1 Memasang dinding bata ringan 200 x 600 x 100 m 3,443.35 156,702.70 539,582,242.05 3,878.03 434.68 68,115,871.25 - - 607,698,113.29 Tambah
2 Membuat plesteran semen instan m 6,929.42 71,949.17 498,565,994.48 8,370.15 1,440.73 103,659,135.82 - - 602,225,130.31 Tambah
3 Membuat acian semen instan m 6,929.42 36,050.30 249,807,669.83 8,250.03 1,320.61 47,608,217.25 - - 297,415,887.07 Tambah
4 Benang sudut m 1,302.26 9,742.60 12,687,394.21 1,473.20 170.94 1,665,399.51 - - 14,352,793.72 Kurang
5 Opening pintu & jendela m 1,447.72 60,827.38 88,061,011.02 1,450.18 2.46 149,513.69 - - 88,210,524.71 Tambah
6 Kolom praktis 12/12 m 21.36 4,132,753.77 88,275,620.63 24.80 3.44 14,222,954.77 - - 102,498,575.40 Tambah
7 Balok praktis 12/12 m 15.89 3,995,964.03 63,495,868.45 17.86 1.97 7,891,536.66 - - 71,387,405.11 Tambah
8 Memasang dinding partisi gypsum 12 mm m 105.00 198,300.23 20,821,821.83 82.80 - - 22.20 4,402,562.60 16,419,259.22 Kurang
9 Meja beton m 1.81 4,684,727.64 8,469,987.58 1.91 0.11 496,581.13 - - 8,966,568.71 Tambah
10 Dinding keramik 30 x 30 cm m 569.70 254,651.82 145,075,139.01 735.73 166.03 42,280,365.43 - - 187,355,504.43 Kurang
11 Plint homogenius 10 x 60 cm cutting size m 407.54 60,336.38 24,589,486.27 762.44 354.90 21,413,077.81 - - 46,002,564.07 Tambah
12 Plint keramik 10 x 30 cm cutting size m 57.66 33,792.64 1,948,483.72 91.46 33.80 1,142,191.29 - - 3,090,675.01 Kurang
13 Hospital plint m 682.33 129,488.98 88,354,212.31 687.75 5.42 702,348.20 - - 89,056,560.51 Kurang
14 Memasang Plint Granit Tiles Ex China 10 cm m 33.80 60,336.38 2,039,369.48 33.80 - - - - 2,039,369.48 Kurang
LANTAI DUA
1 Memasang dinding bata ringan 200 x 600 x 100 m 3,407.60 156,702.70 533,980,120.52 3,241.14 - - 166.46 26,084,432.14 507,895,688.38 Tambah
2 Membuat plesteran semen instan m 6,474.36 71,949.17 465,824,806.70 8,103.70 1,629.34 117,229,554.63 - - 583,054,361.33 Tambah
3 Membuat acian semen instan m 6,474.36 36,050.30 233,402,620.31 7,517.89 1,043.53 37,619,645.34 - - 271,022,265.64 Tambah
4 Benang sudut m 2,346.73 9,742.60 22,863,244.36 2,364.67 17.94 174,782.19 - - 23,038,026.55 Tambah
5 Opening pintu & jendela m 1,076.13 60,827.38 65,458,165.80 1,326.88 250.75 15,252,464.92 - - 80,710,630.72 Kurang
6 Kolom praktis 12/12 m 20.85 4,132,753.77 86,167,916.21 28.69 7.84 32,406,211.77 - - 118,574,127.97 Tambah
7 Balok praktis 12/12 m 4.84 3,995,964.03 19,340,465.91 5.56 0.72 2,886,780.32 - - 22,227,246.23 Tambah
8 Memasang dinding partisi gypsum 12 mm m 164.65 198,300.23 32,650,133.22 - - 164.65 32,650,133.22 - Tambah
VOLUME HARGA VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG JUMLAH HARGA
NO URAIAN PEKERJAAN SAT. JUMLAH HARGA KET.
MC 0 SATUAN CCO 0 VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA CCO 1
9 Meja beton m 0.83 4,684,727.64 3,888,323.94 1.40 0.57 2,652,492.79 - - 6,540,816.73 Kurang
10 Dinding keramik 30 x 30 cm m 385.01 254,651.82 98,043,495.29 683.15 298.14 75,921,618.37 - - 173,965,113.67 Kurang
11 Plint homogenius 10 x 60 cm cutting size m 620.36 60,336.38 37,430,273.60 803.55 183.19 11,053,020.54 - - 48,483,294.13 Tambah
12 Plint keramik 10 x 30 cm cutting size m 131.49 33,792.64 4,443,394.45 199.20 67.71 2,288,099.77 - - 6,731,494.22 Kurang
13 Hospital plint m 531.40 129,488.98 68,810,441.32 68.30 - - 463.10 59,966,344.32 8,844,096.99 Tambah
14 Memasang Plint Granit Tiles Ex China 10 cm m 33.80 60,336.38 2,039,369.48 33.80 - - - - 2,039,369.48 Kurang
LANTAI TIGA
1 Memasang dinding bata ringan 200 x 600 x 100 m 2,849.39 156,702.70 446,507,106.35 3,096.61 247.22 38,739,571.39 - - 485,246,677.74 Tambah
2 Membuat plesteran semen instan m 6,334.29 71,949.17 455,746,886.93 7,304.45 970.16 69,802,012.87 - - 525,548,899.79 Tambah
3 Membuat acian semen instan m 6,334.29 36,050.30 228,353,054.79 6,943.78 609.49 21,972,273.91 - - 250,325,328.70 Tambah
4 Benang sudut m 1,108.19 9,742.60 10,796,648.43 1,315.76 207.57 2,022,270.83 - - 12,818,919.26 Kurang
5 Opening pintu & jendela m 952.31 60,827.38 57,926,519.91 798.20 - - 154.11 9,374,107.15 48,552,412.76 Kurang
6 Kolom praktis 12/12 m 20.89 4,132,753.77 86,333,226.36 23.52 2.63 10,883,821.97 - - 97,217,048.33 Tambah
7 Balok praktis 12/12 m 4.44 3,995,964.03 17,742,080.30 3.76 - - 0.68 2,731,129.53 15,010,950.77 Tambah
8 Memasang dinding partisi gypsum 12 mm m 227.86 198,300.23 45,184,690.90 - - 227.86 45,184,690.90 - Kurang
9 Meja beton m 1.06 4,684,727.64 4,965,811.30 1.36 0.30 1,417,598.58 - - 6,383,409.89 Kurang
10 Dinding keramik 30 x 30 cm m 286.80 254,651.82 73,034,140.54 806.10 519.30 132,239,798.79 - - 205,273,939.34 Kurang
11 Plint homogenius 10 x 60 cm cutting size m 449.09 60,336.38 27,096,462.65 480.83 31.74 1,915,076.54 - - 29,011,539.19 Tambah
12 Plint keramik 10 x 30 cm cutting size m 27.70 33,792.64 936,056.17 27.70 - - 0.00 67.59 935,988.59 Kurang
13 Hospital plint m 583.43 129,488.98 75,547,752.68 467.28 - - 116.15 15,040,144.45 60,507,608.24 Tambah
14 Memasang Plint Granit Tiles Ex China 10 cm m 33.80 60,336.38 2,039,369.48 33.80 - - - - 2,039,369.48 Kurang
-
LANTAI EMPAT -
1 Memasang dinding bata ringan 200 x 600 x 100 m 156,702.70 - - - - - - Kurang
2 Membuat plesteran semen instan m 71,949.17 - - - - - - Tambah
4 Benang sudut m 9,742.60 - - - - - - Tambah
5 Opening pintu & jendela m 60,827.38 - - - - - - Kurang
6 Kolom praktis 12/12 m 4,132,753.77 - - - - - - Tambah
7 Balok praktis 12/12 m 3,995,964.03 - - - - - - Kurang
-
LANTAI LIFT MACHINE ROOM -
1 Memasang dinding bata ringan 200 x 600 x 100 m 435.49 156,702.70 68,242,458.82 435.49 - - - - 68,242,458.82 Tambah
2 Membuat plesteran semen instan m 1,242.87 71,949.17 89,423,460.78 1,242.87 - - - - 89,423,460.78 Tambah
3 Membuat acian semen instan m 1,242.87 36,050.30 44,805,836.36 1,242.87 - - - - 44,805,836.36 Tambah
4 Benang sudut m 110.50 9,742.60 1,076,556.95 110.50 - - - - 1,076,556.95 Kurang
5 Opening pintu & jendela m 55.80 60,827.38 3,394,167.67 55.80 - - - - 3,394,167.67 Kurang
6 Kolom praktis 12/12 m 4.15 4,132,753.77 17,150,928.17 4.15 - - - - 17,150,928.17 Tambah
7 Balok praktis 12/12 m 0.51 3,995,964.03 2,037,941.66 0.51 - - - - 2,037,941.66 Tambah
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap III RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Daya Cipta Dianrancana
Nama Pekerjaan : III PEKERJAAN ARSITEKTUR
Sub Pekerjaan :
B PEKERJAAN PENGECATAN
LANTAI SEMI BASEMENT - - - -
1 Pengecatan Dinding Emultion Paint m 2,715.83 33,907.04 92,085,644.71 3,832.48 1,116.65 37,862,400.28 - - 129,948,044.99 Tambah
2 Pengecatan Dinding Wheathershield m 635.14 34,433.28 21,869,952.19 635.14 - - - - 21,869,952.19
3 Pengecatan Plafond Emultion Paint m 5,547.56 35,917.84 199,256,361.38 5,620.24 72.68 2,610,508.47 - - 201,866,869.84 Tambah
4 Pengecatan List Plafond Emultion Paint m 102.28 3,990.87 408,186.27 90.85 - - 11.43 45,615.65 362,570.62 Kurang
5 Pengecatan plint Int Semi - Gloss m 271.84 6,706.50 1,823,127.77 - - - 271.84 1,823,127.77 - Kurang
6 Cat Marka Jalan & Parkir m 625.05 167,305.13 104,574,073.07 576.00 - - 49.05 8,206,316.75 96,367,756.32 Kurang
LANTAI SATU - -
1 Pengecatan Dinding Emultion Paint m 6,929.42 33,907.04 234,956,107.26 8,015.23 1,085.81 36,816,600.93 - - 271,772,708.19 Tambah
2 Pengecatan Dinding Wheathershield m 297.44 34,433.28 10,241,834.21 297.44 - - - - 10,241,834.21
3 Pengecatan Plafond Emultion Paint m 1,834.36 35,917.84 65,886,245.31 1,583.67 - - 250.69 9,004,242.81 56,882,002.51 Kurang
4 Pengecatan List Plafond Emultion Paint m 1,683.02 3,990.87 6,716,715.52 1,683.02 - - - - 6,716,715.52
5 Pengecatan plint Int Semi - Gloss m 33.25 6,706.50 223,022.80 - - 33.25 223,022.80 - Kurang
LANTAI DUA
1 Pengecatan Dinding Emultion Paint m 6,474.36 33,907.04 219,526,370.55 7,569.63 1,095.27 37,137,361.51 - - 256,663,732.06 Tambah
2 Pengecatan Plafond Emultion Paint m 1,981.18 35,917.84 71,159,702.29 1,993.48 12.30 441,789.41 - - 71,601,491.70 Tambah
3 Pengecatan List Plafond Emultion Paint m 1,692.63 3,990.87 6,755,067.79 1,808.62 115.99 462,901.11 - - 7,217,968.91 Tambah
4 Pengecatan plint Int Semi - Gloss m 64.12 6,706.50 430,017.73 - - - 64.12 430,017.73 - Kurang
LANTAI TIGA
1 Pengecatan Dinding Emultion Paint m 6,334.29 33,907.04 214,776,893.06 6,468.94 134.65 4,565,701.34 - - 219,342,594.40 Tambah
2 Pengecatan Plafond Emultion Paint m 2,021.22 35,917.84 72,597,852.52 2,021.22 - - - - 72,597,852.52
3 Pengecatan List Plafond Emultion Paint m 1,835.10 3,990.87 7,323,647.17 1,885.52 50.42 201,219.71 - - 7,524,866.88 Tambah
4 Pengecatan plint Int Semi - Gloss m 39.40 6,706.50 264,210.80 - - - 39.40 264,210.80 - Kurang
-
-
LANTAI LIFT MACHINE ROOM -
1 Pengecatan dinding Dust Proof Paint m 392.81 32,123.94 12,618,604.09 435.49 42.68 1,371,049.67 - - 13,989,653.76 Tambah
2 Pengecatan Dinding Wheathershield m 200.88 34,433.28 6,916,956.88 1,242.87 1,041.99 35,879,131.34 - - 42,796,088.23 Tambah
3 Pengecatan Plafond Emultion Paint m 265.94 35,917.84 9,551,989.84 1,242.87 976.93 35,089,213.48 - - 44,641,203.32 Tambah
4 Pengecatan List Plafond Emultion Paint m 134.00 3,990.87 534,776.70 110.50 - - 23.50 93,785.47 440,991.23 Kurang
VOLUME HARGA VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG JUMLAH HARGA
NO URAIAN PEKERJAAN SAT. JUMLAH HARGA KET.
