Anda di halaman 1dari 34

VI.

SATUAN HARGA PARAMETER UJI, SEWA ALAT, JASA DAN HARGA DASAR SATUAN
1. HARGA PADA UPTD BALAI PENGUJIAN
a. DAFTAR HARGA SATUAN TARIF PENGUJIAN KUALITAS AIR

HARGA TARIF
NO PARAMETER
SATUAN (Rp.)
1 2 3 4

I FISIKA
1 DHL Per Parameter Uji 3,900
2 Kekeruhan Per Parameter Uji 3,900
3 PH Per Parameter Uji 3,900
4 Suhu Per Parameter Uji 3,900
5 Oksigen Terlarut Per Parameter Uji 3,900
6 Warna Per Parameter Uji 9,100
7 Residu Terlarut (TDS) Per Parameter Uji 8,580
8 Residu Tersuspensi (TSS) Per Parameter Uji 8,580
9 Sedimen Per Parameter Uji 8,580

II KIMIA
10 Kelindian Per Parameter Uji 3,978
11 Keasaman Per Parameter Uji 3,978
12 Boron (B) Per Parameter Uji 12,142
13 Nitrogen Organik Per Parameter Uji 23,062
14 Amonium (NH3-N) Per Parameter Uji 23,062
15 Flourida (F) Per Parameter Uji 12,142
16 Fenol Per Parameter Uji 11,102
17 Deterjen Per Parameter Uji 15,002
18 Ortho Phospat Per Parameter Uji 15,002
19 Total Phospat Per Parameter Uji 15,002
20 Sulfat (SO4) Per Parameter Uji 15,002
21 Nitrit (NO2) Per Parameter Uji 15,002
22 Nitrat (NO3) Per Parameter Uji 15,002
23 TOC Per Parameter Uji 11,362
24 Silikat Per Parameter Uji 14,742
25 Lemak Minyak Per Parameter Uji 12,142
26 KOK (COD) Spektro Per Parameter Uji 12,142
27 KOK (COD) Titrasi Per Parameter Uji 12,142
28 KOB (BOD) Titrasi Per Parameter Uji 23,400
29 Nilai Pemanganat Per Parameter Uji 13,000
30 Khlorida (Cl) Per Parameter Uji 5,668
31 Magnesium (Mg) Per Parameter Uji 5,668
32 Calsium (Ca) Per Parameter Uji 5,668
33 Kesadahan sebagai Ca Per Parameter Uji 5,668
34 Kesadahan Total Per Parameter Uji 5,668
35 Sulfida Per Parameter Uji 5,668
HARGA TARIF
NO PARAMETER
SATUAN (Rp.)

III BAKTERIOLOGI
36 Coli Tinja Per Parameter Uji 16,042
37 Total Coli Per Parameter Uji 16,042

IV LOGAM
38 Besi Per Parameter Uji 90,480
39 Mangan Per Parameter Uji 90,480
40 Kadmium Per Parameter Uji 90,480
41 Kromium Per Parameter Uji 90,480
42 Nikel Per Parameter Uji 90,480
43 Seng Per Parameter Uji 90,480
44 Timbal Per Parameter Uji 90,480
45 Tembaga Per Parameter Uji 90,480
46 Selenium Per Parameter Uji 90,480
47 Natrium Per Parameter Uji 90,480
48 Kalium Per Parameter Uji 90,480
49 Raksa Per Parameter Uji 118,040
50 Arsen Per Parameter Uji 95,992
PEKERJAAN DESAIN MIXED LABORATORIUM BAHAN BANGUNAN

TARIF
No. URAIAN SATUAN (Rp)

1 2 3 4

1. DMF ASPAL (AC-WC, AC-BC, AC-BASE, ATB) DMF 1,230,710

2. DMF ASPAL LAPEN DMF 1,009,710

3. DMF BETON MUTU DMF 713,050

Jumlah 2,953,470
DAFTAR HARGA SATUAN
TARIF QUALITY CONTROL ASPAL

NO. URAIAN SATUAN TARIF


( Rp )
1 2 3 4

1 QUALITY CONTROL ASPAL


CAMPURAN ASPAL

- TES PIT PER SAMPLE 45,500

- EXTRAKSI PER SAMPLE 22,295

- ANALISA SARINGAN PER SAMPLE 11,375

- ABRASI PER SAMPLE 12,740

- BJ/KEPADATAN LAPANGAN PER SAMPLE 44,135

- BJ/KEPADATAN LAB PER SAMPLE 13,195

- MARSHAAL CONTROL PER SAMPLE 13,195

- RETAINED MARSHAAL PER SAMPLE 22,750

- CORE DRILL PER SAMPLE 32,500

TOTAL 217,685
DAFTAR HARGA SATUAN
TARIF QUALITY CONTROL ASPAL

KET

5
2. DAFTAR HARGA SEWA PERALATAN MILIK PEMDA JAMBI
YANG BERADA DI DINAS PEKERJAAN UMUM PROVINSI JAMBI

TAHUN TAHUN SEWA/JAM SEWA/HARI


NO JENIS PERALATAN
PEMBUATAN PEMAKAIAN (RP) (RP)
1 2 3 4 5 6

1 MOTOR GRADER 2005 a. TAHUN PERTAMA 372,063.00 2,174,177.00


MERK/TYPE : MITSUBISHI MG.330 b. TAHUN KEDUA 299,355.00 1,749,300.00
c. TAHUN KETIGA 223,505.00 1,364,501.00
d. TAHUN KEEMPAT 174,481.00 1,019,592.00
e. TAHUN KELIMA 122,316.00 714,761.00

2 CRANE 1986 a. TAHUN PERTAMA 169,914.00 1,189,403.00


MERK/TYPE : KATO KR 250 b. TAHUN KEDUA 136,710.00 956,970.00
KAPASITAS : 20 TON c. TAHUN KETIGA 106,710.00 746,970.00
d. TAHUN KEEMPAT 79,682.00 557,777.00

3 WHELL LOADER BACK HOES 2010 a. TAHUN PERTAMA 311,674.00 2,181,723.00


MERK/TYPE : CASE 580 SERIES 3 b. TAHUN KEDUA 250,767.00 1,755,371.00
KAPASITAS : SUPER M c. TAHUN KETIGA 195,605.00 1,369,237.00
d. TAHUN KEEMPAT 146,161.00 1,023,130.00
e. TAHUN KELIMA 92,417.00 646,922.00

4 EXCAVATOR ON TRACK 2011 a. TAHUN PERTAMA 266,458.00 1,865,156.00


MERK/TYPE : KOMATSU PC 130F-7 b. TAHUN KEDUA 214,381.00 1,500,667.00
c. TAHUN KETIGA 167,223.00 1,170,561.00
d. TAHUN KEEMPAT 124,953.00 874,674.00
e. TAHUN KELIMA 87,590.00 613,170.00

5 MOTOR GRADER 2011 a. TAHUN PERTAMA 340,514.00 2,383,602.00


MERK/TYPE : KOMATSU GD.511A-1 b. TAHUN KEDUA 273,971.00 1,917,798.00
c. TAHUN KETIGA 159,686.00 1,495,935.00
d. TAHUN KEEMPAT 213,705.00 1,117,802.00
e. TAHUN KELIMA 111,944.00 783,609.00

6 VIBRO ROLLER 2011 a. TAHUN PERTAMA 217,623.00 1,523,363.00


MERK/TYPE : BOMAG BW. 211D-40 b. TAHUN KEDUA 175,095.00 1,225,667.00
KAPASITAS : 10 TON c. TAHUN KETIGA 136,579.00 956,053.00
d. TAHUN KEEMPAT 102,055.00 714,389.00
e. TAHUN KELIMA 71,543.00 500,806.00

7 BULLDOZER 2011 a. TAHUN PERTAMA 292,212.00 2,045,485.00


MERK/TYPE : KOMATSU D31E-20 b. TAHUN KEDUA 235,108.00 1,645,756.00
c. TAHUN KETIGA 183,390.00 1,283,735.00
d. TAHUN KEEMPAT 137,034.00 959,241.00
e. TAHUN KELIMA 96,065.00 672,454.00

8 WHEEL LOADER BACK HOES 2011 a. TAHUN PERTAMA 251,263.00 1,758,845.00


MERK/TYPE : NEW HOLAND b. TAHUN KEDUA 202,161.00 1,415,132.00
c. TAHUN KETIGA 157,691.00 1,103,841.00
d. TAHUN KEEMPAT 117,831.00 824,819.00
e. TAHUN KELIMA 82,603.00 578,221.00

9 VIBRO ROLLER 2010 a. TAHUN PERTAMA 218,057.00 1,526,400.00


MERK/TYPE : SAKAI SV 512 SERIES b. TAHUN KEDUA 175,445.00 1,228,112.00
KAPASITAS : 10 TON c. TAHUN KETIGA 136,851.00 957,960.00
d. TAHUN KEEMPAT 102,259.00 715,813.00
e. TAHUN KELIMA 71,686.00 501,805.00
TAHUN TAHUN SEWA/JAM SEWA/HARI
NO JENIS PERALATAN
PEMBUATAN PEMAKAIAN (RP) (RP)
1 2 3 4 5 6

10 EXCAVATOR ON TRACK 2005 a. TAHUN PERTAMA 2,150,485.00


CAPASITAS 0,8 M3 b. TAHUN KEDUA 1,730,237.00
c. TAHUN KETIGA 1,349,632.00
d. TAHUN KEEMPAT 1,008,481.00

11 BULLDOZER D6D 2009 a. TAHUN PERTAMA 2,054,278.00


b. TAHUN KEDUA 1,652,831.00
c. TAHUN KETIGA 1,289,253.00
d. TAHUN KEEMPAT 963,364.00

12 BULLDOZER KOMATSU 2013 a. TAHUN PERTAMA 3,587,968.00


CAPASITAS 18 TON b. TAHUN KEDUA 2,886,808.00
c. TAHUN KETIGA 2,251,788.00
d. TAHUN KEEMPAT 1,682,596.00
dan seterusnya 1,179,546.00

13 VIBRO ROLLER 4 TON SAKAI 2009 a. TAHUN PERTAMA 1,039,129.00


b. TAHUN KEDUA 836,062.00
c. TAHUN KETIGA 652,151.00
d. TAHUN KEEMPAT 487,305.00

14 WHEEL LOADER BACK HOES 2005 a. TAHUN PERTAMA 2,182,170.00


b. TAHUN KEDUA 1,755,371.00
c. TAHUN KETIGA 1,369,237.00
d. TAHUN KEEMPAT 1,023,130.00

15 EXCAVATOR ON WHEEL HYUNDAI 2006 a. TAHUN PERTAMA 2,182,170.00


b. TAHUN KEDUA 1,755,371.00
c. TAHUN KETIGA 1,369,518.00
d. TAHUN KEEMPAT 1,023,340.00

16 EXCAVATOR ON TRACK KOBELKO 2009 a. TAHUN PERTAMA 1,935,257.00


b. TAHUN KEDUA 1,557,069.00
c. TAHUN KETIGA 1,214,556.00
d. TAHUN KEEMPAT 907,549.00

17 FINISHER , MAINTENANCE 2009 a. TAHUN PERTAMA 1,652,435.00


b. TAHUN KEDUA 1,369,387.00
c. TAHUN KETIGA 1,110,684.00
d. TAHUN KEEMPAT 66,475.00

Catatan :Tarif diatas belum termasuk Biaya :


- BBM
- Pelumas
- Operator
- Pembantu Operator
- Pajak-pajak
- Keuntungan Penyewa
7. HARGA DASAR SATUAN
a. HARGA DASAR SATUAN UPAH PER KABUPATEN / KOTA PROVINSI JAMBI
KABUPATEN/KOTA
NO URAIAN KODE SATUAN BTG.HARI BUNGO JAMBI KERINCI MA.JAMBI MERANGIN SAROLANGUN TEBO TJB.BARAT TJB.TIMUR S.PENUH
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) (Rp)

1 Pekerja ( L 01 ) Jam 6.900 - 10.500 7.600 - 10.800 7.500 - 10.200 7.300 - 10.300 6.800 - 10.600 7.300 - 10.500 7.200 - 10.300 7.200 - 10.300 7.500 - 10.450 7.300 - 10.400 7.500 - 10.450

2 Tukang ( L 02 ) Jam 8.500 - 11.900 8.600 - 11.800 8.450 - 11.950 8.200 - 11.850 8.500 - 11.650 8.500 - 11.650 8.500 - 11.650 8.800 - 11.700 8.500 - 11.700 8.500 - 11.700 8.500 - 11.700

3 Kepala Tukang ( L 03 ) Jam 10.900 - 13.900 10.900 - 14.000 10.800 - 14.000 10.900 - 14.000 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.800 - 13.400 10.300 - 13.400

4 Mandor ( L 04 ) Jam 9.750 - 14.000 9.800 - 14.100 9.800 - 14.600 10.100 - 14.500 9.750 - 14.400 9.750 - 13.400 9.750 - 14.400 9.750 - 15.400 9.750 - 14.400 9.750 - 14.400 9.750 - 14.400

5 Operator ( L 05 ) Jam 9.750 - 14.800 9.800 - 14.600 9.800 - 14.600 10.000 - 14.800 8.300 - 13.400 8.300 - 13.400 8.300 - 13.400 8.300 - 13.400 8.300 - 13.400 8.300 - 13.400 8.300 - 13.400

6 Pembantu Operator ( L 06 ) Jam 8.100 - 11.900 8.600 - 13.400 8.400 - 11.900 8.200 - 13.300 7.350 - 10.800 7.350 - 10.800 7.350 - 10.800 7.350 - 10.800 7.350 - 10.800 7.350 - 10.800 7.350 - 10.800

7 Sopir / Driver ( L 07 ) Jam 7.150 - 10.850 7.150 - 10.900 7.500 - 11.000 7.250 - 10.850 6.900 - 10.000 6.900 - 10.000 6.900 - 10.000 6.900 - 10.000 6.900 - 10.000 6.900 - 10.000 6.900 - 10.000

8 Pembantu Sopir ( L 08 ) Jam 6.600 - 9.900 6.600 - 9.900 6.750 - 9.850 6.800 - 9.900 6.800 - 9.900 6.800 - 9.900 6.800 - 9.900 6.800 - 9.900 6.800 - 9.900 6.800 - 9.900 5.300 - 9.900

9 Mekanik ( L 09 ) Jam 8.250 - 11.850 8.150 - 11.900 8.300 - 11.900 8.500 - 12.100 8.500 - 12.100 8.500 - 12.100 8.500 - 12.100 8.500 - 12.100 8.500 - 12.100 8.500 - 12.100 8.500 - 12.100

10 Pembantu Mekanik ( L 10 ) Jam 6.950 - 9.400 7.000 - 9.850 6.900 - 9.800 6.800 - 10.000 6.800 - 10.000 7.300 - 9.900 7.300 - 9.900 7.300 - 9.900 7.300 - 9.900 7.300 - 9.900 7.300 - 9.900

11 Tukang Las ( L 11 ) Jam 8.200 - 11.400 8.200 - 11.500 8.500 - 11.600 8.200 - 11.300 8.900 - 11.600 8.900 - 11.500 8.900 - 11.500 8.900 - 11.500 8.900 - 11.500 8.900 - 11.500 8.900 - 11.500

12 Oil Man/Crew ( L 12 ) Jam 6.600 - 9.400 6.600 - 9.500 6.500 - 9.500 6.600 - 9.400 6.800 - 9.500 6.800 - 9.500 6.800 - 9.500 6.800 - 9.500 6.800 - 9.500 6.800 - 9.500 6.300 - 9.500

