RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH PRIBADI


KONSTRUKSI : PERMANEN
LUAS : 76,95M2
LOKASI : DISTRIK MERAUKE

HRG.SATUAN JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT
Rp. Rp.
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
2 Pengukuran/ Pasang Bouwplank 46.00 M' 82,795.00 3,808,570.00
SUB JUMLAH Rp 3,808,570.00
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi 35.50 M3 101,275.00 3,595,647.35
2 Urugan Tanah Kembali 13.16 M3 33,758.00 444,138.81
3 Urugan Tanah Timbun Peninggian Lantai 33 Cm 25.39 M3 365,768.00 9,288,129.71
4 Urugan Pasir Bawah Lantai & Pondasi 5 Cm 6.37 M3 760,510.00 4,841,026.41
SUB JUMLAH Rp 18,168,942.27
III. PEKERJAAN BETON / PASANGAN / PLESTERAN
1 Pondasi Batu Bata 1 PC : 4 PS 17.00 M3 2,140,717.00 36,384,696.49
2 Cor Beton Bertulang Sloof 15/20 + Bekisting 1.89 M3 6,743,219.00 12,734,569.08
3 Cor Beton Bertulang Kolom 20/20 + Bekisting 2.70 M3 11,240,604.00 30,327,149.59
4 Cor Beton Bertulang Kolom 15/15 + Bekisting 0.48 M3 11,240,604.00 5,387,059.47
5 Cor Beton Bertulang Kolom 10/10 (Kolom Praktis) 10.65 M' 100,801.00 1,073,530.65
6 Cor Beton Bertulang Ringbalk 15/20 + Bekisting 2.57 M3 9,132,980.00 23,443,218.04
7 Cor Beton Bertulang Ringbalk 15/35 + Bekisting 0.37 M3 9,132,980.00 3,356,370.15
8 Dinding Pasangan Bata 1/3 Bata 1Pc :3Psr 37.22 M3 2,140,717.00 79,686,852.38
9 Plesteran Dinding luar dalam Tebal 15 mm 403.70 M2 97,170.00 39,227,431.83
10 Cor Lantai tebal 7cm 5.39 M3 5,473,761.00 29,484,413.63
11 Cor Dag tebal 12cm dan Kanopi 0.95 M3 5,641,821.00 5,346,189.58
SUB JUMLAH Rp 266,451,480.88
IV. PEKERJAAN KAYU
1 Rangka Plafond Kayu Bus 106.95 M2 110,336.00 11,800,435.20
2 Plafond tripleks 106.95 M2 69,607.00 7,444,468.65
3 Kusen pintu dan jendela 0.75 M3 8,940,160.00 6,712,093.32
SUB JUMLAH Rp 25,956,997.17
V. PEKERJAAN ATAP
1 Rangka Kuda-Kuda Kayu Bus,5/10 1.48 M3 7,329,490.00 10,821,039.15
2 Gording Kayu Bus, 5/10 0.98 M3 6,190,685.00 6,095,348.45
3 Kaso kayu Bus, 5/5 0.62 M3 6,190,685.00 3,833,272.15
4 Reng kayu bus, 3/2 0.24 M3 6,190,685.00 1,462,883.63
5 Pas. Atap Sakura Roof 130.82 M2 89,281.00 11,679,383.30
6 Bubungan/Nok atap Sakura roof 10.30 M' 102,125.00 1,051,887.50
7 Listplank papan kayu bus 2x 2/20 104.80 M' 72,636.00 7,612,252.80
SUB JUMLAH Rp 42,556,066.98
VI. PEKERJAAN PASANG MEMASANG
1 Pas Pintu Utama Panel Papan lebar 70cm (double) 2.00 BH 2,071,718.00 4,143,436.00
2 Pas Pintu Panel Papan 80cmx210cm 3.00 BH 2,113,906.00 6,341,718.00
3 Pas. Pintu Panel Papan 70cmx210cm 1.00 BH 2,071,718.00 2,071,718.00
4 Pas. Pintu Kamar mandi 70cmx210cm 1.00 BH 2,563,173.00 2,563,173.00
5 Pas. Jendela Kaca Ungkit 40cm x 190cm 2.00 BH 624,185.00 1,248,370.00
6 Pas. Jendela Kaca Ungkit 50cm x 170cm 4.00 BH 624,185.00 2,496,740.00
7 Pas. Jendela Kaca Ungkit 40cm x 115cm 2.00 BH 624,185.00 1,248,370.00
8 Pas. Jendela Kaca Ungkit 60cm x 35cm 2.00 BH 326,802.00 653,604.00
Pas. Jendela Kaca Ungkit 40cm x 40cm 2.00 BH 312,092.50 624,185.00
9 Pas. Keramik Lantai 40x40 76.39 M2 298,502.00 22,802,567.78
10 Pas. Ubin Lantai dan dinding Kamar mandi 20x20 14.04 M2 317,813.00 4,462,094.52
SUB JUMLAH Rp 48,655,976.30
VII. PEKERJAAN PENGECATAN
1 Cat Residu 44.29 M2 25,728.00 1,139,521.42
2 Cat Meny Kayu 22.52 M2 18,825.00 424,003.01
3 Cat Tembok + Plafond 510.65 M2 19,192.00 9,800,375.61
4 Cat Kilat Kayu 22.52 M2 71,027.00 1,599,769.53
SUB JUMLAH Rp 12,963,669.57
REKAPITULASI
I PEKERJAAN PERSIAPAN ……………………………….. Rp 3,808,570.00

