TERBILANG : Seratus Tujuh Puluh Sembilan Milyar Tujuh Ratus Empat Belas Juta
Tiga Ratus Empat Puluh Ribu Rupiah
A DIVISI I - PERSIAPAN
B DIVISI II - DRAINASE
AN DAN JEMBATAN
MDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN
Rp574,980,003.00 Rp 574,980,003.00
Rp 36,680.50 Rp 454,251,297.37
Rp 27,592.72 Rp 110,370,894.66
Rp 93,894.67 Rp3,157,302,208.54
Rp 31,600.27 ###
Rp 5,963.62 Rp1,282,178,297.57
Rp 387,970.54 Rp5,505,301,926.44
Rp 455,547.72 ###
Rp 511,380.68 ###
Rp 12,120.20 Rp2,408,962,086.44
Rp 14,637.97 Rp1,018,284,615.80
Rp 416,406.41 Rp7,180,147,610.34
Rp 417,855.46 ###
Rp 30,000.00 Rp 17,983,442.88
Rp 1,861,634.00 ###
Rp 1,013,816.85 ###
Rp 1,861,634.00 Rp1,742,712,820.08
Rp 1,677,945.00 Rp 152,666,147.88
Rp 21,984.00 Rp3,795,758,846.00
Rp 19,854.00 ###
Rp 103,500.00 Rp 8,280,000.00
Rp 175,624.69 Rp4,654,180,737.04
JUMLAH ITEM " G " ###
Rp 2,480,990.57 Rp1,649,858,729.86
Rp 2,000,000.00 Rp 664,000,000.00
Rp 157,959.39 Rp2,511,630,064.90
DURASI PELAK
No. URAIAN PEKERJAAN BOBOT SKALA Tahun I
1 -2 3- 4 5- 6 7-8 9 - 10
A DIVISI I - PERSIAPAN
1 MOB DAN DEMOB / PERSIAPAN 0.352 0.211
100.000
B DIVISI II - DRAINASE
1 PEKERJAAN GALIAN BIASA (DRAINASE) 0.278 0.028 0.036 0.047 0.056 0.047
C DIVISI III - PEKERJAAN TANAH
1 PEKERJAAN GALIAN TANAH (MEKANIK) 0.068 0.007 0.009 0.011 0.014 0.011
2 PEKERJAAN TIMBUNAN BIASA (MEDIAN JALAN) 1.933
3 PEKERJAAN TIMBUNAN HASIL GALIAN(BADAN JALAN) 11.409 0.456 1.255 2.054 2.168 2.396
4 PEKERJAAN PENYIAPAN BADAN JALAN 0.785 0.392 0.392
80.000
D DIVISI IV - PELEBARAN PERKERASAN & BAHU JALAN
1 LAPIS PONDASI AGGREGAT KLAS B (BAHU JALAN) 3.370
E DIVISI V - LAPISAN PERKERASAN BERBUTIR
1 LAPIS PONDASI AGGREGAT KLAS B (BADAN JALAN) 11.990 1.199 1.559 2.038
2 LAPIS PONDASI AGGREGAT KLAS A 10.094 0.404 1.110 1.817
F DIVISI VI - PERKERASAN ASPAL
1 Lapis Resap Pengikat - Aspal Cair 1.474 60.000 0.147 0.192 0.251 0.295
2 Lapis Perekat - Aspal Cair 0.623 0.025 0.069 0.112 0.118
3 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) 4.395 0.439 0.571 0.747
4 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) 6.686
5 Bahan anti pengelupasan 0.011
DURASI PELAKSANAAN
Tahun I Tahun II
11 - 12 1 -2 3- 4 5- 6 7-8 9 - 10 11 - 12
0.141
000
0.036 0.028
0.009 0.007
0.387 1.546
1.369 0.799 0.570 0.342
000
2.022 1.348
1.010
0.406
0.769 0.769
000
Rp 70,691,789,827.08 Rp 92,684,883,692.56
SATUAN
NO. JENIS PEKERJAAN KODE
KOMPONEN
HARGA
###
Rp 36,680.50
Rp 27,592.72
Rp 93,894.67
Rp 31,600.27
Rp 5,963.62
Rp 387,970.54
Rp 455,547.72
Rp 2,992,761.00
Rp 865,090.12
Rp 1,572,346.00
Rp 1,572,346.00
Rp 1,572,346.00
Rp 1,271,045.00
Rp 39,950.00
Rp 97,500.00
Rp 435,604.17
Rp 35,458.00
Rp 229,687.00
Rp 82,439.00
Rp 2,480,990.57
Rp 2,480,990.57
Rp 500,000.00
Rp 1,500,000.00
Rp 157,959.39
Rp 68,692.06
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. PERSIAPAN
2.
JUMLAH KOMPONEN TENAGA (A)
B. MOBILISASI DAN DEMOBILISASI
B.1 MOBILISASI
1 CONCRETE MIXER 1 UNIT 1.00 Rp 1,200,000.00
2 CONCRETE CUTTER 1 UNIT 1.00 Rp 700,000.00
3 CONCRETE VIBRATOR 1 UNIT 1.00 Rp 500,000.00
4 BABY ROLLER 1 UNIT 1.00 Rp 4,000,000.00
5 EXCAVATOR 80HP 1 UNIT 2.00 Rp10,000,000.00
6 AIR COMPRESSOR 1 UNIT 1.00 Rp 500,000.00
7 VIBRATOR ROLLER 1 UNIT 1.00 Rp19,000,000.00
8 MOTOR GRADER 1 UNIT 1.00 Rp19,000,000.00
9 BULLDOZER 100-150 HP 1 UNIT 2.00 Rp19,000,001.00
10 WHEEL LOADER 1.0-1.6 M 1 UNIT 1.00 Rp19,000,000.00
11 PENGUJIAN DCP 1 TITIK 1060.00 Rp 150,000.00
12 PENGUJIAN SANDCONE 1 TITIK 530.00 Rp 175,000.00
13 PENGUJIAN KUBUS BETON 1 Sample 2320.00 Rp 50,000.00
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. PERSIAPAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
1 - 0 m3 0.0000 Rp -
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN : STUDI KELAYAKAN AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR
KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
LOKASI : KAB.KONAWE PROV. SULAWESI TENGGARA
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
A. TENAGA (LABOUR)
B. BAHAN (MATERIAL)
C. PERALATAN
Catatan :
1. SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/a
ukuran berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satu
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diu
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Pes
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
2016
1 LS
574,980,003.00
0.35%
JUMLAH
(Rp)
Rp -
Rp 1,200,000.00
Rp 700,000.00
Rp 500,000.00
Rp 4,000,000.00
Rp20,000,000.00
Rp 500,000.00
Rp19,000,000.00
Rp19,000,000.00
Rp38,000,002.00
Rp19,000,000.00
###
Rp92,750,000.00
###
###
2016
1 LS
574,980,003.00
0.35%
JUMLAH
(Rp)
Rp 840,000.00
Rp 490,000.00
Rp 350,000.00
Rp 2,800,000.00
Rp14,000,000.00
Rp 350,000.00
Rp13,300,000.00
Rp13,300,000.00
Rp26,600,001.40
Rp13,300,000.00
Rp85,330,001.40
###
###
2016
12,384.00 m3
454,251,297.37
0.28%
JUMLAH
(Rp)
Rp 7,454.42
Rp 1,928.31
Rp 9,382.73
Rp -
Rp 26,297.77
Rp 1,000.00
Rp 27,297.77
Rp 36,680.50
Rp 36,680.50
2016
0.00 m3
110,370,894.66
0.07%
JUMLAH
(Rp)
Rp 1,222.15
Rp 316.15
Rp 1,538.30
Rp -
Rp 13,051.17
Rp 12,003.26
Rp 1,000.00
Rp 26,054.43
Rp 27,592.72
Rp 27,592.72
2016
0.00 m3
1,282,178,297.57
0.78%
JUMLAH
(Rp)
Rp 293.32
Rp 63.23
Rp 356.55
Rp -
Rp 1,805.73
Rp 1,714.29
Rp 1,087.05
Rp 1,000.00
Rp 5,607.07
Rp 5,963.62
Rp 5,963.62
2016
33,626.00 m3
3,157,302,208.54
1.93%
JUMLAH
(Rp)
Rp 4,746.30
Rp 1,534.71
Rp 6,281.01
Rp 62,294.40
Rp 62,294.40
Rp 20,930.05
Rp 3,389.21
Rp 1,000.00
Rp 25,319.26
Rp 93,894.67
Rp 93,894.67
2016
0.00 m3
0,000.00
0.00%
JUMLAH
(Rp)
Rp 4,746.30
Rp 1,534.71
Rp 6,281.01
Rp -
Rp -
Rp 20,930.05
Rp 3,389.21
Rp 1,000.00
Rp 25,319.26
Rp 31,600.27
Rp 31,600.27
2016
14,190.00 m3
5,505,301,926.44
3.37%
JUMLAH
(Rp)
Rp 14,911.46
Rp 4,821.61
Rp 19,733.07
Rp 318,000.00
Rp 318,000.00
Rp 42,514.15
Rp 6,723.32
Rp 1,000.00
Rp 50,237.46
Rp 387,970.54
Rp 387,970.54
2016
43,000.00 m3
###
11.99%
JUMLAH
(Rp)
Rp 3,041.80
Rp 562.04
Rp 3,603.83
Rp 161,779.80
Rp 64,152.00
Rp 110,430.00
Rp 336,361.80
Rp 21,991.90
Rp 70,005.83
Rp 6,320.06
Rp 5,714.31
Rp 2,940.64
Rp 7,609.35
Rp 1,000.00
Rp 115,582.08
Rp 455,547.72
Rp 455,547.72
2015
32,250.00 m3
###
10.09%
JUMLAH
(Rp)
Rp 7,303.57
Rp 4,650.30
Rp 787.20
Rp 12,741.07
Rp 2,400,000.00
Rp 463,712.98
Rp 29,564.48
Rp 9,555.21
Rp 15,840.00
Rp 16,571.43
Rp 9,047.62
Rp 20,825.00
Rp 2,965,116.72
Rp 2,982.15
Rp 10,921.48
Rp 1,000.00
Rp 14,903.63
Rp 2,992,761.43
Rp 2,992,761.00
jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
69,564.60 m3
1,018,284,615.80
0.62%
JUMLAH
(Rp)
Rp 11,732.64
Rp 5,976.29
Rp 1,264.58
Rp 18,973.51
Rp 365,853.66
Rp 114,159.38
Rp 294,242.36
Rp 29,564.48
Rp 7,920.00
Rp 811,739.88
Rp 28,586.12
Rp 4,790.61
Rp 1,000.00
Rp 34,376.72
Rp 865,090.12
Rp 865,090.12
2016
17,243.12 m3
7,180,147,610.34
4.39%
JUMLAH
(Rp)
Rp 6,966.26
Rp 3,548.42
Rp 1,501.69
Rp 12,016.37
Rp 545,192.31
Rp 121,441.59
Rp 264,818.13
Rp 243,472.22
Rp 315,000.00
Rp 15,840.00
Rp 1,505,764.24
Rp 33,946.02
Rp 19,619.42
Rp 1,000.00
Rp 54,565.44
Rp 1,572,346.05
Rp 1,572,346.00
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
198,756.00 m3
2,408,962,086.44
1.47%
JUMLAH
(Rp)
Rp 6,966.26
Rp 3,548.42
Rp 1,501.69
Rp 12,016.37
Rp 545,192.31
Rp 121,441.59
Rp 264,818.13
Rp 243,472.22
Rp 315,000.00
Rp 15,840.00
Rp 1,505,764.24
Rp 33,946.02
Rp 19,619.42
Rp 1,000.00
Rp 54,565.44
Rp 1,572,346.05
Rp 1,572,346.00
2016
Err:509
Err:509
Err:509
JUMLAH
(Rp)
Rp 30,675.00
Rp 10,416.67
Rp 4,408.33
Rp 45,500.00
Rp 49,500.00
Rp 49,500.00
Rp 2,500.00
Rp 2,500.00
Rp 97,500.00
Rp 97,500.00
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
