Anda di halaman 1dari 29

PERHITUNGAN VOLUME PEKERJAAN

PEKERJAAN PEMBANGUNAN JALAN TOL TERBANGGI BESAR - KAYUAGUNG


ZONA KLB (STA. 28+650 - STA. 53+650)
PROVINSI LAMPUNG
Pemberi Tugas : PT. WASKITA BUMI WIRA
Penyedia Jasa : PT. WASKITA KARYA (Persero) Tbk
Pengawas : PT. INDRA KARYA (Persero)

Pekerjaan : PEMBERSIHAN TEMPAT KERJA PERIODE


No Item : 2.02 (1) Pembersihan Tempat Kerja

REKAPITULASI
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif

28 + 650 47.22
48.535 25 1,213.38
28 + 675 49.85
49.475 25 1,236.88
28 + 700 49.1
47.46 25 1,186.50
28 + 725 45.82
47.43 25 1,185.75
28 + 750 49.04
48.335 25 1,208.38
28 + 775 47.63
45.2 25 1,130.00
28 + 800 42.77
42.005 25 1,050.13
28 + 825 41.24
39.605 25 990.13
28 + 850 37.97
36.065 25 901.63
28 + 875 34.16
33.775 25 844.38
28 + 900 33.39
33.945 25 848.63
28 + 925 34.5
35.495 25 887.38
28 + 950 36.49
36.945 25 923.63
28 + 975 37.4
38.4 25 960.00
29 + 000 39.4
41 25 1,025.00
29 + 025 42.6
42.8 25 1,070.00
29 + 050 43
43.925 25 1,098.13
29 + 075 44.85
46.03 25 1,150.75
29 + 100 47.21
47.82 25 1,195.50
29 + 125 48.43
52.955 25 1,323.88
29 + 150 57.48
59.65 25 1,491.25
29 + 175 61.82
64.43 25 1,610.75
29 + 200 67.04
68.835 25 1,720.88
29 + 225 70.63
70.65 25 1,766.25
29 + 250 70.67
67.795 25 1,694.88
29 + 275 64.92
63.335 25 1,583.38
29 + 300 61.75
59.01 25 1,475.25
29 + 325 56.27
50.91 25 1,272.75
29 + 350 45.55
43.09 25 1,077.25
29 + 375 40.63

Page 1 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
39.02 25 975.50
29 + 400 37.41
36.19 25 904.75
29 + 425 34.97
34.105 25 852.63
29 + 450 33.24
32.48 25 812.00
29 + 475 31.72
31.165 25 779.13
29 + 500 30.61
30.325 25 758.13
29 + 525 30.04
30.205 25 755.13
29 + 550 30.37
30.49 25 762.25
29 + 575 30.61
31.405 25 785.13
29 + 600 32.2
33.615 25 840.38
29 + 625 35.03
37.86 25 946.50
29 + 650 40.69
46.95 25 1,173.75
29 + 675 53.21
56.02 25 1,400.50
29 + 700 58.83
59.24 25 1,481.00
29 + 725 59.65
56.325 25 1,408.13
29 + 750 53
51.29 25 1,282.25
29 + 775 49.58
41.77 25 1,044.25
29 + 800 33.96
32.625 25 815.63
29 + 825 31.29
32.565 25 814.13
29 + 850 33.84
35.16 25 879.00
29 + 875 36.48
37.39 25 934.75
29 + 900 38.3
38.7 25 967.50
29 + 925 39.1
39.92 25 998.00
29 + 950 40.74
41.065 25 1,026.63
29 + 975 41.39
41.695 25 1,042.38
30 + 000 42
42.25 25 1,056.25
30 + 025 42.5
42.56 25 1,064.00
30 + 050 42.62
42.08 25 1,052.00
30 + 075 41.54
41.91 25 1,047.75
30 + 100 42.28
42.2 25 1,055.00
30 + 125 42.12
42.1 25 1,052.50
30 + 150 42.08
42.03 25 1,050.75
30 + 175 41.98
42.115 25 1,052.88
30 + 200 42.25
42.15 25 1,053.75
30 + 225 42.05
41.8 25 1,045.00
30 + 250 41.55
42.635 25 1,065.88
30 + 275 43.72
42.82 25 1,070.50
30 + 300 41.92
41.485 25 1,037.13

Page 2 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
30 + 325 41.05
40.51 25 1,012.75
30 + 350 39.97
39.5 25 987.50
30 + 375 39.03
38.545 25 963.63
30 + 400 38.06
37.33 25 933.25
30 + 425 36.6
36.19 25 904.75
30 + 450 35.78
37.49 25 937.25
30 + 475 39.2
37.395 25 934.88
30 + 500 35.59
34.12 25 853.00
30 + 525 32.65
33.905 25 847.63
30 + 550 35.16
36.04 25 901.00
30 + 575 36.92
37.585 25 939.63
30 + 600 38.25
38.565 25 964.13
30 + 625 38.88
39.155 25 978.88
30 + 650 39.43
39.51 25 987.75
30 + 675 39.59
39.715 25 992.88
30 + 700 39.84
39.725 25 993.13
30 + 725 39.61
39.705 25 992.63
30 + 750 39.8
39.625 25 990.63
30 + 775 39.45
39.415 25 985.38
30 + 800 39.38
38.865 25 971.63
30 + 825 38.35
37.91 25 947.75
30 + 850 37.47
37.89 25 947.25
30 + 875 38.31
39.285 25 982.13
30 + 900 40.26
40.185 25 1,004.63
30 + 925 40.11
39.875 25 996.88
30 + 950 39.64
39.375 25 984.38
30 + 975 39.11
38.935 25 973.38
31 + 000 38.76
38.49 25 962.25
31 + 025 38.22
38.06 25 951.50
31 + 050 37.9
37.675 25 941.88
31 + 075 37.45
37.165 25 929.13
31 + 100 36.88
36.55 25 913.75
31 + 125 36.22
35.265 25 881.63
31 + 150 34.31
32.93 25 823.25
31 + 175 31.55
33.985 25 849.63
31 + 200 36.42
39.31 25 982.75
31 + 225 42.2
41.33 25 1,033.25
31 + 250 40.46

