Anda di halaman 1dari 40

ITEM PEMBAYARAN NO. : 1.

2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = #REF! %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 20,000 500 10,000,000

B. PERALATAN
Periksa lembar 1.2-2 260,300,000

C. FASILITAS KONTRAKTOR
1 Base Camp M2 150 50,000 7,500,000
2 Kantor M2 60 75,000 4,500,000
3 Barak M2 60 45,000 2,700,000
4 Bengkel M2 100 25,000 2,500,000
5 Gudang, dan lain-lain M2 100 25,000 2,500,000
6 ...................... .... 0 0 0

D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000 5,940,000

2 Soil & Aggregate Testing


Compaction Test Set 1 15,000,000 15,000,000
CBR Test Set 1 20,000,000 20,000,000
Specific Gravity Set 1 5,000,000 5,000,000
Atterberg Limits Set 1 5,000,000 5,000,000
Grain Size Analysis Set 1 12,500,000 12,500,000
Field Density Test by Sand Cone Methode Set 2 6,500,000 13,000,000
Moisture Content Set 2 6,000,000 12,000,000
Abrasion of Aggregate by Los Angeles Machine Bln 2 5,000,000 10,000,000

3 Bituminous Testing
Marshall Asphalt Test Set 1 20,000,000 20,000,000
Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000 9,000,000
Specific Gravity for Coarse Aggregate Set 1 9,000,000 9,000,000
Specific Gravity for Fine Aggregate Set 1 9,000,000 9,000,000
Mix Air Viod Content (Accurate Method) Set 1 15,000,000 15,000,000
Core Drill Set 1 15,000,000 15,000,000
Metal Thermometer Set 1 1,000,000 1,000,000
Accessories and Tolls Set 1 5,000,000 5,000,000
Penetration Test Bln 6 1,000,000 6,000,000
Softening Point Set 1 6,000,000 6,000,000
Refusal Density Compactor Set 1 15,000,000 15,000,000

4 Concrete Testing
Slump Cone Set 1 500,000 500,000
Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000 10,000,000
Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000 10,000,000
Crushing Machine Set 1 50,000,000 50,000,000

5 Pendukung (Periksa Fasilitas Laboratorium) 225,000,000

6 Operasional (Periksa Fasilitas Laboratorium) 276,000,000

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS 1 100,000,000 100,000,000
2 Pemeliharaan Jalan Kerja / Samping LS 1 100,000,000 100,000,000
3 ...................... .... 0
4 ...................... .... 0
5 ...................... .... 0
6 ...................... .... 0

E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 5,000,000 5,000,000
2 ...................... .... 0 0 0
3 ...................... .... 0 0 0
4 ...................... .... 0 0 0
5 ...................... .... 0 0 0
6 ...................... .... 0 0 0

F. DEMOBILISASI LS 1 78,090,000 78,090,000

Total Biaya Mobilisasi 1,353,030,000


Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit 1 200,000,000 200,000,000


2 ASPHALT FINISHER E02 Unit 1 500,000 500,000
3 ASPHALT SPRAYER E03 Unit 1 100,000 100,000
4 BULLDOZER 100-150 HP E04 Unit 1 500,000 500,000
5 COMPRESSOR 4000-6500 L\M E05 Unit 1 150,000 150,000
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1 100,000 100,000
7 CRANE 10-15 TON E07 Unit 1 150,000 150,000
8 DUMP TRUCK 6 TON E08 Unit 18 150,000 2,700,000
9 DUMP TRUCK 10 TON E09 Unit 5 150,000 750,000
10 EXCAVATOR 80-140 HP E10 Unit 3 500,000 1,500,000
11 FLAT BED TRUCK 3-4 M3 E11 Unit 1 150,000 150,000
12 GENERATOR SET E12 Unit 1 300,000 300,000
13 MOTOR GRADER >100 HP E13 Unit 1 500,000 500,000
14 TRACK LOADER 75-100 HP E14 Unit 1 500,000 500,000
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 500,000 500,000
16 THREE WHEEL ROLLER 6-8 T E16 Unit 2 500,000 1,000,000
17 TANDEM ROLLER 6-8 T. E17 Unit 1 500,000 500,000
18 TIRE ROLLER 8-10 T. E18 Unit 1 500,000 500,000
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1 500,000 500,000
20 CONCRETE VIBRATOR E20 Unit 5 50,000 250,000
21 STONE CRUSHER E21 Unit 1 40,000,000 40,000,000
22 WATER PUMP 70-100 mm E22 Unit 2 50,000 100,000
23 WATER TANKER 3000-4500 L. E23 Unit 1 150,000 150,000
24 PEDESTRIAN ROLLER E24 Unit 1 50,000 50,000
25 TAMPER E25 Unit 1 50,000 50,000
26 JACK HAMMER E26 Unit 2 50,000 100,000
27 FULVI MIXER E27 Unit 1 500,000 500,000
28 CONCRETE PUMP E28 Unit 2 500,000 1,000,000
29 TRAILER 20 TON E29 Unit 2 1,000,000 2,000,000
30 PILE DRIVER + HAMMER E30 Unit 2 1,000,000 2,000,000
31 CRANE ON TRACK 35 TON E31 Unit 2 1,000,000 2,000,000
32 WELDING SET E32 Unit 2 200,000 400,000
33 BORE PILE MACHINE E33 Unit 1 500,000 500,000
34 ASPHALT LIQUID MIXER E34 Unit 1 300,000 300,000
35 TRONTON E35 Unit 0
36 COLD MILLING MACHINE E37 Unit 0
37 ROCK DRILL BREAKER E36 Unit 0
38 COLD RECYCLER E38 Unit 0
39 HOT RECYCLER E39 Unit 0
40 AGGREGAT (CHIP) SPREADER E40 Unit 0
41 ASPHALT DISTRIBUTOR E41 Unit 0
42 SLIP FORM PAVER E42 Unit 0
43 CONCRETE PAN MIXER E43 Unit 0
44 CONCRETE BREAKER E44 Unit 0
45 ASPAHLT TANKER E45 Unit 0
46 CEMENT TANKER E46 Unit 0
47 CONCRETE MIXER (350) E47 Unit 0
48 VIBRATING RAMMER E48 Unit 0
49 TRUK MIXER (AGITATOR) E49 Unit 0
50 BORE PILE MACHINE E50 Unit 0
51 CRANE ON TRACK 75-100 TON E51 Unit 0
52
53

