Anda di halaman 1dari 103

LABORATORIUM JALAN DAN ASPAL

PROGRAM STUDI TEKNIK SIPIL


FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Berat Jenis Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : Kasar Sedang Tanggal

Persen lolos sarinan Komposisi campursn agregat


Ukuran
saringan Agregat Agregat
kasar k,sedang abu batu kasar k, sedang
35% 40%
3/4 100 100 100 35 40
1/2 89.00 100 100 31.15 40
3/8 63.80 84.60 100 22.33 33.84

4 37.10 61.80 100 12.99 24.72


8 14.30 37.60 98.00 5.01 15.04

16 7.10 22.40 88.17 2.49 8.96


30 3.80 6.60 71.00 1.33 2.64
50 2.60 4.20 56.50 0.91 1.68
100 1.40 2.20 39.50 0.49 0.88
200 0.20 0.20 18.17 0.07 0.08
pan 0 0.00 0 0 0

100

90

80

70

60

50

40

30

20

10

0
40

30

20

10

0
pan 200 100 50 30 16 8 4 0.375 0.5

Laboraturium Jalan Dan Asp


Fakultas Teknik Program Studi Tek
Asisten Laboraturium

SIRAWAN UMATERNATE
N DAN ASPAL
KNIK SIPIL
UNKHAIR
i Kel. Gambesi, Ternate

: Kelompok 1
: Sirawan Umaternate
: 13 Maret 2017

campursn agregat Gradasi


Batas
gabungan
spek
abu batu
25% 100%
25 100.0 100
25 96.2 90-100
25 81.2 77-90

25 62.7 53-69
24.50 44.5 33-53

22.04 33.5 21-40


17.75 21.7 14-30
14.13 16.7 9-22
9.88 11.2 6-15
4.54 4.7 4-9
0 0 0

gabungan
atas
bawah
bawah

4 0.375 0.5 0.75

Laboraturium Jalan Dan Aspal


ultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
LABORATORIUM JALAN DAN
PROGRAM STUDI TEKNIK
FAKULTAS TEKNIK UNKH
Jl. Pertamina Kampus II Gambesi Kel.

pengujian :Titik nyala aspal


Pekerjaan :praktikum
Jenis Material :Aspal

PEMERIKSAAN TITIK NYALA DAN TITIK BAKAR

No Suhu (°c) Waktu (Detik)


Titik nyala Titik bakar Titik nyala
1 270 270 00.00
2 275 275 00.10
3 280 280 00.23
4 285 285 00.33
5 290* 290* 00.41
6 295 295 00.51
7 300 300 01.01
8 305 305* 0.72
9 310
10 315
ket: * = titik nyala** = titik bakar

Fakultas Teknik Program Studi Teknik S


Asisten Laboraturium

SIRAWAN UMATERNATE
ATORIUM JALAN DAN ASPAL
RAM STUDI TEKNIK SIPIL
ULTAS TEKNIK UNKHAIR
mpus II Gambesi Kel. Gambesi, Ternate

nyala aspal Dikerjakan Ole :kelompok 1


Diperiksa Oleh :Sirawan umaternate
Tanggal :3,April 2017

YALA DAN TITIK BAKAR ASPAL

Waktu (Detik)
Titik Bakar
00.00
00.10
00.23
00.33
00.41
00.51
01.01
0.72
01.01
0.1.09

k Program Studi Teknik Sipil


ten Laboraturium

WAN UMATERNATE
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Berat Jenis Dikerjakan Oleh : Kelompok 1


Pekerjaan : Praktikum Diperiksa Oleh : Sirawan Umaternate
Jenis Material : Kasar Sedang Tanggal : 13 Maret 2017

PEMERIKSAAN BERAT JENIS DAN PENYERAPAN AGREGA

Nomor Contoh
Berat Contoh Kering Oven A

Berat Contoh Kering Permukaan (SSD) B

Berat Contoh Dalam Air C


A / (B - C)
Berat Jenis Bulk (kering oven)
Rata-rata

B / (B - C)
Berat Jenis Bulk (SSD)
Rata-rata

A / (A - C)
Berat Jenis Semu (apparent)
Rata-rata

((B - A) / A) * 100
Penyerapan Air (absorpsi)
Rata-rata
Laboraturium Jalan Dan Asp

Fakultas Teknik Program Studi Tek

Asisten Laboraturium

SIRAWAN UMATERNATE
AN DAN ASPAL
TEKNIK SIPIL
K UNKHAIR
esi Kel. Gambesi, Ternate

: Kelompok 1
: Sirawan Umaternate
: 13 Maret 2017

S DAN PENYERAPAN AGREGAT

1 2
5000 5000

5005 5010

3145 3150
2.70 2.69

2.69

2.69 2.69

2.69

2.70 2.70
2.70

0.10 0.20

0.20
Laboraturium Jalan Dan Aspal

Fakultas Teknik Program Studi Teknik Sipil

Asisten Laboraturium

SIRAWAN UMATERNATE
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Berat Jenis Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : Kasar Sedang Tanggal

ANALISA DATA

berat jenis bulk ( kering oven ) =

sampel 1 =

sampel 2 =

berat jenis bulk ( SSD ) =

sampel 1 =

sampel 2 =

berat jenis semu ( apparent ) =

sampel 1 =

sampel 2 =
penyerapan air ( absorpsi ) =

sampel 1 = 5005 -

5000

5010 -
Sampel 2 =
5000

KELOPM[POK 1
RIUM JALAN DAN ASPAL
M STUDI TEKNIK SIPIL
AS TEKNIK UNKHAIR
s II Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh : Kelompok 1


Diperiksa Oleh : Sirawan Umaternate
: 13 Maret 2017

ANALISA DATA

(B - C)

5000 = 2.70
5005 - 3145
5000 = 2.69
5010 - 3150
B

(B - C)

5005 = 2.69
5005 - 3145
5010 = 2.69
5010 - 3150
A

(A - C)

5000 = 2.70
5000 - 3145
5000 = 2.70
5000 - 3150
B-A X 100%
A

5000 X 100% = 0.10

5000
X 100% = 0.20
5000
1
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

pengujian :berat jenis Dikerjakan Oleh


Pekerjaan :praktikum Diperiksa Oleh
Jenis Material : kasar sedang Tanggal

PEMERIKSAAN BERAT JENIS DAN PENYERAPAN AGREGAT

Nomor Contoh 1
Berat Contoh Kering Oven A 5000
Berat Contoh Kering Permukaan (SSD) B 5020
Berat Contoh Dalam Air C 3170
A / (B - C) 2.70
Berat Jenis Bulk (kering oven)
Rata-rata 2.72
B / (B - C) 2.71
Berat Jenis Bulk (SSD)
Rata-rata 2.73
A / (A - C) 2.73
Berat Jenis Semu (apparent)
Rata-rata 2.74
((B - A) / A) * 100 0.40
Penyerapan Air (absorpsi)
Rata-rata 0.50

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Si
Asisten Laboraturium

SIRAWAN UMATERNATE
: kelompok 1
:sirawan umaternate
:13, maret 2017

2
5000
5010
3180
2.73
72
2.74
73
2.75
74
0.20
50

alan Dan Aspal


ram Studi Teknik Sipil
boraturium

MATERNATE
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR

Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

pengujian : berat jenis Dikerjakan Oleh :kelompok 2


Pekerjaan :praktikum Diperiksa Oleh :Sirawan umaternate
Jenis Material : kasar sedang Tanggal : 13 maret 2017

ANALISA DATA

berat jenis bulk ( kering oven ) = A


(B - C)
sampel 5000
= =
1
5020 - 3170
sampel 5000
= =
2
5010 - 3180
berat jenis bulk ( SSD ) = B
(B - C)
sampel 5020
= =
1
5020 - 3170
sampel 5010
= =
2
5010 - 3180
berat jenis semu ( apparent ) = A
(A - C)
sampel 5000
= =
1
5000 - 3170
sampel 5000
= =
2
5000 - 3170
penyerapan air ( absorpsi ) = B-A X 100%
A
sampel 5020 - 5000
= X 100% =
1
5000
5010 - 5000
sampel 2 = X 100% =
5000
mpok 2
wan umaternate
maret 2017

2.70

2.73

2.71

2.74

2.73

2.75

0.40

0.20
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Indeks kepipihan Dikerjakan Oleh


