DAFTAR USULAN PERUBAHAN KUANTITAS DAN HARGA ( BALA
(B). Pemeliharaan Rutin Jalan
Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Penyedia Jasa : PT. IRENDO REKATAMA PERTIWI
No. Mata Harga KUANTITAS JUMLAH HARGA ( Rp ) BOBOT
Satuan
Uraian Pekerjaan Satuan
Pembayaran Kontrak Perubahan Kontrak Perubahan Kontrak
(Rp.)
1. UMUM
1.2 Mobilisasi Ls 206,900,000.00 0.10 0.10 20,690,000.00 20,690,000.00 1.406
Jumlah Harga Pekerjaan DIVISI 1 20,690,000.00 20,690,000.00 1.406
Di setujui : Di periksa :
PPK 1.1 Konsultan Supervisi
Provinsi Kalimantan Barat PT. ARISTA CIPTA
1.406 - - - - - - ###
1.406 - - ###
Di buat :
Penyedia Jasa
PT. IRENDO REKATAMA PERTIWI
……………………………..
Satuan
Kuantitas Perubahan (%)
Uraian Pekerjaan KET
Pembayaran Kontrak Perubahan
Tambah (+) Kurang (-) Tambah (+) Kurang (-)
1. UMUM
1.2 Mobilisasi Ls 0.10 0.10 - - - -
Jumlah Harga Pekerjaan DIVISI 1 -
-
9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN -
Item baru diperlukan untuk penanganan lokasi yang dilakukan penghamparan Campuran Aspal
9.2.(1) Marka Jalan Termoplastik Item Baru M2 45.16 45.160 - - - Panas
Jumlah Harga Pekerjaan DIVISI 9 -
-
10. PEKERJAAN PEMELIHARAAN KINERJA -
Berkurang karena tidak banyak lokasi yang memerlukan penanganan menggunakan LPA, kondisi
10.1 (4) Perbaikan Lapis Pondasi Agregat Klas A M3 474.54 15.00 - 459.540 - 96.84%
existing jalan relatif masih bagus atau tidak banyak terjadi retak/lubang pada badan jalan.
10.1 (6) Perbaikan Lapis Pondasi Agregat Klas S M3 316.38 348.018 31.638 - 10.00% - Bertambah untuk mengakomodir bahu jalan rendah banyak tergerus / turun dari tepi permukaan
aspal existing
Perbaikan Lapis Pondasi Agregat Klas Nego Harga* M3 503.80 503.800 - 159.24% -
Bertambah dikarenakan adanya penanganan lokasi yang terjadi penurunan dan perataan daerah
10.1 (9) Perbaikan Campuran Aspal Panas M3 189.82 203.24 13.420 - 7.07% - bergelombang.
Berkurang karena pekerjaan diperuntukkan pada saluran permanen sesuai pengukuran kondisi
10.1 (21) Pembersihan Drainase M1 41,145.00 29,445.52 - 11,699.480 - 28.43% lapangan
10.1 (22) Pengendalian Tanaman M2 2,113,840.00 1,971,769.80 - 142,070.200 - 6.72% Berkurang karena penyesuaian area pekerjaan.
Jumlah Harga Pekerjaan DIVISI 10
2. Kusnata, S.T. . .. . . . . . . . . . . . . . . .
Sekretaris ( Merangkap Anggota )
HERMAN NASUTION, S.T., M.T. Ir. TABAING GILMAN M. NUNUNG BINARTO AJI, S.T.
NIP. 19670504 200604 1 005 Site Engineer General Suprintendent 3. Dian Prahasa, S. . .. . . . . . . . . . . . . . . .
Anggota
4. Ahmadi, S.T. . .. . . . . . . .. . . . . . . .
Anggota
5. Ika Mutiawati, . .. . . . . . . . . . . . . . . .
Anggota
Satuan
Uraian Pekerjaan Satuan
Pembayaran Kontrak Perubahan Kontrak Perubahan
(Rp.)
