NO REKOMENDASI
Tiang miring terdapat pada tiang nomor : 171, 244, 272, 277,
1 284, 350, 428, Aftak 298.L2, Aftak 275.R4.R6, Aftak 275.R4.R8,
Aftak 275.R4.R11, Aftak 275.R4.R13, Aftak 275.R4.R20, Aftak 271.
L30, Aftak
2 Tiang retak271.
retakL35, Aftak pada
terdapat 271. tiang
L41, Aftak
nomor271. L43,
: 234, Aftak 66.L7,
275.R26, 507 ,
Aftak 66.L8, Aftak 458.L1, Aftak 387.R11, Aftak 387.R31, Aftak 387.
608R37L4.
Tiang
R137, besi
AFtakyang berkarat
387.R142 – terdapat pada
R143, Aftak tiang
387. R31.nomor
R16 –: 110
R17,–Aftak
139,
3 271
387. R20, Aftak 387.R130.R11.L8, 486 ,487 ,490 ,507 ,555 ,570 ,,
– 285, Aftak 479.R11 - R23, Aftak 387.R161, 527R52L3
449L28R1L21
580 ,581 ,589,449L28R1L38
,613 ,608R2 –,449L28R1L53
608R4 ,608R37 , 449L28R1L55.
,608R37L6 ,527L29 ,
527L30 ,527L66
Isolator tumpu ,527L70 ,527L106 ditiang
miring terdapat ,527L113nomor
,527L139 – 527L141
: 341, 365.L9.,
4 527L186 ,527R30 ,527R68 ,527R52L1 ,527R52L2 ,527R52L32 ,
527L80 ,527L91 ,527L92 ,527L96 ,527R47L8.
422L60R18 ,422L60R34 ,422L60R45 ,449L28R1L7 ,449L28R1L12 ,
5 Grounding
449L28R1L39 KWH EXIM, LBS
– 449L28R1L42 dan Recloser Putus terdapat pada
,449L28R1L50
tiang nomor : 614,LBS POM,REC. CDK
6 Tiang retak retak terdapat pada tiang nomor :608R37L4.
7 Tiang retak retak terdapat pada tiang nomor : 275.R26
8
Kawat Fasa yang Rantas terdapat pada tiang nomor : 527.R47.L25
9 Cross Arm Miring terdapat pada tiang nomor : 521 ,528 ,527L58 ,
527L27L7 ,527L165 – 527L167 ,527L185 ,422R1.
10 Tiang main line sampai akhir serta aftak – aftak
11 Tiang retak retak terdapat pada tiang nomor : 234, 275.R26, 507 ,
608R37L4.
12 Tiang retak retak terdapat pada tiang nomor : 234
13 Kontruksi
1.
yang harus dirubah terdapat pada tiang nomer :
Hasil ukur Pembumian Arrester yang masih tinggi, terdapat di
527.L27.L7
Gardu:NWA, NPB, BDR, HMPB, NAW,
yang BIG, BHW,
tinggi,CBK, SGS,
14 1.
TiangHasil
DNA, retak ukur
SDN,retak
Pembumian
PTT,terdapat PHBTR
NGD,pada tiang
CRG, nomor
CMN,
masih
:507KDD,
KPT,
terdapat
CBH, LKB,
di
Gardu:KBDC, NPB, CEB, MDP, BDR, LPB, ANDN, HMPB,
15 CPP,
KKN,CLD,
TJM, KTCB, SAT, SDK,
BIG, BHW, CBK, LSD,
SGS, CDK,
DNA, MSB,
PWG,MSA,
PWC,BSIR,
TSP,
GGH.
PKBT, DNC, ADG, PNN, CKE, CER, CKP, CIE, DPS, BTU, LSM,
PIA, PTT,
16 1. GarduNGD,
tidakCRG, CMN,
dikunci KPT,rusak
/ kunci SKR,terdapat
CBH, LKB, CPC,
di gardu CPP,
: LGD,
CLC,
DLS, KTCB, BUK,NAW,
BDR, HMB, LSD, SGRL, COD,
DIG, TSP, CDK,
DNB, GGH.