MC 0 SATUAN CCO 0 VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA CCO 1
5 Pengecatan plint Int Semi - Gloss m 123.30 6,706.50 826,912.04 55.80 - - 67.50 452,689.07 374,222.97 Kurang
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Arkan Jasa Rencana
Nama Pekerjaan : III Pekerjaan Arsitektur
Satuan Pembayaran : M3
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Arkan Jasa Rencana
Nama Pekerjaan : III Pas. Dinding Bata Ringan
Satuan Pembayaran : M3
DIMENSI
Pengurang VOLUME
NO URAIAN PEKERJAAN SKETSA GAMBAR P T
( Mtr ) ( Mtr ) K dan KP Volume ( M2 )
1 Pas. Dinding Bata Ringan A 1-10 72.35 0.95 8K2+14 kp 6.40 1.596 60.74
vol kontrak
JUMLAH 1417.06
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Arkan Jasa Rencana
Nama Pekerjaan : III Pasangan Dinding BT Ringan
Satuan Pembayaran : M3
DIMENSI
Pengurang VOLUME
NO URAIAN PEKERJAAN SKETSA GAMBAR P T
( Mtr ) ( Mtr ) K dan KP Volume ( M2 )
1 Pasangan Dinding BT Ringan A 0-1 (ddg Full) 20.20 3.50 27 kp 9.45 61.25
VOL CCO
A 1-10 (area jendela) 53.45 2.90 8K2+7 kp 6.40 2.03 146.58
JUMLAH 535.65
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Arkan Jasa Rencana
Nama Pekerjaan : Kolom Praktis
Satuan Pembayaran : M3
DIMENSI
Jumlah VOLUME
NO URAIAN PEKERJAAN Section P L T
( Mtr ) ( Mtr ) ( Mtr ) Unit ( M3 )
JUMLAH 3.01
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Arkan Jasa Rencana
Nama Pekerjaan : Benang Sudut
Satuan Pembayaran : m'
DIMENSI
Jumlah VOLUME
NO URAIAN PEKERJAAN SKETSA GAMBAR P L T
( Mtr ) ( Mtr ) ( Unit ) ( M3 )
JUMLAH 206.08
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Arkan Jasa Rencana
Nama Pekerjaan : III Pasangan ACP Lt 2
Satuan Pembayaran : M2
DIMENSI
VOLUME
NO URAIAN PEKERJAAN SKETSA GAMBAR P T
( Mtr ) ( Mtr ) ( M2 )
Area Tangga E
9.95 4.07 2.20 - 2.20 38.30 76.59 76.59 56.72 109.89 30.12 1.99 4.55
7.55 4.07 3 0.18 0.18 30.55 61.46 61.46 43.04 2.48 2.2 1.65
4.35 4.07 2 0.12 0.12 17.59 35.41 35.41 24.80 2.69 11.54 12.75
1.07 4.07 2 0.12 0.12 4.24 8.71 8.71 6.10 2.48 1.04 10.64
2.85 4.07 3 0.18 0.18 11.42 23.20 23.20 16.25 2.69 1.1 9.80
1.34 4.07 0.74 - 0.74 4.71 9.42 9.42 7.64 2.73 3.25
6.75 0.9 4 0.05 0.05 6.02 12.15 12.15 38.48 3.13 8.10
parapet 249.51 1 28 0.40 0.40 249.11 499.02 499.02 249.51 4.56 1.25
Kolom - - - 584.64 462.84 462.84 5.41
30.12
R.ahu Ac 4.05 4.07 2.20 1 0.06 2.26 14.22 28.57 28.57 23.09 2.65 8.10
R.file 3.58 4.07 2.20 1 0.06 2.26 12.31 24.74 24.74 20.41 2.52 1.25
- - - - 0.00 0.00 2.73
R.tunggu, Front Office & Triage 5.44 1 - - 5.44 10.88 10.88 35.36 1.59 10.88
9.8 1 - - 9.80 19.60 19.60 63.70 26.40 4.31 19.60
13.3 4.07 7.40 6.38 3 0.18 13.96 40.18 80.70 80.70 86.45 30.12 161.40
2.44 4.07 - - 9.93 19.86 19.86 15.86 2.81 4.88
toilet 3.95 4.07 1.60 2 0.12 1.72 14.36 28.95 28.95 25.68 2.81 7.90
3.35 4.07 2 0.12 0.12 13.52 27.27 27.27 21.78 2.89 6.7
3.82 4.07 4 0.23 0.23 15.31 31.09 31.09 21.77 2.85 7.64
3.35 4.07 1.69 1 0.06 1.75 11.88 23.88 23.88 19.10 2.52 6.7
1.05 4.07 1.69 - 1.69 2.58 5.16 5.16 5.99 14.00 2.1
2.5 4.07 1.69 2 0.12 1.81 8.36 16.96 16.96 14.25 5.13 5
1.5 4.07 1 0.06 0.06 6.05 12.21 12.21 8.55 16.61 3
1.5 4.07 1 0.06 0.06 6.05 12.21 12.21 8.55 2.48 3
plaza 15.6 4.07 2 0.12 0.12 63.37 126.98 126.98 88.92 2.89 31.2
linen 5.9 4.07 2.13 2.20 12 0.70 5.04 18.98 39.36 39.36 33.63 5.21 11.8
- - - - 0.00 0.00 13.92
Observasi bed 17.34 4.07 4.18 6 0.35 4.53 66.04 132.79 132.79 98.84 20.35 2.52 34.68
8.37 4.07 2 0.12 0.12 33.95 68.13 68.13 47.71 13.92 16.74 8.37
9.8 1 2 0.03 0.03 9.77 19.60 19.60 55.86 2.73 19.60
5.73 1 2 0.03 0.03 5.70 11.46 11.46 32.66 2.73 11.46
10.95 1 3 0.04 0.04 10.91 21.90 21.90 62.42 10.42 10.95
2.4 4.07 2 0.12 0.12 9.65 19.54 19.54 13.68
- - - - 0.00 0.00
Lab 10.2 4.07 4.40 4 0.23 4.63 36.88 74.23 74.23 58.14 61.05 4.75 9.05
4.45 4.07 4.24 1 0.06 4.30 13.82 27.75 27.75 25.37 30.008 4.45
2.4 4.07 2 0.12 0.12 9.65 19.54 19.54 13.68
1.2 4.07 2.20 2 0.12 2.32 2.57 5.37 5.37 6.84 28.05 16.73
2.3 4.07 4.18 - 4.18 5.18 10.36 10.36 13.11 15.81 4.42
R.dokter 1.2 4.07 2.20 2 0.12 2.32 2.57 5.37 5.37 6.84
1.4 4.07 - - 5.70 11.40 11.40 7.98 13.29
R.Sample 5.62 4.07 0.96 4.4 3 0.18 5.54 17.34 35.03 35.03 32.03 6.41
1.2 4.07 1.69 2 0.12 1.81 3.08 6.39 6.39 6.84 2.5
mushola 2.3 4.07 4.45
bvd3 0.8 2 2 0.06 0.06 1.54 3.20 3.20 4.56 122.1 12.17
4.17 4.07 1 0.06 0.06 16.91 33.94 33.94 23.77
0.8 4.07 1 0.06 0.06 3.20 6.51 6.51 4.56
s.hok 2.42 4.07 1.76 1 0.06 1.82 8.03 16.18 16.18 13.79
0.84 4.07 - - 3.42 6.84 6.84 4.79
koridor dkt lif 0.8 2.2 - - 1.76 3.52 3.52 4.56
shaf 1.8 4.07 - - 7.33 14.65 14.65 10.26
1.6 4.07 - - 6.51 13.02 13.02 9.12
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat dlm Benang Sudut Keramik dnding Cat luar Ring Balk Plin
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m')
As. C - D 2.5 4.07 - - 10.18 20.35 20.35 14.25 4.17
1.4 4.07 2.2 - 2.20 3.50 7.00 7.00 7.98 5.05
- - - - 0.00 0.00 9.84
2.37 4.07 3.89 - 3.89 5.76 11.51 11.51 13.51 2.64
1 4.07 - - 4.07 8.14 8.14 5.70 9.7
ex.mushola
bvd2 0.8 1.35 2.22
toilet 1.3 4.07 2 0.12 0.12 5.17 10.58 10.58 7.41 2.19
1.36 4.07 1.69 1 0.06 1.75 3.79 7.69 7.69 7.75 2
3.57 4.07 2 0.12 0.12 14.41 29.06 29.06 20.35 4.76
0.8 4.07 1.69 - 1.69 1.57 3.13 3.13 4.56 2.64
2.82 4.07 1.69 3 0.18 1.87 9.61 19.57 19.57 16.07
3.61 4.07 1.69 4 0.23 1.92 12.77 26.01 26.01 20.58
2.4 4.07 3.39 1 0.06 3.45 6.32 12.76 12.76 13.68
1.9 4.07 - - 7.73 15.47 15.47 10.83
As. A - C 3.48 4.07 1.69 3 0.18 1.87 12.30 24.95 24.95 19.84 2.7
msct-scan - - - - 0.00 0.00 3.2
1.2 4.07 - - 4.88 9.77 9.77 6.84
toilet 1 4.07 - - 4.07 8.14 8.14 5.70
2.48 4.07 3.39 2 0.12 3.51 6.59 13.41 13.41 14.14
0.9 4.07 1.69 - 1.69 1.97 3.95 3.95 5.13
ka. Unit 7.24 4.07 3.97 3 0.18 4.15 25.32 50.99 50.99 41.27 9.39
adm 6.79 4.07 15.02 2.20 2 0.12 17.34 10.30 20.83 20.83 38.70 2.88 5.03
3.4 4.07 - - 13.84 27.68 27.68 19.38 3.4
2.3 4.07 3.388 - 3.39 5.97 11.95 11.95 13.11 2.3
1.85 4.07 - - 7.53 15.06 15.06 10.55 3.7
gdg 4.3 4.07 3 0.18 0.18 17.33 35.00 35.00 24.51 8.6 9.1
2.5 4.07 1.08 1.08 - 2.16 8.02 16.03 16.03 14.25 5
- - - - 0.00 0.00
R.tindakan & R.dokter 13.92 4.07 4.76 6.38 3 0.18 11.32 45.34 91.03 91.03 79.34 126.17 25.37 13.92
3.43 4.07 1 0.06 0.06 13.90 27.92 27.92 19.55 13.06
3.85 4.07 1.69 - 1.69 13.98 27.95 27.95 21.95 7.7
8.32 4.07 4 0.23 0.23 33.63 67.72 67.72 47.42 14.69 11.5
2.46 4.07 - - 10.01 20.02 20.02 14.02 8.2
5.69 4.07 1.60 3.55 2 0.12 5.27 17.89 36.02 36.02 32.43 47.96 5.69
4 4.07 5 0.29 0.29 15.99 32.56 32.56 22.80 8
1.77 4.07 1 0.06 0.06 7.15 14.41 14.41 10.09 3.54
0.81 4.07 - - 3.30 6.59 6.59 4.62 1.62
1.75 4.07 - - 7.12 14.25 14.25 9.98 3.5
2.5 4.07 1 0.06 0.06 10.12 20.35 20.35 14.25 5
4.14 4.07 - - 16.85 33.70 33.70 23.60 8.28
0.6 4.07 2 0.12 0.12 2.32 4.88 4.88 3.42 1.2
4.87 4.07 1.69 - 1.69 18.13 36.25 36.25 27.76 9.74
2.4 4.07 5.082 - 5.08 4.69 9.37 9.37 13.68 4.8
7.32 4.07 3.2 7.942 4 0.23 11.38 18.42 37.30 37.30 41.72 14.64
- - - - 0.00 0.00 0
pasien loby lif 20.61 4.07 12.76 8 0.47 13.23 70.65 142.25 142.25 117.48 93.61 41.22
6.6 4.07 6 0.35 0.35 26.51 53.72 53.72 37.62
3.2 4.07 - - 13.02 26.05 26.05 18.24 6.4
6.4 4.07 5.4 - 5.40 20.65 41.30 41.30 36.48 12.8
1.53 4.07 - - 6.23 12.45 12.45 8.72 3.06
koridor 2.4 4.07 - - 9.77 19.54 19.54 13.68 4.8
- - - - 0.00 0.00 0
lif pengunjung 7.4 4.07 5.588 3 0.18 5.76 24.35 49.06 49.06 42.18 7.4 7.4
2.62 4.07 2 0.12 0.12 10.55 21.33 21.33 14.93 5.24
1.38 4.07 - - 5.62 11.23 11.23 7.87 1.38
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat dlm Benang Sudut Keramik dnding Cat luar Ring Balk Plin
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m')
4.88 4.07 2.97 4 0.23 3.20 16.66 33.78 33.78 27.82 4.88
1.46 4.07 - - 5.94 11.88 11.88 8.32 1.46
1.34 4.07 - - 5.45 10.91 10.91 7.64 1.34
1.4 4.07 - - 5.70 11.40 11.40 7.98 1.4
1.06 4.07 - - 4.31 8.63 8.63 6.04 1.06
7.37 4.07 3 0.18 0.18 29.82 59.99 59.99 42.01 5.515
tangga 15.75 4.07 8 0.47 0.47 63.63 128.21 128.21 89.78 16.28
3.45 4.07 1 0.06 0.06 13.98 28.08 28.08 19.67 5.85
2.74 4.07 2 0.12 0.12 11.03 22.30 22.30 15.62 4.07 33.8
6.55 0.9 - - 5.90 11.79 11.79 37.34
- - - - 0.00 0.00
Informasi,pendafaran & caf 2.11 1 - - 2.11 4.22 4.22 12.03 40.56 2.11
8 0.5 - - 4.00 8.00 8.00 45.60
3.27 1 - - 3.27 6.54 6.54 18.64
8.4 4.07 4.264 4.18 3 0.18 8.62 25.57 51.49 51.49 47.88 8.4
rka 3.1 1 - - 3.10 6.20 6.20 17.67 85.47
6.1 4.07 1.08 2.20 2 0.12 3.40 21.43 43.09 43.09 34.77 11.6
r.file 7.35 4.07 0.56 2.20 - 2.76 27.15 54.31 54.31 41.90 9.7
2.4 4.07 2 0.12 0.12 9.65 19.54 19.54 13.68 9.35 1.37
- - - - 0.00 0.00
medical record 9.64 4.07 2.20 4 0.23 2.43 36.80 74.07 74.07 54.95 15.17
3.51 1 - - 3.51 7.02 7.02 20.01
- - - - 0.00 0.00
alt non streril 3.7 4.07 2.20 2 0.12 2.32 12.74 25.72 25.72 21.09 2.15
alat steril 5.61 4.07 2.20 1 0.06 2.26 20.57 41.27 41.27 31.98 1.11
43.05 4.07 94.004 4 0.23 94.24 80.98 162.42 162.42 245.39 13.06 1.06
- - - - 0.00 0.00
jan 3.75 4.07 1.54 2 0.12 1.66 13.61 27.45 27.45 21.38 118.03 4.32 2.65
R.perawat 5.54 4.07 2.20 3 0.18 2.38 20.17 40.70 40.70 31.58 16.65
10.15 4.07 2.94 6 0.35 3.29 38.02 76.74 76.74 57.86 8.60
- - - - 0.00 0.00
mushola 9.37 4.07 2.20 3 0.18 2.38 35.76 71.87 71.87 53.41 13.365 12.73
4.37 4.07 2 0.12 0.12 17.67 35.57 35.57 24.91 11.572 2.72 5.54
3.2 4.07 2 0.12 0.12 12.91 26.05 26.05 18.24 12.188 6.83 5.54
- - - - 0.00 0.00
linen 7.61 4.07 2.68 2.20 2 0.12 5.00 25.98 52.19 52.19 43.38 8.98
depo obat - - - - 0.00 0.00 9.57
obat - - - - 0.00 0.00 7.9 2.5
s.hok 2.9 4.07 0.74 3 0.18 0.92 10.88 22.12 22.12 16.53 12.65 2.35
1.15 4.07 - - 4.68 9.36 9.36 6.56
0.7 4.07 - - 2.85 5.70 5.70 3.99
3.18 4.07 1.08 2.20 2 0.12 3.40 9.55 19.33 19.33 18.13 3.23
1.15 4.07 - - 4.68 9.36 9.36 6.56
- - - - 0.00 0.00
one day care 29.94 4.07 23.74 4.18 10 0.59 28.51 93.35 187.87 187.87 170.66 35.44
14.52 4.07 8 0.47 0.47 58.63 118.19 118.19 82.76 36.63
7.5 4.07 3 0.18 0.18 30.35 61.05 61.05 42.75
1.1 4.07 - - 4.48 8.95 8.95 6.27 2.2
20.78 4.07 5.588 7 0.41 6.00 78.58 157.97 157.97 118.45 18.04 18.24
3.18 4.07 1 0.06 0.06 12.88 25.89 25.89 18.13 113.96 30.70
5.05 4.07 1 0.06 0.06 20.49 41.11 41.11 28.79
7.4 4.07 11.517 - 11.52 18.60 37.20 37.20 42.18
7.5 4.07 - - 30.53 61.05 61.05 42.75 18.07
6.05 4.07 0.56 2.20 3 0.18 2.94 21.69 43.73 43.73 34.49 9.05 5.05
7.72 4.07 1.64 4.40 3 0.18 6.22 25.20 50.76 50.76 44.00 9.85
2.77 4.07 - - 11.27 22.55 22.55 15.79 8.85
4.74 4.07 0.56 2.20 3 0.18 2.94 16.36 33.06 33.06 27.02 9.1 2.72
8.52 4.07 1.08 2.20 3 0.18 3.46 31.22 62.79 62.79 48.56 10.06
2.05 4.07 0.56 2.20 2 0.12 2.88 5.47 11.17 11.17 11.69 8.8
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat dlm Benang Sudut Keramik dnding Cat luar Ring Balk Plin
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m')
- - - - 0.00 0.00
X- 33.15 4.07 33.74 16 0.94 34.67 100.25 202.37 202.37 188.96 325.6 3.25 20.10
ray,R.control,msct- 10.97 4.07 4.18 3 0.18 4.36 40.29 80.94 80.94 62.53
scan.R.kardio.
