PERHITUNGAN VOLUME GALIAN TANAH DAN TIMBUNAN

LONG BOH
STA.0+000 - STA.6+200

AREA VOLUME VOL.KOMULATIF


STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
0+000 3.638 0.046 Disetujui Oleh,
25 494.075 0.575 494.075 0.575 PPK Perbatasan 3 Prov. Kaltim
0+025 35.888 0 Pejabat Pembuat Komitmen
25 640.925 0.000 1135.000 0.575
0+050 15.386 0
25 244.688 0.013 1379.688 0.588
0+075 4.189 0.001 Adi Adhiyan's Boyhard Putra, ST
25 52.363 44.713 1432.050 45.300 NIP. 19720127 200710 1 001
0+100 0 3.576
25 125.488 44.700 1557.538 90.000
0+125 10.039 0
25 468.300 0.000 2025.838 90.000
0+150 27.425 0
25 556.813 0.000 2582.650 90.000
0+175 17.12 0
25 318.013 0.050 2900.663 90.050
0+200 8.321 0.004
25 241.988 0.050 3142.650 90.100
0+225 11.038 0
25 169.400 2.250 3312.050 92.350
0+250 2.514 0.18
25 302.150 2.250 3614.200 94.600
0+275 21.658 0
25 1288.413 0.000 4902.613 94.600
0+300 81.415 0 Diperiksa Oleh,
25 1413.275 0.000 6315.888 94.600 Konsultan Supervisi
0+325 31.647 0 PT. Nasuma Putra KSO
25 455.138 0.013 6771.025 94.613
0+350 4.764 0.001
25 540.188 0.013 7311.213 94.625
0+375 38.451 0 Rakhmat, ST
25 1625.263 0.000 8936.475 94.625 Supervision Engineer
0+400 91.57 0
25 2194.488 0.000 11130.963 94.625
0+425 83.989 0
25 2010.263 0.000 13141.225 94.625
0+450 76.832 0
25 1352.125 0.000 14493.350 94.625
0+475 31.338 0
25 433.288 1.813 14926.638 96.438
0+500 3.325 0.145
25 191.163 1.813 15117.800 98.250
0+525 11.968 0
25 167.413 0.650 15285.213 98.900
0+550 1.425 0.052
25 884.788 0.650 16170.000 99.550
0+575 69.358 0
25 3040.788 0.000 19210.788 99.550
0+600 173.905 0
25 5349.200 0.000 24559.988 99.550
0+625 254.031 0
25 6943.700 0.000 31503.688 99.550
0+650 301.465 0
25 7040.100 0.000 38543.788 99.550 Dibuat Oleh,
0+675 261.743 0 Kontraktor Pelaksana
25 6593.863 0.000 45137.650 99.550 PT. Cipta Artha Borneo
0+700 265.766 0
25 6652.225 0.000 51789.875 99.550
0+725 266.412 0
25 7533.800 0.000 59323.675 99.550 Firdaus Surya Alam, ST
0+750 336.292 0 General Superintendent
25 7584.700 0.000 66908.375 99.550
0+775 270.484 0
25 5960.700 0.000 72869.075 99.550
0+800 206.372 0
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
25 5758.625 0.000 78627.700 99.550
0+825 254.318 0
25 6762.513 0.000 85390.213 99.550
0+850 286.683 0 Disetujui Oleh,
25 3867.700 0.000 89257.913 99.550 PPK Perbatasan 3 Prov. Kaltim
0+875 22.733 0 Pejabat Pembuat Komitmen
25 271.813 34.013 89529.725 133.563
0+900 -0.988 2.721
25 -21.363 68.275 89508.363 201.838
0+925 -0.721 2.741 Adi Adhiyan's Boyhard Putra, ST
25 334.425 34.263 89842.788 236.100 NIP. 19720127 200710 1 001
0+950 27.475 0
25 576.450 0.000 90419.238 236.100
0+975 18.641 0
25 376.975 0.000 90796.213 236.100
1+000 11.517 0
25 284.388 0.000 91080.600 236.100
1+025 11.234 0
25 278.613 0.000 91359.213 236.100
1+050 11.055 0
25 337.150 0.000 91696.363 236.100
1+075 15.917 0
25 1083.375 0.000 92779.738 236.100
1+100 70.753 0
25 2066.988 0.000 94846.725 236.100
1+125 94.606 0
25 2889.750 0.000 97736.475 236.100
1+150 136.574 0 Diperiksa Oleh,
25 2384.413 0.000 100120.888 236.100 Konsultan Supervisi
1+175 54.179 0 PT. Nasuma Putra KSO
25 677.238 104.438 100798.125 340.538
1+200 0 8.355
25 2.063 115.113 100800.188 455.650
1+225 0.165 0.854 Rakhmat, ST
25 -12.725 50.400 100787.463 506.050 Supervision Engineer
1+250 -1.183 3.178
25 -1.675 41.625 100785.788 547.675
1+275 1.049 0.152
25 31.800 4.000 100817.588 551.675
1+300 1.495 0.168
25 130.813 2.100 100948.400 553.775
1+325 8.97 0
25 276.800 0.000 101225.200 553.775
1+350 13.174 0
25 222.525 0.375 101447.725 554.150
1+375 4.628 0.03
25 58.700 12.350 101506.425 566.500
1+400 0.068 0.958
25 865.338 11.975 102371.763 578.475
1+425 69.159 0
25 3478.600 0.000 105850.363 578.475
1+450 209.129 0
25 6451.913 0.000 112302.275 578.475
1+475 307.024 0
25 9330.450 0.000 121632.725 578.475
1+500 439.412 0
25 10844.275 0.000 132477.000 578.475 Dibuat Oleh,
1+525 428.13 0 Kontraktor Pelaksana
25 12468.275 0.000 144945.275 578.475 PT. Cipta Artha Borneo