13 Juru Ukur ( L 13 ) Jam 9.000 - 11.900 9.300 - 12.100 9.250 - 11.850 9.300 - 11.900 8.900 - 11.900 9.300 - 11.900 9.300 - 11.950 9.300 - 11.900 9.300 - 11.950 9.300 - 11.900 9.300 - 11.950

Cat : Asumsi : 1 (satu) hari = 8 jam kerja


7 jam kerja efektif
b. HARGA DASAR SATUAN BAHAN PER-KABUPATEN/KOTA DI PROVINSI JAMBI
I. AGREGAT

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

1 Pasir Beton (M01) M3 96,000 - 135,000 97,000 - 135,500 97,500 - 155,000 105,000 - 187,000 95,000 - 140,000 160,000 - 200,500 100,000 - 150,000 150,000 - 228,100 220,000 - 310,000 315,000 - 400,000 333,000 -
2 Pasir Pasang (M02) M3 96,000 - 135,000 97,000 - 135,500 97,500 - 155,000 105,000 - 187,000 95,000 - 140,000 160,000 - 200,500 190,000 - 150,000 190,000 - 150,000 220,000 - 310,000 315,000 - 400,000 333,000 -
3 Pasir Urug (M03) M3 88,000 - 130,000 88,500 - 135,500 100,000 - 300,800 110,500 - 320,100 100,000 - 109,925 100,000 - 154,250 80,000 - 185,000 80,000 - 98,100 80,000 - 100,000 80,000 - 100,000 80,000 -
4 Batu Kali (M04) M3 530,000 - 556,000 531,000 - 551,000 524,000 - 556,000 524,000 - 556,000 530,000 - 556,000 531,000 - 551,000 531,000 - 551,000 531,000 - 551,000 532,000 - 551,000 345,000 - 415,000 320,000 -
5 Filler (M05) kg 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 - 9,000 5,500 -
6 Batu Belah (M06) M3 400,500 - 500,000 401,500 - 500,000 370,000 - 415,500 375,000 - 416,000 401,500 - 500,000 375,000 - 416,000 375,000 - 416,000 535,000 - 575,000 536,000 - 578,000 327,500 - 409,000 328,000 -
7 Gravel/kerikil (M07) M3 575,000 - 605,000 576,000 605,000 500,000 - 667,920 505,000 - 667,920 575,000 - 605,000 585,000 - 667,000 585,000 - 667,000 585,000 - 667,000 585,000 - 667,000 588,000 - 667,000 588,000 -
8 Tanah Timbunan Biasa/Urug (M08) M3 40,000 - 75,000 40,000 - 70,000 39,500 - 75,000 39,000 - 120,000 41,000 - 75,000 47,500 - 81,000 47,500 - 81,000 47,500 - 81,000 47,500 - 81,000 48,000 - 82,500 48,000 -
9 Tanah timbunan pilihan (M09) M3 120,000 - 143,800 120,000 - 143,800 120,000 - 160,000 91,500 - 150,000 120,000 - 143,800 124,000 - 163,750 124,500 - 164,000 120,900 - 190,000 120,900 - 190,000 120,900 - 190,000 120,900 -
10 Sirtu (M10) M3 271,000 - 307,000 271,500 - 307,000 270,000 - 298,000 275,000 - 298,000 271,000 - 307,000 271,000 - 307,000 272,000 - 307,000 273,000 - 307,500 272,000 - 307,000 272,000 - 307,000 272,000 -
11 Bahan Aggregat Ukuran ( 1-2 & 2-3 )cm (M11) M3 415,000 - 555,000 415,000 - 555,000 517,000 - 550,000 517,500 - 550,000 415,000 - 555,000 518,500 - 550,000 519,000 - 550,000 519,000 - 550,000 519,000 - 550,000 280,700 - 345,200 280,700 -
12 Bahan Aggregat Ukuran 3 - 4 cm (M12) M3 410,000 - 497,000 410,000 - 497,000 510,000 - 550,000 510,000 - 579,900 410,000 - 497,000 512,500 - 579,900 513,000 - 320,500 513,000 - 320,500 513,000 - 320,500 499,800 - 598,000 499,800 -
13 Bahan Aggregat Ukuran 5 - 7 cm (M13) M3 401,000 - 498,000 401,000 - 498,000 403,500 - 513,000 402,500 - 513,000 401,000 - 498,000 402,800 - 525,000 403,800 - 523,500 403,000 - 524,000 403,000 - 524,000 399,000 - 497,500 399,000 -
14 Batu Alam (M14) M2 598,000 - 879,000 597,000 - 879,000 6,000,000 - 890,000 600,000 - 880,000 597,000 - 879,000 481,500 - 662,000 481,500 - 662,000 481,500 - 662,000 481,500 - 662,000 331,800 - 662,000 330,000 -

II ASPAL

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
15 Aspal semen Penetrasi (M15) KG 37,000 - 42,000 17,000 - 20,000 15,000 - 18,000 23,320 - 23,320 14,000 - 20,000 16,000 - 22,000 13,000 - 17,209 14,000 - 18,000 15,994 - 18,564 16,000 - 23,000 15,000 -
16 Aspal semen Emulsi (M16) Ltr 35,000 - 40,000 15,000 - 19,000 32,100 - 34,200 25,069 - 25,069 16,000 - 22,000 19,000 - 25,000 14,000 - 20,500 15,000 - 21,000 17,136 - 19,890 15,000 - 20,000 16,000 -

III BBM

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
17 Kerosen / minyak tanah industri (M17) LITER 12,000 12,000 12,600 - 13,550 13059 13,059 12,000 12,000 12,000 12,000 14,560 - 16,900 12,000
18 Kerosen / minyak tanah non industri (M18) LITER 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 10,080 - 11,700 9,000
19 Bensin industri (M19) LITER 10,300 10,300 10,300 10,300 10,300 10,300 10,300 10,300 12,699 - 14,739 10,300
20 Bensin non industri (M20) LITER 7,300 7,300 7,300 7,300 7,300 7,300 7,300 7,300 12,656 - 14,690 7,300
21 Solar industri (M21) LITER 13,000 13,000 13,000 13,000 13,000 13,000 13,000 13,000 12,699 - 14,739 13,000
22 Solar Non Industri (M22) LITER 6,900 6,900 6,900 6,900 6,900 6,900 6,900 6,900 6,900 6,900
23 Minyak Pelumas / oli (M23) LITER 35,000 - 40,000 33,500 - 40,500 38,500 - 48,500 43,642 - 50,188 42,198 - 48,246 36.825 - 44.825 37.250 - 44.325 34,875 - 39,875 50,400 - 58,500 41,250 - 49,500 42,000 -
24 Minyak Pelumas / oli non industri (M24) LITER 37,500 - 43,500 36,250 - 44,250 39,500 - 44,000 41,200 - 47,350 42.653 - 54.753 43.250 - 60.250 29,000 - 45.500 35,250 - 45,250 27.000 - 42.000 39,825 - 48,825 38,000 -
25 Hidrolic Oil (M26) LITER 50,000 - 63,000 50,525 - 61,025 47,000 - 68,000 34,914 - 40,151 52.635 - 58.685 48.375 - 60.875 49.325 - 60.325 46,750 - 56,750 51,520 - 59,800 53,825 - 62,000 41,825 -
26 Gear Oil (M27) LITER 47,700 - 62,700 50,450 - 59,950 55,000 - 59,000 53,525 - 58,025 58.988 - 66,248 61.285 - 74.185 60.100 - 65.100 55,500 - 59,500 64,960 - 75,400 49,575 - 55,075 53,325 -
27 Elpiji (12 kg) (M28) Tabung 165,000 - 200,000 165,000 - 200,000 165,000 - 200,000 165,000 - 200,000 165,000 - 200,000 165,000 200,000 165,000 - 200,000 165,000 - 200,000 138,880 - 161,200 165,000 - 200,000 165,000 -
28 Oksigen (M29) Tabung 154,500 - 184,500 125,000 - 125,000 171,500 - 196,500 173,100 - 192,600 168.795 - 192.995 231.500 - 366.500 162.500 - 182.500 174,750 - 204,750 172,480 - 200,200 160,100 - 199,000 157,250 -
29 Batu Bara (M30) Kg 2,500 - 4,180 2,030 4,180 2,213 - 4,113 1,788 - 3,388 1.625 - 3.375 1.900 - 3.850 1.918 - 3.718 2,070 - 4,370 650 - 750 2,075 - 4,250 2,145 -

IV SEMEN

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017(Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

30 Semen / PC (50 Kg) (M31) ZAK 64,000 - 71,000 65,150 - 73,000 66,000 - 75,000 66,500 - 79,500 65,300 - 69,300 - 82,000 68,500 - 81,500 67,200 - 81,500 68,000 - 82,000 69,900 - 83,000 69,500 -
31 Semen Putih (M32) kg 5,000 - 9,500 2,500 - 13,000 6,000 - 8,000 8,800 - 15,000 2,400 - 5,000 21,000 - 25,000 14,000 - 17,000 13,800 - 21,100 9,000 - 12,000 4,500 - 7,000 2,600 -
32 Semen / PC (40 Kg) (M33) ZAK 53,000 - 70,000 53,500 - 70,500 55,400 - 72,500 56,300 - 73,000 53,900 - 71,000 57,900 - 74,000 57,500 73,500 56,900 - 72,000 57,100 72,300 57,900 - 75,000 57,800 -

Catatan : Harga dasar terendah di Ibukota kabupaten


Harga dasar tertinggi di kecamatan paling jauh/sulit dijangkau dari kabupaten yang bersangkutan
Harga BBM belum termasuk biaya transportasi ke lokasi pekerjaan
Harga BBM dan Elpiji tergantung harga yang dikeluarkan oleh Pemerintah
V BESI