Pekerjaan :praktikum Diperiksa Oleh
Jenis Materia:agregat kasar Tanggal

PEMERIKSAAN INDEKS KEPIPIHAN

Berat
Ukuran Thickness Berat
Ukuran Saringan Lolos
Gauge Tertahan Slot
Slot
No
Lebar Panjang A B
Lolos Tertahan
mm mm gram gram
1 3/4 1/2 13 36.5 440 60
2 1/2 3/8 9 31 435 65
Total 875 125
Indeks Kepipihan (%) ( A / C ) * 100 87.5

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
DAN ASPAL
NIK SIPIL
NKHAIR
Kel. Gambesi, Ternate

:kelompok 1
:sirawan umaternate
:13,maret 2017

PIPIHAN

Berat
Total
Ket.
C

gram
500
500
1000

Laboraturium Jalan Dan Aspal


as Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

pengujian : berat jenis Dikerjakan Oleh


Pekerjaan :praktikum Diperiksa Oleh
Jenis Material : indeks kepipihan Tanggal

ANALISA DATA

berat total = berat lolos + berat tertahan


= 440 + 60
= 500

total lolos = 440 + 435


= 875

total lolos
indeks kepipihan = x 100%
total berat
875
= x 100%
500

= 87.50
AN ASPAL
IK SIPIL
KHAIR
el. Gambesi, Ternate

:kelompok 1
:Sirawan umaternate
: 13 maret 2017
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian :Abrasi/ LA Dikerjakan Oleh


Pekerjaan :Praktikum Diperiksa Oleh
Jenis Material :Agregat kasar Tanggal

PEMERIKSAAN KEAUSAN DENGAN MESIN LOS ANGELES

Nomor Contoh
Ukuran Saringan
1 2
A B C D Ket.
Lolos Tertahan Berat Berat
Berat
Berat
Sebelu Sebelu
Setelah Setelah
m m
1 3/4 gr
3/4 1/2 2500 2500 gr
1/2 3/8 2500 2500 gr
3/8 1/4 gr
Berat tertahan
3745.00 3780.00 gr
saringan No. 12
Berat Total 5000 5000 gr
25.10 24.40 %
Keausan
Rata - rata 24.75 %

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
rtamina Kampus II Gambesi Kel. Gambesi, Ternate

:Kelompok 1
:Sirawan umaternate
:20,maret 2017

RIKSAAN KEAUSAN DENGAN MESIN LOS ANGELES

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
pengujian
Pekerjaan
Jenis Material
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

pengujian : berat jenis Dikerjakan Oleh :kelompok 1


Pekerjaan :praktikum Diperiksa Oleh :Sirawan umaternat
Jenis Material : abu batu Tanggal : 20 maret 2017

ANALISA DATA

Perhitungan untuk sampel 1 :


Berat sebelum (A) 5000 gr
Berat sesuda (B) = 3745.00 gr
% Keausan A - B x 100 %
A
= 5000 - 3745.00 x 100 %
5000
= 25.10 %

Perhitungan untuk sampel 2 :


Berat seb 5000 gr
Berat ses 3780.00 gr
% Keausan = C - D x 100 %
C
= 5000 - 3780 x 100 %
5000
= 24.400 %
jumlah rata-rata % keahausan=24,75
ORIUM JALAN DAN ASPAL
AM STUDI TEKNIK SIPIL
LTAS TEKNIK UNKHAIR
us II Gambesi Kel. Gambesi, Ternate

:kelompok 1
:Sirawan umaternate
: 20 maret 2017
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR LABORATORIUM JALAN DAN ASPAL
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate
Pengujian : Kadar Llumpur Dikerjakan Oleh : Kelompok 12
Pekerjaan : Praktikum Diperiksa Oleh : Muhammad Rizal ST.,M.sc
Jenis Material : Agregat Kasar Tanggal : 11,oktober, 2019 pengujian : Kadar Llumpur Dikerjakan Oleh : Kelompok 12
Pekerjaan : Praktikum Diperiksa Oleh : Muhammad Rizal ST.,M.sc
PEMERIKSAAN KADAR LUMPUR DAN LEMPUNG AGREGAT Jenis Material : indeks kepipihan Tanggal : 11,oktober, 2019

No. Contoh
Uraian Sat.
1.0 2.0 ANALISA DATA
Berat contoh Kering + cawan (sebelum oven) A 1060 1060 gr
Berat contoh Kering + cawan (setelah oven) B 1015 1000 gr berat contoh kering (sebelum oven) D = A-C
Berat cawan/kontainer C 60 60 gr sampel 1 = 1,060 - 60
Berat contoh Kering (sebelum oven) D=A-C 1000 1000 gr = 1,000
Berat contoh Kering (setelah oven) E=B-C 955 940 gr sampel 2 = 1,060 - 60
Kadar Lumpur & Lempung (D - E) / D * 100 5 6 % = 1,000
Rata-rata 5.25 %
berat contoh kering (setelah oven) E = B-C
sampel 1 = 1,015 - 60
Laboraturium Jalan Dan Aspal = 955
Fakultas Teknik Program Studi Teknik Sipil sampel 2 = 1,000 - 60
Asisten Laboraturium = 940

D-E
kadar lumpur & lempung = x 100%
D
Muhammad Rizal ST.,M.Sc sampel 1 = 1,000 - 955
x 100%
1,000
= 5
sampel 2 = 1,000 - 940
x 100%
6
= 6

nilai rata-rat 5.25 %


LABORATORIUM JALAN ADAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR LABORATORIUM JALAN DAN ASPAL
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate
pengujian : Kadar Llumpur Dikerjakan Oleh : Kelompok 12
Pekerjaan : Praktikum Diperiksa Oleh : Muhammad Rizal ST.,M.sc
Jenis Material : Kasar Sedang Tanggal :11,oktober, 2019 pengujian : Kadar lumpur Dikerjakan Oleh: Kelompok 1
Pekerjaan : Praktikum Diperiksa Oleh :Muhammad Rizal ST.,M.sc
PEMERIKSAAN KADAR LUMPUR DAN LEMPUNG AGREGAT Jenis Material : Indeks Kepipihan Tanggal : 11,oktober, 2019

No. Contoh
Uraian Sat.
1 2 ANALISA DATA
Berat contoh Kering + cawan (sebelum oven) A 1060 1060 gr
Berat contoh Kering + cawan (setelah oven) B 980 1020 gr berat contoh kering (sebelum oven) D = A-C
Berat cawan/kontainer C 60 60 gr sampel 1 = 1,060 - 60
Berat contoh Kering (sebelum oven) D=A-C 1000 1000 gr = 1,000
Berat contoh Kering (setelah oven) E=B-C 920 960 gr sampel 2 = 1,060 - 60
Kadar Lumpur & Lempung (D - E) / D * 100 8 4 % = 1,000
Rata-rata 6.00 %
berat contoh kering (setelah oven) E = B-C
Laboraturium Jalan Dan Aspal sampel 1 = 980 - 60
Fakultas Teknik Program Studi Teknik Sipil = 920
Asisten Laboraturium sampel 2 = 1,020 - 60
= 960

D-E
kadar lumpur & lempung = x 100%
Muhammad Rizal ST.,M.Sc D
sampel 1 = 1,000 - 920
x 100%
1,000
= 8.00
sampel 2 = 1,000 - 960
x 100%
1,000
= 4.00

nilai rata-rata = 6.00 %


LABORATORIUM JALAN ADAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

pengujian : Kadar Lumpur Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : Agregat Halus Tanggal

PEMERIKSAAN KADAR LUMPUR DAN LEMPUNG AGREGAT

No. Contoh
Uraian
1
Berat contoh Kering + cawan (sebelum oven A 1060
Berat contoh Kering + cawan (setelah oven) B 820
Berat cawan/kontainer C 60
Berat contoh Kering (sebelum oven) D=A-C 1000
Berat contoh Kering (setelah oven) E=B-C 760
Kadar Lumpur & Lempung (D - E) / D * 100 24
Rata-rata 22.25

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sip
Asisten Laboraturium

Muhammad Rizal ST.,M.Sc


N ADAN ASPAL
EKNIK SIPIL
K UNKHAIR
si Kel. Gambesi, Ternate

: Kelompok 12
: Muhammad Rizal ST.,M.sc
: 11,oktober, 2019

N LEMPUNG AGREGAT

No. Contoh
Sat.
2
1060 gr
855 gr
60 gr
1000 gr
795 gr
21 %
22.25 %

Laboraturium Jalan Dan Aspal


ultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

Muhammad Rizal ST.,M.Sc


LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ter

pengujian : Kadar Lumpur Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : indeks kepipihan Tanggal