Treadmill 5.98 4.07 0.68 2.20 2 0.12 3.00 21.34 42.92 42.92 34.09 11
12.47 4.07 4.18 4 0.23 4.41 46.34 93.15 93.15 71.08
6.51 4.07 1.08 2.20 2 0.12 3.40 23.10 46.43 46.43 37.11 8.82
5.38 4.07 2.20 1 0.06 2.26 19.64 39.39 39.39 30.67
- - - - 0.00 0.00
usg,r.pacu jantung,echo,ekg,holter - - - - 0.00 0.00
12.73 4.07 3.76 10.78 5 0.29 14.83 36.98 74.54 74.54 72.56 7.83
4.03 4.07 - - 16.40 32.80 32.80 22.97 203.5 12.52
6.05 4.07 2 0.12 0.12 24.51 49.25 49.25 34.49 12.92
5.46 4.07 2 0.12 0.12 22.10 44.44 44.44 31.12 11.17
8.39 4.07 2.20 3 0.18 2.38 31.77 63.89 63.89 47.82 12.27
5.81 4.07 2.20 2 0.12 2.32 21.33 42.89 42.89 33.12 14.42
4.37 4.07 2.20 2 0.12 2.32 15.47 31.17 31.17 24.91 14.57
7 4.07 2.20 3 0.18 2.38 26.11 52.58 52.58 39.90 12.02
dse 6.5 4.07 1.08 2.20 2 0.12 3.40 23.06 46.35 46.35 37.05 12.02
- - - - 0.00 0.00
Ruang ganti,toilet, R.kontrol 4.6 4.07 2.20 2 0.12 2.32 16.40 33.04 33.04 26.22 41.44 3.6
4.15 4.07 3 0.18 0.18 16.71 33.78 33.78 23.66 4.15
3.87 4.07 4.90 3 0.18 5.08 10.68 21.70 21.70 22.06 41.44 0.87
1.3 4.07 3 0.18 0.18 5.12 10.58 10.58 7.41
4.6 4.07 4 0.23 0.23 18.49 37.44 37.44 26.22 4.6
5.85 4.07 3 0.18 0.18 23.63 47.62 47.62 33.35 5.85
7.81 4.07 5 0.29 0.29 31.49 63.57 63.57 44.52 17.24 7.81
4.25 4.07 4.40 4 0.23 4.63 12.66 25.80 25.80 24.23 2.25
5.94 4.07 - - 24.18 48.35 48.35 33.86 17.24 11.88
2 4.07 3.39 2 0.12 3.51 4.63 9.50 9.50 11.40 1
3.98 4.07 3.39 1 0.06 3.45 12.75 25.62 25.62 22.69 2.98
3.47 4.07 3 0.18 0.18 13.95 28.25 28.25 19.78 22.55 3.47
1.35 4.07 2 0.12 0.12 5.38 10.99 10.99 7.70 1.35
1.34 4.07 2 0.12 0.12 5.34 10.91 10.91 7.64 11.198 1.34
6.19 4.07 4 0.23 0.23 24.96 50.39 50.39 35.28
23.95 4.07 13.20 10 0.59 13.79 83.69 168.55 168.55 136.52 12.54 17.95
6.6 4.07 3.39 4 0.23 3.62 23.24 46.95 46.95 37.62 6.6
3.74 4.07 4 0.23 0.23 14.99 30.44 30.44 21.32 12.54 3.74
3.74 4.07 3 0.18 0.18 15.05 30.44 30.44 21.32 3.74
3 4.07 3 0.18 0.18 12.03 24.42 24.42 17.10 14.96 3
6 4.07 6.78 4 0.23 7.01 17.41 35.29 35.29 34.20 2
2.4 4.07 4.18 2 0.12 4.30 5.47 11.18 11.18 13.68 16.5 0.50
4.07 21.85 4.07 5.59 7 0.41 6.00 82.93 166.68 166.68 124.55 18.85
3.3 4.07 - - 13.43 26.86 26.86 18.81 12.95
3.3 4.07 2 0.12 0.12 13.31 26.86 26.86 18.81 3.3 6.63
3.71 4.07 2 0.12 0.12 14.98 30.20 30.20 21.15 7.42
3.3 4.07 2 0.12 0.12 13.31 26.86 26.86 18.81 6.6
6.6 4.07 4 0.23 0.23 26.63 53.72 53.72 37.62 10.3
2.15 4.07 2 0.12 0.12 8.63 17.50 17.50 12.26
3.3 4.07 4.4 2 0.12 4.52 8.91 18.06 18.06 18.81 12.32 3.3
Parapet 138.08 0.8 10 0.14 0.14 110.32 220.93 220.93 787.06 276.16
55 0.8 13 0.52 0.52 43.48 88.00 88.00 313.50 110.00
Bata di bawah Ramp 01 27.5 2.25 13 0.52 0.52 61.36 123.75 123.75 123.75
Area Lengkung (U Bed Head) 22.4 0.9 11 0.44 0.44 19.72 20.16 20.16 20.16
1274.4 24.80 3,878.03 8,370.15 8,248.35 8,015.23 1473.2 481.82 766.82 17.86 762.435 687.754 91.46
- - - -
- - - -
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat dlm Benang Sudut Keramik dnding Cat luar Ring Balk Plin
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m')
Partisi - - - -
12 2.85 8.8 - 8.80 25.40
15 2.85 - - 42.75 48.28
7.04 2.85 - - 20.06 12.84
2.67 2.85 - - 7.61
2.9 2.85 - - 8.27 27.32
1.2 2.85 - - 3.42 6.84
1.3 2.85 - - 3.71 7.41
2.4 2.85 - - 6.84 13.68
1.92 2.85 - - 5.47 10.94
2.35 2.85 - - 6.70 13.40
2.45 2.85 - - 6.98 13.97
23.35 2.85 - - 66.55 133.10
19.88 2.85
2.29 4.07 2 0.12 0.12 9.20 18.41 18.41 13.05 9.52 2.29
7.92 4.07 3 0.18 0.18 32.06 64.12 64.12 45.14 468.05 6.35 7.92
6.31
Toilet 3.24 4.07 0.01 4 0.23 0.25 12.94 25.88 25.88 18.47 1.0175 3.24
3.47 4.07 0.01 1 0.06 0.07 14.05 28.10 28.10 19.78 10.615 4.0293 3.47
1.07 4.07 1 0.06 0.06 4.30 8.59 8.59 6.96 1.0175 1.07
Lemari Ganti 3.6 4.07 2 0.12 0.12 14.53 29.07 29.07 20.52 3.6
Linen Bersi, Alat Steril,Gdg obat 3.6 4.07 5 0.29 0.29 14.36 28.72 28.72 20.52 3.6
VIP 3 13.5 3.60 3 0.16 0.16 48.44 96.89 96.89 76.95 13.5
5.17 3.75 2 0.11 0.11 19.28 38.56 38.56 29.47 10.34
2.35 3.75 2 0.11 0.11 8.70 17.41 17.41 13.40 4.7
3.62 3.60 3.99 1 0.05 4.05 8.99 8.99 11.77 3.62
toilet 7.1 4.07 0.01 5 0.29 0.31 28.59 57.18 57.18 40.47 10.505 7.1
VIP2 2.32 4.07 2 0.12 0.12 9.33 18.65 18.65 13.22 2.32
5.4 4.07 6 0.35 0.35 21.63 43.25 43.25 30.78 5.4
6.97 3.60 1.64 - 1.64 23.46 23.46 22.65 6.97
3.35 3.60 3.99 - 3.99 8.07 16.13 16.13 19.10 577.94 10.505 3.35
TANGGA E 3.67 4.07 2 0.12 0.12 14.82 29.64 29.64 20.92 3.67
12.63 3.75 2.20 8 0.43 2.63 44.73 89.46 89.46 71.99 12.63
Ahu AC 8.55 4.07 7 0.41 0.41 34.39 68.78 68.78 48.74 8.55
3.25 4.07 0.74 3 0.18 0.92 12.31 24.62 24.62 18.53 3.25
0.67 4.07 - - 2.73 5.45 5.45 3.82 0.67
Alat non steril,steril & linen 5.97 4.07 2.20 4 0.23 2.43 21.86 43.73 43.73 34.03 5.97
3.8 4.07 2.20 3 0.18 2.38 13.09 26.18 26.18 21.66 3.8
3.5 4.07 2.20 2 0.12 2.32 11.93 23.86 23.86 19.95 3.5
Kamar Rawat Dewasa & anak 20.7 3.6 2 4.61 4.61 69.91 139.82 139.82 117.99 20.7
5.72 4.07 6 0.35 0.35 22.93 45.86 45.86 32.60 5.72
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat dlm Benang Sudut Keramik dnding Cat luar Ring Balk Plin
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m')
17.37 4.07 8 0.47 0.47 70.23 140.45 140.45 99.01 17.37
8.35 3.6 5 0.26 0.26 29.80 59.60 59.60 47.60 8.35
3.5 4.07 2.20 2 0.12 2.32 11.93 23.86 23.86 19.95 3.5
6.12 4.07 2.20 1 0.06 2.26 22.65 45.30 45.30 34.88 2.02
3.75 4.07 2.20 1 0.06 2.26 13.00 26.01 26.01 21.38 3.75
- - -
Lemari ganti,R.meeting,pantry 2.5 4.07 4.18 - 4.18 6.00 11.99 11.99 14.25 2.5
11 4.07 13.13 - 13.13 31.64 63.27 63.27 62.70 11
3.85 4.07 1 0.06 0.06 15.61 31.22 31.22 21.95 3.85
0.55 4.07 - - 2.24 4.48 4.48 3.14 0.55
1.03 4.07 - - 4.19 8.38 8.38 5.87 1.03
4.03 4.07 2 0.12 0.12 16.28 32.57 32.57 22.97 4.03
3.87 4.07 - - 15.75 31.50 31.50 22.06 3.87
2.31 4.07 2 0.12 0.12 9.28 18.57 18.57 13.17 2.31
gdg alat & dirty linen 4.17 4.07 2.20 2 0.12 2.32 14.65 29.31 29.31 23.77 4.17
SWIP 2
Linen bersih 4.73 4.07 4.10 3 0.18 4.28 14.98 29.95 29.95 26.96 4.73
toilet 4.72 4.07 1.69 - 1.69 17.52 35.03 35.03 26.90 23.10 4.72
1.5 4.07 1 0.06 0.06 6.05 12.09 8.55 8.55 1.5
64.24 8.91 8.91
11.27 4.07 2.79 2 0.12 2.91 42.96 85.92 85.92
room 2.36
7.2 4.07 9.04 - 9.04 20.26 20.26 23.40 7.2
SWIP 2 13.65 4.07 3.54 6 0.35 3.89 51.67 51.67 51.67 77.81 8.91 8.91
4.74
6.75 4.07 6.32 - 6.32 21.15 21.15 21.94 6.75
toilet 4.95 4.07 1.69 2 0.12 1.81 18.34 36.67 36.67 28.22 23.10 4.95
1.43 4.07 2 0.12 0.12 5.70 11.41 11.41 8.15 22.33 1.43
Shok & Disabled 24.55 4.07 8.79 - 8.79 91.13 182.27 182.27 139.94 24.55
2.07 4.07 2 0.12 0.12 8.31 16.62 16.62 11.80 54.45 2.07
3.1 4.07 2 0.12 0.12 12.50 25.00 25.00 17.67 3.1
1.75 4.07 2 0.12 0.12 7.01 14.01 14.01 9.98 1.75
4 4.07 5 0.29 0.29 15.99 31.97 31.97 22.80 5.09 4
1.9 4.07 2 0.12 0.12 7.62 15.23 15.23 10.83 1.9
0.81 4.07 2 0.12 0.12 3.18 6.36 6.36 4.62 0.81
4.83 4.07 1.69 4 0.23 1.93 17.73 35.46 35.46 27.53 4.83
1.92 4.07 3.39 2 0.12 3.51 4.31 8.62 8.62 10.94 1.92
4.2 4.07 - - 17.09 34.19 34.19 23.94 4.2
- - -
Area Lobby Pasien 7.37 4.07 8.58 - 8.58 21.42 42.83 42.83 42.01 7.37
14.43 4.07 6.38 6 0.35 6.73 52.00 104.00 104.00 82.25 14.43
5.25 4.07 1.35 5 0.29 1.64 19.72 39.45 39.45 29.93 5.25
1.55 4.07 2 0.12 0.12 6.19 12.38 12.38 8.84 1.55
1.6 4.07 1.35 2 0.12 1.47 5.04 10.09 10.09 9.12 1.6
1.49 4.07 2 0.12 0.12 5.95 11.89 11.89 8.49 1.49
5.23 4.07 1.35 4 0.23 1.58 19.70 39.40 39.40 29.81 5.23
w2d 1.57 4.07 - - 6.39 12.78 12.78 8.95 1.57
1.62 4.07 1.35 2 0.12 1.47 5.13 10.25 10.25 9.23 1.62
7.35 4.07 3 0.18 0.18 29.74 59.48 59.48 41.90 7.35
Clean,Dirty & SL,pl 10.35 4.07 9.77 1 0.06 9.83 32.30 64.60 64.60 59.00 10.35
7.38 4.07 3 0.18 0.18 29.86 59.72 59.72 42.07 7.38
1.45 4.07 - - 5.90 11.80 11.80 8.27 1.45