1. UMUM
1.2 Mobilisasi Ls 206,900,000.00 0.10 0.10 20,690,000.00 20,690,000.00
Jumlah Harga Pekerjaan DIVISI 1 20,690,000.00 20,690,000.00
HERMAN NASUTION, S.T., M.T. Ir. TABAING GILMAN M. NUNUNG BINARTO AJI, S
NIP. 19670504 200604 1 005 Site Engineer General Suprintendent
Di setujui : Di periksa :
PPK 1.1 Konsultan Supervisi
Provinsi Kalimantan Barat PT. ARISTA CIPTA
1.406 1.406 - - - - - -
1.406 1.406 - -
Di buat :
Penyedia Jasa
PT. IRENDO REKATAMA PERTIWI
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Panjang
No Uraian
(m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Jumlah
Divisi : 10
No. Mata Pemb. : 10.1 (4)
Uraian Pekerjaan : Perbaikan Lapis Pondasi Agregat Klas A
Satuan : M3
Panjang
No Uraian
(m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Divisi : 10
No. Mata Pemb. : 10.1 (6)
Uraian Pekerjaan : Perbaikan Lapis Pondasi Agregat Klas S
Satuan : M3
Panjang
No Uraian
(m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Jumlah
Divisi : 10
No. Mata Pemb. : 10.1 (9)
Uraian Pekerjaan : Perbaikan Campuran Aspal Panas
Satuan : M3
Panjang
No Uraian
(m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Jumlah
REKAPITULASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Divisi : 10
No. Mata Pemb. : 10.1 (21)
Uraian Pekerjaan : Pembersihan Drainase
Satuan : M1
Panjang
No Uraian
(m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Jumlah
Divisi : 10
No. Mata Pemb. : 10.1 (22)
Uraian Pekerjaan : Pengendalian Tanaman
Satuan : M2
Panjang
No Uraian
(m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak & Tgl : IK.02.04/PJN.WIL.I-KB/01/2019, Tanggal 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Jumlah
Jumlah X 10 Periode
N PEKERJAAN LAIN-LAIN
Kuantitas
KETERANGAN
M2
Err:509
21.16
-
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Err:509
Kuantitas
KETERANGAN
M3
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Kuantitas
KETERANGAN
M3
851.82
-
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
851.82
Kuantitas
KETERANGAN
M3
7.93
1.32
0.10
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
0.31
79.58
20.10
10.50
119.84
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Kuantitas
KETERANGAN
M1
155.50
8,048.30
149.70
401.00
380.00
178.10
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
9,312.60
Kuantitas
KETERANGAN
M2
42,483.90
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
68,382.93
10,872.13
7,085.00
64,750.53
3,602.50
ASI DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
197,176.98
1,971,769.80
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Dimensi
Posisi Jarak
No Station Type Marka Lebar Panjang
Ki/CL/Ka (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Dimensi
Posisi Jarak
No Station Type Marka Lebar Panjang
Ki/CL/Ka (m) (m) (m)
Jumlah s/d H
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Dimensi
Posisi Jarak
No Station Type Marka Lebar Panjang
Ki/CL/Ka (m) (m) (m)
No Type
1 Putus - putus
2 Solid
KUANTITAS
tifikasi
Luas Jumlah
Marka Marka Kuantitas Keterangan
(m2) (Bh) (m2)
Luas Jumlah
Marka Marka Kuantitas Keterangan
(m2) (Bh) (m2)
Jumlah : 45.16
Jumlah s/d Halaman ini : 45.16
Diajukan oleh,
Penyedia Jasa
PT. Irendo Rekatama Pertiwi
Ari Hidayat
Quantity Engineer
KUANTITAS
tifikasi
Luas Jumlah
Marka Marka Kuantitas Keterangan
(m2) (Bh) (m2)
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Tebal
Panjang Lebar
No Station Posisi T1 T2 T3