599.45 KG
17,983,442.88
0.01%
JUMLAH
(Rp)
Rp 1,022.50
Rp 520.83
Rp 440.83
Rp 1,984.17
Rp 34,356.30
Rp 2,610.00
Rp 36,966.30
Rp 1,000.00
Rp 1,000.00
Rp 39,950.47
Rp 39,950.00
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
Err:509
Err:509
Err:509
JUMLAH
(Rp)
Rp 25,562.50
Rp 13,020.83
Rp 11,020.83
Rp 49,604.17
Rp 385,000.00
Rp -
Rp 385,000.00
Rp 1,000.00
Rp 1,000.00
Rp 435,604.17
Rp 435,604.17
2016
26,141.36 m3
###
6.69%
JUMLAH
(Rp)
Rp 13,749.19
Rp 14,006.92
Rp 5,927.73
Rp 33,683.84
Rp 443,349.75
Rp 108,878.66
Rp 202,779.31
Rp 315,000.00
Rp 9,900.00
Rp 1,079,907.73
Rp 133,997.43
Rp 22,455.96
Rp 1,000.00
Rp 157,453.39
Rp 1,271,044.97
Rp 1,271,045.00
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
41,280.00 m'
385,503,600.00
0.21%
JUMLAH
(Rp)
Rp 3,727.86
Rp 5,696.61
Rp 9,643.23
Rp 19,067.71
Rp 1,747.25
Rp 1,747.25
Rp 4,618.62
Rp 10,921.48
Rp 1,000.00
Rp 16,540.10
Rp 37,355.06
Rp 9,338.75
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
21,070.00 m'
229,278,472.50
0.13%
JUMLAH
(Rp)
Rp 11,183.59
Rp 5,696.61
Rp 4,821.61
Rp 21,701.82
Rp 20,825.00
Rp 20,825.00
Rp 1,000.00
Rp 1,000.00
Rp 43,526.82
Rp 10,881.75
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
2016
Err:509
Err:509
Err:509
JUMLAH
(Rp)
Rp 1,623.02
Rp 620.04
Rp 524.80
Rp 2,767.86
Rp 165,000.00
Rp 30,937.50
Rp 28,226.88
Rp 224,164.38
Rp 1,754.88
Rp 1,000.00
Rp 2,754.88
Rp 229,687.12
Rp 229,687.00
2016
Err:509
Err:509
Err:509
JUMLAH
(Rp)
Rp 284.03
Rp 86.81
Rp 73.47
Rp 444.31
Rp 28,793.60
Rp 5,220.00
Rp 34,013.60
Rp 1,000.00
Rp 1,000.00
Rp 35,457.91
Rp 35,458.00
2016
Err:509
Err:509
Err:509
JUMLAH
(Rp)
Rp 4,260.42
Rp 1,627.60
Rp 1,377.60
Rp 7,265.63
Rp 71,500.00
Rp 2,673.00
Rp 74,173.00
Rp 1,000.00
Rp 1,000.00
Rp 82,438.63
Rp 82,439.00
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
A. ASUMSI
1 Pekerjaan di lakukan secara manual
2 Lokasi pekerjaan rencana pasangan batu drainase
3 Kondisi tanah dari sedang sampai baik
4 Efektifitas jam kerja harian Tk 7.000 jam
5 Faktor kembang bahan (bank to loose cond) Fk 1.200
B URUTAN KERJA
1 Bahan
Tidak ada bahan yang digunakan
2 Alat
a. Dump Truck
Kapasitas Bak V 5.000 M3/jam
Faktor Efesiensi Alat Fa 0.830
Rata-rata kecepatan pada saat berisi mu v1 35.000 Km/jam
Rata-rata kecepatan pada saat kosong v2 50.000 Km/jam
Kapasitas Produksi/Jam =
V x Fa x 60
Q= Q1 8.165 M3/jam
Tc x Fk
Nilai Koefisien alat per = 1/Q1 0.122
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 57.153 M3/hari
Lihat lampiran.
Rp 36,680.50 /M3
A. ASUMSI
1 Bahan
Tidak ada bahan yang digunakan
2 Alat
a EXCAVATOR E07
kapasitas Bucket V 2.00 m3
faktor bucket Fa 0.90
faktor efisiensi alat Fb 0.83
Waktu siklus
- Menggali / memuat T1 1.00 Menit
- Lain-lain T2 0.50 Menit
Tc1 1.50 Menit
Kapasitas Produksi/Jam =
Q= V x Fa x 60 Q1 17.888 M3/jam
Tc x Fk
Nilai Koefisien alat per m3 = 1/Q1 E05 0.056 jam
c Alat Bantu
Diperlukan alat bantu kecil
- Sekop
- Linggis, cangkul, dll
3 Tenaga
Produksi kerja / hari = Tk x Q1 Qtot 348.600 M3/hari
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp 27,592.72 /M3
A. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.000 jam
B URUTAN KERJA
1 Bahan
Tidak ada bahan yang digunakan
2 Alat
a. MOTOR GRADER E10
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade b 2.40 M
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 2.00 Km / Jam
Jumlah lintasan n 6.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 3 buah
TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 1743.00 M2
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt L01 0.0241 Jam
- Mandor = (Tk x M) : Qt L03 0.0040 Jam
Rp. 5,963.620 / M2
WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : 4.11 bulan
A. ASUMSI
1 Pekerjaan di lakukan secara manual
2 Lokasi pekerjaan rencana box culvert & turap
3 Kondisi tanah dari sedang sampai baik
4 Efektifitas jam kerja harian Tk 7.000 jam
5 Faktor kembang bahan (bank to loose cond) Fk 1.200 Kondisi P
6 Tebal Hamparan Padat t 0.300
B URUTAN KERJA
1 Bahan
Material Timbunan =1 x Fk 1.200 M3
2 Alat
b Dump Truck
Kapasitas Bak V 4.000 M3/jam
Faktor Efesiensi Alat Fa 0.850
Rata-rata kecepatan pada saat berisi mu v1 35.000 Km/jam
Rata-rata kecepatan pada saat kosong v2 50.000 Km/jam
- Waktu tempuh bermu=(LX60)/V1 t1 8.571 menit
- Waktu tempuh tan mu=(LX60)/V2 t2 6.000 menit
- dll. t3 2.000 menit
Waktu siklus (t1+t2+t3) tc 16.571 menit
Kapasitas Produksi/Jam =
V x Fa x 60
Q= Q1 10.259 M3/jam
Tc x Fk
Nilai Koefisien alat per m3 = 1/Q1 0.097
c BABY ROLLER E05
Lebar efektif pemadatan be 0.6100
Kecepatan rata-rata pemadatan V 0.5000 km/jam
Faktor efesiensi kerja Fa 0.8300
Jumlah Lintasan n 6.0000
Kapasitas Produksi/Jam(v x 1000) x b x t Q3 42.1917 m3/jam
n
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
e Alat Bantu
Diperlukan alat bantu kecil
- Sekop
- Linggis, cangkul, dll
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 71.810 M/hari
Kebutuhan tenaga ~ Pekerja
~ Mandor
Nilai Koefisien Tenaga per m3 :
~ Pekerja = Tk x P / Qtot P 4.000 orang
~ Mandor = Tk x M / Qtot M 1.000 orang
0.390 jam
0.097 jam
D HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp 93,894.67 /M3
A. ASUMSI
1 Pekerjaan di lakukan secara manual
2 Lokasi pekerjaan rencana box culvert & turap
3 Kondisi tanah dari sedang sampai baik
4 Efektifitas jam kerja harian Tk 7.000 jam
5 Faktor kembang bahan (bank to loose cond) Fk 1.200 Kondisi P
6 Tebal Hamparan Padat t 0.300
B URUTAN KERJA
1 Bahan
Material Timbunan =1 x Fk 1.200 M3
2 Alat
b Dump Truck
Kapasitas Bak V 4.000 M3/jam
Faktor Efesiensi Alat Fa 0.850
Rata-rata kecepatan pada saat berisi mu v1 35.000 Km/jam
Rata-rata kecepatan pada saat kosong v2 50.000 Km/jam
- Waktu tempuh bermu=(LX60)/V1 t1 8.571 menit
- Waktu tempuh tan mu=(LX60)/V2 t2 6.000 menit
- dll. t3 2.000 menit
Waktu siklus (t1+t2+t3) tc 16.571 menit
Kapasitas Produksi/Jam =
V x Fa x 60
Q= Q1 10.259 M3/jam
Tc x Fk
Nilai Koefisien alat per m3 = 1/Q1 0.097
c BABY ROLLER E05
Lebar efektif pemadatan be 0.6100
Kecepatan rata-rata pemadatan V 0.5000 km/jam
Faktor efesiensi kerja Fa 0.8300
Jumlah Lintasan n 6.0000
Kapasitas Produksi/Jam(v x 1000) x b x t Q3 42.1917 m3/jam
n
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
e Alat Bantu
Diperlukan alat bantu kecil
- Sekop
- Linggis, cangkul, dll
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 71.810 M/hari
Kebutuhan tenaga ~ Pekerja
~ Mandor
Nilai Koefisien Tenaga per m3 :
~ Pekerja = Tk x P / Qtot P 4.000 orang
~ Mandor = Tk x M / Qtot M 1.000 orang
Rp 0.00 /M3
Volume pekerjaan : - M3
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
A. ASUMSI
1 Pekerjaan di lakukan secara manual
2 Lokasi pekerjaan: di jalan pada area yang dibutuhkan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 28.000 km
5 Tebal lapis Agregat padat t 0.100 m
6 Faktor kembang material (Padat-Lepas) Fk 1.100
7 Jam kerja efektif per-hari Tk 7.000 jam
8 Lebar bahu jalan Lb 1.000 m
9 Proprsi Campuran : - Aggregat Kasar Ak 35.000 %
- Aggregat Halus Ah 20.000 %
- Bahan pengikat Bp 45.000 %
B URUTAN KERJA
1 Bahan
- Aggregat Kelas B 1.2000 m3
2 Alat
a. Dump Truck
Kapasitas Bak V 4.000 M3/jam
Faktor Efesiensi Alat Fa 0.800
Rata-rata kecepatan pada saat berisi mu v1 35.000 Km/jam
Rata-rata kecepatan pada saat kosong v2 50,000 Km/jam
Kapasitas Produksi/Jam =
Q2 = (v x 1000) x b x t x Fa Q3 21.2688 m3/jam
n
Nilai Koefisien alat per m3 0.0470
c Alat Bantu
Diperlukan alat bantu k
- Sekop
- Linggis, cangkul, dll
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 35.353 M3/hari
Lihat lampiran.