1.34 4.07 - - 5.45 10.91 10.91 7.64 1.34
1.35 4.07 - - 5.49 10.99 10.99 7.70 1.35
1.07 4.07 - - 4.35 8.71 8.71 6.10 1.07
8.3 4.07 4 0.23 0.23 33.55 67.09 67.09 47.31 8.3
8.56 4.07 - - 34.84 69.68 69.68 48.79 8.56
2.4 4.07 1.49 2 0.12 1.60 8.17 16.33 16.33 13.68 2.4
3.24 4.07 1 0.06 0.06 13.13 26.26 26.26 18.47 3.24
0.6 4.07 - - 2.44 4.88 4.88 3.42 0.6
2.42 4.07 1.49 - 1.49 8.36 16.73 16.73 13.79 2.42
area tangga utama 35.72 4.07 9.09 - 9.09 136.29 272.58 272.58 203.60 15.76 35.72
dan ruang perawat 12.02 4.07 2 0.12 0.12 48.80 97.61 97.61 68.51 3.08 12.02
2.66 4.07 2 0.12 0.12 10.71 21.42 21.42 15.16 2.66
8.52 4.07 12.71 3 0.18 12.89 21.79 43.58 43.58 48.56 8.52
1.85 4.07 - - 7.53 15.06 15.06 10.55 1.85
3.09 4.07 1 0.06 0.06 12.52 25.04 25.04 17.61 3.09
3.2 4.07 2 0.12 0.12 12.91 25.81 25.81 18.24 3.2
vip 2 8.35 3.6 4 0.21 0.21 29.85 59.71 59.71 47.60 16.7
4.3 4.07 - - 17.50 17.50 13.98 8.6
11.4 4.07 4.49 - 4.49 41.91 83.82 83.82 64.98 11.4
toilet 4.63 4.07 - - 18.84 37.69 37.69 26.39 22.96 4.63
vip 1 9.52 4.07 2.79 - 2.79 35.95 71.90 71.90 54.26 9.52
4.3 4.07 3.99 - 3.99 13.51 13.51 24.51 4.3
toilet 9.29 4.07 1.69 6 0.35 2.05 35.76 71.53 71.53 52.95 22.96 9.29
lubang shaf 1.1 4.07 1.35 - 1.35 3.13 6.25 6.25 6.27 1.1
R.dokter lk 6.25 4.07 2.20 3 0.18 2.38 23.06 46.12 46.12 35.63 6.25
R.dokter pr 6.75 4.07 2.20 2 0.12 2.32 25.16 50.31 50.31 38.48 6.75
4.2 4.07 - - 17.09 17.09 13.82 4.2
R.konsul 5.72 4.07 4.40 3 0.18 4.58 18.70 37.41 37.41 32.60 5.72
4.34 4.07 4.57 - 4.57 13.10 13.10 14.11 4.34
R.ganti 8.39 4.07 3.39 4 0.23 3.62 30.52 61.05 61.05 47.82 8.39
1.47 4.07 - - 5.98 11.97 11.97 8.38 1.47
nst 5.7 4.07 4.18 - 4.18 19.02 38.04 38.04 32.49 11.4
koridor 2.4 4.07 4.18 - 4.18 5.59 11.18 11.18 13.68 2.4
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat dlm Benang Sudut Keramik dnding Cat luar Ring Balk Plin
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m')
R.tunggu
Gdg obat,linen,alt steril& non 9.89 4.07 8.80 4 0.23 9.03 31.22 62.44 62.44 56.37 9.89
11.4 4.07 8.80 6 0.35 9.15 37.25 74.49 74.49 64.98 11.4
7.05 4.07 - - 28.69 57.39 57.39 40.19 7.05
koridor 2.4 4.07 4.40 - 4.40 5.37 10.74 10.74 13.68 2.4
nst 5.07 4.07 2.20 2 0.12 2.32 18.32 36.64 36.64 28.90 5.07
R.ka 8.12 4.07 2.13 4 0.23 2.37 30.68 61.36 61.36 46.28 8.12
dirty linen 6.79 4.07 2.20 2 0.12 2.32 25.32 50.64 50.64 38.70 6.79
pantry 7.05 4.07 2.20 - 2.20 26.49 52.99 52.99 40.19 9.878 9.878
7.04
K.rawat anak 4 bed 11.37 4.07 4.18 2 0.12 4.30 41.98 83.96 83.96 64.81 11.37
11.19 4.07 2 0.12 0.12 45.43 90.85 90.85 63.78 11.19
1.95 4.07 2 0.12 0.12 7.82 15.64 15.64 11.12 1.95
6.95 4.07 11.37 - 11.37 16.92 16.92 39.62 6.95
loker mhs 6.8 4.07 3.20 3 0.18 3.38 24.30 48.60 48.60 38.76 34.65 6.8
5.97 3.6 2 0.10 0.10 21.39 42.78 42.78 34.03 5.97
1.55 3.6 3 0.16 0.16 5.42 10.85 10.85 8.84 1.55
10.27 4.07 5.59 5 0.29 5.88 35.92 71.84 71.84 58.54 10.27
6.13 4.07 2.27 - 2.27 22.68 22.68 34.94 6.13
7.49 4.07 4.90 4 0.23 5.13 25.35 50.70 50.70 42.69 7.49
R.kontrol & panel 11.59 4.07 2.20 3 0.18 2.38 44.80 89.59 89.59 66.06 11.59
3.85 4.07 4.90 2 0.12 5.02 10.65 21.30 21.30 21.95 3.85
3.05 4.07 2 0.12 0.12 12.30 24.59 24.59 17.39 3.05
1 4.07 - - 4.07 8.14 8.14 5.70 1
koridor 2.43 4.07 4.18 - 4.18 5.71 11.42 11.42 13.85 2.43
area pintu ke roof garden 3.83 4.07 3.45 2.20 - 5.65 9.94 9.94 12.45 3.83
Partisi
Panjang Tinggi Pengurang Vol. dinding
Area ( Ruang ) Grid
(m) (m) jendela Pintu Kp Vol (m2)
1 2 3 4 5 6 7 8 9
24 2.85 68.40
4.88 2.85 13.91
11.5 2.85 32.78
2.2 2.85 6.27
121.35
Hal 22
LANTAI 1
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat Benang Sudut Keramik dnding Wallpaper Cubical Trey Plin
Area ( Ruang ) Grid meja beton
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (m') m3
(12x12) (5+6+7) (3x4)-8)*2
Area Tangga E
9.95 4.07 2.20 - 2.20 38.30 76.59 76.59 56.72 109.89 4.55
7.55 4.07 3 0.18 0.18 30.55 61.46 61.46 43.04 1.65
4.35 4.07 2 0.12 0.12 17.59 35.41 35.41 24.80 12.75 granite
1.07 4.07 2 0.12 0.12 4.24 8.71 8.71 6.10 10.64
2.85 4.07 3 0.18 0.18 11.42 23.20 23.20 16.25 9.80
1.34 4.07 0.74 - 0.74 4.71 9.42 9.42 7.64 3.25
6.75 0.9 4 0.05 0.05 6.02 12.15 12.15 38.48 8.10
parapet 249.51 1 28 0.40 0.40 249.11 499.02 499.02 249.51 1.25
- - - -
R.ahu Ac 4.05 4.07 2.20 1 0.06 2.26 14.22 28.57 28.57 23.09 8.10
R.file 3.58 4.07 2.20 1 0.06 2.26 12.31 24.74 24.74 20.41 1.25
- - - - 0.00 0.00
R.tunggu, Front Office & Triage 5.44 1 - - 5.44 10.88 10.88 35.36 10.88
9.8 1 - - 9.80 19.60 19.60 63.70 26.40 19.60
13.3 4.07 7.40 6.38 3 0.18 13.96 40.18 80.70 80.70 86.45 161.40
2.44 4.07 - - 9.93 19.86 19.86 15.86 4.88
toilet 3.95 4.07 1.60 2 0.12 1.72 14.36 28.95 28.95 25.68 7.90 0.18
3.35 4.07 2 0.12 0.12 13.52 27.27 27.27 21.78 6.7
3.82 4.07 4 0.23 0.23 15.31 31.09 31.09 21.77 7.64
3.35 4.07 1.69 1 0.06 1.75 11.88 23.88 23.88 19.10 6.7
1.05 4.07 1.69 - 1.69 2.58 5.16 5.16 5.99 2.1
2.5 4.07 1.69 2 0.12 1.81 8.36 16.96 16.96 14.25 5
1.5 4.07 1 0.06 0.06 6.05 12.21 12.21 8.55 3 1.57
1.5 4.07 1 0.06 0.06 6.05 12.21 12.21 8.55 3
plaza 15.6 4.07 2 0.12 0.12 63.37 126.98 126.98 88.92 31.2
linen 5.9 4.07 2.13 2.20 12 0.70 5.04 18.98 39.36 39.36 33.63 11.8
- - - - 0.00 0.00
Observasi bed 17.34 4.07 4.18 6 0.35 4.53 66.04 132.79 132.79 98.84 20.35 34.68
8.37 4.07 2 0.12 0.12 33.95 68.13 68.13 47.71 16.74 8.37
9.8 1 2 0.03 0.03 9.77 19.60 19.60 55.86 19.60
5.73 1 2 0.03 0.03 5.70 11.46 11.46 32.66 11.46
10.95 1 3 0.04 0.04 10.91 21.90 21.90 62.42 10.95
2.4 4.07 2 0.12 0.12 9.65 19.54 19.54 13.68
- - - - 0.00 0.00
Lab 10.2 4.07 4.40 4 0.23 4.63 36.88 74.23 74.23 58.14 61.05 4.75 9.05 0.86
4.45 4.07 4.24 1 0.06 4.30 13.82 27.75 27.75 25.37 30.008 4.45
2.4 4.07 2 0.12 0.12 9.65 19.54 19.54 13.68
0.00 0.00 28.05
ka. Unit 7.24 4.07 3.97 3 0.18 4.15 25.32 50.99 50.99 41.27 9.39
adm 6.79 4.07 15.02 2.20 2 0.12 17.34 10.30 20.83 20.83 38.70 2.88 5.03
3.4 4.07 - - 13.84 27.68 27.68 19.38 3.4
2.3 4.07 3.388 - 3.39 5.97 11.95 11.95 13.11 2.3
1.85 4.07 - - 7.53 15.06 15.06 10.55 3.7
gdg 4.3 4.07 3 0.18 0.18 17.33 35.00 35.00 24.51 8.6 9.1
2.5 4.07 1.08 1.08 - 2.16 8.02 16.03 16.03 14.25 5
- - - - 0.00 0.00
R.tindakan & R.dokter 13.92 4.07 4.76 6.38 3 0.18 11.32 45.34 91.03 91.03 79.34 126.17 25.37 13.92 0.6
3.43 4.07 1 0.06 0.06 13.90 27.92 27.92 19.55 13.06
3.85 4.07 1.69 - 1.69 13.98 27.95 27.95 21.95 7.7
8.32 4.07 4 0.23 0.23 33.63 67.72 67.72 47.42 14.69 11.5
2.46 4.07 - - 10.01 20.02 20.02 14.02 8.2
5.69 4.07 1.60 3.55 2 0.12 5.27 17.89 36.02 36.02 32.43 47.96 5.69
4 4.07 5 0.29 0.29 15.99 32.56 32.56 22.80 8
1.77 4.07 1 0.06 0.06 7.15 14.41 14.41 10.09 3.54
Hal 23
0.81 4.07 - - 3.30 6.59 6.59 4.62 1.62
1.75 4.07 - - 7.12 14.25 14.25 9.98 3.5
2.5 4.07 1 0.06 0.06 10.12 20.35 20.35 14.25 5
4.14 4.07 - - 16.85 33.70 33.70 23.60 8.28
0.6 4.07 2 0.12 0.12 2.32 4.88 4.88 3.42 1.2
4.87 4.07 1.69 - 1.69 18.13 36.25 36.25 27.76 9.74
2.4 4.07 5.082 - 5.08 4.69 9.37 9.37 13.68 4.8
7.32 4.07 3.2 7.942 4 0.23 11.38 18.42 37.30 37.30 41.72 14.64
- - - - 0.00 0.00 0
pasien loby lif 20.61 4.07 12.76 8 0.47 13.23 70.65 142.25 142.25 117.48 93.61 41.22
6.6 4.07 6 0.35 0.35 26.51 53.72 53.72 37.62
3.2 4.07 - - 13.02 26.05 26.05 18.24 6.4
6.4 4.07 5.4 - 5.40 20.65 41.30 41.30 36.48 12.8
1.53 4.07 - - 6.23 12.45 12.45 8.72 3.06
koridor 2.4 4.07 - - 9.77 19.54 19.54 13.68 4.8
- - - - 0.00 0.00 0
lif pengunjung 7.4 4.07 5.588 3 0.18 5.76 24.35 49.06 49.06 42.18 7.4 7.4
2.62 4.07 2 0.12 0.12 10.55 21.33 21.33 14.93 5.24
1.38 4.07 - - 5.62 11.23 11.23 7.87 1.38
4.88 4.07 2.97 4 0.23 3.20 16.66 33.78 33.78 27.82 4.88
1.46 4.07 - - 5.94 11.88 11.88 8.32 1.46
1.34 4.07 - - 5.45 10.91 10.91 7.64 1.34
