C. AHSP Listrik Dalam Gedung
C. AHSP Listrik Dalam Gedung
No. Pekerjaan
C.1 Pekerjaan Listrik Dalam Gedung
1 Pasang Kabel NYM 2 x 1,5 Sqmm
2 Pasang Kabel NYM 2 x 2,5 Sqmm
3 Pasang Kabel NYM 2 x 2,5 Sqmm (IB)
4 Pasang Kabel NYM 2 x 4 Sqmm
5 Pasang Kabel NYY 3 x 1.5 Sqmm
6 Pasang Kabel NYY 3 x 2.5 Sqmm
7 Pasang Kabel NYY 3 x 4 Sqmm
8 Pasang Kabel NYY 3 x 6 Sqmm
9 Pasang Kabel NYY 3 x 10 Sqmm
10 Pasang Kabel NYY 4 x 2.5 Sqmm
11 Pasang Kabel NYY 4 x 4 Sqmm
12 Pasang Kabel NYY 4 x 6 Sqmm
13 Pasang Kabel NYY 4 x 10 Sqmm
14 Pasang Kabel NYM 3 x 1,5 Sqmm
15 Pasang Kabel NYM 3 x 2,5 Sqmm
16 Pasang Kabel NYM 3 x 2,5 Sqmm (IB)
17 Pasang Kabel NYM 3 x 4 Sqmm
18 Pasang Kabel NYM 3 x 4 Sqmm (IB)
19 Pasang Kabel NYM 4 x 4 Sqmm
20 Pasang Kabel NYM 4 x 6 Sqmm
21 Upah Pasang Kabel NYA 1 x 1.5 Sqmm
22 Upah Pasang Kabel NYA 1 x 2.5 Sqmm
23 Pasang Kabel NYA 2 x 1,5 sqmm (In Bow)
24 Pasang Kabel NYA 3 x 1,5 sqmm (In Bow)
25 Pasang Kabel NYA 4 x 1,5 sqmm (In Bow)
26 Pasang Kabel NYA 2 x 2,5 sqmm (In Bow)
27 Pasang Kabel NYA 3 x 2,5 sqmm (In Bow)
28 Pasang Kabel NYA 4 x 2,5 sqmm (In Bow)
29 Pasang Saklar Engkel (In Bow)
30 Pasang Stop Kontak (In Bow)
31 Pasang Fitting Tempel
32 Pasang Downlight 4"
33 Pasang Armatur TKI
34 Pasang Armatur TKO (2 x 40 Watt)
35 Pasang Armatur RM (Resecced Mounting)
36 Upah Pasang Kabel NYA 1 x 4 Sqmm
37 Upah Pasang Box Panel dan Panel Kontrol 1 Unit
38 Upah Pasang Box KWH Meter (1 Unit)
39 Upah Pemasangan Komponen + Box
40 Upah Bongkar Komponen
41 Upah Bongkar Armatur
42 Pasang Pralon 3" Kabel NYY 3 x 6 Sqmm
43 Pasang tutup panel ukuran 30x30
44 Pasang MCB Ampere + box tutup panel ukuran 30x30
45 Pasang Kapasitor 12.5 uF
46 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 1300 VA
47 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 2200 VA
48 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 3500 VA
49 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 4400 VA
50 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 7700 VA
51 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA
52 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA (2
Unit Box Panel)
53 Pasang Kabel NYY 3x4 Sqmm (In Bow)
54 Pasang Kabel NYY 3x4 Sqmm (Out Bow)
401
4 Pasang Kabel NYM 2 x 4 Sqmm
403
7 Pasang Kabel NYY 3 x 4 Sqmm
405
10 Pasang Kabel NYY 4 x 2.5 Sqmm
407
13 Pasang Kabel NYY 4 x 10 Sqmm
409
16 Pasang Kabel NYM 3 x 2,5 Sqmm (IB)
411
19 Pasang Kabel NYM 4 x 4 Sqmm
413
22 Upah Pasang Kabel NYA 1 x 2.5 Sqmm
415
25 Pasang Kabel NYA 4 x 1,5 sqmm (In Bow)
417
28 Pasang Kabel NYA 4 x 2,5 sqmm (In Bow)
419
31 Pasang Fitting Tempel
421
34 Pasang Armatur TKO (2 x 40 Watt)
423
37 Upah Pasang Box Panel dan Panel Kontrol 1 Unit
425
40 Upah Bongkar Komponen
427
43 Pasang tutup panel ukuran 30x30
429
46 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 1300 VA
47 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 2200 VA
48 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 3500 VA
49 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 4400 VA
50 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 7700 VA
432
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) -
E Overhead + Profit - -
F Harga Satuan Pekerjaan ( D + E ) -
51 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA
52 Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA (2 Unit Box Panel)
434
54 Pasang Kabel NYY 3x4 Sqmm (Out Bow)
435
C.2 PEMASANGAN PENANGKAL PETIR (KONVENSIONAL)
420
B Bahan
1 Pipa Galvanis 1" m1 2.0000
2 Klem/Konektor Cincin bh 1.0000 -
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) -
E Overhead + Profit - -
F Harga Satuan Pekerjaan ( D + E ) -
421