Total untuk Item B pada Lembar 1 260,300,000


FASILITAS LABORATORIUM

SATUAN PENGUKURAN : Lump sum


HARGA SATUAN : Rp. 779,940,000.00

HARGA
NO. URAIAN SATUAN VOLUME TOTAL KETERANGAN
SATUAN

I. Laboratory Building
1. Laboratory Building m2 108.00 55,000.00 5,940,000.00
SUB TOTAL 5,940,000.00

II. Soil & Aggregate Testing


1. Compaction Test Set 1.00 15,000,000.00 15,000,000.00 Beli
2. CBR Test Set 1.00 20,000,000.00 20,000,000.00 Beli
3 Specifc Gravity Set 1.00 5,000,000.00 5,000,000.00 Beli
4 Atterberg Limits Set 1.00 5,000,000.00 5,000,000.00 Beli
5 Grain Size Analysis Set 1.00 12,500,000.00 12,500,000.00 Beli
6 Field Density Test by Sand Cone Methode Set 2.00 6,500,000.00 13,000,000.00 Beli
7 Moisture Content Set 2.00 6,000,000.00 12,000,000.00 Beli
8 Abrasion of Aggregate by Los Angeles Machine Bln 2.00 5,000,000.00 10,000,000.00 Sewa
SUB TOTAL 92,500,000.00

III. Bituminous Testing


1. Marshall Asphalt Test Set 1.00 20,000,000.00 20,000,000.00 Beli
2. Extraction Test, Centrifuge/Reflux Method Set 1.00 9,000,000.00 9,000,000.00 Beli
3 Specific Gravity of Coarse Aggregate Set 1.00 9,000,000.00 9,000,000.00 Beli
4 Specific Gravity of Fine Aggregate Set 1.00 9,000,000.00 9,000,000.00 Beli
5 Mix Air Viod Content (Accurate Method) Set 1.00 15,000,000.00 15,000,000.00 Beli
6 Core Drill Set 1.00 15,000,000.00 15,000,000.00 Beli
7 Metal Thermometer Set 1.00 1,000,000.00 1,000,000.00 Beli
8 Accessories and Tolls Set 1.00 5,000,000.00 5,000,000.00 Beli
9 Penetration Test Bln 6.00 1,000,000.00 6,000,000.00 Beli
10 Softening Point Set 1.00 6,000,000.00 6,000,000.00 Beli
11 Refusal Density Compactor Set 1.00 15,000,000.00 15,000,000.00 Beli
SUB TOTAL 110,000,000.00

IV. Concrete Testing


1 Slump Cone Set 1.00 500,000.00 500,000.00 Beli
2 Cylinder/Cube Mould for Compressive Strength Set 1.00 10,000,000.00 10,000,000.00 Beli
3 Beam Mould for Flexural Strength Set 1.00 10,000,000.00 10,000,000.00 Beli
4 Crushing Machine Set 1.00 50,000,000.00 50,000,000.00 Beli
SUB TOTAL 70,500,000.00

V. Peralatan pendukung
1 Mobil Pick Up Unit 2.00 100,000,000.00 200,000,000.00 Beli
2 Komputer + Printer Set 1.00 10,000,000.00 10,000,000.00 Beli
3 Furniture Set 1.00 15,000,000.00 15,000,000.00 Beli
SUB TOTAL 225,000,000.00

VI. Operasional
Teknisi Laboratorium Bln 12.00 8,000,000.00 96,000,000.00
Tenaga Kerja Terampil Bln 60.00 3,000,000.00 180,000,000.00
SUB TOTAL 276,000,000.00

VII. Test Luar


Test Luar, sesuai kebutuhan atau atas Ls 1.00 0.00 0.00
perintah Direksi SUB TOTAL 0.00

TOTAL HARGA ( I - VII ) Rp 779,940,000.00

Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
DAFTAR HARGA SATUAN UPAH DAN BAHAN

Provinsi : Kalimantan Barat


Kabupaten : Kubu Raya

Harga Wilayah : 4 (Empat)