DNC, CIE, LSM, PTT,
17 NGD, KDD, DPK, SPR, SKR, CBGO, CBH, LKB, BLW, DRD,
SDK, GDS, CDK,
Gardu-gardu CDG,
tidak MSB,
diberi MSA,
nama danCDD.
nomor, terdapat di lokasi
18 gardu :LNN, LGD, HMB, BHW, BIAN, DIG, DNC, ADG, BTU,
RBSP, SKR, CLC, BCK, SGRL, MKSR, PDM, MSA, GHJ.
19 Gardu yang pondasinya rusak / retak – retak , terdapat digardu :
CLD, HMB,AMKN,DPK, KTB, LSD,
20 Gardu
PHB TRyangyang
pondasinya rusak / retak
tidak dilengkapi – retak
dengan , terdapatterdapat
bohlamp, digardudi:
BHW,KDD,KTCB, BLW,
Gardu :NAW, KKN, CDG,
TJM, BIG,MKSR.
SIS, DNA, PKBT, CIE, CWK,
21 SDN, CRG, CPGL, TTC, XPOL, CBH, CGG, BSH, CPP, DRS,
BLW, DRD, SDK.
22
Engsel pintu Gardu Tembok rusak, terdapat di lokasi gardu : MBAS
23 PHBTR yang Karatan, terdapat pada gardu : BHW, DNC,BCK,
PDM.
24 PHBTR yang Karatan, terdapat pada gardu :CLD,KTB
25 Trafo yang tidak menggunakan braket, hanya diikat dengan kawat
seling, terdapat di gardu : KDD
PERBAIKAN JARING UNTUK KELAIKAN OPERASI (SLO)
PENYULANG CADAS MEKAR
RAYON PLERED
RAB PELAKSANAAN
PEKERJAAN VOL YANTEK
MAT JASA
Pentanahan TM (ERM) 39
Bongkar TM 2B 1
Pasang TM 4B 1
Perbaikan Kawat Rantas (Pasang Joint 70mm) 2
39,719,390 5,095,889
2,932,888
5,191,168
189,000 130,578
29,526,000 5,932,563
84,000
178,700
47,928
81,832
6,660,500
1,250,253
390,660
- 1,705,950
303,790
-
145,000.00
1,405,272.00
14,082,816.00
5,844,360.00
92,500.00
183,484.00
239,644.00
192,753.00
69,434,390 52,172,528
6,943,439 5,217,253
76,377,829 57,389,781
221,881,943
PERBAIKAN JARING UNTUK KELAIKAN OPERA
PENYULANG PAGADEN
RAYON PAGADEN
NO REKOMENDASI
RAB PELAKSANAAN
PEKERJAAN VOL YANTEK
MAT JASA
Perbaikan schoor 16
Penggantian Tiang Beton Retak 8
Pengecetan Tiang Besi TM 2
Perbaikan tiang miring 99
Penggantian Isolator Tumpu 15
Penggantian comp conector for jumper 150 dgn pres hidrolic 6
Penggantian comp cable shoes 6
Perbaikan SUTM kendor 1
Pentanahan TM (ERM) 6 5,112,720 912,702
Perbaikan Kawat Rantas (Pasang Joint 70mm) 8
Perbaikan Travers Miring 16
Penomoran Tiang TM 2000
Bongkar Tiang Beton (Retak) 8 -
Bongkar Pasang TM 7B 1
Bongkar Pasang TM 8B 1
Bongkar Pasang TM 1B 6 -
Perbaikan jemper PGTM gardu 1 -
Perbaikan travers ddk CO/arester miring 1
Pengecetan trafo karat 50KVA 4
Mutasi trafo 50 kVA 1
Pentanahan Gardu Portal 1
Pentanahan Gardu Cantol 6
4,423,670 644,912
5,865,776
162,224
8,373,321
155,250
93,036
85,494
69,125
191,712
163,664
12,926,000