Rp 387,970.54 /M3
A. ASUMSI
B URUTAN KERJA
2 Alat
a. WHEEL LOADER E13
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.50 menit
- Memuat dan lain-lain =(LX60)/V1 T2 0.50 menit
=(LX60)/V2 Ts1 2.00 menit
3 Tenaga
Produksi menentukan : WHEEL LOADER Q1 28.01 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 196.09 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt L01 0.2499 jam
- Mandor = (Tk x M) : Qt L03 0.0357 jam
Lihat lampiran.
A. ASUMSI
1 Menggunakan alat berat (mekanis)
2 Lokasi pekerjaan sepanjang jalan, dll
3 Bahan dasar beton K-350 diterima di lokasi L 60.000 km
4 Jarak Batching Plant ke lokasi pekerjaan Tk 7.000 jam
Jam kerja
Tebal Lapisefektif per-hari
perkerasan beton padat
5 t 0.200 m
6 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.500 -
B URUTAN KERJA
1 Beton K350 diterima di lokasi dengan truck mixer
2 Material plastik cor dihampar
Besi tulangan dipasang, dicat kemudian di tutupi pipa pvc
3 Beton di-cor ke dalam bekisting yang telah disiapkan
Beton dipadatkan dengan Concrete Vibrator
4 Setelah beton mengalami pengeringan dilakukan
pemotongan dengan concrete cutter lalu di isi dengan aspal
Penyelesaian dan perapihan setelah pemasangan
1 Bahan
a Beton K-350 M20 1.200 m3
b Besi Tulangan M07 14.847 kg
c Multiplex 12 mm M15 0.169 lbr
d Kayu Acuan M12 0.005 m3
e Paku M10 0.800 kg
f Aspal Muai M11 1.143 m'
g Plastik Cor M14 3.619 m2
h Pipa PVC 1" M13 0.583 m'
2 Alat
a. Concrete Vibrator E04 20.000 Type Dises
Koefisien Alat / M3 Q1 0.050 Jam
3 Tenaga
Produksi penghamparan beton perjam Q1 20.00 m3/jam
Produksi beton / hari = Tk x Q1 Qtot 140.000 m3
Kebutuhan Tenaga - pekerja M 12.000 orang
- tukang Tb 5.000 orang
- mandor P 1.000 orang
Nilai Koefisien Tenaga per m' :
- pekerja = Tk x P / Qtot 0.600 jam
- tukang = Tk x T / Qtot 0.250 jam
- mandor = Tk x M / Qtot 0.050 jam
D HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Rp 511,380.68 /m3
A. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan 28.000 km
5 Jam kerja efektif per-hari Tk 7.000 jam
1 Bahan
- Semen (PC) 363.46 Kg
- Pasir Beton 0.4543 m3
- Agregat Kasar 0.6875 m3
- Multipleks 12 mm 1.3889 lbr
- Kayu Acuan (bekisting) 0.1500 m3
- Paku 0.8000 Kg
2 Alat
a. TRUCK MIXER E01
Kapasitas V 4.000 M3
Faktor efisiensi alat Fa 0.830
Waktu siklus, Tc
~ Memuat T1 7.000 menit
~ Mengaduk T2 5.000 menit
~ Menuang T3 3.000 menit
~ Menunggu, dll T4 4.000 menit
Waktu siklus Tc 19.000 menit
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
V x Fa x 60
Kapasitas produksi Q1 = --------------- Q1 10.484 M3/jam
Ts1 x 1000
d. ALAT BANTU
Diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 2 buah
3 Tenaga
Produksi menentukan : Concrete Mixer Q1 10.484 m3/jam
Produksi pasangan batu / hari = Tk x Q1 Qtot 73.389 m3/hari
Kebutuhan tenaga
~ Pekerja P 6.000 orang
~ Tukang Batu Tb 2.000 orang
~ Mandor M 1.000 orang
Nilai Koefisien Tenaga per m3 :
~ Pekerja = (Tk x P) / Qt L01 0.572 jam
~ Tukang Batu = (Tk x Tb) / Qt L02 0.191 jam
~ Mandor = (Tk x M) / Qt L03 0.095 jam
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Rp 416,406.41 /m3
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
A. ASUMSI
1 Menggunakan tenaga manusia
2 lokasi pekerjaan langsung di tempat
3 bahan dasar baja seluruhnya diterima dilokasi pekerjaan
4 jarak rata-rata base camp ke lokasi pekerjaan L 4.000 km
5 efektifitas jam kerja harian Tk 7.000 jam
B URUTAN KERJA
1 Bahan
- Besi beton 1.100 kg
- Kawat 0.100 kg
2 Alat Bantu
- Gunting potong ba= 2 buah
- Kunci pembengkok= 2 buah
- Alat lainnya
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 250.000 kg
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Rp 30,000.00 /Kg
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
A. ASUMSI
1 Pekerjaan di lakukan secara manual dan mekanis
2 Lokasi pekerjaan rencana box culvert dan Turap
3 Bahan dasar dari kayu ulin diterima seluruhnya
dilokasi pekerjaan
4 Efektifitas jam kerja harian Tk 7.000 jam
4 Panjang Tiang 2.000 m
B URUTAN KERJA
1 Bahan
Kayu ulin 1.100 M3
2 Alat Bantu
Diperlukan alat bantu kecil
- martil 5 kg
- pemotong kawat, tang dan lain-lain
3 Tenaga
Produksi kerja / hari= Tk x Q2 Qtot 25.000 M'/hari
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Err:509 /M'
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
A. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.000 KM
5 Jam kerja efektif per-hari : Semen Tk 7.000 jam
6 Faktor kehilangan material : Pasir Fh 1.100 -
B URUTAN KERJA
1 Bahan
- Batu Kali/Batu Gunung M22 1.100
2 Alat Bantu
Diperlukan alat bantu kecil
- Palu Batu = 2 buah
- Gerobak Dorong = 4 buah
3 Tenaga
Produksi pasangan batu / hari = Tk x Q1 Qtot 10.000 m3
Kebutuhan tenaga
~ Pekerja P 3.000 orang
~ Tukang Batu Tb 1.000 orang
~ Mandor M 1.000 orang
Nilai Koefisien Tenaga per m3 :
~ Pekerja = (Tk x P) / Qt 0 2.100 jam
~ Tukang Batu = (Tk x Tb) / Qt 0 0.700 jam
~ Mandor = (Tk x M) / Qt 0 0.700 jam
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Err:509 /m3
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
A. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan 28.000 km
5 Jam kerja efektif per-hari Tk 7.000 jam
B URUTAN KERJA
1 Bahan
- Semen (PC= (Sm x D1 x 1000) x Fh2 295.567 Kg
- Pasir Beto= (Ps x D1 / D3) x Fh2 0.4073 m3
- Agregat K= (Kr x D1) / D4) x Fh1 0.7586 m3
- Kayu Perancah 0.1500 m3
- Paku 0.5000 Kg
2 Alat
a. CONCRETE MIXER 0
Kapasitas V 800.000 liter
Faktor efisiensi alat Fa 0.830
Waktu siklus, Tc
~ Memuat T1 5.000 menit
~ Mengaduk T2 3.000 menit
~ Menuang T3 3.000 menit
~ Menunggu, dll T4 4.000 menit
Waktu siklus Tc 15.000 menit
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
V x Fa x 60
Kapasitas produksi Q1 = --------------- Q1 2.656 M3/JAM
Ts1 x 1000
d. ALAT BANTU
Diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 2 buah
3 Tenaga
Produksi menentukan : Concrete Mixer Q1 2.656 m3/jam
Produksi pasangan batu / hari = Tk x Q1 Qtot 18.592 m3
Kebutuhan tenaga
~ Pekerja P 3.000 orang
~ Tukang Batu Tb 2.000 orang
~ Mandor M 1.000 orang
Nilai Koefisien Tenaga per m3 :
~ Pekerja = (Tk x P) / Qt 0 1.130 jam
~ Tukang Batu = (Tk x Tb) / Qt 0 0.753 jam
~ Mandor = (Tk x M) / Qt 0 0.377 jam
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
A. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan 28.000 km
5 Jam kerja efektif per-hari Tk 7.000 jam
B URUTAN KERJA
1 Bahan
- Semen (PC= (Sm x D1 x 1000) x Fh2 243.902 Kg
- Pasir Beto= (Ps x D1 / D3) x Fh2 0.4271 m3
- Agregat K= (Kr x D1) / D4) x Fh1 0.7639 m3
- Multipleks 12 mm 0.1687 lbr
- Paku 0.4000 Kg
2 Alat
a. TRUCK MIXER E01
Kapasitas V 5.000 M3
Faktor efisiensi alat Fa 0.830
Waktu siklus, Tc
~ Memuat T1 10.000 menit
~ Mengaduk T2 5.000 menit
~ Menuang T3 3.000 menit
~ Menunggu, dll T4 2.000 menit
Waktu siklus Tc 20.000 menit
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
V x Fa x 60
Kapasitas produksi Q1 = --------------- Q1 12.450 m3/jam
Ts1 x 1000
c. ALAT BANTU
Diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 2 buah
3 Tenaga
Produksi menentukan : Truck Mixer Q1 12.450 m3/jam
Produksi pasangan batu / hari = Tk x Q1 Qtot 87.150 m3
Kebutuhan tenaga
~ Pekerja P 12.000 orang
~ Tukang Batu Tb 4.000 orang
~ Mandor M 1.000 orang
Nilai Koefisien Tenaga per m3 :
~ Pekerja = (Tk x P) / Qt L01 0.964 jam
~ Tukang Batu = (Tk x Tb) / Qt L02 0.321 jam
~ Mandor = (Tk x M) / Qt L03 0.080 jam
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Rp 14,637.97 /m3
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
A. ASUMSI
1 Menggunakan tenaga manusia
2 Lokasi pekerjaan ditempat
3 Bahan dasar dan alat las
4 diangkut dengan Truk ke lokasi pekerjaan km
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.000 m
6 Efektifitas jam kerja harian Tk 7.000
B URUTAN KERJA
1 Bahan
- Pipa PVC 3/4" M13 0.5833 m
2 Alat Bantu
- Alat Bantu
Diperlukan alat bantu k
- Geregaji potong = 2buah
- Kunci pipa/lem = 2buah
- Alat bantu kecil, dll
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 1,470.000 m'/hari
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Rp 10,881.75 /M
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
A. ASUMSI
1 Menggunakan tenaga manusia
2 Lokasi pekerjaan langsung di tempat (on site)
3 Bahan dasar Sealant diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.000 Km
5 Efektifitas jam kerja harian Tk 7.000 jam
B URUTAN KERJA
1 Bahan
b Asphalt M11 0.1205 kg
2 Alat Bantu
a. AIR COMPRESSOR
Kapasitas produksi dihitung 2x kerja cut V 50.000 m'/jam
Faktor efisiensi alat Fa 0.900
b. CONCRETE CUTTER
Nilai Koefisien Alat 0.200 jam
c. Alat Bantu
Diperlukan alat bantu kecil
3 Tenaga
Produksi kerja / hari= Tk x Q1 Qtot 350.000 m'/hari
Lihat lampiran.
