Anda di halaman 1dari 2

KE INOBONTO

PEMERINTAH
PROVINSI SULAWESI UTARA
SATUAN KERJA
BADAN PENANGGULANGAN
BENCANA DAERAH
PROVINSI SULAWESI UTARA
PEKERJAAN
PERENCANAAN TEKNIS KEGIATAN RR
MINAHASA SELATAN
REKONSTRUKSIBANGUNAN PENGAMAN
RENC. TALUD *PANTAI KAPITU
108 M.
PERKUATAN TEBING/NORMALISASI
*SUNGAI PINSAN (ONGKAW)
PERKUATAN TEBING/NORMALISASI
LOKASI: SUNGAI PINSAN *SUNGAI KONARAN (PINAESAAN
TOMPASO BARU)
(ONGKAW) *REHABILITASI/PERKUATAN TEBING
KECAMATAN KUMELEMBUAI (MALOLA)
KE AMURANG
MENYETUJUI
KEPALA BPBD
PROVINSI SULAWESI UTARA
BALOK 30/40
PAS. BATU SP. 1:4
P3 KOLOM 30/30
Ir. NOLDY W.D. LIOW
Pembina Utama Muda
NIP. 19591110 198703 1 020
MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN
BIDANG REHABILITASI DAN
REKONSTRUKSI

3500

JIMMY E. MOKOLENSANG, ST, MT


Pembina Tingkat 1
NIP. 19710102 199803 1 008
KONSULTAN PERENCANA
CV. GEMA GLORY

1000 LIAN NELWAN, SH


Direktur
GAMBAR SKALA
350

PASIR URUG PONDASI SLOOF 30/40


RENC. TALUD 1:750
TELAPAK DETAIL TALUD 1:50
3000 3000 3000
DETAIL TALUD
NO. LBR. KODE
SKALA 1:50
01 ARS/STR
LOKASI: SUNGAI PINSAN (ONGKAW)
PEMERINTAH
PROVINSI SULAWESI UTARA
SATUAN KERJA
BADAN PENANGGULANGAN
BENCANA DAERAH
PROVINSI SULAWESI UTARA
300
PEKERJAAN
PERENCANAAN TEKNIS KEGIATAN RR
MINAHASA SELATAN
REKONSTRUKSIBANGUNAN PENGAMAN
BALOK 30/40 *PANTAI KAPITU
PAS. BATU SP. 1:4
PERKUATAN TEBING/NORMALISASI
*SUNGAI PINSAN (ONGKAW)
KOLOM 30/30 400
PERKUATAN TEBING/NORMALISASI
*SUNGAI KONARAN (PINAESAAN
SLOOF 30/40 TOMPASO BARU)
TANAH ASLI 50
REHABILITASI/PERKUATAN TEBING
300 *KECAMATAN KUMELEMBUAI (MALOLA)
250
MENYETUJUI
50
300
KEPALA BPBD
PASIR URUG PROVINSI SULAWESI UTARA
3500 1000 DETAIL KOLOM
SKALA 1:20

Ir. NOLDY W.D. LIOW


Pembina Utama Muda
NIP. 19591110 198703 1 020
MENYETUJUI
1000 300
PEJABAT PELAKSANA TEKNIS KEGIATAN
400
TANAH ASLI
BIDANG REHABILITASI DAN
REKONSTRUKSI
PONDASI 1000
TELAPAK 300

100
350
50
DETAIL BALOK/SLOOF
TANAH ASLI
300 SKALA 1:20 JIMMY E. MOKOLENSANG, ST, MT
1500 Pembina Tingkat 1
1000 NIP. 19710102 199803 1 008
1000
PASIR URUG KONSULTAN PERENCANA

DETAIL TALUD (POT. P3) DETAIL PONDASI TELAPAK CV. GEMA GLORY
SKALA 1:50 SKALA 1:20

LIAN NELWAN, SH
Direktur
GAMBAR SKALA

RENC. TALUD 1:750


DETAIL TALUD 1:50
NO. LBR. KODE

02 STR

Anda mungkin juga menyukai