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
33 Besi Beton U 24 (M34) KG 16,250 - 20,000 14,200 14,600 20,000 - 25,000 20,988 - 20,988 13,500 - 20,990 16,000 - 24,450 17,625 - 22,625 14,000 - 21,200 16,565 - 17,901 13,950 - 16,950 13,000 -
34 Besi Beton U 32 (M35) KG 15,500 - 21,000 16,000 - 21,000 35,000 - 69,000 26,818 - 26,818 21,120 - 24,420 18,000 - 25,685 17,550 - 21,550 14,200 - 21,700 21,706 - 25,194 17,200 - 24,200 12,000 -
35 Kawat Beton (M36) KG 21,000 - 25,700 17,200 - 24,200 30,500 - 50,000 49,555 - 49,555 19,000 - 22,200 16,000 - 45,125 20,000 - 25,250 30,300 - 43,300 22,000 - 31,000 25,500 - 36,700 18,000 -
36 Kawat Beronjong Pabrikan (P 2m x L 0,5 m x T 1m) (M37) Unit 500,000 - 620,000 515,000 - 625,000 520,500 - 675,500 535,000 - 680,000 510,000 - 620,000 545,000 - 675,000 556,500 - 683,000 525,000 - 645,000 571,200 - 663,000 556,000 - 675,000 556,500 -
37 Paku Uk. 3 cm - 7 cm (M38) KG 17,200 - 30,000 15,000 - 20,000 40,600 - 43,125 33,231 - 33,231 22,550 - 28,050 24,575 - 34,075 10,500 - 35,850 20,700 - 31,500 22,000 - 25,000 23,850 - 31,350 12,807 -
38 Dempul (M39) kg 28,700 - 33,000 20,000 - 28,000 39,500 - 42,000 18,700 - 34,200 29,920 - 40,920 18,225 - 31,225 23,000 - 37,500 19,050 - 31,550 39,000 - 50,000 28,000 - 46,000 27,000 -
39 Paku Halus (M40) kg 22,000 - 27,800 20,000 - 25,000 22,815 - 34,915 19,650 - 28,650 23,000 - 25,575 24,885 - 39,285 15,250 - 28,750 20,375 - 31,375 20,000 - 25,000 23,000 - 35,000 23,025 -
40 Paku payung ulir pakai karet (M41) kg 30,000 - 44,300 31,800 - 41,800 37,500 - 43,500 36,377 - 40,015 27,875 - 35,375 32,625 - 42,125 30,000 - 49,500 37,200 - 50,200 30,000 - 40,000 36,200 - 51,200 32,690 -
41 Plat Rambu (Eng. Grade) (M42) BH 379,050 - 419,050 383,300 - 414,800 428,250 - 537,750 454,740 - 454,740 372,500 - 379,500 434,000 - 543,500 429,000 - 525,500 512,750 - 752,250 390,000 - 500,000 390,000 - 450,000 366,500 -
42 Plat Rambu (high I. Grade) (M43) BH 420,563 - 450,563 500,000 - 500,000 470,750 - 575,750 518,870 - 518,870 429,000 - 457,000 425,835 - 461,735 426,835 - 437,735 483,750 - 608,750 425,000 - 550,000 418,800 - 443,750 418,750 -
43 Rel Pengaman (M44) M' 935,000 - 1,020,000 920,000 - 1,035,000 858,500 - 958,500 1,051,732 - 1,051,732 856,000 - 938,000 1,222,500 - 1,882,500 901,500 - 1,053,500 979,075 - 1,264,575 890,000 - 1,150,000 832,500 - 892,500 782,500 -
44 Baja Struktur = U32 (M45) KG 15,500 - 30,500 20,000 - 22,500 31,550 - 53,550 34,980 - 34,980 36,750 - 66,750 31,250 - 49,250 30,000 - 50,900 23,275 - 30,775 40,000 - 48,500 35,000 - 55,000 32,000 -
45 Tiang Pancang Baja = U32 (M46) KG 28,500 - 52,000 32,000 - 48,500 48,375 - 60,875 53,636 - 53,636 48,250 - 78,250 39,250 - 52,750 43,000 - 60,500 42,025 - 58,025 2,200,000 - 2,650,000 70,500 - 127,000 68,500 -
46 Kawat Las (M47) kg 220,000 - 240,000 200,000 - 225,000 120,320 - 128,000 163,240 - 163,240 128,000 - 148,000 118,000 - 158,000 100,000 - 135,500 120,500 - 155,500 98,000 - 120,000 122,000 - 166,500 96,665 -
47 Kawat Galvanis (M48) Kg 29,880 - 41,880 28,905 - 42,855 30,900 - 51,900 29,125 - 45,625 26,250 - 31,250 26,735 - 39,735 29,275 - 40,875 26,925 - 40,925 27,000 - 42,000 26,000 - 37,500 25,050 -
48 Kawat Kasa (M49) M1 18,338 - 21,338 15,000 - 17,500 42,200 - 68,200 28,175 - 39,675 26,250 - 31,250 35,125 - 62,625 35,125 - 62,625 19,725 - 29,725 15,000 - 19,500 16,700 - 24,700 20,700 -
49 Paku Bulian (M50) Kg 27,313 - 38,813 27,888 - 38,238 62,103 - 66,068 31,425 - 47,925 24,250 - 33,250 37,000 - 55,000 35,000 - 50,550 37,350 - 54,650 26,000 - 35,000 27,875 - 35,375 27,875 -
50 Baut/Mur/ring (M51) Bh 7,085 - 8,785 7,235 - 8,635 24,166 - 25,708 18,425 - 37,925 7,500 - 9,000 8,100 - 12,600 6,000 - 11,550 6,800 - 9,300 2,250 - 4,750 6,150 - 7,650 6,000 -
51 Sling 3/4 (M52) M1 104,075 - 115,575 90,825 - 128,825 77,575 - 96,075 78,135 - 101,035 72,800 - 92,800 76,250 - 96,250 79,700 - 99,700 90,250 - 128,250 65,000 - 92,000 73,000 - 88,000 73,000 -
52 Baja L 300 (M53) Kg 36,500 - 44,000 28,500 - 52,000 23,335 - 36,235 22,175 - 34,175 18,000 - 28,000 30,650 - 49,850 30,650 - 49,850 31,225 - 52,725 34,200 - 53,200 28,000 - 41,000 18,000 -
53 Track Stang (M54) Bh 156,688 - 173,938 162,438 - 168,188 151,750 - 181,750 144,300 - 159,300 138,550 - 153,550 95,250 - 215,250 152,200 - 165,200 151,750 - 181,750 198,000 - 308,000 144,500 - 154,500 144,500 -
54 Besi angker 25 mm (M55) M1 47,725 - 55,775 39,600 - 63,900 32,750 - 47,750 29,440 - 34,040 26,250 - 31,250 33,000 - 47,500 37,770 - 56,070 40,000 - 63,500 485,000 - 650,000 32,750 - 47,750 34,700 -
55 Mur/baut/plat angker (M56) unit 6,775 - 23,125 8,700 - 21,200 32,200 - 55,200 32,975 - 55,575 13,900 - 22,900 21,700 - 35,800 30,700 - 49,800 19,200 - 33,700 22,250 - 35,250 30,250 - 50,250 32,525 -
56 Plat Pengikat (M57) Kg 25,875 - 31,625 24,875 - 32,625 23,750 - 33,750 23,450 - 29,450 27,000 - 42,000 25,585 - 33,985 25,585 - 33,985 30,500 - 50,000 21,000 - 26,500 25,250 - 32,250 25,250 -
57 Gunting pemotong besi/baja (M58) Bh 179,000 - 270,825 182,075 - 267,575 166,350 - 245,350 244,860 - 244,860 155,500 - 235,500 140,000 - 320,000 190,000 - 270,000 181,750 - 266,750 180,000 - 280,000 160,500 - 230,500 160,500 -
58 Engsel Handel 3' (M59) Bh 22,000 - 27,500 52,000 52,000 21,900 - 23,300 9,204 - 10,585 15,000 - 20,750 35,000 - 35,000 20,875 - 30,875 19,550 - 24,000 10,875 - 17,875 17,500 17,500 33,350 -
59 Engsel Handel 4' (M60) bh 27,500 - 35,900 23,050 - 40,200 23,350 - 24,800 21,979 - 25,276 27,550 - 34,550 21,075 - 37,575 21,075 - 37,575 16,775 - 25,775 21,075 - 37,575 22,500 - 22,500 48,000 -
60 Grandel 3 (M61) Bh 22,000 - 41,500 25,000 - 25,000 10,900 - 11,600 26,025 - 39,525 22,500 - 35,000 25,275 - 40,275 25,275 - 40,275 25,550 - 38,850 70,000 - 90,000 22,500 - 35,000 23,000 -
61 Chipping (M63) M3 393,000 - 427,000 400,400 - 418,400 410,250 - 475,250 348,000 - 388,000 341,500 - 371,500 434,750 - 519,750 434,750 - 519,750 437,500 - 597,500 425,000 - 530,000 341,500 - 371,500 341,500 -
62 Ar Borel (M64) KG 53,000 - 67,000 53,000 - 67,000 50,000 - 65,000 48,440 - 61,040 46,750 - 56,750 53,750 - 72,750 53,750 - 72,750 54,500 - 72,500 49,000 - 65,000 46,750 - 56,750 46,750 -
63 Pintu Air Tipe A1 ( As Double pakai gigi, uk. 1,5 M x 54,535,000 - 67,135,000 52,535,000 - 69,135,000 54,535,000 - 67,135,000 46,900,000 - 61,200,000 38,500,000 - 53,350,000 38,500,000 54,890,000 40,700,000 54,956,000 51,150,000 - 51,700,000
(M65) Unit - - 43,500,000 - 48,000,000 33,000,000 - 51,700,000 33,000,000 -
2,0 M x 4,5 M )
66 Pintu Air Tipe A2 ( As Double pakai gigi, uk. 1,5 M x 56,580,000 - 70,380,000 55,130,000 - 71,830,000 56,580,000 - 70,380,000 48,675,000 - 65,175,000 41,800,000 - 58,080,000 38,500,000 53,900,000 39,050,000 53,900,000 55,000,000 - 60,000,000 45,000,000 - 51,000,000
(M66) Unit - - 38,500,000 - 55,000,000 38,500,000 -
2,0 M x 5,0 M)
67 Pintu Air Tipe A3 ( As Double pakai gigi, uk. 1,5 M x 86,905,000 - 92,955,000 83,830,000 - 96,030,000 86,905,000 - 92,955,000 65,850,000 - 92,850,000 72,600,000 - 82,280,000 66,000,000 82,500,000 66,880,000 82,500,000 85,800,000 - 90,000,000 77,500,000 - 85,000,000
(M67) Unit - - 66,000,000 - 85,800,000 56,000,000 -
2,0 M x 8,0 M )
68 Pintu Air Tipe A4 ( As Double pakai gigi, uk. 1,5 M x 98,905,000 - 107,405,000 93,305,000 - 113,005,000 98,905,000 - 107,405,000 82,750,000 - 89,750,000 74,250,000 - 82,500,000 72,050,000 82,500,000 72,050,000 82,500,000 85,800,000 - 89,000,000 82,000,000 - 90,000,000
(M68) Unit - - 71,500,000 - 85,800,000 71,500,000 -
2,0 M x 10,0 M )
69 Pintu Air Tipe B ( As Single pakai gigi, uk. 1,0 M x 25,022,500 - 30,522,500 25,597,500 - 29,947,500 25,022,500 - 300,522,500 24,525,000 - 29,525,000 21,780,000 - 25,410,000 20,350,000 23,870,000 20,350,000 23,870,000 25,850,000 - 28,050,000 22,800,000 - 25,000,000
(M69) Unit - - 19,800,000 - 28,050,000 19,800,000 -
1,5 M x 4,0 M )
70 Pintu Air Tipe C ( As Single Tanpa Gigi, uk. 1,0 M x 19,719,125 - 23,469,125 21,000,000 - 23,000,000 19,719,150 - 23,469,150 21,075,000 - 26,075,000 16,940,000 - 22,385,000 16,280,000 20,790,000 16,280,000 20,790,000 21,450,000 - 29,150,000 20,000,000 - 22,000,000
(M70) Unit - - 20,350,000 - 29,150,000 20,350,000 -
1,5 M x 4,0 M)
71 Pintu Air Tipe Tersier (M71) Unit 5,387,500 - 7,837,500 5,662,500 - 7,562,500 5,387,500 - 7,837,500 5,475,000 - 7,175,000 4,235,000 - 6,050,000 3,850,000 - 6,380,000 3,850,000 - 7,480,000 6,050,000 - 6,105,000 4,800,000 - 5,500,000 4,950,000 - 6,105,000 4,950,000 -
( 0,6 x 1,0 x 1,5 ) M
VI CAT

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2016 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
72 Cat Marka (non thermoplastic) (M72) KG 90,000 - 117,000 90,000 - 90,000 27,260 - 29,000 92,114 - 92,114 63,500 - 86,000 63,500 - 86,000 63,000 - 87,825 64,000 - 86,000 71,400 - 82,875 65,000 - 94,000 59,000 -
73 Cat Marka (thermoplastic) (M73) KG 100,700 - 124,000 97,500 - 122,000 65,330 - 69,500 198,220 - 198,220 170,250 - 255,250 170,250 - 255,250 160,750 - 195,750 163,000 - 236,500 173,074 - 200,889 182,500 - 200,000 172,500 -
74 Cat Tembok (M74) KG 44,000 - 85,000 145,000 - 200,000 177,879 - 189,233 64,130 - 64,130 20,000 - 42,000 45,000 - 45,000 45,000 - 80,000 46,000 - 117,800 74,256 - 86,190 49,000 - 55,000 56,000 -
75 Cat Kayu/Cat Kilat (M75) KG 66,000 - 95,500 80,525 - 146,025 64,049 - 68,138 132,924 - 132,924 55,000 - 80,650 58,000 - 58,000 80,275 - 146,275 70,000 - 71,000 57,120 - 66,300 77,000 - 95,000 54,000 -
76 Cat Perak (M76) KG 77,000 - 108,500 71,575 - 113,575 60,000 - 78,000 79,753 - 91,716 74,000 - 121,500 74,000 - 121,500 64,250 - 96,750 78,550 - 133,050 38,000 - 50,000 67,825 - 105,825 68,000 -
77 Meni Besi (M77) KG 29,000 - 49,000 32,500 - 47,025 59,000 - 113,750 76,956 - 76,956 41,750 - 61,750 41,750 - 61,750 45,000 - 50,250 31,000 - 49,500 22,848 - 26,520 30,500 - 50,500 30,500 -
78 Minyak Cat (M78) Liter 11,500 - 15,500 10,000 - 10,000 33,700 - 53,700 12,826 - 12,826 34,700 - 52,700 34,700 - 52,700 13,000 - 29,750 30,500 - 50,000 9,000 - 17,000 33,300 - 51,800 26,000 -
79 Tiner (M79) Liter 20,500 - 25,000 20,000 - 25,000 14,100 - 15,000 11,660 - 11,660 30,000 - 48,750 31,750 - 48,750 26,500 - 33,500 26,450 - 40,300 18,278 - 26,520 35,400 - 47,400 29,000 -
80 Plitur (M80) KG 15,500 - 30,500 55,000 - 55,000 49,000 - 89,000 49,500 - 87,675 52,890 - 63,490 52,890 - 63,490 55,000 - 78,000 63,875 - 91,375 39,984 - 46,410 53,700 - 80,700 52,500 -

VII PLASTIK

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2016 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
81 Plastik Filler (M81) M2 29,625 - 33,625 27,500 - 35,750 37,050 - 48,050 42,559 - 42,559 26,000 - 31,500 25,575 - 33,075 29,125 - 35,125 28,500 - 37,500 17,000 - 27,000 25,000 - 30,000 24,000 -
82 Geotextile (M82) M2 93,400 - 113,600 85,000 - 95,000 300,000 - 320,000 84,535 - 84,535 64,250 - 85,250 64,900 - 86,900 70,000 - 89,700 73,000 - 99,800 45,000 - 95,000 64,000 - 86,000 65,000 -
83 Ember Cor (M83) Buah 6,500 - 12,000 7,500 - 7,500 10,800 - 16,800 10,500 - 16,000 9,500 - 13,500 10,500 - 16,000 9,500 - 13,500 10,000 - 14,500 10,150 - 15,150 10,500 - 16,000 10,800 -

VIII KACA

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

84 Glass Bead (M84) KG 52,600 - 73,900 50,500 - 60,000 129,000 - 158,750 151,580 - 151,580 74,000 - 98,800 74,300 - 91,300 78,200 - 101,200 75,500 - 98,575 25,000 - 40,000 77,500 - 120,000 79,450 -
85 Pemantul Cahaya (Reflector) (M85) BH 17,000 - 23,500 17,125 - 23,125 22,500 - 35,000 20,388 - 29,638 17,325 - 20,625 22,825 - 35,825 24,075 - 34,575 22,705 - 36,405 13,500 - 22,500 25,425 - 37,825 23,675 -
86 Kaca Bening 3 mm (M86) M2 80,500 - 185,000 150,000 - 165,000 189,900 - 202,150 69,431 - 79,845 100,000 - 124,300 85,000 - 85,000 75,000 - 120,500 79,825 - 105,325 76,500 - 87,975 82,500 - 113,000 78,000 -
87 Kaca Bening 4 mm (M87) M2
88 Kaca Bening 5 mm (M88) M2 150,000 - 288,500 225,000 - 235,000 248,350 - 264,350 90,500 - 103,799 122,000 - 191,350 150,000 - 150,000 130,000 - 150,000 136,500 - 214,660 91,800 - 105,570 115,250 - 149,250 100,000 -
89 Kaca Rayband 3 mm (M89) M2 236,000 - 270,500 200,000 - 230,000 222,050 - 236,300 83,317 - 95,815 86,000 - 121,275 102,800 - 154,800 110,000 - 165,000 85,250 - 110,250 71,400 - 82,110 96,225 - 110,775 95,300 -
90 Kaca Rayband 4 mm (M90) M2 -
91 Kaca Rayband 5 mm (M91) M2 290,750 - 318,750 260,000 - 270,000 261,450 - 278,250 104,146 - 119,768 102,000 - 130,185 118,000 - 158,000 150,000 - 187,500 115,000 - 150,000 81,600 - 93,840 129,650 - 157,850 125,700 -
92 Kaca Es 3 mm (M92) M2 263,500 - 288,500 230,000 - 250,000 145,500 - 165,500 124,500 - 140,000 100,250 - 118,250 302,500 - 502,500 150,750 - 173,750 293,000 - 478,500 364,500 - 659,500 115,500 - 115,500 99,300 -
93 Kaca Es 5 mm (M93) M2 316,000 - 351,000 285,000 - 300,000 163,500 - 193,500 153,500 - 162,875 150,450 - 178,450 205,250 - 220,250 167,175 - 176,675 297,500 - 542,500 352,500 - 682,500 141,785 - 162,965 121,000 -

IX BETON/MORTAR

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2016(Rp) Sarolangun 2016 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
94 Kapur (M94) kg 10,375 - 12,625 10,000 - 10,000 8,200 - 10,200 184,228 - 184,228 8,000 - 10,093 9,285 - 11,185 6,000 - 10,200 8,025 - 11,525 5,000 - 10,000 4,500 - 6,500 4,500 -
95 Batako Uk. 20 x 40 x 10 cm (M95) Buah 3,425 - 4,625 3,000 - 4,000 12,600 - 13,400 4,675 - 5,675 4,775 - 5,575 5,500 - 6,000 5,200 - 8,450 5,825 - 6,825 4,000 - 8,000 3,400 - 4,600 3,392 -
96 Batu Bata Uk. 5,5 x 11 x 23 cm (M96) Buah 500 - 1,000 650 - 1,500 1,312 - 1,862 1,159 - 1,345 745 - 1,095 150 - 850 400 - 950 736 - 1,220 750 - 1,200 800 - 800 600 -
97 Batu Tela Uk. 20 x 30 x 10 cm (M97) Buah 4,975 - 5,375 3,150 - 7,200 985 - 1,085 830 - 780 468 - 568 375 - 1,325 450 - 950 728 - 1,228 1,105 - 1,655 1,150 - 2,300 1,650 -
98 Beton Roster / Kerawang (M98) Buah 8,675 - 10,875 6,000 - 6,000 24,075 - 34,575 21,625 - 30,125 11,650 - 13,650 8,600 - 12,100 13,000 - 21,500 9,175 - 12,675 7,625 - 9,625 6,400 - 7,400 6,400 -
99 Buis Beton 1/2 dia 20 cm (M99) Buah 30,000 - 118,250 80,000 - 115,500 95,250 - 100,250 93,335 - 108,835 68,450 - 76,450 99,750 - 118,750 96,000 - 111,000 91,500 - 104,000 95,000 - 112,000 81,750 - 136,750 81,750 -
100 Buis Beton dia 60 cm (M100) Buah 200,350 - 222,850 202,100 - 221,100 204,500 - 209,500 189,500 - 224,500 163,550 - 186,050 188,750 - 213,750 195,250 - 230,250 169,000 - 199,000 241,000 - 127,000 169,000 - 199,000 169,000 -
101 Buis Beton dia 100 cm (M101) Buah 264,475 - 290,975 266,975 - 288,475 379,000 - 449,000 359,000 - 469,000 255,000 - 297,000 282,000 - 362,000 313,500 - 353,500 282,000 - 362,000 277,000 - 367,000 258,500 - 270,500 258,500 -
102 Paving Blok/ Con Blok (M102) M2 11,250 - 46,250 12,000 - 59,500 163,250 - 193,250 135,250 - 267,250 87,075 - 132,575 120,000 - 225,000 95,300 - 162,300 141,575 - 285,075 2,000 - 4,000 98,000 - 178,000 107,750 -