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
Rp 9,338.75 /M
A. ASUMSI
1 Menggunakan tenaga manusia
2 lokasi pekerjaan langsung di tempat
3 bahan dasar baja seluruhnya diterima dilokasi pekerjaan
4 jarak rata-rata base camp ke lokasi pekerjaan
5 Efektifitas jam kerja harian Tk 7.000 jam
B URUTAN KERJA
1 Bahan
- Besi Beton M08 1.100 Kg
- Kawat Beton M09 0.2000 Kg
2 Alat bantu
- Gunting potong baja = 2 buah
- Kunci pembengkok = 2 buah
- Alat lainnya
3 Tenaga
Produksi kerja / hari = Tk x Q1 Qtot 1,500.00 kg
Lihat lampiran.
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA TANGGAL :
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA
Dec-99
DAN JEMBATAN SUNGAI POHARA
\
No. URAIAN ANALISIS KODE KOEF SATUAN
Err:509 /KG
Volume pekerjaanErr:509 KG
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
A. ASUMSI
1 Pemasangan dengan manual
2 Lokasi pekerjaan sepanjang jalan yang diperlukan drainase, dll
3 Bahan dasar pasangan diterima lokasi pekerjaan
4 Efektifitas jam kerja harian Tk 7.000 jam
B URUTAN KERJA
Alat
a. CONCRETE MIXER E02
Kapasitas V 700.000 liter
Faktor efisiensi alat Fa 0.600
Waktu siklus, Tc
~ Memuat T1 2.000 menit
~ Mengaduk T2 2.000 menit
~ Menuang T3 1.000 menit
~ Menunggu, dll T4 1.000 menit
Waktu siklus Tc 6.000 menit
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
V x Fa
Kapasitas produksi Q1 = --------------- Q1 70.000 ltr/menit
Tc 4.200 m3/jam
42.000 m2/jam
Nilai Koefisien alat per m3 : 1 / Q1 0.024 jam
b. Alat Bantu LS
Diperlukan alat bantu kecil
- Sekop = 2 buah
- Tandon Air = 1 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 1 buah
3 Tenaga
Produksi menentukan : Concrete Mixer E02 30.00 m'/jam
Produksi pasangan batu / hari = Tk x Q1 Qtot 210.00 m'
Kebutuhan tenaga
~ Pekerja P 4.000 orang
~ Tukang Batu Tb 1.000 orang
~ Mandor M 1.000 orang
Nilai Koefisien Tenaga per m3 :
~ Pekerja = (Tk x P) / Qt P 0.133 jam
~ Tukang Batu = (Tk x Tb) / Qt Tb 0.033 jam
~ Mandor = (Tk x M) / Qt M 0.0333 jam
Lihat lampiran.
Err:509 /m3
F MASA PELAKSANAAN YANG DIPERLUKAN
A. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.000 KM
5 Jam kerja efektif per-hari : Semen Tk 7.000 jam
6 Faktor kehilangan material : Pasir Fh 1.100 -
B URUTAN KERJA
1 Bahan
- Paving Blok M25 1.100 M2
- Pasir Pasang M04 0.01 M3
2 Alat Bantu
Diperlukan alat bantu kecil
- Palu Batu = 2 buah
- Gerobak Dorong = 4 buah
3 Tenaga
Produksi pasangan batu / hari = Tk x Q1 Qtot 80.00 m2
Kebutuhan tenaga
~ Pekerja P 4.000 orang
~ Tukang Batu Tb 1.000 orang
~ Mandor M 1.000 orang
Nilai Koefisien Tenaga per m3 :
~ Pekerja = (Tk x P) / Qt L01 0.350 jam
~ Tukang Batu = (Tk x Tb) / Qt L02 0.088 jam
~ Mandor = (Tk x M) / Qt L03 0.088 jam
Lihat lampiran.
E ANALISA HARGA SATUAN PEKERJAAN
Err:509 /m3
BBPJN VI MAKASSAR STANDAR UNTUK :
SATKER P2JN PROV. SULAWESI TENGGARA 0.0000
STUDI KELAYAKAN AMDAL RENCANA
PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA TANGGAL :
DAN JEMBATAN SUNGAI POHARA 0.0000
2.1
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
2.1
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
3.1.(1)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kutai Kartanegara
PC200
ITEM
PEMBAYARAN:
3.1.(1)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
3.3.1
SAT.
PEMBAYARAN:
M2
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
3.3.1
SAT.
PEMBAYARAN:
M2
( SAMBUNGAN
)
KETERANGAN
Lumpsum
ITEM
PEMBAYARAN:
3.2
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
PC200
ITEM
PEMBAYARAN:
3.2
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
3,2.1
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
PC200
ITEM
PEMBAYARAN:
3,2.1
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
4.2.(2)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
Komposisi
Material LPA
Kls "B"
ITEM
PEMBAYARAN:
4.2.(2)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM PEMBAYARAN:
5.1.(2)
SAT. PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Gradasi harus
memenuhi
spesifikasi
ITEM
PEMBAYARAN:
5.1.(2)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
5.1.(2)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
5.3.(1)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
Type Disesuaikan
Type Disesuaikan
Ditetapkan
Lumpsum
ITEM
PEMBAYARAN:
6.3
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.1 (7)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
Berdasarkan
JMF & sesuai
dgn Spesifikasi
ITEM
PEMBAYARAN:
7.1 (7)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
Type Disesuaikan
ITEM
PEMBAYARAN:
7.1 (7)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.3 (3)
SAT.
PEMBAYARAN:
KG
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
7.3 (3)
SAT.
PEMBAYARAN:
KG
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.6 (1)
SAT.
PEMBAYARAN:
M'
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
7.6 (1)
SAT.
PEMBAYARAN:
M'
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.10.(2)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
7.10.(2)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.1 (8)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
Berdasarkan
JMF & sesuai
dgn Spesifikasi
ITEM
PEMBAYARAN:
7.1 (8)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
Type Disesuaikan
ITEM
PEMBAYARAN:
7.1 (10)
SAT.
PEMBAYARAN:
M3
KETERANGAN
Kondisi Pekerja
Kukar
Berdasarkan
JMF & sesuai
dgn Spesifikasi
ITEM
PEMBAYARAN:
7.1 (10)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
Type Disesuaikan
ITEM
PEMBAYARAN:
7.1 (10)
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
An - 01
SAT.
PEMBAYARAN:
M'
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
An - 01
SAT.
PEMBAYARAN:
M'
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.11 (5)
SAT.
PEMBAYARAN:
M'
KETERANGAN
Kondisi Pekerja
Kukar
ditetapkan LS
ITEM
PEMBAYARAN:
7.11 (5)
SAT.
PEMBAYARAN:
M'
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
7.3 (1)
SAT.
PEMBAYARAN:
KG
KETERANGAN
Kondisi Pekerja
di Penajam
ITEM
PEMBAYARA
N:
SAT.
7.3 (1)
PEMBAYARA
N:
KG
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
A.n- 02
SAT.
PEMBAYARAN:
M1
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
A.n- 02
SAT.
PEMBAYARAN:
M1
( SAMBUNGAN
)
KETERANGAN
ITEM
PEMBAYARAN:
An-03
SAT.
PEMBAYARAN:
M2
KETERANGAN
Kondisi Pekerja
Kukar
ITEM
PEMBAYARAN:
An-03
SAT.