II PEKERJAAN TANAH ………………………………. Rp 18,168,942.27

III PEKERJAAN BETON / PASANGAN / PLESTERAN ………………………………. Rp 266,451,480.88

IV PEKERJAAN KAYU ………………………………. Rp 25,956,997.17

V PEKERJAAN ATAP ………………………………. Rp 42,556,066.98

VI PEKERJAAN PASANG MEMASANG ………………………………. Rp 48,655,976.30

VII PEKERJAAN FINISHING ………………………………. Rp 12,963,669.57


JUMLAH……… Rp 418,561,703.17
DIBULATKAN…… Rp 418,560,000.00

TERBILANG : EMPAT RATUS DELAPAN BELAS JUTA LIMA RATUS ENAM PULUH RIBU RUPIAH

Merauke, Oktober2018
Pemohon,
ANALISA HARGA SATUAN
PEKERJAAN : PEMBANGUNAN RUMAH PRIBADI PERMANEN LUAS 76.95 M2
LOKASI : DISTRIK MERAUKE
KAB. / PROVINSI : MERAUKE - PAPUA
TAHUN : 2018

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 4 5 6 = (4) x (5)

I. PEKERJAAN PERSIAPAN

1 1 M' Pengukuran Dan Pasangan Bouwplank


Balok Kayu Bus 0.0120 M3 Rp. 2,750,000.00 Rp. 33,000.00
Kayu Papan Bus 0.0070 M3 Rp. 2,500,000.00 Rp. 17,500.00
Paku Biasa Campur 2" - 5" 0.0200 KG Rp. 18,525.00 Rp. 370.50
Pekerja kayu 0.1000 OH Rp. 129,000.00 Rp. 12,900.00
Tukang kayu 0.1000 OH Rp. 164,000.00 Rp. 16,400.00
Kepala Tukang Kayu 0.0100 OH Rp. 172,000.00 Rp. 1,720.00
Mandor 0.0050 OH Rp. 181,000.00 Rp. 905.00
JUMLAH Rp. 82,795.00
II. PEKERJAAN TANAH DAN PASIR

1 1 M3 Galian Tanah Biasa Sedalam 1 M


Pekerja 0.7500 OH Rp. 129,000.00 Rp. 96,750.00
Mandor 0.0250 OH Rp. 181,000.00 Rp. 4,525.00
JUMLAH Rp. 101,275.00
2 1 M3 Urugan Kembali Tanah Biasa Sedalam 1 M
1/3 x Galian Tanah 0.3333 M3 Rp. 101,275.00 Rp. 33,758.33
JUMLAH Rp. 33,758.00
3 1 M3 Galian Tanah Biasa Sedalam 1 - 2 M
Pekerja 0.9000 OH Rp. 129,000.00 Rp. 116,100.00
Mandor 0.0450 OH Rp. 181,000.00 Rp. 8,145.00
JUMLAH Rp. 124,245.00
4 1 M3 Urugan Kembali Tanah Biasa Sedalam 1 - 2 M
1/3 x Galian Tanah 0.3333 M3 Rp. 124,245.00 Rp. 41,415.00
JUMLAH Rp. 41,415.00
5 1 M3 Galian Tanah (Mekanis) - Excavator
Mandor (F. Equipment) 0.0315 Jam Rp. 198,000.00 Rp. 6,227.36
Excavator 0.0315 Jam Rp. 725,990.00 Rp. 22,833.32
JUMLAH Rp. 29,060.00
5 1 M3 Urugan Tanah Pilihan (Mekanis) - Stamper
Tanah pilihan (Selmat) 1.2000 M3 Rp. 200,000.00 Rp. 240,000.00
Pekerja 0.3200 Jam Rp. 129,000.00 Rp. 41,280.00
Mandor (F. Equipment) 0.3200 Jam Rp. 198,000.00 Rp. 63,360.00
Stamper 0.3200 Jam Rp. 66,026.00 Rp. 21,128.32
JUMLAH Rp. 365,768.00
6 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi
Pasir Pasang (Lokal) 1.2000 M3 Rp. 600,000.00 Rp. 720,000.00
Pekerja 0.3000 OH Rp. 129,000.00 Rp. 38,700.00
Mandor 0.0100 OH Rp. 181,000.00 Rp. 1,810.00
JUMLAH Rp. 760,510.00

