No Kombinasi Lokasi
Kiri (kN-m) Kanan (kN-m)
1 M- Tump -90.64 -169.08
1,4 D M+ Tump - -
M+ Tengah - -
2 M- Tump -106.50 -208.52
1,2 D+1,6 L M+ Tump - -
M+ Tengah - -
3 M- Tump -621.21 -708.87
1,0 D + 0,5 L + I/R (Ex) + 0,3 I/R (Ey) M+ Tump 447.83 379.27
M+ Tengah - -
4 M- Tump -270.97 -343.16
1,0 D + 0,5 L + 0,3 I/R (Ex) + I/R (Ey) M+ Tump 97.59 13.55
M+ Tengah - -
5 M- Tump -592.79 -652.77
0,9 D + I/R (Ex) + 0,3 I/R (Ey) M+ Tump 476.25 435.37
M+ Tengah - -
6 M- Tump -242.55 -287.05
0,9 D + 0,3 I/R (Ex) + I/R (Ey) M+ Tump 126.02 69.66
M+ Tengah - -
7 M- Tump -621.21 -708.87
Momen Desain M+ Tump 476.25 435.37
M+ Tengah - -
Bentang
Tengah (kN-m)
-
-
73.89
-
-
93.77
-
-
83.61
-
78.83
-
-
58.27
-
-
53.48
-
-
93.77
PENULANGAN LENTUR BALOK LAB FK UNISSULA
DENGAN SHEAR WALL
LANTAI 2 As 3" c-d"
1 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 659.22 400 800 40 25 400 22 22 379.94 10 94 706 3432.87 7 12 12 D 22 4559.28 706 214.55
M+ Tump Kiri 123.97 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 659.91 400 800 40 25 400 22 22 379.94 10 94 706 3436.46 7 12 12 D 22 4559.28 706 214.55
M+Tump Kanan 123.76 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 339.56 400 800 40 25 400 22 0 379.94 10 61 739 1689.29 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 873.52 422.07
TERPENUHI
LANTAI 3 As 3" c-d"
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 718.63 400 800 40 25 400 22 22 379.94 10 94 706 3742.24 7 12 12 D 22 4559.28 706 214.55
M+ Tump Kiri 153.28 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 5 6 D 22 1899.70 739 89.40
M- Tump Kanan 400x800 718.47 400 800 40 25 400 22 22 379.94 10 94 706 3741.41 7 12 12 D 22 4559.28 706 214.55
M+Tump Kanan 153.87 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 5 6 D 22 1899.70 739 89.40
M + Lapangan 339.56 400 800 40 25 400 22 0 379.94 10 61 739 1689.29 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 873.52 422.07
TERPENUHI
LANTAI 4 As 3 c-d 3 4 5
BALOK Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu n max n Psg
Kondisi b h p f'c fy D As D 25 S d' de As Tul Perlu Ast dt a
1 Lps
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
M- Tump Kiri 768.75 400 800 40 25 400 22 22 379.94 10 94 706 4003.24 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 175.8 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
400x800
M- Tump Kanan 400x800 776.28 400 800 40 25 400 22 22 379.94 10 94 706 4042.45 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kanan 174.24 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 343.70 400 800 40 25 400 22 0 379.94 10 61 739 1709.88 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 5 As 3 c-d 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 779.20 400 800 40 25 400 22 22 379.94 10 94 706 4057.66 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 182.15 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 784.12 400 800 40 25 400 22 22 379.94 10 94 706 4083.28 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 178.33 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 341.66 400 800 40 25 400 22 0 379.94 10 61 739 1699.73 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 6 As 3 c-d 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 778.71 400 800 40 25 400 22 22 379.94 10 94 706 4055.11 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 178.91 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 786.10 400 800 40 25 400 22 22 379.94 10 94 706 4093.59 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 173.91 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 346.44 400 800 40 25 400 22 0 379.94 10 61 739 1723.51 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 7 As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 762.09 400 800 40 25 400 22 22 379.94 10 94 706 3968.56 7 11 11 D 22 4179.34 706 196.67
400x800
M+ Tump Kiri 166.21 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 771.39 400 800 40 25 400 22 22 379.94 10 94 706 4016.99 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 123.76 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 350.49 400 800 40 25 400 22 0 379.94 10 61 739 1743.66 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 8 As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 744.99 400 800 40 25 400 22 22 379.94 10 94 706 3879.51 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 156.80 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 753.69 400 800 40 25 400 22 22 379.94 10 94 706 3924.81 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 153.19 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 347.40 400 800 40 25 400 22 0 379.94 10 61 739 1728.29 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI Atap As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 590.64 400 800 40 25 400 22 22 379.94 10 94 706 3075.74 7 9 9 D 22 3419.46 706 160.92
M+ Tump Kiri 122.84 342.24 400 800 40 25 400 22 0 379.94 10 61 739 1702.63 7 5 5 D 22 1899.70 739 89.40
M- Tump Kanan 400x800 606.23 400 800 40 25 400 22 22 379.94 10 94 706 3156.92 7 9 9 D 22 3419.46 706 160.92
M+Tump Kanan 117.58 342.24 400 800 40 25 400 22 0 379.94 10 61 739 1702.63 7 5 5 D 22 1899.70 739 89.40
M + Lapangan 296.09 400 800 40 25 400 22 0 379.94 10 61 739 1473.03 7 4 4 D 22 1519.76 739 71.52
1/4 Momen Max < Momen M
Momen Max dan Min 684.49 342.00
TERPENUHI
b-c
LANTAI 2 As 3 "b-c"
1 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 646.93 400 800 40 25 400 22 22 379.94 10 94 706 3368.87 7 12 12 D 22 4559.28 706 214.55
M+ Tump Kiri 127.26 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 5 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 655.37 400 800 40 25 400 22 22 379.94 10 94 706 3412.82 7 12 10 D 22 4559.28 706 214.55
M+Tump Kanan 122.10 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 5 D 22 2279.64 739 107.28
M + Lapangan 330.73 400 800 40 25 400 22 0 379.94 10 61 739 1645.36 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 873.52 422.07
TERPENUHI
LANTAI 3 As 3 "b-c"
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max Ast dt a
1 Lps n Psg Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
M- Tump Kiri 732.82 400 800 40 25 400 22 22 379.94 10 94 706 3816.13 7 12 12 D 22 4559.28 706 214.55