Page 3 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
42.785 25 1,069.63
31 + 275 45.11
42.82 25 1,070.50
31 + 300 40.53
43.965 25 1,099.13
31 + 325 47.4
45.145 25 1,128.63
31 + 350 42.89
46 25 1,150.00
31 + 375 49.11
45.86 25 1,146.50
31 + 400 42.61
41.155 25 1,028.88
31 + 425 39.7
38.98 25 974.50
31 + 450 38.26
38.055 25 951.38
31 + 475 37.85
39.025 25 975.63
31 + 500 40.2
43.065 25 1,076.63
31 + 525 45.93
45.255 25 1,131.38
31 + 550 44.58
39.325 25 983.13
31 + 575 34.07
33.285 25 832.13
31 + 600 32.5
32.09 25 802.25
31 + 625 31.68
31.905 25 797.63
31 + 650 32.13
32.09 25 802.25
31 + 675 32.05
32.145 25 803.63
31 + 700 32.24
31.405 25 785.13
31 + 725 30.57
31.605 25 790.13
31 + 750 32.64
32.55 25 813.75
31 + 775 32.46
32.825 25 820.63
31 + 800 33.19
33.35 25 833.75
31 + 825 33.51
33.75 25 843.75
31 + 850 33.99
34.23 25 855.75
31 + 875 34.47
34.66 25 866.50
31 + 900 34.85
34.915 25 872.88
31 + 925 34.98
35.045 25 876.13
31 + 950 35.11
34.935 25 873.38
31 + 975 34.76
34.575 25 864.38
32 + 000 34.39
34.19 25 854.75
32 + 025 33.99
33.68 25 842.00
32 + 050 33.37
33 25 825.00
32 + 075 32.63
32.255 25 806.38
32 + 100 31.88
32.13 25 803.25
32 + 125 32.38
32.625 25 815.63
32 + 150 32.87
33.025 25 825.63
32 + 175 33.18
32.545 25 813.63

Page 4 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
32 + 200 31.91
32.475 25 811.88
32 + 225 33.04
33.45 25 836.25
32 + 250 33.86
35.46 25 886.50
32 + 275 37.06
38.645 25 966.13
32 + 300 40.23
40.155 25 1,003.88
32 + 325 40.08
42.82 25 1,070.50
32 + 350 45.56
51.715 25 1,292.88
32 + 375 57.87
58.65 25 1,466.25
32 + 400 59.43
59.705 25 1,492.63
32 + 425 59.98
54.035 25 1,350.88
32 + 450 48.09
39.95 25 998.75
32 + 475 31.81
33.015 25 825.38
32 + 500 34.22
36.055 25 901.38
32 + 525 37.89
39.21 25 980.25
32 + 550 40.53
41.35 25 1,033.75
32 + 575 42.17
42.845 25 1,071.13
32 + 600 43.52
45.27 25 1,131.75
32 + 625 47.02
48.535 25 1,213.38
32 + 650 50.05
50.29 25 1,257.25
32 + 675 50.53
50.485 25 1,262.13
32 + 700 50.44
50.295 25 1,257.38
32 + 725 50.15
49.975 25 1,249.38
32 + 750 49.8
47.225 25 1,180.63
32 + 775 44.65
44.52 25 1,113.00
32 + 800 44.39
43.965 25 1,099.13
32 + 825 43.54
42.995 25 1,074.88
32 + 850 42.45
41.715 25 1,042.88
32 + 875 40.98
40.26 25 1,006.50
32 + 900 39.54
38.625 25 965.63
32 + 925 37.71
36.11 25 902.75
32 + 950 34.51
33.68 25 842.00
32 + 975 32.85
32.61 25 815.25
33 + 000 32.37
31.535 25 788.38
33 + 025 30.7
33.645 25 841.13
33 + 050 36.59
40.77 25 1,019.25
33 + 075 44.95
47.135 25 1,178.38
33 + 100 49.32
44.595 25 1,114.88
33 + 125 39.87

Page 5 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
40.2 25 1,005.00
33 + 150 40.53
41.525 25 1,038.13
33 + 175 42.52
43.99 25 1,099.75
33 + 200 45.46
49.375 25 1,234.38
33 + 225 53.29
52.605 25 1,315.13
33 + 250 51.92
52.54 25 1,313.50
33 + 275 53.16
52.19 25 1,304.75
33 + 300 51.22
53.125 25 1,328.13
33 + 325 55.03
49.05 25 1,226.25
33 + 350 43.07
41.93 25 1,048.25
33 + 375 40.79
40.495 25 1,012.38
33 + 400 40.2
40.295 25 1,007.38
33 + 425 40.39
40.48 25 1,012.00
33 + 450 40.57
41.155 25 1,028.88
33 + 475 41.74
42.035 25 1,050.88
33 + 500 42.33
42.825 25 1,070.63
33 + 525 43.32
44.15 25 1,103.75
33 + 550 44.98
47.13 25 1,178.25
33 + 575 49.28
49.815 25 1,245.38
33 + 600 50.35
51.155 25 1,278.88
33 + 625 51.96
52.675 25 1,316.88
33 + 650 53.39
54.215 25 1,355.38
33 + 675 55.04
59.49 25 1,487.25
33 + 700 63.94
63.61 25 1,590.25
33 + 725 63.28
62.91 25 1,572.75
33 + 750 62.54
64.17 25 1,604.25
33 + 775 65.8
64.85 25 1,621.25
33 + 800 63.9
63.815 25 1,595.38
33 + 825 63.73
63.47 25 1,586.75
33 + 850 63.21
63.78 25 1,594.50
33 + 875 64.35
64.97 25 1,624.25
33 + 900 65.59
68.005 25 1,700.13
33 + 925 70.42
70.22 25 1,755.50
33 + 950 70.02
72.225 25 1,805.63
33 + 975 74.43
72.79 25 1,819.75
34 + 000 71.15
70.325 25 1,758.13
34 + 025 69.5
69.415 25 1,735.38
34 + 050 69.33
68.7 25 1,717.50