III. PEKERJAAN BETON, PASANGAN DAN PLESTERAN

1 1 M3 COR 1 Pc : 3 Ps, Mekanis - Pasir Lokal


Semen Portland (PC) @ 50 Kg 11.2500 Zak Rp. 95,000.00 Rp. 1,068,750.00
Pasir semen (Lokal) 1.2054 M3 Rp. 600,000.00 Rp. 723,214.29
Mandor 1.6000 O/H Rp. 181,000.00 Rp. 289,600.00
Kepala tukang 1.6000 O/H Rp. 172,000.00 Rp. 275,200.00
Tukang pasir/batu 4.8000 O/H Rp. 164,000.00 Rp. 787,200.00
Pekerja 16.0000 O/H Rp. 129,000.00 Rp. 2,064,000.00
Concrete Mixer 1.6000 Jam Rp. 85,173.00 Rp. 136,276.80
Truck tanki air 0.1288 Jam Rp. 186,690.00 Rp. 24,039.15
Water Pump 1.6000 Jam Rp. 62,790.00 Rp. 100,464.00
Alat bantu 1.0000 Jam Rp. 5,017.00 Rp. 5,017.00
JUMLAH Rp. 5,473,761.00
2 1 M3 COR 1 Pc : 2 Ps : 3 Kr, Mekanis - Pasir Lokal
Semen Portland (PC) @ 50 Kg 7.5000 Zak Rp. 95,000.00 Rp. 712,500.00
Pasir semen (Lokal) 0.5357 M3 Rp. 600,000.00 Rp. 321,428.57
Kerikil/batu pecah (import) 0.8333 M3 Rp. 1,125,000.00 Rp. 937,500.00
Mandor 1.6000 Jam Rp. 181,000.00 Rp. 289,600.00
Kepala tukang 1.6000 Jam Rp. 172,000.00 Rp. 275,200.00
Tukang pasir/batu 4.8000 Jam Rp. 164,000.00 Rp. 787,200.00
Pekerja 16.0000 Jam Rp. 129,000.00 Rp. 2,064,000.00
Concrete Mixer 1.6000 Jam Rp. 85,173.00 Rp. 136,276.80
Truck tanki air 0.0678 Jam Rp. 186,690.00 Rp. 12,652.18
Water Pump 1.6000 Jam Rp. 62,790.00 Rp. 100,464.00
Alat bantu 1.0000 Set Rp. 5,000.00 Rp. 5,000.00
JUMLAH Rp. 5,641,821.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 4 5 6 = (4) x (5)

3 1 M3 Sloof beton bertulang (200 kg besi + bekisting)


