JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 260,300,000
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150 50,000 7,500,000
2 Kantor M2 60 75,000 4,500,000
3 Barak M2 60 45,000 2,700,000
4 Bengkel M2 100 25,000 2,500,000
5 Gudang, dan lain-lain M2 100 25,000 2,500,000
6 ...................... .... 0 0 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000 5,940,000
3 Bituminous Testing
Marshall Asphalt Test Set 1 20,000,000 20,000,000
Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000 9,000,000
Specific Gravity for Coarse Aggregate Set 1 9,000,000 9,000,000
Specific Gravity for Fine Aggregate Set 1 9,000,000 9,000,000
Mix Air Viod Content (Accurate Method) Set 1 15,000,000 15,000,000
Core Drill Set 1 15,000,000 15,000,000
Metal Thermometer Set 1 1,000,000 1,000,000
Accessories and Tolls Set 1 5,000,000 5,000,000
Penetration Test Bln 6 1,000,000 6,000,000
Softening Point Set 1 6,000,000 6,000,000
Refusal Density Compactor Set 1 15,000,000 15,000,000
4 Concrete Testing
Slump Cone Set 1 500,000 500,000
Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000 10,000,000
Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000 10,000,000
Crushing Machine Set 1 50,000,000 50,000,000
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS 1 100,000,000 100,000,000
2 Pemeliharaan Jalan Kerja / Samping LS 1 100,000,000 100,000,000
3 ...................... .... 0
4 ...................... .... 0
5 ...................... .... 0
6 ...................... .... 0
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 5,000,000 5,000,000
2 ...................... .... 0 0 0
3 ...................... .... 0 0 0
4 ...................... .... 0 0 0
5 ...................... .... 0 0 0
6 ...................... .... 0 0 0
B. PERALATAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL KETERANGAN
SATUAN
I. Laboratory Building
1. Laboratory Building m2 108.00 55,000.00 5,940,000.00
SUB TOTAL 5,940,000.00
V. Peralatan pendukung
1 Mobil Pick Up Unit 2.00 100,000,000.00 200,000,000.00 Beli
2 Komputer + Printer Set 1.00 10,000,000.00 10,000,000.00 Beli
3 Furniture Set 1.00 15,000,000.00 15,000,000.00 Beli
SUB TOTAL 225,000,000.00
VI. Operasional
Teknisi Laboratorium Bln 12.00 8,000,000.00 96,000,000.00
Tenaga Kerja Terampil Bln 60.00 3,000,000.00 180,000,000.00
SUB TOTAL 276,000,000.00
Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
DAFTAR HARGA SATUAN UPAH DAN BAHAN
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat
misal : Bulldozer, Grader, Whell, Loader, Asphalt Finisher, dll
**) Operator yang mengoperasikan peralatan untuk melayani pekerjaan yang agak ringan
misal : Stell Wheeled Roller, Stamper, Concrete Mixer / Mesin Pengaduk Beton dll
1 2 3 4 5 6
1 Batu Belah 10 -15 cm M 020 M3 707,112.00
2 Batu Pecah 1 - 2 cm M 025 M3 875,051.10 Wilayah IV :
3 Pasir Urug / Timbun M 040 M3 248,856.00 Kecamatan Batu Ampar, Termasuk :
4 Pasir Ayak untuk Beton M 041 M3 248,856.00 Kecamatan Sungai Raya :
5 Timbunan Pilihan (Tanah Datang) M 050 M3 244,244.00 - Desa Pulau Limbung
6 Semen PC M 080 Zak 124,564.44 - Desa Gunung Tamang
Semen PC M 080 kg 2,491.29 - Desa Muara Baru
7 Minyak Diesel / Solar M 183 Lt 14,701.84 Kecamatan Sungai Ambawang :
8 Bensin Premium M 184 Lt 8,277.02 - Desa Teluk Bakung
9 Minyak Pelumas M 185 Lt 41,805.18 Kecamatan Teluk Pakedai :
10 Kayu Bulat / Dolken Dia 8-10 Cm - 4 M - Btg 21,615.59 - Desa Kuala Karang
11 Papan Mal Kls III - M3 2,862,234.38 - Desa Sungai Nibung
12 Paku Campuran - Kg 34,480.44 Kecamatan Terentang :
13 Plastik Filter Cor Beton - M2 6,136.63 - Desa Dungun
14 Besi Beton - Kg 24,729.71 - Desa Permata
15 Kawat Ikat Beton/Bendrat - Kg 31,141.11 - Desa Betuah
Kecamatan Kubu :
- Desa Mengkalang Jambu
- Desa Mengkalang Guntung
- Desa Sepakat Baru
- Desa Dungun
- Desa Permata
- Desa Betuah
INFORMASI UMUM
No. URAIAN INFORMASI
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 4.93 Kilometer
7.45 Km = a C 7.45 Km = b
A B
1.2 Km = c
Base Camp --------->
D
d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk pelapisan ulang permukaan jalan
e. Pekerjaan Pasangan Batu dilaksanakan untuk saluran air dan dinding penahan tanah
20 ....................................