2,500,506
390,660
341,870
637,500
160,635
28,604
638,400
623,900
1,557,372 263,599
6,229,488 912,702
53,545
456,351
304,232
75,000
1,341,396
4,928,986
3,068,289
8,420,000 660,000
832,500
3,584,819
4,755,310
33,444
626,444
514,008
192,753
986,236
191,808
321,255
2,100,000
20,630,530 60,255,266
2,063,053 6,025,527
22,693,583 66,280,793
95,602,340
Pekerjaan : Perbaikan SUTM dan Gardu (untuk SLO) REKAPITULASI
RENCANA ANGGARAN BIAYA
Alamat : Rayon PLERED NO. RAB : /53/09/2015
Penyulang : CADAS MEKAR TANGGAL : 23 MARET 2015
NO KEBUTUHAN MATERIAL
URUT PEKERJAAN JASA BORONGAN MDU NON MDU JUMLAH RAB
PLN PLN ERCT RP
1 2 3 4 5 6 7
3 SUTR
PT.PLN (PERSERO)
DISTRIBUSI JABAR & BANTEN
MENGETAHUI, AREA PURWAKARTA
412894196.xlsx
412894196.xlsx
Pekerjaan : Perbaikan SUTM dan Gardu (untuk SLO)
RINCIAN MATERIAL
MDU
NO URUT KEBUTUHAN MATERIAL VOL SAT HARGA SATUAN RP RP
MATERIAL JTM
1 Tiang Beton 11/350 daN 5 btg -
2 Isolator Tumpu 22 bh -
3 Isolator Afspan lkp. 6 set -
4 Conductor AAAC 70mm (For Grounding) 363 mtr -
5 CCO AL 70/70 mm (For Grounding) 39 bh 15,600.00 -
6 Sepatu kabel AL/CU 70mm (For Grounding) 312 bh 51,000.00 -
7 Travers Afspan 20KV 6 set -
8 Comp. Joint AL 70mm 2 bh 27,000.00 -
9 CCO AL150/150 mm 21 bh 28,920.00 -
B NON MDU
MATERIAL ASSESORIES JTM
1 Stay set TM lkp : 59 set -
- Klem schoor untuk tiang besi bulat 11/200 daN 59 bh 45,000.00
- Mur baud galv. M16-60 mm 118 bh 4,000.00
- Preformed spiral grif 236 bh 17,200.00
- wire steel TM 35 mm 708 mtr 11,500.00
- Turn Buckle medium 59 bh 63,480.00
- shackle for stay 59 bh 19,530.00
- thimble 118 bh 4,830.00
- Iisolator stay 59 bh 47,500.00
- Expanding TM 59 set 273,240.00
2 Pentanahan TM : 39 set -
MDU
NO URUT KEBUTUHAN MATERIAL VOL SAT HARGA SATUAN RP RP
MDU
NO URUT KEBUTUHAN MATERIAL VOL SAT HARGA SATUAN RP RP
B Perbaikan Gardu
A MDU
MATERIAL GARDU
1 Conductor AAAC 70mm (For Grounding) 671 mtr -
2 CCO AL 70/70 mm (For Grounding) 105 bh 15,600.00 -
3 Sepatu kabel AL/CU 70mm (For Grounding) 525 bh 51,000.00 -
4 Trafo Serandang / dudukan Trafo u/ tiang Cantol bulat 1 set -
B NON MDU
MATERIAL ASSESORIES GARDU
1 Pentanahan Gardu : 105 set -
- Pipa Galv 0,75"x3mtr 105 btg 45,000.00
- Rod earthing 20 x 2500 mm lengkap clamp 315 btg 57,500.00
- Pengadaan Link 25 x 25 525 bh 2,760.00
- Pengadaan Stoping buckle 525 bh 2,044.00
- Pengadaan stainlees steel 525 mtr 15,000.00
2 Pengadaan Kunci Gardu 29 bh 25,000.00