Page 6 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
34 + 075 68.07
69.16 25 1,729.00
34 + 100 70.25
69.205 25 1,730.13
34 + 125 68.16
65.645 25 1,641.13
34 + 150 63.13
62.145 25 1,553.63
34 + 175 61.16
60.18 25 1,504.50
34 + 200 59.2
56.51 25 1,412.75
34 + 225 53.82
53.005 25 1,325.13
34 + 250 52.19
49.08 25 1,227.00
34 + 275 45.97
45.46 25 1,136.50
34 + 300 44.95
43.54 25 1,088.50
34 + 325 42.13
41.545 25 1,038.63
34 + 350 40.96
37.63 25 940.75
34 + 375 34.3
32.65 25 816.25
34 + 400 31
30.9 25 772.50
34 + 425 30.8
31.495 25 787.38
34 + 450 32.19
32.85 25 821.25
34 + 475 33.51
33.945 25 848.63
34 + 500 34.38
34.665 25 866.63
34 + 525 34.95
35.1 25 877.50
34 + 550 35.25
35.145 25 878.63
34 + 575 35.04
34.915 25 872.88
34 + 600 34.79
34.775 25 869.38
34 + 625 34.76
34.635 25 865.88
34 + 650 34.51
34.41 25 860.25
34 + 675 34.31
34.245 25 856.13
34 + 700 34.18
33.775 25 844.38
34 + 725 33.37
33.56 25 839.00
34 + 750 33.75
33.53 25 838.25
34 + 775 33.31
32.94 25 823.50
34 + 800 32.57
32.075 25 801.88
34 + 825 31.58
32.02 25 800.50
34 + 850 32.46
35.3 25 882.50
34 + 875 38.14
37.1 25 927.50
34 + 900 36.06
37.195 25 929.88
34 + 925 38.33
34.725 25 868.13
34 + 950 31.12
30.595 25 764.88
34 + 975 30.07
30.03 25 750.75
35 + 000 29.99

Page 7 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
30.065 25 751.63
35 + 025 30.14
30.225 25 755.63
35 + 050 30.31
30.33 25 758.25
35 + 075 30.35
30.31 25 757.75
35 + 100 30.27
30.105 25 752.63
35 + 125 29.94
30.24 25 756.00
35 + 150 30.54
30.68 25 767.00
35 + 175 30.82
30.95 25 773.75
35 + 200 31.08
31.11 25 777.75
35 + 225 31.14
31.18 25 779.50
35 + 250 31.22
31.455 25 786.38
35 + 275 31.69
31.505 25 787.63
35 + 300 31.32
31.495 25 787.38
35 + 325 31.67
31.405 25 785.13
35 + 350 31.14
31.2 25 780.00
35 + 375 31.26
31.375 25 784.38
35 + 400 31.49
31.27 25 781.75
35 + 425 31.05
31.865 25 796.63
35 + 450 32.68
33.21 25 830.25
35 + 475 33.74
34.21 25 855.25
35 + 500 34.68
35.23 25 880.75
35 + 525 35.78
36.585 25 914.63
35 + 550 37.39
39.72 25 993.00
35 + 575 42.05
42.395 25 1,059.88
35 + 600 42.74
43.87 25 1,096.75
35 + 625 45
45.58 25 1,139.50
35 + 650 46.16
46.76 25 1,169.00
35 + 675 47.36
47.18 25 1,179.50
35 + 700 47
47.47 25 1,186.75
35 + 725 47.94
47.625 25 1,190.63
35 + 750 47.31
46.75 25 1,168.75
35 + 775 46.19
46.655 25 1,166.38
35 + 800 47.12
47.695 25 1,192.38
35 + 825 48.27
50.035 25 1,250.88
35 + 850 51.8
52.075 25 1,301.88
35 + 875 52.35
54.6 25 1,365.00
35 + 900 56.85
57.38 25 1,434.50
35 + 925 57.91
58.445 25 1,461.13

Page 8 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
35 + 950 58.98
59.35 25 1,483.75
35 + 975 59.72
59.745 25 1,493.63
36 + 000 59.77
59.67 25 1,491.75
36 + 025 59.57
59.65 25 1,491.25
36 + 050 59.73
59.615 25 1,490.38
36 + 075 59.5
58.9 25 1,472.50
36 + 100 58.3
58.25 25 1,456.25
36 + 125 58.2
57.69 25 1,442.25
36 + 150 57.18
57.45 25 1,436.25
36 + 175 57.72
57.95 25 1,448.75
36 + 200 58.18
57.52 25 1,438.00
36 + 225 56.86
56.02 25 1,400.50
36 + 250 55.18
55.38 25 1,384.50
36 + 275 55.58
57.685 25 1,442.13
36 + 300 59.79
56.315 25 1,407.88
36 + 325 52.84
53.075 25 1,326.88
36 + 350 53.31
53.415 25 1,335.38
36 + 375 53.52
55.055 25 1,376.38
36 + 400 56.59
49.155 25 1,228.88
36 + 425 41.72
37.905 25 947.63
36 + 450 34.09
32.265 25 806.63
36 + 475 30.44
30.8 25 770.00
36 + 500 31.16
31.715 25 792.88
36 + 525 32.27
32.735 25 818.38
36 + 550 33.2
33.485 25 837.13
36 + 575 33.77
33.805 25 845.13
36 + 600 33.84
33.76 25 844.00
36 + 625 33.68
33.115 25 827.88
36 + 650 32.55
31.78 25 794.50
36 + 675 31.01
34.295 25 857.38
36 + 700 37.58
40.97 25 1,024.25
36 + 725 44.36
42.625 25 1,065.63
36 + 750 40.89
38.15 25 953.75
36 + 775 35.41
33.025 25 825.63
36 + 800 30.64
30.45 25 761.25
36 + 825 30.26
30.38 25 759.50
36 + 850 30.5
30.61 25 765.25
36 + 875 30.72

Page 9 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
30.765 25 769.13
36 + 900 30.81
30.89 25 772.25
36 + 925 30.97
31.135 25 778.38
36 + 950 31.3
31.355 25 783.88
36 + 975 31.41
31.495 25 787.38
37 + 000 31.58
31.725 25 793.13
37 + 025 31.87
31.79 25 794.75
37 + 050 31.71
31.575 25 789.38
37 + 075 31.44
31.145 25 778.63
37 + 100 30.85
30.54 25 763.50
37 + 125 30.23
30.07 25 751.75
37 + 150 29.91
30.095 25 752.38
37 + 175 30.28
30.35 25 758.75
37 + 200 30.42
30.94 25 773.50
37 + 225 31.46
31.115 25 777.88
37 + 250 30.77
30.92 25 773.00
37 + 275 31.07
30.93 25 773.25
37 + 300 30.79
30.795 25 769.88
37 + 325 30.8
30.43 25 760.75
37 + 350 30.06
29.975 25 749.38
37 + 375 29.89
30.235 25 755.88
37 + 400 30.58
30.79 25 769.75
37 + 425 31
31.345 25 783.63
37 + 450 31.69
31.85 25 796.25
37 + 475 32.01
32.16 25 804.00
37 + 500 32.31
32.465 25 811.63
37 + 525 32.62
32.82 25 820.50
37 + 550 33.02
32.94 25 823.50
37 + 575 32.86
32.49 25 812.25
37 + 600 32.12
31.515 25 787.88
37 + 625 30.91
31.305 25 782.63
37 + 650 31.7
34.26 25 856.50
37 + 675 36.82
38.835 25 970.88
37 + 700 40.85
43.305 25 1,082.63
37 + 725 45.76
41.085 25 1,027.13
37 + 750 36.41
33.51 25 837.75
37 + 775 30.61
31.405 25 785.13
37 + 800 32.2
32.35 25 808.75