1.4 4.07 - - 5.70 11.40 11.40 7.98 1.4
1.06 4.07 - - 4.31 8.63 8.63 6.04 1.06
7.37 4.07 3 0.18 0.18 29.82 59.99 59.99 42.01 5.515
tangga 15.75 4.07 8 0.47 0.47 63.63 128.21 128.21 89.78 16.28
3.45 4.07 1 0.06 0.06 13.98 28.08 28.08 19.67 5.85
2.74 4.07 2 0.12 0.12 11.03 22.30 22.30 15.62 4.07 33.8
6.55 0.9 - - 5.90 11.79 11.79 37.34
- - - - 0.00 0.00
Informasi,pendafaran & caf 2.11 1 - - 2.11 4.22 4.22 12.03 40.56 2.11
8 0.5 - - 4.00 8.00 8.00 45.60
3.27 1 - - 3.27 6.54 6.54 18.64
8.4 4.07 4.264 4.18 3 0.18 8.62 25.57 51.49 51.49 47.88 8.4
rka 3.1 1 - - 3.10 6.20 6.20 17.67 85.47
6.1 4.07 1.08 2.20 2 0.12 3.40 21.43 43.09 43.09 34.77 11.6
r.file 7.35 4.07 0.56 2.20 - 2.76 27.15 54.31 54.31 41.90 9.7
2.4 4.07 2 0.12 0.12 9.65 19.54 19.54 13.68 9.35 1.37
- - - - 0.00 0.00
medical record 9.64 4.07 2.20 4 0.23 2.43 36.80 74.07 74.07 54.95 15.17
3.51 1 - - 3.51 7.02 7.02 20.01
- - - - 0.00 0.00
alt non streril 3.7 4.07 2.20 2 0.12 2.32 12.74 25.72 25.72 21.09 2.15
alat steril 5.61 4.07 2.20 1 0.06 2.26 20.57 41.27 41.27 31.98 1.11
43.05 4.07 94.004 4 0.23 94.24 80.98 162.42 162.42 245.39 13.06 1.06
- - - - 0.00 0.00
jan 3.75 4.07 1.54 2 0.12 1.66 13.61 27.45 27.45 21.38 105.82 4.32 2.65
R.perawat 5.54 4.07 2.20 3 0.18 2.38 20.17 40.70 40.70 31.58 16.65
10.15 4.07 2.94 6 0.35 3.29 38.02 76.74 76.74 57.86 8.60
- - - - 0.00 0.00
mushola 9.37 4.07 2.20 3 0.18 2.38 35.76 71.87 71.87 53.41 13.365 12.73
4.37 4.07 2 0.12 0.12 17.67 35.57 35.57 24.91 11.572 2.72 5.54
3.2 4.07 2 0.12 0.12 12.91 26.05 26.05 18.24 12.188 6.83 5.54
- - - - 0.00 0.00
linen 7.61 4.07 2.68 2.20 2 0.12 5.00 25.98 52.19 52.19 43.38 8.98
depo obat - - - - 0.00 0.00 9.57
obat - - - - 0.00 0.00 7.9 2.5
s.hok 2.9 4.07 0.74 3 0.18 0.92 10.88 22.12 22.12 16.53 12.65 2.35
1.15 4.07 - - 4.68 9.36 9.36 6.56
0.7 4.07 - - 2.85 5.70 5.70 3.99
3.18 4.07 1.08 2.20 2 0.12 3.40 9.55 19.33 19.33 18.13 3.23
1.15 4.07 - - 4.68 9.36 9.36 6.56
- - - - 0.00 0.00
Hal 24
one day care 29.94 4.07 23.74 4.18 10 0.59 28.51 93.35 187.87 187.87 170.66 35.44
14.52 4.07 8 0.47 0.47 58.63 118.19 118.19 82.76 24.42
7.5 4.07 3 0.18 0.18 30.35 61.05 61.05 42.75
1.1 4.07 - - 4.48 8.95 8.95 6.27 2.2
20.78 4.07 5.588 7 0.41 6.00 78.58 157.97 157.97 118.45 18.04 18.24
3.18 4.07 1 0.06 0.06 12.88 25.89 25.89 18.13 101.75 30.70
5.05 4.07 1 0.06 0.06 20.49 41.11 41.11 28.79
7.4 4.07 11.517 - 11.52 18.60 37.20 37.20 42.18
7.5 4.07 - - 30.53 61.05 61.05 42.75 18.07
6.05 4.07 0.56 2.20 3 0.18 2.94 21.69 43.73 43.73 34.49 9.05 5.05
7.72 4.07 1.64 4.40 3 0.18 6.22 25.20 50.76 50.76 44.00 9.85
2.77 4.07 - - 11.27 22.55 22.55 15.79 8.85
4.74 4.07 0.56 2.20 3 0.18 2.94 16.36 33.06 33.06 27.02 9.1 2.72
8.52 4.07 1.08 2.20 3 0.18 3.46 31.22 62.79 62.79 48.56 10.06
2.05 4.07 0.56 2.20 2 0.12 2.88 5.47 11.17 11.17 11.69 8.8
- - - - 0.00 0.00
X- 33.15 4.07 33.74 16 0.94 34.67 100.25 202.37 202.37 188.96 321.53 3.25 20.10
ray,R.control,msct- 10.97 4.07 4.18 3 0.18 4.36 40.29 80.94 80.94 62.53
scan.R.kardio.
Treadmill 5.98 4.07 0.68 2.20 2 0.12 3.00 21.34 42.92 42.92 34.09 11
12.47 4.07 4.18 4 0.23 4.41 46.34 93.15 93.15 71.08
6.51 4.07 1.08 2.20 2 0.12 3.40 23.10 46.43 46.43 37.11 8.82
5.38 4.07 2.20 1 0.06 2.26 19.64 39.39 39.39 30.67
- - - - 0.00 0.00
usg,r.pacu jantung,echo,ekg,holter - - - - 0.00 0.00
12.73 4.07 3.76 10.78 5 0.29 14.83 36.98 74.54 74.54 72.56 7.83
4.03 4.07 - - 16.40 32.80 32.80 22.97 195.36 12.52
6.05 4.07 2 0.12 0.12 24.51 49.25 49.25 34.49 12.92
5.46 4.07 2 0.12 0.12 22.10 44.44 44.44 31.12 11.17
8.39 4.07 2.20 3 0.18 2.38 31.77 63.89 63.89 47.82 12.27
5.81 4.07 2.20 2 0.12 2.32 21.33 42.89 42.89 33.12 14.42
4.37 4.07 2.20 2 0.12 2.32 15.47 31.17 31.17 24.91 14.57
7 4.07 2.20 3 0.18 2.38 26.11 52.58 52.58 39.90 12.02
dse 6.5 4.07 1.08 2.20 2 0.12 3.40 23.06 46.35 46.35 37.05 12.02
- - - - 0.00 0.00
Ruang ganti,toilet, R.kontrol 4.6 4.07 2.20 2 0.12 2.32 16.40 33.04 33.04 26.22 41.44 3.6
4.15 4.07 3 0.18 0.18 16.71 33.78 33.78 23.66 4.15
3.87 4.07 4.90 3 0.18 5.08 10.68 21.70 21.70 22.06 41.44 0.87 0.128
1.3 4.07 3 0.18 0.18 5.12 10.58 10.58 7.41
4.6 4.07 4 0.23 0.23 18.49 37.44 37.44 26.22 4.6
5.85 4.07 3 0.18 0.18 23.63 47.62 47.62 33.35 5.85
7.81 4.07 5 0.29 0.29 31.49 63.57 63.57 44.52 17.24 7.81
4.25 4.07 4.40 4 0.23 4.63 12.66 25.80 25.80 24.23 2.25
5.94 4.07 - - 24.18 48.35 48.35 33.86 17.24 11.88
2 4.07 3.39 2 0.12 3.51 4.63 9.50 9.50 11.40 1
3.98 4.07 3.39 1 0.06 3.45 12.75 25.62 25.62 22.69 2.98
3.47 4.07 3 0.18 0.18 13.95 28.25 28.25 19.78 22.55 3.47
1.35 4.07 2 0.12 0.12 5.38 10.99 10.99 7.70 1.35
1.34 4.07 2 0.12 0.12 5.34 10.91 10.91 7.64 11.198 1.34
6.19 4.07 4 0.23 0.23 24.96 50.39 50.39 35.28 0.3
23.95 4.07 13.20 10 0.59 13.79 83.69 168.55 168.55 136.52 12.54 17.95
6.6 4.07 3.39 4 0.23 3.62 23.24 46.95 46.95 37.62 6.6
3.74 4.07 4 0.23 0.23 14.99 30.44 30.44 21.32 12.54 3.74
3.74 4.07 3 0.18 0.18 15.05 30.44 30.44 21.32 3.74
3 4.07 3 0.18 0.18 12.03 24.42 24.42 17.10 14.96 3
6 4.07 6.78 4 0.23 7.01 17.41 35.29 35.29 34.20 2
2.4 4.07 4.18 2 0.12 4.30 5.47 11.18 11.18 13.68 16.5 0.50
4.07 21.85 4.07 5.59 7 0.41 6.00 82.93 166.68 166.68 124.55 18.85
3.3 4.07 - - 13.43 26.86 26.86 18.81 12.95
3.3 4.07 2 0.12 0.12 13.31 26.86 26.86 18.81 3.3 6.63
3.71 4.07 2 0.12 0.12 14.98 30.20 30.20 21.15 7.42
3.3 4.07 2 0.12 0.12 13.31 26.86 26.86 18.81 6.6
6.6 4.07 4 0.23 0.23 26.63 53.72 53.72 37.62 10.3
2.15 4.07 2 0.12 0.12 8.63 17.50 17.50 12.26
Hal 25
3.3 4.07 4.4 2 0.12 4.52 8.91 18.06 18.06 18.81 12.32 3.3
1211.06 21.36 3,443.35 6,929.42 6,929.42 5,760.97 1302.26 569.70 407.54 683.334 57.66 1.81
- - - -
- - - -
Partisi - - - -
12 2.85 8.8 - 8.80 25.40
15 2.85 - - 42.75 48.28
7.04 2.85 - - 20.06 12.84
2.67 2.85 - - 7.61
2.9 2.85 - - 8.27 27.32
1.2 2.85 - - 3.42 6.84
1.3 2.85 - - 3.71 7.41
2.4 2.85 - - 6.84 13.68
1.92 2.85 - - 5.47 10.94
2.35 2.85 - - 6.70 13.40
2.45 2.85 - - 6.98 13.97
23.35 2.85 - - 66.55 133.10
19.88 2.85
94.46 105.00
7.92 4.07 3 0.18 0.18 32.06 64.12 64.12 45.14 468.05 7.92
Toilet 3.24 4.07 0.01 4 0.23 0.25 12.94 25.88 25.88 18.47 3.24
3.47 4.07 0.01 1 0.06 0.07 14.05 28.10 28.10 19.78 10.615 3.47 0.25
Lemari Ganti 3.6 4.07 2 0.12 0.12 14.53 29.07 29.07 20.52 3.6
Linen Bersi, Alat Steril,Gdg obat 3.6 4.07 5 0.29 0.29 14.36 28.72 28.72 20.52 3.6
VIP 3 13.5 3.60 3 0.16 0.16 48.44 96.89 96.89 76.95 13.5
5.17 3.75 2 0.11 0.11 19.28 38.56 38.56 29.47 10.34
2.35 3.75 2 0.11 0.11 8.70 17.41 17.41 13.40 4.7
3.62 3.60 3.99 1 0.05 4.05 8.99 8.99 11.77 3.62
toilet 7.1 4.07 0.01 5 0.29 0.31 28.59 57.18 57.18 40.47 10.505 7.1
Hal 26
VIP2 2.32 4.07 2 0.12 0.12 9.33 18.65 18.65 13.22 2.32
5.4 4.07 6 0.35 0.35 21.63 43.25 43.25 30.78 5.4
6.97 3.60 1.64 - 1.64 23.46 23.46 22.65 6.97
3.35 3.60 3.99 - 3.99 8.07 16.13 16.13 19.10 577.94 10.505 3.35
TANGGA E 3.67 4.07 2 0.12 0.12 14.82 29.64 29.64 20.92 3.67 0.056
12.63 3.75 2.20 8 0.43 2.63 44.73 89.46 89.46 71.99 12.63
Ahu AC 8.55 4.07 7 0.41 0.41 34.39 68.78 68.78 48.74 8.55
3.25 4.07 0.74 3 0.18 0.92 12.31 24.62 24.62 18.53 3.25
0.67 4.07 - - 2.73 5.45 5.45 3.82 0.67
Alat non steril,steril & linen 5.97 4.07 2.20 4 0.23 2.43 21.86 43.73 43.73 34.03 5.97
3.8 4.07 2.20 3 0.18 2.38 13.09 26.18 26.18 21.66 3.8
3.5 4.07 2.20 2 0.12 2.32 11.93 23.86 23.86 19.95 3.5
0.45
Kamar Rawat Dewasa & anak 20.7 3.6 2 4.61 4.61 69.91 139.82 139.82 117.99 20.7
5.72 4.07 6 0.35 0.35 22.93 45.86 45.86 32.60 5.72
17.37 4.07 8 0.47 0.47 70.23 140.45 140.45 99.01 17.37
8.35 3.6 5 0.26 0.26 29.80 59.60 59.60 47.60 8.35
3.5 4.07 2.20 2 0.12 2.32 11.93 23.86 23.86 19.95 3.5
6.12 4.07 2.20 1 0.06 2.26 22.65 45.30 45.30 34.88 2.02
3.75 4.07 2.20 1 0.06 2.26 13.00 26.01 26.01 21.38 3.75