1+550 569.332 0
25 12993.988 0.000 157939.263 578.475
1+575 470.187 0
25 12646.500 0.000 170585.763 578.475 Firdaus Surya Alam, ST
1+600 541.533 0 General Superintendent
25 13274.825 0.000 183860.588 578.475
1+625 520.453 0
25 13866.888 0.000 197727.475 578.475
1+650 588.898 0
25 9683.725 0.000 207411.200 578.475
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
1+675 185.8 0
25 3071.613 0.000 210482.813 578.475
1+700 59.929 0
25 749.113 436.788 211231.925 1015.263 Disetujui Oleh,
1+725 0 34.943 PPK Perbatasan 3 Prov. Kaltim
25 0.000 780.825 211231.925 1796.088 Pejabat Pembuat Komitmen
1+750 0 27.523
25 2578.513 344.038 213810.438 2140.125
1+775 206.281 0
25 6348.163 0.000 220158.600 2140.125 Adi Adhiyan's Boyhard Putra, ST
1+800 301.572 0 NIP. 19720127 200710 1 001
25 8933.700 0.000 229092.300 2140.125
1+825 413.124 0
25 10877.925 0.000 239970.225 2140.125
1+850 457.11 0
25 12554.938 0.000 252525.163 2140.125
1+875 547.285 0
25 10600.088 0.000 263125.250 2140.125
1+900 300.722 0
25 5656.263 0.000 268781.513 2140.125
1+925 151.779 0
25 3384.800 0.000 272166.313 2140.125
1+950 119.005 0
25 3042.550 0.000 275208.863 2140.125
1+975 124.399 0
25 1554.988 72.463 276763.850 2212.588
2+000 0 5.797
25 44.538 73.075 276808.388 2285.663 Diperiksa Oleh,
2+025 3.563 0.049 Konsultan Supervisi
25 2190.050 0.613 278998.438 2286.275 PT. Nasuma Putra KSO
2+050 171.641 0
25 5370.638 0.000 284369.075 2286.275
2+075 258.01 0
25 8098.875 0.000 292467.950 2286.275 Rakhmat, ST
2+100 389.9 0 Supervision Engineer
25 7966.463 0.000 300434.413 2286.275
2+125 247.417 0
25 5090.925 0.000 305525.338 2286.275
2+150 159.857 0
25 2635.600 0.000 308160.938 2286.275
2+175 50.991 0
25 637.388 22.100 308798.325 2308.375
2+200 0 1.768
25 0.000 29.563 308798.325 2337.938
2+225 0 0.597
25 13.538 16.813 308811.863 2354.750
2+250 1.083 0.748
25 213.013 9.350 309024.875 2364.100
2+275 15.958 0
25 876.338 0.000 309901.213 2364.100
2+300 54.149 0
25 2280.113 0.000 312181.325 2364.100
2+325 128.26 0
25 4460.350 0.000 316641.675 2364.100
2+350 228.568 0
25 4979.663 0.000 321621.338 2364.100
2+375 169.805 0 Dibuat Oleh,
25 3475.913 0.000 325097.250 2364.100 Kontraktor Pelaksana
2+400 108.268 0 PT. Cipta Artha Borneo
25 2048.250 0.000 327145.500 2364.100
2+425 55.592 0
25 829.988 0.000 327975.488 2364.100
2+450 10.807 0 Firdaus Surya Alam, ST
25 150.888 14.038 328126.375 2378.138 General Superintendent
2+475 1.264 1.123
25 15.800 228.275 328142.175 2606.413
2+500 0 17.139
25 535.313 214.238 328677.488 2820.650
2+525 42.825 0
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
25 1284.188 0.000 329961.675 2820.650
2+550 59.91 0
25 856.950 0.000 330818.625 2820.650
2+575 8.646 0 Disetujui Oleh,
25 108.075 167.013 330926.700 2987.663 PPK Perbatasan 3 Prov. Kaltim
2+600 0 13.361 Pejabat Pembuat Komitmen
25 718.113 167.013 331644.813 3154.675
2+625 57.449 0
25 2807.600 0.000 334452.413 3154.675
2+650 167.159 0 Adi Adhiyan's Boyhard Putra, ST
25 2978.538 0.000 337430.950 3154.675 NIP. 19720127 200710 1 001
2+675 71.124 0
25 1033.325 0.000 338464.275 3154.675
2+700 11.542 0
25 1090.700 0.000 339554.975 3154.675
2+725 75.714 0
25 3383.913 0.000 342938.888 3154.675
2+750 194.999 0
25 3186.738 0.000 346125.625 3154.675
2+775 59.94 0
25 749.250 209.888 346874.875 3364.563
2+800 0 16.791
25 -6.600 237.650 346868.275 3602.213
2+825 -0.528 2.221
25 -14.075 65.875 346854.200 3668.088
2+850 -0.598 3.049
25 1131.388 38.113 347985.588 3706.200
2+875 91.109 0 Diperiksa Oleh,
25 3648.200 0.000 351633.788 3706.200 Konsultan Supervisi
2+900 200.747 0 PT. Nasuma Putra KSO
25 5409.175 0.000 357042.963 3706.200
2+925 231.987 0
25 6163.288 0.000 363206.250 3706.200
2+950 261.076 0 Rakhmat, ST
25 4873.900 0.000 368080.150 3706.200 Supervision Engineer
2+975 128.836 0
25 2026.150 0.000 370106.300 3706.200
3+000 33.256 0
25 625.513 0.000 370731.813 3706.200
3+025 16.785 0
25 354.400 0.000 371086.213 3706.200
3+050 11.567 0
25 543.225 0.000 371629.438 3706.200
3+075 31.891 0