Page 10 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
37 + 825 32.5
32.325 25 808.13
37 + 850 32.15
31.85 25 796.25
37 + 875 31.55
31.16 25 779.00
37 + 900 30.77
30.465 25 761.63
37 + 925 30.16
31.09 25 777.25
37 + 950 32.02
32.595 25 814.88
37 + 975 33.17
33.865 25 846.63
38 + 000 34.56
34.12 25 853.00
38 + 025 33.68
33.48 25 837.00
38 + 050 33.28
32.46 25 811.50
38 + 075 31.64
32.035 25 800.88
38 + 100 32.43
32.54 25 813.50
38 + 125 32.65
32.555 25 813.88
38 + 150 32.46
32.36 25 809.00
38 + 175 32.26
32.1 25 802.50
38 + 200 31.94
31.965 25 799.13
38 + 225 31.99
31.94 25 798.50
38 + 250 31.89
31.985 25 799.63
38 + 275 32.08
32.225 25 805.63
38 + 300 32.37
32.52 25 813.00
38 + 325 32.67
33.005 25 825.13
38 + 350 33.34
33.615 25 840.38
38 + 375 33.89
34.065 25 851.63
38 + 400 34.24
34.37 25 859.25
38 + 425 34.5
34.755 25 868.88
38 + 450 35.01
35.145 25 878.63
38 + 475 35.28
35.2 25 880.00
38 + 500 35.12
35.04 25 876.00
38 + 525 34.96
35.05 25 876.25
38 + 550 35.14
35.445 25 886.13
38 + 575 35.75
36.005 25 900.13
38 + 600 36.26
36.145 25 903.63
38 + 625 36.03
35.92 25 898.00
38 + 650 35.81
35.615 25 890.38
38 + 675 35.42
35.275 25 881.88
38 + 700 35.13
34.935 25 873.38
38 + 725 34.74
34.82 25 870.50
38 + 750 34.9

Page 11 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
35.005 25 875.13
38 + 775 35.11
35.095 25 877.38
38 + 800 35.08
35.22 25 880.50
38 + 825 35.36
35.465 25 886.63
38 + 850 35.57
35.775 25 894.38
38 + 875 35.98
36.15 25 903.75
38 + 900 36.32
36.545 25 913.63
38 + 925 36.77
36.99 25 924.75
38 + 950 37.21
37.505 25 937.63
38 + 975 37.8
38.14 25 953.50
39 + 000 38.48
39.275 25 981.88
39 + 025 40.07
41.215 25 1,030.38
39 + 050 42.36
50.315 25 1,257.88
39 + 075 58.27
61.085 25 1,527.13
39 + 100 63.9
59.255 25 1,481.38
39 + 125 54.61
48.345 25 1,208.63
39 + 150 42.08
40.31 25 1,007.75
39 + 175 38.54
37.315 25 932.88
39 + 200 36.09
35.255 25 881.38
39 + 225 34.42
33.88 25 847.00
39 + 250 33.34
33.025 25 825.63
39 + 275 32.71
32.54 25 813.50
39 + 300 32.37
31.905 25 797.63
39 + 325 31.44
31.395 25 784.88
39 + 350 31.35
31.49 25 787.25
39 + 375 31.63
31.635 25 790.88
39 + 400 31.64
31.65 25 791.25
39 + 425 31.66
31.87 25 796.75
39 + 450 32.08
31.805 25 795.13
39 + 475 31.53
31.55 25 788.75
39 + 500 31.57
31.855 25 796.38
39 + 525 32.14
32.575 25 814.38
39 + 550 33.01
33.11 25 827.75
39 + 575 33.21
33.19 25 829.75
39 + 600 33.17
33.055 25 826.38
39 + 625 32.94
32.77 25 819.25
39 + 650 32.6
32.715 25 817.88
39 + 675 32.83
33.13 25 828.25

Page 12 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
39 + 700 33.43
33.845 25 846.13
39 + 725 34.26
34.675 25 866.88
39 + 750 35.09
35.11 25 877.75
39 + 775 35.13
35.15 25 878.75
39 + 800 35.17
35.32 25 883.00
39 + 825 35.47
35.525 25 888.13
39 + 850 35.58
35.605 25 890.13
39 + 875 35.63
35.18 25 879.50
39 + 900 34.73
33.875 25 846.88
39 + 925 33.02
31.9 25 797.50
39 + 950 30.78
37.52 25 938.00
39 + 975 44.26
37.48 25 937.00
40 + 000 30.7
32.455 25 811.38
40 + 025 34.21
35.525 25 888.13
40 + 050 36.84
37.825 25 945.63
40 + 075 38.81
39.425 25 985.63
40 + 100 40.04
40.645 25 1,016.13
40 + 125 41.25
41.735 25 1,043.38
40 + 150 42.22
42.525 25 1,063.13
40 + 175 42.83
43.04 25 1,076.00
40 + 200 43.25
43.53 25 1,088.25
40 + 225 43.81
43.935 25 1,098.38
40 + 250 44.06
43.6 25 1,090.00
40 + 275 43.14
39.16 25 979.00
40 + 300 35.18
34.905 25 872.63
40 + 325 34.63
34.69 25 867.25
40 + 350 34.75
33.365 25 834.13
40 + 375 31.98
31.455 25 786.38
40 + 400 30.93
30.87 25 771.75
40 + 425 30.81
31.79 25 794.75
40 + 450 32.77
36.075 25 901.88
40 + 475 39.38
39.99 25 999.75
40 + 500 40.6
37.08 25 927.00
40 + 525 33.56
34.485 25 862.13
40 + 550 35.41
35.625 25 890.63
40 + 575 35.84
35.86 25 896.50
40 + 600 35.88
35.585 25 889.63
40 + 625 35.29

