28
163466.05
38788.2
71703.896
222896.08
211788.28
163466.05
38788.2
71703.896
222896.08
0
18982132
11306224
4581432
3618624
61431.48179421
220336.5514878
3208677662.11842
237258611.81088
3634286.8848
12041890.0393
3182277.01968
8202925.7024
0
0
195485991.8022
3634286.8848
13777752.370855
3182277.01968
8202925.7024
0
0
195485991.8022
Pek. Gedung J (IRNA Utama) - page 969 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
211788.28
163466.05
38788.2
71703.896
222896.08
211788.28
163466.05
38788.2
71703.896
JUMLAH 3.2.PEKERJA
140831.940857143
136889.688669643
15603.96
156474.36
140831.940857143
26955.5
3634286.8848
13777752.370855
3182277.01968
8202925.7024
0
0
195485991.8022
3634286.8848
13777752.370855
3182277.01968
8202925.7024
937169692.796865
134246132.307676
23670882.8309414
16178602.353732
6759692.352
13076245.7085857
1426367.82372262
0
0
140831.940857143
136889.688669643
15603.96
156474.36
140831.940857143
26955.5
117249357.73833
11537761.0984897
14997058.019364
6759692.352
13076245.7085857
1426367.82372262
0
0
140831.940857143
136889.688669643
15603.96
156474.36
140831.940857143
26955.5
117249357.73833
11537761.0984897
14997058.019364
6759692.352
13076245.7085857
1426367.82372262
0
0
Pek. Gedung J (IRNA Utama) - page 970 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
140831.940857143
136889.688669643
15603.96
156474.36
140831.940857143
26955.5
JUMLAH 3.3.PEKERJA
117249357.73833
11537761.0984897
14997058.019364
6759692.352
13076245.7085857
1426367.82372262
690497371.598133
16112851.56855
16112851.56855
5683385.01374712
5406114.08296034
5918558.84993495
5774599.26622056
13034849.7522551
5778167.90327238
9381120.85110891
16112851.56855
16112851.56855
28416925.0687356
70279483.0784845
17755676.5498048
28872996.3311028
13034849.7522551
69338014.8392685
112573450.213307
0
14707763.479695
147600229.222574
44610469.93854
0
0
0
16112851.56855
11366770.0274942
108122281.659207
17755676.5498048
17323797.7986617
6080663.46759816
13034849.7522551
40447175.3229066
150097933.617742
0
14707763.479695
111526174.84635
29740313.29236
0
0
0
16112851.56855
11366770.0274942
1225646.95664125
9225014.32641085
7435078.32309
16112851.56855
5683385.01374712
5406114.08296034
5918558.84993495
5774599.26622056
6080663.46759816
13034849.7522551
5778167.90327238
9381120.85110891
1225646.95664125
7435078.32309
7435078.32309
16112851.56855
5683385.01374712
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5406114.08296034
5918558.84993495
5774599.26622056
6080663.46759816
13034849.7522551
5778167.90327238
9381120.85110891
1225646.95664125
2118007.6582225
7435078.32309
7435078.32309
5683385.01374712
5406114.08296034
5918558.84993495
5774599.26622056
6080663.46759816
13034849.7522551
5778167.90327238
9381120.85110891
1225646.95664125
2118007.6582225
7435078.32309
7435078.32309
JUMLAH 3.4.PEKERJA
1297167.212
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
553501.04
326502
316849.995
72894.9375
702707.1975
1297167.212
108122281.659207
17755676.5498048
17323797.7986617
6080663.46759816
13034849.7522551
40447175.3229066
150097933.617742
0
14707763.479695
16944061.26578
208182193.04652
44610469.93854
0
0
0
11366770.0274942
108122281.659207
17755676.5498048
17323797.7986617
6080663.46759816
13034849.7522551
40447175.3229066
150097933.617742
0
14707763.479695
16944061.26578
223052349.6927
44610469.93854
2444062093.06063
12971672.12
40609744.67
20844659.88
3090745.35
2926400.4
10709350.7208187
5320159.35
1606049.0325
553501.04
2742616.8
5386449.915
1239213.9375
7027071.975
12971672.12
Pek. Gedung J (IRNA Utama) - page 972 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
681324.6825
573903
1297167.212
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
553501.04
326502
316849.995
72894.9375
702707.1975
1297167.212
681324.6825
573903
1297167.212
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
553501.04
326502
316849.995
72894.9375
702707.1975
1297167.212
681324.6825
573903
1297167.212
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
6813246.825
38451501
0
0
20754675.392
57331404.24
37520387.784
5563341.63
4389600.6
4118981.04646875
7510813.2
1606049.0325
553501.04
4309826.4
7604399.88
1749478.5
11243315.16
20754675.392
10901194.92
61522401.6
0
0
20754675.392
57331404.24
37520387.784
5563341.63
4389600.6
4118981.04646875
7510813.2
1606049.0325
553501.04
4309826.4
7604399.88
1749478.5
11243315.16
20754675.392
10901194.92
61522401.6
0
0
20754675.392
57331404.24
37520387.784
5563341.63
4389600.6
4118981.04646875
Pek. Gedung J (IRNA Utama) - page 973 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
312950.55
267674.83875
553501.04
326502
316849.995
72894.9375
702707.1975
1297167.212
681324.6825
573903
JUMLAH 3.5.PEKERJA
32850.26245
5448.39813375
42825.079055
36922.091195
3427.5273666667
43611.881555
3427.5273666667
7510813.2
1606049.0325
553501.04
4309826.4
7604399.88
1749478.5
11243315.16
20754675.392
10901194.92
61522401.6
945566192.586725
32850.26245
5448.39813375
42825.079055
36922.091195
3427.5273666667
58226706.8300622
815080.360809
37273232.3803035
39439367.4021943
3337319.98766705
4328627.52473104
385409.000250307
0
0
71735057.6675821
815080.360809
28037546.7102484
35779058.9694868
3317523.96060813
0
0
71735057.6675821
815080.360809
27958962.6901825
35779058.9694868
3317523.96060813
0
0
71735057.6675821
815080.360809
27667752.1526085
35779058.9694868
3317523.96060813
43611.881555
3427.5273666667
0
11684495.3062156
0
32850.26245
5448.39813375
42825.079055
36922.091195
3427.5273666667
32850.26245
5448.39813375
42825.079055
36922.091195
3427.5273666667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 3.6.PEKERJA
573903
399712.5
399712.5
573903
399712.5
399712.5
573903
399712.5
399712.5
JUMLAH 3.7.PEKERJAA
574094663.220731
5062071.71375715
0
0
9089806.66505761
0
7051272.91505761
0
0
0
0
5062071.71375715
0
0
9089806.66505761
0
7051272.91505761
0
0
0
0
5062071.71375715
0
0
9089806.66505761
0
7051272.91505761
0
0
63609453.8816171
107800
143687.866666667
215600
1580566.53333333
169130.993888889
5953410.98488889
29767054.9244444
5953410.98488889
100980.733333333
100980.733333333
Pek. Gedung J (IRNA Utama) - page 975 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
68455.9333333333
410735.6
110129.34
220258.68
69473.34
2917880.28
45554.74
1503306.42
37503.95
900094.8
27688.1
1573468.116
2325800.4
1573468.116
100980.733333333
68455.9333333333
100980.733333333
410735.6
110129.34
220258.68
69473.34
3612613.68
45554.74
1138868.5
37503.95
1350142.2
27688.1
1879301.656
3294883.9
1879301.656
100980.733333333
68455.9333333333
504903.666666667
136911.866666667
110129.34
220258.68
69473.34
3612613.68
45554.74
1138868.5
45554.74
1639970.64
27688.1
1937267.344
3294883.9
1937267.344
100980.733333333
68455.9333333333
504903.666666667
136911.866666667
110129.34
220258.68
69473.34
3612613.68
45554.74
1138868.5
Pek. Gedung J (IRNA Utama) - page 976 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
45554.74
1639970.64
27688.1
1937267.344
3294883.9
1937267.344
31519176
442869.24
31519176
442869.24
1957366.224
356780.16
152496.666666667
359626.08
1957366.224
356780.16
152496.666666667
359626.08
265892.273888889
6381414.57333333
169130.993888889
471240
152496.666666667
6376808.33377778
25031387.0955555
471240
152496.666666667
6376808.33377778
157649960.016
PEK SIPIL
5274895.824
21099583.296
399700.693333333
40369770.0266667
171508.450666667
14063692.9546667
104649.38
362527
287991
8581249.16
1087581
4031874
171508.450666667
21095539.432
104649.38
3139481.4
67381.1013333333
2695244.05333333
55231.7333333333
287991
135531
2430196.26666667
575982
1355310
36182.63
281808
12563828.7573333
3762993.52
1127232
12563828.7573333
Pek. Gedung J (IRNA Utama) - page 977 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
399700.693333333
2398204.16
171508.450666667
287991
13720676.0533333
4319865
104649.38
627896.28
67381.1013333333
5323107.00533333
55231.7333333333
135531
662780.8
1626372
36182.63
6131759.07373333
4378098.23
6131759.07373333
171508.450666667
287991
12520116.8986667
4319865
104649.38
2511585.12
67381.1013333333
5794774.71466667
55231.7333333333
227007
135531
125367
2651123.2
227007
2304027
376101
55231.7333333333
331390.4
36182.63
3328801.96
26492.95
902440
6872958.45866667
2119436
902440
6872958.45866667
171508.450666667
287991
12520116.8986667
4319865
104649.38
2511585.12
67381.1013333333
5794774.71466667
Pek. Gedung J (IRNA Utama) - page 978 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
55231.7333333333
227007
135531
125367
2651123.2
227007
2304027
376101
55231.7333333333
331390.4
36182.63
3328801.96
26492.95
638599.573333333
6872958.45866667
2119436
638599.573333333
6872958.45866667
171508.450666667
21953081.6853333
104649.38
13395120.64
55231.7333333333
8483572.8384
7069661.86666667
8483572.8384
316325166.5768
462000
212520
924000
425040
399700.693333333
19185633.28
171508.450666667
15877019.8928
60199466.184
15877019.8928
193123.333333333
2896850
99508009.3568
17360701.6
18495725.6
18495725.6
11764786
11713288.4
17360701.6
18495725.6
18495725.6
11764786
11713288.4
Pek. Gedung J (IRNA Utama) - page 979 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11053983.6
22176000
12147630
7823200
11053983.6
22176000
12147630
7823200
735207
249970380
179571.333333333
5387140
42014.8666666667
420148.666666667
66412.1333333333
664121.333333333
410094.52
4100945.2
27785.2666666667
277852.666666667
27785.2666666667
277852.666666667
42014.8666666667
1050371.66666667
27785.2666666667
694631.666666667
19357927.6
11709561.6
11923344.4
11897595.6
11219995.6
19357927.6
11709561.6
11923344.4
11897595.6
11219995.6
179571.333333333
6284996.66666667
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
42014.8666666667
420148.666666667
42014.8666666667
420148.666666667
13518370.8
11709561.6
11923344.4
11897595.6
11219995.6
13518370.8
11709561.6
11923344.4
11897595.6
11219995.6
179571.333333333
7182853.33333333
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
42014.8666666667
420148.666666667
Pek. Gedung J (IRNA Utama) - page 980 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
42014.8666666667
420148.666666667
13518370.8
11709561.6
11923344.4
11897595.6
11219995.6
13518370.8
11709561.6
11923344.4
11897595.6
11219995.6
179571.333333333
7182853.33333333
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
42014.8666666667
420148.666666667
124445.333333333
1244453.33333333
6707243.4
10948278
6707243.4
10948278
303101.48
12730262.16
27785.2666666667
277852.666666667
639286767.693334
29147.8
31858.2
41344.6
214967.5
36081.1
36081.1
36081.1
36081.1
1399094.4
573447.6
744202.8
214967.5
4185407.6
1010270.8
360811
180405.5
170766.133333333
197562.133333333
31420968.5333333
31412379.2
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
36081.1
1486537.8
796455
1405716.4
3824596.6
1010270.8
649459.8
180405.5
170766.133333333
197562.133333333
29030242.6666667
31017254.9333333
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
36081.1
1486537.8
796455
1405716.4
3824596.6
1010270.8
649459.8
180405.5
170766.133333333
197562.133333333
29030242.6666667
31017254.9333333
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
36081.1
1486537.8
796455
1405716.4
3824596.6
1010270.8
649459.8
180405.5
170766.133333333
197562.133333333
31762500.8
31017254.9333333
282437031.566667
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
II.
PEKERJAAN MEKANIKAL
2.1. PEKERJAAN HYDRANT & SPRINKLER
2.2. PEKERJAAN PENGKONDISIAN UDARA
2.3. PEKERJAAN ELEVATOR
2.4. PEKERJAAN GAS MEDIS
2.5. PEKERJAAN PNEUMATIC TUBE
III.
IV.
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
LEVEL-1
LEVEL-2
LEVEL-3
NO.
URAIAN PEKERJAAN
1.2. PEKERJAAN PASANGAN PINTU DAN JENDELA
A.
GROUND FLOOR
PINTU
1 A (HM uk. 900x2150) Fire door
2 A (HM uk. 600x1250) SHF-1
3 C (HM uk. 2x900x2150)
JENDELA
1 Type CW/2
2 Type CW/3
1.3.
B.
LEVEL-1
1 A (HM uk. 900x2150) Fire door
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 2x900x2150)
JENDELA
1 Type CW/2
2 Type CW/3
C.
LEVEL-2
1 A (HM uk. 900x2150) Fire door
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 2x900x2150)
JENDELA
1 Type CW/3
D.
LEVEL-3
1 A (HM uk. 900x2150) Fire door
2 A (HM uk. 600x1250) SHF-1
3 A (HM uk. 2X600x1250) SHF-2
4 C (HM uk. 2x900x2150)
JENDELA
1 Type CW/3
NO.
URAIAN PEKERJAAN
2 Signage
LEVEL-1
1 Signage
2 Signage
LEVEL-2
1 Signage
2 Signage
LEVEL-3
1 Signage
2 Signage
C.
toilet
room
toilet
room
toilet
room
toilet
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Addmission Office P. 2.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Station P.8.3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Meja R. Administrasi P.4.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
4 Lemari Dibawah Wastafel P.1.1 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
5 Meja Pantry R. VVIP+Zink dan aksesories
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-1
1 Meja Addmission Office P. 2.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Station P.8.3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Meja R. Administrasi P.4.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
Pek. Gedung J (IRNA Utama) - page 986 of 2419
NO.
URAIAN PEKERJAAN
-Material bantu+aksesories
4 Lemari Dibawah Wastafel P.1.1 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-2
1 Meja Addmission Office P. 2.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Station P.8.3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Meja R. Administrasi P.4.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
4 Lemari Dibawah Wastafel P.1.1 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
LEVEL-3
1 Meja Addmission Office P. 2.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Nurse Station P.8.3 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
3 Meja R. Administrasi P.4.7 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
4 Lemari Dibawah Wastafel P.1.1 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
II.
PEKERJAAN MEKANIKAL
Pek. Gedung J (IRNA Utama) - page 987 of 2419
NO.
URAIAN PEKERJAAN
2.1.
GROUND FLOOR
1 Instalasi Hydrant
a.
b.
c.
Siamesse Connebtion
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Pek. Gedung J (IRNA Utama) - page 988 of 2419
NO.
URAIAN PEKERJAAN
Diameter 50 mm
B.
l.
m.
n.
o.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
Pek. Gedung J (IRNA Utama) - page 989 of 2419
NO.
URAIAN PEKERJAAN
C.
l.
m.
n.
o.
LEVEL 2
1 Instalasi Hydrant
a.
b.
c.
d.
e.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
l.
NO.
URAIAN PEKERJAAN
D.
m.
n.
o.
b.
c.
d.
e.
2 Instalasi Srinkler
a.
b.
c.
d.
e.
f.
g.
h.
i.
Indicating Valve :
Diameter 80 mm
k.
Plat Orifice :
Diameter 80 mm
Diameter 50 mm
l.
m.
n.
NO.
URAIAN PEKERJAAN
E.
o.
RISER
2 Pipa di Shaft
a.
b.
50 mm ( Test )
40 mm ( Flusing )
2.2.
c.
d.
b.
c.
d.
e.
f.
g.
Drain
h.
b.
NO.
URAIAN PEKERJAAN
c.
d.
e.
f.
g.
h.
i.
c.
d.
Dran
e.
16" x 10 "
a.
14" x 10 "
a.
14" x 8 "
a.
12" x 8 "
b.
10" x 10 "
c.
10" x 8 "
d.
8" x 8 "
e.
8" x 6 "
f.
6" x 6 "
g.
Hood
h.
i.
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
Pekerjaan Unit AC
1 Single Split ( IU + OU ) Wall type
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
Dran
n.
16" x 10 "
b.
14" x 10 "
c.
14" x 8 "
d.
12" x 8 "
e.
10" x 8 "
f.
8" x 8 "
g.
8" x 6 "
h.
6" x 6 "
Pek. Gedung J (IRNA Utama) - page 994 of 2419
NO.
URAIAN PEKERJAAN
C.
i.
Hood
j.
k.
LEVEL 2
Pekerjaan Unit AC
1.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
Dran
n.
16" x 10 "
b.
14" x 10 "
c.
14" x 8 "
d.
12" x 8 "
Pek. Gedung J (IRNA Utama) - page 995 of 2419
NO.
URAIAN PEKERJAAN
D.
e.
10" x 8 "
f.
8" x 8 "
g.
8" x 6 "
h.
6" x 6 "
i.
Hood
j.
k.
LEVEL 3
Pekerjaan Unit AC
1.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
Dran
n.
NO.
URAIAN PEKERJAAN
1 Ducting Exhaust
2.3.
a.
16" x 10 "
b.
14" x 10 "
c.
14" x 8 "
d.
12" x 8 "
e.
10" x 8 "
f.
8" x 8 "
g.
8" x 6 "
h.
6" x 6 "
i.
Hood
j.
k.
PEKERJAAN ELEVATOR
1 Hospital Bed Elevator ( No, & No.2 )
a.
Kapasitas : 1000 Kg
b.
Kecepatan 30 Mpm
c.
Lintasan : 3 Lantai
2 Pemasangan
2.4.
GROUND FLOOR
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
Pek. Gedung J (IRNA Utama) - page 997 of 2419
NO.
URAIAN PEKERJAAN
e.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
d.
LEVEL 1
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
Pek. Gedung J (IRNA Utama) - page 998 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 10 mm
d.
LEVEL 2
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
d.
LEVEL 3
1 Instalasi Oxigen :
a.
b.
Pemipaan Tembaga :
- Diameter 32 mm ( di shaft )
Pek. Gedung J (IRNA Utama) - page 999 of 2419
NO.
URAIAN PEKERJAAN
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
d.
2 Instalasi Suction :
a.
b.
Pemipaan Tembaga :
- Diameter 25 mm
- Diameter 15 mm
- Diameter 10 mm
c.
Ball Valve :
- Diameter 25 mm
- Diameter 10 mm
d.
PERLENGKAPAN
1 Perlengkapan Outlet Oksigen
a.
b.
2.5.
a.
Suction Attachement
b.
Suction Jar
c.
Suction tubing
d.
Bacterial filter
GROUND FLOOR
1 Sentral
Pek. Gedung J (IRNA Utama) - page 1000 of 2419
NO.
URAIAN PEKERJAAN
a.
Blower Operatioan
b.
c.
d.
Control Sistem
- Panel Control
- Kabel
- Power Supply
b.
c.
d.
3 Instalasi sistem
4 Accessories & Alat Bantu
5 Testing & Commisioning
B.
LEVEL.1
1 Diverter & Instlalation
C.
a.
b.
c.
LEVEL.2
1 Diverter & Instlalation
D.
a.
b.
c.
LEVEL.3
1 Diverter & Instlalation
a.
NO.
III.
URAIAN PEKERJAAN
b.
c.
GROUND FLOOR
1 Rak Kabel
a.
b.
B.
a.
b.
c.
Lampu TL 2 x 36 W / Louvre M6
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
LEVEL 1
1 Rak Kabel
a.
b.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
NO.
URAIAN PEKERJAAN
C.
d.
e.
g.
h.
j.
Lampu TL 1 x 18 W / Balk
k.
l.
m.
n.
o.
p.
LEVEL 2
1 Rak Kabel
a.
b.
D.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
g.
h.
j.
Lampu TL 1 x 18 W / Balk
k.
l.
m.
n.
o.
p.
NO.
URAIAN PEKERJAAN
1 Rak Kabel
a.
b.
3.2.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
g.
h.
j.
Lampu TL 1 x 18 W / Balk
k.
l.
m.
n.
o.
p.
PEKERJAAN UPS
A.
GROUND FLOOR
1.
Portable UPS,
a.
B.
LEVEL 1
1 Portable UPS,
a.
C.
LEVEL 2
1 Portable UPS,
a.
NO.
URAIAN PEKERJAAN
D.
LEVEL 3
1 Portable UPS,
a.
3.3.
IV.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
1 Sentral Telephone
a.
b.
c.
2 Instalasi
B.
a.
TB-T GF ( 30 Pairs )
b.
c.
d.
e.
LEVEL 1
1 Instalsi
a.
TB-T ( 30 Pairs )
b.
c.
d.
e.
NO.
URAIAN PEKERJAAN
C.
LEVEL 2
1 Instalsi
D.
a.
TB-T ( 30 Pairs )
b.
c.
d.
e.
LEVEL 3
1 Instalsi
4.2.
a.
TB-T ( 30 Pairs )
b.
c.
d.
e.
GROUND FLOOR
1 Instalasi
a.
MDF' - J
b.
TB.F- GF
c.
d.
ROR
e.
f.
Smoke Detector
g.
h.
Bell Alarm
j.
Indicator Lamp
l.
Flow Switch
m.
Titik instalasi :
Pek. Gedung J (IRNA Utama) - page 1006 of 2419
NO.
URAIAN PEKERJAAN
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
LEVEL 1
1 Instalasi
a.
TB.F- 1
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
C.
LEVEL 2
1 Instalasi
a.
TB.F- 2
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
D.
LEVEL 3
Pek. Gedung J (IRNA Utama) - page 1007 of 2419
NO.
URAIAN PEKERJAAN
1 Instalasi
a.
TB.F- 3
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
4.3.
GROUND FLOOR
1 Sentral Tata Suara
a.
b.
c.
d.
Autorserve Cassete
e.
CD / DVD/MP3 - Playaer
f.
Microphone
g.
Equalizer
h.
i.
Cabinet Rack
2 Instalasi
a.
MDF
b.
TB-S.GF
c.
d.
e.
Volume Control
f.
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Instalasi
C.
a.
TB-1
b.
c.
d.
Volume Control
e.
LEVEL 2
1 Instalasi
D.
a.
TB-S 2
b.
c.
d.
Volume Control
e.
LEVEL 3
1 Instalasi
4.4.
a.
TB-S 2
b.
c.
d.
Volume Control
e.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Sentral MATV
a.
b.
c.
d.
Activ Combiner
Pek. Gedung J (IRNA Utama) - page 1009 of 2419
NO.
URAIAN PEKERJAAN
e.
f.
Spliter 4 way
g.
h.
i.
TV Monitor
j.
CD Player
k.
l.
Coaxial Cable
2 Instalasi
B.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 1
1 Instalasi
C.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 2
1 Instalasi
D.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
LEVEL 3
1 Instalasi
4.5.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
NO.
URAIAN PEKERJAAN
A.
GROUND FLOOR
1 Peralatan Utama
a.
b.
2 Instalasi
B.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 1
1 Instalasi
C.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 2
1 Instalasi
D.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 3
1 Instalasi
4.6.
a.
b.
c.
SocketData ( RG-45 )
d.
PEKERJAAN CCTV
Pek. Gedung J (IRNA Utama) - page 1011 of 2419
NO.
URAIAN PEKERJAAN
A.
B.
GROUND FLOOR
1 Fixed Dome Camer
2 Instalasi Camera
C.
LEVEL 1
1 Fixed Dome Camer
2 Instalasi Camera
D.
LEVEL 2
1 Fixed Dome Camer
2 Instalasi Camera
E.
LEVEL 3
1 Fixed Dome Camer
2 Instalasi Camera
AYA
ANAN UNGGULAN/IRNA UTAMA)
ENGGARA BARAT
TU DAN JENDELA
N LAIN-LAIN
JUMLAH I.
JUMLAH II.
JUMLAH III.
JUMLAH IV.
TOTAL PEK. NON ST
SAT
2
VOLUME
3
GAN DINDING
pital Skirting
l Guard
covering
rack+Gordeng
gan Cover Garda Pintu Lift
gan Granite Garda Pintu Lift
pital Skirting
l Guard
rack+Gordeng
gan Cover Garda Pintu Lift
gan Granite Garda Pintu Lift
pital Skirting
l Guard
rack+Gordeng
gan Cover Garda Pintu Lift
gan Granite Garda Pintu Lift
pital Skirting
l Guard
rack+Gordeng
gan Cover Garda Pintu Lift
gan Granite Garda Pintu Lift
m1
m1
m1
m
m1
m
m
472.2608385
280.41
56.539
197.705
19
2.178036
8.976656
m1
m1
m1
m1
m
m
523.1232
393.58
85.1
99.2
2.178036
8.976656
m1
m1
m1
m1
m
m
523.1232
393.58
85.1
140.8
2.178036
8.976656
m1
m1
m1
m1
m
m
523.1232
393.58
85.1
140.8
2.178036
8.976656
SAT
VOLUME
TU DAN JENDELA
unit
unit
unit
m2
m2
unit
unit
unit
unit
m2
m2
unit
unit
unit
unit
4
8
1
84.15
22.95
2
8
1
1
64.09
42.84
2
8
1
1
m2
21.42
unit
unit
unit
unit
m2
2
8
1
1
0
21.42
m
m
m
m
m
95.5903651576
19.1180730315
9.5590365158
95.5903651576
95.5903651576
bh
53
N LAIN-LAIN
EA DROP OFF
SAT
bh
VOLUME
13
bh
bh
46
20
bh
bh
46
20
bh
bh
46
20
unit
u+aksesories
ation P.8.3 m
unit
u+aksesories
nistrasi P.4.7 m
unit
u+aksesories
ah Wastafel P.1.1 m
unit
10
u+aksesories
. VVIP+Zink dan aksesories
unit
unit
u+aksesories
ation P.8.3 m
unit
u+aksesories
nistrasi P.4.7 m
unit
u+aksesories
u+aksesories
ah Wastafel P.1.1 m
SAT
VOLUME
unit
18
unit
u+aksesories
ation P.8.3 m
unit
u+aksesories
nistrasi P.4.7 m
unit
unit
18
unit
u+aksesories
ation P.8.3 m
unit
u+aksesories
nistrasi P.4.7 m
unit
unit
18
u+aksesories
u+aksesories
ah Wastafel P.1.1 m
u+aksesories
u+aksesories
ah Wastafel P.1.1 m
u+aksesories
SAT
VOLUME
Set
l Valve, diameter 65 mm :
Bh
Bh
102
Sch.40 diameter 65 mm
10
Ls
30
110
Ls
Unit
sse Connebtion
Unit
Bh
Bh
54
hedule 40 , diameter 80 mm
14
hedule 40 , diameter 65 mm
10
hedule 40 , diameter 50 mm
hedule 40 , diameter 40 mm
12
hedule 40 , diameter 32 mm
95
hedule 40 , diameter 25 mm
145
Bh
Bh
73
ter 80 mm
Bh
ter 80 mm
Bh
ter 100 mm
ing Valve :
SAT
VOLUME
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
16
an Bantu ( Fitting-Fitting )
Ls
44
hedule 40 , diameter 80 mm
14
hedule 40 , diameter 65 mm
10
hedule 40 , diameter 50 mm
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
72
hedule 40 , diameter 25 mm
131
Bh
Bh
63
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
Flow Switch
ng Valve Diameter 40 mm
ter 100 mm
ing Valve :
SAT
VOLUME
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
16
an Bantu ( Fitting-Fitting )
Ls
44
hedule 40 , diameter 80 mm
14
hedule 40 , diameter 65 mm
10
hedule 40 , diameter 50 mm
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
72
hedule 40 , diameter 25 mm
131
Bh
Bh
63
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Flow Switch
ng Valve Diameter 40 mm
ter 100 mm
ing Valve :
SAT
VOLUME
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Bh
Bh
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
16
an Bantu ( Fitting-Fitting )
Ls
44
hedule 40 , diameter 80 mm
14
hedule 40 , diameter 65 mm
10
hedule 40 , diameter 50 mm
hedule 40 , diameter 40 mm
hedule 40 , diameter 32 mm
72
hedule 40 , diameter 25 mm
131
Bh
Bh
63
ter 80 mm
Bh
ter 80 mm
Bh
ter 50 mm
Bh
lve Diameter 50 mm
Bh
Valve Diameter 50 mm
Bh
Glass Diameter 50 mm
Bh
Flow Switch
ng Valve Diameter 40 mm
ter 100 mm
ing Valve :
SAT
Flow Switch
ng Valve Diameter 40 mm
VOLUME
Bh
Bh
Ls
40
20
Sch.40 diameter
50 mm ( Test )
20
Sch.40 diameter
40 mm ( Flusing )
20
ameter 100 mm
Bh
ameter 50 mm
Bh
ameter 40 mm
Bh
Bh
Ls
U + OU ) Cassete type
100
30
90
U + OU ) Wall type
Unit
Unit
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
Unit
288
96
288
Unit
Unit
Unit
11
195
17
18
42
Bh
Bh
14
Bh
SAT
VOLUME
U + OU ) Wall type
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
396
132
396
Unit
Unit
Unit
16
270
18
46
21
SAT
VOLUME
Bh
Bh
14
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
396
132
396
Unit
Unit
Unit
16
270
U + OU ) Wall type
SAT
VOLUME
18
46
21
Bh
Bh
14
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
396
132
396
Unit
Unit
Unit
16
U + OU ) Wall type
270
SAT
VOLUME
18
46
21
Bh
Bh
14
Bh
Unit
Unit
Bh
meter 32 mm
25
meter 25 mm
34
meter 15 mm
16
meter 10 mm
74
meter 25 mm
Bh
meter 10 mm
Bh
Kapasitas : 1000 Kg
Kecepatan 30 Mpm
Lintasan : 3 Lantai
aan Tembaga :
SAT
VOLUME
an Bantu ( Fitting )
Ls
Bh
meter 32 mm
25
meter 25 mm
34
meter 15 mm
16
meter 10 mm
74
meter 25 mm
Bh
meter 10 mm
Bh
Ls
Unit
Bh
Bh
22
meter 25 mm
22
meter 15 mm
80
meter 10 mm
136
meter 25 mm
Bh
meter 10 mm
Bh
16
an Bantu ( Fitting )
Ls
Bh
22
meter 25 mm
22
meter 15 mm
80
meter 10 mm
136
meter 25 mm
Bh
aan Tembaga :
an Bantu ( Fitting )
aan Tembaga :
aan Tembaga :
meter 10 mm
an Bantu ( Fitting )
SAT
VOLUME
Bh
16
Ls
Unit
Bh
22
Bh
22
meter 25 mm
22
meter 15 mm
80
meter 10 mm
136
meter 25 mm
Bh
meter 10 mm
Bh
16
an Bantu ( Fitting )
Ls
Bh
22
meter 25 mm
22
meter 15 mm
80
meter 10 mm
136
meter 25 mm
Bh
meter 10 mm
Bh
16
Ls
Unit
aan Tembaga :
aan Tembaga :
an Bantu ( Fitting )
Bh
22
Bh
22
16
aan Tembaga :
meter 32 mm ( di shaft )
SAT
VOLUME
meter 25 mm
22
meter 15 mm
80
meter 10 mm
136
meter 25 mm
Bh
meter 10 mm
Bh
16
an Bantu ( Fitting )
Ls
Bh
22
meter 25 mm
22
meter 15 mm
80
meter 10 mm
136
meter 25 mm
Bh
meter 10 mm
Bh
16
Ls
Unit
aan Tembaga :
an Bantu ( Fitting )
Bh
22
Outlet Oksigen
Ls
Ls
Outlet Vacuum
n Attachement
SAT
Operatioan
VOLUME
Set
Unit
Unit
Set
er Horizontal ( DV-H )
Unit
Unit
47
10
d Absorber
Ls
Ls
Ls
er Horizontal ( DV-H )
Unit
Unit
Alat Bantu
mmisioning
30
er Horizontal ( DV-H )
Unit
Unit
er Horizontal ( DV-H )
Unit
33
SAT
VOLUME
Unit
37
65
65
Bh
24
Bh
16
TL 2 x 36 W / Louvre M6
Bh
TL 2 x 36 W / Louvre M6 + battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / IP-20 / Balk
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
10
Bh
Bh
53
Bh
24
Bh
Bh
17
65
65
TL 2 x 36 W / Louvre M6
Bh
TL 2 x 36 W / Louvre m6 + battere
Bh
Bh
16
SAT
VOLUME
Bh
17
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / Balk
Bh
Bh
18
Bh
16
Bh
42
Bh
11
Bh
Bh
23
65
65
TL 2 x 36 W / Louvre M6
Bh
TL 2 x 36 W / Louvre m6 + battere
Bh
Bh
16
Bh
17
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / Balk
Bh
Bh
18
Bh
16
Bh
42
Bh
11
Bh
Bh
23
SAT
VOLUME
65
65
TL 2 x 36 W / Louvre M6
Bh
TL 2 x 36 W / Louvre m6 + battere
Bh
Bh
16
Bh
17
Bh
18
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 36 W / Dust Proof
Bh
TL 1 x 18 W / Balk
Bh
Bh
18
Bh
16
Bh
42
Bh
11
Bh
Bh
23
Unit
Unit
Unit
SAT
VOLUME
Unit
Bh
25
Ttk
Commisioning
Ls
12 / 100 Extention
Unit
Unit
Lot
F ( 30 Pairs )
Bh
20
Bh
23
Ttk
23
et analog
Ttk
23
Bh
24
Bh
26
Ttk
26
et analog
Bh
26
g & Commisioning
Telephone ( RJ-11 )
SAT
VOLUME
Bh
24
Bh
26
Ttk
26
et analog
Bh
26
Bh
24
Bh
26
Ttk
26
et analog
Bh
26
Unit
Unit
30
Bh
50
Bh
Bh
Bh
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
SAT
dari CTB-A ke TB F 1A
VOLUME
Unit
64
Unit
34
Bh
42
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
52
Temperature Detector
Detector
l Breack Glass
unit
34
Bh
42
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
49
Temperature Detector
Detector
l Breack Glass
SAT
unit
VOLUME
1
34
Bh
42
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
49
0 W Power Amplifier
Unit
0 W Power Amplifier
Unit
Tunner AM/FM
Unit
erve Cassete
Unit
VD/MP3 - Playaer
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Temperature Detector
Detector
l Breack Glass
Frame w/ Module
20
Bh
43
Bh
12
Ttk
43
SAT
VOLUME
Bh
34
Bh
40
Bh
17
Ttk
40
Bh
34
Bh
40
Bh
17
Ttk
57
Bh
34
Bh
40
Bh
17
Ttk
57
Unit
Unit
Unit
Unit
SAT
VOLUME
Unit
Unit
Unit
nd Amplifier ( Booster )
Unit
Unit
Unit
Unit
t Rack 19 ( 1,8 M)
TV ( RCA )
TV ( RCA )
TV ( RCA )
TV ( RCA )
100
Bh
Bh
18
Ttk
18
Bh
Bh
23
Ttk
23
Bh
Bh
23
Ttk
23
Bh
Bh
23
Ttk
23
SAT
VOLUME
rame ( Server )
Set
Unit
Unit
20
Data ( RG-45 )
Bh
16
Ttk
16
Unit
24
Data ( RG-45 )
Bh
10
Ttk
10
Unit
28
Data ( RG-45 )
Bh
10
Ttk
10
Unit
28
Data ( RG-45 )
Bh
10
Ttk
10
SAT
VOLUME
AN INSTALASI CCTV
with Printer
Set
Unit
Set
Set
Unit
Set
Unit
Ttk
Unit
Ttk
Unit
Ttk
Unit
Ttk
JUMLAH HARGA
6=4X5
1281663555.96676
176658249.24
240136846.615348
1698458651.82211
466039896.998667
1686825628.432
926600000
393424811.9648
1269162500
4742052837.39547
363158247.6
397936000
13436931.2
774531178.8
109432033.12
67448005.2
93961908.1133333
58190997.0666667
27142556.6866667
77071986
433247486.186667
7648290154.20424
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
76590
502950
578710
398210
302890
67932
265410
36170457.620715
141032209.5
32719684.69
78728108.05
5754910
147958.341552
2382494.26896
0
0
76590
502950
578710
302890
67932
265410
40066005.888
197951061
49248221
30046688
147958.341552
2382494.26896
0
0
76590
502950
578710
302890
67932
265410
40066005.888
197951061
49248221
42646912
147958.341552
2382494.26896
0
0
76590
502950
578710
302890
67932
265410
JUMLAH 1.1.PEKERJA
40066005.888
197951061
49248221
42646912
147958.341552
2382494.26896
1281663555.96676
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3011602.275
1714766.625
5162812.875
221314.5
221314.5
3011602.275
1714766.625
2964394.125
6921547.875
221314.5
221314.5
3011602.275
1714766.625
2964394.125
6921547.875
221314.5
3011602.275
1714766.625
2964394.125
6921547.875
221314.5
JUMLAH 1.2.PEKERJA
12046409.1
13718133
5162812.875
0
18623615.175
5079167.775
0
0
6023204.55
13718133
2964394.125
6921547.875
0
14184046.305
9481113.18
0
0
6023204.55
13718133
2964394.125
6921547.875
0
4740556.59
0
0
6023204.55
13718133
2964394.125
6921547.875
0
4740556.59
176658249.24
103630
104040
113220
10098
8044.74
9906029.54127698
1989044.31819832
1082274.11431379
965271.507360948
768999.634197555
450202.5
23860732.5
Pek. Gedung J (IRNA Utama) - page 1045 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
525937.5
6837187.5
450202.5
525937.5
20709315
10518750
450202.5
525937.5
20709315
10518750
450202.5
525937.5
20709315
10518750
1704037.5
1704037.5
5238337.5
5238337.5
2966287.5
2966287.5
694237.5
6942375
631125
1262250
1704037.5
1704037.5
5238337.5
10476675
2966287.5
2966287.5
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
694237.5
12496275
1704037.5
1704037.5
5238337.5
10476675
2966287.5
2966287.5
694237.5
12496275
1704037.5
1704037.5
5238337.5
10476675
2966287.5
2966287.5
694237.5
12496275
JUMLAH 1.3.PEKERJAA
240136846.615348
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
3546400
313351.573333333
31961860.48
155862.666666667
1558626.66666667
11732170.5013333
11732170.5013333
313351.573333333
9400547.2
313351.573333333
34468673.0666667
15354227.0933333
15354227.0933333
114532.733333333
114532.733333333
1375680
1375680
253459.066666667
253459.066666667
296221.2
296221.2
313351.573333333
16920984.96
191779.133333333
2684907.86666667
155862.666666667
1558626.66666667
135534.666666667
813208
693195.8
8318349.6
104496.92
9927207.4
52457.24
7606299.8
253459.066666667
253459.066666667
271058.333333333
19787258.3333333
228369.533333333
228369.533333333
136215.933333333
136215.933333333
Pek. Gedung J (IRNA Utama) - page 1048 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
14348875.288
14348875.288
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
2364266.66666667
155862.666666667
2493802.66666667
498760.533333333
498760.533333333
313351.573333333
13787469.2266667
191779.133333333
2684907.86666667
155862.666666667
1558626.66666667
135534.666666667
813208
693195.8
2772783.2
104496.92
7523778.24
52457.24
6871898.44
253459.066666667
253459.066666667
271058.333333333
17076675
228369.533333333
228369.533333333
136215.933333333
136215.933333333
114532.733333333
114532.733333333
Pek. Gedung J (IRNA Utama) - page 1049 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
10803801.492
10803801.492
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
2364266.66666667
155862.666666667
2493802.66666667
498760.533333333
498760.533333333
313351.573333333
13787469.2266667
191779.133333333
2684907.86666667
155862.666666667
1558626.66666667
135534.666666667
813208
693195.8
2772783.2
104496.92
7523778.24
52457.24
6871898.44
253459.066666667
253459.066666667
271058.333333333
17076675
228369.533333333
228369.533333333
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
Pek. Gedung J (IRNA Utama) - page 1050 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
177567.866666667
177567.866666667
174944
174944
361049.04
361049.04
147057.533333333
294115.066666667
10803801.492
10803801.492
1108800
2217600
201283.866666667
402567.733333333
591066.666666667
3546400
155862.666666667
2493802.66666667
498760.533333333
498760.533333333
313351.573333333
13787469.2266667
191779.133333333
2684907.86666667
155862.666666667
1558626.66666667
135534.666666667
813208
693195.8
2772783.2
104496.92
7523778.24
52457.24
6871898.44
253459.066666667
253459.066666667
271058.333333333
17076675
228369.533333333
228369.533333333
136215.933333333
136215.933333333
114532.733333333
114532.733333333
177567.866666667
177567.866666667
177567.866666667
177567.866666667
174944
174944
Pek. Gedung J (IRNA Utama) - page 1051 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
361049.04
361049.04
147057.533333333
294115.066666667
10803801.492
10803801.492
313351.573333333
12534062.9333333
313351.573333333
6267031.46666667
135534.666666667
2710693.33333333
693195.8
13863916
253459.066666667
506918.133333333
177567.866666667
177567.866666667
147057.533333333
147057.533333333
107800
107800
10612711.12
10612711.12
466039896.998667
18485588
18485588
18485588
18485588
18485588
18485588
10730456
10730456
10730456
10730456
170503.813333333
17050381.3333333
108605.053333333
3258151.6
21009.2666666667
1890834
3900248
3900248
7872440.84
15744881.68
Pek. Gedung J (IRNA Utama) - page 1052 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3900248
11700744
7872440.84
7872440.84
5528825.72
5528825.72
3900248
7800496
7872440.84
31489763.36
3900248
3900248
7872440.84
7872440.84
170503.813333333
49105098.24
108605.053333333
10426085.12
11827.2
3406233.6
751700.986666667
751700.986666667
55666.6666666667
55666.6666666667
1169102.58666667
12860128.4533333
6591.2
1285284
2821982.592
5643965.184
2604907.008
10419628.032
2387831.424
4775662.848
2170755.84
2170755.84
2170755.84
2170755.84
1953680.256
3907360.512
1736604.672
29522279.424
1519529.088
27351523.584
1302453.504
54703047.168
445984
445984
874998.74
12249982.36
945435.26
945435.26
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7872440.84
31489763.36
3900248
3900248
3900248
3900248
7872440.84
39362204.2
5528825.72
5528825.72
3900248
7800496
7872440.84
31489763.36
3900248
3900248
7872440.84
7872440.84
5528825.72
5528825.72
7872440.84
7872440.84
170503.813333333
67519510.08
108605.053333333
14335867.04
11827.2
4683571.2
751700.986666667
751700.986666667
55666.6666666667
55666.6666666667
1169102.58666667
18705641.3866667
6591.2
1779624
2821982.592
5643965.184
2604907.008
5209814.016
2387831.424
2387831.424
2170755.84
2170755.84
1953680.256
5861040.768
1736604.672
31258884.096
1519529.088
69898338.048
1302453.504
27351523.584
Pek. Gedung J (IRNA Utama) - page 1054 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
445984
445984
874998.74
12249982.36
945435.26
945435.26
7872440.84
31489763.36
3900248
3900248
3900248
3900248
7872440.84
39362204.2
5528825.72
5528825.72
3900248
7800496
7872440.84
31489763.36
3900248
3900248
7872440.84
7872440.84
5528825.72
5528825.72
7872440.84
7872440.84
170503.813333333
67519510.08
108605.053333333
14335867.04
11827.2
4683571.2
751700.986666667
751700.986666667
55666.6666666667
55666.6666666667
1169102.58666667
18705641.3866667
6591.2
1779624
2821982.592
5643965.184
2604907.008
5209814.016
2387831.424
2387831.424
2170755.84
2170755.84
Pek. Gedung J (IRNA Utama) - page 1055 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1953680.256
5861040.768
1736604.672
31258884.096
1519529.088
69898338.048
1302453.504
27351523.584
445984
445984
874998.74
12249982.36
945435.26
945435.26
7872440.84
31489763.36
3900248
3900248
3900248
3900248
7872440.84
39362204.2
5528825.72
5528825.72
3900248
7800496
7872440.84
31489763.36
3900248
3900248
7872440.84
7872440.84
5528825.72
5528825.72
7872440.84
7872440.84
170503.813333333
67519510.08
108605.053333333
14335867.04
11827.2
4683571.2
751700.986666667
751700.986666667
55666.6666666667
55666.6666666667
1169102.58666667
18705641.3866667
6591.2
1779624
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2821982.592
5643965.184
2604907.008
5209814.016
2387831.424
2387831.424
2170755.84
2170755.84
1953680.256
5861040.768
1736604.672
31258884.096
1519529.088
69898338.048
1302453.504
27351523.584
445984
445984
874998.74
12249982.36
945435.26
945435.26
1686825628.432
454300000
908600000
18000000
18000000
926600000
1001000
8008000
45542.0533333333
1138551.33333333
39281.0293333333
1335554.99733333
23097.4
369558.4
17787.2533333333
1316256.74666667
101658.333333333
101658.333333333
52193.5333333333
417548.266666667
Pek. Gedung J (IRNA Utama) - page 1057 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
604274.0288
604274.0288
1001000
8008000
45542.0533333333
1138551.33333333
39281.0293333333
1335554.99733333
23097.4
369558.4
17787.2533333333
1316256.74666667
101658.333333333
101658.333333333
52193.5333333333
417548.266666667
568732.946133333
568732.946133333
999152
999152
2500000
20000000
1001000
22022000
45542.0533333333
1001925.17333333
23097.4
1847792
17787.2533333333
2419066.45333333
62357.5333333333
62357.5333333333
52193.5333333333
835096.533333333
1053756.72533333
1053756.72533333
1001000
22022000
39281.0293333333
864182.645333333
23097.4
1847792
17787.2533333333
2419066.45333333
62357.5333333333
62357.5333333333
Pek. Gedung J (IRNA Utama) - page 1058 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
52193.5333333333
835096.533333333
1026208.21973333
1026208.21973333
999152
999152
2500000
55000000
1001000
22022000
45542.0533333333
1001925.17333333
23097.4
1847792
17787.2533333333
2419066.45333333
62357.5333333333
62357.5333333333
52193.5333333333
835096.533333333
1053756.72533333
1053756.72533333
1001000
22022000
39281.0293333333
864182.645333333
23097.4
1847792
17787.2533333333
2419066.45333333
62357.5333333333
62357.5333333333
52193.5333333333
835096.533333333
1026208.21973333
1026208.21973333
999152
999152
2500000
55000000
1001000
22022000
51710.464
827367.424
Pek. Gedung J (IRNA Utama) - page 1059 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
45542.0533333333
1001925.17333333
23097.4
1847792
17787.2533333333
2419066.45333333
62357.5333333333
62357.5333333333
52193.5333333333
835096.533333333
1053756.72533333
1053756.72533333
1001000
22022000
39281.0293333333
864182.645333333
23097.4
1847792
17787.2533333333
2419066.45333333
62357.5333333333
62357.5333333333
52193.5333333333
835096.533333333
1026208.21973333
1026208.21973333
999152
999152
2500000
55000000
1093400
1093400
1004080
1004080
393424811.9648
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
141240000
141240000
110000000
110000000
27500000
27500000
38500000
38500000
27500000
55000000
59400000
178200000
1017500
47822500
925000
9250000
82500000
82500000
33000000
33000000
5500000
5500000
27500000
27500000
59400000
118800000
1017500
30525000
27500000
27500000
59400000
118800000
1017500
33577500
27500000
27500000
Pek. Gedung J (IRNA Utama) - page 1061 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
59400000
118800000
1017500
37647500
1269162500
326872.883333333
21246737.4166667
258096.483333333
16776271.4166667
212533.333333333
5100800
474744.533333333
7595912.53333333
136889.866666667
1095118.93333333
377847.733333333
2644934.13333333
132146.666666667
396440
372017.066666667
2232102.4
117917.066666667
117917.066666667
89519.4666666667
537116.8
89519.4666666667
895194.666666667
89519.4666666667
716155.733333333
272409.866666667
14437722.9333333
517701.066666667
12424825.6
340169.866666667
340169.866666667
516345.866666667
8777879.73333333
326872.883333333
21246737.4166667
258096.483333333
16776271.4166667
136889.866666667
821339.2
377847.733333333
2644934.13333333
212533.333333333
3400533.33333333
Pek. Gedung J (IRNA Utama) - page 1062 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
474744.533333333
8070657.06666667
132146.666666667
264293.333333333
372017.066666667
2232102.4
117917.066666667
117917.066666667
89519.4666666667
358077.866666667
89519.4666666667
1611350.4
89519.4666666667
1432311.46666667
272409.866666667
11441214.4
517701.066666667
5694711.73333333
581127.733333333
581127.733333333
516345.866666667
11875954.9333333
326872.883333333
21246737.4166667
258096.483333333
16776271.4166667
136889.866666667
821339.2
377847.733333333
2644934.13333333
212533.333333333
3400533.33333333
474744.533333333
8070657.06666667
132146.666666667
264293.333333333
372017.066666667
2232102.4
117917.066666667
117917.066666667
89519.4666666667
358077.866666667
89519.4666666667
1611350.4
89519.4666666667
1432311.46666667
272409.866666667
11441214.4
517701.066666667
5694711.73333333
581127.733333333
581127.733333333
516345.866666667
11875954.9333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
326872.883333333
21246737.4166667
258096.483333333
16776271.4166667
136889.866666667
821339.2
377847.733333333
2644934.13333333
212533.333333333
3400533.33333333
474744.533333333
8070657.06666667
132146.666666667
2378640
372017.066666667
2232102.4
117917.066666667
117917.066666667
89519.4666666667
358077.866666667
89519.4666666667
1611350.4
89519.4666666667
1432311.46666667
272409.866666667
11441214.4
517701.066666667
5694711.73333333
581127.733333333
581127.733333333
516345.866666667
11875954.9333333
363158247.6
36036000
36036000
89628000
89628000
136136000
136136000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
136136000
JUMLAH 3.2.PEKERJAAN UPS
136136000
397936000
8377600
8377600
174944
349888
50512
1262800
1694000
1694000
1752643.2
1752643.2
13436931.2
10875920
10875920
389840
389840
2500000
2500000
211521.2
211521.2
25752.4666666667
515049.333333333
201415.5
4632556.5
498793.386666667
11472247.8933333
215147.166666667
4948384.83333333
211521.2
211521.2
25752.4666666667
618059.2
201415.5
5236803
498793.386666667
12968628.0533333
215147.166666667
5593826.33333333
Pek. Gedung J (IRNA Utama) - page 1065 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
211521.2
211521.2
25752.4666666667
618059.2
201415.5
5236803
498793.386666667
12968628.0533333
215147.166666667
5593826.33333333
211521.2
211521.2
25752.4666666667
618059.2
201415.5
5236803
498793.386666667
12968628.0533333
215147.166666667
5593826.33333333
109432033.12
169400
169400
240240
240240
87472
2624160
74572.6666666667
3728633.33333333
77960.6666666667
155921.333333333
231775.866666667
1390655.2
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
160910.133333333
10298248.5333333
240240
240240
87472
2974048
74572.6666666667
3132052
77960.6666666667
155921.333333333
231775.866666667
231775.866666667
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
160910.133333333
8367326.93333333
240240
240240
87472
2974048
74572.6666666667
3132052
77960.6666666667
155921.333333333
231775.866666667
231775.866666667
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
160910.133333333
7884596.53333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
240240
240240
87472
2974048
74572.6666666667
3132052
77960.6666666667
155921.333333333
231775.866666667
231775.866666667
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
160910.133333333
7884596.53333333
67448005.2
6350677.66666667
6350677.66666667
3569807.26666667
3569807.26666667
742082
742082
948750
948750
609950
609950
815816.833333333
1631633.66666667
1956441.66666667
1956441.66666667
2413821.66666667
2413821.66666667
785400
785400
378840
378840
266112
266112
18849.6
376992
153993.766666667
6621731.96666666
258720
3104640
151320.106666667
6506764.58666667
Pek. Gedung J (IRNA Utama) - page 1068 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
266112
266112
18849.6
640886.4
153993.766666667
6159750.66666667
258720
4398240
151320.106666667
6052804.26666667
266112
266112
18849.6
640886.4
153993.766666667
6159750.66666667
258720
4398240
151320.106666667
8625246.08
266112
266112
18849.6
640886.4
153993.766666667
6159750.66666667
258720
4398240
151320.106666667
8625246.08
93961908.1133333
1940666.66666667
1940666.66666667
882381.866666667
882381.866666667
1338406.66666667
1338406.66666667
403318.666666667
403318.666666667
Pek. Gedung J (IRNA Utama) - page 1069 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
220366.666666667
220366.666666667
227069.333333333
227069.333333333
274120
274120
2864400
2864400
1047200
1047200
609950
609950
785400
785400
19712
1971200
227069.333333333
1362416
84736.6666666667
1525260
369236.266666667
6646252.8
227069.333333333
1589485.33333333
84736.6666666667
1948943.33333333
369236.266666667
8492434.13333333
227069.333333333
1589485.33333333
84736.6666666667
1948943.33333333
369236.266666667
8492434.13333333
227069.333333333
1589485.33333333
84736.6666666667
1948943.33333333
369236.266666667
8492434.13333333
58190997.0666667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Existing
229874.7
229874.7
271885.9
271885.9
21560
431200
15753.1
252049.6
498793.386666667
7980694.18666667
271885.9
271885.9
21560
517440
15753.1
157531
498793.386666667
4987933.86666667
271885.9
271885.9
21560
603680
15753.1
157531
498793.386666667
4987933.86666667
271885.9
271885.9
21560
603680
15753.1
157531
498793.386666667
4987933.86666667
27142556.6866667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
10571000
10571000
306570
306570
8470220
42351100
1219900
1219900
1389300
1389300
396616
396616
2667500
5335000
1500000
3000000
2667500
2667500
1500000
1500000
2667500
2667500
1500000
1500000
2667500
2667500
1500000
1500000
77071986
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. DAK ATAP ( + 4,15 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PENGECATAN
3.6. PEKERJAAN SIGNAGE ROOM DAN LAIN-LAIN
IV.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
2.4.
NO.
URAIAN PEKERJAAN
2.5.
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
3.3.
1 Plapond exposed
3.4.
NO.
URAIAN PEKERJAAN
3.5. PEKERJAAN PENGECATAN
1 Pengecatan dinding dustrproff paint
2 Pengecatan plafond dustrproff paint
3 Pengecatan plint Int Semi Gloss
3.6.
IV.
1 ( satu ) Metering
1 ( satu ) Arester
2 Panel TR ( LVMDP - 1 )
3 Panel TR ( LVMDP - 2 )
4 Capasitor Bank 1., kapasitas : 600 Kvar
5 Capasitor Bank, 2.kapasitas : 600 Kvar
6 Trafo.1, kapasitas : 1250 Kva
7 Trafo.2, kapasitas : 1250 Kva
8 Grounding Sistem
4.2.
NO.
URAIAN PEKERJAAN
4.3.
PP/LP - M
b.
Saklar tunggal
c.
Saklar ganda
d.
4 Titik instalasi
a.
b.
IAYA
/ POWER HOUSE)
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
M DAN LAIN-LAIN
JUMLAH III.
/ POWER HOUSE)
TENGGARA BARAT
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
1
90
10
1
90
1
m3
m3
m3
m2
m3
300
60
63
150
60
m3
m3
m2
m3
m3
m3
62.4
43.68
190
18.72
23.07
11.535
m3
btg
m3
10.08
48
6.975
m3
kg
15.2
8.526
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
NGAN DINDING
ata ringan
aktis 12/12
ktis 12/12
NGAN LANTAI
or hardener
xposed
SAT
m3
m3
m3
m3
m3
m3
m2
m2
VOLUME
9.075
4.5
1.26
7.975
4.64
20.4
204
204
m2
m2
m2
m1
m1
m1
m1
m1
181.1
362.2
495.6
18.3
36.6
173.8
12.9
29
m2
m2
118.5
62.4
m2
154.5
unit
unit
2
1
unit
m1
2
23.6
00x2150)
00x2150)/ R. GENSET
llow 40 x 40
finishing cat duco
SAT
VOLUME
m
m
m1
495.6
154.5
76.85
bh
m1
bh
3
58
4
M DAN LAIN-LAIN
g bangunan U-ditc 20 x 30 cm
Unit
Unit
Unit
Unit
Unit
Unit
Titik
Unit
ke Pondasi
Unit
Unit
Unit
Unit
Ls
Unit
Unit
cle Incoming
cle Outgoing
n Flexible connection
SAT
VOLUME
40
Bh
22
Bh
Bh
00 W / 16A
Bh
10
Ttk
22
Ttk
10
JUMLAH HARGA
30812500
30812500
21873504
23280009.94375
99970582.54983
137490915.632308
438400936.785527
721015948.911415
55978302.7632125
11062913.7
4164624.75
43054658.941445
25402594.1736662
18700607.5
158363701.828324
1609058611.6
3825112500
21159875.8
5455330987.4
6365523138.13974
636552313.813974
7002075451.95371
7002075000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
1500000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
5400000
5672120
1000000
14740380
1500000
30812500
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
3216000
1570800
9900954
4908750
2277000
21873504
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
2998320
828828
6217750
234748.8
4028483.4
8971879.74375
23280009.94375
4543897.4246875
24000
7600874.05146667
JUMLAH 2.3.PEKERJAAN PONDA
45802486.04085
1152000
53016096.50898
99970582.54983
3087224.12682292
10622227.1762374
JUMLAH 2.4.LANTAI DASAR ( EL.
46925806.7277083
90565108.9046
137490915.632308
Pek. Gedung M1 (Genset/ Power House) - page 1084 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8609917.5496
9091515.74085334
10085647.6552857
7017439.7272
7178195.87695833
7143851.34558333
246240
104940
JUMLAH 2.5.DAK ATAP ( + 4,15
78135001.76262
40911820.83384
12707916.04566
55964081.82442
33306828.8690867
145734567.4499
50232960
21407760
438400936.785527
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
JUMLAH 3.1.PEKERJA
25661870
15284840
8474760
397110
135786
1960464
1237145.8023375
2826326.960875
55978302.7632125
38788.2
103630
JUMLAH 3.2.PEKERJA
4596401.7
6466512
11062913.7
26955.5
JUMLAH 3.3.PEKERJA
4164624.75
4164624.75
6921547.875
6921547.875
13843095.75
6921547.875
0
4236015.316445
18054000
0
2118007.6582225
765000
JUMLAH 3.4.PEKERJA
43054658.941445
Pek. Gedung M1 (Genset/ Power House) - page 1085 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
38430.833375
38430.833375
5448.39813375
JUMLAH 3.5.PEKERJA
450202.5
275000
350000
JUMLAH 3.6.PEKERJAA
111216050
19046321.02065
5937563.7564375
418709.396578687
25402594.1736662
1350607.5
15950000
1400000
18700607.5
111216050
0
0
0
0
90944836.4
90944836.4
84233886
84233886
86767269.6
86767269.6
86767269.6
86767269.6
568635650
568635650
568635650
568635650
1694000
11858000
1609058611.6
1623875000
3247750000
412500000
412500000
8910000
17820000
71500000
71500000
10560000
21120000
1072500
1072500
4400000
4400000
19250000
38500000
5225000
10450000
Pek. Gedung M1 (Genset/ Power House) - page 1086 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3825112500
11133262.8
11133262.8
0
21009.2666666667
840370.666666666
0
132146.666666667
2907226.66666667
29147.8
58295.6
31858.2
127432.8
36081.1
360811
0
170766.133333333
3756854.93333333
197562.133333333
1975621.33333333
21159875.8
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. DAK ATAP ( + 4,15 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PENGECATAN
3.6. PEKERJAAN SIGNAGE ROOM DAN LAIN-LAIN
IV.
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN SENTRAL GAS MEDIS
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
2.4.
NO.
URAIAN PEKERJAAN
1 PLAT LANTAI DASAR SD (t=8 cm) ( EL. - 0.05 M )
2 KOLOM TYPE K1 (30x30)
2.5.
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Canopi beton
3.3.
1 Plapond exposed
3.4.
NO.
URAIAN PEKERJAAN
3.5. PEKERJAAN PENGECATAN
1 Pengecatan dinding dustrproff paint
2 Pengecatan plafond dustrproff paint
3 Pengecatan plint Int Semi Gloss
3.6.
IV.
PEKERJAAN MEKANIKAL
4.1.
IAYA
DIS)
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
M DAN LAIN-LAIN
JUMLAH III.
JUMLAH IV.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
DIS)
TENGGARA BARAT
SAT
2
VOLUME
3
AS MEDIS)
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
ls
m'
m2
Ls
m'
Ls
1
120
20
1
120
1
m3
m3
m3
m2
m3
405
81
88.2
210
81
m3
m3
m2
m3
m3
m3
81.9
57.33
310
24.57
37.1575
18.57875
m3
btg
m3
13.23
63
12.825
NGAN DINDING
ata ringan
aktis 12/12
ktis 12/12
NGAN LANTAI
or hardener
xposed
SAT
m3
m3
m3
m3
m3
m3
m2
m2
VOLUME
24.8
7.308
4.2
5.94
3.78
25
250
250
m2
m2
m2
m1
m1
m1
m1
m1
m3
282.24
564.48
634.68
41.8
83.6
180.8
60.2
78
6.73602
m2
m2
198
106.56
m2
257.4
unit
unit
1
6
unit
15
00x2150)
SAT
VOLUME
m
m
m1
634.68
257.4
128.25
bh
m1
bh
7
89.4
4
gnifold 2 x 10 cylinders
Set
al Magnifold 2 x 6 cylinders
Set
Set
Set
Set
Set
m2
120
M DAN LAIN-LAIN
g bangunan U-ditc 20 x 30 cm
Ls
embaga dia. 32 mm
360
embaga dia. 32 mm
360
360
360
360
JUMLAH HARGA
43198080
43198080
30269715.6
36414914.2796875
163004749.26741
172991508.274658
407578671.275053
810259558.696809
117723646.586477
101915334
6938345.7
78462214.9983375
34982134.8978234
29136417.5
369158093.682638
241320429.44
241320429.44
1463936161.81945
146393616.181945
1610329778.00139
1610330000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
1500000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
7200000
11344240
1000000
19653840
1500000
43198080
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
4341600
2120580
13861335.6
6872250
3073950
30269715.6
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
3935295
1087836.75
10144750
308107.8
6488442.65
14450482.0796875
36414914.2796875
4838362.77833333
24000
7600874.05146667
JUMLAH 2.3.PEKERJAAN PONDA
64011539.55735
1512000
97481209.71006
163004749.26741
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3087224.12682292
13194902.8365421
JUMLAH 2.4.LANTAI DASAR ( EL.
76563158.3452083
96428349.92945
172991508.274658
9817433.4896
10413177.5138519
10079336.6526111
7143851.34558333
246240
104940
JUMLAH 2.5.DAK ATAP ( + 4,15
41233220.65632
61854274.43228
38099892.54687
178596283.639583
61560000
26235000
407578671.275053
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
3922839.091875
JUMLAH 3.1.PEKERJA
39993408
23821056
10853028
907060
310156
2039424
5773347.077575
7601844.92925
26424322.5796518
117723646.586477
38788.2
884340
JUMLAH 3.2.PEKERJA
7680063.6
94235270.4
101915334
26955.5
JUMLAH 3.3.PEKERJA
6938345.7
6938345.7
5162812.875
6921547.875
5162812.875
41529287.25
0
31770114.8733375
2118007.6582225
JUMLAH 3.4.PEKERJA
78462214.9983375
Pek. Gedung M2 (Gas Medis) - page 1098 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
38430.833375
38430.833375
5448.39813375
JUMLAH 3.5.PEKERJA
450202.5
275000
350000
JUMLAH 3.6.PEKERJAA
24391281.326445
9892096.510725
698757.060653437
34982134.8978234
3151417.5
24585000
1400000
29136417.5
9979200
9979200
7576800
7576800
5072760
5072760
2125200
2125200
1013320
1013320
199584
199584
200200
24024000
4999086.4
4999086.4
0
51710.464
18615767.04
199910.333333333
71967720
162642.333333333
58551240
52193.5333333333
18789672
51128
18406080
241320429.44
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. DAK ATAP ( + 4,20 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PASANGAN SANITER
3.6. PEKERJAAN PENGECATAN
IV.
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
4.3. PEKERJAAN AIR HUJAN
4.4. PEKERJAAN FIRE EXTINGUISHER
4.5. PEKERJAAN PENGKONDISIAN UDARA
V.
VI.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
A.
I.
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
III.
URAIAN PEKERJAAN
6 SLOOF TB2 20/35
2.4.
2.5.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint keramik 10 x 20 cm
10 Plint homogenius tile 10 x 60 cm cutting size
11 Border keramik 5 x 20 cm
12 Border keramik 20 x 40 cm
13 Dinding keramik 20 x 25 cm
14 Plint Hospital Skirting
3.3.
1 Plapond gypsum 9 mm
Pek. Gedung X (Bank Darah) - page 1103 of 2419
NO.
URAIAN PEKERJAAN
2 Plapond grc 9 mm
3 List plafond gypsum
3.4.
IV.
3.5.
3.6.
PEKERJAAN PENGECATAN
1 Pengecatan
2 Pengecetan
3 Pengecatan
4 Pengecatan
PEKERJAAN MEKANIKAL
4.1.
GV diameter 40 mm
PPR diameter 40 mm
Pek. Gedung X (Bank Darah) - page 1104 of 2419
NO.
URAIAN PEKERJAAN
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
4.2.
c.
CO diameter 100 mm
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
e.
CO diameter 65 mm
f.
CO diameter 50 mm
PVC diameter 32 mm
b.
PVC diameter 25 mm
4.3.
RD diameter 100 mm
NO.
URAIAN PEKERJAAN
4.4.
4.5.
V.
Drain
PP/LP - X
2 Kabel Feeder
a.
5.2.
Saklar tunggal
b.
Saklar ganda
c.
d.
2 Titik instalasi
a.
b.
NO.
URAIAN PEKERJAAN
5.3.
VI.
a.
Lampu TL 2 x 36 W / Louvre M6
PEKERJAAN TELEPHONE
1 Instalasi
a.
b.
c.
YA
H)
NGGARA BARAT
JUMLAH I.
JUMLAH II.
U DAN JENDELA
JUMLAH III.
JUMLAH IV.
EL FEEDER
DAYA DAN PENERANGAN
FIXTURE ARMATUR PENERANGAN
JUMLAH V.
JUMLAH VI.
H)
NGGARA BARAT
g tanah sedalam 20 cm
R 4 + test ( 10 ttk)
ping dan Grubbing Keluar Proyek
2 1,00X3,00X0.40 -5 unit
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
80
20
1
80
1
1
m3
m3
m3
m2
m3
225
45
75.6
180
45
m3
m3
m2
m3
m3
m3
56.55
39.585
125
16.965
17.868
8.934
m3
btg
m3
btg
m3
2.835
13.5
6.3
30
7.655625
GAN DINDING
ata ringan
SAT
m3
VOLUME
4.8405
m3
m3
10
9.2365
m3
m3
m3
m3
m2
m2
4.125
4.471875
2.28
14
140
140
aktis 12/12
ktis 12/12
mik 10 x 20 cm
ogenius tile 10 x 60 cm cutting size
ramik 5 x 20 cm
ramik 20 x 40 cm
eramik 20 x 25 cm
pital Skirting
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
420.829
841.658
841.658
76.35
152.7
305.4
57.2
19.15
10.75
46.2
11.5
10.75
129.50525
74.6425
GAN LANTAI
mogenius tile 60 x 60 cm
ramik 20 x 20 cm
m2
m2
109.6306
3.4
gypsum 9 mm
m2
109.6306
grc 9 mm
nd gypsum
SAT
VOLUME
m2
m1
3.4
153.25
unit
unit
unit
unit
unit
unit
2
1
1
3
1
4
unit
unit
unit
2
4
1
set
set
m
bh
bh
set
bh
bh
2
5
5
2
2
2
2
2
m
m
m
m1
265.10975
205.09
113.0306
153.25
Bh
U DAN JENDELA
ne PN.10 :
SAT
ng-Fitting )
elas 10 kg/cm
VOLUME
12
28
45
Ls
Unit
Unit
:
m
38
Bh
16
20
12
Bh
Bh
Bh
20
20
ng-Fitting )
Ls
Bh
ameter 100 mm
89
tu ( Fitting-Fitting )
Ls
meter 100 mm
Bh
C Kelas 10 kg/cm
SAT
VOLUME
Bh
Unit
Unit
Unit
Unit
Unit
Liquid + Suction )
90
30
100
( IU + OU )
EL FEEDER
Unit
60
Bh
Bh
00 W / 16 A
Bh
11
00 W / 16 A
Bh
Ttk
16
Ttk
14
SAT
VOLUME
p dengan armature
36 W / Louvre M6
Bh
Bh
Light PLC 13 W
Bh
Bh
one ( RJ-11 )
Bh
Ttk
Ttk
JUMLAH HARGA
35246800
35246800
23069494.8
17840660.8325
138205981.156897
128984442.581546
251360730.531509
559461309.902452
153525334.656131
24992015.558048
18296221.9868099
116488790.147052
14027950.065
22190515.0189111
349520827.431953
4898098.87333333
16700858.8384
42318327.392
1182133.33333333
45419845.68
110519264.117067
11716192
6332020.4
4297573.86666667
22345786.2666667
2746068.16
2746068.16
1079840055.87814
107984005.587814
1187824061.46595
1187824000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
1500000
1000000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
4800000
11344240
1000000
13102560
1500000
1000000
35246800
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
2412000
1178100
11881144.8
5890500
1707750
23069494.8
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
2717227.5
751125.375
4090625
212741.1
3120110.16
6948831.6975
17840660.8325
4838362.77833333
24000
4681227.31083333
24000
7600874.05146667
13716758.476575
324000
29491732.05825
720000
58189441.4102595
Pek. Gedung X (Bank Darah) - page 1118 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7388503.09096429
JUMLAH 2.3.PEKERJAAN PONDAS
35764049.2118126
138205981.156897
3087224.12682292
10622227.1762374
JUMLAH 2.4.LANTAI DASAR ( EL.
30872241.2682292
98112201.3133167
128984442.581546
9091515.74085333
9680135.75238519
9381908.85729166
7143851.34558333
246240
104940
JUMLAH 2.5.DAK ATAP ( + 4,20
37502502.43102
43288357.0676975
21390752.194625
100013918.838167
34473600
14691600
251360730.531509
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
17760
26420
92550
145380
163760
76590
JUMLAH 3.1.PEKERJA
59631469.3
35517967.6
14392351.8
1656795
566517
3444912
5485638.75145
1866350.38968125
190920
1220604
1064325
1562835
21207779.74
5716869.075
153525334.656131
222896.08
163466.05
JUMLAH 3.2.PEKERJA
24436230.988048
555784.57
24992015.558048
140831.940857143
15439490.1753331
Pek. Gedung X (Bank Darah) - page 1119 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
136889.688669643
15603.96
JUMLAH 3.3.PEKERJA
465424.941476786
2391306.87
18296221.9868099
5406114.08296034
5774599.26622056
13034849.7522551
5778167.90327238
12439913.2852183
9381120.85110891
10812228.1659207
5774599.26622056
13034849.7522551
17334503.7098171
12439913.2852183
37524483.4044356
0
0
3804110.35213
10761864.42672
5002237.784335
1902055.176065
2690466.10668
5002237.784335
JUMLAH 3.4.PEKERJA
2388808.51
1016636.148
243866.7
312950.55
553501.04
316849.995
72894.9375
217712.88
JUMLAH 3.5.PEKERJA
32850.26245
42825.079055
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJA
116488790.147052
4777617.02
5083180.74
1219333.5
625901.1
1107002.08
633699.99
145789.875
435425.76
14027950.065
8708924.86555389
8782995.46338995
4173326.12102557
525268.568941667
22190515.0189111
100980.733333333
100980.733333333
110129.34
770905.38
Pek. Gedung X (Bank Darah) - page 1120 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
69473.34
833680.08
45554.74
1275532.72
27688.1
1245964.5
671035.46
671035.46
4898098.87333333
212520
212520
902440
902440
171508.450666667
6517321.12533333
287991
575982
104649.38
1674390.08
67381.1013333333
1347622.02666667
55231.7333333333
662780.8
227007
227007
135531
813186
125367
125367
36182.63
723652.6
26492.95
529859
2388731.2064
2388731.2064
16700858.8384
335435.76
2012614.56
371721.24
33083190.36
6616638.072
6616638.072
100980.733333333
605884.4
42318327.392
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
591066.666666667
1182133.33333333
1182133.33333333
3900248
3900248
5528825.72
5528825.72
5528825.72
5528825.72
5528825.72
5528825.72
5528825.72
5528825.72
170503.813333333
15345343.2
108605.053333333
3258151.6
8008
800800
45419845.68
10049076
10049076
27785.2666666667
1667116
11716192
29147.8
233182.4
31858.2
95574.6
36081.1
396892.1
36081.1
108243.3
170766.133333333
2732258.13333333
197562.133333333
2765869.86666667
6332020.4
Pek. Gedung X (Bank Darah) - page 1122 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
276475.466666667
829426.4
132146.666666667
528586.666666667
272409.866666667
1906869.06666667
516345.866666667
1032691.73333333
4297573.86666667
201415.5
604246.5
498793.386666667
1496380.16
215147.166666667
645441.5
2746068.16
1 Dari Gedung
2 Dari Gedung
3 Dari Gedung
4 Dari Gedung
5 Dari Gedung
6 Dari Gedung
7 Dari Gedung
8 Dari Gedung
9 Dari Gedung
H1
G
Ke
Ke
G
J
N
F
H2, l
Ke
Ke
Ke
Ke
N
U
U
Ke
Ke
Ke
J
O Dan N
J
I ,H1,H2, Dan K1,L
U
T
P Dan Q
0.74404762
12.4007937
3.47222222
33.4325397
5.29513889
21.5277778
4.89831349
4.34027778
13.8888889
Panjang
6
100
28
269.6
42.7
173.6
39.5
35
112
Lantai
Volume
Lebar
3
3
3
3
3
3
3
3
3
18
300
84.00
808.80
128.10
520.8
118.50
105.00
336.00
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN PONDASI DAN TANAH
2.3. LANTAI DASAR ( EL. + 0,00 M )
2.4. LANTAI SATU ( EL. + 4.60 M )
2.5. LANTAI DUA ( EL. + 8,80 M )
2.6. DAK ATAP ( EL. + 13,00 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PENGECATAN
3.5. PEKERJAAN HAND RAILLANG DAN LAIN-LAIN
IV.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
JEMBATAN PENGHUBUNG
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
2.3.
NO.
III.
URAIAN PEKERJAAN
2.4. LANTAI SATU ( EL. + 4.60 M )
JEMBATAN PENGHUBUNG
1 BALOK TYPE B1 (30x55)
2 BALOK TYPE B2 (30x50)
3 BALOK TYPE BA (25x45)
4 BALOK TYPE BL (20x50)
5 PELAT LANTAI SATU S1 (t=12 cm)
6 KOLOM TYPE K1 (45x45)
2.5.
2.6.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
LEVEL-1
NO.
URAIAN PEKERJAAN
4 Benang sudut
5 Balok praktis 12/12
6 Plint homogenius tile 10 x 60 cm cutting size
C.
LEVEL-2
GROUND FLOOR
LEVEL-1
LEVEL-2
3.3.
1 Plapond grc 9 mm
2 List plafond gypsum
B.
LEVEL-1
1 Plapond grc 9 mm
2 List plafond gypsum
C.
LEVEL-2
1 Plapond grc 9 mm
2 List plafond gypsum
3.4.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecetan dinding Watershield (Exterior)
2 Pengecatan plafond Watershield
3 Pengecatan list plafond Watershield
B.
LEVEL-1
Pek. Gedung Y1 (Connection Bridge Selasar) - page 1129 of 2419
NO.
URAIAN PEKERJAAN
1 Pengecetan
2 Pengecatan
3 Pengecatan
C.
LEVEL-2
1 Pengecetan
2 Pengecatan
3 Pengecatan
3.5.
IV.
Lampu TL 1 x 18 W
Instalasi lampu TL 1 x 18 W ( Selasar )
IAYA
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
NG DAN LAIN-LAIN
JUMLAH III.
NERANGAN SELASAR
JUMLAH IV.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
Ls
Ls
1
107.2
1
1
m3
m3
m3
m2
m3
180
36
84
120
36
m2
125
m3
6.561
SAT
S1 (t=12 cm)
S1 (t=12 cm)
(t=10 cm)
uthene Sheet 3000
engkap kawat ayam
VOLUME
m3
m3
m3
m3
m3
m3
3.96
5.745
3.504375
1.2
15
5.913
m3
m3
m3
m3
m3
m3
3.96
5.745
3.504375
1.2
15
5.913
m3
m3
m3
m3
m3
m2
m2
3.96
5.22
3.3075
0.6
11.4
114
114
m
m
m
m
m
m
31.2
62.4
129.6
78
35
39
m
m
m
31.2
62.4
129.6
NGAN DINDING
ata ringan
ktis 12/12
ogenius tile 10 x 60 cm cutting size
ata ringan
SAT
VOLUME
m
m
m
78
35
39
m
m
m
m
m
m
31.2
62.4
67.2
78
35
39
mogenius tile 60 x 60 cm
m2
107.25
mogenius tile 60 x 60 cm
m2
107.25
mogenius tile 60 x 60 cm
m2
107.25
grc 9 mm
nd gypsum
m2
m1
107.25
49
grc 9 mm
nd gypsum
m2
m1
107.25
49
grc 9 mm
nd gypsum
m2
m1
107.25
49
ktis 12/12
ogenius tile 10 x 60 cm cutting size
ata ringan
ktis 12/12
ogenius tile 10 x 60 cm cutting size
NGAN LANTAI
m
m
m1
129.6
107.25
49
SAT
m
m
m1
VOLUME
m
m
m1
129.6
107.25
49
m1
m3
35
5.07
m1
m3
35
5.07
m1
m3
35
5.07
129.6
107.25
49
NG DAN LAIN-LAIN
NERANGAN SELASAR
pu TL 1 x 18 W ( Selasar )
Buah
Titik
JUMLAH HARGA
9932000
9932000
21366552
256162500
95218583.41644
293871265.760796
275941909.093596
232865420.6338
1175426230.90463
547188349.611844
71716813.74
46338039.4494576
31186360.1498053
119926197.587419
816355760.538525
1821999.2
1821999.2
2003535990.64316
200353599.064316
2203889589.70747
2203890000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
1000000
60000
1500000
1000000
JUMLAH I.PEKERJAAN PERSIAPA
1000000
6432000
1500000
1000000
9932000
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
1929600
942480
13201272
3927000
1366200
21366552
2049300
256162500
256162500
14512815.6403658
JUMLAH 2.3.LANTAI DASAR ( EL.
95218583.41644
95218583.41644
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8791759.36888889
9335661.85102222
9624911.26438519
8396674.5401
5466947.12131944
13464063.3596875
JUMLAH 2.4.LANTAI SATU ( EL. +
34815367.1008
53633377.3341227
33729298.4121298
10076009.44812
82004206.8197917
79613006.645832
293871265.760796
8791759.36888889
9335661.85102222
9624911.26438519
8396674.5401
5466947.12131944
10431870.4513161
JUMLAH 2.5.LANTAI DUA ( EL. +
34815367.1008
53633377.3341227
33729298.4121298
10076009.44812
82004206.8197917
61683649.978632
275941909.093596
8791759.36888889
9335661.85102222
9624911.26438519
8396674.5401
6351840.34558333
246240
104940
JUMLAH 2.6.DAK ATAP ( EL. + 13
141700
42200
17100
11280
97459.550375
26420
34815367.1008
48732154.862336
31834394.006954
5038004.72406
72410979.93965
28071360
11963160
232865420.6338
165273427.384
98440912.288
54088965.312
29877451.2064
132871975.697194
38519089.198
0
0
141700
42200
17100
4421040
2633280
2216160
Pek. Gedung Y1 (Connection Bridge Selasar) - page 1138 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11280
97459.550375
26420
879840
3411084.263125
1030380
0
0
141700
42200
17100
11280
97459.550375
26420
JUMLAH 3.1.PEKERJA
4421040
2633280
1149120
879840
3411084.263125
1030380
547188349.611844
222896.08
23905604.58
0
222896.08
23905604.58
0
222896.08
JUMLAH 3.2.PEKERJA
136889.688669643
15603.96
23905604.58
0
71716813.74
14681419.1098192
764594.04
0
136889.688669643
15603.96
14681419.1098192
764594.04
0
136889.688669643
15603.96
JUMLAH 3.3.PEKERJA
14681419.1098192
764594.04
46338039.4494576
42825.079055
43611.881555
3427.5273666667
5550130.245528
4677374.29677375
167948.840966667
0
Pek. Gedung Y1 (Connection Bridge Selasar) - page 1139 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
42825.079055
43611.881555
3427.5273666667
42825.079055
43611.881555
3427.5273666667
JUMLAH 3.4.PEKERJA
573903
3922839.091875
573903
3922839.091875
573903
3922839.091875
JUMLAH 3.5.PEKERJAA
5550130.245528
4677374.29677375
167948.840966667
0
5550130.245528
4677374.29677375
167948.840966667
31186360.1498053
20086605
19888794.1958063
0
20086605
19888794.1958063
0
20086605
19888794.1958063
119926197.587419
89519.4666666667
626636.266666667
170766.133333333
1195362.93333333
1821999.2
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN PONDASI DAN TANAH
2.3. LANTAI DASAR ( EL. + 0,00 M )
2.4. LANTAI SATU ( EL. + 4.60 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PENGECATAN
3.5. PEKERJAAN HAND RAILLANG DAN LAIN-LAIN
IV.
V.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
II.
SELASAR
(DARI GEDUNG H1-F, G-H2&J, J-I,H1,H2,K1,L)
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Listrik Kerja dan Air Kerja
4 Mobilisasi dan Demobilisasi
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
2.3.
NO.
URAIAN PEKERJAAN
2.4. LANTAI SATU ( EL. + 4.60 M )
DAK ATAP ( + 3,15 M )
1 BALOK TYPE B1 (20x30)
2 PELAT DAK ATAP SA
3 - Water Profing Bithuthene Sheet 3000
4 - Pasangan screed lengkap kawat ayam
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Batu tempel alam
5 Plint homogenius tile 10 x 60 cm cutting size
3.3.
1 Plapond grc 9 mm
2 List plafond gypsum
IV.
3.4.
PEKERJAAN PENGECATAN
1 Pengecetan dinding Watershield (Exterior)
2 Pengecatan plafond Watershield
3 Pengecatan list plafond Watershield
3.5.
Lampu TL 1 x 18 W
Instalasi lampu TL 1 x 18 W ( Selasar )
Pek. Gedung Y1 (Connection Bridge Selasar) - page 1143 of 2419
NO.
V.
URAIAN PEKERJAAN
PVC diameter 65 mm
IAYA
DARI GEDUNG H1-F, G-H2&J, J-I,H1,H2,K1,L)
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
NG DAN LAIN-LAIN
JUMLAH III.
NERANGAN SELASAR
JUMLAH IV.
JUMLAH IV.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
SAT
2
VOLUME
3
2&J, J-I,H1,H2,K1,L)
ls
m'
Ls
Ls
BR 4 + test
ipping dan Grubbing Keluar Proyek
1
547.8273809524
1
1
m3
m3
m3
m2
m3
1560.2678571429
312.0535714286
78.0133928571
650.1116071429
312.0535714286
m3
btg
m3
m3
m3
m2
m3
m3
m3
69.02625
328.6964285714
44.7900892857
427.3053571429
299.11375
749.96875
128.1916071429
107.1834672619
53.591733631
m3
m3
59.9975
50.8452287946
SAT
NGAN DINDING
ata ringan
pel alam
ogenius tile 10 x 60 cm cutting size
VOLUME
m3
m3
m2
m2
44.7900892857
109.9954166667
1099.9541666667
1099.9541666667
m
m
m
m
m
237.66
237.66
740.94
349.5
559.2
m2
838.8
m2
m1
838.8
559.2
NGAN LANTAI
grc 9 mm
nd gypsum
m
m
m1
740.94
838.8
559.2
NG DAN LAIN-LAIN
Stainless steel pipe 2"
m1
559.2
NERANGAN SELASAR
pu TL 1 x 18 W ( Selasar )
Buah
94
Titik
94
ct 30 x 40
SAT
VOLUME
:
m
279.6
bh
69
559.2
bh
20
JUMLAH HARGA
36369642.8571429
36369642.8571429
52850410.1517857
656849510.581662
705309472.667426
1573671125.51825
2988680518.91913
144037338
140815688.94
123548805.288096
70229133.6267857
320926557.6
799557523.454882
24466846.4
24466846.4
175965265.9328
175965265.9328
4025039797.56395
402503979.756395
4427543777.32035
4427544000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
1000000
60000
1500000
1000000
JUMLAH I.PEKERJAAN PERSIAPA
1000000
32869642.8571429
1500000
1000000
36369642.8571429
8338
20222.4
101629.44
25278
29381
JUMLAH 2.1.PEKERJAAN PEMA
13009513.3928571
6310472.14285714
7928457.42857143
16433521.2053571
9168445.98214286
52850410.1517857
5251237.255
24000
3878755.34692675
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN PONDA
362473215.572944
7888714.28571429
173729798.306291
20532022.4107143
5675683.40625
24542727.34375
1607522.75357143
18716377.0532738
41683449.4491537
656849510.581662
3087224.12682292
10228761.9792
JUMLAH 2.3.LANTAI DASAR ( EL.
185225729.549058
520083743.118368
705309472.667426
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8966231.64433333
7143851.34558333
246240
104940
JUMLAH 2.4.LANTAI SATU ( EL. +
401598315.906087
785790905.362166
270852714
115429190.25
1573671125.51825
141700
42200
17100
220980
18650
JUMLAH 3.1.PEKERJA
33676422
10029252
12670074
77232510
10429080
144037338
167877.55
JUMLAH 3.2.PEKERJA
140815688.94
140815688.94
136889.688669643
15603.96
JUMLAH 3.3.PEKERJA
114823070.856096
8725734.432
123548805.288096
42825.079055
43611.881555
3427.5273666667
31730814.0750117
36581646.248334
1916673.30344
JUMLAH 3.4.PEKERJA
573903
JUMLAH 3.5.PEKERJAA
70229133.6267857
320926557.6
320926557.6
89519.4666666667
8414829.86666667
170766.133333333
16052016.5333333
Pek. Gedung Y1 (Connection Bridge Selasar) - page 1151 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
24466846.4
67381.1013333333
18839755.9328
193123.333333333
13325510
250000
139800000
200000
4000000
175965265.9328
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN PONDASI DAN TANAH
2.3. LANTAI DASAR ( EL. + 0,00 M )
2.4. LANTAI SATU ( EL. + 4.60 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PENGECATAN
3.5. PEKERJAAN HAND RAILLANG DAN LAIN-LAIN
IV.
V.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
II.
PEMBANGUNAN SELASAR
(DARI GEDUNG G-J, J-O&N, N-U,U-T,P&Q)
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
2.3.
NO.
URAIAN PEKERJAAN
2.4. LANTAI SATU ( EL. + 4.60 M )
DAK ATAP ( + 3,15 M )
1 BALOK TYPE B1 (20x30)
2 PELAT DAK ATAP SA
3 - Water Profing Bithuthene Sheet 3000
4 - Pasangan screed lengkap kawat ayam
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Plint keramik 10 x 30 cm
3.3.
1 Plapond grc 9 mm
2 List plafond gypsum
IV.
3.4.
PEKERJAAN PENGECATAN
1 Pengecetan dinding Watershield (Exterior)
2 Pengecatan plafond Watershield
3 Pengecatan list plafond Watershield
3.5.
Lampu TL 1 x 18 W
Instalasi lampu TL 1 x 18 W ( Selasar )
NO.
V.
URAIAN PEKERJAAN
PEKERJAAN MEKANIKAL DAN PLUMBING
5.1.
PVC diameter 65 mm
IAYA
DARI GD G-J, J-O&N, N-U,U-T,P&Q)
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
NG DAN LAIN-LAIN
JUMLAH III.
NERANGAN SELASAR
JUMLAH IV.