25 1252.975 0.000 372882.413 3706.200
3+100 68.347 0
25 1166.713 0.000 374049.125 3706.200
3+125 24.99 0
25 312.375 95.188 374361.500 3801.388
3+150 0 7.615
25 1163.113 95.188 375524.613 3896.575
3+175 93.049 0
25 4633.663 0.000 380158.275 3896.575
3+200 277.644 0
25 4817.500 0.000 384975.775 3896.575
3+225 107.756 0
25 1504.550 0.000 386480.325 3896.575 Dibuat Oleh,
3+250 12.608 0 Kontraktor Pelaksana
25 1343.913 0.000 387824.238 3896.575 PT. Cipta Artha Borneo
3+275 94.905 0
25 4276.075 0.000 392100.313 3896.575
3+300 247.181 0
25 5535.500 0.000 397635.813 3896.575 Firdaus Surya Alam, ST
3+325 195.659 0 General Superintendent
25 4430.225 0.000 402066.038 3896.575
3+350 158.759 0
25 2007.438 10.575 404073.475 3907.150
3+375 1.836 0.846
25 885.350 10.575 404958.825 3917.725
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
3+400 68.992 0
25 3304.725 0.000 408263.550 3917.725
3+425 195.386 0
25 3899.775 0.000 412163.325 3917.725 Disetujui Oleh,
3+450 116.596 0 PPK Perbatasan 3 Prov. Kaltim
25 1636.525 0.000 413799.850 3917.725 Pejabat Pembuat Komitmen
3+475 14.326 0
25 1532.413 0.000 415332.263 3917.725
3+500 108.267 0
25 3811.713 0.000 419143.975 3917.725 Adi Adhiyan's Boyhard Putra, ST
3+525 196.67 0 NIP. 19720127 200710 1 001
25 4594.675 0.000 423738.650 3917.725
3+550 170.904 0
25 4915.788 0.000 428654.438 3917.725
3+575 222.359 0
25 6314.913 0.000 434969.350 3917.725
3+600 282.834 0
25 5751.663 0.000 440721.013 3917.725
3+625 177.299 0
25 3291.913 0.000 444012.925 3917.725
3+650 86.054 0
25 1460.713 0.000 445473.638 3917.725
3+675 30.803 0
25 385.038 118.625 445858.675 4036.350
3+700 0 9.49
25 364.313 118.625 446222.988 4154.975
3+725 29.145 0
25 364.313 117.125 446587.300 4272.100 Diperiksa Oleh,
3+750 0 9.37 Konsultan Supervisi
25 310.425 117.125 446897.725 4389.225 PT. Nasuma Putra KSO
3+775 24.834 0
25 596.463 0.000 447494.188 4389.225
3+800 22.883 0
25 556.088 0.000 448050.275 4389.225 Rakhmat, ST
3+825 21.604 0 Supervision Engineer
25 671.488 0.000 448721.763 4389.225
3+850 32.115 0
25 525.063 0.000 449246.825 4389.225
3+875 9.89 0
25 136.925 5.438 449383.750 4394.663
3+900 1.064 0.435
25 253.000 5.438 449636.750 4400.100
3+925 19.176 0
25 748.225 0.000 450384.975 4400.100
3+950 40.682 0
25 1096.938 0.000 451481.913 4400.100
3+975 47.073 0
25 1266.150 0.000 452748.063 4400.100
4+000 54.219 0
25 879.113 0.000 453627.175 4400.100
4+025 16.11 0
25 201.375 159.650 453828.550 4559.750
4+050 0 12.772
25 915.713 159.650 454744.263 4719.400
4+075 73.257 0
25 4046.900 0.000 458791.163 4719.400
4+100 250.495 0 Dibuat Oleh,
25 4476.613 0.000 463267.775 4719.400 Kontraktor Pelaksana
4+125 107.634 0 PT. Cipta Artha Borneo
25 1617.413 0.000 464885.188 4719.400
4+150 21.759 0
25 439.213 0.000 465324.400 4719.400
4+175 13.378 0 Firdaus Surya Alam, ST
25 174.650 4.913 465499.050 4724.313 General Superintendent
4+200 0.594 0.393
25 846.338 4.913 466345.388 4729.225
4+225 67.113 0
25 1259.150 0.000 467604.538 4729.225
4+250 33.619 0
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
25 850.263 0.000 468454.800 4729.225
4+275 34.402 0
25 2345.775 0.000 470800.575 4729.225
4+300 153.26 0 Disetujui Oleh,
25 2733.463 0.000 473534.038 4729.225 PPK Perbatasan 3 Prov. Kaltim
4+325 65.417 0 Pejabat Pembuat Komitmen
25 845.200 0.088 474379.238 4729.313
4+350 2.199 0.007
25 123.913 0.088 474503.150 4729.400
4+375 7.714 0 Adi Adhiyan's Boyhard Putra, ST
25 138.700 1.450 474641.850 4730.850 NIP. 19720127 200710 1 001
4+400 3.382 0.116
25 130.375 1.500 474772.225 4732.350
4+425 7.048 0.004
25 237.200 0.050 475009.425 4732.400
4+450 11.928 0
25 321.613 0.000 475331.038 4732.400
4+475 13.801 0
25 547.725 0.000 475878.763 4732.400
4+500 30.017 0
25 455.200 0.375 476333.963 4732.775
4+525 6.399 0.03
25 79.988 26.575 476413.950 4759.350
4+550 0 2.096
25 1587.225 26.200 478001.175 4785.550
4+575 126.978 0
25 6792.988 0.000 484794.163 4785.550
4+600 416.461 0 Diperiksa Oleh,
25 9910.588 0.000 494704.750 4785.550 Konsultan Supervisi
