- c = 25 hari (20 40 hari) - F/M ratio = 0,05 kgBOD/kgMLVSS.hari (0,05-0,15 kgBOD/kgMLVSS.hari) - Jumlah OD = 4 bak - Qmaks = 1,09 m3/detik - Organik Loading = 0,3 kgBOD/m3.hari (0,1 0,5 kgBOD/m3.hari) - BODin = 71,5 mg/l (effluen BP I) - MBODin = 2613,12 kg/hari (effluen BP I) - MLSS = 3000 mg/l (3000-6000 mg/L) = 3 kg/ m3 Perhitungan : - Qbak = Q maks/ jumlah bak = 1.09 m3/detik/ 4 = 0,2725 m3/detik - F = Q x [BOD] = 0,2725 m3/detikx 71,5 mg/l x 1000 l/m3 x 86400 det/hari x 1 kg/106 mg = 1683,396 kg/hari - M = F/ratio = 1683,396 kg/hari / 3 kg/m3 = 561,132 kg - Volume tiap bak = M/MLSS = 561,132 kg/ 3000 mg/l x 106 mg/kg x 10-3 m3/l - = 187,044 m3 / - Cek Organik Loading =
= 2613,12 kg/hari / 4 buah/ 187,044 m3
= 0,1 kgBOD/m3.hari (OK) (0,1 0,5 kgBOD/m3.hari) - Lebar dasar (Ld) = 3 m - Kedalaman =2m - Slope dinding = 600 - Tan 600 = 1,73 - X = kedalaman : slope = 2 m / 1,73 = 1,156 m - Lebar atas (La) = lebar dasar + (2 x X) = 3 m + (2 x 1,156 m) = 5,3 m - Lebar tengah =4m - A cross = lebar atas x kedalaman = 5,3 m x 2 m = 10,6 m2 - Jari jari belokan = [(2 x lebar atas) + lebar tengah]/2 = [(2 x 5,3) + 4]/2 = 7,3 m - Volume belokan = [( r2)/2) x lebar tengah]1 - [( 12)/2) x lebar tengah]2 = [( (7,32)/2) x 2] [( (12)/2) x 2] = 329,5 m3 - Volume lurus = Volume bak (2 x volume belokan) = 726,5 (2 x 329,5) = 67,5 m3 - Total Panjang Ditch= Volume bak / A cross = 726,5 m3 / 10,6 m2 = 68,4 m - Panjang 2 belokan= 2 x x jari jari belokan / 2 = 2 x x 7,3 m / 2 = 22,9 m - Panjang ditch lurus= (total panjang ditch-panjang belokan)/2 = (68,4 m 22,7 m) /2 = 22,7 m - Dimensi Oxidation ditch digunakan : Kedalaman OD =2m Lebar dasar (Ld) =3m Lebar atas (La) = 5,3 m Panjang OD = 22,7 m