3 Penerangan PHBTR : 22 set -
- Sakelar Pintu 22 bh 30,000.00
- Fitting lampu 22 bh 10,000.00
- NYM 2x1,5mm 44 mtr 8,000.00
- Lampu Bohlam 10wat 22 bh 7,000.00
4 Test Lamp pada PHBTR 55 set -
- Sakelar Pintu 55 bh 30,000.00
- Fitting lampu 55 bh 10,000.00
MDU
NO URUT KEBUTUHAN MATERIAL VOL SAT HARGA SATUAN RP RP
- -
- -
- -
- -
608,400.00 -
15,912,000.00 -
- -
54,000.00 -
607,320.00 -
-
- -
- 2,655,000.00
- 472,000.00
- 4,059,200.00
- 8,142,000.00
- 3,745,320.00
- 1,152,270.00
- 569,940.00
- 2,802,500.00
- 16,121,160.00
- -
- -
1,638,000.00 -
26,775,000.00 -
- -
- -
- 4,725,000.00
- 18,112,500.00
- 1,449,000.00
- 1,073,100.00
- 7,875,000.00
- 725,000.00
-
- 660,000.00
- 220,000.00
- 352,000.00
- 154,000.00
- -
- 1,650,000.00
- 550,000.00
NO URUT ONGKOS /JASA BORONGAN VOL SAT HARGA SATUAN JUMLAH HARGA
JASA JTM
1 Pemasangan Stay Set TM 59 set 86,371.00 5,095,889.00
2 Penggantian Tiang Beton Retak 4 btg 733,222.00 2,932,888.00
3 Pengecetan Tiang Besi TM 64 bh 81,112.00 5,191,168.00
4 Penggantian Isolator Tumpu 21 bh 6,218.00 130,578.00
5 Pentanahan TM (ERM) 39 set 152,117.00 5,932,563.00
6 Bongkar TM 2B 1 set 84,000.00 84,000.00
7 Pasang TM 4B 1 set 178,700.00 178,700.00
8 Perbaikan Kawat Rantas (Pasang Joint 70mm) 2 bh 23,964.00 47,928.00
9 Perbaikan Travers Miring 8 set 10,229.00 81,832.00
10 Penomoran Tiang TM 700 bh 9,515.00 6,660,500.00
11 Bongkar Tiang Beton (Retak) 4 btg 312,563.30 1,250,253.20
12 Bongkar Pasang TM 7B 1 set 390,660.00 390,660.00
13 Bongkar Pasang TM 11B 1 set 1,705,950.00 1,705,950.00
14 Bongkar Pasang TM 4B 1 set 303,790.00 303,790.00
JUMLAH A 29,986,699.20
NO URUT ONGKOS /JASA BORONGAN VOL SAT HARGA SATUAN JUMLAH HARGA
B Perbaikan Gardu
C JASA GARDU
1 Pentanahan Gardu Portal 13 set 263,599.00 3,426,787.00
2 Pentanahan Gardu Cantol 56 set 152,117.00 8,518,552.00
3 Pemasangan Kunci Gardu 29 bh 5,000.00 145,000.00
4 Pembuatan Nama, Nomor Gardu & Tanda bahaya/tanda kilat 88 bh 15,969.00 1,405,272.00
5 Pondasi Gardu Portal 6 bh 2,347,136.00 14,082,816.00
6 Pondasi Gardu Cantol 6 bh 974,060.00 5,844,360.00
7 Biaya pemasangan Penerangan & Test Lamp pada PHBTR 77 set 15,000.00 1,155,000.00
8 Biaya Perbaikan Engksel Pintu Gardu Tembok 1 bh 92,500.00 92,500.00
9 Pengecetan PHBTR 2 Jurusan (Karatan) 4 bh 45,871.00 183,484.00
10 Pengecetan PHBTR 4 Jurusan (Karatan) 2 bh 119,822.00 239,644.00