(m') (m') (m') (m') (m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Tebal
Panjang Lebar
No Station Posisi T1 T2 T3
(m') (m') (m') (m') (m')
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Tebal
Panjang Lebar
No Station Posisi T1 T2 T3
(m') (m') (m') (m') (m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Tebal
Panjang Lebar
No Station Posisi T1 T2 T3
(m') (m') (m') (m') (m')
Jumlah
Tebal
Luas Kuantitas
Rata-Rata Keterangan
(m') (m2) (m3)
Tebal
Luas Kuantitas
Rata-Rata Keterangan
(m') (m2) (m3)
Jumlah 851.82
Jumlah s/d Halaman ini 851.82
0.150 225.00
0.120 120.00
0.120 143.78
0.120 150.00
KUANTITAS
ifikasi
Tebal
Luas Kuantitas
Rata-Rata Keterangan
(m') (m2) (m3)
0.100 37.50
0.120 142.50
0.150 315.00
0.100 150.00
0.160 162.00
0.130 135.00
0.100 75.00
0.100 37.50
0.100 37.50
0.100 75.00
0.090 37.50
0.090 112.50
0.100 37.50
0.100 112.50
0.10 37.50
0.10 37.50
0.10 37.50
0.10 37.50
0.09 75.00
0.10 300.00
0.13 187.50
0.12 187.50
0.10 37.50
0.10 37.50
0.10 22.50
0.10 37.50
0.10 37.50
0.10 37.50
0.10 187.50
0.10 75.00
0.10 37.50
KUANTITAS
ifikasi
Tebal
Luas Kuantitas
Rata-Rata Keterangan
(m') (m2) (m3)
0.10 75.00
0.10 75.00
0.10 37.50
0.10 37.50
0.10 675.00
0.10 37.50
0.20 30.00
0.10 255.00
Jumlah -
Jumlah s/d Halaman ini 851.82
Diajukan oleh,
Penyedia Jasa
PT. Irendo Rekatama Pertiwi
Ari Hidayat
Quantity Engineer
DATA PENDUKUNG KUANTIT
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar Teb
Panjang Rata-
No Station Posisi Awal Akhir T1
Rata
(m') (m') (m') (m') (m')
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar Teb
Panjang Rata-
No Station Posisi Awal Akhir T1
Rata
(m') (m') (m') (m') (m')
Tebal
Rata- Luas Kuantitas
T2 T3 Keterangan
Rata
(m') (m') (m') (m2) (m3)
Tebal
Rata- Luas Kuantitas
T2 T3 Keterangan
Rata
(m') (m') (m') (m2) (m3)
Jumlah 119.84
Jumlah s/d Halaman ini 119.84
Diajukan oleh,
Penyedia Jasa
PT. Irendo Rekatama Pertiwi
Ari Hidayat
Quantity Engineer
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019 No. Mata Pemby
Tanggal Kontrak : 15 Februari 2019 Item Pekerjaan
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan Satuan
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019 No. Mata Pemby
Tanggal Kontrak : 15 Februari 2019 Item Pekerjaan
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan Satuan
Jumlah 4,646.40
Jumlah s/d Halaman ini 4,646.40
Ruas : 006 Singkawang - Tebas
37 28+083 - 28+088 Ki-Ka 5.00 8.80 8.80
38 32+181 - 32+185 Ki-Ka 4.00 11.00 11.00
39 32+801 - 32+804 Ki-Ka 3.00 11.00 11.00
40 45+424 - 45+429 Ki-Ka 5.00 10.80 10.80
41 46+544 - 46+551 Ki-Ka 7.00 10.90 10.90
42 47+732 - 47+733 Ki-Ka 1.00 9.40 9.40
43 47+860 - 47+861 Ki-Ka 1.00 12.00 12.00
44 48+518 - 48+519 Ki-Ka 1.00 11.70 11.70
45 48+786 - 48+787 Ki-Ka 1.00 11.40 11.40
46 49+447 - 49+448 Ki-Ka 1.00 12.20 12.20
47 50+499 - 50+500 Ki-Ka 1.00 13.70 13.70
48 51+137 - 51+138 Ki-Ka 1.00 11.00 11.00
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019 No. Mata Pemby
Tanggal Kontrak : 15 Februari 2019 Item Pekerjaan
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan Satuan
Jumlah 684.60
Jumlah s/d Halaman ini 5,331.00
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019 No. Mata Pemby
Tanggal Kontrak : 15 Februari 2019 Item Pekerjaan
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan Satuan
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019 No. Mata Pemby
Tanggal Kontrak : 15 Februari 2019 Item Pekerjaan