Tahun Anggaran : 2014

Harga Upah Harga Upah


No. Uraian Tenaga Kerja Kode (Orang/Hari) (Orang/Jam) Keterangan
Satuan Rp. Satuan Rp.
1 2 3 4 5 6 7 8
1 Mandor Lapangan L 061 Hari 105,000.00 Jam 15,000.00 HARGA
2 Mekanik L 071 Hari 105,000.00 Jam 15,000.00 SATUAN
3 Kepala Tukang L 073 Hari 105,000.00 Jam 15,000.00 SUDAH
4 Tukang L 079 Hari 100,000.00 Jam 14,285.71 TERMASUK
5 Operator Terlatih *) L 081 Hari 90,000.00 Jam 12,857.14 PAJAK
6 Operator Kurang Terlatih **) L 082 Hari 80,000.00 Jam 11,428.57 DAN
7 Pembantu Operator L 083 Hari 75,000.00 Jam 10,714.29 KEUNTUNGAN
8 Pekerja L 101 Hari 75,000.00 Jam 10,714.29
9 Pengawas - Hari 100,000.00 Jam 14,285.71
10 Pengatur - Hari 90,000.00 Jam 12,857.14

Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat
misal : Bulldozer, Grader, Whell, Loader, Asphalt Finisher, dll
**) Operator yang mengoperasikan peralatan untuk melayani pekerjaan yang agak ringan
misal : Stell Wheeled Roller, Stamper, Concrete Mixer / Mesin Pengaduk Beton dll

No Uraian Bahan Kode Satuan Harga Bahan Keterangan

1 2 3 4 5 6
1 Batu Belah 10 -15 cm M 020 M3 707,112.00
2 Batu Pecah 1 - 2 cm M 025 M3 875,051.10 Wilayah IV :
3 Pasir Urug / Timbun M 040 M3 248,856.00 Kecamatan Batu Ampar, Termasuk :
4 Pasir Ayak untuk Beton M 041 M3 248,856.00 Kecamatan Sungai Raya :
5 Timbunan Pilihan (Tanah Datang) M 050 M3 244,244.00 - Desa Pulau Limbung
6 Semen PC M 080 Zak 124,564.44 - Desa Gunung Tamang
Semen PC M 080 kg 2,491.29 - Desa Muara Baru
7 Minyak Diesel / Solar M 183 Lt 14,701.84 Kecamatan Sungai Ambawang :
8 Bensin Premium M 184 Lt 8,277.02 - Desa Teluk Bakung
9 Minyak Pelumas M 185 Lt 41,805.18 Kecamatan Teluk Pakedai :
10 Kayu Bulat / Dolken Dia 8-10 Cm - 4 M - Btg 21,615.59 - Desa Kuala Karang
11 Papan Mal Kls III - M3 2,862,234.38 - Desa Sungai Nibung
12 Paku Campuran - Kg 34,480.44 Kecamatan Terentang :
13 Plastik Filter Cor Beton - M2 6,136.63 - Desa Dungun
14 Besi Beton - Kg 24,729.71 - Desa Permata
15 Kawat Ikat Beton/Bendrat - Kg 31,141.11 - Desa Betuah
Kecamatan Kubu :
- Desa Mengkalang Jambu
- Desa Mengkalang Guntung
- Desa Sepakat Baru
- Desa Dungun
- Desa Permata
- Desa Betuah
INFORMASI UMUM
No. URAIAN INFORMASI

1. Nomor Paket Kontrak ###

2. Nama Paket ###

3. Propinsi / Kabupaten / Kotamadya ###

4. Lokasi pekerjaan Periksa lampiran


5. Kondisi jalan lama Aspal
6. Panjang efektif ( lihat sketsa di bawah ) 1.20 Kilometer ( Leff = a + b )
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 1.00 + 7.00 + 1.00 ) meter
8. Lebar Rencana ( bahu + perkerasan + bahu ) ( 2.00 + 7.00 + 2.00 ) meter
9. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.
10. Jangka waktu pelaksanaan pekerjaan 360 hari kalender
Atau : 12.00 bulan (Periode Pelaksanaan)

11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 4.93 Kilometer

Perhitungan didasarkan pada sketsa di bawah ini : L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

7.45 Km = a C 7.45 Km = b
A B
1.2 Km = c
Base Camp --------->
D

Kalkulasi Jarak Rata-Rata =

12. Jam kerja efektif dalam 1 hari 7.0 jam


13. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
14. Tingkat Suku Bunga Investasi Alat 15.00 %
15. Biaya Umum dan Keuntungan 0.00 % x Biaya Langsung

16. RINGKASAN METODE PELAKSANAAN

a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b. Pekerjaan Tanah dilaksanakan untuk perbaikan bahu jalan

c. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk bahu jalan

d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk pelapisan ulang permukaan jalan

e. Pekerjaan Pasangan Batu dilaksanakan untuk saluran air dan dinding penahan tanah

f. Pekerjaan Pengembalian Kondisi dilaksanakan untuk

17. Lokasi Quarry : Periksa lampiran.


a. Batu = Km.
b. Pasir = Km.
c. Tanah = Km.

18 Jumlah Jembatan = - Buah Periksa lampiran.

19 Total Bentang Jembatan = - M Periksa lampiran.

20 ....................................