4+625 376.386 0 PT. Nasuma Putra KSO
25 8612.150 0.000 503316.900 4785.550
4+650 312.586 0
25 5219.600 0.000 508536.500 4785.550
4+675 104.982 0 Rakhmat, ST
25 1437.938 0.000 509974.438 4785.550 Supervision Engineer
4+700 10.053 0
25 588.388 0.000 510562.825 4785.550
4+725 37.018 0
25 2027.475 0.000 512590.300 4785.550
4+750 125.18 0
25 3070.313 0.000 515660.613 4785.550
4+775 120.445 0
25 2951.238 0.000 518611.850 4785.550
4+800 115.654 0
25 2485.063 0.000 521096.913 4785.550
4+825 83.151 0
25 1751.338 0.000 522848.250 4785.550
4+850 56.956 0
25 819.675 0.000 523667.925 4785.550
4+875 8.618 0
25 94.688 17.625 523762.613 4803.175
4+900 -1.043 1.41
25 174.913 17.625 523937.525 4820.800
4+925 15.036 0
25 462.863 0.000 524400.388 4820.800
4+950 21.993 0
25 800.450 0.000 525200.838 4820.800 Dibuat Oleh,
4+975 42.043 0 Kontraktor Pelaksana
25 1332.113 0.000 526532.950 4820.800 PT. Cipta Artha Borneo
5+000 64.526 0
25 1497.988 0.000 528030.938 4820.800
5+025 55.313 0
25 2716.163 0.000 530747.100 4820.800 Firdaus Surya Alam, ST
5+050 161.98 0 General Superintendent
25 2719.513 0.000 533466.613 4820.800
5+075 55.581 0
25 694.763 58.563 534161.375 4879.363
5+100 0 4.685
25 77.725 58.600 534239.100 4937.963
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
5+125 6.218 0.003
25 245.263 0.038 534484.363 4938.000
5+150 13.403 0
25 428.163 0.000 534912.525 4938.000 Disetujui Oleh,
5+175 20.85 0 PPK Perbatasan 3 Prov. Kaltim
25 1275.638 0.000 536188.163 4938.000 Pejabat Pembuat Komitmen
5+200 81.201 0
25 2871.538 0.000 539059.700 4938.000
5+225 148.522 0
25 5052.000 0.000 544111.700 4938.000 Adi Adhiyan's Boyhard Putra, ST
5+250 255.638 0 NIP. 19720127 200710 1 001
25 4277.788 0.000 548389.488 4938.000
5+275 86.585 0
25 2280.563 0.000 550670.050 4938.000
5+300 95.86 0
25 1198.250 86.588 551868.300 5024.588
5+325 0 6.927
25 0.000 405.350 551868.300 5429.938
5+350 0 25.501
25 1303.525 318.763 553171.825 5748.700
5+375 104.282 0
25 3408.438 0.000 556580.263 5748.700
5+400 168.393 0
25 4370.188 0.000 560950.450 5748.700
5+425 181.222 0
25 4835.488 0.000 565785.938 5748.700
5+450 205.617 0
25 2570.213 62.488 568356.150 5811.188 Diperiksa Oleh,
5+475 0 4.999 Konsultan Supervisi
25 -4.813 71.925 568351.338 5883.113 PT. Nasuma Putra KSO
5+500 -0.385 0.755
25 1200.713 9.438 569552.050 5892.550
5+525 96.442 0
25 5134.575 0.000 574686.625 5892.550 Rakhmat, ST
5+550 314.324 0 Supervision Engineer
25 5403.000 0.000 580089.625 5892.550
5+575 117.916 0
25 2276.125 0.000 582365.750 5892.550
5+600 64.174 0
25 946.500 0.000 583312.250 5892.550
5+625 11.546 0
25 146.175 1.738 583458.425 5894.288
5+650 0.148 0.139
25 -11.863 16.825 583446.563 5911.113
5+675 -1.097 1.207
25 -24.313 44.250 583422.250 5955.363
5+700 -0.848 2.333
25 74.375 29.300 583496.625 5984.663
5+725 6.798 0.011
25 220.513 0.138 583717.138 5984.800
5+750 10.843 0
25 221.775 0.000 583938.913 5984.800
5+775 6.899 0
25 133.013 0.000 584071.925 5984.800
5+800 3.742 0
25 595.600 0.000 584667.525 5984.800
5+825 43.906 0 Dibuat Oleh,
25 1497.113 0.000 586164.638 5984.800 Kontraktor Pelaksana
5+850 75.863 0 PT. Cipta Artha Borneo
25 1415.875 0.000 587580.513 5984.800
5+875 37.407 0
25 908.463 0.000 588488.975 5984.800
5+900 35.27 0 Firdaus Surya Alam, ST
25 852.938 0.000 589341.913 5984.800 General Superintendent
5+925 32.965 0
25 745.713 0.000 590087.625 5984.800
5+950 26.692 0
25 537.950 0.000 590625.575 5984.800
5+975 16.344 0
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
25 317.363 0.000 590942.938 5984.800
6+000 9.045 0
25 193.750 0.000 591136.688 5984.800
6+025 6.455 0
25 444.675 0.000 591581.363 5984.800
6+050 29.119 0
25 741.150 0.000 592322.513 5984.800
6+075 30.173 0
25 758.713 0.000 593081.225 5984.800
6+100 30.524 0
25 667.025 0.000 593748.250 5984.800
6+125 22.838 0
25 343.663 0.575 594091.913 5985.375
6+150 4.655 0.046
25 134.238 0.700 594226.150 5986.075
6+175 6.084 0.01
25 76.763 4.850 594302.913 5990.925
6+200 0.057 0.378