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan Satuan
Jumlah 380.00
Jumlah s/d Halaman ini 5,711.00
Ruas : Jalan Merdeka (Sambas)
1 0+100 - 0+150 Ka 0.80 50.00 50.00
2 1+720 - 1+752 Ki 0.80 35.60 35.60
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019 No. Mata Pemby
Tanggal Kontrak : 15 Februari 2019 Item Pekerjaan
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan Satuan
Jumlah 178.10
Jumlah s/d Halaman ini 5,889.10
x 5 Periode 29,445.52
Keterangan
Box Culvert
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
: 10.1 (21)
: Pembersihan Drainase
: M1
Keterangan
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Saluran Mortar
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Saluran Mortar
Saluran Mortar
Saluran Mortar
Box Culvert
Box Culvert
: 10.1 (21)
: Pembersihan Drainase
: M1
Keterangan
Mortar
Mortar
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Gorong-Gorong
Box Culvert
Gorong-Gorong
Box Culvert
Gorong-Gorong
Box Culvert
Box Culvert
Gorong-Gorong
Gorong-Gorong
Box Culvert
Gorong-Gorong
Box Culvert
Box Culvert
Gorong-Gorong
: 10.1 (21)
: Pembersihan Drainase
: M1
Keterangan
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Box Culvert
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Box Culvert
Gorong-Gorong
Box Culvert
Gorong-Gorong
Gorong-Gorong
Box Culvert
Box Culvert
Gorong-Gorong
Box Culvert
Gorong-Gorong
Gorong-Gorong
Box Culvert
Box Culvert
Box Culvert
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
Gorong-Gorong
: 10.1 (21)
: Pembersihan Drainase
: M1
Keterangan
Saluran Mortar
Saluran Mortar
Jembatan Komposit
Box Culvert
Box Culvert
Gorong-Gorong
Box Culvert
Box Culvert
Jembatan Komposit
Box Culvert
Box Culvert
Gorong-Gorong
Gorong-Gorong
Box Culvert
: 10.1 (21)
: Pembersihan Drainase
: M1
Keterangan
Diajukan oleh,
Penyedia Jasa
PT. Irendo Rekatama Pertiwi
Ari Hidayat
Quantity Engineer
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Ruas : 007 Sei Duri - Singkawang
56 31+300 - 31+550 Ki 250.00 2.00 2.00 2.00
57 31+550 - 31+700 Ki 150.00 2.00 2.00 2.00
58 32+325 - 32+500 Ki 175.00 2.50 2.50 2.50
59 32+700 - 32+910 Ki 210.00 2.50 2.50 2.50
60 32+300 - 32+500 Ki 200.00 2.00 2.00 2.00
61 32+700 - 33+000 Ki 300.00 2.00 2.00 2.00
62 33+000 - 33+150 Ki 150.00 2.00 2.00 2.00
63 33+300 - 33+430 Ki 130.00 1.50 1.50 1.50
64 33+480 - 33+625 Ki 145.00 2.00 2.00 2.00
65 33+710 - 33+800 Ki 90.00 3.00 3.00 3.00
66 34+600 - 35+300 Ki 700.00 1.50 1.50 1.50
67 36+500 - 36+760 Ki 260.00 2.00 2.00 2.00
68 36+860 - 37+200 Ki 340.00 1.50 1.50 1.50
69 37+400 - 37+500 Ki 100.00 1.50 1.50 1.50
70 40+550 - 40+600 Ki 50.00 1.50 1.50 1.50
71 41+300 - 41+500 Ki 200.00 3.00 3.00 3.00
72 41+500 - 41+825 Ki 325.00 3.00 3.00 3.00
73 42+075 - 42+300 Ki 225.00 2.00 2.00 2.00
74 42+410 - 42+480 Ki 70.00 2.00 2.00 2.00
75 42+500 - 42+700 Ki 200.00 2.00 2.00 2.00
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Ruas : 007 Sei Duri - Singkawang
1 1+014 - 1+051 Ka 37.00 1.90 1.90 1.90
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Ruas : 007 Sei Duri - Singkawang
56 25+500 - 25+800 Ka 300.00 2.50 2.50 2.50
57 26+000 - 26+200 Ka 200.00 2.50 2.50 2.50
58 26+400 - 26+500 Ka 100.00 2.50 2.50 2.50
59 27+075 - 27+100 Ka 25.00 3.00 3.00 3.00
60 27+400 - 27+700 Ka 300.00 3.00 3.00 3.00
61 28+100 - 28+200 Ka 100.00 3.00 3.00 3.00
62 28+700 - 28+800 Ka 100.00 3.00 3.00 3.00
63 29+300 - 29+385 Ka 85.00 1.50 1.50 1.50