M+ Tump Kiri 159.28 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 5 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 761.90 400 800 40 25 400 22 22 379.94 10 94 706 3967.57 7 12 10 D 22 4559.28 706 214.55
M+Tump Kanan 164.26 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 5 D 22 2279.64 739 107.28
M + Lapangan 353.19 400 800 40 25 400 22 0 379.94 10 61 739 1757.09 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 873.52 422.07
TERPENUHI
LANTAI 4 As 3 "b-c" 3 4 5
BALOK Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu n max n Psg
Kondisi b h p f'c fy D As D 25 S d' de As Tul Perlu Ast dt a
1 Lps
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
M- Tump Kiri 754.79 400 800 40 25 400 22 22 379.94 10 94 706 3930.54 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 183.62 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 778.13 400 800 40 25 400 22 22 379.94 10 94 706 4052.09 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kanan 172.92 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 337.91 400 800 40 25 400 22 0 379.94 10 61 739 1681.08 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 5 As 3 "b-c" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 764.67 400 800 40 25 400 22 22 379.94 10 94 706 3981.99 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 190.94 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 792.12 400 800 40 25 400 22 22 379.94 10 94 706 4124.94 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 179.78 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 337.18 400 800 40 25 400 22 0 379.94 10 61 739 1677.45 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 6 As 3 "b-c" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max Ast dt a
1 Lps n Psg Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
M- Tump Kiri 757.81 400 800 40 25 400 22 22 379.94 10 94 706 3946.27 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 188.26 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 793.03 400 800 40 25 400 22 22 379.94 10 94 706 4129.68 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 175.75 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 339.41 400 800 40 25 400 22 0 379.94 10 61 739 1688.54 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 7 As 3 "b-c" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 740.07 400 800 40 25 400 22 22 379.94 10 94 706 3853.89 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 178.91 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 782.46 400 800 40 25 400 22 22 379.94 10 94 706 4074.63 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 162.38 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
400x800
M + Lapangan 343.58 400 800 40 25 400 22 0 379.94 10 61 739 1709.29 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI 8 As 3 "b-c" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 741.06 400 800 40 25 400 22 22 379.94 10 94 706 3859.04 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 165.27 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 786.37 400 800 40 25 400 22 22 379.94 10 94 706 4094.99 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 157.91 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 355.10 400 800 40 25 400 22 0 379.94 10 61 739 1766.60 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI Atap As 3 "b-c" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 562.57 400 800 40 25 400 22 22 379.94 10 94 706 2929.56 7 8 8 D 22 3039.52 706 143.04
M+ Tump Kiri 125.21 308.56 400 800 40 25 400 22 0 379.94 10 61 739 1535.08 7 5 5 D 22 1899.70 739 89.40
M- Tump Kanan 400x800 606.92 400 800 40 25 400 22 22 379.94 10 94 706 3160.51 7 9 9 D 22 3419.46 706 160.92
M+Tump Kanan 116.00 342.24 400 800 40 25 400 22 0 379.94 10 61 739 1702.63 7 5 5 D 22 1899.70 739 89.40
M + Lapangan 282.95 400 800 40 25 400 22 0 379.94 10 61 739 1407.66 7 4 4 D 22 1519.76 739 71.52
1/4 Momen Max < Momen M
Momen Max dan Min 684.49 342.00
TERPENUHI
C_D
LANTAI 2 As 3 "c-d"
1 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 784.23 400 800 40 25 400 22 22 379.94 10 94 706 4083.85 7 14 14 D 22 5319.16 706 250.31
M+ Tump Kiri 191.06 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M- Tump Kanan 400x800 794.14 400 800 40 25 400 22 22 379.94 10 94 706 4135.46 7 14 14 D 22 5319.16 706 250.31
M+Tump Kanan 187.51 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M + Lapangan 339.56 400 800 40 25 400 22 0 379.94 10 61 739 1689.29 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 988.67 422.07
TERPENUHI
LANTAI 3 As 3 "c-d"
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 906.06 400 800 40 25 400 22 22 379.94 10 94 706 4718.28 7 14 14 D 22 5319.16 706 250.31
M+ Tump Kiri 253.91 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M- Tump Kanan 400x800 919.79 400 800 40 25 400 22 22 379.94 10 94 706 4789.77 7 14 14 D 22 5319.16 706 250.31
M+Tump Kanan 249.47 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M + Lapangan 336.21 400 800 40 25 400 22 0 379.94 10 61 739 1672.62 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 988.67 422.07
TERPENUHI
LANTAI 4 As 3 "c-d" 3 4 5
BALOK Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu n max n Psg
Kondisi b h p f'c fy D As D 25 S d' de As Tul Perlu Ast dt a
1 Lps
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
M- Tump Kiri 964.24 400 800 40 25 400 22 22 379.94 10 94 706 5021.25 7 14 14 D 22 5319.16 706 250.31
M+ Tump Kiri 278.84 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M- Tump Kanan 400x800 986.41 400 800 40 25 400 22 22 379.94 10 94 706 5136.70 7 14 14 D 22 5319.16 706 250.31
M+ Tump Kanan 272.75 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M + Lapangan 343.70 400 800 40 25 400 22 0 379.94 10 61 739 1709.88 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 988.67 422.07
TERPENUHI
LANTAI 5 As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
1 Lps
Kondisi BALOK n max n Psg Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 944.35 400 800 40 25 400 22 22 379.94 10 94 706 4917.67 7 13 13 D 22 4939.22 706 232.43
M+ Tump Kiri 270.85 466.09 400 800 40 25 400 22 0 379.94 10 61 739 2318.77 7 6 7 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 964.06 400 800 40 25 400 22 22 379.94 10 94 706 5020.31 7 14 14 D 22 5319.16 706 250.31