ANALISA DATA

berat contoh kering (sebel D = A-C


sampel 1= 1,060 -
= 1,000
sampel 2= 1,060 -
= 1,000

berat contoh kering (setelaE = B-C


sampel 1= 820 -
= 760
sampel 2= 855 -
= 795

D-E
kadar lumpur & lempung = x
D
sampel 1= 1,000 -
1,000
= -
sampel 2= 1,000 -
1,000
= -

nilai rata-rata 22.25 %


AN DAN ASPAL
TEKNIK SIPIL
K UNKHAIR
esi Kel. Gambesi, Ternate

akan Oleh : Kelompok 12


: Muhammad Rizal ST.,M.sc
: 11,oktober, 2019

60

60

60

60

100%

760
x 100%

795
x 100%
LABORATORIUM ALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL LABORATORIUM JALAN DAN ASPAL
FAKULTAS TEKNIK UNKHAIR PROGRAM STUDI TEKNIK SIPIL
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Kadar Lumpur Dikerjakan Oleh : Kelompok 12


Pekerjaan : Praktikum Diperiksa Oleh : Muhammad Rizal ST.,M.sc pengujian : Kadar Lumpur Dikerjakan Oleh : Kelompok 12
Jenis Materia: Abu Batu Tanggal : 11,oktober, 2019 Pekerjaan : Praktikum Diperiksa Oleh : Muhammad Rizal ST.,M.sc
Jenis Material : Abu Batu Tanggal : 11,oktober, 2019
PEMERIKSAAN KADAR LUMPUR DAN LEMPUNG AGREGAT
ANALISA DATA
No. Contoh
Uraian Sat.
1 2 berat contoh kering (sebelum oven) D = A- C
Berat contoh Kering + cawan (sebelum oven) A 1060 1060 gr sampel 1 1060 - 60
Berat contoh Kering + cawan (setelah oven) B 730 720 gr = 1000
Berat cawan/kontainer C 60 60 gr sampel 2 1060 - 60
Berat contoh Kering (sebelum oven) D =A- C 1000 1000 gr = 1,000
Berat contoh Kering (setelah oven) E=B-C 670 660 gr
Kadar Lumpur & Lempung (D - E) / D * 100 33 34 % berat contoh kering (setelah oven) E = B-C
rata - rata 33.50 % sampel 1 = 730 - 60
= 670
Laboraturium Jalan Dan Aspal sampel 2 = 720 - 60
Fakultas Teknik Program Studi Teknik Sipil = 660
Asisten Laboraturium
D-E
kadar lumpur & lempung = x 100%
D
sampel 1 = 1,000 - 670
x ###
Muhammad Rizal ST.,M.Sc 1,000
= 33
sampel 2 = 1,000 - 660
x ###
1,000
= 34
Nilai rata rata = 33.50 %
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Berat jenis Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : abu batu Tanggal

PEMERIKSAAN BERAT JENIS DAN PENYERAPAN AGREGAT

Nomor Contoh 1

Berat Contoh Kering Permukaan 500

Berat Contoh Kering Oven A 495


Berat botol + air batas kalibrasi B 665

Berat Contoh + botol + air batas kalibrasi C 960


A / (B + 500 - C) 2.41
Berat Jenis Bulk (kering oven)
Rata-rata 2.65
500 / (B + 500 - C) 2.44
Berat Jenis Bulk (SSD)
Rata-rata 2.69
A / (B + A - C) 2.48
Berat Jenis Semu (apparent)
Rata-rata 2.77
((500 - A) / A) * 100 1.01
Penyerapan Air (absorpsi)
Rata-rata 2.03

Laboraturium Jalan Dan As


Fakultas Teknik Program Studi Te
Asisten Laboraturium

SIRAWAN UMATERNATE
BORATORIUM JALAN DAN ASPAL
ROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Kampus II Gambesi Kel. Gambesi, Ternate

:kelompok 1
:Sirawan umaternate
:20,maret, 2017

AN BERAT JENIS DAN PENYERAPAN AGREGAT

2
500

490
625
955
2.88
2.65
2.94
2.69
3.06
2.77
2.04
2.03

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
LABORATORIUM JALAN DAN A
PROGRAM STUDI TEKNIK SI
FAKULTAS TEKNIK UNKHA
Jl. Pertamina Kampus II Gambesi Kel. Ga

pengujian : berat jenis


Pekerjaan :praktikum
Jenis Material : abu batu

ANALISA DATA

berat jenis bulk ( kering oven ) A


= (B + 500 - C)

495
sampel 1 = 665 + 500
490
sampel 2 =
625 + 500
berat jenis bulk ( SSD ) 500
=
(B + 500 - C)
500
sampel 1 =
665 + 500
500
sampel 2 =
625 + 500
berat jenis semu ( apparent ) A
=
(B + A - C)
495
sampel 1 =
665 + 495
490
sampel 2 =
625 + 490
penyerapan air ( absorpsi ) 500 - A
=
A
500 - 495
sampel 1 =
495
500 - 490
sampel 2 =
490

Rata rata = 2.03


RATORIUM JALAN DAN ASPAL
GRAM STUDI TEKNIK SIPIL
KULTAS TEKNIK UNKHAIR
ampus II Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh :kelompok 1


Diperiksa Oleh :Sirawan umaternate
Tanggal : 20 maret 2017

ANALISA DATA

A
(B + 500 - C)

495
= 2.41
- 960
490
= 2.88
- 955
500
(B + 500 - C)
500
= 2.44
- 960
500
= 2.94
- 955
A
(B + A - C)
495
= 2.48
- 960
490
= 3.06
- 955

X 100%

X 100% = 1.01

X 100% = 2.04
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ter

Pengujian : Analisa Saringan


Pekerjaan : Praktikum
Jenis Material : Kasar

PEMERIKSAAN ANALISA SAR

Berat Kering Contoh : 2500 gr sampel 1

Berat tertahan persen


Ukuran
kumulatif tertahan total
Saringan
tertahan
2 0 0 0
1.5 0 0 0
1 0 0 0
0.75 0 0 0
0.5 270 270 10.8
0.375 620 890 35.7
4 660 1,550 62.1
8 450 2,000 80.2
16 195 2,195 88.0
30 80 2,275 91.2
50 50 2,325 93.2
100 70 2,395 96.0
200 40 2,435 97.6
PAN 60 2,495 100.0
100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
PAN 200 100 50 30 8 4 0.375
Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh : Kelompok 4


Diperiksa Oleh : Siti Aulia Ramadhany, ST
Tanggal : 5 November 2019

MERIKSAAN ANALISA SARINGAN AGREGAT

sampel 1 Berat Kering Contoh : 2500 gr sampel 2

persen
persen Berat kumulatif Persen total
persen lolos lolos rata
lolos tertahan tertahan tertahan
rata
100 0 0 0.00 100.00 100.000
100 0 0 0.00 100.00 100.000
100 0 0 0.00 100.00 100.000
100 0 0 0.00 100.00 100.000
89.18 270 270 10.80 89.20 89.189
64.33 655 925 37.00 63.00 63.664
37.88 635 1,560 62.40 37.60 37.738
19.84 555 2,115 84.60 15.40 17.620
12.02 150 2,265 90.60 9.40 10.712
8.82 95 2,360 94.40 5.60 7.209
6.81 40 2,400 96.00 4.00 5.407
4.01 25 2,425 97.00 3.00 3.504
2.40 25 2,450 98.00 2.00 2.202
0.00 50 2,500 100.00 0.00 0.000
Column AC

8 4 0.375 0.5 0.75 1 1.5 2

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

ISMAR RIDWAN
NPM:07231511096
89.189
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ter

Pengujian : Analisa Saringan


Pekerjaan : Praktikum
Jenis Material : Kasar Sedang

PEMERIKSAAN ANALISA SAR

Berat Kering Contoh : 2500 gr sampel 1

Berat tertahan persen


Ukuran
kumulatif tertahan total
Saringan
tertahan
2 0 0 0
1.5 0 0 0
1 0 0 0
0.75 0 0 0.0
0.5 0 0 0.0
0.375 380 380 15.2
4 575 955 38.2
8 605 1,560 62.4
16 380 1,560 62.4
30 395 1,955 78.2
50 160 2,115 84.6
100 145 2,260 90.4
200 130 2,390 95.6
PAN 110.00 2,500 100.0
100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
PAN 200 100 50 30 8 4 0.375
Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh : Kelompok 4


