Anda di halaman 1dari 16

IV.

DAFTAR HARGA SATUAN UPAH DAN BAHAN

Propinsi : Kalimantan Barat


Kabupaten : Kubu Raya
Tahun : 2014

No Uraian Tenaga Kerja Satuan Kode


Wil I Wil II Wil III

A. UPAH
1 Mandor Lapangan L 061 Hari 105,000.00 105,000.00 105,000.00
2 Mekanik L 071 Hari 105,000.00 105,000.00 105,000.00
3 Mekanik Pembantu L 072 Hari 100,000.00 100,000.00 100,000.00
4 Kepala Tukang L 073 Hari 105,000.00 105,000.00 105,000.00
5 Tukang L 079 Hari 100,000.00 100,000.00 100,000.00
6 Operator Terlatih *) L 081 Hari 90,000.00 90,000.00 90,000.00
7 Operator Kurang Terlatih *) L 082 Hari 80,000.00 80,000.00 80,000.00
8 Pembantu Operator L 083 Hari 75,000.00 75,000.00 75,000.00
9 Supir Material / Truck L 091 Hari 90,000.00 90,000.00 90,000.00
10 Supir Personil L 092 Hari 85,000.00 85,000.00 85,000.00
11 Pembantu Supir / Kernet L 099 Hari 75,000.00 75,000.00 75,000.00
12 Buruh Lapangan Tak Terlatih L 101 Hari 75,000.00 75,000.00 75,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 80,000.00 80,000.00 80,000.00
14 Buruh Lapangan Terlatih L 106 Hari 85,000.00 85,000.00 85,000.00
15 Penjaga Api - Hari 60,000.00 60,000.00 60,000.00
16 Penjaga Malam - Hari 72,500.00 72,500.00 72,500.00
17 Pengawas - Hari 100,000.00 100,000.00 100,000.00
18 Pengatur - Hari 90,000.00 90,000.00 90,000.00

Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat
misal : Bulldozer, Grader, Whell, Loader, Asphalt Finisher, dll
*) Operator yang mengoperasikan peralatan untuk melayani pekerjaan yang agak ringan
misal : Stell Wheeled Roller, Stamper, Concrete Mixer / Mesin Pengaduk Beton dll
*) Harga Upah dan Bahan Sudah Termasuk PPN 10 %
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III

B. BAHAN PENGISI

1 Batu Kong ### M³ M.101 320,250.00 352,275.00 384,300.00


2 Batu Sap Pinang ### M³ - 448,350.00 493,185.00 538,020.00
3 Batu Pecah 10-15 cm ### M³ - 512,400.00 563,640.00 614,880.00
4 Batu Pecah 5-7 cm ### M³ M.022 446,215.00 490,836.50 535,458.00
5 Batu Pecah 3-5 cm ### M³ M.023 516,670.00 568,337.00 620,004.00
6 Batu Pecah 2-3 cm ### M³ M.024 540,155.00 594,170.50 648,186.00
7 Batu Pecah 1-2 cm ### M³ M.025 634,095.00 697,504.50 760,914.00
8 Batu Pecah 1-1 cm ### M³ - 657,580.00 723,338.00 789,096.00
9 Batu Pecah 0,5 cm ### M³ M.026 657,580.00 723,338.00 789,096.00
10 Stone Dust ### M³ - 657,580.00 723,338.00 789,096.00
11 Aspal ### Kg - 17,848.60 19,633.46 21,418.32
12 Pasir ### M³ M.040 126,819.00 152,182.80 177,546.60
13 Semen PC ### Zak M.080 95,818.80 105,400.68 114,982.56
14 Tanah Timbunan Pilihan ### M³ M.050.a 187,880.00 206,668.00 225,456.00
15 Paving Block ### Bh - 3,663.66 4,030.03 4,396.39
16 Bataco 15 x 30 x 7 cm ### Bh - 1,409.10 1,550.01 1,690.92
17 Bataco 20 x 40 x 9 cm ( Press ) ### Bh - 3,945.48 4,340.03 4,734.58
18 Bataco 20 x 40 x 7 cm ( Press ) ### Bh - 2,818.20 3,100.02 3,381.84
19 Kerawang ( Roster ) 18 x 18 cm ### Bh - 35,932.05 39,525.26 43,118.46
20 Kerawang Press ( Roster ) 30 x 30 cm ### Bh - 54,954.90 60,450.39 65,945.88
21 Keramik 20 x 20 cm ### Kotak - 81,023.25 85,074.41 89,328.13
22 Keramik 25 x 25 cm ### Kotak - 81,023.25 85,074.41 89,328.13
22 Keramik 30 x 30 cm ### Kotak - 81,023.25 85,074.41 89,328.13
23 Keramik 30 x 30 cm Unpolished ### Kotak - 89,125.58 95,364.37 102,039.87
24 Keramik 30 x 30 cm Artistik ### Kotak - 105,330.23 112,703.34 120,592.57
25 Keramik 40 x 40 cm (Biasa) ### Kotak - 106,950.69 114,437.24 122,447.84
26 Keramik 40 x 40 cm Polished (Setaraf Indogress) ### Kotak - 280,000.00 294,000.00 308,700.00
27 Keramik 40 x 40 cm Polished (Setaraf Decogress) ### Kotak - 210,660.45 221,193.47 232,253.15
28 Keramik 40 x 40 cm Unpolished (Setaraf Indogress) ### Kotak - 218,621.87 229,552.96 241,030.61
29 Keramik 40 x 40 cm Unpolished (Setaraf Decogress) ### Kotak - 162,046.50 170,148.83 178,656.27
30 Keramik 60 x 60 cm Polished (Setaraf Indogress) ### Kotak - 429,705.05 451,190.30 473,749.81
31 Keramik 60 x 60 cm Polished (Setaraf Decogress) ### Kotak - 319,640.24 335,622.26 352,403.37
32 Keramik 60 x 60 cm Unpolished (Setaraf Indogress) ### Kotak - 405,000.00 425,250.00 446,512.50
33 Keramik 60 x 60 cm Unolished (Setaraf Decogress) ### Kotak - 280,000.00 294,000.00 308,700.00
34 Marmer ### M² - 1,690,920.00 1,860,012.00 2,029,104.00
35 Wood Flooring ### M² - 366,366.00 403,002.60 439,639.20
36 List Keramik WC Uk. 8 x 20 cm ### Bh - 14,091.00 15,500.10 16,909.20
37 Plint Kayu Uk. 2 x 10 cm ### Bh - 73,695.93 81,065.52 88,435.12
38 Keramik Dinding 20 x 20 cm ### Kotak - 89,125.58 93,581.85 98,260.95
39 Keramik Dinding 20 x 25 cm ### Kotak - 97,227.90 102,089.30 107,193.76
40 Keramik Dinding 25 x 40 cm ### Kotak - 97,227.90 102,089.30 107,193.76
40 Floor Hardener ### Kg - 13,569.63 14,519.51 15,535.87
41 Beton Ready Mix B 0 ### M³ - 1,287,212.85 1,351,573.49
42 Beton Ready Mix 125 ### M³ - 1,390,781.70 1,460,320.79
43 Beton Ready Mix 175 ### M³ - 1,486,600.50 1,560,930.53
44 Beton Ready Mix 225 ### M³ - 1,676,829.00 1,760,670.45
45 Beton Ready Mix 300 ### M³ - 1,782,511.50 1,871,637.08
46 Additive Ready Mix ### Liter - 53,545.80 56,223.09
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III
47 Karung Goni Curing Beton ( 0.7 m² ) ### Lembar - 15,500.10 17,050.11 18,600.12
48 Tiang Pancang (Mini Pile / Ready Mix) Uk. Π 20 x 20, K 300 - 6 m ### Btg - 1,550,010.00 1,705,011.00 1,860,012.00
49 Tiang Pancang (Mini Pile / Ready Mix) Uk. Π 25 x 25, K 300 - 6 m ### Btg - 2,036,149.50 2,239,764.45 2,443,379.40
50 Tiang Pancang (Mini Pile / Ready Mix) Uk. Δ 28 x 28 x 28, K 300 - 6 m ### Btg - 1,323,144.90 1,455,459.39 1,587,773.88
51 Tiang Pancang (Mini Pile / Ready Mix) Uk. Δ 32 x 32 x 32, K 300 - 6 m ### Btg - 1,476,736.80 1,624,410.48 1,772,084.16
52 Papan Turap Uk. 15/50 - 5 m - K 300 ### Kpg - 1,175,189.40 1,292,708.34 1,410,227.28
53 Papan Turap Uk. 15/50 - 6 m - K 300 ### Kpg - 1,499,282.40 1,649,210.64 1,799,138.88
54 Pemancangan Mini Pile - 6 m ### Btg - 176,137.50 193,751.25 211,365.00
55 Sewa Pompa Ready Mix (Min. 100 m³) ### M³ - 73,414.11 80,755.52 88,096.93
56 Bahan Plastik Cor Beton ### M² - 4,720.49 5,192.53 5,664.58