M+Tump Kanan 261.62 494.34 400 800 40 25 400 22 0 379.94 10 61 739 2459.28 7 7 7 D 22 2659.58 739 125.16
M + Lapangan 341.66 400 800 40 25 400 22 0 379.94 10 61 739 1699.73 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 988.67 422.07
TERPENUHI
LANTAI 6 As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 909.50 400 800 40 25 400 22 22 379.94 10 94 706 4736.19 7 13 13 D 22 4939.22 706 232.43
M+ Tump Kiri 249.52 466.09 400 800 40 25 400 22 0 379.94 10 61 739 2318.77 7 7 7 D 22 2659.58 739 125.16
M- Tump Kanan 400x800 931.28 400 800 40 25 400 22 22 379.94 10 94 706 4849.61 7 13 13 D 22 4939.22 706 232.43
M+Tump Kanan 239.38 466.09 400 800 40 25 400 22 0 379.94 10 61 739 2318.77 7 7 7 D 22 2659.58 739 125.16
M + Lapangan 346.44 400 800 40 25 400 22 0 379.94 10 61 739 1723.51 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 932.18 422.07
TERPENUHI
LANTAI 7 As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 838.30 400 800 40 25 400 22 22 379.94 10 94 706 4365.42 7 12 12 D 22 4559.28 706 214.55
M+ Tump Kiri 209.01 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 861.16 400 800 40 25 400 22 22 379.94 10 94 706 4484.46 7 12 12 D 22 4559.28 706 214.55
M+Tump Kanan 199.06 436.76 400 800 40 25 400 22 0 379.94 10 61 739 2172.84 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 350.39 400 800 40 25 400 22 0 379.94 10 61 739 1743.16 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 873.52 422.07
TERPENUHI
LANTAI 8 As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 750.94 400 800 40 25 400 22 22 379.94 10 94 706 3910.49 7 11 11 D 22 4179.34 706 196.67
M+ Tump Kiri 164.37 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M- Tump Kanan 400x800 770.71 400 800 40 25 400 22 22 379.94 10 94 706 4013.45 7 11 11 D 22 4179.34 706 196.67
M+Tump Kanan 156.80 406.34 400 800 40 25 400 22 0 379.94 10 61 739 2021.51 7 6 6 D 22 2279.64 739 107.28
M + Lapangan 347.42 400 800 40 25 400 22 0 379.94 10 61 739 1728.39 7 5 5 D 22 1899.70 739 89.40
1/4 Momen Max < Momen M
Momen Max dan Min 812.68 422.07
TERPENUHI
LANTAI Atap As 3 "c-d" 2 3 4 5
Dimensi Balok Mutu Baja Tulangan Yang Dibutuhkan Untuk Lentur
Mu
Kondisi BALOK b h p f'c fy D As D 22 S d' de As n max n Psg Ast dt a
Tul Perlu
(kN-m) (mm) (mm) (mm) (Mpa) (Mpa) (mm) (mm) (mm) (mm) (mm) (mm) 1 Lps (mm) (mm) (mm)
M- Tump Kiri 563.36 400 800 40 25 400 22 22 379.94 10 94 706 2933.68 7 8 8 D 22 3039.52 706 143.04
M+ Tump Kiri 112.10 308.56 400 800 40 25 400 22 0 379.94 10 61 739 1535.08 7 5 5 D 22 1899.70 739 89.40
M- Tump Kanan 400x800 585.60 400 800 40 25 400 22 22 379.94 10 94 706 3049.49 7 9 9 D 22 3419.46 706 160.92
M+Tump Kanan 104.84 342.24 400 800 40 25 400 22 0 379.94 10 61 739 1702.63 7 5 5 D 22 1899.70 739 89.40
M + Lapangan 295.97 400 800 40 25 400 22 0 379.94 10 61 739 1472.43 7 4 4 D 22 1519.76 739 71.52
1/4 Momen Max < Momen M
Momen Max dan Min 684.49 342.00
TERPENUHI
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 9.035282823
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 9.044739977
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.4461915
omen Min
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 9.8495575
422.068 NOT OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 5.71891577
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 9.847364537
422.068 NOT OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 5.71891577
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.4461915
omen Min
6 7 8
CheckPen
Check AsMinimum Check Ratio Tulangan ampang
As >As
Mn Mn > Mu As Min As Syarat p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
Syarat
(kN-m) (mm) (mm)
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.319 under reinforced 10.53650325
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.319 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.319 under reinforced 10.63970958
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.319 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.319 under reinforced 4.500400573
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.67973116
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.74716478
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.473688856
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.67301521
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.7743027
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.536278075
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.44522115
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.57268714
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.58930869
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.2108482
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.33009058
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.548848295
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
684.485 OK 1000.000 1120.000 OK 0.01069 0.027 0.020 OK 0.228 0.31875 under reinforced 8.095323938
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.481317407
684.485 OK 1000.000 1120.000 OK 0.01069 0.027 0.020 OK 0.228 0.31875 under reinforced 8.309000798
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.481317407
342.002 OK 1000.000 1120.000 OK 0.00475 0.027 0.020 OK 0.097 0.31875 under reinforced 3.876996234
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 8.866835831
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 8.982514644
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.330571666
omen Min
6 7 8
CheckPen
Check AsMinimum Check Ratio Tulangan ampang
As >As
Mn Mn > Mu As Min As Syarat p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
Syarat
(kN-m) (mm) (mm)
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.319 under reinforced 10.3451672
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.319 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.319 under reinforced 10.66506572
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.319 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.319 under reinforced 4.424586435
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.48058268
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.85681295