21 ....................................
Analisa EI-716

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 7.1 (6).a


JENIS PEKERJAAN : Beton K-175 (Site Mix)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja L 101 jam 1.9277 10,714.29 20,654.04


2. Tukang L 079 jam 0.9639 14,285.71 13,769.36
3. Mandor L 061 jam 0.2410 15,000.00 3,614.46

JUMLAH HARGA TENAGA 38,037.87

B. BAHAN

1. Semen M 080 Kg 327.5400 2,491.29 815,996.73


2. Pasir beton M 041 M3 0.5024 248,856.00 125,021.43
3. Batu 1 - 2 cm M 025 M3 0.9053 875,051.10 792,140.01
4. Papan Mal - M3 0.0160 2,862,234.38 45,795.75
5. Paku - Kg 0.1280 34,480.44 4,413.50
6. Plastik Filter - M2 5.0000 6,136.63 30,683.15

JUMLAH HARGA BAHAN 1,814,050.57

C. PERALATAN

1. Conc. Mixer E47 jam 0.2410 82,861.65 19,966.66


2. Water Pump E22 jam 0.1205 37,388.32 4,504.62
3. Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 25,471.28

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,877,559.71

E. HARGA SATUAN PEKERJAAN 1,877,559.71

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-324

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2 (4).a


JENIS PEKERJAAN : Timbunan Batu dengan Manual
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L 101) Jam 0.6686 10,714.29 7,163.55


2. Mandor (L 061) Jam 0.0334 15,000.00 501.45

JUMLAH HARGA TENAGA 7,665.00

B. BAHAN

1. Bahan timbunan (M08) M3


- Batu Ukuran 10 / 15 cm M3 0.9920 707,112.00 701,455.10
- Batu Ukuran 5 - 7 cm M3 0.2480 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C. PERALATAN
1. Three Wheel Roller (E16) Jam 0.0535 276,094.02 14,784.15
2. Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 15,784.15

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


E. OVERHEAD & PROFIT 0 % x D Err:509
E. HARGA SATUAN PEKERJAAN Err:509

Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-321

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2 (1).b


JENIS PEKERJAAN : Timbunan Biasa Bahu Jalan
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L 101) Jam 1.0000 10,714.29 10,714.29


2 Mandor (L 061) Jam 0.0833 15,000.00 1,250.00

JUMLAH HARGA TENAGA 11,964.29

B. BAHAN

1. Bahan Timbunan Menggunakan M3 1.2000 47,600.00 57,120.00


Hasil dari Galian
(Analisa (3.1.(1).a )

JUMLAH HARGA BAHAN 57,120.00

C. PERALATAN
1. Pedestrian Roller (E24) Jam 0.0263 98,715.18 2,599.65
2. Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 3,099.65

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 72,183.93


E. OVERHEAD & PROFIT 0 % x D 0.00
E. HARGA SATUAN PEKERJAAN 72,183.93

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-311

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.1 (1).a


JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L 101) Jam 4.2000 10,714.29 45,000.00


2 Mandor (L 061) Jam 0.1400 15,000.00 2,100.00

JUMLAH HARGA TENAGA 47,100.00

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 500.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 47,600.00


E. OVERHEAD & PROFIT 0 % x D 0.00
E. HARGA SATUAN PEKERJAAN 47,600.00

Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-612

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (2).a


JENIS PEKERJAAN : Lapis Perekat
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L 101) Jam 0.0021 10,714.29 22.32


2. Mandor (L 061) Jam 0.0004 15,000.00 6.25

JUMLAH HARGA TENAGA 28.57

B. BAHAN

1. Aspal (M061) Kg 0.8487 Err:509 Err:509


2. Kerosene (M065) liter 0.2060 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C. PERALATAN

1. Alat bantu Lsm 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 500.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


E. OVERHEAD & PROFIT - % x D Err:509
E. HARGA SATUAN PEKERJAAN Err:509

Note : 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-632A

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (2).a


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja L 101 Jam 0.0041 10,714.29 44.26


2. Mandor L 061 Jam 0.0010 15,000.00 15.49

JUMLAH HARGA TENAGA 59.75

B. BAHAN

1. Pasir Kasar M 041 M3 0.0015 248,856.00 362.24


2. Pasir Halus M 041 M3 0.0014 248,856.00 346.49
3 Abu Batu / Stone Dust Err:509 M3 0.0005 Err:509 Err:509
4 Kayu Bakar Err:509 M3 0.1480 Err:509 Err:509
4 Aspal Err:509 Kg 3.1724 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C. PERALATAN
1. Tandem Roller E17 Jam 0.0011 579,348.02 628.84
2. Alat Bantu Ls 1.0000 1,500.00 1,500.00

JUMLAH HARGA PERALATAN 2,128.84

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


E. OVERHEAD & PROFIT - % x D Err:509
E. HARGA SATUAN PEKERJAAN Err:509

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6 (1).a


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L 101) Jam 0.1417 10,714.29 1,518.68


2. Mandor (L 061) Jam 0.0142 15,000.00 212.62

JUMLAH HARGA TENAGA 1,731.29

B. BAHAN
1. Agregat Kasar :
- Batu Uk. 3/5 (M023) M3 1.4049 Err:509 Err:509
2 Agregat Halus :
- Batu Uk. 2/3 (M024) M3 0.2641 Err:509 Err:509
- Batu Uk. 1/1 M3 0.1479 Err:509 Err:509
3 Aspal (M061) Kg 98.5857 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C. PERALATAN

1. 3-Wheel Roller E16 Jam 0.0003 276,094.02 70.03


2. Alat bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 570.03

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


E. OVERHEAD & PROFIT - % x D Err:509
E. HARGA SATUAN PEKERJAAN Err:509

Note : 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-634

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (4)


JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L 101) Jam 0.3135 10,714.29 3,358.43


2. Mandor (L 061) Jam 0.0448 15,000.00 671.69

JUMLAH HARGA TENAGA 4,030.12

B. BAHAN

1. Agr 5-10 mm & 10-15 mm (M026) M3 0.6596 Err:509 Err:509


2. Agr 0-5 mm (M027) M3 0.3132 Err:509 Err:509
3 Pasir Halus (M041) M3 0.5052 248,856.00 125,718.73
3 Filler/Semen (M080) Kg 35.1225 2,491.29 87,500.29
4 Aspal (M061) Kg 137.8 Err:509 Err:509