C. BAHAN KAYU

1 Ky. Belian Tidak Ketam Uk. 6/6 - 4 m ### M³ - 15,656,666.67 17,222,333.33 18,788,000.00
2 Ky. Belian Tidak Ketam Uk. 7/7 - 4 m ### M³ - 13,659,642.86 15,025,607.14 16,391,571.43
3 Ky. Belian Tidak Ketam Uk. 8/8 - 4 m ### M³ - 11,559,023.44 12,714,925.78 13,870,828.13
4 Ky. Belian Tidak Ketam Uk. 8/16 - 4 m ### M³ - 11,008,593.75 12,109,453.13 13,210,312.50
5 Ky. Belian Tidak Ketam Uk. 9/9 - 4 m ### M³ M.181.a 12,500,000.00 13,750,000.00 15,125,000.00
6 Ky. Belian Tidak Ketam Uk. 10/10 - 4 m ### M³ M.181.b 12,329,625.00 13,562,587.50 14,795,550.00
7 Ky. Belian Tidak Ketam Uk. 12/12 - 4 m ### M³ - 14,062,500.00 15,468,750.00 17,015,625.00
8 Ky. Belian Tidak Ketam Uk. 15/15 - 4 m 14,873,833.33 16,361,216.67 17,848,600.00
9 Ky. Belian Tidak Ketam Uk. 5/10 - 4 m ### M³ - 14,091,000.00 15,500,100.00 16,909,200.00
10 Ky. Belian Tidak Ketam Uk. 4/8 - 4 m M³ - 14,780,000.00 16,258,000.00 17,883,800.00
10 Ky. Belian Ketam Uk. 6/6 - 4 m ### M³ - 16,635,208.33 18,298,729.17 19,962,250.00
11 Ky. Belian Ketam Uk. 7/7 - 4 m ### M³ - 13,659,642.86 15,025,607.14 16,391,571.43
12 Ky. Belian Ketam Uk. 8/8 - 4 m ### M³ - 12,109,453.13 13,320,398.44 14,531,343.75
13 Ky. Belian Ketam Uk. 5/10 - 4 m ### M³ - 14,795,550.00 16,275,105.00 17,754,660.00
14 Ky. Belian Ketam Uk. 4/8 - 4 m ### M³ - 15,412,031.25 16,953,234.38 18,494,437.50
15 Papan Belian Ketam (4 m) ### M³ M.181.e 18,266,111.11 20,092,722.22 21,919,333.33
16 Papan Belian Tidak Ketam (4 m) ### M³ M.181.d 16,961,388.89 18,657,527.78 20,353,666.67
17 Ky. Klas I Bengkirai Uk. 5/10 - 4 m ( Ketam / Untuk Kusen ) ### M³ - 14,091,000.00 15,500,100.00 17,050,110.00
18 Ky. Klas II Uk. 8/8 - 4 m ( Tidak Ketam ) ### M³ M.181.h 4,218,750.00 4,640,625.00 5,104,687.50
19 Ky. Klas II Uk. 8/8 - 4 m ( Ketam ) ### M³ M.181.i 4,482,421.88 4,930,664.06 5,423,730.47
20 Ky. Klas II Uk. 7/7 - 4 m ( Tidak Ketam ) ### M³ - 5,032,500.00 5,535,750.00 6,039,000.00
21 Ky. Klas II Uk. 7/7 - 4 m ( Ketam ) ### M³ - 5,751,428.57 6,326,571.43 6,901,714.29
22 Ky. Klas II Uk. 4/6 - 4 m ( Tidak Ketam ) ### M³ - 5,577,687.50 6,135,456.25 6,693,225.00
23 Ky. Klas II Uk. 5/7 - 4 m ( Tidak Ketam ) ### M³ - 5,032,500.00 5,535,750.00 6,039,000.00
24 Ky. Klas II Uk. 5/10 - 4 m ( Tidak Ketam ) ### M³ - 4,931,850.00 5,425,035.00 5,918,220.00
25 Ky. Klas II Uk. 6/12 - 4 m ( Tidak Ketam ) ### M³ - 5,871,250.00 6,458,375.00 7,045,500.00
26 Ky. Klas II Uk. 4/8 - 4 m ( Tidak Ketam ) ### M³ - 5,273,437.50 5,800,781.25 6,380,859.38
27 Ky. Klas II Uk. 3/5 - 4 m ( Tidak Ketam ) 5,871,250.00 6,458,375.00 7,045,500.00
28 Ky. Klas II Uk. 8/15 - 4 m ( Tidak Ketam ) ### M³ - 4,990,562.50 5,489,618.75 5,988,675.00
29 Ky. Klas II Uk. 8/12 - 4 m ( Tidak Ketam ) ### M³ - 5,504,296.88 6,054,726.56 6,605,156.25
30 Ky. Klas III Uk. 3/5 - 4 m ( Tidak Ketam ) ### M³ - 3,053,050.00 3,358,355.00 3,663,660.00
31 Ky. Klas III Uk. 4/6 - 4 m ( Tidak Ketam ) ### M³ - 2,642,062.50 2,906,268.75 3,170,475.00