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.41502783
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.38655938
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.86928542
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.444227403
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.14341458
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.72441279
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.498829296
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.15698354
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.77800333
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.649671933
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
617.127 OK 1000.000 1120.000 OK 0.00950 0.027 0.020 OK 0.203 0.31875 under reinforced 7.710595943
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.04032083
684.485 OK 1000.000 1120.000 OK 0.01069 0.027 0.020 OK 0.228 0.31875 under reinforced 8.318457952
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.481317407
342.002 OK 1000.000 1120.000 OK 0.00475 0.027 0.020 OK 0.097 0.31875 under reinforced 3.70494135
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 10.57638777
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 10.86805188
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
422.068 Err:504 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.323239038
omen Min
6 7 8
CheckPen
Check AsMinimum Check Ratio Tulangan ampang
As >As
Mn Mn > Mu As Min As Syarat p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
Syarat
(kN-m) (mm) (mm)
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.319 offerrreinforced 13.07472118
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.319 under reinforced 6.472821872
988.671 NOT OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.319 offerrreinforced 13.62926677
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.319 under reinforced 6.472821872
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.319 under reinforced 4.418432265
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
932.182 NOT OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.81512915
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 13.41764581
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.411492456
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
932.182 OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.26661421
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
932.182 NOT OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.9575347
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.43977545
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
932.182 OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 11.26333351
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
932.182 OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.03621601
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.493722644
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.33817713
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 11.00812741
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
422.068 Err:504 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.643517763
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
617.127 OK 1000.000 1120.000 OK 0.00950 0.027 0.020 OK 0.203 0.31875 under reinforced 7.492807278
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.04032083
684.485 OK 1000.000 1120.000 OK 0.01069 0.027 0.020 OK 0.228 0.31875 under reinforced 8.127396026
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.481317407
342.002 Err:504 1000.000 1120.000 OK 0.00475 0.027 0.020 OK 0.097 0.31875 under reinforced 3.710702701
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 10.74867244
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 10.88449911
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
422.068 Err:504 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.4461915
omen Min
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 12.41847692
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 12.60666058
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.402326671
omen Min
6 7 8
CheckPen
Check AsMinimum Check Ratio Tulangan ampang
As >As
Mn Mn > Mu As Min As Syarat p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
Syarat
(kN-m) (mm) (mm)
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.319 offerrreinforced 13.21589319
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.319 under reinforced 6.472821872
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.319 offerrreinforced 13.51975566
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.319 under reinforced 6.472821872
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.319 under reinforced 4.500400573
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
Syarat
As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
932.182 NOT OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.94328044
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 6.102984769
988.671 OK 1000.000 1120.000 OK 0.01662 0.027 0.020 OK 0.355 0.31875 offerrreinforced 13.21342611
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.472821872
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.473688856
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
932.182 OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.46562563
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
932.182 OK 1000.000 1120.000 OK 0.01544 0.027 0.020 OK 0.329 0.31875 offerrreinforced 12.76414276
575.679 OK 1000.000 1120.000 OK 0.00831 0.027 0.020 OK 0.169 0.31875 under reinforced 6.102984769
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.536278075
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 11.48975697
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
873.518 OK 1000.000 1120.000 OK 0.01425 0.027 0.020 OK 0.304 0.31875 under reinforced 11.8030766
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.71891577
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.587999292
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.29239902
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
812.681 OK 1000.000 1120.000 OK 0.01306 0.027 0.020 OK 0.279 0.31875 under reinforced 10.56336705