Page 13 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
35.27 25 881.75
40 + 650 35.25
34.755 25 868.88
40 + 675 34.26
33.865 25 846.63
40 + 700 33.47
32.515 25 812.88
40 + 725 31.56
32.34 25 808.50
40 + 750 33.12
38.96 25 974.00
40 + 775 44.8
39.6 25 990.00
40 + 800 34.4
33.75 25 843.75
40 + 825 33.1
34.56 25 864.00
40 + 850 36.02
37.155 25 928.88
40 + 875 38.29
38.805 25 970.13
40 + 900 39.32
39.475 25 986.88
40 + 925 39.63
39.385 25 984.63
40 + 950 39.14
38.06 25 951.50
40 + 975 36.98
35.125 25 878.13
41 + 000 33.27
31.995 25 799.88
41 + 025 30.72
34.775 25 869.38
41 + 050 38.83
41.805 25 1,045.13
41 + 075 44.78
45.86 25 1,146.50
41 + 100 46.94
46.03 25 1,150.75
41 + 125 45.12
44.485 25 1,112.13
41 + 150 43.85
43.985 25 1,099.63
41 + 175 44.12
43.58 25 1,089.50
41 + 200 43.04
43.495 25 1,087.38
41 + 225 43.95
43.57 25 1,089.25
41 + 250 43.19
43.915 25 1,097.88
41 + 275 44.64
43.285 25 1,082.13
41 + 300 41.93
41.81 25 1,045.25
41 + 325 41.69
41.215 25 1,030.38
41 + 350 40.74
40.76 25 1,019.00
41 + 375 40.78
40.835 25 1,020.88
41 + 400 40.89
41 25 1,025.00
41 + 425 41.11
39.68 25 992.00
41 + 450 38.25
38.27 25 956.75
41 + 475 38.29
37.815 25 945.38
41 + 500 37.34
36.91 25 922.75
41 + 525 36.48
36.28 25 907.00
41 + 550 36.08
36.49 25 912.25

Page 14 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
41 + 575 36.9
37.775 25 944.38
41 + 600 38.65
37.265 25 931.63
41 + 625 35.88
35.765 25 894.13
41 + 650 35.65
37.28 25 932.00
41 + 675 38.91
38.2 25 955.00
41 + 700 37.49
37.84 25 946.00
41 + 725 38.19
38.315 25 957.88
41 + 750 38.44
38.02 25 950.50
41 + 775 37.6
36.745 25 918.63
41 + 800 35.89
35.92 25 898.00
41 + 825 35.95
35.875 25 896.88
41 + 850 35.8
35.785 25 894.63
41 + 875 35.77
35.88 25 897.00
41 + 900 35.99
35.75 25 893.75
41 + 925 35.51
35.51 25 887.75
41 + 950 35.51
35.715 25 892.88
41 + 975 35.92
35.955 25 898.88
42 + 000 35.99
35.885 25 897.13
42 + 025 35.78
35.425 25 885.63
42 + 050 35.07
35.34 25 883.50
42 + 075 35.61
35.635 25 890.88
42 + 100 35.66
36.005 25 900.13
42 + 125 36.35
36.01 25 900.25
42 + 150 35.67
36.02 25 900.50
42 + 175 36.37
35.355 25 883.88
42 + 200 34.34
33.895 25 847.38
42 + 225 33.45
32.81 25 820.25
42 + 250 32.17
33.88 25 847.00
42 + 275 35.59
34.705 25 867.63
42 + 300 33.82
32.825 25 820.63
42 + 325 31.83
31.89 25 797.25
42 + 350 31.95
32.795 25 819.88
42 + 375 33.64
33.965 25 849.13
42 + 400 34.29
34.34 25 858.50
42 + 425 34.39
34.485 25 862.13
42 + 450 34.58
34.155 25 853.88
42 + 475 33.73
33.235 25 830.88
42 + 500 32.74

Page 15 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
32.275 25 806.88
42 + 525 31.81
31.81 25 795.25
42 + 550 31.81
32.08 25 802.00
42 + 575 32.35
34.145 25 853.63
42 + 600 35.94
38.41 25 960.25
42 + 625 40.88
41.7 25 1,042.50
42 + 650 42.52
39.625 25 990.63
42 + 675 36.73
34.02 25 850.50
42 + 700 31.31
32.6 25 815.00
42 + 725 33.89
35.18 25 879.50
42 + 750 36.47
37.37 25 934.25
42 + 775 38.27
39.13 25 978.25
42 + 800 39.99
40.525 25 1,013.13
42 + 825 41.06
41.58 25 1,039.50
42 + 850 42.1
42.095 25 1,052.38
42 + 875 42.09
42.165 25 1,054.13
42 + 900 42.24
42.235 25 1,055.88
42 + 925 42.23
41.18 25 1,029.50
42 + 950 40.13
40.16 25 1,004.00
42 + 975 40.19
39.49 25 987.25
43 + 000 38.79
37.475 25 936.88
43 + 025 36.16
36.195 25 904.88
43 + 050 36.23
35.04 25 876.00
43 + 075 33.85
35.06 25 876.50
43 + 100 36.27
36.065 25 901.63
43 + 125 35.86
35.79 25 894.75
43 + 150 35.72
36.735 25 918.38
43 + 175 37.75
37.9 25 947.50
43 + 200 38.05
37.87 25 946.75
43 + 225 37.69
37.33 25 933.25
43 + 250 36.97
36.655 25 916.38
43 + 275 36.34
36.11 25 902.75
43 + 300 35.88
35.065 25 876.63
43 + 325 34.25
36.375 25 909.38
43 + 350 38.5
39.72 25 993.00
43 + 375 40.94
40.525 25 1,013.13
43 + 400 40.11
39.24 25 981.00
43 + 425 38.37
38.585 25 964.63