32 Papan Kayu Klas II Tidak Ketam ### M³ M.181.j 7,968,460.50 8,765,306.55 9,562,152.60
33 Papan Kayu Klas II Ketam ### M³ M.181.k 9,670,294.12 10,637,323.53 11,604,352.94
34 Papan Kayu Klas I Tidak Ketam ### M³ - 16,961,388.89 18,657,527.78 20,523,280.56
35 Papan Kayu Klas I Ketam ### M³ - 18,266,111.11 20,092,722.22 22,101,994.44
36 Papan Mal Klas III ### M³ M.181.l 2,201,718.75 2,421,890.63 2,642,062.50
37 Papan Simpiran ### M³ - 1,409,100.00 1,550,010.00 1,690,920.00
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III
38 Renglat Kayu Klas II Uk. 1/4 cm ### Btg - 49,318.50 54,250.35 59,182.20
39 Kayu Profil 10 cm ### Btg - 35,227.50 38,750.25 42,273.00
40 Kayu Cerucuk / Dolken ø 4 - 6 - Pj. 4 m ### Btg - 6,834.14 7,517.55 8,200.96
41 Kayu Cerucuk / Dolken ø 6 - 8 - Pj. 4 m ### Btg - 12,681.90 13,950.09 15,218.28
42 Kayu Cerucuk / Dolken ø 8 - 10 - Pj. 4 m ### Btg - 16,627.38 18,290.12 19,952.86
43 Kayu Cerucuk / Dolken ø 8 - 10 - Pj. 6 m ### Btg - 37,450.00 40,071.50 42,876.51
44 Kayu Cerucuk / Dolken ø 10 - 12 - Pj. 8 m ### Btg - 74,900.00 80,143.00 85,753.01
45 Kayu Cerucuk / Dolken ø 12 - Pj. 12 m ### Btg - 112,622.32 118,253.43 124,166.11
46 Kayu Cerucuk / Dolken ø 15 - Pj. 12 m ### Btg - 137,739.53 147,381.29 157,697.98
47 Kayu Simpiran / Bakar ### M³ - 371,250.00 389,812.50 428,793.75
48 Alas Laci ### Btg - 21,009.68 22,010.14 22,060.17
49 Wood Plank ### M' - 76,936.86 22,011.14 80,783.70

D. BAHAN CAT

1 Amplas ### Lbr - 3,522.75 3,875.03 4,227.30


2 Minyak Cat ### Kg - 34,522.95 37,975.25 41,427.54
3 Cat Kilat ### Kg - 55,659.45 66,791.34
4 Plamur ### Kg - 36,213.87 39,835.26 43,456.64
5 Cat Dasar ### Kg - 58,477.65 64,325.42 70,173.18
6 Cat Tembok ### Kg - 89,477.85 98,425.64 107,373.42
7 Cat Tembok Type Weather Shield ### Kg - 219,819.60 241,801.56 263,783.52
8 Cat Seng ### Kg - 235,319.70 258,851.67 282,383.64
9 Dempul ### Kg - 45,091.20 49,600.32 54,109.44
10 Plitur ### Kg - 60,873.12 66,960.43 73,047.74
11 Thiner ### Ltr M.090.f 31,704.75 34,875.23 38,045.70
12 Thiner ND ### Ltr - 39,454.80 43,400.28 47,345.76
13 Melamic ### Ltr - 71,159.55 78,275.51 85,391.46
14 Vernis ### Ltr - 86,659.65 95,325.62 103,991.58
15 Meni ### Kg - 78,909.60 86,800.56 94,691.52
16 Oker ### Kg - 67,636.80 74,400.48 81,164.16
17 Lem Kayu ### Kg - 26,068.35 28,675.19 31,282.02
18 Sealent ### Tube - 166,978.35 183,676.19 200,374.02
19 Soda Api ### Kg - 23,954.70 26,350.17 28,745.64
20 Sabun / Cream Pembersih Kotoran ### Kg - 24,659.25 27,125.18 29,591.10
21 Teak Oil ### Ltr - 58,618.56 64,480.42 70,342.27
22 Ter / Residu ### Ltr - 70,595.91 77,655.50 84,715.09
23 Kuas 4" ### Bh - 25,081.98 27,590.18 30,098.38
24 Road Line Paint ( Cat Marka ) ### Ltr M.090.e 119,773.50 131,750.85 143,728.20
25 Glass Bit ### Kg M.090.g 48,613.95 53,475.35 58,336.74
26 Weatherbond Emulsion ( Cat Kerb ) ### Kg M.090.h 133,159.95 146,475.95 159,791.94
27 Termoplast ### Kg - 50,023.05 55,025.36 60,027.66
28 Water Proofing ### M² - 88,773.30 97,650.63 106,527.96