11 Pemasangan Rangka Gardu Cantol 1 set 192,753.00 192,753.00
JUMLAH B 35,286,168.00
Jumlah jasa borong 65,272,867.20
A Perbaikan tiang TM
1 Perbaikan schoor 16
2 Penggantian Tiang Beton Retak 8
3 Pengecetan Tiang Besi TM 2
4 Perbaikan tiang miring 99
5 Penggantian Isolator Tumpu 15
6 Penggantian comp conector for jumper 150 dgn pres hidrolic 6
7 Penggantian comp cable shoes 6
8 Perbaikan SUTM kendor 1
9 Pentanahan TM (ERM) 6
10 Perbaikan Kawat Rantas (Pasang Joint 70mm) 8
11 Perbaikan Travers Miring 16
12 Penomoran Tiang TM 2000
13 Bongkar Tiang Beton (Retak) 8
14 Bongkar Pasang TM 7B 1
15 Bongkar Pasang TM 8B 1
16 Bongkar Pasang TM 1B 6
JUMLAH A
B Perbaikan Gardu
1 Perbaikan jemper PGTM gardu 1
2 Perbaikan travers ddk CO/arester miring 1
3 Pengecetan trafo karat 50KVA 4
4 Mutasi trafo 50 kVA 1
5 Pentanahan Gardu Portal 1
6 Pentanahan Gardu Cantol 6
7 Pasang pipa grounding 5
8 Perbaikan grounding trafo + arester 6
9 Perbaikan grounding LVC 4
10 Pemasangan Kunci Gardu 15
11 Pembuatan Nama, Nomor Gardu & Tanda bahaya/tanda kilat 84
12 Perbaikan Pondasi Gardu Portal 6
13 Perbaikan Pondasi Gardu Cantol 9
14 Biaya pemasangan Penerangan & Test Lamp pada PHBTR 66
15 Biaya Perbaikan Engksel Pintu dan kunci Gardu 9
16 Pengecetan PHBTR 2 Jurusan (Karatan) 37
17 Pengecetan PHBTR 4 Jurusan (Karatan) 14
18 Pembersihan halaman gardu 3
19 pembersihan rel dan instalasi PHBTR 2jur 13
20 pembersihan rel dan instalasi PHBTR 4jur 8
21 Peninggian PHBTR cantol 1
22 Peninggian PHBTR Portal 2
23 Pemasangan tanda bahaya 24
24 Pasang pipa kabel naik 5
25 Biaya Perbaikan lubang PHBTR bag bawah 28
JUMLAH B
Jumlah jasa borong
RINCIAN JASA BORONG
NO KEBUTUHAN MATERIAL
URUT PEKERJAAN JASA BORONGAN MDU
PLN
1 2 3 4
1 SUTM 33,513,752.40
2 GARDU 27,654,215.60
MENGETAHUI,
PLH MANAJER,
ASMAN KONSTRUKSI
YAYO SUWARNO
REKAPITULASI
RENCANA ANGGARAN BIAYA
NO. RAB : 035 /53/09/2015
TANGGAL : 26 MARET 2015
KEBUTUHAN MATERIAL
NON MDU JUMLAH RAB
PLN ERCT RP
5 6 7
SUMARNA
Pekerjaan : Perbaikan SUTM dan Gardu (untuk SLO)
RINCIAN MA
A PERBAIKAN SUTM
1 Tiang Beton 11/350 daN 6 btg
2 Tiang Beton 13/350 daN 2 btg
3 Isolator Tumpu 20 kV 19 bh
4 Isolator Afspan lkp. 9 set
5 Conductor AAAC 70mm (For Grounding) 60 mtr
6 CCO AL 70/70 mm (For Grounding) 6 bh
7 Sepatu kabel AL/CU 70mm (For Grounding) 48 bh
8 Travers Tumpu 20KV 6 set
9 Travers Afspan 20KV 2m 3 set
10 Comp. Joint AL 240mm 6 bh
11 A3C 240 mm2 90 mtr