Diperiksa Oleh : Siti Aulia Ramadhany, ST
Tanggal : 5 November 2019

MERIKSAAN ANALISA SARINGAN AGREGAT

sampel 1 Berat Kering Contoh : 2500 gr sampel 2

persen
persen Berat kumulatif Persen total
persen lolos lolos rata
lolos tertahan tertahan tertahan
rata
100 0 0 0.00 100.00 100.000
100 0 0 0.00 100.00 100.000
100 0 0 0.00 100.00 100.000
100.00 0 0 0.00 100.00 100.000
100.00 0 0 0.00 100.00 100.000
84.80 380 380 15.48 84.52 84.661
61.80 555 935 38.09 61.91 61.857
37.60 595 1,530 62.32 37.68 37.639
37.60 370 1,900 77.39 22.61 30.103
21.80 385 1,915 78.00 22.00 21.898
15.40 150 2,065 84.11 15.89 15.643
9.60 130 2,195 89.41 10.59 10.095
4.40 140 2,335 95.11 4.89 4.644
0.00 120.00 2,455 100.00 0.00 0.000
Column AC

8 4 0.375 0.5 0.75 1 1.5 2

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

ISMAR RIDWAN
NPM:07231511096
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Analisis Saringan Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : Pasir Tanggal

PEMERIKSAAN ANALISA SARINGAN AGREGAT

Berat Kering Contoh : 1500 gr

Berat
Ukuran tertahan kumulatif persen total
persen lolos Berat tertahan
Saringan tertahan tertahan

1 0.00 0.00 0.00 100.00 0.00


3/4 0 0.00 0.00 100.00 0.00
1/2 0 0.00 0.00 100.00 0.00
3/8 0 0.00 0.00 100.00 0.00
4 0 0.00 0.00 100.00 0.00
8 50 50.00 3.45 96.55 200.00
16 145 195.00 13.45 86.55 530.00
30 215 265.00 18.28 81.72 730.00
50 270 535.00 36.90 63.10 150.00
100 280 815.00 56.21 43.79 175.00
200 395 1,210.00 83.45 16.55 55.00
pan 240 1,450.00 100.00 0.00 190.00
PASIR
100.00
90.00
80.00
70.00
60.00 PASIR
50.00
40.00
30.00
20.00
10.00
0.00
pan 200 100 50 30 8 4 3'/8 0.5 0.75 1
TORIUM JALAN DAN ASPAL
RAM STUDI TEKNIK SIPIL
LTAS TEKNIK UNKHAIR
pus II Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh : Kelompok 4


: Siti Aulia Ramadhany, ST
: 5 November 2019

ALISA SARINGAN AGREGAT

persen total
persen lolos
kumulatif terahan tertahan persen lolos
rata-rata
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
200.00 13.33 86.67 91.61
730.00 48.67 51.33 68.94
930.00 62.00 38.00 59.86
1080.00 72.00 28.00 45.55
1255.00 83.67 16.33 30.06
1310.00 87.33 12.67 14.61
1500.00 100.00 0.00 0.00
Laboraturium Jalan Dan Aspal
Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

ISMAR RIDWAN
NPM:07231511096
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Analisis Saringan Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : Abu Batu Tanggal

PEMERIKSAAN ANALISA SARINGAN AGREGAT

Berat Kering Contoh : 1500 gr

Ukuran kumulatif persen total


Berat tertahan persen lolos Berat tertahan
Saringan tertahan tertahan

1 0.00 0.00 0.00 100.00 0.00


3/4 0 0.00 0.00 100.00 0.00
1/2 0 0.00 0.00 100.00 0.00
3/8 0 0.00 0.00 100.00 0.00
4 0 0.00 0.00 100.00 0.00
8 45 45.00 3.02 96.98 50.00
16 170 215.00 14.43 85.57 230.00
30 280 325.00 21.81 78.19 200.00
50 225 550.00 36.91 63.09 190.00
100 250 800.00 53.69 46.31 260.00
200 420 1,220.00 81.88 18.12 340.00
pan 270 1,490.00 100.00 0.00 230.00
ABU BATU
100.00
90.00
80.00
70.00
60.00 ABU BATU
50.00
40.00
30.00
20.00
10.00
0.00
pan 200 100 50 30 8 4 3'/8 0.5 0.75 1
TORIUM JALAN DAN ASPAL
RAM STUDI TEKNIK SIPIL
LTAS TEKNIK UNKHAIR
pus II Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh : Kelompok 4


: Siti Aulia Ramadhany, ST
: 5 November 2019

ALISA SARINGAN AGREGAT

persen total
persen lolos
kumulatif terahan tertahan persen lolos
rata-rata
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
0.00 0.00 100.00 100.00
50.00 3.33 96.67 96.82
280.00 18.67 81.33 83.45
480.00 32.00 68.00 73.09
670.00 44.67 55.33 59.21
930.00 62.00 38.00 42.15
1270.00 84.67 15.33 16.73
1500.00 100.00 0.00 0.00
Laboraturium Jalan Dan Aspal
Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

ISMAR RIDWAN
NPM:07231511096
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Analisis Saringan Dikerjakan Oleh


Pekerjaan : Praktikum Diperiksa Oleh
Jenis Material : Gabungan Tanggal

Persen lolos sarinan Komposisi campursn agregat


Ukuran
saringan Agregat Agregat
kasar k,sedang pasir abu batu kasar k, sedang pasir
35% 40% 10%
3/4 100.00 100.00 100.00 100.00 35.00 40.00 10.00
1/2 89.19 100.00 100.00 100.00 31.22 40.00 10.00
3/8 63.66 84.66 100.00 100.00 22.28 33.86 10.00

4 37.74 61.86 100.00 100.00 13.21 24.74 10.00


8 17.62 37.64 91.61 96.82 6.17 15.06 9.16

16 10.71 30.10 68.94 83.45 3.75 12.04 6.89


30 7.21 21.90 59.86 73.09 2.52 8.76 5.99
50 5.41 15.64 45.55 59.21 1.89 6.26 4.56
100 3.50 10.10 30.06 42.15 1.23 4.04 3.01
200 2.20 4.64 14.61 16.73 0.77 1.86 1.46
pan 0.00 0.00 0.00 0.00 0.00 0.00 0.00

100

90

80

70

60

50

40

30

20

10

0
40

30

20

10

0
pan 200 100 50 30 16 8 4 0.375 0.5 0.75

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
ASPAL
SIPIL
AIR
Gambesi, Ternate

: Kelompok 4
: Siti Aulia Ramadhany, ST
: 5 November 2019

n agregat Gradasi
Batas
gabungan
spek
abu batu
15% 100%
15.00 100.00 100
15.00 96.22 90-100
15.00 81.15 77-90

15.00 62.95 53-69


14.52 44.91 33-53

12.52 35.20 21-40


10.96 28.23 14-30
8.88 21.59 9-22
6.32 14.59 6-15
2.51 6.60 4-9
0.00 0.00 0

gabungan
atas
bawah
bawah

0.375 0.5 0.75

urium Jalan Dan Aspal


k Program Studi Teknik Sipil
sten Laboraturium

WAN UMATERNATE
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, T

penetrasi aspal

penurunan aspal

Berat Jenis Aspal

Titik lembek aspal


ALAN DAN ASPAL
DI TEKNIK SIPIL
KNIK UNKHAIR
mbesi Kel. Gambesi, Ternate
LABORA
PROGR
FAKU
Jl. Pertamina Kam

pengujian LA/ abrasi

Pengujian indeks kepipihan

uji berat jenis abubatu


uji berat jenis k, sedang

berat jenis kasar

kadar lumpur abu batu

kadar lumpur ksedang

Aadar lumpur kasar


Analisa saringan kasar

Analisa saringan k, sedang

Analisa saringan abubtau


LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Dikerjakan Oleh : Kelompok 1


Pekerjaan : Praktikum Diperiksa: : Sirawan Umaternate
Jenis Material : Tanggal : 20 Maret 2017