E. BAHAN BESI DAN ALUMINIUM

1 Besi Tulangan Beton ### Kg M.167 19,022.85 20,925.14 22,827.42


2 Besi Wire Mesh ø 5 ### Kg - 24,941.07 27,435.18 29,929.28
3 Kawat Baja / Bendrat ### Kg M.168 23,954.70 26,350.17 28,745.64
4 Simpai Roll ### Kg - 28,182.00 31,000.20 33,818.40
5 Kawat Simpai ### Kg - 66,227.70 72,850.47 79,473.24
6 Baut Dia. 4/8 " Pj = 20 cm ### Btg M.163 10,004.61 11,005.07 12,005.53
7 Besi Penahan ### Bh - 40,159.35 44,175.29 48,191.22
8 Beugel Plat L. 3 cm ### Bh - 51,432.15 56,575.37 61,718.58
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III
9 Plat 1,2 x 2,4 x 12 ### Bh - 591,822.00 651,004.20 710,186.40
10 Besi Konstruksi (I, H) ### Kg - 23,954.70 26,350.17 28,745.64
11 Besi Konstruksi (C) ### Kg - 24,659.25 27,125.18 29,591.10
12 Besi Konstruksi (Siku) ### Kg - 24,659.25 27,125.18 29,591.10
13 Kawat Las ### Btg - 27,477.45 30,225.20 32,972.94
14 Kawat Las ### Kg - 155,001.00 170,501.10 186,001.20
15 Kawat Harmonika ### M² - 48,613.95 53,475.35 58,336.74
16 Kawat Kasa ### M² - 18,318.30 20,150.13 21,981.96
17 Pipa Galvanis Dia. 3/4" ### Btg - 180,364.80 198,401.28 216,437.76
18 Pipa Galvanis Dia. 1/2" ### Btg - 147,955.50 162,751.05 177,546.60
19 Pipa Galvanis Dia. 1" ### Btg - 232,501.50 255,751.65 279,001.80
20 Pipa Galvanis Dia. 1 1/4" ### Btg - 326,911.20 359,602.32 392,293.44
21 Pipa Galvanis Dia. 1 1/2" ### Btg - 380,457.00 418,502.70 456,548.40
22 Pipa Galvanis Dia. 2" ### Btg - 465,003.00 511,503.30 558,003.60
23 Pipa Galvanis Dia. 3" ### Btg - 746,823.00 821,505.30 896,187.60
24 Pipa Galvanis Dia. 4" ### Btg - 1,021,597.50 1,123,757.25 1,225,917.00
25 Folding Gate ### M² - 859,551.00 945,506.10 1,031,461.20
26 Rangka Aluminium 1 1/2" x 3" ### Meter - 109,909.80 120,900.78 131,891.76
27 Rangka Aluminium 1 3/4" x 4" ### Meter - 140,910.00 155,001.00 169,092.00
28 Pintu Aluminium Std IKP, Lengkap 4" ### Unit - 3,180,338.70 3,498,372.57 3,816,406.44
29 Rangka Baja Ringan Zincalume (Truss / Color) (Tanpa Jurai Dalam - Bentang s/d 16 m) ### M² - 250,819.80 275,901.78 300,983.76
30 Rangka Baja Ringan Zincalume (Truss / Color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) ### M² - 352,275.00 387,502.50 422,730.00
31 Rangka Baja Ringan Zincalume (Truss / Color) (Dengan Jurai Dalam - Bentang s/d 16 m) ### M² - 263,501.70 289,851.87 316,202.04
32 Rangka Baja Ringan Zincalume (Truss / Color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) ### M² - 394,548.00 434,002.80 473,457.60
33 Rangka Baja Ringan Zincalume (Truss / Polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) ### M² - 233,910.60 257,301.66 280,692.72
34 Rangka Baja Ringan Zincalume (Truss / Polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) ### M² - 293,092.80 322,402.08 351,711.36
35 Rangka Baja Ringan Zincalume (Truss / Polos) (Dengan Jurai Dalam - Bentang s/d 16 m) ### M² - 250,819.80 275,901.78 300,983.76
36 Rangka Baja Ringan Zincalume (Truss / Polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) ### M² - 338,184.00 372,002.40 405,820.80
37 Alumunium Komposit + Rangka Besi ### M² - 1,268,190.00 1,395,009.00 1,521,828.00
38 Rangka Plafond Metal Furing + Pemasangan ### M² - 178,955.70 196,851.27 214,746.84

F. BAHAN PENGANTUNG

1 Pintu Plastik Untuk WC ### Bh - 403,002.60 423,152.73 465,468.00


2 Kait Angin ### Bh - 19,600.58 20,580.61 22,638.67
3 Handle Jendela ### Bh - 21,409.87 22,480.36 24,728.39
4 Handle Pintu ### Bh - 211,083.18 221,637.34 243,801.07
5 Engsel Jendela ### Bh - 31,964.02 33,562.23 36,918.45
6 Engsel Pintu ### Bh - 42,970.50 45,119.03 49,630.93
7 Slot Pintu ### Bh - 26,536.17 27,862.98 30,649.28
8 Slot Jendela ### Bh - 30,908.61 32,454.04 35,699.44
9 Kunci Tanam 2 Slag (Setaraf Belluci) ### Bh - 238,222.45 250,133.57 275,146.93
10 Kunci Tanam 1 Slag ### Bh - 241,237.92 253,299.82 278,629.80
11 Kunci Tanam Antik ### Bh - 230,683.76 242,217.95 266,439.74
12 Kunci Tanam Biasa ### Bh - 114,588.01 120,317.41 132,349.15
13 Kunci Silinder ### Bh - 143,235.02 150,396.77 165,436.44
14 Door Closer ### Bh - 301,547.40 316,624.77 348,287.25
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III