PEMBAYARAN:
M3
( SAMBUNGAN
)
KETERANGAN
TABEL ANALISA KEBUTUHAN ALAT
2 STABILITAS TANAH DASAR (TIMBUNAN PIL DUMP TRUCK 10.259 m3/jam 244.64 m3 7 7 48 0.010
2 Lapis Perekat - Aspal Cair TRUCK MIXER 12.450 m3/jam 69,564.60 m3 7 7 48 2.376
3 Laston Lapis Aus (AC-WC) (gradasi halus/TRUCK MIXER 10.484 m3/jam 17,243.12 m3 7 7 48 0.699
4 Laston Lapis Antara (AC-BC) (gradasi haluCONCRETE MIXER 2.656 m3/jam 26,141.36 m3 7 7 48 4.185
7 PEKERJAAN JOINT SEALANT AIR COMPRESSOR 50.000 M'/Jam 41,280.00 m' 7 7 48 0.351
EL ANALISA KEBUTUHAN ALAT
JUMLAH
ALAT
1
1
1
OWNING AND OPERATION COST
FOR PROJECT EQIUPMENTS
SATUAN
NO. JENIS PERALATAN KODE UNIT HARGA
KOMPONEN
HP A W B C D
1 2 3 4 5 6 7 8 9
1 BULDOSER 110 HP (E001) 110 5 1300 1,891,778,232.96 189,177,823.30 0.28085
2 BULDOZER 65 HP (E003) 65 5 1300 1,499,158,584.00 149,915,858.40 0.28085
3 MOTOR GRADER 110 HP (E010) 110 5 1600 1,595,721,600.00 159,572,160.00 0.28085
4 HYDRAULIC EXCAVATOR 1.0 M3 90 HP (E020) 90 5 1600 1,506,869,971.00 150,686,997.10 0.28085
5 CRUSHER/ SCR 30 T/H 185 HP (E031) 185 10 1800 1,275,757,560.00 127,575,756.00 0.18062
6 SCREENING PLANT 80 HP (E040) 80 5 1800 1,221,246,180.00 122,124,618.00 0.28085
7 LOADER WHELED 80 HP (E052) 80 5 1800 1,648,730,160.00 164,873,016.00 0.28085
8 TRACTOR WHEELED 60 HP (E053) 60 5 2000 637,687,036.80 63,768,703.68 0.28085
9 ROLLER 3 WHEEL 8-10 TON (E080) 51 5 1800 888,030,000.00 88,803,000.00 0.28085
10 TANDEM ROLLER 6-10 (E081) 40 5 1800 956,340,000.00 95,634,000.00 0.28085
11 SELF VIBRATOR ROLLER 10 TON (E082) 35 5 1800 1,285,320,960.00 128,532,096.00 0.28085
12 PNEUMATIC TRUE ROLLER 8-15 TON (E084) 95 5 1800 1,323,574,560.00 132,357,456.00 0.28085
13 VIBRATOR-PED ROLLER 1 TON (E087) 12 5 1600 277,338,600.00 27,733,860.00 0.28085
14 PLATE VIBRATOR TAMPER 4 HP (E088) 4 5 1600 37,412,020.80 3,741,202.08 0.28085
15 CONCRETE VIBRATOR 4 HP (E089) 4 4 1800 34,428,240.00 3,442,824.00 0.33271
16 CHIP SPREADER 3 TON (E130) 0 4 700 101,180,772.00 10,118,077.20 0.33271
17 SPRAYER, SELF PROP 10001 (E153) 25 5 1200 348,107,760.00 34,810,776.00 0.28085
18 ASPHALT SPRAYER TOWED 4001 (E154) 6 5 1000 119,886,782.40 11,988,678.24 0.28085
19 ASPALT MIXING PLANT 30 T/H (E155) 150 10 1200 5,349,765,960.00 534,976,596.00 0.18062
20 ASPHALT FINISHER 1.82 M (E157) 30 5 1300 996,123,744.00 99,612,374.40 0.28085
21 WATER TANK TRUCK 68 HP (E182) 68 4 1000 345,866,608.00 34,586,660.80 0.33271
22 TRAILER TOWED 1 TON (E191) 0 5 1000 109,405,296.00 10,940,529.60 0.28085
23 DUMP TRUCK 3.5 TON /44 HP (E211) 44 5 1800 306,101,664.00 30,610,166.40 0.28085
24 DUMP TRUCK 5 TON / 68 HP (E212) 68 4 1000 405,488,160.00 40,548,816.00 0.33271
25 FLAT BED TRUCK 3.5 TON/44 HP (E221) 44 5 1800 321,406,747.20 32,140,674.72 0.28085
26 CONCRETE MIXER 0.25 M3 (E252) 4 5 1800 97,355,412.00 9,735,541.20 0.28085
27 AIR COMPRESSOR 210 M3/H (E301) 35 5 750 192,033,072.00 19,203,307.20 0.28085
28 PUMP WATER (5CM) 20 M3/H (E341) 5 5 1800 19,700,604.00 1,970,060.40 0.28085
29 JACK HAMMER EQUIPMENT, ETC (E351) 0 5 1100 57,380,400.00 5,738,040.00 0.28085
30 TRACKTOR EQUIPMENT, ETC (E401) 0 4 600 84,349,188.00 8,434,918.80 0.33271
31 BATCHING PLANT 150 10 2000 4,132,260,000.00 413,226,000.00 0.18062
32 TRUCK MIXER 68 5 2000 743,806,800.00 74,380,680.00 0.28085
33 FINISHER BETON 30 6 2000 6,281,035,200.00 628,103,520.00 0.24668
34 GENSET 65 6 2000 12,529,040.00 1,252,904.00 0.24668
35 GENSET 300 KVA 175 7 2000 1,147,115,376.00 114,711,537.60 0.22260
36 CRAWLER CRANE 150 TON 150 6 2000 4,380,195,600.00 438,019,560.00 0.24668
37 CRAWLER CRANE 50 TON 100 5 2000 2,039,729,472.00 203,972,947.20 0.28085
38 PONTON 1000 TON 0 6 2000 1,545,465,240.00 154,546,524.00 0.24668
39 TUG BOAT 100 5 2000 909,097,200.00 90,909,720.00 0.28085
40 DIESEL HAMMERK-35+PILE DRIVER 130 3 2000 1,049,406,336.00 104,940,633.60 0.41993
41 VIBRO HAMMER 70 6 1500 1,097,634,384.00 109,763,438.40 0.24668
42 SERVICE CRANE25 TON 70 6 1800 1,338,728,688.00 133,872,868.80 0.24668
43 MESIN LAS/ WELDING SET 50 6 1800 171,824,400.00 17,182,440.00 0.24668
44 CONCRETE CUTTER 1.5 4 1500 30,830,184.00 3,083,018.40 0.33271
45 TRAILER 20 TON 175 6 2000 276,507,000.00 27,650,700.00 0.24668
46 CONCRETE PUMP 8 M3 100 8 2000 182,952,000.00 18,295,200.00 0.20483
47 BORE PILE MACHINE 150 5 2000 3,643,200,000.00 364,320,000.00 0.28085
KETERANGAN:
1. Tingkat Suku Bunga = 12.50% pertahun
2. Upah Operator/Sopir/Mekanik = 22,857.14 per jam kerja
3. Upah Pembantu Operator/Pembantu Sopir/Pembantu Mekanik = 18,571.43 per jam kerja
4. Harga Bahan Bakar Bensin = 10,100.00 per liter
5. Harga Bahan Bakar Solar = 11,000.00 per liter
6. Harga Kerosin (minyak tanah) = 16,000.00 per liter
7. Minyak Pelumas = 40,000.00 per liter
8. Khusus AMP biaya bahan bakar ditambah (untuk pemanasan material) sebesar 12 liter x (kapasitas AMP)= 0.7x (kapasitas AMP/Jam) x Harga BBM Solar
GAN PERALATAN
BIAYA PASTI BIAYA PASTI PERJAM TOTAL BIAYA BIAYA OPERASI
PERJAM BAHAN BAKAR DAN PELUMAS PERBAIKAN & PERAWATAN PERJAM ALAT PERJAM
(Rp) E+J
BAHAN BAKAR MINYAK BIAYA SPARE PART BIAYA OPERATOR/ PEMBANTU
(Rp)
(0,125-0,175 PELUMAS (Rp) 12,5% (S/D) (g1xB) JAM OPERATOR/J
Ltr/HP/Jam)x 1%-2% 17,50% w AM (Rp)
Bahan Bakar (Rp) (Rp)
(Rp)
(B-
C)D+0,002
w
(Rp)
E f1 f2 F (g1) G H I J K
10 11 12 13 14 15 16 17 18 19
367,832.46 163,350.00 88,000.00 251,350.00 0.175 254,662.45 22,857.14 18,571.43 547,441.03 915,273.49
291,492.51 96,525.00 52,000.00 148,525.00 0.175 201,809.81 22,857.14 18,571.43 391,763.38 683,255.90
252,092.73 163,350.00 88,000.00 251,350.00 0.175 174,532.05 22,857.14 18,571.43 467,310.62 719,403.35
238,055.92 133,650.00 72,000.00 205,650.00 0.175 164,813.90 22,857.14 18,571.43 411,892.47 649,948.39
115,214.80 274,725.00 148,000.00 422,725.00 0.175 124,031.99 22,857.14 18,571.43 588,185.56 703,400.36
171,495.96 118,800.00 64,000.00 182,800.00 0.175 118,732.27 22,857.14 18,571.43 342,960.84 514,456.80
231,526.26 118,800.00 64,000.00 182,800.00 0.175 160,293.21 22,857.14 18,571.43 384,521.78 616,048.04
80,593.64 89,100.00 48,000.00 137,100.00 0.175 55,797.62 22,857.14 18,571.43 234,326.19 314,919.83
124,703.41 75,735.00 40,800.00 116,535.00 0.175 86,336.25 22,857.14 18,571.43 244,299.82 369,003.23
134,295.98 59,400.00 32,000.00 91,400.00 0.175 92,977.50 22,857.14 18,571.43 225,806.07 360,102.05
180,493.79 51,975.00 28,000.00 79,975.00 0.175 124,961.76 22,857.14 18,571.43 246,365.33 426,859.12
185,865.63 141,075.00 76,000.00 217,075.00 0.175 128,680.86 22,857.14 18,571.43 387,184.43 573,050.06
43,814.06 17,820.00 9,600.00 27,420.00 0.175 30,333.91 22,857.14 18,571.43 99,182.48 142,996.54
5,910.37 5,940.00 3,200.00 9,140.00 0.175 4,091.94 22,857.14 18,571.43 54,660.51 60,570.88
5,727.27 5,940.00 3,200.00 9,140.00 0.175 3,347.19 22,857.14 18,571.43 53,915.76 59,643.04
43,281.83 - - - 0.175 25,295.19 22,857.14 18,571.43 66,723.76 110,005.59
73,325.60 37,125.00 20,000.00 57,125.00 0.175 50,765.72 22,857.14 18,571.43 149,319.29 222,644.89
30,303.62 8,910.00 4,800.00 13,710.00 0.175 20,980.19 22,857.14 18,571.43 76,118.76 106,422.38
724,713.20 222,750.00 120,000.00 342,750.00 0.175 780,174.20 22,857.14 18,571.43 1,164,352.77 1,889,065.97
193,683.72 44,550.00 24,000.00 68,550.00 0.175 134,093.58 22,857.14 18,571.43 244,072.15 437,755.87
103,565.30 100,980.00 54,400.00 155,380.00 0.175 60,526.66 22,857.14 18,571.43 257,335.23 360,900.53
27,654.23 - - - 0.175 19,145.93 22,857.14 18,571.43 60,574.50 88,228.73
42,984.94 65,340.00 35,200.00 100,540.00 0.175 29,759.88 22,857.14 18,571.43 171,728.46 214,713.40
121,418.21 100,980.00 54,400.00 155,380.00 0.175 70,960.43 22,857.14 18,571.43 267,769.00 389,187.21
45,134.19 65,340.00 35,200.00 100,540.00 0.175 31,247.88 22,857.14 18,571.43 173,216.45 218,350.64
13,671.33 5,940.00 3,200.00 9,140.00 0.175 9,465.11 22,857.14 18,571.43 60,033.68 73,705.01
64,719.92 51,975.00 28,000.00 79,975.00 0.175 44,807.72 22,857.14 18,571.43 166,211.29 230,931.20
2,766.50 7,425.00 4,000.00 11,425.00 0.175 1,915.34 22,857.14 18,571.43 54,768.91 57,535.41
13,185.42 - - - 0.175 9,128.70 22,857.14 18,571.43 50,557.27 63,742.69
42,095.46 - - - 0.175 24,601.85 22,857.14 18,571.43 66,030.42 108,125.88
335,869.27 222,750.00 120,000.00 342,750.00 0.175 361,572.75 22,857.14 18,571.43 745,751.32 1,081,620.60