VOLUME 594302.913 5990.925


PERHITUNGAN VOLUME GALIAN TANAH DAN TIMBUNAN
LONG BOH
STA.6+200 - STA.8+700

AREA VOLUME VOL.KOMULATIF


STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
6+200 7.747 0 Disetujui Oleh,
25 285.413 0.000 285.413 0.000 PPK Perbatasan 3 Prov. Kaltim
6+225 15.086 0 Pejabat Pembuat Komitmen
25 334.675 0.000 620.088 0.000
6+250 11.688 0
25 199.913 0.675 820.000 0.675
6+275 4.305 0.054 Adi Adhiyan's Boyhard Putra, ST
25 249.738 0.675 1069.738 1.350 NIP. 19720127 200710 1 001
6+300 15.674 0
25 605.738 0.000 1675.475 1.350
6+325 32.785 0
25 1132.288 0.000 2807.763 1.350
6+350 57.798 0
25 1342.425 0.000 4150.188 1.350
6+375 49.596 0
25 1676.088 0.000 5826.275 1.350
6+400 84.491 0
25 2892.038 0.000 8718.313 1.350
6+425 146.872 0
25 3400.875 0.000 12119.188 1.350
6+450 125.198 0
25 2141.000 0.000 14260.188 1.350
6+475 46.082 0
25 629.388 0.000 14889.575 1.350
6+500 4.269 0 Diperiksa Oleh,
25 327.613 0.000 15217.188 1.350 Konsultan Supervisi
6+525 21.94 0 PT. Nasuma Putra KSO
25 1696.725 0.000 16913.913 1.350
6+550 113.798 0
25 3511.175 0.000 20425.088 1.350
6+575 167.096 0 Rakhmat, ST
25 3871.475 0.000 24296.563 1.350 Supervision Engineer
6+600 142.622 0
25 3311.313 0.000 27607.875 1.350
6+625 122.283 0
25 3377.388 0.000 30985.263 1.350
6+650 147.908 0
25 1848.850 258.575 32834.113 259.925
6+675 0 20.686
25 0.000 398.713 32834.113 658.638
6+700 0 11.211
25 540.625 140.138 33374.738 798.775
6+725 43.25 0
25 1824.150 0.000 35198.888 798.775
6+750 102.682 0
25 4039.625 0.000 39238.513 798.775
6+775 220.488 0
25 7136.988 0.000 46375.500 798.775
6+800 350.471 0 Dibuat Oleh,
25 7896.613 0.000 54272.113 798.775 Kontraktor Pelaksana
6+825 281.258 0 PT. Cipta Artha Borneo
25 6284.625 0.000 60556.738 798.775
6+850 221.512 0
25 4179.350 0.000 64736.088 798.775
6+875 112.836 0 Firdaus Surya Alam, ST
25 1897.975 0.000 66634.063 798.775 General Superintendent
6+900 39.002 0
25 2237.138 0.000 68871.200 798.775
6+925 139.969 0
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
25 3350.125 0.000 72221.325 798.775
6+950 128.041 0
25 2849.638 0.000 75070.963 798.775 Disetujui Oleh,
6+975 99.93 0 PPK Perbatasan 3 Prov. Kaltim
25 3500.463 0.000 78571.425 798.775 Pejabat Pembuat Komitmen
7+000 180.107 0
25 5159.250 0.000 83730.675 798.775
7+025 232.633 0
25 5401.213 0.000 89131.888 798.775 Adi Adhiyan's Boyhard Putra, ST
7+050 199.464 0 NIP. 19720127 200710 1 001
25 4510.238 0.000 93642.125 798.775
7+075 161.355 0
25 2016.938 131.138 95659.063 929.913
7+100 0 10.491
25 126.875 131.138 95785.938 1061.050
7+125 10.15 0
25 578.375 0.000 96364.313 1061.050
7+150 36.12 0
25 2535.638 0.000 98899.950 1061.050
7+175 166.731 0
25 4558.000 0.000 103457.950 1061.050
7+200 197.909 0
25 5906.450 0.000 109364.400 1061.050
7+225 274.607 0
25 6174.775 0.000 115539.175 1061.050
7+250 219.375 0
25 10664.925 0.000 126204.100 1061.050 Diperiksa Oleh,
7+275 633.819 0 Konsultan Supervisi
25 16374.625 0.000 142578.725 1061.050 PT. Nasuma Putra KSO
7+300 676.151 0
25 18252.375 0.000 160831.100 1061.050
7+325 784.039 0
25 17369.963 0.000 178201.063 1061.050 Rakhmat, ST
7+350 605.558 0 Supervision Engineer
25 9190.350 0.000 187391.413 1061.050
7+375 129.67 0
25 2510.038 0.000 189901.450 1061.050
7+400 71.133 0