499.961 OK 1000.000 1120.000 OK 0.00712 0.027 0.020 OK 0.145 0.31875 under reinforced 5.320614877
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.549110175
omen Min
6 7 8
Check AsMinimum Check Ratio Tulangan CheckPenampang
Mn As Min As Syarat As >As
Mn > Mu p pb 0,75pb p<0,75pb a/d atcl/d a/d < atcl/d
(kN-m) (mm) (mm) Syarat
617.127 OK 1000.000 1120.000 OK 0.00950 0.027 0.020 OK 0.203 0.31875 under reinforced 7.721423699
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.04032083
684.485 OK 1000.000 1120.000 OK 0.01069 0.027 0.020 OK 0.228 0.31875 under reinforced 8.026245595
422.068 OK 1000.000 1120.000 OK 0.00594 0.027 0.020 OK 0.121 0.31875 under reinforced 4.481317407
342.002 OK 1000.000 1120.000 OK 0.00475 0.027 0.020 OK 0.097 0.31875 under reinforced 3.875424957
omen Min
MOMEN KAPASITAS LENTUR
M- Tump Kiri 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 3 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 155.63921738 -103.0523662 1124.4933456 1155.1466544
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 1899.70 739 949.85 72.298256932 -319.4564576 522.35490633 427.49509367
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 155.63921738 -103.0523662 1124.4933456 1155.1466544
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 1899.70 739 949.85 72.298256932 -319.4564576 522.35490633 427.49509367
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 4 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
400x800
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 5 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 6 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 7 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
400x800
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 8 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI Atap As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 9 D 22 3419.46 706 1709.73 114.17895498 -140.4723806 824.94294975 884.78705025
M+ Tump Kiri 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 949.85 75.855323879 -228.3571924 548.05471503 401.79528497
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 9 D 22 3419.46 706 1709.73 114.17895498 -140.4723806 824.94294975 884.78705025
M+Tump Kanan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 949.85 75.855323879 -228.3571924 548.05471503 401.79528497
M + Lapangan 400 800 40 25 400 22 0 10 4 D 22 1519.76 739 - - - - -
AS b-c
M- Tump Kiri 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+ Tump Kiri 400 800 40 25 400 22 0 10 5 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 10 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+Tump Kanan 400 800 40 25 400 22 0 10 5 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 3 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+ Tump Kiri 400 800 40 25 400 22 0 10 5 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 10 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+Tump Kanan 400 800 40 25 400 22 0 10 5 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 4 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 5 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 6 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 7 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 8 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI Atap As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 8 D 22 3039.52 706 1519.76 103.05236617 -155.6392174 744.55334556 775.20665444
M+ Tump Kiri 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 949.85 77.563670113 -198.5134279 560.39751657 389.45248343
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 9 D 22 3419.46 706 1709.73 114.17895498 -140.4723806 824.94294975 884.78705025
M+Tump Kanan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 949.85 75.855323879 -228.3571924 548.05471503 401.79528497
M + Lapangan 400 800 40 25 400 22 0 10 4 D 22 1519.76 739 - - - - -
M- Tump Kiri 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 3 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 4 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
400x800
M- Tump Kiri 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 6 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 7 As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
M+ Tump Kiri 400 800 40 25 400 22 22 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
400x800
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+Tump Kanan 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI Atap As 3" b-c" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 8 D 22 3039.52 706 1519.76 103.05236617 -155.6392174 744.55334556 775.20665444
M+ Tump Kiri 400 800 40 25 400 22 0 10 6 D 22 1899.70 739 949.85 77.563670113 -198.5134279 560.39751657 389.45248343
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 9 D 22 3419.46 706 1709.73 114.17895498 -140.4723806 824.94294975 884.78705025
M+Tump Kanan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 949.85 75.855323879 -228.3571924 548.05471503 401.79528497
M + Lapangan 400 800 40 25 400 22 0 10 4 D 22 1519.76 739 - - - - -
AS c-d
M- Tump Kiri 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 3 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
400x800
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 4 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 - - - - -
LANTAI 5 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 152.50102239 -126.2075968 1101.8198868 1367.7901132
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2279.64 739 1139.82 76.151125355 -328.5680112 550.19188069 589.62811931
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 14 D 22 5319.16 706 2659.58 149.84854176 -149.8485418 1082.6557142 1576.9242858
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 79.835829359 -337.5114003 576.81386712 752.97613288
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 6 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
400x800
M+ Tump Kiri 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 13 D 22 4939.22 706 2469.61 137.27742597 -163.5708516 991.82940261 1477.7805974
M+Tump Kanan 400 800 40 25 400 22 0 10 7 D 22 2659.58 739 1329.79 81.370208168 -307.4936684 587.89975402 741.89024598