Kayu Bekisting Kelas 3 0.2700 M3 Rp. 2,750,000.00 Rp. 742,500.00
Paku Campur Biasa 2.0000 KG Rp. 18,525.00 Rp. 37,050.00
Minyak Bekisting 0.6000 Liter Rp. 500.00 Rp. 300.00
Besi tulangan beton dia. 10 mm 210.0000 KG Rp. 11,205.00 Rp. 2,353,050.00
Kawat ikat besi beton 3.0000 KG Rp. 29,000.00 Rp. 87,000.00
Semen Portland (PC) @ 50 Kg 336.0000 KG Rp. 1,900.00 Rp. 638,400.00
Pasir semen (import) 0.5400 M3 Rp. 1,125,000.00 Rp. 607,500.00
Kerikil/batu pecah (import) 0.8100 M3 Rp. 1,125,000.00 Rp. 911,250.00
Pekerja 5.6500 OH Rp. 129,000.00 Rp. 728,850.00
Tukang Batu 0.2750 OH Rp. 164,000.00 Rp. 45,100.00
Tukang Kayu 1.5600 OH Rp. 164,000.00 Rp. 255,840.00
Tukang Besi 1.4000 OH Rp. 164,000.00 Rp. 229,600.00
Kepala Tukang 0.3230 OH Rp. 172,000.00 Rp. 55,556.00
Mandor 0.2830 OH Rp. 181,000.00 Rp. 51,223.00
JUMLAH Rp. 6,743,219.00
4 1 M3 Kolom beton bertulang (300 kg besi + bekisting)
Kayu Bekisting Kelas 3 0.4000 M3 Rp. 2,750,000.00 Rp. 1,100,000.00
Paku Campur Biasa 4.0000 KG Rp. 18,525.00 Rp. 74,100.00
Minyak Bekisting 2.0000 Liter Rp. 500.00 Rp. 1,000.00
Besi tulangan beton dia. 10 mm 315.0000 KG Rp. 11,205.00 Rp. 3,529,575.00
Kawat ikat besi beton 4.5000 KG Rp. 29,000.00 Rp. 130,500.00
Semen Portland (PC) @ 50 Kg 336.0000 KG Rp. 1,900.00 Rp. 638,400.00
Pasir semen (import) 0.5400 M3 Rp. 1,125,000.00 Rp. 607,500.00
Kerikil/batu pecah (import) 0.8100 M3 Rp. 1,125,000.00 Rp. 911,250.00
Balok Kayu Kelas 2 0.1500 M3 Rp. 4,000,000.00 Rp. 600,000.00
Plywood 9 mm 3.5000 Lembar Rp. 450,000.00 Rp. 1,575,000.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 20.0000 Batang Rp. 18,526.00 Rp. 370,520.00
Pekerja 7.0500 OH Rp. 129,000.00 Rp. 909,450.00
Tukang Batu 0.2750 OH Rp. 164,000.00 Rp. 45,100.00
Tukang Kayu 1.6500 OH Rp. 164,000.00 Rp. 270,600.00
Tukang Besi 2.1000 OH Rp. 164,000.00 Rp. 344,400.00
Kepala Tukang 0.4030 OH Rp. 172,000.00 Rp. 69,316.00
Mandor 0.3530 OH Rp. 181,000.00 Rp. 63,893.00
JUMLAH Rp. 11,240,604.00
5 1 M3 Balok beton bertulang (200 kg besi + bekisting)
Kayu Bekisting Kelas 3 0.3200 M3 Rp. 2,750,000.00 Rp. 880,000.00
Paku Campur Biasa 3.2000 KG Rp. 18,525.00 Rp. 59,280.00
Minyak Bekisting 1.6000 Liter Rp. 500.00 Rp. 800.00
Besi tulangan beton dia. 10 mm 210.0000 KG Rp. 11,205.00 Rp. 2,353,050.00
Kawat ikat besi beton 3.0000 KG Rp. 29,000.00 Rp. 87,000.00
Semen Portland (PC) @ 50 Kg 336.0000 KG Rp. 1,900.00 Rp. 638,400.00
Pasir semen (import) 0.5400 M3 Rp. 1,125,000.00 Rp. 607,500.00
Kerikil/batu pecah (import) 0.8100 M3 Rp. 1,125,000.00 Rp. 911,250.00
Balok Kayu Kelas 2 0.1400 M3 Rp. 4,000,000.00 Rp. 560,000.00
Plywood 9 mm 2.8000 Lembar Rp. 450,000.00 Rp. 1,260,000.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 16.0000 Batang Rp. 18,526.00 Rp. 296,416.00
Pekerja 6.3500 OH Rp. 129,000.00 Rp. 819,150.00
Tukang Batu 0.2750 OH Rp. 164,000.00 Rp. 45,100.00
Tukang Kayu 1.6500 OH Rp. 164,000.00 Rp. 270,600.00
Tukang Besi 1.4000 OH Rp. 164,000.00 Rp. 229,600.00
Kepala Tukang 0.3330 OH Rp. 172,000.00 Rp. 57,276.00
Mandor 0.3180 OH Rp. 181,000.00 Rp. 57,558.00
JUMLAH Rp. 9,132,980.00
6 1 M' Kolom penguat/praktis beton bertulang (11 x 11) cm
Kayu Bekisting Kelas 3 0.0020 M3 2,750,000.00 Rp. 5,500.00
Paku Campur Biasa 0.0100 KG 18,525.00 Rp. 185.25
Besi tulangan beton dia. 10 mm 3.0000 KG 11,205.00 Rp. 33,615.00
Kawat ikat besi beton 0.0450 KG 29,000.00 Rp. 1,305.00
Semen Portland (PC) @ 50 Kg 4.0000 KG 1,900.00 Rp. 7,600.00
Pasir semen (import) 0.0060 M3 1,125,000.00 Rp. 6,750.00
Kerikil/batu pecah (import) 0.0090 M3 1,125,000.00 Rp. 10,125.00
Pekerja 0.1800 OH 129,000.00 Rp. 23,220.00
Tukang Batu 0.0200 OH 164,000.00 Rp. 3,280.00
Tukang Kayu 0.0200 OH 164,000.00 Rp. 3,280.00
Tukang Besi 0.0200 OH 164,000.00 Rp. 3,280.00
Kepala Tukang 0.0060 OH 172,000.00 Rp. 1,032.00
Mandor 0.0090 OH 181,000.00 Rp. 1,629.00
JUMLAH Rp. 100,801.00
7 1 M3 PAS. BATU BATA 1 PC : 3 PS - PASIR IMPORT
Batu bata 649.0000 Buah Rp. 1,200.00 Rp. 778,800.00
Semen Portland (PC) @ 50 Kg 4.2874 Zak Rp. 95,000.00 Rp. 407,300.63
Pasir semen (lokal) 0.4594 M3 Rp. 600,000.00 Rp. 275,616.96
Pekerja pasir/batu 2.8571 OH Rp. 129,000.00 Rp. 368,571.43
Tukang pasir/batu 1.2857 OH Rp. 164,000.00 Rp. 210,857.14
Kepala tukang pasir/batu 0.4286 OH Rp. 172,000.00 Rp. 73,714.29
Mandor pasir/batu 0.1429 OH Rp. 181,000.00 Rp. 25,857.14
JUMLAH Rp. 2,140,717.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 4 5 6 = (4) x (5)