- - -
Lemari ganti,R.meeting,pantry 2.5 4.07 4.18 - 4.18 6.00 11.99 11.99 14.25 2.5
11 4.07 13.13 - 13.13 31.64 63.27 63.27 62.70 11
3.85 4.07 1 0.06 0.06 15.61 31.22 31.22 21.95 3.85
0.55 4.07 - - 2.24 4.48 4.48 3.14 0.55
1.03 4.07 - - 4.19 8.38 8.38 5.87 1.03
4.03 4.07 2 0.12 0.12 16.28 32.57 32.57 22.97 4.03
3.87 4.07 - - 15.75 31.50 31.50 22.06 3.87
2.31 4.07 2 0.12 0.12 9.28 18.57 18.57 13.17 2.31
gdg alat & dirty linen 4.17 4.07 2.20 2 0.12 2.32 14.65 29.31 29.31 23.77 4.17
SWIP 2
Linen bersih 4.73 4.07 4.10 3 0.18 4.28 14.98 29.95 29.95 26.96 4.73
toilet 4.72 4.07 1.69 - 1.69 17.52 35.03 35.03 26.90 23.10 4.72
1.5 4.07 1 0.06 0.06 6.05 12.09 8.55 8.55 1.5
64.24 8.91 8.91
11.27 4.07 2.79 2 0.12 2.91 42.96 85.92 85.92
room 2.36
7.2 4.07 9.04 - 9.04 20.26 20.26 23.40 7.2
SWIP 2 13.65 4.07 3.54 6 0.35 3.89 51.67 51.67 51.67 77.81 8.91 8.91
4.74
6.75 4.07 6.32 - 6.32 21.15 21.15 21.94 6.75
toilet 4.95 4.07 1.69 2 0.12 1.81 18.34 36.67 36.67 28.22 23.10 4.95
1.43 4.07 2 0.12 0.12 5.70 11.41 11.41 8.15 22.33 1.43
Shok & Disabled 24.55 4.07 8.79 - 8.79 91.13 182.27 182.27 139.94 24.55
2.07 4.07 2 0.12 0.12 8.31 16.62 16.62 11.80 54.45 2.07
3.1 4.07 2 0.12 0.12 12.50 25.00 25.00 17.67 3.1
1.75 4.07 2 0.12 0.12 7.01 14.01 14.01 9.98 1.75
4 4.07 5 0.29 0.29 15.99 31.97 31.97 22.80 5.09 4
1.9 4.07 2 0.12 0.12 7.62 15.23 15.23 10.83 1.9
0.81 4.07 2 0.12 0.12 3.18 6.36 6.36 4.62 0.81
4.83 4.07 1.69 4 0.23 1.93 17.73 35.46 35.46 27.53 4.83
1.92 4.07 3.39 2 0.12 3.51 4.31 8.62 8.62 10.94 1.92
4.2 4.07 - - 17.09 34.19 34.19 23.94 4.2
- - -
Area Lobby Pasien 7.37 4.07 8.58 - 8.58 21.42 42.83 42.83 42.01 7.37
14.43 4.07 6.38 6 0.35 6.73 52.00 104.00 104.00 82.25 14.43
5.25 4.07 1.35 5 0.29 1.64 19.72 39.45 39.45 29.93 5.25
1.55 4.07 2 0.12 0.12 6.19 12.38 12.38 8.84 1.55
Hal 27
1.6 4.07 1.35 2 0.12 1.47 5.04 10.09 10.09 9.12 1.6
1.49 4.07 2 0.12 0.12 5.95 11.89 11.89 8.49 1.49
5.23 4.07 1.35 4 0.23 1.58 19.70 39.40 39.40 29.81 5.23
1.57 4.07 - - 6.39 12.78 12.78 8.95 1.57
1.62 4.07 1.35 2 0.12 1.47 5.13 10.25 10.25 9.23 1.62
7.35 4.07 3 0.18 0.18 29.74 59.48 59.48 41.90 7.35
Clean,Dirty & SL,pl 10.35 4.07 9.77 1 0.06 9.83 32.30 64.60 64.60 59.00 10.35
7.38 4.07 3 0.18 0.18 29.86 59.72 59.72 42.07 7.38
1.45 4.07 - - 5.90 11.80 11.80 8.27 1.45
1.34 4.07 - - 5.45 10.91 10.91 7.64 1.34
1.35 4.07 - - 5.49 10.99 10.99 7.70 1.35
1.07 4.07 - - 4.35 8.71 8.71 6.10 1.07
8.3 4.07 4 0.23 0.23 33.55 67.09 67.09 47.31 8.3
8.56 4.07 - - 34.84 69.68 69.68 48.79 8.56
2.4 4.07 1.49 2 0.12 1.60 8.17 16.33 16.33 13.68 2.4
3.24 4.07 1 0.06 0.06 13.13 26.26 26.26 18.47 3.24
0.6 4.07 - - 2.44 4.88 4.88 3.42 0.6
2.42 4.07 1.49 - 1.49 8.36 16.73 16.73 13.79 2.42
area tangga utama 35.72 4.07 9.09 - 9.09 136.29 272.58 272.58 203.60 15.76 35.72
dan ruang perawat 12.02 4.07 2 0.12 0.12 48.80 97.61 97.61 68.51 3.08 12.02
2.66 4.07 2 0.12 0.12 10.71 21.42 21.42 15.16 2.66
8.52 4.07 12.71 3 0.18 12.89 21.79 43.58 43.58 48.56 8.52
1.85 4.07 - - 7.53 15.06 15.06 10.55 1.85
Hal 28
3.09 4.07 1 0.06 0.06 12.52 25.04 25.04 17.61 3.09
3.2 4.07 2 0.12 0.12 12.91 25.81 25.81 18.24 3.2
vip 2 8.35 3.6 4 0.21 0.21 29.85 59.71 59.71 47.60 16.7
4.3 4.07 - - 17.50 17.50 13.98 8.6
11.4 4.07 4.49 - 4.49 41.91 83.82 83.82 64.98 11.4
toilet 4.63 4.07 - - 18.84 37.69 37.69 26.39 22.96 4.63
vip 1 9.52 4.07 2.79 - 2.79 35.95 71.90 71.90 54.26 9.52
4.3 4.07 3.99 - 3.99 13.51 13.51 24.51 4.3
toilet 9.29 4.07 1.69 6 0.35 2.05 35.76 71.53 71.53 52.95 22.96 9.29
lubang shaf 1.1 4.07 1.35 - 1.35 3.13 6.25 6.25 6.27 1.1
R.dokter lk 6.25 4.07 2.20 3 0.18 2.38 23.06 46.12 46.12 35.63 6.25
R.dokter pr 6.75 4.07 2.20 2 0.12 2.32 25.16 50.31 50.31 38.48 6.75
4.2 4.07 - - 17.09 17.09 13.82 4.2
R.konsul 5.72 4.07 4.40 3 0.18 4.58 18.70 37.41 37.41 32.60 5.72
4.34 4.07 4.57 - 4.57 13.10 13.10 14.11 4.34
R.ganti 8.39 4.07 3.39 4 0.23 3.62 30.52 61.05 61.05 47.82 8.39
1.47 4.07 - - 5.98 11.97 11.97 8.38 1.47
nst 5.7 4.07 4.18 - 4.18 19.02 38.04 38.04 32.49 11.4
koridor 2.4 4.07 4.18 - 4.18 5.59 11.18 11.18 13.68 2.4
R.tunggu
Gdg obat,linen,alt steril& non 9.89 4.07 8.80 4 0.23 9.03 31.22 62.44 62.44 56.37 9.89
11.4 4.07 8.80 6 0.35 9.15 37.25 74.49 74.49 64.98 11.4
7.05 4.07 - - 28.69 57.39 57.39 40.19 7.05
koridor 2.4 4.07 4.40 - 4.40 5.37 10.74 10.74 13.68 2.4
nst 5.07 4.07 2.20 2 0.12 2.32 18.32 36.64 36.64 28.90 5.07
R.ka 8.12 4.07 2.13 4 0.23 2.37 30.68 61.36 61.36 46.28 8.12
dirty linen 6.79 4.07 2.20 2 0.12 2.32 25.32 50.64 50.64 38.70 6.79
pantry 7.05 4.07 2.20 - 2.20 26.49 52.99 52.99 40.19 9.878 9.878 0.3
7.04
K.rawat anak 4 bed 11.37 4.07 4.18 2 0.12 4.30 41.98 83.96 83.96 64.81 11.37
11.19 4.07 2 0.12 0.12 45.43 90.85 90.85 63.78 11.19
1.95 4.07 2 0.12 0.12 7.82 15.64 15.64 11.12 1.95
6.95 4.07 11.37 - 11.37 16.92 16.92 39.62 6.95
loker mhs 6.8 4.07 3.20 3 0.18 3.38 24.30 48.60 48.60 38.76 34.65 6.8
5.97 3.6 2 0.10 0.10 21.39 42.78 42.78 34.03 5.97
1.55 3.6 3 0.16 0.16 5.42 10.85 10.85 8.84 1.55
10.27 4.07 5.59 5 0.29 5.88 35.92 71.84 71.84 58.54 10.27
6.13 4.07 2.27 - 2.27 22.68 22.68 34.94 6.13
7.49 4.07 4.90 4 0.23 5.13 25.35 50.70 50.70 42.69 7.49
R.kontrol & panel 11.59 4.07 2.20 3 0.18 2.38 44.80 89.59 89.59 66.06 11.59
3.85 4.07 4.90 2 0.12 5.02 10.65 21.30 21.30 21.95 3.85
3.05 4.07 2 0.12 0.12 12.30 24.59 24.59 17.39 3.05
1 4.07 - - 4.07 8.14 8.14 5.70 1
koridor 2.43 4.07 4.18 - 4.18 5.71 11.42 11.42 13.85 2.43
area pintu ke roof garden 3.83 4.07 3.45 2.20 - 5.65 9.94 9.94 12.45 3.83
- - - 0
20.89 2849.99 6334.29 6334.29 4817.20 1108.19 286.803 449.09 583.43 27.70 1.056
Benang sudut CW 30 45.4
Benang sudut CW 5 & CW 9 16.8
Hal 29
LANTAI LMR
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat Sudutan Keramik dnding Wallpaper Cubical Trey Plin
Area ( Ruang ) Grid meja beton
(m) (m) jendela Pintu Kp Vol (m2) (m2) (m2) (m2) m' (m2) (m2) (m') HT HP KR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 m3
(12x12) (5+6+7) ((3x4)-8)*2
R. Mesin Lif 4' CD 11.00 3.00 4 0.17 0.17 32.83 65.65 65.65 62.70
Samp Tangga 7' CD 11.00 3.00 4 0.17 0.17 32.83 65.65 65.65 62.70
C 4'-7' 23.00 3.00 4.18 6 0.26 4.44 64.56 129.12 129.12 131.10 51.00
D 4'-7' 23.00 3.00 6.38 7 0.30 6.68 62.32 124.64 124.64 131.10 13.20
R. Mesin Lif 5' CD 8.60 3.00 5 0.22 0.22 25.58 51.17 51.17 49.02
5'" CD 8.60 3.00 8.36 8 0.35 8.71 17.09 34.19 34.19 49.02
Bel. Tangga C 7-7' 7.00 3.00 4 0.17 0.17 20.83 41.65 41.65 22.75
Dep Tangga D 7' 6.50 3.00 2.20 2 0.09 2.29 17.21 34.43 34.43 21.13
Area Shaf C D 5' 14.40 3.00 4.40 18 0.78 5.18 38.02 76.04 76.04 82.08
5' 4.64 3.00 8.80 8 0.35 9.15 4.77 9.55 9.55 26.45
Rg. Mesin Lif C' 24.9 3.00 8.80 18 0.78 9.58 65.12 65.12 65.12 80.93
Hal 30
LANTAI BASEMENT
Panjang Tinggi Pengurang Vol. dinding Plesteran Aci Cat Keramik KM
Area ( Ruang ) No Ket
(m) (m) Kusen jendela Pintu Kolom (8) Vol (m2) (m2) (m2) (m2) (m2)
1 2 3 4 5 6 7 K Kp Vol Kolom 9 10 11 12 13 14 15
(12x12) (6+7+8) ((3x4)-9)*2
R.Enginering A 7-7' 36.90 4.37 D2, 3 BV2, 2 BV 1c 3.91 2.20 12 Kp 12 6.29 12.40 148.86 310.30 310.30 310.30
Security, MEP, Medikal H B 9-10 6.45 3.9 3.64 5Kp 5 2.34 5.98 19.17 43.02 43.02 43.02
H B' 8-10 17.75 4.05 2 D18 8.36 10 Kp 10 4.86 13.22 58.67 127.06 127.06 127.06
H C' 8-10 17.75 4.05 2LV1,1LV2 1.97 10 Kp 10 4.86 6.83 65.06 139.85 139.85 139.85
V 7' B'-C' 9.00 4.37 3Kp 3 1.57 1.57 37.76 78.66 78.66 78.66
V 9 B'-C' 8.25 3.9 3Kp 3 1.40 1.40 30.76 64.32 64.32 64.32
V 9' B-B' 4.29 3.9 D2,WD4 7.29 2.20 2Kp 2 0.94 10.42 6.31 14.49 14.49 14.49
V 10 B-D 15.80 3.9 2LV2 3.58 6Kp 6 2.81 6.38 55.24 116.09 116.09 116.09
Bawah Ram 2
KM 3.00 2.31 2Kp 2 0.55 0.55 6.38 13.86 7.86 7.86 6.00