Spesifikasi
No Pemeriksaan Hasil Satuan
Min Max
Berat jenis agregat kasar
1 a. Agregat kasar
-berat jenis bulk 2.69
- berat jenis SSD 2.69 2.50% 3% gr
- berat jenis semu 2.70
- penyerapan (absorp 0.20
berat jenis agregat kasar sedang
b. Agregat kasar sedang
2 -berat jenis bulk 2.72
- berat jenis SSD 2.73 2.50% 3% gr
- berat jenis semu 2.74
- penyerapan (absorp 0.50
berat jenis abu batu
c. Abu batu
3 -berat jenis bulk 2.65
- berat jenis SSD 2.69 2.50% 3% gr
- berat jenis semu 2.77
- penyerapan (absorp 2.03
4 kehausan 40% gr
5 indeks kepipihan 5% gr

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

SIRAWAN UMATERNATE
Ternate

maternate
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Tern

Pengujian : A,saringan Dikerjakan Oleh


Pekerjaan :praktikum Diperiksa:
Jenis Material : abu batu Tanggal

Kadar Aspal % 5% 5.5% 6%


Berat Aspal gr 55.00 60.50 66.00
Kadar Agregat % 95.00% 94.50% 94.00%
- Kasar ( gr ) 35% 365.75 363.83 361.90

- Kasar Sedang ( gr ) 40% 418.00 415.80 413.60


-Pasir (10 %) 0% 0.00 0.00 0.00
- Halus ( gr ) 25% 261.25 259.88 258.50
Kapasitas Mould gr 1100.00 1100.00 1100.00

Pembagian berat dari fraksi butir agregat berdasarkan presentasi gradasi agregat
Kadar Aspal : 5%
Berat Aspal : 1100.00 x 5%

Agregat Kasar 95% x 35%


3/4" = 100 - 89.00
1/2" = 89.00 - 63.80
3/8" = 63.80 - 37.10
#4 = 37.10 - 14.30
#8 = 14.30 - 7.10
#16 = 7.10 - 3.80
#30 = 3.80 - 2.60
#50 = 2.60 - 1.40
#100 = 1.40 - 0.20
# 200 = 0.20 - 0.00
Pan = 0 - 0.00

Agregat Kasar sedang = 95% x 40%


3/4" = 100.00 - 100.00
1/2" = 100.00 - 84.60
3/8" = 84.60 - 61.80
#4 = 61.80 - 37.60
#8 = 37.60 - 22.40
#16 = 22.40 - 6.60
#30 = 6.60 - 4.20
#50 = 4.20 - 2.20
#100 = 2.20 - 0.20
# 200 = 0.20 - 0.00
Pan = 0 - 0

Abu batu = 95% x 25%


3/4" = 100 - 100
1/2" = 100 - 100
3/8" = 100 - 100.00
#4 = 100 - 98.00
#8 = 98 - 88.17
#16 = 88.17 - 71.00
#30 = 71.00 - 56.50
#50 = 56.50 - 39.50
#100 = 39.50 - 18.17
# 200 = 18.17 - 0.00
Pan = 0.00 - 0.00
ALAN DAN ASPAL
I TEKNIK SIPIL
NIK UNKHAIR
mbesi Kel. Gambesi, Ternate

kerjakan Oleh :kelompok 1


:sirawan umaternate
:20, maret, 2017

6.5% 7%
71.50 77.00
93.50% 93.00%
359.98 358.05

411.40 409.20
0.00 0.00
257.13 255.75
1100.00 1100.00

55

x 1100.00 = 365.75 gr
x 365.75 = 40.23 gr 40.23
x 365.75 = 92.17 gr 132.40
x 365.75 = 97.66 gr 230.06
x 365.75 = 83.39 gr 313.45
x 365.75 = 26.33 gr 339.78
x 365.75 = 12.07 gr 351.85
x 365.75 = 4.39 gr 356.24
x 365.75 = 4.39 gr 360.63
x 365.75 = 4.39 gr 365.02
x 365.75 = 0.73 gr 365.75
x 365.75 = 0.00 gr 365.75
365.75 gr

x 1100.00 = 418 gr
x 418.00 = 0.00 gr 0.00
x 418.00 = 64.37 gr 64.37
x 418.00 = 95.30 gr 159.68
x 418.00 = 101.16 gr 260.83
x 418.00 = 63.54 gr 324.37
x 418.00 = 66.04 gr 390.41
x 418.00 = 10.03 gr 400.44
x 418.00 = 8.36 gr 408.80
x 418.00 = 8.36 gr 417.16
x 418.00 = 0.84 gr 418.00
x 418.00 = 0.00 gr 418.00
418.00 gr

x 1100.00 = 261.25 gr
x 261.25 = 0.00 gr 0.00
x 261.25 = 0.00 gr 0.00
x 261.25 = 0.00 gr 0.00
x 261.25 = 5.23 gr 5.23
x 261.25 = 25.68 gr 30.91
x 261.25 = 44.86 gr 75.76
x 261.25 = 37.88 gr 113.64
x 261.25 = 44.41 gr 158.06
x 261.25 = 55.72 gr 213.78
x 261.25 = 47.47 gr 261.25
x 261.25 = 0.00 gr 261.25
261.25 gr

agregat 1045.00
aspal 55.00
Total 1100.00
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : A,saringan
Pekerjaan :praktikum
Jenis Material : abu batu

Kadar Aspal % 5% 5.5% 6%


Berat Aspal gr 55.00 60.50 66.00
Kadar Agregat % 95.00% 94.50% 94.00%
- Kasar ( gr ) 35% 365.75 363.83 361.90
- Kasar Sedang ( gr ) 40% 418.00 415.80 413.60
-Pasir (10 %) 0% 0.00 0.00 0.00
- Halus ( gr ) 25% 261.25 259.88 258.50
Kapasitas Mould gr 1100.00 1100.00 1100.00
Pembagian berat dari fraksi butir agregat berdasarkan presentasi gradasi agregat
Kadar Aspal : 5.5%
Berat Aspal : 1100.00 x 5.5%

Agregat Kasar 94.50% x 35%


3/4" = 100 - 89.00
1/2" = 89.00 - 63.80
3/8" = 63.80 - 37.10
#4 = 37.10 - 14.30
#8 = 14.30 - 7.10
#16 = 7.10 - 3.80
#30 = 3.80 - 2.60
#50 = 2.60 - 1.40
#100 = 1.40 - 0.20
# 200 = 0.20 - 0
Pan = 0 - 0

Agregat Kasar sedang 94.50% x 40%


3/4" = 100.00 - 100.00
1/2" = 100.00 - 84.60
3/8" = 84.60 - 61.80
#4 = 61.80 - 37.60
#8 = 37.60 - 22.40
#16 = 22.40 - 6.60
#30 = 6.60 - 4.20
#50 = 4.20 - 2.20
#100 = 2.20 - 0.20
# 200 = 0.20 - 0.00
Pan = 0 - 0

Abu batu 94.50% x 25%


3/4" = 100 - 100
1/2" = 100 - 100
3/8" = 100 - 100.00
#4 = 100 - 98.00
#8 = 98 - 88.17
#16 = 88.17 - 71.00
#30 = 71.00 - 56.50
#50 = 56.50 - 39.50
#100 = 39.50 - 18.17
# 200 = 18.17 - 0.00
Pan = 0.00 - 0.00
JALAN DAN ASPAL
DI TEKNIK SIPIL
KNIK UNKHAIR
mbesi Kel. Gambesi, Ternate

Dikerjakan Oleh :kelompok 1


Diperiksa: :sirawan umaternate
Tanggal :20, maret, 2017

6.5% 7%
71.50 77.00
93.50% 93.00%
359.98 358.05
411.40 409.20
0.00 0.00
257.13 255.75
1100.00 1100.00
ntasi gradasi agregat