21 ....................................
Analisa EI-716
A. TENAGA
B. BAHAN
C. PERALATAN
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-324
A. TENAGA
B. BAHAN
C. PERALATAN
1. Three Wheel Roller (E16) Jam 0.0535 276,094.02 14,784.15
2. Alat Bantu Ls 1.0000 1,000.00 1,000.00
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-321
A. TENAGA
B. BAHAN
C. PERALATAN
1. Pedestrian Roller (E24) Jam 0.0263 98,715.18 2,599.65
2. Alat Bantu Ls 1.0000 500.00 500.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-311
A. TENAGA
B. BAHAN
C. PERALATAN
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-612
A. TENAGA
B. BAHAN
C. PERALATAN
Note : 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-632A
A. TENAGA
B. BAHAN
C. PERALATAN
1. Tandem Roller E17 Jam 0.0011 579,348.02 628.84
2. Alat Bantu Ls 1.0000 1,500.00 1,500.00
Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-661
A. TENAGA
B. BAHAN
1. Agregat Kasar :
- Batu Uk. 3/5 (M023) M3 1.4049 Err:509 Err:509
2 Agregat Halus :
- Batu Uk. 2/3 (M024) M3 0.2641 Err:509 Err:509
- Batu Uk. 1/1 M3 0.1479 Err:509 Err:509
3 Aspal (M061) Kg 98.5857 Err:509 Err:509
C. PERALATAN
Note : 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
Analisa EI-634
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0783 453,838.18 35,534.44
2. AMP E01 Jam 0.0448 9,842,594.89 440,742.70
3. Genset E12 Jam 0.0448 603,768.75 27,036.23
4. Dump Truck E08 Jam 0.5724 347,548.94 198,948.49
5. Asphalt Finisher E02 Jam 0.0364 1,101,693.66 40,131.27
6. Tandem Roller E17 Jam 0.0930 579,348.02 53,900.36
7 P. Tyre Roller E18 Jam 0.0415 556,206.01 23,091.26
8 Alat Bantu Ls 1.0000 100.00 100.00
Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan dan biaya-biaya lainnya.
ANALISA BIAYA PEKERJAAN
ANALISIS TURAP KAYU BULAT KODE
PENERBIT M2S BANDUNG ( DIHITUNG PEKERJAAN 1 M' ) E ( 17 ) 2
Volume / Quality : 1.00 Satuan M' Harga satuan Rp 395,979.40 Per M'
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
BIAYA
HARGA SEWA KET.
No. URAIAN KODE HP KAP.
ALAT ALAT/JAM
(di luar PPN)
###
A. URAIAN PERALATAN E41
1. Jenis Peralatan ROCK DRILL BREAKER E36
2. Tenaga Pw 3.0 HP ###
3. Kapasitas Cp - - ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 990,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 99,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 Kondisi Alat
3. Biaya Pasti per Jam : Nilai B' dari
a. Biaya Pengembalian Modal = (B-C)xD E 118,355.73 Rupiah Depresiasi
W
###
b. Asuransi, dll = 0.002 x B F 1,320.00 Rupiah E42
W ###
###
Biaya Pasti per Jam = (E+F) G 119,675.73 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 6,615.83 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 1,881.23 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 57,750 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 115,500.00 Rupiah Kondisi Alat
perbaikan W Nilai B' dari
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah Depresiasi
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah
###
Biaya Operasi per Jam = (H+I+K+L+M) P 228,175.63 Rupiah E43
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 347,851.36 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
Kondisi Alat
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan COLD RECYCLER E38
2. Tenaga Pw 900.0 HP ###
3. Kapasitas Cp 2,200 M ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 21,450,000,000 Rupiah ###
5. ###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 2,145,000,000 Rupiah Kondisi Alat
Nilai B' dari
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - Depresiasi
(1 + i)^A - 1
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 2,879,490.87 Rupiah E45
W ###
###
b. Asuransi, dll = 0.002 x B F 21,450.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 2,900,940.87 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 1,984,748.06 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 564,369.87 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 938,438 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
3. Perawatan dan = (12,5 % - 17,5 %) x B K 1,340,625.00 Rupiah
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah E46
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 4,874,609.00 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 7,775,549.87 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
Kondisi Alat
Nilai B' dari
Depresiasi
URAIAN ANALISA ALAT
E47
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan HOT RECYCLER E39
2. Tenaga Pw 400.0 HP ###
3. Kapasitas Cp 3 M ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 32,175,000,000 Rupiah ###
###
###
###
Kondisi Alat
B. BIAYA PASTI PER JAM KERJA Nilai B' dari
1. Nilai Sisa Alat = 10 % x B C 3,217,500,000 Rupiah Depresiasi
###
E50
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER E40
2. Tenaga Pw 115.0 HP ###
3. Kapasitas Cp 3.5 M ###
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam ###
c. Harga Alat B 434,500,000.0 Rupiah ###
###
Kondisi Alat
Nilai B' dari
Depresiasi
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 43,450,000 Rupiah ###
E51
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 136,971.27 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 869.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 137,840.27 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 253,606.70 Rupiah ###
Kondisi Alat
Nilai B' dari
2. Pelumas = (2.5%-3%) x Pw x Mp I 72,113.93 Rupiah Depresiasi
###
B. BIAYA PASTI PER JAM KERJA E
1. Nilai Sisa Alat = 10 % x B C 43,450,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 58,328.15 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 434.50 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 58,762.65 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA > 15th ?