JUMLAH HARGA BAHAN Err:509

C. PERALATAN
1. Wheel Loader E15 Jam 0.0783 453,838.18 35,534.44
2. AMP E01 Jam 0.0448 9,842,594.89 440,742.70
3. Genset E12 Jam 0.0448 603,768.75 27,036.23
4. Dump Truck E08 Jam 0.5724 347,548.94 198,948.49
5. Asphalt Finisher E02 Jam 0.0364 1,101,693.66 40,131.27
6. Tandem Roller E17 Jam 0.0930 579,348.02 53,900.36
7 P. Tyre Roller E18 Jam 0.0415 556,206.01 23,091.26
8 Alat Bantu Ls 1.0000 100.00 100.00

JUMLAH HARGA PERALATAN 819,484.77

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


E. OVERHEAD & PROFIT - % x D Err:509
E. HARGA SATUAN PEKERJAAN Err:509

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
ANALISA BIAYA PEKERJAAN
ANALISIS TURAP KAYU BULAT KODE
PENERBIT M2S BANDUNG ( DIHITUNG PEKERJAAN 1 M' ) E ( 17 ) 2

Propinsi KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL :


Kalimantan Barat 61 Kubu Raya 0.2 CV. HEXA PRIMA KONSULTAN
JUMLAH JUMLAH UPAH BIAYA SUB.TOTAL
PEKERJA HARI KODE
P ORANG HARI ORANG (Rp./org/hari) (Rp) ( Rp )
E
K Mandor 0.0250 1.00 L061 0.0250 105,000.00 2,625.00
E Kepala Tukang 0.0080 1.00 L073 0.0080 105,000.00 840.00
R Tukang 0.0800 1.00 L079 0.0800 100,000.00 8,000.00
J Buruh Tak Terlatih 1.0000 1.00 L101 1.0000 75,000.00 75,000.00
A
86,465.00
JUMLAH VOLUME HARGA BIAYA SUB.TOTAL
MATERIAL KODE
M SATUAN SATUAN ( Rp ) (Rp) ( Rp )
A
T
E
R Kayu Bulat dia 8 - 10 - 1 m 14.0000 Btg L061 21,615.59 302,618.32
I Paku Campuran 0.2000 Kg L073 34,480.44 6,896.09
A
L
309,514.40
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
P ALAT KERJA KERJA ( Rp / JAM ) (Rp) ( Rp )
E
R
A
L
A
T
A
N
0.00
TOTAL Rp. 395,979.40

Volume / Quality : 1.00 Satuan M' Harga satuan Rp 395,979.40 Per M'
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
HARGA SEWA KET.
No. URAIAN KODE HP KAP.
ALAT ALAT/JAM
(di luar PPN)

1 ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 3,135,000,000 9,842,594.89


2 ASPHALT FINISHER E02 72.4 10.0 Ton 2,425,500,000 1,101,693.66
3 ASPHALT SPRAYER E03 4.0 850.0 Liter 95,700,000 71,548.51
4 BULLDOZER 100-150 HP E04 155.0 - - 990,000,000 715,011.53
5 COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 5,000.00 121,000,000 228,338.02
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 193,050,000 197,335.83
7 CRANE 10-15 TON E07 138.0 15.0 Ton 1,636,800,000 821,672.89
8 DUMP TRUCK 6 TON E08 100.0 3.5 Ton 132,000,000 347,548.94
9 DUMP TRUCK 10 TON E09 190.0 10.0 Ton 396,000,000 673,550.48
10 EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,210,000,000 704,034.79
11 FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 363,880,000 665,793.76
12 GENERATOR SET E12 180.0 135.0 KVA 227,700,000 603,768.75
13 MOTOR GRADER >100 HP E13 135.0 10,800.0 10,800.00 743,600,000 597,230.64
14 TRACK LOADER 75-100 HP E14 70.0 0.8 M3 596,200,000 372,233.64
15 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 620,400,000 453,838.18
16 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 385,000,000 276,094.02
17 TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 1,314,967,500 579,348.02
18 TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 990,000,000 556,206.01
19 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 1,010,666,250 507,290.28
20 CONCRETE VIBRATOR E20 5.5 25.0 25.00 4,400,000 39,024.39
21 STONE CRUSHER E21 220.0 50.0 T/Jam 1,112,088,638 945,324.61
22 WATER PUMP 70-100 mm E22 6.0 - - 5,500,000 37,388.32
23 WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 115,500,000 343,564.32
24 PEDESTRIAN ROLLER E24 8.8 835.00 Ton 165,000,000 98,715.18
25 TAMPER E25 4.7 121.00 Ton 18,700,000 49,490.08
26 JACK HAMMER E26 0.0 1,330.00 1,330.00 38,500,000 32,154.58
27 FULVI MIXER E27 345.0 2,005.00 2,005.00 990,000,000 1,766,980.80
28 CONCRETE PUMP E28 100.0 8.00 M3 123,750,000 343,658.88
29 TRAILER 20 TON E29 175.0 20.00 Ton 660,000,000 683,475.07
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 962,500,000 329,568.33
31 CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 935,000,000 599,974.99
32 WELDING SET E32 40.0 250.0 Amp 19,250,000 145,488.95
33 BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,475,000,000 1,021,102.74
34 ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 16,500,000 43,225.37
35 TRONTON E35 150.0 15.0 Ton 495,000,000 689,663.21
36 COLD MILLING E36 248.0 1,000.0 m 4,945,000,000 1,920,887.25
37 ROCK DRILL BREAKER E37 3.0 - - 990,000,000 325,708.50
38 COLD RECYCLER E38 900.0 2.2 M 21,450,000,000 7,753,407.01
39 HOT RECYCLER E39 400.0 3.0 M 32,175,000,000 8,927,232.07
40 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 434,500,000 591,040.35
41 ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 434,500,000 454,934.61
42 SLIP FORM PAVER E42 105.0 2.5 M 1,470,857,143 654,326.87
43 CONCRETE PAN MIXER E43 134.0 600.0 Liter 1,100,000,000 729,294.08
44 CONCRETE BREAKER E44 290.0 20.0 m3/jam 90,000,000 867,402.44
45 ASPAHLT TANKER E45 190.0 4,000.0 liter 550,000,000 744,051.97
46 CEMENT TANKER E46 190.0 4,000.0 liter 550,000,000 686,818.97
47 CONCRETE MIXER (350) E47 20.0 250.0 liter 38,500,000 82,861.65
48 VIBRATING RAMMER E48 4.2 80.0 KG 22,000,000 31,481.07
49 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 825,000,000 846,634.33
50 BORE PILE MACHINE E50 125.0 60.0 CM 1,287,000,000 759,133.31
51 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 990,000,000 829,833.44
52 BLENDING EQUIPMENT E52 50.0 30.0 Ton 550,000,000 328,639.89
53 ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 165,000,000 181,283.30
URAIAN ANALISA ALAT