Page 16 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
43 + 450 38.8
37.98 25 949.50
43 + 475 37.16
37.905 25 947.63
43 + 500 38.65
38.07 25 951.75
43 + 525 37.49
36.765 25 919.13
43 + 550 36.04
35.395 25 884.88
43 + 575 34.75
35.31 25 882.75
43 + 600 35.87
35.32 25 883.00
43 + 625 34.77
34.075 25 851.88
43 + 650 33.38
33.665 25 841.63
43 + 675 33.95
36.455 25 911.38
43 + 700 38.96
39.25 25 981.25
43 + 725 39.54
36.08 25 902.00
43 + 750 32.62
33.935 25 848.38
43 + 775 35.25
33.71 25 842.75
43 + 800 32.17
32.345 25 808.63
43 + 825 32.52
33.355 25 833.88
43 + 850 34.19
34.525 25 863.13
43 + 875 34.86
35.02 25 875.50
43 + 900 35.18
35.695 25 892.38
43 + 925 36.21
36.57 25 914.25
43 + 950 36.93
36.805 25 920.13
43 + 975 36.68
36.395 25 909.88
44 + 000 36.11
35.61 25 890.25
44 + 025 35.11
34.635 25 865.88
44 + 050 34.16
33.305 25 832.63
44 + 075 32.45
31.95 25 798.75
44 + 100 31.45
30.905 25 772.63
44 + 125 30.36
30.7 25 767.50
44 + 150 31.04
32.16 25 804.00
44 + 175 33.28
34.86 25 871.50
44 + 200 36.44
39.475 25 986.88
44 + 225 42.51
51.64 25 1,291.00
44 + 250 60.77
62.035 25 1,550.88
44 + 275 63.3
60.055 25 1,501.38
44 + 300 56.81
51.25 25 1,281.25
44 + 325 45.69
42.825 25 1,070.63
44 + 350 39.96
38.3 25 957.50
44 + 375 36.64

Page 17 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
35.96 25 899.00
44 + 400 35.28
34.68 25 867.00
44 + 425 34.08
33.79 25 844.75
44 + 450 33.5
33.035 25 825.88
44 + 475 32.57
32.33 25 808.25
44 + 500 32.09
31.795 25 794.88
44 + 525 31.5
31.36 25 784.00
44 + 550 31.22
31.12 25 778.00
44 + 575 31.02
31 25 775.00
44 + 600 30.98
31.015 25 775.38

Page 18 of 29
Lebar Lebar Rata-Rata Jarak Volume Tiap Unit Progres Pekerjaan
Sta Keterangan
(m) (m) (m) (m2) Sebelumnya Saat ini Kumulatif
44 + 625 31.05
30.675 25 766.88
44 + 650 30.3

TOTAL 630,398.25 - - -

Diketahui oleh, Diperiksa dan disetujui oleh, Dibuat oleh,


PEMBERI TUGAS KONSULTAN PENGAWAS KONTRAKTOR
PT. WASKITA BUMI WIRA PT. INDRA KARYA (Persero) PT. WASKITA KARYA (Persero) Tbk

M. HUNSEIN PURNOMO GESNI PINEM EKO ERWANTO


Manager Lapangan Quantity Engineer Quantity Surveyor

Page 19 of 29
Lebar Lebar Rata-Rata Jarak Volume (m2)
No STA
(m) (m) (m) Tiap Unit Kumulatif

1 28+600 45.760
45.29 25.00 1,132.13 1,132.13
2 28+625 44.810
46.02 25.00 1,150.38 2,282.50
3 28+650 47.220
48.54 25.00 1,213.38 3,495.88
4 28+675 49.850
49.48 25.00 1,236.88 4,732.75
5 28+700 49.100
47.46 25.00 1,186.50 5,919.25
6 28+725 45.820
47.43 25.00 1,185.75 7,105.00
7 28+750 49.040
48.34 25.00 1,208.38 8,313.38
8 28+775 47.630
45.20 25.00 1,130.00 9,443.38
9 28+800 42.770
42.01 25.00 1,050.13 10,493.50
10 28+825 41.240
39.61 25.00 990.13 11,483.63
11 28+850 37.970
36.07 25.00 901.63 12,385.25
12 28+875 34.160
33.78 25.00 844.38 13,229.63
13 28+900 33.390
33.95 25.00 848.63 14,078.25
14 28+925 34.500
35.50 25.00 887.38 14,965.63
15 28+950 36.490
36.95 25.00 923.63 15,889.25
16 28+975 37.400
38.40 25.00 960.00 16,849.25
17 29+000 39.400
41.00 25.00 1,025.00 17,874.25
18 29+025 42.600
42.80 25.00 1,070.00 18,944.25
19 29+050 43.000
43.93 25.00 1,098.13 20,042.38
20 29+075 44.850
46.03 25.00 1,150.75 21,193.13
21 29+100 47.210
47.82 25.00 1,195.50 22,388.63
22 29+125 48.430
52.96 25.00 1,323.88 23,712.50
23 29+150 57.480
59.34 25.00 1,483.50 25,196.00
24 29+175 61.200
64.12 25.00 1,603.00 26,799.00
25 29+200 67.040
68.84 25.00 1,720.88 28,519.88
26 29+225 70.630
70.65 25.00 1,766.25 30,286.13
27 29+250 70.670
Lebar Lebar Rata-Rata Jarak Volume (m2)
No STA
(m) (m) (m) Tiap Unit Kumulatif
67.80 25.00 1,694.88 31,981.00
28 29+275 64.920
63.34 25.00 1,583.38 33,564.38
29 29+300 61.750
59.01 25.00 1,475.25 35,039.63
30 29+325 56.270
50.91 25.00 1,272.75 36,312.38
31 29+350 45.550
43.09 25.00 1,077.25 37,389.63
32 29+375 40.630
39.02 25.00 975.50 38,365.13
33 29+400 37.410
36.19 25.00 904.75 39,269.88
34 29+425 34.970
34.11 25.00 852.63 40,122.50
35 29+450 33.240
32.48 25.00 812.00 40,934.50
36 29+475 31.720
31.17 25.00 779.13 41,713.63
37 29+500 30.610
30.33 25.00 758.13 42,471.75
38 29+525 30.040
30.21 25.00 755.13 43,226.88
39 29+550 30.370
30.49 25.00 762.25 43,989.13
40 29+575 30.610
31.41 25.00 785.13 44,774.25
41 29+600 32.200
33.62 25.00 840.38 45,614.63
42 29+625 35.030
37.86 25.00 946.50 46,561.13
43 29+650 40.690
46.95 25.00 1,173.75 47,734.88
44 29+675 53.210
56.02 25.00 1,400.50 49,135.38
45 29+700 58.830
59.24 25.00 1,481.00 50,616.38
46 29+725 59.650
56.33 25.00 1,408.13 52,024.50
47 29+750 53.000
51.29 25.00 1,282.25 53,306.75
48 29+775 49.580
41.77 25.00 1,044.25 54,351.00
49 29+800 33.960
32.63 25.00 815.63 55,166.63
50 29+825 31.290
32.57 25.00 814.13 55,980.75
51 29+850 33.840
35.16 25.00 879.00 56,859.75
52 29+875 36.480
37.39 25.00 934.75 57,794.50
53 29+900 38.300
38.70 25.00 967.50 58,762.00
54 29+925 39.100
Lebar Lebar Rata-Rata Jarak Volume (m2)
No STA
(m) (m) (m) Tiap Unit Kumulatif
39.92 25.00 998.00 59,760.00
55 29+950 40.740
41.07 25.00 1,026.63 60,786.63
56 29+975 41.390
41.70 25.00 1,042.38 61,829.00
57 30+000 42.000
42.25 25.00 1,056.25 62,885.25
58 30+025 42.500
42.56 25.00 1,064.00 63,949.25
59 30+050 42.620
42.08 25.00 1,052.00 65,001.25
60 30+075 41.540
41.91 25.00 1,047.75 66,049.00
61 30+100 42.280
42.20 25.00 1,055.00 67,104.00
62 30+125 42.120
42.10 25.00 1,052.50 68,156.50
63 30+150 42.080
42.03 25.00 1,050.75 69,207.25
64 30+175 41.980
42.12 25.00 1,052.88 70,260.13
65 30+200 42.250
42.15 25.00 1,053.75 71,313.88
66 30+225 42.050
41.80 25.00 1,045.00 72,358.88
67 30+250 41.550
42.64 25.00 1,065.88 73,424.75
68 30+275 43.720
42.82 25.00 1,070.50 74,495.25
69 30+300 41.920
41.49 25.00 1,037.13 75,532.38
70 30+325 41.050
40.51 25.00 1,012.75 76,545.13
71 30+350 39.970
39.50 25.00 987.50 77,532.63
72 30+375 39.030
38.55 25.00 963.63 78,496.25
73 30+400 38.060
37.33 25.00 933.25 79,429.50
74 30+425 36.600
36.19 25.00 904.75 80,334.25
75 30+450 35.780
37.49 25.00 937.25 81,271.50
76 30+475 39.200
37.40 25.00 934.88 82,206.38
77 30+500 35.590
34.12 25.00 853.00 83,059.38
78 30+525 32.650
33.91 25.00 847.63 83,907.00
79 30+550 35.160
36.04 25.00 901.00 84,808.00
80 30+575 36.920
37.59 25.00 939.63 85,747.63
81 30+600 38.250
Lebar Lebar Rata-Rata Jarak Volume (m2)
No STA
(m) (m) (m) Tiap Unit Kumulatif
38.57 25.00 964.13 86,711.75
82 30+625 38.880
39.16 25.00 978.88 87,690.63
83 30+650 39.430
39.51 25.00 987.75 88,678.38
84 30+675 39.590
39.72 25.00 992.88 89,671.25
85 30+700 39.840
39.73 25.00 993.13 90,664.38
86 30+725 39.610
39.71 25.00 992.63 91,657.00
87 30+750 39.800
39.63 25.00 990.63 92,647.63
88 30+775 39.450
39.42 25.00 985.38 93,633.00
89 30+800 39.380
38.87 25.00 971.63 94,604.63
90 30+825 38.350
37.91 25.00 947.75 95,552.38
91 30+850 37.470
37.89 25.00 947.25 96,499.63
92 30+875 38.31
39.29 25.00 982.13 97,481.75
93 30+900 40.26
40.19 25.00 1,004.63 98,486.38
94 30+925 40.11
39.88 25.00 996.88 99,483.25
95 30+950 39.64
39.38 25.00 984.38 100,467.63
96 30+975 39.11
38.94 25.00 973.38 101,441.00
97 31+000 38.76
PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGANG ZONA KLB I

