Harga Jumlah
No Jenis Barang/Jasa Satuan Vol HPS HPS 100/111 NEGO Jumlah HPS Jumlah Nego
Penawaran Penawaran
1 2 3 4 5 6 7 8 9 10 11
PEMBANGUNAN/ RENOVASI LABORATORIUM MINI BALAI PENYULUHAN PERTANIAN KECAMATAN ADIPALA
I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan unit 1,00 150.000,00 135.135,14 100.000,00 99.761,05 135.135,14 100.000,00 99.761,05
2 Mobilisasi unit 1,00 300.000,00 270.270,27 249.938,68 249.938,68 270.270,27 249.938,68 249.938,68
3 Biaya K3 pkt 1,00 504.000,00 454.054,05 444.000,00 444.000,00 454.054,05 444.000,00 444.000,00
II PEKERJAAN DINDING
1 Pasang Bata Merah Tebal 1/2 Bata , 1 Pc 6 Ps m2 1,56 130.113,94 117.219,77 113.742,60 113.742,60 182.862,83 177.438,46 177.438,46
2 Pasang Keramik Dinding 20x25 m2 12,11 238.607,71 214.961,90 205.919,10 205.919,10 2.603.188,62 2.493.680,30 2.493.680,30
3 Pasang Granit Meja Beton 60x60 m2 2,78 362.749,09 326.800,98 325.451,90 325.451,90 908.506,73 904.756,28 904.756,28
III PEKERJAAN PLESTERAN
1 Plesteran 1 Pc 5 Ps , Tebal 15 mm m2 3,12 65.342,71 58.867,30 54.550,10 54.550,10 183.665,98 170.196,31 170.196,31
2 Acian m2 1,60 39.294,20 35.400,18 32.582,00 32.582,00 56.640,29 52.131,20 52.131,20
IV PEKERJAAN BETON
1 MEJA BETON TB. 6 cm
2 Membuat Beton mutu Fc = 14,5 Mpa, (K-175) m3 0,10 1.075.769,69 969.161,88 943.970,01 943.970,01 96.916,19 94.397,00 94.397,00
3 Pembesian dg Besi Polos atau Besi Ulir kg 15,27 17.635,13 15.887,51 15.887,64 15.887,64 242.602,25 242.604,26 242.604,26
4 Membuat Bekisting m2 1,60 470.083,46 423.498,61 417.415,60 417.415,60 677.597,78 667.864,96 667.864,96
V PEKERJAAN PENGECATAN
1 Pengecatan Tembok Lama m2 30,17 25.212,84 22.714,27 22.018,76 22.018,76 685.289,43 664.305,99 664.305,99
2 Pegecatan Plafond Lama m2 7,70 25.212,84 22.714,27 22.018,76 22.018,76 174.899,85 169.544,45 169.544,45
3 Pengecatan Pintu dan Jendela m2 6,87 49.418,05 44.520,77 44.121,70 44.121,70 305.857,66 303.116,08 303.116,08
VI PEKERJAAN LISTRIK
1 Pekerjaan Instalasi Stop Kontak ttk 3,00 398.622,77 359.119,61 358.469,33 358.469,33 1.077.358,83 1.075.407,99 1.075.407,99
2 Stop Kontak bh 3,00 93.590,64 84.315,89 80.513,40 80.513,40 252.947,68 241.540,20 241.540,20
3 Pasang Lampu LED 13 watt Philips bh 1,00 75.020,00 67.585,59 73.020,00 67.585,59 67.585,59 73.020,00 67.585,59
Harga Jumlah
No Jenis Barang/Jasa Satuan Vol HPS HPS 100/111 NEGO Jumlah HPS Jumlah Nego
Penawaran Penawaran
1 2 3 4 5 6 7 8 9 10 11
VII PEKERJAAN LAIN-LAIN
1 Pemasangan Pintu Geser PVC Board 18 mm + Aksesories m2 1,74 1.210.000,00 1.090.090,09 1.113.200,00 1.090.090,09 1.896.756,76 1.936.968,00 1.896.756,76
2 Pasang Pipa PVC 3 inch Pembuangan m 12,00 89.350,86 80.496,27 78.969,95 78.969,95 965.955,19 947.639,40 947.639,40
3 Pasang Pipa PVC 3/4 Air Bersih m 20,00 29.223,27 26.327,27 25.561,01 25.561,01 526.545,47 511.220,20 511.220,20
4 Pasang Kran Wastafel bh 1,00 255.009,15 229.737,97 227.290,50 227.290,50 229.737,97 227.290,50 227.290,50
5 Pasang Gorden Tarik (eks. Awing) m2 2,10 600.000,00 540.540,54 597.000,00 540.540,54 1.135.135,14 1.253.700,00 1.135.135,14
6 Pemasangan Lemari Dinding Almunium Kaca m 2,60 1.089.000,00 981.081,08 968.000,00 968.000,00 2.550.810,81 2.516.800,00 2.516.800,00
7 Pemasangan Papan White Board uk. 40x60 unit 1,00 145.200,00 130.810,81 123.420,00 123.420,00 130.810,81 123.420,00 123.420,00
8 Pemasangan Kotak P3K uk. 31x13x45 cm unit 1,00 242.000,00 218.018,02 229.900,00 218.018,02 218.018,02 229.900,00 218.018,02
9 Pemasangan Alat Pemadam Api Ringan (APAR) Dry Chemical Powder 3,5
unitkg 1,00 890.500,00 802.252,25 880.500,00 802.252,25 802.252,25 880.500,00 802.252,25
10 Kursi 45 x 40 x 45, kayu kelas kuat II bh 5,00 350.000,00 315.315,32 347.000,00 315.315,32 1.576.576,58 1.735.000,00 1.576.576,58
11 Lemari Etalase Almunium Kaca uk. 50x100x170 bh 1,00 2.662.000,00 2.398.198,20 2.057.000,00 2.398.198,20 2.398.198,20 2.057.000,00 2.398.198,20
Terbilang : Empat Puluh Enam Juta Seratus Tiga Belas Ribu Rupiah DAK-014