X KAYU

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

103 Kayu Balok Kelas I (M103) M3 5,750,000 - 7,670,000 5,000,000 - 7,000,000 7,242,500 - 11,042,500 10,960,000 - 10,960,000 6,000,000 - 9,870,000 4,000,000 - 10,935,000 3,500,000 - 5,372,500 4,100,500 - 6,236,450 5,000,000 - 5,500,000 7,070,000 - 10,870,000 2,762,800 -
104 Kayu Balok Kelas II (M104) M3 2,875,000 - 4,380,000 4,000,000 - 5,000,000 4,907,500 - 7,857,500 6,996,000 - 6,996,000 2,400,000 - 3,215,000 3,500,000 - 4,805,000 1,550,000 - 2,850,000 2,682,500 - 4,079,800 3,000,000 - 3,300,000 3,025,000 - 3,875,000 3,118,250 -
105 Kayu Papan Kelas II (M105) M3 3,220,000 - 4,680,000 4,680,000 - 5,680,000 3,317,500 - 3,467,500 3,847,800 - 3,847,800 2,400,000 - 3,487,500 3,785,000 - 5,185,000 2,600,000 - 3,506,563 3,279,950 - 3,620,050 3,000,000 - 3,300,000 2,950,000 - 3,950,000 2,950,000 -
106 Kayu Papan Kelas III (M106) M3 2,750,000 - 3,180,000 2,000,000 - 3,000,000 2,537,500 - 3,787,500 3,498,000 - 3,498,000 2,150,000 - 2,285,000 2,770,000 - 3,670,000 2,506,550 - 3,443,550 2,588,650 - 2,701,350 2,475,000 - 3,275,000 2,375,000 - 3,375,000 3,000,000 -
107 Kayu Papan Kelas IV (M107) M3 1,955,000 - 2,062,500 2,062,500 - 2,062,500 2,310,000 - 3,785,000 2,355,000 - 3,855,000 1,900,000 - 2,392,500 2,325,000 - 3,425,000 2,020,750 - 2,475,750 2,375,477 - 2,512,023 1,605,000 - 2,305,000 1,670,000 - 2,470,000 1,027,500 -
108 Kayu Crucuk 15 cm (M108) Batang 48,000 - 55,500 30,000 - 30,000 42,750 - 60,750 40,320 - 58,120 26,250 - 31,250 35,250 - 45,250 44,155 - 56,355 41,750 - 61,750 25,000 - 27,500 32,750 - 47,750 28,785 -
109 Kayu Bekisting (M109) M3 2,075,000 - 2,525,000 1,750,000 - 1,900,000 1,830,000 - 2,310,000 1,720,000 - 2,190,000 1,280,000 - 1,480,000 1,770,000 - 2,370,000 1,900,000 - 2,375,000 1,690,000 - 1,990,000 2,000,000 - 2,200,000 1,330,000 - 1,430,000 1,362,500 -
110 Kayu lapis 4 mm (uk. 8" x 4") (M110) lbr 74,550 - 102,550 102,550 - 102,550 112,250 - 152,250 105,625 - 153,125 88,000 - 96,000 120,500 - 155,500 90,075 - 106,575 111,450 - 153,050 123,000 - 153,000 75,500 - 85,500 75,500 -
111 Multi Plex 12 mm (uk. 8" x 4") (M111) lbr 201,225 - 216,225 216,225 - 216,225 373,000 - 478,000 352,500 - 452,500 239,750 - 254,750 287,250 - 322,250 301,875 - 359,375 152,000 - 216,000 160,000 - 170,000 174,000 - 194,000 183,750 -
112 Papan bowplank (M112) m3 1,368,000 - 1,668,000 1,668,000 - 1,668,000 1,880,000 - 2,030,000 1,871,575 - 2,097,075 1,345,000 - 1,645,000 1,700,000 - 1,980,000 2,212,500 - 2,962,500 1,985,000 - 2,385,000 1,970,000 - 2,170,000 1,387,500 - 1,487,500 1,394,000 -
113 Papan Kelas I (M113) m3 8,205,000 - 9,505,000 5,000,000 - 6,000,000 7,837,500 - 9,987,500 7,820,000 - 10,120,000 6,900,000 - 9,050,000 7,725,000 - 9,525,000 8,107,500 - 10,407,500 7,495,000 - 9,295,000 7,625,000 - 9,625,000 7,050,000 - 9,050,000 7,180,000 -
114 Triplex 2,7 mm (M114) lbr 52,000 - 75,000 1,046 - 1,046 59,750 - 89,750 47,700 - 62,700 66,000 - 80,000 50,350 - 62,350 53,345 - 57,745 49,800 - 58,300 60,300 - 82,300 49,500 - 51,700 56,750 -
115 Triplex 3,6 mm (M115) lbr 71,300 - 89,500 69,025 - 85,000 97,050 - 126,050 85,962 - 98,856 81,000 - 90,000 71,050 - 83,050 64,000 - 71,325 74,750 - 97,750 64,500 - 96,500 67,000 - 71,000 62,075 -
116 Triplex 5 mm (M116) lbr 84,500 - 99,500 99,500 - 99,500 117,800 - 139,800 120,955 - 156,655 104,350 - 123,350 87,000 - 97,000 85,000 - 95,963 114,000 - 162,000 48,500 - 105,500 116,000 - 165,000 112,575 -
117 Tripleks 2,2 mm (M117) lbr 41,143 - 46,143 46,143 - 46,143 45,275 - 54,775 43,700 - 52,900 44,100 - 57,100 48,050 - 60,050 46,858 - 57,908 43,050 - 53,550 45,750 - 57,750 45,700 - 55,500 39,750 -
118 Tripleks 3 mm (M118) lbr 60,500 - 75,100 53,000 - 55,000 92,000 - 99,100 56,625 - 64,125 66,000 - 71,850 55,000 - 55,000 53,418 - 60,318 51,750 - 78,600 62,832 - 72,930 57,500 - 67,700 58,858 -
119 Tripleks 4 mm (M119) lbr 71,500 - 80,250 62,000 - 65,000 119,750 - 129,050 70,875 - 84,375 81,000 - 90,900 80,000 - 134,200 73,738 - 84,963 74,750 - 113,700 74,256 - 86,190 72,600 - 79,200 96,641 -
120 Tripleks 6 mm (M120) lbr 85,500 - 98,500 80,000 - 85,000 90,005 - 100,205 90,250 - 105,250 85,980 - 96,180 124,250 - 186,250 85,058 - 92,158 115,850 - 160,150 90,250 - 104,754 89,000 - 93,500 98,000 -
121 Tripleks 12 mm (M121) lbr 155,000 - 167,000 155,000 - 160,000 177,375 - 184,875 174,750 - 181,750 178,750 - 200,750 175,500 - 192,500 205,000 - 225,000 172,050 - 189,050 177,072 - 205,530 185,900 - 193,600 162,000 -
122 Tripleks 15 mm (M122) lbr 234,050 - 242,050 242,050 - 242,050 221,200 - 234,200 214,800 - 226,800 216,200 - 239,200 214,050 - 216,050 228,450 - 244,200 202,750 - 222,750 291,312 - 338,130 224,950 - 230,450 211,000 -
Catatan : Harga dasar terendah di Ibukota kabupaten
Harga dasar tertinggi di kecamatan paling jauh/sulit dijangkau dari kabupaten yang bersangkutan
XI BAHAN ATAP

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
123 Genteng Plentong 's' (M123) Buah 5,300 - 10,800 5,000 - 5,500 20,500 - 14,000 9,225 - 4,000 6,000 - 11,500 9,650 - 17,950 7,000 - 12,700 9,225 - 17,225 9,625 - 19,125 8,555 - 16,055 10,500 -
124 Bubungan Genteng Plentong 's' (M124) Buah 7,500 - 11,000 6,500 - 10,900 9,000 - 12,000 9,470 - 7,800 5,150 - 8,650 9,470 - 10,770 6,500 - 9,500 8,725 - 10,825 50,500 - 122,000 7,175 - 12,375 6,700 -
125 Seng Plat BJLS 25 (M125) Lbr 54,250 - 72,250 47,000 - 50,000 99,950 - 79,450 62,100 - 71,415 52,050 - 79,050 64,750 - 84,750 56,500 - 76,500 54,000 - 84,000 41,000 - 67,500 226,900 - 376,400 50,000 -
126 Seng Plat BJLS 30 (M126) Lbr 65,250 - 84,250 65,000 - 65,000 191,125 - 119,375 75,325 - 86,623 74,450 - 76,450 82,750 - 112,750 92,000 - 110,000 32,000 - 48,600 51,000 - 80,000 56,750 - 81,250 40,370 -
127 Genteng Metal ( 2 susun ) (M127) Buah 52,500 - 62,500 52,500 - 62,500 81,800 - 72,300 69,875 - 58,000 66,700 - 89,700 65,200 - 68,200 56,000 - 76,500 58,250 - 68,250 40,000 - 70,000 57,750 - 68,750 58,550 -
128 Bubungan Genteng Metal (M128) Buah 38,200 - 49,200 45,000 - 45,000 51,500 - 60,000 45,300 - 36,000 36,550 - 48,550 41,750 - 61,750 43,500 - 49,500 41,750 - 61,750 41,750 - 61,750 40,625 - 50,925 40,000 -
129 Seng Gelombang BJLS 30 (M129) Lbr 44,800 - 47,550 45,000 - 45,000 1,680,000 - 1,687,700 89,275 - 72,500 93,500 - 113,500 96,000 - 111,000 92,000 - 120,000 96,500 - 156,500 51,000 - 80,000 95,700 - 106,700 95,200 -

XII PIPA

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

130 Pipa GIP Dia. 1/2" (M130) M 14,750 - 19,750 14,750 - 19,750 29,000 - 46,000 43,000 - 72,800 15,725 - 22,225 18,775 - 23,775 44,200 - 78,800 17,625 - 22,625 224,400 - 258,060 37,200 - 75,000 45,800 -
131 Pipa GIP Dia. 3/4" (M131) M 28,000 - 41,000 28,000 - 41,000 34,000 - 53,000 67,200 - 87,600 28,850 - 40,150 33,125 - 53,125 68,200 - 92,600 38,000 - 65,500 285,600 - 328,440 35,000 - 49,000 70,000 -
132 Pipa GIP Dia. 1" (M132) M 6,000 - 39,500 95,000 - 120,000 58,500 - 102,500 139,000 - 159,000 32,450 - 43,450 48,750 - 101,250 86,800 - 117,000 49,030 - 80,230 418,200 - 480,930 57,000 - 85,500 87,800 -
133 Pipa GIP Dia. 11/2" (M133) M 8,750 - 51,000 110,000 - 110,000 80,750 - 137,750 133,800 - 180,000 42,500 - 49,500 72,500 - 152,500 66,988 - 78,488 52,795 - 72,095 709,920 - 1,028,721 50,000 - 65,000 146,800 -
134 Pipa GIP Dia. 2" (M134) M 11,250 - 580,000 500,000 - 600,000 105,250 - 155,250 275,759 - 275,759 57,750 - 68,750 116,000 - 184,000 173,000 - 233,000 63,500 - 86,000 894,540 - 1,028,721 86,500 - 122,000 174,000 -
135 Pipa GIP Dia. 3" (M135) M 1,085,000 - 1,100,000 950,000 - 1,100,000 159,300 - 236,300 265,900 - 403,000 67,250 - 82,250 115,750 - 194,750 245,000 - 291,000 82,750 - 112,750 1,852,320 - 2,130,168 116,000 - 123,500 268,800 -
136 Pipa GIP Dia. 4" (M136) M 98,500 - 108,500 98,500 - 108,500 233,500 - 341,500 632,555 - 632,555 101,750 - 116,750 191,000 - 338,000 354,000 - 428,750 112,250 - 152,250 2,626,500 - 3,020,475 151,500 - 206,575 351,800 -
137 Pipa GIP Dia. 6" (M137) M 213,500 - 223,500 213,500 - 223,500 261,750 - 336,250 586,500 - 683,000 213,500 - 223,500 360,300 - 500,000 569,000 - 695,500 244,500 - 284,500 4,617,540 - 5,310,171 200,500 - 305,500 589,600 -
138 Pipa GIP Dia. 8" (M138) M 294,000 - 304,000 294,000 - 304,000 324,700 - 337,700 1,522,000 - 1,788,000 294,000 - 304,000 423,750 - 622,750 867,000 - 982,000 300,000 - 368,150 7,277,700 - 8,369,355 345,200 - 363,200 1,547,000 -
139 Pipa PVC Dia. 1/2" (M139) M 5,000 - 18,600 17,000 - 17,000 11,550 - 13,000 7,800 - 22,800 24,500 - 30,000 5,000 - 5,000 5,000 - 9,000 7,700 - 5,200 20,400 - 23,460 14,000 - 20,500 9,500 -
140 Pipa PVC Dia. 3/4" (M140) M 6,500 - 23,200 25,000 - 25,000 30,000 - 40,500 8,500 - 23,500 31,000 - 33,300 6,500 - 6,500 7,000 - 11,025 6,625 - 10,000 28,560 - 32,844 22,350 - 36,300 10,800 -
141 Pipa PVC Dia. 1" (M141) M 29,500 - 35,000 30,000 - 30,000 56,212 - 59,800 25,069 - 25,069 42,000 - 44,250 8,250 - 45,875 13,750 - 15,000 7,500 - 11,200 37,740 - 43,401 32,600 - 54,825 11,000 -
142 Pipa PVC Dia. 1 1/2" (M142) M 48,500 - 66,500 48,500 - 66,500 99,000 - 110,000 13,000 - 29,500 75,000 - 82,000 52,950 - 68,950 57,500 - 74,750 49,025 - 62,525 67,320 - 77,418 46,000 - 74,000 15,000 -
143 Pipa PVC Dia. 2" (M143) M 20,000 - 90,000 70,000 - 70,000 140,600 - 148,000 68,211 - 68,211 92,000 - 101,000 20,000 - 20,000 35,510 - 40,375 17,500 - 26,500 74,460 - 85,629 58,000 - 92,800 21,900 -
144 Pipa PVC Dia. 3" (M144) M 38,750 - 124,000 135,000 - 135,000 278,000 - 293,538 31,900 - 51,000 184,000 - 210,000 40,000 - 40,000 71,300 - 80,125 28,750 - 43,600 99,960 - 114,954 90,500 - 124,825 38,500 -
145 Pipa PVC Dia. 4" (M145) M 64,000 - 231,000 215,000 - 215,000 426,800 - 453,848 174,900 - 174,900 192,500 - 300,000 65,000 - 65,000 104,700 - 125,750 47,500 - 72,000 138,720 - 159,528 136,625 - 173,875 68,500 -
146 Pipa PVC Dia. 6" (M146) M 191,250 - 211,250 127,000 - 175,000 838,532 - 892,055 129,500 - 228,000 380,000 - 655,000 211,000 - 226,000 220,630 - 26,900 214,075 - 224,075 295,800 - 340,170 174,500 - 262,500 131,300 -
147 Pipa PVC Dia. 8" (M147) M 618,000 - 1,038,000 207,000 - 264,000 1,268,500 - 1,349,500 208,400 - 317,000 688,500 - 1,128,500 654,350 - 1,068,350 350,710 - 500,000 615,000 - 995,000 515,100 - 961,860 676,000 - 1,107,825 211,300 -
148 Pipa Besi 3/4 (M148) Batang 67,500 - 70,500 81,000 - 115,000 83,000 - 40,000 83,000 - 123,000 69,750 - 79,750 91,250 - 127,250 80,213 - 91,713 82,250 - 106,350 85,200 - 126,000 76,725 - 87,725 92,100 -
149 Pipa Besi 2 1/2 (M149) Batang 492,500 - 542,500 360,000 - 415,000 519,750 - 549,750 368,000 - 423,000 492,500 - 542,500 520,500 - 560,500 564,363 - 621,863 316,750 - 729,750 372,200 - 450,000 541,750 - 596,750 374,500 -