8 1 M2 PLESTERAN 1 Pc : 3 Ps Tebal 15 mm - Pasir Lokal


Semen Portland (PC) @ 50 Kg 7.7760 KG Rp. 1,900.00 Rp. 14,774.40
Pasir semen (lokal) 0.0230 M3 Rp. 600,000.00 Rp. 13,800.00
Pekerja pasir/batu 0.3000 OH Rp. 129,000.00 Rp. 38,700.00
Tukang pasir/batu 0.1500 OH Rp. 164,000.00 Rp. 24,600.00
Kepala tukang pasir/batu 0.0150 OH Rp. 172,000.00 Rp. 2,580.00
Mandor pasir/batu 0.0150 OH Rp. 181,000.00 Rp. 2,715.00
JUMLAH Rp. 97,170.00
9 1 M2 ACIAN
Semen Portland (PC) @ 50 Kg 3.2500 KG Rp. 1,900.00 Rp. 6,175.00
Pekerja pasir/batu 0.2000 OH Rp. 129,000.00 Rp. 25,800.00
Tukang pasir/batu 0.1000 OH Rp. 164,000.00 Rp. 16,400.00
Kepala tukang pasir/batu 0.0100 OH Rp. 172,000.00 Rp. 1,720.00
Mandor pasir/batu 0.0100 OH Rp. 181,000.00 Rp. 1,810.00
JUMLAH Rp. 51,905.00
10 1 M2 LANTAI KERAMIK UK. 40 X 40 CM
Ubin Keramik Ukuran 40 x 40 6.2500 Buah Rp. 14,083.00 Rp. 88,018.75
Semen Portland (PC) @ 50 Kg 10.0000 KG Rp. 1,900.00 Rp. 19,000.00
Pasir Semen (lokal) 0.0450 M3 Rp. 600,000.00 Rp. 27,000.00
Semen Warna 1.6200 KG Rp. 2,733.32 Rp. 4,427.98
Pekerja 0.7000 OH Rp. 129,000.00 Rp. 90,300.00
Tukang batu 0.3500 OH Rp. 164,000.00 Rp. 57,400.00
Kepala tukang 0.0350 OH Rp. 172,000.00 Rp. 6,020.00
Mandor 0.0350 OH Rp. 181,000.00 Rp. 6,335.00
JUMLAH Rp. 298,502.00
11 1 M2 LANTAI KERAMIK BERGLASIR UK. 30 X 30 CM
Ubin Keramik Ukuran 30 x 30 berglasir 11.8700 Buah Rp. 6,204.00 Rp. 73,641.48
Semen Portland (PC) @ 50 Kg 10.0000 KG Rp. 1,900.00 Rp. 19,000.00
Pasir Semen (lokal) 0.0450 M3 Rp. 600,000.00 Rp. 27,000.00
Semen Warna 1.5000 KG Rp. 2,733.32 Rp. 4,099.98
Pekerja 0.7000 OH Rp. 129,000.00 Rp. 90,300.00
Tukang batu 0.3500 OH Rp. 164,000.00 Rp. 57,400.00
Kepala tukang 0.0350 OH Rp. 172,000.00 Rp. 6,020.00
Mandor 0.0350 OH Rp. 181,000.00 Rp. 6,335.00
JUMLAH Rp. 283,797.00
12 1 M' PLINT UBIN UK. 10 x 40 CM
Plint Ubin Abu-Abu Ukuran 10 x 40 cm 2.6500 Buah Rp. 12,250.00 Rp. 32,462.50
Semen Portland (PC) @ 50 Kg 1.2400 KG Rp. 1,900.00 Rp. 2,356.00
Pasir Semen (lokal) 0.0030 M3 Rp. 600,000.00 Rp. 1,800.00
Pekerja 0.0900 OH Rp. 129,000.00 Rp. 11,610.00
Tukang batu 0.0900 OH Rp. 164,000.00 Rp. 14,760.00
Kepala tukang 0.0090 OH Rp. 172,000.00 Rp. 1,548.00
Mandor 0.0050 OH Rp. 181,000.00 Rp. 905.00
JUMLAH Rp. 65,442.00
13 1 M2 KERAMIK DINDING MOTIF BATU ALAM UK. 20 x 20 CM
Ubin Keramik Ukuran 20 x 20 Motif Batu Alam 26.5000 Buah Rp. 2,953.00 Rp. 78,254.50
Semen Portland (PC) @ 50 Kg 9.3000 KG Rp. 1,900.00 Rp. 17,670.00
Pasir Semen (lokal) 0.0180 M3 Rp. 600,000.00 Rp. 10,800.00
Semen Warna 1.9400 KG Rp. 2,733.32 Rp. 5,302.64
Pekerja 0.9000 OH Rp. 129,000.00 Rp. 116,100.00
Tukang batu 0.4500 OH Rp. 164,000.00 Rp. 73,800.00
Kepala tukang 0.0450 OH Rp. 172,000.00 Rp. 7,740.00
Mandor 0.0450 OH Rp. 181,000.00 Rp. 8,145.00
JUMLAH Rp. 317,813.00
14 1 M2 KERAMIK DINDING ANDESIT UK. 20 x 20 CM
Keramik Andesit 1.0500 M2 Rp. 86,250.00 Rp. 90,562.50
Semen Portland (PC) @ 50 Kg 9.3000 KG Rp. 1,900.00 Rp. 17,670.00
Pasir Semen (lokal) 0.0180 M3 Rp. 600,000.00 Rp. 10,800.00
Semen Warna 1.9400 KG Rp. 2,733.32 Rp. 5,302.64
Pekerja 0.9000 OH Rp. 129,000.00 Rp. 116,100.00
Tukang batu 0.4500 OH Rp. 164,000.00 Rp. 73,800.00
Kepala tukang 0.0450 OH Rp. 172,000.00 Rp. 7,740.00
Mandor 0.0450 OH Rp. 181,000.00 Rp. 8,145.00
JUMLAH Rp. 330,121.00
IV. PEKERJAAN KAYU
1 1 M3 Pekerjaan Kusen Pintu dan Jendela Kayu Kls II
Balok Kayu Kelas II (Kayu Rahay) 1.2000 M3 Rp. 4,000,000.00 Rp. 4,800,000.00
Paku Campuran 1.2500 KG Rp. 18,525.00 Rp. 23,156.25
Lem Kayu 1.0000 KG Rp. 27,104.00 Rp. 27,104.00
Pekerja Kayu 6.0000 OH Rp. 129,000.00 Rp. 774,000.00
Tukang Kayu 18.0000 OH Rp. 164,000.00 Rp. 2,952,000.00
Kepala Tukang 1.8000 OH Rp. 172,000.00 Rp. 309,600.00
Mandor 0.3000 OH Rp. 181,000.00 Rp. 54,300.00
JUMLAH Rp. 8,940,160.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 4 5 6 = (4) x (5)