7.34 2.68 2D12 5.59 4Kp 4 1.29 6.87 12.80 28.17 0.37 0.37 27.80
Rg. Kontrol E' 5.00 3.1 D2 2.20 1Kp 1 0.37 2.57 12.93 26.60 26.60 26.60
F' 4.15 3.77 1Kp 1 0.45 0.45 15.19 31.29 31.29 31.29
Mushollah 4.70 3.77 2LV2 1.94 2Kp 2 0.90 2.84 14.87 31.56 31.56 31.56
Kantin 10 G-G' 4.11 4.17 1Kp 1 0.50 0.50 16.64 34.28 34.28 34.28
Kantin Lengkung 10' 11.80 4.17 - - 98.41 98.41 49.21
Ram sisi dalam 23.92 2.085 2LV2 1.94 6Kp 6 1.50 3.44 46.43 95.87 95.87 95.87
Ram sisi dalam Thp 2 40.60 2.085 169.30 169.30 169.30
Bawah Ram 1
Dinding Luar ddg 1 BT 62.00 2.125 6Kp 6 1.53 8.54 123.21 263.50 263.50 263.50
Dinding Dalam ddg 1 BT 53.44 2.125 6Kp 6 1.53 8.54 105.02 227.12 227.12 227.12
A' 1-3 H1 13.48 4.07 D3,D12 3.89 8Kp 8 3.91 7.80 47.06 101.94 76.80 76.80 25.14
A' 2-4 H1a 10.42 4.07 D2,D11 4.40 6Kp 6 2.93 7.33 35.08 76.02 76.02 76.02
A' 1-5 H2 26.01 4.07 2D2,D12,D14,D5,2BV2,2BV3 5.36 6.84 15Kp 15 7.33 19.52 86.34 187.33 187.33 187.33
B 5-7 H2a 11.81 4.07 3D3,D12 8.29 7Kp 7 3.42 11.71 36.35 79.55 79.55 79.55
B 7'-8 H2b 15.36 4.07 4D8 11.18 1Kp 1 0.49 11.66 50.85 102.68 102.68 102.68
B 1-4' H3 31.62 4.07 3D13,D12 5.74 14kP/4K2 13.02 14 19.86 38.63 90.06 245.90 245.90 245.90
B 4'-5 (KM) H3a 4.20 4.07 - - 17.09 34.19 17.14 17.14 17.05
B' 5-7 H4 12.20 4.07 2D2 4.40 9Kp 9 4.40 8.80 40.86 90.51 90.51 90.51
B' 6'-7 H4a 7.70 4.07 2D13,D12,D8 7.19 3KP 3 1.47 8.65 22.69 48.30 48.30 48.30
B' 8-8' (KM) H4b 10.00 4.07 2D12,BVD2 1.08 3.39 2Kp 2 0.98 5.44 35.26 72.46 64.10 64.10 8.36
C 7 (KM) H4c 2.00 4.07 16.28 10.78 10.78 5.50
C 4'-7' H5 13.80 4.07 3D3 6.60 5Kp 5 2.44 9.04 47.12 99.13 99.13 99.13
C 6-6' H5a 4.50 4.07 D3 2.20 3Kp 3 1.47 3.67 14.65 32.23 32.23 32.23
C 9-10 H6 9.39 4.07 D20 5.28 5Kp 5 2.44 7.72 30.50 65.87 65.87 65.87
C 4'-9 H6a 30.28 4.07 D12,2D21,3D3,2BVD1,BVD4 4.29 18.85 18Kp 18 8.79 31.94 91.30 200.19 200.19 200.19
C 1-10 H7 61.06 4.073D20,D10,D13,2D2,D4,D14,D12,W2R 1.49 34.07 42Kp/7K2 22.79 42 43.30 101.65 146.86 425.91 425.91 425.91
C5 H7a,H7b 4.00 4.07 - - 16.28 32.56 23.76 23.76 8.80
4 C-D H7c 23.63 4.07 4 D12 2.97 7Kp 7 3.42 6.39 186.41 186.41 186.41
C' 5'-6 (KM) H7d 12.00 4.07 D12 1.69 1K2, 3Kp 3.26 3 24.26 25.95 22.89 94.29 39.29 39.29 55.00
C 8 (KM) H 7e 3.50 4.07 28.49 18.87 18.87 9.63
D8 H 7f 13.52 4.07 4D12 6.78 10Kp 10 4.88 11.66 43.37 96.50 60.64 60.64 35.86
C' 8 H7j 6.48 4.07 52.75 52.75 52.75
C 8 (KM) H 7h 8.02 4.07 D2 2.20 2Kp 2 0.98 16.61 16.03 60.88 53.78 53.78 7.10 Pantry
D 8' H 7i 4.05 4.07 - - 16.48 32.97 16.47 16.47 16.50
D 1-3 H8 18.40 4.07 D2 2.20 7Kp 7 3.42 5.62 69.27 145.38 145.38 145.38
D 1-2 H 8a 5.38 4.07 D3 2.20 1Kp 1 0.49 2.69 19.21 39.39 39.39 39.39
D' 1-10 H9 35.15 4.07 4D3,D12,D21,2D2,BVD5 27 Kp 27 13.19 13.19 129.87 286.12 286.12 286.12
E 3-4 (KM) H9a 24.13 4.07 6 D12,D4 12.364 21 Kp 21 10.26 22.62 75.59 171.69 96.46 96.46 75.23
D 4-6 H10 15.00 4.07 D4, BVD7,2BV2 5.84 2.20 7 Kp 7 3.42 11.46 49.59 106.02 106.02 106.02
D' 7-9 H 10a 12.50 4.07 2BVD3, D20 3.20 5.28 7Kp 7 3.42 11.90 38.98 84.79 84.79 84.79
D' 4-6 H 10b 10.80 4.07 2D12,2BVD6 6.32 3.388 5Kp 5 2.44 12.15 31.81 68.50 68.50 68.50
D' 4-5 (KM) H 10c 6.95 4.07 2D4, D12 6.094 2Kp 2 0.98 7.07 21.22 44.39 44.39 44.39
E 4-5 (KM) H 10d 12.45 4.07 6 Kp 6 2.93 2.93 47.74 101.34 73.95 73.95 27.39
E 6 (T4 Wudhu) H 10e 1.60 4.07 2 Kp - - 6.51 13.02 9.50 9.50 3.52
E 6 (Janitor) H 10f 0.80 4.07 D12 1.69 - 1.69 1.56 3.12 3.12 3.12
E 7-8 H 10g 5.09 4.07 D2 2.20 4Kp 4 1.95 4.15 16.56 37.03 37.03 37.03
E 7'-8 H 10h 5.58 4.07 2D12 3.39 2 Kp 2 0.98 4.36 18.35 38.65 22.28 22.28 16.37
D 9'-10 H 10i 7.36 4.07 W2R,D20 1.49 5.28 6Kp 6 2.93 9.70 20.26 46.38 46.38 46.38
1 A-E V1 30.30 4.07 2D2,2D3 8.80 1K2,12Kp 3.26 12 9.12 17.92 105.40 229.04 229.04 229.04
2 A-E V2 19.40 4.07 2D2,2D3 8.80 1K2,6Kp 3.26 6 6.19 14.99 63.97 140.32 140.32 140.32
3 A-E V3 17.25 4.07 D2,D21,D12 9.17 2K2,5Kp 16.28 5 18.72 27.90 42.31 122.07 114.81 114.81 7.26
3' A-E V4 13.40 4.07 D 7, D12 5.87 5 Kp 5 2.44 8.32 46.22 97.33 97.33 97.33
D 3-4 (km) V 4a 22.02 4.07 - - 89.62 179.24 103.91 103.91 75.33
3' C-D V4b 7.20 4.07 2 D12,D 19 7.57 5 Kp 5 2.44 10.01 19.29 43.47 43.47 43.47
D 4 V 4c 11.40 4.07 - - 46.40 92.80 92.80 92.80
4' C-D (KM) V 4d 27.62 4.07 2 D12 3.39 2K2,15Kp 6.51 15 13.84 17.23 95.19 218.05 137.71 137.71 80.34
5 B-C V5 33.35 4.07 2D3 4.40 15 Kp 15 7.33 11.73 124.01 262.67 262.67 262.67
5 B-C V5a 6.00 4.07 2D12 3.39 8 Kp 8 3.91 7.30 17.12 42.06 28.86 28.86 13.20
4E V6 33.65 4.07 D2 2.20 3 K2, 10 Kp 9.77 10 14.65 16.85 120.10 269.51 266.54 266.54 2.97
4' E (KM) V6a 6.45 4.07 2 D12 3.388 8Kp 8 3.91 7.30 18.96 45.73 26.81 26.81 18.92
6B V7 47.80 4.07 D3,D12,D21 9.17 22Kp 22 10.74 33.35 161.20 370.74 369.24 369.24 1.50
8B V8 22.35 4.07 D12,D21 6.97 1K2,16Kp 3.26 16 11.07 18.04 72.92 167.98 161.60 161.60 6.38
V9 26.00 4.07 D11,D12,D20,D21 14.45 1K2,7Kp 3.26 7 6.67 21.13 84.69 182.73 182.73 182.73
8C V10 28.21 4.07 4D3,D12,D14 11.24 3K2,16Kp 9.77 16 17.58 28.82 85.98 207.12 204.26 204.26 2.86
8 C' (KM) V10a 19.00 4.07 3D12 5.082 K2,15Kp 3.26 15 10.58 15.66 61.67 144.50 102.70 102.70 41.80
7E V11 36.70 4.07 D2,D12,D21 9.17 4K2,14Kp 13.02 14 19.86 29.04 120.33 280.39 280.39 280.39
tangga & Lif L1 21.91 4.07 2D8, D21, D3 13.07 10 Kp 10 0.59 13.65 75.52 152.21 152.21 152.21
L2 15.84 4.07 4 D14 2.97 13Kp 13 0.76 3.73 60.74 61.50 61.50 61.50
L3 9.70 4.07 D13, D21 6.63 6Kp 6 0.35 6.98 32.50 65.70 65.70 65.70
La 12.80 4.07 D13, D21 3.10 6Kp 6 0.35 3.45 48.65 48.65 48.65 48.65
Lb 13.24 4.07 4k2,2Kp 13.02 2 0.12 0.12 53.77 107.77 107.77 107.77
LC 4.28 4.07 6 0.35 0.35 17.07
Ld 11.22 4.07 4 Kp 4 0.23 0.23 45.43 91.33 82.71 82.71 8.62
Le 6.90 4.07 D11 2.20 4 Kp 4 0.23 2.43 25.65 51.77 36.59 36.59 15.18
ddg stenlis 8.65 4.07 4Kp 4 0.23 0.23 34.97 70.41 70.41 70.41
Kolom Lt 2 47.20 4.07 - - 192.10
Dinding Luar sisi dlm - - - 673.80 673.80 673.80
TOTAL 489.00 3,223.31 8,068.04 7,482.23 7,674.33 585.81
Partisi
Panjang Tinggi Pengurang Vol
Area ( Ruang ) Grid
(m) (m) (m2) (m2)
1 2 3 4 9 9
Rg. Hemodialisa B8 10.86 2.85 13.12 17.83
0.04 5.98
0.10 14.64
0.09 6.65
0.04 5.98
0.24 34.16
0.03 9.5
0.35 43.2
0.06 21.2
1.45 253.79
0.12 15
0.12 15
0.16 43.2
0.01 0
0.28 75.6
0.03 0
0.52 140.4
0.10 18.9
0.07 12.6
0.26 50.4
0.05 11.34
0.00 0
0.10 18.9
0.12 32.4
0.56 170.61
0.14 25.9
0.11 26
0.22 51.03
0.05 9.28
0.16 30
0.25 43
0.31 50.4
0.22 34.65
0.05 8.2
0.13 19
0.05 24.108
0.10 37.488
0.07 21.42
0.18 48.184
0.10 26.064
0.06 14.718
0.14 31.408
0.39 59.7
0.09 18.728
0.20 39.928
0.13 23.2
0.03 9.54
0.19 55.55
0.05 12.48
0.42 64.72
0.10 25.6
0.03 7.7
0.04 9
0.02 3.3
6.55 1434.65
0.40 108
0.65 172.8
0.10 27
0.03 6.3
0.10 18.9
0.03 6.3
0.22 51.03
0.07 12.6
0.08 21.6
1.03 315.37
0.14 25.9
0.11 26
0.07 21.2
0.00 0
0.07 12.6
0.16 27.2
0.48 81.6
0.02 5.47
0.06 12
0.18 30.1
0.21 33.6
0.04 6.93
0.05 8.2
0.13 19
0.07 10.8
0.09 15.6
4.60 1076.1
0.36 97.2
0.60 162
0.01 0
0.02 5.4
0.07 12.6
0.20 37.8
0.05 11.34
0.23 44.1
0.04 10.8
0.62 191.29
0.16 29.6
0.12 29.25
0.00 0
0.17 39.69
0.02 5.47
0.31 64
0.03 4.3
0.28 44.8
0.09 13.86
0.06 9.5
0.31 82.4
3.76 798.2
0.16 43.2
0.07 12.6
0.02 5.4
0.13 25.2
0.13 25.2
0.51 55.8
PERHITUNGAN MUTUAL CHEK NOL (MC 0%)
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap III RSUP Wahidin Sudirohusodo
Kontraktor Pelaksa : PT. Hutama Karya (Persero)
Konsultan : PT. Daya Cipta Dianrancana
Nama Pekerjaan : III.2 Pekerjaan Plin
Satuan Pembayara : m2
HT HP Keramik 10 x30
NO URAIAN PEKERJAAN Area
(M') (M') (M')
1 Lt Basement
Rg. Engginering Dalam 37.90
Sisi Luar 10.94
Rg Security Dalam 20.00
Sisi Luar
Rg. MEP dan Medikal Gas Dalam
Sisi Luar
Tangga 37.77
B' 5'-7 Sisi Luar 12.78
Lift Lobby Pasien Sisi Dalam 24.80
