- BONGKAR BEKISTING - PS. PEMBESIAN - PS. BEKISTING 2. PEKERJAAN SLOOF & PILECAP = 10 ORANG 3. PEKERJAAN BATU KALI = 5 ORANG 4. PEKERJAAN SALURAN = 4 ORANG 5. PEKERJAAN FINISHING KOLOM = 3 ORANG 6. PEKERJAAN PLESTER DINDING = 4 ORANG 7. PEKERJAAN ATAP = 9 ORANG 8. PEKERJAAN FABRIKASI KOLOM (BEKISTING) = 3 ORANG TOTAL MAN POWER PER 09/10/2017
9. PEKERJAAN RETAINING WALL = 25 ORANG
- BONGKAR BEKISTING - PS. PEMBESIAN - PS. BEKISTING 10. PEKERJAAN SLOOF & PILECAP = 10 ORANG 11. PEKERJAAN BATU KALI = 5 ORANG 12. PEKERJAAN SALURAN = 4 ORANG 13. PEKERJAAN FINISHING KOLOM = 3 ORANG 14. PEKERJAAN PLESTER DINDING = 4 ORANG 15. PEKERJAAN ATAP = 9 ORANG 16. PEKERJAAN FABRIKASI KOLOM (BEKISTING) = 3 ORANG