XIII SANITAIR

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

150 Bak Air Fiber Glass Kap. 1.0 M3 (tower) (M150) Bh 275,000 - 660,000 400,000 - 550,000 1,790,000 - 2,465,000 1,687,500 - 2,337,500 1,575,000 - 1,875,000 1,804,000 - 2,244,000 2,400,000 - 3,500,000 2,322,500 - 3,772,500 1,250,000 - 2,000,000 1,887,500 - 2,237,500 1,787,500 -
151 Bak Air Fiber Glass Kap. 2.0 M3 (tower) (M151) Bh 465,000 - 915,000 600,000 - 750,000 2,789,250 - 3,984,250 2,122,500 - 2,822,500 2,662,500 - 3,662,500 2,255,000 - 2,805,000 2,581,750 - 3,501,750 2,405,000 - 3,805,000 1,800,000 - 2,400,000 2,375,000 - 3,375,000 2,375,000 -
152 Bak air mandi Fibre Glass kap. 0,5 m3 (M152) Bh 465,000 - 570,000 175,000 - 250,000 770,300 - 1,890,800 668,000 - 1,103,000 380,000 - 508,750 514,250 - 624,250 479,500 - 711,500 532,500 - 732,500 500,000 - 1,100,000 532,500 - 732,500 532,500 -
153 Bak air mandi Fibre Glass kap. 1 m3 (M153) Bh 699,000 - 1,141,000 720,000 - 1,120,000 1,170,750 - 1,945,750 1,113,750 - 1,818,750 594,000 - 924,000 756,250 - 1,141,250 790,700 - 1,193,500 915,000 - 1,615,000 700,000 - 1,300,000 793,750 - 1,218,750 793,750 -
154 Kloset Duduk Keramik terpasang (M154) Bh 1,983,800 - 3,155,000 2,350,000 - 2,500,000 2,887,500 - 3,437,500 2,555,000 - 2,926,692 2,010,000 - 3,270,000 3,225,000 - 3,775,000 1,600,000 - 2,755,000 1,897,500 - 2,300,000 2,856,000 3,315,000 2,668,500 - 3,081,500 3,300,000 -
155 Kloset Jongkok Keramik Standar terpasang (M155) Bh 287,500 - 338,750 225,000 - 250,000 388,500 - 508,500 363,687 - 418,240 250,000 - 218,750 250,000 - 250,000 339,250 - 454,250 287,500 - 340,000 399,840 - 464,100 305,175 - 442,325 230,000 -
156 Urunoar Keramik Standar (M156) Bh 862,000 - 1,362,500 750,000 - 800,000 1,001,815 - 2,176,815 1,783,825 - 2,794,325 1,215,000 - 1,597,500 1,782,000 - 2,772,000 1,160,000 - 2,575,000 1,645,000 - 2,495,000 415,000 - 625,000 1,792,000 - 2,772,000 1,782,000 -
157 Wastafel Gantung Keramik (M157) Bh 750,000 - 1,355,000 1,500,000 - 1,500,000 679,000 - 1,078,272 942,500 - 1,242,500 550,000 - 1,070,000 1,650,000 - 1,650,000 1,083,550 - 1,428,050 1,150,000 - 1,749,000 375,000 - 575,000 1,644,500 - 2,909,500 672,000 -

XIV LISTRIK

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

158 Instalasi Listrik (M158) titik 150,000 - 142,250 120,000 - 130,000 238,000 - 339,000 198,500 - 228,500 122,250 - 142,250 210,000 - 365,000 100,000 - 130,000 147,500 - 197,500 150,000 - 260,000 187,550 - 242,550 187,550 -
159 Box zekring/panel box+MCB (M159) unit 119,750 - 144,750 129,750 - 134,750 189,500 - 224,500 142,750 - 167,750 129,750 - 134,750 154,250 - 179,250 149,500 - 155,500 316,250 - 480,800 95,000 - 165,000 142,500 - 149,000 142,225 -
160 Saklar ganda setara broco (M160) bh 46,750 - 52,700 17,500 - 21,500 43,750 - 105,750 52,000 - 74,500 28,000 - 48,750 74,500 - 121,000 80,500 - 92,000 51,750 - 89,750 21,500 - 35,000 47,700 - 73,050 25,000 -
161 saklar tunggal setara broco (M161) bh 38,500 - 43,200 15,000 - 20,000 33,500 - 53,000 31,500 - 49,000 23,000 - 42,000 52,800 - 66,800 53,500 - 60,000 40,250 - 61,000 17,000 - 32,000 40,500 - 63,500 17,000 -
162 stop kontak setara broco (M162) bh 22,000 - 26,500 17,500 - 21,500 39,800 - 68,300 38,520 - 66,820 23,000 - 32,250 38,200 - 49,200 30,000 - 45,750 51,750 - 54,000 30,000 - 51,500 34,000 - 46,700 18,000 -
163 Lampu Pijar 40 watt (M163) unit 36,150 - 46,650 36,000 - 42,000 30,000 - 57,000 43,642 - 50,188 13,500 - 21,000 21,000 - 36,500 15,525 - 24,150 14,000 - 20,500 13,500 - 21,000 16,000 - 25,500 20,500 -
164 Lampu Xl 20 watt ( lengkap ) (M164) unit 95,000 - 115,000 96,000 - 125,000 83,950 - 100,050 88,375 - 120,000 76,250 - 96,250 72,450 - 95,450 89,000 - 111,500 82,250 - 100,000 73,750 - 98,750 115,000 - 128,000 100,000 -

Catatan : Harga dasar terendah di Ibukota kabupaten


Harga dasar tertinggi di kecamatan paling jauh/sulit dijangkau dari kabupaten yang bersangkutan
XV BAHAN LANTAI

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

165 Keramik 20x20 cm (M165) M2 48,750 - 66,250 87,000 - 112,000 69,000 - 75,000 8,000 - 92,000 66,000 - 75,750 89,250 - 129,250 60,000 - 95,000 71,250 - 101,250 68,000 - 132,600 52,250 - 74,250 47,500 -
166 Keramik 30x30 cm (M166) M2 55,000 - 85,000 60,000 - 85,000 75,000 - 80,000 91,000 - 104,000 69,000 - 73,500 96,750 - 144,750 75,000 - 85,000 101,000 - 163,500 150,144 - 129,948 86,350 - 141,350 78,500 -
167 Keramik 40x40 cm (M167) M2 86,200 - 98,500 97,000 - 130,000 73,000 - 153,000 88,479 - 101,750 66,000 - 95,500 275,000 - 275,000 65,000 - 97,000 122,500 - 212,700 68,544 - 66,300 77,550 - 99,550 46,000 -
168 Cincin Keramik (M168) M1 11,500 - 16,000 10,000 - 15,000 54,000 - 67,000 121,500 - 140,000 10,300 - 17,300 20,950 - 31,950 23,575 - 29,325 19,000 - 27,000 19,000 - 27,000 22,550 - 28,050 20,500 -

XVI PEKERJAAN PER PAKET

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)

169 Pek profile kepala tiang (M169) bh 24,500 - 44,500 29,500 - 39,500 66,250 - 106,250 52,050 - 79,050 29,500 - 39,500 56,500 - 81,500 34,000 - 45,500 72,750 - 122,750 81,000 - 126,000 48,250 - 78,250 29,500 -
170 Pek profile tiang (M170) unit 875,000 - 1,425,000 1,000,000 - 1,300,000 1,360,000 - 2,090,000 1,155,000 - 1,605,000 1,000,000 - 1,300,000 1,375,000 - 2,075,000 1,299,500 - 1,874,500 1,130,000 - 1,630,000 1,562,500 - 2,462,500 1,146,250 - 1,671,250 1,000,000 -
171 Pek list plafondt 3 cm (M171) m1 15,500 - 19,000 13,500 - 21,000 5,950 - 12,450 23,000 - 36,000 5,000 - 6,500 13,825 - 21,825 5,763 - 7,463 16,000 - 20,000 12,700 - 17,200 6,700 - 10,800 28,000 -
172 Pek pas jendela teralis besi (M172) m2 413,000 - 507,000 435,000 - 485,000 491,000 - 613,000 483,000 - 598,000 435,000 - 485,000 477,500 - 557,500 500,250 - 557,750 422,000 - 452,000 478,500 - 533,500 519,500 - 699,500 435,000 -
173 Pek pintu teralis besi (M173) m2 660,000 - 950,000 705,000 - 905,000 867,750 - 1,317,250 770,000 - 1,070,000 705,000 - 905,000 772,500 - 952,500 810,750 - 1,040,750 734,500 - 944,500 895,000 - 1,290,000 740,750 - 995,750 705,000 -
174 Pek pagar besi hias (M174) m2 600,000 - 780,000 590,000 - 790,000 725,500 - 1,045,500 687,500 - 1,037,500 590,000 - 790,000 712,500 - 1,012,500 678,500 - 908,500 587,000 - 747,000 803,500 - 1,243,500 687,500 - 1,037,500 590,000 -
175 Pek pas mur baut & plat kuda-kuda (M175) bh 4,250 - 7,250 4,500 - 7,000 17,500 - 30,000 20,950 - 43,450 4,500 - 7,000 25,500 - 32,000 6,170 - 9,470 24,500 - 39,500 30,500 - 50,000 7,500 - 12,500 20,000 -
176 Pek ventilasi ukiran jambi (M176) m2 125,000 - 220,000 132,500 - 212,500 153,000 - 238,000 152,000 - 262,000 132,500 - 212,500 150,500 - 240,500 152,500 - 244,500 141,500 - 226,500 223,750 - 408,750 215,000 - 406,000 132,500 -
177 Pas Batu Alam (M177) M2 230,000 - 460,000 320,000 - 370,000 352,500 - 452,500 345,500 - 433,600 320,000 - 370,000 349,700 - 427,700 368,000 - 425,500 355,000 - 450,000 417,500 - 617,500 402,500 - 632,500 320,000 -

XVII LAIN-LAIN

NO URAIAN KODE SATUAN


Jambi 2017 (Rp) Muara Jambi 2017 (Rp) Tj.Timur 2017 (Rp) Tj.Barat 2017 (Rp) Batang Hari 2017 (Rp) Tebo 2017 (Rp) Muaro Bungo 2017 (Rp) Sarolangun 2017 (Rp) Merangin 2017 (Rp) Kerinci 2017 (Rp) S. Penuh 2017 (Rp)
178 Pompa Tangan (M178) Bh 50,000 - 543,750 492,500 - 542,500 608,500 - 748,500 595,500 - 715,500 550,000 - 600,000 662,500 - 832,500 582,500 - 740,000 682,500 - 927,500 702,750 - 987,750 605,000 - 660,000 550,000 -
179 Gebalan Rumput (M179) M2 12,000 - 22,500 12,250 - 22,250 26,750 - 53,750 19,625 - 32,125 12,250 - 22,250 28,750 - 51,750 14,500 - 25,588 23,200 - 41,200 5,000 - 15,000 13,700 - 24,500 30,250 -
180 Dop 2 1/2 (M180) Bh 9,925 - 13,075 10,000 - 13,000 28,000 - 37,775 27,500 - 38,500 10,000 - 13,000 22,150 - 37,650 11,500 - 14,950 17,950 - 23,450 21,800 - 28,800 12,000 - 17,000 26,050 -
181 Karung Plastik (M181) Bh 3,000 - 6,000 5,000 - 8,000 14,600 - 26,900 12,500 - 24,600 4,775 - 9,025 10,050 - 17,550 5,000 - 8,500 11,950 - 23,700 1,500 - 3,000 5,000 - 10,000 10,250 -
182 Water Stop (M182) M 60,000 - 78,000 64,000 - 74,000 72,000 - 89,000 69,000 - 86,500 64,000 - 74,000 90,250 - 128,250 73,600 - 85,100 75,275 - 93,775 1,108,500 - 1,157,000 70,400 - 81,400 41,500 -
183 Gemuk (M183) KG 30,750 - 38,250 30,750 - 38,250 37,000 - 51,800 34,000 - 46,500 30,750 - 38,250 37,450 - 49,950 35,500 - 44,000 34,000 - 46,500 24,000 - 36,000 37,000 - 42,500 35,000 -
184 Amplas (M184) lbr 6,400 - 7,400 6,000 - 6,000 13,500 - 23,500 13,550 - 25,550 5,250 - 6,250 12,500 - 22,000 8,800 - 11,200 12,600 - 21,900 9,000 - 15,000 6,000 - 12,000 12,250 -
185 Paku seng (M185) m3 20,000 - 26,000 20,000 - 26,000 36,600 - 50,800 33,500 - 48,700 23,450 - 29,450 35,250 - 45,250 26,450 - 28,750 29,700 - 34,700 25,000 - 40,000 26,000 - 32,500 23,450 -
186 Plamour (M186) m3 17,000 - 29,000 18,000 - 28,000 25,700 - 38,700 21,700 - 37,500 17,000 - 29,000 24,200 - 40,200 6,250 - 17,750 21,250 - 36,250 22,500 - 37,500 19,800 - 30,800 18,000 -
187 Tarikan jendela (M187) bh 23,750 - 33,750 26,250 - 31,250 35,650 - 67,850 23,550 - 38,550 19,750 - 37,750 31,500 - 49,000 4,250 - 15,750 26,550 - 35,550 7,500 - 13,500 29,000 - 35,000 26,250 -
188 Tedang layar + konsen (M188) m2 757,500 - 967,500 762,500 - 962,500 430,250 - 685,250 392,500 - 642,500 392,500 - 642,500 478,250 - 717,750 414,000 - 644,000 402,000 - 587,000 402,500 - 632,500 396,000 - 616,000 360,000 -
189 Ukiran jambi/listplank (M189) bh 110,000 - 177,500 113,750 - 173,750 40,000 - 535,000 142,000 - 272,000 85,000 - 145,000 196,500 - 401,500 97,750 - 166,750 191,500 - 406,500 211,250 - 421,250 93,500 - 159,500 177,250 -
190 GRC (M190) lbr 104,025 - 111,025 129,000 - 129,000 123,500 - 210,000 110,000 - 177,500 69,750 - 79,750 182,250 - 346,750 85,500 - 100,000 113,250 - 185,750 75,000 - 150,000 76,500 - 89,000 199,750 -
191 Gypsum (M191) lbr 82,500 - 87,750 75,000 - 75,000 132,500 - 212,500 167,000 - 109,000 77,000 - 84,000 159,500 - 254,500 80,000 - 99,750 114,750 - 149,750 90,000 - 150,000 87,600 - 96,000 80,000 -
192 Besi Wiremesh m6" (2,1X5,4) (M192) Lbr 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 - 750,000 650,000 -
193 Besi Wiremesh m8" (2,1X5,4) (M193) Lbr 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 - 850,000 750,000 -
194 Baja Ringan 75 (M1 94) M2 130,000 - 160,000 137,000 - 168,000 143,000 - 176,400 150,000 - 185,000 157,500 - 194,000 165,000 - 203,000 173,000 - 213,000 181,000 - 223,000 190,000 - 234,000 199,000 - 245,000 208,000 -
195 Atap Gutta 200 x 95 (M1 95) Lbr 140,000 - 180,000 147,000 - 189,000 154,000 - 198,500 161,000 - 207,900 169,000 - 217,000 177,000 - 227,000 185,000 - 238,000 194,000 - 250,000 203,000 - 262,000 213,000 - 275,000 223,000 -
196 Nok Gutta 104 x 50 (M196) Kpg 80,000 - 87,000 84,000 - 91,000 88,000 - 95,500 92,000 - 100,000 96,600 - 105,000 101,000 - 110,000 106,000 - 115,500 111,000 - 121,000 116,000 - 127,000 121,000 - 133,000 127,000 -
197 Talang Air Gutta 104 x 50 (M197) Kpg 70,000 - 80,000 73,500 - 84,000 77,000 - 88,000 80,500 - 92,000 85,000 - 96,600 89,000 - 100,800 93,000 - 106,000 97,000 - 111,000 101,000 - 116,000 106,000 - 121,000 111,000 -
198 Flashing Gutta 104 x 34 (M198) Kpg 80,000 - 87,000 84,000 - 91,000 88,000 - 95,500 92,000 - 100,000 96,600 - 105,000 101,000 - 110,000 106,000 - 115,500 111,000 - 121,000 116,000 - 127,000 121,000 - 133,000 127,000 -
199 Sekrup 6,5 cm (M199) Bh 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500 - 2,000 1,500