15 Door Stoper ### Bh - 99,510.64 104,486.17 114,934.79


16 Paku Seng ### Kg M.166.a 31,662.48 33,245.60 36,570.16
17 Paku Campuran 1" - 5 " ### Kg M.166.b 27,139.27 28,496.23 31,345.85
18 Paku Beton ### Kg - 35,431.82 37,203.41 40,923.75
19 Paku Atap Seng ### Kg M.166.c 35,431.82 37,203.41 40,923.75
20 Paku Triplek ### Kg - 37,693.43 39,578.10 43,535.91
21 Paku GRC ### Kg - 37,693.43 39,578.10 43,535.91
22 Sekrup Gypsum ### Kg - 125,896.04 132,190.84 145,409.93
23 Sekrup Fixer ### Bh - 2,148.53 2,255.95 2,481.55
24 Sekrup Steel Sheet ### Bh - 678.48 712.41 783.65
25 Sekrup Zincalume ### Bh 753.87 791.56 870.72
26 Pintu Tempered Polos 12 mm - Uk. 87 x 213,5 cm ### Unit - 6,257,108.55 6,569,963.98 7,226,960.38
27 Pintu Alumunium + Engsel Tanam - Uk. 90 x 215 cm ### Unit - 3,136,092.96 3,292,897.61 3,622,187.37
28 Pintu Alumunium + Engsel Kupu-kupu - Uk. 90 x 215 cm ### Unit - 2,336,992.35 2,453,841.97 2,699,226.16
29 Jendela Casement - Uk. 60 x 120 cm (Lengkap - Tanpa Kaca) ### Unit - 934,796.94 981,536.79 1,079,690.47
30 Kusen Alumunium ### M' - 110,064.80 115,568.04 127,124.85

G. BAHAN ATAP

1 Sirap Belian ### Lbr - 7,327.32 8,060.05 8,792.78


2 Asbes ### Lbr - 69,045.90 75,950.49 82,855.08
3 Eternit ### M² - 95,818.80 105,400.68 114,982.56
4 Genteng Metal 0.25 Lbr - 68,000.00 74,800.00 82,280.00
5 Genteng Metal Type Prima 0.35 ### Lbr - 84,546.00 93,000.60 101,455.20
6 Genteng Metal Type Royal 0.35 ### Lbr - 84,546.00 93,000.60 101,455.20
7 Genteng Metal Type Classic 0.35 ### Lbr - 81,727.80 89,900.58 98,073.36
8 Genteng Metal Stone (Type Classic 0.35) ### Lbr - 108,500.70 119,350.77 130,200.84
9 Genteng Metal Stone (Type Prima 0.35) ### Lbr - 108,500.70 119,350.77 130,200.84
10 Atap Metal Supersheet 0.35 (Polos) ### M' - 112,728.00 124,000.80 135,273.60
11 Atap Metal Supersheet 0.35 (Polos) ### M² - 155,001.00 170,501.10 186,001.20
12 Atap Trim Deck 0.3 (Polos) ### M² - 139,500.90 153,450.99 167,401.08
13 Atap Trim Deck 0.33 (Color) ### M² - 156,410.10 172,051.11 187,692.12
14 Nok Bubungan Genteng Metal 1/2 Lingkaran 0.35 (Pj. 40 cm) ### Bh - 85,955.10 94,550.61 103,146.12
15 Nok Bubungan Genteng Metal Stone 1/2 Lingkaran 0.35 (Pj. 40 cm) ### Bh - 105,682.50 116,250.75 126,819.00
16 Nok Bubungan Genteng Metal Kotak 0.35 ### M' - 114,137.10 125,550.81 136,964.52
17 Nok Bubungan Genteng Metal Stone Kotak 0.35 ### M' - 135,273.60 148,800.96 162,328.32
18 Nok Bubungan Trim Deck (Polos) ### M' - 152,182.80 167,401.08 182,619.36
19 Nok Bubungan Trim Deck (Color) ### M' - 171,910.20 189,101.22 206,292.24
20 Nok Bubungan Steel Sheet 0.33 (Color) (Pj. 50 cm) ### M' - 62,000.40 68,200.44 74,400.48
21 Nok Bubungan Steel Sheet 0.43 (Color) (Pj. 50 cm) ### M' - 70,455.00 77,500.50 84,546.00
22 Nok Bubungan Steel Sheet 0.35 (Polos) (Pj. 50 cm) ### M' - 57,068.55 62,775.41 68,482.26
23 Nok Bubungan Steel Sheet 0.40 (Polos) (Pj. 50 cm) ### M' - 62,000.40 68,200.44 74,400.48
24 Seng Gelombang Bjls 30 ### Lbr - 88,068.75 96,875.63 105,682.50
25 Seng Gelombang Bjls 20 ### Lbr - 62,704.95 68,975.45 75,245.94
26 Seng Plat Bjls 20 ### Lbr - 64,114.05 70,525.46 76,936.86
27 Seng Plat Bjls 30 ### Lbr - 88,068.75 96,875.63 105,682.50
28 Seng Plat Bjls 30 (Lebar 45 cm) ### M' - 27,900.18 30,690.20 33,480.22
29 Plat Datar Color 0.35 ### Lbr - 76,091.40 83,700.54 91,309.68
30 Zincalume Gelombang Persegi 0.35 (Polos) ### M² - 167,682.90 184,451.19 201,219.48
31 Zincalume Gelombang Persegi 0.30 (Polos) ### M² - 147,955.50 162,751.05 177,546.60
32 Zincalume Gelombang Persegi 0.35 (Color) ### M² - 187,410.30 206,151.33 224,892.36
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III
33 Zincalume Gelombang Persegi 0.30 (Color) ### M² - 167,682.90 184,451.19 201,219.48
34 Zincalume Plat 0.2 ### Lbr - 174,728.40 192,201.24 209,674.08
35 Aluminium Foil ### M² - 73,273.20 80,600.52 87,927.84
36 Atap Steel Sheet 0.33 (Color) ### M² - 156,410.10 172,051.11 187,692.12
37 Atap Steel Sheet 0.40 (Polos) ### M² - 156,410.10 172,051.11 187,692.12
38 Papan Belian Utk Atap Uk. 1/15 Pj. 50 cm Lbr 21,136.50 23,250.15 25,363.80