JUMLAH IV.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
SAT
2
BR 4 + test
ipping dan Grubbing Keluar Proyek
VOLUME
3
ls
m'
Ls
Ls
1
1032.1726190476
1
1
m3
m3
m3
m2
m3
2939.7321428572
587.9464285714
146.9866071429
1224.8883928572
587.9464285714
m3
btg
m3
m3
m3
m2
m3
m3
m3
130.05375
619.3035714286
84.3899107143
805.0946428571
563.56625
1413.03125
241.5283928571
201.9465327381
100.973266369
m3
m3
113.0425
95.7985212054
NGAN DINDING
ata ringan
mik 10 x 30 cm
SAT
VOLUME
m3
m3
m2
m2
84.3899107143
207.2445833333
2072.4458333333
2072.4458333333
m
m
m
m
447.78
895.56
2054.52
1053.6
m2
1580.4
m2
m1
1580.4
1053.6
NGAN LANTAI
grc 9 mm
nd gypsum
m
m
m1
2054.52
1580.4
1053.6
NG DAN LAIN-LAIN
Stainless steel pipe 2"
m1
1053.6
NERANGAN SELASAR
pu TL 1 x 18 W ( Selasar )
Buah
176
Titik
176
ct 30 x 40
SAT
VOLUME
:
m
279.6
bh
132
1053.6
bh
44
JUMLAH HARGA
65930357.1428571
65930357.1428571
99576523.8482143
1237583412.64099
1328887804.72532
2964985511.16958
5631033252.38411
156024990
265313680.02
232780796.229504
160520441.863121
604664200.8
1419304108.91262
45810265.6
45810265.6
316532035.9328
316532035.9328
7478610019.97239
747861001.997239
8226471021.96963
8226471000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
1500000
60000
1500000
1000000
JUMLAH I.PEKERJAAN PERSIAPA
1500000
61930357.1428571
1500000
1000000
65930357.1428571
8338
20222.4
101629.44
25278
29381
JUMLAH 2.1.PEKERJAAN PEMA
24511486.6071429
11889687.8571429
14938166.5714286
30962728.7946428
17274454.0178571
99576523.8482143
5251237.255
24000
3878755.34692675
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN PONDA
682943097.152456
14863285.7142857
327327817.409707
38684797.5892857
10693669.59375
46241447.65625
3028766.04642857
35263903.5467262
78536627.9320964
1237583412.64099
3087224.12682292
10228761.9792
JUMLAH 2.3.LANTAI DASAR ( EL.
348987533.35638
979900271.368942
1328887804.72532
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8966231.64433333
7143851.34558333
246240
104940
JUMLAH 2.4.LANTAI SATU ( EL. +
756659487.908893
1480524495.51069
510319062
217482465.75
2964985511.16958
141700
42200
17100
18650
JUMLAH 3.1.PEKERJA
63450426
37792632
35132292
19649640
156024990
167877.55
JUMLAH 3.2.PEKERJA
265313680.02
265313680.02
136889.688669643
15603.96
JUMLAH 3.3.PEKERJA
216340463.973504
16440332.256
232780796.229504
42825.079055
43611.881555
3427.5273666667
87984981.4200786
68924217.609522
3611242.83352
JUMLAH 3.4.PEKERJA
573903
JUMLAH 3.5.PEKERJAA
160520441.863121
604664200.8
604664200.8
89519.4666666667
15755426.1333333
170766.133333333
30054839.4666667
45810265.6
Pek. Gedung Y1 (Connection Bridge Selasar) - page 1163 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
67381.1013333333
18839755.9328
193123.333333333
25492280
250000
263400000
200000
8800000
316532035.9328
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN PONDASI
2.3. LANTAI DASAR ( EL. + 0,00 M )
2.4. LANTAI SATU ( EL. + 4.60 M )
2.5. LANTAI DUA ( EL. + 8,80 M )
2.6. LANTAI TIGA ( EL. + 13,00 M )
2.7. LANTAI ATAP ( EL. + 17,20 M )
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PENGECATAN
3.5. PEKERJAAN HAND RAILLING
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN PONDASI
1 PEKERJAAN PONDASI KSLL
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
NO.
URAIAN PEKERJAAN
2.3. LANTAI DASAR ( EL. + 0,00 M )
1 KOLOM TYPE K1 (50x50)
RAMP (LT. DASAR - LT. SATU)
2 BALOK TYPE B1 (30x65)
3 BALOK TYPE B2 (30x60)
4 BALOK TYPE BA (25x45)
5 BALOK TYPE BL (20x65)
6 PELAT LANTAI RAMP S1 (t=12 cm)
2.4.
2.5.
2.6.
NO.
URAIAN PEKERJAAN
6 KOLOM TYPE K1 (50x50)
2.7.
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
LEVEL-1
LEVEL-2
NO.
URAIAN PEKERJAAN
C.
LEVEL-3
GROUND FLOOR
LEVEL-1
LEVEL-2
LEVEL-3
3.3.
1 Plapond exposed
2 Plapond GRC 9 mm
3 List Gypsum
B.
LEVEL-1
1 Plapond exposed
2 Plapond GRC 9 mm
3 List Gypsum
C.
LEVEL-2
1 Plapond exposed
2 Plapond GRC 9 mm
Pek. Gedung Y2 (RAMP) - page 1169 of 2419
NO.
URAIAN PEKERJAAN
3 List Gypsum
D.
LEVEL-3
1 Plapond GRC 9 mm
2 List Gypsum
3.4.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecetan dinding Watershield (Exterior)
2 Pengecetan plafond Watershield (Exterior)
3 Pengecetan list plafond Watershield (Exterior)
B.
LEVEL-1
1 Pengecetan dinding Watershield (Exterior)
2 Pengecetan plafond Watershield (Exterior)
3 Pengecetan list plafond Watershield (Exterior)
C.
LEVEL-2
1 Pengecetan dinding Watershield (Exterior)
2 Pengecetan plafond Watershield (Exterior)
3 Pengecetan list plafond Watershield (Exterior)
D.
LEVEL-3
1 Pengecetan dinding Watershield (Exterior)
2 Pengecetan plafond Watershield (Exterior)
3 Pengecetan list plafond Watershield (Exterior)
3.5.
IAYA
TENGGARA BARAT
JUMLAH I.
JUMLAH II.
JUMLAH III.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
TENGGARA BARAT
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
Ls
1
103
20
1
103
1
1
1
m3
m3
m3
m2
m3
276
55.2
193.2
391
55.2
m2
242.4
SAT
S1 (t=12 cm)
S1 (t=12 cm)
S1 (t=12 cm)
S1 (t=12 cm)
S1 (t=12 cm)
S1 (t=12 cm)
VOLUME
m3
18.7625
m3
m3
m3
m3
m3
5.265
17.964
1.8
1.3
20.4
m3
m3
m3
m3
m3
m3
4.1535
3.24
1.873125
0.78
7.668
16.8625
m3
m3
m3
m3
m3
4.68
17.964
1.8
1.3
20.4
m3
m3
m3
m3
m3
m3
4.1535
3.24
1.873125
0.78
5.22
15.0875
m3
m3
m3
m3
m3
4.68
17.964
1.8
1.3
20.4
m3
m3
m3
m3
m3
4.1535
3.24
1.873125
0.78
5.22
Pek. Gedung Y2 (RAMP) - page 1173 of 2419
SA (t=10 cm)
uthene Sheet 3000
engkap kawat ayam
SAT
m3
m3
m3
m3
m3
m3
m2
m2
VOLUME
15.0875
8.8335
17.892
4.573125
2.08
24.24
242.4
242.4
NGAN DINDING
ata ringan
aktis 12/12
ktis 12/12
ogenius tile 10 x 60 cm
ata ringan
aktis 12/12
ktis 12/12
ogenius tile 10 x 60 cm
ata ringan
aktis 12/12
ktis 12/12
ogenius tile 10 x 60 cm
m2
m2
m2
m1
m1
m1
m1
m1
230.2489959
460.4979917
608.0979917
116.9779917
292.4449793
48.74082988
146.2224896
146.2224896
m2
m2
m2
m1
m1
m1
m1
m1
199.4489959
398.8979917
546.4979917
110.5779917
276.4449793
46.07416321
138.2224896
138.2224896
m2
m2
m2
m1
m1
m1
m1
m1
199.4489959
398.8979917
546.4979917
110.5779917
276.4449793
46.07416321
138.2224896
138.2224896
ata ringan
SAT
VOLUME
m2
m2
m2
m1
m1
m1
m1
m1
238.4989959
476.9979917
624.5979917
24.4
61
10.16666667
79.246
30.5
nil sheet
mogenius tile 60 x 60 cm
munilum
m2
m2
m1
104.8630407
124.5301071
215.4449793
nil sheet
mogenius tile 60 x 60 cm
munilum
m2
m2
m1
104.5750406
106.024607
214.8049792
nil sheet
mogenius tile 60 x 60 cm
munilum
m2
m2
m1
104.5750406
106.024607
214.8049792
mogenius tile 60 x 60 cm
m2
45.0225
xposed
GRC 9 mm
m2
m2
m1
235.3931477
63.33
38.5
xposed
GRC 9 mm
m2
m2
m1
216.5996477
45.55
30.35
xposed
GRC 9 mm
m2
m2
214.1996477
45.55
aktis 12/12
ktis 12/12
ogenius tile 10 x 60 cm
NGAN LANTAI
GRC 9 mm
SAT
VOLUME
m1
30.35
m2
m1
259.2162
79.246
m
m
m1
608.0979917031
298.7231477211
38.5
m
m
m1
546.4979917031
262.149647672
30.35
m
m
m1
546.4979917031
262.149647672
30.35
m
m
m1
624.5979917031
259.2162
79.246
m1
107.7224896288
m1
107.4024895944
m1
107.4024895944
JUMLAH HARGA
46018786
46018786
49657096.6
496750320
538539931.194371
631108079.545362
598709710.138655
251764127.429721
532158075.373468
3098687340.28158
322888166.817795
246642008.435872
77365914.1825836
147408034.400387
185099481.936856
979403605.773494
4124109732.05507
412410973.205507
4536520705.26058
4536521000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
1500000
1000000
5625000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
6180000
11344240
1000000
16869546
1500000
1000000
5625000
46018786
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
2958720
1445136
30362925.6
12795475
2094840
49657096.6
2049300
496750320
496750320
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
10492074.4174474
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
6126956.28798611
JUMLAH 2.3.LANTAI DASAR ( EL.
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
6126956.28798611
9802580.51477033
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
6126956.28798611
JUMLAH 2.4.LANTAI SATU ( EL. +
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
6126956.28798611
9802580.51477033
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
6126956.28798611
JUMLAH 2.5.LANTAI DUA ( EL. +
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
6126956.28798611
196857546.257357
0
41883002.97192
149792945.145184
15283132.8234933
9733395.7215
124989908.274917
538539931.194371
33041035.677848
27016763.65344
15904010.0944477
5840037.4329
46981500.8162775
165296013.930315
0
37229335.97504
149792945.145184
15283132.8234933
9733395.7215
124989908.274917
631108079.545362
33041035.677848
27016763.65344
15904010.0944477
5840037.4329
31982711.8232875
147896433.516597
0
37229335.97504
149792945.145184
15283132.8234933
9733395.7215
124989908.274917
598709710.138655
33041035.677848
27016763.65344
15904010.0944477
5840037.4329
31982711.8232875
Pek. Gedung Y2 (RAMP) - page 1179 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
9145290.3892492
JUMLAH 2.6.LANTAI TIGA ( EL. +
137979568.747797
251764127.429721
7954986.31945299
8338507.30044444
8490629.34638518
7487227.47807692
7143851.34558333
246240
104940
JUMLAH 2.7.LANTAI ATAP ( EL. +
70270371.652888
149192572.619552
38828709.3296877
15573433.1544
173166956.61694
59688576
25437456
532158075.373468
141700
42200
17100
3710
11280
95902.775375
97459.550375
26420
32626282.7121623
19433015.2498695
10398475.6581225
433988.349218381
3298779.36602651
4674380.8592158
14250778.0939393
3863198.17599381
0
141700
42200
17100
3710
11280
95902.775375
97459.550375
26420
28261922.7121623
16833495.2498695
9345115.65812246
410244.349218381
3118299.36602651
4418640.12488246
13471101.6909393
3651838.17599381
0
141700
42200
17100
3710
11280
95902.775375
97459.550375
26420
28261922.7121623
16833495.2498695
9345115.65812246
410244.349218381
3118299.36602651
4418640.12488246
13471101.6909393
3651838.17599381
Pek. Gedung Y2 (RAMP) - page 1180 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
141700
42200
17100
3710
11280
95902.775375
97459.550375
26420
JUMLAH 3.1.PEKERJA
33795307.7121623
20129315.2498695
10680625.6581225
90524
688080
975011.549645833
7723279.52901725
805810
322888166.817795
275084.311425
222896.08
116586
28846177.3355249
27757272.7045706
25117868.3517346
0
275084.311425
222896.08
116586
28766953.0453114
23632469.2921021
25043253.3037074
0
275084.311425
222896.08
116586
28766953.0453114
23632469.2921021
25043253.3037074
0
222896.08
JUMLAH 3.2.PEKERJA
10035338.7618
246642008.435872
26955.5
136889.688669643
15603.96
6345139.99339582
8669223.98344848
600752.46
0
26955.5
136889.688669643
15603.96
5838551.80282345
6235325.31890223
473580.186
0
26955.5
136889.688669643
5773858.60282345
6235325.31890223
Pek. Gedung Y2 (RAMP) - page 1181 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
15603.96
473580.186
0
136889.688669643
15603.96
JUMLAH 3.3.PEKERJA
35484024.9161279
1236551.41416
77365914.1825836
42825.079055
43611.881555
3427.5273666667
26041844.5678706
13027878.5361489
131959.803616667
0
23403819.6980826
11432839.3839576
104025.455578333
0
23403819.6980826
11432839.3839576
104025.455578333
0
26748458.3722781
11304906.2115372
271617.833698867
42825.079055
43611.881555
3427.5273666667
42825.079055
43611.881555
3427.5273666667
42825.079055
43611.881555
3427.5273666667
JUMLAH 3.4.PEKERJA
573903
573903
573903
JUMLAH 3.5.PEKERJAA
147408034.400387
61822259.965457
0
61638610.9856997
0
61638610.9856997
185099481.936856
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 3.28 M )
2.6. RING BALOK ( EL. + 6,83 M )
2.7. ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
IV.
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
III.
URAIAN PEKERJAAN
2.4.
2.5.
2.6.
2.7.
ATAP
1 Rangka Atap Baja Ringan
2 Genting Keramik + insulasi
3 Nok
4 Listplank 3/30
5 Talang jurai dalam
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Pek. Canopy beton
10 Plint homogenius tile 10 x 60 cm cutting size
Pek. Gedung S (Rencana Rumah Dinas) - page 1186 of 2419
NO.
URAIAN PEKERJAAN
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
B.
3.2.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
5 Rabat Beton
B.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
3.3.
3 Expose
4 List plafond gypsum
B.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 Expose
4 List plafond gypsum
NO.
URAIAN PEKERJAAN
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
A.
GROUND FLOOR
PINTU TYPE
1 A (AL-ED uk. 900x2150)
2 A (AL-ED uk. 2850x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
4 Pintu Lipat SD
JENDELA TYPE
1 W1/RD
2 W2/RD
3 W2/RD'
B.
3.5.
LEVEL-1
PINTU TYPE
1 A (AL-ED uk. 900x2150)
2 M (AL-ED uk. 900x2150)
3 C (AL-ED uk. 750x2150) *Plastic Laminate
JENDELA TYPE
1 W2/RD'
2 W2/RD
3 CW/RD
4 DW/RD
5 BV-1
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Bak mandi
Pek. Gedung S (Rencana Rumah Dinas) - page 1188 of 2419
NO.
URAIAN PEKERJAAN
3 Wastafel under counter lengkap dengan aksesoris
4 Cove ligth wastafel
5 Kaca cermin
6 Floor drain
7 Memasang kran dinding 1/2"
8 Memasang meja zink satu lubang
9 Hand Dryer
10 Tisue holder
11 Soap holder
12 Soap dish
3.6.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecetan Watershiel (Exterior)
3 Pengecatan plafond emulsion paint
4 Pengecatan list plafond emulsion paint
B.
3.7.
IV.
LEVEL-1
1 Pengecatan
2 Pengecetan
3 Pengecatan
4 Pengecatan
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN AIR BERSIH
A.
GOUND FLOOR
1 Pipa utama Polypropeline PN.10 dari Jaringan site
a.
PPR diameter 32 mm
2 Bak vave & meter air diameter 32 mm:
3 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 32 mm
b.
PPR diameter 25 mm
c.
PPR diameter 15 mm
4 Gate valve diameter 15 mm
5 Peralatan Bantu ( Fitting-Fitting )
Pek. Gedung S (Rencana Rumah Dinas) - page 1189 of 2419
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Gate Valve :
a.
GV diameter 15 mm
2 Pemipaan Polypropelyne PN.10 :
a.
b.
PPR diameter 25 mm
c.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
4.2.
b.
c.
PVC diameter 80 mm
c.
d
e
PVC diameter 65 mm
CO diameter 100 mm
CO diameter 65 mm
a.
PVC diameter 25 mm
5 Peralatan Bantu ( Fitting-Fitting )
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
c
a.
b.
PVC diameter 65 mm
CO diameter 65 mm
NO.
URAIAN PEKERJAAN
b.
PVC diameter 25 mm
c
Vent Out ( VO )
4 Peralatan Bantu ( Fitting-Fitting )
V.
B.
LEVEL 1
1 Panel Listrik
b.
PP/LP-1
2 Kabel Feeder
a.
5.3.
LEVEL 1
1 Saklar tunggal
2 Saklar ganda
3 Saklar hotel
4 Stop Kontak 200 W / 10 A
5 Titik Instalasi
a.
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
b.
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
AYA
ERUMAHAN DINAS)
NGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
ERUMAHAN DINAS)
NGGARA BARAT
JUMLAH I.
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.PEKERJAA
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V. PEKERJAA
TOTAL PEK. STANDA
ERUMAHAN DINAS)
NGGARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
-3 0,80X2,10X0,34 -1 unit
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
1
90
15
1
90
1
m3
m3
m3
m2
m3
300
60
210
150
60
m3
m3
m2
m3
m3
m3
66.612
46.6284
84.7
19.9836
12.7936
6.3968
m3
btg
m3
btg
m3
btg
m3
5.8212
49.5
2.97675
45
0.6174
10.5
4.9005
SAT
(t=12 cm)
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
men Instant.
& Jendela
VOLUME
m3
m3
m3
m3
m3
6.776
3.4398
3.0375
2.7945
0.711
m3
m3
m3
m3
m2
m2
m3
m3
2.541
2.142
6.792
1.44
14.4
14.4
1.8
0.432
m3
m3
1.38375
1.209375
m2
m2
m1
m1
m1
161.595
161.595
47.145
51.03
13.965
m2
m2
m2
m1
m1
m1
m1
m1
m3
m1
216.7525
433.505
433.505
25.355
69.4
78.45
98
30.6
3.21
11
10 x 20 cm
mik 20 x 25 cm
SAT
m1
m2
VOLUME
10.1
18.49
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
203.388
406.776
406.776
29.425
222
58.24
63
30.69
6.5
16.2
31.605
enius tile 60 x 60 cm
enius tile 30 x 60 cm
m2
m2
66.06
4.88
ramik 20 x 20 cm
m2
& Jendela
3.1
m2
m2
33.78
0.231
enius tile 60 x 60 cm
enius tile 30 x 60 cm
m2
m2
40.04
2.16
ramik 20 x 20 cm
m2
8.04
m2
m2
51.38
16.49
m2
9.14
m1
106.04
m2
m2
37.09
59.6
m2
2.16
m1
180.02
SAT
VOLUME
TU DAN JENDELA
900x2150)
2850x2150)
750x2150) *Plastic Laminate
900x2150)
900x2150)
750x2150) *Plastic Laminate
an dinding 1/2"
eja zink satu lubang
wastafel under counter
unit
unit
unit
unit
5
1
3
1
unit
unit
unit
6
1
2
unit
unit
unit
4
2
2
unit
unit
unit
unit
unit
2
1
2
2
2
set
set
set
bh
bh
m
bh
bh
bh
m
bh
set
bh
bh
bh
1
1
1
1
1
0.0495
2
1
1
0.495
1
1
1
2
2
set
set
2
1
an dinding 1/2"
eja zink satu lubang
SAT
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
VOLUME
1
1
1
2
2
1
1
2
2
2
m
m
m
m'
343.685
89.82
77.01
106.04
m
m
m
m'
307.56
99.216
98.85
180.02
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
ameter 32 mm
eter air diameter 32 mm:
ypropelyne PN.10 :
m
Bh
25
1
ameter 32 mm
12
ameter 25 mm
24
ameter 15 mm
ameter 15 mm
tu ( Fitting-Fitting )
m
Bh
Ls
16
5
1
SAT
VOLUME
meter 15 mm
ypropelyne PN.10 :
Bh
ameter 40 mm ( di shaft )
10
ameter 25 mm
12
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
12
1
Unit
30
ameter 100 mm
meter 100 mm
m
Bh
52
4
ameter 100 mm
ameter 80 mm
10
ameter 65 mm
meter 100 mm
meter 65 mm
m
Bh
Bh
33
1
5
m
Ls
25
1
10
ameter 100 mm
meter 100 mm
m
Bh
10
1
10
ameter 65 mm
meter 65 mm
m
Bh
9
1
10
ameter 25 mm
tu ( Fitting-Fitting )
ameter 32 mm ( di shaft )
SAT
m
Bh
Ls
ameter 25 mm
tu ( Fitting-Fitting )
VOLUME
10
1
1
BEL FEEDER
Unit
m
Unit
1
30
30
00 W / 10 A
Bh
Bh
Bh
Bh
3
2
1
8
Ttk
Ttk
8
8
00 W / 10 A
Bh
Bh
Bh
Bh
5
6
1
10
Ttk
Ttk
19
10
JUMLAH HARGA
1066000695.26294
47919061.7333333
1113919756.99627
111391975.699627
1225311732.6959
1225312000
JUMLAH HARGA
33648560
33648560
44975730
14317307.818
98289847.0673835
140227093.543388
135210566.828981
22817346.7605875
68081076.7335
523918968.75184
156313206.712778
28280500.8464
27643604.1661046
182983284.760711
20872271.6354228
36962648.2495526
1998562.5
455054078.870968
7381803.39066667
33098132.8494667
40479936.2401333
3512150.4
9387001
12899151.4
1066000695.26294
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
1500000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
5400000
8508180
1000000
14740380
1500000
33648560
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
3216000
1570800
33003180
4908750
2277000
44975730
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
3200706.6
884773.89
2771807.5
250594.344
2234018.432
4975407.052
14317307.818
6516890.75059524
24000
5786292.69777778
24000
5225369.44940476
24000
7628452.75866667
JUMLAH 2.3.PEKERJAAN PONDAS
37936124.437365
1188000
17224346.78811
1080000
3226143.0980625
252000
37383232.743846
98289847.0673835
Pek. Gedung S (Rencana Rumah Dinas) - page 1203 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3087224.12682292
5515340.72822141
16684517.5737778
15454679.24
9098552.11894445
JUMLAH 2.4.LANTAI DASAR ( EL.
20919030.6833521
18971669.036936
50679222.13035
43188101.13618
6469070.5565695
140227093.543388
9103560.95663492
9794120.15022222
6126956.28798611
7143851.34558333
246240
104940
15464598.8908278
14594236.1742222
JUMLAH 2.5.LANTAI SATU ( EL. +
23132148.3908093
20979005.361776
41614287.1080017
10287145.93764
3545856
1511136
27836278.00349
6304710.027264
135210566.828981
8471638.99022222
9173925.62924445
JUMLAH 2.6.RING BALOK ( EL. +
11722630.45272
11094716.3078675
22817346.7605875
106920
204522.654285714
183747.96
163800
52416
JUMLAH 2.7.ATAP
17277737.4
33049838.3193
8662797.5742
8358714
731989.44
68081076.7335
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
3922839.091875
26420
30713829.25
18293911
7412935.5
550203.5
257474
884916
9398471.98675
2982262.241475
12592313.4849188
290620
Pek. Gedung S (Rencana Rumah Dinas) - page 1204 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
17760
163760
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
JUMLAH 3.1.PEKERJAAN PASAN
179376
3027922.4
0
0
28820079.6
17165947.2
6955869.6
638522.5
823620
656947.2
6041874.848625
2991033.60100875
171730
287712
5175634.8
156313206.712778
222896.08
211788.28
14724515.0448
1033526.8064
163466.05
506744.755
38788.2
38788.2
222896.08
211788.28
1310265.396
8960.0742
0
0
8924759.0432
457462.6848
163466.05
1314267.042
28280500.8464
140831.940857143
136889.688669643
7235945.12124
2257310.96616241
26955.5
246373.27
15603.96
140831.940857143
136889.688669643
1654643.9184
0
0
5223456.68639143
8158625.44471072
26955.5
58223.88
15603.96
JUMLAH 3.3.PEKERJAAN PASA
2809024.8792
27643604.1661046
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5605301.57748535
12099926.5440488
2706892.16619086
16053351.8867884
2856471.60943375
5305894.0975425
7306423.96473
5605301.57748535
5778167.90327238
5406114.08296034
7306423.96473
5305894.0975425
4071971.98145375
3160750.037335
1225646.95664125
JUMLAH 3.4.PEKERJAAN PASAN
2388808.51
420912.25
1016636.148
309074.535
243866.7
3922839.091875
312950.55
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
681324.6825
239095.395
2388808.51
350000
28026507.8874268
12099926.5440488
8120676.49857258
16053351.8867884
0
17138829.6566025
5305894.0975425
14612847.92946
0
0
0
22421206.3099414
11556335.8065448
10812228.1659207
0
14612847.92946
5305894.0975425
8143943.9629075
6321500.07467
2451293.9132825
182983284.760711
2388808.51
420912.25
1016636.148
309074.535
243866.7
194180.535047813
625901.1
191794.535625
553501.04
161618.49
610373.61
316849.995
72894.9375
1362649.365
478190.79
0
0
4777617.02
350000
Pek. Gedung S (Rencana Rumah Dinas) - page 1206 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2084465.988
309074.535
243866.7
312950.55
191794.535625
553501.04
610373.61
72894.9375
681324.6825
239095.395
JUMLAH 3.5.PEKERJAAN PASAN
2084465.988
309074.535
243866.7
625901.1
383589.07125
553501.04
610373.61
145789.875
1362649.365
478190.79
20872271.6354228
32850.26245
42825.079055
36922.091195
3427.5273666667
11290142.4501282
3846548.6007201
2843370.24292695
363455.001961333
0
0
10103426.719122
4248933.04352088
3649748.71462575
617023.476547333
36962648.2495526
32850.26245
42825.079055
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
399712.5
1998562.5
0
0
1998562.5
69473.34
368368
1736833.5
368368
0
69473.34
833680.08
45554.74
1093313.76
27688.1
34575.9333333333
474000.688
443009.6
172879.666666667
474000.688
Pek. Gedung S (Rencana Rumah Dinas) - page 1207 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
34575.9333333333
0
0
0
0
103727.8
0
110129.34
1101293.4
45554.74
546656.88
27688.1
175782.816
332257.2
175782.816
7381803.39066667
212520
212520
0
171508.450666667
5145253.52
171508.450666667
287991
8918439.43466666
1151964
0
171508.450666667
857542.253333333
104649.38
1046493.8
67381.1013333333
287991
135531
2223576.344
287991
677655
0
26492.95
4061783.0704
662323.75
4061783.0704
0
0
0
0
171508.450666667
1715084.50666667
171508.450666667
287991
1715084.50666667
287991
0
171508.450666667
1715084.50666667
67381.1013333333
135531
606429.912
135531
0
36182.63
361826.3
Pek. Gedung S (Rencana Rumah Dinas) - page 1208 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
26492.95
86240
964389.445066666
JUMLAH 4.2.PEKERJAAN AIR KO
264929.5
86240
964389.445066666
33098132.8494667
1414472.4
1414472.4
0
11827.2
354816
0
0
0
0
1388046
0
1388046
11827.2
JUMLAH 5.1.PEKERJAAN PANEL
354816
3512150.4
29147.8
31858.2
41344.6
36081.1
87443.4
63716.4
41344.6
288648.8
0
1366129.06666667
1580497.06666667
0
0
145739
191149.2
41344.6
360811
0
3244556.53333333
1975621.33333333
9387001
170766.133333333
197562.133333333
29147.8
31858.2
41344.6
36081.1
170766.133333333
197562.133333333
JUMLAH 5.3.PEKERJAAN TITIK
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN PENGKONDISIAN UDARA & EXHAUST FAN
III.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
GROUND FLOOR
1 Plint kayu T. 10 cm
B.
LEVEL-1
1 Plint kayu T. 10 cm
II.
PEKERJAAN MEKANIKAL
2.1.
B.
LEVEL.1
1.2.1 Pekerjaan AC
1 IU 1.1 & OU 1.1 - Wall Type, Kapasitas : 9 500 BTU/h ( 1 PK )
Pek. Gedung S (Rencana Rumah Dinas) - page 1211 of 2419
NO.
URAIAN PEKERJAAN
2 IU 1.2 & OU 1.2 - Wall Type, Kapasitas : 6 000 BTU/h ( 3/4 PK )
3 IU 1.3 & OU 1.3 - Wall Type, Kapasitas : 6 000 BTU/h ( 3/4 PK )
4 Instalasi daya listrik AC, NYM 3 x 2,5 mm2
1.2.2 Pekerjaan Exhaust Fan
1 EF 1 C.1, kapasitas : 100 CFM - Ceiling Fan
2 EF 1 C.2, kapasitas : 100 CFM - Ceiling Fan
3 Instalasi daya listrik Fan, NYM 3 x 2,5 mm2
III.
GROUND FLOOR
1 Fixtures lampu lengkap dengan armature
B.
a.
b.
c.
Lampu PLC 9 W
d.
LEVEL.1
1 Fixtures lampu lengkap dengan armature
a.
b.
c.
Lampu PLC 9 W
d.
Lampu Gantung 18 W
e.
YA
ERUMAHAN DINAS)
NGGARA BARAT
ATUR PENERANGAN
JUMLAH III. PEKERJA
TOTAL PEK. NON ST
ERUMAHAN DINAS)
NGGARA BARAT
SAT
2
VOLUME
3
u T. 10 cm
m1
64.93
u T. 10 cm
m1
41.2
Unit
Unit
Unit
Unit
60
60
SAT
VOLUME
Unit
Unit
Unit
Unit
40
Baret TLC 20 W
Bh
Bh
Bh
Bh
Baret TLC 20 W
Bh
Bh
Bh
Gantung 18 W
Bh
Taman PLC 13 W
Bh
60
ATUR PENERANGAN
Taman PLC 13 W
JUMLAH HARGA
6=4X5
8798177
8798177
31710923.9333333
31710923.9333333
7409960.8
7409960.8
47919061.7333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
82900
5382697
0
82900
JUMLAH 1.1.PEKERJA
3415480
8798177
3746568.32
3746568.32
3746568.32
3746568.32
5528825.72
5528825.72
6591.2
395472
0
1169102.58666667
1169102.58666667
1169102.58666667
1169102.58666667
1169102.58666667
1169102.58666667
6591.2
395472
0
0
0
3900248
3900248
Pek. Gedung S (Rencana Rumah Dinas) - page 1217 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3746568.32
3746568.32
3746568.32
3746568.32
6591.2
395472
0
1169102.58666667
1169102.58666667
1169102.58666667
1169102.58666667
6591.2
263648
31710923.9333333
365918.666666667
1463674.66666667
272409.866666667
272409.866666667
68992
137984
766920
766920
0
0
0
365918.666666667
2561430.66666667
272409.866666667
817229.6
68992
482944
140448
140448
766920
766920
7409960.8
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 3.60 M )
2.6. RING BALOK ( EL. + 7,15 M )
2.7. ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
IV.
PEKERJAAN PLUMBING
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
- 13 unit
-7 unit
-4 unit
-20 unit
NO.
URAIAN PEKERJAAN
5 - Cerucuk Dolken 8 - 10 cm
6 SLOOF TB1 25/45
7 SLOOF TB2 20/35
2.4.
2.5.
2.6.
2.7.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 90.90.9
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
Pek. Gedung P (IPRS) - page 1222 of 2419
NO.
URAIAN PEKERJAAN
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Talang jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
12 Meja Beton Bengkel Medis dan Non medis
B.
3.2.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
3 Lantai keramik 20 x 20 cm
Pek. Gedung P (IPRS) - page 1223 of 2419
NO.
URAIAN PEKERJAAN
4 Floor hardener
B.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai homogenius tile 30 x 60 cm
3 Lantai keramik 20 x 20 cm
3.3.
3 Expose
4 List plafond gypsum
5 Curtain Box
B.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 Expose
4 List plafond gypsum
5 Curtain Box
3.4.
LEVEL-1
PINTU TYPE
1 E (AL-ED/GL-1* uk. 2x900x2150)
2 M (AL-ED uk. 900x2150)
3 E (AL-ED/GL-1* uk. 900x2150)
4 B (AL-ED uk. 900x2150)
5 C (AL-ED uk. 900x2150)
6 C (AL-ED uk. 750x2150) *Plastic Laminate
Pek. Gedung P (IPRS) - page 1224 of 2419
NO.
URAIAN PEKERJAAN
JENDELA TYPE
1 BV/3EA
2 W3EA
3 CW2E
3.5.
3.6.
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Wastafel under counter lengkap dengan aksesoris
3 Cove ligth wastafel
4 Kaca cermin
5 Meja beton
6 Floor drain
7 Memasang cubical toilet
8 Memasang kran dinding 1/2"
9 Memasang meja zink satu lubang
10 Meja granite wastafel under counter
11 Hand Dryer
12 Tisue holder
13 Soap holder
14 Soap dish
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecetan Watershiel (Exterior)
3 Pengecatan plafond emulsion paint
4 Pengecatan list plafond emulsion paint
Pek. Gedung P (IPRS) - page 1225 of 2419
NO.
URAIAN PEKERJAAN
B.
3.7.
IV.
LEVEL-1
1 Pengecatan
2 Pengecetan
3 Pengecatan
4 Pengecatan
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
PEKERJAAN PLUMBING
4.1. PEKERJAAN AIR BERSIH
A.
GROUND FLOOR
1 Pipa utama Polypropeline PN.10 dari Jaringan site
a.
PPR diameter 50 mm
b.
PPR diameter 40 mm
2 Gate Valve :
a.
GV diameter 40 mm
3 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
4 Peralatan Bantu ( Fitting-Fitting )
B.
LEVEL 1
1 Gate Valve :
a.
GV diameter 40 mm
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
4.2.
NO.
URAIAN PEKERJAAN
1 Bak Sumpit
2 Bak kontrol
4 Submersible Swage Pump 150 Lpm - Head 60 meter
5 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
PVC diameter 80 mm
b.
c.
PVC diameter 65 mm
CO diameter 65 mm
PVC diameter 40 mm
a.
PVC diameter 32 mm
b.
PVC diameter 25 mm
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
PVC diameter 80 mm
b.
c.
d.
PVC diameter 65 mm
CO diameter 80 mm
CO diameter 65 mm
PVC diameter 40 mm
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
4 Peralatan Bantu ( Fitting-Fitting )
C.
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
NO.
URAIAN PEKERJAAN
a.
Diameter 50 mm
4 Peralatan Bantu ( Fitting-Fitting )
V.
B.
5.2.
a.
b.
c.
d.
LEVEL 1
1 Panel Listrik
a.
LP - P 1
b.
PP - P 1
c.
PP - AC.P 1
2 Kabel Feeder
a.
b.
c.
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
Stop Kontak 200 W / 16 A
e.
Stop Kontak 350 W / 16 A
f.
Stop Kontak 500 W / 16 A
2 Titik instalasi
a.
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
b.
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
AYA
ENGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
ENGGARA BARAT
JUMLAH I.
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V.
TOTAL PEK. STANDA
ENGGARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
-2 1,50X1,50X0.40 -7 unit
-3 1,20X1,20X0.40 -4 unit
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
200
35
1
200
1
1
m3
m3
m3
m2
m3
1440
288
630
1500
288
m3
m3
m2
m3
m3
m3
373.438
261.4066
1433
112.0314
174.56215
87.281075
m3
btg
m3
btg
m3
btg
m3
17.6904
104
6.615
31.5
2.4192
18
33.6
Pek. Gedung P (IPRS) - page 1232 of 2419
1 (t=12 cm)
SAT
btg
m3
m3
VOLUME
160
58.3875
11.221
m3
m3
m3
m3
m3
m3
m3
41.28
183.4
6.8796
35.904
14.688
0.464
0.48
m3
m3
m3
m3
m3
31.7625
33.75
19.584
116.208
24.288
m3
m3
m3
m3
m2
m2
18.15
18
0.48
6.16
61.6
61.6
kg
kg
kg
kg
kg
unit
bh
bh
bh
bh
kg
bh
11651.976
2144.2302
12484.9158
4976.181
2352.63924
34
136
1552
2614
1652
9543.9528947369
514.6663157895
Pek. Gedung P (IPRS) - page 1233 of 2419
SAT
bh
VOLUME
16
m3
m3
m1
m1
14.3633247975
6.7220427273
189
16.8
m2
m1
1760.535
140.7
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
m
1342.5009
2685.0018
2685.0018
33.495
187.95
196.75
199.5
150.25
601.85
37.3
185.76
1.0575
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
1036.03986
2072.07972
2072.07972
28.545
222
310.75
182
158.35
143
37.3
109.048
enius tile 60 x 60 cm
enius tile 30 x 60 cm
m2
m2
1353.54
13.52
ramik 20 x 20 cm
m2
24.14
men Instant.
& Jendela
& Jendela
SAT
m2
VOLUME
10.89
enius tile 60 x 60 cm
enius tile 30 x 60 cm
m2
m2
ramik 20 x 20 cm
m2
24.14
m2
m2
1087.78
289.9
m2
13.52
m1
m2
m2
m2
m2
m1
623.8
9
754.83
4.5
623.8
24.14
9
487.92
m2
50.131
unit
unit
unit
unit
unit
2
4
10
1
3
unit
unit
m2
42
3
11.55
unit
unit
unit
unit
unit
unit
9
3
1
1
1
3
TU DAN JENDELA
* uk. 2x900x2150)
* uk. 900x2150)
2x900x2150)
900x2150)
750x2150) *Plastic Laminate
* uk. 2x900x2150)
900x2150)
* uk. 900x2150)
900x2150)
900x2150)
750x2150) *Plastic Laminate
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
VOLUME
unit
unit
m2
2
53
9.405
set
set
bh
bh
m
bh
unit
bh
bh
m
bh
bh
bh
bh
4
2
2
2
3.105
4
4
4
1
2
2
4
4
4
set
set
bh
bh
m
bh
unit
bh
bh
m
bh
bh
bh
bh
4
2
2
2
3.105
4
4
4
1
2
2
4
4
4
m
m
m
m'
2192.439
492.5628
1391.2
754.83
Pek. Gedung P (IPRS) - page 1236 of 2419
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
SAT
m
m
m
m'
VOLUME
1638.6906
433.38912
656.94
487.92
7.6
ameter 50 mm
25
ameter 40 mm
meter 40 mm
ypropelyne PN.10 :
Bh
ameter 40 mm
ameter 32 mm
18
ameter 25 mm
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
36
1
meter 40 mm
ypropelyne PN.10 :
Bh
ameter 40 mm
ameter 32 mm
28
ameter 25 mm
26
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
39
1
SAT
Unit
Unit
Unit
VOLUME
1
1
2
:
m
Bh
16
2
ameter 80 mm
10
ameter 65 mm
meter 65 mm
m
Bh
25
4
ameter 40 mm
ameter 32 mm
12
ameter 25 mm
34
m
Ls
20
1
m
Bh
12
2
ameter 80 mm
26
ameter 65 mm
meter 80 mm
meter 65 mm
m
Bh
Bh
38
1
3
ameter 40 mm
ameter 32 mm
12
ameter 25 mm
tu ( Fitting-Fitting )
m
Ls
39
1
10
10
ameter 100 mm
meter 100 mm
ameter 100 mm
meter 100 mm
ter 100 mm
ter 80 mm
:
Pek. Gedung P (IPRS) - page 1238 of 2419
SAT
ter 50 mm
tu ( Fitting-Fitting )
m
Ls
VOLUME
12
1
BEL FEEDER
Unit
Unit
Unit
Unit
1
1
1
1
60
10
10
10
Unit
Unit
Unit
1
1
1
10
10
10
Bh
Bh
Bh
Bh
Bh
Bh
Bh
13
10
2
6
3
23
19
Ttk
Ttk
162
51
ontak
ontak
ontak
ontak
200 W / 10 A
350 W / 16 A
500 W / 16 A
1000 W/ 16 A
SAT
VOLUME
ontak 200 W / 16 A
ontak 350 W / 16 A
ontak 500 W / 16 A
Bh
Bh
Bh
Bh
Bh
Bh
15
5
2
62
3
1
Ttk
Ttk
97
66
JUMLAH HARGA
9765406186.03815
555793849.87241
10321200035.9106
1032120003.59106
11353320039.5016
11353320000
JUMLAH HARGA
107908820
107908820
182003280
169572620.354969
774911531.905695
1240891924.3752
1730200966.93334
361540908.487293
2127554154.40664
6586675386.46314
767818861.798946
453825351.2848
311726620.07305
997600437.233442
73001311.7675438
245388748.510145
3037815
2852399145.66793
13518787.6618889
33263753.7452
46782541.4070889
98616215.8666667
73024076.6333333
171640292.5
9765406186.03815
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
15000000
60000
567212
1000000
163782
14000000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
15000000
12000000
19852420
1000000
32756400
14000000
13300000
107908820
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
15436800
7539840
99009540
49087500
10929600
182003280
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
17943695.9
4960190.235
46894925
1404873.756
30482042.633
67886892.8309688
169572620.354969
4591742.25277778
24000
4838362.77833333
24000
5216241.16979167
24000
4543897.4246875
81229757.14854
2496000
32005769.778675
756000
12619130.63796
432000
152674953.4695
Pek. Gedung P (IPRS) - page 1243 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
24000
6952712.95546667
7388503.09096429
JUMLAH 2.3.PEKERJAAN PONDAS
3840000
405951527.68731
82906393.1837102
774911531.905695
3087224.12682292
2683307.06279167
5515340.72822141
11490048.9918958
10864525.8753517
14588939.0439454
9381908.85729166
JUMLAH 2.4.LANTAI DASAR ( EL.
127440611.95525
492118515.315992
37943338.073872
412538719.005028
159578156.057166
6769267.71639067
4503316.2515
1240891924.3752
8609917.5496
9091515.74085333
9381908.85729166
6126956.28798611
10464145.4683333
JUMLAH 2.5.LANTAI SATU ( EL. +
273472506.16917
306838656.2538
183735303.0612
712001336.31429
254153165.13488
1730200966.93334
7858441.7416
8264892.35205333
9381908.85729166
7143851.34558333
246240
104940
JUMLAH 2.6.RING BALOK ( EL. +
142630717.61004
148768062.33696
4503316.2515
44006124.2887933
15168384
6464304
361540908.487293
31192.48691625
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
23040
31192.48691625
116640
363454108.928459
66883872.4589281
389435572.741983
155219460.735392
73384668.7123563
16597440
25655040
35758080
60226560
38062080
297699625.798385
60030679.0736842
Pek. Gedung P (IPRS) - page 1244 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
97200
6048000
5796000
163800
52416
204522.654285714
183747.96
JUMLAH 2.7.ATAP
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
3922839.091875
1555200
0
86869388.37528
38960959.6472727
30958200
880588.8
0
360069291.1629
25853337.972
2127554154.40664
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
JUMLAH 3.1.PEKERJAAN PASAN
190232377.53
113307075.96
45913530.78
726841.5
697294.5
2219340
19132603.6873125
14643297.4438437
15900877
662448
30420057.6
4148402.33965781
0
0
146806848.162
87441764.184
35432563.212
619426.5
823620
3505260
17454305.11825
15432719.8018812
3778060
662448
17857700.48
767818861.798946
222896.08
211788.28
301698760.1232
2863377.5456
163466.05
3946070.447
Pek. Gedung P (IPRS) - page 1245 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
38788.2
222896.08
211788.28
422403.498
0
0
139042574.704
1906094.52
163466.05
3946070.447
453825351.2848
140831.940857143
136889.688669643
153194168.625583
39684320.7453295
26955.5
364438.36
15603.96
11778337.1268
140831.940857143
633743.733857143
140831.940857143
136889.688669643
0
0
87850964.7066857
3304517.08448518
26955.5
242599.5
15603.96
7613484.1632
140831.940857143
7060046.02710943
13034849.7522551
6080663.46759816
12439913.2852183
5774599.26622056
5406114.08296034
2685974.74692937
8517162.5000275
221314.5
13034849.7522551
5778167.90327238
6080663.46759816
5683385.01374712
5774599.26622056
5406114.08296034
311726620.07305
26069699.5045101
24322653.8703926
124399132.852183
5774599.26622056
16218342.248881
0
112810939.371034
25551487.5000825
2556182.475
0
0
0
117313647.770296
17334503.7098171
6080663.46759816
5683385.01374712
5774599.26622056
16218342.248881
Pek. Gedung P (IPRS) - page 1246 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3060245.97633562
9118684.9781775
221314.5
JUMLAH 3.4.PEKERJAAN PASAN
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
72894.9375
681324.6825
239095.395
0
6120491.95267125
483290303.843407
2081462.8725
997600437.233442
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
72894.9375
681324.6825
239095.395
JUMLAH 3.5.PEKERJAAN PASAN
9555234.04
4168931.976
618149.07
487733.4
12180415.3802719
1251802.2
1070699.355
767178.1425
553501.04
653004
1220747.22
291579.75
2725298.73
956381.58
0
0
9555234.04
4168931.976
618149.07
487733.4
12180415.3802719
1251802.2
1070699.355
767178.1425
553501.04
653004
1220747.22
291579.75
2725298.73
956381.58
73001311.7675438
32850.26245
42825.079055
36922.091195
3427.5273666667
72022196.5556156
21094040.8495522
51366013.270484
2587200.482181
Pek. Gedung P (IPRS) - page 1247 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
32850.26245
42825.079055
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
399712.5
0
0
53831416.284348
18559923.3255769
24255598.5896433
1672359.152744
245388748.510145
3037815
0
0
3037815
169130.993888889
4228274.84722222
110129.34
660776.04
0
100980.733333333
0
100980.733333333
110129.34
110129.34
69473.34
1250520.12
45554.74
364437.92
27688.1
544371.796
996771.6
544371.796
0
0
0
0
100980.733333333
0
100980.733333333
110129.34
110129.34
69473.34
1945253.52
45554.74
1184423.24
27688.1
841902.532
1079835.9
841902.532
13518787.6618889
HARGA SATUAN
JUMLAH HARGA
(Rp)
Pek sipil
(Rp)
212520
3625807.152
212520
7251614.304
0
171508.450666667
287991
2744135.21066667
575982
0
104649.38
1046493.8
67381.1013333333
135531
1684527.53333333
542124
0
41027.47
82054.94
36182.63
434191.56
26492.95
900760.3
11827.2
1335063.4968
236544
1335063.4968
0
0
0
0
171508.450666667
287991
2058101.408
575982
0
104649.38
2720883.88
67381.1013333333
227007
135531
2560481.85066667
227007
406593
0
41027.47
246164.82
36182.63
434191.56
26492.95
1845881.10373333
1033225.05
1845881.10373333
0
0
0
0
171508.450666667
1715084.50666667
0
104649.38
1046493.8
0
Pek. Gedung P (IPRS) - page 1249 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
55231.7333333333
684871.821333333
662780.8
684871.821333333
33263753.7452
18299177.6
11291821.2
11606227.6
11133262.8
18299177.6
11291821.2
11606227.6
11133262.8
0
179571.333333333
10774280
27785.2666666667
277852.666666667
94871.3333333333
948713.333333333
27785.2666666667
277852.666666667
0
0
0
11053983.6
11133262.8
11053983.6
0
11053983.6
11133262.8
11053983.6
21009.2666666667
210092.666666667
27785.2666666667
277852.666666667
27785.2666666667
277852.666666667
98616215.8666667
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
36081.1
378921.4
318582
82689.2
216486.6
108243.3
829865.3
685540.9
0
27664113.6
10075668.8
0
170766.133333333
197562.133333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
170766.133333333
197562.133333333
JUMLAH 5.2.PEKERJAAN TITIK
0
0
437217
159291
82689.2
2237028.2
108243.3
36081.1
0
16564314.9333333
13039100.8
73024076.6333333
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN PEMADAMAN KEBAKARAN
2.2.
PEKERJAAN PENGKONDISIAN UDARA
III.
IV.
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
GROUND FLOOR
1 Plint kayu T. 10 cm
B.
LEVEL-1
1 Plint kayu T. 10 cm
1.2.
1.3.
II.
LEVEL-1
PINTU TYPE
1 A (HM uk. 2X600x1250) SHF-2
2 C (HM uk. 900x2150)
PEKERJAAN MEKANIKAL
2.1.
GROUND FLOOR
1 Instalasi Hydrant
Pek. Gedung P (IPRS) - page 1253 of 2419
NO.
URAIAN PEKERJAAN
a.
b.
c.
d.
Pilar Hydrant ( PH )
e.
B.
f.
f.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
C.
RISER
2 Pipa di Shaft
a.
b.
80 mm
2.2.
c.
d.
NO.
URAIAN PEKERJAAN
Pekerjaan Exhaust Fan
1 Exhaust Fan EF GF.1 , Kapasitas : 600 CFM - Inline Fan
2 Exhaust Fan EF GF.2 , Kapasitas : 350 CFM - Wall Fan
3 Exhaust Fan EF GF.3 , Kapasitas : 450 CFM - Wall Fan
4 Exhaust Fan EF GF.4 , Kapasitas : 300 CFM - Wall Fan
5 Exhaust Fan EF GF.5 , Kapasitas : 500 CFM - Wall Fan
6 Exhaust Fan EF GF.6, Kapasitas : 500 CFM - Wall Fan
7 Exhaust Fan EF GF.7, Kapasitas : 500 CFM - Wall Fan
8 Exhaust Fan EF GF.8, Kapasitas : 500 CFM - Wall Fan
9 Exhaust Fan EF GF.9, Kapasitas : 1 200 CFM - Wall Fan
10 Exhaust Fan EF GF.10, Kapasitas : 1 200 CFM - Wall Fan
11 Exhaust Fan EF GF.11, Kapasitas : 700 CFM - Wall Fan
12 Exhaust Fan EF GF.12, Kapasitas : 700 CFM - Wall Fan
13 Exhaust Fan EF GF.13, Kapasitas : 1800 CFM - Wall Fan
14 Exhaust Fan EF GF.12, Kapasitas : 800 CFM - Wall Fan
15 Instalasi daya listrik Fan, NYM 3 x 2,5 mm2
14" x 10 "
12" x 10 "
8" x 8 "
8" x 6 "
6" x 6 "
2.2 LEVEL 1
Pekerjaan Unit AC
1 Single Split Wall Type ( IU + OU )
-
NO.
URAIAN PEKERJAAN
-
Dran
Dran
14" x 10 "
12" x 10 "
8" x 8 "
8" x 6 "
6" x 6 "
III.
GROUND FLOOR
1 Fixtures lampu lengkap dengan armature
Pek. Gedung P (IPRS) - page 1256 of 2419
NO.
URAIAN PEKERJAAN
B.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
f.
g.
h.
i.
j.
LEVEL 1
1 Fixtures lampu lengkap dengan armature
3.2.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
f.
g.
h.
i.
j.
IV.
NO.
URAIAN PEKERJAAN
4.1.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
1 Instalasi
B.
a.
CTB P ( 20 Pairs )
a.
b.
c.
d.
e.
LEVEL 1
1 Instalsi
4.2.
a.
TB-TP1 ( 10 Pairs )
b.
c.
d.
e.
GROUND FLOOR
1 Instalasi
a.
a.
CTB F
b.
TB.F- PGF
c.
d.
ROR
e.
f.
Smoke Detector
g.
h.
Bell Alarm
j.
Indicator Lamp
Pek. Gedung P (IPRS) - page 1258 of 2419
NO.
URAIAN PEKERJAAN
l.
Flow Switch
m.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
LEVEL 1
1 Instalasi
a.
TB.F- P1
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
4.3.
GROUND FLOOR
1 Sentral Tata Suara
a.
Power Amplifier 90 W
b.
Equalizer
c.
d.
Microphone
e.
Cabinet Rach
2 Instalasi
a.
CTB S
b.
TB-S.GF
c.
d.
e.
Volume Control
Pek. Gedung P (IPRS) - page 1259 of 2419
NO.
URAIAN PEKERJAAN
f.
B.
LEVEL 1
1 Instalasi
4.5.
a.
TB-1
b.
c.
d.
Volume Control
e.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Instalasi
a.
B.
b.
Spliter 4 way
c.
Coupler
d.
Socket TV ( RCA )
d.
LEVEL 1
1 Instalasi
4.6.
a.
Coupler
b.
Socket TV ( RCA )
c.
GROUND FLOOR
1 Instalasi
a.
b.
NO.
URAIAN PEKERJAAN
B.
c.
d.
e.
LEVEL 1
1 Instalasi
a.
b.
c.
SocketData ( RG-45 )
d.
YA
NGGARA BARAT
AN LAIN-LAIN
JUMLAH I.
KEBAKARAN
AN UDARA
JUMLAH II.
JUMLAH IV.
TOTAL PEK. NON ST
NGGARA BARAT
SAT
2
VOLUME
3
u T. 10 cm
m1
9.5
u T. 10 cm
m1
198.47
00x1250) SHF-2
unit
unit
1
1
00x1250) SHF-2
unit
unit
1
1
AN LAIN-LAIN
bh
bh
13
4
bh
bh
12
4
KEBAKARAN
SAT
VOLUME
Set
l Valve, diameter 65 mm :
Bh
Bh
ydrant ( PH )
Set
21
23
Sch.40 diameter 65 mm
an Bantu ( Fitting-Fitting )
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
an Bantu ( Fitting-Fitting )
Ls
Sch.40 diameter
ameter 100 mm
Bh
ameter 50 mm
Bh
Bh
Ls
AN UDARA
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
260
Bh
Unit
Unit
all Type ( IU + OU )
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
180
54
180
assete Type ( IU + OU )
80
24
Unit
20
Bh
SAT
VOLUME
TL 2 x 36 W / Louvre M6
Bh
TL 2 x 36 W / Louvre M6 + Battere
Bh
Bh
86
Bh
18
TL 1 x 36 W / 84 / Dust Proof
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
43
Bh
Bh
TL 2 x 36 W / Louvre M6
Bh
32
TL 2 x 36 W / Louvre M6 + Battere
Bh
12
Bh
Bh
TL 1 x 36 W / 84 / Dust Proof
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
34
Bh
Bh
Commisioning
Bh
25
Ttk
Ls
SAT
VOLUME
( 20 Pairs )
Bh
PGF ( 10 Pairs )
Bh
20
Bh
Ttk
et analog
Ttk
( 10 Pairs )
Bh
24
Bh
11
Ttk
11
et analog
Bh
11
Telephone ( RJ-11 )
arm ( 2 zone )
Unit
Unit
Unit
30
Bh
12
Bh
Bh
10
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
SAT
Bh
VOLUME
1
Unit
27
Unit
34
Bh
21
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
27
Amplifier 90 W
Unit
Unit
Unit
Bh
Unit
Unit
Unit
dari CTB-A ke TB F 1
Temperature Detector
Detector
l Breack Glass
20
Bh
21
Bh
1
Pek. Gedung P (IPRS) - page 1269 of 2419
SAT
VOLUME
Ttk
22
Bh
34
Bh
22
Bh
Ttk
30
Unit
Bh
Bh
Bh
Ttk
Bh
Bh
Ttk
ata 2 x 24 Port
Unit
Unit
TV ( RCA )
TV ( RCA )
SAT
VOLUME
20
Bh
Ttk
Unit
24
Data ( RG-45 )
Bh
28
Ttk
28
JUMLAH HARGA
6=4X5
17240713
16254414
15462562.5
48957689.5
31909595.632
292528874.013744
324438469.645744
73333606.6666667
13436931.2
86770537.8666667
17737236.2933333
23854423.3333333
29104904.18
7257361.46666667
17673227.5866667
95627152.86
555793849.87241
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
82900
787550
0
82900
JUMLAH 1.1.PEKERJA
16453163
17240713
2964394.125
5162812.875
2964394.125
5162812.875
0
0
0
2964394.125
5162812.875
2964394.125
5162812.875
JUMLAH 1.2.PEKERJA
450202.5
525937.5
450202.5
525937.5
JUMLAH 1.3.PEKERJAA
16254414
5852632.5
2103750
0
5402430
2103750
15462562.5
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
3546400
1375680
1375680
0
313351.573333333
6580383.04
313351.573333333
7207086.18666667
155862.666666667
935176
253459.066666667
253459.066666667
2944529.04533333
2944529.04533333
0
0
0
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
1182133.33333333
0
155862.666666667
935176
187035.2
187035.2
0
0
0
0
313351.573333333
1566757.86666667
313351.573333333
1566757.86666667
0
253459.066666667
253459.066666667
177567.866666667
177567.866666667
107800
107800
470027.36
470027.36
31909595.632
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
751700.986666667
751700.986666667
540150.666666667
540150.666666667
588260.266666667
2353041.06666667
540150.666666667
540150.666666667
588260.266666667
588260.266666667
588260.266666667
588260.266666667
588260.266666667
588260.266666667
588260.266666667
588260.266666667
861857.333333333
861857.333333333
861857.333333333
861857.333333333
640435.466666667
640435.466666667
640435.466666667
640435.466666667
1193340.92307692
1193340.92307692
683801.866666667
683801.866666667
6591.2
1713712
0
0
0
0
2604907.008
5209814.016
2387831.424
7163494.272
1736604.672
8683023.36
1519529.088
13675761.792
1302453.504
3907360.512
945435.26
7563482.08
0
0
0
0
0
0
3900248
3900248
7872440.84
15744881.68
Pek. Gedung P (IPRS) - page 1275 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5528825.72
5528825.72
7872440.84
7872440.84
7872440.84
7872440.84
5528825.72
5528825.72
5528825.72
5528825.72
170503.813333333
30690686.4
108605.053333333
5864672.88
356479.2
64166256
0
15497372
15497372
15497372
15497372
170503.813333333
13640305.0666667
108605.053333333
2606521.28
21009.2666666667
84037.0666666666
0
0
0
751700.986666667
751700.986666667
6591.2
131824
0
0
0
3953125.73333333
7906251.46666667
1209116.77333333
3627350.32
1736604.672
8683023.36
66412.1333333333
597709.2
1302453.504
3907360.512
945435.26
7563482.08
292528874.013744
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
276475.466666667
276475.466666667
521766.666666667
521766.666666667
132146.666666667
11364613.3333333
782146.666666667
14078640
117917.066666667
117917.066666667
372017.066666667
1488068.26666667
89519.4666666667
268558.4
272409.866666667
11713624.2666667
517701.066666667
517701.066666667
516345.866666667
2065383.46666667
0
0
0
276475.466666667
8847214.93333333
521766.666666667
6261200
132146.666666667
528586.666666667
782146.666666667
1564293.33333333
117917.066666667
117917.066666667
372017.066666667
1488068.26666667
89519.4666666667
268558.4
272409.866666667
9261935.46666667
517701.066666667
517701.066666667
516345.866666667
2065383.46666667
73333606.6666667
8377600
8377600
174944
349888
50512
1262800
1694000
1694000
1752643.2
1752643.2
13436931.2
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
192548.4
192548.4
168154.8
168154.8
20331.6666666667
406633.333333333
201415.5
1409908.5
498793.386666667
3491553.70666667
215147.166666667
1506030.16666667
0
0
0
0
168154.8
168154.8
13555.6666666667
325336
201415.5
2215570.5
498793.386666667
5486727.25333333
215147.166666667
2366618.83333333
17737236.2933333
2618000
2618000
169400
169400
240240
240240
87472
2624160
0
74572.6666666667
894872
77960.6666666667
155921.333333333
231775.866666667
2317758.66666667
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
Pek. Gedung P (IPRS) - page 1278 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
83160
83160
0
160910.133333333
4344573.6
0
0
0
240240
240240
87472
2974048
0
74572.6666666667
1566026
77960.6666666667
155921.333333333
231775.866666667
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
83160
83160
0
160910.133333333
4344573.6
23854423.3333333
3569807.26666667
3569807.26666667
1956441.66666667
1956441.66666667
2413821.66666667
2413821.66666667
815816.833333333
1631633.66666667
785400
785400
0
378840
378840
266112
266112
18849.6
376992
153993.766666667
3233869.1
258720
258720
Pek. Gedung P (IPRS) - page 1279 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
151320.106666667
3329042.34666667
0
0
0
0
266112
266112
18849.6
640886.4
153993.766666667
3387862.86666667
258720
2069760
151320.106666667
4539603.2
29104904.18
220366.666666667
220366.666666667
227069.333333333
227069.333333333
227069.333333333
454138.666666667
84736.6666666667
508420
369236.266666667
2215417.6
0
0
0
0
227069.333333333
454138.666666667
84736.6666666667
593156.666666667
369236.266666667
2584653.86666667
7257361.46666667
229874.7
229874.7
271885.9
271885.9
Pek. Gedung P (IPRS) - page 1280 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
21560
431200
15753.1
47259.3
498793.386666667
1496380.16
0
0
0
0
271885.9
271885.9
21560
517440
15753.1
441086.8
498793.386666667
13966214.8266667
17673227.5866667
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
1 PEKERJAAN STRUKTUR
III.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Listrik Kerja dan Air Kerja
II.
PEKERJAAN STRUKTUR
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
7 Plat Pondasi STP
8 Toolkits (Lab mini)
III.
b.
c.
d.
e.
Difusser (1 unit)
f.
Blower (2 unit)
g.
h.
i.
j.
k.
l.
NO.
URAIAN PEKERJAAN
- Analisa Laboratorium
- Buku manual
- Training operator
- Koordinasi pekerjaan sipil
2 Grease Trap Kapasitas 3 m3 (Pagakape-FRP)
3 Bak Kontrol
3 Kolam Indikator uk. 1 x 1 0.6 m
4 Sumpit uk. 80 x 120 x 120 (variable)
5 Pompa sumbmersible (Sawage pump)
Kapasitas : 400 Lt/mnt
Head
: 25 m
Jumlah
: 20 m
Jumlah
AYA
ENGGARA BARAT
JUMLAH I.
JUMLAH II.
JUMLAH II.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
ENGGARA BARAT
tas : 130 M3
SAT
2
VOLUME
3
ls
m'
Ls
1
52.8
1
m3
m3
m3
m3
m3
m3
ls
542.5
217
325.5
10.85
5.425
32.55
1
Set
en (1 unit)
fitting (1 lot )
Mobilisasi (1 lot)
mmissioning (1 ls)
SAT
VOLUME
ekerjaan sipil
as 3 m3 (Pagakape-FRP)
Unit
Unit
Unit
x 120 (variable)
Unit
e (Sawage pump)
Set
Set
1 x 1 0.6 m
1 Panel Control
e (Sawage pump)
1 Panel Control
Meter
1150
O ) diameter 150 mm
Buah
m3
230
m3
23
JUMLAH HARGA
5668000
5668000
337762998.247967
337762998.247967
524981590.333333
524981590.333333
868412588.581301
86841258.8581301
955253847.439431
955254000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
1000000
60000
1500000
JUMLAH I.PEKERJAAN PERSIAPA
1000000
3168000
1500000
5668000
48050
18975
12540
174620
777796.25
8030179.92601282
36000000
JUMLAH II.PEKERJAAN STRUKTU
26067125
4117575
4081770
1894627
4219544.65625
261382356.591717
36000000
337762998.247967
16632000
16632000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
4127200
4127200
212520
212520
750000
750000
450000
1350000
8477392
16954784
7693840
7693840
399700.693333333
459655797.333333
362527
2537689
48050
11051500
174620
JUMLAH PENGADAAN DAN INSTA
4016260
524981590.333333
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
2.2.
PEKERJAAN TANAH
2.3.
PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4.
LANTAI DASAR ( EL. + 0,00 M )
2.5.
DAK ATAP
2.6.
ATAP
III.
PEKERJAAAN ARSITEK
3.1.
PEKERJAAN PASANGAN DINDING
3.2.
PEKERJAAN PASANGAN LANTAI
3.3.
PEKERJAAN PASANGAN PLAFOND
3.4.
PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5.
PEKERJAAN PENGECATAN
3.6.
PEKERJAAN SIGNAGE ROOM DAN LAIN-LAIN
IV.
PEKERJAAN PLUMBING
4.1.
PEKERJAAN AIR BERSIH
4.2.
PEKERJAAN AIR KOTOR
4.3.
PEKERJAAN EXHAUST FAN
V.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
III.
URAIAN PEKERJAAN
7 SLOOF TB1 20/35
8 SLOOF TB2 20/30
9 PONDASI BATU KALI
2.4.
2.5.
DAK ATAP
1 BALOK TYPE RB (20x35)
2 BALOK TYPE RB1 (20x30)
3 BALOK TYPE RB2 (20x60)
4 BALOK TYPE BM (20x30)
5 BALOK TYPE BM1 (20x50)
6 PELAT DAK ATAP SA
7 - Water Profing Bithuthene Sheet 3000
8 - Pasangan screed lengkap kawat ayam
2.6.
ATAP
1 GORDENG BAJA
- Gording CNP 100.75.3.2
- Trekstang 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
4 ORNAMEN KUBAH
- Ornamen Kubah Lengkap
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
NO.
URAIAN PEKERJAAN
GROUND FLOOR
1 Lantai keramik 30 x 30 cm
2 Plint keramik 10 x 20 cm
3 Dinding keramik 20 x 25 cm
4 Lantai homogenius tile 60 x 60 cm
5 Plint homogenius tile 10 x 60 cm cutting size
6 Plint kayu T. 10 cm
7 Pasangan Paving Block
3.3.
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
3.4.
3.5.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecatan dinding traffic resistant paint
3 Pengecetan Watershiel (Exterior)
4 Pengecatan plafond emulsion paint
Pek. Gedung U (Masjid) - page 1295 of 2419
NO.
URAIAN PEKERJAAN
5 Pengecatan list plafond emulsion paint
3.6.
IV.
PEKERJAAN PLUMBING
4.1.
PEKERJAAN AIR BERSIH
A.
GOUND FLOOR
1 Pipa utama Polypropeline PN.10 dari Jaringan site
a.
PPR diameter 50 mm
2 Meter Air
3 Gate Valve :
a.
GV diameter 50 mm
4 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
5 Peralatan Bantu ( Fitting-Fitting )
4.2.
e.
t.
PVC diameter 50 mm
CO diameter 50 mm
PVC diameter 32 mm
b.
PVC diameter 25 mm
NO.
URAIAN PEKERJAAN
8 Peralatan Bantu ( Fitting-Fitting )
4.3.
V.
5.2.
5.3.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
NO.
URAIAN PEKERJAAN
e
AYA
ENGGARA BARAT
JUMLAH I.
JUMLAH II.
M DAN LAIN-LAIN
JUMLAH III.
JUMLAH IV.
ABEL FEEDER
SI DAYA DAN PENERANGAN
AN FIXTURE ARMATUR PENERANGAN
JUMLAH V.
JUMLAH PEK. STAND
PPN 10%
TOTAL
Pek. Gedung U (Masjid) - page 1299 of 2419
DIBULATKAN
ENGGARA BARAT
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
120
15
1
120
1
1
m3
m3
m3
m2
m3
540
108
378
625
108
m3
m3
m2
m3
m3
m3
136.864
95.8048
359
41.0592
46.5448
23.2724
m3
btg
m3
btg
m3
btg
3.6288
57
8.82
96
7.35
78
Pek. Gedung U (Masjid) - page 1301 of 2419
SAT
m3
m3
m1
VOLUME
13.44
3.444
27
m3
m3
m3
28.72
16.896
11.682
m3
m3
m3
m3
m3
m3
m2
m2
15.96
2.04
1.92
2.616
6.12
7.6
76
76
kg
bh
1275.2280701754
115.8198245614
m3
m3
m1
3.23468208
1.5138327273
137.76
m2
m1
396.48
46.2
unit
m2
m2
m2
m1
m1
m1
497.9549
995.9098
995.9098
565.4
229.5
282.7
NGAN DINDING
ata ringan
aktis 12/12
ktis 12/12
SAT
VOLUME
m1
m1
229.5
60.06
ramik 30 x 30 cm
mik 10 x 20 cm
eramik 20 x 25 cm
mogenius tile 60 x 60 cm
ogenius tile 10 x 60 cm cutting size
u T. 10 cm
Paving Block
m2
m1
m2
m2
m1
m1
m2
22.58
36.4
81.485
285.71
73.02
65.73
23.96
gypsum 9 mm
grc 9 mm
nd gypsum
m2
m2
m1
210.37
22.58
248.25
unit
unit
unit
3
3
4
unit
unit
unit
unit
4
12
1
6
NGAN LANTAI
2x900x2150)/ (DW/2')
900x2150)
750x2150) *Plastic Laminate
m
m
m
m
375.625
81.605
730.996
232.95
Pek. Gedung U (Masjid) - page 1303 of 2419
SAT
m
VOLUME
248.25
M DAN LAIN-LAIN
bh
bh
m1
bh
4
4
96.4539
19
ameter 50 mm
m
Bh
25
1
meter 50 mm
ypropelyne PN.10 :
Bh
ameter 40 mm
20
ameter 32 mm
ameter 25 mm
14
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
45
1
Unit
Unit
Unit
g bangunan U-ditc 20 x 30 cm
1
1
2
:
m
Bh
32
2
ameter 100 mm
25
ameter 50 mm
meter 50 mm
m
Bh
8
1
ameter 32 mm
20
ameter 25 mm
14
20
ameter 100 mm
meter 100 mm
tu ( Fitting-Fitting )
SAT
Ls
VOLUME
Unit
Unit
Unit
160
ABEL FEEDER
Unit
40
Bh
Bh
Bh
Bh
6
4
10
2
Ttk
Ttk
Ttk
203
10
2
36 W / Louvre M6
Bh
16
Bh
ng 5 x PLC 13 W
Bh
Light PLC 13 W
Bh
19
ontak 200 W / 16 A
Baret TLC 20 W
SAT
Bh
VOLUME
4
JUMLAH HARGA
43862020
43862020
92573689
46886207.0725
Err:509
355977121.457384
325889546.146617
198717676.661337
Err:509
168301752.014085
90879567.0958
36591467.6382777
213861356.346996
56232374.2918872
37079382.5
602945899.887046
10097303.9538889
22042984.1896
10518746.0266667
42659034.1701556
12052912.6666667
38374453.2133333
12372546.2666667
62799912.1466667
Err:509
Err:509
Err:509
Pek. Gedung U (Masjid) - page 1307 of 2419
Err:509
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
2000000
3000000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
7200000
8508180
1000000
19653840
2000000
3000000
43862020
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
5788800
2827440
59405724
20453125
4098600
92573689
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
6576315.2
1817896.08
11748275
514882.368
8127652.976
18101185.4485
46886207.0725
5832589.53177084
24000
5152633.71333333
24000
5872993.808
24000
21165300.89289
1368000
45446229.3516
2304000
43166504.4888
1872000
Pek. Gedung U (Masjid) - page 1309 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7388503.09096429
8054841.311
Err:509
JUMLAH 2.3.PEKERJAAN PONDAS
99301481.54256
27740873.475084
Err:509
Err:509
3087224.12682292
8502124.84438802
10585528.4338512
JUMLAH 2.4.LANTAI DASAR ( EL.
88665076.9223542
143651901.37078
123660143.16425
355977121.457384
7816368.41165714
10079336.6526111
8493284.43822222
10079336.6526111
9300793.8716
7143851.34558333
246240
104940
JUMLAH 2.5.DAK ATAP
124749239.850048
20561846.7713267
16307106.1213867
26367544.6832307
56920858.494192
54293270.2264333
18714240
7975440
325889546.146617
31192.48691625
116640
39777534.8941821
13509224.3368421
0
19563357.21984
8774174.48727273
22565088
0
81089141.9712
8489155.752
0
4950000
198717676.661337
6048000
5796000
163800
204522.654285714
183747.96
4950000
JUMLAH 2.6.ATAP
141700
42200
17100
3710
11280
21700
70560209.33
42027393.56
17030057.58
2097634
2588760
6134590
Pek. Gedung U (Masjid) - page 1310 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
95902.775375
97459.550375
JUMLAH 3.1.PEKERJA
22009686.9485625
5853420.5955225
168301752.014085
167877.55
17760
163760
222896.08
26420
82900
85000
JUMLAH 3.2.PEKERJA
3790675.079
646464
13343983.6
63683639.0168
1929188.4
5449017
2036600
90879567.0958
140831.940857143
136889.688669643
15603.96
JUMLAH 3.3.PEKERJA
29626815.3981172
3090969.17016054
3873683.07
36591467.6382777
19757758.1979582
5778167.90327238
5406114.08296034
59273274.5938747
17334503.7098171
21624456.3318414
0
0
4902587.826565
54632262.49602
4192521.64496
51901749.7439183
1225646.95664125
4552688.541335
4192521.64496
8650291.62398638
JUMLAH 3.4.PEKERJA
32850.26245
38430.833375
42825.079055
36922.091195
213861356.346996
12339379.8327813
3136148.15756687
31304961.4888888
8601001.14387525
Pek. Gedung U (Masjid) - page 1311 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3427.5273666667
JUMLAH 3.5.PEKERJA
450202.5
525937.5
275000
350000
JUMLAH 3.6.PEKERJAA
169130.993888889
321552
143687.866666667
850883.668775
56232374.2918872
1800810
2103750
26524822.5
6650000
37079382.5
4228274.84722222
321552
0
143687.866666667
0
110129.34
2202586.8
69473.34
416840.04
45554.74
637766.36
27688.1
900631.54
1245964.5
900631.54
10097303.9538889
Pek sipil
212520
3625807.152
0
212520
7251614.304
0
171508.450666667
287991
5488270.42133333
575982
0
171508.450666667
4287711.26666667
55231.7333333333
125367
441853.866666667
125367
0
36182.63
723652.6
26492.95
370901.3
11827.2
236544
Pek. Gedung U (Masjid) - page 1312 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2328567.43093333
2328567.43093333
22042984.1896
55666.6666666667
55666.6666666667
55666.6666666667
55666.6666666667
1169102.58666667
4676410.34666667
1169102.58666667
4676410.34666667
6591.2
1054592
10518746.0266667
11212542
11212542
0
21009.2666666667
840370.666666666
12052912.6666667
29147.8
31858.2
36081.1
383768
174886.8
127432.8
360811
767536
0
34665525.0666667
1975621.33333333
302640.213333333
170766.133333333
197562.133333333
151320.106666667
JUMLAH 5.2.PEKERJAAN TITIK
38374453.2133333
276475.466666667
4423607.46666667
132146.666666667
528586.666666667
780890
780890
272409.866666667
5175787.46666667
Pek. Gedung U (Masjid) - page 1313 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
365918.666666667
1463674.66666667
12372546.2666667
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
2.2.
PEKERJAAN TANAH
2.3.
PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4.
LANTAI DASAR ( EL. + 0,00 M )
2.5.
RING BALOK ( EL. + 3.60 M )
2.6.
ATAP
III.
PEKERJAAAN ARSITEK
3.1.
PEKERJAAN PASANGAN DINDING
3.2.
PEKERJAAN PASANGAN LANTAI
3.3.
PEKERJAAN PASANGAN PLAFOND
3.4.
PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5.
PEKERJAAN PENGECATAN
3.6.
PEKERJAAN SIGNAGE ROOM DAN LAIN-LAIN
IV.
PEKERJAAN MEKANIKAL
4.1.
PEKERJAAN AIR BERSIH
4.2.
PEKERJAAN AIR KOTOR
4.3.
PEKERJAAN FIRE EXTINGUISHER
4.4.
PEKERJAAN PENGKONDISIAN UDARA EXHAUST FAN & FIRE EXTINGUISHER
V.
VI.
6.4.
6.5.
6.6.
PEKERJAAN MATV
PEKERJAAN DATA LAN
PEKERJAAN CCTV
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
III.
URAIAN PEKERJAAN
2.4.
2.5.
2.6.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Besi L 45.45.4
- Plat Buhul t=12 mm
- Base plate 300 x 300 mm t =16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Mur + Baut 12 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Talang jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
Pek. Gedung W (Gedung Logistik) - page 1318 of 2419
NO.
URAIAN PEKERJAAN
GROUND FLOOR
1 Lantai keramik 30 x 30 cm
2 Plint keramik 10 x 20 cm
3 Dinding keramik 20 x 25 cm
4 Lantai floor hardener
5 Lantai homogenius tile 60 x 60 cm
6 Plint homogenius tile 10 x 60 cm cutting size
3.3.
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 Acustic Tile 60 x 60 cm
4 Plapond exposed
5 List plafond gypsum
3.4.
NO.
URAIAN PEKERJAAN
JENDELA
1 BV/3E
2 W3E
3 DW/4E
IV.
3.5.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecatan dinding dustrproff paint
3 Pengecetan Watershiel (Exterior)
4 Pengecatan plint Int Semi Gloss
5 Pengecatan plafond dustrproff paint
6 Pengecatan list plafond emulsion paint
3.6.
PEKERJAAN MEKANIKAL
4.1.
PPR diameter 40 mm
2 Meter Air
2 Gate Valve :
a.
GV diameter 40 mm
PPR diameter 32 mm
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
4.2.
NO.
URAIAN PEKERJAAN
2 Portable Grease trap
3 Submersible Swage Pump 150 Lpm - Head 80 meter
3 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
b.
c.
CO diameter 100 mm
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
PVC diameter 50 mm
d.
CO diameter 80 mm
PVC diameter 25 mm
4.3.
4.4.
A.
B.
Dran
NO.
V.
URAIAN PEKERJAAN
GROUND FLOOR
1 Panel Listrik
b.
PP - W
c.
LP - W
2 Kabel Feeder
5.2.
a.
b.
Saklar tunggal
b.
Saklar ganda
d.
e.
f.
2 Titik instalasi
a.
b.
5.3.
Ukuran 30 Cm
Lampu TL 2 x 36 W / Louvre M6
b.
c.
d.
e.
f.
NO.
VI.
URAIAN PEKERJAAN
PEKERJAAN TELEPHONE
1 Instalasi
6.2.
a.
TB-T GF ( 10 Pairs )
b.
c.
d.
e.
TB.F- W
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
j.
Indicator Lamp
l.
Flow Switch
m.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
6.3.
TB-S.W
b.
c.
d.
Volume Control
Pek. Gedung W (Gedung Logistik) - page 1323 of 2419
NO.
URAIAN PEKERJAAN
e.
6.4.
PEKERJAAN MATV
1 Instalasi
a.
6.5.
Terminak Box
b.
Spliter 4 way
c.
Socket TV ( RCA )
d.
6.6.
a.
b.
c.
d.
PEKERJAAN CCTV
1 Sentral CCTV
-
Bivar
Rack CCTV
2 Instalasi
1 Fixed Dome Camer
2 Instalasi Camera
YA
OGISTIK)
NGGARA BARAT
JUMLAH I.
JUMLAH II.
M DAN LAIN-LAIN
JUMLAH III.
ABEL FEEDER
SI DAYA DAN PENERANGAN
AN FIXTURE ARMATUR PENERANGAN
JUMLAH V.
JUMLAH VI.
JUMLAH PEK. STAND
PPN 10%
TOTAL
DIBULATKAN
OGISTIK)
NGGARA BARAT
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
110
35
1
110
1
1
m3
m3
m3
m2
m3
420
84
294
490
84
m3
m3
m2
m3
m3
m3
139.23
97.461
507
41.769
64.56975
32.284875
m3
btg
m3
btg
m3
m3
m1
10.395
49.5
12.096
90
26.6625
8.127
6
SAT
00 mm t =16 mm
m-400mm
VOLUME
m3
m3
m3
34.96
14
19.747
m3
m3
m3
m3
m2
m2
11.475
9.6
1.26
16.1
161
161
kg
kg
kg
kg
kg
unit
bh
bh
bh
bh
bh
kg
bh
bh
1793.2824
6009.696
3098.347
246.8466
1337.78064
20
80
320
1374
1000
132
3466.4921052632
186.8636842105
10
m3
m3
m1
m1
5.216952825
2.4415363636
107.1
18.3
m2
m1
639.45
93.765
NGAN DINDING
Pek. Gedung W (Gedung Logistik) - page 1328 of 2419
ata ringan
artisi Gypsum Board
SAT
VOLUME
m2
m2
m2
m2
m1
m1
m1
m1
m1
1016.9895
18.42
2033.979
2033.979
600.08
289.8
300.04
289.8
66.517
ramik 30 x 30 cm
mik 10 x 20 cm
eramik 20 x 25 cm
or hardener
mogenius tile 60 x 60 cm
ogenius tile 10 x 60 cm cutting size
m2
m1
m2
m2
m2
m1
8.1
20.09
442.771
26.43
371.17
312.95
gypsum 9 mm
grc 9 mm
le 60 x 60 cm
xposed
nd gypsum
m2
m2
m2
m2
m1
160.01
84.79
191.16
26.43
471.29
unit
unit
unit
unit
unit
unit
unit
unit
10
4
3
1
2
3
2
2
NGAN LANTAI
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 2x900x2150)
2x900x2150)
900x2150)
00x2150)
SAT
unit
unit
unit
VOLUME
9
12
1
m
m
m
m1
m
m
1075.1175
109.89
190.117
23.25
462.39
471.29
bh
bh
m1
bh
17
4
108.9833
12
20
Bh
Bh
12
10
20
M DAN LAIN-LAIN
g bangunan U-ditc 20 x 30 cm
lyne PN.10 :
ting-Fitting )
Ls
Unit
SAT
Kelas 10 kg/cm2
VOLUME
Unit
Unit
:
m
38
Bh
Bh
12
ting-Fitting )
Ls
Bh
Unit
Unit
Liquid + Suction )
36
12
40
AN UDARA
e ( IU + OU )
Unit
Unit
Unit
Unit
Unit
280
SAT
VOLUME
ABEL FEEDER
Unit
Unit
DP - PP - W, NYY 4 x 16 mm2
60
P - W ke LP - W, NYY 4 x 4 mm2
10
Bh
32
Bh
00 W / 16 A
Bh
38
50 W / 16 A
Bh
00 W / 16 A
Bh
Ttk
55
Ttk
43
30
36 W / Louvre M6
Bh
36 W / Louvre M6 + Battere
Bh
Bh
27
18 W / IP-40/Cove wastafel
Bh
Light PLC 13 W
Bh
21
Bh
SAT
VOLUME
Bh
20
one ( RJ-11 )
Bh
Ttk
Ttk
Unit
30
Bh
Bh
Bh
11
Bh
Bh
Bh
Bh
ature Detector
Unit
23
Unit
20
er 3 Watt
Bh
Bh
SAT
VOLUME
Ttk
Unit
Bh
Bh
Ttk
B Managable 1 x 12 port )
Unit
t 5e - 0,6 mm2
20
Bh
Ttk
Set
Unit
Set
Set
Unit
Set
Unit
Ttk
with Printer
JUMLAH HARGA
52968440
52968440
72129022
62040906.6867188
Err:509
358140588.660105
393131223.258582
822166091.126774
Err:509
314862806.865969
166250434.6546
72119458.3898505
376698341.963753
67194899.5473783
43927600
1041053541.42155
4836706.90933333
18347200.4848
1773200
32443794.4533333
57400901.8474667
26968868.6666667
20435242.3666667
20776782.7666667
68180893.8
3320856.29333333
10393754
1969085.72666667
Pek. Gedung W (Gedung Logistik) - page 1335 of 2419
1809354.8
1732178.87333333
30688606
49913835.6933333
Err:509
Err:509
Err:509
Err:509
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
2000000
3000000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
6600000
19852420
1000000
18016020
2000000
3000000
52968440
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
4502400
2199120
46204452
16035250
3187800
72129022
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
6690001.5
1849322.475
16591575
523783.26
11275169.745
25111054.7067187
62040906.6867188
4838362.77833333
24000
5885542.89010417
24000
7600874.05146667
7388503.09096429
Err:509
50294781.080775
1188000
71191526.7987
2160000
202658304.39723
60046364.6202667
Err:509
Pek. Gedung W (Gedung Logistik) - page 1337 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 2.3.PEKERJAAN PONDAS
Err:509
3087224.12682292
2683307.06279167
10768467.8334579
JUMLAH 2.4.LANTAI DASAR ( EL.
107929355.473729
37566298.8790833
212644934.307293
358140588.660105
9575887.65238518
10311662.6668
10079336.6526111
7143851.34558333
246240
104940
JUMLAH 2.5.RING BALOK ( EL. +
109883310.81112
98991961.60128
12699964.18229
115016006.663892
39644640
16895340
393131223.258582
31192.48691625
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
23040
20160
31192.48691625
116640
97200
6048000
5796000
163800
52416
204522.654285714
183747.96
JUMLAH 2.6.ATAP
55936937.7991414
187457363.85064
96645148.2595025
7699759.3408208
41728705.1100126
9763200
15091200
7372800
31656960
23040000
2661120
108128509.638705
21795780.1263158
972000
0
31552130.6856
14151144.7636364
17542980
959212.8
0
130782011.283
17229127.4694
822166091.126774
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
141700
209500
42200
17100
3710
11280
21700
95902.775375
97459.550375
JUMLAH 3.1.PEKERJA
144107412.15
3858990
85833913.8
34781040.9
2226296.8
3268944
6510868
27792624.303675
6482716.91229388
314862806.865969
167877.55
17760
163760
38788.2
222896.08
26420
JUMLAH 3.2.PEKERJA
1359808.155
356798.4
72508178.96
1025172.126
82732338.0136
8268139
166250434.6546
140831.940857143
136889.688669643
156474.36
26955.5
15603.96
JUMLAH 3.3.PEKERJA
22534518.8565514
11606876.702299
29911638.6576
712433.865
7353990.3084
72119458.3898505
12432894.6291779
5406114.08296034
5774599.26622056
13034849.7522551
12439913.2852183
5778167.90327238
6921547.875
5162812.875
124328946.291779
21624456.3318414
17323797.7986617
13034849.7522551
24879826.5704366
17334503.7098171
13843095.75
10325625.75
Pek. Gedung W (Gedung Logistik) - page 1339 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2678052.9722925
8497688.59289625
7928500.143575
JUMLAH 3.4.PEKERJA
32850.26245
38430.833375
42825.079055
5448.39813375
38430.833375
3427.5273666667
JUMLAH 3.5.PEKERJA
450202.5
525937.5
275000
350000
JUMLAH 3.6.PEKERJAA
0
24102476.7506325
101972263.114755
7928500.143575
376698341.963753
35317892.0395879
4223164.27957875
8141775.55469944
126675.256609687
17770033.0442663
1615359.37263633
67194899.5473783
7653442.5
2103750
29970407.5
4200000
43927600
110129.34
2202586.8
321552
321552
0
100980.733333333
100980.733333333
0
69473.34
833680.08
45554.74
455547.4
27688.1
553762
368597.896
368597.896
4836706.90933333
Pek sipil
0
Pek. Gedung W (Gedung Logistik) - page 1340 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
902440
902440
3625807.152
7251614.304
0
171508.450666667
6517321.12533333
287991
575982
0
104649.38
418597.52
67381.1013333333
269524.405333333
55231.7333333333
220926.933333333
227007
227007
0
26492.95
317915.4
1645871.7968
1645871.7968
18347200.4848
591066.666666667
1773200
1773200
5528825.72
5528825.72
7872440.84
7872440.84
170503.813333333
6138137.28
108605.053333333
1303260.64
8008
320320
0
0
588260.266666667
2941301.33333333
626205.866666667
626205.866666667
588260.266666667
3529561.6
1169102.58666667
1169102.58666667
1169102.58666667
1169102.58666667
6591.2
1845536
Pek. Gedung W (Gedung Logistik) - page 1341 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
32443794.4533333
11640785.2
11640785.2
11133262.8
11133262.8
0
66412.1333333333
3984728
21009.2666666667
210092.666666667
26968868.6666667
29147.8
932729.6
31858.2
63716.4
36081.1
1371081.8
36081.1
72162.2
36081.1
108243.3
0
170766.133333333
9392137.33333333
197562.133333333
8495171.73333333
298549.203333333
20435242.3666667
8956476.1
0
276475.466666667
276475.466666667
521766.666666667
1043533.33333333
132146.666666667
3567960
89519.4666666667
179038.933333333
272409.866666667
5720607.2
516345.866666667
1032691.73333333
Pek. Gedung W (Gedung Logistik) - page 1342 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
20776782.7666667
168154.8
168154.8
20331.6666666667
406633.333333333
201415.5
604246.5
498793.386666667
1496380.16
215147.166666667
645441.5
3320856.29333333
240240
240240
87472
2624160
74572.6666666667
596581.333333333
77960.6666666667
77960.6666666667
231775.866666667
2549534.53333333
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
83160
83160
0
160910.133333333
3700933.06666667
10393754
266112
266112
18849.6
376992
153993.766666667
461981.3
258720
258720
Pek. Gedung W (Gedung Logistik) - page 1343 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
151320.106666667
605280.426666667
1969085.72666667
220366.666666667
220366.666666667
227069.333333333
227069.333333333
84736.6666666667
254210
369236.266666667
1107708.8
1809354.8
271885.9
271885.9
21560
431200
15753.1
31506.2
498793.386666667
997586.773333333
1732178.87333333
10571000
10571000
306570
306570
8470220
8470220
1219900
1219900
1389300
1389300
396616
396616
2667500
5335000
1500000
3000000
30688606
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 3.60 M )
2.6. RING BALOK ( EL. + 6,83 M )
2.7. ATAP
III.
