Run I Run II Run I (A 0,0816 M, KU 6, KS 5) Run II (A 0,0816 M, KU 8, KS 5)
Run I Run II Run I (A 0,0816 M, KU 6, KS 5) Run II (A 0,0816 M, KU 8, KS 5)
1.0
Normalisasi Moisture Content
Run I
(kg H2O/kg padatan)
Run II
0.8
Run I (A= 0,0816 m2, KU= 6, KS =5)
Run II (A= 0,0816 m2, KU= 8, KS =5)
0.6
0.4
0.2
0.0
0 100 200 300 400 500 600 700
Waktu (menit)
14000
Laju Perpindahan Panas
12000
10000
8000
(J/jam)
6000
4000
2000
0
0 100 200 300 400 500 600 700
Waktu (menit)
25
20
Laju Pengeringan
(gr/m2.menit)
15
10
5
0
0 100 200 300 400 500 600 700
Waktu (menit)
25
Laju Pengeringan (gr/m2.menit)
20
15
10
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Moisture Content (kg H2O/kg padatan