H. BAHAN KACA

1 Kaca Polos, t = 5 mm ### M² - 162,046.50 178,251.15 194,455.80


2 Kaca Polos, t = 12 mm ### M² - 732,732.00 806,005.20 879,278.40
3 Kaca Rayben, t = 5 mm ### M² - 194,455.80 213,901.38 233,346.96
4 Kaca Cermin t = 3 mm ### M² - 293,092.80 322,402.08 351,711.36
5 Kaca Patri ### M² - 3,663,660.00 4,030,026.00 4,396,392.00
6 Sealent ### Kg - 147,955.50 162,751.05 177,546.60
7 Nako + Bingkai (80 x 15) x 10 Daun Polos ### Bh - 338,184.00 372,002.40 405,820.80
8 Nako + Bingkai (80 x 15) x 10 Daun Rayben ### Bh - 377,638.80 415,402.68 453,166.56
9 Kaca Es ### M² - 222,637.80 244,901.58 267,165.36
10 Kaca Polos, t = 8 mm M² - 380,457.00 418,502.70 456,548.40
11 Kaca Raindown, t = 5 mm M² - 193,046.70 212,351.37 231,656.04
12 Kaca Buram, t = 5 mm M² - 193,046.70 212,351.37 231,656.04

I. BAHAN TRIPLEK

1 Triplek t = 3 mm ### Lbr - 77,500.50 85,250.55 93,000.60


2 Triplek t = 6 mm ### Lbr - 155,001.00 170,501.10 186,001.20
3 Triplek t = 9 mm ### Lbr - 218,410.50 240,251.55 262,092.60
4 Multiplek t = 10 mm ### Lbr - 250,819.80 275,901.78 300,983.76
5 Multiplek t = 12 mm ### Lbr - 279,001.80 306,901.98 334,802.16
6 Plywood 4' x 8' x 4 mm ### Lbr - 132,455.40 145,700.94 158,946.48
7 Panel GRC 120 x 240 x 40 ### Lbr - 78,909.60 86,800.56 94,691.52
8 Gypsum Board t = 9 mm ### Lbr - 81,727.80 89,900.58 98,073.36

J. BAHAN SANITASI

1 Kloset Duduk Monoblok ### Bh - 2,254,560.00 2,480,016.00 2,705,472.00


2 Kloset Duduk Putih (Setaraf TOTO) ### Bh - 2,719,563.00 2,991,519.30 3,263,475.60
3 Kloset Duduk Warna (Setaraf TOTO) ### Bh - 2,987,292.00 3,286,021.20 3,584,750.40
4 Kloset Jongkok (Setaraf TOTO) ### Bh - 472,500.00 519,750.00 571,725.00
5 Kloset Jongkok (Setaraf INA) ### Bh - 270,000.00 297,000.00 326,700.00
6 Kran Air Uk. 1/2" ### Bh - 46,500.30 51,150.33 55,800.36
7 Pipa Paralon Dia. 1/2" ### Btg - 21,841.05 24,025.16 26,209.26
8 Pipa Paralon Dia. 3/4" ### Btg - 33,536.58 36,890.24 40,243.90
9 Pipa Paralon Dia. 1" ### Btg - 49,318.50 54,250.35 59,182.20
10 Pipa Paralon Dia. 2" ### Btg - 74,682.30 82,150.53 89,618.76
11 Pipa Paralon Dia. 3" ### Btg - 142,319.10 156,551.01 170,782.92
12 Pipa Paralon Dia. 4" ### Btg - 215,592.30 237,151.53 258,710.76
13 Pipa Paralon Dia. 6" Btg - 845,460.00 930,006.00 1,014,552.00
14 Fiber Glass 1/2 m³ M³ - 1,045,875.60 1,115,600.33 1,227,160.73
15 Fiber Glass 1 m³ M³ - 2,091,751.20 2,231,200.65 2,454,321.45
16 Penampungan Air PE 1 m³ M³ - 1,900,000.00 1,995,000.00 2,194,500.00
No Uraian Bahan Satuan Kode
Wil I Wil II Wil III

K. BAHAN MINYAK DAN BAHAN PELENGKAP ALAT BERAT

1 Minyak Solar Non Subsidi ### Ltr M.183 12,700.00 13,335.00 14,001.75
2 Minyak Solar ### Ltr M.183 6,050.00 6,352.50 6,670.13
3 Minyak Solar Industri ### Ltr - 12,700.00 13,335.00 14,001.75
4 Bensin Premium ### Ltr M.184 7,150.00 7,507.50 7,882.88
5 Minyak Pelumas ### Ltr M.185 32,904.51 34,549.73 38,004.70
6 Oli BEO 154W40/Cat ### Ltr - 63,430.00 66,601.50 73,261.65
7 Minyak Tanah ### Ltr M.064 11,925.95 12,522.25 13,774.48
8 Gas Elpiji ### Kg - 11,308.03 11,873.43 13,060.77
9 Alat-Alat Bantu ### Set M.170 76,091.40 83,700.54 91,309.68
10 Sewa Alat Untuk Pengelasan ### Jam - 83,136.90 91,450.59 99,764.28
11 Sewa Kuali Termasuk Angkutan Set - 84,546.00 93,000.60 101,455.20
12 Metting/Landasan Btg - 119,773.50 131,750.85 143,728.20
13 Drum Kosong Bh - 310,312.00 341,343.20 372,374.40
14 Majun/Lap Kg - 23,273.40 25,600.74 27,928.08
15 Slang Plastik 3/4" M - 12,399.22 13,639.14 14,879.06
16 Jerigen Plastik 20 L Bh - 62,062.40 68,268.64 74,474.88
17 Corong Minyak Bh - 15,515.60 17,067.16 18,618.72
18 Pompa Minyak Bh - 757,479.55 833,227.51 908,975.46
19 Sabun Deterjen Kg - 38,789.00 42,667.90 46,546.80
20 Obat-Obatan Pcs - 310,312.00 341,343.20 372,374.40
21 Air Accu Botol - 4,641.42 5,105.56 5,569.70

