Dokumen - Tips - Analisa Pek Borepile
Dokumen - Tips - Analisa Pek Borepile
A Analisa Dasar
1 Handling pembesian a kg
b kg Besi beton
b kg Kawat bendrat
u kg Upah handling pembesian
2 Handling pengecoran a m3
b m3 Ready mix K-300 slump 16
u m3 Upah handling pengecoran
Analisa Pekerjaan Borepile
8,830.50
1.020 7,775.00 7,930.50 Harga Net Supplier
- 15,000.00 0.00 Include upah mandoran
1.000 900.00 900.00 Harga Mandoran
844,000.00
1.200 645,000.00 774,000.00 Harga Net Supplier
1.000 70,000.00 70,000.00 Harga Mandoran
600,075.52
1.000 120,000.00 120,000.00 Harga Net Subkon
28.044 8,830.50 247,643.65 Dari Analisa
0.196 844,000.00 165,635.00 Dari Analisa
0.294 226,910.83 66,796.88 Harga Net Subkon
31,516,959.46
1.000 130,000.00 130,000.00 Harga Net Subkon
40.384 774,000.00 31,256,859.96 Dari Analisa
0.283 120,000.00 33,912.00 Dari Analisa
0.424 226,910.83 96,187.50 Harga Net Subkon
18,155,382.36
1.000 140,000.00 140,000.00 Harga Net Subkon
71.793 247,643.65 17,779,070.36 Dari Analisa
0.502 130,000.00 65,312.00 Dari Analisa
0.754 226,910.83 171,000.00 Harga Net Subkon
110,000.00
1.000 110,000.00 110,000.00 Harga Mandoran
120,000.00
1.000 120,000.00 120,000.00 Harga Mandoran
140,000.00
1.000 140,000.00 140,000.00 Harga Mandoran