Tabel-tabel di bawah ini


No. URAIAN KODE KOEF. SATUAN KET.
Merupakan acuan untuk
HARGA
A. URAIAN PERALATAN ALAT
1. Jenis Peralatan TRONTON E35
2. Tenaga Pw 150.0 HP UE'
3. Kapasitas Cp 15.0 Ton ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 495,000,000 Rupiah ###
5. ###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 49,500,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 59,177.86 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 660.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 59,837.86 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 330,791.34 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 188,123.29 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 28,875 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 57,750.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 651,968.20 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 711,806.07 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
HARGA
No. URAIAN KODE KOEF. SATUAN KET.
BARU
Depresiasi
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE E37
2. Tenaga Pw 248.0 HP E38
3. Kapasitas Cp 1,000 m ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 4,945,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 494,500,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 663,826.68 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 4,945.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 668,771.68 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 546,908.36 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 155,515.25 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 216,344 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 309,062.50 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 1,274,258.43 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 1,943,030.11 Rupiah E40
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
Kondisi Alat
Nilai B' dari
No. URAIAN KODE KOEF. SATUAN KET.

###
A. URAIAN PERALATAN E41
1. Jenis Peralatan ROCK DRILL BREAKER E36
2. Tenaga Pw 3.0 HP ###
3. Kapasitas Cp - - ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 990,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 99,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 Kondisi Alat
3. Biaya Pasti per Jam : Nilai B' dari
a. Biaya Pengembalian Modal = (B-C)xD E 118,355.73 Rupiah Depresiasi
W
###
b. Asuransi, dll = 0.002 x B F 1,320.00 Rupiah E42
W ###
###
Biaya Pasti per Jam = (E+F) G 119,675.73 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 6,615.83 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 1,881.23 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 57,750 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 115,500.00 Rupiah Kondisi Alat
perbaikan W Nilai B' dari
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah Depresiasi
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah
###
Biaya Operasi per Jam = (H+I+K+L+M) P 228,175.63 Rupiah E43
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 347,851.36 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
Kondisi Alat

Nilai B' dari


URAIAN ANALISA ALAT

###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan COLD RECYCLER E38
2. Tenaga Pw 900.0 HP ###
3. Kapasitas Cp 2,200 M ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 21,450,000,000 Rupiah ###
5. ###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 2,145,000,000 Rupiah Kondisi Alat
Nilai B' dari
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - Depresiasi
(1 + i)^A - 1
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 2,879,490.87 Rupiah E45
W ###
###
b. Asuransi, dll = 0.002 x B F 21,450.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 2,900,940.87 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 1,984,748.06 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 564,369.87 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 938,438 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
3. Perawatan dan = (12,5 % - 17,5 %) x B K 1,340,625.00 Rupiah
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah E46
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 4,874,609.00 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 7,775,549.87 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
Kondisi Alat
Nilai B' dari
Depresiasi
URAIAN ANALISA ALAT
E47
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan HOT RECYCLER E39
2. Tenaga Pw 400.0 HP ###
3. Kapasitas Cp 3 M ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 32,175,000,000 Rupiah ###
###
###
###
Kondisi Alat
B. BIAYA PASTI PER JAM KERJA Nilai B' dari
1. Nilai Sisa Alat = 10 % x B C 3,217,500,000 Rupiah Depresiasi

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###


(1 + i)^A - 1 E48
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 4,319,236.31 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 32,175.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 4,351,411.31 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 882,110.25 Rupiah ###
###
> 15th ?
2. Pelumas = (2.5%-3%) x Pw x Mp I 250,831.05 Rupiah Kondisi Alat
Nilai B' dari
Biaya bengkel (6.25% dan 8.75%) x B J 1,407,656 Rupiah Depresiasi
W
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 2,010,937.50 Rupiah E49
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 4,597,963.62 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 8,949,374.93 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter Kondisi Alat
6. Minyak Pelumas Mp 41,805.18 Liter Nilai B' dari
Depresiasi