Mengetahui
Kepala Dinas Cipta Karya, Tata Ruang dan Kebersihan
Kabupaten Kubu Raya

Ir. RUSNALDI, H. MT
NIP. 19610714 199003 1 007
N

Keterangan
Wil IV

105,000.00 #REF!
105,000.00 #REF!
100,000.00 #REF!
105,000.00 #REF!
100,000.00 #REF!
90,000.00 #REF!
80,000.00 #REF!
75,000.00 #REF!
90,000.00 #REF!
85,000.00
75,000.00
75,000.00
80,000.00
85,000.00
60,000.00
72,500.00
100,000.00
90,000.00
Keterangan
Wil IV

Catatan :
416,325.00
582,855.00 Wilayah I :
707,112.00 Kecamatan Sungai Raya dan Sungai Kakap,
615,776.70 Termasuk :
713,004.60 Kecamatan Sungai Ambawang :
745,413.90 - Desa Kuala Ambawang
875,051.10 - Desa Jawa Tengah
907,460.40 - Desa Mega Timur
907,460.40 - Desa Sungai Malaya
907,460.40 - Desa Ampera Raya
23,203.18 Kecamatan Kuala Mandor B :
248,856.00 - Desa Kuala Mandor A
124,564.44 Wilayah II :
244,244.00 Kecamatan Kuala Mandor B, Rasau Jaya
4,762.76 dan Sungai Ambawang Termasuk :
1,831.83 Kecamatan Sungai Raya :
5,129.12 - Desa Mekar Sari
3,663.66 - Desa Tebang Kacang
46,711.67 - Desa Sungai Asam
78,265.12 - Desa Madu Sari
93,794.54 - Desa Ambangah
93,794.54 Kecamatan Sungai Kakap :
93,794.54 - Desa Punggur Besar
109,182.66 - Desa Punggur Kecil
129,034.05 - Desa Sungai Kupah
131,019.19 - Desa Punggur Kapuas
324,135.00 Wilayah III :
243,865.80 Kecamatan Kubu, Teluk Pakedai
253,082.14 dan Terentang Termasuk :
187,589.08 Kecamatan Sungai Raya :
497,437.30 - Desa Sungai Bulan
370,023.54 - Desa Kali Bandung
468,838.13 Kecamatan Sungai Kakap :
324,135.00 - Desa Tanjung Saleh
2,198,196.00 - Desa Sepuk Laut
476,275.80 Kecamatan Sungai Ambawang :
18,318.30 - Desa Bengkarek
95,804.71 - Desa Pasak Piang
103,173.99 Kecamatan Kuala Mandor B :
112,553.45 - Desa Kubu Padi
112,553.45 - Desa Retok
16,623.38 - Desa Sungai Enau
Keterangan
Wil IV
20,150.13
2,015,013.00 Wilayah IV :
2,646,994.35 Kecamatan Batu Ampar, Termasuk :
1,720,088.37 Kecamatan Sungai Raya :
1,919,757.84 - Desa Pulau Limbung
1,527,746.22 - Desa Gunung Tamang
1,949,067.12 - Desa Muara Baru
228,978.75 Kecamatan Sungai Ambawang :
95,438.34 - Desa Teluk Bakung
6,136.63 Kecamatan Teluk Pakedai :
- Desa Kuala Karang
- Desa Sungai Nibung
20,353,666.67 Kecamatan Terentang :
17,757,535.71 - Desa Dungun
15,026,730.47 - Desa Permata
14,311,171.88 - Desa Betuah
16,637,500.00 Kecamatan Kubu :
16,028,512.50 - Desa Mengkalang Jambu
18,717,187.50 - Desa Mengkalang Guntung
19,335,983.33 - Desa Sepakat Baru
18,318,300.00 - Desa Dungun
19,672,180.00 - Desa Permata
21,625,770.83 - Desa Betuah
17,757,535.71
15,742,289.06
19,234,215.00
20,035,640.63
23,745,944.44
22,049,805.56
18,755,121.00
5,615,156.25
5,966,103.52
6,542,250.00
7,476,857.14
7,250,993.75
6,542,250.00
6,411,405.00
7,632,625.00
7,018,945.31
7,632,625.00
6,487,731.25
7,155,585.94
3,968,965.00
3,434,681.25
10,358,998.65
12,571,382.35
22,575,608.61
24,312,193.89
2,862,234.38
1,831,830.00
Keterangan
Wil IV
64,114.05
45,795.75
8,884.38
16,486.47 Catatan :
21,615.59
45,877.86 Wilayah I :
91,755.72 Kecamatan Sungai Raya dan Sungai Kakap,
130,374.41 Termasuk :
168,736.84 Kecamatan Sungai Ambawang :
450,233.44 - Desa Kuala Ambawang
24,011.06 - Desa Jawa Tengah
24,012.06 - Desa Mega Timur
Kecamatan Kuala Mandor B :
- Desa Kuala Mandor A
4,579.58 Wilayah II :
44,879.84 Kecamatan Kuala Mandor B, Rasau Jaya
72,357.29 dan Sungai Ambawang Termasuk :
47,078.03 Kecamatan Sungai Raya :
76,020.95 - Desa Mekar Sari
116,321.21 - Desa Tebang Kacang
285,765.48 - Desa Sungai Asam
305,915.61 - Desa Madu Sari
58,618.56 - Desa Ambangah
79,135.06 Kecamatan Sungai Kakap :
41,216.18 - Desa Punggur Besar
51,291.24 - Desa Punggur Kecil
92,507.42 - Desa Sungai Kupah
112,657.55 Wilayah III :
102,582.48 Kecamatan Kubu, Teluk Pakedai
87,927.84 dan Terentang Termasuk :
33,888.86 Kecamatan Sungai Raya :
217,071.86 - Desa Sungai Bulan
31,141.11 Kecamatan Sungai Kakap :
32,057.03 - Desa Tanjung Saleh
76,204.13 - Desa Sepuk Laut
91,774.68 Kecamatan Sungai Ambawang :
32,606.57 - Desa Bengkarek
155,705.55 - Desa Pasak Piang
63,198.14 Kecamatan Kuala Mandor B :
173,107.94 - Desa Kubu Padi
65,029.97 - Desa Retok
115,405.29 - Desa Sungai Enau