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 7 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 12 D 22 4559.28 706 2279.64 138.73279188 -138.7327919 1002.3444213 1277.2955787
M+Tump Kanan 400 800 40 25 400 22 0 10 6 D 22 2279.64 739 1139.82 77.427819181 -298.2925943 559.41599358 580.40400642
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI 8 As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+ Tump Kiri 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 11 D 22 4179.34 706 2089.67 126.20759679 -152.5010224 911.84988677 1177.8201132
M+Tump Kanan 400 800 40 25 400 22 22 10 6 D 22 2279.64 739 1139.82 78.927329261 -268.2399936 570.24995391 569.57004609
M + Lapangan 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 - - - - -
LANTAI Atap As 3" c-d" 3 5 6
M- Tump Kiri 400 800 40 25 400 22 22 10 8 D 22 3039.52 706 1519.76 103.05236617 -155.6392174 744.55334556 775.20665444
400x800
M+ Tump Kiri 400 800 40 25 400 22 0 10 5 D 22 1899.70 739 949.85 77.563670113 -198.5134279 560.39751657 389.45248343
M- Tump Kanan 400x800 400 800 40 25 400 22 22 10 9 D 22 3419.46 706 1709.73 114.17895498 -140.4723806 824.94294975 884.78705025
M+Tump Kanan 400 800 40 25 400 22 22 10 5 D 22 1899.70 739 949.85 75.855323879 -228.3571924 548.05471503 401.79528497
M + Lapangan 400 800 40 25 400 22 0 10 4 D 22 1519.76 739 - - - - -
7
Mn ket
a
kN-m Cs' a b
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
7
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
ket
a
kN-m Cs'
- - -
7
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
7
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
Mn ket
a
kN-m Cs'
- - -
c
-139058.04 126.20759679
GAYA GESER PADA BALOK INDUK
1 2 3 4 5 6 7 8
Goyangan Ke Kiri Goyangan Ke Kanan Vsway V total (goyang kiri) V total (goyang kanan)
Vg (1,2D+1L) Ln Vu Terpakai
BALOK KONDISI Mpr1 Mpr4 Mpr2 Mpr3 kiri kanan Max ujug kiri ujung kanan ujugng kiri ujung kanan
(kNm) (kNm) (kNm) (kNm) (kNm) (m) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm)
As 3 (c-d) Tump 769.36 1430.26 1430.26 769.36 380.20 8.10 271.56 271.56 271.56 651.76 -108.64 -108.64 651.76 651.76
Lt2
As 3 (c-d) Tump 645.70 1426.46 1426.46 645.70 375.96 8.10 255.82 255.82 255.82 631.78 -120.14 -120.14 631.78 631.78
Lt3
As 3 (c-d)
Tump 769.66 1315.68 1315.68 769.66 376.31 8.10 257.45 257.45 257.45 633.76 -118.86 -118.86 633.76 633.76
Lt4
As 3 (c-d) Tump 769.66 1315.68 1315.68 769.66 374.84 8.10 257.45 257.45 257.45 632.29 -117.39 -117.39 632.29 632.29
Lt5
As 3 (c-d) Tump 769.66 1315.68 1315.68 769.66 380.05 8.10 257.45 257.45 257.45 637.50 -122.60 -122.60 637.50 637.50
Lt6
As 3 (c-d) Tump 769.66 1315.68 1315.68 769.66 378.02 8.10 257.45 257.45 257.45 635.47 -120.57 -120.57 635.47 635.47
Lt7
As 3 (c-d)
Tump 769.66 1083.87 1083.87 646.50 373.85 8.10 228.83 213.63 228.83 602.68 -145.02 -160.22 587.48 602.68
Lt8
As 3 (c-d) Lt
Atap Tump 646.50 1083.87 1083.87 646.50 297.59 8.10 213.63 213.63 213.63 511.22 -83.96 -83.96 511.22 511.22
Goyangan Ke Kiri Goyangan Ke Kanan Vsway V total (goyang kiri) V total (goyang kanan)
Vg (1,2D+1L) Ln Vu Terpakai
BALOK KONDISI Mpr1 Mpr4 Mpr2 Mpr3 kiri kanan Max ujug kiri ujung kanan ujugng kiri ujung kanan
(kNm) (kNm) (kNm) (kNm) (kNm) (m) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm)
As 3 (b-c) Tump 769.36 1430.26 1430.26 769.36 373.52 8.10 271.56 271.56 271.56 645.08 -101.96 -101.96 645.08 645.08
Lt2
As 3 (b-c)
Tump 769.36 1430.26 1430.26 769.36 404.41 8.10 271.56 271.56 271.56 675.97 -132.85 -132.85 675.97 675.97
Lt3
As 3 (b-c)
Tump 769.66 1315.68 1315.68 769.66 374.33 8.10 257.45 257.45 257.45 631.78 -116.88 -116.88 631.78 631.78
Lt4
As 3 (b-c) Tump 769.66 1315.68 1315.68 769.66 373.91 8.10 257.45 257.45 257.45 631.36 -116.46 -116.46 631.36 631.36
Lt5
As 3 (b-c)
Tump 769.66 1315.68 1315.68 769.66 378.20 8.10 257.45 257.45 257.45 635.65 -120.75 -120.75 635.65 635.65
Lt6
As 3 (b-c) Tump 769.66 1315.68 1315.68 769.66 377.55 8.10 257.45 257.45 257.45 635.00 -120.10 -120.10 635.00 635.00
Lt7
As 3 (b-c) Tump 769.66 1315.68 1315.68 769.66 388.44 8.10 257.45 257.45 257.45 645.89 -130.99 -130.99 645.89 645.89
Lt8
As 3 (b-c) Tump 646.86 1083.87 967.47 646.50 295.34 8.10 213.67 199.26 213.67 509.01 -81.67 -96.08 494.60 509.01
Lt9
1 2 3 4 5 6 7 8
Goyangan Ke Kiri Goyangan Ke Kanan Vsway V total (goyang kiri) V total (goyang kanan)
Vg (1,2D+1L) Ln Vu Terpakai
BALOK KONDISI Mpr1 Mpr4 Mpr2 Mpr3 kiri kanan Max ujug kiri ujung kanan ujugng kiri ujung kanan
(kNm) (kNm) (kNm) (kNm) (kNm) (m) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm)
As 3 (b-c) Tump 892.36 1660.48 1660.48 892.36 431.42 8.10 315.17 315.17 315.17 746.59 -116.25 -116.25 746.59 746.59
Lt2
As 3 (b-c) Tump 892.36 1660.48 1660.48 892.36 462.61 8.10 315.17 315.17 315.17 777.78 -147.44 -147.44 777.78 777.78
Lt3
As 3 (b-c) Tump 892.36 1660.48 1660.48 892.36 432.57 8.10 315.17 315.17 315.17 747.74 -117.40 -117.40 747.74 747.74
Lt4
As 3 (b-c) Tump 892.65 1660.48 1546.77 892.36 431.92 8.10 315.20 301.13 315.20 747.12 -116.72 -130.79 733.05 747.12
Lt5
As 3 (b-c)
Tump 892.65 1546.77 1546.77 892.65 436.97 8.10 301.16 301.16 301.16 738.13 -135.81 -135.81 738.13 738.13
Lt6
As 3 (b-c) Tump 892.65 1546.77 1546.77 892.65 436.15 8.10 301.16 301.16 301.16 737.31 -134.99 -134.99 737.31 737.31
Lt7
As 3 (b-c) Tump 769.66 1430.26 1315.68 769.36 446.90 8.10 271.59 257.41 271.59 718.49 -175.31 -189.49 704.31 718.49
Lt8
As 3 (b-c) Tump 646.86 1083.87 967.47 646.50 353.40 8.10 213.67 199.26 213.67 567.07 -139.73 -154.14 552.66 567.07
Lt9
Goyangan Ke Kiri Goyangan Ke Kanan Vsway V total (goyang kiri) V total (goyang kanan)
Vg (1,2D+1L) Ln Vu Terpakai
BALOK KONDISI Mpr1 Mpr4 Mpr2 Mpr3 kiri kanan Max ujug kiri ujung kanan ujugng kiri ujung kanan
BALOK KONDISI
(kNm) (kNm) (kNm) (kNm) (kNm) (m) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm) (kNm)
As 3 (c-d) Tump 892.36 1660.48 1660.48 892.36 439.60 8.10 315.17 315.17 315.17 754.77 -124.43 -124.43 754.77 754.77
Lt2
As 3 (c-d) Tump 892.36 1660.48 1660.48 892.36 435.11 8.10 315.17 315.17 315.17 750.28 -119.94 -119.94 750.28 750.28
Lt3
As 3 (c-d)
Tump 892.36 1660.48 1660.48 892.36 435.34 8.10 315.17 315.17 315.17 750.51 -120.17 -120.17 750.51 750.51
Lt4