PERHITUNGAN PEKERJAAN TIMBUNAN

Lokasi : No. Kontrak :


Item Pekerjaan : Timbunan tanah Kontraktor :

Luas Luas Rata-Rata Jarak Volume (m3)


No STA
(m2) (m2) (m) Tiap Unit Kumulatif

1 28+850 55.658
39.23 25.00 980.76
2 28+875 22.803
17.08 25.00 426.94
3 28+900 11.353
11.61 25.00 290.31
4 28+925 11.873
16.47 25.00 411.83
5 28+950 21.074
24.96 25.00 623.88
6 28+975 28.836
34.16 25.00 854.08
7 29+000 39.490
45.61 25.00 1,140.19
8 29+025 51.725
63.81 25.00 1,595.33
9 29+050 75.901
85.04 25.00 2,126.01
10 29+075 94.180
101.31 25.00 2,532.81
11 29+100 108.445
118.27 25.00 2,956.84
12 29+125 128.102
154.11 25.00 3,852.68
13 29+150 180.113
237.73 25.00 5,943.27
14 29+175 295.349
286.23 25.00 7,155.82
15 29+200 277.117
326.24 25.00 8,155.98
16 29+225 375.361
376.94 25.00 9,423.48
17 29+250 378.517
377.92 25.00 9,448.05
18 29+275 377.327
309.03 25.00 7,725.85
19 29+300 240.742
215.92 25.00 5,398.06
20 29+325 191.103
160.80 25.00 4,020.12
21 29+350 130.507
111.54 25.00 2,788.55
22 29+375 92.577
79.43 25.00 1,985.82
23 29+400 66.289
58.50 25.00 1,462.40
24 29+425 50.704
44.68 25.00 1,117.02
25 29+450 38.658
34.44 25.00 861.08
PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGANG ZONA KLB I

PERHITUNGAN PEKERJAAN TIMBUNAN

Lokasi : No. Kontrak :


Item Pekerjaan : Timbunan tanah Kontraktor :

Luas Luas Rata-Rata Jarak Volume (m3)


No STA
(m2) (m2) (m) Tiap Unit Kumulatif
26 29+475 30.229
26.55 25.00 663.72
27 29+500 22.869
19.75 25.00 493.63
28 29+525 16.622
18.73 25.00 468.35
29 29+550 20.846
22.78 25.00 569.58
30 29+575 24.720
30.89 25.00 772.37
31 29+600 37.069
48.99 25.00 1,224.87
32 29+625 60.921
81.62 25.00 2,040.44
33 29+650 102.315
192.02 25.00 4,800.60
34 29+675 281.733
309.44 25.00 7,736.00
35 29+700 337.147
320.96 25.00 8,023.99
36 29+725 304.772
286.60 25.00 7,165.10
37 29+750 268.436
215.81 25.00 5,395.17
38 29+775 163.177
112.82 25.00 2,820.50
39 29+800 62.463
51.08 25.00 1,277.05
40 29+825 39.701
19.85 25.00 496.26
41 29+850
- 25.00 -
42 29+875
- 25.00 -
43 29+900
- 25.00 -
44 29+925
- 25.00 -
45 29+950
- 25.00 -
46 29+975
- 25.00 -
47 30+000
- 25.00 -
48 30+025
- 25.00 -
49 30+050
- 25.00 -
50 30+075
- 25.00 -
51 30+100
PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGANG ZONA KLB I