60.5 gr

x 1100.00 = 363.83 gr
x 363.83 = 40.02 gr 40.02
x 363.83 = 91.68 gr 131.70
x 363.83 = 97.14 gr 228.85
x 363.83 = 82.95 gr 311.80
x 363.83 = 26.20 gr 337.99
x 363.83 = 12.01 gr 350.00
x 363.83 = 4.37 gr 354.37
x 363.83 = 4.37 gr 358.73
x 363.83 = 4.37 gr 363.10
x 363.83 = 0.73 gr 363.83
x 363.83 = 0.00 gr 363.83
363.83 gr

x 1100.00 = 415.8 gr
x 415.8 = 0.00 gr 0.00
x 415.8 = 64.03 gr 64.03
x 415.8 = 94.80 gr 158.84
x 415.8 = 100.62 gr 259.46
x 415.8 = 63.20 gr 322.66
x 415.8 = 65.70 gr 388.36
x 415.8 = 9.98 gr 398.34
x 415.8 = 8.32 gr 406.65
x 415.8 = 8.32 gr 414.97
x 415.8 = 0.83 gr 415.80
x 415.8 = 0.00 gr 415.80
415.80 gr

x 1100.00 = 259.875 gr
x 259.875 = 0.00 gr 0.00
x 259.875 = 0.00 gr 0.00
x 259.875 = 0.00 gr 0.00
x 259.875 = 5.20 gr 5.20
x 259.875 = 25.55 gr 30.74
x 259.875 = 44.62 gr 75.36
x 259.875 = 37.68 gr 113.05
x 259.875 = 44.18 gr 157.22
x 259.875 = 55.43 gr 212.66
x 259.875 = 47.22 gr 259.88
x 259.875 = 0.00 gr 259.88
259.88 gr

agregat 1039.50
aspal 60.50
Total 1100.00
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : A,saringan Dikerjakan Oleh


Pekerjaan :praktikum Diperiksa:
Jenis Material : abu batu Tanggal

Kadar Aspal % 5% 5.5% 6% 6.5%


Berat Aspal gr 55.00 60.50 66.00 71.50
Kadar Agregat % 95.00% 94.50% 94.00% 93.50%
- Kasar ( gr ) 35% 365.75 363.83 361.90 359.98
- Kasar Sedang ( gr ) 40% 418.00 415.80 413.60 411.40
-Pasir (10 %) 0% 0.00 0.00 0.00 0.00
- Halus ( gr ) 25% 261.25 259.88 258.50 257.13
Kapasitas Mould gr 1100.00 1100.00 1100.00 1100.00
Pembagian berat dari fraksi butir agregat berdasarkan presentasi gradasi agregat
Kadar Aspal : 6%
Berat Aspal : 1100.00 x 6% 66

Agregat Kasar 94.00% x 35% x


3/4" = 100 - 89.00 x
1/2" = 89.00 - 63.80 x
3/8" = 63.80 - 37.10 x
#4 = 37.10 - 14.30 x
#8 = 14.30 - 7.10 x
#16 = 7.10 - 3.80 x
#30 = 3.80 - 2.60 x
#50 = 2.60 - 1.40 x
#100 = 1.40 - 0.20 x
# 200 = 0.20 - 0 x
Pan = 0 - 0 x

Agregat Kasar sedang 94.00% x 40% x


3/4" = 100.00 - 100.00 x
1/2" = 100.00 - 84.60 x
3/8" = 84.60 - 61.80 x
#4 = 61.80 - 37.60 x
#8 = 37.60 - 22.40 x
#16 = 22.40 - 6.60 x
#30 = 6.60 - 4.20 x
#50 = 4.20 - 2.20 x
#100 = 2.20 - 0.20 x
# 200 = 0.20 - 0.00 x
Pan = 0 - 0 x
Abu batu 94.00% x 25% x
3/4" = 100 - 100 x
1/2" = 100 - 100 x
3/8" = 100 - 100.00 x
#4 = 100 - 98.00 x
#8 = 98 - 88.17 x
#16 = 88.17 - 71.00 x
#30 = 71.00 - 56.50 x
#50 = 56.50 - 39.50 x
#100 = 39.50 - 18.17 x
# 200 = 18.17 - 0.00 x
Pan = 0.00 - 0.00 x
L

si, Ternate

:kelompok 1
:sirawan umaternate
:20, maret, 2017

7%
77.00
93.00%
358.05
409.20
0.00
255.75
1100.00

gr

1100.00 = 361.9 gr
361.9 = 39.81 gr 39.81
361.9 = 91.20 gr 131.01
361.9 = 96.63 gr 227.64
361.9 = 82.51 gr 310.15
361.9 = 26.06 gr 336.21
361.9 = 11.94 gr 348.15
361.9 = 4.34 gr 352.49
361.9 = 4.34 gr 356.83
361.9 = 4.34 gr 361.18
361.9 = 0.72 gr 361.90
361.9 = 0.00 gr 361.90
361.90 gr

1100.00 = 413.6 gr
413.6 = 0.00 gr 0.00
413.6 = 63.69 gr 63.69
413.6 = 94.30 gr 158.00
413.6 = 100.09 gr 258.09
413.6 = 62.87 gr 320.95
413.6 = 65.35 gr 386.30
413.6 = 9.93 gr 396.23
413.6 = 8.27 gr 404.50
413.6 = 8.27 gr 412.77
413.6 = 0.83 gr 413.60
413.6 = 0.00 gr 413.60
413.60 gr
1100.00 = 258.5 gr
258.5 = 0.0 gr 0.0
258.5 = 0.0 gr 0.0
258.5 = 0.0 gr 0.0
258.5 = 5.2 gr 5.2
258.5 = 25.4 gr 30.6
258.5 = 44.4 gr 75.0
258.5 = 37.5 gr 112.4
258.5 = 43.9 gr 156.4
258.5 = 55.1 gr 211.5
258.5 = 47.0 gr 258.5
258.5 = 0.0 gr 258.5
258.5 gr

agregat 1034.00
aspal 66.00
Total 1100.00
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : A,saringan Dikerjakan Oleh


Pekerjaan :praktikum Diperiksa:
Jenis Material : abu batu Tanggal

Kadar Aspal % 5% 5.5% 6% 6.5%


Berat Aspal gr 55.00 60.50 66.00 71.50
Kadar Agregat % 95.00% 94.50% 94.00% 93.50%
- Kasar ( gr ) 35% 365.75 363.83 361.90 359.98
- Kasar Sedang ( gr ) 40% 418.00 415.80 413.60 411.40
-Pasir (10 %) 0% 0.00 0.00 0.00 0.00
- Halus ( gr ) 25% 261.25 259.88 258.50 257.13
Kapasitas Mould gr 1100.00 1100.00 1100.00 1100.00
Pembagian berat dari fraksi butir agregat berdasarkan presentasi gradasi agregat
Kadar Aspal : 6.5%
Berat Aspal : 1100.00 x 6.5% 71.5

Agregat Kasar 93.50% x 35% x


3/4" = 100 - 89.00 x
1/2" = 89.00 - 63.80 x
3/8" = 63.80 - 37.10 x
#4 = 37.10 - 14.30 x
#8 = 14.30 - 7.10 x
#16 = 7.10 - 3.80 x
#30 = 3.80 - 2.60 x
#50 = 2.60 - 1.40 x
#100 = 1.40 - 0.20 x
# 200 = 0.20 - 0 x
Pan = 0 - 0 x

Agregat Kasar sedang 93.50% x 40% x


3/4" = 100.00 - 100.00 x
1/2" = 100.00 - 84.60 x
3/8" = 84.60 - 61.80 x
#4 = 61.80 - 37.60 x
#8 = 37.60 - 22.40 x
#16 = 22.40 - 6.60 x
#30 = 6.60 - 4.20 x
#50 = 4.20 - 2.20 x
#100 = 2.20 - 0.20 x
# 200 = 0.20 - 0.00 x
Pan = 0 - 0 x

Abu batu 93.50% x 25%


3/4" = 100 - 100 x
1/2" = 100 - 100 x
3/8" = 100 - 100.00 x
#4 = 100 - 98.00 x
#8 = 98 - 88.17 x
#16 = 88.17 - 71.00 x
#30 = 71.00 - 56.50 x
#50 = 56.50 - 39.50 x
#100 = 39.50 - 18.17 x
# 200 = 18.17 - 0.00 x
Pan = 0.00 - 0.00 x
N DAN ASPAL
EKNIK SIPIL
UNKHAIR
si Kel. Gambesi, Ternate

Dikerjakan Oleh :kelompok 1


Diperiksa: :sirawan umaternate
:20, maret, 2017

7%
77.00
93.00%
358.05
409.20
0.00
255.75
1100.00
gradasi agregat

gr

1100.00 = 359.98 gr
359.98 = 39.60 gr 39.60
359.98 = 90.71 gr 130.31
359.98 = 96.11 gr 226.42
359.98 = 82.07 gr 308.50
359.98 = 25.92 gr 334.42
359.98 = 11.88 gr 346.30
359.98 = 4.32 gr 350.62
359.98 = 4.32 gr 354.94
359.98 = 4.32 gr 359.26
359.98 = 0.72 gr 359.98
359.98 = 0.00 gr 359.98
359.98 gr