24,729.71
32,423.39
31,141.11
36,636.60
86,096.01
13,005.99
52,207.16
66,861.80
Keterangan
Wil IV
769,368.60
31,141.11
32,057.03 Wilayah IV :
32,057.03 Kecamatan Batu Ampar, Termasuk :
35,720.69 Kecamatan Sungai Raya :
201,501.30 - Desa Pulau Limbung
63,198.14 - Desa Gunung Tamang
23,813.79 - Desa Muara Baru
234,474.24 Kecamatan Sungai Ambawang :
192,342.15 - Desa Teluk Bakung
302,251.95 Kecamatan Teluk Pakedai :
424,984.56 - Desa Kuala Karang
494,594.10 - Desa Sungai Nibung
604,503.90 Kecamatan Terentang :
970,869.90 - Desa Dungun
1,328,076.75 - Desa Permata
1,117,416.30 - Desa Betuah
142,882.74 Kecamatan Kubu :
183,183.00 - Desa Mengkalang Jambu
4,134,440.31 - Desa Mengkalang Guntung
326,065.74 - Desa Sepakat Baru
457,957.50 - Desa Dungun
342,552.21 - Desa Permata
512,912.40 - Desa Betuah
304,083.78
381,020.64
326,065.74
439,639.20
1,648,647.00
232,642.41

512,014.80
24,902.54
27,201.23
268,181.18
40,610.29
54,594.03
33,714.21
39,269.39
302,661.62
306,492.78
293,083.72
145,584.07
181,980.09
383,115.97
Keterangan
Wil IV

126,428.27
40,227.18 Catatan :
34,480.44
45,016.13 Wilayah I :
45,016.13 Kecamatan Sungai Raya dan Sungai Kakap,
47,889.50 Termasuk :
47,889.50 Kecamatan Sungai Ambawang :
159,950.92 - Desa Kuala Ambawang
2,729.70 - Desa Jawa Tengah
862.01 - Desa Mega Timur
957.79 Kecamatan Kuala Mandor B :
7,949,656.41 - Desa Kuala Mandor A
3,984,406.11 Wilayah II :
2,969,148.78 Kecamatan Kuala Mandor B, Rasau Jaya
1,187,659.51 dan Sungai Ambawang Termasuk :
139,837.33 Kecamatan Sungai Raya :
- Desa Mekar Sari
- Desa Tebang Kacang
9,525.52 - Desa Sungai Asam
89,759.67 - Desa Madu Sari
124,564.44 - Desa Ambangah
90,508.00 Kecamatan Sungai Kakap :
109,909.80 - Desa Punggur Besar
109,909.80 - Desa Punggur Kecil
106,246.14 - Desa Sungai Kupah
141,050.91 Wilayah III :
141,050.91 Kecamatan Kubu, Teluk Pakedai
146,546.40 dan Terentang Termasuk :
201,501.30 Kecamatan Sungai Raya :
181,351.17 - Desa Sungai Bulan
203,333.13 Kecamatan Sungai Kakap :
111,741.63 - Desa Tanjung Saleh
137,387.25 - Desa Sepuk Laut
148,378.23 Kecamatan Sungai Ambawang :
175,855.68 - Desa Bengkarek
197,837.64 - Desa Pasak Piang
223,483.26 Kecamatan Kuala Mandor B :
80,600.52 - Desa Kubu Padi
91,591.50 - Desa Retok
74,189.12 - Desa Sungai Enau
80,600.52
114,489.38
81,516.44
83,348.27
114,489.38
36,270.23
98,918.82
217,987.77
192,342.15
243,633.39
Keterangan
Wil IV
217,987.77
227,146.92
95,255.16
203,333.13 Wilayah IV :
203,333.13 Kecamatan Batu Ampar, Termasuk :
27,477.45 Kecamatan Sungai Raya :
- Desa Pulau Limbung
- Desa Gunung Tamang
210,660.45 Kecamatan Sungai Ambawang :
952,551.60 - Desa Teluk Bakung
252,792.54 Kecamatan Teluk Pakedai :
381,020.64 - Desa Kuala Karang
4,762,758.00 - Desa Sungai Nibung
192,342.15 Kecamatan Terentang :
439,639.20 - Desa Dungun
490,930.44 - Desa Permata
289,429.14 - Desa Betuah
494,594.10 Kecamatan Kubu :
250,960.71 - Desa Mengkalang Jambu
250,960.71 - Desa Mengkalang Guntung
- Desa Sepakat Baru
- Desa Dungun
100,750.65 - Desa Permata
201,501.30 - Desa Betuah
283,933.65
326,065.74
362,702.34
172,192.02
102,582.48
106,246.14

2,930,928.00
3,535,431.90
3,883,479.60
628,897.50
359,370.00
60,450.39
28,393.37
43,597.55
64,114.05
97,086.99
185,014.83
280,269.99
1,099,098.00
1,349,876.33
2,699,752.65
2,413,950.00
Keterangan
Wil IV

14,701.84
7,137.03
14,701.84
8,277.02
41,805.18
80,587.82
15,151.92
14,366.85
98,918.82
108,077.97
109,909.80
155,705.55
403,405.60
30,255.42
16,118.98
80,681.12
20,170.28
984,723.42
50,425.70
403,405.60
6,033.84

Kebersihan