2 1 M3 Pekerjaan Kuda-Kuda Kayu Kls II


Balok Kayu Kelas II (Kayu Rahay) 1.1000 M3 Rp. 4,000,000.00 Rp. 4,400,000.00
Besi Strip Tebal 5 cm 15.0000 KG Rp. 6,610.00 Rp. 99,150.00
Paku Campuran 5.6000 KG Rp. 18,525.00 Rp. 103,740.00
Pekerja Kayu 4.0000 OH Rp. 129,000.00 Rp. 516,000.00
Tukang Kayu 12.0000 OH Rp. 164,000.00 Rp. 1,968,000.00
Kepala Tukang 1.2000 OH Rp. 172,000.00 Rp. 206,400.00
Mandor 0.2000 OH Rp. 181,000.00 Rp. 36,200.00
JUMLAH Rp. 7,329,490.00
3 1 M3 Pekerjaan Gordeng Kayu Kls II
Balok Kayu Kelas II (Kayu Rahay) 1.1000 M3 Rp. 4,000,000.00 Rp. 4,400,000.00
Besi Strip Tebal 5 cm 15.0000 KG Rp. 6,610.00 Rp. 99,150.00
Paku Campuran 3.0000 KG Rp. 18,525.00 Rp. 55,575.00
Pekerja Kayu 2.4000 OH Rp. 129,000.00 Rp. 309,600.00
Tukang Kayu 7.2000 OH Rp. 164,000.00 Rp. 1,180,800.00
Kepala Tukang 0.7200 OH Rp. 172,000.00 Rp. 123,840.00
Mandor 0.1200 OH 181,000.00 Rp. 21,720.00
JUMLAH Rp. 6,190,685.00
4 1 M2 Jalusi Kusen Kayu Kls II
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm 0.0600 M3 Rp. 4,500,000.00 Rp. 270,000.00
Paku Campuran 0.1500 KG Rp. 18,525.00 Rp. 2,778.75
Pekerja Kayu 0.6700 OH Rp. 129,000.00 Rp. 86,430.00
Tukang Kayu 2.0000 OH Rp. 164,000.00 Rp. 328,000.00
Kepala Tukang 0.2000 OH Rp. 172,000.00 Rp. 34,400.00
Mandor 0.3350 OH Rp. 181,000.00 Rp. 60,635.00
JUMLAH Rp. 782,243.00
5 1 M1 LISTPLANK 2 x 20 CM KAYU KELAS II
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm 0.0088 M3 Rp. 4,500,000.00 Rp. 39,600.00
Paku Campuran 0.0600 KG Rp. 18,525.00 Rp. 1,111.50
Pekerja Kayu 0.1000 OH Rp. 129,000.00 Rp. 12,900.00
Tukang Kayu 0.1000 OH Rp. 164,000.00 Rp. 16,400.00
Kepala Tukang 0.0100 OH Rp. 172,000.00 Rp. 1,720.00
Mandor 0.0050 OH Rp. 181,000.00 Rp. 905.00
JUMLAH Rp. 72,636.00
V. PEKERJAAN ATAP

1 1 M2 Penutup Atap Genteng Metal - Multiroof


Genteng Metal - Multiroof 1.0500 Lembar Rp. 39,500.00 Rp. 41,475.00
Paku Campuran 0.2000 KG Rp. 18,525.00 Rp. 3,705.00
Pekerja 0.2000 OH Rp. 129,000.00 Rp. 25,800.00
Tukang Kayu 0.1000 OH Rp. 164,000.00 Rp. 16,400.00
Kepala Tukang 0.0100 OH Rp. 172,000.00 Rp. 1,720.00
Mandor 0.0010 OH Rp. 181,000.00 Rp. 181.00
JUMLAH Rp. 89,281.00
2 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof
Bubungan Genteng Metal - Multiroof 1.1000 Buah Rp. 35,833.00 Rp. 39,416.30
Paku Campuran 0.0500 KG Rp. 18,525.00 Rp. 926.25
Pekerja 0.2500 OH Rp. 129,000.00 Rp. 32,250.00
Tukang Kayu 0.1500 OH Rp. 164,000.00 Rp. 24,600.00
Kepala Tukang 0.0150 OH Rp. 172,000.00 Rp. 2,580.00
Mandor 0.0130 OH Rp. 181,000.00 Rp. 2,353.00
JUMLAH Rp. 102,125.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 4 5 6 = (4) x (5)