PEKERJAAAN ARSITEK
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
PEKERJAAN PENGECATAN
3.7.
PEKERJAAN RAILLING
3.8.
PEKERJAAN ATAP
IV.
PEKERJAAN PLUMBING
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
4.3. PEKERJAAN AIR HUJAN
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
URAIAN PEKERJAAN
2.4.
2.5.
2.6.
2.7.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 90.90.9
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
Pek. Gedung T (Mortuary/ Forensic) - page 1348 of 2419
NO.
URAIAN PEKERJAAN
- Talang jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
GROUND FLOOR
NO.
URAIAN PEKERJAAN
B.
3.3.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
B.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Acustic Tile 60 x 60 cm
3.4.
LEVEL-1
PINTU TYPE
1 B (AL-ED uk. 900x2150)
2 C (AL-ED uk. 750x2150) *Plastic Laminate
3 E (AL-ED/GL-1* uk. 900x2150)
4 M* (AL-ED uk. 900x2150) *Slidding Door
5 M (AL-ED uk. 2x900x2150)
6 M (AL-ED uk. 900x2150)
JENDELA TYPE
1 BV/3EA
Pek. Gedung T (Mortuary/ Forensic) - page 1350 of 2419
NO.
URAIAN PEKERJAAN
2 BV/4E
3 W/3EA
4 W/4E
3.5.
3.6.
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Kloset jongkok
3 Wastafel gantung lengkap dengan aksesoris
4 Wastafel under counter lengkap dengan aksesoris
5 Cove ligth wastafel
6 Kaca cermin
7 Meja beton
8 Floor drain
9 Memasang kran dinding 1/2"
10 Meja granite wastafel under counter
11 Hand Dryer
12 Tisue holder
13 Soap dish
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecetan Watershiel (Exterior)
3 Pengecatan plafond emulsion paint
4 Pengecatan list plafond emulsion paint
B.
LEVEL-1
1 Pengecatan dinding emulsion paint
2 Pengecatan plafond emulsion paint
Pek. Gedung T (Mortuary/ Forensic) - page 1351 of 2419
NO.
IV.
URAIAN PEKERJAAN
3 Pengecatan list plafond emulsion paint
3.7.
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
3.8.
PEKERJAAN ATAP
a.
Rangka atap baja ringan+material bantu dan aksesories
b.
Penutup atap metal roof
c.
Nok metal roof
d.
List plang GRC 6 mm
PEKERJAAN PLUMBING
4.1. PEKERJAAN AIR BERSIH
A.
GOUND FLOOR
1 Pipa utama Polypropeline PN.10 dari Jaringan site
a.
PPR diameter 50 mm
2 Gate Valve :
a.
GV diameter 40 mm
3 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 50 mm
b.
PPR diameter 40 mm
c.
PPR diameter 32 mm
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
4 Peralatan Bantu ( Fitting-Fitting )
B.
LEVEL 1
1 Gate Valve :
a.
GV diameter 40 mm
2 Pemipaan Polypropelyne PN.10 :
a.
PPR diameter 50 mm
b.
PPR diameter 40 mm
c.
PPR diameter 32 mm
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
3 Peralatan Bantu ( Fitting-Fitting )
NO.
URAIAN PEKERJAAN
4.2.
b.
c.
b.
c.
PVC diameter 80 mm
d.
PVC diameter 65 mm
e.
t.
PVC diameter 50 mm
CO diameter 65 mm
PVC diameter 40 mm
b.
PVC diameter 25 mm
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
d.
e.
f.
PVC diameter 50 mm
CO diameter 80 mm
CO diameter 65 mm
CO diameter 50 mm
PVC diameter 40 mm
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
4 Peralatan Bantu ( Fitting-Fitting )
Pek. Gedung T (Mortuary/ Forensic) - page 1353 of 2419
NO.
URAIAN PEKERJAAN
C.
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
a.
Diameter 50 mm
4 Peralatan Bantu ( Fitting-Fitting )
4.3.
b.
PVC diameter 100 mm
3 Peralatan Bantu ( Fitting-Fitting )
4 Roof Drain :
a.
RD diameter 100 mm
V.
B.
a.
b.
c.
d.
LEVEL 1
1 Panel
a.
b.
c.
d.
Listrik
SDP - T 1
LP - T 1
PP - T 1
PP - AC.T 1
Pek. Gedung T (Mortuary/ Forensic) - page 1354 of 2419
NO.
URAIAN PEKERJAAN
2 Kabel Feeder
5.2.
a.
a.
b.
c.
LEVEL 1
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
Stop Kontak 200 W / 16 A
g.
Stop Kontak 500 W / 16 A
2 Titik instalasi
a.
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC
b.
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam conduit PVC
AYA
FORENSIC)
NGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
FORENSIC)
NGGARA BARAT
JUMLAH I.
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V.
TOTAL PEK. STANDA
FORENSIC)
NGGARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
140
35
1
140
1
1
m3
m3
m3
m2
m3
720
144
252
600
144
m3
m3
m2
m3
m3
m3
244.53
171.171
601.1
73.359
79.70825
39.854125
m3
btg
m3
btg
m3
m3
27.216
160
12.285
58.5
29.61
11.0005
(t=12 cm)
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
SAT
VOLUME
m3
m3
m3
m3
m3
m3
48.088
3.4398
17.952
8.976
0.225
0.24
m3
m3
m3
m3
m3
m3
m2
m2
m3
17.215
17.25
12.112
5.058
59.592
14.97
149.7
149.7
12.144
m3
m3
8.91
6.75
kg
kg
kg
kg
kg
unit
bh
bh
bh
bh
kg
bh
bh
m3
m3
m1
3105.144
699.867
6620.9094
2730.532
1206.157008
18
72
466
1452
880
4007.8113157895
216.0610526316
8
6.0316198425
2.8228009091
107.1
SAT
m1
m2
m1
VOLUME
22.26
739.305
98.91
GAN DINDING
ata ringan
Semen Instant.
men Instant.
Pintu & Jendela
aktis 12/12
ktis 12/12
m2
m2
m2
m1
m1
m1
m1
m1
m2
m1
m1
m2
841.03125
1682.0625
1682.0625
322.38
644.76
273.6
273.6
61.49
13.2675
332.26
30.76
457.3365
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
eramik 20 x 25 cm
m2
292.009
m2
m2
m1
m2
509.79
15.55
25.5
14.92
& Jendela
809.8699
1619.7398
1619.7398
360.15
720.3
226.8
226.8
69.19
355.03
48.73
GAN LANTAI
mogenius tile 60 x 60 cm
ramik 30 x 30 cm
ing keramik 5 x 20 cm
SAT
VOLUME
mogenius tile 60 x 60 cm
ramik 30 x 30 cm
m2
m2
428.32
21.56
gypsum 9 mm
grc 9 mm
nd gypsum
m2
m2
m1
263.7
264.3
439.65
gypsum 9 mm
grc 9 mm
nd gypsum
le 60 x 60 cm
m2
m2
m1
m2
521.138
21.56
546.29
42.13
unit
unit
unit
unit
1
5
6
3
unit
unit
unit
unit
unit
17
6
1
1
1
unit
unit
unit
unit
unit
unit
7
6
1
1
2
5
unit
TU DAN JENDELA
900x2150)
750x2150) *Plastic Laminate
* uk. 2x900x2150)
900x2150)
900x2150)
750x2150) *Plastic Laminate
* uk. 900x2150)
900x2150) *Slidding Door
2x900x2150)
900x2150)
an dinding 1/2"
wastafel under counter
an dinding 1/2"
wastafel under counter
SAT
unit
unit
unit
VOLUME
7
8
2
set
set
set
bh
bh
m
bh
bh
m
bh
bh
bh
3
2
1
1
1
0.089848
5
5
0.89848
1
3
2
set
set
set
set
bh
bh
m
bh
bh
m
bh
bh
bh
4
2
3
1
4
4
0.089848
6
6
0.89848
1
4
6
m
m
m
m'
537.9285
57.2325
528
439.65
m
m
1175.3425
584.828
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
SAT
m'
VOLUME
546.29
13.636
m2
m2
m1
m1
670.0836
670.0836
85.6968
101.4
ameter 50 mm
25
meter 40 mm
ypropelyne PN.10 :
Bh
ameter 50 mm
ameter 40 mm
18
ameter 32 mm
ameter 25 mm
73
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
69
1
meter 40 mm
ypropelyne PN.10 :
Bh
ameter 50 mm
15
ameter 40 mm
14
ameter 32 mm
ameter 25 mm
33
ameter 15 mm
tu ( Fitting-Fitting )
m
Ls
54
1
SAT
Unit
Unit
Unit
Unit
VOLUME
1
1
1
2
ameter 150 mm
14
ameter 100 mm
meter 100 mm
m
Bh
35
2
ameter 150 mm
14
ameter 100 mm
ameter 80 mm
30
ameter 65 mm
48
ameter 50 mm
meter 65 mm
m
Bh
20
8
ameter 40 mm
66
ameter 25 mm
48
m
Ls
20
1
m
Bh
36
5
ameter 80 mm
27
ameter 65 mm
19
ameter 50 mm
meter 80 mm
meter 65 mm
meter 50 mm
m
Bh
Bh
Bh
19
2
6
2
ameter 40 mm
ameter 32 mm
40
ameter 25 mm
tu ( Fitting-Fitting )
m
Ls
16
1
ameter 100 mm
meter 100 mm
SAT
VOLUME
:
m
10
10
m
Ls
12
1
Bh
ameter 150 mm
20
ameter 100 mm
tu ( Fitting-Fitting )
m
Ls
50
1
meter 100 mm
Bh
Unit
Unit
Unit
Unit
1
1
1
1
ter 100 mm
ter 80 mm
ter 50 mm
tu ( Fitting-Fitting )
C Kelas 10 kg/cm2
BEL FEEDER
60
10
10
10
Unit
Unit
Unit
Unit
1
1
1
1
SAT
VOLUME
60
10
10
10
Bh
Bh
Bh
Bh
Bh
Bh
Bh
10
16
1
28
2
8
10
70
38
10
ontak 200 W / 16 A
ontak 500 W / 16 A
Bh
Bh
Bh
Bh
Bh
9
3
1
27
2
Ttk
Ttk
70
29
ontak
ontak
ontak
ontak
200 W / 10 A
350 W / 16 A
1000 W / 16 A
3 Kw / 25 A
JUMLAH HARGA
5537198860.87598
499782660.143333
6036981521.01931
603698152.101932
6640679673.12125
6640680000
JUMLAH HARGA
81981900
81981900
76191936
80505599.1720313
476799202.746946
476787580.954141
1096466513.50729
125806739.294016
926762031.938589
3259319603.61301
661037422.315655
217738146.7813
171638378.310742
501152353.014556
38876455.5767486
103199661.56723
5450479.65
155363783.751
1854456680.96723
23122596.2613333
67861894.3610667
20312737.5733333
111297228.195733
185908267.6
44235180.5
230143448.1
5537198860.87598
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
2500000
60000
567212
1000000
163782
14000000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
2500000
8400000
19852420
1000000
22929480
14000000
13300000
81981900
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
7718400
3769920
39603816
19635000
5464800
76191936
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
11749666.5
3247969.725
19670997.5
919921.86
13918654.615
30998388.9720312
80505599.1720313
4591742.25277778
24000
4838362.77833333
24000
6952712.95546667
7388503.09096429
JUMLAH 2.3.PEKERJAAN PONDAS
124968857.1516
3840000
59439286.731825
1404000
205869830.611368
81277228.2521526
476799202.746946
Pek. Gedung T (Mortuary/ Forensic) - page 1369 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3087224.12682292
5515340.72822141
11490048.9918958
10864525.8753517
14851092.28944
9277660.75729167
JUMLAH 2.4.LANTAI DASAR ( EL.
148458433.81066
18971669.036936
206269359.502514
97519984.257157
3341495.765124
2226638.58175
476787580.954141
8609917.5496
9091515.74085333
9381908.85729166
9975088.55261111
6126956.28798611
5515340.72822141
246240
104940
10464145.4683333
JUMLAH 2.5.LANTAI SATU ( EL. +
148219730.616364
156828646.52972
113633680.079517
50453997.899107
365117579.113668
82564650.7014745
36862128
15709518
127076582.56744
1096466513.50729
7858441.7416
8264892.35205333
JUMLAH 2.6.RING BALOK ( EL. +
70018715.917656
55788023.37636
125806739.294016
31192.48691625
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
23040
31192.48691625
116640
97200
6048000
5796000
163800
96857163.5930722
21830592.2406151
206522629.833177
85172083.684402
37623036.6909833
8786880
13582080
10736640
33454080
20275200
125013602.030562
25201361.1789474
777600
0
36479236.80744
16360954.0690909
17542980
Pek. Gedung T (Mortuary/ Forensic) - page 1370 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
52416
204522.654285714
183747.96
JUMLAH 2.7.ATAP
1166780.16
0
151204620.9267
18174510.7236
926762031.938589
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
119174128.125
70983037.5
28763268.75
6995646
2392059.6
3086208
26238999.3426
5992787.75255875
209500
2779541.25
26420
17760
163760
8778309.2
546297.6
74893425.24
0
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
0
114758564.83
68353019.56
27697550.58
7815255
2672313
2558304
21750749.45505
6743226.29044625
9379892.6
865444.8
163760
JUMLAH 3.1.PEKERJA
47819393.84
661037422.315655
222896.08
167877.55
71703.896
38788.2
113630192.6232
2610495.9025
1828449.348
578719.944
Pek. Gedung T (Mortuary/ Forensic) - page 1371 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
222896.08
167877.55
JUMLAH 3.2.PEKERJA
140831.940857143
136889.688669643
15603.96
0
0
95470848.9856
3619439.978
217738146.7813
37137382.8040286
36179944.7153866
6860281.014
0
0
140831.940857143
136889.688669643
15603.96
156474.36
JUMLAH 3.3.PEKERJA
73392875.9944097
2951341.6877175
8524287.3084
6592264.7868
171638378.310742
5683385.01374712
5406114.08296034
13034849.7522551
5778167.90327238
5683385.01374712
27030570.4148017
78209098.5135303
17334503.7098171
0
45526900.5289725
20376736.84827
3766861.755085
5683761.8666675
7928500.143575
0
0
0
39783695.0962299
32436684.4977621
6080663.46759816
7511618.27425409
24879826.5704366
28890839.5163619
0
27454023.0352575
2678052.9722925
3396122.808045
3766861.755085
5683761.8666675
7928500.143575
5683385.01374712
5406114.08296034
6080663.46759816
7511618.27425409
12439913.2852183
5778167.90327238
3050447.0039175
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3766861.755085
9130573.89745875
11581030.1484625
JUMLAH 3.4.PEKERJA
2388808.51
420912.25
2084465.988
309074.535
243866.7
3922839.091875
312950.55
191794.535625
326502
610373.61
72894.9375
239095.395
2388808.51
420912.25
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
191794.535625
326502
610373.61
72894.9375
239095.395
JUMLAH 3.5.PEKERJAAN PASAN
32850.26245
42825.079055
36922.091195
3427.5273666667
32850.26245
36922.091195
26368032.285595
73044591.17967
23162060.296925
501152353.014556
7166425.53
841824.5
2084465.988
309074.535
243866.7
352459.246726785
1564752.75
958972.678125
293355.51696
610373.61
218684.8125
478190.79
0
0
9555234.04
841824.5
3049908.444
2084465.988
1236298.14
975466.8
352459.246726785
1877703.3
1150767.21375
293355.51696
610373.61
291579.75
1434572.37
38876455.5767486
17671092.4043348
2450986.33701529
19494864.15096
1506912.406755
0
0
38610309.5936391
21593072.7493895
Pek. Gedung T (Mortuary/ Forensic) - page 1373 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
1872423.92513633
103199661.56723
399712.5
5450479.65
0
0
5450479.65
113602.5
100980
58905
64374.75
JUMLAH 3.8.PEKERJAAN ATAP
76123172.169
67665041.928
5047970.004
6527599.65
155363783.751
169130.993888889
4228274.84722222
100980.733333333
100980.733333333
169130.993888889
1353047.95111111
110129.34
1982328.12
69473.34
416840.04
45554.74
3325496.02
27688.1
1527028.616
1910478.9
1527028.616
100980.733333333
100980.733333333
169130.993888889
2536964.90833333
110129.34
1541810.76
69473.34
416840.04
45554.74
1503306.42
27688.1
683060.772
1495157.4
683060.772
23122596.2613333
Pek. Gedung T (Mortuary/ Forensic) - page 1374 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Pek sipil
212520
212520
3625807.152
7251614.304
399700.693333333
5595809.70666667
171508.450666667
287991
6002795.77333333
575982
399700.693333333
5595809.70666667
171508.450666667
1372067.60533333
104649.38
3139481.4
67381.1013333333
3234292.864
55231.7333333333
135531
1104634.66666667
1084248
41027.47
2707813.02
26492.95
1271661.6
11827.2
4963425.0072
236544
4963425.0072
171508.450666667
287991
6174304.224
1439955
104649.38
2825533.26
67381.1013333333
1280240.92533333
55231.7333333333
227007
135531
125367
1049402.93333333
454014
813186
250734
41027.47
82054.94
36182.63
1447305.2
26492.95
3163346.09653333
423887.2
3163346.09653333
Pek sipil
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
171508.450666667
1715084.50666667
104649.38
1046493.8
55231.7333333333
684871.821333333
662780.8
684871.821333333
67861894.3610667
212520
1062600
399700.693333333
7994013.86666667
171508.450666667
1715084.50666667
8575422.53333333
1715084.50666667
193123.333333333
965616.666666667
20312737.5733333
11450379.6
11133262.8
11606227.6
11710578
11450379.6
11133262.8
11606227.6
11710578
735207
44112420
27785.2666666667
277852.666666667
94871.3333333333
948713.333333333
94871.3333333333
948713.333333333
13776197.6
11154607.2
11238290.8
11791890
13776197.6
11154607.2
11238290.8
11791890
Pek. Gedung T (Mortuary/ Forensic) - page 1376 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
735207
44112420
27785.2666666667
277852.666666667
42014.8666666667
420148.666666667
94871.3333333333
948713.333333333
185908267.6
29147.8
31858.2
41344.6
36081.1
36081.1
36081.1
171601.1
291478
509731.2
41344.6
1010270.8
72162.2
288648.8
1716011
170766.133333333
197562.133333333
171601.1
11953629.3333333
7507361.06666667
1716011
29147.8
31858.2
41344.6
36081.1
36081.1
262330.2
95574.6
41344.6
974189.7
72162.2
170766.133333333
197562.133333333
11953629.3333333
5729301.86666667
44235180.5
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT
2.2.
PEKERJAAN PENGKONDISIAN UDARA
III.
IV.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
LEVEL-1
1 Plint kayu T. 10 cm
1.2.
1.3.
LEVEL-1
PINTU TYPE
1 A (HM uk. 600x1250) SHF-1
2 C (HM uk. 2x900x2150)
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja R. Administrasi P.2,19 m
Pek. Gedung T (Mortuary/ Forensic) - page 1379 of 2419
NO.
URAIAN PEKERJAAN
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT
A.
GROUND FLOOR
1 Instalasi Hydrant
a.
b.
c.
e
B.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
C.
RISER
2 Pipa di Shaft
a.
b.
80 mm
2.2.
c.
d.
NO.
URAIAN PEKERJAAN
A.
Dran
10" x 8 "
8" x 8 "
6" x 6 "
B.
LEVEL 1
Pekerjaan Unit AC
1 Single Split Wall Type ( IU + OU )
-
NO.
URAIAN PEKERJAAN
-
Dran
Dran
III.
8" x 6 "
6" x 6 "
GROUND FLOOR
1 Fixtures lampu lengkap dengan armature
B.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
Lampu TL 1 x 36 W / Louvre M6
d.
LEVEL 1
1 Fixtures lampu lengkap dengan armature
Pek. Gedung T (Mortuary/ Forensic) - page 1382 of 2419
NO.
URAIAN PEKERJAAN
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
Lampu TL 1 x 36 W / Louvre M6
d.
3.2.
IV.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
1 Instalasi
B.
a.
CTB T ( 20 Pairs )
b.
TB-T GF ( 10 Pairs )
c.
d.
e.
LEVEL 1
1 Instalsi
a.
TB-T ( 10 Pairs )
b.
c.
d.
e.
NO.
URAIAN PEKERJAAN
4.2.
GROUND FLOOR
1 Instalasi
a.
CTB F
b.
TB.F- GF
c.
d.
ROR
e.
f.
Smoke Detector
g.
h.
Bell Alarm
j.
Indicator Lamp
l.
Flow Switch
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
LEVEL 1
1 Instalasi
a.
TB.F- 1
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
4.3.
GROUND FLOOR
2 Instalasi
a.
CTB S
Pek. Gedung T (Mortuary/ Forensic) - page 1384 of 2419
NO.
URAIAN PEKERJAAN
B.
b.
TB-S.GF
c.
d.
e.
Volume Control
f.
LEVEL 1
1 Instalasi
4.4.
a.
TB-1
b.
c.
d.
Volume Control
e.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Instalasi
a.
B.
Terminak Box
b.
Spliter 4 way
c.
Socket TV ( RCA )
d.
LEVEL 1
1 Instalasi
4.5.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
GROUND FLOOR
1 Instalasi
a.
b.
c.
d.
e.
NO.
URAIAN PEKERJAAN
B.
LEVEL 1
1 Instalasi
4.6.
a.
b.
c.
SocketData ( RG-45 )
d.
PEKERJAAN CCTV
A.
GROUND FLOOR
1 Fixed Dome Camer
2 Instalasi Camera
B.
LEVEL 1
1 Fixed Dome Camer
2 Instalasi Camera
YA
FORENSIC)
NGGARA BARAT
AN LAIN-LAIN
JUMLAH I.
AN UDARA
JUMLAH II.
JUMLAH IV.
TOTAL PEK. NON ST
FORENSIC)
NGGARA BARAT
SAT
2
VOLUME
3
u T. 10 cm
m1
95.23
00x2150)
unit
unit
unit
unit
1
4
4
1
x1250) SHF-1
00x2150)
unit
unit
1
1
x1250) SHF-1
900x2150)
AN LAIN-LAIN
nistrasi P.2,19 m
bh
bh
13
5
bh
bh
16
6
unit
SAT
VOLUME
u+aksesories
Set
l Valve, diameter 65 mm :
Bh
Bh
20
Sch.40 diameter 65 mm
12
an Bantu ( Fitting-Fitting )
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
an Bantu ( Fitting-Fitting )
Ls
Sch.40 diameter
ameter 100 mm
Bh
ameter 50 mm
Bh
Bh
Ls
AN UDARA
Pek. Gedung T (Mortuary/ Forensic) - page 1389 of 2419
SAT
VOLUME
all Type ( IU + OU )
& OU GF.1, Kap. 12 000 BTU/h ( 1 1/2 PK )
Unit
Unit
36
12
40
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
220
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
all Type ( IU + OU )
SAT
VOLUME
180
54
120
60
all Type ( IU + OU )
Unit
Unit
40
12
Ttk
40
Unit
60
15
TL 2 x 36 W / Louvre M6
Bh
26
TL 2 x 36 W / Louvre M6 + Battere
Bh
13
TL 1 x 36 W / Louvre M6
Bh
16
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
Bh
SAT
VOLUME
TL 2 x 36 W / Louvre M6
Bh
26
TL 2 x 36 W / Louvre M6 + Battere
Bh
13
TL 1 x 36 W / Louvre M6
Bh
16
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
Bh
Bh
25
Ttk
Ls
( 20 Pairs )
Bh
F ( 10 Pairs )
Bh
20
Bh
Ttk
et analog
Ttk
Bh
24
Bh
10
Ttk
10
et analog
Bh
10
Commisioning
Telephone ( RJ-11 )
SAT
VOLUME
Unit
Unit
30
Bh
14
Bh
Bh
Bh
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
dari CTB-A ke TB F 1
Unit
19
Unit
34
Bh
10
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
18
Temperature Detector
Detector
l Breack Glass
Unit
SAT
Unit
VOLUME
1
20
Bh
12
Bh
Ttk
14
Bh
34
Bh
10
Bh
Ttk
12
Unit
Bh
Bh
Ttk
Bh
Bh
Ttk
ata 1 x 32 Port
Unit
Unit
20
Bh
Ttk
TV ( RCA )
TV ( RCA )
Data ( RG-45 )
SAT
VOLUME
Unit
24
Data ( RG-45 )
Bh
10
Ttk
10
Unit
Ttk
Unit
Ttk
JUMLAH HARGA
6=4X5
7894567
44038354.14
20223348.75
72156269.89
20604942.4533333
279008509.286667
299613451.74
42230696.5333334
13436931.2
55667627.7333334
15906524.1866667
16129405.3333333
10286008.04
3398342.93333333
9955030.28666666
16670000
72345310.78
499782660.143333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
82900
JUMLAH 1.1.PEKERJA
7894567
7894567
1714766.625
4301634.3975
2389796.8875
6921547.875
1714766.625
17206537.59
9559187.55
6921547.875
0
0
0
1714766.625
6921547.875
1714766.625
6921547.875
JUMLAH 1.2.PEKERJA
450202.5
525937.5
450202.5
525937.5
1382163.75
44038354.14
5852632.5
2629687.5
0
7203240
3155625
0
0
0
1382163.75
Pek. Gedung T (Mortuary/ Forensic) - page 1397 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
0
0
JUMLAH 1.3.PEKERJAA
20223348.75
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
1773200
0
313351.573333333
6267031.46666667
155862.666666667
1870352
1627476.69333333
1627476.69333333
0
0
0
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
1182133.33333333
0
155862.666666667
935176
187035.2
187035.2
0
0
0
0
313351.573333333
1566757.86666667
313351.573333333
1566757.86666667
0
253459.066666667
253459.066666667
177567.866666667
177567.866666667
107800
107800
470027.36
470027.36
20604942.4533333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5528825.72
5528825.72
3900248
3900248
170503.813333333
6138137.28
108605.053333333
1303260.64
8008
320320
0
0
683801.866666667
683801.866666667
626205.866666667
626205.866666667
640435.466666667
2561741.86666667
683801.866666667
683801.866666667
751700.986666667
751700.986666667
626205.866666667
626205.866666667
1169102.58666667
1169102.58666667
1169102.58666667
1169102.58666667
6591.2
1450064
0
0
0
1953680.256
3907360.512
1736604.672
15629442.048
1302453.504
7814721.024
945435.26
2836305.78
0
0
0
0
19908548
19908548
11797676
23595352
19908548
19908548
3900248
3900248
5528825.72
5528825.72
7872440.84
7872440.84
23608244
23608244
11797676
11797676
Pek. Gedung T (Mortuary/ Forensic) - page 1399 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
170503.813333333
30690686.4
108605.053333333
5864672.88
8008
960960
21009.2666666667
1260556
0
10730456
10730456
9129626
9129626
170503.813333333
6820152.53333333
108605.053333333
1303260.64
54208
2168320
0
0
445096.666666667
445096.666666667
1169102.58666667
5845512.93333333
6591.2
395472
0
0
0
1519529.088
10636703.616
1302453.504
19536802.56
279008509.286667
276475.466666667
7188362.13333333
521766.666666667
6782966.66666667
124445.333333333
1991125.33333333
377847.733333333
755695.466666667
132146.666666667
264293.333333333
372017.066666667
372017.066666667
89519.4666666667
89519.4666666667
272409.866666667
1089639.46666667
516345.866666667
2581729.33333333
0
0
0
Pek. Gedung T (Mortuary/ Forensic) - page 1400 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
276475.466666667
7188362.13333333
521766.666666667
6782966.66666667
124445.333333333
1991125.33333333
377847.733333333
755695.466666667
132146.666666667
264293.333333333
372017.066666667
372017.066666667
89519.4666666667
89519.4666666667
272409.866666667
1089639.46666667
516345.866666667
2581729.33333333
42230696.5333334
8377600
8377600
174944
349888
50512
1262800
1694000
1694000
1752643.2
1752643.2
13436931.2
192548.4
192548.4
168154.8
168154.8
20331.6666666667
406633.333333333
201415.5
1208493
498793.386666667
2992760.32
215147.166666667
1290883
0
0
0
168154.8
168154.8
13555.6666666667
325336
201415.5
2014155
498793.386666667
4987933.86666667
215147.166666667
2151471.66666667
15906524.1866667
Pek. Gedung T (Mortuary/ Forensic) - page 1401 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
169400
169400
240240
240240
87472
2624160
0
74572.6666666667
1044017.33333333
77960.6666666667
77960.6666666667
231775.866666667
231775.866666667
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
83160
83160
0
160910.133333333
3057292.53333333
0
0
0
240240
240240
87472
2974048
0
74572.6666666667
745726.666666667
77960.6666666667
155921.333333333
231775.866666667
463551.733333333
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
83160
83160
0
160910.133333333
2896382.4
16129405.3333333
378840
378840
Pek. Gedung T (Mortuary/ Forensic) - page 1402 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
266112
266112
18849.6
376992
153993.766666667
1847925.2
258720
517440
151320.106666667
2118481.49333333
0
0
0
266112
266112
18849.6
640886.4
153993.766666667
1539937.66666667
258720
517440
151320.106666667
1815841.28
10286008.04
220366.666666667
220366.666666667
227069.333333333
227069.333333333
84736.6666666667
254210
369236.266666667
1107708.8
0
0
0
227069.333333333
227069.333333333
84736.6666666667
254210
369236.266666667
1107708.8
3398342.93333333
229874.7
229874.7
271885.9
271885.9
21560
431200
15753.1
94518.6
498793.386666667
2992760.32
Pek. Gedung T (Mortuary/ Forensic) - page 1403 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
0
0
271885.9
271885.9
21560
517440
15753.1
157531
498793.386666667
4987933.86666667
9955030.28666666
2667500
8002500
1500000
4500000
0
0
2667500
2667500
1500000
1500000
16670000
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 3.60 M )
2.6. RING BALOK ( EL. + 7,15 M )
2.7. ATAP
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PASANGAN SANITER
3.6. PEKERJAAN PENGECATAN
3.7. PEKERJAAN RAILLING
IV.
PEKERJAAN PLUMBING
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
4.3. PEKERJAAN AIR HUJAN
V.
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
URAIAN PEKERJAAN
5 SLOOF TB1 25/45
6 SLOOF TB2 20/35
7 PONDASI BATU KALI
2.4.
2.5.
2.6.
2.7.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 60.60.6
- Besi L 50.50.5
- Besi L 45.45.4
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 16 mm
- Mur + Baut 12 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
Pek. Gedung N (Instalasi Gizi) - page 1408 of 2419
NO.
URAIAN PEKERJAAN
- Talang jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
B.
3.2.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
2 Lantai keramik 30 x 30 cm
3 Step noising keramik 5 x 20 cm
4 Floor hardener
B.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Floor hardener
Pek. Gedung N (Instalasi Gizi) - page 1409 of 2419
NO.
URAIAN PEKERJAAN
3.3.
3.4.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
3.5.
LEVEL-1
PINTU TYPE
1 C (AL-ED uk. 900x2150)
2 E (AL-ED/GL-1* uk. 2x900x2150)
3 E (AL-ED/GL-1* uk. 900x2150)
JENDELA TYPE
1 BV3
2 CW4
3 W3E
NO.
URAIAN PEKERJAAN
6 Meja beton
7 Floor drain
8 Memasang cubical toilet
9 Memasang kran dinding 1/2"
10 Memasang meja zink satu lubang
11 Meja granite wastafel under counter
12 Hand Dryer
13 Jet washer
14 Tisue holder
15 Soap dish
B.
3.6.
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecetan Watershiel (Exterior)
3 Pengecatan plafond emulsion paint
4 Pengecatan list plafond emulsion paint
B.
3.7.
IV.
LEVEL-1
1 Memasang kran dinding 1/2" (tempat wudhu)
LEVEL-1
1 Pengecatan dinding emulsion paint
2 Pengecatan plafond emulsion paint
3 Pengecatan list plafond emulsion paint
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
PEKERJAAN PLUMBING
4.1.
GOUND FLOOR
1 Pipa utama Polypropeline PN.10 dari Jaringan site
a.
PPR diameter 50 mm
b.
PPR diameter 40 mm
2 Meter Air
3 Gate Valve :
Pek. Gedung N (Instalasi Gizi) - page 1411 of 2419
NO.
URAIAN PEKERJAAN
a.
GV diameter 50 mm
PPR diameter 50 mm
b.
PPR diameter 40 mm
c.
PPR diameter 32 mm
d.
PPR diameter 25 mm
e.
PPR diameter 15 mm
LEVEL 1
1 Gate Valve :
a.
GV diameter 32 mm
PPR diameter 32 mm
b.
PPR diameter 25 mm
c.
PPR diameter 15 mm
4.2.
b.
c.
CO diameter 100 mm
PVC diameter 80 mm
c.
PVC diameter 65 mm
PVC diameter 50 mm
NO.
URAIAN PEKERJAAN
e
CO diameter 65 mm
PVC diameter 40 mm
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
LEVEL 1
1 Pemipaan Air kotor cair PVC Kelas 10 kg/cm2
a.
PVC diameter 80 mm
b.
PVC diameter 65 mm
c.
CO diameter 80 mm
PVC diameter 40 mm
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
4.3.
b.
V.
RD diameter 100 mm
GROUND FLOOR
1 Panel Listrik
Pek. Gedung N (Instalasi Gizi) - page 1413 of 2419
NO.
URAIAN PEKERJAAN
b.
SDP - N
c.
LP - N GF
d.
PP - N GF
e.
PP - AC.N GF
2 Kabel Feeder
B.
a.
b.
c.
d.
LEVEL 1
1 Panel Listrik
a.
LP - N 1
b.
PP - N 1
2 Kabel Feeder
5.2.
a.
b.
GROUND FLOOR
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
2 Titik instalasi
a.
b.
B.
LEVEL 1
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
Pek. Gedung N (Instalasi Gizi) - page 1414 of 2419
NO.
URAIAN PEKERJAAN
c.
Saklar hotel
d.
g.
2 Titik instalasi
a.
b.
AYA
GIZI)
NGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
GIZI)
NGGARA BARAT
JUMLAH I.
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.PEKERJA
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V. PEKERJAA
TOTAL PEK. STANDA
GIZI)
NGGARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
180
35
1
180
1
1
m3
m3
m3
m2
m3
1200
240
504
1200
240
m3
m3
m2
m3
m3
m3
272.948
191.0636
964.6
81.8844
126.2769
63.13845
m3
btg
m3
btg
m3
btg
m3
2.7216
16
24.57
117
16.8
80
8.775
SAT
m3
m3
m1
(t=12 cm)
VOLUME
41.5125
14.0665
9.85
m3
m3
m3
m3
m3
m3
77.168
3.4398
12.5
5
21.2415
0.24
m3
m3
m3
m3
m3
m3
8.775
16.9125
12
7.52
55.8
7.625
m3
m3
5.265
5.25
kg
kg
kg
kg
unit
bh
bh
bh
bh
kg
bh
bh
m3
m3
m1
1274.784
8476.356
4876.515
1755.3186
44
176
132
3138
2516
6748.56
363.89
24
10.15635348
4.7531781818
214.2
SAT
m1
VOLUME
28.98
m2
m1
1244.88
182.07
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
1362.516
2725.032
2725.032
347.5
695
273.6
273.6
70.18
663.97
72.8
987.1985
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
281.775
563.55
563.55
94.25
188.5
75.6
75.6
21.23
99.3
14.3
30.745
enius tile 60 x 60 cm
m2
852.69
ramik 30 x 30 cm
m2
men Instant.
& Jendela
& Jendela
41.37
eramik 5 x 20 cm
m1
m2
26.775
13.6
enius tile 60 x 60 cm
m2
149.27
ramik 30 x 30 cm
m2
m2
12.08
28.03
SAT
VOLUME
m2
m2
m1
m2
153.42
696.08
881.17
65.23
m2
m2
m1
221.784
12.08
154.7
TU DAN JENDELA
2x900x2150)
900x2150)
* uk. 2x900x2150)
2x900x2150)
900x2150)
900x2150)
* uk. 2x900x2150)
* uk. 900x2150)
unit
unit
unit
unit
unit
1
6
6
2
5
unit
m2
unit
25
14.7
3
unit
unit
unit
1
1
2
unit
m2
unit
6
11.97
2
set
set
set
bh
bh
2
2
2
2
2
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
SAT
m
bh
unit
bh
bh
m
bh
set
bh
bh
VOLUME
0.128414
2
2
2
8
1.28414
2
2
2
2
bh
11
m
m
m
m'
1499.807
180.93
928.33
881.17
m
m
m'
472.47
233.864
154.7
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
13.636
ameter 50 mm
25
ameter 40 mm
25
Bh
SAT
meter 50 mm
VOLUME
Bh
ameter 50 mm
30
ameter 40 mm
11
ameter 32 mm
35
ameter 25 mm
ameter 15 mm
42
tu ( Fitting-Fitting )
Ls
meter 32 mm
Bh
ameter 32 mm
ameter 25 mm
ameter 15 mm
34
tu ( Fitting-Fitting )
Ls
Unit
Unit
Unit
Unit
ypropelyne PN.10 :
ypropelyne PN.10 :
30
ameter 100 mm
20
Bh
ameter 100 mm
43
ameter 80 mm
50
ameter 65 mm
ameter 50 mm
meter 100 mm
SAT
meter 65 mm
VOLUME
Bh
ameter 40 mm
20
ameter 32 mm
24
ameter 25 mm
30
40
tu ( Fitting-Fitting )
Ls
ameter 80 mm
ameter 65 mm
meter 80 mm
Bh
ameter 40 mm
ameter 32 mm
ameter 25 mm
tu ( Fitting-Fitting )
Ls
Bh
ameter 150 mm
48
ameter 100 mm
36
tu ( Fitting-Fitting )
Ls
meter 100 mm
Bh
C Kelas 10 kg/cm
BEL FEEDER
SAT
VOLUME
Unit
Unit
Unit
Unit
335
10
10
10
Unit
Unit
10
10
Bh
27
Bh
13
Bh
ontak 200 W / 10 A
Bh
55
ontak 350 W / 16 A
Bh
ontak 500 W / 16 A
Bh
19
Ttk
105
Ttk
76
Bh
Bh
SAT
VOLUME
Bh
ontak 200 W / 16 A
Bh
ontak 500 W / 16 A
Bh
Ttk
20
Ttk
10
JUMLAH HARGA
Err:509
513188874.542
Err:509
Err:509
Err:509
Err:509
JUMLAH HARGA
103433180
103433180
146732832
120493270.504813
Err:509
662515782.949554
805266409.743455
97765249.0144
1349822083.98406
Err:509
675620626.920729
235840635.9457
176151006.013658
341262176.970125
24130803.563049
118999264.255111
5450479.65
1577454993.31837
20808808.5718889
47339857.9544
29839945.0154667
97988611.5417555
189153645.266667
42903228.7333333
232056874
Err:509
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
15000000
60000
567212
1000000
163782
14000000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
15000000
10800000
19852420
1000000
29480760
14000000
13300000
103433180
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
12864000
6283200
79207632
39270000
9108000
146732832
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
13115151.4
3625431.81
31566535
1026830.376
22050472.278
49108849.6408125
120493270.504813
4591742.25277778
24000
4838362.77833333
24000
4543897.4246875
24000
9406506.3570641
12496885.71516
384000
118878573.46365
2808000
76337476.73475
1920000
82542093.2832375
Pek. Gedung N (Instalasi Gizi) - page 1429 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7600874.05146667
7388503.09096429
Err:509
JUMLAH 2.3.PEKERJAAN PONDAS
315531284.06151
103930378.729049
Err:509
Err:509
3087224.12682292
5515340.72822141
9939581.97140187
9395126.65076187
10914348.6322465
9381908.85729166
JUMLAH 2.4.LANTAI DASAR ( EL.
238234911.418671
18971669.036936
124244774.642523
46975633.2538093
231837136.471864
2251658.12575
662515782.949554
9503284.21176068
8609917.5496
9091515.74085334
9381908.85729166
6126956.28798611
7177122.08012415
JUMLAH 2.5.LANTAI SATU ( EL. +
83391318.9582
145615230.55761
109098188.89024
70551954.6068333
341884160.869625
54725555.8609467
805266409.743455
9503284.21176068
9091515.74085334
JUMLAH 2.6.RING BALOK ( EL. +
50034791.37492
47730457.63948
97765249.0144
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
15840
31192.48691625
116640
97200
6048000
5796000
163800
39763683.2410448
264398623.627477
152110630.334397
54752752.4643503
21479040
33200640
3041280
72299520
39853440
210504369.503528
42444129.6
2332800
0
61425625.84704
27549420.7418182
35085960
Pek. Gedung N (Instalasi Gizi) - page 1430 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
52416
204522.654285714
183747.96
JUMLAH 2.7.ATAP
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
1519015.68
0
254606161.8672
33454991.0772
1349822083.98406
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
JUMLAH 3.1.PEKERJAAN PASAN
193068517.2
114996350.4
46598047.2
7540750
2578450
3086208
26238999.3426
6839711.2453175
17542087.4
1292928
161663626.36
0
0
39927517.5
23781810
9636705
2045225
699335
852768
7250249.81835
2069066.25446125
2623506
253968
5034801.2
675620626.920729
222896.08
190061258.4552
167877.55
6945094.2435
71703.896
38788.2
222896.08
1919871.8154
527519.52
0
0
33271697.8616
167877.55
2027960.804
38788.2
JUMLAH 3.2.PEKERJAAN PASAN
1087233.246
235840635.9457
Pek. Gedung N (Instalasi Gizi) - page 1431 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
140831.940857143
136889.688669643
15603.96
156474.36
140831.940857143
136889.688669643
15603.96
JUMLAH 3.3.PEKERJAAN PASA
12253497.9982524
5774599.26622056
13034849.7522551
12439913.2852183
5778167.90327238
21606436.3663029
95286174.489165
13749741.4332
10206822.5028
0
0
31234271.1710606
1653627.43912929
2413932.612
176151006.013658
2678052.9722925
221314.5
8497688.59289625
JUMLAH 3.4.PEKERJAAN PASAN
12253497.9982524
34647595.5973234
78209098.5135303
24879826.5704366
28890839.5163619
0
0
66951324.3073125
3253323.15
25493065.7786887
0
0
0
5774599.26622056
13034849.7522551
12161326.9351963
0
16068317.833755
2649134.565
16995377.1857925
341262176.970125
2388808.51
1297167.212
2084465.988
309074.535
243866.7
4777617.02
2594334.424
4168931.976
618149.07
487733.4
2678052.9722925
221314.5
8497688.59289625
5774599.26622056
13034849.7522551
6080663.46759816
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
191794.535625
JUMLAH 3.5.PEKERJAAN PASAN
32850.26245
42825.079055
36922.091195
3427.5273666667
32850.26245
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
399712.5
503747.459144036
625901.1
535349.6775
383589.07125
4428008.32
419274.27828
1220747.22
633699.99
145789.875
478190.79
0
0
2109739.891875
24130803.563049
49269053.5743471
7748341.55342115
34275884.9190543
3020234.28968567
0
0
15520763.4997515
8634747.93522748
530238.483623333
118999264.255111
5450479.65
0
0
5450479.65
169130.993888889
4228274.84722222
110129.34
2753233.5
321552
321552
0
Pek. Gedung N (Instalasi Gizi) - page 1433 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
143687.866666667
143687.866666667
0
169130.993888889
5073929.81666667
110129.34
1211422.74
69473.34
2431566.9
45554.74
273328.44
27688.1
1162900.2
1015843.656
1015843.656
0
0
0
68455.9333333333
68455.9333333333
0
69473.34
555786.72
45554.74
273328.44
27688.1
941395.4
354102.112
354102.112
20808808.5718889
Pek sipil
0
212520
212520
902440
902440
3625807.152
7251614.304
0
399700.693333333
11991020.8
171508.450666667
3430169.01333333
287991
575982
0
171508.450666667
7374863.37866666
104649.38
5232469
67381.1013333333
404286.608
55231.7333333333
497085.6
Pek. Gedung N (Instalasi Gizi) - page 1434 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
135531
677655
0
41027.47
820549.4
36182.63
868383.12
26492.95
794788.5
11827.2
473088
3802612
3802612
0
0
0
104649.38
627896.28
67381.1013333333
269524.405333333
227007
227007
0
41027.47
246164.82
36182.63
144730.52
26492.95
211943.6
303064.605066667
303064.605066667
47339857.9544
212520
1700160
0
399700.693333333
19185633.28
171508.450666667
6174304.224
1234860.8448
1234860.8448
0
193123.333333333
1544986.66666667
29839945.0154667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
14407043.2
14407043.2
17371200
17371200
12936000
12936000
11088000
11088000
0
299442.44
100313217.4
27785.2666666667
277852.666666667
27785.2666666667
277852.666666667
94871.3333333333
948713.333333333
0
0
17371200
17371200
12936000
12936000
0
27785.2666666667
277852.666666667
94871.3333333333
948713.333333333
189153645.266667
29147.8
786990.6
31858.2
414156.6
41344.6
41344.6
36081.1
1984460.5
36081.1
72162.2
36081.1
685540.9
0
170766.133333333
17930444
197562.133333333
15014722.1333333
0
0
29147.8
116591.2
31858.2
63716.4
Pek. Gedung N (Instalasi Gizi) - page 1436 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
41344.6
41344.6
36081.1
144324.4
36081.1
216486.6
0
170766.133333333
3415322.66666667
197562.133333333
1975621.33333333
42903228.7333333
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT
2.2.
PEKERJAAN PENGKONDISIAN UDARA
III.
IV.
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
LEVEL-1
1 Plint kayu T. 10 cm
II.
1.2.
1.3.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT
A.
GROUND FLOOR
1 Instalasi Hydrant
a.
b.
c.
d.
Phillar Hydrant ( PH )
e.
f.
NO.
URAIAN PEKERJAAN
- BSP Sch.40 diameter 100 mm,
- BSP Sch.40 diameter 100 mm ) Phillar Hydrant )
- BSP Sch.40 diameter 65 mm
g.
B.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
C.
RISER
2 Pipa di Shaft
a.
b.
80 mm
2.2.
c.
d.
Dran
Pek. Gedung N (Instalasi Gizi) - page 1440 of 2419
NO.
URAIAN PEKERJAAN
-
III.
30" x 15 "
12" x 10 "
12" x 8 "
10" x 10 "
10" x 8 "
8" x 8 "
8" x 6 "
Grille Hood
Hood
GROUND FLOOR
1 Rak Kabel
a.
NO.
URAIAN PEKERJAAN
b.
B.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
Lampu TL 1 x 36 W / Louvre M6
d.
e.
f.
g.
h.
i.
j.
LEVEL 1
1 Fixtures lampu lengkap dengan armature
3.2.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
c.
Lampu TL 1 x 36 W / Louvre M6
d.
e.
f.
IV.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
Pek. Gedung N (Instalasi Gizi) - page 1442 of 2419
NO.
URAIAN PEKERJAAN
1 Instalasi
B.
a.
CTB-T N ( 20 Pairs )
b.
TB-T N GF ( 10 Pairs )
c.
d.
e.
f.
LEVEL 1
1 Instalsi
4.2.
a.
b.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Instalasi
a.
B.
b.
Spliter 4 way
c.
Coupler
d.
Socket TV ( RCA )
e.
LEVEL 1
1 Instalasi
4.3.
a.
Coupler
b.
Socket TV ( RCA )
c.
GROUND FLOOR
1 Instalasi
Pek. Gedung N (Instalasi Gizi) - page 1443 of 2419
NO.
URAIAN PEKERJAAN
B.
a.
b.
c.
d.
e.
LEVEL 1
1 Instalasi
4.4.
a.
SocketData ( RG-45 )
b.
PEKERJAAN CCTV
A.
SENTRAL CCTV
1 Video Wib server Cam Plug
2 Digiplex key Pad
3 PC Computer with Printer
4 Bivar
5 21 " LCD TV Monitor
6 Rack CCTV
B.
GROUND FLOOR
1 Fixed Dome Camer
2 Instalasi Camera
C.
LEVEL 1
1 Fixed Dome Camer
2 Instalasi Camera
YA
GIZI)
NGGARA BARAT
AN LAIN-LAIN
JUMLAH I.
AN UDARA
JUMLAH II.PEKERJAA
JUMLAH IV.
TOTAL PEK. NON ST
GIZI)
NGGARA BARAT
SAT
2
VOLUME
3
u T. 10 cm
m1
23.1
unit
unit
3
3
00x2150)
AN LAIN-LAIN
bh
bh
27
2
bh
Set
l Valve, diameter 65 mm :
Bh
Bh
Hydrant ( PH )
Unit
Bh
SAT
VOLUME
16
20
Sch.40 diameter 65 mm
an Bantu ( Fitting-Fitting )
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
16
an Bantu ( Fitting-Fitting )
Ls
Sch.40 diameter
ameter 100 mm
Bh
Bh
Ls
Unit
Unit
Unit
AN UDARA
all Type ( IU + OU )
126
42
SAT
VOLUME
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
140
340
20
24
10
Bh
10
Bh
58
SAT
VOLUME
58
TL 2 x 36 W / Louvre M6
Bh
19
TL 2 x 36 W / Louvre M6 + Battere
Bh
15
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 36 W / Louvre M6 + Battere
Bh
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
31
Bh
12
Bh
TL 2 x 36 W / Louvre M6
Bh
10
TL 2 x 36 W / Louvre M6 + Battere
Bh
TL 1 x 36 W / Louvre M6
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/ Balk
Bh
Bh
Commisioning
Bh
25
Ttk
Ls
SAT
N ( 20 Pairs )
VOLUME
Bh
Bh
20
Bh
10
Ttk
10
et analog
Ttk
10
Telephone ( RJ-11 )
Bh
Ttk
et analog
Bh
Unit
Bh
Bh
Bh
Ttk
Bh
Bh
Ttk
GF ( 10 Pairs )
TV ( RCA )
TV ( RCA )
SAT
VOLUME
ata 2 x 48 Port
Unit
Unit
20
Bh
10
Ttk
10
Data ( RG-45 )
Bh
Ttk
Set
Unit
Set
Set
Unit
Set
Unit
Ttk
Unit
Ttk
Data ( RG-45 )
with Printer
JUMLAH HARGA
6=4X5
1914990
36253082.25
14557950
52726022.25
29225036.128
269181408.357333
298406444.485333
72054766.2
13436931.2
85491697.4
10836253.12
3171439.33333333
6592971.95333333
55964046
76564710.4066667
513188874.542
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
82900
JUMLAH 1.1.PEKERJA
1914990
1914990
6921547.875
5162812.875
20764643.625
15488438.625
JUMLAH 1.2.PEKERJA
450202.5
525937.5
450202.5
JUMLAH 1.3.PEKERJAA
36253082.25
12155467.5
1051875
0
1350607.5
14557950
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
2955333.33333333
1375680
1375680
253459.066666667
253459.066666667
0
Pek. Gedung N (Instalasi Gizi) - page 1453 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
313351.573333333
5013625.17333333
313351.573333333
6267031.46666667
155862.666666667
779313.333333333
2411993.99466667
2411993.99466667
0
0
0
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
591066.666666667
0
155862.666666667
2493802.66666667
498760.533333333
498760.533333333
0
0
0
0
313351.573333333
1566757.86666667
313351.573333333
1566757.86666667
0
253459.066666667
253459.066666667
107800
107800
470027.36
470027.36
29225036.128
3900248
3900248
5528825.72
27644128.6
3900248
3900248
170503.813333333
21483480.48
108605.053333333
4561412.24
Pek. Gedung N (Instalasi Gizi) - page 1454 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
8008
1121120
0
0
0
683801.866666667
683801.866666667
626205.866666667
1878617.6
640435.466666667
2561741.86666667
683801.866666667
683801.866666667
751700.986666667
751700.986666667
626205.866666667
626205.866666667
626205.866666667
626205.866666667
626205.866666667
626205.866666667
1169102.58666667
4676410.34666667
6591.2
2241008
0
0
0
0
4884200.64
39073605.12
2387831.424
19102651.392
2170755.84
8683023.36
1953680.256
17583122.304
1953680.256
39073605.12
1736604.672
41678512.128
1519529.088
15195290.88
1037927.66
10379276.6
445984
445984
269181408.357333
326872.883333333
18958627.2333333
Pek. Gedung N (Instalasi Gizi) - page 1455 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
258096.483333333
14969596.0333333
0
276475.466666667
5253033.86666667
521766.666666667
7826500
124445.333333333
1120008
377847.733333333
3400629.6
132146.666666667
264293.333333333
372017.066666667
744034.133333333
89519.4666666667
179038.933333333
272409.866666667
8444705.86666666
272409.866666667
3268918.4
516345.866666667
2065383.46666667
0
0
0
276475.466666667
2764754.66666667
521766.666666667
1043533.33333333
124445.333333333
373336
372017.066666667
744034.133333333
89519.4666666667
89519.4666666667
272409.866666667
544819.733333333
72054766.2
8377600
8377600
174944
349888
50512
1262800
1694000
1694000
1752643.2
1752643.2
13436931.2
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
192548.4
192548.4
168154.8
168154.8
20331.6666666667
406633.333333333
201415.5
2014155
498793.386666667
4987933.86666667
215147.166666667
2151471.66666667
0
0
0
201415.5
201415.5
498793.386666667
498793.386666667
215147.166666667
215147.166666667
10836253.12
220366.666666667
220366.666666667
227069.333333333
227069.333333333
227069.333333333
227069.333333333
84736.6666666667
338946.666666667
369236.266666667
1476945.06666667
0
0
0
227069.333333333
227069.333333333
84736.6666666667
84736.6666666667
369236.266666667
369236.266666667
3171439.33333333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
229874.7
229874.7
271885.9
271885.9
21560
431200
15753.1
157531
498793.386666667
4987933.86666667
0
0
0
15753.1
15753.1
498793.386666667
498793.386666667
6592971.95333333
10571000
10571000
306570
306570
8470220
25410660
1219900
1219900
1389300
1389300
396616
396616
0
0
0
2667500
8002500
1500000
4500000
0
0
2667500
2667500
1500000
1500000
55964046
NO.
URAIAN PEKERJAAN
A.
PEKERJAAN STANDAR
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
2.2. PEKERJAAN TANAH
2.3. PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4. LANTAI DASAR ( EL. + 0,00 M )
2.5. LANTAI SATU ( EL. + 3.60 M )
2.6. RING BALOK ( EL. + 7,15 M )
2.7. ATAP
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
3.2. PEKERJAAN PASANGAN LANTAI
3.3. PEKERJAAN PASANGAN PLAFOND
3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
3.5. PEKERJAAN PASANGAN SANITER
3.6. PEKERJAAN PENGECATAN
3.7. PEKERJAAN RAILLING
IV.
PEKERJAAN MEKANIKAL
4.1. PEKERJAAN AIR BERSIH
4.2. PEKERJAAN AIR KOTOR
4.3. PEKERJAAN AIR HUJAN
V.
PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN PANEL DAN KABEL FEEDER
5.2. PEKERJAAN TITIK INSTALASI DAYA DAN PENERANGAN
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
7 Mobilisasi dan Demobilisasi
II.
PEKERJAAN STRUKTUR
2.1. PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
NO.
URAIAN PEKERJAAN
5 SLOOF TB2 20/35
2.4.
2.5.
2.6.
2.7.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 80.80.8
- Besi L 60.60.6
- Besi L 50.50.5
- Besi L 45.45.4
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Mur + Baut 12 mm
Pek. Gedung O (Instalasi Loundry) - page 1462 of 2419
NO.
URAIAN PEKERJAAN
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
- Talang jurai dalam
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
PEKERJAAAN ARSITEK
3.1. PEKERJAAN PASANGAN DINDING
A.
GROUND FLOOR
1 Dinding bata ringan
2 Plesteran Semen Instant.
3 Acian Semen Instant.
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Memasang dinding partisi gypsum board
10 Plint homogenius tile 10 x 60 cm cutting size
11 Plint keramik 10 x 20 cm
12 Dinding keramik 20 x 25 cm
B.
3.2.
LEVEL-1
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Opening Pintu & Jendela
5 Nat tali air
6 Benang sudut
7 Kolom praktis 12/12
8 Balok praktis 12/12
9 Plint homogenius tile 10 x 60 cm cutting size
10 Plint keramik 10 x 20 cm
11 Dinding keramik 20 x 25 cm
NO.
URAIAN PEKERJAAN
2 Lantai keramik 20 x 20 cm
3 Step noising keramik 5 x 20 cm
4 Floor hardener
B.
LEVEL-1
1 Lantai homogenius tile 60 x 60 cm
2 Lantai keramik 30 x 30 cm
3 Lantai keramik 20 x 20 cm
4 Floor hardener
3.3.
3.4.
LEVEL-1
1 Plapond gypsum 9 mm
2 Plapond grc 9 mm
3 List plafond gypsum
4 Expose
LEVEL-1
PINTU TYPE
1 C (AL-ED uk. 2x900x2150)
2 C (AL-ED uk. 750x2150) *Plastic Laminate
3 C (AL-ED uk. 900x2150)
4 E (AL-ED/GL-1* uk. 2x900x2150)
5 M (AL-ED uk. 2x900x2150)
6 M (AL-ED uk. 900x2150)
Pek. Gedung O (Instalasi Loundry) - page 1464 of 2419
NO.
URAIAN PEKERJAAN
JENDELA TYPE
1 BV3
2 CW 4
3 W3E
3.5.
3.6.
LEVEL-1
1 Monoblock lengkap dengan aksesoris
2 Wastafel under counter lengkap dengan aksesoris
3 Cove ligth wastafel
4 Kaca cermin
5 Meja beton
6 Floor drain
7 Memasang kran dinding 1/2"
8 Meja granite wastafel under counter
9 Hand Dryer
10 Tisue holder
11 Soap dish
PEKERJAAN PENGECATAN
A.
GROUND FLOOR
1 Pengecatan dinding emulsion paint
2 Pengecetan Watershiel (Exterior)
3 Pengecatan plafond emulsion paint
4 Pengecatan list plafond emulsion paint
NO.
URAIAN PEKERJAAN
B.
LEVEL-1
1 Pengecatan dinding emulsion paint
2 Pengecatan plafond emulsion paint
3 Pengecatan list plafond emulsion paint
3.7.
IV.
PEKERJAAN RAILLING
A.
GROUND FLOOR
1 Railling Tangga Darurat
-Black steel pipe 1" W/Synthetic enamel paint finish
-Black steel pipe 2" W/Synthetic enamel paint finish
PEKERJAAN MEKANIKAL
4.1.
GROUND FLOOR
1 Pipa utama Polypropeline PN.10 dari Jaringan site
a.
PPR diameter 50 mm
b.
Meter Air
2 Gate Valve :
a.
GV diameter 40 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
LEVEL 1
1 Gate Valve :
a.
GV diameter 40 mm
PPR diameter 40 mm
b.
PPR diameter 32 mm
c.
PPR diameter 25 mm
d.
PPR diameter 15 mm
NO.
URAIAN PEKERJAAN
4.2.
GROUND FLOOR
1 Bak Sumpit
2 Bak kontrol
3 Bak Netralisasi Diterjen
4 Submersible Swage Pump 150 Lpm - Head 60 meter
5 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
c.
CO diameter 100 mm
b.
c.
PVC diameter 80 mm
PVC diameter 65 mm
PVC diameter 50 mm
CO diameter 150 mm
CO diameter 65 mm
PVC diameter 40 mm
PVC diameter 32 mm
c.
PVC diameter 25 mm
B.
LEVEL 1
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
b.
CO diameter 100 mm
PVC diameter 80 mm
c.
PVC diameter 65 mm
PVC diameter 50 mm
CO diameter 65 mm
CO diameter 50 mm
PVC diameter 40 mm
Pek. Gedung O (Instalasi Loundry) - page 1467 of 2419
NO.
URAIAN PEKERJAAN
b.
PVC diameter 32 mm
c.
PVC diameter 25 mm
C.
SHAFT
1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2
a.
Diameter 100 mm
Diameter 80 mm
Diameter 50 mm
4.3.
b.
PVC diameter 80 mm
V.
RD diameter 100 mm
PEKERJAAN ELEKTRIKAL
5.1.
GROUND FLOOR
1 Panel Listrik
a.
SDP - O
b.
LP - O GF
c.
PP - O GF
d.
PP - AC.O GF
2 Kabel Feeder
a.
b.
c.
NO.
URAIAN PEKERJAAN
d.
B.
LEVEL 1
1 Panel Listrik
a.
LP - O 1
b.
PP - O 1
c.
PP - AC.O 1
2 Kabel Feeder
5.2.
a.
b.
c.
GROUND FLOOR
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
e.
f.
g.
Stop Kontak 3 Kw / 25 A
2 Titik instalasi
a.
B.
b.
c.
LEVEL 1
1 Saklar dan Stop kontak
a.
Saklar tunggal
b.
Saklar ganda
c.
Saklar hotel
d.
g.
2 Titik instalasi
a.
b.
NO.
URAIAN PEKERJAAN
AYA
LOUNDRY)
ENGGARA BARAT
JUMLAH A+B
PPN 10%
TOTAL
DIBULATKAN
AYA
LOUNDRY)
ENGGARA BARAT
JUMLAH I.
JUMLAH II.
TU DAN JENDELA
JUMLAH III.
JUMLAH IV.
BEL FEEDER
I DAYA DAN PENERANGAN
JUMLAH V.
TOTAL PEK. STANDA
LOUNDRY)
ENGGARA BARAT
ng tanah sedalam 20 cm
R 4 + test ( 10 ttk)
pping dan Grubbing Keluar Proyek
-3 1,00X4,00X0.40 -8 unit
SAT
2
VOLUME
3
ls
m'
m2
Ls
m'
Ls
Ls
1
200
35
1
200
1
1
m3
m3
m3
m2
m3
1440
288
630
1500
288
m3
m3
m2
m3
m3
m3
390.442
273.3094
1354.5
117.1326
171.76685
85.883425
m3
btg
m3
btg
m3
btg
m3
10.8864
64
38.745
184.5
13.44
64
61.3125
(t=12 cm)
(t=10 cm)
hene Sheet 3000
ngkap kawat ayam
SAT
m3
VOLUME
12.474
m3
m3
m3
m3
m3
m3
m3
108.36
3.583125
16.32
27.489
0.45
0.177625
0.24
m3
m3
m3
m3
m3
m2
m2
m3
27.75
31.6125
11.64
36.72
23.1
231
231
9.92
m3
m3
m3
m3
m2
m2
6
8.1
0.48
4.2
42
42
kg
kg
kg
kg
kg
unit
bh
bh
bh
bh
bh
1793.2824
5026.2912
10391.367
5097.7563
2677.043628
57
188
443
954
3730
2636
men Instant.
& Jendela
& Jendela
enius tile 60 x 60 cm
SAT
kg
bh
bh
VOLUME
8896.7605263158
479.7584210526
24
m3
m3
m1
m1
13.389322275
6.2662090909
383.25
0
m2
m1
1641.15
207.9
m2
m2
m2
m1
m1
m1
m1
m1
m2
m1
m1
m2
1695.795
3391.59
3391.59
460.25
920.5
410.8
410.8
89.155
70.2325
708.86
129.6
834.695
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
743.13
1486.26
1486.26
128.3
256.6
145.6
145.6
24.145
204.3
45.53
121.7545
m2
1038.77
k 20 x 20 cm
eramik 5 x 20 cm
SAT
m2
m1
m2
VOLUME
enius tile 60 x 60 cm
m2
ramik 30 x 30 cm
m2
k 20 x 20 cm
m2
m2
25.47
28.67
m2
m2
m1
838.53
321.88
1010.81
m2
m2
m1
m2
258.96
25.47
272.28
13.94
130.55
26.775
153.48
244.23
18.27
TU DAN JENDELA
2x900x2150)
750x2150) *Plastic Laminate
* uk. 2x900x2150)
2x900x2150)
900x2150)
2x900x2150)
750x2150) *Plastic Laminate
900x2150)
* uk. 2x900x2150)
2x900x2150)
900x2150)
unit
unit
unit
unit
unit
8
2
2
2
7
unit
m2
unit
unit
27
9.975
3
11
unit
unit
unit
unit
unit
unit
1
4
1
2
2
2
bical toilet
an dinding 1/2"
eja zink satu lubang
wastafel under counter
an dinding 1/2"
wastafel under counter
SAT
VOLUME
unit
m2
unit
7
8.1225
1
set
set
set
set
bh
bh
m
bh
unit
bh
bh
m
bh
set
bh
bh
4
2
8
4
12
12
0.318252
4
6
6
set
set
bh
bh
m
bh
bh
m
bh
bh
bh
2
2
2
2
0.150744
2
6
1.50744
2
2
2
m
m
m
m'
2694.0025
120.6
1304.98
1023.91
3.18252
4
2
4
2
SAT
m
m
m'
a Darurat
pe 1" W/Synthetic enamel paint finish
pe 2" W/Synthetic enamel paint finish
VOLUME
677.0735
298.37
272.28
13.636
40
Bh
Bh
ameter 40 mm
35
ameter 32 mm
48
ameter 25 mm
27
ameter 15 mm
70
tu ( Fitting-Fitting )
Ls
Unit
meter 40 mm
Bh
ameter 40 mm
ameter 32 mm
ameter 25 mm
ameter 15 mm
36
tu ( Fitting-Fitting )
Ls
ameter 50 mm
meter 40 mm
ypropelyne PN.10 :
ypropelyne PN.10 :
SAT
si Diterjen
VOLUME
Unit
Unit
Unit
Unit
25
ameter 100 mm
28
Bh
ameter 150 mm
34
ameter 100 mm
32
ameter 80 mm
12
ameter 65 mm
30
ameter 50 mm
16
meter 150 mm
Bh
Bh
ameter 40 mm
12
ameter 32 mm
28
ameter 25 mm
45
20
tu ( Fitting-Fitting )
Ls
Bh
ameter 80 mm
ameter 65 mm
ameter 50 mm
meter 65 mm
Bh
Bh
meter 100 mm
meter 65 mm
ameter 100 mm
meter 100 mm
meter 50 mm
ameter 40 mm
SAT
VOLUME
ameter 32 mm
ameter 25 mm
12
tu ( Fitting-Fitting )
Ls
:
m
10
10
ter 50 mm
10
tu ( Fitting-Fitting )
Ls
Bh
16
ameter 100 mm
90
ameter 80 mm
96
tu ( Fitting-Fitting )
Ls
meter 100 mm
Bh
16
ter 100 mm
ter 80 mm
C Kelas 10 kg/cm
BEL FEEDER
Unit
Unit
Unit
Unit
85
10
10
SAT
m
VOLUME
16
Unit
Unit
Unit
14
14
10
Bh
10
Bh
16
Bh
ontak 200 W / 10 A
Bh
28
ontak 350 W / 16 A
Bh
ontak 1000 W / 16 A
Bh
ontak 3 Kw / 25 A
Bh
10
Ttk
129
Ttk
38
10
Bh
Bh
Bh
ontak 200 W / 16 A
Bh
27
ontak 500 W / 16 A
Bh
Ttk
37
Ttk
29
SAT
VOLUME
JUMLAH HARGA
8366919217.50702
679380807.716667
9046300025.22369
904630002.522369
9950930027.74606
9950930000
JUMLAH HARGA
107908820
107908820
182003280
166535372.518156
864212667.932203
802840277.291581
1224377799.36688
182215245.94239
1892268527.03326
5314453170.08448
921247291.646138
323531909.0449
222507324.837106
519063361.84523
60154304.663653
179547197.487832
5450479.65
2231501869.17486
322291800.694222
186255681.968133
35059546.4853333
543607029.147689
120773229.133333
48675099.9666667
169448329.1
8366919217.50702
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
15000000
60000
567212
1000000
163782
14000000
13300000
JUMLAH I.PEKERJAAN PERSIAPA
15000000
12000000
19852420
1000000
32756400
14000000
13300000
107908820
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEMA
15436800
7539840
99009540
49087500
10929600
182003280
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANAH
18760738.1
5186045.865
44326012.5
1468842.804
29993927.347
66799805.9021562
166535372.518156
4591742.25277778
24000
4838362.77833333
24000
4543897.4246875
24000
7600874.05146667
49987542.86064
1536000
187462365.846525
4428000
61069981.3878
1536000
466028590.28055
Pek. Gedung O (Instalasi Loundry) - page 1485 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
7388503.09096428
JUMLAH 2.3.PEKERJAAN PONDAS
92164187.5566885
864212667.932203
3087224.12682292
5481836.63452991
11490048.9918958
9053701.74869308
14851092.28944
18787380.4047159
9381908.85729166
JUMLAH 2.4.LANTAI DASAR ( EL.
334531606.382531
19642105.8911
187517599.54774
248877207.369824
6682991.530248
3337108.44438767
2251658.12575
802840277.291581
9091515.74085333
9680135.75238518
9381908.85729166
6126956.28798611
7143851.34558333
246240
104940
8643361.49286559
JUMLAH 2.5.LANTAI SATU ( EL. +
252289561.80868
306013291.472277
109205419.098875
224981834.89485
165022966.082975
56881440
24241140
85742146.0092267
1224377799.36688
9091515.74085333
9680135.75238518
9381908.85729166
7143851.34558333
246240
104940
JUMLAH 2.6.RING BALOK ( EL. +
54549094.44512
78409099.59432
4503316.2515
30004175.65145
10342080
4407480
182215245.94239
31192.48691625
31192.48691625
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
23040
15840
55936937.7991414
156782522.493263
324132579.189452
159011696.689981
83503648.3406205
27825120
35464320
10206720
21980160
85939200
41754240
Pek. Gedung O (Instalasi Loundry) - page 1486 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
31192.48691625
116640
97200
6048000
5796000
163800
52416
204522.654285714
183747.96
JUMLAH 2.7.ATAP
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
209500
26420
17760
163760
277512086.314115
55959022.231579
2332800
0
80978621.1192
36318947.8909091
62776350
0
0
335652354.081
38201200.884
1892268527.03326
141700
42200
17100
21700
3710
11280
95902.775375
97459.550375
26420
17760
163760
JUMLAH 3.1.PEKERJAAN PASAN
240294151.5
143125098
57996189
9987425
3415055
4633824
39396860.12405
8689006.21368313
14713708.75
18728081.2
2301696
136689653.2
0
0
105301521
62720172
25415046
2784110
951986
1642368
13963444.0946
2353160.84380437
5397606
808612.8
19938516.92
921247291.646138
222896.08
231537761.0216
Pek. Gedung O (Instalasi Loundry) - page 1487 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
163466.05
71703.896
38788.2
222896.08
21340492.8275
1919871.8154
5953212.936
0
0
54437909.6184
167877.55
3067122.8385
163466.05
38788.2
JUMLAH 3.2.PEKERJAAN PASAN
4163480.2935
1112057.694
323531909.0449
140831.940857143
136889.688669643
15603.96
118091807.36694
44062052.9889847
15772638.8076
0
0
36469839.4043657
3486580.3704158
4248646.2288
375759.67
222507324.837106
140831.940857143
136889.688669643
15603.96
26955.5
JUMLAH 3.3.PEKERJAAN PASA
12432894.6291779
5406114.08296034
13034849.7522551
12439913.2852183
5778167.90327238
2685974.74692937
221314.5
5917606.48839937
8497688.59289625
12432894.6291779
5406114.08296034
5774599.26622056
13034849.7522551
12439913.2852183
5778167.90327238
99463157.0334232
10812228.1659207
26069699.5045101
24879826.5704366
40447175.3229066
0
72521318.1670931
2207612.1375
17752819.4651981
93474574.5218587
0
0
0
12432894.6291779
21624456.3318414
5774599.26622056
26069699.5045101
24879826.5704366
11556335.8065448
Pek. Gedung O (Instalasi Loundry) - page 1488 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
2685974.74692937
221314.5
8497688.59289625
JUMLAH 3.4.PEKERJAAN PASAN
2388808.51
1297167.212
1016636.148
2084465.988
309074.535
243866.7
3922839.091875
312950.55
267674.83875
191794.535625
553501.04
326502
610373.61
316849.995
72894.9375
239095.395
2388808.51
2084465.988
309074.535
243866.7
3922839.091875
312950.55
191794.535625
326502
610373.61
72894.9375
239095.395
JUMLAH 3.5.PEKERJAAN PASAN
32850.26245
42825.079055
36922.091195
3427.5273666667
0
18801823.2285056
1797627.02625
8497688.59289625
519063361.84523
9555234.04
2594334.424
8133089.184
8337863.952
3708894.42
2926400.4
1248451.3866674
1251802.2
1606049.0325
1150767.21375
0
1039099.14504
2441494.44
633699.99
291579.75
478190.79
0
0
4777617.02
4168931.976
618149.07
487733.4
591344.456065605
625901.1
1150767.21375
492182.17488
1220747.22
145789.875
478190.79
60154304.663653
88498689.1659561
5164704.534033
48182590.5676511
3509479.54600367
0
Pek. Gedung O (Instalasi Loundry) - page 1489 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
32850.26245
36922.091195
3427.5273666667
JUMLAH 3.6.PEKERJAAN PENGE
399712.5
0
22242042.1729401
11016444.3498522
933247.151396
179547197.487832
5450479.65
0
0
5450479.65
169130.993888889
6765239.75555555
321552
321552
0
100980.733333333
100980.733333333
0
110129.34
3854526.9
69473.34
3334720.32
45554.74
1229977.98
27688.1
1938167
2071478.44
2071478.44
300000000
300000000
0
0
0
100980.733333333
100980.733333333
0
110129.34
440517.36
69473.34
416840.04
45554.74
364437.92
27688.1
996771.6
355609.912
355609.912
322291800.694222
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
Pek sipil
0
212520
212520
122880000
122880000
3625807.152
3625807.152
0
399700.693333333
9992517.33333333
171508.450666667
4802236.61866667
287991
1439955
0
399700.693333333
13589823.5733333
171508.450666667
5488270.42133333
104649.38
1255792.56
67381.1013333333
2021433.04
55231.7333333333
883707.733333333
362527
725054
135531
542124
0
41027.47
492329.64
36182.63
1013113.64
26492.95
1192182.75
11827.2
236544
6450768.04533333
6450768.04533333
0
0
0
0
171508.450666667
1372067.60533333
287991
575982
0
104649.38
837195.04
67381.1013333333
269524.405333333
55231.7333333333
441853.866666667
135531
135531
125367
250734
0
41027.47
164109.88
Pek. Gedung O (Instalasi Loundry) - page 1491 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
36182.63
217095.78
26492.95
317915.4
852818.715466667
852818.715466667
0
0
0
0
171508.450666667
1715084.50666667
0
104649.38
1046493.8
0
55231.7333333333
552317.333333333
662779.128
662779.128
186255681.968133
212520
3400320
0
171508.450666667
15435760.56
104649.38
10046340.48
3087152.112
3087152.112
0
193123.333333333
3089973.33333333
35059546.4853333
13636273.2
13636273.2
11291821.2
11291821.2
11606227.6
11606227.6
11554730
11554730
0
375401.4
31909119
27785.2666666667
277852.666666667
21009.2666666667
210092.666666667
Pek. Gedung O (Instalasi Loundry) - page 1492 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
27785.2666666667
444564.266666667
0
0
0
11053983.6
11053983.6
11133262.8
11133262.8
16762086
16762086
0
21009.2666666667
294129.733333333
27785.2666666667
388993.733333333
21009.2666666667
210092.666666667
120773229.133333
29147.8
291478
31858.2
509731.2
41344.6
41344.6
36081.1
1010270.8
36081.1
72162.2
36081.1
288648.8
171601.1
1716011
0
170766.133333333
22028831.2
197562.133333333
7507361.06666667
171601.1
1716011
0
0
0
29147.8
262330.2
31858.2
95574.6
41344.6
41344.6
36081.1
974189.7
36081.1
72162.2
0
170766.133333333
6318346.93333333
197562.133333333
5729301.86666667
Pek. Gedung O (Instalasi Loundry) - page 1493 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
48675099.9666667
URAIAN PEKERJAAN
1
PEKERJAAAN ARSITEK
1.1.
1.2.
1.3.
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT
2.2.
PEKERJAAN PENGKONDISIAN UDARA & EXHAUST FAN
III.
IV.
NO.
URAIAN PEKERJAAN
1
I.
PEKERJAAAN ARSITEK
1.1. PEKERJAAN PASANGAN DINDING DAN LANTAI
A.
GROUND FLOOR
1 Plint kayu T. 10 cm
B.
LEVEL-1
1 Plint kayu T. 10 cm
1.2.
1.3.
PEKERJAAN FURNITURE
GROUND FLOOR
1 Meja Loket Distribusi P. 4,8 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
2 Meja Reseiving Office P. 4,8 m
-Multiplex 12 mm
-Finishing Tacon Sheet
-Material bantu+aksesories
NO.
URAIAN PEKERJAAN
II.
PEKERJAAN MEKANIKAL
2.1.
PEKERJAAN HYDRANT
A.
GROUND FLOOR
1 Instalasi Hydrant
a.
b.
c.
e.
B.
f.
g.
LEVEL 1
1 Instalasi Hydrant
a.
b.
c.
d.
e.
C.
RISER
2 Pipa di Shaft
a.
b.
2.2.
c.
d.
NO.
URAIAN PEKERJAAN
-
Dran
B.
16" x 14 "
14" x 12 "
12" x 10 "
10" x 8 "
8" x 8 "
6" x 6 "
LEVEL 1
Pekerjaan Unit AC
1 Single Split Wall Type ( IU + OU )
-
Dran
Dran
NO.
URAIAN PEKERJAAN
Pekerjaan Unit Fan
1 Exhaust Fan ( EF 1.1 ) , Kapasitas : 250 CFM - Inline Fan
2 Exhaust Fan ( EF 1.2 ) , Kapasitas : 250 CFM - Inline Fan
3 Exhaust Fan ( EF 1.3 ) , Kapasitas : 500 CFM - Inline Fan
4 Instalasi daya listrik Fan, NYM 3 x 2,5 mm2
Pekerjaan Instalasi Ducting & Grille
1 Ducting Exhaust
-
12" x 10 "
8" x 8 "
8" x 6 "
6" x 6 "
III.
GROUND FLOOR
1 Rak Kabel
a.
Ukuran 40 Cm
B.
a.
Lampu TL 2 x 36 W / Louvre M6
b.
Lampu TL 1 x 36 W / Louvre M6
c.
d.
e.
f.
g.
h.
LEVEL 1
1 Rak Kabel
a.
Ukuran 30 Cm
Lampu TL 2 x 36 W / Louvre M6
b.
Lampu TL 1 x 36 W / Louvre M6
Pek. Gedung O (Instalasi Loundry) - page 1499 of 2419
NO.
URAIAN PEKERJAAN
3.2.
c.
d.
e.
f.
g.
IV.
PEKERJAAN TELEPHONE
A.
GROUND FLOOR
1 Instalasi
B.
a.
CTB O ( 30 Pairs )
a.
TB-T GF ( 20 Pairs )
b.
c.
d.
e.
LEVEL 1
1 Instalsi
4.2.
a.
TB-T ( 10 Pairs )
b.
c.
d.
e.
GROUND FLOOR
1 Instalasi
Pek. Gedung O (Instalasi Loundry) - page 1500 of 2419
NO.
URAIAN PEKERJAAN
a.
MDF
b.
TB.F- GF
c.
d.
ROR
e.
f.
Smoke Detector
g.
h.
Bell Alarm
j.
Indicator Lamp
l.
Flow Switch
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
B.
LEVEL 1
1 Instalasi
a.
TB.F- 1
b.
c.
ROR
d.
e.
Smoke Detector
f.
g.
Bell Alarm
h.
Indicator Lamp
i.
Flow Switch
j.
Titik instalasi :
- Instalasi Detector, NYY4 x 1x 1,5 mm2)
4.3.
GROUND FLOOR
2 Instalasi
a.
MDF
b.
TB-S.GF
c.
d.
e.
Volume Control
Pek. Gedung O (Instalasi Loundry) - page 1501 of 2419
NO.
URAIAN PEKERJAAN
f.
B.
LEVEL 1
1 Instalasi
4.4.
a.
TB-1
b.
c.
d.
Volume Control
e.
PEKERJAAN MATV
A.
GROUND FLOOR
1 Instalasi
a.
B.
Terminak Box
b.
Spliter 4 way
c.
Socket TV ( RCA )
d.
LEVEL 1
1 Instalasi
4.5.
a.
Spliter 4 way
b.
Socket TV ( RCA )
c.
GROUND FLOOR
1 Instalasi
B.
a.
b.
c.
SocketData ( RG-45 )
d.
LEVEL 1
1 Instalasi
a.
b.
NO.
URAIAN PEKERJAAN
4.6.
c.
SocketData ( RG-45 )
d.
PEKERJAAN CCTV
A.
GROUND FLOOR
1 Fixed Dome Camer
2 Instalasi Camera
B.
LEVEL 1
1 Fixed Dome Camer
2 Instalasi Camera
YA
LOUNDRY)
NGGARA BARAT
AN LAIN-LAIN
JUMLAH I.
LOUNDRY)
NGGARA BARAT
SAT
2
VOLUME
3
u T. 10 cm
m1
11.4
u T. 10 cm
m1
16.5
unit
unit
5
5
00x2150)
AN LAIN-LAIN
bh
bh
28
4
bh
bh
9
3
stribusi P. 4,8 m
unit
u+aksesories
g Office P. 4,8 m
unit
u+aksesories
SAT
VOLUME
Set
l Valve, diameter 65 mm :
Bh
Bh
30
Sch.40 diameter 65 mm
13
Unit
an Bantu ( Fitting-Fitting )
Ls
Set
l Valve diameter 65 mm
Bh
Bh
eter 65 mm
an Bantu ( Fitting-Fitting )
Ls
10
ameter 100 mm
Bh
ameter 50 mm
Bh
Bh
Ls
Unit
all Type ( IU + OU )
& OU GF.1, Kap. 25000 BTU/h ( 2 3/4 PK )
SAT
& OU GF.2, Kap. 25000 BTU/h ( 2 3/4 PK )
Unit
VOLUME
1
36
12
40
Unit
14
Unit
Unit
285
20
12
16
22
16
Bh
Bh
Unit
Unit
Unit
all Type ( IU + OU )
60
10
Ttk
20
Ttk
40
all Type ( IU + OU )
Unit
20
10
Ttk
20
SAT
VOLUME
Unit
Unit
Unit
60
10
Bh
96
TL 2 x 36 W / Louvre M6
Bh
42
TL 1 x 36 W / Louvre M6
Bh
16
Bh
15
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
42
Bh
Bh
24
TL 2 x 36 W / Louvre M6
Bh
17
TL 1 x 36 W / Louvre M6
Bh
amp PLC 18 W
SAT
VOLUME
Bh
TL 1 x 36 W / GMS + Battere
Bh
TL 1 x 18 W / IP-40/Cove wastafel
Bh
Bh
Bh
Bh
25
Ttk
Commisioning
Ls
( 30 Pairs )
Bh
F ( 20 Pairs )
Bh
20
Bh
35
Ttk
15
et analog
Ttk
15
Bh
24
Bh
29
Ttk
et analog
Bh
Telephone ( RJ-11 )
SAT
VOLUME
Unit
Unit
30
Bh
31
Bh
Bh
Bh
Bh
Bh
Bh
Temperature Detector
Detector
l Breack Glass
dari CTB-A ke TB F 1A
Unit
44
Unit
34
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
16
Temperature Detector
Detector
l Breack Glass
Unit
Unit
20
Bh
20
Bh
SAT
VOLUME
Ttk
20
Bh
34
Bh
10
Bh
Ttk
12
Unit
Bh
Bh
Ttk
Bh
Bh
Ttk
Unit
20
Data ( RG-45 )
Bh
31
Ttk
31
TV ( RCA )
TV ( RCA )
Unit
1
24
SAT
VOLUME
Data ( RG-45 )
Bh
26
Ttk
26
Unit
Ttk
Unit
Ttk
JUMLAH HARGA
6=4X5
2312910
60421803.75
26397855
89132568.75
25479295.8933333
359374701.82
384853997.713333
79883698.7466667
13436931.2
93320629.9466667
29001272.1533333
22625604.1333333
11908438.8133333
5214234.66666667
30821561.54
12502500
112073611.306667
679380807.716667
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
82900
945060
82900
JUMLAH 1.1.PEKERJA
1367850
2312910
6921547.875
5162812.875
34607739.375
25814064.375
JUMLAH 1.2.PEKERJA
450202.5
525937.5
450202.5
525937.5
3029400
3029400
JUMLAH 1.3.PEKERJAA
60421803.75
12605670
2103750
0
4051822.5
1577812.5
0
0
0
3029400
0
0
0
3029400
0
26397855
Pek. Gedung O (Instalasi Loundry) - page 1514 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
2364266.66666667
0
313351.573333333
9400547.2
155862.666666667
2026214.66666667
457072
457072
2285352.37333333
2285352.37333333
0
0
0
1108800
1108800
201283.866666667
201283.866666667
591066.666666667
591066.666666667
0
155862.666666667
935176
187035.2
187035.2
0
0
0
0
313351.573333333
3133515.73333333
0
253459.066666667
253459.066666667
177567.866666667
177567.866666667
107800
107800
940054.72
940054.72
25479295.8933333
11797676
11797676
Pek. Gedung O (Instalasi Loundry) - page 1515 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
11797676
11797676
170503.813333333
6138137.28
108605.053333333
1303260.64
21009.2666666667
840370.666666666
0
0
55666.6666666667
779333.333333333
861857.333333333
861857.333333333
861857.333333333
861857.333333333
6591.2
1878492
0
0
0
3256133.76
65122675.2
2821982.592
33863791.104
2387831.424
38205302.784
1953680.256
42980965.632
1736604.672
6946418.688
1302453.504
20839256.064
874998.74
5249992.44
1037927.66
8303421.28
0
0
0
0
14785892
14785892
11797676
11797676
3900248
3900248
170503.813333333
10230228.8
108605.053333333
1086050.53333333
11827.2
236544
21009.2666666667
840370.666666666
0
15497372
15497372
170503.813333333
3410076.26666667
108605.053333333
1086050.53333333
21009.2666666667
420185.333333333
0
Pek. Gedung O (Instalasi Loundry) - page 1516 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
0
445096.666666667
445096.666666667
445096.666666667
445096.666666667
670456.746666666
670456.746666666
6591.2
395472
0
0
0
2387831.424
7163494.272
1736604.672
3473209.344
1519529.088
6078116.352
1302453.504
13024535.04
945435.26
6618046.82
359374701.82
326872.883333333
31379796.8
0
276475.466666667
11611969.6
124445.333333333
1991125.33333333
132146.666666667
1982200
372017.066666667
744034.133333333
89519.4666666667
358077.866666667
272409.866666667
11441214.4
516345.866666667
3098075.2
179578.666666667
359157.333333333
0
0
0
298549.203333333
7165180.88
0
276475.466666667
4700082.93333333
124445.333333333
248890.666666667
Pek. Gedung O (Instalasi Loundry) - page 1517 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
132146.666666667
396440
372017.066666667
744034.133333333
89519.4666666667
179038.933333333
272409.866666667
2451688.8
516345.866666667
1032691.73333333
79883698.7466667
8377600
8377600
174944
349888
50512
1262800
1694000
1694000
1752643.2
1752643.2
13436931.2
25256
25256
192548.4
192548.4
20331.6666666667
406633.333333333
201415.5
7049542.5
498793.386666667
7481900.8
215147.166666667
3227207.5
0
0
0
168154.8
168154.8
13555.6666666667
325336
201415.5
5841049.5
498793.386666667
2992760.32
215147.166666667
1290883
29001272.1533333
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
169400
169400
240240
240240
87472
2624160
0
74572.6666666667
2311752.66666667
77960.6666666667
77960.6666666667
231775.866666667
1390655.2
271076.666666667
542153.333333333
165371.066666667
330742.133333333
84736.6666666667
169473.333333333
83160
83160
0
160910.133333333
7080045.86666667
0
0
0
240240
240240
87472
2974048
0
74572.6666666667
671154
77960.6666666667
77960.6666666667
231775.866666667
463551.733333333
271076.666666667
271076.666666667
165371.066666667
165371.066666667
84736.6666666667
84736.6666666667
83160
83160
0
160910.133333333
2574562.13333333
22625604.1333333
378840
378840
266112
266112
18849.6
376992
153993.766666667
3079875.33333333
258720
0
Pek. Gedung O (Instalasi Loundry) - page 1519 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
151320.106666667
3026402.13333333
0
0
0
266112
266112
18849.6
640886.4
153993.766666667
1539937.66666667
258720
517440
151320.106666667
1815841.28
11908438.8133333
220366.666666667
220366.666666667
227069.333333333
227069.333333333
84736.6666666667
508420
369236.266666667
2215417.6
0
0
0
227069.333333333
227069.333333333
84736.6666666667
338946.666666667
369236.266666667
1476945.06666667
5214234.66666667
271885.9
271885.9
21560
431200
15753.1
488346.1
498793.386666667
15462594.9866667
0
0
0
271885.9
271885.9
21560
517440
Pek. Gedung O (Instalasi Loundry) - page 1520 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
15753.1
409580.6
498793.386666667
12968628.0533333
30821561.54
2667500
5335000
1500000
3000000
0
0
2667500
2667500
1500000
1500000
12502500
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
2.2.
