- Saluran berpenampang trapesium

- td aerator = 24 jam = 86400 detik (18 - 48 jam)


- c = 25 hari (20 40 hari)
- F/M ratio = 0,05 kgBOD/kgMLVSS.hari (0,05-0,15 kgBOD/kgMLVSS.hari)
- Jumlah OD = 4 bak
- Qmaks = 1,09 m3/detik
- Organik Loading = 0,3 kgBOD/m3.hari (0,1 0,5 kgBOD/m3.hari)
- BODin = 71,5 mg/l (effluen BP I)
- MBODin = 2613,12 kg/hari (effluen BP I)
- MLSS = 3000 mg/l (3000-6000 mg/L)
= 3 kg/ m3
Perhitungan :
- Qbak = Q maks/ jumlah bak
= 1.09 m3/detik/ 4 = 0,2725 m3/detik
- F = Q x [BOD]
= 0,2725 m3/detikx 71,5 mg/l x 1000 l/m3 x 86400 det/hari x 1 kg/106 mg
= 1683,396 kg/hari
- M = F/ratio
= 1683,396 kg/hari / 3 kg/m3 = 561,132 kg
- Volume tiap bak = M/MLSS
= 561,132 kg/ 3000 mg/l x 106 mg/kg x 10-3 m3/l
-
= 187,044 m3
/
- Cek Organik Loading =

= 2613,12 kg/hari / 4 buah/ 187,044 m3


= 0,1 kgBOD/m3.hari (OK) (0,1 0,5 kgBOD/m3.hari)
- Lebar dasar (Ld) = 3 m
- Kedalaman =2m
- Slope dinding = 600
- Tan 600 = 1,73
- X = kedalaman : slope
= 2 m / 1,73
= 1,156 m
- Lebar atas (La) = lebar dasar + (2 x X)
= 3 m + (2 x 1,156 m)
= 5,3 m
- Lebar tengah =4m
- A cross = lebar atas x kedalaman
= 5,3 m x 2 m
= 10,6 m2
- Jari jari belokan = [(2 x lebar atas) + lebar tengah]/2
= [(2 x 5,3) + 4]/2
= 7,3 m
- Volume belokan = [( r2)/2) x lebar tengah]1 - [( 12)/2) x lebar tengah]2
= [( (7,32)/2) x 2] [( (12)/2) x 2]
= 329,5 m3
- Volume lurus = Volume bak (2 x volume belokan)
= 726,5 (2 x 329,5)
= 67,5 m3
- Total Panjang Ditch= Volume bak / A cross
= 726,5 m3 / 10,6 m2
= 68,4 m
- Panjang 2 belokan= 2 x x jari jari belokan / 2
= 2 x x 7,3 m / 2
= 22,9 m
- Panjang ditch lurus= (total panjang ditch-panjang belokan)/2
= (68,4 m 22,7 m) /2
= 22,7 m
- Dimensi Oxidation ditch digunakan :
Kedalaman OD =2m
Lebar dasar (Ld) =3m
Lebar atas (La) = 5,3 m
Panjang OD = 22,7 m