Pondasi
a. Tiang Pancang Ø 30 cm
1
Beton 3,75 x 0,75 x 0,07 m 2
b. Pile Cap
0,8 x 0,5 x 0,5 m 10
Abutmen Batu kali 1 x 1,7 x 3 m 2
1 x 1,2 x 3 m 2
a. Penahan Kabel Stay Beton 0,6 x 3,2 x 3 m 2
0,5 x 2,4 x 3 m 2
2
Ø 22 ; 10,65 42
Ø 19 ; 3,68 62
b. Penulangan Baja
Ø 22 ; 5,152 42
Ø 19 ; 3,68 34
Gelagar
5/7 x 5000 cm 4
a. Memanjang
5/10 x 130 cm 50
3 Kayu ulin
5/10 x 100 cm 51
b. Melintang
1,5/15 x 100 cm 251
c. Dudukan Pipa 5/7 x 25 cm 51
Pilar 10/15 x 180 cm 19
10/15 x 370 cm 4
5/10 x 100 cm 2
4 Kayu ulin 5/10 x 150 cm 2
5/10 x 240 cm 2
5/10 x 340 cm 2
5/10 x 190 cm 4
Kabel Gantung
Ø 19 ; 53 m 2
a. Kabel Utama
5 Baja Ø 12 ; 35 m 4
b. Kabel Gantung Ø 16 ; 62,85 m 2
c. Besi Angkur Besi Ø 16 ; 3,1 m 4
VOLUME NOMOR GAMBAR CHECK LIST
-
5
0.39375 m3
2 m3
10.2 m3
3.6 m3
5.76 m3
3.6 m3
4
1332.954 Kg
506.5152 Kg
644.82432 Kg
277.7664 Kg
200 m
65 m
2
51 m
251 m
` m
34.2 m
14.8
2 m
3 m 3
4.8 m
6.8 m
7.6 m
106 m
140 m 2
125.7 m
12.4 m
URAIAN VOLUME PEKERJAAN PERSIAPAN DAN POND
1 Direksi keet
● Panjang = 2.000 m V = L x P
● Lebar A = 2.000 m = 2.00 x 2.000
= 4.000 m2
V = 4.000 m2
V = L x P
= 16.00 x 4.000
= 128 m³
2
V = L x P
= 20.00 x 11.000
= 440 m³
2
URAIAN VOLUME PEKERJAAN PONDASI DAN ABUTMENT
1 Pondasi Sumuran
● Panjang = 11.000 m Jmlah Tulangan = Panjang : jarak Diameter
● Diameter Pond. = 3.000 m - ( B1 ) = D Pond / D tulangan
● Tinggi = 4.000 m = 3.000 / 150
● Diameter (Ø ) = = 21
- ( B1 ) Ø 13 / 150 mm P = 4.61 m - ( B2 ) = D Pond / D tulangan
- ( B2 ) Ø 13 / 150 mm P = 4.70 m = 3.000 / 150
- ( B3 ) Ø 13 / 150 mm P = 12.00 m = 21
- ( B4 ) Ø 13 / 200 mm P = 12.00 m - ( B3 ) = D Pond / D tulangan
- ( B5 ) Ø 27 - 22 mm P = 1.26 m = 4.000 / 150
= 28
- ( B4 ) = D Pond / D tulangan
= 4.000 / 200
= 21
Beton
( B5 ) = -
= -
= 22
= π r luar tulangan^2
Luas tulangan luar
= 3.14*1.5^2
= 7 m2
= 3.14*(1.5-.30)^2
Luas tulangan dalam
= 5 m2
3 Abutment
22
ar tulangan^2
(1.5-.30)^2
jarak Diameter = - A1 = 627 m 13 - A12 = 1
Panjang
- A2 = 3 m 13 - A2 = 3
Tulangan Total
- A3/A3a = 63 m 13 - A9 = 8
- A4 = 308 m 13 - A13 = 50
- A5 = 80 m 13 - A5 = 80
- A6 = 84 m 13 - A8 = 110
- A7 = 851 m 13 - A18 = 162
- A8 = 110 m 13 - A19 = 162
- A9 = 8 m 16 - A3/A3a = 63
- A10 = 88 m 16 - A16 = 169
- A11 / A11a = 190 m 16 - A17 = 183
- A12 = 1 m 16 - A14 = 201
- A13 = 50 m 16 - A15 = 230
- A14 = 201 m 19 - A10 = 88
- A15 = 230 m 22 - A6 = 84
- A16 = 169 m 22 - A4 = 308
- A17 = 183 m 22 - A1 = 627
- A18 = 162 m 22 - A7 = 851
- A19 = 162 m 16 / 19 - A11/A11a = 190
● = ● Ø 13 = 576 m
Tulangan yang ● Ø 16 = 1036 m
dibutuhkan ● Ø 19 = 88 m
2
5.70 m ● Ø 22 = 1869 m
1.00 m
11.00 m ● = ● Ø 13 = 1151 m
Tulangan yang
dibutuhkan
Abutment 1 dan
2
2
4.20 m ● Ø 16 = 2072 m
Tulangan yang
4.00 m dibutuhkan ● Ø 19 = 176 m
5.00 m Abutment 1 dan ● Ø 22 = 3738 m
2
11.60 m
11.00 m
0.80 m
11.00 m
3.46 m
0.35 m
11.00 m
3.65 m
3.14 m
2.30 m
11.00 m
2.95 m
2.95 m
UKURAN JUMLAH VOLUME NOMOR GAMBAR CHECK LIST
Ø 30 cm -
3,75 x 0,75 x 0,07 m 2 0.39375 m3
5