25 3181.700 0.000 193083.150 1061.050
7+425 183.403 0
25 4846.525 0.000 197929.675 1061.050
7+450 204.319 0
25 3919.500 0.000 201849.175 1061.050
7+475 109.241 0
25 2358.988 0.000 204208.163 1061.050
7+500 79.478 0
25 1619.713 0.000 205827.875 1061.050
7+525 50.099 0
25 772.038 0.000 206599.913 1061.050
7+550 11.664 0
25 259.775 0.000 206859.688 1061.050 Dibuat Oleh,
7+575 9.118 0 Kontraktor Pelaksana
25 153.750 0.163 207013.438 1061.213 PT. Cipta Artha Borneo
7+600 3.182 0.013
25 129.250 0.163 207142.688 1061.375
7+625 7.158 0
25 256.438 0.000 207399.125 1061.375 Firdaus Surya Alam, ST
7+650 13.357 0 General Superintendent
25 972.400 0.000 208371.525 1061.375
7+675 64.435 0
25 2341.550 0.000 210713.075 1061.375
7+700 122.889 0
25 3144.813 0.000 213857.888 1061.375
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
7+725 128.696 0
25 2848.813 0.000 216706.700 1061.375 Disetujui Oleh,
7+750 99.209 0 PPK Perbatasan 3 Prov. Kaltim
25 2133.138 0.000 218839.838 1061.375 Pejabat Pembuat Komitmen
7+775 71.442 0
25 2157.938 0.000 220997.775 1061.375
7+800 101.193 0
25 2375.450 0.000 223373.225 1061.375 Adi Adhiyan's Boyhard Putra, ST
7+825 88.843 0 NIP. 19720127 200710 1 001
25 2340.575 0.000 225713.800 1061.375
7+850 98.403 0
25 2385.500 0.000 228099.300 1061.375
7+875 92.437 0
25 2635.450 0.000 230734.750 1061.375
7+900 118.399 0
25 2703.263 0.000 233438.013 1061.375
7+925 97.862 0
25 1727.275 0.000 235165.288 1061.375
7+950 40.32 0
25 504.000 170.963 235669.288 1232.338
7+975 0 13.677
25 88.700 170.963 235757.988 1403.300
8+000 7.096 0
25 508.613 0.000 236266.600 1403.300
8+025 33.593 0
25 2208.225 0.000 238474.825 1403.300 Diperiksa Oleh,
8+050 143.065 0 Konsultan Supervisi
25 3418.063 0.000 241892.888 1403.300 PT. Nasuma Putra KSO
8+075 130.38 0
25 2546.650 0.000 244439.538 1403.300
8+100 73.352 0
25 1539.888 0.000 245979.425 1403.300 Rakhmat, ST
8+125 49.839 0 Supervision Engineer
25 1053.863 0.000 247033.288 1403.300
8+150 34.47 0
25 430.875 0.000 247464.163 1403.300
8+175 0 9.575
25 0.000 119.688 247464.163 1522.988
8+200 0 12.413
25 0.000 155.163 247464.163 1678.150
8+225 26.659 0
25 333.238 0.000 247797.400 1678.150
8+250 40.136 0
25 501.700 0.000 248299.100 1678.150
8+275 50.334 0
25 629.175 0.000 248928.275 1678.150
8+300 18.53 0
25 231.625 0.000 249159.900 1678.150
8+325 47.402 0
25 592.525 0.000 249752.425 1678.150 Dibuat Oleh,
8+350 38.538 0 Kontraktor Pelaksana
25 481.725 0.000 250234.150 1678.150 PT. Cipta Artha Borneo
8+375 10.147 0
25 126.838 0.000 250360.988 1678.150
8+400 -0.824 1.331
25 -10.300 16.638 250350.688 1694.788 Firdaus Surya Alam, ST
8+425 2.637 3.403 General Superintendent
25 32.963 42.538 250383.650 1737.325
8+450 7.3 4.293
25 91.250 53.663 250474.900 1790.988
8+475 1.339 6.63
25 16.738 82.875 250491.638 1873.863
8+500 43.788 2.56
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
25 547.350 32.000 251038.988 1905.863
8+525 48.57 0
25 607.125 0.000 251646.113 1905.863
8+550 59.747 0
25 746.838 0.000 252392.950 1905.863
8+575 57.2 0
25 715.000 0.000 253107.950 1905.863
8+600 0 6.989
25 0.000 87.363 253107.950 1993.225
8+625 56.355 0
25 704.438 0.000 253812.388 1993.225
8+650 87.586 0
25 1094.825 0.000 254907.213 1993.225
8+675 52.18 0.542
25 652.250 6.775 255559.463 2000.000
8+700 16.186 4.847