###
E50
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER E40
2. Tenaga Pw 115.0 HP ###
3. Kapasitas Cp 3.5 M ###
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam ###
c. Harga Alat B 434,500,000.0 Rupiah ###
###
Kondisi Alat
Nilai B' dari
Depresiasi
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 43,450,000 Rupiah ###
E51
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 136,971.27 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 869.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 137,840.27 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 253,606.70 Rupiah ###
Kondisi Alat
Nilai B' dari
2. Pelumas = (2.5%-3%) x Pw x Mp I 72,113.93 Rupiah Depresiasi

Biaya bengkel (6.25% dan 8.75%) x B J 27,156 Rupiah ###


W E
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 76,037.50 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 13 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 475,342.95 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 613,183.21 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam > 15th ?
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam Kondisi Alat
4. Bahan Bakar Bensin Mb 8,277.02 Liter Nilai B' dari
5. Bahan Bakar Solar Ms 14,701.84 Liter Depresiasi
6. Minyak Pelumas Mp 41,805.18 Liter
###
E
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan ASPHALT DISTRIBUTOR E41
2. Tenaga Pw 115 HP ###
3. Kapasitas Cp 4,000 Liter ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam > 15th ?
c. Harga Alat B 434,500,000 Rupiah Kondisi Alat
Nilai B' dari
Depresiasi

###
B. BIAYA PASTI PER JAM KERJA E
1. Nilai Sisa Alat = 10 % x B C 43,450,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 58,328.15 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 434.50 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 58,762.65 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA > 15th ?
Kondisi Alat
1. Bahan Bakar = (12%-15%) x Pw x Ms H 253,606.70 Rupiah Nilai B' dari
Depresiasi

2. Pelumas = (2.5%-3%) x Pw x Mp I 72,113.93 Rupiah ###


E
Biaya bengkel (6.25% dan 8.75%) x B J 19,009 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 27,156.25 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 418,314.82 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 477,077.47 Rupiah ###
###
###
E. LAIN - LAIN > 15th ?
1. Tingkat Suku Bunga i 15.00 % / Tahun Kondisi Alat
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam Nilai B' dari
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam Depresiasi
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter E
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan SLIP FORM PAVER E42
2. Tenaga Pw 105 HP ###
3. Kapasitas Cp 2.50 M > 15th ?
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun Kondisi Alat
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam Nilai B' dari
c. Harga Alat B 1,470,857,143 Rupiah Depresiasi

###
E
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 147,085,714 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 174,894.63 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,470.86 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 176,365.49 Rupiah > 15th ?
Kondisi Alat
C. BIAYA OPERASI PER JAM KERJA Nilai B' dari
Depresiasi
1. Bahan Bakar = (12%-15%) x Pw x Ms H 231,553.94 Rupiah
###
E
2. Pelumas = (2.5%-3%) x Pw x Mp I 65,843.15 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 64,350 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 91,928.57 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 500,104.23 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 676,469.73 Rupiah ###
> 15th ?
Kondisi Alat
E. LAIN - LAIN Nilai B' dari
1. Tingkat Suku Bunga i 15.00 % / Tahun Depresiasi
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter E
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP Kondisi Alat
3. Kapasitas Cp 600.00 Liter Nilai B' dari
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun Depresiasi
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,100,000,000 Rupiah ###
E
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 110,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 131,506.36 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,466.67 Rupiah ###
W > 15th ?
Kondisi Alat
Biaya Pasti per Jam = (E+F) G 132,973.03 Rupiah Nilai B' dari
Depresiasi
C. BIAYA OPERASI PER JAM KERJA
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 295,506.93 Rupiah E
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 84,028.40 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 64,167 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 128,333.33 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 618,463.91 Rupiah ###
> 15th ?
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 751,436.94 Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam E
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
> 15th ?
A. URAIAN PERALATAN Kondisi Alat
1. Jenis Peralatan CONCRETE BREAKER E44
2. Tenaga Pw 290 HP Depresiasi
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam E
c. Harga Alat B 90,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 9,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 12,081.78 Rupiah ###
W ###
> 15th ?
b. Asuransi, dll = 0.002 x B F 90.00 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
Biaya Pasti per Jam = (E+F) G 12,171.78 Rupiah
###
C. BIAYA OPERASI PER JAM KERJA E
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 639,529.93 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 181,852.51 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 3,938 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 5,625.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
> 15th ?
Biaya Operasi per Jam = (H+I+K+L+M) P 877,373.51 Rupiah Kondisi Alat
Nilai B' dari
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 889,545.29 Rupiah Depresiasi

###
E. LAIN - LAIN E
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
Kondisi Alat
Nilai B' dari
A. URAIAN PERALATAN Depresiasi
1. Jenis Peralatan ASPAHLT TANKER E45
2. Tenaga Pw 190 HP ###
3. Kapasitas Cp 4,000.00 liter E
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 550,000,000 Rupiah ###
###
5. Kapasitas tangki air Ca 4,000.00 liter ###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 55,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 65,398.63 Rupiah > 15th ?
W Kondisi Alat
Nilai B' dari
b. Asuransi, dll = 0.002 x B F 550.00 Rupiah Depresiasi
W
###
Biaya Pasti per Jam = (E+F) G 65,948.63 Rupiah E
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H1 419,002.37 Rupiah ###
Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms H2 58,807.35 Rupiah ###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 119,144.75 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 24,063 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 34,375.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah > 15th ?
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah Kondisi Alat
Nilai B' dari
Biaya Operasi per Jam = (H+I+K+L+M) P 680,391.97 Rupiah Depresiasi