Kondisi Alat
1. Bahan Bakar = (12%-15%) x Pw x Ms H 253,606.70 Rupiah Nilai B' dari
Depresiasi
###
E
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 147,085,714 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 174,894.63 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,470.86 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 176,365.49 Rupiah > 15th ?
Kondisi Alat
C. BIAYA OPERASI PER JAM KERJA Nilai B' dari
Depresiasi
1. Bahan Bakar = (12%-15%) x Pw x Ms H 231,553.94 Rupiah
###
E
2. Pelumas = (2.5%-3%) x Pw x Mp I 65,843.15 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 64,350 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 91,928.57 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 500,104.23 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 676,469.73 Rupiah ###
> 15th ?
Kondisi Alat
E. LAIN - LAIN Nilai B' dari
1. Tingkat Suku Bunga i 15.00 % / Tahun Depresiasi
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter E
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP Kondisi Alat
3. Kapasitas Cp 600.00 Liter Nilai B' dari
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun Depresiasi
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,100,000,000 Rupiah ###
E
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 110,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 131,506.36 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,466.67 Rupiah ###
W > 15th ?
Kondisi Alat
Biaya Pasti per Jam = (E+F) G 132,973.03 Rupiah Nilai B' dari
Depresiasi
C. BIAYA OPERASI PER JAM KERJA
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 295,506.93 Rupiah E
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 84,028.40 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 64,167 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 128,333.33 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 618,463.91 Rupiah ###
> 15th ?
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 751,436.94 Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam E
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
> 15th ?
A. URAIAN PERALATAN Kondisi Alat
1. Jenis Peralatan CONCRETE BREAKER E44
2. Tenaga Pw 290 HP Depresiasi
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam E
c. Harga Alat B 90,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 9,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 12,081.78 Rupiah ###
W ###
> 15th ?
b. Asuransi, dll = 0.002 x B F 90.00 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
Biaya Pasti per Jam = (E+F) G 12,171.78 Rupiah
###
C. BIAYA OPERASI PER JAM KERJA E
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 639,529.93 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 181,852.51 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 3,938 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 5,625.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
> 15th ?
Biaya Operasi per Jam = (H+I+K+L+M) P 877,373.51 Rupiah Kondisi Alat
Nilai B' dari
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 889,545.29 Rupiah Depresiasi
###
E. LAIN - LAIN E
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8,277.02 Liter ###
5. Bahan Bakar Solar Ms 14,701.84 Liter ###
6. Minyak Pelumas Mp 41,805.18 Liter ###
###
###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
Kondisi Alat
Nilai B' dari
A. URAIAN PERALATAN Depresiasi
1. Jenis Peralatan ASPAHLT TANKER E45
2. Tenaga Pw 190 HP ###
3. Kapasitas Cp 4,000.00 liter E
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 550,000,000 Rupiah ###
###
5. Kapasitas tangki air Ca 4,000.00 liter ###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 55,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 65,398.63 Rupiah > 15th ?
W Kondisi Alat
Nilai B' dari
b. Asuransi, dll = 0.002 x B F 550.00 Rupiah Depresiasi
W
###
Biaya Pasti per Jam = (E+F) G 65,948.63 Rupiah E
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H1 419,002.37 Rupiah ###
Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms H2 58,807.35 Rupiah ###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 119,144.75 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 24,063 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 34,375.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah > 15th ?
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah Kondisi Alat
Nilai B' dari
Biaya Operasi per Jam = (H+I+K+L+M) P 680,391.97 Rupiah Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER E48
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 22,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 825,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E50
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,287,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON E51
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 990,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 550,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,277.02 Liter
5. Bahan Bakar Solar Ms 14,701.84 Liter
6. Minyak Pelumas Mp 41,805.18 Liter
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
KETERANGAN
Di Luar PPN
per 1 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK #REF!
NAMA PAKET #REF!
PROP / KAB / KODYA #REF!
ITEM PEMBAYARAN NO. : AGREGAT KELAS A :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 Err:509 Err:509
2. Blending Equpment (E52) jam 0.0482 Err:509 Err:509
3 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK #REF!
NAMA PAKET #REF!
PROP / KAB / KODYA #REF!
ITEM PEMBAYARAN NO. : AGREGAT KELAS B :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 Err:509 Err:509
2. Blending Equpment (E52) jam 0.0482 Err:509 Err:509
3 Alat Bantu Ls 1.0000 0.00 0.00