1100.00 = 411.4 gr
411.4 = 0.0 gr 0.0
411.4 = 63.4 gr 63.4
411.4 = 93.8 gr 157.2
411.4 = 99.6 gr 256.7
411.4 = 62.5 gr 319.2
411.4 = 65.0 gr 384.2
411.4 = 9.9 gr 394.1
411.4 = 8.2 gr 402.3
411.4 = 8.2 gr 410.6
411.4 = 0.8 gr 411.4
411.4 = 0.0 gr 411.4
411.4 gr

1100.00 = 257.13 gr
257.13 = 0.0 gr 0.0
257.13 = 0.0 gr 0.0
257.13 = 0.0 gr 0.0
257.13 = 5.1 gr 5.1
257.13 = 25.3 gr 30.4
257.13 = 44.1 gr 74.6
257.13 = 37.3 gr 111.8
257.13 = 43.7 gr 155.6
257.13 = 54.8 gr 210.4
257.13 = 46.7 gr 257.1
257.13 = 0.0 gr 257.1
257.13 gr

agregat 1028.50
aspal 71.50
Total 1100.00
LABORATORIUM JALAN DAN ASPA
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambe

Pengujian : A,saringan
Pekerjaan :praktikum
Jenis Material : abu batu

Kadar Aspal % 5% 5.5% 6% 6.5%


Berat Aspal gr 55.00 60.50 66.00 71.50
Kadar Agregat % 95.00% 94.50% 94.00% 93.50%
- Kasar ( gr ) 35% 365.75 363.83 361.90 359.98
- Kasar Sedang ( gr ) 40% 418.00 415.80 413.60 411.40
-Pasir (10 %) 0% 0.00 0.00 0.00 0.00
- Halus ( gr ) 25% 261.25 259.88 258.50 257.13
Kapasitas Mould gr 1100.00 1100.00 1100.00 1100.00
Pembagian berat dari fraksi butir agregat berdasarkan presentasi gradasi agregat
Kadar Aspal : 7.0%
Berat Aspal : 1100.00 x 7% 77

Agregat Kasar 93.00% x 35% x


3/4" = 100 - 89.00 x
1/2" = 89.00 - 63.80 x
3/8" = 63.80 - 37.10 x
#4 = 37.10 - 14.30 x
#8 = 14.30 - 7.10 x
#16 = 7.10 - 3.80 x
#30 = 3.80 - 2.60 x
#50 = 2.60 - 1.40 x
#100 = 1.40 - 0.20 x
# 200 = 0.20 - 0 x
Pan = 0 - 0 x

Agregat Kasar sedang 93.00% x 40% x


3/4" = 100.00 - 100.00 x
1/2" = 100.00 - 84.60 x
3/8" = 84.60 - 61.80 x
#4 = 61.80 - 37.60 x
#8 = 37.60 - 22.40 x
#16 = 22.40 - 6.60 x
#30 = 6.60 - 4.20 x
#50 = 4.20 - 2.20 x
#100 = 2.20 - 0.20 x
# 200 = 0.20 - 0.00 x
Pan = 0 - 0 x

Abu batu 93.00% x 25% x


3/4" = 100 - 100 x
1/2" = 100 - 100 x
3/8" = 100 - 100.00 x
#4 = 100 - 98.00 x
#8 = 98 - 88.17 x
#16 = 88.17 - 71.00 x
#30 = 71.00 - 56.50 x
#50 = 56.50 - 39.50 x
#100 = 39.50 - 18.17 x
# 200 = 18.17 - 0.00 x
Pan = 0.00 - 0.00 x
IUM JALAN DAN ASPAL
STUDI TEKNIK SIPIL
S TEKNIK UNKHAIR
II Gambesi Kel. Gambesi, Ternate

Dikerjakan Oleh :kelompok 1


Diperiksa: :sirawan umaternate
Tanggal :20, maret, 2017

7%
77.00
93.00%
358.05
409.20
0.00
255.75
1100.00

gr

1100.00 = 358.05 gr
358.05 = 39.39 gr 39.39
358.05 = 90.23 gr 129.61
358.05 = 95.60 gr 225.21
358.05 = 81.64 gr 306.85
358.05 = 25.78 gr 332.63
358.05 = 11.82 gr 344.44
358.05 = 4.30 gr 348.74
358.05 = 4.30 gr 353.04
358.05 = 4.30 gr 357.33
358.05 = 0.72 gr 358.05
358.05 = 0.00 gr 358.05
358.05 gr

1100.00 = 409.2 gr
409.2 = 0.00 gr 0.00
409.2 = 63.02 gr 63.02
409.2 = 93.30 gr 156.31
409.2 = 99.03 gr 255.34
409.2 = 62.20 gr 317.54
409.2 = 64.65 gr 382.19
409.2 = 9.82 gr 392.01
409.2 = 8.18 gr 400.20
409.2 = 8.18 gr 408.38
409.2 = 0.82 gr 409.20
409.2 = 0.00 gr 409.20
409.20 gr

1100.00 = 255.75 gr
255.75 = 0.00 gr 0.00
255.75 = 0.00 gr 0.00
255.75 = 0.00 gr 0.00
255.75 = 5.12 gr 5.12
255.75 = 25.14 gr 30.26
255.75 = 43.91 gr 74.17
255.75 = 37.08 gr 111.25
255.75 = 43.48 gr 154.73
255.75 = 54.55 gr 209.28
255.75 = 46.47 gr 255.75
255.75 = 0.00 gr 255.75
255.75 gr

agregat 1023.00
aspal 77.00
Total 1100.00
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

pengujian : titik lembek aspal Dikerjakan Oleh : KELOMPOK IV


Pekerjaan : praktikum Diperiksa Oleh : ISMAR RIDWAN
Jenis Material : aspal Tanggal :

PEMERIKSAAN PENETRASI ASPAL SETELAH KEHILANGAN BERAT

Bulk Bulk Apparent Absorption


Material
( Dry ) ( SSD ) ( Semu ) (%)
Agregat Kasar 2.52 3.84 2.63 0.75
Sedang 3.28 3.34 3.46 1.60
Abu batu 2.57 2.63 2.75 2.57
Pasir 2.65 2.57 2.74 1.53

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium

ISMAR RIDWAN
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Marshall Dikerjakan Oleh : Kelompok IV


Pekerjaan : Praktikum Diperiksa Oleh : ISMAR RIDWAN
Jenis Material : Tanggal :

SIFAT CAMPURAN ASPAL PANAS DENGAN METODE MARSHALL ( ASTM D-1559 )

ANGKA PENETRASI ASPAL 60/70 Jenis Agregat Gko Gapp


BERAT JENIS ASPAL (T) = 1.046 Agregat Kasar (AK) 2.52 2.63
Agregat Kasar Sedang (AKS) 3.28 3.46
Agregat Halus Abu batu (AH AB) 2.57 2.75
Agregat Halus Pasir (AH P) 2.65 2.74

No. PROPROSI BRT AGREGAT THDP BRT TOTAL KADAR BJ BJ BJ BERAT BENDA UJI (Gram) VOLUME BJ RONGGA RONGGA % RONGGA STABILITAS FLOW MARS PENYE
KODE CMPRN ASPAL BULK EFF. MAX KERING DALAM KERING BENDA BULK UDARA ANTAR VOLUME TERISI DI- DIKALI- DISE- QUOT RAPAN
BENDA AK AKS AH AB AH P (%) AGR. AGR CAMP. UDARA AIR PERM. UJI (cc) CAMP BTR AGR. ASPAL ASPAL BACA BRASI SUAIKAN (mm) Kg/mm ASPAL
UJI a b c d A B C D E F G H I J K L M N O P Q R S

Tot. Agr. 0.35 0.30 0.20 0.15

I 0.333 0.285 0.190 0.143 5 2.74 2.81 2.592 1080.00 661.0 1125.00 464.00 2.33 10.20 19.34 11.13 52.17 52 837.48 870.98 4.20 207.376 0.430
II 0.333 0.285 0.190 0.143 5 2.74 2.81 2.592 1100.00 699.8 1125.00 425.22 2.59 0.19 10.35 12.37 98.45 53 853.59 887.73 4.80 184.944 0.420
III 0.333 0.285 0.190 0.143 5 2.74 2.81 2.592 1115.00 650.2 1120.00 469.80 2.37 8.43 17.75 11.34 57.36 45 724.74 753.73 4.20 179.460 0.230
2.429 6 16 69 837.48 4.60 571.78 1.080