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 746,340.60 Rupiah ###


E
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
> 15th ?
Kondisi Alat
No. URAIAN KODE KOEF. SATUAN KET.
Depresiasi

A. URAIAN PERALATAN ###


1. Jenis Peralatan CEMENT TANKER E46
2. Tenaga Pw 190 HP ###
3. Kapasitas Cp 4,000.00 liter ###
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 550,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 55,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 > 15th ?
3. Biaya Pasti per Jam : Kondisi Alat
a. Biaya Pengembalian Modal = (B-C)xD E 65,398.63 Rupiah Nilai B' dari
W Depresiasi

b. Asuransi, dll = 0.002 x B F 550.00 Rupiah ###


W E
###
Biaya Pasti per Jam = (E+F) G 65,948.63 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 419,002.37 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 119,144.75 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 24,063 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 34,375.00 Rupiah > 15th ?
perbaikan W Kondisi Alat
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah Nilai B' dari
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah Depresiasi

Biaya Operasi per Jam = (H+I+K+L+M) P 621,584.62 Rupiah ###


###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 687,533.25 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter ###
E
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan CONCRETE MIXER (350) E47
2. Tenaga Pw 20 HP ###
3. Kapasitas Cp 350.00 liter ###
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun > 15th ?
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam Kondisi Alat
c. Harga Alat B 38,500,000 Rupiah Nilai B' dari
Depresiasi

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,850,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.61512 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 10,656.89 Rupiah
W

b. Asuransi, dll = 0.002 x B F 38.50 Rupiah


W

Biaya Pasti per Jam = (E+F) G 10,695.39 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 44,105.51 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 12,541.55 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,684 Rupiah


W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 2,406.25 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 85,737.69 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 96,433.08 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER E48
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 22,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,200,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 6,935.25 Rupiah
W

b. Asuransi, dll = 0.002 x B F 44.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 6,979.25 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 9,262.16 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 2,633.73 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,375 Rupiah


W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 3,850.00 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 42,120.88 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 49,100.14 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 825,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 82,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 110,749.65 Rupiah
W

b. Asuransi, dll = 0.002 x B F 825.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 111,574.65 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 485,160.64 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 137,957.08 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 36,094 Rupiah


W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 51,562.50 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 735,773.97 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 847,348.61 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E50
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,287,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 128,700,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 153,862.44 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,716.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 155,578.44 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 275,659.45 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 78,384.70 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 75,075 Rupiah


W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 150,150.00 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 604,269.16 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 759,847.60 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON E51
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 990,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 99,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 132,899.58 Rupiah
W

b. Asuransi, dll = 0.002 x B F 990.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 133,889.58 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 441,055.13 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 125,415.53 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 43,313 Rupiah


W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 61,875.00 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 696,658.15 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 830,547.73 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 550,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 55,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 65,753.18 Rupiah
W

b. Asuransi, dll = 0.002 x B F 733.33 Rupiah


W

Biaya Pasti per Jam = (E+F) G 66,486.51 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 110,263.78 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 31,353.88 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 32,083 Rupiah


W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 64,166.67 Rupiah


perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 262,867.66 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 329,354.18 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEFISIEN SATUAN

III.2. HARGA SATUAN AGREGAT PECAH MESIN 5-10 & 10-20 mm


( berlaku juga untuk Aggregat 20-30 mm)
Agregat Kasar Produksi Stone Crusher = 70% K 70.00 %
(Tertahan saringan # 4 = 4,75mm)
Harga Satuan Agregat Kasar / M3 = (K x HSb) / K HSAk Err:509 Rupiah

III.3. HARGA SATUAN AGREGAT PECAH MESIN 0-5 mm


(Agregat Halus)
3.a. Agregat Halus Produksi Stone Crusher = 30% H 30.00 %
Harga Agregat Halus Prod. Stone Crsh.= (H x HSb) / H Hs1 Err:509 Rupiah
URAIAN ANALISA HARGA SATUAN
Lanjutan 1

KETERANGAN

Di Luar PPN

per 1 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK #REF!
NAMA PAKET #REF!
PROP / KAB / KODYA #REF!
ITEM PEMBAYARAN NO. : AGREGAT KELAS A :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0755 #REF! #REF!


2. Mandor (L03) jam 0.0378 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Agregat 20-30 M93 M3 0.3524 #REF! #REF!


2. Agregat 5-10 & 10-20 M92 M3 0.5286 #REF! #REF!
3 Pasir Urug M44 M3 0.3776 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 Err:509 Err:509
2. Blending Equpment (E52) jam 0.0482 Err:509 Err:509
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN Err:509

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK #REF!
NAMA PAKET #REF!
PROP / KAB / KODYA #REF!
ITEM PEMBAYARAN NO. : AGREGAT KELAS B :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0755 #REF! #REF!


2. Mandor (L03) jam 0.0378 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Aggregat 20-30 M93 M3 0.2265 #REF! #REF!


2. Agg 5 - 10 & 10 - 20 M92 M3 0.2265 #REF! #REF!
3 Sirtu M16 M3 0.8055 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 Err:509 Err:509
2. Blending Equpment (E52) jam 0.0482 Err:509 Err:509
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN Err:509

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509

Anda mungkin juga menyukai