R. Clean 11.52
R. Dirty 11.52
Lift Loby 20.00
Rg. Janitor 44.55
Selasar dep KM 9.07
Rg Kontrol 24.59
Mushollah 18.16
Kantin 21.04
Tangga Utama 22.20 14.45
279.84 24.80 22.20 14.45
Diperiksa Oleh : Diperiksa Oleh : Dihitung Oleh : Dihitung Oleh : Dihitung Oleh :
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap III RSUP Wahidin Sudirohusodo
Kontraktor Pelaksa : PT. Hutama Karya (Persero)
Konsultan : PT. Daya Cipta Dianrancana
Nama Pekerjaan : III.2 Pekerjaan Pasangan Lantai
Satuan Pembayara : m2
Diperiksa Oleh : Diperiksa Oleh : Dihitung Oleh : Dihitung Oleh : Dihitung Oleh :
VIANDRI PADUDUNG )
te Engineer Manager
ontraktor Pelaksana
utama Karya (Persero)
VIANDRI PADUDUNG )
te Engineer Manager
PLAFON LANTAI BASEMENT
Nama Ruang No Gypsumboard List GRC Akustik
9 mm Gypsum Tiles
2 3 4
Kolom
K3
K2
K1
K2 (Penebalan)
K2 (Penebalan)
Bawah Ramp 1
Bawah Ramp 2
Bawah Ramp 3
PLAFON LANTAI I
Nama Ruang No Gypsumboard List GRC Akustik
9 mm Gypsum Tiles
2 3 4
Kolom
K1 1
K2
K7
PLAFON LANTAI II
Nama Ruang No Gypsumboard List GRC Akustik
9 mm Gypsum Tiles
2 3 4
Kolom
K1 1
K2
K3
K4
K7
Kolom
K2
K3
K5
K7
Expose Curtain Box Metal Ceiling
Gypsum
5 6 7
152.88
386.88
577.2 1166.1
14.82
34.32
161.67
204.34
58.11 424.12
1,590.22
504
80.64
18.09
602.73
14.4
414.72
10.08
51.84
18.09
509.13
426.24
10.08
14.4
18.09
468.81
REKAPITULAS
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap III RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Daya Cipta Dianrancana
Nama Pekerjaan : III PEKERJAAN ARSITEKTUR
Sub Pekerjaan :
VOLUME
NO URAIAN PEKERJAAN SAT.
KONTRAK
LANTAI SATU
1 Memasang dinding bata ringan 200 x 600 x 100 m 2,875.59
2 Membuat plesteran semen instan m 5,176.06
3 Membuat acian semen instan m 5,176.06
4 Benang sudut m 1,555.97
5 Opening pintu & jendela m 1,331.34
6 Kolom praktis 12/12 m 16.05
7 Balok praktis 12/12 m 5.31
8 Memasang dinding partisi gypsum 12 mm m 105.00
9 Meja beton m 1.81
10 Dinding keramik 30 x 30 cm m 693.66
11 Plint homogenius 10 x 60 cm cutting size m 334.29
12 Plint keramik 10 x 30 cm cutting size m 105.82
13 Hospital plint m 725.80
14 Memasang Plint Granit Tiles Ex China 10 cm m 69.00
LANTAI DUA
1 Memasang dinding bata ringan 200 x 600 x 100 m 3,299.83
2 Membuat plesteran semen instan m 6,169.24
3 Membuat acian semen instan m 6,240.54
4 Benang sudut m 1,883.27
5 Opening pintu & jendela m 1,473.17
6 Kolom praktis 12/12 m 17.43
7 Balok praktis 12/12 m 3.76
8 Memasang dinding partisi gypsum 12 mm m 147.42
9 Meja beton m 1.17
10 Dinding keramik 30 x 30 cm m 608.90
11 Plint homogenius 10 x 60 cm cutting size m 368.15
12 Plint keramik 10 x 30 cm cutting size m 271.73
13 Hospital plint m 523.32
14 Memasang Plint Granit Tiles Ex China 10 cm m 69.00
LANTAI TIGA
1 Memasang dinding bata ringan 200 x 600 x 100 m 2,656.94
2 Membuat plesteran semen instan m 4,935.63
3 Membuat acian semen instan m 5,019.42
4 Benang sudut m 1,631.77
5 Opening pintu & jendela m 984.58
6 Kolom praktis 12/12 m 13.14
7 Balok praktis 12/12 m 0.13
8 Memasang dinding partisi gypsum 12 mm m 567.08
9 Meja beton m 3.29
10 Dinding keramik 30 x 30 cm m 497.94
11 Plint homogenius 10 x 60 cm cutting size m 286.75
12 Plint keramik 10 x 30 cm cutting size m 204.70
13 Hospital plint m 520.60
14 Memasang Plint Granit Tiles Ex China 10 cm m 69.00
LANTAI EMPAT
1 Memasang dinding bata ringan 200 x 600 x 100 m 3,346.62
2 Membuat plesteran semen instan m 4,921.48
4 Benang sudut m 1,863.26
5 Opening pintu & jendela m 1,054.00
6 Kolom praktis 12/12 m 17.92
7 Balok praktis 12/12 m 4.46
LANTAI LIFT MACHINE ROOM
1 Memasang dinding bata ringan 200 x 600 x 100 m 368.24
2 Membuat plesteran semen instan m 1,049.33
3 Membuat acian semen instan m 1,049.33
4 Benang sudut m 130.20
5 Opening pintu & jendela m 89.00
6 Kolom praktis 12/12 m 1.75
7 Balok praktis 12/12 m 0.33
Diperiksa Oleh :
- -
156,702.70 226,199,838.17 1,264.56 - -
71,949.17 186,945,098.85 2,877.40 279.11 20,081,558.51
36,050.30 93,669,283.60 2,822.70 224.41 8,089,960.94
9,742.60 4,661,832.60 629.28 150.78 1,468,988.76
60,827.38 16,596,749.96 253.79 - -
4,132,753.77 20,451,180.02 9.66 4.72 19,487,747.17
3,995,964.03 4,716,708.07 1.45 0.27 1,066,826.49
4,684,727.64 295,137.84 - -
60,336.38 2,081,604.94 22.20 - -
60,336.38 5,734,525.95 279.84 184.80 11,150,005.23
33,792.64 304,045.91 - -
129,488.98 3,284,487.85 24.80 - -
Diperiksa Oleh :
Konsultan Pengawas
PT. Daya Cipta Dian Rancana
(DIMAS P, S.T)
Staff Ahli
PEKERJAAN KURANG JUMLAH HARGA
KET.
VOLUME JUMLAH HARGA MC 0
- -
178.94 28,040,245.75 198,159,592.42 Kurang
- - 207,026,657.36 Tambah
- - 101,759,244.54 Tambah
- - 6,130,821.36 Kurang 22,718.20
19.06 1,159,369.82 15,437,380.15 Tambah
- - 39,938,927.19 Tambah
- - 5,783,534.56 Tambah
0.06 295,137.84 - Tambah
12.30 742,137.41 1,339,467.53 Kurang
- - 16,884,531.18 Tambah
9.00 304,045.91 - Tambah
0.57 73,161.27 3,211,326.58 Kurang
- - 9,903.80
- - 539,581,963.11 Tambah
- - 498,565,980.09 Tambah
- - 249,807,662.62 Tambah
253.71 2,471,745.54 12,687,394.21 Kurang
- - 87,265,753.89 Tambah
- - 88,282,563.66 Tambah
- - 63,209,234.76 Tambah
0.00 297.45 20,821,524.38 Kurang
- - 8,479,357.03 Tambah
123.96 31,566,212.45 145,075,139.01 Kurang
- - 24,589,486.27 Tambah
48.16 1,627,311.69 1,948,483.72 Kurang
42.47 5,498,801.12 88,484,219.24 Kurang
35.20 2,123,840.40 2,039,369.48 Kurang
- - 446,600,938.68 Tambah
- - 455,746,886.93 Tambah
- - 228,353,054.79 Tambah
523.58 5,101,019.13 10,796,648.43 Kurang
186.38 11,336,884.97 48,552,412.76 Kurang
- - 86,317,488.83 Tambah
- - 15,010,950.77 Tambah
339.22 67,267,305.60 45,184,195.15 Kurang
2.24 10,479,735.74 4,947,072.39 Kurang
211.14 53,767,213.50 73,034,904.50 Kurang
- - 27,096,462.65 Tambah
177.00 5,981,263.78 935,988.59 Kurang
- - 75,547,752.68 Tambah
35.20 2,123,840.40 2,039,369.48 Kurang
351,228,254.45 6,901,050,631.46
Dihitung Oleh :
Kontraktor Pelaksana
PT. Hutama Karya (Persero)
( SEVIANDRI PADUDUNG )
Site Engineer Manager
VOLUME
TAMBAH KURANG
14,296,108.90
PERHITUNGAN MUTUAL CHEK NOL (MC 0%)
Nama Proyek : Pembangunan Gedung Pusat Jantung Terpadu Tahap III RSUP Wahidin Sudirohusodo
Kontraktor Pelaksana : PT. Hutama Karya (Persero)
Konsultan Pengawas : PT. Daya Cipta Dian Rancana
Nama Pekerjaan : III Acian dan Plesteran
Satuan Pembayaran : m2
DIMENSI
Pengurang VOLUME
NO URAIAN PEKERJAAN SKETSA GAMBAR P T
( Mtr ) ( Mtr ) K dan KP Volume ( M2 )
Dikurangi 93.49
Luas Jendela 93.49
JUMLAH 673.80
Wastafel Luar
Wastafel 14 0.99
Wastafel 15 0.92
Wastafel 16 0.92
Wastafel 17 0.92
Wastafel 18 0.92
Wastafel 19 0.92
Wastafel 20 0.92
Wastafel 21 0.99
Wastafel 22 0.99
Wastafel 23 0.99
Wastafel 24 0.99
Wastafel 25 0.99
Wastafel 26 0.99
Wastafel 27 0.99
Wastafel 28 0.99
Wastafel 29 0.99
Wastafel 30 0.99
Wastafel 31 0.99
Wastafel 32 0.99
Wastafel 33 0.99
Wastafel 34 0.99
Wastafel 35 0.99
Total LT 1 735.73 238.29
Keramik HT 4 71.49
Keramik HT 1 664.25
Wastafel Luar
Wastafel 1 0.92
Wastafel 2 0.99
Wastafel 3 1.17
Wastafel 4 1.17
Wastafel 5 0.99
Wastafel 6 0.99
Wastafel 7 0.99
Wastafel 8 0.99
Wastafel 9 0.99
Wastafel 10 0.99
Wastafel 11 0.99
Wastafel 12 0.99
Wastafel 13 0.99
Wastafel 14 0.99
Wastafel 15 0.99
REKAP TOTAL
HT 1 HT 4
LT BASEMENT 33.80
LT 1 664.25 71.49
LT 2 622.98 60.16
LT 3 726.65 79.45
JUMLAH 2047.68 211.10
PERHITUNGAN VOLUME
No Item :
Item Pekerjaan : Lintal Bean Pintu dan Jendela PJT RSWS
Ukuran
No Type Jumlah
Tinggi
1 2 3 4
Basement Pintu type D 2 2 2.20
Pintu type D 3 4 2.20
Pintu type D 5 2 2.20
Pintu swing type D 8 2 2.20
Pek Non Standart Pintu D11 1 2.20
Pintu type D 12 2 2.20
Pek Non Standart Pintu D13 4 1.35
Pek Non Standart Pintu D14 4 1.35
Pintu type D 18 2 2.20