MATERIAL ASSESORIES JTM
1 Stay set TM lkp : set
- Klem schoor untuk tiang besi bulat 11/200 daN 7 bh
- Mur baud galv. M16-60 mm 2 bh
- Preformed spiral grif 14 bh
- wire steel TM 35 mm 84 mtr
- Turn Buckle medium 7 bh
- shackle for stay 7 bh
- thimble 14 bh
- Iisolator stay 7 bh
- Expanding TM 7 set
2 Pentanahan TM : 6 set
- Pipa Galv 0,75"x3mtr 6 btg
- Rod earthing 20 x 2500 mm lengkap clamp 18 btg
- Pengadaan Link 25 x 25 30 bh
- Pengadaan Stoping buckle 30 bh
- Pengadaan stainlees steel 30 mtr
3 Binding Wire 28 mtr
JUMLAH A
B Perbaikan Gardu
MATERIAL GARDU
1 Trafo dist 3ph 50 kVA 20kv/400V 1 u
2 Conductor AAAC 70mm (For Grounding+jemper PGTM) 145 mtr
3 CCO AL 70/70 mm (For Grounding+jemper PGTM) 33 bh
4 Sepatu kabel AL/CU 70mm (For Grounding+jemper PGTM) 22 bh
5 Sepatu kabel CU 150mm 12 bh
MATERIAL ASSESORIES GARDU
1 Pentanahan Gardu : 7 set
- Pipa Galv 0,75"x3mtr 19 btg
- Rod earthing 20 x 2500 mm lengkap clamp 39 btg
- Pengadaan Link 25 x 25 90 bh
- Pengadaan Stoping buckle 90 bh
- Pengadaan stainlees steel 90 mtr
2 Pengadaan Kunci Gardu 15 bh
3 Penerangan gardu tembok : 2 set
- Sakelar Pintu 2 bh
- Fitting lampu 2 bh
- NYM 2x1,5mm 4 mtr
- Lampu Bohlam 10wat 2 bh
4 Test Lamp pada PHBTR 66 set
- Sakelar Pintu 66 bh
- Fitting lampu 66 bh
- NYM 2x1,5mm 99 mtr
- Lampu Bohlam 5wat 66 bh
5 Handle pintu PHBTR 3 bh
6 Tanda bahaya 24 bh
7 Pipa Galv 3"x6mtr 5 bh
8 Pipa Galv 3"x1mtr 5 bh
JUMLAH B
Jumlah kebutuhan Material
RINCIAN MATERIAL
-
-
-
-
-
15,600.00 93,600
51,000.00 2,448,000
-
-
70,000.00 420,000
-
45,000.00 315,000.00
4,000.00 8,000.00
17,200.00 240,800.00
11,500.00 966,000.00
63,480.00 444,360.00
19,530.00 136,710.00
4,830.00 67,620.00
47,500.00 332,500.00
273,240.00 1,912,680.00
-
45,000.00 270,000.00
57,500.00 1,035,000.00
2,760.00 82,800.00
2,044.00 61,320.00
15,000.00 450,000.00
9,000.00 252,000.00
- 2,961,600.00 6,574,790.00
-
-
18,000.00 594,000.00
51,000.00 1,122,000.00
43,000.00 516,000.00
-
45,000.00 855,000.00
57,500.00 2,242,500.00
2,760.00 248,400.00
2,044.00 183,960.00
15,000.00 1,350,000.00
45,000.00 675,000.00
-
30,000.00 60,000.00
10,000.00 20,000.00
8,000.00 32,000.00
7,000.00 14,000.00
- -
30,000.00 1,980,000.00
10,000.00 660,000.00
8,000.00 792,000.00
7,000.00 462,000.00
100,000.00 300,000.00
50,000 1,200,000.00
500,000 2,500,000.00
80,000 400,000.00
- 2,232,000.00 13,974,860.00
- 5,193,600.00 20,549,650.00