PEKERJAAN TANAH
2.3.
PEKERJAAN PONDASI, PILE CAP DAN SLOOF
2.4.
LANTAI DASAR ( EL. + 0,00 M )
2.5.
RING BALOK ( EL. + 2,90 M )
2.6.
ATAP
III.
PEKERJAAN ARSITEKTUR
3.1.
PEKERJAAN PASANGAN DINDING DAN PELAPIS LANTAI
3.2.
PEKERJAAN KUSEN PINTU/JENDELA LENGKAP
3.3.
PEKERJAAN CAT
IV.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pengukuran (Uitzet)
2 Pemasangan Bouwplank
3 Direksi Keet (sewa)
4 Papan Nama Proyek
5 Pagar proyek
6 Listrik Kerja dan Air Kerja
II.
PEKERJAAN STRUKTUR
2.1.
PEKERJAAN PEMATANGAN LAHAN
1 Pembersihan lahan
2 Stripping dan Grubbing tanah sedalam 20 cm
3 Pengadaan tanah urug
4 Pemadatan Tanah CBR 4 + test ( 10 ttk)
5 Buang Tanah Ex. Stripping dan Grubbing Keluar Proyek
2.2.
PEKERJAAN TANAH
1 Galian Tanah
2 Buang Tanah Ex. Galian Tanah Keluar Proyek
3 Pemadatan Tanah CBR 4 + test ( 5 ttk)
4 Urugan Kembali Ex. Galian
5 Pasir Urug t. = 10 cm
6 Lantai Kerja t. = 5 cm
2.3.
2.4.
NO.
URAIAN PEKERJAAN
2.5.
2.6.
ATAP
1 KUDA - KUDA RANGKA BAJA
- Besi L 50.50.5
- Besi L 45.45.5
- Plat Buhul t=12 mm
- Base plate 16 mm
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 16 mm
- Mur + Baut 12 mm
- Gording CNP 200.75.3.2
- Trekstang 12 mm
- Ikatan angin 12 mm
2 RANGKA ATAP KAYU
- Kaso 5/7
- Reng 3/4
- Listplank 3/30
3 PENUTUP ATAP
- Genting Keramik + Insulasi
- Nok
III.
IV.
PEKERJAAN ARSITEKTUR
3.1.
PEKERJAAN PASANGAN DINDING DAN PELAPIS LANTAI
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Pasangan lantai keramik 30x30
5 Pasangan plint lantai keramik 10 x 30
3.2.
3.3.
PEKERJAAN CAT
1 Pengecatan exterior
2 Pengecatan interior
NO.
URAIAN PEKERJAAN
1 Incenerator type smoke list,Kapasitas 50 Kg/Jam
R)
GGARA BARAT
JUMLAH I.
JUMLAH II.
ANGAN INCENERATOR
t,Kapasitas 50 Kg/Jam
JUMLAH IV.
TOTAL PEK. STANDA
PPN 10%
TOTAL
DIBULATKAN
R)
GGARA BARAT
SAT
2
BR 4 + test ( 10 ttk)
ipping dan Grubbing Keluar Proyek
VOLUME
3
ls
m'
m2
Ls
m'
Ls
1
50
35
1
50
1
m3
m3
m3
m2
m3
90
18
63
59
18
m3
m3
m2
m3
m3
m3
139.23
97.461
59
41.769
14.1376
7.0688
m3
btg
m3
3.36
16
1.608
m3
m3
4.72
2.35
m-400mm
SAT
m3
kg
kg
kg
unit
bh
bh
bh
bh
kg
bh
bh
VOLUME
1.608
996.66
559.2888
186.713856
8
32
24
308
324
489.5210526316
26
4
m3
m3
m1
0.73671255
0.3447818182
36.54
m2
m1
90.3
26.775
m2
m2
m2
m2
m'
36.35
72.7
72.7
40.83
24.39
amik 30x30
i keramik 10 x 30
ENDELA LENGKAP
ANGAN INCENERATOR
unit
unit
1
9
m2
m2
43.05
43.05
lLs
SAT
VOLUME
t,Kapasitas 50 Kg/Jam
JUMLAH HARGA
57041520
57041520
13950869
18960676.079
30980342.004888
38855419.7571375
17078388.0247787
132999173.357739
252824868.223543
16771293.527
33626278.91997
3257823.45179025
53655395.8987603
300000000
300000000
663521784.122303
66352178.4122303
729873962.534534
729874000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
15000000
60000
567212
1000000
163782
10000000
JUMLAH I.PEKERJAAN PERSIAP
15000000
3000000
19852420
1000000
8189100
10000000
57041520
10720
26180
157158
32725
37950
JUMLAH 2.1.PEKERJAAN PEM
964800
471240
9900954
1930775
683100
13950869
48050
18975
32725
12540
174620
777796.25
JUMLAH 2.2.PEKERJAAN TANA
6690001.5
1849322.475
1930775
523783.26
2468707.712
5498086.132
18960676.079
5251237.255
24000
8054841.311
JUMLAH 2.3.PEKERJAAN PONDA
3087224.12682292
10333498.6717163
17644157.1768
384000
12952184.828088
30980342.004888
14571697.8786042
24283721.8785333
Pek. Gedung R (Incenerator) - page 1531 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
JUMLAH 2.4.LANTAI DASAR ( EL
38855419.7571375
10620888.0751111
JUMLAH 2.5.RING BALOK ( EL.
17078388.0247787
17078388.0247787
31192.48691625
31192.48691625
31192.48691625
488160
188640
23040
23040
20160
31192.48691625
116640
97200
204522.654285714
183747.96
JUMLAH 2.6.ATAP
31088304.0099497
17445608.5764052
5824069.51036259
3905280
6036480
552960
7096320
6531840
15269379.0294395
3032640
388800
0
4455637.5024
1998355.41818182
5985252
0
18468395.682
4919851.629
132999173.357739
141700
42200
17100
167877.55
18653.0611111111
JUMLAH 3.1.PEKERJAAN PASA
5150795
3067940
1243170
6854440.3665
454948.1605
16771293.527
7015491.29853
2956754.18016
JUMLAH 3.2.PEKERJAAN KUSE
7015491.29853
26610787.62144
33626278.91997
42825.079055
32850.26245
JUMLAH 3.3.PEKERJAAN CAT
1843619.65331775
1414203.7984725
3257823.45179025
300000000
300000000
6048000
5796000
163800
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
300000000
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
I.
II.
PEKERJAAN PERSIAPAN
PEKERJAAN SIPIL
2.1 PEKERJAAN GALIAN, DAN URUGAN
2.2 PEKERJAAN PONDASI DAN SLOOP
2.3 PEKERJAAN STRUKTUR
III.
PEKERJAAN ARSITEKTUR
3.1.
3.2.
3.3.
3.4.
IV.
V.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
I.
PEKERJAAN PERSIAPAN
1 Pek.Pengukuran Dan Bouwplank
2 Pek. Pembersihan lapangan dan Perataan
II.
PEKERJAAN SIPIL
2.1 PEKERJAAN GALIAN, DAN URUGAN
1 Pek. Galian tanah
2 Pek. Urugan Kembali Ex. Galian
3 Pek. Pemadatan Tanah
4 Pek. Urug Pasir Bawah Pondasi dan Lantai t.10 cm
2.2 PEKERJAAN PONDASI DAN SLOOP
1 Pek. Pondasi batu kali 1:5
2 Pek.Astamping 1:3
3 Pek. SloofSloof 15/20
2.3 PEKERJAAN STRUKTUR
1 Pek. Kolom K1 (0.15 x 0.15 x 3.25) 4 UNIT
2 Pek.Ring Balok (0.15 x 0.15 x 8 )
3 Pek. List Plank Beton
4 Pek.Plat Dak Atap (T.10 cm)
5 Pek.Water profing coating
6 Pek. Pasangan Screed
III.
PEKERJAAN ARSITEKTUR
3.1.
PEKERJAAN PASANGAN DINDING,PLESTERAN DAN ACIAN
1 Dinding bata ringan
2 Plesteran
3 Acian semen
4 Pek.Balok latei 12 x 12 cm
3.2.
NO.
URAIAN PEKERJAAN
3.3.
PENGECATAN
1 Pek. Pengecatan Interior dan exterior
3.4.
IV.
V.
JENDELA
1 Pek.Jendela ukuran 80 x 200 cm
Lampu TL 1 x 18 W
Saklar tunggal
BUAH
GGARA BARAT
DAN PLUMBING
ARUS KUAT
JUMLAH PEMBA
PPN 10 %
TOTAL
DIBULATKAN
BUAH
GGARA BARAT
an dan Perataan
i Ex. Galian
SAT
2
VOLUME
3
m'
m2
9.2
6.25
m3
m3
m3
m3
6.72
3.16
3.125
0.56
m3
m3
m3
2.04
0.96
0.24
m3
m3
m3
m3
m2
m2
0.2925
0.18
0.096
0.5625
3.5344
3.5344
m2
m2
11.06
20.12
n (tebal 5 cm)
m2
m
m2
m2
m3
20.12
3.5
3.4225
7.4
0.171125
SAT
VOLUME
m2
20.12
80 x 200 cm
unit
m'
bh
6
2
Bh
Bh
Bh
pu TL 1 x 18 W ( Pos Jaga )
Ttk
Ttk
JUMLAH HARGA
619000
562575.225
3482392.65804444
8910284.45478943
3101426.4263125
845693.950378472
660947.280494
11367523.733335
869490
1046153.26666667
31465486.9950205
3146548.69950205
34612035.6945226
34612000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
60000
10720
JUMLAH I.PEKERJAAN PERSIAP
552000
67000
619000
48050
12540
32725
174620
JUMLAH 2.1PEKERJAAN GALIA
322896
39626.4
102265.625
97787.2
562575.225
604860
300280
8167539.40851852
JUMLAH 2.2PEKERJAAN PONDA
1233914.4
288268.8
1960209.45804444
3482392.65804444
8895799.803
5735842.80429487
6126956.28798611
6126956.28798611
246240
104940
JUMLAH 2.3PEKERJAAN STRUK
2602021.4423775
1032451.70477308
588187.803646667
3446412.91199219
870310.656
370899.936
8910284.45478943
141700
42200
1567202
849064
17100
344052
97459.550375
JUMLAH 3.1.PEKERJAAN PASA
341108.4263125
3101426.4263125
167877.55
18653.0611111111
777796.25
JUMLAH 3.2.PEKERJAAN PASA
574560.914875
138032.652222222
133100.38328125
845693.950378472
Pek. Gedung Z (Pos Jaga) - page 1541 of 2419
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
32850.26245
JUMLAH 3.3.PENGECATAN
660947.280494
660947.280494
5683761.8666675
JUMLAH 3.4.JENDELA
11367523.733335
11367523.733335
62315
247800
JUMLAH IV.PEKERJAAN MEKAN
373890
495600
869490
89519.4666666667
179038.933333333
29147.8
58295.6
36081.1
72162.2
170766.133333333
341532.266666667
197562.133333333
395124.266666667
1046153.26666667
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
PEKERJAAN SIPIL
A.
PEKERJAAN SALURAN TERBUKA
B.
PEKERJAAN JALAN
C.
PEKERJAAN PERTAMANAN
D.
PEMBUATAN GAPURA SISI PINTU SELATAN
E.
PEMBUATAN GAPURA SISI PINTU TIMUR (DASAN CERMEN)
F.
JEMBATAN BETON
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN STANDAR
A.
B.
PEKERJAAN JALAN
1 Penyiapan badan jalan (pemadatan)
2 Lapisan pondasi bawah sirtu kelas B Tebal 27 cm
3 Lapisan pondasi atas agregrat kelas A Tebal 20 cm
4 Lapisan resap pengikat
5 Lapisan permukaan aspal Tebal 5 cm
6 Kanstein 15 x 30 x 50 cm
7 Cat Marka Jalan dan Parkir L. 10 cm
8 Cat Marka Kanstein L. 45 cm
C.
PEKERJAAN PERTAMANAN
1 Urugan tanah subur 10 cm
2 Rumput Gajah Mini dan The-Tehan
3 Pohon Ketapang
4 Pohon Angsana
5 Tanaman Pisang Kipas
6 Pohon Palm Raja
7 Tanaman Sansivera
8 Tanaman Nanas Kerang
9 Tanaman Jaburan Putih
10 Tanaman Agave
D.
E.
F.
JEMBATAN BETON
1 Jembatan Beton
GGARA BARAT
PINTU SELATAN
PINTU TIMUR (DASAN CERMEN)
JUMLAH PEKERJAAN S
TOTAL PEK. STANDA
PPN 10%
TOTAL
DIBULATKAN
GGARA BARAT
SAT
2
VOLUME
3
cm (Utama)
cm (Jalan)
cm (Keliling Bangunan)
g Tbl. 20 cm
m
m
m
m3
unit
unit
unit
madatan)
tu kelas B Tebal 27 cm
grat kelas A Tebal 20 cm
m2
m3
m3
m2
m2
m1
m2
m2
25649.3447
6925.323069
5129.86894
25649.3447
1282.467235
5682.8543
139.5
2557.284435
m3
m2
btg
btg
btg
btg
btg
btg
btg
btg
2206.272355
22062.72355
2
66
22
21
31
11
42
30
Tebal 5 cm
1043.369
487.4207435337
3735.28
18.736
48
15
31
m2
m2
ls
ls
27
18
1
1
m2
ls
ls
27
1
1
ls
JUMLAH HARGA
1260003636.83388
4447188463.85802
877902967.71606
416000000
335000000
150000000
7486095068.40796
7486095068.40796
748609506.840796
8234704575.24875
8234705000
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
352670
217330
164030
6126956.28798611
414160
603040
957730
JUMLAH A.PEKERJAAN SALUR
367964945.23
105931150.192168
612697978.4
114794653.011708
19879680
9045600
29689630
1260003636.83388
32720
225380
232300
10120
73990
82040
12890
12890
JUMLAH B.PEKERJAAN JALAN
839246558.584
1560829313.29122
1191668554.762
259571368.364
94889750.71765
466221366.772
1798155
32963396.36715
4447188463.85802
130372
25000
153153
114444
146421
190179
123700.5
94248
113602.5
107712
JUMLAH C.PEKERJAAN PERTA
287636139.46606
551568088.75
306306
7553304
3221262
3993759
3834715.5
1036728
4771305
3231360
877902967.71606
5000000
4500000
150000000
50000000
JUMLAH D.PEMBUATAN GAPURA
135000000
81000000
150000000
50000000
416000000
5000000
150000000
50000000
JUMLAH E.PEMBUATAN GAPURA
135000000
150000000
50000000
335000000
150000000
JUMLAH F.JEMBATAN BETON
150000000
150000000
NO.
URAIAN PEKERJAAN
PEKERJAAN STANDAR
A.
PEKERJAAN MEKANIKAL
I.
PEKERJAAN PLAMBING
1.1.
PEKERJAAN SISTEM AIR BERSIH
II.
PEKERJAAN PEMADAMAN KEBAKARAN
2.1.
PERALATAN UTAMA HYDRANT & SPRINKLER
B.
TERBILANG:
NO.
URAIAN PEKERJAAN
1
PEKERJAAN MEKANIKAL
I.
PEKERJAAN PLAMBING
1.1.
2 Wate Filter
a.
d.
c.
Dosing Pump
d.
Gate Valve, 10 K :
- Diameter 50 mm
e.
Water Tank Bawah Modul sistem bahan FRP (khusus Air Bersih
kapasitas : 285 M3 Lengkap dudukan dan alat bantunya.
c.
d.
e.
b.
c.
Strainer dia. 65 mm
d.
NO.
URAIAN PEKERJAAN
e.
f.
Pressure Indicator
g.
Header 100 mm
h.
Horn Buzzer
i.
b.
c.
e.
Gate Valve
Gate Valve dia. 65 mm
Gate Valve dia. 50 mm
d.
7 Pompa Booster
a
c.
d.
Strainer dia 65 mm
e.
c.
d.
PPR dia. 80 mm
PPR dia. 65 mm
PPR dia. 50 mm
II.
NO.
URAIAN PEKERJAAN
2.1.
c.
d.
e.
b.
: 129 Meter
- Type
- Daya
: 127 KW
- Putaran
: 2900 RPM
- Standar
: NFPA 20
c.
: 129 Meter
- Type
- Daya
: 127 KW
- Putaran
: 2900 RPM
- Standar
: NFPA 20
: 138 Meter
- Type
: Multi Stage
- Daya
: 37 KW
- Putaran
: 1450 RPM
- Standar
: NFPA 20
: 12 Meter
Pek. Utilytas - page 1555 of 2419
NO.
URAIAN PEKERJAAN
- Type
- Daya
: 7,5 KW
- Putaran
: 1450 RPM
FJ diameter 150 mm
FJ diameter 100 mm
FJ diameter 65 mm
FJ diameter 50 mm
11 Check Valve :
-
CV diameter 150 mm
CV diameter 100 mm
CV diameter 65 mm
CV diameter 50 mm
12 Gate Valve :
-
GV dameter 150 mm
GV diameter 100 mm
GV diameter 65 mm
GV diameter 50 mm
GV diameter 40 mm
GV diameter 25 mm
NO.
URAIAN PEKERJAAN
-
B.
II.
Panel Listrik
-
2.
Kabel Feeder ke LP - PL
-
3.
LP - PL
NYFGbY 4 x 25 mm2
Route - 1
-
NO.
URAIAN PEKERJAAN
4.
Route - 2
-
5 Route - 3
-
6 Route - 4
-
7 Route - 5
-
8 Route - 6
-
9 Route - 7
-
10 Route - 8
-
A BARAT
R BERSIH
NGAN SITE
G
A BARAT
SAT
2
R BERSIH
Unit
Unit
Unit
Unit
alve, 10 K :
eter 50 mm
Buah
Flow Switch
Buah
Unit
g valve diameter 50 mm
Buah
Unit
alve strainer
Buah
Submersible kuras
Unit
Unit
e joint dia. 65 mm
Buah
er dia. 65 mm
Buah
valve diameter 65 mm
Buah
Pek. Utilytas - page 1560 of 2419
SAT
alve dia. 65 mm
Buah
re Indicator
Buah
r 100 mm
Buah
Buah
Ls
aterial Fibre
ank, kapasitas : 70 M3
Unit
g valve diameter 50 mm
Buah
Unit
alve dia. 65 mm
Buah
alve dia. 50 mm
Buah
r diameter 100 mm
unit
Set
e joint diameter 65 mm
Buah
alve dia.65 mm
Buah
er dia 65 mm
Buah
Titik
lypropelyne PN.10 :
Meter
Meter
Meter
Meter
PPR dia. 80 mm
Meter
PPR dia. 65 mm
Meter
PPR dia. 50 mm
Meter
Ls
M'
SAT
Tank Bawah (Khusus Air Cadangan kebakaran) Modul sistem bahan FRP, kaUnit
g valve diameter 50 mm
Buah
Unit
alve strainer
Buah
Submersible kuras
Unit
daman Kebakaran
unit
an
dar
: 2900 RPM
: NFPA 20
unit
an
dar
: 2900 RPM
: NFPA 20
unit
an
dar
: 1450 RPM
: NFPA 20
Ground- Submersible
unit
SAT
: Centrifugal End Suction
: 7,5 KW
an
: 1450 RPM
unit
g - 100 liter
unit
unit
buah
Valve dia. 40 mm
buah
buah
meter 150 mm
buah
meter 100 mm
buah
meter 65 mm
buah
meter 50 mm
buah
meter 150 mm
buah
meter 100 mm
buah
meter 65 mm
buah
meter 50 mm
buah
meter 150 mm
buah
meter 100 mm
buah
meter 65 mm
buah
meter 50 mm
buah
meter 40 mm
buah
meter 25 mm
buah
a. 200 mm
buah
ve dia. 200 mm
buah
buah
Meter
Meter
Meter
hedule 40 , diameter 65 mm
Meter
Pek. Utilytas - page 1563 of 2419
SAT
hedule 40 , diameter 50 mm
Meter
hedule 40 , diameter 25 mm
Meter
Meter
Meter
Meter
Meter
Unit
Unit
Meter
ntu ( Fitting )
Ls
a Listrik pompa
Ls
istrik ( PP - Hydrant )
Unit
NGAN SITE
Unit
Meter
Buah
Pek. Utilytas - page 1564 of 2419
SAT
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
alvanized 11 Meter )
Buah
Titik
Titik
Titik
mpu TL 1 x 18 W ( Selasar )
Titik
Titik
JUMLAH HARGA
1304281896.50133
2566274209.104
JUMLAH A.PEKERJA
3870556105.60533
454522053.626667
271195327.866667
JUMLAH B. PEKERJA
725717381.493333
4596273487.09867
PPN 10%
459627348.709867
TOTAL
5055900835.80853
DIBULATKAN
5055901000
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
5 6=4X5
1 Sudah Dilaksanakan
88032054
88032054
91487814
91487814
1924882.08
1924882.08
0
143687.866666667
574751.466666667
205744
205744
0
21107240
21107240
520420.56
1040841.12
703270.92
703270.92
532515.72
1065031.44
3428945.696
6857891.392
0
101285910
202571820
0
356780.16
713560.32
351088.32
702176.64
359626.08
719252.16
Pek. Utilytas - page 1567 of 2419
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
152496.666666667
304993.333333333
283976
283976
471240
942480
114576
114576
8000000
8000000
0
179722000
179722000
520420.56
1040841.12
703270.92
703270.92
0
152496.666666667
304993.333333333
143687.866666667
862127.2
471240
471240
0
1957366.224
1957366.224
0
356780.16
713560.32
152496.666666667
304993.333333333
351088.32
702176.64
171601.1
343202.2
0
45
265892.273888889
11965152.325
35
265892.273888889
9306229.58611111
270
265892.273888889
71790913.95
0
410
790816.479444444
324234756.572222
200
371246.559444444
74249311.8888889
67
265892.273888889
17814782.3505556
173
169130.993888889
29259661.9427778
107724161.723111
107724161.723111
850
51128
JUMLAH 1.1.PEKERJAAN SISTEM
43458800
1304281896.50133
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
19264784
19264784
520420.56
1040841.12
703270.92
703270.92
532515.72
1065031.44
3428945.696
6857891.392
826267750
826267750
572167750
572167750
81373600
81373600
3428945.696
3428945.696
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
1650000
1650000
550000
550000
703270.92
703270.92
283976
283976
93632
93632
114576
229152
420101.88
840203.76
392354.16
784708.32
356780.16
356780.16
339704.64
339704.64
199584
199584
296221.2
1184884.8
126280
126280
120736
241472
256256
1025024
253459.066666667
1520754.4
201283.866666667
201283.866666667
177567.866666667
177567.866666667
147057.533333333
147057.533333333
133505.533333333
267011.066666667
1503040
3006080
261800
523600
884576
884576
638599.573333333
5108796.58666667
16
475975.573333333
7615609.17333333
28
313351.573333333
8773844.05333333
155862.666666667
311725.333333333
Pek. Utilytas - page 1570 of 2419
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
135534.666666667
271069.333333333
52457.24
314743.44
810
475975.573333333
385540214.4
810
475975.573333333
385540214.4
110
313351.573333333
34468673.0666667
531
313351.573333333
166389685.44
1108800
4435200
1108800
4435200
51128
204512
6718736.376
6718736.376
10000000
10000000
18639517.6
JUMLAH 2.1.PERALATAN UTAMA
18639517.6
2566274209.104
228
60310.0666666667
13750695.2
14
60310.0666666667
844340.933333333
14
60310.0666666667
844340.933333333
21
4939711.33333333
103733938
22
4939711.33333333
108673649.333333
25
3953125.73333333
98828143.3333333
25
3953125.73333333
98828143.3333333
12
1209116.77333333
14509401.28
12
1209116.77333333
JUMLAH I.PEKERJAAN KABEL FE
14509401.28
454522053.626667
16470946.8
16470946.8
45
111003.2
4995144
163240
1142680
Pek. Utilytas - page 1571 of 2419
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp)
(Rp)
301224
1204896
12
301224
3614688
27
766920
20706840
20
766920
15338400
25
766920
19173000
20
766920
15338400
37
766920
28376040
24
766920
18406080
23
1145760
26352480
23
437322.233333333
10058411.3666667
153
437322.233333333
66910301.7
170766.133333333
341532.266666667
131
170766.133333333
22370363.4666667
197562.133333333
JUMLAH II.PEKERJAAN INSTALAS
395124.266666667
271195327.866667
NO
A. DAFTAR UPAH
1 Pekerja
2 Tukang kayu
3 Tukang batu
4 Tukang cat
5 Tukang Plafond
6 Kepala tukang
7 Mandor
URAIAN
B. DAFTAR BAHAN
1 Bata merah
2 Bata ringan
3 Batu Split 1/2
4 Batu belah 15/20
5 Beton Ready Mix K 300
6 Beton Ready Mix K 250
7 Besi beton U-24
8 Besi beton U-39
9 Besi Siku (Profil)
10 Besi Sinapat (Lip Channel)
11 Drymix floor hardener @ 25 kg
12 Drymix Self leveling floor @ 25 kg
13 Semen
14 Semen warna
15 Semen instan bata ringan
16 Semen instan plesteran 50 kg/sak
17 Semen instan acian 40 kg/sak
18 Pasir beton
19 Pasir pasang
20 Pasir urug
21 Tanah urug
22 Pasir batu
23 Kanstein (15 x 30 x 60)
24 Glass block
NO
25
26
27
28
29
30
31
32
33
34
35
URAIAN
Aggregat Kasar Untuk Pondasi Klas A
Aggregat Halus Untuk Pondasi Klas A
Aggregat Kasar Untuk Pondasi Klas B
Aggregat Halus Untuk Pondasi Klas B
Aggregat Halus Untuk Campuran Asphalt
Kawat ayam
Base plate 300 x 300 mm t =16 mm (double)
Saluran U dict uk. 60 x 60 cm
Saluran U dict uk. 50 x 50 cm
Saluran U dict uk. 40 x 40 cm
Saluran U dict uk. 30 x 30 cm
NO
URAIAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
17
18
19
20
1
2
3
4
5
6
7
8
9
10
NO
2
3
4
1
2
3
4
5
6
7
8
9
9
10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
1
2
3
4
URAIAN
GRC 1200 mm x 2400 mm x 6 mm
Plafond Akustik 60 x 60 cm
List Gypsum profil
NO
5
6
7
8
9
10
1
2
3
URAIAN
Cat Epoxy
Residu
Dempul
Meni Duco
Cat Duco
Thinner
NO
URAIAN
- Fitting L-Side Panel Patch
- Fitting Top Patch
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Daun Pintu
1 Pintu type C HM 900 x 2150 mm
2 Pintu type C HM 2 X 900 x 2150 mm
3 Pintu type A HM 900 x 2150 mm (fire door)
4 Pintu type A HM 600 x 1250 mm
5 Pintu type A HM 2 x 600 x 1250 mm
6 Pintu type B HM 600 x 1250 mm
7 Pintu type B HM 900 x 2150
8 Pintu type B. automatic hermetic sliding door (900 x 2150)
9 Pintu type B. automatic hermetic sliding door (2 x 900 x 2150)
10 Pintu Swing, Manual Swing (1x90x215)
11 Pintu Swing, Automatic Swing (1x90x215)
12 Pintu Radiologi, Automatic Single Swing (1x90x215)
13 Pintu Single Swing (1x90x215)
14 Daun Pintu ( 700 x 2150 )
15 Daun Pintu ( 900 x 2150 )
16 Daun Pintu ( 400 x 800 x 2150 )
17 Daun Pintu / Wired Glass 6 mm
18 SINGLE STEEL DOOR Type T uk. 90 x 215
19 SINGLE STEEL DOOR Type H uk. 90 x 215
20 SINGLE STEEL DOOR Type H uk. 70 x 215
MDF T. 9 mm
Clear glass 6 mm
Tempered glass 6 mm
Tempered glass 8 mm
Tempered glass 12 mm
Plastik laminate formika
Kick Plate 200x600x1,5mm SS
Louver 500x600 mm
Keling alluminium
Sealent
Gasket
Louver Allumunium
Curtain wall (terpasang)
Upah pasang pintu besi
NO
18
19
20
21
URAIAN
Railling black steel pipe 2" Tangga darurat cat duco
Hand railling black steel pipe 2" cat duco
Hand railling stainless steel 2" Ramp
Hand railling penyandang cacat stainless steel 2"
1
2
3
4
5
6
7
8
9
10
Genteng Keramik
Nock keramik
Talang jurai
Penutup Atap Metal
Penutup Atap Melintang Metal Roof (Nock Pinggir)
Penutup Atap Arah Memanjang Metal Roof (Nock Depan)
List plank GRC
Rangka Atap Baja Ringan
Penutup Atap Safety Glass
Talang Jurai Metal Roof
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Air
Paku
Minyak bekisiting
Paku biasa
Besi strip
Seng Gelombang
Seng plat
Besi Hollow 40 x 40
Jendela nako
Kaca polos
Kunci tanam
Roll Cat
Amplas
Kape
Kawat beton
Skrup
Paku ramset+misiu
Gantungan
U Chanel 75
C stud 75
Jointing Coumpond
Joint Tape @ 75 m
NO
23
24
25
26
27
28
29
30
31
URAIAN
Mur 25 mm
Siku metal furing L.2.5 cm
Canal C metal furing C.2 x 3 x 2 cm
Menti Crossti (Profil Alumunium "T")
Lem/adhesive
Signage room
Signage penunjuk arah ruangan
Signage exit lamp
Lemari dibawah meja wastafel dan zink
NO
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
1
2
3
URAIAN
Meja counter
C stud 75
U Chanel 75
Sound proff insulation spray
Lapis pengikat aspal
Aspal
Kerosene
Filler
Waterproofing coating Elastomeric Acrylic/ Terpasang
Waterproofing Bituthene Sheet 3000/ Terpasang
- Angker Bolt 22mm-400mm
- Mur + Baut 22 mm
- Mur + Baut 19 mm
- Mur + Baut 16 mm
- Trekstang 12 mm
- Ikatan angin 12 mm lengkap kontra mur
- Base Plate 25x25 cm t = 16 mm
- Angker Bold 19 mm - p = 40 cm
- Pelat buhul
- CNP 100.50.20.2,3
Kolom H-Beam
Pagar Panel 218.40.5
Kawat Duri t=60 cm (jumlah baris 10)
Besi Siku L 40.40.4 (panjang 0.6 m)
Wiremest M-4
Rumput Gajah Mini dan The-Tehan
Pohon Ketapang
Pohon Angsana
Tanaman Pisang Kipas
Pohon Palm Raja
Tanaman Sansivera
Tanaman Nanas Kerang
Tanaman Jaburan Putih
Tanaman Agave
Signage room
Signage penunjuk arah ruangan
Signage exit lamp
NO
URAIAN
4
5
1
2
3
4
5
6
7
Mesin gergaji
Mata gergaji
Mesin bor
Mata bor
Mesin potong plat
Mesin gerinda potong
Mata gerinda potong
NO
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
URAIAN
Gerinda seleb
Mata gerinda seleb
Gas Asetilin
Oksigen
Listrk
kawat las
Mesil las
solar
olie
Motor grader
Vibrator roller
Whell loader
Dump truck
Motor Grader
Vibrator Roller
Water Tanker
Pneumatic Tire Roller
P.tyre roller
Water tanker
Asphalt spray
Commpresor
Aspal mixing plant
Aspal finisher
Tandem roller ( 6-8)
Ongkos pasang reng
Ongkos pasang insulation
Ongkos pasang metal roof
Ongkos pasang nok
Ongkos pasang list plang
HARGA SATUAN
50,000.00
76,500.00
75,000.00
75,000.00
75,000.00
85,500.00
95,000.00
552.50
952,000.00
265,000.00
135,000.00
745,200.00
734,400.00
13,200.00
13,200.00
14,220.00
15,200.00
93,330.00
89,505.00
1,600.00
5,200.00
68,850.00
29,452.50
53,550.00
175,000.00
160,000.00
119,000.00
76,500.00
131,000.00
29,835.00
16,313.63
oh
oh
oh
oh
oh
oh
oh
bh
m
m
m
m
m
kg
kg
kg
kg
zak
zak
kg
kg
zak
zak
zak
m
m
m
m
m
bh
bh
HARGA SATUAN
104,040.00
113,220.00
100,980.00
105,417.00
136,170.00
21,420.00
286,875.00
357,255.00
299,880.00
209,610.00
151,470.00
m
m
m
m
m
m
bh
bh
bh
bh
bh
HARGA SATUAN
2,111.40
5,111.59
6,808.50
104,193.00
95,013.00
211,140.00
15,973.20
64,260.00
14,504.40
12,484.80
11,322.00
4,238.10
165,240.00
133,110.00
128,520.00
98,226.00
218,484.00
116,586.00
197,370.00
438,804.00
504,900.00
252,450.00
67,932.00
18,360.00
2,065,500.00
2,830,500.00
9,180,000.00
6,885,000.00
2,830,500.00
2,830,500.00
52,020.00
84,150.00
459,000.00
bh
bh
bh
m
m
m
bh
m
bh
bh
bh
bh
m
m
m
m
m
m
m
m
m
m
m
btg
m
m
m
m
m
m
lbr
m
unit
53,014.50 lbr
HARGA SATUAN
44,370.00 lbr
18,513.00 lbr
10,098.00 m
1,800,810.00
180,922.50
1,357,875.00
1,511,334.00
644,589.00
274,329.00
319,617.00
164,934.00
326,502.00
1,783,980.00
808,681.50
211,140.00
97,231.50
63,112.50
528,462.00
608,404.50
589,891.50
207,009.00
267,597.00
287,793.00
703,494.00
250,767.00
307,147.50
188,496.00
275,170.50
102,663.00
307,147.50
226,363.50
3,786.75
17,881.88
30,489.84
44,633.16
35,343.00
bh
bh
bh
bh
bh
bh
bh
bh
m2
bh
bh
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
bh
bh
unit
m'
unit
roll
kg
kg
kg
kg
HARGA SATUAN
26,928.00
14,305.50
23,562.00
29,452.50
39,550.50
20,196.00
kg
ltr
kg
kg
kg
ltr
123,012.00 m
104,422.50 m
2,213,145.00
1,402,359.75
454,410.00
525,096.00
187,578.00
191,862.00
163,251.00
1,312,740.00
100,980.00
35,343.00
31,977.00
26,928.00
302,940.00
338,895.00
168,300.00
1,262,250.00
161,568.00
165,775.50
114,444.00
358,479.00
706,860.00
269,280.00
774,180.00
31,977.00
18,513.00
23,562.00
26,086.50
225,522.00
set
set
set
set
set
set
set
set
bh
bh
bh
bh
bh
set
set
set
set
set
set
set
set
set
set
bh
bh
bh
bh
set
HARGA SATUAN
4,459,950.00
6,058,800.00
2,504,304.00
1,325,362.50
2,461,387.50
1,409,512.50
1,889,167.50
10,098,000.00
16,661,700.00
3,534,300.00
8,583,300.00
9,593,100.00
3,492,225.00
1,556,775.00
1,788,187.50
1,973,317.50
2,915,797.50
2,423,520.00
2,302,344.00
1,542,974.40
91,800.00
105,187.50
226,095.75
369,112.50
455,175.00
35,343.00
180,922.50
147,262.50
52,173.00
22,720.50
17,671.50
119,493.00
221,314.50
155,677.50
unit
unit
unit
unit
unit
unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
lbr
m
m
m
m
m
bh
bh
kg
btl
m
m
m
unit
HARGA SATUAN
399,712.50
399,712.50
573,903.00
573,903.00
m
m
m
m
10,098.00
21,289.95
56,380.50
100,980.00
58,905.00
58,905.00
64,374.75
113,602.50
106,029.00
80,784.00
Bh
Bh
m
m
m
m
m
m
m
m
105.19
14,305.50
16,830.00
13,464.00
10,273.95
38,556.00
30,294.00
5,722.20
53,703.00
94,248.00
96,772.50
21,037.50
3,901.50
14,305.50
10,404.00
126.23
315.56
9,180.00
16,677.00
12,546.00
2,692.80
6,311.25
ltr
kg
ltr
kg
kg
lbr
m2
m
bh
m
bh
bh
lbr
bh
kg
bh
bh
bh
m
m
kg
roll
HARGA SATUAN
3,534.30
5,722.20
15,147.00
13,464.00
31,135.50
450,202.50
525,937.50
534,352.50
568,012.50
bh
m
m
m
kg
bh
bh
bh
m
HARGA SATUAN
631,125.00
15,651.90
24,403.50
65,637.00
10,098.00
8,044.74
6,563.70
15,147.00
226,363.50
235,467.00
180,387.00
22,032.00
19,278.00
16,524.00
15,147.00
111,537.00
262,548.00
164,934.00
13,800.60
11,612.70
77,418.00
43,758.00
71,527.50
60,588.00
20,196.00
222,156.00
153,153.00
114,444.00
146,421.00
190,179.00
123,700.50
94,248.00
113,602.50
107,712.00
m
m
m
m
m
kg
ltr
ltr
m
m
bh
bh
bh
bh
bh
bh
unit
bh
kg
kg
btg
m'
m'
bh
m
m
bh
bh
bh
bh
bh
bh
bh
bh
450,202.50 bh
525,937.50 bh
534,352.50 bh
HARGA SATUAN
568,012.50 m
631,125.00 m
12,622.50
315,562.50
10,098.00
82,467.00
147,262.50
11,781.00
6,311.25
jam
bh
jam
bh
jam
jam
bh
HARGA SATUAN
1,640,925.00
72,369.00
378,675.00
273,487.50
1,009.80
25,245.00
21,037.50
6,311.25
35,343.00
273,487.50
256,657.50
206,167.50
138,847.50
273,487.50
256,657.50
47,124.00
231,412.50
248,242.50
47,124.00
37,867.50
43,758.00
1,043,460.00
472,923.00
208,692.00
10,098.00
15,147.00
13,632.30
3,870.90
6,311.25
bh
bh
btl
btl
kwh
kg
jam
ltr
ltr
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
m
m
m
bh
bh
Uraian
1 Pekerja
2 Tukang kayu
3 Kepala Tukang kayu
4 Tukang batu
5 Kepala Tukang Batu
6 Tukang besi
7 Kepala tukang besi
8 Tukang cat
9 Kepala tukang cat
10 Mandor
11 Tukang Pipa
12 Tukang Las
13 Tukang gali
.
DAFTAR HARGA BAHAN
1 Amplas
2 Balok kayu Borneo
5 x 7 x 400
4 x 6 x 400
2 x 3 x 400
2 x 20 x 400
3 Balok kayu Samarinda
3 x 30 x 400
4 Kayu Klass III ( Kayu Perancah / papan Bekisting,Balok dan kaso2 )
5 x 7 x 400
3 x 20 x 400
5 Dolken 8 - 10 cm
6 Bendrat
7 Beton Ready Mix K. 225
8 Beton Ready Mix K. 250
9 Beton Ready Mix K. 300
10 Besi BJTD-39
11 Besi BJTP-24
12 Besi strip t = 3 mm
13 Cat Kayu
14 Minyak Bekisting
15 Multiplex 4 mm 120 x 240
No.
Uraian
16 Multiplex 6 mm 120 x 240
17 Multiplex 9 mm 120 x 240
18 Multiplex 12 mm 120 x 240
19 Paku 1.1/2"
20 Paku 2 s/d 5"
21 Pasir Pasang
22 Pasir Beton
23 Pasir Urug
24 Batu kali
25 PC 50 kg
26 PC warna
27 Koral Beton / Split 2/3 pecah mesin
28 Koral Beton / Split 1/2 pecah mesin
29 Seng Plat BJLS 0.20
30 Seng Gelombang
31 Tiang Pancang 200 X 200 mm
32 Waterproofing Coating/slurry (untuk dinding) terpasang
33 Water Profing Bithuthene Sheet 3000 terpasang
34 Waterproofing Integral
35 Water Stop terpasang
36 Jaring BRC berbagai type terpasang
37 Bondeck
38 Genteng Keramik
39 Bubungan Genteng Keramik
40 - Base plate 16 mm
41 - Angker Bolt 22mm-400mm
42 - Mur + Baut 22 mm
43 - Mur + Baut 19 mm
44 - Mur + Baut 16 mm
45 - Mur + Baut 12 mm
46 - Trekstang 12 mm
47 - Ikatan angin 12 mm
48 - Pasangan screed lengkap kawat ayam
49 Rangka Atap Baja Ringan
50 - Ornamen Kubah Lengkap
51 Surveyor
52 Assisten Surveyor
53 Pekerja
54 Patok Beton
55 Patok Kayu
56 Theodolite
57 Waterpass
No.
58 Jendela Nako
59 Main Frame MF 190
60 Join Pin
61 Cross Brace CB 220
62 Cat Walk ( 500 x 1800 )
63 Batako
64 Paku genteng
65 Glass Wool
66 Roof mess
67 Aluminium Foil Doble Side
68 Aluminium Tape
69 Ongkos Pasang
Uraian
Uraian
Harga Satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
usuk
usuk
reng
papan
papan
Balok dan kaso2 )
usuk
papan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
76,500.00
85,500.00
75,000.00
85,500.00
76,500.00
85,500.00
75,000.00
85,500.00
95,000.00
62,500.00
77,500.00
80,000.00
per
per
per
per
per
per
per
per
per
per
per
per
per
4,320.00 per
5,040,000.00
5,040,000.00
5,040,000.00
5,040,000.00
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
Lbr
per
per
per
per
M3
M3
M3
M3
14,000,000.00 per
M3
2,664,000.00
2,664,000.00
20,000.00
21,200.00
711,200.00
734,400.00
745,200.00
15,200.00
13,200.00
14,220.00
25,920.00
15,840.00
72,000.00
per
per
per
per
per
per
per
per
per
per
per
per
per
M3
M3
Btg
Kg
M3
M3
M3
Kg
Kg
kg
Kg
Ltr
Lbr
Uraian
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Harga Satuan
94,000.00 per
154,000.00 per
196,000.00 per
21,700.00 per
20,500.00 per
160,000.00 per
175,000.00 per
119,000.00 per
135,000.00 per
80,000.00 per
5,200.00 per
275,000.00 per
265,000.00 per
37,440.00 per
55,500.00 per
97,200.00 per
156,960.00 per
246,240.00 per
61,920.00 per
80,640.00 per
22,464.00 per
82,800.00 per
9,504.00 per
20,037.60 per
488,160.00
188,640.00
23,040.00
20,160.00
17,280.00
15,840.00
116,640.00
97,200.00
104,940.00
106,920.00
4,950,000.00
77,040.00
66,240.00
55,440.00
260,640.00
120,240.00
104,400.00
90,000.00
Lbr
Lbr
Lbr
Kg
Kg
M3
M3
M3
M3
Zak
kg
M3
M3
Lbr
Lbr
m'
M2
M2
Ltr
m'
kg
M2
buah
buah
unit
bh
bh
bh
bh
bh
bh
bh
M2
M2
UNIT
Orang
Orang
Orang
Buah
Buah
Unit
Unit
Uraian
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Harga Satuan
56,160.00
8,640.00
2,880.00
5,760.00
18,000.00
1,980.00
23,040.00
288,000.00
486,000.00
204,480.00
62,640.00
90,000.00
bh
bh
bh
bh
bh
bh
kg
Rol
Rol
Rol
Rol
lot
No.
URAIAN
1 Mandor
2 Tukang pipa
3 Kepala tukang pipa
4 Tukang listrik
5 Kepala tukang listrik
6 Tukang AC
7 Kepala tukang AC
8 Tukang las
9 Tukang gali
No.
PEKERJAAN VAC :
AC MULTY SPLIT KAP. 2 X 25 000 BTU/H - WALL
AC MULTY SPLIT KAP. 2 X 29 000 BTU/H - CASSETE
AC MULTY SPLIT KAP. 2 X 12 000 BTU/H - WALL
AC MULTY SPLIT KAP. 2 X 9 500 BTU/H - WALL
AC MULTY SPLI KAP. ( 11 940 + 7 140 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 7 080 + 5 340 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 11 340 + 8 280 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 7 620 + 9 840 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 5 100 + 20 940 BTU/h ) Wall type
No.
URAIAN
AC MULTY SPLIT KAP..( 5 640 + 10 680 BTU/h ) Wall type
AC MULTY SPLI KAP. ( 16 260 + 7 200 BTU/h ) Wall type
AC MULTY SPLIT KAP. (18 400 + 10 720 BTU/h ) Wall type
AC MULTY SPLIY KAP. ( 5 400 + 5 700 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 21 600 + 21 600 BTU/h ) Cassetel type
AC MULTY SPLIT KAP.( 12 240 + 23 400 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 23 223 + 23 223 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 26 960 + 26 960 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 25 000 + 25 000 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 37 700 + 37 700 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 4 200 + 7 200 BTU/h ) Wall type
AC MULTY SPLIT, KAP. ( 7 740 + 7 860 BTU/h ) Wall type
AC MULTY SPLIT, KAP. ( 9 500 + 12 000 BTU/h ) Wall type
AC SINGLE SPLIT / WALL TYPE Kap. 12 779 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 14 000 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 16 100 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 5 026 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 6 867 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 9 500 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 9 700 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.10 031 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.18 100 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.21 632 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.24 621 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.26 400 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.28 458 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.29 510 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.32 000 BTUh
AC SINGLE SPLIT / WALL TYPE Kap.37 700 BTUh
No.
URAIAN
AC SINGLE SPLIT / WALL TYPE Kap.49 600 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.22 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.23 520 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.26 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.28 434 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.30 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.34 223 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.38 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.44 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.12 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.13 500 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap.18 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 25 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 49 000 BTUh
AC SPLIT DUCT TYPE Kap.97 580 BTUh
AC SPLIT DUCT TYPE Kap.87 040 BTUh
AC SPLIT DUCT TYPE Kap.74 400 BTUh
AC SPLIT DUCT TYPE Kap.71 250 BTUh
AC SPLIT DUCT TYPE Kap.67 950 BTUh
AC SPLIT DUCT TYPE Kap.54 000 BTUh
AC SPLIT DUCT TYPE Kap.55 950 BTUh
Indoor unti ( IU ) gf.3, Kapasitas : 46 200 BTU/h - Cassete type
Indoor unit ( IU ) gf.4, Kapasitas : 33 000 BTU/h - Cassete type
Indoor unit ( IU ) gf.5, Kapasitas : 24 000 BTU/h - Cassete type
Indoor unit ( IU ) gf.6, Kapasitas : 22 200 BTU/h - Wall type
Indoor unit ( IU ) gf.7, Kapasitas : 9 600 BTU/h - Wall type
Indoor unit ( IU ) gf.8, Kapasitas : 19 800 BTU/h - Casste type
Indoor unit ( IU ) gf.9, Kapasitas : 20 400 BTU/h - Wall type
Indoor unit ( IU ) gf.10, Kapasitas : 13 800 BTU/h - Wall type
No.
URAIAN
Outdoor unit ( OU ) gf.1, Kapasitas : 189 000 BTU/h
DUCTING VAC ( MATERIAL " FIRST DUCT " ( PIR )
1. TD ducting panel density +/- 52 kg /m3
2. Invisible flange ( PVC )
3. Tee connector flange ( PVC )
4. Bayonet ( PVC )
5. Covering angle ( PVC )
6. TD Glue
7. Sealant neutral ( with colour )
8. Chair saction bar Allumunium
9. "F" section bar Allumunium
10. Shaped disk Allumunium
12. Reinforcenent bar Allumunium
13. Ball joint damper ( Allumunium )
14. Ball joint damper ( plastik )
15. Allumunium Tape
16. Zinc cozted
3. PENGGANTUNG DUCTING
Grille EAG 6 '' x 6 "
Grille EAG 8 '' x 8 "
Grille EAG 10 '' x 8 "
Grille EAG 12 '' x 12 "
Grille EAG 14 '' x 14 "
Grille EAG 16'' x 8 "
Grille EAG 20'' x 12 "
Grille EAG 22'' x 8 "
Grille EAG 24'' x 12 "
Grille EAG 28 '' x 8 "
No.
URAIAN
Grille EAG 28 '' x 12 "
Grille EAG 28 '' x 10 "
Grille EAG 30 '' x 12 "
Grille EAG 32 '' x 12 "
Grille EAG 10 '' x 1 0 "
Grille EAG 16 '' x 1 0 "
Grille EAG 12 '' x 10 "
Grille EAG 18 '' x 12 "
Grille Presuurized IAG 40 '' x 16 "
Intake Air Grille (IAG 40 " x 6 " )
Intake Air Grille (IAG 22 " x 16 " )
Hefa Filter + Housing Box
Medium Filter
Pree Filter
Supply Air Difusher ( SAD ) SAD 16 ' x 8 "
Supply Air Difusher ( SAD ) SAD 16 ' x 16 "
Supply Air Difusher ( SAD ) SAD 18 ' x 18 "
Supply Air Difusher ( SAD ) SAD 40 ' x 40 "
Supply Air Difusher ( SAD )SAD 12 ' x 12 "
Supply Air Difusher ( SAD )SAD 14 ' x 14 "
Supply Air Difusher ( SAD )SAD 10 ' x 10 "
Supply Air Register ( SAR 18 ' x 4 "
Supply Air Register ( SAR 14 ' x 8 "
Supply Air Register ( SAR 16 ' x 4 "
Supply Air Register ( SAR 24 ' x 8 "
Supply Air Register ( SAR 26 ' x 8 "
Return Air Grille ( RAG ) 36 " X 16 "
Return Air Grille ( RAG ) 32 " X 16 "
Return Air Grille ( RAG ) 30 " X 20 "
No.
URAIAN
Return Air Grille ( RAG ) 30 " X 16 "
Return Air Grille ( RAG ) 28 " X 4 "
Return Air Grille ( RAG ) 28 " X 6 "
Return Air Grille ( RAG ) 28 " X 12 "
Return Air Grille ( RAG ) 26 " X 18 "
Return Air Grille ( RAG ) 26 " X 10 "
Return Air Grille ( RAG ) 24 " X 12 "
Return Air Grille ( RAG ) 24 " X 10 "
Return Air Grille ( RAG ) 22 " X 10 "
Return Air Grille ( RAG ) 20 " X 14 "
Return Air Grille ( RAG ) 20 " X 10 "
Return Air Grille ( RAG ) 20 " X 8 "
Return Air Grille ( RAG ) 16 " X 12 "
Return Air Grille ( RAG ) 16 " X 10 "
Return Air Grille ( RAG ) 16 " X 8 "
Return Air Grille ( RAG ) 14 " X 8 "
Fresh Air Grille ( FAG ) 12" x 10 "
Fresh Air Grille ( FAG ) 16" x 10 "
Fresh Air Grille ( FAG ) 12" x 12 "
Fresh Air Grille ( FAG ) 22" x 16 "
Fresh Air Grille ( FAG ) 14" x 12 "
Fresh Air Grille ( FAG ) 10" x 8 "
Fresh Air Grille ( FAG ) 12" x 8 "
PIPA REFRIGERANT
Pipa PVC berisolasi / Drain AC
Exhaust Fan Axial Inline Type Kap. 100 CFM
Exhaust Fan Axial Inline Type Kap. 700 CFM
Exhaust Fan Axial Inline Type Kap. 900 CFM
Exhaust Fan Axial Inline Type Kap. 1000 CFM
No.
URAIAN
Exhaust Fan Axial Inline Type Kap. 1400 CFM
Exhaust Fan Axial Inline Type Kap. 1600 CFM
Exhaust Fan Axial Inline Type Kap. 1800 CFM
Exhaust Fan Axial Inline Type Kap. 1200 CFM
Exhaust Fan Axial Inline Type Kap. 2100 CFM
Exhaust Fan Axial Inline Type Kap. 2700 CFM
Exhaust Fan Axial Inline Type Kap. 400 CFM
Exhaust Fan Axial Inline Type Kap. 500 CFM
Exhaust Fan Axial Inline Type Kap. 4000 CFM
Exhaust Fan Axial Inline Type Kap. 3750 CFM
Exhaust Fan Axial Inline Type Kap. 3450 CFM
Exhaust Fan Axial Inline Type Kap. 6000 CFM
Ceiling Fan - Gantung lengkap Kontrol speed
Exhaust Fan Centrifugal Inline Type Kap. 300 CFM
Exhaust Fan centrifugal inline Kap. 800 CFM
Exhaust Fan centrifugal inline Kap. 13000 CFM/0,1,3 iNwG
Exhaust Fan centrifugal inline Kap. 12000 CFM/0,1,2 iNwG
Exhaust Fan centrifugal inline Kap. 11000 CFM/0,1,2 iNwG
Exhaust Fan Wall Type Kap. 100 CFM
Exhaust Fan Wall Type Kap. 150 CFM
Exhaust Fan Wall Type Kap. 200 CFM
Exhaust Fan Wall Type Kap. 200 CFM
Exhaust Fan Wall Type Kap. 300 CFM
Exhaust Fan Wall Type Kap. 450 CFM
Exhaust Fan Wall Type Kap. 500 CFM
Exhaust Fan Wall Type Kap. 600 CFM
Exhaust Fan Wall Type Kap. 700 CFM
Exhaust Fan Wall Type Kap. 900 CFM
Exhaust Fan Wall Type Kap. 1 000 CFM
No.
URAIAN
Exhaust Fan Wall Type Kap. 1 200 CFM
Exhaust Fan Wall Type Kap. 1 500 CFM
Exhaust Fan Wall Type Kap. 2000 CFM
Hood ( 1,2 x 1,2 ) M
Hood ( 5,5 x 2 ) M
PEKERJAAN FIRE HYDRANT
Fire House Cabinet (Indoor )
Fire House Cabinet ( Outdoor )
Dudukan FHC & pondasi
PILLAR HYDRANT + GATE VALVE DIA. 100 MM
SIAMESE CONNECTION Check valve dia. 100 mm
Fire Extinguisher ( Dry Chemical ) Kap. 3 Kg
Fire Extinguisher ( Dry Chemical ) Kap. 6 Kg
Control valve diameter 65 mm
Indicating valve 80 mm
Plat Orifice 80 mm
Plat Orifice 50 mm
Water Hammer
Sight Glass
Water Flow Switch
Pressure Gauge
Pressure Switch
Water Level Control
Water Level Switch
Safety Relief Valve
Horn Buzzer
AAV
Foot valve diameyer 200 mm
No.
URAIAN
Buterflt valve diameter 200 mm
HEAD SPRINKLER
GATE VALVE DIA. 100 MM / 20 K
GATE VALVE DIA. 150 MM / 20 K
GATE VALVE DIA. 200MM / 20 K
GATE VALVE DIA.25 MM / 20 K
GATE VALVE DIA.40 MM / 20 K
GATE VALVE DIA.50 MM / 20 K
GATE VALVE DIA.65 MM / 20 K
GATE VALVE DIA.80 MM / 20 K
GATE VALVE DIA.100 MM / 20 K
CHECK VALVE DIA. 150 MM
CHECK VALVE DIA. 100 MM
CHECK VALVE DIA. 65 MM
CHECK VALVE DIA. 50 MM
PIPA BSP SCH.40 Dia. 3/4
PIPA BSP SCH.40 Dia. 1
PIPA BSP SCH.40 Dia. 1 1/2
PIPA BSP SCH.40 Dia. 1 1/4
PIPA BSP SCH.40 Dia. 2
PIPA BSP SCH. 40 Dia. 2 1/2
PIPA BSP SCH. 40 Dia. 3
PIPA BSP SCH.40 Dia. 4
PIPA BSP SCH.40 Dia. 5
PIPA BSP SCH. Dia. 6
PIPA BSP SCH.40 Dia. 8
PIPA HEADER BSP SCH.40 DIA. 300 MM
BAK KONTROL VALVE DIA. 100 MM
No.
URAIAN
PEKERJAAN PLUMBING
INSTALASI AIR BERSIH
Pompa Transfer ( Multy Split ) Kapasitas : 400 LPM/ 40 M
Pompa Transfer ( Multy Split ) Kapasitas : 400 LPM/ 135 M
Package Booster Pump, Kapasitas : 2X( 150 l/min) x 30 M
Submersible Sumpit semi Vortex, Kapasitas : 300 l/min x 60 M
Submersible Sumpit semi Vortex, Kapasitas : 400 l/min x 25 M
Submersible Sumpit semi Vortex, Kapasitas : 320 l/min x 20 M
Submersible Sumpit semi Vortex, Kapasitas : 150 l/min x 60 M
Submersible kuras, Kapasitas : 90 l/min x 8 M
Sand Filter (8-10 M3 / Jam )=(100-166 Lpm)-dia. 710 x 1200 mm
Carbon Filter (8-10 M3 / Jam )-(100-166 Lpm) dia.710 x 1200 mm
Dosing Pump & Chemical tank
Ground Tank. Kapasitas : 285 M3
Ground Tank. Kapasitas : 235 M3
Roof Tank kapasitas : 70 M3
Roof Tank kapasitas : 16 M3
Roof Tank kapasitas : 10 M3
Ploating valve dia 40 mm
Ploating valve dia 50 mm
Ploating valve dia 100 mm
Foot valve dia. 65 mm
Pressure Switch
Strainer
Water Level Control ( WLC )
Flow Switch
Meter air
GATE VALVE DIA.15 MM /10 Kg
GATE VALVE DIA.20 MM /10 Kg
No.
URAIAN
GATE VALVE DIA.25 MM / 10 Kg
GATE VALVE DIA.32 MM / 10 Kg
GATE VALVE DIA.40 MM / 10 Kg
GATE VALVE DIA.50 MM / 10 Kg
GATE VALVE DIA.65 MM / 10 Kg
GATE VALVE DIA.80 MM / 10 Kg
GATE VALVE DIA.100 MM / 10 Kg
GATE VALVE DIA.125 MM / 10 Kg
GATE VALVE DIA.150 MM / 10 Kg
DIFFERENTIAL VALVE
BUTTERFLY VALVE 200 MM
FLEXIBLE JOINT DIA.150 MM
FLEXIBLE JOINT DIA.100 MM
FLEXIBLE JOINT DIA.80 MM
FLEXIBLE JOINT DIA.65 MM
FLEXIBLE JOINT DIA.50 MM
STRAINER DIA.65 MM
STRAINER DIA.50 MM
CHECK VALVE DIA. 65 MM
CHECK VALVE DIA. 50 MM
PPR PN-10 10 mm
PPR PN-10 15 mm
PPR PN-10 20 mm
PPR PN-10 25 mm
PPR PN-10 32 mm
PPR PN-10 40 mm
PPR PN-10 50 mm
PPR PN-10 63 mm
PPR PN-10 75 mm
No.
URAIAN
PPR PN-10 90 mm
PPR PN-10 110 mm
PPR PN-10 125 mm
HEADER 150 MM2
HEADER 200 MM2
PPR PN-16 16 mm
PPR PN-16 20 mm
PPR PN-16 25 mm
PPR PN-16 32 mm
PPR PN-16 40 mm
PPR PN-16 50 mm
PPR PN-16 63 mm
PPR PN-16 75 mm
PPR PN-16 90 mm
PPR PN-16 110 mm
PPR PN-16 125 mm
PPR PN-16 160 mm
GALIAN & URUGAN TABAH UBTUK PENANAMAN PIPA
INSTALASI AIR KOTOR
Clean Out dia. 50 mm
Clean Out dia. 65 mm
Clean Out dia. 80 mm
Clean Out dia. 100 mm
Clean Out dia. 150 mm
Vent Out ( VO )
Roof Drain diameter 100 mm
Roof Drain diameter 80 mm
Roof Drain diameter 65 mm
No.
URAIAN
Sumur Resapan
Bak Kontrol
STP Biological Fistem kapasitas : 130 M3
Portable Grease Trap
Grease Trap Kap. 3m3
PIPA PVC Dia. 1 1/2
PIPA PVC Dia. 1 1/4
PIPA PVC Dia. 1/2
PIPA PVC Dia. 1
PIPA PVC Dia. 10
PIPA PVC Dia. 2 1/2
PIPA PVC Dia. 2
PIPA PVC dia. 3/4
PIPA PVC Dia. 3
PIPA PVC Dia. 4
PIPA PVC Dia. 5
PIPA PVC Dia. 6
PIPA PVC Dia. 8
INSTALASI AIR PANAS
Electric Water Heater
PPR PN-20 16 mm
PPR PN-20 20 mm
PPR PN-20 25 mm
PPR PN-20 32 mm
PPR PN-20 40 mm
PPR PN-20 50 mm
PPR PN-20 63 mm
PPR PN-20 75 mm
No.
URAIAN
PPR PN-20 90 mm
PPR PN-20 110 mm
PPR PN-20 125 mm
INSTALASI MEDICAL GAS
Medical Gas Manifold Oxigen (O), 2x10 Cyl.
Nitrous Oxide Sentral Magnifold 2 x 4 cylinders
Medical Gas Vacuum Pump system (V), 2x3.7 kW
Medical Compressor Air System 2 x (500 lpm - 8,5 Bar)
Master Alarm 4 Gas (O, V)
Alarm Gas sistem
Zone Valve / Box valve
Outlet Gas screw connect c/w wallbox & flushplate
Instalasi alarm gas medis lengkap Box
Perlengkapan Outlet Oksigen
Perlengkapan Outlet N2O
Perlengkapan Outlet Vacuum
Perlengkapan Outlet Compressed Air
Peredam suara ( Sound Proof ) Ruang Gas
Pipa tembaga Seamless standart ASTM B88 dia. 10 mm
Pipa tembaga Seamless standart ASTM B88 dia. 12 mm
Pipa tembaga Seamless standart ASTM B88 dia. 15 mm
Pipa tembaga Seamless standart ASTM B88 dia. 22 mm
Pipa tembaga Seamless standart ASTM B88 dia. 25 mm
Pipa tembaga Seamless standart ASTM B88 dia. 32 mm
Pipa tembaga Seamless standart ASTM B88 dia. 40 mm
BALL VALVE DIA. 80 MM
BALL VALVE DIA. 50 MM
BALL VALVE DIA. 32 MM
No.
URAIAN
BALL VALVE DIA. 25 MM
BALL VALVE DIA. 20 MM
BALL VALVE DIA. 15 MM
BEDHEAD
Medical Gas Ceiling Mounted Outlet for 4 Gases
PEKERJAAN ELEKTRIKAL
Capasitor Bank kapasitas 200 Kvar
Capasitor Bank kapasitas 600 Kvar
Cubicle Incoming
Cubicle Metering
Cubicle Arester
Cubicle Outgoing
Trafo 1250 kVA
Trafo 1600 kVA
UPS (Back Up Time 30 Menit ) kap. 10 Kva
UPS (Back Up Time 30 Menit ) kap. 20 Kva
UPS (Back Up Time 30 Menit ) kap. 15 Kva
Kabel FRC 4x16 mm2
Kabel FRC 4x185 mm2
Kabel N2XSY 3 (1x50 mm2)
Kabel NYFGbY 3x2,5 mm2
Kabel NYFGbY 4 x 120 mm2
Kabel NYFGbY 4 x 150 mm2
Kabel NYFGbY 4 x 185 mm2
Kabel NYFGbY 4 x 240 mm2
Kabel NYFGbY 4 x 300 mm2
Kabel NYFGbY 4x4 mm2
Kabel NYFGbY 4x6 mm2
No.
URAIAN
Kabel NYFGbY 4x25 mm2
Kabel NYFGbY 4x70 mm2
Kabel NYFGbY 4x95 mm2
Kabel NYM 3x2,5 mm2
Kabel NYM 2x2,5 mm2
Kabel NYM 3x4 mm2
Kabel NYY 1x120 mm2
Kabel NYY 1x150 mm2
Kabel NYY 1x185 mm2
Kabel NYY 1x240 mm2
Kabel NYY 1x300 mm2
Kabel NYY 3x25 mm2
Kabel, NYY 3 x 2,5 mm2
Kabel, NYY 2 x 2,5 mm2
Kabel NYY 3x4 mm2
Kabel NYY 3x6 mm2
Kabel NYY 4x10 mm2
Kabel NYY 4x150 mm2
Kabel NYY 4x120 mm2
Kabel NYY 4x16 mm2
Kabel NYY 4x25 mm2
Kabel NYY 4x35 mm2
Kabel, NYY 4 x 2,5 mm2
Kabel NYY 4x4 mm2
Kabel NYY 4x50 mm2
Kabel NYY 4x6 mm2
Kabel NYY 4x70 mm2
Kabel NYY 4x95 mm2
Kabel FRC 4x10 mm2
No.
URAIAN
Kabel FRC 4x6 mm2
Kabel Tray lebar 20 cm (200 -100)
Kabel Tray lebar 30 cm (300 -100)
Kabel Tray lebar 40 cm (400 -100)
Kabel Tray lebar 50 cm (500 -100)
Kabel Tray lebar 60 cm (600 -100)
Galian, urugan & pelindung kabel
Cover Glass
Lampu Baret TLC 18 W
Lampu dinding luar PL 18 W
Lampu dinding PLC 18 W
Lampu DL/Sorot Par 38
Lampu Down Light PL 1 x 13 W
Lampu Down Light PL 2 x 13 W
Lampu Down Light PLC 11 W + Cover Glass
Lampu Exit 10 w+ Battere
Lampu Indicator
Lampu taman SL 18 W
Lampu TL 1x18 W/BL
Lampu TL 1x18 W/TKI
Lampu TL 1x36 W
Lampu TL 1x36 W/BL
Lampu TL 1x36 W/DF
Lampu TL 1x36 W/GMS
Lampu TL 1x36 W/Louvre M6
Lampu TL 1x36 W/TKI
Lampu TL 2x36 W/Acrilic Putih susu
Lampu TL 2x36 W/Louvre M6
Lampu TL T5 14 W
No.
URAIAN
Lampu TL 1x36 W/TKO
Lampu Baret TLC 18 W
Wall Lamp PLC 18 W
Lampu Gantung 5 x PLC 13 W
Lampu Gantung PLC 18 W
Lampu sorot 1000 W
Lampu Taman Mercury 80 W + Tiang lampu 2 1/2 Meter
Lampu Jalan SON ( 1 x 125 W )
Lampu Jalan 2 x 125 W
Lampu taman HPLN 80 W
Tiang lampu Jalan tinggi 11 Meter
PLC 8 W / Fiting Biasa
Battere Emergency
Saklar ganda 10 A
Saklar group 4 modul
Saklar group 6 modul
Saklar hotel 10 A
Saklar tunggal 10 A
Stop kontak daya 10/16 A
Stop kontak daya 2 X 10/16 A
Stop kontak daya 10/16 A - 3 Phase
Socket Pipa
Tee Doos
Pipa Conduit
Las Doop
Klem Pipa
Isolasi ban
Fhiser
MCB 6 A/1 Phasa
No.
URAIAN
MCB 10 A/1 Phasa
MCB 16 A/1 Phasa
MCB 10 A/3 Phasa
MCB 16 A/3 Phasa
MCB 20 A/3 Phasa
MCB 25 A/3 Phasa
MCB 32 A/3 Phasa
MCB 40 A/3 Phasa
MCB 50 A/3 Phasa
MCB 6 A/1 Phasa
MCCB 125 A/3 Phasa
MCCB 140 A/3 Phasa
MCCB 32 A/3 Phasa
MCCB 63 A/3 Phasa
MCCB 50 A/3 Phasa
ACB 1000 A
ACB 1250 A
ACB 1600 A
ACB 2500 A
ACB 3200 A
MCCB 630-800 A/3 Phasa
MCCB 400-630 A/3 Phasa
MCCB 350-500 A/3 Phasa
MCCB 250-350 A/3 Phasa
MCCB 175-250 A/3 Phasa
MCCB 140-200 A/3 Phasa
MCCB 125-250 A/3 Phasa
MCCB 100-125 A/3 Phasa
MCCB 80-100 A/3 Phasa
No.
URAIAN
MCCB 63-80 A/3 Phasa
MCB 20-25 A/3 Phasa
MCB 16 A/3 Phasa
Ampere meter
Fuse & Indicator
Selector Switch
Volt Meter
COS
Shun trip
Way delta A
Way delta B
Mechanic Motor Interlock
Box Panel & Accessories A
Box Panel & Accessories D
Box Panel & Accessories E
Box Panel & Accessories F
Box Panel & Accessories G
Box Panel & Accessories H
Box Panel & Accessories I
Box Panel & Accessories J
Grounding A
Grounding B
Panel Pneumatic
Panel DWL
Panel LP-PL
Panel STP
Panel LP- GF N
Panel PP - GF N
Panel AC GF N
No.
URAIAN
Panel LP - 1 N
Panel PP - 1 N
PENANGKAL PETIR
Air Terminal lengkap menara ( Electro Statis ) Radiuas 50 M
Obstraction Lamp
Coaxial Cable 2 x 35 mm
Grounding sistem
- Copper road
- Pentanahan & pipa GIP dia. 1 1/2 "
- Bak kontrol ( 40x40) cm lengkap tutup
- Kawat BCC dia. 70 mm
Testing/pengukuran pentanahan
Panel kontrol / Kelelengkap instalasi
PEKERJAAN SOUND SISTEM
2 x 180 W Power Amplifier
120 W Power Amplifier
Sistem Manager ( VX 2000 )
Autorserve Cassete
CD Playaer
Emergency Microphone ( w/ RU 2001 ) - PM 660D/1
Equalizer Card ( VX-200 )
Mixer Frame w/ Module (V-1000B )
Monitor Panel ( MP- 032B )
Mixer Frame w/ Module (V-1000B )
Pagging Microphone PM 660D/1 ( w/ RU-2001 )
Radio Tunner AM/FM ( V-1034B )
Remote Microphone - RM 200 X
No.
URAIAN
Speaker Selector ( SS-021B )
Wall Box Speaker 20 W
Horn Speaker ( ZH-615SM )
Ceiling Speaker ( ZS-646R )
Attenuator
Kabel NYMHY 2x1,5 mm2
Kabel NYMHY 3x1,5 mm2
Kabel NYMHY 3( 3 x2,5 mm2 )
Kabel NYMHY 3x2,5 mm2
UPS 1 Kva
Head Phone Monitor
Terminal Box / TB
MDF / CTB
Cabinet Rack
Outlet Mic
PEKERJAAN MATV
Active Filter
Antena Yagi UHF 17 Element
Antena Yagi VHF 22 Element
Digital Satelite Receiver & Modulator
Selective Program
Spliter 4 way
Socket TV ( RCA )
Terminal Box+Booster signal & P.supply
Head And Amplifier
MATV Modulator
Main Booster
Power Supply
No.
URAIAN
Control Unit
TV Monitor 21'
Kabel Coaxial RG11( 0,6 mm2 )
Kabel Coaxial RG8 ( 0,6 mm2 )
Kabel Coaxial 5C-2V
Tiang / Dudukan
PEKERJAAN CCTV
Video Control Matrix 16 Chanel
Modem
21 LCD TFT Monitor
Bracket
Digiplex key Pad
PC Computer + Printer
Fixed Dome Camera
Rack CCTV
Relay Control Unit 10 Ch.
Instalasi CCTV
PEKERJAAN NURSE CALL
Master Station Digital
Ceiling sub station
Central Controller & Power Supply
Coridoor Light
Call riset button
Hand feld call button
Bath Room Full Cord
PEKERJAAN DATA
No.
URAIAN
HUB Un Managable Path Panel 1 x 8 port
HUB Un Managable Path Panel 1 x 12 port
HUB Un Managable Path Panel 1 x 24 port
Path Panel 1x48 port
Path Panel 2x48 port
Path Panel 10x48 port
Monitor
Printer
Socket Data ( RG-45 )
PEKERJAAN FIRE ALARM
MCAF Kapasitas 2 zone
MCAF Kapasitas 20 zone
MCAF Kapasitas 50 zone
MDF/ CTB
Terminal Box Fire
Alarm Bell
ROR
Fixed Heat Detector
Manual Breack glass
Smoke Detector
End Of Line
Annunciator Panel
Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
Jeck Telephone
Flow Switch
Gas Detector
No.
URAIAN
PEKERJAAN TELEPHONE
Pesawat Telephone Single Line
Pesawat Digital
PABX 20 Line / 400 Extention
PABX 12 Line / 100 Extention
MDF 100 Pairs
CTB 20 Pairs
CTB 30 Pairs
CTB 40 Pairs
CTB 120 Pairs
Billing Sistem
Socket Telephone RJ-11
Terminal Box 10 Pairs
Terminal Box 20 Pairs
Terminal Box 30 Pairs
Terminal Box 40 Pairs
Kabel ITC 10x2x2x0,6 mm2
Kabel ITC 20x2x2x0,6 mm2
Kabel ITC 30x2x2x0,6 mm2
Kabel ITC 40x2x2x0,6 mm2
Kabel ITC 50x2x2x0,6 mm2
Kabel ITC 100x2x2x0,6 mm2
URAIAN
23,408.00 meter
18,356.80 meter
13,182,400.00 UNIT
15,769,600.00 UNIT
9,055,200.00 UNIT
7,669,200.00 UNIT
7,515,200.00 UNIT
5,962,880.00 UNIT
8,500,800.00 UNIT
6,418,720.00 UNIT
9,732,800.00 UNIT
URAIAN
URAIAN
URAIAN
282,128.00 Meter
87,472.00 Meter
77,616.00 Meter
81,312.00 Meter
67,760.00 Buah
25,872.00 Kg
22,176.00 Botol
38,808.00 Meter
20,944.00 Meter
170,016.00 Buah
443,520.00 Meter
295,680.00 Buah
258,720.00 Buah
129,360.00 Meter
215,600.00 Buah
46,816.00 SET
716,408.00 BH
777,392.00 BH
810,040.00 BH
829,752.00 BH
851,312.00 BH
859,320.00 BH
857,472.00 BH
869,792.00 BH
875,952.00 BH
884,576.00 BH
URAIAN
URAIAN
URAIAN
URAIAN
2,652,496.00 BH
2,775,696.00 BH
200,200.00 BH
1,108,800.00 BH
1,108,800.00 BH
462,000.00 BH
554,400.00 BH
154,000.00 BH
192,192.00 BH
108,416.00 BH
88,704.00 BH
223,608.00 BH
174,944.00 BH
46,816.00 BH
283,976.00 BH
100,408.00 BH
119,504.00 BH
91,168.00 BH
93,632.00 BH
114,576.00 BH
107,800.00 BH
1,503,040.00 BH
URAIAN
URAIAN
32,032,000.00 UNIT
87,472,000.00 UNIT
1,516,592.00 UNIT
4,473,392.00 UNIT
4,238,696.00 UNIT
3,846,920.00 UNIT
3,003,616.00 UNIT
2,847,768.00 UNIT
78,232,000.00 UNIT
81,312,000.00 UNIT
1,445,136.00 UNIT
21,107,240.00 UNIT
19,264,784.00 UNIT
175,560,000.00 UNIT
44,352,000.00 UNIT
31,207,176.00 UNIT
162,008.00 BUAH
229,152.00 BUAH
354,816.00 BUAH
239,624.00 BUAH
105,952.00 BUAH
850,080.00 BUAH
387,464.00 SET
205,744.00 BUAH
321,552.00 BUAH
16,016.00 BH
19,712.00 BH
URAIAN
URAIAN
104,720.00 BH
113,960.00 BH
197,120.00 BH
252,560.00 BH
320,320.00 BH
86,240.00 BH
169,400.00 BH
154,000.00 BH
132,440.00 BH
URAIAN
1,755,600.00 UNIT
28,336.00 m
33,633.60 m
51,744.00 m
85,008.00 m
131,208.00 m
205,128.00 m
324,632.00 m
459,536.00 m
URAIAN
9,979,200.00 Unit
7,576,800.00 Unit
5,072,760.00 Unit
2,125,200.00 Unit
1,013,320.00 Unit
199,584.00 Unit
999,152.00 Unit
1,001,000.00 BH
386,848.00 TTK
1,093,400.00 Lot
924,000.00 Lot
1,004,080.00 Lot
887,040.00 Lot
200,200.00 Meter
8,870.40 M'
13,367.20 M'
16,940.00 M'
26,857.60 M'
32,032.00 M'
38,438.40 M'
45,029.60 M'
166,320.00 BH
132,440.00 BH
120,736.00 BH
URAIAN
12,936,000.00 BH
78,414,336.00 BH
16,632,000.00 BH
19,096,000.00 BH
24,024,000.00 BH
20,328,000.00 BH
513,744,000.00 BH
760,760,000.00 BH
36,036,000.00 UNIT
136,136,000.00 UNIT
89,628,000.00 UNIT
651,974.40 M'
2,113,865.60 M'
51,744.00 M'
16,385.60 M'
332,024.00 M'
407,792.00 M'
505,120.00 M'
659,120.00 M'
823,592.00 M'
33,880.00 M'
42,196.00 M'
URAIAN
URAIAN
URAIAN
URAIAN
URAIAN
URAIAN
8,377,600.00 Unit
174,944.00 BH
50,512.00 Meter
1,694,000.00 Set
924,000.00 Titik
462,000.00 Titik
5,688,760.00 BH
3,160,696.00 BH
16,581,488.00 BH
770,000.00 BH
462,000.00 BH
706,860.00 BH
1,694,000.00 BH
2,109,800.00 BH
1,811,040.00 BH
2,109,800.00 BH
706,860.00 BH
582,120.00 BH
748,440.00 BH
URAIAN
243,320.00 BH
739,200.00 BH
571,032.00 BH
1,093,400.00 BH
274,120.00 Unit
144,760.00 BH
46,200.00 BH
77,000.00 BH
2,864,400.00 Unit
834,064.00 Unit
146,608.00 Unit
1,401,400.00 Unit
URAIAN
9,240,000.00 UNIT
924,000.00 Unit
1,078,000.00 UNIT
200,200.00 BH
46,200.00 UNIT
7,515,200.00 UNIT
2,240,000.00 UNIT
175,560.00 UNIT
77,000.00 BH
1,134,000.00 Titik
6,135,360.00 UNIT
301,840.00 Unit
2,132,592.00 Unit
77,000.00 Unit
67,760.00 Unit
110,880.00 UNIT
277,200.00 UNIT
URAIAN
2,618,000.00 Unit
7,293,686.40 Unit
15,820,420.00 Unit
169,400.00 Unit
240,240.00 Unit
119,504.00 BH
36,960.00 BH
40,040.00 BH
215,600.00 BH
179,872.00 BH
46,200.00 BH
8,324,316.00 BH
87,472.00 M
52,360.00 Titik
83,160.00 Buah
535,920.00 Buah
URAIAN
187,880.00 BH
1,478,400.00 BH
15,400,000.00 UNIT
9,517,200.00 UNIT
169,400.00 UNIT
19,712.00 BH
25,256.00 BH
34,496.00 BH
56,672.00 BH
2,002,000.00 UNIT
172,480.00 BH
60,368.00 BH
82,544.00 BH
99,792.00 BH
120,120.00 BH
9,240.00 M'
15,400.00 M'
20,328.00 M'
25,872.00 M'
31,416.00 M'
61,600.00 M'
NO.
URAIAN PEKERJA
PEKERJAAN PERSIAPAN
P.
1 1 m
P.
2 1 m
P.
3 1 m
P.
4 1 m
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
A.
1 1 m
A.
2 1 m
A.
3 1 m
A.
4 1 m
A.
5 1 m
A.
6 1 m
B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
B.
1 1 m
B.
2 1 m
B.
3 1 m
B.
4 1 m
B.
5 1 m2
B.
6 1 m2
B.
71 m
B.
81 m
B.
91 m
B.
10 1 m
B.
11 1 m
B.
12 1 m
B.
13 1 m
B.
14 1 m
C. ANALISA BIAYA PEKERJAAN DINDING
C.
1 1 m
C.
2 1 m
NO.
C.
URAIAN PEKERJA
3 1 m
NO.
E.
E.
E.
E.
E.
E.
E.
URAIAN PEKERJA
91
10 1
11 1
12 1
13 1
14 1
15 1
m
m
m
m
m
m3
Btg
NO.
H.
H.
H.
H.
H.
H.
H.
H.
H.
URAIAN PEKERJA
17 1
18 1
19 1
20 1
21 1
22 1
23 1
24 1
25 1
bh
bh
bh
bh
bh
unit
bh
bh
bh
11
21
31
41
51
61
71
81
91
10 1
m
m
m
m
m
m
m
m
m
m
NO.
K.
URAIAN PEKERJA
6 1 m
NO.
URAIAN PEKERJA
NO.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
N.
URAIAN PEKERJA
11 1 unit
12 1 unit
13 1 unit
14 1 unit
PINTU HOLLOW METAL
15 1 unit
16 1 unit
17 1 unit
18 1 unit
19 1 unit
20 1 unit
21 1 unit
22 1 unit
23 1 unit
24 1 unit
25 1 unit
PINTU LOBBY
26 1 unit
27 1 unit
28 1 unit
29 1 unit
30 1 unit
31 1 unit
32 1 unit
33 1 unit
JENDELA
JENDELA GEDUNG - K
41 1 unit
42 1 unit
43 1 unit
44 1 unit
45 1 unit
46 1 unit
47 1 unit
48 1 unit
49 1 unit
NO.
URAIAN PEKERJA
URAIAN PEKERJAAN
AAN PERSIAPAN
Pagar sementara dari seng gelombang tinggi 2 meter
Pengukuran dan pemasangan bowplank
Pekerjaan Pembersihan Lahan
Pembuatan Direksi keet
URAIAN PEKERJAAN
Pasangan bata ringan
URAIAN PEKERJAAN
Pasang bekisting untuk lantai
Pasang bekisting untuk tangga
Beton Ready mix K 250
Membuat kolom praktis ( 12 x 12 ) cm
Membuat balok praktis (12 x 12 ) cm
Membuat meja beton
PEMASANGAN CERUCUK DOLKEN 8 cm - p = 4 m
LISA BIAYA KONSTRUKSI PEKERJAAN KAYU KAP, KUSEN, DAUN PINTU KAYU DAN LANGIT-LANGIT
Plafond gypsum tbl. 9 mm
Plafond GRC 6 mm
Plafond akustik 60 x 60 cm
List plafond gypsum profil
Curtain box gypsum
Plapond exposed
URAIAN PEKERJAAN
Soap desh
Tisue holder
Towel bar
Hand dryer
Hand shower lengkap dengan aksesories
Memasang cubical toilet
Pemasangan Spool hok/sloof zink
Pemasangan Gordyn kamar mandi
Bak shower
URAIAN PEKERJAAN
Hand railling penyandang cacat stainless steel 2"
URAIAN PEKERJAAN
URAIAN PEKERJAAN
Pintu type C Al/MDF 2 x 900 x 2150 mm
Pintu type C Al/MDF* 2 x 900 x 2150 mm
Pintu type E Al/Glass* 2 x 90 x 2150 mm
Pintu type M Al/MDF 2 x 900 x 2150 mm
PINTU HOLLOW METAL
Pintu type A HM 900 x 2150 mm (fire door)
Pintu type A HM 600 x 1250 mm (SHF-1)
Pintu type A HM 2 x 600 x 1250 mm (SHF-2)
Pintu type B HM 600 x 1250 mm
Pintu type B HM 900 x 2150 mm
Pintu type B HM 2 x 900 x 2150 mm
Pintu type B HM 900 x 2150 mm *Hermatic Door
Pintu type B HM 2 x 900 x 2150 mm *Hermatic Door
Pintu type B HM 2 x 900 x 2150 mm *Hermatic Slidding Door
Pintu type C HM 900 x 2150 mm
Pintu type C HM 2 x 900 x 2150 mm
PINTU LOBBY
Pintu type D1A & D1B main lobby (Gedung A)
Pintu type D1A/C (Gedung C)
Pintu type D1B/C (Gedung C)
Pintu type D1 (Gedung I)
Pintu type D2 (Gedung I)
Pintu type D1 (Gedung J)
Pintu type D1 (Gedung L)
Pintu Lipat SD (Rumah Dinas)
JENDELA
NDELA GEDUNG - K
Jendela type W/1E
Jendela type W/1EA
Jendela type W/2E
Jendela type W/2EA
Jendela type W/3E
Jendela type W/3EA
Jendela type LV/2
Jendela type LV/3
Bouvenlight type BV/2
URAIAN PEKERJAAN
VOLUME ARSITEK
HARGA SATUAN
TERPASANG
359,070.00
68,940.00
10,720.00
1,176,850.00
43,860.00
54,200.00
12,540.00
32,720.00
174,620.00
118,520.00
604,860.00
300,280.00
232,300.00
225,380.00
10,120.00
73,990.00
82,040.00
12,890.00
352,670.00
217,330.00
164,030.00
414,160.00
603,040.00
957,730.00
104,440.00
97,070.00
HARGA SATUAN
TERPASANG
141,700.00
40,570.00
37,300.00
11,280.00
3,710.00
26,950.00
20,000.00
26,420.00
17,760.00
18,650.00
82,900.00
76,590.00
92,550.00
145,380.00
163,760.00
265,410.00
226,540.00
220,980.00
502,950.00
148,590.00
398,210.00
302,890.00
209,500.00
578,710.00
42,200.00
17,100.00
21,700.00
884,340.00
103,630.00
19,980.00
19,981.57
172,031.92
187,599.67
199,666.17
205,436.50
HARGA SATUAN
TERPASANG
281,550.17
200,471.65
1,043,988.11
95,902.78
97,459.55
3,922,839.09
39,171.00
150,925.91
506,036.03
190,520.06
104,808.96
140,831.94
136,889.69
156,474.36
15,603.96
140,831.94
26,955.50
2,388,808.51
420,912.25
2,205,486.25
1,016,636.15
2,084,465.99
553,501.04
757,587.31
191,794.54
312,950.55
309,074.54
243,866.70
316,850.00
369,157.64
2,060,496.90
934,027.13
112,302.38
HARGA SATUAN
TERPASANG
239,095.40
72,894.94
681,324.68
610,373.61
702,707.20
267,674.84
217,712.88
388,541.59
1,297,167.21
163,466.05
167,877.55
180,037.55
222,896.08
211,788.28
38,788.20
71,703.90
275,084.31
169,282.87
219,278.07
32,850.26
42,825.08
38,430.83
34,450.54
36,922.09
43,611.88
3,427.53
5,448.40
40,615.47
316,016.80
295,568.35
399,712.50
399,712.50
573,903.00
HARGA SATUAN
TERPASANG
573,903.00
HARGA SATUAN
TERPASANG
493,740.00
226,908.00
564,426.00
201,666.00
1,446,277.50
139,395.00
45,343.23
126,410.63
260,618.78
419,367.38
49,338.00
45,972.00
40,923.00
316,935.00
2,438,359.08
2,505,294.43
2,583,485.90
2,706,892.17
2,534,441.87
2,845,852.88
2,586,545.03
4,228,646.76
5,605,301.58
5,683,385.01
5,774,599.27
5,918,558.85
5,406,114.08
6,080,663.47
5,778,167.90
9,381,120.85
12,099,926.54
12,253,498.00
HARGA SATUAN
TERPASANG
12,432,894.63
12,716,028.72
13,034,849.75
12,439,913.29
3,011,602.28
1,714,766.63
2,964,394.13
1,807,331.63
2,389,796.89
4,301,634.40
12,773,970.00
21,077,050.50
23,184,755.55
5,162,812.88
6,921,547.88
25,480,977.72
17,086,770.35
13,915,596.53
13,106,496.47
18,723,699.70
16,112,851.57
16,112,851.57
16,053,351.89
4,952,875.84
4,634,471.77
8,631,253.41
7,325,219.18
12,890,506.77
10,425,794.23
4,540,042.15
5,143,850.31
11,587,862.40
HARGA SATUAN
TERPASANG
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
URAIAN PEKERJAAN
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
M2
M3
M2
M'
M2
UNIT
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
UNIT
M2
M2
M2
M2
M2
M2
M2
KG
KG
M'
M2
M'
M2
KG
KG
PENGUKURAN SITE
MEMBUAT BOUWPLANK
LOS KERJA/DIREKSI KEET
PAGAR PENGAMAN PROYEK
PEMBERSIHAN LAPANGAN
PAPAN NAMA PROYEK 80 X 120 CM
GALIAN TANAH BIASA SEDALAM 1 M
GALIAN TANAH BIASA SEDALAM 3 M
GALIAN TANAH KERAS SEDALAM 3 M
URUGAN KEMBALI TANAH BEKAS GALIAN
BUANGAN TANAH SEJAUH 150 M
PEMADATAN TANAH
MENGURUG PASIR URUG
BETON MUTU K - 175 ( 1Pc : 2Psr : 3Krl )
LANTAI KERJA TEBAL 5 CM BETON ( 1Pc : 3Psr : 5Krl )
BETON MUTU K-225 UNTUK ( SITE MIX )
COR BETON fc 17.5 Mpa READY MIX
COR BETON K. 300 READY MIX
BETON TUMBUK 1 PC : 3 PS : 5 KR ( SITE MIX )
SCAFOLDING (STOODWERK)
BEKISTING BETON PONDASI POER / PILE CAP
BEKISTING UNTUK SLOOF ( 3 X PAKAI )
BEKISTING KOLOM (3 X PAKAI)
BEKISTING BALOK (3 X PAKAI)
BEKISTING PLAT LANTAI ( 3 X PAKAI )
BEKISTING TANGGA (3 X PAKAI)
BEKISTING DINDING ( 3 X PAKAI )
MENGERJAKAN BESI BETON U 39
MENGERJAKAN BESI BETON U 24
PASANG LIST PLANK 3/30
PASANG ATAP GENTENG KERAMIK
PASANG BUBUNGAN / NOK GENTENG
PASANG INSULASI ATAP
PABRIKASI BESI PROFIL
PENYETELAN DAN ERECTION
NO.