94,005.51 100,980.00 54,400.00 155,380.00 0.175 65,083.10 22,857.14 18,571.43 261,891.67 355,897.18
697,231.97 44,550.00 24,000.00 68,550.00 0.175 549,590.58 22,857.14 18,571.43 659,569.15 1,356,801.13
1,390.80 96,525.00 52,000.00 148,525.00 0.175 1,096.29 22,857.14 172,478.43 173,869.23
114,908.13 259,875.00 140,000.00 399,875.00 0.175 100,372.60 22,857.14 18,571.43 541,676.17 656,584.30
486,227.56 222,750.00 120,000.00 342,750.00 0.175 383,267.12 22,857.14 18,571.43 767,445.69 1,253,673.25
257,789.82 148,500.00 80,000.00 228,500.00 0.175 178,476.33 22,857.14 18,571.43 448,404.90 706,194.72
171,555.76 - - - 0.175 135,228.21 22,857.14 18,571.43 176,656.78 348,212.54
114,895.63 148,500.00 80,000.00 228,500.00 0.175 79,546.01 22,857.14 18,571.43 349,474.58 464,370.21
198,305.15 193,050.00 104,000.00 297,050.00 0.175 91,823.05 22,857.14 18,571.43 430,301.63 628,606.78
162,458.53 103,950.00 56,000.00 159,950.00 0.175 128,057.34 22,857.14 18,571.43 329,435.92 491,894.44
165,118.65 103,950.00 56,000.00 159,950.00 0.175 130,154.18 22,857.14 18,571.43 331,532.75 496,651.40
21,192.80 74,250.00 40,000.00 114,250.00 0.175 16,705.15 22,857.14 18,571.43 172,383.72 193,576.52
6,154.47 2,227.50 1,200.00 3,427.50 0.175 3,596.85 22,857.14 18,571.43 48,452.93 54,607.39
30,693.91 259,875.00 140,000.00 399,875.00 0.175 24,194.36 22,857.14 18,571.43 465,497.93 496,191.84
16,863.51 148,500.00 80,000.00 228,500.00 0.175 16,008.30 22,857.14 18,571.43 285,936.87 302,800.38
460,443.35 222,750.00 120,000.00 342,750.00 0.175 318,780.00 22,857.14 18,571.43 702,958.57 1,163,401.92
OWNING AND OPERATION COST
FOR PROJECT EQIUPMENTS
PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN
KEGIATAN : STUDI KELAYAKAN AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAA
LOKASI : KAB.KONAWE PROV. SULAWESI TENGGARA
SUMBER DANA : APBN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.5917
( 1+i )^A -1
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 281,056.60
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 1,055.56
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.5917
( 1+i )^A -1
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 170,113.21
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 638.89
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.4163
( 1+i )^A -1
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 3,252.73
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 17.36
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.3292
( 1+i )^A -1
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 5,350.06
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 36.11
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.3292
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 39,668.63
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 267.75
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.3292
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 15,980.79
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 107.87
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.2774
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 151,176.24
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 1,211.01
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.4163
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 7,170.15
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 38.27
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.2774
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 91,309.29
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 731.44
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.2774
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 131,325.77
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 1,052.00
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.3292
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 27,768.04
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 187.43
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.2774
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 73,406.22
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 588.03
W'
D. LAIN - LAIN
ix(1+i)^A
2 Faktor Angsuran Modal = ----------------------- D 0.2774
( 1+i )^A -2
( B' - C ) x D
a. Pengembalian Modal = ----------------------- F 49,811.36
W'
0.002 x B'
b. Asuransi dan lain-lain = ----------------------- G 399.02
W'
D. LAIN - LAIN
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
TRUCK MIXER
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,020
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
CONCRETE MIXER
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,020
Rp 12,5% - 17,5%
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
Rp
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
CONCRETE CUTTER
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,020
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
CONCRETE VIBRATOR
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,020
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
DUMP TRUCK
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,020
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
BABY ROLLER
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
EXCAVATOR 80HP
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
AIR COMPRESSOR
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
VIBRATOR ROLLER
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
MOTOR GRADER
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
BULLDOZER 100-150 HP
HP
Ton/Jam
Tahun
Jam
Rp
Tahun
Jam
Rp
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
SATUAN KET.
---
Rp CRF
Rp
Rp
Rp
Rp 0,125 - 0,175
Rp 0,010 - 0,02
Rp 12,5% - 17,5%
Rp
Rp
NING AND OPERATION COST
OR PROJECT EQIUPMENTS
AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
Rp
%/Tahun Relative
Rp/Jam
Rp/Jam
Liter
Liter
Liter
Rp/Jam
DAFTAR KOMPONEN UPAH
BERDASARKAN SATUAN MASING-MASING
ANALISA K3
No Jenis Peralatan Satuan Harga
Total 300,000.00
UPAH JAM + K3
### JOK
### JOK
### JOK
### JOK
### JOK
### JOK
### JOK
### JOK
### JOK
### JOK
DAFTAR KOMPONEN BAHAN
BERDASARKAN SATUAN MASING-MASING
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY
(Rp) ( Km )
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
5,00 km 10,00 km
5,00 km
Jenis : - P a s i r Pasang
Lokasi : Quarry
Tujuan: Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 10.00 Km
4 Harga satuan pasir di Quarry M04 1.00 M3
5 Harga Satuan Dasar Excavator E07 1.00 Jam
6 Harga Satuan Dasar Dump Truck E05 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR E07
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Jenis : - P a s i r Pasang
Lokasi : Quarry
Tujuan: Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 10.00 Km
4 Harga satuan batu gunung di Quarry M02 1.00 M3
5 Harga Satuan Dasar Excavator E07 1.00 Jam
6 Harga Satuan Dasar Dump Truck E05 1.00 Jam
7 Harga Satuan Dasar Wheel Loader E13 1.00 Jam
8 Harga Satuan Upah Pekerja L01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 8,729.65 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 10.00 Km
4 Harga satuan pasir urug di Quarry M06 1.00 M3
5 Harga Satuan Dasar Excavator E07 1.00 Jam
6 Harga Satuan Dasar Dump Truck E05 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR E07
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Jenis : - P a s i r Beton
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km
4 Harga satuan pasir beton di Quarry M04 1.00 M3
5 Harga Satuan Dasar Excavator E07 1.00 Jam
6 Harga Satuan Dasar Dump Truck E05 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR E07
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Jenis : - P a s i r Beton
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
10,00 km ke Lokasi
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
214,286.00
649,948.39
214,713.40
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
218,571.00
649,948.39
214,713.40
616,048.04
12,172.62
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
151,429.00
649,948.39
214,713.40
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA DASAR SATUAN BAHAN
HARGA
SATUAN
(Rp.)
214,286.00
649,948.39
214,713.40
Bersambung
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
SATUAN
(Rp.)