I 0.331 0.284 0.189 0.142 5.5 2.74 2.81 2.572 1115.00 650.2 1125.00 474.80 2.35 8.69 19.05 12.35 58.69 50 805.27 837.48 4.80 174.475 0.300
II 0.331 0.284 0.189 0.142 5.5 2.74 2.81 2.572 1100.00 660.2 1115.00 454.81 2.42 5.96 16.63 12.72 68.08 51 821.37 854.23 4.30 198.658 0.410
III 0.331 0.284 0.189 0.142 5.5 2.74 2.81 2.572 1080.00 661.0 1085.00 424.00 2.55 0.96 12.20 13.39 93.29 49 789.16 820.73 4.20 195.412 0.420
2.438 5.21 16 73.35 837.5 4.43 568.55 1.130

I 0.329 0.282 0.188 0.141 6 2.74 2.81 2.552 1080.00 661.0 1085.00 424.00 2.55 0.20 12.66 14.61 98.66 58 934.11 971.48 3.90 249.097 0.240
II 0.329 0.282 0.188 0.141 6 2.74 2.81 2.552 1100.00 660.2 1120.00 459.80 2.39 6.26 17.97 13.72 68.66 51 821.37 854.23 3.60 237.286 0.300
III 0.329 0.282 0.188 0.141 6 2.74 2.81 2.552 1130.00 634.9 1135.00 500.10 2.26 11.47 22.52 12.96 53.06 52 837.48 870.98 4.20 207.376 0.420
2.400 5.98 17.72 73.46 898.9 3.90 693.76 0.960

I 0.327 0.281 0.187 0.140 6.5 2.74 2.81 2.533 1080.00 661.0 1090.00 429.00 2.52 0.61 14.14 15.64 96.27 49 789.16 820.73 3.90 210.444 0.500
II 0.327 0.281 0.187 0.140 6.5 2.74 2.81 2.533 1130.00 634.9 1135.00 500.10 2.26 10.79 22.93 14.04 56.55 56 901.90 937.98 4.90 191.424 0.230
III 0.327 0.281 0.187 0.140 6.5 2.74 2.81 2.533 1100.00 660.2 1120.000 459.80 2.39 5.55 18.41 14.87 72.83 45 724.74 753.73 4.30 175.287 0.400
2.390 5.65 18.49 75.22 837.5 4.60 577.15 1.130

I 0.326 0.279 0.186 0.140 7 2.74 2.81 2.514 1130.00 656.0 1135.00 479.00 2.36 6.15 19.97 15.79 71.96 45 724.74 753.73 4.90 153.823 0.400
II 0.326 0.279 0.186 0.140 7 2.74 2.81 2.514 1120.00 670.2 1130.00 459.81 2.44 3.10 17.37 16.30 84.02 48 773.06 803.98 3.80 211.574 0.410
III 0.326 0.279 0.186 0.140 7 2.74 2.81 2.514 1160.00 673.0 1175.00 502.00 2.31 8.07 21.61 15.46 65.70 53 853.59 930.41 3.90 238.566 0.380
2.369 5.775 19.65 73.89 829.37 4.20 603.96 1.190

SPESIFIKASI HRS BASE = 4-6 min 16 > 68 min 800 min 3 min 250 max 1.2

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium
ISMAR RIDWAN
GRAFIK PENGUJIAN MARSHALL TEST
LATASTON (HRS-WC)

GRAFIK HUBUNGAN KADAR ASPAL VS BJ. BULK CAMPURAN GRAFIK HUBUNGAN


KADAR ASPAL VS RON

RONGGA UDARA (%)


2.450
9.00
DENSITY(t/m3)

8.00
2.400
7.00

6.00
2.350
5.00

2.300 4.00

3.00
2.250 2.00

1.00
2.200 4 5 6 7
4 5 6 7 8 9

KADAR ASPAL (%) KADAR ASPAL (


RONGGA ANTAR BUTIR AGGREGAT (%)

RONGGA TERISI ASPAL (%)

GRAFIK HUBUNGAN KADAR ASPAL V

GRAFIK HUBUNGAN KADAR ASPAL VS RONGGA ANTAR BUTIR AGGREGAT 90.00

85.00

80.00
20.00
75.00
19.00 70.00

18.00 65.00

60.00
17.00
55.00
16.00 50.00

15.00 45.00

40.00
14.00 4 5 6 7
4 5 6 7 8 9
KADAR ASPAL (%)
KADAR ASPAL (%)

GRAFIK HUBUNGAN KADAR ASPAL VS STABILITAS GRAFIK HUBUNGAN


STABILITAS (KG)

6.00
2400.00

2200.00 5.50
FLOW(mm)

2000.00
5.00
1800.00

1600.00
4.50
1400.00

1200.00 4.00

1000.00
3.50
800.00

600.00 3.00
4 5 6 7 8 9 4 5 6 7 8 9
2200.00 5.50

STAB

FLOW(mm)
2000.00
5.00
1800.00

1600.00
4.50
1400.00

1200.00 4.00

1000.00
3.50
800.00

600.00 3.00
4 5 6 7 8 9 4 5 6 7 8 9

KADAR ASPAL (%) KADAR ASPAL (%)


IK PENGUJIAN MARSHALL TEST
LATASTON (HRS-WC)

GRAFIK HUBUNGAN
KADAR ASPAL VS RONGGA UDARA
RONGGA UDARA (%)

9.00

8.00

7.00

6.00

5.00

4.00

3.00

2.00

1.00
4 5 6 7 8 9

KADAR ASPAL (%)


RONGGA TERISI ASPAL (%)

GRAFIK HUBUNGAN KADAR ASPAL VS RONGGA TERISI ASPAL

90.00

85.00

80.00

75.00

70.00

65.00

60.00

55.00

50.00

45.00

40.00
4 5 6 7 8 9
KADAR ASPAL (%)

GRAFIK HUBUNGAN KADAR ASPAL VS FLOW

6.00

5.50
FLOW(mm)

5.00

4.50

4.00

3.50

3.00
4 5 6 7 8 9
5.50

FLOW(mm)
5.00

4.50

4.00

3.50

3.00
4 5 6 7 8 9

KADAR ASPAL (%)


LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK UNKHAIR
Jl. Pertamina Kampus II Gambesi Kel. Gambesi, Ternate

Pengujian : Analisis Saringan Dikerjakan Oleh : Kelompok 4


Pekerjaan : Praktikum Diperiksa Oleh : Siti Aulia Ramadha
Jenis Material : AbuAbu Batu Tanggal : 5 November 2019

PEMERIKSAAN ANALISA SARINGAN AGREGAT

Berat Kering Cont 1500 gr

perse
Ukur Berat n
Berat
an tertah kumulatif persen total total
persen lolos
tertah
kumulatif terahan
Sari an tertahan tertahan tertah
an
ngan an

1 0 0.00 0 100 0 0.00 0


3/4 0 0.00 0.00 100 0 0.00 0
1/2 0 0.00 0.00 100 0 0.00 0
3/8 0 0.00 0.00 100 0 0.00 0
4 0 0.00 0.00 100.00 0 0.00 0.0
8 335 335.00 15.23 84.77 310 310.00 14.9
30 1475 1,810.00 82.27 17.73 1440 1750.00 84.1
50 140 1,950.00 88.64 11.36 110 1860.00 89.4
### 215 2,165.00 98.41 1.59 185 2045.00 98.3
### 30 2,195.00 99.77 0.23 30 2075.00 99.8
pan 5 2,200.00 100.00 0.00 5 2080.00 100

ABUBATU
100
90 Laboraturium Jalan Dan A
80
70
Fakultas Teknik Program S
60 ABUBATU Asisten Laboraturium
50
40
30
20
10
100
90
80
70
60 ABUBATU
50
40
30
20
10
ISMAR RIDWAN
0
1 NPM:0723
nate

: Kelompok 4
: Siti Aulia Ramadhany, ST
: 5 November 2019

persen lolos
persen lolos

rata-rata
100 100
100 100
100 100
100 100
100.0 100.00
85.1 84.93
15.9 16.80
10.6 10.97
1.7 1.64
0.2 0.23
0 0

Laboraturium Jalan Dan Aspal


Fakultas Teknik Program Studi Teknik Sipil
Asisten Laboraturium
ISMAR RIDWAN
NPM:07231511096