URAIAN PEKERJAAN
URAIAN PEKERJAAN
HARGA SATUAN
2,040.00
75,520.00
1,418,030.00
272,970.00
10,720.00
770,960.00
26,180.00
48,050.00
57,660.00
12,540.00
18,975.00
32,725.00
174,620.00
1,093,416.75
777,796.25
1,252,061.25
1,003,211.00
1,042,481.00
777,796.25
10,098.00
127,088.06
125,789.03
189,932.78
197,704.28
276,905.38
181,521.08
242,601.88
27,248.93
24,938.93
164,599.88
168,486.21
183,747.96
36,036.44
28,745.54
2,446.95
URAIAN PEKERJAAN
HARGA SATUAN
LT.
LT.
LT.
LT.
LT.
LT.
LT.
LT.
LT.
LT.
LT.
LT.
LT.
DASAR
SATU
DUA
DASAR
SATU
DUA
DASAR
SATU
DUA
DASAR
DASAR
SATU
DUA
9,501,430.13
9,605,303.10
8,920,037.49
11,190,959.62
11,315,094.23
10,496,159.52
12,858,040.63
13,009,633.04
11,992,183.52
12,024,500.13
11,484,370.27
11,597,943.82
10,859,658.50
7,348,257.89
8,241,415.02
8,512,723.33
8,791,759.37
9,335,661.85
9,095,047.50
9,625,158.69
8,271,787.51
9,171,717.21
7,635,603.56
9,759,822.05
8,167,539.41
2,683,307.06
6,126,956.29
7,143,851.35
6,426,811.12
6,387,884.75
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
10
1 UNIT
11
1 UNIT
12
1 UNIT
13
1 UNIT
14
1 UNIT
15
1 UNIT
16
1 UNIT
17
1 UNIT
18
1 UNIT
19
1 UNIT
20
1 UNIT
21
1 UNIT
22
1 UNIT
23
1 UNIT
24
1 UNIT
NO.
URAIAN
25
1 UNIT
26
1 UNIT
27
1 UNIT
28
1 UNIT
29
1 UNIT
30
1 BH
31
1 BH
32
1 BH
33
1 BH
34
1 BH
35
1 BH
36
1 BH
37
1 BH
38
1 BH
39
1 BH
40
1 BH
41
1 UNIT
42
1 UNIT
43
1 M'
44
1 M'
45
1 M'
46
1 M'
47
1 M'
48
1 M'
49
1 M'
50
1 M'
51
1 M'
52
1 M'
NO.
URAIAN
53
1 M'
54
1 M'
55
1 M'
56
1 M'
57
1 M'
58
1 M'
59
1 M'
60
1 M'
61
1 M'
62
1 M'
63
1 M'
64
1 M'
65
1 M'
66
1 M'
67
1 M'
68
1 M'
69
1 M'
70
1 M'
71
1 M'
72
1 M'
73
1 M'
74
1 UNIT
75
1 UNIT
76
1 SET
77
1 Unit
78
1 BH
79
1 BH
80
1 BH
NO.
URAIAN
81
1 BH
82
1 BH
83
1 UNIT
84
1 UNIT
85
1 M'
86
1 M'
87
1 M'
88
1 M'
89
1 M'
90
1 M'
91
1 M'
92
1 M'
93
1 M'
94
1 M'
95
1 M'
96
1 BH
97
1 BH
98
1 BH
99
1 BH
100
1 BH
101
1 BH
102
1 BH
103
1 BH
104
1 BH
105
1 BH
106
1 BH
107
1 BH
108
1 BH
NO.
URAIAN
109
1 BH
110
1 BH
111
1 BH
112
1 UNIT
113
1 M'
114
1 M'
115
1 M'
116
1 M'
117
1 M'
118
1 BH
119
1 BH
120
1 BH
121
1 BH
122
1 BH
123
1 BH
124
1 UNIT
125
1 UNIT
126
1 UNIT
127
1 UNIT
128
1 UNIT
129
1 UNIT
130
1 UNIT
131
1 UNIT
132
1 SET
133
1 SET
134
1 SET
135
1 SET
136
1 SET
NO.
URAIAN
137
1 SET
138
1 M2
139
1 BH
140
1 BH
141
1 BH
142
1 BH
143
1 BH
144
1 BH
145
1 BH
146
1 BH
147
1 BH
148
1 BH
149
1 BH
150
1 BH
151
1 BH
152
1 BH
153
1 BH
154
1 BH
155
1 BH
156
1 BH
157
1 BH
158
1 BH
159
1 BH
160
1 BH
161
1 BH
162
1 BH
163
1 BH
164
1 BH
NO.
URAIAN
165
1 BH
166
1 BH
167
1 BH
168
1 BH
169
1 BH
170
1 BH
171
1 BH
172
1 BH
173
1 BH
174
1 BH
175
1 BH
176
1 BH
177
1 BH
178
1 BH
179
1 BH
180
1 BH
181
1 BH
182
1 BH
183
1 BH
184
1 BH
185
1 BH
186
1 BH
187
1 BH
188
1 BH
189
1 BH
190
1 BH
191
1 BH
192
1 BH
NO.
URAIAN
193
1 BH
194
1 BH
195
1 BH
196
1 BH
197
1 BH
198
1 BH
199
1 BH
200
1 BH
201
1 BH
202
1M
203
1M
204
205
1M
206
1M
207
1M
208
1M
209
1M
210
1M
211
1M
212
1M
213
1M
214
1M
215
1M
216
1M
217
1M
218
1M
219
1M
220
1M
NO.
URAIAN
221
1M
222
1M
223
1M
224
1M
225
1M
226
1M
227
1M
228
1M
229
1M
230
1M
231
1 BH
232
1 BH
233
1 BH
234
1 BH
235
1 BH
236
1 BH
237
1 BH
238
1 BH
239
1 BH
240
1 BH
241
1 BH
242
1 BH
243
1 BH
244
1 BH
245
1 BH
246
1 BH
247
1 BH
248
1 M'
NO.
URAIAN
249
1 M'
250
1 M'
251
1 M'
252
1 M'
253
1 M'
254
1 M'
255
1 M'
256
1 M'
257
1 M'
258
1 M'
259
1 M'
260
1 M'
261
1 M'
262
1 M'
263
1 M'
264
1 M'
265
1 M'
266
1 M'
267
1 M'
268
1 M'
269
1 M'
270
1 M'
271
1 M'
272
1 M'
273
1 BH
274
1 BH
275
1 BH
276
1 BH
NO.
URAIAN
277
1 BH
278
1 BH
279
1 BH
280
1 BH
281
1 BH
282
1 BH
283
1 BH
284
1 BH
285
1 BH
286
1 BH
287
1 BH
288
1 BH
289
1 BH
290
1 BH
291
1 BH
292
1 BH
293
1 BH
294
1 BH
295
1 BH
296
1 BH
297
1 BH
298
1 BH
299
1 BH
300
1 BH
301
1 BH
302
1 BH
303
1 BH
304
1 BH
NO.
URAIAN
305
1 BH
306
1 BH
307
1 TTK
308
1 TTK
309
1 TTK
310
1 TTK
311
1 TTK
312
1 TTK
313
1 TTK
314
1 TTK
315
1 TTK
316
1 TTK
317
1 UNIT
318
1 UNIT
319
1 UNIT
320
1 UNIT
321
1 UNIT
322
1 UNIT
323
1 UNIT
324
1 UNIT
325
1 UNIT
326
1 UNIT
327
1 UNIT
328
1 UNIT
329
1 UNIT
340
1 UNIT
341
1 UNIT
342
1 UNIT
NO.
URAIAN
343
1 UNIT
344
1 UNIT
345
1 UNIT
346
1 UNIT
347
1 UNIT
350
1 UNIT
351
1 UNIT
352
1 UNIT
353
1 UNIT
354
1 UNIT
355
1 UNIT
356
1 UNIT
357
1 UNIT
358
1 UNIT
359
1 UNIT
360
1 UNIT
361
1 M'
362
1 M'
363
1 M'
364
1 M'
365
1 BH
366
1 BH
367
1 BH
368
1 BH
369
1 BH
370
1 UNIT
371
1 UNIT
372
1 M'
NO.
URAIAN
373
1 BH
374
1 BH
375
1 BH
376
1 BH
377
1 BH
378
1 BH
379
1 BH
380
1 BH
381
1 BH
382
1 BH
383
1 BH
384
1 BH
385
1 BH
386
1 BH
387
1 BH
388
1 BH
389
1 BH
390
1 BH
391
1 BH
392
1 BH
393
1 BH
394
1 BH
395
1 BH
396
1 BH
397
1 BH
398
1 M'
399
1 BH
400
1 BH
NO.
URAIAN
401
1 BH
402
1 BH
403
1 BH
404
1 BH
405
1 BH
406
1 UNIT
407
1 UNIT
408
1 UNIT
409
1M
410
1 BH
411
1 BH
412
1 BH
413
1 BH
414
1 BH
415
1 BH
416
1 BH
417
1 BH
418
1 BH
419
1 BH
420
1 BH
421
1 BH
422
1 BH
423
1 BH
424
1 UNIT
425
1 UNIT
426
1 UNIT
427
1 UNIT
NO.
URAIAN
URAIAN
URAIAN
FLEXIBLE JOINT DIA.50 MM'
STRAINER DIA.65 MM'
STRAINER DIA.50 MM'
CHECK VALVE DIA.65 MM'
CHECK VALVE DIA.50 MM'
GATE VALVE DIA.15 MM /10 Kg
GATE VALVE DIA.20 MM /10 Kg
GATE VALVE DIA.25 MM /10 Kg
GATE VALVE DIA.32 MM /10 Kg
GATE VALVE DIA.40 MM /10 Kg
GATE VALVE DIA.50 MM /10 Kg
GATE VALVE DIA.65 MM /10 Kg
GATE VALVE DIA.80 MM /10 Kg
GATE VALVE DIA.100 MM /10 Kg
GATE VALVE DIA.125 MM /10 Kg
GATE VALVE DIA.150 MM /10 Kg
Flow Switch
Water Hammer
PIPA POLLYPROPELINE DIA. 10 mm
PIPA POLLYPROPELINE DIA. 1/2" PN-10
PIPA POLLYPROPELINE DIA. 3/4" / PN-10
PIPA POLLYPROPELINE DIA. 1" / PN - 10
PIPA POLLYPROPELINE DIA. 1 1/4" / PN - 10
PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 10
PIPA POLLYPROPELINE DIA. 2" / PN - 10
PIPA POLLYPROPELINE DIA. 2 1/2" / PN - 10
PIPA POLLYPROPELINE DIA. 3" / PN - 10
PIPA POLLYPROPELINE DIA. 4" / PN - 10
URAIAN
PIPA POLLYPROPELINE DIA. 5" / PN - 10
PIPA POLLYPROPELINE DIA. 5" / PN - 20
PIPA POLLYPROPELINE DIA. 1/2" / PN-20
PIPA POLLYPROPELINE DIA. 3/4" / PN-20
PIPA POLLYPROPELINE DIA. 1" / PN - 20
PIPA POLLYPROPELINE DIA. 1 1/4" / PN - 20
PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 20
PIPA POLLYPROPELINE DIA. 2" / PN - 20
PIPA POLLYPROPELINE DIA. 2 1/2" / PN - 20
PIPA POLLYPROPELINE DIA. 3" / PN - 20
PIPA POLLYPROPELINE DIA. 4" / PN - 20
PIPA PVC Dia. 1/2
PIPA PVC Dia. 1
PIPA PVC Dia. 1 1/4
PIPA PVC Dia. 1 1/2
PIPA PVC Dia. 2
PIPA PVC Dia. 2 1/2
PIPA PVC Dia. 3
PIPA PVC Dia. 4
PIPA PVC Dia. 6
PIPA PVC Dia. 8
Sumur Resapan
Bak Kontrol
STP Biological Fistem kapasitas : 130 M3
Portable Grease Trap
CLEAN OUT DIA. 150 mm
CLEAN OUT DIA. 100 mm
CLEAN OUT DIA. 80 mm
URAIAN
CLEAN OUT DIA. 65 mm
CLEAN OUT DIA. 50 mm
ROOF DRAIN
AAV
PIPA BSP SCH.40 DIA. 3/4"
PIPA BSP SCH.40 DIA. 1"
PIPA BSP SCH.40 DIA. 1 1/4"
PIPA BSP SCH.40 DIA. 1 1/2"
PIPA BSP SCH.40 DIA. 2"
PIPA BSP SCH.40 DIA. 2 1/2"
PIPA BSP SCH.40 DIA. 3"
PIPA BSP SCH.40 DIA. 4"
PIPA BSP SCH.40 DIA. 5"
PIPA BSP SCH.40 DIA. 6"
PIPA BSP SCH.40 DIA. 8"
GATE VALVE DIA.40 MM / 20 K
GATE VALVE DIA.25 MM / 20 K
GATE VALVE DIA.50 MM / 20 K
GATE VALVE DIA.65 MM / 20 K
GATE VALVE DIA.80 MM / 20 K
GATE VALVE DIA.100 MM / 20 K
CHECK VALVE DIA.100 MM / 20 K
INDICATING VALVE 80 MM
PELAT ORIFICE 80 MM
PELAT ORIFICE 50 MM
PILLAR HYDRANT
PILLAR HYDRANT + GATE VALVE DIA. 100 MM
SIAMESE CONNECTION Check valve dia. 100 mm
URAIAN
FIRE EXTINGUISHER
HEAD SPRINKLER
BAK & VALVE DIA.100 MM / 20 K
WATER FOW SWITCH
PIPA TEMBAGA DIA.10 MM
PIPA TEMBAGA DIA.15 MM
PIPA TEMBAGA DIA.22 MM
PIPA TEMBAGA DIA.25 MM
PIPA TEMBAGA DIA.32 MM
BALL VALVE DIA. 80 MM
BALL VALVE DIA. 50 MM
BALL VALVE DIA. 15 MM
BALL VALVE DIA. 20 MM
BALL VALVE DIA. 25 MM
BALL VALVE DIA. 32 MM
Zone Valve / Box valve
Outlet Gas screw connect c/w wallbox & flushplate
Instalasi alarm gas medis lengkap Box
Perlengkapan Outlet Oksigen
Perlengkapan Outlet N2O
Perlengkapan Outlet Vacuum
Perlengkapan Outlet Compressed Air
Peredam suara ( Sound Proof ) Ruang Gas
Medical Gas Manifold Oxigen (O), 2x10 Cyl.
Nitrous Oxide Sentral Magnifold 2 x 4 cylinders
Medical Gas Vacuum Pump system (V), 2x3.7 kW
Medical Compressor Air System 2 x (500 lpm - 8,5 Bar)
Master Alarm 4 Gas (O, V)
URAIAN
Alarm Gas sistem
Peredam suara ( Sound Proof ) Ruang Gas
AC MULTY SPLIT / WALL TYPE Kap. 2 X 12000 BTUh
AC MULTY SPLIT / CASSETE TYPE Kap. 2 X 29 000 BTUh
AC MULTY SPLIT / WALL TYPE Kap. 2 X 25 000 BTUh
AC MULTY SPLIT / WALL TYPE Kap. 2 X 9 500 BTUh
AC MULTY SPLIT / WALL TYPE Kap. 11 940 + 7 140 BTUh
AC MULTY SPLIT KAP. ( 7 080 + 5 340 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 11 340 + 8 280 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 7 620 + 9 840 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 5 100 + 20 940 BTU/h ) Wall type
AC MULTY SPLIT KAP..( 5 640 + 10 680 BTU/h ) Wall type
AC MULTY SPLI KAP. ( 16 260 + 7 200 BTU/h ) Wall type
AC MULTY SPLIT KAP. (18 400 + 10 720 BTU/h ) Wall type
AC MULTY SPLIY KAP. ( 5 400 + 5 700 BTU/h ) Wall type
AC MULTY SPLIT KAP. ( 21 600 + 21 600 BTU/h ) Cassetel type
AC MULTY SPLIT KAP.( 12 240 + 23 400 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 23 223 + 23 223 BTU/h ) Cassete type
AC MULTY SPLIY KAP..( 26 960 + 26 960 BTU/h ) Cassete type
AC MULTY SPLIT KAP..( 4 200 + 7 200 BTU/h ) Wall type
AC MULTY SPLIT, KAP. ( 7 740 + 7 860 BTU/h ) Wall type
AC SINGLE SPLIT / WALL TYPE Kap. 6 500 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 9 500 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 9 700 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 12 000 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 18 000 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 49 600 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 25 000 BTUh
URAIAN
AC SINGLE SPLIT / WALL TYPE Kap. 29 000 BTUh
AC SINGLE SPLIT / WALL TYPE Kap. 37 700 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 23 520 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 22 140 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 34 223 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 12000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 26 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 38 000 BTUh
AC SINGLE SPLIT / CASSETE TYPE Kap. 30 000 BTUh
SPLIT DUCT TIPE KAPASITAS : 87 040 BTU/h
SPLIT DUCT TIPE KAPASITAS : 97 580 BTU/h
SPLIT DUCT TIPE KAPASITAS : 53 550 BTU/h
SPLIT DUCT TIPE KAPASITAS : 71250 BTU/h
SPLIT DUCT TIPE KAPASITAS : 67 950 BTU/h
SPLIT DUCT TIPE KAPASITAS : 55 950 BTU/h
PIPA REFRIGERANT
PIPA DRAIN
EXHAUST FAN KAP. 1 300 CFM / WALL TYPE
EXHAUST FAN KAP. 600-700 CFM / AXIAL INLINE
EXHAUST FAN KAP. 800 CFM / INLINE
EXHAUST FAN KAP. 500 CFM / AXIAL INLINE
EXHAUST FAN KAP. 400 CFM / AXIAL INLINE
EXHAUST FAN KAP. 200- 300 CFM / INLINE
EXHAUST FAN KAP. 200 CFM / WALL TYPE
EXHAUST FAN KAP. 300 CFM / WALL TYPE
EXHAUST FAN KAP. 400 CFM / WALL TYPE
EXHAUST FAN KAP. 600 CFM / WALL TYPE
EXHAUST FAN KAP. 700 CFM / WALL TYPE
URAIAN
EXHAUST FAN KAP. 900 CFM / WALL TYPE
BOOSTER FAN KAP. 2100 CFM / AXIAL INLINE
EXHAUST FAN KAP. 1400 CFM / AXIAL INLINE
EXHAUST FAN KAP. 1800 CFM / AXIAL INLINE
EXHAUST FAN KAP. 2000 CFM / AXIAL INLINE
EXHAUST FAN KAP. 2700 CFM / AXIAL INLINE
EXHAUST FAN KAP. 3600 CFM / AXIAL INLINE
EXHAUST FAN KAP. 6000 CFM / AXIAL INLINE
CEILING FAN 100 CFM
Ducting Ukuran 32 " x 20 "
Ducting Ukuran 30 " x 20 "
Ducting Ukuran 30 " x 15 "
Ducting Ukuran 22 " x 16 "
Ducting Ukuran 24 " x 12 "
Ducting Ukuran 24 " x 12 "
Ducting Ukuran 28 " x 18 "
Ducting Ukuran 26 " x 18 "
Ducting Ukuran 26 " x 16 "
Ducting Ukuran 24 " x 16 "
Ducting Ukuran 22 " x 10\"
Ducting Ukuran 20 " x 16 "
Ducting Ukuran 20 " x 14 "
Ducting Ukuran 20 " x10 "
Ducting Ukuran 18 " x 14 "
Ducting Ukuran 16 " x 14 "
Ducting Ukuran 16 " x 12 "
Ducting Ukuran 16 " x 10 "
Ducting Ukuran 16 " x 8 "
URAIAN
Ducting Ukuran 14 " x 12 "
Ducting Ukuran 14 " x 10 "
Ducting Ukuran 14 " x 8 "
Ducting Ukuran 12 " x 10 "
Ducting Ukuran 12 " x 8 "
Ducting Ukuran 10 " x 10 "
Ducting Ukuran 10 " x 8 "
Ducting Ukuran 8 " x 8 "
Ducting Ukuran 8 " x 6 "
Ducting Ukuran 6 " x 6 "
SUPLY AIR DIFUSER ( SAD ) 10 " X 10 "
SUPLY AIR DIFUSER ( SAD ) 12 " X 12 "
INTAKE AIR GRILLE ( FAG ) 36 " X 16 "
RETURN AIR GRILLE ( RAG ) 20 " X 14 "
RETURN AIR GRILLE ( RAG ) 20 " X 10 "
RETURN AIR GRILLE ( RAG ) 28 " X 6 "
FRESHAIR GRILLE ( FAG ) 12 " X 12 "
FRESHAIR GRILLE ( FAG ) 16 " X 10 "
EXHAUST AIR GRILLE ( EAG ) 20 " X 12 "
EXHAUST AIR GRILLE ( EAG ) 16 " X 10 "
EXHAUST AIR GRILLE ( EAG ) 12 " X 10 "
EXHAUST AIR GRILLE ( EAG ) 10 " X 10 "
EXHAUST AIR GRILLE ( EAG ) 8 " X 8 "
EXHAUST AIR GRILLE ( EAG ) 6 " X 6 "
HEPA FILTER + HOUSING BOX
MEDIUM FILTER
PREE FILTER
KABEL TM, N2XSY 3 X 1 X 50 mm2
URAIAN
KABEL TR, NYY 4 X 5 ( 1 X 300 MM2 )
KABEL TR, NYY 4 X 4 ( 1 X 300 MM2 )
KABEL TR, NYY 4 ( 1 X 185 mm2 )
KABEL TR, NYY 2 X 4 ( 1 X 185 mm2 )
KABEL TR, NYFGbY 2 x ( 4 X 185 mm2 )
KABEL TR, NYFGbY 4 x 2 ( 1 X 150 mm2 )
KABEL TR, NYY 4 X 4 mm2
KABEL TR, NYY 4 X 6 mm2
KABEL TR, NYY 4 X 10 mm2
KABEL TR, NYY 4 X 16 mm2
KABEL TR, NYY 4 X 25 mm2
KABEL TR, NYY 4 X 35 mm2
KABEL TR, NYY 4 X 50 mm2
KABEL TR, NYY 4 X 70 mm2
KABEL TR, NYY 4 X 150 mm2
KABEL TR, NYY 4 X 120 mm2
KABEL TR, FRC 4 X 10 mm2
KABEL TR, FRC 4 X 6 mm2
KABEL TR, NYFGBY 4 X 240 mm2
KABEL TR, NYFGBY 4 X 120 mm2
KABEL TR, NYFGBY 4 X 70 mm2
KABEL TRAY LEBAR 20 CM
KABEL TRAY LEBAR 30 CM
KABEL TRAY LEBAR 40 CM
LAMPU TL 1X36 W - LOUVRE
LAMPU TL 1X36 W - LOUVRE + BATTERE
LAMPU TL 1X36 W - LOUVRE M6
LAMPU TL 1X36 W - LOUVRE + BATTERE
URAIAN
LAMPU TL 2X36 W - ACRILIC PUTIH SUSU
LAMPU TL 2X36 W - ACRILIC PUTH SUSU + BATTERE
LAMPU TL 1X36 W - DUSTPROOF
LAMPU TL 1X36 W - TKI
LAMPU TL 2X36 W - LOUVRE
LAMPU TL 2X36 W - LOUVRE + BATTERE
LAMPU TL 1 X 36 W - GMS + BATTERE
LAMPU TL 1 X 36 W - BLK
LAMPU TL 1X18 W / TKI
LAMPU TL 1X18 W - BLK
LAMPU DOWN LIGHT PLC 13W
LAMPU DOWN LIGHT PLC 13W + BATTERE
LAMPU DOWN LIGHT PLC 2 X 13W
LAMPU DOWN LIGHT PLC 2 X 13W + BATTERE
LAMPU DOWN LIGHT PLC 11 W + COVER GLASS
LAMPU DOWN LIGHT PLC DENGAN COVER GLASS + BATTERE
LAMPU DL / SOROTPAR 38
WALL LAMP PLC 18 W
LAMPU BARET TLC 20 W
LAMPU GANTUNG 5 X PLC 13 W
PLC 8 W / Fiting Biasa
Lampu Gantung PLC 18 W
Lampu Taman Mercury 80 W + Tiang lampu 2 1/2 Meter
SAKLAR TUNGGAL
SAKLAR GANDA
SAKLAR HOTEL
SAKLAR GROUP 6 MODUL
STOP KONTAK DAYA / 1 Phase
URAIAN
STOP KONTAK DAYA / 1 Phase 2X250 VA
STOP KONTAK DAYA / 3 Phase
TITIK INSTALASI PENERANGAN
TITIK INSTALASI PENERANGAN LUAR BANGUNAN
TITIK INSTALASI STOP KONTAK
TITIK INSTALASI STOP KONTAK 3 PHASE
TITIK INSTALASI DAYA AC/FAN - 1 PHASE
TITIK INSTALASI DAYA AC/FAN - 3 PHASE
TITIK INSTALASI TELEPHONE / DATA
TITIK INSTALASI SPEAKER
TITIK INSTALASI FIRE ALARM
TITIK INSTALASI MATV
CAPACITOR BANK 200 KVAR
Capasitor Bank kapasitas 600 Kvar
Transformator ( Oil Omerside ) kapasitas : 1000 Kva
Cubicle MVMDP
PANEL LVMDP-1
PANEL LVMDP-2
PANEL MDP K
PANEL SDP GF - K, SDP- GF - I , SDP -GF - J
PANEL SDP - 1 K, SDP - 1 I, SDP - 1 J
PANEL SDP - 2 K, SDP 2 I, SDP - 2 J
PANEL LP- GF - K
PANEL PP - AC GF- K, AC GF I, PP - AC GF J
PANEL PP - GF K
PANEL PP/LP- UPS-GF K
PANEL LP-1 - K
PANEL PP-1 - K, PP- 1 - I, PP-2 - I, PP-2 - I, PP-1 - J, PP-2 - J, PP-3 - I, PP-3 - J
URAIAN
PANEL PP-UPS-1 - K
PANEL LP - 2 - K
PANEL PP-2 - K
PANEL PP-UPS-2 - K
PANEL PP - AC 1 - K, PP - AC 1 - I, PP- AC 2 - I, PP-AC 3-I, PP-AC - 1-J, PP-AC - 2 J, PP-AC 3 - J
PANEL PP - AC 2 - K
UPS (Back Up Time 30 Menit ) kap. 20 Kva
UPS (Back Up Time 30 Menit ) kap. 10 Kva
UPS (Back Up Time 30 Menit ) kap. 15 Kva
PABX 12 / 100 Extention
PMDF 100 PAIRS
PESAWAT TELEPON SINGLE LINE
SOCKET TELEPON ( RJ - 11 )
TERMINAL BOX 10 PAIRS
TERMINAL BOX 20 PAIRS
TERMINAL BOX 30 PAIRS
KABEL TELEPON 10 PAIRS
KABEL TELEPON 20 PAIRS
KABEL TELEPON 30 PAIRS
Kabel Coaxial RG11( 0,6 mm2 )
SOCKET DATA
PATH PANEL 2 X 48 PORT
Monitor
Printer
PATH PANEL 1 X 12 PORT
MDF/ CTB
Terminal Box Fire
Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
URAIAN
SMOKE DETECTOR
ROR
FIXED TEMPERATURE DETECTOR
MANUAL BREACK GLASS
AUDIBLE BELL
INDICATOR LAMP
MFACP
Flow Switch
RADIO TUNNER AM/FM
AUTORESERVE CASSETE
CD PLAYER
PAGGING MICROPHONE
MIXER FRAME W/MODULE
EQUALIZER
2 z 180 W POWER AMPLIFIER
120 W POWER AMPLIFIER
MONITOR PANEL
SPEAKER SELECTOR
CEILING SPEAKER
WALL BOX SPEAKER
HORN SPEAKER
Attenuator
Terminal Box / TB
MDF / CTB
Cabinet Rack
Kabel NYMHY 3( 3 x2,5 mm2 )
ANTENA YAGI UHF
ANTENA YAGI VHF 22 ELEMENT
URAIAN
TERMINAL BOX + BOOSTER
ACTIVE FILTER
DIGITAL SATELITE RECEIVER & MODULATOR
SPLITER
SOCKET TV
Selective Program
Head And Amplifier
TV Monitor 21'
Kabel Coaxial 5C-2V
MASTER STATION DIGITAL
CENTRAL CONTROLLER & POWER SUPPLY
CORIDOR LIGHT
HAND FELD CALL BUTTON
CALL RISET BUTTON
CEILING SUB STATION
BATHROOM FULL CORD
VIDEO CONTROL MATRIC
DIGIPLEX KEY PAD
PC COMPUTER & PRINTER
21 LCD TFT MONITOR
RACK CCTV
BIVAR & POWER SUPPLY
DOM CAMERA
Air Terminal lengkap menara ( Electro Statis ) Radiuas 50 M
Obstraction Lamp
Coaxial Cable 2 x 35 mm
Grounding sistem
URAIAN
HARGA SATUAN
37,252,710.00
101,285,910.00
1,957,366.22
5,274,895.82
3,625,807.15
3,428,945.70
88,032,054.00
91,487,814.00
1,924,882.08
179,722,000.00
46,039,000.00
31,519,176.00
2,283,468.00
442,869.24
520,420.56
665,562.48
703,270.92
361,049.04
532,515.72
558,129.00
420,101.88
392,354.16
371,721.24
356,780.16
HARGA SATUAN
339,704.64
351,088.32
335,435.76
359,626.08
342,550.56
34,575.93
38,641.53
39,440.67
68,455.93
100,980.73
143,687.87
152,496.67
178,245.47
268,366.27
312,428.60
253,495.73
205,744.00
223,608.00
27,814.27
27,688.10
37,503.95
45,554.74
69,473.34
110,129.34
169,130.99
265,892.27
371,246.56
790,816.48
HARGA SATUAN
1,640,526.88
2,705,226.21
42,789.23
50,364.80
71,574.58
115,008.06
175,992.06
274,023.47
431,768.75
610,303.84
1,306,334.56
13,411.88
26,492.95
36,182.63
41,027.47
55,231.73
67,381.10
104,649.38
171,508.45
399,700.69
661,322.33
462,000.00
212,520.00
16,632,000.00
902,440.00
362,527.00
287,991.00
227,007.00
HARGA SATUAN
135,531.00
125,367.00
193,123.33
107,800.00
38,634.20
52,457.24
104,496.92
693,195.80
135,534.67
155,862.67
191,779.13
313,351.57
366,204.37
475,975.57
638,599.57
147,057.53
133,505.53
177,567.87
201,283.87
229,065.47
253,459.07
296,221.20
228,369.53
136,215.93
114,532.73
1,375,680.00
1,108,800.00
1,108,800.00
HARGA SATUAN
591,066.67
271,058.33
500,959.07
361,049.04
17,787.25
23,097.40
39,281.03
45,542.05
51,710.46
199,910.33
162,642.33
52,193.53
62,357.53
101,658.33
149,767.93
999,152.00
1,001,000.00
386,848.00
1,093,400.00
924,000.00
1,004,080.00
887,040.00
200,200.00
9,979,200.00
7,576,800.00
5,072,760.00
2,125,200.00
1,013,320.00
HARGA SATUAN
199,584.00
200,200.00
10,730,456.00
18,485,588.00
15,497,372.00
9,129,626.00
8,951,756.00
7,158,826.40
10,090,124.00
7,685,321.60
11,513,084.00
7,528,796.00
10,090,124.00
12,082,268.00
6,105,836.00
14,430,152.00
12,864,896.00
14,572,448.00
16,137,704.00
5,714,522.00
6,105,836.00
3,746,568.32
3,900,248.00
3,992,740.40
5,528,825.72
7,872,440.84
23,608,244.00
11,797,676.00
HARGA SATUAN
14,785,892.00
19,908,548.00
17,685,173.00
17,240,498.00
23,821,688.00
11,441,936.00
19,367,823.20
24,444,233.00
23,572,670.00
33,045,144.00
35,649,160.80
21,376,872.00
28,278,228.00
25,147,716.00
20,167,356.00
170,503.81
108,605.05
861,857.33
751,700.99
55,666.67
670,456.75
623,499.07
445,096.67
55,666.67
540,150.67
588,260.27
626,205.87
640,435.47
HARGA SATUAN
683,801.87
1,445,101.56
1,092,790.60
1,382,362.96
1,461,337.24
1,445,101.56
1,495,616.64
1,952,386.80
1,169,102.59
5,643,965.18
5,426,889.60
4,884,200.64
3,690,284.93
3,907,360.51
3,907,360.51
4,992,738.43
4,775,662.85
4,558,587.26
4,341,511.68
3,473,209.34
3,907,360.51
3,690,284.93
3,256,133.76
3,473,209.34
3,256,133.76
3,039,058.18
2,821,982.59
2,604,907.01
HARGA SATUAN
2,821,982.59
2,604,907.01
2,387,831.42
2,387,831.42
2,170,755.84
2,170,755.84
1,953,680.26
1,736,604.67
1,519,529.09
1,302,453.50
1,022,275.10
1,072,078.70
2,445,235.10
2,021,581.10
1,847,591.90
1,003,987.60
1,306,867.10
1,242,833.90
1,037,927.66
1,044,330.98
998,084.78
1,033,658.78
945,435.26
874,998.74
1,022,379.01
2,097,188.13
1,090,952.13
60,310.07
HARGA SATUAN
4,939,711.33
3,953,125.73
607,950.05
1,209,116.77
1,301,912.70
1,087,791.10
21,009.27
27,785.27
42,014.87
66,412.13
94,871.33
121,975.33
179,571.33
210,067.00
502,708.89
410,094.52
476,770.36
303,101.48
735,207.00
375,401.40
299,442.44
258,096.48
298,549.20
326,872.88
136,889.87
377,847.73
124,445.33
377,847.73
HARGA SATUAN
212,533.33
474,744.53
117,917.07
132,146.67
276,475.47
521,766.67
372,017.07
107,075.47
103,502.67
89,519.47
272,409.87
517,701.07
340,169.87
581,127.73
516,345.87
761,637.07
261,568.27
179,578.67
365,918.67
780,890.00
68,992.00
140,448.00
766,920.00
29,147.80
31,858.20
41,344.60
214,967.50
36,081.10
HARGA SATUAN
37,436.30
171,601.10
170,766.13
437,322.23
197,562.13
281,808.00
183,539.99
591,308.52
498,793.39
151,320.11
160,910.13
369,236.27
13,447,500.00
86,767,269.60
568,635,650.00
111,216,050.00
90,944,836.40
84,233,886.00
21,164,409.20
18,495,725.60
19,357,927.60
13,518,370.80
11,450,379.60
11,713,288.40
11,844,065.20
11,212,542.00
11,529,658.80
11,923,344.40
HARGA SATUAN
11,313,165.60
11,529,658.80
11,923,344.40
11,313,165.60
11,897,595.60
12,377,336.40
136,136,000.00
36,036,000.00
89,628,000.00
10,875,920.00
389,840.00
215,147.17
201,415.50
168,154.80
192,548.40
211,521.20
13,555.67
20,331.67
25,752.47
21,560.00
15,753.10
229,874.70
666,512.00
428,120.00
271,885.90
169,400.00
240,240.00
87,472.00
HARGA SATUAN
231,775.87
74,572.67
77,960.67
271,076.67
165,371.07
84,736.67
8,430,055.04
83,160.00
742,082.00
948,750.00
609,950.00
815,816.83
2,413,821.67
1,956,441.67
6,350,677.67
3,569,807.27
2,085,185.67
516,541.67
153,993.77
1,481,804.67
552,300.33
258,720.00
266,112.00
378,840.00
785,400.00
18,849.60
1,940,666.67
882,381.87
HARGA SATUAN
220,366.67
403,318.67
1,338,406.67
227,069.33
84,736.67
274,120.00
2,864,400.00
1,047,200.00
19,712.00
7,830,785.60
2,987,436.32
152,533.33
138,926.33
91,494.33
399,857.33
321,878.33
10,571,000.00
306,570.00
8,470,220.00
1,389,300.00
396,616.00
1,219,900.00
2,667,500.00
8,377,600.00
174,944.00
50,512.00
1,694,000.00
HARGA SATUAN
NO.
Kebutuhan
PEKERJAAN PERSIAPAN
P.
1 1 m Pagar sementara dari seng gelombang tinggi 2 meter
Bahan:
1 Dolken kayu dia. 8-10/400 cm
2 Semen
3 Seng Gelombang
4 Pasir beton
5 Koral beton
6 Kayu 5/7
7 Paku biasa
8 Meni besi
Tenaga Kerja:
1 Tukang kayu
2 Pekerja
3 Kepala tukang
4 Mandor
P.
1 m
Satuan
btg
kg
lbr
m
m
m
kg
ltr
oh
oh
oh
oh
m
kg
m
oh
oh
oh
oh
NO.
P.
Kebutuhan
1 m
Satuan
oh
oh
NO.
P.
P.
Kebutuhan
1 m
1 m
Satuan
btg
m
kg
kg
kg
m
m
m
bh
lbr
bh
m
bh
lbr
oh
oh
oh
oh
oh
UNIT
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
oh
oh
NO.
A.
A.
A.
A.
A.
Kebutuhan
1 m
1 m
1 m
1 m
1 m
Satuan
oh
oh
Urugan kembali
Tenaga Kerja:
1 Pekerja
2 Mandor
oh
oh
Pemadatan tanah
Tenaga Kerja:
1 Pekerja
2 Mandor
oh
oh
Urugan pasir
Bahan:
1 Pasir Urug
Tenaga Kerja:
1 Pekerja
2 Mandor
Urugan tanah
Bahan:
1 Tanah urug
m
oh
oh
NO.
Kebutuhan
Tenaga Kerja:
1 Pekerja
2 Mandor
Satuan
oh
oh
NO.
Kebutuhan
B.
B.
1 m
1 m
Satuan
m
kg
m
oh
oh
oh
oh
m
m
oh
oh
oh
oh
m
m
jam
jam
jam
jam
jam
NO.
Kebutuhan
6 Pneumatic Tire Roller
7 Alat bantu
Tenaga Kerja:
1 Pekerja
2 Mandor
Satuan
jam
ls
jam
jam
NO.
B.
B.
Kebutuhan
1 m
1 m2
Satuan
m
m
jam
jam
jam
jam
jam
jam
ls
jam
jam
kg
ltr
jam
jam
jam
jam
jam
NO.
B.
B.
B.
Kebutuhan
1 m2
1m
1m
Satuan
kg
m3
m3
kg
jam
jam
jam
jam
jam
jam
jam
jam
jam
m3
m3
bh
m3
m'
m'
oh
NO.
Kebutuhan
2 Mandor
B.
B.
B.
1m
10 1 m
11 1 m
Satuan
oh
bh
m2
oh
oh
bh
m2
oh
oh
bh
m2
oh
oh
NO.
B.
12 1 m
Kebutuhan
Bak Kontrol 40x40 cm
Bahan:
1 Galian Tanah
2 Pasangan bata merah tebal bata. 1 Pc : 5 Ps
3 Plesteran 1 Pc : 5 Ps tebal 15 mm.
4 Membuat acian semen
5 Dek Beton
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
m3
m2
m2
m2
m3
oh
oh
oh
oh
NO.
B.
B.
13 1 m
14 1 m
Kebutuhan
Bak Kontrol 50x50 cm
Bahan:
1 Galian Tanah
2 Pasangan bata merah tebal bata. 1 Pc : 5 Ps
3 Plesteran 1 Pc : 5 Ps tebal 15 mm.
4 Membuat acian semen
5 Dek Beton
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
m3
m2
m2
m2
m3
oh
oh
oh
oh
m3
m2
m2
m2
m3
oh
oh
oh
oh
bh
kg
m
NO.
Kebutuhan
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
oh
oh
oh
oh
NO.
C.
C.
Kebutuhan
1 m
1 m
Satuan
bh
kg
m
oh
oh
oh
oh
m
sak
oh
oh
oh
oh
kg
m
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
NO.
D.
D.
D.
Kebutuhan
1 m
1 m
1 m
Benangan Sudut
Bahan:
1 Semen
2 Pasir pasang
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
kg
m
oh
oh
oh
oh
kg
m
oh
oh
oh
oh
zak
oh
oh
oh
oh
NO.
D.
Kebutuhan
1 m
Acian semen
Bahan:
1 Semen
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
kg
oh
oh
oh
oh
NO.
D.
D.
D.
Kebutuhan
1 m
1 m
1 m
Satuan
bh
kg
m
oh
oh
oh
oh
m
kg
m
oh
oh
oh
oh
bh
kg
m
kg
oh
oh
NO.
Kebutuhan
3 Kepala tukang
4 Mandor
Satuan
oh
oh
NO.
D.
D.
D.
Kebutuhan
1 m
10 1 m
11 1 m
Plint kayu T. 10 cm
Bahan:
1 Plint kayu T. 10 cm
2 Paku
Tenaga Kerja:
1 Tukang kayu
2 Kepala tukang
3 Mandor
Satuan
bh
kg
m
kg
oh
oh
oh
oh
m
kg
oh
oh
oh
bh
kg
m
kg
oh
oh
oh
NO.
Kebutuhan
4 Mandor
Satuan
oh
NO.
D.
D.
D.
12 1 m
13 1 m
14 1 m
Kebutuhan
Border keramik 5 x 20 cm
Bahan:
1 Border keramik 5 x 20 cm
2 Semen
3 Pasir pasang
4 Semen warna
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Border keramik 20 x 40 cm
Bahan:
1 Border keramik 20 x 40 cm
2 Semen
3 Pasir pasang
4 Semen warna
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Dinding keramik 20 x 25 cm
Bahan:
1 Keramik dinding uk. 20 x 25 cm @ 1 dus/20 bh
2 Semen
3 Pasir pasang
4 Semen warna
Tenaga Kerja:
Satuan
bh
kg
m
kg
oh
oh
oh
oh
bh
kg
m
kg
oh
oh
oh
oh
bh
kg
m
kg
NO.
Kebutuhan
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
oh
oh
oh
oh
NO.
D.
D.
D.
15 1 m
16 1 m
17 1 m
Kebutuhan
Plesteran granite stone
Bahan:
1 Granite stone
2 Semen
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Plesteran andesite
Bahan:
1 Batu Andesite
2 Semen
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
m
kg
oh
oh
oh
oh
m
kg
oh
oh
oh
oh
m
kg
oh
oh
oh
oh
NO.
D.
18 1 m
Kebutuhan
Satuan
m
ls
ls
NO.
D.
D.
D.
D.
19 1 m
20 1 m
21 1 m
22 1 m
Kebutuhan
Satuan
m
ltr
m
m
ltr
m
Medical track+gordeng
Bahan:
1 Medical track+gordeng
2 material dan alat bantu
Upah Pasang
m
m
m
lbr
m
m
bh
roll
bh
NO.
Kebutuhan
7 Jointing Coumpond
8 material dan alat bantu
9 Sound proff insulation spray
Tenaga Kerja:
1 Pekerja
2 Tukang
3 Kepala tukang
4 Mandor
Satuan
kg
m
m
oh
oh
oh
oh
NO.
D.
D.
D.
D.
23 1 m
24 1 m
25 1 m
26 1 m
Kebutuhan
Hand raill guard
Bahan dan upah pasang
1 Hand raill guard+Aksesories
2 mobilisasi dan on site material
3 Upah pasang
Satuan
m
ls
ls
sak
oh
oh
oh
oh
sak
oh
oh
oh
oh
sak
sak
NO.
Kebutuhan
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
kg
m
m
ltr
oh
oh
oh
oh
E.
1 m
E.
1 kg
kg
kg
oh
oh
NO.
Kebutuhan
3 Kepala tukang
4 Mandor
Satuan
oh
oh
NO.
E.
E.
E.
Kebutuhan
1 kg
1 m
1 m
kg
kg
oh
oh
oh
oh
Satuan
m
kg
ltr
oh
oh
oh
oh
m
kg
ltr
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
NO.
E.
E.
E.
Kebutuhan
1 m
1 m
1 m
Satuan
m
kg
ltr
m
lbr
btg
oh
oh
oh
oh
m
kg
ltr
m
lbr
btg
oh
oh
oh
oh
NO.
Kebutuhan
2 Paku
3 Minyak bekisiting
4 Balok Kayu Kelas III.
5 Plywood 9 mm
6 Dolken kayu dia. 8-10/400 cm
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
Satuan
kg
ltr
m
lbr
btg
oh
oh
oh
oh
NO.
E.
E.
E.
10 1 m
11 1 m
12 1 m
Kebutuhan
Pasang bekisting untuk tangga
Bahan:
1 Kayu Kelas III
2 Paku
3 Minyak bekisiting
4 Balok Kayu Kelas III.
5 Plywood 9 mm
6 Dolken kayu dia. 8-10/400 cm
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
Satuan
m
kg
ltr
m
lbr
btg
oh
oh
oh
oh
m
ls
ls
oh
oh
oh
oh
m
kg
kg
kg
NO.
Kebutuhan
5 Semen
6 Pasir beton
7 Batu Split 1/2
8 Air
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Tukang kayu
4 Tukang besi
5 Kepala tukang
6 Mandor
Satuan
kg
m
m
ltr
oh
oh
oh
oh
oh
oh
NO.
E.
E.
13 1 m
14 1 m3
Kebutuhan
Membuat balok praktis (12 x 12 ) cm
1 Kayu Kelas III
2 Paku
3 Besi beton U-24
4 Kawat beton
5 Semen
6 Pasir beton
7 Batu Split 1/2
8 Air
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Tukang kayu
4 Tukang besi
5 Kepala tukang
6 Mandor
Satuan
m
kg
kg
kg
kg
m
m
ltr
oh
oh
oh
oh
oh
oh
m
kg
kg
kg
kg
m
m
ltr
oh
oh
oh
oh
oh
oh
NO.
E.
Kebutuhan
Satuan
btg
oh
oh
NO.
Kebutuhan
F.
F.
1 m
1 m
Satuan
m
m
Kg
oh
oh
oh
oh
m
Jam
Kwh
Kg
oh
oh
oh
oh
Bh
Kg
oh
oh
oh
oh
NO.
F.
Kebutuhan
1 m
Satuan
Bh
Kg
Kg
m
oh
oh
oh
oh
NO.
Kebutuhan
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU KAP, KUSEN, DAUN PINTU KAYU
G.
1 1 m Plafond gypsum tbl. 9 mm
Bahan:
1 Gypsum board 1200 mm x 2400 mm x 9 mm
2 Siku metal furing L.2.5 cm
3 Canal C metal furing C.2 x 3 x 2 cm
4 Gantungan
5 Paku ramset+misiu
6 Joint Tape @ 75 m
7 Skrup
8 Jointing Coumpond
9 material dan alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang
3 Kepala tukang
4 Mandor
G.
1 m
Plafond GRC 6 mm
Bahan:
1 Grc (UK. 120 X 240 X 0.06 CM)
2 Siku metal furing L.2.5 cm
3 Canal C metal furing C.2 x 3 x 2 cm
4 Gantungan
5 Paku ramset+misiu
6 Joint Tape @ 75 m
7 Skrup
8 Jointing Coumpond
9 material dan alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang
3 Kepala tukang
4 Mandor
Satuan
DAN LANGIT-LANGIT
lbr
m
m
m
bh
roll
bh
kg
m
oh
oh
oh
oh
lbr
m
m
m
bh
roll
bh
kg
m
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
NO.
G.
G.
G.
Kebutuhan
1 m
1 m
1 m
Plafond akustik 60 x 60 cm
Bahan:
1 Plafond Akustik 60 x 60 cm
2 Menti Crossti (Profil Alumunium "T")
3 Gantungan
4 Paku ramset+misiu
Tenaga Kerja:
1 Pekerja
2 Tukang
3 Kepala tukang
4 Mandor
Satuan
lbr
m
m
bh
oh
oh
oh
oh
m
kg
kg
oh
oh
oh
lbr
m
m
m
bh
roll
bh
NO.
Kebutuhan
8 Jointing Coumpond
9 material dan alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang
3 Kepala tukang
4 Mandor
Satuan
kg
m
oh
oh
oh
oh
NO.
G.
Kebutuhan
1 m
Plapond exposed
Bahan:
1 Semen
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
kg
oh
oh
oh
oh
H.
1 bh
Satuan
bh
hk
oh
oh
oh
oh
bh
kg
m
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
NO.
H.
Kebutuhan
1 bh
Satuan
bh
hk
kg
m
oh
oh
oh
oh
H.
1 bh
H.
1 bh
NO.
Kebutuhan
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
H.
1 bh
H.
1 bh
Bak Mandi
Bahan:
1 Bak mandi fiber
2 Perlengkapan 18% harga bak
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
H.
1 bh
bh
hk
oh
oh
oh
oh
bh
roll
oh
oh
oh
oh
NO.
H.
H.
H.
H.
Kebutuhan
1 bh
10 1 bh
11 1 bh
12 1 bh
Satuan
m2
oh
oh
oh
oh
bh
ls
Kaca cermin
Bahan:
1 Kaca cermin
Upah Pasang dan Material Bantu
bh
ls
bh
ls
NO.
H.
H.
H.
13 1 bh
14 1 bh
15 1 bh
Kebutuhan
Satuan
bh
ls
Urinoir
Bahan:
1 Urinoir
Upah Pasang dan Material Bantu
bh
ls
Partisi urinoir
Bahan:
1 Partisi Urinoir type A 50
Upah Pasang dan Material Bantu
bh
ls
NO.
H.
H.
H.
H.
H.
16 1 bh
17 1 bh
18 1 bh
19 1 bh
20 1 bh
Kebutuhan
Satuan
Soap holder
Bahan:
1 Soap holder type S 11N
Upah Pasang dan Material Bantu
bh
ls
Soap desh
Bahan:
1 Soap desh
Upah Pasang dan Material Bantu
bh
ls
Tisue holder
Bahan:
1 Tisue holder type TX 11
Upah Pasang dan Material Bantu
bh
ls
Towel bar
Bahan:
1 Towel bar type TS 113 W
Upah Pasang dan Material Bantu
bh
ls
Hand dryer
Bahan:
1 Hand dryer
Upah Pasang dan Material Bantu
bh
ls
NO.
H.
21 1 bh
Kebutuhan
Satuan
NO.
H.
H.
H.
H.
Kebutuhan
23 1 bh
24 1 bh
25 1 bh
Satuan
unit
ls
m
unit
ls
unit
ls
Bak shower
Bahan:
1 Bak shower
2 Perlengkapan 18% harga bak
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
bh
hk
oh
oh
oh
oh
NO.
Kebutuhan
I.
I.
1 m
1 m
Lantai keramik 30 x 30 cm
Bahan:
1 Keramik lantai uk. 30 x 30 cm @ 1 dus/11 bh
2 Semen
3 Pasir pasang
4 Semen warna
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
bh
kg
m
kg
oh
oh
oh
oh
bh
kg
m
kg
oh
oh
oh
oh
bh
kg
m
NO.
Kebutuhan
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
oh
oh
oh
oh
NO.
I.
I.
I.
Kebutuhan
1 m
1 m
1 m
Floor hardener
Bahan:
1 Drymix floor hardener @ 25 kg
Tenaga Kerja:
1 Pekerja
2 Tukang batu
3 Kepala tukang
4 Mandor
Satuan
m
kg
m
oh
oh
oh
oh
m
kg
m
oh
oh
oh
oh
kg
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
NO.
I.
I.
I.
I.
Kebutuhan
1 m
1 m
1 m
10 1 m
Satuan
bh
kg
m
kg
oh
oh
oh
oh
m
kg
zak
kg
m
Trim allumunium
Non Standar
Bahan:
1 Trim alumunium
Upah Pasang
m
m
Karpet
NO.
Kebutuhan
Non Standar
Bahan:
1 Karpet
Upah Pasang
Satuan
m
m
NO.
Kebutuhan
J.
J.
1 m
1 m
Satuan
kg
kg
kg
bh
lbr
oh
oh
oh
oh
kg
kg
kg
bh
lbr
oh
oh
oh
oh
kg
kg
kg
NO.
Kebutuhan
4 Rol cat
5 Amplas
Tenaga Kerja:
1 Pekerja
2 Tukang cat
3 Kepala tukang
4 Mandor
Satuan
bh
lbr
oh
oh
oh
oh
NO.
J.
J.
J.
Kebutuhan
1 m
1 m
1 m
Pengecatan Epoxy
Bahan:
1 Plamir (1 x Lapis)
2 Cat dasar (1 x Lapis)
3 Cat penutup (2 x lapis)
4 Rol cat
5 Amplas
Tenaga Kerja:
1 Pekerja
2 Tukang cat
3 Kepala tukang
4 Mandor
Satuan
kg
kg
kg
bh
lbr
oh
oh
oh
oh
kg
kg
kg
bh
lbr
bh
oh
oh
oh
oh
kg
NO.
Kebutuhan
2 Cat dasar (1 x Lapis)
3 Cat penutup (2 x lapis)
4 Rol cat
5 Amplas
6 Kape
Tenaga Kerja:
1 Pekerja
2 Tukang cat
3 Kepala tukang
4 Mandor
Satuan
kg
kg
bh
lbr
bh
oh
oh
oh
oh
NO.
J.
J.
J.
Kebutuhan
1 m
1 m
1 m
Pengecatan Duco
Bahan:
1 Dempul
2 Meni Duco
Satuan
kg
kg
kg
bh
lbr
oh
oh
oh
oh
kg
kg
kg
bh
lbr
bh
oh
oh
oh
oh
kg
kg
NO.
Kebutuhan
3 Cat Duco
4 Tiner
5 Amplas
6 Alat Bantu
Tenaga Kerja:
1 Pekerja
2 Tukang cat
3 Kepala tukang
4 Mandor
Satuan
kg
kg
lbr
ls
oh
oh
oh
oh
NO.
Kebutuhan
K.
1 m
Satuan
m
kg
oh
oh
oh
oh
m
kg
oh
oh
oh
oh
NO.
L.
Kebutuhan
1 set
Satuan
set
oh
oh
oh
oh
NO.
L.
L.
L.
L.
Kebutuhan
1 set
1 set
1 set
1 bh
Door stoper
Bahan:
1 Door stoper
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
Satuan
set
oh
oh
oh
oh
set
oh
oh
oh
oh
set
oh
oh
oh
oh
set
oh
oh
oh
NO.
Kebutuhan
4 Mandor
L.
1 m
MDF T. 9 mm
Bahan:
1 MDF T. 9 mm
2 Sewa alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
Satuan
oh
lbr
m
oh
oh
oh
oh
NO.
L.
L.
L.
L.
Kebutuhan
1 m
1 m
10 1 m
11 1 bh
Clear glass 6 mm
Bahan:
1 Clear glass 6 mm
2 Sewa alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
Tempered glass 6 mm
Bahan:
1 Tempered glass 6 mm
2 Sewa alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
Tempered glass 8 mm
Bahan:
1 Tempered glass 8 mm
2 Sewa alat bantu
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
Engsel pintu
Bahan:
1 Engsel pintu
Tenaga Kerja:
Satuan
m
m
oh
oh
oh
oh
m
m
oh
oh
oh
oh
m
m
oh
oh
oh
oh
bh
NO.
Kebutuhan
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
L.
L.
12 1 bh
13 1 bh
oh
oh
oh
oh
Engsel jendela
Bahan:
1 Engsel jendela
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
bh
oh
oh
oh
oh
Kait angin
Bahan:
1 Kait angin
Tenaga Kerja:
1 Pekerja
2 Tukang kayu
3 Kepala tukang
4 Mandor
L.
14 1 bh
Satuan
bh
oh
oh
oh
oh
bh
oh
oh
oh
oh
NO.
Kebutuhan
Satuan
Bahan:
M.
m
m
btl
m
bh
m
m
m
m
m
m
btl
m
bh
m
m
m
NO.
M.
M.
M.
Kebutuhan
Satuan
m
m
btl
m
bh
bh
m
m
m
m
m
m
btl
m
bh
bh
m
m
m
m
m
m
btl
m
bh
bh
m
NO.
M.
Kebutuhan
Satuan
m
m
m
m
btl
m
m
m
NO.
M.
M.
Kebutuhan
Satuan
m
m
m
btl
m
bh
m
m
m
m
m
m
btl
m
bh
m
m
m
NO.
Kebutuhan
Satuan
N.
N.
N.
NO.
N.
N.
Kebutuhan
Satuan
m
unit
btl
set
bh
bh
m
unit
NO.
Kebutuhan
Satuan
N.
N.
N.
m
unit
btl
set
bh
bh
m
unit
NO.
N.
Kebutuhan
Satuan
m
unit
btl
set
bh
bh
m
unit
NO.
N.
N.
N.
Kebutuhan
Satuan
m
unit
btl
set
bh
bh
m
unit
m
unit
btl
set
bh
bh
m
unit
m
unit
btl
set
bh
bh
m
unit
NO.
N.
Kebutuhan
Satuan
m
unit
btl
set
bh
bh
m
unit
NO.
N.
N.
N.
N.
N.
Kebutuhan
Satuan
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
NO.
N.
Kebutuhan
Satuan
unit
unit
unit
NO.
Kebutuhan
Satuan
N.
N.
N.
N.
unit
unit
unit
unit
unit
unit
N.
NO.
N.
N.
N.
Kebutuhan
Satuan
PINTU LOBBY
26 1 unit Pintu type D1A & D1B main lobby (Gedung A)
1 Tempered glass 12 mm
2 Patch Fitting
3 Pull Handle
4 Floor Hinge
5 Fitting Corner Lock
6 Material bantu dan alat
Upah perakitan kusen dan Pemasangan pintu
m
set
set
set
set
ls
unit
m
set
set
bh
set
ls
unit
m
set
set
bh
set
ls
unit
NO.
N.
N.
Kebutuhan
Satuan
m
m
set
set
bh
set
ls
unit
m
m
m
set
set
set
ls
unit
NO.
N.
N.
N.
Kebutuhan
Satuan
m
m
set
set
bh
set
ls
unit
m
m
set
set
bh
set
ls
unit
NO.
Kebutuhan
JENDELA GEDUNG - K
N.
41 1 unit Jendela type W/1E
1 Kusen jendela alluminium
2 Frame jendela alluminium
3 Clear glass 6 mm
4 Tempered glass 6 mm
5 Sealent
6 Gasket
7 Friction Stay 16"
8 Casement Handle/ Rambuncis
9 Material bantu dan alat
Upah perakitan kusen dan Pemasangan jendela
N.
N.
Satuan
m
m
m
m
btl
m
bh
bh
m
unit
m
m
m
btl
m
bh
bh
m
unit
m
m
m
m
btl
m
bh
NO.
N.
Kebutuhan
Satuan
bh
m
unit
m
m
m
btl
m
bh
bh
m
unit
NO.
N.
N.
N.
Kebutuhan
Satuan
m
m
m
m
btl
m
bh
bh
m
unit
m
m
m
btl
m
bh
bh
m
unit
m
btl
m
m
unit
NO.
N.
Kebutuhan
Satuan
m
btl
m
m
unit
NO.
N.
Kebutuhan
Satuan
m
m
btl
m
m
unit
Indeks
Harga Satuan
359,070.00
1.25
2.5
1.2
0.005
0.009
0.072
0.06
0.45
18,360.00
1,600.00
38,556.00
175,000.00
265,000.00
2,830,500.00
13,464.00
14,305.50
22,950.00
4,000.00
46,267.20
875.00
2,385.00
203,796.00
807.84
6,437.48
0.2
0.4
0.02
0.02
76,500.00
50,000.00
85,500.00
95,000.00
15,300.00
20,000.00
1,710.00
1,900.00
326,428.52
32,642.85
359,071.37
Jumlah
Over head 10%
Harga Satuan
68,940.00
0.012
0.02
0.007
2,830,500.00
13,464.00
2,065,500.00
33,966.00
269.28
14,458.50
0.1
0.1
0.01
0.005
76,500.00
50,000.00
85,500.00
95,000.00
7,650.00
5,000.00
855.00
475.00
62,673.78
6,267.38
Jumlah
Over head 10%
Indeks
Harga Satuan
Harga Satuan
0.1
0.05
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
5,000.00
4,750.00
9,750.00
975.00
10,725.00
Indeks
Harga Satuan
1.25
0.18
0.85
1.1
35
0.15
0.1
0.15
30
0.25
2
0.08
0.15
0.06
18,360.00
2,065,500.00
13,464.00
10,273.95
1,600.00
160,000.00
175,000.00
265,000.00
552.50
30,294.00
53,703.00
94,248.00
96,772.50
52,020.00
22,950.00
371,790.00
11,444.40
11,301.35
56,000.00
24,000.00
17,500.00
39,750.00
16,575.00
7,573.50
107,406.00
7,539.84
14,515.88
3,121.20
2
1
2
0.3
0.05
76,500.00
75,000.00
50,000.00
85,500.00
95,000.00
153,000.00
75,000.00
100,000.00
25,650.00
4,750.00
1,069,867.16
106,986.72
1,176,853.88
Jumlah
Over head 10%
Harga Satuan
547,700.00
1
459,000.00
459,000.00
0.4
0.2
0.02
0.02
50,000.00
76,500.00
85,500.00
95,000.00
20,000.00
15,300.00
1,710.00
1,900.00
497,910.00
49,791.00
547,701.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
43,860.00
0.75
0.025
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
37,500.00
2,375.00
39,875.00
3,987.50
43,862.50
Indeks
Harga Satuan
0.9
0.045
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
45,000.00
4,275.00
49,275.00
4,927.50
54,202.50
12,540.00
0.192
0.019
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
9,600.00
1,805.00
11,405.00
1,140.50
12,545.50
32,720.00
0.5
0.05
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
25,000.00
4,750.00
29,750.00
2,975.00
32,725.00
174,620.00
1.2
119,000.00
142,800.00
0.3
0.01
50,000.00
95,000.00
15,000.00
950.00
158,750.00
15,875.00
174,625.00
Jumlah
Over head 10%
Harga Satuan
118,520.00
1.2
76,500.00
91,800.00
Indeks
0.3
0.01
Harga Satuan
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
604,860.00
1.1
163
0.052
135,000.00
1,600.00
160,000.00
148,500.00
260,800.00
8,320.00
1.5
0.6
0.06
0.075
50,000.00
75,000.00
85,500.00
95,000.00
75,000.00
45,000.00
5,130.00
7,125.00
549,875.00
54,987.50
604,862.50
Jumlah
Over head 10%
Harga Satuan
300,280.00
1.2
0.3
135,000.00
119,000.00
162,000.00
35,700.00
0.78
0.39
0.039
0.039
50,000.00
75,000.00
85,500.00
95,000.00
39,000.00
29,250.00
3,334.50
3,705.00
272,989.50
27,298.95
300,288.45
Jumlah
Over head 10%
Harga Satuan
232,300.00
0.768
0.432
104,040.00
113,220.00
79,902.72
48,911.04
0.0076232
0.3622482
0.0108295
0.0159593
0.0124179
206,167.50
138,847.50
273,487.50
256,657.50
47,124.00
1,571.66
50,297.26
2,961.74
4,096.08
585.18
Indeks
Harga Satuan
0.011325
1
231,412.50
19,094.64
2,620.75
19,094.64
0.1538724
0.0153872
6,250.00
11,875.00
961.70
182.72
211,185.50
21,118.55
232,304.05
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.768
0.432
100,980.00
105,417.00
77,552.64
45,540.14
0.0076232
0.3622482
0.0108295
0.0159593
0.0124179
0.011325
1
206,167.50
138,847.50
273,487.50
256,657.50
47,124.00
231,412.50
18,522.55
1,571.66
50,297.26
2,961.74
4,096.08
585.18
2,620.75
18,522.55
0.1538724
0.0153872
6,250.00
11,875.00
961.70
182.72
204,892.43
20,489.24
225,381.67
Jumlah
Over head 10%
Harga Satuan
10,120.00
0.6417
0.4889
8,044.74
6,563.70
5,162.31
3,208.99
0.003
0.0031
0.003
37,867.50
43,758.00
138,847.50
113.60
135.65
416.54
0.0211
0.003
6,250.00
11,875.00
131.88
35.63
9,204.60
920.46
10,125.06
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
6.2517
0.0407
0.0252
2.0152
8,044.74
104,040.00
113,220.00
15,147.00
50,293.30
4,234.43
0.0019
0.0026
0.00248
0.0035
0.0031
0.0029
1
206,167.50
1,043,460.00
138,847.50
472,923.00
208,692.00
248,242.50
6,099.89
391.72
2,713.00
344.34
1,655.23
646.95
719.90
6,099.89
0.0211
0.003
6,250.00
11,875.00
131.88
35.63
67,266.25
6,726.63
73,992.88
Jumlah
Over head 10%
Harga Satuan
82,040.00
0.04
0.01
1.66
0.02
1
43,860.00
174,620.00
29,835.00
12,540.00
21,311.00
Jumlah
Over head 10%
Harga Satuan
1,754.40
1,746.20
49,526.10
250.80
21,311.00
74,588.50
7,458.85
82,047.35
12,890.00
0.06
42,825.08
2,569.50
0.1538724
50,000.00
7,693.62
Indeks
Harga Satuan
0.0153872
95,000.00
Jumlah
Over head 10%
Harga Satuan
0.8333333
0.51
357,255.00
26,950.00
297,712.50
13,744.50
0.1538724
0.0153872
50,000.00
95,000.00
7,693.62
1,461.79
320,612.41
32,061.24
352,673.65
Jumlah
Over head 10%
Harga Satuan
217,330.00
0.8333333
0.51
209,610.00
26,950.00
174,675.00
13,744.50
0.1538724
0.0153872
50,000.00
95,000.00
7,693.62
1,461.79
197,574.91
19,757.49
217,332.40
Jumlah
Over head 10%
Harga Satuan
164,030.00
0.8333333
0.51
151,470.00
26,950.00
126,225.00
13,744.50
0.1538724
0.0153872
50,000.00
95,000.00
7,693.62
1,461.79
149,124.91
14,912.49
164,037.40
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.15
0.8
0.8
0.8
0.0375
43,860.00
97,070.00
37,300.00
26,950.00
5,735,842.80
6,579.00
77,656.00
29,840.00
21,560.00
215,094.11
0.32
0.1
0.01
0.015
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
7,500.00
855.00
1,425.00
376,509.11
37,650.91
414,160.02
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.252
1.25
1.25
1.25
0.054
43,860.00
97,070.00
37,300.00
26,950.00
5,735,842.80
11,052.72
121,337.50
46,625.00
33,687.50
309,735.51
0.32
0.1
0.01
0.015
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
7,500.00
855.00
1,425.00
548,218.23
54,821.82
603,040.05
Jumlah
Over head 10%
Harga Satuan
957,730.00
0.64
2.45
2.45
2.45
0.0735
43,860.00
97,070.00
37,300.00
26,950.00
5,735,842.80
28,070.40
237,821.50
91,385.00
66,027.50
421,584.45
0.32
0.1
0.01
0.015
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
7,500.00
855.00
1,425.00
870,668.85
87,066.88
957,735.73
Jumlah
Over head 10%
Harga Satuan
104,440.00
72
14.37
0.04
552.50
1,600.00
160,000.00
39,780.00
22,992.00
6,400.00
Indeks
0.32
0.1
0.01
0.015
Harga Satuan
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
72
9.68
0.045
552.50
1,600.00
160,000.00
39,780.00
15,488.00
7,200.00
0.32
0.1
0.01
0.015
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
7,500.00
855.00
1,425.00
88,248.00
8,824.80
97,072.80
Jumlah
Over head 10%
Harga Satuan
141,700.00
0.11
0.11
952,000.00
68,850.00
104,720.00
7,573.50
0.2
0.0667
0.0067
0.01
50,000.00
75,000.00
85,500.00
95,000.00
10,000.00
5,002.50
572.85
950.00
128,818.85
12,881.89
141,700.74
Jumlah
Over head 10%
Harga Satuan
40,570.00
6.48
0.019
1,600.00
160,000.00
10,368.00
3,040.00
0.2
0.15
0.015
0.01
50,000.00
75,000.00
85,500.00
95,000.00
10,000.00
11,250.00
1,282.50
950.00
36,890.50
Jumlah
Indeks
Harga Satuan
Over head 10%
Harga Satuan
Indeks
Harga Satuan
4.32
0.022
1,600.00
160,000.00
6,912.00
3,520.00
0.2
0.15
0.015
0.01
50,000.00
75,000.00
85,500.00
95,000.00
10,000.00
11,250.00
1,282.50
950.00
33,914.50
3,391.45
37,305.95
Jumlah
Over head 10%
Harga Satuan
11,280.00
0.5
0.002
1,600.00
160,000.00
800.00
320.00
0.057
0.038
0.038
0.002
50,000.00
75,000.00
85,500.00
95,000.00
2,850.00
2,850.00
3,249.00
190.00
10,259.00
1,025.90
11,284.90
Jumlah
Over head 10%
Harga Satuan
3,710.00
0.0270833
53,550.00
1,450.31
0.02
0.01
0.001
0.001
50,000.00
75,000.00
85,500.00
95,000.00
1,000.00
750.00
85.50
95.00
3,380.81
338.08
3,718.89
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
3.25
1,600.00
5,200.00
0.2
0.1
0.01
0.01
50,000.00
75,000.00
85,500.00
95,000.00
10,000.00
7,500.00
855.00
950.00
24,505.00
2,450.50
26,955.50
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1.2345679
1.2644444
0.0046667
6,808.50
1,600.00
160,000.00
8,405.56
2,023.11
746.67
0.0688889
0.0388889
0.0038889
0.0033333
50,000.00
75,000.00
85,500.00
95,000.00
3,444.44
2,916.67
332.50
316.67
18,185.61
1,818.56
20,004.17
Jumlah
Over head 10%
Harga Satuan
26,420.00
0.125
1.4225
0.00525
104,193.00
1,600.00
160,000.00
13,024.13
2,276.00
840.00
0.0775
0.04375
0.004375
0.00375
50,000.00
75,000.00
85,500.00
95,000.00
3,875.00
3,281.25
374.06
356.25
24,026.69
2,402.67
26,429.36
Jumlah
Over head 10%
Harga Satuan
17,760.00
2.7777778
1.138
0.0042
0.15
2,111.40
1,600.00
160,000.00
5,200.00
5,865.00
1,820.80
672.00
780.00
0.0688889
0.0388889
50,000.00
75,000.00
3,444.44
2,916.67
Indeks
0.0038889
0.0033333
Harga Satuan
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1.2345679
1.2644444
0.0046667
0.1666667
5,111.59
1,600.00
160,000.00
5,200.00
6,310.61
2,023.11
746.67
866.67
0.0688889
0.0388889
0.0038889
0.0033333
50,000.00
75,000.00
85,500.00
95,000.00
3,444.44
2,916.67
332.50
316.67
16,957.33
1,695.73
18,653.06
Jumlah
Over head 10%
Harga Satuan
82,900.00
1.1
0.01
64,260.00
14,305.50
70,686.00
143.06
0.05
0.005
0.003
76,500.00
85,500.00
95,000.00
3,825.00
427.50
285.00
75,366.56
7,536.66
82,903.21
Jumlah
Over head 10%
Harga Satuan
76,590.00
3.53
1.14
0.003
0.1
14,504.40
1,600.00
160,000.00
5,200.00
51,200.53
1,824.00
480.00
520.00
0.05
0.1
0.01
50,000.00
75,000.00
85,500.00
2,500.00
7,500.00
855.00
Indeks
0.05
Harga Satuan
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
5.2631579
1.14
0.003
0.1
12,484.80
1,600.00
160,000.00
5,200.00
65,709.47
1,824.00
480.00
520.00
0.05
0.1
0.01
0.05
50,000.00
75,000.00
85,500.00
95,000.00
2,500.00
7,500.00
855.00
4,750.00
84,138.47
8,413.85
92,552.32
Jumlah
Over head 10%
Harga Satuan
145,380.00
2.9675
10
0.045
1.5
11,322.00
1,600.00
160,000.00
5,200.00
33,598.04
16,000.00
7,200.00
7,800.00
0.7
0.35
0.035
0.035
50,000.00
75,000.00
85,500.00
95,000.00
35,000.00
26,250.00
2,992.50
3,325.00
132,165.54
13,216.55
145,382.09
Jumlah
Over head 10%
Harga Satuan
163,760.00
11.87
10
0.045
1.5
4,238.10
1,600.00
160,000.00
5,200.00
50,306.25
16,000.00
7,200.00
7,800.00
Indeks
0.7
0.35
0.035
0.035
Harga Satuan
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1.1
10
165,240.00
1,600.00
181,764.00
16,000.00
0.45
0.225
0.023
0.023
50,000.00
75,000.00
85,500.00
95,000.00
22,500.00
16,875.00
1,966.50
2,185.00
241,290.50
24,129.05
265,419.55
Jumlah
Over head 10%
Harga Satuan
226,540.00
1.1
10
133,110.00
1,600.00
146,421.00
16,000.00
0.45
0.225
0.023
0.023
50,000.00
75,000.00
85,500.00
95,000.00
22,500.00
16,875.00
1,966.50
2,185.00
205,947.50
20,594.75
226,542.25
Jumlah
Over head 10%
Harga Satuan
220,980.00
1.1
10
128,520.00
1,600.00
141,372.00
16,000.00
0.45
0.225
0.023
0.023
50,000.00
75,000.00
85,500.00
95,000.00
22,500.00
16,875.00
1,966.50
2,185.00
200,898.50
20,089.85
Jumlah
Over head 10%
Indeks
Harga Satuan
Harga Satuan
1
1
1
438,804.00
877.61
17,552.16
Jumlah
Over head 10%
Harga Satuan
438,804.00
877.61
17,552.16
457,233.77
45,723.38
502,957.14
Indeks
Harga Satuan
1.05
0.025
1
98,226.00
31,135.50
31,174.71
Jumlah
Over head 10%
Harga Satuan
103,137.30
778.39
31,174.71
135,090.39
13,509.04
148,599.43
398,210.00
1.1
0.025
1
252,450.00
31,135.50
83,542.02
Jumlah
Over head 10%
Harga Satuan
277,695.00
778.39
83,542.02
362,015.40
36,201.54
398,216.94
302,890.00
1.05
0.025
1
218,484.00
2,184.84
45,892.56
Jumlah
Over head 10%
Harga Satuan
229,408.20
54.62
45,892.56
275,355.39
27,535.54
302,890.92
209,500.00
0.7291667
3.25
3.25
4
0.1428571
8
53,014.50
5,722.20
15,147.00
315.56
6,311.25
126.23
38,656.41
18,597.15
49,227.75
1,262.25
901.61
1,009.80
Indeks
Harga Satuan
0.5
1
1
2,692.80
4,166.48
65,637.00
1,346.40
4,166.48
65,637.00
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
190,457.34
19,045.73
209,503.07
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1
1
1
504,900.00
1,009.80
20,196.00
Jumlah
Over head 10%
Harga Satuan
504,900.00
1,009.80
20,196.00
526,105.80
52,610.58
578,716.38
42,200.00
0.7604563
29,452.50
22,397.34
0.1333
0.1
0.01
0.01
50,000.00
75,000.00
85,500.00
95,000.00
6,665.00
7,500.00
855.00
950.00
38,367.34
3,836.73
42,204.07
Jumlah
Over head 10%
Harga Satuan
17,100.00
0.05
53,550.00
2,677.50
0.1333333
0.0666667
0.0066667
0.0066667
50,000.00
75,000.00
85,500.00
95,000.00
6,666.67
5,000.00
570.00
633.33
15,547.50
1,554.75
17,102.25
Jumlah
Over head 10%
Harga Satuan
21,700.00
0.1140114
0.0074963
29,452.50
53,550.00
3,357.92
401.42
Indeks
0.1333
0.1
0.01
0.01
Harga Satuan
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
884,340.00
218
0.52
0.87
215
1,600.00
175,000.00
265,000.00
105.19
348,800.00
91,000.00
230,550.00
22,615.31
1.65
0.25
0.025
0.08
50,000.00
75,000.00
85,500.00
95,000.00
82,500.00
18,750.00
2,137.50
7,600.00
803,952.81
80,395.28
884,348.09
Jumlah
Over head 10%
Harga Satuan
103,630.00
10
0.026
0.044
21.5
1,600.00
175,000.00
265,000.00
105.19
16,000.00
4,550.00
11,660.00
2,261.53
1.15
0.02
0.002
0.006
50,000.00
75,000.00
85,500.00
95,000.00
57,500.00
1,500.00
171.00
570.00
94,212.53
9,421.25
103,633.78
Jumlah
Over head 10%
Harga Satuan
19,980.00
1.05
0.015
13,200.00
10,404.00
13,860.00
156.06
0.03
0.03
50,000.00
75,000.00
1,500.00
2,250.00
Indeks
0.003
0.0015
Harga Satuan
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1.05
0.015
13,200.00
10,404.00
13,860.00
156.06
0.03
0.03
0.003
0.0015
50,000.00
75,000.00
85,500.00
95,000.00
1,500.00
2,250.00
256.50
142.50
18,165.06
1,816.51
19,981.57
Jumlah
Over head 10%
Harga Satuan
172,031.92
0.04
0.3
0.1
2,830,500.00
14,305.50
16,830.00
113,220.00
4,291.65
1,683.00
0.3
0.26
0.026
0.005
50,000.00
75,000.00
85,500.00
95,000.00
15,000.00
19,500.00
2,223.00
475.00
156,392.65
15,639.27
172,031.92
Jumlah
Over head 10%
Harga Satuan
187,599.67
0.045
0.3
0.1
2,830,500.00
14,305.50
16,830.00
127,372.50
4,291.65
1,683.00
0.3
0.26
0.026
0.005
50,000.00
75,000.00
85,500.00
95,000.00
15,000.00
19,500.00
2,223.00
475.00
Indeks
Harga Satuan
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.02
0.4
0.2
0.0075
0.175
2
2,830,500.00
14,305.50
16,830.00
2,830,500.00
84,150.00
18,360.00
56,610.00
5,722.20
3,366.00
21,228.75
14,726.25
36,720.00
0.3
0.33
0.033
0.006
50,000.00
75,000.00
85,500.00
95,000.00
15,000.00
24,750.00
2,821.50
570.00
181,514.70
18,151.47
199,666.17
Jumlah
Over head 10%
Harga Satuan
205,436.50
0.02
0.4
0.2
0.009
0.175
2
2,830,500.00
14,305.50
16,830.00
2,830,500.00
84,150.00
18,360.00
56,610.00
5,722.20
3,366.00
25,474.50
14,726.25
36,720.00
0.32
0.33
0.033
0.006
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
24,750.00
2,821.50
570.00
186,760.45
18,676.05
205,436.50
Jumlah
Over head 10%
Harga Satuan
281,550.17
0.02
2,830,500.00
56,610.00
Indeks
Harga Satuan
0.4
0.2
0.0075
0.175
6
14,305.50
16,830.00
2,830,500.00
84,150.00
18,360.00
5,722.20
3,366.00
21,228.75
14,726.25
110,160.00
0.32
0.33
0.033
0.006
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
24,750.00
2,821.50
570.00
255,954.70
25,595.47
281,550.17
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.015
0.4
0.15
0.0075
0.35
2
2,830,500.00
14,305.50
16,830.00
2,830,500.00
84,150.00
18,360.00
42,457.50
5,722.20
2,524.50
21,228.75
29,452.50
36,720.00
0.32
0.33
0.033
0.006
50,000.00
75,000.00
85,500.00
95,000.00
16,000.00
24,750.00
2,821.50
570.00
182,246.95
18,224.70
200,471.65
Jumlah
Over head 10%
Harga Satuan
1,043,988.11
1.05
1
1
734,400.00
36,720.00
44,064.00
771,120.00
36,720.00
44,064.00
1
0.3334
0.1667
0.08335
50,000.00
75,000.00
85,500.00
95,000.00
50,000.00
25,005.00
14,252.85
7,918.25
949,080.10
94,908.01
1,043,988.11
Jumlah
Over head 10%
Harga Satuan
95,902.78
0.003
0.02
3.6
0.05
2,830,500.00
14,305.50
13,200.00
10,404.00
8,491.50
286.11
47,520.00
520.20
Indeks
Harga Satuan
5.5
0.009
0.015
21.5
1,600.00
175,000.00
265,000.00
105.19
8,800.00
1,575.00
3,975.00
2,261.53
0.1
0.033
0.033
0.033
0.01
0.005
50,000.00
75,000.00
75,000.00
75,000.00
85,500.00
95,000.00
5,000.00
2,475.00
2,475.00
2,475.00
855.00
475.00
87,184.34
8,718.43
95,902.78
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.0035
0.02
3.6
0.05
5.5
0.009
0.015
21.5
2,830,500.00
14,305.50
13,200.00
10,404.00
1,600.00
175,000.00
265,000.00
105.19
0.1
0.033
0.033
0.033
0.01
0.005
50,000.00
75,000.00
75,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
0.12501
0.84
151.2
2.1
231
0.378
0.63
21.5
2,830,500.00
14,305.50
13,200.00
10,404.00
1,600.00
175,000.00
265,000.00
105.19
353,840.81
12,016.62
1,995,840.00
21,848.40
369,600.00
66,150.00
166,950.00
2,261.53
4.2
1.386
1.386
1.386
0.42
0.21
50,000.00
75,000.00
75,000.00
75,000.00
85,500.00
95,000.00
210,000.00
103,950.00
103,950.00
103,950.00
35,910.00
19,950.00
Indeks
Harga Satuan
Jumlah
Over head 10%
Harga Satuan
18,360.00
0.25
0.05
50,000.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.0126
0.0048
0.25
6,885,000.00
6,885,000.00
14,305.50
0.1
0.1
0.01
0.005
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
0.035
1
1
0.5
9,180,000.00
16,524.00
4,131.00
14,305.50
0.5
1
0.1
0.025
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
14
0.1
10,098.00
14,305.50
0.25
0.2
0.02
0.0125
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
150,925.91
86,751.00
33,048.00
3,576.38
5,000.00
7,500.00
855.00
475.00
137,205.38
13,720.54
150,925.91
506,036.03
321,300.00
16,524.00
4,131.00
7,152.75
25,000.00
75,000.00
8,550.00
2,375.00
460,032.75
46,003.28
506,036.03
190,520.06
141,372.00
1,430.55
12,500.00
15,000.00
1,710.00
1,187.50
173,200.05
17,320.01
190,520.06
Indeks
Harga Satuan
5
0.05
0.216
0.032
10,098.00
14,305.50
1,600.00
160,000.00
0.4
0.2
0.02
0.02
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
53,014.50
5,722.20
15,147.00
9,180.00
315.56
6,311.25
126.23
2,692.80
4,625.48
19,328.20
22,888.80
30,294.00
36,720.00
1,262.25
901.61
1,009.80
1,346.40
4,625.48
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
128,029.04
12,802.90
140,831.94
Jumlah
Over head 10%
Harga Satuan
136,889.69
0.3645833
4
2
4
4
0.1428571
8
0.5
1
44,370.00
5,722.20
15,147.00
9,180.00
315.56
6,311.25
126.23
2,692.80
4,193.25
16,176.56
22,888.80
30,294.00
36,720.00
1,262.25
901.61
1,009.80
1,346.40
4,193.25
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
124,445.17
Jumlah
Indeks
Harga Satuan
Over head 10%
Harga Satuan
Indeks
Harga Satuan
2.97
4
4
4
18,513.00
13,464.00
9,180.00
315.56
54,983.61
53,856.00
36,720.00
1,262.25
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
156,474.36
15,647.44
172,121.80
Jumlah
Over head 10%
Harga Satuan
15,603.96
1.05
0.15
0.01
10,098.00
2,692.80
13,464.00
10,602.90
403.92
134.64
0.05
0.005
0.003
75,000.00
85,500.00
95,000.00
3,750.00
427.50
285.00
15,603.96
1,560.40
17,164.36
Jumlah
Over head 10%
Harga Satuan
140,831.94
0.3645833
4
2
4
4
0.1428571
8
53,014.50
5,722.20
15,147.00
9,180.00
315.56
6,311.25
126.23
19,328.20
22,888.80
30,294.00
36,720.00
1,262.25
901.61
1,009.80
Indeks
Harga Satuan
0.5
1
2,692.80
4,625.48
1,346.40
4,625.48
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
128,029.04
12,802.90
140,831.94
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
3.25
1,600.00
5,200.00
0.2
0.1
0.01
0.01
50,000.00
75,000.00
85,500.00
95,000.00
10,000.00
7,500.00
855.00
950.00
24,505.00
2,450.50
26,955.50
Jumlah
Over head 10%
Harga Satuan
2,388,808.51
1
0.06
1,800,810.00
1,800,810.00
1,800,810.00
108,048.60
3.3
1.1
0.001
0.16
50,000.00
75,000.00
85,500.00
95,000.00
165,000.00
82,500.00
85.50
15,200.00
2,171,644.10
217,164.41
2,388,808.51
Jumlah
Over head 10%
Harga Satuan
420,912.25
1
6
0.01
180,922.50
1,600.00
160,000.00
180,922.50
9,600.00
1,600.00
1
1.5
0.15
0.16
50,000.00
75,000.00
85,500.00
95,000.00
50,000.00
112,500.00
12,825.00
15,200.00
382,647.50
Jumlah
Indeks
Harga Satuan
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1
0.3
6
0.01
1,357,875.00
1,357,875.00
1,600.00
160,000.00
1,357,875.00
407,362.50
9,600.00
1,600.00
1
1
1.1
0.1
50,000.00
75,000.00
85,500.00
95,000.00
50,000.00
75,000.00
94,050.00
9,500.00
2,004,987.50
200,498.75
2,205,486.25
Jumlah
Over head 10%
Harga Satuan
1,016,636.15
1
0.12
6
0.01
644,589.00
644,589.00
1,600.00
160,000.00
644,589.00
77,350.68
9,600.00
1,600.00
1.2
1.45
0.15
0.1
50,000.00
75,000.00
85,500.00
95,000.00
60,000.00
108,750.00
12,825.00
9,500.00
924,214.68
92,421.47
1,016,636.15
Jumlah
Over head 10%
Harga Satuan
2,084,465.99
1
0.12
6
0.01
1,511,334.00
1,511,334.00
1,600.00
160,000.00
1,511,334.00
181,360.08
9,600.00
1,600.00
Indeks
1.2
1.45
0.15
0.1
Harga Satuan
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1
0.12
0.01
0.12
250,767.00
1,600.00
160,000.00
250,767.00
250,767.00
192.00
1,600.00
30,092.04
1.45
1.15
1.2
0.1
50,000.00
75,000.00
85,500.00
95,000.00
72,500.00
86,250.00
102,600.00
9,500.00
553,501.04
55,350.10
608,851.14
Jumlah
Over head 10%
Harga Satuan
757,587.31
1
0.18
287,793.00
287,793.00
287,793.00
51,802.74
1.8
2.7
0.54
0.11
50,000.00
75,000.00
85,500.00
95,000.00
90,000.00
202,500.00
46,170.00
10,450.00
688,715.74
68,871.57
757,587.31
Jumlah
Over head 10%
Harga Satuan
191,794.54
1
0.025
164,934.00
3,786.75
164,934.00
94.67
0.01
0.1
0.01
0.005
50,000.00
75,000.00
85,500.00
95,000.00
500.00
7,500.00
855.00
475.00
Indeks
Harga Satuan
Jumlah
Over head 10%
Harga Satuan
275,170.50
275,170.50
0.01
0.1
0.01
0.005
50,000.00
75,000.00
85,500.00
95,000.00
500.00
7,500.00
855.00
475.00
284,500.50
28,450.05
312,950.55
Jumlah
Over head 10%
Harga Satuan
309,074.54
1
1
267,597.00
13,379.85
Jumlah
Over head 10%
Harga Satuan
267,597.00
13,379.85
280,976.85
28,097.69
309,074.54
243,866.70
1
1
211,140.00
10,557.00
Jumlah
Over head 10%
Harga Satuan
211,140.00
10,557.00
221,697.00
22,169.70
243,866.70
316,850.00
1
1
274,329.00
13,716.45
Jumlah
Over head 10%
274,329.00
13,716.45
288,045.45
28,804.55
Indeks
Harga Satuan
Harga Satuan
1
1
319,617.00
15,980.85
Jumlah
Over head 10%
Harga Satuan
319,617.00
15,980.85
335,597.85
33,559.79
369,157.64
2,060,496.90
1
1
1,783,980.00
89,199.00
Jumlah
Over head 10%
Harga Satuan
1,783,980.00
89,199.00
1,873,179.00
187,317.90
2,060,496.90
934,027.13
1
1
808,681.50
40,434.08
Jumlah
Over head 10%
Harga Satuan
808,681.50
40,434.08
849,115.58
84,911.56
934,027.13
Indeks
Harga Satuan
1
1
97,231.50
4,861.58
Jumlah
Over head 10%
Harga Satuan
97,231.50
4,861.58
102,093.08
10,209.31
112,302.38
239,095.40
1
1
207,009.00
10,350.45
Jumlah
Over head 10%
Harga Satuan
207,009.00
10,350.45
217,359.45
21,735.95
239,095.40
72,894.94
1
1
63,112.50
3,155.63
Jumlah
Over head 10%
Harga Satuan
63,112.50
3,155.63
66,268.13
6,626.81
72,894.94
681,324.68
1
1
589,891.50
29,494.58
Jumlah
Over head 10%
Harga Satuan
589,891.50
29,494.58
619,386.08
61,938.61
681,324.68
610,373.61
1
1
528,462.00
26,423.10
Jumlah
528,462.00
26,423.10
554,885.10
Indeks
Harga Satuan
Over head 10%
Harga Satuan
1
1
608,404.50
30,420.23
Jumlah
Over head 10%
Harga Satuan
608,404.50
30,420.23
638,824.73
63,882.47
702,707.20
Indeks
Harga Satuan
1
1
1
226,363.50
11,318.18
5,659.09
Jumlah
Over head 10%
Harga Satuan
226,363.50
11,318.18
5,659.09
243,340.76
24,334.08
267,674.84
217,712.88
1
1
188,496.00
9,424.80
Jumlah
Over head 10%
Harga Satuan
1.1
1
307,147.50
15,357.38
Jumlah
Over head 10%
Harga Satuan
188,496.00
9,424.80
197,920.80
19,792.08
217,712.88
388,541.59
337,862.25
15,357.38
353,219.63
35,321.96
388,541.59
1,297,167.21
1
0.18
703,494.00
703,494.00
703,494.00
126,628.92
1.8
2.7
0.54
0.11
50,000.00
75,000.00
85,500.00
95,000.00
90,000.00
202,500.00
46,170.00
10,450.00
1,179,242.92
117,924.29
1,297,167.21
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
163,466.05
25
11.38
0.042
1.5
2,111.40
1,600.00
160,000.00
5,200.00
52,785.00
18,208.00
6,720.00
7,800.00
0.62
0.35
0.035
0.03
50,000.00
75,000.00
85,500.00
95,000.00
31,000.00
26,250.00
2,992.50
2,850.00
148,605.50
14,860.55
163,466.05
Jumlah
Over head 10%
Harga Satuan
167,877.55
11.111111
11.38
0.042
1.5
5,111.59
1,600.00
160,000.00
5,200.00
56,795.45
18,208.00
6,720.00
7,800.00
0.62
0.35
0.035
0.03
50,000.00
75,000.00
85,500.00
95,000.00
31,000.00
26,250.00
2,992.50
2,850.00
152,615.95
15,261.60
167,877.55
Jumlah
Over head 10%
Harga Satuan
180,037.55
11.111111
11.38
0.042
6,808.50
1,600.00
160,000.00
75,650.00
18,208.00
6,720.00
Indeks
0.62
0.35
0.035
0.03
Harga Satuan
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
1.1
11.38
0.042
104,193.00
1,600.00
160,000.00
114,612.30
18,208.00
6,720.00
0.62
0.35
0.035
0.03
50,000.00
75,000.00
85,500.00
95,000.00
31,000.00
26,250.00
2,992.50
2,850.00
202,632.80
20,263.28
222,896.08
Jumlah
Over head 10%
Harga Satuan
211,788.28
1.1
11.38
0.042
95,013.00
1,600.00
160,000.00
104,514.30
18,208.00
6,720.00
0.62
0.35
0.035
0.03
50,000.00
75,000.00
85,500.00
95,000.00
31,000.00
26,250.00
2,992.50
2,850.00
192,534.80
19,253.48
211,788.28
Jumlah
Over head 10%
Harga Satuan
38,788.20
0.2
93,330.00
18,666.00
0.12
0.12
0.012
0.006
50,000.00
75,000.00
85,500.00
95,000.00
6,000.00
9,000.00
1,026.00
570.00
35,262.00
Jumlah
Indeks
Harga Satuan
Over head 10%
Harga Satuan
Indeks
Harga Satuan
3.53
1.14
0.003
0.1
15,973.20
1,600.00
160,000.00
5,200.00
56,385.40
1,824.00
480.00
520.00
0.09
0.09
0.009
0.005
50,000.00
75,000.00
85,500.00
95,000.00
4,500.00
6,750.00
769.50
475.00
71,703.90
7,170.39
78,874.29
Jumlah
Over head 10%
Harga Satuan