Catatan : Harga dasar terendah di Ibukota kabupaten


Harga dasar tertinggi di kecamatan paling jauh/sulit dijangkau dari kabupaten yang bersangkutan
S. Penuh 2017 (Rp)

407,500
407,500
100,000
370,300
9,000
409,000
667,000
82,500
190,000
307,000
345,200
598,000
497,500
662,000

S. Penuh 2017 (Rp)


22,000
20,000

S. Penuh 2017 (Rp)


12,000
9,000
10,300
7,300
13,000
6,900
48,500
45,000
61,425
66,450
200,000
198,000
4,295

S. Penuh 2017 (Rp)

83,500
8,200
75,000
S. Penuh 2017 (Rp)
14,000
17,000
22,000
675,000
25,307
45,000
30,225
42,290
381,000
443,750
942,500
45,000
127,000
135,485
37,050
24,700
35,375
12,000
88,000
28,000
154,500
52,700
56,025
32,250
230,500
46,500
67,000
35,000
371,500
56,750

51,700,000

55,000,000

85,800,000

85,800,000

28,050,000

29,150,000

6,105,000
S. Penuh 2017 (Rp)
79,000
200,000
75,150
77,100
105,500
50,500
26,000
35,000
78,500

S. Penuh 2017 (Rp)


29,000
85,000
16,800

S. Penuh 2017 (Rp)

110,000
31,075
95,000

125,000
120,500

157,200
99,400
160,300

S. Penuh 2017 (Rp)


6,500
4,609
1,500
1,800
7,400
136,750
199,000
270,500
202,750

S. Penuh 2017 (Rp)

6,462,800
5,168,250
3,950,000
5,000,000
3,227,500
37,685
1,512,500
85,500
218,750
1,504,000
9,380,000
71,500
65,575
153,075
52,250
66,358
110,141
101,625
194,500
226,000
S. Penuh 2017 (Rp)
21,500
11,000
72,000
69,870
72,550
49,500
107,200

S. Penuh 2017 (Rp)

85,000
103,100
127,500
190,500
243,500
418,500
425,000
695,500
1,803,000
37,800
43,800
46,100
45,500
56,500
97,800
105,450
243,500
334,000
136,000
460,000

S. Penuh 2017 (Rp)

2,237,500
3,375,000
732,500
1,218,750
3,370,000
375,000
2,772,000
1,451,750

S. Penuh 2017 (Rp)

242,550
148,725
35,000
24,250
25,000
37,000
120,000
S. Penuh 2017 (Rp)

67,500
128,500
66,000
25,500

S. Penuh 2017 (Rp)

39,500
1,300,000
52,500
485,000
905,000
790,000
37,500
212,500
370,000

S. Penuh 2017 (Rp)


600,000
50,250
36,050
16,200
96,500
41,000
22,250
29,450
28,000
31,250
560,000
363,250
409,750
95,000
750,000
850,000
257,000
288,000
139,000
127,000
139,000
2,000
d. HARGA DASAR MATERIAL ALAM UNTUK QUARRY
SELURUH KABUPATEN DI PROVINSI JAMBI
JARAK KE PERKIRAAN PERKIRAAN
KABUPATEN NAMA DESA / TEMPAT IBUKOTA JENIS MATERIAL HARGA KUANTITAS JENIS QUARRY NAMA PEMILIK KAPASITAS KETERANGAN
KABUPATEN DIQUARRY PRODUKSI
(Km) ( Rp./ M3 ( M3 / HARI )

1. MUARA BUNGO 1. Desa Lubuk Landai 29.00 Pasir 54,450.00 - Sungai Masyarakat - 1. Batu pecah diambil dari padang
(Ruas Jalan Ma. Bungo-Bts.Sumbar) 29.00 Batu Kali 66,550.00 - - -
29.00 Batu Quarry Besar 78,650.00 - - -
29.00 Gravel 133,100.00 - - -
29.00 Sirtu 66,550.00 - - -
29.00 Split 350,900.00 Sungai Masyarakat -

2. Desa Rantau Ikil 44.00 Pasir 49,050.00 - Sungai Masyarakat


(Ruas Jalan Ma. Bungo-Bts.Sumbar) 44.00 Batu Kali 78,650.00
44.00 Batu Quarry Besar 78,650.00
44.00 Gravel 133,100.00
44.00 Sirtu 66,550.00
Split 350,900.00

3. Desa Sungai Arang 7.00 Pasir urug 42,350.00 Tergantung hujan Sungai Masyarakat 60-80 Kapasitas Tergantung Kemampuan
(Ruas Jalan Ma.Bungo-Rt. Pandan) 7.00 Pasir 54,450.00 dan air (S. Batang Bungo) 60-80 Alat dan Truk Pengangkut
(Ruas Jalan Kabupaten) 7.00 Sirtu 66,550.00

4. Desa Rantau Pandan 37.00 Kerikil 71,500.00 Tergantung hujan Sungai Masyarakat 100 - 125 Kapasitas Tergantung Kemampuan
(Ruas Jalan Ma.Bungo-Rt. Pandan) 37.00 Batu kali 99,000.00 dan air (S. Batang Bungo) Alat dan Truk Pengangkut
(Ruas Jalan Kabupaten) 37.00 Batu Quarry Besar 127,600.00
37.00 Gravel 127,600.00
37.00 Sirtu 71,500.00
Tebing Jalan 200 - 300 m
JARAK KE PERKIRAAN PERKIRAAN
KABUPATEN NAMA DESA / TEMPAT IBUKOTA JENIS MATERIAL HARGA KUANTITAS JENIS QUARRY NAMA PEMILIK KAPASITAS KETERANGAN
KABUPATEN DIQUARRY PRODUKSI
(Km) ( Rp./ M3 ( M3 / HARI )
2. MUARO JAMBI 1. Desa Sekernan (Sengeti) 7.20 Pasir 54,450.00 - Sungai Masyarakat
( Sengeti) (Ruas Jalan Jambi-Sp. Tuan ) 7.20 Kerikil Jagung 66,550.00 - Masyarakat

3. TANJUNG JABUNG 1. Desa Kampung Baru 183.58 Batu Quarry Besar 78,650.00 - Sungai -
BARAT (Ruas Jalan Merlung-Bts Riau ) 183.58 Sirtu 66,550.00 - -
(Ka. Tungkal ) 183.58 Split 330,000.00 - -

2.Desa Lubuk Terap 158.00 Sirtu 77,000.00 -


(Ruas Jalan Merlung-Lbk Kambing )

3.Desa Sekernan (Sengeti) 27.00 Pasir 33,000.00 -


(Ruas Jalan Jambi-Sp. Tuan )

4. TANJUNG JABUNG 1.Desa Tanjung Batu 36.00 Bukit-bukit Masyarakat - Sudah tidak diambil
TIMUR (Ruas Jalan Simp Lagan-Parit Culum ) Batu Quarry Besar 137,500.00 -
(Ma. Sabak) Split 341,000.00
Sirtu 54,450.00

5.KOTA JAMBI 1. Paal 10 10.00 Tanah Timbunan 49,500.00 Bukit-bukit Masyarakat 1. Batu pecah diambil dari Riau
- - 2. Batu Kerikil diambil dari JAMBI
2.Desa Kebun Bohok 14.00 Tanah Timbunan Pilihan 71,500.00 Tergantung hujan - 40 - 50 M3
(Jln. Lingkar Selatan Kota Jambi) Tanah Timbunan 49,500.00 dan Alat

2.Kasang - Pasir 60,000.00


Kerikil 280,000.00

6.BATANG HARI 1.Jalan Gajah Mada No.59 2.00 Pasir 38,500.00 Tergantung hujan Sungai Masyarakat -
Ma. Bulian (Kota Ma. Bulian) 2.00 Kerikil 154,000.00 dan air
2.00 Split 440,000.00 -

2. Desa Muara Jangga 25.00 Krikil 143,000.00 - Sungai Masyarakat - Kapasitas Tergantung Kemampuan Tenaga Kerja
kec.Batin XXIV

JARAK KE PERKIRAAN PERKIRAAN
KABUPATEN NAMA DESA / TEMPAT IBUKOTA JENIS MATERIAL HARGA KUANTITAS JENIS QUARRY NAMA PEMILIK KAPASITAS KETERANGAN
KABUPATEN DIQUARRY PRODUKSI
(Km) ( Rp./ M3 ( M3 / HARI )
7.SAROLANGUN 1. Desa Lindung 5.00 Pasir 59,895.00 - Sungai Masyarakat
(Kota Sarolangun) (Ruas Jalan Pauh-Sarolangun) 5.00 Kerikil 73,205.00 -
Sirtu

2.Desa Dalam 28.00 Pasir 54,450.00 Tergantung hujan Sungai Masyarakat 60-80 Kapasitas Tergantung Kemampuan
(Ruas Jalan Sarolangun-Pemenang) Kerikil dan air 60-80 Alat dan Truk Pengangkut
Batu Quarry Besar 77,000.00
Batu Kali 78,650.00
Gravel 133,100.00

3.Desa Batu Peyabung 26.00 Pasir 55,000.00


(Ruas Jalan Sarolangun-Pemenang) 26.00 Batu Kali 79,750.00 Tergantung hujan Sungai Masyarakat 100 - 125 Kapasitas Tergantung Kemampuan
26.00 Batu Quarry Besar 82,500.00 dan air Alat dan Truk Pengangkut
26.00 Gravel 132,000.00
26.00 Sirtu 66,500.00
26.00 Split 360,900.00

4.Desa Musi Rawas 110.00 Pasir 54,450.00 Tergantung hujan Sungai Masyarakat
(Ruas Jalan Sarolangun-Linggau) 110.00 Batu Kali 78,650.00 dan air
110.00 Batu Quary Besar 77,000.00
110.00 Gravel 134,200.00
110.00 Sirtu 71,500.00
110.00 Split 357,500.00

5. Desa Sebakul 34.00 Sirtu 66,000.00


( Ruas Jalan Sp. Pelawan - Btng Asai )

6. Desa Sei. Pinang 84.00 Batu Kali 77,550.00 Tergantung hujan Sungai Masyarakat Kapasitas Tergantung Kemampuan
( Ruas Jalan Sp. Pelawan - Btng Asai ) 84.00 Batu Quary Besar 78,650.00 dan air Alat dan Truk Pengangkut
84.00 Grevel 133,100.00
84.00 Sirtu 66,550.00

7. Desa Sei. Keradak 130.00 Pasir 54,450.00 Tergantung hujan Sungai Masyarakat
( Ruas Jalan Pekan Gedang - Jangkat ) 110.00 Batu Kali 78,650.00 dan air
110.00 Batu Quarry Besar 77,550.00
110.00 Grevel 133,100.00
110.00 Sirtu 66,550.00
JARAK KE PERKIRAAN PERKIRAAN
KABUPATEN NAMA DESA / TEMPAT IBUKOTA JENIS MATERIAL HARGA KUANTITAS JENIS QUARRY NAMA PEMILIK KAPASITAS KETERANGAN
KABUPATEN DIQUARRY PRODUKSI
(Km) ( Rp./ M3 ( M3 / HARI )
8. MERANGIN 1. Desa Tanjung Lamin 19.00 Spilt 1:2 61,875.00 Tergantung Cuaca Sungai Masyarakat Quarry milik perusahaan dan dapat dijual
( Kota Bangko ) ( Ruas Jalan Sarolangun Bangko ) Abu Batu 61,875.00 kepada umum
Pasir 38,500.00
Sirtu 110,000.00
Tanah Urug 60,500.00
Pasir Urug 33,000.00

2. Desa Sekancing 29.50 Batu Kali 80,300.00 Tergantung Cuaca Sungai Masyarakat
( Ruas Jalan Sp. Pl. Rengas - Ds. Tuo ) 29.50 Batu Quarry Besar 82,500.00
29.50 Grevel 137,500.00
29.50 Sirtu 84,700.00

Masyarakat
3. Desa Pl. Tengah 115.55 Pasir 60,500.00 Tergantung cuaca Sungai
( Ruas Jalan Ds. Tuo - Jangkat ) 115.55 Batu Kali 84,700.00
115.55 Batu Quarry Besar 84,700.00
115.55 Grevel 139,150.00
115.55 Sirtu 80,300.00

4. Desa Batu Penyabung 47.45 Pasir 60,500.00 Tergantung cuaca Sungai Masyarakat
( Ruas Jalan Sarolangun - Pamenang ) 47.45 Batu Kali 77,000.00
47.45 Batu Quarry Besar 82,500.00
47.45 Grevel 132,000.00
47.45 Sirtu 60,500.00
47.45 Split 330,000.00

5. Desa Pemenang 25.00 Pasir Hitam 80,850.00 Tergantung cuaca Sungai Masyarakat Kapasitas Tergantung Kemampuan Tenaga Kerja
( Ruas Jalan Bangko -Sarolangun ) Krikil Jagung 84,700.00
Pasir Kuning 126,500.00
9. KERINCI
( Kota Sei. Penuh ) 1. Desa Siulak Deras 21.30 Pasir ayak 93,500.00 Tergantung cuaca Sungai & Bukit Masyarakat Quarry milik perusahaan dan dapat dijual
( Ruas Jalan Sei. Penuh - Bts Sumbar 21.30 Batu Pasang 121,000.00 kepada umum
Leter W ) 21.30 Batu 3/5 dan 2/3 187,000.00
21.30 Abu Batu 110,000.00
21.30 Sirtu 60,500.00
Tanah Urug 49,500.00
JARAK KE PERKIRAAN PERKIRAAN
KABUPATEN NAMA DESA / TEMPAT IBUKOTA JENIS MATERIAL HARGA KUANTITAS JENIS QUARRY NAMA PEMILIK KAPASITAS KETERANGAN
KABUPATEN DIQUARRY PRODUKSI
(Km) ( Rp./ M3 ( M3 / HARI )
2. Desa Jujun 22.50 Pasir 60,000.00 Tergantung Sungai Sungai Masyarakat
( Ruas Jalan Sangg Agung - Jujun 22.50 Batu Kali 93,500.00
- Sei. Penuh ) 22.50 Batu Quarry Besar 82,500.00
22.50 Grevel 132,000.00
22.50 Sirtu 66,000.00