PERHITUNGAN VOLUME PEKERJAAN
BERDASARKAN SATUAN MASING - MASING
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
A DIVISI I - PERSIAPAN
1 MOB DAN DEMOB / PERSIAPAN
B DIVISI II - DRAINASE
2.1 PEKERJAAN GALIAN BIASA (DRAINASE)
A. RUAS 1
0 - 8600.000 8600.0 1.2 1.2
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
0 - 8600.000 8600 25
PERHITUNGAN VOLUME PEKERJAAN
BERDASARKAN SATUAN MASING - MASING
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
PERHITUNGAN VOLUME PEKERJAAN
BERDASARKAN SATUAN MASING - MASING
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
BOX TIPE II
A. PLAT/SLAB BOX CULVERT 4 24 0.25 1 2
B. PLAT PONDASI BOX CULVERT 4 24 0.25 1 2
C. DINDING BOX CULVERT 2 24 0.25 3 2
D. PENEBALAN DINDING BOX DAN PLAT 0.5 0.25 24 0.38 8 2
E. SAYAP BOX CULVERT 0.5 1.5 1.8 0.2 4 2
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
BOX TIPE I 1.5x1.5
B. LANTAI KERJA 22.3 2.3 0.1
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
7.3 BAJA TULANGAN
A. PEMBESIAN RIGID PAVEMENT
7.3 (1) BANGKU 0.40 35 3440
BESI MEMANJANG 7.00 4 3440
TIE BARS 0.70 7 3440
TOTAL U24 RIGID
6.4.(9) DOWEL U32 RIGID 0.70 18 3440
PEMBESIAN
P L T A1 A2
NO. JENIS PEKERJAAN Koef. N1 N2 a b c d e f
(m) (m) (m) (m2) (m3) (cm) (cm) (cm) (cm) (cm) (cm)
TH4 ɸ19-18 4 122 200 5 5
TH5 ɸ19-18 4 122 62.5 62.5 5 5
Tt1 ɸ19-12 2 183 158 5 5
Tx1 ɸ19-12 4 183 45 5 5
Tx2 ɸ19-10 2 130 365 5 5
Tt3 ɸ12-12 4 1667 1667
Err:509 Err:509
BOX CULVERT TIPE 1 (SINGLE) 2 2 14
BOX CULVERT TIPE 2 (DOUBLE) 4 2 3
Err:509 Err:509
A. RUAS 1
0 - 8600.00 8600
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
1.00 LS
12,384.00 M3
A 12,384.00 M3
A+B 12,384.00 M3
4,000.00 M3
A 4,000.00 M3
A+B 4,000.00 M3
33,626.00 M3
A 33,626.00 M3
A+B 33,626.00 M3
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
215,000.00 M3
A 215,000.00 M3
A+B 215,000.00 M3
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
14,190.00 M3
A 14,190.00 M3
A+B 14,190.00
43,000.00 M3
A 43,000.00 M3
A+B 43,000.00
32,250.00 M3
A 32,250.00 M3
A+B 32,250.00
12,900.00 M3
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
A 12,900.00 M3
A+B 12,900.00
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
168.00 M3
168.00 M3
336.00 M3
63.00 M3
15.12 M3
48.00 M3
48.00 M3
72.00 M3
18.00 M3
2.16 M3
936.12 M3
6,966.00 M3
A 6,966.00 M3
A+B 6,966.00 M3
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
14 71.81 M3
2 19.18 M3
90.98 M3
AN VOLUME PEKERJAAN
SATUAN MASING - MASING
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
PEMBESIAN
g P.TOT. BJ VOLUME SATUAN
(cm) (m) (Kg/m')
2.1 2.23 2,289.47 KG
1.35 2.23 1,471.80 KG
1.675 2.23 1,369.59 KG
0.55 2.23 899.43 KG
3.75 2.23 2,174.25 KG
33.333 0.887 118.27 KG
B2 21,851.02 KG
2 TOT B2 43,702.04 KG
172,660.06 KG
78.74 677,164.00 KG
A 677,164.00 KG
A+B 677,164.00 KG
56.00 M'
24.00 M'
80.00 M'
DATA UMUM
- Panjang 1 Pias = 5.0 m - Tebal 1 Pias = 0.3
- Lebar 1 Pias = 7.0 m (1 Jalur) - Berat Jenis Besi = 14.85
- Panjang Jalan = ### m - Berat Jenis Cat = 9.400
- Jumlah Pias = 3440 bh
A. PEMBESIAN
1. BANGKU D 13 Jarak 40 cm (1 PIAS)
Diameter Panjang Jum Sisi Berat Jenis Berat
D 13 mm 0.40 m 18 2 0.995000kg/m' 13.93
2. BESI MEMANJANG D 13
Diameter Panjang Jum Sisi Berat Jenis Berat
D 13 mm 7.00 m 4 2 0.995000kg/m' 55.72
C. ASPAL MUAI
Panjang Volume
Melintang 7.00 m 7.00
Memanjang 5.00 m 5.00
Jumlah Total Panjang Aspal Muai per Pias 12.00
Kebutuhan Joint Sealent / m3 Beton 1.14
m
kg/m3
kg/m3
Berat
kg
Berat
kg
Berat
kg
Berat
kg
Berat
kg
kg
kg
kg
Volume
m'
m'
m'
Volume
m'
m'
m'
m'
Volume
m2
m2
m2
Berat
kg
kg
kg
Volume
m2
m2
m2
lbr
Volume
m3
m3
m3
m3
m3
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN
STUDI KELAYAKAN AMDAL RENCANA PEMBANGUNAN JALAN
LOKASI :
LINGKAR KOTA UNAAHA DAN JEMBATAN SUNGAI POHARA
TAHUN ANGGARAN : KAB.KONAWE PROV. SULAWESI TENGGARA
SUMBER DANA : APBN
DATA UMUM
- Panjang = 1.0 m - Tebal Saluran = 0.15
- Lebar saluran = 2.0 m - Berat Jenis Besi = 0.00
- Panjang Jalan = ### m - Berat Jenis Cat = 9.4
- Jumlah Pias = 3440 bh - Tinggi saluran = 1.0
A. PEMBESIAN
DRAINASE
1. BESI VERTIKAL Ǿ 10 mm Jarak 20 cm
Diameter Panjang Jum Sisi Berat Jenis Berat
10 mm 4.00 m 10 2 0.620000kg/m' 49.6
m
kg/m3
kg/m3
m
Berat
kg
Berat
kg
Berat
kg
Berat
kg
kg
Volume
m'
m2
m2
m2
HARGA
UPAH, MATERIAL DAN ALAT
KONSULTAN PERENCANA
KONSULTAN PERENCANA
KONSULTAN PERENCANA
KONSULTAN PERENCANA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.0
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.10
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 48.00
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0
- Lain-lain = geser, tunggu, dll T4 10.0
Ts 90.0
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 37.33
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 8.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1875
- Tukang = (Tk x Tb) : Qt (L02) 0.3750
- Pekerja = (Tk x P) : Qt (L01) 1.5000
SATUAN KETERANGAN
KM
jam
-
bh
Kg
m1
Buah
menit
menit
menit
menit
menit
Buah
Jam
lumpsum
Buah
orang
orang
orang
jam
jam
jam
Berlanjut ke hal. berikut.
Analisa EI-876
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
SATUAN
: 1.00
: 1,062,480.28
: 0.04
JUMLAH
HARGA
(Rp.)
18,258.93
6,975.45
2,952.01
28,186.38
2,000,000.00
62,466.00
2,062,466.00
66,730.72
0.00
0.00
66,730.72
2,157,383.11
323,607.47
2,480,990.57
atan, volume dan/atau ukuran
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.0
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Material Fh 1.05
7 Tebal lapisan cat secara manual t 0.015
8 Berat Jenis Bahan Cat BJ.Cat 1.00
9 Perbandingan pemakaian bahan : - Cat C 65
- Thinner T 35
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500
1.c. Blass Bead (M34) 0.4500
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Cat Tb 3.00
- Pekerja P 8.00
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANA
Rp. 157,959.39 / M2
SATUAN KETERANGAN
KM
jam
-
M Spec.10.4.3(2)(d)
Kg/Liter
%
%
Kg
Liter
Kg Spec.10.4.3(2)(e)
Ltr/Jam
Ltr/M2
M2/Jam
Jam
M2/Jam
Jam
Ls
M2
orang
orang
orang
jam
jam
jam
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
SATUAN
: 15,900.48
: 2,511,630,064.90
: 1.54
JUMLAH
HARGA
(Rp.)
7,303.57
4,185.27
1,180.80
12,669.64
68,250.00
10,143.00
12,870.00
91,263.00
17,319.84
16,103.50
0.00
33,423.35
137,355.99
20,603.40
157,959.39
atan, volume dan/atau ukuran
esaikan satu satuan pekerjaan
asa tidak dapat diubah kecuali
nstruksi Kepada Peserta Lelang
akai dan operator.
an (tetapi tidak termasuk PPN
PIPA PVC TYPE AW DIAMETER 4"
Bahan
Pipa PVC ### m' 1.200 @ Rp. 50,000.00 Rp. 60,000.00
Perlengkapan ### hrg pipa 0.350 @ Rp. 17,500.00 Rp. 6,125.00
Jumlah A Rp. 66,125.00
Tenaga
Pekerja ### OH 0.0540 @ Rp. 12,172.62 Rp. 657.32
Tukang Pipa ### OH 0.0900 @ Rp. 18,601.19 Rp. 1,674.11
Kepala Tukang ### OH 0.0090 @ Rp. 21,458.33 Rp. 193.13
Mandor ### OH 0.0027 @ Rp. 15,744.05 Rp. 42.51
Jumlah B Rp. 2,567.06
Jumlah (A+B) Rp. 68,692.06
ITEM PEMBAYARAN NO. : 8.4.(10).(a)
JENIS PEKERJAAN : Kerb Pracetak Jenis 1 (Peninggi/Mountable)
SATUAN PEMBAYARAN : M'
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Faktor kehilangan bahan Fh
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1
- Angkut = Lef x V x 60 T2
- Kembali = Lef x V x 60 T3
- Menurun= Rata-rata 2 menit/m T4
- Lain-lain= geser, atur, tunggu dll T5
Ts
Kap. Prod. Cp Q1
Ts : 60
Koefisien = 1 : Q1 (E11)
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt
Kebutuhan- Mandor M
- Tukang Tb
- Pekerja P
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03)
- Tukang = (Tk x Tb) : Qt (L02)
- Pekerja = (Tk x P) : Qt (L01)
8.7 KM
7.00 jam
1.05 -
0.0600 M3
0.0100 M3
40.00 Buah
26.67 menit
0.00 menit
0.00 menit
40.00 menit
7.00 menit
73.67 menit
32.579 M
0.0307 Jam
228.05 M'
1.00 orang
4.00 orang
10.00 orang
0.0307 jam
0.1228 jam
0.3069 jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam 0.31 12,142.86
2. Tukang (L02) jam 0.12 130,000.00
3. Mandor (L03) jam 0.03 110,000.00
B. BAHAN
C. PERALATAN
TUK
G HARGA SATUAN
JUMLAH
HARGA
(Rp.)
3,727.18
15,961.11
3,376.39
23,064.68
120,000.00
0.00
120,000.00
10,924.07
0.00
10,924.07
153,988.75
23,098.31
177,087.06
an Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.00
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00
- Pasir Urug PU 30.00
9 Berat Isi Agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00
- Sirtu St 64.00
9 Berat volume agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595
- Mandor = (Tk x M) : Qt - 0.0085
SATUAN KETERANGAN
KM
M
-
jam
% Gradasi harus
% memenuhi Spec.
%
ton/m3
M3
M3 (lepas)
- kondisi sedang
-
menit panduan
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
m
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
SATUAN KETERANGAN
Analisa EI-512
SATUAN KETERANGAN
KM
M
jam
% Gradasi harus
% memenuhi
% Spesifikasi
ton/m3
M3
M3
- lepas
- kondisi sedang
menit panduan
menit
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
m
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A TOTAL HARGA
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 384,521.78
2. Dump Truck (E08) jam 0.5730 171,728.46
3. Motor Grader (E13) jam 0.0043 467,310.62
4. Tandem Roller (E17) jam 0.0134 225,806.07
5. Water Tanker (E23) jam 0.0141 257,335.23
6. Alat Bantu Ls 1.0000 0.00
7.
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1.(2) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B TOTAL HARGA
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 126,274.16
2. Dump Truck (E08) jam 0.4861 131,217.37
3. Motor Grader (E13) jam 0.0043 174,470.44
4. Tandem Roller (E17) jam 0.0054 108,972.93
5. Water Tanker (E23) jam 0.0141 131,217.37
6. Alat Bantu Ls 1.0000 0.00
ATUAN
: 32,250.00
: 16,492,026,867.10
: 10.09
JUMLAH
HARGA
(Rp.)