275,084.31
1
8
0.072
0.25
1
211,140.00
1,600.00
89,505.00
31,135.50
11,908.41
Jumlah
Over head 10%
Harga Satuan
211,140.00
12,800.00
6,444.36
7,783.88
11,908.41
250,076.65
25,007.66
275,084.31
169,282.87
1.1
1
116,586.00
25,648.92
Jumlah
Over head 10%
Harga Satuan
128,244.60
25,648.92
153,893.52
15,389.35
169,282.87
219,278.07
Indeks
Harga Satuan
1
1
197,370.00
1,973.70
Jumlah
Over head 10%
Harga Satuan
197,370.00
1,973.70
199,343.70
19,934.37
219,278.07
Indeks
Harga Satuan
32,850.26
0.15
0.17
0.26
0.016
0.5
17,881.88
30,489.84
30,489.84
21,037.50
3,901.50
2,682.28
5,183.27
7,927.36
336.60
1,950.75
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
32,850.26
3,285.03
36,135.29
Jumlah
Over head 10%
Harga Satuan
42,825.08
0.15
0.17
0.26
0.016
0.5
17,881.88
44,633.16
44,633.16
21,037.50
3,901.50
2,682.28
7,587.64
11,604.62
336.60
1,950.75
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
38,931.89
3,893.19
42,825.08
Jumlah
Over head 10%
Harga Satuan
38,430.83
0.15
0.17
0.26
17,881.88
35,343.00
35,343.00
2,682.28
6,008.31
9,189.18
Indeks
Harga Satuan
0.016
0.5
21,037.50
3,901.50
336.60
1,950.75
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
34,937.12
3,493.71
38,430.83
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.15
0.17
0.26
0.016
0.5
17,881.88
26,928.00
26,928.00
21,037.50
3,901.50
2,682.28
4,577.76
7,001.28
336.60
1,950.75
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
31,318.67
3,131.87
34,450.54
Jumlah
Over head 10%
Harga Satuan
36,922.09
0.15
0.17
0.26
0.016
0.5
0.05
17,881.88
30,489.84
30,489.84
21,037.50
3,901.50
14,305.50
2,682.28
5,183.27
7,927.36
336.60
1,950.75
715.28
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
33,565.54
3,356.55
36,922.09
Jumlah
Over head 10%
Harga Satuan
43,611.88
0.15
17,881.88
2,682.28
Indeks
Harga Satuan
0.17
0.26
0.016
0.5
0.05
44,633.16
44,633.16
21,037.50
3,901.50
14,305.50
7,587.64
11,604.62
336.60
1,950.75
715.28
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
39,647.17
3,964.72
43,611.88
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
0.0111111
0.0111111
0.0522222
0.0017778
0.0555556
17,881.88
30,489.84
30,489.84
21,037.50
3,901.50
198.69
338.78
1,592.25
37.40
216.75
0.0088889
0.0066667
0.0006667
0.0004444
50,000.00
75,000.00
85,500.00
95,000.00
444.44
500.00
57.00
42.22
3,427.53
342.75
3,770.28
Jumlah
Over head 10%
Harga Satuan
5,448.40
0.0125
0.0125
0.05875
0.002
0.0625
0.00625
17,881.88
44,633.16
44,633.16
21,037.50
3,901.50
14,305.50
223.52
557.91
2,622.20
42.08
243.84
89.41
0.01
0.0075
0.00075
0.0005
50,000.00
75,000.00
85,500.00
95,000.00
500.00
562.50
64.13
47.50
4,953.09
495.31
5,448.40
Jumlah
Over head 10%
Harga Satuan
40,615.47
0.15
0.17
23,562.00
29,452.50
3,534.30
5,006.93
Indeks
Harga Satuan
0.26
0.016
0.5
1
39,550.50
20,196.00
3,901.50
1,054.91
10,283.13
323.14
1,950.75
1,054.91
0.04
0.15
0.015
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
2,000.00
11,250.00
1,282.50
237.50
36,923.15
3,692.32
40,615.47
Jumlah
Over head 10%
Harga Satuan
Indeks
Harga Satuan
316,016.80
1
2
123,012.00
52,173.00
123,012.00
104,346.00
0.6
0.06
0.12
0.04
75,000.00
85,500.00
50,000.00
95,000.00
45,000.00
5,130.00
6,000.00
3,800.00
287,288.00
28,728.80
316,016.80
Jumlah
Over head 10%
Harga Satuan
295,568.35
1
2
104,422.50
52,173.00
104,422.50
104,346.00
0.6
0.06
0.12
0.04
75,000.00
85,500.00
50,000.00
95,000.00
45,000.00
5,130.00
6,000.00
3,800.00
268,698.50
26,869.85
295,568.35
Jumlah
Over head 10%
Harga Satuan
493,740.00
1
454,410.00
454,410.00
0.01
0.5
0.01
0.005
50,000.00
75,000.00
85,500.00
95,000.00
500.00
37,500.00
855.00
475.00
493,740.00
Jumlah
Indeks
Harga Satuan
187,578.00
187,578.00
0.01
0.5
0.01
0.005
50,000.00
75,000.00
85,500.00
95,000.00
500.00
37,500.00
855.00
475.00
226,908.00
Jumlah
Indeks
Harga Satuan
525,096.00
525,096.00
0.01
0.5
0.01
0.005
50,000.00
75,000.00
85,500.00
95,000.00
500.00
37,500.00
855.00
475.00
564,426.00
Jumlah
201,666.00
1
163,251.00
163,251.00
0.005
0.5
0.005
0.0025
50,000.00
75,000.00
85,500.00
95,000.00
250.00
37,500.00
427.50
237.50
201,666.00
Jumlah
1,446,277.50
1
1,312,740.00
1,312,740.00
0.15
1.5
0.15
0.0075
50,000.00
75,000.00
85,500.00
95,000.00
7,500.00
112,500.00
12,825.00
712.50
1,446,277.50
Jumlah
139,395.00
1
100,980.00
100,980.00
0.005
0.5
0.005
50,000.00
75,000.00
85,500.00
250.00
37,500.00
427.50
Indeks
Harga Satuan
0.0025
95,000.00
Jumlah
0.3787879
1
91,800.00
918.00
34,772.73
918.00
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
45,343.23
Jumlah
Indeks
Harga Satuan
1.1
1
105,187.50
1,051.88
115,706.25
1,051.88
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
126,410.63
Jumlah
260,618.78
1.1
1
226,095.75
2,260.96
248,705.33
2,260.96
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
260,618.78
Jumlah
419,367.38
1.1
1
369,112.50
3,691.13
406,023.75
3,691.13
0.1
0.05
0.005
0.005
50,000.00
75,000.00
85,500.00
95,000.00
5,000.00
3,750.00
427.50
475.00
419,367.38
Jumlah
49,338.00
1
35,343.00
35,343.00
Indeks
Harga Satuan
0.015
0.15
0.015
0.0075
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
31,977.00
31,977.00
0.015
0.15
0.015
0.0075
50,000.00
75,000.00
85,500.00
95,000.00
750.00
11,250.00
1,282.50
712.50
45,972.00
Jumlah
40,923.00
1
26,928.00
26,928.00
0.015
0.15
0.015
0.0075
50,000.00
75,000.00
85,500.00
95,000.00
750.00
11,250.00
1,282.50
712.50
40,923.00
Jumlah
316,935.00
1
302,940.00
302,940.00
0.015
0.15
0.015
0.0075
50,000.00
75,000.00
85,500.00
95,000.00
750.00
11,250.00
1,282.50
712.50
316,935.00
Jumlah
2,438,359.08
Indeks
Harga Satuan
6.1
1.935
1.22
6.1
1
1.935
1
1.935
295,568.35
45,343.23
22,720.50
17,671.50
180,922.50
40,615.47
30,142.08
63,298.36
Jumlah
6.1
1.795
0.14
1.58
7.9
1
1.795
1
1.795
295,568.35
45,343.23
126,410.63
22,720.50
17,671.50
180,922.50
40,615.47
36,462.61
76,571.48
Jumlah
1,802,966.94
81,391.09
17,697.49
35,898.39
139,604.85
180,922.50
72,904.77
36,462.61
137,445.80
2,505,294.43
Indeks
Harga Satuan
6.1
1.635
1.66
6.1
1
1
1.635
1
1.635
295,568.35
45,343.23
22,720.50
17,671.50
180,922.50
147,262.50
40,615.47
37,505.20
78,760.92
Jumlah
1,802,966.94
74,136.18
37,716.03
107,796.15
180,922.50
147,262.50
66,406.29
37,505.20
128,774.11
2,583,485.90
2,706,892.17
6.1
1.635
3.27
1.66
6.1
1
1
1.635
1
1.635
295,568.35
45,343.23
35,343.00
22,720.50
17,671.50
180,922.50
147,262.50
40,615.47
39,272.35
82,471.94
Jumlah
1,802,966.94
74,136.18
115,571.61
37,716.03
107,796.15
180,922.50
147,262.50
66,406.29
39,272.35
134,841.62
2,706,892.17
2,534,441.87
5.8
1.3125
2.625
1.6
5.8
1
1
1.3125
295,568.35
45,343.23
35,343.00
22,720.50
17,671.50
180,922.50
147,262.50
40,615.47
1,714,296.43
59,512.99
92,775.38
36,352.80
102,494.70
180,922.50
147,262.50
53,307.80
Indeks
Harga Satuan
1
1.3125
39,272.35
82,471.94
Jumlah
5.8
1.935
1.16
5.8
1
1.935
295,568.35
419,367.38
22,720.50
17,671.50
37,766.39
79,309.41
Jumlah
1,714,296.43
811,475.87
26,355.78
102,494.70
37,766.39
153,463.71
2,845,852.88
Indeks
Harga Satuan
6.1
1.935
0.84
1.66
6.1
1
1.935
1
1.935
295,568.35
45,343.23
126,410.63
22,720.50
17,671.50
180,922.50
40,615.47
36,462.61
76,571.48
Jumlah
1,802,966.94
87,739.14
106,184.93
37,716.03
107,796.15
180,922.50
78,590.93
36,462.61
148,165.81
2,586,545.03
4,228,646.76
11
2.44
0.14
1.28
12.8
1.5
2.44
1
2.44
295,568.35
45,343.23
126,410.63
22,720.50
17,671.50
180,922.50
40,615.47
36,462.61
76,571.48
Jumlah
5.2
1
1.04
1
3
1
1
1
316,016.80
2,438,359.08
22,720.50
493,740.00
49,338.00
139,395.00
34,595.69
174,708.25
Jumlah
3,251,251.85
110,637.47
17,697.49
29,082.24
226,195.20
271,383.75
99,101.74
36,462.61
186,834.41
4,228,646.76
5,605,301.58
1,643,287.36
2,438,359.08
23,629.32
493,740.00
148,014.00
139,395.00
34,595.69
174,708.25
5,095,728.71
Indeks
Harga Satuan
509,572.87
5,605,301.58
316,016.80
2,505,294.43
22,720.50
493,740.00
49,338.00
139,395.00
35,265.05
178,088.49
Jumlah
Over head 10%
Harga Satuan
5,683,385.01
1,643,287.36
2,505,294.43
23,629.32
493,740.00
148,014.00
139,395.00
35,265.05
178,088.49
5,166,713.65
516,671.36
5,683,385.01
5.2
1
1.04
1
3
1
1
1
316,016.80
2,583,485.90
22,720.50
493,740.00
49,338.00
139,395.00
36,046.96
182,037.16
Jumlah
Over head 10%
Harga Satuan
5,774,599.27
1,643,287.36
2,583,485.90
23,629.32
493,740.00
148,014.00
139,395.00
36,046.96
182,037.16
5,249,635.70
524,963.57
5,774,599.27
5.2
1
1.04
1
3
1
1
1
316,016.80
2,706,892.17
22,720.50
493,740.00
49,338.00
139,395.00
37,281.02
188,269.17
5,918,558.85
1,643,287.36
2,706,892.17
23,629.32
493,740.00
148,014.00
139,395.00
37,281.02
188,269.17
5.2
1
1.04
1
3
1
1
1
Indeks
5.2
1
1.04
1
3
1
1
1
5.2
1
1.04
1
3
1
1
1
Harga Satuan
Jumlah
Over head 10%
Harga Satuan
5,380,508.05
538,050.80
5,918,558.85
316,016.80
2,534,441.87
22,720.50
226,908.00
49,338.00
139,395.00
32,888.20
166,085.42
Jumlah
Over head 10%
Harga Satuan
5,406,114.08
1,643,287.36
2,534,441.87
23,629.32
226,908.00
148,014.00
139,395.00
32,888.20
166,085.42
4,914,649.17
491,464.92
5,406,114.08
316,016.80
2,845,852.88
22,720.50
493,740.00
49,338.00
139,395.00
38,670.63
195,286.69
Jumlah
Over head 10%
Harga Satuan
6,080,663.47
1,643,287.36
2,845,852.88
23,629.32
493,740.00
148,014.00
139,395.00
38,670.63
195,286.69
5,527,875.88
552,787.59
6,080,663.47
Indeks
5.2
1
1.04
1
3
1
1
1
5.2
1
1.04
1
6
1
1
1
6.1
2
1.22
1
6
2
1
1
Harga Satuan
316,016.80
2,586,545.03
22,720.50
493,740.00
49,338.00
139,395.00
36,077.55
182,191.64
Jumlah
Over head 10%
Harga Satuan
5,778,167.90
1,643,287.36
2,586,545.03
23,629.32
493,740.00
148,014.00
139,395.00
36,077.55
182,191.64
5,252,879.91
525,287.99
5,778,167.90
316,016.80
4,228,646.76
22,720.50
493,740.00
49,338.00
1,446,277.50
65,567.40
331,115.35
Jumlah
Over head 10%
Harga Satuan
9,381,120.85
1,643,287.36
4,228,646.76
23,629.32
493,740.00
296,028.00
1,446,277.50
65,567.40
331,115.35
8,528,291.68
852,829.17
9,381,120.85
316,016.80
2,438,359.08
22,720.50
564,426.00
49,338.00
1,446,277.50
48,371.38
366,413.19
Jumlah
Over head 10%
12,099,926.54
1,927,702.48
4,876,718.16
27,719.01
564,426.00
296,028.00
2,892,555.00
48,371.38
366,413.19
10,999,933.22
1,099,993.32
Indeks
6.1
2
1.22
1
6
2
1
1
Harga Satuan
Harga Satuan
12,099,926.54
316,016.80
2,505,294.43
22,720.50
564,426.00
49,338.00
1,446,277.50
49,040.73
371,483.55
Jumlah
Over head 10%
Harga Satuan
12,253,498.00
1,927,702.48
5,010,588.87
27,719.01
564,426.00
296,028.00
2,892,555.00
49,040.73
371,483.55
11,139,543.63
1,113,954.36
12,253,498.00
Indeks
6.1
2
1.22
1
6
2
1
1
6.1
2
1.22
1
6
2
1
1
6.1
2
1.22
1
6
2
1
1
Harga Satuan
316,016.80
2,583,485.90
22,720.50
564,426.00
49,338.00
1,446,277.50
49,822.65
377,406.55
Jumlah
Over head 10%
Harga Satuan
12,432,894.63
1,927,702.48
5,166,971.79
27,719.01
564,426.00
296,028.00
2,892,555.00
49,822.65
377,406.55
11,302,631.48
1,130,263.15
12,432,894.63
316,016.80
2,706,892.17
22,720.50
564,426.00
49,338.00
1,446,277.50
51,056.71
386,754.58
Jumlah
Over head 10%
Harga Satuan
12,716,028.72
1,927,702.48
5,413,784.33
27,719.01
564,426.00
296,028.00
2,892,555.00
51,056.71
386,754.58
11,560,026.11
1,156,002.61
12,716,028.72
316,016.80
2,845,852.88
22,720.50
564,426.00
49,338.00
1,446,277.50
52,446.32
397,280.85
Jumlah
Over head 10%
13,034,849.75
1,927,702.48
5,691,705.75
27,719.01
564,426.00
296,028.00
2,892,555.00
52,446.32
397,280.85
11,849,863.41
1,184,986.34
Indeks
6.1
2
1.22
1
6
2
1
1
Harga Satuan
Harga Satuan
13,034,849.75
316,016.80
2,586,545.03
22,720.50
564,426.00
49,338.00
1,446,277.50
49,853.24
377,638.28
Jumlah
Over head 10%
Harga Satuan
12,439,913.29
1,927,702.48
5,173,090.07
27,719.01
564,426.00
296,028.00
2,892,555.00
49,853.24
377,638.28
11,309,012.08
1,130,901.21
12,439,913.29
Indeks
Harga Satuan
2,504,304.00
155,677.50
77,838.75
Jumlah
Over head 10%
Harga Satuan
3,011,602.28
2,504,304.00
155,677.50
77,838.75
2,737,820.25
273,782.03
3,011,602.28
1
1
1
1,325,362.50
155,677.50
77,838.75
Jumlah
Over head 10%
Harga Satuan
1,714,766.63
1,325,362.50
155,677.50
77,838.75
1,558,878.75
155,887.88
1,714,766.63
1
1
1
2,461,387.50
155,677.50
77,838.75
Jumlah
Over head 10%
Harga Satuan
2,964,394.13
2,461,387.50
155,677.50
77,838.75
2,694,903.75
269,490.38
2,964,394.13
1,409,512.50
155,677.50
77,838.75
Jumlah
Over head 10%
Harga Satuan
1,807,331.63
1,409,512.50
155,677.50
77,838.75
1,643,028.75
164,302.88
1,807,331.63
1,889,167.50
188,916.75
94,458.38
Jumlah
2,389,796.89
1,889,167.50
188,916.75
94,458.38
2,172,542.63
1
1
1
1
1
1
1
1
1
Indeks
Harga Satuan
1
1
1
217,254.26
2,389,796.89
3,400,501.50
340,050.15
170,025.08
Jumlah
Over head 10%
Harga Satuan
4,301,634.40
3,400,501.50
340,050.15
170,025.08
3,910,576.73
391,057.67
4,301,634.40
Indeks
Harga Satuan
10,098,000.00
1,009,800.00
504,900.00
Jumlah
Over head 10%
Harga Satuan
12,773,970.00
10,098,000.00
1,009,800.00
504,900.00
11,612,700.00
1,161,270.00
12,773,970.00
1
1
1
16,661,700.00
1,666,170.00
833,085.00
Jumlah
Over head 10%
Harga Satuan
21,077,050.50
16,661,700.00
1,666,170.00
833,085.00
19,160,955.00
1,916,095.50
21,077,050.50
1
1
1
18,327,870.00
1,832,787.00
916,393.50
Jumlah
Over head 10%
Harga Satuan
23,184,755.55
18,327,870.00
1,832,787.00
916,393.50
21,077,050.50
2,107,705.05
23,184,755.55
4,459,950.00
155,677.50
77,838.75
Jumlah
Over head 10%
Harga Satuan
5,162,812.88
4,459,950.00
155,677.50
77,838.75
4,693,466.25
469,346.63
5,162,812.88
6,058,800.00
155,677.50
77,838.75
Jumlah
6,921,547.88
6,058,800.00
155,677.50
77,838.75
6,292,316.25
1
1
1
1
1
1
1
1
1
Indeks
Harga Satuan
Over head 10%
Harga Satuan
12.84
4
4
4
3
1
1
455,175.00
225,522.00
2,213,145.00
1,262,250.00
706,860.00
28,938.42
366,891.78
Jumlah
Over head 10%
Harga Satuan
25,480,977.72
5,844,447.00
902,088.00
8,852,580.00
5,049,000.00
2,120,580.00
28,938.42
366,891.78
23,164,525.20
2,316,452.52
25,480,977.72
15.4422
2
2
2
1
1
1
455,175.00
225,522.00
2,213,145.00
1,262,250.00
706,860.00
28,938.42
366,891.78
Jumlah
Over head 10%
Harga Satuan
17,086,770.35
7,028,903.39
451,044.00
4,426,290.00
2,524,500.00
706,860.00
28,938.42
366,891.78
15,533,427.59
1,553,342.76
17,086,770.35
455,175.00
225,522.00
2,213,145.00
1,262,250.00
706,860.00
28,938.42
366,891.78
Jumlah
Over head 10%
Harga Satuan
13,915,596.53
3,694,974.10
902,088.00
4,426,290.00
2,524,500.00
706,860.00
28,938.42
366,891.78
12,650,542.30
1,265,054.23
13,915,596.53
8.1177
4
2
2
1
1
1
Indeks
2.6925
32.0775
2
2
2
1
1
1
22.55
11.6
2.66
4
2
2
1
1
Harga Satuan
455,175.00
67,932.00
225,522.00
2,213,145.00
1,262,250.00
706,860.00
29,617.74
372,037.63
Jumlah
Over head 10%
Harga Satuan
13,106,496.47
1,225,558.69
2,179,088.73
451,044.00
4,426,290.00
2,524,500.00
706,860.00
29,617.74
372,037.63
11,914,996.79
1,191,499.68
13,106,496.47
316,016.80
295,568.35
419,367.38
191,862.00
1,402,359.75
774,180.00
20,135.89
210,592.88
Jumlah
Over head 10%
Harga Satuan
18,723,699.70
7,126,178.84
3,428,592.86
1,115,517.22
767,448.00
2,804,719.50
1,548,360.00
20,135.89
210,592.88
17,021,545.18
1,702,154.52
18,723,699.70
Indeks
12.45
6.93
2
2
2
1
1
1
12.45
6.93
2
2
2
1
1
1
7.15
4
1
6
1
1
1
Harga Satuan
455,175.00
67,932.00
225,522.00
2,213,145.00
1,262,250.00
706,860.00
29,617.74
372,037.63
Jumlah
Over head 10%
Harga Satuan
16,112,851.57
5,666,928.75
470,768.76
451,044.00
4,426,290.00
2,524,500.00
706,860.00
29,617.74
372,037.63
14,648,046.88
1,464,804.69
16,112,851.57
455,175.00
67,932.00
225,522.00
2,213,145.00
1,262,250.00
706,860.00
29,617.74
372,037.63
Jumlah
Over head 10%
Harga Satuan
16,112,851.57
5,666,928.75
470,768.76
451,044.00
4,426,290.00
2,524,500.00
706,860.00
29,617.74
372,037.63
14,648,046.88
1,464,804.69
16,112,851.57
500,000.00
2,438,359.08
493,740.00
49,338.00
250,000.00
37,314.37
188,437.57
Jumlah
Over head 10%
Harga Satuan
16,053,351.89
3,575,000.00
9,753,436.32
493,740.00
296,028.00
250,000.00
37,314.37
188,437.57
14,593,956.26
1,459,395.63
16,053,351.89
Indeks
7.71
4.51
0.93195
0.52875
2.444
12.22
2
1
1
1
Harga Satuan
316,016.80
295,568.35
126,410.63
260,618.78
22,720.50
17,671.50
23,562.00
26,086.50
21,773.10
111,042.82
Jumlah
Over head 10%
Harga Satuan
6.96
4.93
0.934675
2.378
11.89
2
1
1
1
316,016.80
295,568.35
126,410.63
22,720.50
17,671.50
23,562.00
26,086.50
16,560.73
84,459.70
Jumlah
Over head 10%
Harga Satuan
12.708
9.092
1.90232
0.53463
4.36
21.8
4
316,016.80
295,568.35
126,410.63
260,618.78
22,720.50
17,671.50
23,562.00
Indeks
Harga Satuan
2
1
1
26,086.50
21,773.10
111,042.82
Jumlah
Over head 10%
Harga Satuan
8.952
9.892
1.90232
3.7688
18.844
4
2
1
1
316,016.80
295,568.35
126,410.63
22,720.50
17,671.50
23,562.00
26,086.50
16,560.73
84,459.70
Jumlah
Over head 10%
Harga Satuan
Indeks
18.093
13.902
3.08052
1.685655
6.399
31.995
6
3
1
1
Harga Satuan
316,016.80
295,568.35
126,410.63
260,618.78
22,720.50
17,671.50
23,562.00
26,086.50
21,773.10
111,042.82
Jumlah
Over head 10%
Harga Satuan
12.702
15.102
1.069152
5.5608
27.804
4
2
1
1
316,016.80
295,568.35
126,410.63
22,720.50
17,671.50
23,562.00
26,086.50
16,560.73
84,459.70
Jumlah
Over head 10%
Harga Satuan
11.202
2.2404
4.02102
1
1
316,016.80
22,720.50
119,493.00
9,164.61
46,739.49
Jumlah
Over head 10%
Indeks
Harga Satuan
Harga Satuan
12.702
2.5404
4.59072
1
1
316,016.80
22,720.50
119,493.00
9,164.61
46,739.49
Jumlah
Over head 10%
Harga Satuan
Indeks
30.64
0.8866
6.128
30.64
1
1
Harga Satuan
316,016.80
126,410.63
22,720.50
17,671.50
9,656.39
49,247.58
Jumlah
Over head 10%
Harga Satuan
No.
1
URAIAN
1 M2
PENGUKURAN SITE
Surveyor
Assisten Surveyor
Pekerja
Patok Beton
Patok Kayu
Theodolite
Waterpass
SATUAN
Orang
Orang
Orang
Buah
Buah
Unit
Unit
Jasa Kontraktor
2
1 M3
MEMBUAT BOUWPLANK
Bahan
Kayu 5/7
Paku 2" - 5"
m3
Kg
m3
Tukang Kayu
Pekerja
Mandor
Orang
Orang
Orang
Jasa Kontraktor
LOS KERJA/DIREKSI KEET
Kayu 6/12 , 5/7
Paku
Besi Strip
Semen (PC)
Pasir Pasang
Pasir Beton
Koral beton
Asbes Gelombang
Jendela Nako
Kaca polos 5 mm
Kunci Tanam
( SNI 03-2835-2002 )
m3
Kg
kg
kg
m3
m3
m3
Lembar
bh
m2
bh
Upah
1 M2
BHN
No.
URAIAN
UPAH
Multiplek 4 mm
SATUAN
Lembar
Pekerja
Tukang Kayu
Tukang Batu
Kepala Tukang
Mandor
Orang
Orang
Orang
Orang
Orang
Jasa Kontraktor
No.
4
1 M'
BHN.
Upah
URAIAN
PAGAR PENGAMAN PROYEK
Dolken kayu dia 8 - 10 cm
Semen Portand
Seng Gelombang
Pasir Beton
Koral beton
Kayu Meranti 5/7
Paku biasa 2" - 5"
Meni besi
SATUAN
( SNI 03-2835-2002 )
Btg
Kg
lbr
m3
m3
m3
Kg
Kg
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Orang
Orang
Orang
Orang
Jasa Kontraktor
5
1 M2
Upah
1 UNIT
Jasa Kontraktor
PAPAN NAMA PROYEK 80 X 120 CM
Bahan
Kayu Meranti
m3
Seng Plat
Paku
Cat Kayu
m2
kg
kg
Beton Cor 1 : 2 : 3
m3
Tukang Kayu
Tukang Cat
Pekerja
Mandor
Orang
Orang
Orang
Orang
Jasa Kontraktor
GALIAN TANAH BIASA SEDALAM 1 M
Pekerja
Mandor
Orang
Orang
Upah
1 M3
PEMBERSIHAN LAPANGAN
Pekerja
Mandor
( SNI 03-2835-2002 )
Orang
Orang
No.
8
10
11
URAIAN
1 M3
1 M3
1 M3
1 M3
SATUAN
Jasa Kontraktor
GALIAN TANAH BIASA SEDALAM 3 M
Pekerja
Mandor
Orang
Orang
Jasa Kontraktor
GALIAN TANAH KERAS SEDALAM 3 M
Pekerja
Mandor
Orang
Orang
Jasa Kontraktor
URUGAN KEMBALI TANAH BEKAS GALIAN
Pekerja
Mandor
Orang
Orang
Jasa Kontraktor
BUANGAN TANAH SEJAUH 150 M
Pekerja
Mandor
Orang
Orang
Jasa Kontraktor
No.
12
13
URAIAN
1 M3
1 M3
SATUAN
PEMADATAN TANAH
Pekerja
Mandor
Orang
Orang
Jasa Kontraktor
MENGURUG PASIR URUG
Pasir Urug
Pekerja
Mandor
m3
Orang
Orang
Jasa Kontraktor
15
1M
Bahan
Upah
m3
Pasir Beton
Semen PC
m3
kg
Pekerja
Tukang batu
Kepala Tukang
Mandor
Orang
Orang
Orang
Orang
Jasa Kontraktor
16
1 M3
Bahan
Kerikil
m3
Pasir Beton
Semen PC
Pekerja
Tukang batu
Kepala Tukang
Mandor
m3
kg
Orang
Orang
Orang
Orang
Upah
Jasa Kontraktor
17
1 M3
Bahan
Kerikil
m3
Pasir Beton
Semen PC
m3
kg
No.
URAIAN
Upah
18
1 M3
Bahan
Upah
Pekerja
Tukang batu
Kepala Tukang
Mandor
SATUAN
Orang
Orang
Orang
Orang
Jasa Kontraktor
COR BETON fc 17.5 Mpa READY MIX
Ready Mix
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat bantu (Slang+ Tes Lab)
m3
Orang
Orang
Orang
Orang
lot
Jasa Kontraktor
No.
19
1 M3
Bahan
Upah
URAIAN
COR BETON K. 300 READY MIX
Ready Mix
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Alat bantu (Slang+ Tes Lab)
SATUAN
m3
Orang
Orang
Orang
Orang
lot
Jasa Kontraktor
20
1 M3
BETON TUMBUK
Bahan
Kerikil
m3
Pasir Beton
Semen PC
Pekerja
Tukang Batu
Kepala Tukang
Mandor
m3
kg
Orang
Orang
Orang
Orang
Upah
1 PC : 3 PS : 5 KR ( SITE MIX )
Jasa Kontraktor
21
1 UNIT
SCAFOLDING (STOODWERK)
Main Frame MF 190
Join Pin
Cross Brace CB 220
Cat Walk ( 500 x 1800 )
Upah Kerja
bh
bh
bh
bh
ls
Jasa Kontraktor
22
1 M2
Bahan
Upah
buah
Zak
Pasir Pasang
Alat
Pekerja
m3
ls
Orang
No.
URAIAN
Tukang Batu
Kepala Tukang
Mandor
Tukang Bongkar / siram beton
SATUAN
Orang
Orang
Orang
Orang
Jasa Kontraktor
23
1 M2
Bahan
( SNI 03-3434-2002 )
lembar
Upah
m3
kg
Lt
Orang
Orang
Orang
Orang
Jasa Kontraktor
No.
24
URAIAN
1 M2
Bahan
Upah
SATUAN
( SNI 03-3434-2002 )
lembar
m3
kg
Lt
m3
Btg
Orang
Orang
Orang
Orang
Jasa Kontraktor
25
1 M2
Bahan
Upah
( SNI 03-3434-2002 )
lembar
m3
kg
Lt
m3
Btg
Orang
Orang
Orang
Orang
Jasa Kontraktor
26
1 M2
Bahan
Upah
( SNI 03-3434-2002 )
lembar
m3
kg
Lt
m3
Btg
Orang
Orang
Orang
Orang
No.
URAIAN
SATUAN
Jasa Kontraktor
27
1 M2
Bahan
Upah
( SNI 03-3434-2002 )
lembar
m3
kg
Lt
m3
Btg
Orang
Orang
Orang
Orang
Jasa Kontraktor
No.
28
URAIAN
1 M2
Bahan
Upah
SATUAN
( SNI 03-3434-2002 )
lembar
m3
kg
Lt
m3
Btg
bh
Orang
Orang
Orang
Orang
Jasa Kontraktor
29
1 KG
Bahan
Upah
( SNI 03-3434-2002 )
Kg
Kg
Orang
Orang
Orang
Orang
Jasa Kontraktor
30
1 KG
Bahan
Upah
31
1 M'
( SNI 03-3434-2002 )
Kg
Kg
Orang
Orang
Orang
Orang
Jasa Kontraktor
PASANG LIST PLANK 3/30
Listplank Kamper 3/30
Paku
Pekerja
Tukang Kayu
m3
Kg
Orang
Orang
No.
32
URAIAN
1 M2
Kepala Tukang
Mandor
SATUAN
Orang
Orang
lbr
kg
orang
orang
orang
orang
No.
33
34
1 M'
1 M2
URAIAN
PASANG BUBUNGAN / NOK GENTENG
Nok Genteng Keramik
Paku Genteng Metal
Semen
Pasir pasang
Semen warna
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
SATUAN
buah
kg
zak
m3
Kg
orang
orang
orang
orang
Rol
Rol
Rol
Rol
lot
Jasa Kontraktor
35
1 KG
kg
jam
bh
jam
bh
kwh
orang
orang
orang
orang
1 KG
kg
No.
URAIAN
Pekerja
Tukang Las
Kep tukang las
Mandor
Alat bantu
SATUAN
orang
orang
orang
orang
lot
LT. DASAR
m3
kg
kg
m2
m2
No.
2
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
URAIAN
KOLOM TYPE K0 (55x55)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K0 (55x55)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K1 (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K1 (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K1 (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K1' (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K1' (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
SATUAN
LT. SATU
m3
kg
kg
m2
m2
LT. DUA
m3
kg
kg
m2
m2
LT. DASAR
m3
kg
kg
m2
m2
LT. SATU
m3
kg
kg
m2
m2
LT. DUA
m3
kg
kg
m2
m2
LT. DASAR
m3
kg
kg
m2
m2
LT. SATU
m3
kg
No.
URAIAN
1 M3
10
1 M3
11
1 M3
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K1' (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K2 (45x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K6
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
SATUAN
kg
m2
m2
LT. DUA
m3
kg
kg
m2
m2
LT. DASAR
m3
kg
kg
m2
m2
LT. DASAR
m3
kg
kg
m2
m2
No.
12
1 M3
13
1 M3
14
1 M3
15
16
17
18
URAIAN
1 M3
1 M3
1 M3
1 M3
KOLOM TYPE K6
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
KOLOM TYPE K6
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B0 (40x75)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B1 (30x75)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B2 (35x70)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B3 (30x55)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B4 (30x50)
Beton K 225 (Ready Mix)
Besi beton U - 39
SATUAN
LT. SATU
m3
kg
kg
m2
m2
LT. DUA
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
No.
19
20
21
URAIAN
1 M3
1 M3
1 M3
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B5 (25x55)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE B6 (25x50)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
BALOK TYPE BA (25x45)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
SATUAN
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
No.
22
1 M3
23
1 M3
24
1 M3
25
1 M3
26
1 M3
27
1 M3
28
1 M3
URAIAN
SATUAN
BALOK TYPE BA1 (20x35)
Beton K 225 (Ready Mix)
m3
Besi beton U - 39
kg
Besi beton U - 24
kg
Bekisting
m2
Stootwerk
m2
BALOK TYPE BL (20x60)
Beton K 225 (Ready Mix)
m3
Besi beton U - 39
kg
Besi beton U - 24
kg
Bekisting
m2
Stootwerk
m2
BALOK TYPE BR (20x30)
Beton K 225 (Ready Mix)
m3
Besi beton U - 39
kg
Besi beton U - 24
kg
Bekisting
m2
Stootwerk
m2
BALOK TYPE BT (25x45)
Beton K 225 (Ready Mix)
m3
Besi beton U - 39
kg
Besi beton U - 24
kg
Bekisting
m2
Stootwerk
m2
PLAT LANTAI DASAR SD (t=10 cm) ( EL. - 0.05 M )
Beton K 225 (Ready Mix)
m3
Besi beton U - 39
kg
Besi beton U - 24
m2
Begisting
m2
PLAT LANTAI SATU S1 (t=12 cm)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
PLAT LANTAI TIGA SA (t=10 cm)
Beton K 225 (Ready Mix)
Besi beton U - 39
m3
kg
kg
m2
m2
m3
kg
No.
27
28
URAIAN
1 M3
1 M3
Besi beton U - 24
Bekisting
Stootwerk
TANGGA - A (1 unit)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
TANGGA - B (1 unit)
Beton K 225 (Ready Mix)
Besi beton U - 39
Besi beton U - 24
Bekisting
Stootwerk
SATUAN
kg
m2
m2
m3
kg
kg
m2
m2
m3
kg
kg
m2
m2
ARAT
VOLUME
0.001
0.002
0.004
0.0008
0.01
0.0001
0.0001
HARGA SATUAN
77,040.00
66,240.00
55,440.00
260,640.00
120,240.00
104,400.00
90,000.00
Jumlah
JUMLAH (RP)
TOTAL (RP)
2,040.00
77.04
132.48
221.76
208.51
1,202.40
10.44
9.00
1,861.63
186.16
75,520.00
0.012
0.02
2,664,000.00
20,500.00
31,968.00
410.00
0.007
2,664,000.00
Jumlah 1
18,648.00
51,026.00
0.19
0.06
0.001
76,500.00
50,000.00
95,000.00
Jumlah 2
14,535.00
3,000.00
95.00
17,630.00
6,865.60
( SNI 03-2835-2002 )
0.247
0.85
1.1
35
0.15
0.1
0.15
0.55
2
0.08
0.15
2,664,000.00
20,500.00
14,220.00
1,600.00
160,000.00
175,000.00
275,000.00
55,500.00
56,160.00
94,248.00
96,772.50
658,008.00
17,425.00
15,642.00
56,000.00
24,000.00
17,500.00
41,250.00
30,525.00
112,320.00
7,539.84
14,515.88
68,656.00
1,418,030.00
1,289,124.92
VOLUME
0.1736
2
1
1
0.3
0.05
HARGA SATUAN
72,000.00
Jumlah 1
50,000.00
76,500.00
75,000.00
85,500.00
95,000.00
Jumlah 2
JUMLAH (RP)
12,499.20
1,007,224.92
100,000.00
76,500.00
75,000.00
25,650.00
4,750.00
281,900.00
128,912.49
TOTAL (RP)
VOLUME
( SNI 03-2835-2002 )
1.25
2.5
1.2
0.005
0.009
0.036
0.06
0.45
0.4
0.2
0.02
0.02
HARGA SATUAN
20,000.00
1,600.00
55,500.00
175,000.00
265,000.00
2,664,000.00
20,500.00
29,452.50
Jumlah 1
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah 2
JUMLAH (RP)
25,000.00
4,000.00
66,600.00
875.00
2,385.00
95,904.00
1,230.00
13,253.63
209,247.63
20,000.00
15,300.00
1,710.00
1,900.00
38,910.00
24,815.76
( SNI 03-2835-2002 )
TOTAL (RP)
272,970.00
248,157.63
10,720.00
0.1
0.05
50,000.00
95,000.00
Jumlah
5,000.00
4,750.00
9,750.00
975.00
770,960.00
0.05
2,664,000.00
133,200.00
1.62
0.6
1.5
37,440.00
20,500.00
25,920.00
60,652.80
12,300.00
38,880.00
0.1
1,093,416.75
Jumlah 1
76,500.00
75,000.00
50,000.00
95,000.00
Jumlah 2
109,341.68
354,374.48
76,500.00
75,000.00
100,000.00
95,000.00
346,500.00
70,087.45
1
1
2
1
( SNI 03-2835-2002 )
0.4
0.04
700,874.48
26,180.00
50,000.00
95,000.00
Jumlah
20,000.00
3,800.00
23,800.00
VOLUME
( SNI 03-2835-2002 )
0.735
0.073
( SNI 03-2835-2002 )
0.882
0.0876
( SNI 03-2835-2002 )
0.192
0.019
( SNI 03-2835-2002 )
0.25
0.05
HARGA SATUAN
JUMLAH (RP)
2,380.00
TOTAL (RP)
48,050.00
50,000.00
95,000.00
Jumlah
36,750.00
6,935.00
43,685.00
4,368.50
50,000.00
95,000.00
Jumlah
44,100.00
8,322.00
52,422.00
5,242.20
57,660.00
12,540.00
50,000.00
95,000.00
Jumlah
9,600.00
1,805.00
11,405.00
1,140.50
18,975.00
50,000.00
95,000.00
Jumlah
12,500.00
4,750.00
17,250.00
1,725.00
VOLUME
HARGA SATUAN
( SNI 03-2835-2002 )
0.5
50,000.00
0.05
95,000.00
Jumlah
( SNI 03-2835-2002 )
1.2
0.3
0.01
JUMLAH (RP)
25,000.00
4,750.00
29,750.00
2,975.00
174,620.00
119,000.00
50,000.00
95,000.00
Jumlah
142,800.00
15,000.00
950.00
158,750.00
15,875.00
( SNI 03-3434-2002 )
1,093,416.75
0.81
265,000.00
214,650.00
0.54
336
175,000.00
1,600.00
Jumlah 1
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah 2
94,500.00
537,600.00
846,750.00
100,000.00
26,250.00
2,992.50
95,000.00
224,242.50
22,424.25
2
0.35
0.035
1
TOTAL (RP)
32,725.00
( SNI 03-3434-2002 )
1,070,992.50
777,796.25
0.87
265,000.00
230,550.00
0.52
218
0.165
0.25
0.025
0.08
175,000.00
1,600.00
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
91,000.00
348,800.00
8,250.00
18,750.00
2,137.50
7,600.00
707,087.50
70,708.75
( SNI 03-3434-2002 )
1,252,061.25
0.74
265,000.00
196,100.00
0.37
479
175,000.00
1,600.00
64,750.00
766,400.00
VOLUME
1.65
0.25
0.025
0.08
HARGA SATUAN
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
JUMLAH (RP)
82,500.00
18,750.00
2,137.50
7,600.00
1,138,237.50
113,823.75
1.05
2.5
0.25
0.1
0.01
1
711,200.00
50,000.00
75,000.00
85,500.00
95,000.00
12,000.00
Jumlah
746,760.00
125,000.00
18,750.00
8,550.00
950.00
12,000.00
912,010.00
91,201.00
TOTAL (RP)
1,003,211.00
VOLUME
HARGA SATUAN
1.05
2.5
0.25
0.1
0.01
1
745,200.00
50,000.00
75,000.00
85,500.00
95,000.00
12,000.00
Jumlah
JUMLAH (RP)
TOTAL (RP)
1,042,481.00
782,460.00
125,000.00
18,750.00
8,550.00
950.00
12,000.00
947,710.00
94,771.00
( SNI 03-3434-2002 )
777,796.25
0.87
265,000.00
230,550.00
0.52
218
0.165
0.25
0.025
0.08
175,000.00
1,600.00
50,000.00
75,000.00
85,500.00
95,000.00
Jumlah
91,000.00
348,800.00
8,250.00
18,750.00
2,137.50
7,600.00
707,087.50
70,708.75
10,098.00
1.5
16
20
4
8,640.00
2,880.00
5,760.00
18,000.00
1,980.00
Jumlah
Jumlah 1
per - m
12,960.00
46,080.00
115,200.00
72,000.00
246,240.00
7,200.00
1,980.00
9,180.00
918.00
127,088.06
12.5
0.225
1,980.00
80,000.00
24,750.00
18,000.00
0.017
1
0.5
160,000.00
4,839.60
50,000.00
2,720.00
4,839.60
25,000.00
VOLUME
0.2
0.05
0.01
0.4
( SNI 03-3434-2002 )
0.1166666667
0.015
0.3
0.3
0.5
0.2
0.05
0.01
HARGA SATUAN
75,000.00
85,500.00
95,000.00
50,000.00
Jumlah
JUMLAH (RP)
15,000.00
4,275.00
950.00
20,000.00
115,534.60
11,553.46
154,000.00
17,966.67
2,664,000.00
20,500.00
15,840.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
39,960.00
6,150.00
4,752.00
25,000.00
15,300.00
4,275.00
950.00
114,353.67
11,435.37
TOTAL (RP)
125,789.03
VOLUME
HARGA SATUAN
JUMLAH (RP)
( SNI 03-3434-2002 )
0.1166666667
154,000.00
17,966.67
0.0133333333
0.35
0.2
2,664,000.00
20,500.00
15,840.00
35,520.00
7,175.00
3,168.00
0.005
2
0.3
0.33
0.033
0.006
5,040,000.00
20,000.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
25,200.00
40,000.00
15,000.00
25,245.00
2,821.50
570.00
172,666.17
17,266.62
TOTAL (RP)
189,932.78
( SNI 03-3434-2002 )
0.1166666667
197,704.28
154,000.00
17,966.67
0.0133333333
0.4
0.2
2,664,000.00
20,500.00
15,840.00
35,520.00
8,200.00
3,168.00
0.006
2
0.32
0.33
0.033
0.006
5,040,000.00
20,000.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
30,240.00
40,000.00
16,000.00
25,245.00
2,821.50
570.00
179,731.17
17,973.12
( SNI 03-3434-2002 )
0.1166666667
276,905.38
154,000.00
17,966.67
0.0133333333
0.4
0.2
2,664,000.00
20,500.00
15,840.00
35,520.00
8,200.00
3,168.00
0.005
6
0.5
0.2
0.005
0.01
5,040,000.00
20,000.00
50,000.00
76,500.00
85,500.00
95,000.00
25,200.00
120,000.00
25,000.00
15,300.00
427.50
950.00
VOLUME
HARGA SATUAN
Jumlah
JUMLAH (RP)
251,732.17
25,173.22
( SNI 03-3434-2002 )
0.1166666667
154,000.00
17,966.67
0.01
0.4
0.15
2,664,000.00
20,500.00
15,840.00
26,640.00
8,200.00
2,376.00
0.005
2
0.32
0.33
0.033
0.006
5,040,000.00
20,000.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
25,200.00
40,000.00
16,000.00
25,245.00
2,821.50
570.00
165,019.17
16,501.92
TOTAL (RP)
181,521.08
VOLUME
HARGA SATUAN
JUMLAH (RP)
( SNI 03-3434-2002 )
0.1166666667
154,000.00
17,966.67
0.01
0.4
0.6
2,664,000.00
20,500.00
15,840.00
26,640.00
8,200.00
9,504.00
0.0066666667
3
4
0.32
0.33
0.033
0.006
5,040,000.00
20,000.00
5,000.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
33,600.00
60,000.00
20,000.00
16,000.00
25,245.00
2,821.50
570.00
220,547.17
22,054.72
15,200.00
21,200.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
15,960.00
318.00
337.50
5,163.75
1,923.75
1,068.75
24,771.75
2,477.18
TOTAL (RP)
242,601.88
( SNI 03-3434-2002 )
27,248.93
1.05
0.015
0.00675
0.0675
0.0225
0.01125
( SNI 03-3434-2002 )
24,938.93
1.05
0.015
0.00675
0.0675
0.0225
0.01125
13,200.00
21,200.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
13,860.00
318.00
337.50
5,163.75
1,923.75
1,068.75
22,671.75
2,267.18
0.009
0.025
0.075
0.225
14,000,000.00
20,500.00
50,000.00
76,500.00
126,000.00
512.50
3,750.00
17,212.50
164,599.88
VOLUME
0.0225
0.0025
HARGA SATUAN
85,500.00
95,000.00
Jumlah
Jasa Kontraktor
JUMLAH (RP)
1,923.75
237.50
149,636.25
14,963.63
TOTAL (RP)
168,486.21
14
0.0285714286
0.2
0.1
0.01
0.01
9,504.00
23,040.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
Jasa Kontraktor
133,056.00
658.29
10,000.00
7,650.00
855.00
950.00
153,169.29
15,316.93
VOLUME
5
0.015
0.216
0.032
1
0.4
0.2
0.02
0.02
HARGA SATUAN
20,037.60
23,040.00
80,000.00
160,000.00
5,200.00
50,000.00
76,500.00
85,500.00
95,000.00
Jumlah
Jasa Kontraktor
JUMLAH (RP)
TOTAL (RP)
183,747.96
100,188.00
345.60
17,280.00
5,120.00
5,200.00
20,000.00
15,300.00
1,710.00
1,900.00
167,043.60
16,704.36
36,036.44
0.0555555556
0.0185185185
0.0133333333
0.0444444444
0.025
288,000.00
486,000.00
204,480.00
62,640.00
90,000.00
Jumlah
16,000.00
9,000.00
2,726.40
2,784.00
2,250.00
32,760.40
3,276.04
28,745.54
110
4
0.1667
4
0.08
15
4
4
2
1
15,200.00
12,622.50
315,562.50
10,098.00
82,467.00
1,009.80
50,000.00
77,500.00
85,500.00
95,000.00
Jumlah
1,672,000.00
50,490.00
52,604.27
40,392.00
6,597.36
15,147.00
200,000.00
310,000.00
171,000.00
95,000.00
2,613,230.63
26,132.31
2,613.23
2,446.95
VOLUME
2
1
0.2
0.03
1
HARGA SATUAN
50,000.00
77,500.00
85,500.00
95,000.00
25,000.00
Jumlah
JUMLAH (RP)
100,000.00
77,500.00
17,100.00
2,850.00
25,000.00
222,450.00
TOTAL (RP)
2,224.50
222.45
LT. DASAR
1
204.775022957
57.1107438017
7.2727272727
7.2727272727
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
5,579,899.24
1,424,280.56
1,381,329.33
73,440.00
9,501,430.13
9,501,430.13
VOLUME
HARGA SATUAN
JUMLAH (RP)
1
208.147788041
57.5906660185
7.2727272727
7.2727272727
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
5,671,803.47
1,436,249.30
1,381,329.33
73,440.00
1
183.763324949
56.7560186849
7.2727272727
7.2727272727
LT. DASAR
1
244.718792867
68.2508641975
8.8888888889
8.8888888889
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
5,007,353.06
1,415,434.09
1,381,329.33
73,440.00
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
6,668,324.03
1,702,103.18
1,688,291.41
89,760.00
1
248.749455338
68.8244008715
8.8888888889
8.8888888889
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
6,778,155.25
1,716,406.57
1,688,291.41
89,760.00
1
219.608516729
67.8269457864
8.8888888889
8.8888888889
LT. DASAR
1
305.898491084
68.2508641975
8.8888888889
8.8888888889
1
310.936819172
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
27,248.93
1,042,481.00
5,984,096.00
1,691,531.11
1,688,291.41
89,760.00
1,042,481.00
8,335,405.04
1,702,103.18
1,688,291.41
89,760.00
1,042,481.00
8,472,694.07
TOTAL (RP)
9,605,303.10
9,605,303.10
8,920,037.49
8,920,037.49
11,190,959.62
11,190,959.62
11,315,094.23
11,315,094.23
10,496,159.52
10,496,159.52
12,858,040.63
12,858,040.63
13,009,633.04
13,009,633.04
VOLUME
68.8244008715
8.8888888889
8.8888888889
1
274.510645912
67.8269457864
8.8888888889
8.8888888889
LT. DASAR
1
275.308641975
68.2508641975
8.8888888889
8.8888888889
LT. DASAR
1
219.444444444
71.9833333333
13.3333333333
13.3333333333
HARGA SATUAN
24,938.93
189,932.78
10,098.00
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
JUMLAH (RP)
1,716,406.57
1,688,291.41
89,760.00
1,042,481.00
7,480,120.00
1,691,531.11
1,688,291.41
89,760.00
1,042,481.00
7,501,864.54
1,702,103.18
1,688,291.41
89,760.00
1,042,481.00
5,979,625.21
1,795,186.95
2,532,437.11
134,640.00
TOTAL (RP)
11,992,183.52
11,992,183.52
12,024,500.13
12,024,500.13
11,484,370.27
11,484,370.27
VOLUME
HARGA SATUAN
JUMLAH (RP)
1
223.058823529
72.5882352941
13.3333333333
13.3333333333
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
6,078,113.15
1,810,272.56
2,532,437.11
134,640.00
1
196.927536232
71.5362318841
13.3333333333
13.3333333333
1,042,481.00
27,248.93
24,938.93
189,932.78
10,098.00
1,042,481.00
5,366,063.67
1,784,036.72
2,532,437.11
134,640.00
1.1
147.666666667
34.552
6.3333333333
6.3333333333
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,146,729.10
4,023,757.93
861,689.74
1,252,127.13
63,954.00
1.1
161.208888889
41.6817777778
8
8
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,146,729.10
4,392,768.92
1,039,498.73
1,581,634.27
80,784.00
1.1
180.816326531
38.2791836735
7.1428571429
7.1428571429
1.1
174.787878788
44.8727272727
8.4848484848
8.4848484848
1.1
192.266666667
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
27,248.93
1,146,729.10
4,927,050.52
954,641.69
1,412,173.45
72,128.57
1,146,729.10
4,762,781.80
1,119,077.58
1,677,490.89
85,680.00
1,146,729.10
5,239,059.98
TOTAL (RP)
11,597,943.82
11,597,943.82
10,859,658.50
10,859,658.50
7,348,257.89
7,348,257.89
8,241,415.02
8,241,415.02
8,512,723.33
8,512,723.33
8,791,759.37
8,791,759.37
9,335,661.85
9,335,661.85
VOLUME
46.0693333333
8.6666666667
8.6666666667
1.1
170.821818182
50.2574545455
9.8181818182
9.8181818182
1.1
187.904
51.3344
10
10
1.1
143.368888889
43.8755555556
10.2222222222
10.2222222222
HARGA SATUAN
24,938.93
197,704.28
10,098.00
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
JUMLAH (RP)
1,148,919.65
1,713,437.12
87,516.00
1,146,729.10
4,654,710.91
1,253,366.89
1,941,096.60
99,144.00
1,146,729.10
5,120,182.00
1,280,224.75
1,977,042.83
100,980.00
1,146,729.10
3,906,648.10
1,094,209.19
2,020,977.12
103,224.00
TOTAL (RP)
9,095,047.50
9,095,047.50
9,625,158.69
9,625,158.69
8,271,787.51
8,271,787.51
VOLUME
HARGA SATUAN
JUMLAH (RP)
1
142.2
63.4628571429
12.8571428571
12.8571428571
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
3,874,797.14
1,582,695.43
2,541,912.21
129,831.43
1
100.283333333
57.5866666667
11.6666666667
11.6666666667
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
2,732,613.03
1,436,149.56
2,306,549.97
117,810.00
1
158
65.8133333333
13.3333333333
13.3333333333
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
4,305,330.15
1,641,313.78
2,636,057.11
134,640.00
1
143.368888889
43.8755555556
10.2222222222
10.2222222222
1,042,481.00
27,248.93
24,938.93
197,704.28
10,098.00
1,042,481.00
3,906,648.10
1,094,209.19
2,020,977.12
103,224.00
1
0
64.785
0.2
1,042,481.00
27,248.93
24,938.93
125,789.03
1,042,481.00
1,615,668.26
25,157.81
1
0
107.975
8.3333333333
8.3333333333
1
0
1,042,481.00
27,248.93
24,938.93
276,905.38
10,098.00
1,042,481.00
27,248.93
1,042,481.00
2,692,780.43
2,307,544.86
84,150.00
1,042,481.00
-
TOTAL (RP)
9,171,717.21
9,171,717.21
7,635,603.56
7,635,603.56
9,759,822.05
9,759,822.05
8,167,539.41
8,167,539.41
2,683,307.06
2,683,307.06
6,126,956.29
6,126,956.29
7,143,851.35
7,143,851.35
VOLUME
129.57
10
10
1
58.1176470588
70.7735294118
10.6235294118
10.6235294118
1
56.3333333333
71.9833333333
10.5166666667
10.5166666667
HARGA SATUAN
24,938.93
276,905.38
10,098.00
1,042,481.00
27,248.93
24,938.93
181,521.08
10,098.00
1,042,481.00
27,248.93
24,938.93
181,521.08
10,098.00
JUMLAH (RP)
3,231,336.51
2,769,053.83
100,980.00
1,042,481.00
1,583,643.41
1,765,015.74
1,928,394.57
107,276.40
1,042,481.00
1,535,022.78
1,795,186.95
1,908,996.73
106,197.30
TOTAL (RP)
6,426,811.12
6,426,811.12
6,387,884.75
6,387,884.75
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
1
1
1
1
1
NO.
URAIAN
Harga Unit Pompa
Alat Bantu
Upah Pasang :
Tukang pipa
Kepala tukang pipa
Mandor
1 UNIT
SAT
INDEK
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
SAND FILTER
Harga Unit Sand Filter
Alat Bantu
Upah Pasang :
Tukang pipa
Kepala tukang pipa
Mandor
CARBON FILTER
Harga Unit Carbon Filter
Alat Bantu
Upah Pasang :
Tukang pipa
Kepala tukang pipa
Mandor
INDEK
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
1
1
3
3
NO.
URAIAN
Mandor
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
Hari
INDEK
3
1
1
3
3
3
1
1
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
NO.
URAIAN
Upah Pasang :
Tukang pipa
Kepala tukang pipa
Mandor
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
1
1
NO.
URAIAN
Mandor
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 BH
SAT
INDEK
Hari
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
Buah
Buah
1
1
Hari
Hari
Hari
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
BH
Tukang pipa
Hari
0.1666667
Hari
0.1666667
Mandor
Hari
0.0833333
BH
Tukang pipa
Hari
0.1666667
Hari
0.1666667
Mandor
Hari
0.0833333
BH
Tukang pipa
Hari
0.1666667
Hari
0.1666667
Mandor
Hari
0.0833333
BH
Tukang pipa
Hari
0.1666667
Hari
0.1666667
Mandor
Hari
0.0833333
BH
Tukang pipa
Hari
0.25
Hari
0.25
Mandor
Hari
0.125
NO.
URAIAN
1 BH
SAT
INDEK
BH
Tukang pipa
Hari
0.3333333
Hari
0.3333333
Mandor
Hari
0.1666667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
BH
Tukang pipa
Hari
0.0833333
Hari
0.0833333
Mandor
Hari
0.0416667
NO.
URAIAN
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.0333333
0.0333333
0.0166667
Meter
M3
Hari
Hari
Hari
1
0.28
0.0333333
0.0333333
0.0166667
Meter
NO.
URAIAN
1 M'
SAT
Ls
Hari
Hari
Hari
Meter
Ls
Hari
Hari
Hari
INDEK
1
0.05
0.05
0.025
1
1
0.0666667
0.0666667
0.0333333
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.0833333
0.0833333
0.0416667
Jasa Kontraktor
PIPA PVC Dia. 6
PIPA PVC Dia. 6
Alat bantu & penunjang
Tukang pipa
Kepala tukang pipa
Mandor
Meter
Ls
Hari
Hari
Hari
1
1
0.0833333
0.0833333
0.0416667
Meter
Ls
Hari
Hari
Hari
1
1
0.1
0.1
0.05
Meter
Ls
Hari
Hari
Hari
1
1
0.1
0.1
0.05
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0166667
0.0083333
Meter
NO.
URAIAN
Alat bantu & penunjang
Tukang pipa
Kepala tukang pipa
Mandor
1 M'
SAT
Ls
Hari
Hari
Hari
Meter
Ls
Hari
Hari
Hari
INDEK
1
0.0166667
0.0166667
0.0083333
1
1
0.0166667
0.0166667
0.0083333
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.0333333
0.0333333
0.0166667
Meter
Ls
Hari
Hari
Hari
1
1
0.0333333
0.0333333
0.0166667
Meter
Ls
Hari
Hari
Hari
1
1
0.0333333
0.0333333
0.0166667
Meter
Ls
Hari
Hari
Hari
1
1
0.0333333
0.0333333
0.0166667
Meter
Ls
Hari
Hari
Hari
1
1
0.05
0.05
0.025
Meter
NO.
URAIAN
1 M'
SAT
INDEK
Ls
Hari
Hari
Hari
1
0.05
0.05
0.025
Meter
Ls
Hari
Hari
Hari
1
1
0.05
0.05
0.025
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.05
0.05
0.025
Meter
Ls
Hari
Hari
Hari
1
1
0.0666667
0.0666667
0.0333333
Meter
Ls
Hari
Hari
Hari
1
1
0.0666667
0.0666667
0.0333333
Meter
Ls
Hari
Hari
Hari
1
1
0.0833333
0.0833333
0.0416667
Meter
Ls
Hari
Hari
Hari
1
1
0.1333333
0.1333333
0.0666667
Meter
NO.
URAIAN
1 M'
SAT
INDEK
Ls
Hari
Hari
Hari
1
0.1333333
0.1333333
0.0666667
Meter
Ls
Hari
Hari
Hari
1
1
0.1333333
0.1333333
0.0666667
NO.
URAIAN
1 M'
1 UNIT
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.1333333
0.1333333
0.0666667
Meter
bh
Ls
Hari
Hari
Hari
1
0
1
1
1
0.5
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
NO.
URAIAN
Polypropeline dia. 1
Fitting & alat bantu
Tukang pipa
Kepala tukang pipa
Mandor
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.025
0.0125
0.005
1
1
0.025
0.0125
0.005
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
1
1
0.025
0.0125
0.005
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
1
1
0.0291667
0.0145833
0.0048611
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
Meter
NO.
URAIAN
1 M'
SAT
INDEK
Ls
Hari
Hari
Hari
1
0.0291667
0.0145833
0.0048611
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.0166667
0.0083333
0.0041667
Meter
Ls
Hari
Hari
Hari
1
1
0.025
0.0125
0.005
1
1
0.025
0.0125
0.005
1
1
0.025
0.0125
0.005
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
NO.
URAIAN
1 M'
SAT
INDEK
Ls
Hari
Hari
Hari
1
0.0291667
0.0145833
0.0048611
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
NO.
URAIAN
1 M'
1 M'
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
Meter
Ls
Hari
Hari
Hari
1
1
0.0291667
0.0145833
0.0048611
WATER HAMMER
Water Hammer
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
0.5
0.5
0.25
BH
Hari
Hari
Hari
1
0.05
0.05
0.025
BH
Hari
Hari
Hari
1
0.05
0.05
0.025
BH
Hari
Hari
Hari
1
0.05
0.05
0.025
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
BH
Hari
Hari
Hari
1
0.05
0.05
0.025
BH
Hari
Hari
Hari
1
0.05
0.05
0.025
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
Unit
Unit
Hari
Hari
Hari
1
1
2
2
1
Unit
Unit
Hari
Hari
Hari
1
1
2
2
1
Unit
Unit
Hari
Hari
Hari
1
1
2
2
1
ROOF DRAIN
Roof Drain dia. 100 mm
Tukang pipa
Kepala tukang pipa
Mandor
Unit
Hari
Hari
Hari
1
0.0333333
0.0333333
0.0166667
ROOF DRAIN
ROOF DRAIN
Roof Drain dia. 80 mm
Tukang pipa
Kepala tukang pipa
Mandor
Unit
Hari
Hari
Hari
1
0.0333333
0.0333333
0.0166667
ROOF DRAIN
ROOF DRAIN
NO.
URAIAN
Roof Drain dia. 65 mm
Tukang pipa
Kepala tukang pipa
Mandor
SAT
Unit
Hari
Hari
Hari
INDEK
1
0.0333333
0.0333333
0.0166667
NO.
URAIAN
1 UNIT
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
AAV
AAV
Tukang pipa
Kepala tukang pipa
Mandor
buah
Hari
Hari
Hari
1
0.3333333
0.3333333
0.1666667
BH
Hari
Hari
Hari
1
0.0833333
0.0833333
0.0416667
BH
Hari
Hari
Hari
1
0.0833333
0.0833333
0.0416667
BH
Hari
Hari
Hari
1
0.1666667
0.1666667
0.0833333
BH
Hari
Hari
Hari
1
0.1666667
0.1666667
0.0833333
BH
Hari
Hari
Hari
1
0.1666667
0.1666667
0.0833333
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
BH
Hari
Hari
Hari
1
0.1666667
0.1666667
0.0833333
BH
Hari
Hari
Hari
1
0.5
0.5
0.25
BH
Hari
Hari
Hari
1
0.5
0.5
0.25
BH
Hari
Hari
Hari
1
0.5
0.5
0.25
INDICATING VALVE 80 MM
INDICATING VALVE 80 MM
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
0.0833333
0.0833333
0.0416667
PELAT ORIFICE 80 MM
PELAT ORIFICE 80 MM
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
0.0833333
0.0833333
0.0416667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
PELAT ORIFICE 50 MM
PELAT ORIFICE 50 MM
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
0.0833333
0.0833333
0.0416667
PILLAR HYDRANT
PILLAR HYDRANT
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
1
1
0.5
SIAMESSE CONNECTION
SIAMESSE CONNECTION
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
1
1
0.5
BH
BH
Hari
Hari
Hari
1
1
0.5
0.5
0.25
BH
BH
Hari
Hari
Hari
1
0
0.5
0.5
0.25
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
FIRE EXTINGUISHER
Fire Extinguisher 6 Kg
Dudukan Fire Extinguisher
Tukang pipa
Kepala tukang pipa
Mandor
BH
BH
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.1666667
HEAD SPRINKLER
Head Sprinkler
Tukang pipa
Kepala tukang pipa
Mandor
BH
Hari
Hari
Hari
1
0.0833333
0.0833333
0.0416667
BH
BH
Hari
Hari
Hari
1
1
0.1666667
0.1666667
0.0833333
1
1
1
1
1
1
1
1
Kepala Tukang AC
Tukang
1
1
Hari
Hari
NO.
URAIAN
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
INDEK
Set
Hari
Hari
Hari
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
INDEK
Set
Hari
Hari
Hari
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
Set
Hari
Hari
Hari
INDEK
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
INDEK
Set
Hari
Hari
Hari
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
INDEK
Set
Hari
Hari
Hari
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
Bh
Set
Hari
Hari
Hari
1
1
3
3
3
Bh
Set
Hari
Hari
Hari
1
1
3
3
3
Bh
Set
Hari
Hari
Hari
1
1
3
3
3
Bh
Set
Hari
Hari
Hari
1
1
3
3
3
Bh
NO.
URAIAN
1 BH
SAT
INDEK
Alat bantu
Mandor
Kepala Tukang AC
Tukang
Set
Hari
Hari
Hari
1
3
3
3
Bh
Set
Hari
Hari
Hari
1
1
3
3
3
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
INDEK
Set
Hari
Hari
Hari
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
Set
Hari
Hari
Hari
INDEK
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NO.
URAIAN
Alat bantu
Mandor
Kepala Tukang AC
Tukang
1 BH
SAT
Set
Hari
Hari
Hari
INDEK
1
1
1
1
1
1
1
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
PIPA REFRIGERANT
Pipa Refrigerant
Alat bantu
Mandor
Kepala Tukang AC
Tukang
m'
Set
Hari
Hari
Hari
1
1
0.1666667
0.1666667
0.1666667
PIPA DRAIN
Pipa PVC berisolasi
Alat bantu
Mandor
Kepala Tukang AC
Tukang
m'
Set
Hari
Hari
Hari
1
1
0.1666667
0.1666667
0.1666667
NO.
URAIAN
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
NO.
URAIAN
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
NO.
URAIAN
1 BH
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
Bh
Set
Hari
Hari
Hari
1
1
0.5
0.5
0.5
NO.
URAIAN
1 BH
1 BH
1 BH
1M
SAT
INDEK
Bh
Set
Hari
Hari
Hari
1
1
0.3333333
0.3333333
0.3333333
FIRE EXTINGUISHER 3 KG
Fire Extinguisher ( Dry Chemical )
Kap. 3 Kg
Unit Fan
Alat bantu
Mandor
Kepala Tukang
Tukang
Bh
Set
Hari
Hari
Hari
1
1
0.0833333
0.1666667
0.1666667
FIRE EXTINGUISHER 6 KG
Fire Extinguisher ( Dry Chemical )
Kap. 6 Kg
Unit Fan
Alat bantu
Mandor
Kepala Tukang AC
Tukang
Bh
Set
Hari
Hari
Hari
1
1
0.0833333
0.1666667
0.1666667
DUCTING AC
MATERIAL " FIRST DUCT " ( PIR )
TD ducting panel density +/- 52 kg /m3
Invisible flange ( PVC )
Tee connector flange ( PVC )
Bayonet ( PVC )
Covering angle ( PVC )
TD Glue
Sealant neutral ( with colour )
Chair saction bar Allumunium
"F" section bar Allumunium
Shaped disk Allumunium
1 Meter
1 Meter
1 Meter
1 Meter
1 Buah
0.2 Kg
0.16667 Botol
1 Meter
1 Meter
1 Buah
NO.
URAIAN
Reinforcenent bar Allumunium
Ball joint damper ( Allumunium )
Ball joint damper ( plastik )
Allumunium Tape
Zinc cozted
Penggantung
Upah Pasang
SAT
INDEK
1 Meter
0.5 Buah
0.5 Buah
1 Meter
1 Buah
Jumlah h. bahan / 1 Meter
0.5 Buah
0.2 Meter
NO.
URAIAN
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
1 BH
1 BH
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ducting
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
SAT
14 " x 12 "
14 " x 10 "
14 " x 8 "
14 " x 14 "
10 " x 10 "
10 " x 8 "
6"x 6"
8"x 6"
8"x 8"
12 " x 8 "
12 " x 10 "
14 " x 8 "
14 " x 12 "
16 " x 8 "
16 " x 12 "
16 " x 14 "
16 " x 10 "
18 " x 14 "
18 " x 16 "
20 " x10 "
20 " x 14 "
20 " x 16 "
24 " x 12 "
22 " x 16 "
22 " x 10\"
24 " x 12 "
24 " x 16 "
26 " x 16 "
26 " x 18 "
28 " x 18 "
30 " x 15 "
30 " x 20 "
32 " x 20 "
INDEK
1.3 Meter
1.2 Meter
1.1 Meter
1.4 Meter
1 Meter
0.9 Meter
0.6 Meter
0.7 Meter
0.8 Meter
1 Meter
1.1 Meter
1.1 Meter
1.3 Meter
1.2 Meter
1.4 Meter
1.5 Meter
1.3 Meter
1.6 Meter
1.7 Meter
1.5 Meter
1.7 Meter
1.8 Meter
1.8 Meter
1.7 Meter
1.6 Meter
1.8 Meter
2 Meter
2.1 Meter
2.2 Meter
2.3 Meter
2.25 Meter
2.5 Meter
2.6 Meter
bh
Hr
Ll
1
0.1666667
1
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.3333333
1
MEDIUM FILTER
Medium Filter
Upah Pasang
Peralatan bantu/penunjang
bh
Hr
Ll
1
0.3333333
1
NO.
URAIAN
1 BH
1 BH
1 BH
SAT
INDEK
PREE FILTER
Pree Filter
Upah Pasang
Peralatan bantu/penunjang
bh
Hr
Ll
1
0.3333333
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 M'
1 M'
1 M'
SAT
INDEK
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
bh
Hr
Ll
1
0.1666667
1
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
M'
Hr
Hr
1
0.0083333
0.0166667
NO.
URAIAN
1 M'
1 M'
SAT
INDEK
Tukang
Hr
0.0166667
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
Jasa Kontraktor
KABEL TR, NYY 4 X 16 mm2
Kabel NYY 4x16 mm2
Mandor
Kepala Tukang listrik
Tukang
M'
Hr
Hr
Hr
1
0.0166667
0.0333333
0.0333333
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
M'
Hr
Hr
Hr
1
0.0166667
0.0333333
0.0333333
M'
Hr
Hr
Hr
1
0.0166667
0.0333333
0.0333333
M'
Hr
Hr
Hr
1
0.0166667
0.0333333
0.0333333
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
M'
Hr
Hr
Hr
16
0.0166667
0.0333333
0.0333333
M'
Hr
Hr
Hr
20
0.0166667
0.0333333
0.0333333
M'
Hr
Hr
Hr
4
0.0166667
0.0333333
0.0333333
NO.
URAIAN
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
M'
Hr
Hr
Hr
8
0.0166667
0.0333333
0.0333333
M'
M'
Hr
Hr
Hr
2
1
0.25
0.25
0.25
M'
M'
Hr
Hr
Hr
2
1
0.25
0.25
0.25
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
Jasa Kontraktor
KABEL TR, FRC 4 X 6 mm2
Kabel FRC 4x6 mm2
Mandor
Kepala Tukang listrik
Tukang
M'
Hr
Hr
Hr
1
0.025
0.05
0.05
Jasa Kontraktor
NO.
URAIAN
1 M'
1 M'
1 M'
1 BH
1 BH
1 BH
SAT
INDEK
M'
Lot
Hr
Hr
Hr
1
1
0.0583333
0.125
0.125
M'
Lot
Hr
Hr
Hr
1
1
0.0583333
0.125
0.125
M'
Lot
Hr
Hr
Hr
1
1
0.0583333
0.125
0.125
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
1
0.0333333
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
Hr
Hr
0.0666667
0.0666667
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
LAMPU TL 1 X 36 W - BLK
Lampu TL 1 x 36 W/ BL
Mandor
Kepala Tukang listrik
Tukang
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
1
1
0.0333333
0.0666667
NO.
URAIAN
Tukang
1 BH
1 BH
SAT
INDEK
Hr
0.0666667
1
1
0.0333333
0.0666667
0.0666667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
LAMPU DL / SOROTPAR 38
Lampu DL/Sorot Par 38
Mandor
Kepala Tukang listrik
Tukang
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Bh
Hr
Hr
Hr
1
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
0.0333333
0.0666667
0.0666667
Bh
Hr
Hr
Hr
1
1
1
1
NO.
URAIAN
1 UNIT
1 BH
SAT
INDEK
Bh
Hr
Hr
Hr
1
2
2
2
SAKLAR TUNGGAL
Saklar tunggal 10 A
Mandor
Kepala Tukang listrik
Tukang
Bh
Hr
Hr
Hr
1
0.025
0.05
0.05
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
SAKLAR GANDA
Saklar ganda 10 A
Mandor
Kepala Tukang listrik
Tukang
Bh
Hr
Hr
Hr
1
0.025
0.05
0.05
SAKLAR HOTEL
Saklar hotel 10 A
Mandor
Kepala Tukang listrik
Tukang
Bh
Hr
Hr
Hr
1
0.025
0.05
0.05
Bh
Hr
Hr
Hr
1
0.025
0.05
0.05
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
NO.
URAIAN
1 TTK
1 TTK
1 TTK
SAT
INDEK
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Hr
Hr
Hr
11
11
1
2
3
6
2
0.25
0.1666667
0.3
0.3
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Hr
Hr
Hr
14
14
1
2
3
6
2
0.25
0.1666667
0.3
0.3
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Hr
Hr
Hr
14
14
14
1
2
3
6
2
0.25
0.3
0.3
0.3
NO.
URAIAN
1 TTK
1 TTK
SAT
INDEK
20
1
0.1666667
0.4166667
0.3
16
1
0.1666667
0.3
0.3
M'
Bh
Hr
Hr
Hr
NO.
URAIAN
1 TTK
1 TTK
1 TTK
1 TTK
SAT
INDEK
M'
M'
Bh
Hr
Hr
Hr
16
16
1
0.2
0.5
0.5
M'
M'
Bh
Hr
Hr
Hr
20
20
1
0.2
0.5
0.5
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
16
16
1
2
3
6
2
0.25
Hr
Hr
Hr
0.1666667
0.3
0.3
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
10
10
1
2
3
6
2
0.25
NO.
URAIAN
Tenaga Kerja :
Mandor
Kepala Tukang listrik
Pekerja
1 TTK
SAT
INDEK
Hr
Hr
Hr
0.1666667
0.3
0.3
M'
M'
Bh
Bh
Bh
14
14
1
2
0.25
Hr
Hr
Hr
0.1666667
0.3
0.3
NO.
URAIAN
1 TTK
1 UNIT
1 UNIT
1 UNIT
SAT
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
12
12
1
2
3
6
2
0.25
Hr
Hr
Hr
0.1666667
0.3
0.3
Cubicle MVMDP
1 - Cubicle Incoming
- Cubicle Outgoing
- Cubicle Artester
- Metering
2 Upah Pasang
- Tenaga Akhli
- Tukang listrik
- Pembantu tukang listrik
INDEK
1
1
3
3
3
Bh
Bh
Bh
Bh
1
2
1
1
hari
hari
hari
3
3
3
Bh
hari
hari
hari
2
2
2
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
PANEL LVMDP-1
ACB 1600 A
ACB 1250 A
MCCB 800 A
MCCB 400-630A
MCCB 300-400A
MCCB 175-250A
Interlock
Volt Meter
Ampere meter
Selector Switch
Fuse & Indicator
Box Panel & Accessories A
Grounding A
Wiring
Mandor
Kepala Tukang listrik
Tukang Listrik
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Unit
Ls
Ls
Hr
Hr
Hr
1
1
1
1
3
1
1
2
6
2
2
4
1
1
3
3
3
PANEL LVMDP-2
ACB 1600 A
ACB 1250 A
MCCB 175-250A
Interlock
Volt Meter
Ampere meter
Selector Switch
Fuse & Indicator
Box Panel & Accessories A
Grounding A
Wiring
Mandor
Kepala Tukang listrik
Tukang Listrik
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Unit
Ls
Ls
Hr
Hr
Hr
1
1
6
1
2
6
2
2
4
1
1
3
3
3
PANEL MDP I
MCCB 250-350A
MCCB 125-160A
MCCB 100-125A
Bh
Bh
Bh
1
3
4
NO.
URAIAN
1 UNIT
SAT
INDEK
MCCB 80-100A
MCB 40A/3 Phase
Volt Meter
Ampere meter
Selector Switch
Fuse & Indicator
Box Panel & Accessories A
Grounding A
Mandor
Kepala Tukang listrik
Tukang Listrik
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
2
1
1
3
1
1
1
1
2
2
2
PANEL MDP K
MCCB 250-350A
MCCB 125-160A
MCCB 80-100A
MCB 40A/3 Phase
MCB 32A/3 Phase
MCB 20A/3 Phase
Interlock
Volt Meter
Ampere meter
Selector Switch
Fuse & Indicator
Box Panel & Accessories A
Grounding A
Mandor
Kepala Tukang listrik
Tukang Listrik
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
2
2
2
1
1
1
1
1
3
1
1
1
1
2
2
2
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
2
1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
2
1
2
1
1
3
1
1
1
1
2
2
2
Bh
Bh
Bh
Bh
Bh
Bh
1
2
1
1
1
1
1
1
1
3
1
1
1
1
1
1
1
NO.
URAIAN
MCB 20 A/3 Phasa
Volt Meter
Ampere meter
Selector Switch
Fuse & Indicator
Box Panel & Accessories A
Grounding A
Mandor
Kepala Tukang listrik
Tukang Listrik
SAT
Bh
Bh
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
INDEK
1
1
3
1
1
1
1
2
2
2
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
PANEL LP- GF - K
MCB 25 A/3 Phasa
MCB 6 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories E
Grounding B
Mandor
Kepala Tukang listrik
Tukang Listrik
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
21
1
1
1
1
1
1
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
12
1
1
1
1
1
1
PANEL PP - AC GF- K, AC GF I, PP - AC GF J
MCB 25 A/3 Phasa
MCB 10 A/1 Phasa
Shunt Trip
Fuse & Indicator
Box Panel & Accessories E
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Bh
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
15
1
1
1
1
1
1
1
PANEL PP - AC 2 - K
MCCB 125-160A/3 Phasa
MCCB 105-125A/3 Phasa
MCB 40 A/3 Phasa
MCB 10 A/1 Phasa
Shunt Trip
Fuse & Indicator
Box Panel & Accessories E
Bh
Bh
Bh
Bh
Bh
Bh
Unit
4
21
1
1
1
NO.
URAIAN
1 UNIT
SAT
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Ls
Hr
Hr
Hr
PANEL PP - GF K
MCB 60-80 A/3 Phasa
MCB 10 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories E
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
INDEK
1
1
1
1
1
30
1
1
1
1
1
1
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
PANEL LP-1 - K
MCB 25 A/3 Phasa
MCB 10 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories F
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
24
1
1
1
1
1
1
PANEL PP-2 - K
MCCB 63 - 80 A/3 Phasa
MCB 10 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories F
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
33
1
1
1
1
1
1
PANEL LP - 2 - K
MCB 25 A/3 Phasa
MCB 10 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories F
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
24
1
1
1
1
1
1
PANEL PP-UPS-1 - K
MCB 32 A/3 Phasa
MCB 10 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories F
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
1
15
1
1
1
1
1
1
NO.
URAIAN
1 UNIT
PANEL PP-UPS-2 - K
MCB 32 A/3 Phasa
MCB 10 A/1 Phasa
Fuse & Indicator
Box Panel & Accessories F
Grounding B
Mandor
Kepala Tukang listrik
Pekerja
SAT
Bh
Bh
Bh
Unit
Ls
Hr
Hr
Hr
INDEK
1
15
1
1
1
1
1
1
NO.
URAIAN
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
1 UNIT
SAT
INDEK
Bh
Bh
Bh
bh
Unit
Ls
Hr
Hr
Hr
1
2
1
0
1
1
0.8333333
0.8333333
0.8333333
unit
Hr
Hr
Hr
1
1
2
2
unit
Hr
Hr
Hr
1
0.5
1
1
unit
Hr
Hr
Hr
1
0.0208333
0.0416667
0.0416667
SOCKET TELEPON ( RJ - 11 )
Socket Telephone RJ-11
Mandor
Tukang listrik
Pekerja
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
NO.
URAIAN
1 UNIT
1 UNIT
SAT
INDEK
Mandor
Tukang listrik
Pekerja
Hr
Hr
Hr
0.25
0.5
0.5
Bh
Hr
Hr
Hr
1
0.25
0.5
0.5
Bh
Hr
Hr
Hr
1
0.25
0.5
0.5
NO.
URAIAN
1 UNIT
1 M'
1 M'
1 M'
1 M'
1 M'
SAT
INDEK
Bh
Hr
Hr
Hr
1
0.25
0.5
0.5
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
NO.
URAIAN
1 M'
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
M'
Hr
Hr
Hr
1
0.0083333
0.0166667
0.0166667
Jasa Kontraktor
SOCKET DATA
Socket Data ( RG-45 )
Mandor
Tukang listrik
Pekerja
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
Hr
Hr
Hr
1
0.025
0.06
0.06
Bh
Hr
Hr
Hr
1
0.4166667
0.8333333
0.8333333
SMOKE DETECTOR
Smoke Detector
Mandor
Tukang listrik
Pekerja
Buah
Hr
Hr
Hr
1
0.0833333
0.1666667
0.1666667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
ROR
ROR
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.0833333
0.1666667
0.1666667
Buah
Hari
Hari
Hari
1
0.0833333
0.1666667
0.1666667
Buah
Hari
Hari
Hari
1
0.0833333
0.1666667
0.1666667
AUDIBLE BELL
Alarm Bell
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.0833333
0.1666667
0.1666667
INDICATOR LAMP
Lampu Indicator
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.0833333
0.1666667
0.1666667
MFACP
MCAF Kapasitas 20 zone
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
1
2
2
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
MFACP
MCAF Kapasitas 15 zone
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
1
2
2
Buah
Hari
Hari
Hari
1
0.25
0.5
0.5
AUTORESERVE CASSETE
Autorserve Cassete
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.25
0.5
0.5
CD PLAYER
CD Playaer
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.25
0.5
0.5
PAGGING MICROPHONE
Pagging Microphone PM 660D/1 ( w/ RU-2001 ) Buah
Mandor
Hari
Tukang listrik
Hari
Pekerja
Hari
1
0.125
0.1666667
0.1666667
REMOTE MICROPHONE
Remote Microphone - RM 200 X
Mandor
Tukang listrik
Pekerja
1
0.125
0.1666667
0.1666667
Buah
Hari
Hari
Hari
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
EMERGENCY MICROPHONE
Emergency Microphone ( w/ RU 2001 ) - PM 660DBuah
Mandor
Hari
Tukang listrik
Hari
Pekerja
Hari
1
0.125
0.1666667
0.1666667
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
EQUALIZER
Equalizer Card ( VX-200 )
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
MONITOR PANEL
Monitor Panel ( MP- 032B )
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
SISTEM MANAGER
Sistem Manager ( VX 2000 )
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
1
2
2
SPEAKER SELECTOR
Speaker Selector ( SS-021B )
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
RELAY CONTROL
Relay Control Unit 10 Ch.