64 30+700 - 30+800 Ka 100.00 2.50 2.50 2.50
65 30+900 - 31+000 Ka 100.00 2.50 2.50 2.50
66 31+300 - 31+500 Ka 200.00 2.50 2.50 2.50
67 31+500 - 31+700 Ka 200.00 2.50 2.50 2.50
68 32+300 - 32+500 Ka 200.00 2.00 2.00 2.00
69 32+700 - 32+825 Ka 125.00 2.00 2.00 2.00
70 32+925 - 33+135 Ka 210.00 2.00 2.00 2.00
71 33+275 - 33+575 Ka 300.00 2.00 2.00 2.00
72 33+720 - 33+800 Ka 80.00 1.50 1.50 1.50
73 34+600 - 35+000 Ka 400.00 1.50 1.50 1.50
74 35+000 - 35+200 Ka 200.00 1.50 1.50 1.50
75 35+240 - 35+300 Ka 60.00 2.50 2.50 2.50
76 36+760 - 37+200 Ka 440.00 2.00 2.00 2.00
77 37+400 - 37+500 Ka 100.00 2.00 2.00 2.00
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Ruas : 006 Singkawang - Tebas
1 0+185 - 0+225 Ki 40.00 2.50 2.50 2.50
2 0+150 - 0+195 Ka 45.00 2.50 2.50 2.50
3 0+225 - 0+235 Ki 10.00 1.00 1.00 1.00
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Ruas : Jalan Merdeka (Sambas)
1 1+925 - 1+950 Ki 25.00 1.00 1.00 1.00
2 1+950 - 2+000 Ki 50.00 1.00 1.00 1.00
3 2+000 - 2+050 Ki 50.00 1.00 1.00 1.00
4 2+050 - 2+100 Ki 50.00 1.00 1.00 1.00
5 2+100 - 2+150 Ki 50.00 1.00 1.00 1.00
6 2+150 - 2+200 Ki 50.00 1.00 1.00 1.00
7 2+200 - 2+250 Ki 50.00 1.00 1.00 1.00
8 2+250 - 2+300 Ki 50.00 1.00 1.00 1.00
9 2+300 - 2+350 Ki 50.00 1.00 1.00 1.00
10 2+350 - 2+400 Ki 50.00 1.00 1.00 1.00
11 2+400 - 2+450 Ki 50.00 1.00 1.00 1.00
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Ruas : Jalan Merdeka (Sambas)
55 3+100 - 3+150 Ka 50.00 1.50 1.50 1.50
56 3+150 - 3+200 Ka 50.00 1.50 1.50 1.50
57 3+200 - 3+250 Ka 50.00 1.50 1.50 1.50
58 3+250 - 3+300 Ka 50.00 1.50 1.50 1.50
59 3+300 - 3+350 Ka 50.00 1.50 1.50 1.50
60 3+350 - 3+400 Ka 50.00 1.50 1.50 1.50
DATA PENDUKUNG KUANTITAS
Draft Teknis Justifikasi
Nama Paket : Preservasi Jalan Ruas Galing - Sambas - Singkawang - Sei Duri
Penyedia Jasa : PT. Irendo Rekatama Pertiwi
No. Kontrak : IK.02.04/PJN.WIL.I-KB/01/2019
Tanggal Kontrak : 15 Februari 2019
Lingkup Pekerjaan : (B). Pemeliharaan Rutin Jalan
Lebar
Posisi Panjang
No Station Awal Akhir Rata - rata
(Ki/Ka) (m) (m) (m) (m)
Jumlah
Jumlah s/d Halaman ini
Jumlah s/d Halaman ini x 10 Periode
Kuantitas
Keterangan
(m2)
66.00
48.00
70.40
70.20
150.00
22.80
42.00
63.00
57.50
240.00
120.00
60.00
11.00
24.00
8.50
50.00
164.00
300.00
48.00
37.00
339.00
120.00
30.00
35.00
104.00
100.00
96.00
30.00
30.00
60.00
45.00
20.00
37.50
145.00
66.00
210.00
120.00
30.00
135.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
50.00
70.50
72.00
75.00
147.60
325.00
127.50
600.00
300.00
900.00
300.00
600.00
60.00
270.00
50.00
250.00
7,602.50
500.00
300.00
437.50
525.00
400.00
600.00
300.00
195.00
290.00
270.00
1,050.00
520.00
510.00
150.00
75.00
600.00
975.00
450.00
140.00
400.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
400.00
495.00
787.50
650.00
262.50
112.50
135.00
204.00
637.50
300.00
187.50
12,859.00
70.30
NTITAS
asi
Kuantitas
Keterangan
(m2)
5.00
25.20
58.80
70.20
19.00
140.00
39.60
84.00
85.00
117.50
330.00
45.60
438.00
292.00
65.00
487.50
30.00
25.00
13.00
22.00
100.00
15.00
55.00
175.00
40.00
10.00
22.50
34.50
240.00
87.50
60.00
10.00
40.00
127.50
22.00
22.00
88.00
20.00
162.00
25.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
48.00
5.00
126.00
25.00
7.20
57.50
475.00
72.00
50.00
72.00
30.00
270.00
48.00
1,000.00
6,104.40
750.00
500.00
250.00
75.00
900.00
300.00
300.00
127.50
250.00
250.00
500.00
500.00
400.00
250.00
420.00
600.00
120.00
600.00