VOLUME 255559.463 2000.000


GALIAN TOMBUNAN
PERHITUNGAN VOLUME GALIAN TANAH DAN TIMBUNAN
LONG BOH
STA.8+700 - STA.10+650

AREA VOLUME VOL.KOMULATIF


STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
8+700 6.231 0.041 Disetujui Oleh,
25 89.363 3.838 89.363 3.838 PPK Perbatasan 3 Prov. Kaltim
8+725 0.918 0.266 Pejabat Pembuat Komitmen
25 39.313 7.788 128.675 11.625
8+750 2.227 0.357
25 96.525 4.675 225.200 16.300
8+775 5.495 0.017 Adi Adhiyan's Boyhard Putra, ST
25 68.688 497.500 293.888 513.800 NIP. 19720127 200710 1 001
8+800 0 39.783
25 89.775 497.488 383.663 1011.288
8+825 7.182 0.016
25 124.288 0.238 507.950 1011.525
8+850 2.761 0.003
25 243.225 0.038 751.175 1011.563
8+875 16.697 0
25 809.925 0.000 1561.100 1011.563
8+900 48.097 0
25 966.113 0.000 2527.213 1011.563
8+925 29.192 0
25 364.900 53.075 2892.113 1064.638
8+950 0 4.246
25 0.000 229.788 2892.113 1294.425
8+975 0 14.137
25 158.550 176.713 3050.663 1471.138
9+000 12.684 0 Diperiksa Oleh,
25 198.425 4.188 3249.088 1475.325 Konsultan Supervisi
9+025 3.19 0.335 PT. Nasuma Putra KSO
25 151.825 4.188 3400.913 1479.513
9+050 8.956 0
25 186.188 0.000 3587.100 1479.513
9+075 5.939 0 Rakhmat, ST
25 262.363 0.000 3849.463 1479.513 Supervision Engineer
9+100 15.05 0
25 463.563 0.000 4313.025 1479.513
9+125 22.035 0
25 275.438 410.838 4588.463 1890.350
9+150 0 32.867
25 669.613 410.838 5258.075 2301.188
9+175 53.569 0
25 1048.825 0.000 6306.900 2301.188
9+200 30.337 0
25 379.213 80.788 6686.113 2381.975
9+225 0 6.463
25 0.000 741.413 6686.113 3123.388
9+250 0 52.85
25 485.450 660.625 7171.563 3784.013
9+275 38.836 0
25 1970.725 0.000 9142.288 3784.013
9+300 118.822 0 Dibuat Oleh,
25 4811.700 0.000 13953.988 3784.013 Kontraktor Pelaksana
9+325 266.114 0 PT. Cipta Artha Borneo
25 6819.850 0.000 20773.838 3784.013
9+350 279.474 0
25 5073.513 0.000 25847.350 3784.013
9+375 126.407 0 Firdaus Surya Alam, ST
25 1710.863 0.000 27558.213 3784.013 General Superintendent
9+400 10.462 0
25 130.775 49.200 27688.988 3833.213
9+425 0 3.936
25 853.950 49.200 28542.938 3882.413
9+450 68.316 0
25 2174.250 0.000 30717.188 3882.413
9+475 105.624 0
25 2993.325 0.000 33710.513 3882.413
9+500 133.842 0
25 2245.225 0.000 35955.738 3882.413
9+525 45.776 0
25 701.400 0.000 36657.138 3882.413
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
9+550 10.336 0
25 213.063 0.000 36870.200 3882.413
9+575 6.709 0
25 200.850 0.000 37071.050 3882.413 Disetujui Oleh,
9+600 9.359 0 PPK Perbatasan 3 Prov. Kaltim
25 116.988 7.513 37188.038 3889.925 Pejabat Pembuat Komitmen
9+625 0 0.601
25 0.000 65.850 37188.038 3955.775
9+650 0 4.667
25 366.350 58.338 37554.388 4014.113 Adi Adhiyan's Boyhard Putra, ST
9+675 29.308 0 NIP. 19720127 200710 1 001
25 1253.063 0.000 38807.450 4014.113
9+700 70.937 0
25 1751.700 0.000 40559.150 4014.113
9+725 69.199 0
25 1573.638 0.000 42132.788 4014.113
9+750 56.692 0
25 1343.125 0.000 43475.913 4014.113
9+775 50.758 0