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.1666667
0.5
0.5
CEILING SPEAKER
Ceiling Speaker ( ZS-646R )
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.0666667
0.15
0.15
Buah
Buah
Hari
Hari
Hari
1
1
0.0666667
0.15
0.15
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
HORN SPEAKER
Horn Speaker ( ZH-615SM )
Bracket
Tenaga kerja
Mandor
Tukang listrik
Pekerja
Buah
Buah
INDEK
1
1
Hari
Hari
Hari
0.0666667
0.15
0.15
Buah
Ls
Hari
Hari
Hari
1
1
0.3333333
0.6666667
0.6666667
Buah
Ls
Hari
Hari
Hari
1
1
0.3333333
0.6666667
0.6666667
Buah
Hari
Hari
Hari
1
0.3333333
0.6666667
0.6666667
ACTIVE FILTER
Active Filter
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.3333333
0.6666667
0.6666667
Buah
Hari
1
0.3333333
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
Tukang listrik
Pekerja
Hari
Hari
0.6666667
0.6666667
SPLITER
Spliter 4 way
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.1666667
0.3333333
0.3333333
SOCKET TV
Socket TV ( RCA )
Mandor
Tukang listrik
Pekerja
Buah
Hari
Hari
Hari
1
0.0833333
0.1666667
0.1666667
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
INDEK
Unit
Ls
Hari
Hari
Hari
1
1
1
2
2
Unit
Ls
Hari
Hari
Hari
1
1
1
2
2
CORIDOR LIGHT
Coridoor Light
Mandor
Tukang listrik
Pekerja
Unit
Hari
Hari
Hari
1
0.1666667
0.3333333
0.3333333
Unit
Hari
Hari
Hari
1
0.0416667
0.0833333
0.0833333
Unit
Hari
Hari
Hari
1
0.0416667
0.0833333
0.0833333
Unit
Hari
Hari
Hari
1
0.1666667
0.3333333
0.3333333
NO.
URAIAN
1 BH
1 BH
SAT
INDEK
Unit
Hari
Hari
Hari
1
0.0416667
0.0833333
0.0833333
Unit
Hari
Hari
Hari
1
1
2
2
NO.
URAIAN
1 BH
1 BH
1 BH
1 BH
1 BH
1 BH
SAT
Unit
Hari
Hari
Hari
INDEK
1
1
2
2
1
1
2
2
Unit
Hari
Hari
Hari
1
1
2
2
Unit
Hari
Hari
Hari
1
1
1
1
Unit
Hari
Hari
Hari
1
0.5
1
1
Unit
Hari
Hari
Hari
1
0.5
1
1
NO.
URAIAN
1 BH
1 BH
1 BH
SAT
INDEK
Unit
Hari
Hari
Hari
1
0.5
1
1
RACK CCTV
Rack CCTV
Mandor
Tukang listrik
Pekerja
Unit
Hari
Hari
Hari
1
0.5
1
1
DOM CAMERA
Fixed Dome Camera
Mandor
Tukang listrik
Pekerja
Unit
Hari
Hari
Hari
1
0.5
1
1
ARA BARAT
HARGA SATUAN
JUMLAH
32,032,000.00
1,601,600.00
32,032,000.00
1,601,600.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
33,866,100.00
3,386,610.00
Jumlah
Overhead
87,472,000.00
4,373,600.00
87,472,000.00
4,373,600.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
92,078,100.00
9,207,810.00
Jumlah
Overhead
1,516,592.00
30,331.84
1,516,592.00
30,331.84
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
1,779,423.84
177,942.38
Jumlah
Overhead
4,473,392.00
89,467.84
4,473,392.00
89,467.84
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
4,795,359.84
479,535.98
Jumlah
Overhead
TOTAL
37,252,710.00
33,866,100.00
101,285,910.00
92,078,100.00
1,957,366.22
1,779,423.84
5,274,895.82
4,795,359.84
3,625,807.15
HARGA SATUAN
JUMLAH
TOTAL
3,003,616.00
60,072.32
3,003,616.00
60,072.32
3,296,188.32
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
3,296,188.32
329,618.83
Jumlah
Overhead
2,847,768.00
56,955.36
2,847,768.00
56,955.36
62,500.00
75,000.00
75,000.00
62,500.00
75,000.00
75,000.00
3,117,223.36
311,722.34
Jumlah
Overhead
3,428,945.70
3,117,223.36
HARGA SATUAN
JUMLAH
78,232,000.00
1,564,640.00
78,232,000.00
1,564,640.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
80,029,140.00
8,002,914.00
Jumlah
Overhead
81,312,000.00
1,626,240.00
81,312,000.00
1,626,240.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
83,170,740.00
8,317,074.00
Jumlah
Overhead
1,445,136.00
72,256.80
1,445,136.00
72,256.80
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
1,749,892.80
174,989.28
Jumlah
Overhead
1,755,600.00
87,780.00
1,755,600.00
87,780.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
2,075,880.00
207,588.00
Jumlah
Overhead
715,000,000.00
35,750,000.00
715,000,000.00
35,750,000.00
62,500.00
75,000.00
187,500.00
225,000.00
TOTAL
88,032,054.00
80,029,140.00
91,487,814.00
83,170,740.00
1,924,882.08
1,749,892.80
2,283,468.00
2,075,880.00
826,592,250.00
751,447,500.00
HARGA SATUAN
95,000.00
Jumlah
Overhead
JUMLAH
285,000.00
751,447,500.00
75,144,750.00
495,000,000.00
24,750,000.00
495,000,000.00
24,750,000.00
62,500.00
75,000.00
95,000.00
187,500.00
225,000.00
285,000.00
520,447,500.00
52,044,750.00
Jumlah
Overhead
70,070,000.00
3,503,500.00
70,070,000.00
3,503,500.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
73,806,000.00
7,380,600.00
Jumlah
Overhead
162,008.00
8,100.40
162,008.00
8,100.40
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
402,608.40
40,260.84
Jumlah
Overhead
229,152.00
11,457.60
229,152.00
11,457.60
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
473,109.60
47,310.96
Jumlah
Overhead
354,816.00
17,740.80
TOTAL
354,816.00
17,740.80
572,492,250.00
520,447,500.00
81,186,600.00
73,806,000.00
442,869.24
402,608.40
520,420.56
473,109.60
665,562.48
605,056.80
HARGA SATUAN
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
62,500.00
75,000.00
95,000.00
605,056.80
60,505.68
387,464.00
19,373.20
387,464.00
19,373.20
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
639,337.20
63,933.72
Jumlah
Overhead
91,168.00
4,558.40
91,168.00
4,558.40
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
328,226.40
32,822.64
Jumlah
Overhead
239,624.00
11,981.20
239,624.00
11,981.20
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
484,105.20
48,410.52
Jumlah
Overhead
261,800.00
13,090.00
261,800.00
13,090.00
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
507,390.00
50,739.00
Jumlah
Overhead
TOTAL
703,270.92
639,337.20
361,049.04
328,226.40
532,515.72
484,105.20
558,129.00
507,390.00
HARGA SATUAN
JUMLAH
142,296.00
7,114.80
142,296.00
7,114.80
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
381,910.80
38,191.08
Jumlah
Overhead
118,272.00
5,913.60
118,272.00
5,913.60
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
356,685.60
35,668.56
Jumlah
Overhead
100,408.00
5,020.40
100,408.00
5,020.40
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
337,928.40
33,792.84
Jumlah
Overhead
87,472.00
4,373.60
87,472.00
4,373.60
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
324,345.60
32,434.56
Jumlah
Overhead
72,688.00
3,634.40
72,688.00
3,634.40
62,500.00
75,000.00
62,500.00
75,000.00
TOTAL
420,101.88
381,910.80
392,354.16
356,685.60
371,721.24
337,928.40
356,780.16
324,345.60
339,704.64
308,822.40
HARGA SATUAN
95,000.00
Jumlah
Overhead
JUMLAH
95,000.00
308,822.40
30,882.24
82,544.00
4,127.20
82,544.00
4,127.20
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
319,171.20
31,917.12
Jumlah
Overhead
68,992.00
3,449.60
68,992.00
3,449.60
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
304,941.60
30,494.16
Jumlah
Overhead
89,936.00
4,496.80
89,936.00
4,496.80
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
326,932.80
32,693.28
Jumlah
Overhead
75,152.00
3,757.60
75,152.00
3,757.60
62,500.00
75,000.00
95,000.00
62,500.00
75,000.00
95,000.00
311,409.60
31,140.96
Jumlah
Overhead
TOTAL
351,088.32
319,171.20
335,435.76
304,941.60
359,626.08
326,932.80
342,550.56
311,409.60
34,575.93
HARGA SATUAN
JUMLAH
16,016.00
16,016.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
TOTAL
31,432.67
31,432.67
Overhead
3,143.27
38,641.53
19,712.00
19,712.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
35,128.67
35,128.67
Overhead
3,512.87
39,440.67
24,024.00
24,024.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
39,440.67
39,440.67
Overhead
3,944.07
68,455.93
46,816.00
46,816.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
62,232.67
62,232.67
Overhead
6,223.27
100,980.73
76,384.00
76,384.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
Overhead
91,800.67
91,800.67
9,180.07
HARGA SATUAN
JUMLAH
TOTAL
143,687.87
99,792.00
99,792.00
62,500.00
10,416.67
75,000.00
12,500.00
95,000.00
7,916.67
Jumlah
130,625.33
130,625.33
Overhead
13,062.53
152,496.67
107,800.00
107,800.00
62,500.00
10,416.67
75,000.00
12,500.00
95,000.00
7,916.67
Jumlah
138,633.33
138,633.33
Overhead
13,863.33
178,245.47
131,208.00
131,208.00
62,500.00
10,416.67
75,000.00
12,500.00
95,000.00
7,916.67
Jumlah
162,041.33
162,041.33
Overhead
16,204.13
268,366.27
213,136.00
213,136.00
62,500.00
10,416.67
75,000.00
12,500.00
95,000.00
7,916.67
Jumlah
243,969.33
243,969.33
Overhead
24,396.93
312,428.60
237,776.00
237,776.00
62,500.00
15,625.00
75,000.00
18,750.00
95,000.00
11,875.00
Jumlah
Overhead
284,026.00
284,026.00
28,402.60
253,495.73
HARGA SATUAN
JUMLAH
168,784.00
168,784.00
62,500.00
20,833.33
75,000.00
25,000.00
95,000.00
15,833.33
Jumlah
TOTAL
230,450.67
230,450.67
Overhead
23,045.07
199,910.33
166,320.00
166,320.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
Overhead
181,736.67
181,736.67
18,173.67
HARGA SATUAN
JUMLAH
TOTAL
162,642.33
132,440.00
132,440.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
147,856.67
147,856.67
Overhead
14,785.67
149,767.93
120,736.00
120,736.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
136,152.67
136,152.67
Overhead
13,615.27
101,658.33
77,000.00
77,000.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
92,416.67
92,416.67
Overhead
9,241.67
62,357.53
41,272.00
41,272.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
56,688.67
56,688.67
Overhead
5,668.87
52,193.53
32,032.00
32,032.00
62,500.00
5,208.33
75,000.00
6,250.00
95,000.00
3,958.33
Jumlah
Overhead
47,448.67
47,448.67
4,744.87
HARGA SATUAN
8,808.80
1,321.32
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
12,196.80
3,659.04
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
8,808.80
1,321.32
1,041.67
625.00
395.83
12,192.62
1,219.26
4,675.00
3,659.04
1,041.67
625.00
395.83
10,396.54
1,039.65
TOTAL
13,411.88
12,192.62
11,436.19
10,396.54
HARGA SATUAN
16,940.00
5,082.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
23,716.00
7,114.80
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
27,104.00
8,131.20
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
33,880.00
10,164.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
50,820.00
15,246.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
66,066.00
JUMLAH
16,940.00
5,082.00
1,041.67
625.00
395.83
24,084.50
2,408.45
23,716.00
7,114.80
1,041.67
625.00
395.83
32,893.30
3,289.33
27,104.00
8,131.20
1,041.67
625.00
395.83
37,297.70
3,729.77
33,880.00
10,164.00
2,083.33
2,500.00
1,583.33
50,210.67
5,021.07
50,820.00
4,268.88
2,083.33
2,500.00
1,583.33
61,255.55
6,125.55
66,066.00
TOTAL
26,492.95
24,084.50
36,182.63
32,893.30
41,027.47
37,297.70
55,231.73
50,210.67
67,381.10
61,255.55
104,649.38
95,135.80
HARGA SATUAN
19,819.80
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
110,448.80
33,134.64
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
19,819.80
3,125.00
3,750.00
2,375.00
95,135.80
9,513.58
110,448.80
33,134.64
4,166.67
5,000.00
3,166.67
155,916.77
15,591.68
171,508.45
155,916.77
HARGA SATUAN
192,099.60
57,629.88
62,500.00
75,000.00
95,000.00
Jumlah
267,652.00
80,295.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
448,232.40
134,469.72
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
749,086.80
224,726.04
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
8,870.40
887.04
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
13,367.20
JUMLAH
192,099.60
57,629.88
5,208.33
6,250.00
3,958.33
265,146.15
26,514.61
267,652.00
80,295.60
5,208.33
6,250.00
3,958.33
363,364.27
36,336.43
448,232.40
134,469.72
6,250.00
7,500.00
4,750.00
601,202.12
60,120.21
749,086.80
224,726.04
6,250.00
7,500.00
4,750.00
992,312.84
99,231.28
8,870.40
887.04
1,041.67
1,250.00
791.67
12,840.77
1,284.08
13,367.20
TOTAL
291,660.76
265,146.15
399,700.69
363,364.27
661,322.33
601,202.12
1,091,544.12
992,312.84
12,840.77
12,840.77
17,787.25
17,787.25
HARGA SATUAN
1,336.72
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
1,336.72
1,041.67
1,250.00
791.67
17,787.25
1,778.73
16,940.00
1,694.00
16,940.00
1,694.00
62,500.00
75,000.00
95,000.00
1,041.67
1,250.00
791.67
21,717.33
2,171.73
Jumlah
Overhead
TOTAL
23,097.40
20,925.67
HARGA SATUAN
26,857.60
2,685.76
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
32,032.00
3,203.20
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
38,438.40
3,843.84
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
45,029.60
4,502.96
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
21,560.00
4,312.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
32,032.00
JUMLAH
26,857.60
2,685.76
2,083.33
2,500.00
1,583.33
35,710.03
3,571.00
32,032.00
3,203.20
2,083.33
2,500.00
1,583.33
41,401.87
4,140.19
38,438.40
3,843.84
2,083.33
2,500.00
1,583.33
48,448.91
4,844.89
45,029.60
4,502.96
2,083.33
2,500.00
1,583.33
55,699.23
5,569.92
21,560.00
4,312.00
3,125.00
3,750.00
2,375.00
35,122.00
3,512.20
32,032.00
TOTAL
39,281.03
35,710.03
45,542.05
41,401.87
51,710.46
46,865.57
59,685.82
54,115.89
38,634.20
35,122.00
52,457.24
47,688.40
HARGA SATUAN
6,406.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
71,456.00
14,291.20
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
6,406.40
3,125.00
3,750.00
2,375.00
47,688.40
4,768.84
71,456.00
14,291.20
3,125.00
3,750.00
2,375.00
94,997.20
9,499.72
104,496.92
94,997.20
HARGA SATUAN
517,440.00
103,488.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
92,400.00
18,480.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
107,800.00
21,560.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
132,440.00
26,488.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
216,832.00
43,366.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
256,872.00
JUMLAH
517,440.00
103,488.00
3,125.00
3,750.00
2,375.00
630,178.00
63,017.80
92,400.00
18,480.00
4,166.67
5,000.00
3,166.67
123,213.33
12,321.33
107,800.00
21,560.00
4,166.67
5,000.00
3,166.67
141,693.33
14,169.33
132,440.00
26,488.00
5,208.33
6,250.00
3,958.33
174,344.67
17,434.47
216,832.00
43,366.40
8,333.33
10,000.00
6,333.33
284,865.07
28,486.51
256,872.00
TOTAL
693,195.80
630,178.00
135,534.67
123,213.33
155,862.67
141,693.33
191,779.13
174,344.67
313,351.57
284,865.07
366,204.37
332,913.07
HARGA SATUAN
51,374.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
340,032.00
68,006.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
51,374.40
8,333.33
10,000.00
6,333.33
332,913.07
33,291.31
340,032.00
68,006.40
8,333.33
10,000.00
6,333.33
432,705.07
43,270.51
475,975.57
432,705.07
HARGA SATUAN
463,232.00
92,646.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
2,652,496.00
152,152.00
200,200.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
17,864.00
5,359.20
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
19,712.00
5,913.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
24,640.00
7,392.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
463,232.00
92,646.40
8,333.33
10,000.00
6,333.33
580,545.07
58,054.51
2,652,496.00
200,200.00
62,500.00
75,000.00
47,500.00
3,037,696.00
303,769.60
17,864.00
5,359.20
1,041.67
625.00
395.83
25,285.70
2,528.57
19,712.00
5,913.60
1,041.67
625.00
395.83
27,688.10
2,768.81
24,640.00
7,392.00
1,041.67
625.00
395.83
34,094.50
3,409.45
TOTAL
638,599.57
580,545.07
3,341,465.60
3,037,696.00
27,814.27
25,285.70
27,688.10
27,688.10
37,503.95
34,094.50
45,554.74
HARGA SATUAN
32,032.00
6,406.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
50,512.00
10,102.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
32,032.00
6,406.40
1,562.50
937.50
475.00
41,413.40
4,141.34
50,512.00
10,102.40
1,562.50
937.50
475.00
63,589.40
6,358.94
TOTAL
41,413.40
69,473.34
63,114.40
HARGA SATUAN
81,312.00
16,262.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
125,664.00
25,132.80
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
198,968.00
39,793.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
278,432.00
55,686.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
596,288.00
119,257.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
1,240,008.00
JUMLAH
81,312.00
16,262.40
1,562.50
937.50
475.00
100,549.40
10,054.94
125,664.00
25,132.80
1,822.92
1,093.75
461.81
154,175.27
15,417.53
198,968.00
39,793.60
1,822.92
1,093.75
461.81
242,140.07
24,214.01
278,432.00
55,686.40
1,822.92
1,093.75
461.81
337,496.87
33,749.69
596,288.00
119,257.60
1,822.92
1,093.75
461.81
718,924.07
71,892.41
1,240,008.00
TOTAL
110,129.34
100,074.40
169,130.99
153,713.47
265,892.27
241,678.27
371,246.56
337,496.87
790,816.48
718,924.07
1,640,526.88
1,491,388.07
HARGA SATUAN
248,001.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
28,336.00
8,500.80
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
248,001.60
1,822.92
1,093.75
461.81
1,491,388.07
149,138.81
28,336.00
8,500.80
1,041.67
625.00
395.83
38,899.30
3,889.93
42,789.23
38,899.30
HARGA SATUAN
33,633.60
10,090.08
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
51,744.00
10,348.80
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
85,008.00
17,001.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
131,208.00
26,241.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
205,128.00
41,025.60
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
324,632.00
JUMLAH
33,633.60
10,090.08
1,041.67
625.00
395.83
45,786.18
4,578.62
51,744.00
10,348.80
1,562.50
937.50
475.00
65,067.80
6,506.78
85,008.00
17,001.60
1,562.50
937.50
475.00
104,984.60
10,498.46
131,208.00
26,241.60
1,562.50
937.50
475.00
160,424.60
16,042.46
205,128.00
41,025.60
1,822.92
1,093.75
461.81
249,532.07
24,953.21
324,632.00
TOTAL
50,364.80
45,786.18
71,574.58
65,067.80
115,008.06
104,509.60
175,992.06
159,949.60
274,023.47
249,070.27
431,768.75
392,475.07
HARGA SATUAN
64,926.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
459,536.00
91,907.20
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
64,926.40
1,822.92
1,093.75
461.81
392,936.87
39,293.69
459,536.00
91,907.20
1,822.92
1,093.75
461.81
554,821.67
55,482.17
610,303.84
554,821.67
HARGA SATUAN
986,832.00
197,366.40
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
2,046,598.40
409,319.68
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
223,608.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
320,320.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
252,560.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
197,120.00
62,500.00
75,000.00
95,000.00
JUMLAH
986,832.00
197,366.40
1,822.92
1,093.75
461.81
1,187,576.87
118,757.69
2,046,598.40
409,319.68
1,822.92
1,093.75
461.81
2,459,296.55
245,929.66
223,608.00
31,250.00
37,500.00
23,750.00
316,108.00
31,610.80
320,320.00
3,125.00
3,750.00
2,375.00
329,570.00
32,957.00
252,560.00
3,125.00
3,750.00
2,375.00
261,810.00
26,181.00
197,120.00
3,125.00
3,750.00
2,375.00
TOTAL
1,306,334.56
1,187,576.87
2,705,226.21
2,459,296.55
347,718.80
316,108.00
362,527.00
329,570.00
287,991.00
261,810.00
227,007.00
206,370.00
HARGA SATUAN
Jumlah
Overhead
113,960.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
104,720.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
206,370.00
20,637.00
113,960.00
3,125.00
3,750.00
2,375.00
123,210.00
12,321.00
104,720.00
3,125.00
3,750.00
2,375.00
113,970.00
11,397.00
135,531.00
123,210.00
125,367.00
113,970.00
HARGA SATUAN
175,560,000.00
3,500,000.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
44,352,000.00
1,250,000.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
31,207,176.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
169,400.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
175,560,000.00
3,500,000.00
125,000.00
150,000.00
95,000.00
3,870,000.00
387,000.00
44,352,000.00
1,250,000.00
125,000.00
150,000.00
95,000.00
1,620,000.00
162,000.00
31,207,176.00
125,000.00
150,000.00
95,000.00
370,000.00
37,000.00
169,400.00
2,083.33
2,500.00
1,583.33
175,566.67
17,556.67
TOTAL
179,722,000.00
179,335,000.00
46,039,000.00
45,877,000.00
31,519,176.00
31,482,176.00
193,123.33
175,566.67
318,750.00
158,583.33
154,000.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
154,000.00
2,083.33
2,500.00
1,583.33
160,166.67
16,016.67
275,630.00
137,023.33
HARGA SATUAN
132,440.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
TOTAL
132,440.00
2,083.33
2,500.00
1,583.33
138,606.67
13,860.67
HARGA SATUAN
107,800.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
105,952.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
118,272.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
130,592.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
152,152.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
177,408.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
107,800.00
20,833.33
25,000.00
15,833.33
169,466.67
16,946.67
105,952.00
5,208.33
6,250.00
3,958.33
121,368.67
12,136.87
118,272.00
5,208.33
6,250.00
3,958.33
133,688.67
13,368.87
130,592.00
10,416.67
12,500.00
7,916.67
161,425.33
16,142.53
152,152.00
10,416.67
12,500.00
7,916.67
182,985.33
18,298.53
177,408.00
10,416.67
12,500.00
7,916.67
208,241.33
20,824.13
TOTAL
169,466.67
169,466.67
133,505.53
121,368.67
147,057.53
133,688.67
177,567.87
161,425.33
201,283.87
182,985.33
229,065.47
208,241.33
HARGA SATUAN
199,584.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
256,256.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
321,552.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
176,792.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
192,192.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
108,416.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
199,584.00
10,416.67
12,500.00
7,916.67
230,417.33
23,041.73
256,256.00
31,250.00
37,500.00
23,750.00
348,756.00
34,875.60
321,552.00
31,250.00
37,500.00
23,750.00
414,052.00
41,405.20
176,792.00
31,250.00
37,500.00
23,750.00
269,292.00
26,929.20
192,192.00
5,208.33
6,250.00
3,958.33
207,608.67
20,760.87
108,416.00
5,208.33
6,250.00
3,958.33
123,832.67
12,383.27
TOTAL
253,459.07
230,417.33
366,411.20
325,006.00
455,457.20
414,052.00
296,221.20
269,292.00
228,369.53
207,608.67
136,215.93
123,832.67
HARGA SATUAN
88,704.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
1,108,800.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
1,108,800.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
2,775,696.00
200,200.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
2,652,496.00
154,000.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
JUMLAH
88,704.00
5,208.33
6,250.00
3,958.33
104,120.67
10,412.07
1,108,800.00
62,500.00
75,000.00
47,500.00
1,293,800.00
129,380.00
1,108,800.00
62,500.00
75,000.00
47,500.00
1,293,800.00
129,380.00
2,775,696.00
200,200.00
31,250.00
37,500.00
23,750.00
3,068,396.00
306,839.60
2,652,496.00
31,250.00
37,500.00
23,750.00
2,744,996.00
274,499.60
TOTAL
114,532.73
104,120.67
1,375,680.00
1,246,300.00
1,375,680.00
1,246,300.00
6,113,042.00
3,044,646.00
2,707,496.00
2,683,746.00
HARGA SATUAN
554,400.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
231,000.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
225,000.00
199,584.00
62,500.00
75,000.00
95,000.00
Jumlah
Overhead
3,008,544.00
150,427.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
554,400.00
20,833.33
25,000.00
15,833.33
616,066.67
61,606.67
231,000.00
5,208.33
6,250.00
3,958.33
246,416.67
24,641.67
225,000.00
199,584.00
10,416.67
12,500.00
7,916.67
455,417.33
45,541.73
3,008,544.00
150,427.20
95,000.00
80,000.00
72,000.00
3,405,971.20
340,597.12
3,141,600.00
157,080.00
95,000.00
3,141,600.00
157,080.00
95,000.00
80,000.00
72,000.00
80,000.00
72,000.00
3,545,680.00
354,568.00
Jumlah
Overhead
TOTAL
591,066.67
575,233.33
271,058.33
246,416.67
500,959.07
455,417.33
3,746,568.32
3,405,971.20
3,900,248.00
3,545,680.00
3,992,740.40
HARGA SATUAN
JUMLAH
TOTAL
3,221,680.00
161,084.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
3,221,680.00
161,084.00
95,000.00
80,000.00
72,000.00
3,629,764.00
362,976.40
3,629,764.00
4,551,624.00
227,581.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
4,551,624.00
227,581.20
95,000.00
80,000.00
72,000.00
5,026,205.20
502,620.52
5,528,825.72
5,026,205.20
HARGA SATUAN
6,580,728.00
329,036.40
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
9,979,200.00
498,960.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
12,566,400.00
628,320.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
17,001,600.00
850,080.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
20,204,800.00
1,010,240.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
15,076,600.00
JUMLAH
6,580,728.00
329,036.40
95,000.00
80,000.00
72,000.00
7,156,764.40
715,676.44
9,979,200.00
498,960.00
95,000.00
80,000.00
72,000.00
10,725,160.00
1,072,516.00
12,566,400.00
628,320.00
95,000.00
80,000.00
72,000.00
13,441,720.00
1,344,172.00
17,001,600.00
850,080.00
95,000.00
80,000.00
72,000.00
18,098,680.00
1,809,868.00
20,204,800.00
1,010,240.00
95,000.00
80,000.00
72,000.00
21,462,040.00
2,146,204.00
15,076,600.00
TOTAL
7,872,440.84
7,156,764.40
11,797,676.00
10,725,160.00
14,785,892.00
13,441,720.00
19,908,548.00
18,098,680.00
23,608,244.00
21,462,040.00
17,685,173.00
16,077,430.00
HARGA SATUAN
753,830.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
15,769,600.00
788,480.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
753,830.00
95,000.00
80,000.00
72,000.00
16,077,430.00
1,607,743.00
15,769,600.00
788,480.00
95,000.00
80,000.00
72,000.00
16,805,080.00
1,680,508.00
18,485,588.00
16,805,080.00
HARGA SATUAN
14,691,600.00
734,580.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
20,389,600.00
1,019,480.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
9,671,200.00
483,560.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
16,533,440.00
826,672.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
20,928,600.00
1,046,430.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
20,174,000.00
JUMLAH
14,691,600.00
734,580.00
95,000.00
80,000.00
72,000.00
15,673,180.00
1,567,318.00
20,389,600.00
1,019,480.00
95,000.00
80,000.00
72,000.00
21,656,080.00
2,165,608.00
9,671,200.00
483,560.00
95,000.00
80,000.00
72,000.00
10,401,760.00
1,040,176.00
16,533,440.00
826,672.00
95,000.00
80,000.00
72,000.00
17,607,112.00
1,760,711.20
20,928,600.00
1,046,430.00
95,000.00
80,000.00
72,000.00
22,222,030.00
2,222,203.00
20,174,000.00
TOTAL
17,240,498.00
15,673,180.00
23,821,688.00
21,656,080.00
11,441,936.00
10,401,760.00
19,367,823.20
17,607,112.00
24,444,233.00
22,222,030.00
23,572,670.00
21,429,700.00
HARGA SATUAN
1,008,700.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
22,761,200.00
1,138,060.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
1,008,700.00
95,000.00
80,000.00
72,000.00
21,429,700.00
2,142,970.00
22,761,200.00
1,138,060.00
95,000.00
80,000.00
72,000.00
24,146,260.00
2,414,626.00
26,560,886.00
24,146,260.00
HARGA SATUAN
4,712,400.00
235,620.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
5,051,200.00
252,560.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
7,515,200.00
375,760.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
7,207,200.00
360,360.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
5,962,880.00
298,144.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
8,500,800.00
JUMLAH
4,712,400.00
235,620.00
95,000.00
80,000.00
72,000.00
5,195,020.00
519,502.00
5,051,200.00
252,560.00
95,000.00
80,000.00
72,000.00
5,550,760.00
555,076.00
7,515,200.00
375,760.00
95,000.00
80,000.00
72,000.00
8,137,960.00
813,796.00
7,207,200.00
360,360.00
95,000.00
80,000.00
72,000.00
7,814,560.00
781,456.00
5,962,880.00
298,144.00
95,000.00
80,000.00
72,000.00
6,508,024.00
650,802.40
8,500,800.00
TOTAL
5,714,522.00
5,195,020.00
6,105,836.00
5,550,760.00
8,951,756.00
8,137,960.00
8,596,016.00
7,814,560.00
7,158,826.40
6,508,024.00
10,090,124.00
9,172,840.00
HARGA SATUAN
425,040.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
6,418,720.00
320,936.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
425,040.00
95,000.00
80,000.00
72,000.00
9,172,840.00
917,284.00
6,418,720.00
320,936.00
95,000.00
80,000.00
72,000.00
6,986,656.00
698,665.60
7,685,321.60
6,986,656.00
HARGA SATUAN
9,732,800.00
486,640.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
6,283,200.00
314,160.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
8,500,800.00
425,040.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
10,225,600.00
511,280.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
5,051,200.00
252,560.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
12,258,400.00
JUMLAH
9,732,800.00
486,640.00
95,000.00
80,000.00
72,000.00
10,466,440.00
1,046,644.00
6,283,200.00
314,160.00
95,000.00
80,000.00
72,000.00
6,844,360.00
684,436.00
8,500,800.00
425,040.00
95,000.00
80,000.00
72,000.00
9,172,840.00
917,284.00
10,225,600.00
511,280.00
95,000.00
80,000.00
72,000.00
10,983,880.00
1,098,388.00
5,051,200.00
252,560.00
95,000.00
80,000.00
72,000.00
5,550,760.00
555,076.00
12,258,400.00
TOTAL
11,513,084.00
10,466,440.00
7,528,796.00
6,844,360.00
10,090,124.00
9,172,840.00
12,082,268.00
10,983,880.00
6,105,836.00
5,550,760.00
14,430,152.00
13,118,320.00
HARGA SATUAN
612,920.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
10,903,200.00
545,160.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
612,920.00
95,000.00
80,000.00
72,000.00
13,118,320.00
1,311,832.00
10,903,200.00
545,160.00
95,000.00
80,000.00
72,000.00
11,695,360.00
1,169,536.00
12,864,896.00
11,695,360.00
HARGA SATUAN
12,381,600.00
619,080.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
13,736,800.00
686,840.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
19,712,000.00
985,600.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
14,414,400.00
720,720.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
13,182,400.00
659,120.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
15,769,600.00
JUMLAH
12,381,600.00
619,080.00
95,000.00
80,000.00
72,000.00
13,247,680.00
1,324,768.00
13,736,800.00
686,840.00
95,000.00
80,000.00
72,000.00
14,670,640.00
1,467,064.00
19,712,000.00
985,600.00
95,000.00
80,000.00
72,000.00
20,944,600.00
2,094,460.00
14,414,400.00
720,720.00
95,000.00
80,000.00
72,000.00
15,382,120.00
1,538,212.00
13,182,400.00
659,120.00
95,000.00
80,000.00
72,000.00
14,088,520.00
1,408,852.00
15,769,600.00
TOTAL
14,572,448.00
13,247,680.00
16,137,704.00
14,670,640.00
23,039,060.00
20,944,600.00
16,920,332.00
15,382,120.00
15,497,372.00
14,088,520.00
18,485,588.00
16,805,080.00
HARGA SATUAN
788,480.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
9,055,200.00
452,760.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
788,480.00
95,000.00
80,000.00
72,000.00
16,805,080.00
1,680,508.00
9,055,200.00
452,760.00
95,000.00
80,000.00
72,000.00
9,754,960.00
975,496.00
10,730,456.00
9,754,960.00
HARGA SATUAN
7,669,200.00
383,460.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
27,904,800.00
1,395,240.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
30,159,360.00
1,507,968.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
23,777,600.00
1,188,880.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
21,067,200.00
1,053,360.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
16,755,200.00
JUMLAH
7,669,200.00
383,460.00
95,000.00
80,000.00
72,000.00
8,299,660.00
829,966.00
27,904,800.00
1,395,240.00
285,000.00
240,000.00
216,000.00
30,041,040.00
3,004,104.00
30,159,360.00
1,507,968.00
285,000.00
240,000.00
216,000.00
32,408,328.00
3,240,832.80
23,777,600.00
1,188,880.00
285,000.00
240,000.00
216,000.00
25,707,480.00
2,570,748.00
21,067,200.00
1,053,360.00
285,000.00
240,000.00
216,000.00
22,861,560.00
2,286,156.00
16,755,200.00
TOTAL
9,129,626.00
8,299,660.00
33,045,144.00
30,041,040.00
35,649,160.80
32,408,328.00
28,278,228.00
25,707,480.00
25,147,716.00
22,861,560.00
20,167,356.00
18,333,960.00
HARGA SATUAN
837,760.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
17,802,400.00
890,120.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
837,760.00
285,000.00
240,000.00
216,000.00
18,333,960.00
1,833,396.00
17,802,400.00
890,120.00
285,000.00
240,000.00
216,000.00
19,433,520.00
1,943,352.00
21,376,872.00
19,433,520.00
HARGA SATUAN
21,467,600.00
1,073,380.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
14,660,800.00
146,608.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
23,038,400.00
230,384.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
20,106,300.00
201,063.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
19,478,000.00
194,780.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
11,519,200.00
JUMLAH
21,467,600.00
1,073,380.00
95,000.00
80,000.00
72,000.00
22,787,980.00
2,278,798.00
14,660,800.00
146,608.00
95,000.00
80,000.00
72,000.00
15,054,408.00
1,505,440.80
23,038,400.00
230,384.00
95,000.00
80,000.00
72,000.00
23,515,784.00
2,351,578.40
20,106,300.00
201,063.00
95,000.00
80,000.00
72,000.00
20,554,363.00
2,055,436.30
19,478,000.00
194,780.00
95,000.00
80,000.00
72,000.00
19,919,780.00
1,991,978.00
11,519,200.00
TOTAL
25,066,778.00
22,787,980.00
16,559,848.80
15,054,408.00
25,867,362.40
23,515,784.00
22,609,799.30
20,554,363.00
21,911,758.00
19,919,780.00
13,069,531.20
11,881,392.00
HARGA SATUAN
115,192.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
10,681,500.00
106,815.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
115,192.00
95,000.00
80,000.00
72,000.00
11,881,392.00
1,188,139.20
10,681,500.00
106,815.00
95,000.00
80,000.00
72,000.00
11,035,315.00
1,103,531.50
12,138,846.50
11,035,315.00
HARGA SATUAN
15,079,700.00
150,797.00
95,000.00
80,000.00
65,000.00
Jumlah
Overhead
14,294,300.00
142,943.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
10,681,500.00
106,815.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
9,424,800.00
94,248.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
4,681,600.00
46,816.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
5,654,900.00
JUMLAH
15,079,700.00
150,797.00
95,000.00
80,000.00
65,000.00
15,470,497.00
1,547,049.70
14,294,300.00
142,943.00
95,000.00
80,000.00
72,000.00
14,684,243.00
1,468,424.30
10,681,500.00
106,815.00
95,000.00
80,000.00
72,000.00
11,035,315.00
1,103,531.50
9,424,800.00
94,248.00
95,000.00
80,000.00
72,000.00
9,766,048.00
976,604.80
4,681,600.00
46,816.00
95,000.00
80,000.00
72,000.00
4,975,416.00
497,541.60
5,654,900.00
TOTAL
17,017,546.70
15,470,497.00
16,152,667.30
14,684,243.00
12,138,846.50
11,035,315.00
10,742,652.80
9,766,048.00
5,472,957.60
4,975,416.00
6,554,293.90
5,958,449.00
HARGA SATUAN
56,549.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
10,053,200.00
100,532.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
56,549.00
95,000.00
80,000.00
72,000.00
5,958,449.00
595,844.90
10,053,200.00
100,532.00
95,000.00
80,000.00
72,000.00
10,400,732.00
1,040,073.20
11,440,805.20
10,400,732.00
HARGA SATUAN
8,726,900.00
87,269.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
9,116,800.00
91,168.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
8,747,200.00
87,472.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
10,472,000.00
104,720.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
7,330,400.00
73,304.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
8,500,800.00
JUMLAH
8,726,900.00
87,269.00
95,000.00
80,000.00
72,000.00
9,061,169.00
906,116.90
9,116,800.00
91,168.00
95,000.00
80,000.00
72,000.00
9,454,968.00
945,496.80
8,747,200.00
87,472.00
95,000.00
80,000.00
72,000.00
9,081,672.00
908,167.20
10,472,000.00
104,720.00
95,000.00
80,000.00
72,000.00
10,823,720.00
1,082,372.00
7,330,400.00
73,304.00
95,000.00
80,000.00
72,000.00
7,650,704.00
765,070.40
8,500,800.00
TOTAL
9,967,285.90
9,061,169.00
10,400,464.80
9,454,968.00
9,989,839.20
9,081,672.00
11,906,092.00
10,823,720.00
8,415,774.40
7,650,704.00
9,716,088.80
8,832,808.00
HARGA SATUAN
85,008.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
6,283,200.00
62,832.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
85,008.00
95,000.00
80,000.00
72,000.00
8,832,808.00
883,280.80
6,283,200.00
62,832.00
95,000.00
80,000.00
72,000.00
6,593,032.00
659,303.20
7,252,335.20
6,593,032.00
HARGA SATUAN
36,097,600.00
360,976.00
95,000.00
77,500.00
72,000.00
Jumlah
Overhead
315,835,600.00
3,158,356.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
211,838,600.00
2,118,386.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
108,416.00
5,420.80
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
54,824.00
2,741.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
36,097,600.00
360,976.00
95,000.00
77,500.00
72,000.00
36,703,076.00
3,670,307.60
315,835,600.00
3,158,356.00
95,000.00
80,000.00
72,000.00
319,240,956.00
31,924,095.60
211,838,600.00
2,118,386.00
95,000.00
80,000.00
72,000.00
214,203,986.00
21,420,398.60
108,416.00
5,420.80
15,833.33
13,333.33
12,000.00
155,003.47
15,500.35
54,824.00
2,741.20
15,833.33
13,333.33
12,000.00
98,731.87
9,873.19
TOTAL
40,373,383.60
36,703,076.00
351,165,051.60
319,240,956.00
235,624,384.60
214,203,986.00
170,503.81
155,003.47
108,605.05
98,731.87
55,666.67
31,666.67
HARGA SATUAN
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
31,666.67
26,666.67
24,000.00
82,333.33
8,233.33
55,666.67
31,666.67
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
31,666.67
26,666.67
24,000.00
82,333.33
8,233.33
HARGA SATUAN
JUMLAH
TOTAL
588,260.27
564,260.27
484,176.00
48,417.60
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
484,176.00
48,417.60
31,666.67
26,666.67
24,000.00
614,926.93
61,492.69
540,150.67
516,150.67
440,440.00
44,044.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
440,440.00
44,044.00
31,666.67
26,666.67
24,000.00
566,817.33
56,681.73
626,205.87
602,205.87
518,672.00
51,867.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
518,672.00
51,867.20
31,666.67
26,666.67
24,000.00
652,872.53
65,287.25
640,435.47
616,435.47
531,608.00
53,160.80
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
531,608.00
53,160.80
31,666.67
26,666.67
24,000.00
667,102.13
66,710.21
683,801.87
659,801.87
HARGA SATUAN
571,032.00
57,103.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
571,032.00
57,103.20
31,666.67
26,666.67
24,000.00
710,468.53
71,046.85
861,857.33
837,857.33
686,840.00
68,684.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
686,840.00
68,684.00
31,666.67
26,666.67
24,000.00
837,857.33
83,785.73
HARGA SATUAN
JUMLAH
TOTAL
55,666.67
31,666.67
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
546,392.00
54,639.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
479,248.00
47,924.80
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
333,872.00
33,387.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
440,440.00
44,044.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
31,666.67
26,666.67
24,000.00
82,333.33
8,233.33
546,392.00
54,639.20
31,666.67
26,666.67
24,000.00
683,364.53
68,336.45
479,248.00
47,924.80
31,666.67
26,666.67
24,000.00
609,506.13
60,950.61
333,872.00
33,387.20
31,666.67
26,666.67
24,000.00
449,592.53
44,959.25
440,440.00
44,044.00
31,666.67
26,666.67
24,000.00
566,817.33
56,681.73
751,700.99
683,364.53
670,456.75
609,506.13
494,551.79
449,592.53
623,499.07
566,817.33
HARGA SATUAN
293,000.00
29,300.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
293,000.00
29,300.00
31,666.67
26,666.67
24,000.00
404,633.33
40,463.33
TOTAL
445,096.67
404,633.33
1,092,790.60
993,446.00
828,520.00
41,426.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
828,520.00
41,426.00
47,500.00
40,000.00
36,000.00
993,446.00
99,344.60
HARGA SATUAN
JUMLAH
TOTAL
1,382,362.96
1,256,693.60
1,079,232.00
53,961.60
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
1,079,232.00
53,961.60
47,500.00
40,000.00
36,000.00
1,256,693.60
125,669.36
1,461,337.24
1,328,488.40
1,147,608.00
57,380.40
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
1,147,608.00
57,380.40
47,500.00
40,000.00
36,000.00
1,328,488.40
132,848.84
1,445,101.56
1,306,819.60
1,199,352.00
59,967.60
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
1,199,352.00
59,967.60
47,500.00
40,000.00
36,000.00
1,382,819.60
138,281.96
1,445,101.56
1,306,819.60
1,199,352.00
59,967.60
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
1,199,352.00
59,967.60
47,500.00
40,000.00
36,000.00
1,382,819.60
138,281.96
1,495,616.64
1,352,742.40
HARGA SATUAN
1,243,088.00
62,154.40
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
JUMLAH
TOTAL
1,243,088.00
62,154.40
47,500.00
40,000.00
36,000.00
1,428,742.40
142,874.24
1,952,386.80
1,767,988.00
1,638,560.00
81,928.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
1,638,560.00
81,928.00
47,500.00
40,000.00
36,000.00
1,843,988.00
184,398.80
HARGA SATUAN
JUMLAH
TOTAL
1,169,102.59
1,062,820.53
891,352.00
89,135.20
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
891,352.00
89,135.20
31,666.67
26,666.67
24,000.00
1,062,820.53
106,282.05
583,595.00
529,450.00
462,000.00
46,200.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
462,000.00
46,200.00
7,916.67
13,333.33
12,000.00
541,450.00
54,145.00
707,399.00
643,090.00
554,400.00
55,440.00
95,000.00
80,000.00
72,000.00
Jumlah
Overhead
554,400.00
55,440.00
7,916.67
13,333.33
12,000.00
643,090.00
64,309.00
2,170,755.84
1,973,414.40
282,128.00
87,472.00
77,616.00
81,312.00
67,760.00
25,872.00
22,176.00
38,808.00
20,944.00
170,016.00
282,128.00
87,472.00
77,616.00
81,312.00
67,760.00
5,174.40
3,696.00
38,808.00
20,944.00
170,016.00
HARGA SATUAN
443,520.00
295,680.00
258,720.00
129,360.00
215,600.00
Jumlah h. bahan / 1 Meter
46,816.00
247,000.00
Jumlah
Overhead
JUMLAH
TOTAL
443,520.00
147,840.00
129,360.00
129,360.00
215,600.00
1,900,606.40
23,408.00
49,400.00
1,973,414.40
197,341.44
HARGA SATUAN
JUMLAH
TOTAL
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,170,755.84
2,821,982.59
2,604,907.01
2,387,831.42
3,039,058.18
2,170,755.84
1,953,680.26
1,302,453.50
1,519,529.09
1,736,604.67
2,170,755.84
2,387,831.42
2,387,831.42
2,821,982.59
2,604,907.01
3,039,058.18
3,256,133.76
2,821,982.59
3,473,209.34
3,690,284.93
3,256,133.76
3,690,284.93
3,907,360.51
3,907,360.51
3,690,284.93
3,473,209.34
3,907,360.51
4,341,511.68
4,558,587.26
4,775,662.85
4,992,738.43
4,884,200.64
5,426,889.60
5,643,965.18
2,821,982.59
2,604,907.01
2,387,831.42
3,039,058.18
2,170,755.84
1,953,680.26
1,302,453.50
1,519,529.09
1,736,604.67
2,170,755.84
2,387,831.42
2,387,831.42
2,821,982.59
2,604,907.01
3,039,058.18
3,256,133.76
2,821,982.59
3,473,209.34
3,690,284.93
3,256,133.76
3,690,284.93
3,907,360.51
3,907,360.51
3,690,284.93
3,473,209.34
3,907,360.51
4,341,511.68
4,558,587.26
4,775,662.85
4,992,738.43
4,884,200.64
5,426,889.60
5,643,965.18
843,920.00
247,000.00
44,254.33
843,920.00
41,166.67
44,254.33
929,341.00
92,934.10
Jumlah
Overhead
1,022,275.10
929,341.00
1,072,078.70
HARGA SATUAN
887,040.00
247,000.00
46,410.33
Jumlah
Overhead
JUMLAH
887,040.00
41,166.67
46,410.33
974,617.00
97,461.70
1,767,920.00
247,000.00
90,454.33
Jumlah
Overhead
1,767,920.00
41,166.67
90,454.33
1,899,541.00
189,954.10
1,558,480.00
247,000.00
79,982.33
Jumlah
Overhead
1,558,480.00
41,166.67
79,982.33
1,679,629.00
167,962.90
TOTAL
974,617.00
2,021,581.10
1,899,541.00
1,847,591.90
1,679,629.00
HARGA SATUAN
843,920.00
152,000.00
43,462.67
Jumlah
Overhead
1,121,120.00
247,000.00
58,114.33
Jumlah
Overhead
1,090,320.00
247,000.00
56,574.33
Jumlah
Overhead
1,034,880.00
247,000.00
53,802.33
Jumlah
Overhead
2,075,920.00
247,000.00
105,854.33
Jumlah
Overhead
762,608.00
247,000.00
84,494.13
Jumlah
Overhead
1,650,880.00
247,000.00
173,321.33
JUMLAH
843,920.00
25,333.33
43,462.67
912,716.00
91,271.60
1,121,120.00
41,166.67
58,114.33
1,220,401.00
122,040.10
1,090,320.00
41,166.67
56,574.33
1,188,061.00
118,806.10
1,034,880.00
41,166.67
53,802.33
1,129,849.00
112,984.90
2,075,920.00
41,166.67
105,854.33
2,222,941.00
222,294.10
762,608.00
82,333.33
84,494.13
929,435.47
92,943.55
1,650,880.00
82,333.33
173,321.33
TOTAL
1,003,987.60
912,716.00
1,342,441.10
1,220,401.00
1,306,867.10
1,188,061.00
1,242,833.90
1,129,849.00
2,445,235.10
2,222,941.00
1,022,379.01
929,435.47
2,097,188.13
1,906,534.67
HARGA SATUAN
Jumlah
Overhead
819,280.00
247,000.00
90,161.33
Jumlah
Overhead
857,472.00
247,000.00
44,931.93
Jumlah
Overhead
863,016.00
247,000.00
45,209.13
Jumlah
Overhead
JUMLAH
TOTAL
1,906,534.67
190,653.47
819,280.00
82,333.33
90,161.33
991,774.67
99,177.47
857,472.00
41,166.67
44,931.93
943,570.60
94,357.06
863,016.00
41,166.67
45,209.13
949,391.80
94,939.18
1,090,952.13
991,774.67
1,037,927.66
943,570.60
1,044,330.98
949,391.80
HARGA SATUAN
822,976.00
247,000.00
43,207.13
Jumlah
Overhead
853,776.00
247,000.00
44,747.13
Jumlah
Overhead
777,392.00
247,000.00
40,927.93
Jumlah
Overhead
716,408.00
247,000.00
37,878.73
Jumlah
Overhead
51,744.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
16,016.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
22,176.00
95,000.00
72,500.00
JUMLAH
822,976.00
41,166.67
43,207.13
907,349.80
90,734.98
853,776.00
41,166.67
44,747.13
939,689.80
93,968.98
777,392.00
41,166.67
40,927.93
859,486.60
85,948.66
716,408.00
41,166.67
37,878.73
795,453.40
79,545.34
51,744.00
791.67
1,208.33
1,083.33
54,827.33
5,482.73
16,016.00
791.67
1,208.33
1,083.33
19,099.33
1,909.93
22,176.00
791.67
1,208.33
TOTAL
998,084.78
907,349.80
1,033,658.78
939,689.80
945,435.26
859,486.60
874,998.74
795,453.40
60,310.07
54,827.33
21,009.27
19,099.33
27,785.27
25,259.33
HARGA SATUAN
65,000.00
Jumlah
Overhead
35,112.00
95,000.00
72,500.00
65,000.00
Jumlah
54,208.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
1,083.33
25,259.33
2,525.93
35,112.00
791.67
1,208.33
1,083.33
38,195.33
3,819.53
54,208.00
1,583.33
2,416.67
2,166.67
60,374.67
6,037.47
42,014.87
38,195.33
66,412.13
60,374.67
HARGA SATUAN
80,080.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
104,720.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
157,080.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
181,720.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
447,758.08
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
363,563.20
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
JUMLAH
80,080.00
1,583.33
2,416.67
2,166.67
86,246.67
8,624.67
104,720.00
1,583.33
2,416.67
2,166.67
110,886.67
11,088.67
157,080.00
1,583.33
2,416.67
2,166.67
163,246.67
16,324.67
181,720.00
2,375.00
3,625.00
3,250.00
190,970.00
19,097.00
447,758.08
2,375.00
3,250.00
3,625.00
457,008.08
45,700.81
363,563.20
2,375.00
3,250.00
3,625.00
372,813.20
37,281.32
TOTAL
94,871.33
86,246.67
121,975.33
110,886.67
179,571.33
163,246.67
210,067.00
190,970.00
502,708.89
457,008.08
410,094.52
372,813.20
HARGA SATUAN
659,120.00
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
332,024.00
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
262,970.40
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
224,224.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
224,224.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
136,628.80
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
JUMLAH
659,120.00
2,375.00
3,250.00
3,625.00
668,370.00
66,837.00
332,024.00
2,375.00
3,250.00
3,625.00
341,274.00
34,127.40
262,970.40
2,375.00
3,250.00
3,625.00
272,220.40
27,222.04
3,587,584.00
1,583.33
2,416.67
2,166.67
3,593,750.67
359,375.07
4,484,480.00
1,583.33
2,416.67
2,166.67
4,490,646.67
449,064.67
546,515.20
1,583.33
2,166.67
2,416.67
552,681.87
55,268.19
TOTAL
735,207.00
668,370.00
375,401.40
341,274.00
299,442.44
272,220.40
3,953,125.73
3,593,750.67
4,939,711.33
4,490,646.67
607,950.05
552,681.87
HARGA SATUAN
136,628.80
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
505,120.00
115,192.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
407,792.00
115,192.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
1,093,030.40
1,583.33
2,166.67
2,416.67
1,099,197.07
109,919.71
1,010,240.00
115,192.00
23,750.00
18,125.00
16,250.00
1,183,557.00
118,355.70
815,584.00
115,192.00
23,750.00
18,125.00
16,250.00
988,901.00
98,890.10
424,177.60
95,000.00
65,000.00
72,500.00
424,177.60
2,375.00
3,250.00
3,625.00
433,427.60
43,342.76
266,296.80
95,000.00
65,000.00
72,500.00
266,296.80
2,375.00
3,250.00
3,625.00
275,546.80
27,554.68
Jumlah
Jumlah
JUMLAH
TOTAL
1,209,116.77
1,099,197.07
1,301,912.70
1,183,557.00
1,087,791.10
988,901.00
476,770.36
433,427.60
303,101.48
275,546.80
HARGA SATUAN
211,904.00
21,190.40
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
226,072.00
22,607.20
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
249,480.00
24,948.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
239,008.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
239,008.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
112,112.00
95,000.00
JUMLAH
211,904.00
21,190.40
5,541.67
9,062.50
8,125.00
22,729.17
2,272.92
226,072.00
22,607.20
5,541.67
9,062.50
8,125.00
271,408.37
27,140.84
249,480.00
24,948.00
5,541.67
9,062.50
8,125.00
297,157.17
29,715.72
239,008.00
3,166.67
4,833.33
4,333.33
251,341.33
25,134.13
239,008.00
222,992.00
3,166.67
4,833.33
4,333.33
474,333.33
47,433.33
112,112.00
3,166.67
TOTAL
258,096.48
255,823.57
298,549.20
271,408.37
326,872.88
297,157.17
276,475.47
251,341.33
521,766.67
474,333.33
136,889.87
124,445.33
HARGA SATUAN
72,500.00
65,000.00
Jumlah
Overhead
112,112.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
200,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
4,833.33
4,333.33
124,445.33
12,444.53
112,112.00
222,992.00
3,166.67
4,833.33
4,333.33
347,437.33
34,743.73
200,200.00
3,166.67
4,833.33
4,333.33
212,533.33
21,253.33
377,847.73
343,104.00
212,533.33
212,533.33
HARGA SATUAN
200,200.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
85,008.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
94,864.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
107,800.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
107,800.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
81,760.00
95,000.00
72,500.00
65,000.00
JUMLAH
200,200.00
222,992.00
3,166.67
4,833.33
4,333.33
435,525.33
43,552.53
85,008.00
3,166.67
4,833.33
4,333.33
97,341.33
9,734.13
94,864.00
3,166.67
4,833.33
4,333.33
107,197.33
10,719.73
107,800.00
3,166.67
4,833.33
4,333.33
120,133.33
12,013.33
107,800.00
222,992.00
3,166.67
4,833.33
4,333.33
343,125.33
34,312.53
81,760.00
3,166.67
4,833.33
4,333.33
TOTAL
474,744.53
431,192.00
107,075.47
97,341.33
117,917.07
107,197.33
132,146.67
120,133.33
377,437.87
343,125.33
103,502.67
94,093.33
HARGA SATUAN
Jumlah
Overhead
69,048.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
112,112.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
94,093.33
9,409.33
69,048.00
3,166.67
4,833.33
4,333.33
81,381.33
8,138.13
112,112.00
3,166.67
4,833.33
4,333.33
124,445.33
12,444.53
89,519.47
81,381.33
124,445.33
124,445.33
HARGA SATUAN
102,872.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
85,008.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
235,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
235,312.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
296,912.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
296,912.00
222,992.00
95,000.00
72,500.00
JUMLAH
102,872.00
222,992.00
3,166.67
4,833.33
4,333.33
338,197.33
33,819.73
85,008.00
3,166.67
4,833.33
4,333.33
97,341.33
9,734.13
235,312.00
3,166.67
4,833.33
4,333.33
247,645.33
24,764.53
235,312.00
222,992.00
3,166.67
4,833.33
4,333.33
470,637.33
47,063.73
296,912.00
3,166.67
4,833.33
4,333.33
309,245.33
30,924.53
296,912.00
222,992.00
3,166.67
4,833.33
TOTAL
372,017.07
338,197.33
107,075.47
97,341.33
272,409.87
247,645.33
517,701.07
470,637.33
340,169.87
309,245.33
581,127.73
527,904.00
HARGA SATUAN
65,000.00
Jumlah
Overhead
315,392.00
141,680.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
315,392.00
141,680.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
4,333.33
532,237.33
53,223.73
315,392.00
141,680.00
3,166.67
4,833.33
4,333.33
469,405.33
46,940.53
315,392.00
141,680.00
222,992.00
3,166.67
4,833.33
4,333.33
692,397.33
69,239.73
516,345.87
469,405.33
761,637.07
692,397.33
HARGA SATUAN
320,320.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
225,456.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
115,192.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
115,192.00
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
150,920.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
477,400.00
95,000.00
72,500.00
65,000.00
Jumlah
JUMLAH
320,320.00
3,166.67
4,833.33
4,333.33
332,653.33
33,265.33
225,456.00
3,166.67
4,833.33
4,333.33
237,789.33
23,778.93
115,192.00
3,166.67
4,833.33
4,333.33
127,525.33
12,752.53
115,192.00
222,992.00
3,166.67
4,833.33
4,333.33
350,517.33
35,051.73
150,920.00
3,166.67
4,833.33
4,333.33
163,253.33
16,325.33
477,400.00
95,000.00
72,500.00
65,000.00
709,900.00
TOTAL
365,918.67
332,653.33
261,568.27
237,789.33
140,277.87
127,525.33
385,569.07
350,517.33
179,578.67
163,253.33
780,890.00
709,900.00
HARGA SATUAN
Overhead
12,936,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
17,248.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
70,990.00
12,936,000.00
190,000.00
145,000.00
130,000.00
465,000.00
46,500.00
17,248.00
2,375.00
3,625.00
3,250.00
26,498.00
2,649.80
13,447,500.00
13,401,000.00
29,147.80
26,498.00
HARGA SATUAN
19,712.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
28,336.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
169,400.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
184,800.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
22,176.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
23,408.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
19,712.00
2,375.00
3,625.00
3,250.00
28,962.00
2,896.20
28,336.00
2,375.00
3,625.00
3,250.00
37,586.00
3,758.60
169,400.00
2,375.00
3,625.00
3,250.00
178,650.00
17,865.00
184,800.00
2,375.00
4,350.00
3,900.00
195,425.00
19,542.50
22,176.00
2,375.00
4,350.00
3,900.00
32,801.00
3,280.10
23,408.00
2,375.00
4,350.00
3,900.00
34,033.00
3,403.30
TOTAL
31,858.20
28,962.00
41,344.60
37,586.00
196,515.00
178,650.00
214,967.50
195,425.00
36,081.10
32,801.00
37,436.30
34,033.00
HARGA SATUAN
145,376.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
222,992.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
145,376.00
2,375.00
4,350.00
3,900.00
156,001.00
15,600.10
222,992.00
2,375.00
4,350.00
3,900.00
233,617.00
23,361.70
TOTAL
171,601.10
156,001.00
256,978.70
233,617.00
HARGA SATUAN
6,591.20
2,340.80
2,464.00
2,464.00
308.00
246.40
1,540.00
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
6,591.20
2,340.80
2,464.00
2,464.00
308.00
246.40
1,540.00
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
6,591.20
5,112.80
2,340.80
2,464.00
2,464.00
308.00
246.40
1,540.00
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
JUMLAH
72,503.20
25,748.80
2,464.00
4,928.00
924.00
1,478.40
3,080.00
1,078.00
15,833.33
21,750.00
19,500.00
169,287.73
16,928.77
92,276.80
32,771.20
2,464.00
4,928.00
924.00
1,478.40
3,080.00
1,078.00
15,833.33
21,750.00
19,500.00
196,083.73
19,608.37
92,276.80
71,579.20
32,771.20
2,464.00
4,928.00
924.00
1,478.40
3,080.00
1,078.00
28,500.00
21,750.00
19,500.00
280,329.60
TOTAL
170,766.13
169,287.73
197,562.13
196,083.73
281,808.00
280,329.60
HARGA SATUAN
Overhead
16,385.60
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
6,591.20
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
28,032.96
327,712.00
4,312.00
15,833.33
30,208.33
19,500.00
397,565.67
39,756.57
105,459.20
4,312.00
15,833.33
21,750.00
19,500.00
166,854.53
16,685.45
437,322.23
397,565.67
183,539.99
166,854.53
HARGA SATUAN
16,016.00
11,827.20
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
22,176.00
17,248.00
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
256,256.00
189,235.20
4,312.00
19,000.00
36,250.00
32,500.00
537,553.20
53,755.32
443,520.00
344,960.00
4,312.00
19,000.00
36,250.00
32,500.00
880,542.00
88,054.20
21,560.00
2,340.80
2,464.00
2,464.00
308.00
246.40
1,540.00
4,312.00
344,960.00
37,452.80
2,464.00
4,928.00
924.00
1,478.40
3,080.00
1,078.00
95,000.00
72,500.00
65,000.00
15,833.33
21,750.00
19,500.00
453,448.53
45,344.85
Jumlah
Overhead
4,312.00
2,340.80
2,464.00
2,464.00
308.00
246.40
1,540.00
4,312.00
43,120.00
23,408.00
2,464.00
4,928.00
924.00
1,478.40
3,080.00
1,078.00
TOTAL
591,308.52
537,553.20
968,596.20
880,542.00
498,793.39
453,448.53
151,320.11
137,563.73
HARGA SATUAN
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
2,464.00
2,340.80
2,464.00
2,464.00
4,312.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
15,833.33
21,750.00
19,500.00
137,563.73
13,756.37
34,496.00
32,771.20
2,464.00
4,928.00
1,078.00
15,833.33
21,750.00
19,500.00
132,820.53
13,282.05
160,910.13
132,820.53
HARGA SATUAN
JUMLAH
19,712.00
2,340.80
2,464.00
2,464.00
308.00
246.40
1,540.00
4,312.00
236,544.00
28,089.60
2,464.00
4,928.00
924.00
1,478.40
3,080.00
1,078.00
95,000.00
72,500.00
65,000.00
15,833.33
21,750.00
19,500.00
335,669.33
33,566.93
Jumlah
Overhead
513,744,000.00
2,500,000.00
513,744,000.00
2,500,000.00
95,000.00
72,500.00
65,000.00
285,000.00
217,500.00
195,000.00
516,941,500.00
51,694,150.00
Jumlah
Overhead
16,632,000.00
20,328,000.00
24,024,000.00
19,096,000.00
16,632,000.00
40,656,000.00
24,024,000.00
19,096,000.00
95,000.00
72,500.00
65,000.00
285,000.00
217,500.00
195,000.00
101,105,500.00
10,110,550.00
Jumlah
Overhead
78,414,336.00
78,414,336.00
95,000.00
72,500.00
65,000.00
190,000.00
145,000.00
130,000.00
78,879,336.00
Jumlah
TOTAL
369,236.27
335,669.33
568,635,650.00
516,941,500.00
111,216,050.00
101,105,500.00
86,767,269.60
78,879,336.00
HARGA SATUAN
Overhead
19,712,000.00
17,248,000.00
4,589,200.00
3,301,760.00
2,136,288.00
1,639,792.00
410,872.00
362,824.00
149,072.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
3,200,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
19,712,000.00
17,248,000.00
1,639,792.00
410,872.00
362,824.00
149,072.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
3,200,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
2,541,000.00
1,315,776.00
559,020.00
JUMLAH
TOTAL
7,887,933.60
19,712,000.00
17,248,000.00
4,589,200.00
3,301,760.00
6,408,864.00
1,639,792.00
410,872.00
725,648.00
894,432.00
220,528.00
66,528.00
19,712,000.00
3,850,000.00
3,200,000.00
285,000.00
217,500.00
195,000.00
82,677,124.00
8,267,712.40
19,712,000.00
17,248,000.00
9,838,752.00
410,872.00
725,648.00
894,432.00
220,528.00
66,528.00
19,712,000.00
3,850,000.00
3,200,000.00
285,000.00
217,500.00
195,000.00
76,576,260.00
7,657,626.00
2,541,000.00
3,947,328.00
2,236,080.00
90,944,836.40
82,677,124.00
84,233,886.00
76,576,260.00
21,548,608.40
19,589,644.00
HARGA SATUAN
263,648.00
141,372.00
362,824.00
149,072.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
2,541,000.00
1,315,776.00
263,648.00
141,372.00
128,744.00
121,968.00
410,872.00
362,824.00
149,072.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
527,296.00
141,372.00
362,824.00
447,216.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
190,000.00
145,000.00
130,000.00
19,589,644.00
1,958,964.40
5,082,000.00
2,631,552.00
527,296.00
141,372.00
128,744.00
121,968.00
410,872.00
362,824.00
447,216.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
190,000.00
145,000.00
130,000.00
19,240,372.00
1,924,037.20
21,164,409.20
19,240,372.00
HARGA SATUAN
263,648.00
263,648.00
251,944.00
145,376.00
141,372.00
121,968.00
362,824.00
149,072.00
110,264.00
33,264.00
10,472,000.00
3,850,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
263,648.00
527,296.00
251,944.00
141,372.00
121,968.00
362,824.00
447,216.00
110,264.00
33,264.00
10,472,000.00
3,850,000.00
95,000.00
72,500.00
65,000.00
16,814,296.00
1,681,429.60
559,020.00
263,648.00
145,376.00
251,944.00
121,968.00
362,824.00
149,072.00
110,264.00
33,264.00
10,472,000.00
3,850,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
559,020.00
527,296.00
145,376.00
503,888.00
121,968.00
362,824.00
447,216.00
110,264.00
33,264.00
10,472,000.00
3,850,000.00
190,000.00
145,000.00
130,000.00
17,598,116.00
1,759,811.60
559,020.00
263,648.00
251,944.00
251,944.00
251,944.00
128,744.00
559,020.00
527,296.00
251,944.00
251,944.00
251,944.00
128,744.00
TOTAL
18,495,725.60
16,814,296.00
19,357,927.60
17,598,116.00
13,518,370.80
12,289,428.00
HARGA SATUAN
121,968.00
362,824.00
149,072.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
121,968.00
362,824.00
447,216.00
110,264.00
33,264.00
4,928,000.00
3,850,000.00
190,000.00
145,000.00
130,000.00
12,289,428.00
1,228,942.80
HARGA SATUAN
JUMLAH
121,968.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
121,968.00
504,504.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,409,436.00
1,040,943.60
121,968.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
121,968.00
288,288.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,193,220.00
1,019,322.00
121,968.00
24,024.00
383,152.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
1,315,776.00
559,020.00
145,376.00
24,024.00
383,152.00
33,264.00
4,928,000.00
121,968.00
360,360.00
383,152.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,648,444.00
1,064,844.40
581,504.00
504,504.00
383,152.00
33,264.00
4,928,000.00
TOTAL
11,450,379.60
10,409,436.00
11,212,542.00
10,193,220.00
11,713,288.40
10,648,444.00
12,377,336.40
11,252,124.00
HARGA SATUAN
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
263,648.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
4,589,200.00
95,000.00
72,500.00
65,000.00
11,252,124.00
1,125,212.40
263,648.00
720,720.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,767,332.00
1,076,733.20
11,844,065.20
10,767,332.00
HARGA SATUAN
JUMLAH
121,968.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
121,968.00
576,576.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,481,508.00
1,048,150.80
263,648.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
263,648.00
792,792.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,839,404.00
1,083,940.40
121,968.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
141,372.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
121,968.00
576,576.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,481,508.00
1,048,150.80
141,372.00
360,360.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
TOTAL
11,529,658.80
10,481,508.00
11,923,344.40
10,839,404.00
11,529,658.80
10,481,508.00
11,313,165.60
10,284,696.00
HARGA SATUAN
Jumlah
Overhead
141,372.00
24,024.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
10,284,696.00
1,028,469.60
141,372.00
360,360.00
33,264.00
4,928,000.00
4,589,200.00
95,000.00
72,500.00
65,000.00
10,284,696.00
1,028,469.60
11,313,165.60
10,284,696.00
HARGA SATUAN
121,968.00
121,968.00
4,928,000.00
4,928,000.00
3,850,000.00
924,000.00
95,000.00
65,000.00
72,500.00
Jumlah
Overhead
JUMLAH
121,968.00
243,936.00
4,928,000.00
3,850,000.00
924,000.00
79,166.67
54,166.67
60,416.67
10,261,654.00
1,026,165.40
9,517,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
9,517,200.00
95,000.00
145,000.00
130,000.00
9,887,200.00
988,720.00
169,400.00
95,000.00
72,500.00
65,000.00
169,400.00
47,500.00
72,500.00
65,000.00
354,400.00
35,440.00
Jumlah
Overhead
187,880.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
172,480.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
60,368.00
187,880.00
1,979.17
3,020.83
2,708.33
195,588.33
19,558.83
172,480.00
2,375.00
4,350.00
3,900.00
183,105.00
18,310.50
60,368.00
TOTAL
11,287,819.40
10,261,654.00
10,875,920.00
9,887,200.00
389,840.00
354,400.00
215,147.17
195,588.33
201,415.50
183,105.00
168,154.80
152,868.00
HARGA SATUAN
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
82,544.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
99,792.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
23,750.00
36,250.00
32,500.00
152,868.00
15,286.80
82,544.00
23,750.00
36,250.00
32,500.00
175,044.00
17,504.40
99,792.00
23,750.00
36,250.00
32,500.00
192,292.00
19,229.20
192,548.40
175,044.00
211,521.20
192,292.00
HARGA SATUAN
120,120.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
9,240.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
15,400.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
20,328.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
25,872.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
31,416.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
120,120.00
23,750.00
36,250.00
32,500.00
212,620.00
21,262.00
9,240.00
791.67
1,208.33
1,083.33
12,323.33
1,232.33
15,400.00
791.67
1,208.33
1,083.33
18,483.33
1,848.33
20,328.00
791.67
1,208.33
1,083.33
23,411.33
2,341.13
25,872.00
791.67
1,208.33
1,083.33
28,955.33
2,895.53
31,416.00
791.67
1,208.33
1,083.33
34,499.33
3,449.93
TOTAL
233,882.00
212,620.00
13,555.67
12,323.33
20,331.67
18,483.33
25,752.47
23,411.33
31,850.87
28,955.33
37,949.27
34,499.33
HARGA SATUAN
JUMLAH
61,600.00
95,000.00
72,500.00
65,000.00
61,600.00
791.67
1,208.33
1,083.33
64,683.33
6,468.33
3,696.00
95,000.00
72,500.00
65,000.00
3,696.00
2,375.00
4,350.00
3,900.00
14,321.00
1,432.10
Jumlah
Jumlah
Overhead
198,352.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
236,544.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
348,040.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
179,872.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
198,352.00
2,375.00
4,350.00
3,900.00
208,977.00
20,897.70
236,544.00
2,375.00
4,350.00
3,900.00
247,169.00
24,716.90
348,040.00
39,583.33
60,416.67
54,166.67
502,206.67
50,220.67
179,872.00
7,916.67
12,083.33
10,833.33
210,705.33
21,070.53
TOTAL
71,151.67
64,683.33
15,753.10
14,321.00
229,874.70
208,977.00
271,885.90
247,169.00
552,427.33
502,206.67
231,775.87
210,705.33
HARGA SATUAN
36,960.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
40,040.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
215,600.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
119,504.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
46,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
7,293,686.40
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
36,960.00
7,916.67
12,083.33
10,833.33
67,793.33
6,779.33
40,040.00
7,916.67
12,083.33
10,833.33
70,873.33
7,087.33
215,600.00
7,916.67
12,083.33
10,833.33
246,433.33
24,643.33
119,504.00
7,916.67
12,083.33
10,833.33
150,337.33
15,033.73
46,200.00
7,916.67
12,083.33
10,833.33
77,033.33
7,703.33
7,293,686.40
95,000.00
145,000.00
130,000.00
7,663,686.40
766,368.64
TOTAL
74,572.67
67,793.33
77,960.67
70,873.33
271,076.67
246,433.33
165,371.07
150,337.33
84,736.67
77,033.33
8,430,055.04
7,663,686.40
HARGA SATUAN
215,600.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
582,120.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
770,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
462,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
706,860.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
748,440.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
215,600.00
95,000.00
145,000.00
130,000.00
585,600.00
58,560.00
582,120.00
23,750.00
36,250.00
32,500.00
674,620.00
67,462.00
770,000.00
23,750.00
36,250.00
32,500.00
862,500.00
86,250.00
462,000.00
23,750.00
36,250.00
32,500.00
554,500.00
55,450.00
706,860.00
11,875.00
12,083.33
10,833.33
741,651.67
74,165.17
748,440.00
11,875.00
12,083.33
10,833.33
783,231.67
78,323.17
TOTAL
644,160.00
585,600.00
742,082.00
674,620.00
948,750.00
862,500.00
609,950.00
554,500.00
815,816.83
741,651.67
861,554.83
783,231.67
HARGA SATUAN
706,860.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
2,109,800.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
1,694,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
5,688,760.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
706,860.00
11,875.00
12,083.33
10,833.33
741,651.67
74,165.17
2,109,800.00
15,833.33
36,250.00
32,500.00
2,194,383.33
219,438.33
1,694,000.00
15,833.33
36,250.00
32,500.00
1,778,583.33
177,858.33
5,688,760.00
15,833.33
36,250.00
32,500.00
5,773,343.33
577,334.33
3,160,696.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
3,160,696.00
15,833.33
36,250.00
32,500.00
3,245,279.33
324,527.93
1,811,040.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
1,811,040.00
15,833.33
36,250.00
32,500.00
1,895,623.33
189,562.33
TOTAL
815,816.83
741,651.67
2,413,821.67
2,194,383.33
1,956,441.67
1,778,583.33
6,350,677.67
5,773,343.33
3,569,807.27
3,245,279.33
2,085,185.67
1,895,623.33
HARGA SATUAN
JUMLAH
16,581,488.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
16,581,488.00
95,000.00
145,000.00
130,000.00
16,951,488.00
1,695,148.80
385,000.00
95,000.00
72,500.00
65,000.00
385,000.00
15,833.33
36,250.00
32,500.00
469,583.33
46,958.33
Jumlah
Overhead
77,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
113,036.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
513,744.00
200,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
77,000.00
15,833.33
36,250.00
32,500.00
161,583.33
16,158.33
113,036.00
6,333.33
10,875.00
9,750.00
139,994.33
13,999.43
513,744.00
200,200.00
6,333.33
10,875.00
9,750.00
740,902.33
74,090.23
TOTAL
18,646,636.80
16,951,488.00
516,541.67
469,583.33
177,741.67
161,583.33
153,993.77
139,994.33
1,481,804.67
740,902.33
HARGA SATUAN
315,392.00
200,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
739,200.00
107,800.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
571,032.00
107,800.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
77,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
243,320.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
1,093,400.00
95,000.00
JUMLAH
315,392.00
200,200.00
6,333.33
10,875.00
9,750.00
542,550.33
54,255.03
739,200.00
107,800.00
31,666.67
48,333.33
43,333.33
970,333.33
97,033.33
571,032.00
107,800.00
31,666.67
48,333.33
43,333.33
802,165.33
80,216.53
77,000.00
31,666.67
48,333.33
43,333.33
200,333.33
20,033.33
243,320.00
31,666.67
48,333.33
43,333.33
366,653.33
36,665.33
1,093,400.00
31,666.67
TOTAL
552,300.33
542,550.33
1,940,666.67
970,333.33
882,381.87
802,165.33
220,366.67
200,333.33
403,318.67
366,653.33
1,338,406.67
1,216,733.33
HARGA SATUAN
72,500.00
65,000.00
Jumlah
Overhead
144,760.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
46,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
48,333.33
43,333.33
1,216,733.33
121,673.33
144,760.00
15,833.33
24,166.67
21,666.67
206,426.67
20,642.67
46,200.00
7,916.67
12,083.33
10,833.33
77,033.33
7,703.33
227,069.33
206,426.67
84,736.67
77,033.33
HARGA SATUAN
6,135,360.00
613,536.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
2,132,592.00
213,259.20
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
77,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
110,880.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
67,760.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
301,840.00
95,000.00
72,500.00
65,000.00
JUMLAH
6,135,360.00
613,536.00
95,000.00
145,000.00
130,000.00
7,118,896.00
711,889.60
2,132,592.00
213,259.20
95,000.00
145,000.00
130,000.00
2,715,851.20
271,585.12
77,000.00
15,833.33
24,166.67
21,666.67
138,666.67
13,866.67
110,880.00
3,958.33
6,041.67
5,416.67
126,296.67
12,629.67
67,760.00
3,958.33
6,041.67
5,416.67
83,176.67
8,317.67
301,840.00
15,833.33
24,166.67
21,666.67
TOTAL
7,830,785.60
7,118,896.00
2,987,436.32
2,715,851.20
152,533.33
138,666.67
138,926.33
126,296.67
91,494.33
83,176.67
399,857.33
363,506.67
HARGA SATUAN
Jumlah
Overhead
277,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
136,136,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
TOTAL
363,506.67
36,350.67
277,200.00
3,958.33
6,041.67
5,416.67
292,616.67
29,261.67
136,136,000.00
95,000.00
145,000.00
130,000.00
136,506,000.00
13,650,600.00
321,878.33
292,616.67
150,156,600.00
136,506,000.00
HARGA SATUAN
JUMLAH
36,036,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
36,036,000.00
95,000.00
145,000.00
130,000.00
36,406,000.00
3,640,600.00
89,628,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
89,628,000.00
95,000.00
145,000.00
130,000.00
89,998,000.00
8,999,800.00
9,240,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
46,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
9,240,000.00
95,000.00
145,000.00
130,000.00
9,610,000.00
961,000.00
46,200.00
95,000.00
72,500.00
65,000.00
278,700.00
27,870.00
7,515,200.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
7,515,200.00
47,500.00
72,500.00
65,000.00
7,700,200.00
770,020.00
1,078,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
1,078,000.00
47,500.00
72,500.00
65,000.00
1,263,000.00
126,300.00
TOTAL
40,046,600.00
36,406,000.00
98,997,800.00
89,998,000.00
10,571,000.00
9,610,000.00
306,570.00
278,700.00
8,470,220.00
7,700,200.00
1,389,300.00
1,263,000.00
HARGA SATUAN
924,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
175,560.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
2,240,000.00
95,000.00
72,500.00
65,000.00
Jumlah
Overhead
JUMLAH
924,000.00
47,500.00
72,500.00
65,000.00
1,109,000.00
110,900.00
175,560.00
47,500.00
72,500.00
65,000.00
360,560.00
36,056.00
2,240,000.00
47,500.00
72,500.00
65,000.00
2,425,000.00
242,500.00
TOTAL
1,219,900.00
1,109,000.00
396,616.00
360,560.00
2,667,500.00
2,425,000.00
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
IV.
A
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
1232.4
862.68
2163
369.72
309.13
154.565
kg
kg
m2
m3
btg
17614.598
9420.4656
796.32
199.08
948
kg
kg
m2
m3
6740.28
7439.0456
1291.8
129.18
kg
m2
m3
14012.996
34.608
173.04
kg
kg
18723
14739.883
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
m2
m3
Halaman - 2176
VOLUME
2346.3
146.64375
kg
kg
m2
m3
20410.44
7439.0456
1291.8
129.18
kg
m2
m3
m2
m2
41104.787
3172.4
317.24
3172.4
3172.4
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
PEKERJAAN PONDASI
1 PEKERJAAN PONDASI KSLL
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
TOTAL III
IV.
A
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
0
0
0
0
0
0
m2
242.4
kg
kg
m2
m3
4338.688
1164.7973
150.1
18.7625
Halaman - 2177
NO
URAIAN PEKERJAAN
2 BALOK TYPE B1 (30x65)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE B2 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 PELAT LANTAI RAMP S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
kg
kg
m2
m3
722.52
56.16
226.5624
43.2
5.265
kg
kg
kg
m2
m3
2670.648
207.584
788.18048
149.7
17.964
kg
kg
kg
m2
m3
224.784
33.28
94.7712
18.4
1.8
kg
kg
kg
m2
m3
99.54
20.8
74.04
15
1.3
kg
m2
m3
2202.69
170
20.4
kg
kg
kg
m2
m3
569.988
44.304
178.73256
34.08
4.1535
kg
Halaman - 2178
VOLUME
481.68
NO
URAIAN PEKERJAAN
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PELAT LANTAI SATU S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
6 KOLOM TYPE K1 (50x50)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
RAMP ( LT. SATU - LT. DUA )
7 BALOK TYPE B1 (30x65)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE B2 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 BALOK TYPE BA (25x45)
SATUAN
kg
kg
m2
m3
Halaman - 2179
VOLUME
37.44
142.1568
27
3.24
kg
kg
kg
m2
m3
233.91585
34.632
98.62128
19.1475
1.873125
kg
kg
kg
m2
m3
59.724
12.48
44.424
9
0.78
kg
m2
m3
827.9523
63.9
7.668
kg
kg
m2
m3
3457.392
1063.5106
134.9
16.8625
kg
kg
kg
m2
m3
642.24
49.92
201.3888
38.4
4.68
kg
kg
kg
m2
m3
2670.648
207.584
788.18048
149.7
17.964
NO
URAIAN PEKERJAAN
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 PELAT LANTAI RAMP S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
TOTAL IV.B
SATUAN
kg
kg
kg
m2
m3
kg
kg
kg
m2
m3
99.54
20.8
74.04
15
1.3
kg
m2
m3
2202.69
170
20.4
kg
kg
kg
m2
m3
569.988
44.304
178.73256
34.08
4.1535
kg
kg
kg
m2
m3
481.68
37.44
142.1568
27
3.24
kg
kg
kg
m2
m3
233.91585
34.632
98.62128
19.1475
1.873125
kg
kg
Halaman - 2180
VOLUME
224.784
33.28
94.7712
18.4
1.8
59.724
12.48
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PELAT LANTAI DUA S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
6 KOLOM TYPE K1 (50x50)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
RAMP ( LT. DUA -LT. TIGA )
7 BALOK TYPE B1 (30x65)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE B2 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 PELAT LANTAI RAMP S1 (t=12 cm)
- Besi 10 (Double Layer)
SATUAN
kg
m2
m3
kg
m2
m3
563.6295
43.5
5.22
kg
kg
m2
m3
3093.456
951.56208
120.7
15.0875
kg
kg
kg
m2
m3
642.24
49.92
201.3888
38.4
4.68
kg
kg
kg
m2
m3
2670.648
207.584
788.18048
149.7
17.964
kg
kg
kg
m2
m3
224.784
33.28
94.7712
18.4
1.8
kg
kg
kg
m2
m3
99.54
20.8
74.04
15
1.3
kg
Halaman - 2181
VOLUME
44.424
9
0.78
2202.69
NO
URAIAN PEKERJAAN
- Begisting
- Cor Beton K-300
TOTAL IV.C
SATUAN
m2
m3
VOLUME
170
20.4
kg
kg
kg
m2
m3
569.988
44.304
178.73256
34.08
4.1535
kg
kg
kg
m2
m3
481.68
37.44
142.1568
27
3.24
kg
kg
kg
m2
m3
233.91585
34.632
98.62128
19.1475
1.873125
kg
kg
kg
m2
m3
59.724
12.48
44.424
9
0.78
kg
m2
m3
563.6295
43.5
5.22
kg
kg
m2
m3
2729.52
951.56208
120.7
15.0875
NO
D
URAIAN PEKERJAAN
LANTAI ATAP ( EL. + 17,20 M )
1 BALOK TYPE B1 (30x65)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B2 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PELAT LANTAI ATAP SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.D
Halaman - 2183
SATUAN
VOLUME
kg
kg
kg
m2
m3
1212.228
94.224
380.12136
72.48
8.8335
kg
kg
kg
m2
m3
2659.944
206.752
785.02144
149.1
17.892
kg
kg
kg
m2
m3
571.09185
84.552
240.77808
46.7475
4.573125
kg
kg
kg
m2
m3
159.264
33.28
118.464
24
2.08
kg
m2
m3
m2
m2
3140.7768
242.4
24.24
242.4
242.4
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
PEKERJAAN PONDASI
1 PEKERJAAN PONDASI KSLL
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
TOTAL III
IV.
A
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
0
0
0
0
0
0
m2
125
kg
kg
m2
m3
2441.216
408.7008
58.32
6.561
Halaman - 2184
NO
B
URAIAN PEKERJAAN
SATUAN
VOLUME
kg
kg
kg
m2
m3
642.24
49.92
177.696
33.6
3.96
kg
kg
kg
m2
m3
1024.908
79.664
264.66832
49.79
5.745
kg
kg
kg
m2
m3
583.5018
64.792
184.50768
35.8225
3.504375
kg
kg
kg
m2
m3
119.448
24.96
71.0784
14.4
1.2
kg
m2
m3
1619.625
125
15
kg
kg
m2
m3
1945.344
398.03904
52.56
5.913
NO
URAIAN PEKERJAAN
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B2 (30x50)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BL (20x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PELAT LANTAI DUA S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
6 KOLOM TYPE K1 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
SATUAN
kg
kg
kg
m2
m3
kg
kg
kg
m2
m3
1024.908
79.664
264.66832
49.79
5.745
kg
kg
kg
m2
m3
583.5018
64.792
184.50768
35.8225
3.504375
kg
kg
kg
m2
m3
119.448
24.96
71.0784
14.4
1.2
kg
m2
m3
1619.625
125
15
kg
kg
m2
m3
1287.36
398.03904
52.56
5.913
kg
kg
kg
Halaman - 2186
VOLUME
642.24
49.92
177.696
33.6
3.96
642.24
49.92
177.696
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B2 (30x50)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BL (20x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PELAT DAK ATAP SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.D
Halaman - 2187
SATUAN
m2
m3
VOLUME
33.6
3.96
kg
kg
kg
m2
m3
931.248
72.384
240.48192
45.24
5.22
kg
kg
kg
m2
m3
550.7208
61.152
174.14208
33.81
3.3075
kg
kg
kg
m2
m3
59.724
12.48
35.5392
7.2
0.6
kg
m2
m3
m2
m2
1477.098
114
11.4
114
114
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
139.23
97.461
507
41.769
64.56975
32.284875
kg
kg
m2
m3
btg
843.1038
475.6752
27.72
10.395
49.5
kg
kg
m2
m3
btg
1254.204
707.616
40.32
12.096
90
kg
kg
kg
m2
m3
3805.272
492.96
1228.3236
213.3
26.6625
kg
kg
m2
m3
1100.628
451.29231
81.27
8.127
NO
IV.
A
URAIAN PEKERJAAN
5 PONDASI BATU KALI
- Pas. Bt. Kali
TOTAL III
SATUAN
VOLUME
m1
kg
m2
m3
2831.1045
6.992
34.96
kg
m2
m3
906.99
2.8
14
kg
kg
m2
m3
3967.38
1556.1727
225.68
19.747
kg
kg
kg
m2
m3
1933.92
212.16
604.1664
117.3
11.475
kg
kg
kg
m2
m3
1820.16
199.68
521.2416
100.8
9.6
kg
kg
m2
m3
209.034
82.9248
16.8
1.26
NO
URAIAN PEKERJAAN
4 PELAT DAK ATAP SA
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.B
Halaman - 2190
SATUAN
kg
m2
m3
m2
m2
VOLUME
2086.077
161
16.1
161
161
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
56.55
39.585
125
16.965
17.868
8.934
kg
kg
m2
m3
btg
229.9374
129.7296
7.56
2.835
13.5
kg
kg
m2
m3
btg
487.746
275.184
16.8
6.3
30
kg
kg
kg
m2
m3
1092.6108
141.544
352.68954
61.245
7.655625
kg
kg
m2
m3
655.542
268.79297
48.405
4.8405
NO
URAIAN PEKERJAAN
TOTAL III
IV.