722.09
133.50
855.59
333,531.46
333,531.46
3,266.60
98,394.71
1,990.49
3,022.84
3,617.16
0.00
110,291.80
444,678.85
66,701.83
511,380.68
tan, volume dan/atau ukuran
saikan satu satuan pekerjaan
sa tidak dapat diubah kecuali
struksi Kepada Peserta Lelang
akai dan operator.
n (tetapi tidak termasuk PPN
Analisa EI-512
ATUAN
: 1.00
: 271,530.94
: 0.01
JUMLAH
HARGA
(Rp.)
269.52
60.79
330.32
167,760.65
167,760.65
1,072.73
63,779.08
743.15
583.52
1,844.42
0.00
68,022.90
236,113.87
35,417.08
271,530.94
tan, volume dan/atau ukuran
saikan satu satuan pekerjaan
sa tidak dapat diubah kecuali
struksi Kepada Peserta Lelang
akai dan operator.
n (tetapi tidak termasuk PPN
ITEM PEMBAYARAN NO. : 6.1 (1)(a)
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
ITEM PEMBAYARAN NO. : 6.1 (1)(a)
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan v
Kapasitas pompa aspal pas
Faktor effesiensi kerja Fa
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC L) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- AC-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock file ke cold bin l
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
10.00 KM
7.00 Jam
1.03 -
64 % terhadap volume
36 % terhadap volume
1.03 Kg / liter
0.80 Kg / liter
1.03 liter
0.6790 Kg.
0.3708 Liter
3.00 M
30.00 m/menit Asumsi
100 liter/menit Panduan
0.80 Sedang
4,800.00 liter
0.0002 Jam
4,800.00 liter
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
Analisa EI-612a
10.00 KM
7.00 Jam
1.03 -
80 % terhadap volume
20 % terhadap volume
1.03 Kg / liter
0.80 Kg / liter
1.03 liter
0.8487 Kg
0.2060 liter
3.00 M
30.00 M/menit asumsi
100 liter/menit Panduan
0.80 sedang
4,800.00 liter
0.0002 Jam
4,800.00 liter
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
10.00 KM
0.04 M
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3
2.32 ton / M3
1.42 ton / M3
1.57 ton / M3
0.05 km
0.3305 M3
0.3210 M3
1.50 M3 panduan
0.85 -
0.83 -
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
30.00 menit
15.00 menit
20.00 menit
68.50 menit
2.45 ton
0.4077 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.83 -
0.30 M
0.0000 ton
73.94
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
0.0058 Jam
Lump Sum
49.80 M2 / Jam
348.60 M2
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-636a
10.00 KM
0.06 M
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3
2.32 ton / M3
1.41 ton / M3
1.57 ton / M3
0.05 km
0.3887 M3
0.2729 M3
1.50 M3
0.85 -
0.83 -
1.10 menit
15.00 km/jam panduan
20.00 km/jam panduan
0.20 menit
0.15 menit
0.75 menit
1.10 menit
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
30.00 menit
15.00 menit
20.00 menit
68.50 menit
2.45 ton
0.4077 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
109.18 ton
0.0092 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
110.91 ton
0.0090 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
258.51 ton
0.0039 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1 (1)(a) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1 (2)(a) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3(5a) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) (gradasi haluTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 384,521.78
2. AMP E01 Jam 0.0201 1,164,352.77
3. Genset E12 Jam 0.0201 172,478.43
4. Dump Truck E08 Jam 0.4077 171,728.46
5. Asp. Finisher E02 Jam 0.0137 244,072.15
6. Tandem Roller E17 Jam 0.0135 225,806.07
7 P. Tyre Roller E18 Jam 0.0058 244,299.82
8 Alat Bantu Ls 1.0000 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3(6a) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) (gradasi haTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 384,521.78
2. AMP E01 Jam 0.0201 1,164,352.77
3. Genset E12 Jam 0.0201 172,478.43
4. Dump Truck E08 Jam 0.4077 171,728.46
5. Asphalt Finisher E02 Jam 0.0092 244,072.15
6. Tandem Roller E17 Jam 0.0090 225,806.07
7 P. Tyre Roller E18 Jam 0.0039 244,299.82
8 Alat Bantu Ls 1.0000 -
ATUAN
: 198,756.00
: 2,408,962,086.44
: 1.47
JUMLAH
HARGA
(Rp.)
25.30
6.55
31.85
9,845.15
611.82
10,456.97
15.86
34.63
50.49
10,539.30
1,580.90
12,120.20
tan, volume dan/atau ukuran
saikan satu satuan pekerjaan
sa tidak dapat diubah kecuali
struksi Kepada Peserta Lelang
akai dan operator.
n (tetapi tidak termasuk PPN
Analisa EI-612a
ATUAN
: 69,564.60
: 1,018,284,615.80
: 0.62
JUMLAH
HARGA
(Rp.)
25.30
6.55
31.85
12,306.44
339.90
12,646.34
15.86
34.63
50.49
12,728.67
1,909.30
14,637.97
tan, volume dan/atau ukuran
saikan satu satuan pekerjaan
sa tidak dapat diubah kecuali
struksi Kepada Peserta Lelang
akai dan operator.
n (tetapi tidak termasuk PPN
Analisa EI-635a
ATUAN
: 1.00
: 269,824.89
: 0.01
JUMLAH
HARGA
(Rp.)
2,438.32
315.55
2,753.87
127,316.15
123,653.35
250,969.50
3,680.40
23,380.58
3,463.42
70,020.23
3,353.21
3,053.78
1,417.54
0.00
108,369.16
362,092.53
54,313.88
416,406.41
tan, volume dan/atau ukuran
ATUAN
: 1.00
: 270,636.82
: 0.01
JUMLAH
HARGA
(Rp.)
2,438.32
315.55
2,753.87
149,732.37
105,105.35
254,837.72
3,680.40
23,380.58
3,463.42
70,020.23
2,235.47
2,035.86
945.02
0.00
105,760.99
363,352.58
54,502.89
417,855.46
tan, volume dan/atau ukuran
Pada Pelebaran
Lebar Lebar
Pada Pelebaran
Lebar Lebar
SUB TOTAL 1
.................................. ...................................
DATA PENDUKUNG KUANTITAS FIELD ENGINEERING
LEMBAR PERHITUNGAN
Pada Pelebaran
Lebar Lebar
SUB TOTAL 2
TOTAL 1 s/d 2
Pada Pelebaran
Lebar Lebar
Konsultan Supervisi
.................................. ...................................
ENGINEERING
N
(31,272,386,586)
(31,272,386,586)
Hamparan Volume
(Ltr/m2) (Liter)
g h = f*g
1.00 72.00
1.00 540.00
1.00 472.50
EMBATAN I
1.00 543.00
1.00 585.00
1.00 63.00
1.00 158.40
1.00 252.00
1.00 949.50
1.00 603.00
1.00 270.00
ENGINEERING
N
(31,272,386,586)
(31,272,386,586)
1.00 318.00
1.00 324.00
5,150
Diajukan Oleh,
Kontraktor
.................................
ENGINEERING
N
(31,272,386,586)
(31,272,386,586)
Hamparan Volume
(Ltr/m2) (Liter)
g h = f*g
1.00 195.00
1.00 187.50
1.00 727.50
1.00 1,125.00
1.00 487.50
2,722.50
7,872.90
Diajukan Oleh,
ENGINEERING
N
(31,272,386,586)
(31,272,386,586)
Kontraktor
.................................
DATA PENDUKUNG KUANTITAS FIELD ENGINEERING
LEMBAR PERHITUNGAN
Lebar
TOTAL
.................................. ...................................
ENGINEERING
N
Hamparan Volume
(Ltr/m2) (Liter)
g h = f*g
0.35 5,040.00
0.35 5,040.00
0.35 33.60
0.35 44.10
10,002.30
Diajukan Oleh,
Kontraktor
.................................
DATA PROYEK
A. ADMINISTRASI
B. KONSTRUKSI
- LEBAR BADAN JALAN (TIMBUNAN) : 11.00 Meter
- LPA : Lebar 0,75 Meter + Tebal 0,15 Meter Kiri dan Kanan Jalan
- LPB : Lebar 0,75 Meter + Tebal 0,20 Meter Kiri dan Kanan Jalan
- AC - WC : Lebar 6,00 Meter + Tebal 0,04 Meter
- AC - BC : Lebar 6,00 Meter + Tebal 0,06 Meter
- URPIL BAHU JALAN : Lebar 1,25 Meter + Tebal 0,25 Meter Kiri dan Kanan Jalan
6 METER
AC - WC
AC - BC
URPIL LPA LAPEN LAMA LPA URPIL
URBIS LPB LPA LAMA LPB URBIS
1.5 4.5 1.5
URBIS URBIS
11 METER
HAM - HURIMBER
BARAT (FAKFAK)
DATA PENDUKUNG KUANTITAS FIELD ENGINEE
LEMBAR PERHITUNGAN
Nama Paket : STUDI KELAYAKAN AMDAL RENCANA PEMBANGUNAN JALAN LINGKAR KOTA UNAAHA DA
Lokasi : KAB.KONAWE PROV. SULAWESI TENGGARA
Nomor Kontrak : -
Konsultan : PT. HEXA MULIA KONSULTAN
Item Pembayaran : 6.3(5a) - Laston Lapis Aus (AC-WC) (Gradasi Halus/Kasar)
SKETSA
Lebar 6.00m
TOTAL
ELD ENGINEERING
GAN
17,243.12
DATA PENDUKUNG KUANTITAS FIELD ENGIN
LEMBAR PERHITUNGAN
Nama Paket : Peningkatan Struktur Jalan Hurimber - Bomberay
Provinsi : Papua Barat
Nomor Kontrak : 01/HK.02.03/SPK/498690/14/HB/APBN/2013
Penyedia Jasa : PT.TOREA FAKFAK INDAH
Item Pembayaran : 6.3(6a) - Laston Lapis Aus (AC-BC) (Gradasi Halus/Kasar)
SKETSA
Lebar 6.00m
JUMLAH I
FIELD ENGINEERING
NGAN
26,141.36
DATA PENDUKUNG KUANTITAS FIELD ENGINEERI
LEMBAR PERHITUNGAN
Lebar 6.00m
TOTAL
.................................. ...................................
LD ENGINEERING
GAN
Anti
Aspal Vol. Anti
Volume Vol. Aspal Stripping
Content Stripping
Content
(Ton) (%) (Ton) (%) (Ton)
j = h*i k l=j*k m n=l*m
4,611.14 6.50 299.724 0.20 599.448
599.448
Diajukan Oleh,
Kontraktor
.................................