As 3 (c-d) Tump 769.10 1660.48 1543.56 892.36 433.69 8.10 299.95 300.73 300.73 733.64 -133.74 -132.96 734.42 734.42
Lt5
As 3 (c-d) Tump 892.65 1546.77 1546.77 892.65 439.99 8.10 301.16 301.16 301.16 741.15 -138.83 -138.83 741.15 741.15
Lt6
As 3 (c-d) Tump 769.36 1430.26 1430.26 769.36 437.63 8.10 271.56 271.56 271.56 709.19 -166.07 -166.07 709.19 709.19
Lt7
As 3 (c-d)
Tump 769.66 1315.68 1315.68 769.66 433.24 8.10 257.45 257.45 257.45 690.69 -175.79 -175.79 690.69 690.69
Lt8
As 3 (c-d) Lt
Atap Tump 646.86 1083.87 967.47 646.50 357.33 8.10 213.67 199.26 213.67 571.00 -143.66 -158.07 556.59 571.00
TULANGAN SENGKANG BALOK INDUK
1 2 3 4 6 7 8 9
Dimensi Balok Spasi Tulangan Geser (Sendi Plastis)
Vs < Vs Jum d uta d Vs
BALOK Vs Vu Vc Vc Vs Vs Max Av Vu/ Vc+Vs Check
Kon- Max Leg hoop 24 Terpasang
b h d s.hitung d/4 8 db 300 S Max S pakai
disi d.h
400 800 739.0 Tum 271.56 651.76 Cari Vc 615.83 253.18 1079.38 OK 4 22 10 314.29 366.95 185 176 240 300 176.00 150 619.35 253.18 1235.19 OK
As 3 (c-d) Lt2
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 255.82 631.78 Cari Vc 615.83 226.54 1079.38 OK 4 22 10 314.29 410.09 185 176 240 300 176.00 150 619.35 226.54 1235.19 OK
As 3 (c-d) Lt3
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 633.76 Cari Vc 615.83 229.18 1079.38 OK 4 22 10 314.29 405.37 185 176 240 300 176.00 150 619.35 229.18 1235.19 OK
As 3 (c-d) Lt4
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 632.29 Cari Vc 615.83 227.22 1079.38 OK 4 22 10 314.29 408.87 185 176 240 300 176.00 150 619.35 227.22 1235.19 OK
As 3 (c-d) Lt5
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 637.50 Cari Vc 615.83 234.17 1079.38 OK 4 22 10 314.29 396.74 185 176 240 300 176.00 150 619.35 234.17 1235.19 OK
As 3 (c-d) Lt6
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 635.47 Cari Vc 615.83 231.46 1079.38 OK 4 22 10 314.29 401.38 185 176 240 300 176.00 150 619.35 231.46 1235.19 OK
As 3 (c-d) Lt7
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 228.83 602.68 Cari Vc 615.83 187.74 1079.38 OK 4 22 10 314.29 494.85 185 176 240 300 176.00 150 619.35 187.74 1235.19 OK
As 3 (c-d) Lt8
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 213.63 511.22 Cari Vc 615.83 65.79 1079.38 OK 4 22 10 314.29 1412.16 185 176 240 300 176.00 150 619.35 65.79 1235.19 OK
As 3 (c-d) Lt Atap
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
1 2 3 4 6 7 8 9
Dimensi Balok Spasi Tulangan Geser (Sendi Plastis)
Vs < Vs Jum d uta d Vs
BALOK Vs Vu Vc Vc Vs Vs Max Av Vu/ Vc+Vs Check
Kon- Max Leg hoop 24 Terpasang
b h d s.hitung d/4 8 db 300 S Max S pakai
disi d.h
400 800 739.0 Tum 271.56 645.08 Cari Vc 615.83 244.27 1079.38 OK 4 22 10 314.29 380.33 185 176 240 300 176.00 150 619.35 244.27 1235.19 OK
As 3 (b-c) Lt2
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 271.56 675.97 Cari Vc 615.83 285.46 1079.38 OK 4 22 10 314.29 325.45 185 176 240 300 176.00 150 619.35 285.46 1235.19 OK
As 3 (b-c) Lt3
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 631.78 Cari Vc 615.83 226.54 1079.38 OK 4 22 10 314.29 410.10 185 176 240 300 176.00 150 619.35 226.54 1235.19 OK
As 3 (b-c) Lt4
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 631.36 Cari Vc 615.83 225.98 1079.38 OK 4 22 10 314.29 411.11 185 176 240 300 176.00 150 619.35 225.98 1235.19 OK
As 3 (b-c) Lt5
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 635.65 Cari Vc 615.83 231.70 1079.38 OK 4 22 10 314.29 400.96 185 176 240 300 176.00 150 619.35 231.70 1235.19 OK
As 3 (b-c) Lt6
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 635.00 Cari Vc 615.83 230.83 1079.38 OK 4 22 10 314.29 402.47 185 176 240 300 176.00 150 619.35 230.83 1235.19 OK
As 3 (b-c) Lt7
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 645.89 Cari Vc 615.83 245.36 1079.38 OK 4 22 10 314.29 378.64 185 176 240 300 176.00 150 619.35 245.36 1235.19 OK
As 3 (b-c) Lt8
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 213.67 509.01 Cari Vc 615.83 62.85 1079.38 OK 4 22 10 314.29 1478.25 185 176 240 300 176.00 150 619.35 62.85 1235.19 OK
As 3 (b-c) Lt Atap
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
1 2 3 4 6 7 8 9
Dimensi Balok Spasi Tulangan Geser (Sendi Plastis)
Vs < Vs Jum d uta d Vs
BALOK Vs Vu Vc Vc Vs Vs Max Av Vu/ Vc+Vs Check
Kon- Max Leg hoop 24 Terpasang
b h d s.hitung d/4 8 db 300 S Max S pakai
disi d.h
Vs < Vs Jum d uta d Vs
BALOK Vs Vu Vc Vc Vs Vs Max Av Vu/ Vc+Vs Check
Kon- Max Leg hoop 24 Terpasang
b h d s.hitung d/4 8 db 300 S Max S pakai
disi d.h
400 800 739.0 Tum 315.17 746.59 Cari Vc 615.83 379.61 1079.38 OK 4 22 10 314.29 244.73 185 176 240 300 176.00 150 619.35 379.61 1235.19 OK
As 3 (b-c) Lt2
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 315.17 777.78 Cari Vc 615.83 421.20 1079.38 OK 4 22 10 314.29 220.57 185 176 240 300 176.00 150 619.35 421.20 1235.19 OK
As 3 (b-c) Lt3
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 315.17 747.74 Cari Vc 615.83 381.15 1079.38 OK 4 22 10 314.29 243.74 185 176 240 300 176.00 150 619.35 381.15 1235.19 OK
As 3 (b-c) Lt4
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 315.20 747.12 Cari Vc 615.83 380.33 1079.38 OK 4 22 10 314.29 244.27 185 176 240 300 176.00 150 619.35 380.33 1235.19 OK
As 3 (b-c) Lt5
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 301.16 738.13 Cari Vc 615.83 368.34 1079.38 OK 4 22 10 314.29 252.22 185 176 240 300 176.00 150 619.35 368.34 1235.19 OK
As 3 (b-c) Lt6
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 301.16 737.31 Cari Vc 615.83 367.25 1079.38 OK 4 22 10 314.29 252.97 185 176 240 300 176.00 150 619.35 367.25 1235.19 OK
As 3 (b-c) Lt7
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 271.59 718.49 Cari Vc 615.83 342.16 1079.38 OK 4 22 10 314.29 271.52 185 176 240 300 176.00 150 619.35 342.16 1235.19 OK
As 3 (b-c) Lt8
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 213.67 567.07 Cari Vc 615.83 140.26 1079.38 OK 4 22 10 314.29 662.36 185 176 240 300 176.00 150 619.35 140.26 1235.19 OK
As 3 (b-c) Lt Atap
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
1 2 3 4 6 7 8 9
Dimensi Balok Spasi Tulangan Geser (Sendi Plastis)
Vs < Vs Jum d Vs
BALOK Vs Vu Vc Vc Vs Vs Max Leg d uta hoop Av Vu/ Vc+Vs Check
Kon- Max 24 Terpasang
b h d s.hitung d/4 8 db 300 S Max S pakai