SATUAN
VOLUME
kg
m2
m3
809.8125
2
10
kg
kg
m2
m3
1811.628
721.89
105.56
9.2365
kg
kg
kg
m2
m3
625.68
68.64
211.7544
41.25
4.125
kg
kg
kg
m2
m3
753.66
82.68
235.4472
45.7125
4.471875
kg
kg
kg
m2
m3
283.689
59.28
140.676
28.5
2.28
kg
m2
m3
m2
1813.98
140
14
140
NO
URAIAN PEKERJAAN
- Pasangan screed lengkap kawat ayam
TOTAL IV.B
Halaman - 2193
SATUAN
m2
VOLUME
140
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
244.53
171.171
601.1
73.359
79.70825
39.854125
kg
kg
m2
m3
btg
2070.432
1192.464
60.48
27.216
160
kg
kg
m2
m3
btg
996.3954
562.1616
32.76
12.285
58.5
kg
kg
kg
m2
m3
3521.616
547.456
1364.113
236.88
29.61
kg
kg
m2
m3
1489.782
610.85777
110.005
11.0005
NO
URAIAN PEKERJAAN
TOTAL III
IV.
SATUAN
VOLUME
kg
m2
m3
3894.2264
9.6176
48.088
kg
kg
kg
m2
m3
165.1104
97.95492
101.0646
30.912
3.4398
kg
kg
m2
m3
4385.964
1288.4441
179.52
17.952
kg
kg
m2
m3
1986.93
644.22204
89.76
8.976
kg
kg
m2
m3
65.096
24.58128
3.6
0.225
kg
kg
kg
m2
m3
29.862
6.24
14.808
3
0.24
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B2 (25x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (20x40)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA1 (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PLAT LANTAI SATU S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
6 PLAT LANTAI SATU SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
7 KOLOM TYPE K1 (40x40)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
Halaman - 2196
SATUAN
kg
kg
kg
m2
m3
VOLUME
2373.792
260.416
865.18208
169.02
17.215
kg
kg
kg
m2
m3
2616.48
287.04
885.5184
172.5
17.25
kg
kg
kg
m2
m3
1507.0356
314.912
747.3104
151.4
12.112
kg
kg
m2
m3
839.1222
332.88384
67.44
5.058
kg
m2
m3
6434.4462
496.6
59.592
kg
m2
m3
m2
m2
1939.6629
149.7
14.97
149.7
149.7
kg
kg
m2
m3
2472.624
912.1728
121.44
12.144
NO
C
URAIAN PEKERJAAN
RING BALOK ( EL. + 7,55 M )
1 BALOK TYPE B3 (25x55)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B4 (25x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
SATUAN
Halaman - 2197
VOLUME
kg
kg
kg
m2
m3
982.8864
134.784
447.79392
87.48
8.91
kg
kg
kg
m2
m3
819.072
112.32
346.5072
67.5
6.75
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
136.864
95.8048
359
41.0592
46.5448
23.2724
kg
kg
m2
m3
btg
376.2612
212.2848
10.584
3.6288
57
kg
kg
m2
m3
btg
780.3936
440.2944
23.52
8.82
96
kg
kg
m2
m3
btg
780.3936
440.2944
17.64
7.35
78
kg
kg
m2
m3
1820.16
746.3232
134.4
13.44
NO
IV.
A
URAIAN PEKERJAAN
5 SLOOF TB2 20/30
- Besi D 16
- Besi 10
- Begisting Batako
- Cor Beton K-300
6 PONDASI BATU KALI
- Pas. Bt. Kali
TOTAL III
SATUAN
VOLUME
kg
kg
m2
m3
544.152
198.32848
34.44
3.444
m1
27
kg
m2
m3
2325.7815
5.744
28.72
kg
kg
m2
m3
2332.08
1150.5816
168.96
16.896
kg
kg
m2
m3
2016.08
1018.05
155.76
11.682
kg
kg
m2
m3
2269.512
1012.8672
205.2
15.96
kg
kg
m2
m3
338.436
134.2592
27.2
2.04
Halaman - 2199
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BM (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BM1 (20x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 PELAT DAK ATAP SA
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.B
Halaman - 2200
SATUAN
kg
kg
kg
m2
m3
VOLUME
212.352
33.28
110.5664
22.4
1.92
kg
kg
m2
m3
433.9944
172.16768
34.88
2.616
kg
kg
kg
m2
m3
812.2464
127.296
362.49984
73.44
6.12
kg
m2
m3
m2
m2
984.732
76
7.6
76
76
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
66.612
46.6284
84.7
19.9836
12.7936
6.3968
kg
kg
m2
m3
btg
689.8122
389.1888
19.404
5.8212
49.5
kg
kg
m2
m3
btg
298.62
157.9032
13.23
2.97675
45
kg
kg
m2
m3
btg
54.9129
29.9208
2.1315
0.6174
10.5
kg
kg
m2
m3
688.248
209.17512
65.34
4.9005
NO
URAIAN PEKERJAAN
TOTAL III
IV.
SATUAN
VOLUME
kg
m2
m3
548.72895
1.3552
6.776
kg
kg
kg
m2
m3
165.1104
97.95492
101.0646
30.912
3.4398
kg
kg
m2
m3
1045.17
243.432
64.8
3.0375
kg
kg
m2
m3
703.248
248.8416
74.52
2.7945
kg
kg
kg
m2
m3
77.6412
14.6229
33.44544
11.2575
0.711
kg
kg
m2
m3
317.1168
121.42592
41.14
2.541
NO
URAIAN PEKERJAAN
- Besi D 13
- Besi 8
- Begisting Multipleks
- Cor Beton K-300
3 PLAT LANTAI SATU S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
4 PLAT LANTAI SATU SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
5 KOLOM TYPE K1 (15x25)
- Besi D 16
- Besi 8
- Begisting Multipleks
- Cor Beton K-300
6 KOLOM TYPE K2 (15x15)
- Besi D 13
- Besi 8
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
RING BALOK ( EL. + 6,83 M )
1 BALOK TYPE RB1 (15x30)
- Besi D 13
- Besi 8
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE RB2 (15x25)
- Besi D 13
- Besi 8
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
Halaman - 2203
SATUAN
kg
kg
m2
m3
VOLUME
311.8752
104.49152
35.7
2.142
kg
m2
m3
733.3662
56.6
6.792
kg
m2
m3
m2
m2
186.5808
14.4
1.44
14.4
14.4
kg
kg
m2
m3
533.25
150.2928
38.4
1.8
kg
kg
m2
m3
93.6
40.07808
11.52
0.432
kg
kg
m2
m3
134.316
67.5024
23.0625
1.38375
kg
kg
m2
m3
140.868
60.6816
20.9625
1.209375
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
IV.
A
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
139.23
97.461
59
41.769
#REF!
#REF!
kg
kg
m2
m3
btg
297.2928
158.9952
13.44
3.36
16
kg
kg
m2
m3
254.064
92.59936
16.08
1.608
kg
m2
m3
382.2315
0.944
4.72
kg
kg
308.416
236.928
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
m2
m3
kg
kg
m2
m3
Halaman - 2205
VOLUME
37.6
2.35
304.8768
105.82784
21.44
1.608
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
IV.
A
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=11 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
TOTAL III
VOLUME
ls
ls
ttk
ls
0
0
0
0
m3
m3
m2
m3
m3
m3
866.4
606.48
1444
259.92
7.2
3.6
m2
1444
kg
m2
m3
466.452
1.44
7.2
kg
131.04
kg
kg
kg
283.92
168.441
194.355
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
4 TANGGA - B (1 unit)
- Besi 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
5 STEK KOLOM
- Besi D 19
- Besi D 16
6 KOLOM TYPE K1 (35x35)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 KOLOM TYPE K2 (35x35)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE BT (20x40)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
m2
m3
kg
kg
kg
m2
m3
kg
kg
131.04
77.742
105.27563
24.948
2.394
5023.744
121.344
kg
kg
m2
m3
5619.6
1567.2787
211.68
18.522
kg
kg
m2
m3
2408.4
671.69088
90.72
7.938
kg
kg
kg
m2
m3
59.724
12.48
29.616
6
0.48
kg
kg
kg
m2
m3
4853.76
532.48
1642.7008
320
32
kg
kg
Halaman - 2207
VOLUME
53.004
5.04
5801.76
636.48
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (20x40)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA1 (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BL (20x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 PLAT LANTAI SATU S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
7 PLAT LANTAI SATU SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
8 KOLOM TYPE K1 (35x35)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
LANTAI DUA / ATAP ( EL. + 8,40 M )
1 BALOK TYPE B3 (25x50)
Halaman - 2208
SATUAN
kg
m2
m3
VOLUME
1812.4992
351.9
34.425
kg
kg
kg
m2
m3
4026.393
841.36
1996.612
404.5
32.36
kg
kg
m2
m3
287.6706
114.12032
23.12
1.734
kg
kg
kg
m2
m3
179.172
37.44
106.6176
21.6
1.8
kg
m2
m3
16079.637
1241
148.92
kg
m2
m3
m2
m2
1399.356
108
10.8
108
108
kg
kg
m2
m3
5619.6
1567.2787
211.68
18.522
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B4 (25x45)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE BA (20x40)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BL (20x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 PLAT LANTAI TIGA SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
6 KOLOM TYPE K1 (35x35)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE B3 (25x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE B4 (25x45)
- Besi D 16
- Besi D 13
- Besi 10
Halaman - 2209
SATUAN
kg
kg
kg
m2
m3
VOLUME
1789.824
245.44
757.1824
147.5
14.75
kg
kg
kg
m2
m3
2457.216
336.96
959.5584
186.3
18.225
kg
kg
kg
m2
74.655
37.02
7.5
0.6
kg
kg
kg
m2
m3
149.31
31.2
88.848
18
1.5
kg
m2
m3
m2
m2
634.893
49
4.9
49
49
kg
kg
m2
m3
109.716
36.42768
5.74
0.50225
kg
kg
kg
m2
m3
60.672
8.32
25.6672
5
0.5
kg
kg
kg
91.008
12.48
35.5392
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
9 BALOK TYPE BL (20x50)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
SATUAN
m2
m3
kg
kg
kg
m2
m3
Halaman - 2210
VOLUME
6.9
0.675
59.724
12.48
35.5392
7.2
0.6
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
IV.
A
Luas
Galian tanah Rib
Urugan tanah kembali
RIB /,10/90,/,12/235,12/130,(150 kg/m3) K225
Beton Plat t=12 cm (120 kg/m3) K300
Beton pertebalan Rib & voute K225
Lantai Kerja 1 : 5 rib
TOTAL III
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
697.8
488.46
1384.38
209.34
18.45
9.225
m2
1163
kg
m2
m3
1195.2833
3.69
18.45
kg
87.36
kg
kg
kg
357.7392
212.23566
218.9733
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
4 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
5 STEK KOLOM
- Besi D 22
- Besi D 19
- Besi D 16
5 KOLOM TYPE K1 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 KOLOM TYPE K2' (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K4 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K5 (25x25)
- Besi D 19
SATUAN
m2
m3
kg
kg
kg
m2
m3
kg
kg
kg
214.64352
127.3414
131.38398
38.682
3.4398
7171.072
28.544
192.128
kg
kg
m2
m3
2431.68
398.03904
63.36
5.832
kg
kg
m2
m3
13374.24
2189.2147
285.12
32.076
kg
kg
m2
m3
4863.36
796.07808
103.68
11.664
kg
kg
m2
m3
2431.68
398.03904
51.84
5.832
kg
kg
m2
m3
972.672
199.01952
25.92
2.916
kg
Halaman - 2212
VOLUME
64.47
5.733
90.984
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K7 (0.20x0.40)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K8
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K9
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
m2
m3
kg
kg
m2
m3
79
37.31616
7.2
0.576
kg
kg
m2
m3
47.4
31.0968
4.32
0.288
kg
kg
m2
m3
189.6
136.82592
17.28
1.44
kg
kg
m2
m3
252.8
149.26464
23.04
1.728
kg
kg
m2
m3
189.6
78.976
16
1.2
kg
kg
kg
m2
m3
224.784
33.28
78.976
18.4
1.8
kg
Halaman - 2213
VOLUME
49.75488
7.2
0.45
4270.896
NO
URAIAN PEKERJAAN
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B2 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE B3 (30x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE B4 (30x50)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE B6 (25x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BL1 (15x60)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
SATUAN
kg
kg
m2
m3
Halaman - 2214
VOLUME
632.32
1275.4624
243.2
29.64
kg
kg
kg
m2
m3
7474.068
553.28
2100.7616
399
47.88
kg
kg
kg
m2
m3
5191.44
403.52
1436.376
271.6
32.01
kg
kg
kg
m2
m3
214.56
12.48
41.4624
7.8
0.9
kg
kg
kg
m2
m3
72.252
6.24
22.212
4.35
0.45
kg
kg
kg
m2
m3
68.256
12.48
41.4624
8.1
0.54
kg
kg
kg
m2
4420.752
490.88
1397.8752
271.4
NO
URAIAN PEKERJAAN
- Cor Beton K-300
8 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 PLAT LANTAI SATU S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
11 PLAT LANTAI SATU SA (t=12 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
12 TANGGA - A (2 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
13 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K1 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
Halaman - 2215
SATUAN
m3
VOLUME
26.55
kg
kg
m2
m3
571.3596
254.99376
51.66
4.018
kg
kg
kg
m2
m3
59.724
12.48
44.424
9
0.78
kg
m2
m3
13896.383
1072.5
139.425
kg
m2
m3
m2
m2
313.88333
24.225
2.907
24.225
24.225
kg
kg
kg
m2
m3
312.312
185.2851
202.1292
56.994
5.229
kg
kg
kg
m2
m3
214.64352
127.3414
131.38398
38.682
3.4398
kg
kg
m2
m3
1869.056
379.0848
59.84
5.508
NO
URAIAN PEKERJAAN
15 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 KOLOM TYPE K2' (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
17 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
18 KOLOM TYPE K5 (25x25)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
19 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
20 KOLOM TYPE K7 (0.20x0.40)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
21 KOLOM TYPE K8
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
22 KOLOM TYPE K9
- Besi D 16
- Besi 10
- Begisting Multipleks
SATUAN
Halaman - 2216
VOLUME
kg
kg
m2
m3
10279.808
2084.9664
269.28
30.294
kg
kg
m2
m3
3738.112
758.1696
97.92
11.016
kg
kg
m2
m3
1869.056
379.0848
48.96
5.508
kg
kg
m2
m3
87.416
47.3856
6.8
0.425
kg
kg
m2
m3
75.84
35.5392
6.8
0.544
kg
kg
m2
m3
45.504
29.616
4.08
0.272
kg
kg
m2
m3
182.016
130.3104
16.32
1.36
kg
kg
m2
242.688
142.1568
21.76
NO
URAIAN PEKERJAAN
- Cor Beton K-300
21 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
22 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
SATUAN
m3
VOLUME
1.632
kg
kg
m2
m3
189.6
78.976
16
1.2
kg
kg
kg
m2
m3
224.784
33.28
78.976
18.4
1.8
kg
kg
kg
m2
m3
4270.896
632.32
1275.4624
243.2
29.64
kg
kg
kg
m2
m3
7474.068
553.28
2100.7616
399
47.88
kg
kg
kg
m2
m3
4709.76
366.08
1303.104
246.4
29.04
kg
kg
kg
m2
m3
214.56
12.48
41.4624
7.8
0.9
NO
URAIAN PEKERJAAN
5 BALOK TYPE B6 (25x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BL1 (15x60)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 PLAT LANTAI DUA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
10 TANGGA - A (2 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
SATUAN
Halaman - 2218
VOLUME
kg
kg
kg
m2
m3
72.252
6.24
22.212
4.35
0.45
kg
kg
kg
m2
m3
68.256
12.48
41.4624
8.1
0.54
kg
kg
kg
m2
m3
4420.752
490.88
1397.8752
271.4
26.55
kg
kg
m2
m3
881.9244
393.59664
79.74
6.202
kg
kg
kg
m2
m3
776.412
162.24
577.512
117
10.14
kg
m2
m3
14791.711
1141.6
148.408
kg
kg
kg
m2
m3
312.312
185.2851
202.1292
56.994
5.229
NO
URAIAN PEKERJAAN
11 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K1 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K2' (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 KOLOM TYPE K5 (25x25)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
17 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
18 KOLOM TYPE K7 (0.20x0.40)
- Besi D 16
- Besi 10
SATUAN
kg
kg
kg
m2
m3
214.64352
127.3414
131.38398
38.682
3.4398
kg
kg
m2
m3
1869.056
379.0848
59.84
5.508
kg
kg
m2
m3
10279.808
2084.9664
269.28
30.294
kg
kg
m2
m3
3738.112
758.1696
97.92
11.016
kg
kg
m2
m3
1869.056
379.0848
48.96
5.508
kg
kg
m2
m3
87.416
47.3856
6.8
0.425
kg
kg
m2
m3
75.84
35.5392
6.8
0.544
kg
kg
Halaman - 2219
VOLUME
45.504
29.616
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
19 KOLOM TYPE K8
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
20 KOLOM TYPE K9
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
19 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
20 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
SATUAN
m2
m3
kg
kg
m2
m3
182.016
130.3104
16.32
1.36
kg
kg
m2
m3
242.688
142.1568
21.76
1.632
kg
kg
m2
m3
189.6
78.976
16
1.2
kg
kg
kg
m2
m3
224.784
33.28
78.976
18.4
1.8
kg
kg
kg
m2
m3
4270.896
316.16
1200.4352
228
27.36
kg
kg
kg
m2
m3
7653.36
594.88
2117.544
400.4
47.19
kg
kg
Halaman - 2220
VOLUME
4.08
0.272
5793.12
336.96
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE B6 (25x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BL1 (15x60)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 PLAT LANTAI TIGA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
10 PLAT LANTAI SATU SA (t=12 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
11 TANGGA - B (1 unit)
Halaman - 2221
SATUAN
kg
m2
m3
VOLUME
1119.4848
210.6
24.3
kg
kg
kg
m2
m3
72.252
6.24
22.212
4.35
0.45
kg
kg
kg
m2
m3
68.256
12.48
41.4624
8.1
0.54
kg
kg
kg
m2
m3
4420.752
490.88
1397.8752
271.4
26.55
kg
kg
m2
m3
881.9244
393.59664
79.74
6.202
kg
kg
kg
m2
m3
776.412
162.24
577.512
117
10.14
kg
m2
m3
11889.343
917.6
119.288
kg
m2
m3
m2
m2
2902.368
224
26.88
224
224
NO
URAIAN PEKERJAAN
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K1 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K2' (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 KOLOM TYPE K5 (25x25)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
17 KOLOM TYPE K7 (0.20x0.40)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
18 KOLOM TYPE K8
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
19 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
SATUAN
kg
kg
kg
m2
m3
kg
kg
m2
m3
1401.792
379.0848
59.84
5.508
kg
kg
m2
m3
7709.856
2084.9664
269.28
30.294
kg
kg
m2
m3
2803.584
758.1696
97.92
11.016
kg
kg
m2
m3
87.416
47.3856
6.8
0.425
kg
kg
m2
m3
75.84
35.5392
6.8
0.544
kg
kg
m2
m3
45.504
29.616
4.08
0.272
kg
kg
m2
m3
182.016
130.3104
16.32
1.36
kg
kg
Halaman - 2222
VOLUME
214.64352
127.3414
131.38398
38.682
3.4398
118.5
49.36
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
20 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.D
SATUAN
m2
m3
VOLUME
10
0.75
kg
kg
kg
m2
m3
140.49
20.8
49.36
11.5
1.125
kg
kg
kg
m2
m3
2135.448
158.08
600.2176
114
13.68
kg
kg
kg
m2
m3
4281.6
332.8
1184.64
224
26.4
kg
kg
kg
m2
m3
6436.8
374.4
1243.872
234
27
kg
kg
kg
m2
m3
72.252
6.24
22.212
4.35
0.45
kg
kg
kg
m2
m3
68.256
12.48
41.4624
8.1
0.54
kg
590.058
NO
URAIAN PEKERJAAN
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BL (20x65)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 PLAT LANTAI TIGA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
8 PLAT LANTAI EMPAT SA (t=12 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
9 KOLOM TYPE K1 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.E
Halaman - 2224
SATUAN
kg
kg
m2
m3
VOLUME
65.52
186.5808
36.225
3.54375
kg
kg
kg
m2
m3
836.136
174.72
621.936
126
10.92
kg
m2
m3
979.5492
75.6
9.828
kg
m2
m3
m2
m2
4353.552
336
40.32
336
336
kg
kg
m2
m3
1230.144
379.0848
59.84
5.508
kg
kg
m2
m3
1730.784
416.99328
63.36
7.128
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
556.7952
389.75664
227.25
167.03856
22.725
11.3625
titik
titik
407
407
kg
kg
kg
m2
m3
852.306
474.474
78.624
30.24
13.608
kg
kg
kg
m2
m3
708.0696
374.2704
80.3712
30.912
10.2144
kg
kg
kg
m2
m3
1348.704
647.01
115.3152
44.352
24.3936
kg
432.7092
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
6 PILE CAP TYPE P-6 1,80X2,80X0.80 - 15 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
7 PILE CAP TYPE P-7 2,80X2,80X0.80 - 1 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
8 PILE CAP TYPE P-8A 2,80X2,80X0.80 - 5 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
9 PILE CAP TYPE P-8 1,80X3,80X0.80 - 8 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
10 PILE CAP TYPE P-9A 2,80X2,80X0.80 - 4 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
11 PILE CAP TYPE P-10 1,80X4,80X0.80 - 1 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
12 PILE CAP TYPE P-12 2,80X3,80X0.80 - 7 unit
- Besi D 19
- Besi D 16
Halaman - 2226
SATUAN
kg
kg
m2
m3
VOLUME
230.9328
48.9216
18.816
6.4512
kg
kg
kg
m2
m3
3505.2255
2020.662
301.392
115.92
63.504
kg
kg
kg
m2
m3
320.3172
191.1168
24.4608
9.408
6.5856
kg
kg
kg
m2
m3
1601.586
955.584
122.304
47.04
32.928
kg
kg
kg
m2
m3
2532.5664
1483.8096
195.6864
75.264
45.9648
kg
kg
kg
m2
m3
1281.2688
764.4672
97.8432
37.632
26.3424
kg
kg
kg
m2
m3
386.3475
228.942
28.8288
11.088
7.2576
kg
kg
3035.5206
1844.1444
NO
IV.
A
URAIAN PEKERJAAN
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
13 SLOOF TB0 30/70
- Besi D 22
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
14 SLOOF TB1 30/55
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
15 SLOOF TB2 25/45
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
16 SLOOF TB3 20/35
- Besi D 16
- Besi 10
- Begisting Batako
- Cor Beton K-300
17 DINDING BETON PIT LIFT (t=15 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
TOTAL III
SATUAN
kg
m2
m3
VOLUME
201.8016
77.616
62.5632
kg
kg
kg
m2
m3
6007.68
349.44
1306.0656
235.2
35.28
kg
kg
kg
m2
m3
8991.36
1048.32
3265.164
554.4
83.16
kg
kg
kg
m2
m3
5016.162
779.792
1943.0317
337.41
42.17625
kg
kg
m2
m3
478.74
196.29855
35.35
3.535
kg
m2
m3
392.66189
63.6405
4.7730375
kg
m2
m3
1472.2391
4.545
22.725
kg
116.48
kg
715.4784
NO
URAIAN PEKERJAAN
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
4 STEK KOLOM
- Besi D 22
- Besi D 16
5 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 KOLOM TYPE K2 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 KOLOM TYPE K4 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K5
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 BALOK TYPE BR (20x30)
- Besi D 16
SATUAN
kg
kg
m2
m3
kg
kg
7628.8
252.8
kg
kg
m2
m3
10096.24
2135.3136
274.12
37.6915
kg
kg
m2
m3
1442.32
305.0448
39.16
5.3845
kg
kg
m2
m3
15865.52
2684.3942
360.36
40.5405
kg
kg
m2
m3
1442.32
244.03584
32.76
3.6855
kg
kg
m2
m3
853.2
762.612
72.8
5.46
kg
kg
m2
m3
213.3
183.02688
18.2
1.456
kg
Halaman - 2228
VOLUME
424.47132
437.9466
128.94
11.466
308.1
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
m2
m3
kg
kg
kg
m2
m3
168.588
24.96
59.232
13.8
1.35
kg
kg
kg
m2
m3
7209.216
698.88
1658.496
310.8
44.1
kg
kg
kg
m2
m3
8124.336
574.08
2179.7376
414
49.68
kg
kg
kg
m2
m3
8300.952
586.56
2227.1232
408.9
54.285
kg
kg
kg
m2
m3
9455.9136
1049.984
2491.6928
580.52
56.79
kg
kg
Halaman - 2229
VOLUME
128.336
26
1.95
960.561
428.6916
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BL (20x70)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 PLAT LANTAI SATU S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
8 TANGGA (4 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K2 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K4 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K5
SATUAN
m2
m3
Halaman - 2230
VOLUME
86.85
6.755
kg
kg
kg
m2
m3
497.7
104
345.52
70
6
kg
m2
m3
23146.385
1786.4
232.232
kg
kg
kg
m2
m3
624.624
370.5702
404.2584
113.988
10.458
kg
kg
m2
m3
6808.704
1741.4208
215.6
29.645
kg
kg
m2
m3
972.672
248.7744
30.8
4.235
kg
kg
m2
m3
10699.392
2189.2147
285.12
32.076
kg
kg
m2
m3
972.672
199.01952
25.92
2.916
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
SATUAN
kg
kg
m2
m3
VOLUME
632
621.936
57.6
4.32
kg
kg
m2
m3
158
149.26464
14.4
1.152
kg
kg
m2
m3
308.1
128.336
26
1.95
kg
kg
kg
m2
m3
168.588
24.96
59.232
13.8
1.35
kg
kg
kg
m2
m3
7209.216
698.88
1658.496
310.8
44.1
kg
kg
kg
m2
m3
8124.336
574.08
2179.7376
414
49.68
kg
kg
kg
8300.952
586.56
2227.1232
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BL (20x70)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 PLAT LANTAI DUA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
8 TANGGA (4 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K2 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
SATUAN
m2
m3
Halaman - 2232
VOLUME
408.9
54.285
kg
kg
kg
m2
m3
7211.3517
1067.664
2533.6488
590.295
57.74625
kg
kg
m2
m3
816.228
364.2768
73.8
5.74
kg
kg
kg
m2
m3
497.7
104
345.52
70
6
kg
m2
m3
23146.385
1786.4
232.232
kg
kg
kg
m2
m3
624.624
370.5702
404.2584
113.988
10.458
kg
kg
m2
m3
6808.704
1741.4208
215.6
29.645
kg
kg
m2
m3
858.24
248.7744
30.8
4.235
NO
URAIAN PEKERJAAN
11 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K4 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K5
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
SATUAN
VOLUME
kg
kg
m2
m3
10699.392
2189.2147
285.12
32.076
kg
kg
m2
m3
858.24
199.01952
25.92
2.916
kg
kg
m2
m3
632
621.936
57.6
4.32
kg
kg
m2
m3
158
149.26464
14.4
1.152
kg
kg
m2
m3
308.1
128.336
26
1.95
kg
kg
kg
m2
m3
168.588
24.96
59.232
13.8
1.35
kg
kg
kg
m2
m3
6007.68
698.88
1575.5712
294
41.16
NO
URAIAN PEKERJAAN
2 BALOK TYPE B5 (35x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE B6 (35x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BL (20x70)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 PLAT LANTAI TIGA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
8 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K3 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
SATUAN
Halaman - 2234
VOLUME
kg
kg
kg
m2
m3
7385.76
574.08
2179.7376
414
49.68
kg
kg
kg
m2
m3
7546.32
586.56
2227.1232
408.9
54.285
kg
kg
kg
m2
m3
7541.5032
1116.544
2649.6448
617.32
60.39
kg
kg
m2
m3
1313.928
586.3968
118.8
9.24
kg
kg
kg
m2
m3
676.872
141.44
469.9072
95.2
8.16
kg
m2
m3
24208.859
1868.4
242.892
kg
kg
m2
m3
4505.76
1741.4208
215.6
29.645
kg
kg
m2
m3
7080.48
2189.2147
285.12
32.076
NO
URAIAN PEKERJAAN
10 KOLOM TYPE K5
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.D
LANTAI EMPAT / ATAP ( EL. + 17,20 M )
1 BALOK TYPE B7 (30x70)
- Besi D 22
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B8 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE B9 (30x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BL (20x70)
- Besi D 16
Halaman - 2235
SATUAN
VOLUME
kg
kg
m2
m3
556.16
621.936
57.6
4.32
kg
kg
m2
m3
139.04
149.26464
14.4
1.152
kg
kg
m2
m3
290.562
121.03072
24.52
1.839
kg
kg
kg
m2
m3
3862.08
449.28
959.5584
183.6
26.46
kg
kg
kg
m2
m3
5234.256
406.848
1544.7706
293.4
35.208
kg
kg
kg
m2
m3
5940.72
461.76
1643.688
310.8
36.63
kg
kg
kg
m2
m3
1712.5731
253.552
601.6984
140.185
13.71375
kg
179.172
NO
URAIAN PEKERJAAN
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 PLAT LANTAI EMPAT SA (t=12 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.E
Halaman - 2236
SATUAN
kg
kg
m2
m3
kg
m2
m3
m2
m2
VOLUME
37.44
124.3872
25.2
2.16
5708.8542
440.6
52.872
440.6
440.6
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
358.3632
250.85424
1384.38
107.50896
184.27035
92.135175
titik
titik
273
273
kg
kg
kg
m2
m3
753.0264
398.16
90.8544
34.944
9.6768
kg
kg
kg
m2
m3
354.0348
187.1352
40.1856
15.456
5.1072
kg
kg
kg
m2
m3
1363.6896
828.1728
125.7984
48.384
21.7728
kg
354.0348
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
6 PILE CAP TYPE P-5 0,80X4,80X0.80 - 2 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
7 PILE CAP TYPE P-6 1,80X2,80X0.80 - 3 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
8 PILE CAP TYPE P-7 2,80X2,80X0.80 - 1 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
9 PILE CAP TYPE P-8 1,80X3,80X0.80 - 3 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
10 PILE CAP TYPE P-10 1,80X4,80X0.80 - 8 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
11 PILE CAP TYPE P-12 2,80X3,80X0.80 - 4 unit
- Besi D 19
- Besi D 16
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
12 PILE CAP TYPE P-12' 1,80X4,80X0.80 - 2 unit
- Besi D 19
- Besi D 16
Halaman - 2238
SATUAN
kg
kg
m2
m3
VOLUME
187.1352
40.1856
15.456
5.1072
kg
kg
kg
m2
m3
432.7092
230.9328
48.9216
18.816
6.4512
kg
kg
kg
m2
m3
701.0451
404.1324
60.2784
23.184
12.7008
kg
kg
kg
m2
m3
320.3172
191.1168
24.4608
9.408
6.5856
kg
kg
kg
m2
m3
949.7124
556.4286
73.3824
28.224
17.2368
kg
kg
kg
m2
m3
3090.78
1831.536
230.6304
88.704
58.0608
kg
kg
kg
m2
m3
1734.5832
1053.7968
115.3152
44.352
35.7504
kg
kg
772.695
457.884
NO
IV.
A
URAIAN PEKERJAAN
- Besi D 13 tulangan samping
- Begisting Batako
- Cor Beton K-300
13 SLOOF TB0 30/70
- Besi D 22
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
14 SLOOF TB1 30/55
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
15 SLOOF TB2 25/45
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
16 SLOOF TB3 20/35
- Besi D 16
- Besi 10
- Begisting Batako
- Cor Beton K-300
17 DINDING BETON PIT LIFT (t=15 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
TOTAL III
SATUAN
kg
m2
m3
VOLUME
57.6576
22.176
14.5152
kg
kg
kg
m2
m3
6436.8
374.4
1399.356
252
37.8
kg
kg
kg
m2
m3
6261.84
730.08
2273.9535
386.1
57.915
kg
kg
kg
m2
m3
2073.231
322.296
803.07486
139.455
17.431875
kg
kg
m2
m3
904.392
370.82934
66.78
6.678
kg
m2
m3
573.02333
92.8725
6.9654375
kg
m2
m3
8135.7003
25.116
125.58
kg
87.36
kg
1666.0111
NO
URAIAN PEKERJAAN
- Begisting
- Cor Beton K-300
3 TANGGA - A (2 unit)
- Besi 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
4 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
5 STEK KOLOM
- Besi D 22
- Besi D 19
- Besi D 16
5 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 KOLOM TYPE K3 (25x25)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 KOLOM TYPE K4
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K5
SATUAN
m2
m3
kg
kg
kg
m2
m3
357.7392
212.23566
218.9733
64.47
5.733
kg
kg
kg
m2
m3
178.8696
106.11783
109.48665
32.235
2.8665
kg
kg
kg
Halaman - 2240
VOLUME
5.1432
25.716
6598.912
28.544
192.128
kg
kg
m2
m3
8653.92
1830.2688
234.96
32.307
kg
kg
m2
m3
10817.4
1830.2688
245.7
27.64125
kg
kg
m2
m3
107.932
61.00896
9.1
0.56875
kg
kg
m2
m3
526.456
533.8284
50.96
3.822
NO
URAIAN PEKERJAAN
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K6 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K7 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
kg
m2
m3
VOLUME
188.02
183.02688
18.2
1.456
kg
kg
m2
m3
2078.848
610.0896
78.32
10.769
kg
kg
m2
m3
2858.416
671.09856
90.09
10.135125
kg
kg
m2
m3
290.562
121.03072
24.52
1.839
kg
kg
kg
m2
m3
126.441
18.72
44.424
10.35
1.0125
kg
kg
kg
m2
m3
6179.328
599.04
1421.568
266.4
37.8
kg
kg
kg
m2
5386.788
380.64
1445.2608
274.5
NO
URAIAN PEKERJAAN
- Cor Beton K-300
3 BALOK TYPE B3 (35x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE B7 (30x70)
- Besi D 22
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE B8 (30x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE B9 (30x50)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 BALOK TYPE BL (20x70)
- Besi D 16
- Besi D 13
SATUAN
m3
Halaman - 2242
VOLUME
32.94
kg
kg
kg
m2
m3
4901.094
346.32
1314.9504
241.425
32.05125
kg
kg
kg
m2
m3
1287.36
149.76
319.8528
61.2
7.56
kg
kg
kg
m2
m3
947.304
73.632
262.1016
49.56
5.841
kg
kg
kg
m2
m3
1851.792
143.936
478.19968
89.96
10.38
kg
kg
kg
m2
m3
7541.5032
837.408
1987.2336
462.99
45.2925
kg
kg
m2
m3
1493.1
666.36
135
10.5
kg
kg
298.62
62.4
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 PLAT LANTAI SATU S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
11 PLAT LANTAI SATU SA (t=12 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
12 TANGGA - A (2 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
13 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 KOLOM TYPE K3 (25x25)
- Besi D 19
- Besi 10
- Begisting Multipleks
Halaman - 2243
SATUAN
kg
m2
m3
VOLUME
207.312
42
3.6
kg
m2
m3
14081.668
1086.8
141.284
kg
m2
m3
m2
m2
3648.6912
281.6
33.792
281.6
281.6
kg
kg
kg
m2
m3
312.312
185.2851
202.1292
56.994
5.229
kg
kg
kg
m2
m3
156.156
92.64255
101.0646
28.497
2.6145
kg
kg
m2
m3
5836.032
1492.6464
184.8
25.41
kg
kg
m2
m3
7295.04
1492.6464
194.4
21.87
kg
kg
m2
90.984
49.75488
7.2
NO
URAIAN PEKERJAAN
- Cor Beton K-300
17 KOLOM TYPE K4
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
18 KOLOM TYPE K5
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
19 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
20 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
SATUAN
m3
kg
kg
m2
m3
442.4
435.3552
40.32
3.024
kg
kg
m2
m3
158
149.26464
14.4
1.152
kg
kg
m2
m3
290.562
121.03072
24.52
1.839
kg
kg
kg
m2
m3
126.441
18.72
44.424
10.35
1.0125
kg
kg
kg
m2
m3
6179.328
599.04
1421.568
266.4
37.8
kg
kg
kg
m2
m3
5386.788
380.64
1445.2608
274.5
32.94
kg
Halaman - 2244
VOLUME
0.45
4901.094
NO
URAIAN PEKERJAAN
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 PLAT LANTAI DUA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
7 TANGGA - A (2 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
8 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
SATUAN
kg
kg
m2
m3
Halaman - 2245
VOLUME
346.32
1314.9504
241.425
32.05125
kg
kg
kg
m2
m3
4848.3099
717.808
1703.4136
396.865
38.82375
kg
kg
m2
m3
1255.6971
560.40876
113.535
8.8305
kg
m2
m3
13906.23
1073.26
139.5238
kg
kg
kg
m2
m3
312.312
185.2851
202.1292
56.994
5.229
kg
kg
kg
m2
m3
156.156
92.64255
101.0646
28.497
2.6145
kg
kg
m2
m3
5836.032
1492.6464
184.8
25.41
kg
kg
7295.04
1492.6464
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K3 (25x25)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K4
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K5
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.C
SATUAN
m2
m3
kg
kg
m2
m3
90.984
49.75488
7.2
0.45
kg
kg
m2
m3
442.4
435.3552
40.32
3.024
kg
kg
m2
m3
158
149.26464
14.4
1.152
kg
kg
m2
m3
290.562
121.03072
24.52
1.839
kg
kg
kg
m2
m3
126.441
18.72
44.424
10.35
1.0125
kg
kg
kg
m2
m3
5664.384
599.04
1350.4896
252
35.28
kg
kg
Halaman - 2246
VOLUME
194.4
21.87
4897.08
380.64
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE B6 (35x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
4 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 PLAT LANTAI TIGA S1 (t=13 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
7 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
8 KOLOM TYPE K1 (55x55)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K2 (45x45)
- Besi D 22
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K3 (25x25)
- Besi D 19
- Besi 10
SATUAN
kg
m2
m3
kg
kg
kg
m2
m3
4455.54
346.32
1314.9504
241.425
32.05125
kg
kg
kg
m2
m3
4848.3099
717.808
1703.4136
396.865
38.82375
kg
kg
m2
m3
1255.6971
560.40876
113.535
8.8305
kg
m2
m3
13906.23
1073.26
139.5238
kg
kg
kg
m2
m3
156.156
92.64255
101.0646
28.497
2.6145
kg
kg
m2
m3
3862.08
1492.6464
184.8
25.41
kg
kg
m2
m3
4827.6
1492.6464
194.4
21.87
kg
kg
Halaman - 2247
VOLUME
1354.932
256.2
30.195
90.984
49.75488
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K4
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K5
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.D
LANTAI EMPAT / ATAP ( EL. + 17,20 M )
1 BALOK TYPE B7 (30x70)
- Besi D 22
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
2 BALOK TYPE B8 (30x55)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
3 BALOK TYPE B9 (30x50)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
Halaman - 2248
SATUAN
m2
m3
VOLUME
7.2
0.45
kg
kg
m2
m3
442.4
435.3552
40.32
3.024
kg
kg
m2
m3
158
149.26464
14.4
1.152
kg
kg
m2
m3
290.562
121.03072
24.52
1.839
kg
kg
kg
m2
m3
42.147
6.24
14.808
3.45
0.3375
kg
kg
kg
m2
m3
5149.44
599.04
1279.4112
244.8
35.28
kg
kg
kg
m2
m3
4455.54
346.32
1232.766
233.1
27.4725
kg
kg
kg
m2
m3
2448.54
190.32
632.3016
118.95
13.725
NO
URAIAN PEKERJAAN
4 BALOK TYPE B10 (30x60)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
5 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 PLAT LANTAI EMPAT SA (t=12 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.E
Halaman - 2249
SATUAN
VOLUME
kg
kg
kg
m2
m3
1204.2
93.6
355.392
67.5
8.1
kg
kg
kg
m2
m3
1515.1847
224.328
532.3476
124.0275
12.133125
kg
kg
m2
m3
517.608
231.0048
46.8
3.64
kg
m2
m3
m2
m2
5390.112
416
49.92
416
416
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
0
0
0
0
m3
m3
m2
m3
m3
m3
321.006
224.7042
1651.3
96.3018
3.8
1.9
kg
m2
m3
362.796
1.12
5.6
TOTAL III
IV.
A
Halaman - 2250
kg
kg
kg
kg
m2
m3
kg
kg
kg
87.36
155.61
92.318625
97.1775
28.4445
2.6775
141.96
84.2205
97.1775
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
5 TANGGA - C (1 unit)
- Besi 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
6 STEK KOLOM
- Besi D 19
- Besi D 16
7 KOLOM TYPE K0 (55x55)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 KOLOM TYPE K1 (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 KOLOM TYPE K1' (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
10 KOLOM TYPE K2 (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
SATUAN
m2
m3
kg
kg
kg
m2
m3
141.96
84.2205
97.1775
26.502
2.52
kg
kg
5023.744
121.344
kg
kg
m2
m3
1338
373.1616
47.52
6.534
kg
kg
m2
m3
11239.2
3134.5574
408.24
45.927
kg
kg
m2
m3
892
199.01952
25.92
2.916
kg
kg
m2
m3
2007
497.5488
64.8
7.29
kg
kg
m2
m3
379.2
124.3872
23.04
1.728
kg
kg
Halaman - 2251
VOLUME
26.502
2.52
113.76
47.3856
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
13 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
m2
m3
VOLUME
9.6
0.72
kg
kg
kg
m2
m3
84.294
12.48
29.616
6.9
0.675
kg
kg
kg
m2
m3
2287.98
237.12
590.8392
108.3
17.1
kg
kg
kg
m2
m3
289.008
37.44
84.4056
16.2
2.025
kg
kg
kg
m2
m3
2528.82
262.08
590.8392
110.25
15.435
kg
kg
kg
m2
m3
7329.564
569.712
2027.9556
383.46
45.1935
kg
kg
kg
9305.79
723.32
2403.0916
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BA (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE BL (20x60)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 PLAT LANTAI SATU S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
10 PLAT LANTAI SATU SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
11 TANGGA - A (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
12 TANGGA - B (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
Halaman - 2253
SATUAN
m2
m3
VOLUME
452.075
52.1625
kg
kg
kg
m2
m3
8088.7118
1197.56
2841.902
662.1125
64.771875
kg
kg
m2
m3
712.2087
317.85372
64.395
5.0085
kg
kg
kg
m2
m3
599.2308
125.216
416.00608
84.28
7.224
kg
m2
m3
19267.059
1487
178.44
kg
m2
m3
m2
m2
1943.55
150
15
150
150
kg
kg
kg
m2
m3
155.61
92.318625
97.1775
28.4445
2.6775
kg
kg
kg
141.96
84.2205
97.1775
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
13 TANGGA - C (1 unit)
- Besi D 13 (Single Layer)
- Besi 10 (Single Layer)
- Besi Trap 10
- Begisting Multipleks
- Cor Beton K-300
14 KOLOM TYPE K0 (55x55)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
15 KOLOM TYPE K1 (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
16 KOLOM TYPE K1' (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
17 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
18 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
19 BALOK TYPE BT (25x45)
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
SATUAN
m2
m3
Halaman - 2254
VOLUME
26.502
2.52
kg
kg
kg
m2
m3
141.96
84.2205
97.1775
26.502
2.52
kg
kg
m2
m3
1284.48
355.392
44.88
6.171
kg
kg
m2
m3
10789.632
2985.2928
385.56
43.3755
kg
kg
m2
m3
856.32
189.5424
24.48
2.754
kg
kg
m2
m3
364.032
118.464
21.76
1.632
kg
kg
m2
m3
113.76
47.3856
9.6
0.72
kg
kg
kg
m2
m3
84.294
12.48
29.616
6.9
0.675
NO
URAIAN PEKERJAAN
TOTAL IV.B
SATUAN
VOLUME
kg
kg
kg
m2
m3
722.52
74.88
186.5808
34.2
5.4
kg
kg
kg
m2
m3
289.008
37.44
84.4056
16.2
2.025
kg
kg
kg
m2
m3
1806.3
187.2
422.028
78.75
11.025
kg
kg
kg
m2
m3
7730.964
600.912
2139.0156
404.46
47.6685
kg
kg
kg
m2
m3
8369.19
650.52
2161.2276
406.575
46.9125
kg
kg
kg
m2
m3
8313.4958
1230.84
2920.878
680.5125
66.571875
NO
URAIAN PEKERJAAN
7 BALOK TYPE BA1 (20x35)
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
8 BALOK TYPE BL (20x60)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
9 PLAT LANTAI DUA S1 (t=12 cm)
- Besi 10 (Double Layer)
- Begisting
- Cor Beton K-300
10 KOLOM TYPE K0 (55x55)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
11 KOLOM TYPE K1 (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
12 KOLOM TYPE K1' (45x45)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
13 KOLOM TYPE K6
- Besi D 16
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
14 BALOK TYPE BR (20x30)
- Besi D 16
- Besi 10
- Begisting Multipleks
SATUAN
Halaman - 2256
VOLUME
kg
kg
m2
m3
552.9447
246.77532
49.995
3.8885
kg
kg
kg
m2
m3
688.8168
143.936
478.19968
96.88
8.304
kg
m2
m3
19218.47
1483.25
177.99
kg
kg
m2
m3
1150.68
355.392
45.54
6.26175
kg
kg
m2
m3
9665.712
2985.2928
391.23
44.013375
kg
kg
m2
m3
767.12
189.5424
24.84
2.7945
kg
kg
m2
m3
326.112
118.464
22.08
1.656
kg
kg
m2
113.76
47.3856
9.6
NO
URAIAN PEKERJAAN
- Cor Beton K-300
TOTAL IV.C
SATUAN
m3
VOLUME
0.72
kg
kg
kg
m2
m3
1083.78
112.32
253.2168
47.25
6.615
kg
kg
kg
m2
m3
2432.484
189.072
673.0236
127.26
14.9985
kg
kg
kg
m2
m3
6615.072
642.72
2135.3136
417.15
42.4875
kg
kg
kg
m2
m3
5972.832
580.32
1790.2872
348.75
34.875
kg
kg
kg
m2
m3
463.617
68.64
162.888
37.95
3.7125
kg
kg
kg
m2
m3
688.8168
143.936
478.19968
96.88
8.304
kg
m2
113.37375
8.75
NO
URAIAN PEKERJAAN
- Cor Beton K-300
8 PLAT LANTAI TIGA SA (t=10 cm)
- Besi 10 (Double Layer)
- Begisting Multipleks
- Cor Beton K-300
- Water Profing Bithuthene Sheet 3000
- Pasangan screed lengkap kawat ayam
TOTAL IV.D
Halaman - 2258
SATUAN
m3
kg
m2
m3
m2
m2
VOLUME
1.05
1434.3399
110.7
11.07
110.7
110.7
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
IV.
A
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
62.4
43.68
190
18.72
23.07
11.535
kg
kg
m2
m3
btg
750.5316
427.1904
25.2
10.08
48
kg
kg
kg
m2
m3
995.472
128.96
321.3336
55.8
6.975
kg
m2
m3
1230.915
3.04
15.2
kg
1672.272
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
m2
m3
VOLUME
666.36
97.44
8.526
kg
kg
kg
m2
m3
1251.36
137.28
456.0864
89.1
9.075
kg
kg
kg
m2
m3
682.56
74.88
231.0048
45
4.5
kg
kg
kg
m2
m3
179.172
37.44
79.9632
16.2
1.26
kg
kg
kg
m2
m3
659.808
120.64
372.1744
78.3
7.975
kg
m2
m3
300.6024
98.6
4.64
kg
m2
m3
m2
2643.228
204
20.4
204
NO
URAIAN PEKERJAAN
- Pasangan screed lengkap kawat ayam
TOTAL IV.B
Halaman - 2261
SATUAN
m2
VOLUME
204
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
IV.
A
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
81.9
57.33
310
24.57
37.1575
18.57875
kg
kg
m2
m3
btg
1073.0412
605.4048
35.28
13.23
63
kg
kg
kg
m2
m3
1830.384
237.12
590.8392
102.6
12.825
kg
m2
m3
2008.335
4.96
24.8
kg
1950.984
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
m2
m3
Halaman - 2263
VOLUME
647.85
97.44
7.308
kg
kg
kg
m2
m3
637.056
87.36
248.7744
50.4
4.2
kg
kg
kg
m2
m3
1001.088
137.28
358.3536
72.6
5.94
kg
kg
m2
m3
627.102
248.7744
50.4
3.78
kg
m2
m3
m2
m2
3239.25
250
25
250
250
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
272.948
191.0636
964.6
81.8844
126.2769
63.13845
kg
kg
m2
m3
btg
207.0432
119.2464
6.048
2.7216
16
kg
kg
m2
m3
btg
1992.7908
1124.3232
65.52
24.57
117
kg
kg
m2
m3
btg
1250.886
711.984
42
16.8
80
kg
kg
kg
m2
1931.04
187.2
330.4035
58.5
NO
IV.
A
URAIAN PEKERJAAN
- Cor Beton K-300
5 SLOOF TB1 25/45
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
6 SLOOF TB2 20/35
- Besi D 16
- Besi 10
- Begisting Batako
- Cor Beton K-300
7 PONDASI BATU KALI
- Pas. Bt. Kali
TOTAL III
SATUAN
m3
VOLUME
8.775
kg
kg
kg
m2
m3
5924.664
767.52
1912.4532
332.1
41.5125
kg
kg
m2
m3
1905.006
781.11275
140.665
14.0665
m1
9.85
kg
m2
m3
6249.1611
15.4336
77.168
kg
kg
kg
m2
m3
165.1104
97.95492
101.0646
30.912
3.4398
kg
kg
m2
m3
2658.16
752.9868
100
12.5
kg
kg
m2
m3
963.36
301.19472
40
5
kg
4351.32
NO
URAIAN PEKERJAAN
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
6 BALOK TYPE BT (20x40)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
kg
m2
m3
VOLUME
1706.7701
242.76
21.2415
kg
kg
kg
m2
m3
29.862
6.24
14.808
3
0.24
kg
kg
kg
m2
m3
1609.2
187.2
377.604
72
8.775
kg
kg
kg
m2
m3
2332.08
255.84
849.9792
166.05
16.9125
kg
kg
kg
m2
m3
1820.16
199.68
616.0128
120
12
kg
kg
kg
m2
m3
935.676
195.52
463.984
94
7.52
kg
m2
6025.005
465
NO
URAIAN PEKERJAAN
- Cor Beton K-300
6 KOLOM TYPE K1 (50x50)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
SATUAN
m3
Halaman - 2267
VOLUME
55.8
kg
kg
m2
m3
1016.88
373.1616
48.8
7.625
kg
kg
kg
m2
m3
965.52
112.32
226.5624
43.2
5.265
kg
kg
kg
m2
m3
796.32
87.36
269.5056
52.5
5.25
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
390.442
273.3094
1354.5
117.1326
171.76685
85.883425
kg
kg
m2
m3
btg
828.1728
476.9856
24.192
10.8864
64
kg
kg
m2
m3
btg
3142.4778
1772.9712
103.32
38.745
184.5
kg
kg
m2
m3
btg
1000.7088
569.5872
33.6
13.44
64
kg
kg
kg
m2
8750.52
1133.6
2824.626
490.5
NO
IV.
A
URAIAN PEKERJAAN
- Cor Beton K-300
5 SLOOF TB2 20/35
- Besi D 16
- Besi 10
- Begisting Batako
- Cor Beton K-300
TOTAL III
SATUAN
m3
VOLUME
61.3125
kg
kg
m2
m3
1689.336
692.68122
124.74
12.474
kg
m2
m3
8775.1283
21.672
108.36
kg
kg
kg
m2
m3
171.99
102.03638
105.27563
31.5735
3.583125
kg
kg
m2
m3
3987.24
1171.3128
163.2
16.32
kg
kg
m2
m3
3754.08
2208.7613
314.16
27.489
kg
kg
m2
m3
130.192
49.16256
7.2
0.45
kg
kg
m2
85.32
16.88112
2.03
Halaman - 2269
NO
URAIAN PEKERJAAN
- Cor Beton K-300
7 BALOK TYPE BT (20x40)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
m3
VOLUME
0.177625
kg
kg
kg
m2
m3
29.862
6.24
14.808
3
0.24
kg
kg
kg
m2
m3
4209.12
461.76
1424.5296
277.5
27.75
kg
kg
kg
m2
m3
5327.76
584.48
1664.4192
323.15
31.6125
kg
kg
kg
m2
m3
1448.307
302.64
718.188
145.5
11.64
kg
m2
m3
3964.842
306
36.72
kg
m2
m3
m2
m2
2993.067
231
23.1
231
231
NO
URAIAN PEKERJAAN
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
SATUAN
kg
kg
m2
m3
Halaman - 2271
VOLUME
1355.84
746.3232
99.2
9.92
kg
kg
kg
m2
m3
910.08
99.84
308.0064
60
6
kg
kg
kg
m2
m3
1365.12
149.76
426.4704
82.8
8.1
kg
kg
kg
m2
m3
59.724
12.48
29.616
6
0.48
kg
m2
m3
m2
m2
544.194
42
4.2
42
42
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
SATUAN
Pengukuran (Uitzet)
2 Mobilisasi dan Demobilisasi
3 Biaya Loading Test PDA
4 Pembersihan Awal dan Akhir Proyek
TOTAL I
II.
PEKERJAAN TANAH
1
2
3
4
5
6
Galian Tanah
Buang Tanah Ex. Galian Tanah Keluar Proyek
Pemadatan Tanah CBR 4 + test ( 5 ttk)
Urugan Kembali Ex. Galian
Pasir Urug Bawah Pondasi t.10 cm
Lantai Kerja Bawah Pondasi t.5 cm
TOTAL II
III.
VOLUME
ls
ls
ttk
ls
1
1
3
1
m3
m3
m2
m3
m3
m3
373.438
261.4066
1433
112.0314
174.56215
87.281075
kg
kg
m2
m3
btg
1345.7808
775.1016
39.312
17.6904
104
kg
kg
m2
m3
btg
536.5206
302.7024
17.64
6.615
31.5
kg
kg
m2
m3
btg
215.0064
117.936
8.064
2.4192
18
kg
kg
m2
m3
2501.772
1423.968
84
33.6
- 13 unit
-7 unit
-4 unit
-20 unit
Halaman - 2272
NO
IV.
A
URAIAN PEKERJAAN
- Cerucuk Dolken 8 - 10 cm
5 SLOOF TB1 25/45
- Besi D 19
- Besi D 13
- Besi 10
- Begisting Batako
- Cor Beton K-300
6 SLOOF TB2 20/35
- Besi D 16
- Besi 10
- Begisting Batako
- Cor Beton K-300
TOTAL III
SATUAN
btg
VOLUME
160
kg
kg
kg
m2
m3
6944.22
1079.52
2689.8732
467.1
58.3875
kg
kg
m2
m3
1519.644
623.10213
112.21
11.221
kg
m2
m3
3342.906
8.256
41.28
kg
m2
m3
11881.569
36.68
183.4
kg
kg
kg
m2
m3
330.2208
195.90984
202.1292
61.824
6.8796
kg
kg
m2
m3
8771.928
2576.8882
359.04
35.904
kg
kg
m2
m3
3251.34
1054.1815
146.88
14.688
NO
URAIAN PEKERJAAN
6 KOLOM TYPE KP (40x40)
- Besi D 19
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
7 BALOK TYPE BT (20x40)
- Besi D 16
- Besi D 13
- Besi 10
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.A
SATUAN
VOLUME
kg
kg
m2
m3
160.56
39.38928
4.64
0.464
kg
kg
kg
m2
m3
59.724
12.48
29.616
6
0.48
kg
kg
kg
m2
m3
4379.76
480.48
1596.3024
311.85
31.7625
kg
kg
kg
m2
m3
5119.2
561.6
1732.536
337.5
33.75
kg
kg
kg
m2
m3
2436.7392
509.184
1208.3328
244.8
19.584
kg
m2
m3
12547.559
968.4
116.208
kg
kg
4945.248
1824.3456
NO
URAIAN PEKERJAAN
- Begisting Multipleks
- Cor Beton K-300
TOTAL IV.B
SATUAN
m2
m3
Halaman - 2275
VOLUME
242.88
24.288
kg
kg
kg
m2
m3
2002.176
274.56
912.1728
178.2
18.15
kg
kg
kg
m2
m3
2184.192
299.52
924.0192
180
18
kg
kg
kg
m2
m3
627.102
12.48
29.616
6
0.48
kg
m2
m3
m2
m2
798.1512
61.6
6.16
61.6
61.6
GROUND FLOOR
1 AC Wall Mounted Split Type Cap. 2 PK
-IU.GF.6-OU.GF.6 (Kap.18000 btu/h)
-IU.GF.7-OU.GF.7 (Kap.18000 btu/h)
-IU.GF.8-OU.GF.8 (Kap.18000 btu/h)
-IU.GF.8-OU.GF.8 (Kap.18000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Compact Cassete Type Cap. 6 PK
-IU.GF.1-OU.GF.1 (Kap.49.000 btu/h)
-IU.GF.2-OU.GF.2 (Kap.49.000 btu/h)
-IU.GF.4-OU.GF.4 (Kap.49.000 btu/h)
-IU.GF.5-OU.GF.5 (Kap.49.000 btu/h)
-IU.GF.9-OU.GF.9 (Kap.49.000 btu/h)
-IU.GF.10-OU.GF.10 (Kap.49.000 btu/h)
-IU.GF.11-OU.GF.11 (Kap.49.000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
3 AC Compact Cassete Type Cap. 4 PK
-IU.GF.3-OU.GF.3 (Kap.29.000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
LEVEL 1
1 AC Multi Compact Cassete Type Cap. 6 PK
-IU.1.1 Kap. 25000 btu/h-IU.1.2. Kap. 25000 btu/h-OU.1+2 Kap. 50000 btu/h
-IU.1.4 Kap. 25000 btu/h-IU.1.15. Kap. 25000 btu/h-OU.14+15 Kap. 50000 btu/h
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Wall Mounted Split Type Cap. 1. 1/2 PK
-IU.1.3-OU.1.3 (Kap. 12000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
LEVEL 2
1 AC Wall Mounted Split Type Cap. 1. 1/2 PK
-IU.2.18-OU.2.18 (Kap. 9500 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Wall Mounted Split Type Cap. 2 PK
-IU.2.1-OU.2.1 (Kap.18000 btu/h)
-IU.2.2-OU.2.2 (Kap.18000 btu/h)
-IU.2.3-OU.2.3 (Kap.18000 btu/h)
-IU.2.6-OU.2.6 (Kap.18000 btu/h)
-IU.2.7-OU.2.7 (Kap.18000 btu/h)
-IU.2.9-OU.2.9 (Kap.18000 btu/h)
-IU.2.8-OU.2.8 (Kap.18000 btu/h)
-IU.2.9-OU.2.9 (Kap.18000 btu/h)
-IU.2.10-OU.2.10 (Kap.18000 btu/h)
-IU.2.11-OU.2.11 (Kap.18000
-IU.2.14-OU.2.14 (Kap.18000
-IU.2.15-OU.2.15 (Kap.18000
-IU.2.16-OU.2.16 (Kap.18000
-IU.2.17-OU.2.17 (Kap.18000
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
btu/h)
btu/h)
btu/h)
btu/h)
btu/h)
LEVEL - 1
PEKERJAAN AIR CONDITIONING
1 AC Wall Mounted Split Type Cap. 1. 1/2 PK
-IU.1.2-OU.1.2 (Kap.12000 btu/h)
-IU.1.11-OU.1.11 (Kap.12000 btu/h)
-IU.1.16-OU.1.16 (Kap.12000 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Multi Wall Mounted Split Type Cap. 2. 1/2 PK
-IU.1.17 Kap. 9500 btu/h-IU.1.18 Kap. 12000 btu/h-OU.1.17+18 Kap. 21500 btu/h
-IU.1.19 Kap. 9500 btu/h-IU.1.20 Kap. 12000 btu/h-OU.1.19+20 Kap. 21500 btu/h
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Compact Cassete Type Cap. 5 PK
-IU.1.4-OU.1.4 (Kap.37700 btu/h)
-IU.1.5-OU.1.5 (Kap.37700 btu/h)
-IU.1.6-OU.1.6 (Kap.37700 btu/h)
-IU.1.7-OU.1.7 (Kap.37700 btu/h)
-IU.1.9-OU.19 (Kap.37700 btu/h)
-IU.1.22-OU.22 (Kap.37700 btu/h)
-IU.1.23-OU.23 (Kap.37700 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
1 AC Compact Cassete Type Cap. 6 PK
-IU.1.1-OU.1.1 (Kap.49000 btu/h)
-IU.1.8-OU.1.8 (Kap.49600 btu/h)
-Pipa Refrigerant
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Multi Compact Cassete Type Cap. 6 PK
-IU.1.13A Kap. 25000 btu/h-IU.1.13B Kap. 25000 btu/h-OU.1.13A+13B Kap. 50000 btu/h
-Pipa Refrigerant
-Kabel kontrol NYM 3 x 2.5 mm
-Kabel Power NYM 3 x 4 mm
-Pipa Drain (Berisolasi)
2 AC Multi Compact Cassete Type Cap. 10 PK
-IU.1.12 Kap. 37700 btu/h-IU.1.13 Kap. 37700 btu/h-OU.1.12+13 Kap. 75400 btu/h
-IU.1.14 Kap. 37700 btu/h-IU.1.13 Kap. 37700 btu/h-OU.1.14+15 Kap. 75400 btu/h
-Pipa Refrigerant
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
unit
m
m
m
unit
m
m
m
unit
m
m
m
unit
m
m
m
unit
m
m
m
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
unit
m
m
m
unit
m
m
m
unit
m
m
m
unit
m
m
m
unit
11
14
15
16
17
(Kap.18000
(Kap.18000
(Kap.18000
(Kap.18000
(Kap.18000
btu/h)
btu/h)
btu/h)
btu/h)
btu/h)
NYM 3 x 4 mm
m
m
m
unit
NYM 3 x 4 mm
m
m
m
unit
unit
Berisolasi
m
m
m
m
bh
bh
unit
16 (Kap.18000 btu/h)
MS.1(Kap.18000 btu/h)
NYM 3 x 4 mm
m
m
m
unit
NYM 3 x 4 mm
m
m
m
unit
Berisolasi
m
bh
DITIONING
ted Split Type Cap. 1. 1/2 PK
(Kap.12000 btu/h)
11 (Kap.12000 btu/h)
16 (Kap.12000 btu/h)
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 4 mm
NYM 3 x 2.5 mm
NYM 3 x 4 mm
unit
m
m
m
unit
m
m
m
unit
m
m
m
unit
m
m
m
unit
m
m
m
m
unit
NYM 3 x 4 mm
m
m
unit
NYM 3 x 4 mm
m
m
m
unit
unit
unit
unit
unit
Berisolasi
m
m
m
bh
bh
41
182
60
7
84
263
105
1
8
42
15
54
85
15
1
12
38
15
108
375
135
1
12
45
15
2
48
143
30
1
12
16
15
14
180
631
210
4
48
179
60
16
1
1
2
8
36.53
18
1
13
180
631
195
4
48
179
60
16
24
16
65
80
45
2
32
87
30
7
92
290
105
2
24.7
56
30
1
14.5
14.5
30
15
2
54.5
81
30
2
18
99
30
1
1
2
2
4
15
2
5
6
2
PEKERJAAN PERSIAPAN
Pekerjaan persiapan diawali dengan pembersihkan lahan dari rumput, humus, pohon dan dari sampah
B.
PEKERJAAN TANAH
Pekerjaan tanah dimulai dengan pekerjaan galian tanah. Kemudian mengurug lantai pondasi dengan p
C.
PEKERJAAN PONDASI
Pekerjaan pondasi dimulai dari pemasangan profil pondasi, lalu memasang batu kali dengan adukan.
D.
Pekerjaan beton bertulang diawali dari pekerjaan sloof, kolom, balok, plat, dan terakhir ring balk. Taha
E.
PEKERJAAN DINDING
Pekerjaan dinding diawali dengan memasang batu bata kemudian dilanjutkan pekerjaan plesteran. Pe
Pemasangan pasangan batu bata dilakukan diatas sloof. Pemasangan harus lurus, tegak, tidak siar da
Pekerjaan plester yaitu bagian yang akan diplester disiram dengan air terlebih dahulu dan plesteran h
F.
Pekerjaan kayu merupakan pekerjaan kering harus dipisahkan dari pekerjaan pasangan dan pekerjaan
G.
Pekerjaan penutup atap diawali dengan pemasangan kuda-kuda, kemudian pemasangan rangka atap,
H.
PEKERJAAN SANITASI
Pekerjaan sanitasi dikerjakan mulai saat atau setelah pemasangan Bouwplank atau setelah pemasang
I.
PEKERJAAN KERAMIK
Pekerjaan keramik terdiri dari lantai keramik dan dinding keramik.Bahan lantai keramik 30 x 30 cm da
J.
Pekerjaan instalasi listrik dikerjakan mulai saat atau setelah pemasangan Bowplank atau sebelum pem
K.
Pekerjaan memasang kunci terdiri dari kunci tanam biasa dan kunci tanam kamar mandi.
L.
PEKERJAAN FINISHING
Setelah semua pekerjaan selesai kemudian mengecat bangunan dan terakhir merapikan dan member
PEKERJAAN PERSIAPAN
Pembersihan lahan
B.
Pagar terbuat dari seng gelombang dengan tinggi 2 m dan kayu dolken. Dipasang mengelilingi laha
C.
D.
Pemasangan bouwplank
II.
A.
PEKERJAAN TANAH
Gali tanah sesuai lebar pondasi bagian bawah dan kedalaman rencana
Gali sisi-sisi miringnya sehinga dicapai sudut kemiringan yang tepat
Tanah hasil galian diletakkan di pinggir galian diluar bouwplank, yang nantinya untuk pekerjaan pen
Cek posisi, lebar, kedalaman, dan kerapiannya, sesuai dengan rencana
PEKERJAAN PONDASI
A.
Pondasi bangunan yang digunakan adalah pondasi batu kali / batu gunung yang memenuhi persya
Pasangan pondasi adalah dari batu kali, ukuran pondasi sesuai dengan gambar rencana pondasi ata
Celahcelah yang besar antara batu diisi dengan batu kecil yang cocok padatnya.
Pasangan pondasi batu kali tidak saling bersentuhan dan selalu ada perekat diantaranya hinga rap
Pada pasangan batu kali sudah harus disiapkan anker besi untuk kolom, kedalaman anker 30 cm ha
Cor stek kolom dan rapikan kembali
Setelah pasangan mengeras, tanah dapat diurug kembali
IV.
A.
Pembesian
B.
Bekisting
Bekisting dibuat dengan bahan kayu kelas III (terentang) dan balok kayu kelas II, serta dolken diam
Cek jarak sabuk kolom/balok/sloof/ring balk
Cek pertemuan panel sudut bekisting
Permukaan plywood dibersihkan dan dilumasi minyak bekisting
Penyetelan sabuk dan kayu support bekisting
Pemberian mortar pada dudukan bekisting, pastikan mortar yang ditabur mengering
C.
Betonisasi
Pelepasan bekisting
E.
Perawatan beton
PEKERJAAN DINDING
Pasang acuan kayu (profil) secara vertikal pada setiap ujung dinding yang akan dipasang.
Di ukur dan di tandai jarak setiap ketinggian pasangan bata / batako dan di kontrol kesetimbangan
Basahi bata yang akan di pasang sampai tidak menyerap air.
Beri adukan mortar (sebagai perekat) pada setiap sambungan antara batu bata dan pada setiap sa
Usahakan potongan batu bata yang besarnya kurang dari setengahnya tidak dipakai atau tidak dipa
Tinggi pemasangan dinding batu bata dalam satu hari supaya tidak lebih dari 1 meter, untuk menja
B. Pekerjaan plesteran dinding
Siapkan material yang akan di pakai pada lokasi yang terdekat atau strategis dari dinding yang aka
Siram permukaan bata / bataco dengan air sampai basah secara merata ( curing ).
Buat adukan untuk kamprotan dengan perbandingan tertentu (misalkan = 1 pc : 2 ps)
Lakukan kamprotan pada bidang yang telah dicuring dengan jarak lemparan 50 cm dar
Setelah bidang yang dikamprot kering, lakukan penyiraman ( curing ) selama 3 hari ; pagi,
Setelah itu mulailah membuat caplakan dengan adukan 1 pc : 3 ps.
Buat kepalaan dengan ketebalan 15 mm.
Lanjutkan dengan penyiraman jika kepalaan telah mengering.
Pastikan bidang yang akan diplester telah dicuring.
Buat adukan 1 pc : 3 ps, gunakan pasir yang diayak ( halus ).
Lakukan plesteran pada bidang bidang yang telah ada kepalaannya sampai selesai seluruh
Gunakan jidar untuk meratakan permukaan sesuai dengan kepalaan.
Siapkan alat dan bahan secukupnya di tempat yang aman dan mudah dijangkau.
Rentangkan benang berjarak separuh dari tebal kusen terhadap as bouwplank untuk menentukan k
Pasang angker pada kusen secukupnya.
Dirikan kusen dan tentukan tinggi kedudukan kusen pintu/jendela.
Setel kedudukan kusen pintu/jendela sehingga berdiri tegak dengan menggunakan unting-unting.
Pasang skur sehingga kedudukannya stabil dan kokoh.
Pasang patok untuk diikat bersama dengan skur sehingga kedudukan menjadi kokoh.
Cek kembali kedudukan kusen pintu/jendela, apakah sudah sesuai pada tempatnya, ketinggian dan
Bersihkan tempat sekelilingnya.
B.
C.
Pemasangan kaca
Letakkan daun pintu/jendela dengan posisi alur terletak pada bagian atas. Usahakan letakkan pada
Haluskan seluruh sisi kaca agar tidak tajam.
Pasangkan lembaran kaca dengan hati-hati, gunakan selembar karton atau kain untuk memegang k
Pasang paku pada list kayu sebelum dipasang pada keempat sisi daun pintu/jendela.
Setelah lis terpasang, perlahan masukkan paku dengan martil.
Sebaiknya letakkan selembar kain di atas permukaan kaca yang sedang dipasang lis kayu. Ini untuk
VII.
A.
Pemasangan gording
Pengecatan gording
Memindahkan bahan gording ke lantai atas
Gording ditempatkan diatas kuda-kuda pada titik buhul kuda-kuda
Pemasangan genteng
Sebelum dilakukan pekerjaan pemasangn genteng sebelumnya disiapkan diatas atap (disusun) pad
Genteng dipasang secarah horisontal terlebih dahulu pada bagian atas.
Setelah pada bagian paling atas terpasang diteruskan pada bagian bawahnyasecara horizontal.
Dengan cara pemasangan genteng pada bagian atas diangkat atau diungkit setelah itu dimasukan
Pertemuan dengan jurai genteng dipotong dengan bentuk segitiga agar rapi.
E.
Pemasangan lisplank
Tentukan / marking elevasi plafond dan buat garis sipatan pada dinding & as sumbu ruanga
Pasang paku kait. tembakan paku paku kait pada marking titik titik yang telah ada 60
Pasang penggantung rangka plafond ( rod ) yang terdiri dari hanger dan clip adjuster ( ex
Pasang rangka tepi ( steel hollow ) & wall angle profil l 20 x 20 mm atau mouldin
Tentukan jarak penempatan kait penggantung.
Pasang tarikan benang sebagai pedoman penentu kelurusan dan ketinggian rangka plafon
Pasang rangka utama / top cross rail ( ex.boral type 201 ) dengan jarak 1200 mm.
Pasang rangka pembagi / furing chanel ( ex.boral type 204 ) dengan jarak 600 mm mengg
Pasang dan kencangkan clip / rod.
Pasang panel gypsum pada rangka dengan sekrup ceiling menggunakan screw driver dengan
Cek kerapihan dan kerataan bidang plafond dengan menggunakan waterpass.
Perataan sambungan plafond dengan men gunakan ceiling net / lakban.
Kemudian ditutup dengan paper tape dan compound ceiling.
Setelah itu diamplas
Finish permukaan plafond gypsum tersebut dengan cat.
Ratakan permukaan plafon gypsum menggunakan plamur sampai terlihat rata dan lurus.
Haluskan dengan amplas sampai rata dan benar benar halus.
Cat seluruh permukaan plafond secara merata dengan kuas untuk bagian tepi dan sudut,
G.
Buat marking elevasi, as dan jarak penggantung rangka plafon sesuai dengan shopdrawi
Pasang benang nylon dua sisi dan sejajar sebagai pedoman kelurusan & ketinggian rangka
Pasang instalasi terlebih dahulu sebelum memasang rangka plafond.
Pasang rangka plafond (yang telah dihaluskan, dimeni & dipotong) sesuai marking yang te
Periksa kelurusan dan kerataan rangka menggunakan waterpass & siku besi.
Potong panel plafond plywood dengan gergaji sesuai shop drawing.
Haluskan bekas potongan plywood dengan amplas.
Pasang panel plafond plywood tersebut dengan mengatur :
kelurusan & kerapatan nad plafond
kerataan plafond
Pemasangan plafond dimulai dari tepi ( mengikuti gambar kerja) dan diperkuat dengan
Cek kerataan permukaan plafond yang sudah jadi dengan waterpass.
Rapikan & haluskan permukaan plafond plywood yang telah terpasang dengan amplas s
Bersihkan permukaan yang telah diamplas dengan kain lap.
VIII.
A.
B.
C.
D.
E.
F.
G.
PEKERJAAN SANITASI
Pemasangan kloset duduk
Pemasangan kloset jongkok
Pemasangan kran air
Pemasangan bak cuci piring
Pekerjaan bak mandi
Pekerjaan bak peresapan
Pekerjaan septictank
H.
I.
J.
K.
IX.
A.
Rendam keramik yang akan dipasang kedalam bak air ( ember ) selama 1 jam.
Keramik dianginkan dengan cara diletakan pada tempat dudukan / tatakan keramik, setelah
Tentukan garis dasar pasangan serta peil dari lantai. Penentuan peil ini untuk seluruh kesatu
Pasang benang arah horizontal dan vertikal pada lantai sesuai elevasi pada shop drawing.
Pasang keramik sebagai pasangan kepalaan , sepanjang garis dasar yang telah terpasang
Cek kesikuan keramik dengan besi siku dan kerataan elevasi keramik dengan waterpass.
Isi bagian / daerah permukaan lantai yang lain nya dengan adukan / spesi.
Setelah itu pasang keramik berikutnya sesuai posisinya sampai selesai, usahakan supaya
Jika keramik sudah terpasang semua, ketuk per mukaan keramik dengan palu karet untuk m
Setelah itu cek kerataan elevasi keramik dengan waterpass
Bersihkan permukaan pasangan keramik yang telah terpasang dengan kain / lap basah sa
Untuk menghindari naiknya lantai ( menggelembungnya lantai ) maka buatlah delatasi.
Kemudian siapkan isian / bahan cor nad pada bak air ( ember ) dan aduklah hingga rata
Setelah adukan rata , isi sela sela nad dengan bahan cor nad dengan menggunakan se
Kemudian rapikan nad tersebut dengan cape.
Diamkan dan tunggu sampai nad tersebut benar -benar kering.
Setelah kering, bersihkan permukaan pasangan keramik yang sudah dipasang nad dari si
B.
Rendam keramik yang akan dipasang kedalam bak air ( ember ) selama 1 jam.
Keramik dianginkan dengan cara diletakan pada tempat dudukan / tatakan keramik, sete
Membuat garis-garis sipatan waterpas pada dinding keramik keliling +/- 1m untuk menentukan k
Membuat lot pada dinding di tiap pojok ruangan dan kesikuannya serta garis pertengahan dindin
Mengukur jarak-jarak dinding untuk lebar dan tinggi ruangan, serta bagian-bagian yang terpasan
Berdasarkan data data pengukuran kemudian membuat gambar kerja untuk pembagian pemas
Ukuran pemasangan keramik mengikuti gambar yang sudah dibuat sebelumnya sebagai acuan k
Pada pelaksanaan pekerjaan keramik dinding, sebaiknya keramik lantai belum terpasang sehingg
Pemasangan keramik harus padat dan rata sehingga tidak ada keramik dengan spesi kosong
Membuat kepalaan keramik baik secara horisontal maupun vertikal mengikuti garis sipatan dan l
Sebelum keramik dipasang sebelumnya dinding dibasahi terlebih dahulu dengan air.
X.
Semua hantaran (kabel) yang ditarik dalam pipa / cabelduct harus diusahakan tidak tampak dari lu
Pemasangan pipa harus dilaksanakan sebelum pengecoran. Pemasangan sparing-sparing listrik yan
Pipa yang dipasang pada dinding dilaksanakan sebelum pekerjaan plesteran dan acian dikerjakan.
Penempatan sambungan/percabangan harus ditempatkan di daerah yang mudah dicapai untuk per
Sambungan harus menggunakan klem / isolasi kabel supaya terlindung dengan baik sehingga tidak
Lekukan/belokan pipa harus beradius > 3 kali diameter pipa dan harus rata (untuk memudahkan pe
Jaringan arde harus dipasang tersendiri/terpisah dengan arde penangkal petir.
Err:509
Err:509
Err:509
Pada hantaran di atas langit-langit, harus diklem pada bagian bawah plat / balok atau pada balok k
Untuk hantaran/tarikan kabel yang menyusur dinding bata/beton pada shaft harus diklem atau den
Stop kontak dan saklar. Pemasangan stop kontak setinggi > 40 cm dari lantai, saklar dipasang setin
150 cm dari lantai (bila tidak ditentukan spesifikasinya). Pemasangan stop kontak dan saklar harus
Box / kotak Panel bodynya harus diarde, untuk menghindari adanya arus.
XI.
Kunci tanam
Kunci kamar mandi
Engsel pintu
Engsel jendela
Teralis tangga
XII.
A.
PEKERJAAN FINISHING
Pengecatan
Bersihkan permukaan dinding dari debu , kotoran dan bekas percikan plesteran dengan kain lap.
Lindungi bahan bahan / pekerjaan lain yang berbatasan dengan dinding yang akan dicat dengan
Gunakan skrap untuk memperbaiki bagian bagian dinding yang retak & kurang rata dengan plam
Haluskan plamir yang telah kering dengan amplas hingga rata.
Cek, kerataan permukaan dinding.
Jika permukaan sudah rata, maka lakukan pengecatan dasar dengan alat rol pada bidang yang luas
Jika cat dasar tersebut sudah kering, lakukan pengecatan finish yang pertama.
Jika cat finish yang pertama sudah kering, lakukan pengecatan finish yang kedua / terakhir ( jumlah
Cek kerataan pengecatan yang terakhir.
Apabila sudah rata, bersihkan cat - cat yang mengotori bahan bahan / pekerjaan lain yang se
B.
Pembersihan kembali
, pohon dan dari sampah. Selanjutnya dilakukan pemasangan pagar pengaman pada sekeliling area proyek pen
n terakhir ring balk. Tahap awal pada tiap-tiap item pekerjaan di atas adalah pekerjaan pembesian, lalu memasa
n pekerjaan plesteran. Pekerjaan dinding dilakukan setelah pekerjaan kolom, balok, dan plat selesai.
urus, tegak, tidak siar dan tidak ada batu bata yang pecah melebihi 5 % dan pemasangan batu bata maksimal 1
h dahulu dan plesteran harus menghasilkan bidang yang rata dan sponeng yang lurus. Semua dinding harus dip
pasangan dan pekerjaan beton yang merupakan pekerjaan basah. Pemisahan ini untuk memperjelas jenis peke
emasangan rangka atap, gording, reng, usuk, dan terakhir pemasangan genteng.
k atau setelah pemasangan plafond dan sebelum pemasangan lantai. Pekerjaan ini meliputi pembuatan septicta
ai keramik 30 x 30 cm dan keramik 20 x 20 cm. Sedang bahan dinding keramik adalah keramik 20 x 20 cm. Kera
wplank atau sebelum pemasangan plafond dan sebelum pengecatan dinding. Pekerjaan ini meliputi pemasanga
mar mandi.
a jaringan listrik, telepon, septictank dan lain-lain apabila akan memulai pekerjaan pondasi.
g dan dipadatkan.
mengering
akan dipasang.
i kontrol kesetimbangan horisontalnya antara ujung satu dengan yang lainnya.
bata dan pada setiap sambungan atas dan bawah dari batu bata tidak boleh membentuk garis lurus/vertikal.
ak dipakai atau tidak dipasang.
ari 1 meter, untuk menjaga keruntuhan.
sampai selesai seluruh permukaan pada setiap bagian dengan cara dilempar dari jarak 50 cm
seluruhnya.
gunakan unting-unting.
adi kokoh.
mpatnya, ketinggian dan ketegakan dari kusen.
engan toleransi kelonggaran 3 5 mm, baik ke arah lebar maupun kearah tinggi.
daun pintu (sisi tebal) dengan jarak dari sisi bagian bawah 30 cm, dan dari sisi bagian atas 25 cm (untuk pintu
kedudukannya, kemudian beri tanda pada tiang kusen pintu/jendela tempat engsel yang sesuai dengan engsel
epas pennya, kemudian pasang/tanam pada tiang kusen
engselnya, kemudian masukkan pennya sampai pas, sehingga
melepaskan pen.
baik, rata dan lurus dengan kusen
Usahakan letakkan pada meja yang luasnya minimal sama dengan luas daun pintu. Atau letakkan pada lantai y
pasang lis kayu. Ini untuk menghindari goresan pada permukaan kaca karena gerakan martil
erupakan tulangan dari kolom yang dilebihkan sebagai pengikat antara kuda-kuda dan dinding.Angkur kemudia
nyasecara horizontal.
it setelah itu dimasukan genteng pada bagian bawahnya.
n dan pengecatan
paku kait pada langit- langit dengan jarak sesuai shop dra
dan clip adjuster ( ex. Boral type 223 ), dengan posisi tegak lurus.
0 mm atau moulding profil w sebagai list tepi tepat pada sipatan marking elevasi plafond.
an screw driver dengan jarak 60 cm dan setiap sambungan harus tepat pada rangka.
sang
ma 1 jam.
atakan keramik, setelah pro ses perendaman.
ni untuk seluruh kesatuan
asi pada shop drawing. Kedudukan benang harus datar dan siku , apabila
yang telah terpasang
mik dengan waterpass.
h dipasang nad dari sisa sisa bahan cor nad dengan menggunakan kain / lap basah sampai bersih
elama 1 jam.
/ tatakan keramik, setelah pro ses perendaman.
1m untuk menentukan ketinggian dan kedataran pemasangan keramik.
garis pertengahan dinding untuk pembagian keramik.
an-bagian yang terpasang pada ruangan tersebut.
untuk pembagian pemasangan keramik dinding tersebut.
elumnya sebagai acuan kerja.
belum terpasang sehingga nantinnya mendapat nut yang segaris antara dinding dan lantai.
dengan spesi kosong
gikuti garis sipatan dan lot ketegakan yang telah dibuat sebelumnya.
u dengan air.
ol pada bidang yang luas & dengan kwas untuk bidang yang sempit ( sulit ).
ekeliling area proyek penentuan as dan peil bangunan, terakhir pemasangan bouwplank. Selain itu air kerja dan
pembesian, lalu memasang bekisting, betonisasi, melepas bekisting, dan terakhir merawat beton.
plat selesai.
k memperjelas jenis pekerjaannya dan tidak saling menggaggu pekerjaan dan pengangkutan material.
iputi pembuatan septictank, pemasangan pipa-pipa, pemasangan kloset dan bak mandi. Pemasangan kloset da
keramik 20 x 20 cm. Keramik yang akan dipasang menggunakan spes dan harus disetujui terlebih dahulu oleh d
ini meliputi pemasangan titik lampu pada tempat yang telah ditentukan dan pemasangan saklar dan stop kont
emudian diplester kasar , bagian bawah pondasi dipasang batu kosong (aanstamping) tebal 20 cm dengan sel
uk garis lurus/vertikal.
ri jarak 50 cm
atas 25 cm (untuk pintu/jendela dengan 2 engsel), dan pada bagian tengah (untuk pintu dengan 3 engsel)
ng sesuai dengan engsel pada daun pintu/jendela.
dinding.Angkur kemudian ditempatkan pada plat dudukan kuda-kuda yang sudah dilobangi, kemudian angkur
levasi plafond.
dinding keramik, maka kedudukan nad lantai harus disesuaikan dengan yang a
ak rusak / cacat.
dahulu sebelum pengecoran, kabel diusahakan dimasukkan bersamaan dengan pemasangan sparing.
k. Selain itu air kerja dan listrik kerja harus sudah diperhitungkan penyediaannya oleh pemborong dengan mem
awat beton.
kutan material.
di. Pemasangan kloset dan pipa perlu diperhatikan agar semuanya berfungsi dengan baik dan tidak ada yang bo
jui terlebih dahulu oleh direksi. Pemasangan nat sesuai dengan warna keramik dan lantai tidak boleh bergelom
gan saklar dan stop kontak. Pemasangan kabel pada dinding menggunakan pipa sebagai selubung kabel. Penye
tebal 20 cm dengan sela- selanya disisi pasir urug, disiram air sampai Penuh dan ditumbuk hingga padat dan
tu dengan 3 engsel)
angi, kemudian angkur dan plat dudukan kuda-kuda tersebut disambung dengan baut angkur 12 mm.
sangan sparing.
pemborong dengan membelinya. Administrasi proyek juga diurus pada pekerjaan persiapan.
ai selubung kabel. Penyelesaian dinding sebagai akibat dari pemasangan saklar perlu diperhatikan dan permuk
angkur 12 mm.
FireRing
Hydrant Box Indoor , Type : A2
Size : 100 X 80 X 18 cm
c/ w :
- 1 roll Fire Hoze 1, 5" x 30 mtr
- 1 bh Hydrant Valve 1, 5"
- 1 bh Hose Nozzle 1, 5"
- 1 bh Hose Rack 1, 5"
Type : FR-35D
Weight : 3, 5 Kg
Harga : Rp. 425.000
Type: YP-10 ET
Capacity: 3 kg
Price: Rp. 1.000.000
VIKING
Sprinkler Head Micromatic
K Factor : 5.6 ( 8, 1) / VK 104
Material : Chrome
with Celling Plate
Type :
Side Wall
Side Wall
Side Wall
Side Wall
VIKING
Gate Valve OS & Y " FIREKING"
Size
Size
Size
Size
3"
4"
6"
8"
,
,
,
,
P/
P/
P/
P/
N
N
N
N
OF200-300,
OF200-400,
OF200-600,
OF200-800,
USD
USD
USD
USD
$
$
$
$
340
395
610
1000
2"
3"
4"
6"
Rp.
Rp.
Rp.
Rp.
2.290.000
2.744.000
3.888.000
7.206.000
Keterangan
WEILONG Y-Strainer
Description : CI Body.SS304 Screen.Flanged
Type : FIG # 7101
PN 16 Class 125
Size : 2"
DN : DN50
Price : Rp. 762.000
Size : 2-1/ 2"
DN : DN65
3,264,000
3,792,000
5,856,000
9,600,000
Price : Rp 1.002.000
Size : 3"
DN : DN80
Price : Rp. 1.117.000
Size : 4"
DN : DN100
Price : Rp 1.596.000
Size : 5"
DN : DN125
Price : Rp 2.436.000
Size : 6"
DN : DN150
Price : Rp 3.348.000
Size : 8"
DN : DN200
Price : Rp 5.022.000
USD $140
1,344,000
(Gambar)
HORING LIH ELECTRONIC SOUNDER AND BEACON AH-03127
391,000
850,000
DN80 / 3"
Price: 2.453.000, DN100 / 4"
Price: 3.575.000, DN125 / 5"
Price: 4.367.000, DN150 / 6"
Price: 5.588.000, DN200 / 8"
Price: 8.470.000, DN250 / 10"
Price: 14.553.000, DN300 / 12"
Price: 23.210.000, FIG# 5201-300-F
FM/ UL Approved
Ductile Iron Body
Bronze / Rubber Seat
Flange - Flange
Pressure: 300 PSI
Size: 1 1/ 2"
Price: 284.000, Size: 2"
Price: Rp. 365.000, Size: 2 1/ 2"
Price: Rp. 480.000, Size: 3"
Price: Rp. 650.000, Keterangan
GMT Automatic Air Vent Valve
Size: 1"
867,000
DN200/ 8"
Price: Rp. 4.042.500, -
OMRON
61F-G1 = Rp.250.000,-
Water Meter
LINFLOW
279,000
NITTAN
Annunciator Panel 10 Zone
Type : PSH-10L
Price : Rp. 6.268.900
Annunciator Panel 15 Zone
Type : PSH-15L
Price : Rp. 8.555.600
Annunciator Panel 20 Zone
Type : PSH-20L
Price : Rp. 9.105.800
Annunciator Panel 25 Zone
Type : PSH-25L
Price : Rp. 9.762.500
Annunciator Panel 30 Zone
Type : PSH-30L
Price : Rp. 11.534.700
Annunciator Panel 40 Zone
Type : PSH-40L
Price : Rp. 13.291.700
Annunciator Panel 50 Zone
Type : PSH-50L
Price : Rp. 23.833.400
Annunciator Panel 60 Zone
Type : PSH-60L
Price : Rp. 25.361.100
Annunciator Panel 80 Zone
Type : PSH-80L
Price : Rp. 29.944.500
Annunciator Panel 100 Zone
Type : PSH-100L
Price : Rp. 37.888.900