VI. PEKERJAAN PASANG - MEMASANG


1 1 Unit Jendela Ungkit Uk. 60 x 35 cm Kayu Kls II
Papan kayu Rahay 0.0068 M3 Rp. 4,500,000.00 Rp. 30,442.50
Kaca Polos 5 mm 0.0945 M2 Rp. 215,500.00 Rp. 20,364.75
Engsel 3" Kuningan (untuk Jendela) 1.0000 Set Rp. 17,333.00 Rp. 17,333.00
Kait angin 1.0000 Buah Rp. 10,625.00 Rp. 10,625.00
Grendel besar 1.0000 Buah Rp. 33,500.00 Rp. 33,500.00
Paku Campur 0.0695 KG Rp. 18,525.00 Rp. 1,286.64
Mandor kayu 0.0153 OH Rp. 181,000.00 Rp. 2,774.64
Kepala tukang kayu 0.0943 OH Rp. 172,000.00 Rp. 16,224.96
Tukang kayu 0.9433 OH Rp. 164,000.00 Rp. 154,703.10
Pekerja kayu 0.3066 OH Rp. 129,000.00 Rp. 39,548.34
JUMLAH Rp. 326,802.00
2 1 Unit Jendela Ungkit Uk. 40 x 190 cm Kayu Kls II
Papan kayu Rahay 0.0132 M3 Rp. 4,500,000.00 Rp. 59,535.00
Kaca Polos 5 mm 0.3881 M2 Rp. 215,500.00 Rp. 83,631.24
Engsel 3" Kuningan (untuk Jendela) 1.0000 Set Rp. 17,333.00 Rp. 17,333.00
Kait angin 1.0000 Buah Rp. 10,625.00 Rp. 10,625.00
Grendel besar 1.0000 Buah Rp. 33,500.00 Rp. 33,500.00
Paku Campur 0.1358 KG Rp. 18,525.00 Rp. 2,516.21
Mandor kayu 0.0300 OH Rp. 181,000.00 Rp. 5,426.23
Kepala tukang kayu 0.1845 OH Rp. 172,000.00 Rp. 31,730.41
Tukang kayu 1.8448 OH Rp. 164,000.00 Rp. 302,545.76
Pekerja kayu 0.5996 OH Rp. 129,000.00 Rp. 77,342.87
JUMLAH Rp. 624,185.00
3 1 M2 KACA MATI POLOS 5 MM
Kaca Polos tebal 5 mm 1.1000 M2 Rp. 215,500.00 Rp. 237,050.00
Kayu Lat - Batang Rp. 25,000.00 Rp. -
Paku Campur - KG Rp. 18,280.00 Rp. -
Pekerja kayu 0.1600 OH Rp. 129,000.00 Rp. 20,640.00
Tukang kayu 0.1600 OH Rp. 164,000.00 Rp. 26,240.00
Kepala tukang 0.0160 OH Rp. 172,000.00 Rp. 2,752.00
Mandor kayu 0.0080 OH Rp. 181,000.00 Rp. 1,448.00
JUMLAH Rp. 288,130.00
4 1 Unit Pintu Panel Uk. 80 x 210 cm Kayu Kls II
Papan kayu Rahay 0.0750 M3 Rp. 4,500,000.00 Rp. 337,500.00
Engsel 4" Kuningan (untuk pintu) 1.5000 Buah Rp. 25,250.00 Rp. 37,875.00
Kait angin 1.0000 Buah Rp. 10,625.00 Rp. 10,625.00
Kunci tanam (setara kuda terbang) 1.0000 Buah Rp. 87,750.00 Rp. 87,750.00
Grendel besar 1.0000 Buah Rp. 60,000.00 Rp. 60,000.00
Paku Campur 0.2200 KG Rp. 18,280.00 Rp. 4,021.60
Mandor kayu 0.1133 OH Rp. 181,000.00 Rp. 20,507.30
Kepala tukang kayu 0.6972 OH Rp. 172,000.00 Rp. 119,918.40
Tukang kayu 6.9720 OH Rp. 164,000.00 Rp. 1,143,408.00
Pekerja kayu 2.2659 OH Rp. 129,000.00 Rp. 292,301.10
JUMLAH Rp. 2,113,906.00
5 1 Unit Pintu Panel Uk. 70 x 210 cm - Kayu Kls II
Papan kayu Rahay 0.0656 M3 Rp. 4,500,000.00 Rp. 295,312.50
Engsel 4" Kuningan (untuk pintu) 1.5000 Buah Rp. 25,250.00 Rp. 37,875.00
Kait angin 1.0000 Buah Rp. 10,625.00 Rp. 10,625.00
Kunci tanam (setara kuda terbang) 1.0000 Buah Rp. 87,750.00 Rp. 87,750.00
Grendel besar 1.0000 Buah Rp. 60,000.00 Rp. 60,000.00
Paku Campur 0.2200 KG Rp. 18,280.00 Rp. 4,021.60
Mandor kayu 0.1133 OH Rp. 181,000.00 Rp. 20,507.30
Kepala tukang kayu 0.6972 OH Rp. 172,000.00 Rp. 119,918.40
Tukang kayu 6.9720 OH Rp. 164,000.00 Rp. 1,143,408.00
Pekerja kayu 2.2659 OH Rp. 129,000.00 Rp. 292,301.10
JUMLAH Rp. 2,071,718.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 4 5 6 = (4) x (5)