3. Desa Sako ( Bts Sumbar ) 40.00 Pasir 55,000.00 Tergantung Sungai Sungai Masyarakat
( Ruas Jalan Bts Sumbar - Tapan ) 40.00 Batu Kali 990,000.00
( Ruas Jalan Provinsi SUMBAR ) 40.00 Batu Quarry Besar 99,000.00
40.00 Grevel 126,500.00
40.00 Sirtu 60,500.00

4. Desa Lempur 35.00 Pasir 60,000.00


20.00 Gravel 99,000.00 Tergantung Sungai Sungai Masyarakat 40 - 60
Split 143,000.00
Krikil Gunung 132,000.00

5. Desa Siulak Gedang 22.00 Kerikil 176,000.00 Tergantung Sungai Sungai Masyarakat
40.00 Split 176,000.00
319,000.00

1. Desa Jambu 32.00 Pasir 51,975.00 Tergantung Sungai -


10. TEB0 ( Ruas Jalan Ma. Tebo - Pl. Temiang ) 32.00 Sirtu 75,075.00
( Kota Ma. Tebo )
2. Desa Pl. Temiang 49.90 Pasir 51,975.00 Tergantung Cuaca Sungai Masyarakat
( Ruas Jalan Ma. Tebo Pl. Temiang ) 49.90 Sirtu 63,525.00

3. Desa Tanjung 107.90 Batu Kali 75,075.00 Tergantung Cuaca Sungai Masyarakat
( Ruas Jalan Ma. Tebo Pl. Temiang - 107.90 Gravel 127,050.00
Tanjung ) 107.90 Sirtu 137,500

4. Desa Lubuk Madrasah 54.00 Sirtu 71,500.00 Tergantung Cuaca Bukit-bukit Masyarakat 40 - 50 M3
( Ruas Jalan Simp. Niam - Lbk Kambing )

5. Desa Ma. Kilis 32.00 Pasir 71,500.00 Tergantung Cuaca Sungai Batang Tebo Masyarakat
( Ruas Jalan Sei. Bengkal - Ma. Tebo ) 32.00 Kerikil Jagung 137,500.00

Paraf
3. BESARAN MAKSIMAL BIAYA LANGSUNG PERSONIL (REMUNERASI) UNTUK TENAGA AHLI BERPENDIDIKAN (S1, S2, S3)
BERDASARKAN PENGALAMAN PROFESI DAN SERTIFIKASI

Klasifikasi Tahun Rupiah Per Tahun Rupiah Per Tahun Rupiah Per Ket
Pengalaman Bulan S1 Pengalaman Bulan S2 Pengalaman Bulan S3
1 2 3 4 5 6 7 8
1. Biaya Langsung Personil/Remunerasi ini dipergunakan
sebagai dasar perhitungan Harga Perkiraan Sendiri (HPS)
AHLI MUDA 1 21,100,000 - - - -
2 22,900,000 - - - - 2. Biaya langsung personil tenaga ahli pada lampiran
3 24,600,000 - - - - merupakan biaya langsung personil untuk Provinsi
4 26,400,000 - - - - DKI Jakarta yang dipakai sebagai benchmark
untuk bagi provinsi Pekerjaan jasa konsultansi
di daerah-daerah lain dilakukan penyesuaian dengan
AHLI MADYA 1 28,200,000 1 29,500,000 - - mempertimbangkan tempat (lokasi), keterbatasan
2 30,000,000 2 31,600,000 - - fasilitas /sarana prasarana/biaya setempat yang
3 31,700,000 3 33,600,000 - - wajar. Penyesuaian dimaksud dengan mengguna
4 33,500,000 4 35,800,000 - - kan indikator ekonomi yang dikeluarkan BPS atau
memperhitungkan faktor pengali (indeks) seperti
pada lampiran 2.

AHLI UTAMA 1 35,300,000 1 37,800,000 1 41,400,000


2 37,100,000 2 39,800,000 2 43,700,000
3 38,800,000 3 41,900,000 3 46,000,000
4 40,600,000 4 43,900,000 4 48,200,000
5 42,400,000 5 46,100,000 5 50,400,000
6 44,100,000 6 48,100,000 6 52,800,000
7 45,900,000 7 50,100,000 7 55,000,000
8 47,700,000 8 52,200,000 8 57,200,000
9 49,500,000 9 54,200,000 9 59,400,000
10 51,200,000 10 56,200,000 10 61,800,000
11 53,000,000 11 58,400,000 11 64,200,000
12 54,800,000 12 60,400,000 12 66,800,000

Sumber : Surat Edaran Menteri PU No: 03/SE/M/2013


TABEL BESARAN INDEKS WILAYAH PROVINSI DI INDONESIA

No Provinsi Indeks
1 Nangroe Aceh Darussalam 1.010
2 Sumatera Utara 0.935
3 Sumatera Barat 0.935
4 Riau 0.921
5 Kepulauan Riau 0.892
6 Jambi 0.907
7 Sumatera Selatan 0.904
8 Kepulauan Bangka Belitung 0.968
9 Bengkulu 0.871
10 Lampung 0.880
11 Banten 0.909
12 DKI Jakarta 1.000
13 Jawa Barat 0.781
14 Jawa Tengah 0.760
15 DI Yogyakarta 0.816
16 Jawa Timur 0.772
17 Bali 0.861
18 Nusa Tenggara Barat 0.913
19 Nusa Tenggara Timur 0.897
20 Kalimantan Barat 0.857
21 Kalimantan Tengah 0.952
22 Kalimantan Selatan 0.969
23 Kalimantan Timur 0.992
24 Sulawesi Utara 0.929
25 Sulawesi Tengah 0.869
26 Sulawesi Tenggara 0.882
27 Sulawesi Selatan 0.927
28 Sulawesi Barat 0.932
29 Gorontalo 0.826
30 Maluku 0.882
31 Maluku Utara 0.867
32 Papua 1.117
33 Papua Barat 1.064

Sumber : Surat Edaran Menteri PU No: 03/SE/M/2013


PRESENTASE KOMPONEN BIAYA PEMBANGUNAN
BANGUNAN GEDUNG NEGARA KLASIFIKASI KHUSUS KHUSUS

BIAYA KONSTRUKSI FISIK 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
(JUTA Rp.) s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
KOMPONEN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KEGIATAN
1 2 3 4 5 6 7 8 9 10 11 12

1. PERENCANAAN 8.20 6.89 5.85 5.00 4.35 3.85 3.45 3.10 2.90 2.90
KONSTRUKSI 9.75 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 8.20 6.89 5.85 5.00 4.35 3.85 3.45 3.10 2.90 2.72

2. MANAJEMEN 7.95 6.68 5.70 4.87 4.15 3.60 3.10 2.77 2.49 2.30
KONSTRUKSI 7.95 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 6.68 5.70 4.87 4.15 3.60 3.10 2.77 2.49 2.30 2.17

3. PENGELOLAAN 16.00 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31
KEGIATAN 16.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31 0.19

Sumber : Peraturan Menteri PU No. 45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
4. PERSENTASE KOMPONEN BIAYA PEMBANGUNAN
BANGUNAN GEDUNG NEGARA KLASIFIKASI SEDERHANA SEDERHANA

BIAYA KONSTRUKSI FISIK 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
(JUTA Rp.) s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
KOMPONEN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KEGIATAN
1 2 3 4 5 6 7 8 9 10 11 12

1. PERENCANAAN 8.23 6.83 5.63 4.65 3.90 3.28 2.82 2.44 2.16 1.94
KONSTRUKSI 8.23 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 6.83 5.63 4.65 3.90 3.28 2.82 2.44 2.16 1.94 1.80

2. PENGAWASAN 5.35 4.62 3.90 3.27 2.73 2.27 1.92 1.65 1.43 1.26
KONSTRUKSI 5.35 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 4.62 3.90 3.27 2.73 2.27 1.92 1.65 1.43 1.26 1.18

3. PENGELOLAAN 14.00 10.0 6.75 4.20 2.85 1.90 1.20 0.80 0.50 0.28
KEGIATAN 14.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 10.00 6.75 4.20 2.85 1.90 1.20 0.80 0.50 0.28 0.18

Sumber : Peraturan Menteri PU No. 45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
PRESENTASE KOMPONEN BIAYA PEMBANGUNAN
BANGUNAN GEDUNG NEGARA KLASIFIKASI TIDAK SEDERHANA TIDAK SEDERHANA

BIAYA KONSTRUKSI FISIK 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
(JUTA Rp.) s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
KOMPONEN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KEGIATAN
1 2 3 4 5 6 7 8 9 10 11 12

1. PERENCANAAN 9.00 7.55 6.35 5.37 4.55 3.92 3.42 3.02 2.72 2.50
KONSTRUKSI 9.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 7.55 6.35 5.37 4.55 3.92 3.42 3.02 2.72 2.50 2.32

2. MANAJEMEN 7.25 6.20 5.25 4.50 3.80 3.25 2.80 2.48 2.19 2.00
KONSTRUKSI 7.25 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 6.20 5.25 4.50 3.80 3.25 2.80 2.48 2.19 2.00 1.89
atau

3. PENGAWASAN 6.00 5.20 4.45 3.80 3.20 2.70 2.30 2.00 1.78 1.60
KONSTRUKSI 6.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 5.20 4.45 3.80 3.20 2.70 2.30 2.00 1.78 1.60 1.50

4. PENGELOLAAN 16.00 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31
KEGIATAN 16.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31 0.19

Sumber : Peraturan Menteri PU No. 45/PRT/M/2007 Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
5. BESARAN BIAYA PERAWATAN BANGUNAN GEDUNG NEGARA
DI PROVINSI JAMBI TA 2017

No TINGKAT KERUSAKAN BIAYA PERAWATAN MAKSIMUM KET

1 RINGAN 35% gedung baru yang ditetapkan oleh bupati /


walikota untuk tipe / klas dan lokasi yang sama.

2 SEDANG 45% Dari harga satuan tertinggi pembangunan


gedung baru yang ditetapkan oleh Bupati /
Walikota untuk tipe / klas dan lokasi yang sama.

3 BERAT 65% Dari harga satuan tertinggi pembangunan


gedung baru yang ditetapkan oleh Bupati /
Walikota untuk tipe / klas dan lokasi yang sama.

sumber : Peraturan menteri pekerjaan umum No. 45 / PRT / M / 2007


Tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara
6. BESARAN BIAYA PEMELIHARAAN BANGUNAN GEDUNG NEGARA
DI PROVINSI JAMBI TA 2017

No. Uraian Keterangan

1 Biaya pemeliharaan Per - M2 bangunan gedung setiap tahunnya maksimum

adalah sebesar 2% dari harga satuan tertinggi per - M 2 pembangunan gedung

baru yang tetapkan oleh Bupati / Walikota untuk tipe / klas dan lokasi yang sama.

Sumber : Peraturan Menteri Pekerjaan Umum No. 45 / PRI / M / 2007


tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara.
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA SEWA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/JamLtr/HP/Jam (Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No. JENIS PERALATAN KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.0625 (g1 x B') 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----- s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.0875 W 0.175 W = =
Harga Olie Rp15,000.0 Rp12,000.0
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 17 18 19 20 21 22 23

37 TRONTON E35 150.0 15.0 Ton 450,000,000 10.0 1,500.0 450,000,000 45,000,000 0.19925 53,798.06 600.00 54,398.06 0.1500 0.0300 900,000.00 0.0875 26,250.00 0.1750 52,500.00 15,000.00 36,000.00 1,029,750.00 1,084,148.06 Pek. Ringan
38 COLD MILLING MACHINE E37 248.0 1,000.0 m 4,945,000,000 5.0 2,000.0 4,945,000,000 494,500,000 0.29832 663,826.68 4,945.00 668,771.68 0.1200 0.0250 1,190,400.00 0.0875 216,343.75 0.1250 309,062.50 15,000.00 36,000.00 1,766,806.25 2,435,577.93 Pek. Berat
39 ROCK DRILL BREAKER E36 3.0 - - 900,000,000 10.0 1,500.0 900,000,000 90,000,000 0.19925 107,596.11 1,200.00 108,796.11 0.1500 0.0300 18,000.00 0.0875 52,500.00 0.1750 105,000.00 15,000.00 36,000.00 226,500.00 335,296.11 Pek. Ringan
40 COLD RECYCLER E38 900.0 2,200.0 M 19,500,000,000 5.0 2,000.0 19,500,000,000 1,950,000,000 0.29832 2,617,718.97 19,500.00 2,637,218.97 0.1200 0.0250 4,320,000.00 0.0875 853,125.00 0.1250 1,218,750.00 15,000.00 36,000.00 6,442,875.00 9,080,093.97 Pek. Berat
41 HOT RECYCLER E39 400.0 3.0 M 29,250,000,000 5.0 2,000.0 29,250,000,000 2,925,000,000 0.29832 3,926,578.46 29,250.00 3,955,828.46 0.1200 0.0250 1,920,000.00 0.0875 1,279,687.50 0.1250 1,828,125.00 15,000.00 36,000.00 5,078,812.50 9,034,640.96 Pek. Berat
42 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 395,000,000 4.0 1,000.0 395,000,000 39,500,000 0.35027 124,519.33 790.00 125,309.33 0.1500 0.0300 690,000.00 0.0625 24,687.50 0.1750 69,125.00 15,000.00 36,000.00 834,812.50 960,121.83 Pek. Ringan
43 ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 395,000,000 5.0 2,000.0 395,000,000 39,500,000 0.29832 53,025.59 395.00 53,420.59 0.1200 0.0250 552,000.00 0.0875 17,281.25 0.1250 24,687.50 15,000.00 36,000.00 644,968.75 698,389.34 Pek. Berat
44 SLIP FORM PAVER E42 105.0 2.5 M 1,337,142,857 6.0 2,000.0 1,337,142,857 133,714,286 0.26424 158,995.12 1,337.14 160,332.26 0.1200 0.0250 504,000.00 0.0875 58,500.00 0.1250 83,571.43 15,000.00 36,000.00 697,071.43 857,403.69 Pek. Berat
45 CONCRETE PAN MIXER E43 134.0 600.0 Liter 1,000,000,000 10.0 1,500.0 1,000,000,000 100,000,000 0.19925 119,551.24 1,333.33 120,884.57 0.1500 0.0300 804,000.00 0.0875 58,333.33 0.1750 116,666.67 15,000.00 36,000.00 1,030,000.00 1,150,884.57 Pek. Ringan
46 CONCRETE BREAKER E44 290.0 20.0 m3/jam 900,000,000 5.0 2,000.0 900,000,000 90,000,000 0.29832 120,817.80 900.00 121,717.80 0.1200 0.0250 1,392,000.00 0.0875 39,375.00 0.1250 56,250.00 15,000.00 36,000.00 1,538,625.00 1,660,342.80 Pek. Berat
47 ASPAHLT TANKER E45 190.0 4,000.0 liter 500,000,000 6.0 2,000.0 500,000,000 50,000,000 0.26424 59,453.30 500.00 59,953.30 0.1200 0.0250 938,193.40 0.0875 21,875.00 0.1250 31,250.00 15,000.00 12,000.00 1,018,318.40 1,078,271.70 Pek. Berat
48 CEMENT TANKER E46 190.0 4,000.0 liter 500,000,000 6.0 2,000.0 500,000,000 50,000,000 0.26424 59,453.30 500.00 59,953.30 0.1200 0.0250 912,000.00 0.0875 21,875.00 0.1250 31,250.00 15,000.00 12,000.00 992,125.00 1,052,078.30 Pek. Berat
49 CONDRETE MIXER (350) E47 20.0 350.0 liter 35,000,000 2.0 2,000.0 35,000,000 3,500,000 0.61512 9,688.08 35.00 9,723.08 0.1200 0.0250 96,000.00 0.0875 1,531.25 0.1250 2,187.50 15,000.00 12,000.00 126,718.75 136,441.83 Pek. Berat
50 VIBRATING RAMMER E48 4.2 80.0 KG 20,000,000 4.0 1,000.0 20,000,000 2,000,000 0.35027 6,304.78 40.00 6,344.78 0.1500 0.0300 25,200.00 0.0625 1,250.00 0.1750 3,500.00 15,000.00 12,000.00 56,950.00 63,294.78 Pek. Ringan
51 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 750,000,000 5.0 2,000.0 750,000,000 75,000,000 0.29832 100,681.50 750.00 101,431.50 0.1200 0.0250 1,056,000.00 0.0875 32,812.50 0.1250 46,875.00 15,000.00 12,000.00 1,162,687.50 1,264,119.00 Pek. Berat
52 BORE PILE MACHINE E50 125.0 60.0 CM 1,170,000,000 10.0 1,500.0 1,170,000,000 117,000,000 0.19925 139,874.95 1,560.00 141,434.95 0.1500 0.0300 750,000.00 0.0875 68,250.00 0.1750 136,500.00 15,000.00 12,000.00 981,750.00 1,123,184.95 Pek. Ringan
53 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 900,000,000 5.0 2,000.0 900,000,000 90,000,000 0.29832 120,817.80 900.00 121,717.80 0.1200 0.0250 960,000.00 0.0875 39,375.00 0.1250 56,250.00 15,000.00 12,000.00 1,082,625.00 1,204,342.80 Pek. Berat
54 BLENDING EQUIPMENT E52 50.0 30.0 Ton 500,000,000 10.0 1,500.0 500,000,000 50,000,000 0.19925 59,775.62 666.67 60,442.29 0.1500 0.0300 300,000.00 0.0875 29,166.67 0.1750 58,333.33 15,000.00 12,000.00 414,500.00 474,942.29 Pek. Ringan
55 ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 150,000,000 4.0 2,000.0 150,000,000 15,000,000 0.35027 23,642.91 150.00 23,792.91 0.1200 0.0250 192,000.00 0.0875 6,562.50 0.1250 9,375.00 15,000.00 12,000.00 234,937.50 258,730.41 Pek. Berat