PERHITUNGAN PEKERJAAN TIMBUNAN

Lokasi : No. Kontrak :


Item Pekerjaan : Timbunan tanah Kontraktor :

Luas Luas Rata-Rata Jarak Volume (m3)


No STA
(m2) (m2) (m) Tiap Unit Kumulatif
- 25.00 -
52 30+125
- 25.00 -
53 30+150
- 25.00 -
54 30+175
- 25.00 -
55 30+200
- 25.00 -
56 30+225
- 25.00 -
57 30+250
- 25.00 -
58 30+275
- 25.00 -
59 30+300
- 25.00 -
60 30+325
- 25.00 -
61 30+350
- 25.00 -
62 30+375
- 25.00 -
63 30+400
- 25.00 -
64 30+425
- 25.00 -
65 30+450
13.99 25.00 349.78
66 30+475 27.983
77.30 25.00 1,932.38
67 30+500 126.608
74.07 25.00 1,851.74
68 30+525 21.531
10.77 25.00 269.14
69 30+550
- 25.00 -
70 30+575
- 25.00 -
71 30+600
- 25.00 -
72 30+625
- 25.00 -
73 30+650
- 25.00 -
74 30+675
- 25.00 -
75 30+700
- 25.00 -
76 30+725
- 25.00 -
PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGANG ZONA KLB I

PERHITUNGAN PEKERJAAN TIMBUNAN

Lokasi : No. Kontrak :


Item Pekerjaan : Timbunan tanah Kontraktor :

Luas Luas Rata-Rata Jarak Volume (m3)


No STA
(m2) (m2) (m) Tiap Unit Kumulatif
77 30+750
- 25.00 -
78 30+775
- 25.00 -
79 30+800
- 25.00 -
80 30+825
- 25.00 -
81 30+850
- 25.00 -
82 30+875
- 25.00 -
83 30+900
- 25.00 -
84 30+925
- 25.00 -
85 30+950
- 25.00 -
86 30+975
- 25.00 -
87 31+000
- 25.00 -
88 31+025
- 25.00 -
89 31+050
- 25.00 -
90 31+075
- 25.00 -
91 31+100
- 25.00 -
92 31+125
- 25.00 -
93 31+150
6.04 25.00 150.90
94 31+175 12.072
28.06 25.00 701.58
95 31+200 44.054
69.14 25.00 1,728.55
96 31+225 94.230
114.24 25.00 2,856.07
97 31+250 134.255
123.70 25.00 3,092.60
98 31+275 113.152
112.54 25.00 2,813.56
99 31+300 111.932
145.70 25.00 3,642.62
100 31+325 179.477
199.88 25.00 4,996.92
101 31+350 220.276
230.61 25.00 5,765.23
102 31+375 240.942
PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGANG ZONA KLB I

PERHITUNGAN PEKERJAAN TIMBUNAN

Lokasi : No. Kontrak :


Item Pekerjaan : Timbunan tanah Kontraktor :

Luas Luas Rata-Rata Jarak Volume (m3)


No STA
(m2) (m2) (m) Tiap Unit Kumulatif
217.74 25.00 5,443.51
103 31+400 194.539
196.80 25.00 4,919.96
104 31+425 199.058
194.38 25.00 4,859.41
105 31+450 189.695
186.10 25.00 4,652.40
106 31+475 182.497
179.43 25.00 4,485.86
107 31+500 176.372
163.15 25.00 4,078.67
108 31+525 149.922
116.68 25.00 2,917.11
109 31+550 83.446
65.16 25.00 1,628.91
110 31+575 46.867
38.52 25.00 962.89
111 31+600 30.164
25.19 25.00 629.68
112 31+625 20.210
23.23 25.00 580.69
113 31+650 26.245
17.74 25.00 443.49
114 31+675 9.234
8.32 25.00 208.12
115 31+700 7.415
13.23 25.00 330.83
116 31+725 19.051
11.23 25.00 280.87
117 31+750 3.418
3.94 25.00 98.45
118 31+775 4.458
2.23 25.00 55.72
119 31+800
- 25.00 -
120 31+825
- 25.00 -
121 31+850
- 25.00 -
122 31+875
- 25.00 -
123 31+900
- 25.00 -
124 31+925
- 25.00 -
125 31+950
- 25.00 -
126 31+975
- 25.00 -
127 32+000
- 25.00 -
PROYEK JALAN TOL TERBANGGI BESAR - PEMATANG PANGANG ZONA KLB I

PERHITUNGAN PEKERJAAN TIMBUNAN

Lokasi : No. Kontrak :


Item Pekerjaan : Timbunan tanah Kontraktor :

Luas Luas Rata-Rata Jarak Volume (m3)


No STA
(m2) (m2) (m) Tiap Unit Kumulatif
128 32+025
- 25.00 -
129 32+050
- 25.00 -
130 32+075
4.95 25.00 123.77
131 32+100 9.902
13.82 25.00 345.43
132 32+125 17.732
22.22 25.00 555.55
133 32+150 26.711
28.43 25.00 710.87
134 32+175 30.158
36.77 25.00 919.25
135 32+200 43.382
43.03 25.00 1,075.81
136 32+225 42.682
50.84 25.00 1,270.89
137 32+250 58.989
68.71 25.00 1,717.68
138 32+275 78.426
90.12 25.00 2,252.99
139 32+300 101.813
116.71 25.00 2,917.83
140 32+325 131.613
158.18 25.00 3,954.46
141 32+350 184.744
228.73 25.00 5,718.35
142 32+375 272.724
299.42 25.00 7,485.40
143 32+400 326.107
328.02 25.00 8,200.48
144 32+425 329.931
279.93 25.00 6,998.37
145 32+450 229.938
137.23 25.00 3,430.63
146 32+475 44.512
22.26 25.00 556.40
147 32+500
- 25.00 -

Total 3,675.00 242,186.56

Disetujui Oleh: Diperiksa Oleh Dibuat Oleh: