REKAPITULASI
No URAIAN PEKERJAAN JUMLAH
TOTAL 149,704,587.30
DIBULATKAN 149,700,000.00
TERBILANG : // SERATUS EMPAT PULUH SEMBILAN JUTA TUJUH RATUS RIBU RUPIAH //
LAMPIRAN BERITA ACARA KLARIFIKASI TEKNIS DAN NEGOSIASI HARGA
HARGA PENAWARAN SAAT PEMBUKAAN HARGA PENAWARAN TERKOREKSI DEVIASI EVALUASI KEWAJARAN HARGA
NO. URAIAN PEKERJAAN Keterangan
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA Harga Satuan % HPS % Thd.
VOLUME VOLUME Rupiah %
(Rp.) (Rp) (Rp.) (Rp) HPS (Rp.) thd. HPS Total HPS
REKAPITULASI
No URAIAN PEKERJAAN JUMLAH JUMLAH
III PEKERJAAN REHAB LANSEKAP (KONTUR DEPAN ISTANA) 22,384,125.99 22,384,125.99 - - 14.92
II PEKERJAAN REHAB LANSEKAP (BELAKANG SELASAR) 23,340,066.42 15.59 5.20 5.20 5.20
III PEKERJAAN REHAB LANSEKAP (KONTUR DEPAN ISTANA) 22,384,125.99 14.95 7.48 7.48 50%
IV PEKERJAAN REHAB LANSEKAP (BELAKANG RUJAB) 43,448,223.83 29.02 9.67 9.67 9.67
DIBULATKAN 149,720,000.00
ATIKA SATRIA
Direktur
DAFTAR KUANTITAS DAN HARGA
REKAPITULASI
No URAIAN PEKERJAAN JUMLAH
TOTAL 149,720,587.30
DIBULATKAN 149,720,000.00
TERBILANG : // SERATUS EMPAT PULUH SEMBILAN JUTA TUJUH RATUS DUA PULUH RIBU RUPIAH //
ATIKA SATRIA
Direktur
URAIAN PERHITUNGAN VOLU
(BACK UP DATA)
LOKASI : PALANGKARAYA
1 2
I PEKERJAAN PERSIAPAN
SUB TOTAL I
SUB TOTAL II
SUB TOTAL II
IV PEKERJAAN LAIN-LAIN
BATAN
3 4
1.00 1.00 Bh
(6,8+5,6+22,63+8,9)*((0,4+0,7)/2)*2,5 60.40 M3
1 1.00 Pkt
(931,55*2,5) 2,328.88 M3
(1237,71*0,1) 123.77 m3
1 1.00 Pkt
DAFTAR ANALISA PEKERJAAN
Harga Satuan
Kebutuhan Satuan Indeks Jumlah (Rp.)
Bahan/Upah (Rp.)
Harga Satuan
Kebutuhan Satuan Indeks Jumlah
Bahan/Upah
Harga Satuan
Kebutuhan Satuan Indeks Jumlah
Bahan/Upah
Harga Satuan
Kebutuhan Satuan Indeks Jumlah
Bahan/Upah
B. BAHAN BANGUNAN