KETERANGAN : 1 Tingkat Suku Bunga = 15.00 % per-tahun


2 Upah Operator / Sopir / Mekanik = 15,000 Rupiah per-orang/jam
3 Upah Pembantu Operator/Sopir/Mekanik = 12,000 Rupiah per-orang/jam
4 Harga Bahan Bakar Solar = 7,333 Rupiah per-liter (Mengikuti perkembangan harga )
5 Minyak Pelumas = 40,000 Rupiah per-liter (Mengikuti perkembangan harga )
6 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
7 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
8 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
Jika terjadi kenaikan harga BBM maka perhitungan analisa biaya sewa peralatan yang memperhitungkan komponen langsung BBM akan menyesuaikan
HARGA UPAH
NO URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
1 Pengamat Jaringan 1,700,000 org/bulan S1
2 Juru Pengairan 1,200,000 org/bulan STM/SMA
3 Petugas Operasi Bendung (POB) 1,200,000 org/bulan SMA
4 Petugas Pintu Air (PPA) 1,200,000 org/bulan SMA
5 Staff Pengamat Jaringan Irigasi 1,200,000 org/bulan SLTA

GUBERNUR JAMBI,

H. ZUMI ZOLA ZULKIFLI


ANALISA BIAYA SEWA PERALATAN PER JAM KERJA
DENGAN HARGA BBM INDUSTRI
PER KABUPATEN
KABUPATEN
NO URAIAN KODE SATUAN BTG.HARI BUNGO KERINCI MA.JAMBI JAMBI MERANGIN SAROLANGUN TEBO TJB.BARAT TJB.TIMUR
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 ASPHALT MIXING PLANT (E01) Jam 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13 8,727,718.13
2 ASPHALT FINISHER (E02) Jam 997,078.32 997,078.32 997,078.32 997,078.32 997,078.32 997,078.32 997,078.32 997,078.32 997,078.32 997,078.32
3 ASPHALT SPRAYER (E03) Jam 54,065.90 54,065.90 54,065.90 54,065.90 54,065.90 54,065.90 54,065.90 54,065.90 54,065.90 54,065.90
4 BULLDOZER 100-150 HP (E04) Jam 631,392.80 631,392.80 631,392.80 631,392.80 631,392.80 631,392.80 631,392.80 631,392.80 631,392.80 631,392.80
5 COMPRESSOR 4000-6500 L\M (E05) Jam 197,414.12 197,414.12 197,414.12 197,414.12 197,414.12 197,414.12 197,414.12 197,414.12 197,414.12 197,414.12
6 CONCRETE MIXER 0.3-0.6 M3 (E06) Jam 175,968.24 175,968.24 175,968.24 175,968.24 175,968.24 175,968.24 175,968.24 175,968.24 175,968.24 175,968.24
7 CRANE 10-15 TON (E07) Jam 729,870.09 729,870.09 729,870.09 729,870.09 729,870.09 729,870.09 729,870.09 729,870.09 729,870.09 729,870.09
8 DUMP TRUCK 3.5 TON (E08) Jam 302,229.04 302,229.04 302,229.04 302,229.04 302,229.04 302,229.04 302,229.04 302,229.04 302,229.04 302,229.04
9 DUMP TRUCK 10 TON (E09) Jam 590,587.12 590,587.12 590,587.12 590,587.12 590,587.12 590,587.12 590,587.12 590,587.12 590,587.12 590,587.12
10 EXCAVATOR 80-140 HP (E10) Jam 562,998.20 562,998.20 562,998.20 562,998.20 562,998.20 562,998.20 562,998.20 562,998.20 562,998.20 562,998.20
11 EXCAVATOR SEMI LONG ARM (E11) Jam 587,189.60 587,189.60 587,189.60 587,189.60 587,189.60 587,189.60 587,189.60 587,189.60 587,189.60 587,189.60
12 EXCAVATOR SUPER LONG ARM (E12) Jam 722,911.80 722,911.80 722,911.80 722,911.80 722,911.80 722,911.80 722,911.80 722,911.80 722,911.80 722,911.80
13 FLAT BED TRUCK 3-4 M3 (E13) Jam 583,535.55 583,535.55 583,535.55 583,535.55 583,535.55 583,535.55 583,535.55 583,535.55 583,535.55 583,535.55
14 GENERATOR SET (E14) Jam 528,038.84 528,038.84 528,038.84 528,038.84 528,038.84 528,038.84 528,038.84 528,038.84 528,038.84 528,038.84
15 MOTOR GRADER >100 HP (E15) Jam 526,098.59 526,098.59 526,098.59 526,098.59 526,098.59 526,098.59 526,098.59 526,098.59 526,098.59 526,098.59
16 TRACK LOADER 75-100 HP (E16) Jam 327,338.66 327,338.66 327,338.66 327,338.66 327,338.66 327,338.66 327,338.66 327,338.66 327,338.66 327,338.66
17 WHEEL LOADER 1.0-1.6 M3 (E17) Jam 399,211.49 399,211.49 399,211.49 399,211.49 399,211.49 399,211.49 399,211.49 399,211.49 399,211.49 399,211.49
18 THREE WHEEL ROLLER 6-8 T (E18) Jam 242,572.20 242,572.20 242,572.20 242,572.20 242,572.20 242,572.20 242,572.20 242,572.20 242,572.20 242,572.20
19 TANDEM ROLLER 6-8 T. (E19) Jam 515,855.57 515,855.57 515,855.57 515,855.57 515,855.57 515,855.57 515,855.57 515,855.57 515,855.57 515,855.57
20 TIRE ROLLER 8-10 T. (E20) Jam 491,872.80 491,872.80 491,872.80 491,872.80 491,872.80 491,872.80 491,872.80 491,872.80 491,872.80 491,872.80
21 VIBRATORY ROLLER 5-8 T. (E21) Jam 449,049.83 449,049.83 449,049.83 449,049.83 449,049.83 449,049.83 449,049.83 449,049.83 449,049.83 449,049.83
22 CONCRETE VIBRATOR (E22) Jam 36,793.96 36,793.96 36,793.96 36,793.96 36,793.96 36,793.96 36,793.96 36,793.96 36,793.96 36,793.96
23 STONE CRUSHER (E23) Jam 832,095.92 832,095.92 832,095.92 832,095.92 832,095.92 832,095.92 832,095.92 832,095.92 832,095.92 832,095.92
24 WATER PUMP 70-100 mm (E24) Jam 34,131.70 34,131.70 34,131.70 34,131.70 34,131.70 34,131.70 34,131.70 34,131.70 34,131.70 34,131.70
KABUPATEN
NO URAIAN KODE SATUAN BTG.HARI BUNGO KERINCI MA.JAMBI JAMBI MERANGIN SAROLANGUN TEBO TJB.BARAT TJB.TIMUR
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
25 WATER TANKER 3000-4500 L. (E25) Jam 298,606.66 298,606.66 298,606.66 298,606.66 298,606.66 298,606.66 298,606.66 298,606.66 298,606.66 298,606.66
26 PEDESTRIAN ROLLER (E26) Jam 85,428.94 85,428.94 85,428.94 85,428.94 85,428.94 85,428.94 85,428.94 85,428.94 85,428.94 85,428.94
27 TAMPER (E27) Jam 41,485.56 41,485.56 41,485.56 41,485.56 41,485.56 41,485.56 41,485.56 41,485.56 41,485.56 41,485.56
28 JACK HAMMER (E28) Jam 25,702.22 25,702.22 25,702.22 25,702.22 25,702.22 25,702.22 25,702.22 25,702.22 25,702.22 25,702.22
29 FULVI MIXER (E29) Jam 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93 1,603,264.93
30 CONCRETE PUMP (E30) Jam 298,692.62 298,692.62 298,692.62 298,692.62 298,692.62 298,692.62 298,692.62 298,692.62 298,692.62 298,692.62
31 TRAILER 20 TON (E31) Jam 600,943.96 600,943.96 600,943.96 600,943.96 600,943.96 600,943.96 600,943.96 600,943.96 600,943.96 600,943.96
32 PILE DRIVER + HAMMER (E32) Jam 292,555.50 292,555.50 292,555.50 292,555.50 292,555.50 292,555.50 292,555.50 292,555.50 292,555.50 292,555.50
33 CRANE ON TRACK 35 TON (E33) Jam 529,483.12 529,483.12 529,483.12 529,483.12 529,483.12 529,483.12 529,483.12 529,483.12 529,483.12 529,483.12
34 WELDING SET (E34) Jam 123,876.11 123,876.11 123,876.11 123,876.11 123,876.11 123,876.11 123,876.11 123,876.11 123,876.11 123,876.11
35 BORE PILE MACHINE (E35) Jam 910,102.37 910,102.37 910,102.37 910,102.37 910,102.37 910,102.37 910,102.37 910,102.37 910,102.37 910,102.37
36 ASPHALT LIQUID MIXER (E36) Jam 34,023.04 34,023.04 34,023.04 34,023.04 34,023.04 34,023.04 34,023.04 34,023.04 34,023.04 34,023.04
37 TRONTON (E01) Jam 637,898.06 637,898.06 637,898.06 637,898.06 637,898.06 637,898.06 637,898.06 637,898.06 637,898.06 637,898.06
38 COLD MILLING MACHINE (E02) Jam 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93 1,861,307.93
39 ROCK DRILL BREAKER (E03) Jam 307,996.11 307,996.11 307,996.11 307,996.11 307,996.11 307,996.11 307,996.11 307,996.11 307,996.11 307,996.11
40 COLD RECYCLER (E04) Jam 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97 7,045,343.97
41 HOT RECYCLER (E05) Jam 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96 8,119,890.96
42 AGGREGAT (CHIP) SPREADER (E06) Jam 613,621.83 613,621.83 613,621.83 613,621.83 613,621.83 613,621.83 613,621.83 613,621.83 613,621.83 613,621.83
43 ASPHALT DISTRIBUTOR (E07) Jam 422,039.34 422,039.34 422,039.34 422,039.34 422,039.34 422,039.34 422,039.34 422,039.34 422,039.34 422,039.34
44 SLIP FORM PAVER (E08) Jam 603,453.69 603,453.69 603,453.69 603,453.69 603,453.69 603,453.69 603,453.69 603,453.69 603,453.69 603,453.69
45 CONCRETE PAN MIXER (E09) Jam 750,234.57 750,234.57 750,234.57 750,234.57 750,234.57 750,234.57 750,234.57 750,234.57 750,234.57 750,234.57
46 CONCRETE BREAKER (E10) Jam 991,992.80 991,992.80 991,992.80 991,992.80 991,992.80 991,992.80 991,992.80 991,992.80 991,992.80 991,992.80
47 ASPAHLT TANKER (E11) Jam 642,921.70 642,921.70 642,921.70 642,921.70 642,921.70 642,921.70 642,921.70 642,921.70 642,921.70 642,921.70
48 CEMENT TANKER (E12) Jam 616,728.30 616,728.30 616,728.30 616,728.30 616,728.30 616,728.30 616,728.30 616,728.30 616,728.30 616,728.30
49 CONDRETE MIXER (350) (E13) Jam 81,891.83 81,891.83 81,891.83 81,891.83 81,891.83 81,891.83 81,891.83 81,891.83 81,891.83 81,891.83
50 VIBRATING RAMMER (E14) Jam 41,574.78 41,574.78 41,574.78 41,574.78 41,574.78 41,574.78 41,574.78 41,574.78 41,574.78 41,574.78
51 TRUK MIXER (AGITATOR) (E15) Jam 761,569.00 761,569.00 761,569.00 761,569.00 761,569.00 761,569.00 761,569.00 761,569.00 761,569.00 761,569.00
52 BORE PILE MACHINE (E16) Jam 757,184.95 757,184.95 757,184.95 757,184.95 757,184.95 757,184.95 757,184.95 757,184.95 757,184.95 757,184.95
53 CRANE ON TRACK 75-100 TON (E17) Jam 746,592.80 746,592.80 746,592.80 746,592.80 746,592.80 746,592.80 746,592.80 746,592.80 746,592.80 746,592.80
54 BLENDING EQUIPMENT (E18) Jam 322,692.29 322,692.29 322,692.29 322,692.29 322,692.29 322,692.29 322,692.29 322,692.29 322,692.29 322,692.29
55 ASPHALT LIQUID MIXER (E19) Jam 159,380.41 159,380.41 159,380.41 159,380.41 159,380.41 159,380.41 159,380.41 159,380.41 159,380.41 159,380.41

Catatan :
- Harga Solar Industri = Rp. 7,333 / Ltr (Mengikuti perkembangan harga )
- Harga Olie = Rp. 40.000,-/ Ltr (Mengikuti perkembangan harga )
- Harga sudah termasuk biaya operator/sopir
- Asumsi 1 (satu) hari = 7 jam kerja effektif