6 1 Unit Pintu Panel Lapis Plat Uk. 70 x 210 cm - Kayu Kls II


Papan kayu Rahay 0.0656 M3 Rp. 4,500,000.00 Rp. 295,312.50
Besi Plat 3.0 mm - 120 x 240 Cm 0.5359 Lembar Rp. 917,000.00 Rp. 491,454.69
Engsel 4" Kuningan (untuk pintu) 1.5000 Buah Rp. 25,250.00 Rp. 37,875.00
Kait angin 1.0000 Buah Rp. 10,625.00 Rp. 10,625.00
Kunci tanam (setara kuda terbang) 1.0000 Buah Rp. 87,750.00 Rp. 87,750.00
Grendel besar 1.0000 Buah Rp. 60,000.00 Rp. 60,000.00
Paku Campur 0.2200 KG Rp. 18,280.00 Rp. 4,021.60
Mandor kayu 0.1133 OH Rp. 181,000.00 Rp. 20,507.30
Kepala tukang kayu 0.6972 OH Rp. 172,000.00 Rp. 119,918.40
Tukang kayu 6.9720 OH Rp. 164,000.00 Rp. 1,143,408.00
Pekerja kayu 2.2659 OH Rp. 129,000.00 Rp. 292,301.10
JUMLAH Rp. 2,563,173.00
8 1 M2 Rangka Plafond (60x120)cm, Kayu Kelas III
Balok Kayu Kelas III (Kayu Bus) 0.0130 M3 Rp. 2,750,000.00 Rp. 35,750.00
Paku Campuran 0.1200 KG Rp. 18,280.00 Rp. 2,193.60
Pekerja Kayu 0.1700 OH Rp. 129,000.00 Rp. 21,930.00
Tukang Kayu 0.2700 OH Rp. 164,000.00 Rp. 44,280.00
Kepala Tukang 0.0270 OH Rp. 172,000.00 Rp. 4,644.00
Mandor 0.0085 OH Rp. 181,000.00 Rp. 1,538.50
JUMLAH Rp. 110,336.00
9 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 6 mm
Triplek ukuran (120 x 240) cm tebal 6 mm 0.3750 Lembar 99,142.00 Rp. 37,178.25
Paku Triplek 0.0300 KG 16,824.00 Rp. 504.72
Pekerja Kayu 0.1000 OH 129,000.00 Rp. 12,900.00
Tukang Kayu 0.1000 OH 164,000.00 Rp. 16,400.00
Kepala Tukang 0.0100 OH 172,000.00 Rp. 1,720.00
Mandor 0.0050 OH 181,000.00 Rp. 905.00
JUMLAH Rp. 69,607.00

VII. PEKERJAAN PENGECATAN


1 1 M2 Cat Ter/Residu (Kuda-Kuda dan Gording)
Residu/ter 0.3500 KG Rp. 20,250.00 Rp. 7,087.50
Minyak Tanah 0.0300 Liter Rp. 10,699.00 Rp. 320.97
Kuas 0.0200 Buah Rp. 10,000.00 Rp. 200.00
Kepala tukang cat 0.0100 OH Rp. 172,000.00 Rp. 1,720.00
Tukang cat 0.1000 OH Rp. 164,000.00 Rp. 16,400.00
JUMLAH Rp. 25,728.00
2 1 M2 Pelapisan Bidang Kayu Dengan Meny
Cat meny kayu 0.1700 KG Rp. 31,000.00 Rp. 5,270.00
Minyak Cat 0.1000 Liter Rp. 30,062.00 Rp. 3,006.20
Kuas 0.0150 Buah Rp. 10,000.00 Rp. 150.00
Mandor cat 0.0040 OH Rp. 181,000.00 Rp. 724.00
Pekerja cat 0.0750 OH Rp. 129,000.00 Rp. 9,675.00
JUMLAH Rp. 18,825.00
3 1 M2 Mengecat Penutup 2 Lapis Pada Kayu
Cat tutup/cat kayu 0.3000 KG Rp. 56,125.00 Rp. 16,837.50
Minyak Cat 0.2000 Liter Rp. 30,062.00 Rp. 6,012.40
Kuas 0.0200 Buah Rp. 10,000.00 Rp. 200.00
Mandor cat 0.0080 OH Rp. 181,000.00 Rp. 1,448.00
Kepala tukang cat 0.0150 OH Rp. 172,000.00 Rp. 2,580.00
Tukang cat 0.1500 OH Rp. 164,000.00 Rp. 24,600.00
Pekerja cat 0.1500 OH Rp. 129,000.00 Rp. 19,350.00
JUMLAH Rp. 71,027.00
4 1 M2 Dinding Tembok
Plamur 0.1000 KG Rp. 8,350.00 Rp. 835.00
Cat dasar 0.1000 KG Rp. 10,860.00 Rp. 1,086.00
Cat penutup 2 kali 0.2600 KG Rp. 10,860.00 Rp. 2,823.60
Mandor cat 0.0025 OH Rp. 181,000.00 Rp. 452.50
Kepala tukang cat 0.0063 OH Rp. 172,000.00 Rp. 1,083.60
Tukang cat 0.0630 OH Rp. 164,000.00 Rp. 10,332.00
Pekerja cat 0.0200 OH Rp. 129,000.00 Rp. 2,580.00
JUMLAH Rp. 19,192.00