300.00
150.00
880.00
200.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
1,150.00
1,275.00
45.00
262.50
300.00
450.00
975.00
525.00
400.00
200.00
650.00
262.50
100.00
127.50
262.50
310.50
15,918.00
100.00
112.50
10.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
2.50
15.00
20.00
5.00
12.00
12.00
1.20
28.00
30.00
22.80
18.00
10.00
31.50
49.00
90.00
50.00
169.20
5.00
150.00
60.00
46.50
31.00
20.00
150.00
437.50
150.00
30.00
20.00
80.00
137.50
172.80
30.00
18.00
87.00
22.00
12.50
40.00
225.00
44.00
25.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
25.00
187.50
1,280.00
1,000.00
750.00
102.50
512.50
300.00
1,080.00
2,100.00
1,020.00
1,200.00
12,340.00
200.00
200.00
205.20
225.00
2,400.00
600.00
156.00
520.00
1,140.00
570.00
1,000.00
2,750.00
1,426.00
245.00
517.50
1,713.50
920.00
230.00
1,400.00
700.00
1,531.25
875.00
840.00
60.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
720.00
5,600.00
1,812.50
650.00
400.00
125.00
6.00
91.98
313.50
525.80
27.50
320.00
1,080.00
270.00
777.00
612.50
650.00
465.00
850.00
1,850.00
740.00
1,575.00
972.00
1,260.00
720.00
1,890.00
300.00
2,250.00
2,250.00
1,000.00
50,528.23
520.00
990.00
108.00
20.00
2,125.80
NTITAS
asi
Kuantitas
Keterangan
(m2)
384.00
338.40
82.50
400.00
96.00
250.00
200.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
5,514.70
5.00
5.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
100.00
50.00
300.00
200.00
375.00
50.00
450.00
125.00
125.00
170.00
56.25
100.00
100.00
200.00
200.00
52.50
NTITAS
asi
Kuantitas
Keterangan
(m2)
53.13
150.00
135.00
20.00
25.00
37.50
25.00
22.50
20.00
21.25
15.00
27.50
50.00
95.00
137.50
135.00
10.00
17.50
125.00
110.00
105.00
112.50
112.50
107.50
107.50
50.00
100.00
100.00
5,090.63
112.50
125.00
112.50
100.00
87.50
87.50
75.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
75.00
112.50
75.00
75.00
100.00
112.50
100.00
112.50
125.00
125.00
125.00
125.00
125.00
87.50
75.00
112.50
112.50
100.00
100.00
100.00
75.00
87.50
87.50
87.50
100.00
100.00
100.00
100.00
137.50
112.50
112.50
100.00
112.50
125.00
75.00
125.00
62.50
312.50
50.00
45.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
100.00
136.50
50.00
100.00
75.00
62.50
112.50
5,519.00
132.50
130.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
262.50
87.00
33.00
725.00
580.00
290.00
3,600.00
1,770.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
1,180.00
641.25
290.00
769.95
285.00
118.00
570.00
280.00
142.50
435.00
885.00
435.00
435.00
290.00
442.50
675.45
870.00
832.50
855.00
855.00
870.00
450.00
295.00
590.00
1,150.00
570.00
1,180.00
3,000.00
503.13
1,180.00
1,387.50
2,012.50
1,050.00
6,916.88
1,140.00
662.50
825.00
474.38
750.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
1,140.00
1,387.50
570.00
737.50
684.00
47,898.03
832.50
885.00
855.00
2,400.00
285.00
580.00
1,710.00
1,180.00
2,517.50
3,135.00
2,065.00
7,492.50
NTITAS
asi
Kuantitas
Keterangan
(m2)
23,937.50
25.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
45.00
57.50
62.50
62.50
72.50
67.50
33.75
33.75
60.00
60.00
60.00
60.00
60.00
67.50
75.00
75.00
75.00
75.00
75.00
75.00
62.50
50.00
62.50
75.00
75.00
75.00
75.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
75.00
75.00
75.00
75.00
3,152.50
75.00
75.00
75.00
75.00
75.00
75.00
NTITAS
asi
Kuantitas
Keterangan
(m2)
450.00
197,176.98
1,971,769.80
Diajukan oleh,
Penyedia Jasa
PT. Irendo Rekatama Pertiwi
Ari Hidayat
Quantity Engineer