disi d.h
400 800 739.0 Tum 315.17 754.77 Cari Vc 615.83 390.52 1079.38 OK 4 22 10 314.29 237.89 185 176 240 300 176.00 150 619.35 390.52 1235.19 OK
As 3 (c-d) Lt2
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 315.17 750.28 Cari Vc 615.83 384.53 1079.38 OK 4 22 10 314.29 241.60 185 176 240 300 176.00 150 619.35 384.53 1235.19 OK
As 3 (c-d) Lt3
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 315.17 750.51 Cari Vc 615.83 384.84 1079.38 OK 4 22 10 314.29 241.41 185 176 240 300 176.00 150 619.35 384.84 1235.19 OK
As 3 (c-d) Lt4
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 300.73 734.42 Cari Vc 615.83 363.40 1079.38 OK 4 22 10 314.29 255.65 185 176 240 300 176.00 150 619.35 363.40 1235.19 OK
As 3 (c-d) Lt5
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 301.16 741.15 Cari Vc 615.83 372.37 1079.38 OK 4 22 10 314.29 249.49 185 176 240 300 176.00 150 619.35 372.37 1235.19 OK
As 3 (c-d) Lt6
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 271.56 709.19 Cari Vc 615.83 329.75 1079.38 OK 4 22 10 314.29 281.74 185 176 240 300 176.00 150 619.35 329.75 1235.19 OK
As 3 (c-d) Lt7
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 257.45 690.69 Cari Vc 615.83 305.09 1079.38 OK 4 22 10 314.29 304.51 185 176 240 300 176.00 150 619.35 305.09 1235.19 OK
As 3 (c-d) Lt8
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
400 800 739.0 Tum 213.67 571.00 Cari Vc 615.83 145.50 1079.38 OK 4 22 10 314.29 638.51 185 176 240 300 176.00 150 619.35 145.50 1235.19 OK
As 3 (c-d) Lt Atap
400 800 739.0 Lap Maksimum spasing tulangan geser di luar sendi plastis = d/2 369.50 300 Dipasang Tulangan
10
Tulangan
Geser
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
10
Tulangan
Geser
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
10
Tulangan
Geser
Tulangan
Geser
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
10
Tulangan
Geser
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
4D10-150
D10-300
PENULANGAN TORSI
1 2 3 CekTorsi 4
b h d p s Tu Acp Pcp Ceking Vu Vc b' h' Aoh Ph Cek Penampang Melintang Tc Reduksi Ts
AS Cek
(mm) (mm) (mm) (mm) (mm) (kNm) (mm) h (mm) (kNm) (kN) (kN) (mm) (mm) (mm) (mm) (kNm)
As 3 "c-d" lt 2 400 800 739 40 10 41.63 320000 2400 14.61 PERLU TORSI 651.76 269.84 310 710 220100 2040 2.434 2.739 AMAN 53.33 -11.70 GUNAKAN TUL
TORSI
MINIMUM
As 3 "c-d" lt 3 400 800 739 40 10 67.06 320000 2400 14.61 PERLU TORSI 631.78 269.84 310 710 220100 2040 2.707 2.739 AMAN 53.33 13.73
0.00
As 3 "c-d" lt 4 400 800 739 40 10 73.30 320000 2400 14.61 PERLU TORSI 633.76 269.84 310 710 220100 2040 2.810 2.739 TIDAK AMAN 53.33 19.97
0.00
As 3 "c-d" lt 5 400 800 739 40 10 76.03 320000 2400 14.61 PERLU TORSI 632.29 269.84 310 710 220100 2040 2.850 2.739 TIDAK AMAN 53.33 22.70
0.00
As 3 "c-d" lt 6 400 800 739 40 10 72.24 320000 2400 14.61 PERLU TORSI 637.50 269.84 310 710 220100 2040 2.802 2.739 TIDAK AMAN 53.33 18.91
0.00
As 3 "c-d" lt 7 400 800 739 40 10 61.27 320000 2400 14.61 PERLU TORSI 635.47 269.84 310 710 220100 2040 2.632 4.930 AMAN 53.33 7.94
0.00
As 3 "c-d" lt 8 400 800 739 40 10 55.11 320000 2400 14.61 PERLU TORSI 602.68 269.84 310 710 220100 2040 2.454 2.739 AMAN 53.33 1.78
0.00
As 3 "c-d" lt Atap 400 800 739 40 10 39.57 320000 2400 14.61 PERLU TORSI 511.22 269.84 310 710 220100 2040 1.988 2.739 AMAN 53.33 -13.76 GUNAKAN TUL
TORSI
MINIMUM
5 6
Ao At/s Al D Al pakai
n CEK Pasang
(mm) (mm) (mm) (mm) (mm)
1 2 3 4 5 6 7
Dimensi Tul Tumpuan Kiri Tul Lapangan Tul Tumpuan Kanan Tul Geser
Posisi Tul Torsi
b (mm) h (mm) Atas Bawah Atas Bawah Atas Bawah Tumpuan Lapangan
As 3 (c-d) Lt2 400 800 12 D 22 6 D 22 6 D 22 12 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt3 400 800 12 D 22 6 D 22 5 D 22 12 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt4 400 800 11 D 22 6 D 22 5 D 22 11 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt5 400 800 11 D 22 6 D 22 5 D 22 11 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt6 400 800 11 D 22 6 D 22 5 D 22 11 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt7 400 800 11 D 22 6 D 22 5 D 22 11 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt8 400 800 11 D 22 6 D 22 5 D 22 11 D 22 6 D 22 4D10-150 D10-300
As 3 (c-d) Lt
Atap 400 800 9 D 22 5 D 22 4 D 22 9 D 22 5 D 22 4D10-150 D10-300
1 2 3 4 5 6 7
Dimensi Tul Tumpuan Kiri Tul Lapangan Tul Tumpuan Kanan Tul Geser
Posisi Tul Torsi
b (mm) h (mm) Atas Bawah Atas Bawah Atas Bawah Tumpuan Lapangan
As 3 (c-d) Lt2
As 3 (c-d) Lt3
As 3 (c-d) Lt4
As 3 (c-d) Lt5
As 3 (c-d) Lt6
As 3 (c-d) Lt7
As 3 (c-d) Lt8
As 3 (c-d) Lt
Atap
gouanmg kanan
b-c c-d
Dimensi Kolom
As Kolom Lb Mkap, ki Mkap, ka Mea
b h
As 3 - C Lt 2 90 90 250 16604829.856 8923636.27786 5981765.8
As 3 - C Lt 3 90 90 320 16604829.856 8923636.27786 1467575.7
As 3 - C Lt 4 80 80 320 16604829.856 8923636.27786 3827120
As 3 - C Lt 5 80 80 320 16604829.856 7690954.01163 4496945
As 3 - C Lt 6 80 80 320 15467670.742 8926461.78597 4586647
As 3 - C Lt 7 70 70 320 15467670.742 7693604.00228 3856879
As 3 - C Lt 8 70 70 320 14302603.886 7696588.65671 3221240
As 3 - C Lt 9 70 70 320 10838681.696 6468573.59112 2439639.6
Meb Rn Pu (kg) Mu(kg.cm) ton.m Nu (Kg) absis ordinat
4874252.7 1.1 1229344.1 8661706.14832741 86.6170615 1358559.6 0.06 0.91
3637811.7 1.1 1067416.4 3454194.59874383 34.541946 1170740.1 0.03 0.79
3266892 1.1 904298.8 6393959.88614257 63.9395989 999692.3 0.09 1.13
3078085.09 1.1 746384.3 7800884.6600766 78.0088466 833882.0 0.11 0.94
2274740.43 1.1 588986.3 10147275.1058046 101.472751 668614.1 0.14 0.76
2227848.52 1.1 431965 9437274.43020691 94.3727443 503741.8 0.20 0.74
2362791.79 1.1 276366.7 8750673.81076217 87.5067381 340363.5 0.18 0.50
0 1.1 124841.39 15746367.8550294 157.463679 172720.5 0.33 0.26
x y
Tul Terpasang
r As n
dipakai
1.283 0.01 0.01283 103.923 27.35248 40 40 60
1.283 0.01 0.01283 103.923 27.35248 40 40 48
1.00 0.029 0.029 185.6 48.84982 36 36 48
1.00 0.023 0.023 147.2 38.74296 32 32 40
1.00 0.02 0.02 128 33.68953 32 32 40
1.00 0.03 0.03 147 38.69032 32 28 40
1.00 0.015 0.015 73.5 19.34516 28 28 36
1.00 0.013 0.013 63.7 16.76581 28 28 36
DENGAN SHEARWALL
OK
OK
OK
OK
OK
OK
OK
OK
OK
TIDAK
OK
TIDAK
TIDAK
TIDAK
OK
Status
OK
OK
OK
TIDAK
OK
OK
TIDAK
TIDAK
OK
TIDAK
TIDAK
TIDAK
TIDAK
TIDAK
OK