25 1121.400 0.000 44597.313 4014.113
9+800 38.954 0
25 486.925 48.200 45084.238 4062.313
9+825 0 3.856
25 0.000 317.000 45084.238 4379.313
9+850 0 21.504
25 0.000 496.100 45084.238 4875.413
9+875 0 18.184
25 636.600 227.300 45720.838 5102.713 Diperiksa Oleh,
9+900 50.928 0 Konsultan Supervisi
25 1462.875 0.000 47183.713 5102.713 PT. Nasuma Putra KSO
9+925 66.102 0
25 1684.313 0.000 48868.025 5102.713
9+950 68.643 0
25 2429.000 0.000 51297.025 5102.713 Rakhmat, ST
9+975 125.677 0 Supervision Engineer
25 4344.663 0.000 55641.688 5102.713
10+000 221.896 0
25 5671.400 0.000 61313.088 5102.713
10+025 231.816 0
25 3873.063 0.000 65186.150 5102.713
10+050 78.029 0
25 2309.375 0.000 67495.525 5102.713
10+075 106.721 0
25 3722.388 0.000 71217.913 5102.713
10+100 191.07 0
25 5144.738 0.000 76362.650 5102.713
10+125 220.509 0
25 4933.188 0.000 81295.838 5102.713
10+150 174.146 0
25 3839.463 0.000 85135.300 5102.713
10+175 133.011 0
25 3452.788 0.000 88588.088 5102.713 Dibuat Oleh,
10+200 143.212 0 Kontraktor Pelaksana
25 6954.638 0.000 95542.725 5102.713 PT. Cipta Artha Borneo
10+225 413.159 0
25 12278.525 0.000 107821.250 5102.713
10+250 569.123 0
25 16006.450 0.000 123827.700 5102.713 Firdaus Surya Alam, ST
10+275 711.393 0 General Superintendent
25 17732.263 0.000 141559.963 5102.713
10+300 707.188 0
25 14318.600 0.000 155878.563 5102.713
10+325 438.3 0
25 8324.363 0.000 164202.925 5102.713
10+350 227.649 0 594302.913 255559.463 155878.563
25 2845.613 16.963 167048.538 5119.675
10+375 0 1.357 5990.925 2000 5102.713
25 0.000 87.975 167048.538 5207.650
10+400 0 5.681
25 71.650 71.013 167120.188 5278.663
10+425 5.732 0
25 71.650 121.500 167191.838 5400.163
AREA VOLUME VOL.KOMULATIF
STA GALIAN TIMBUNAN JARAK GALIAN TIMBUNAN GALIAN TIMBUNAN
M2 M2 M' M3 M3 M3 M3
10+450 0 9.72
25 255.550 121.500 167447.388 5521.663
10+475 20.444 0
25 2396.988 0.000 169844.375 5521.663
10+500 171.315 0
25 4229.638 0.000 174074.013 5521.663
10+525 167.056 0
25 4272.900 0.000 178346.913 5521.663
10+550 174.776 0
25 4115.150 0.000 182462.063 5521.663
10+575 154.436 0
25 3465.400 0.000 185927.463 5521.663
10+600 122.796 0
25 2324.575 0.000 188252.038 5521.663
10+625 63.17 0
25 809.350 0.000 189061.388 5521.663
10+650 1.578 0

TOTAL VOLUME SAMAPAI STA .10+650 VOLUME 189061.388 5521.663 594302.913 255559.463 189061.388
GALIAN TOMBUNAN
5990.925 2000 5521.663

TOTAL VOLUME SAMAPAI STA .10+325 = 1005740.938 13093.638


KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDRAL BINAMARGA
BALAI BESAR PELAKSANA KALIMANTAN TIMUR

SATUAN PELAKSANAAN JALAN PERBATASAN KALIMANTAN TIMUR

DATA SURVEI LAPANGAN MC.0%

Satuan Kerja : Pelaksanaan Jalan Perbatasan Kalimantan Timur

Nama Paket : Pembangunan Jalan Long Pahangai - Long Boh

Kontraktor : PT.CIPTA ARTHA BORNEO

No.Kontrak : HK.03.01/PBTSN-KALTIM/BTS.3/LP-LB/037

Tanggal : 29 Januari 2021

Nilai Kontrak : Rp 58,979,750,000.00

Sumber Dana : APBN MURNI

T.Anggaran : 2021